# cuteQM

# Piping



# User Management

### **1.1 Login**

To login into the ***cuteQM*** app,

1. Open your web browser.
2. Type the URL provided by your administrator, in the address bar of your web browser. The login page appears.
    
    [![image-1651599486234.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651599486234.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651599486234.png)
3. In the login page, enter your user name and password in the respective boxes. [![image-1651599502803.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651599502803.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651599502803.png)**Note**: If you forgot your password, click “**I can’t access my account**”. You will be redirected into a new web page. Enter your username to receive your password.

4. In the **Module** section, select **Piping**.
5. Click **Login**.

Once you have successfully logged in into the ***cuteQM*** app, the home page of the ***cuteQM*** app opens.

[![image-1651599549509.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651599549509.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651599549509.png)

 **Figure 4.1 Home page of *cuteQM app***

[![image-1651599574057.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651599574057.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651599574057.png) **Note**: The user name you have entered, the project you have been assigned, and the module you have selected are displayed in the upper right corner of the home page.

### **1.2 My Profile**

##### **If you want to upload digital signature ,**

1. Click your user name displayed on the quick access bar of the home page. See Fig 1.1. A drop-down list opens with multiple options.
2. Click **My Profile** option

[![image-1724415499138.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724415499138.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724415499138.png)

[![image-1724415789149.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724415789149.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724415789149.png)

3.Click **Edit** button placed at the right top corner as shown above fig

4.Click **file upload** icon as shown below

5.**Upload the signature** from device

7.Click **Update** button.

[![image-1724416213953.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724416213953.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724416213953.png)

**My profile updated successfully.**

### **1.3 Change Password**

If you want to change your current password,

1. Click your user name displayed on the quick access bar of the home page. See Fig 1.1. A drop-down list opens with multiple options.
    
    [![image-1724414555569.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724414555569.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724414555569.png)

2. Click the **Change Password** option. The **Change Password** page opens.
    
    [![image-1651599664112.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651599664112.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651599664112.png)
    
    [![image-1651599674088.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651599674088.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651599674088.png)**Note**: Before changing your password read the conditions specified in the **Change Password** page.

3. In the **Password** box, enter your current password.
4. In the **New** **Password** box, enter your new password.
5. In the **Confirm** **New** **Password** box, enter your new password again.
6. Click **Change Password**.

Your password will be successfully changed.

### **1.4 Log Out**

If you want to log out from the app,

1. Click your user name displayed on the quick access bar of the home page. See Fig 1.1. A drop-down list opens with multiple options.
2. Click **Log out**.

Your current session ends now. The home page appears.

# Home

**2.0** The home menu in the ***cuteQM*** app used to view a dashboard and a switch board of a project. This menu helps you to change project and module.

[![image-1651060124426.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651060124426.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060124426.png)

### **2.1 Dashboard**

The **Dashboard** tab in the **Home** menu displays graphs, charts, and tables, which helps you to monitor and track the summary reports of various inspection and welding progress in the piping module.

[![image-1651060621986.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651060621986.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060621986.png)**Note**: The dashboard displayed on the app is linked to a database that allows the report to be constantly updated.

The Dashboard page shows the following graphs, charts, and tables:

- Piping – Weld Rejection Rate (Cumulative)
- Piping Drawing Status
- Piping – Weekly Weld Rejection Rate
- Piping Dia Inch
- Piping Status by System
- Piping Welding Progress by Date
- NDT Progress Status
- NDT Number of Joint Status

[![image-1651060865034.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651060865034.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060865034.png)

### **2.2 Switch Board**

The **Switch Board** tab in the **Home** menu show the consolidated view of various tabs listed in multiple menus in the menu bar.

Once you have successfully logged in into the ***cuteQM*** app, you can view the Home Page. In the Home Page, the menu bar appears with multiple menus, otherwise you can select the **Switch Board** tab to view all the menus.

To select the **Switch Board** tab,

1. Navigate to **Home**.
2. Click **Switch Board**.

The **Switch Board** tab includes multiple options such as **Project Data, Materials, Inspection, Piping, Test Pack, Punch List, and Documentation.**

[![image-1651061654091.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651061654091.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651061654091.png)


### **2.3 Switch Project**

 The **Switch Project** tab in the **Home** menu helps you to add a new project/module and switch between various projects and modules added in the app.

#### **2.3.1 Switch between Various Projects and Modules**

1. Navigate to the **Home** menu.
2. Click **Switch Project**.

The switch project window opens with a list of projects and modules that are already added in the web.

[![image-1651065431654.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651065431654.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651065431654.png)

 **Figure 5.1: Switch project window**

3\. If you want to switch between various projects and modules,

1. Select a project you want from multiple projects listed in the left side of the window. Once you have selected the project, a list of modules related to the project is displayed.
2. Select a module you want from multiple modules listed in the right side of the window.

4\. Click **Select.**

#### **2.3.2 Add a New Project** 

If you want to add a new project, do the following

<table border="1" id="bkmrk-if-you-want-to-add-a-0" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">If you want to add a new project, you must have been assigned as an administrator or a power user otherwise you cannot add any new project.

</td></tr></tbody></table>

1. Click **New Skid/ Module**. See Fig 2.1.

 The add project/module page opens with two options such as **Projects** and **Skid/ Module**.

[![image-1651068352873.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651068352873.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651068352873.png)

 **Figure 2.2: Add project/module page**

2\. Click **Projects**.

The **Projects** page opens.

[![image-1651068415000.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651068415000.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651068415000.png)

 **Figure 2.3: Projects page**

**3.** Click [![image-1651068454494.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651068454494.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651068454494.png) (**ADD** button) in the upper side of the **Projects** page.

A new window opens to add a new project.

[![image-1651068497023.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651068497023.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651068497023.png)

[![image-1651068510033.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651068510033.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651068510033.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.

1. In the **Project Number** box, enter the project number.
2. In the ****Project Name**** box, enter a project name.
3. In the **End User** box, select an end user from a drop-down list.
4. In the ****Client**** box, select a client from a drop-down list.
5. In the ****AI/ Third Party**** box, select an AI or a third party from a drop-down list. [![image-1651112349330.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651112349330.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651112349330.png) **Note**: If you want to add multiple third parties, add third parties by clicking
    
    [![image-1651112372982.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651112372982.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651112372982.png) (**Add TP** button) in the **Third party** column of the **Projects page**.
6. In the ****Purchase Order (PO) Number**** box, enter the PO number.
7. In the ****Manufacturer Job Code**** box, enter the manufacturer job code number.
8. In the **Client Project** box, enter the client project code.
9. In the ****Client Job Code**** box, enter the client job code.
10. In the **Owner Project** box, enter the owner project code.
11. In the **Owner Job** Code box, enter the owner job code.
12. In the ****Delivery Date**** box, choose the delivery date.
13. In the **Location** box, enter the location detail.
14. In the **Non-Destructive Examination (NDE) Weld Length Limit** box, enter the length limit of NDE welding.
15. If you need an external qualified welder, click the check box provided with the ****External Qualified Welder**** option.
16. In the ****Weld Repair Allowance**** box, enter the amount for weld repair.

4\. Click **Save**.

A new project is added successfully.

#### **2.3.3 Edit a Project**

If you want to edit any existing project details from the list of projects in the **Projects** page, do the following,

1\. Click [![image-1651068921167.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651068921167.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651068921167.png)(Edit icon) in the **Edit** column for the respective project. See Fig 2.3.

A new window opens to edit the project.[![image-1651068999405.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651068999405.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651068999405.png)

2\. Click any box where you want to edit the details, and then edit the details in the respective box in the **Projects** page.

3\. Click **Save**.

#### **2.3.4 Delete a Project.**

If you want to delete any specific project from the list of projects, you can use (Delete icon) provided in the **Delete** column of the **Projects** page, See Fig 2.3.

1\. Click [![image-1651072213142.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651072213142.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651072213142.png) (Delete icon) for the corresponding project.

You receive a notification message “**Do you want to delete this row**?”.

2\. Click **OK.**

#### **2.3.5 Export Projects List**

You can export a list of projects in the pdf and excel formats.

1. If you want to export the projects list in the pdf format, click [![image-1651074157833.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651074157833.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651074157833.png) (**PDF** button). See Fig 2.3. The project list will be downloaded in the pdf format.
2. If you want to export the projects list in the excel format, click [![image-1651112491032.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651112491032.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651112491032.png) (**Excel** button).
    
    The project list will be downloaded in the excel format.

#### **2.3.6 Add a New Module**

If you want to add a new module, do the following

<table border="1" id="bkmrk-if-you-want-to-add-a-2" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">If you want to add a new module, you must have been assigned as an administrator or a power user otherwise you cannot add any new module.

</td></tr></tbody></table>

1. Click **New Skid/ Module**. See Fig 2.1. The add project/module page opens with two options such as **Projects** and **Skid/ Module**. See Fig 2.2.
2. Click ****Skid/Module****. The **Skid/Module** page opens.
    
    [![image-1651112732625.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651112732625.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651112732625.png)
    
     **Figure 5.3.1: Skid/Module page**
3. Click [![image-1651112747605.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651112747605.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651112747605.png) (**ADD** button) in the upper side of the **Skid/Module** page.
    
    The skid/module box opens to add a new module.
    
    [![image-1651112824376.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651112824376.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651112824376.png)
    
    [![image-1651112832376.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651112832376.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651112832376.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving. 
    1. 1. In the ****Master** **Project Name**** box, enter the master project name from a drop-down list.
        2. In the ****Skid/Module**** box, enter a module name.
        3. In the ****Abbreviation**** box, enter the abbreviation for the added module.
        4. In the ****Report Prefix**** box, the report prefix will be entered automatically. If you want change, you can edit the report prefix.
        5. In the ****Piping Class**** box, enter the piping class name.
        6. In the ****Delivery Date**** box, choose the delivery date.
        7. In the ****Project Type**** box, select the type of project from a drop-down list.
        8. If you want to show this module in the ***cuteQM*** mobile app, click the check box provided with the **Show in Apps** option.
        9. In the ****Shift Start Time (24hr)****box, enter the shift starting time.
        10. In the ****Shift End Time (24hr)****box, enter the shift ending time.
        11. In the ****Break Time (mins)****box, enter the break time duration.
        12. If you want to enable the repair project flow option, select the check box provided with the ****Repair Project Flow**** column.
        13. If you want to enable the welder qualification restriction option, select the check box provided with the ****Welder Qualification Restriction**** column.
        14. Click **Save**. A new module is added successfully.

#### **2.3.7 Add a Surveyor, a Client or Other Role for Module**

If you want to add a surveyor, a client or other role for any added module,

1. Click a respective [![image-1651113117272.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651113117272.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651113117272.png)(Add icon) provided in the **Add Surveyor/Client** column. The **Add Surveyor/Client/Others** window opens.
    
    [![image-1651113167260.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651113167260.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651113167260.png)
2. Click [![image-1651115778472.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651115778472.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651115778472.png) (**ADD** button). A new window opens to enter the name and type of a role.
    
    [![image-1651115830614.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651115830614.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651115830614.png)
3. In the **Name** box, enter the name of the person to whom you want to add a role.
4. In the **Type** box, select the type of role from a drop-down list.
5. Click ****Save****.

#### **2.3.8 Edit a Module**

If you want to edit any existing module details from the list of modules in the **Skid/Module** page, do the following,

1. Click [![image-1651115972146.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651115972146.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651115972146.png) (Edit icon) in the **Edit** column for the respective module. See Fig 2.3.1.
    
    A new window opens to edit the module.
    
    [![image-1651116016329.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651116016329.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651116016329.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box in the ****Skid/Module**** page.
3. Click **Save**.

#### **2.3.9 Delete a Module**

If you want to delete any specific module from the list of modules, you can use [![image-1651116090538.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651116090538.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651116090538.png) (Delete icon) provided in the **Delete** column of the **Skid/Module** page, See Fig 2.3.1.

1. Click [![image-1651116156710.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651116156710.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651116156710.png) (Delete icon) for the corresponding module.
    
    You receive a notification message “**Do you want to delete**?”.
2. Click **OK**.

#### **2.3.10 Export Modules List**

You can export a list of modules added in the **Skid/Module** page in the pdf and excel formats.

1. If you want to export the modules list in the pdf format, click [![image-1651116320668.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651116320668.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651116320668.png) (**PDF** button). See Fig 2.3.1.
    
    The modules list will be downloaded in the pdf format.
2. If you want to export the modules list in the excel format, click [![image-1651116397692.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651116397692.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651116397692.png)
    
    (**Excel** button).
    
    The modules list will be downloaded in the excel format.

#### **2.3.11 Close a Project**

If you want to close any project from the app, do the following

<table border="1" id="bkmrk-make-sure-that-once-" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Make sure that once you have closed any project, you cannot even open or access the closed project.

</td></tr></tbody></table>

1. Click **Close Project** in the **Close Project** column for the corresponding module and project type. See Fig 2.3.1. You receive a notification message “**Are you sure want to close this project? You will not be able to access/reopen this project again**”.
2. Click **OK** to close the project.

# Project Data

### **3.0 Project Data**

The **Project Data** menu in the ***cuteQM*** app helps you to add the master data and the personal data for the piping project. Once you click the **Project Data** menu, the following tabs open,

### **3.1 Piping and Instrumentation Diagram (P&amp;ID)**

P&amp;ID is a schematic diagram which shows the functional relationship of piping, instrumentation, and system equipment components. The P&amp;ID includes mechanical equipment with names and numbers, Process piping, sizes and identification, Flow directions, and so on.

The **P&amp;ID** tab in the **Project Data** menu helps you to add a P&amp;ID. If you want to navigate to **P&amp;ID,** do the following,

1. Click ****P&amp;ID**** in the ****Project Data**** menu. The **P&amp;ID** page opens.
    
    [![image-1651119091006.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651119091006.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651119091006.png)
    
     **Figure 3.1: P&amp;ID page**

#### **3.1.1 Add a P&amp;ID**

If you want to add a new P&amp;ID, do the following steps,

1. Click [![image-1651119261792.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651119261792.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651119261792.png) (**ADD** button) in the **P&amp;ID** page. See Fig 3.1.
    
    A new window opens to add a new P&amp;ID.
    
    [![image-1651119327370.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651119327370.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651119327370.png)
    
    [![image-1651119345695.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651119345695.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651119345695.png) **Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.
2. In the **P&amp;ID** box, enter the P&amp;ID number.
3. In the **Revision Number** box, enter the revision number for the P&amp;ID.
4. Click ****Save.**** The P&amp;ID is successfully added and listed in the **P&amp;ID** page.

#### **3.1.2 Edit a P&amp;ID**

If you want to edit any existing P&amp;ID in the **P&amp;ID** page,

1. Click [![image-1651119535516.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651119535516.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651119535516.png)(Edit icon) of the respective P&amp;ID. See Fig 3.1.
2. The **P&amp;ID** page shows the details of the P&amp;ID.
3. [![image-1651119624700.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651119624700.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651119624700.png)
4. Edit the details where you want.
5. Click **Save**.

#### **3.1.3 Delete a P&amp;ID**

If you want to delete any existing P&amp;ID in the **P&amp;ID** page,

1. Click [![image-1651119763562.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651119763562.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651119763562.png) (Delete icon) of the respective P&amp;ID. See Fig 3.1.
    
    You receive a notification message “**Confirm Delete?**”.
2. Click **OK**.
    
    The selected P&amp;ID will be deleted from the **P&amp;ID** page.

#### **3.1.4 Export P&amp;ID list**

You can export a list of P&amp;IDs added in the **P&amp;ID** page in both the pdf and excel formats.

1. If you want to export the P&amp;ID list in the pdf format, click [![image-1651119905005.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651119905005.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651119905005.png)(**PDF** button).
    
    The P&amp;ID list will be downloaded as a pdf file.
2. If you want to export the P&amp;ID list in the excel format, click [![image-1651119961686.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651119961686.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651119961686.png) (**Excel** button).
    
    The P&amp;ID list will be downloaded as an excel file.

#### **3.1.5 Filter a P&amp;ID**

If you want to filter any specific P&amp;ID in the **P&amp;ID** page, do the following,

1. Click [![image-1651120162201.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120162201.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120162201.png) (**FILTER** button) located on the **P&amp;ID  See Fig 3.1.
    
    Once you clicked the **Filter** button, the filter box opens for the **P&amp;ID** and **Revision Number** columns.
    
    [![image-1651120201531.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120201531.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120201531.png)
2. Enter relevant detail in the respective column’s filter box to filter any P&amp;ID.

#### **3.1.6 Import Multiple P&amp;IDs**

If you want to import multiple P&amp;IDs together, do the following,

1. Click [![image-1651120365377.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120365377.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120365377.png) (**TEMPLATE** button). See Fig 3.1.
    
    An excel worksheet will be downloaded with a predefined template to enter the details of P&amp;IDs.
    
    [![image-1651120425289.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120425289.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120425289.png)
2. Enter the required P&amp;ID details in the respective columns of the excel worksheet.
3. Once you have added the P&amp;ID details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651120501083.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120501083.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120501083.png) (**IMPORT** button). See Fig 3.1.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651120563525.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120563525.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120563525.png)
5. Click [![image-1651120579811.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120579811.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120579811.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651120651822.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120651822.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120651822.png) (**Upload** button) to export the P&amp;IDs that are included in the excel worksheet.
    
    The details of the P&amp;IDs in the worksheet will be displayed in the **P&amp;ID** page.

#### **3.1.7 Attach a File into a P&amp;ID**

If you want to attach a file for example drawing, with any existing P&amp;ID listed in the **P&amp;ID** page,

1. Click [![image-1651120776655.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120776655.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120776655.png) (Attach icon) provided against the respective P&amp;ID in the **P&amp;ID** page.
    
    The **File Upload (P&amp;ID - Drawings)** page opens.
    
    [![image-1651120946537.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120946537.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120946537.png)
    
    [![image-1651120969847.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120969847.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120969847.png)**Note**: Before uploading any file, read the instructions given in the **File Upload (P&amp;ID - Drawings)** page.
2. Click [![image-1651120997251.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120997251.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120997251.png) (**Browse** button).
3. Select a file which you want to upload from your computer.
4. Click [![image-1651121030903.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121030903.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121030903.png) (**Upload** button) to attach the file.
    
    The uploaded file will be displayed in the **File Upload** table.
    
    [![image-1651121061820.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121061820.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121061820.png)


### **3.2 System**

You can add the details of systems to be used in the piping project by using the **Systems** tab in the **Project Data** menu. If you want to navigate to **Systems,**

1. Click **Systems** in the **Project Data** menu.
    
    The **System** page opens.
    
    [![image-1651121131964.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121131964.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121131964.png)
    
     **Figure 3.2: System page**


#### **3.2.1 Add a System**

If you want to add a new system, do the following steps,

1. Click [![image-1651121326059.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121326059.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121326059.png) (**ADD** button) in the **System**  See Fig 3.2.
    
    A new window opens to add a new system.
    
    [![image-1651121364671.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121364671.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121364671.png)
    
    [![image-1651121376559.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121376559.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121376559.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the ****System**** box, enter the system name.
3. In the ****Abbreviation**** box, enter the abbreviation for the system name.
4. In the **System Number** box, enter the system number.
5. Click ****Save.****The system is successfully added and listed in the **System** page.
    
    [![image-1651121590257.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121590257.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121590257.png)**Note**:
    
    
    - - If you want to map cover page for any added system, click the respective [![image-1651121618076.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121618076.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121618076.png) (Add icon)
            
            provided in the **Map Cover Page** column and add the cover pages.
        - If you want to map certificates for any added system, click the respective [![image-1651121746668.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121746668.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121746668.png)(Add icon)
            
            provided in the **Map Certificates** column and add the cover pages.
        - If you want to map Check Record/Check Sheet (CR/CS) for any added system,
            
            click the respective [![image-1651121804240.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121804240.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121804240.png)(Add icon) provided in the **Map CR/CS** column and add the cover pages.

#### **3.2.2 Edit a System**

If you want to edit any existing system in the **System** page,

1. Click [![image-1651121873901.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121873901.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121873901.png)(Edit icon) of the respective System. See Fig 3.2.
    
    The **System** page shows the details of the selected system.
    
    [![image-1651121910492.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121910492.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121910492.png)
2. Edit the details where you want.
3. Click **Save**.

#### **3.2.3 Delete a System**

If you want to delete any existing system in the **System** page, you can use (Delete icon) provided in the **System** page. To know how to delete, see the topic, “[<u>Delete P&amp;ID</u>](#bkmrk-3.1.3%C2%A0delete-a-p%26id "Project Data")”.

#### **3.2.4 Export System List**

You can export a list of systems added in the **System** page in both the pdf and excel formats by using [![image-1651122299855.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651122299855.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651122299855.png) (**PDF** button) and [![image-1651122478697.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651122478697.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651122478697.png) (**Excel** button). To know how to export, see the topic, “[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **3.2.5 Filter a System**

If you want to filter any specific system in the **System** page, you can use [![image-1651122763905.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651122763905.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651122763905.png) (**FILTER** button) located on the **System** page. To know how to filter, see the topic, “[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

#### **3.2.6 Import Multiple Systems**

If you want to import multiple systems together, do the following,

1. Click [![image-1651122886316.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651122886316.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651122886316.png) (**TEMPLATE** button). See Fig 3.2.
    
    An excel worksheet will be downloaded with a predefined template to enter the details of systems.
    
    [![image-1651122931636.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651122931636.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651122931636.png)
2. Enter the required system details in the respective columns of the excel worksheet.
3. Once you have added the system details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651122972277.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651122972277.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651122972277.png) (**IMPORT** button). See Fig 3.2.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651122999447.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651122999447.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651122999447.png)
5. Click [![image-1651123014955.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123014955.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123014955.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651123042197.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123042197.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123042197.png) (**Upload** button) to export the systems that are included in the excel worksheet.
    
    The details of the systems in the worksheet will be displayed in the **System** page.

#### **3.2.7 Attach a File into a System**

If you want to attach any file with any system listed in the **System** page, you can attach the file by using (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.


### **3.3 Sub System**

The **Sub** **Systems** tab in the **Project Data** menu helps you to add the details of sub systems to be in used in the piping project. If you want to navigate to **Sub** **Systems,**

1. Click **Sub** **Systems** in the **Project Data** menu.
    
    The **Sub** **Systems** page opens.
    
    [![image-1651123216599.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123216599.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123216599.png)
    
     **Figure 6.3: Sub System page**

#### **3.3.1 Add a Sub System**

If you want to add a new sub system, do the following steps,

1. Click [![image-1651123283337.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123283337.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123283337.png) (**ADD** button) in the **Sub** **System**  See Fig 3.3.
    
    A new window opens to add a new sub system.
    
    [![image-1651123319434.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123319434.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123319434.png)
    
    [![image-1651123334977.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123334977.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123334977.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the ****System**** box, select a system from a drop-down list.
3. In the ****Sub** **System**** box, select a sub system from a drop-down list.
4. In the ****Abbreviation**** box, enter the abbreviation for the sub system.
5. In the ****Sub** **System Number**** box, enter the sub system number.
6. If the added subsystem needs to be flushed, select **Yes** in the **Flushing** option otherwise select **No**.
7. If there is need to perform the leakage test for the added subsystem, select ****Yes**** in the ****Leak Test**** option otherwise select ****No****.
8. In the ****Description**** box, enter the description for the added sub system.
9. Click ****Save.****The sub system is successfully added and listed in the **Sub** **System** page.

#### **3.3.2 Edit a Sub System**

If you want to edit any existing sub system in the **Sub** **System** page,

1. Click [![image-1651123496277.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123496277.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123496277.png)(Edit icon) of the respective sub system. See Fig 3.3.
    
    The **Sub System** page shows the details of the selected sub system.
    
    [![image-1651123531945.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123531945.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123531945.png)
2. Edit the details where you want.
3. Click **Save**.

#### **3.3.3 Delete a Sub System**

If you want to delete any existing sub system in the **Sub System** page, you can use [![image-1651123593833.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123593833.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123593833.png) (Delete icon) provided in the **Sub** **System** page. To know how to delete, see the topic,

#### **3.3.4 Export Sub System List**

You can export a list of sub systems added in the **Sub System** page in both the pdf and excel formats by using [![image-1651123664991.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123664991.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123664991.png) (**PDF** button) and [![image-1651123690259.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123690259.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123690259.png) (**Excel** button). To know how to export, see the topic, “[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **3.3.5 Filter a Sub System**

If you want to filter any specific sub system in the **Sub System** page, you can use [![image-1651123790660.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123790660.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123790660.png) (**FILTER** button) located on the **Sub System** page. To know how to filter, see the topic, “[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

#### **3.3.6 Import Multiple Sub Systems**

If you want to import multiple sub systems together, do the following,

1. Click [![image-1651123870609.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123870609.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123870609.png) (**TEMPLATE** button). See Fig 3.3.
    
    An excel worksheet will be downloaded with a predefined template to enter the details of sub systems.
    
    [![image-1651123911588.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123911588.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123911588.png)
2. Enter the required sub system details in the respective columns of the excel worksheet.
3. Once you have added the sub system details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651123941803.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123941803.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123941803.png) (**IMPORT** button). See Fig 3.3.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651123970121.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123970121.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123970121.png)
5. Click [![image-1651123982893.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123982893.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123982893.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651124010915.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651124010915.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651124010915.png) (**Upload** button)to export the sub systems that are included in the excel worksheet.
    
    The details of the sub systems in the worksheet will be displayed in the **Sub System** page.

#### **3.3.7 Attach a File into a Sub System**

If you want to attach any file with any sub system listed in the **Sub** **System** page, you can attach the file by using [![image-1651124079903.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651124079903.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651124079903.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic. “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.


### **3.4 Lines**

The **Lines** tab in the **Project Data** menu helps you to add the details of lines to be in used in the piping project. If you want to add **Lines,**

1. Click ****Lines**** in the ******Project Data****** menu, The **Lines** page opens.
    
    [![image-1651124204405.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651124204405.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651124204405.png)
    
     **Figure 3.4: Lines page**

#### **3.4.1 Add a Line**

If you want to add a line, do the following steps,

1. Click [![image-1651124269606.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651124269606.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651124269606.png) (**ADD** button) in the **Lines** page. See Fig 3.4.
    
    A new window opens to add new lines.
    
    [![image-1651124295360.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651124295360.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651124295360.png)
    
    [![image-1651124303799.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651124303799.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651124303799.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the ****Sub System**** box, select a sub system from a drop-down list.
3. In the ****Line Number**** box, enter the line number.
4. In the ****Size**** box, select the size of the line.
5. In the ****Piping Class**** box, enter the piping class name.
6. In the ****Line Code**** box, enter the line code.
7. In the ****Sheet Number**** box, enter the sheet number.
8. In the ****RT Req. %**** box, enter the requirement percentage of RT.
9. In the ****UT Req. %**** box, enter the requirement percentage of UT.
10. In the ****MT Req. %**** box, enter the requirement percentage of MT.
11. In the ****PT Req. %****box, enter the requirement percentage of PT.
12. In the ****PWHT Req. %****box, enter the requirement percentage of PWHT.
13. In the ****PMI Req. %****box, enter the requirement percentage of PMI. [![image-1651124410452.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651124410452.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651124410452.png)**Note**: The RT, UT, MT, PT, PWHT, and PMI Requirements (%) should be filled with valid numerical numbers. The joint testing will be performed based on the value given by you, for example, if you enter 100 % of requirement, which means 100 % of the joints will be tested. If you enter 0 %, none of joints will be tested.
14. Click **Save.**
    
    The line is successfully added and listed in the **Lines** page.

#### **3.4.2 Edit a Line**

If you want to edit any existing line in the **Lines** page,

1. Click [![image-1651126180149.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651126180149.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651126180149.png)(Edit icon) of the respective sub system. See Fig 3.4.
    
    The **Lines** page shows the details of the selected line.
    
    [![image-1651126233689.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651126233689.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651126233689.png)
2. Edit the details where you want.
3. Click **Save**.

#### **3.4.3 Delete a Line**

If you want to delete any existing line in the **Lines** page, you can use [![image-1651126724369.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651126724369.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651126724369.png) (Delete icon) provided in the **Lines** page. To know how to delete, see the topic, “[<u>Delete P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

#### **3.4.4 Export Line List**

You can export a list of lines added in the **Lines** page in both the pdf and excel formats by using [![image-1651126780734.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651126780734.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651126780734.png) (**PDF** button) and [![image-1651126798134.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651126798134.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651126798134.png)(**Excel** button). To know how to export, see the topic “[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **3.4.5 Filter a Line**

If you want to filter any specific line in the **Lines** page, you can use [![image-1651126966554.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651126966554.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651126966554.png) (**FILTER** button) located on the **Lines** page. To know how to filter, see the topic, “[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

#### **3.4.6 Import Multiple Lines**

If you want to import multiple lines together, do the following,

1. Click [![image-1651127025691.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651127025691.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651127025691.png) (**TEMPLATE** button). See Fig 3.4.
    
    An excel worksheet will be downloaded with a predefined template to enter the details of lines.
    
    [![image-1651127086914.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651127086914.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651127086914.png)
2. Enter the required line details in the respective columns of the excel worksheet.
3. Once you have added the line details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651127121187.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651127121187.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651127121187.png) (**IMPORT** button). See Fig 3.4.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651127150104.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651127150104.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651127150104.png)
5. Click [![image-1651127193042.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651127193042.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651127193042.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651127277086.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651127277086.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651127277086.png) (**Upload** button) to export the lines that are included in the excel worksheet.
    
    The details of the lines in the worksheet will be displayed in the **Lines** page.

#### **3.4.7 Attach a File into a Line**

If you want to attach any file with a line listed in the **Lines** page, you can attach the file by using [![image-1651127356456.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651127356456.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651127356456.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.


### **3.5 Isometric (ISO) Drawings**

An isometric drawing is a detailed orthographic drawing that represents the details of 3D structure of the piping system in a 2D format for fabrication of the pipe. If you want to navigate to **ISO**,

1. Click ****ISO Drawings**** in the ******Project Data****** menu. The **ISO** page opens.
    
    [![image-1651127433012.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651127433012.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651127433012.png)
    
     **Figure 3.5: ISO page**

#### **3.5.1 Add an ISO Drawing**

If you want to add a new ISO drawing, do the following steps,

1. Click [![image-1651127541296.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651127541296.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651127541296.png) (**ADD** button) in the **ISO** page. See Fig 3.5.
    
    A new window opens to add a new ISO drawing.
    
    [![image-1651127575296.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651127575296.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651127575296.png)
    
    [![image-1651127586154.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651127586154.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651127586154.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the ****Line Number**** box, select the line number from a drop-down list.
3. In the ****P&amp;ID**** box, select the P&amp;ID from a drop-down list.
4. In the ****ISO Drawing Number**** box, enter the number for an ISO drawing you want to add.
5. In the ****Revision Number**** box, enter the revision number for the ISO drawing.
6. In the **Internal Drawing No** box, enter the internal drawing number of the isometric drawing.
7. In the ****Internal Drawing Rev. No**** box, enter the revision number for the internal drawing.
8. In the ****Sheet No**** box, enter the sheet number.
9. In the ****Sheet Rev. No**** box, enter the sheet revision number.
10. In the ****Master Sheet No**** box, enter the master sheet number.
11. In the ****Line Size**** box, select the line size from a drop-down list.
12. In the ****Location**** box, select the location from a drop-down list.
13. In the ****Sub Contractor**** box, select the sub-contractor from a drop-down list.
14. In the ****RT Req. %**** box, enter the requirement percentage of RT.
15. In the ****UT Req. %**** box, enter the requirement percentage of UT.
16. In the ****MT Req. %**** box, enter the requirement percentage of MT.
17. In the ****PT Req. %**** box, enter the requirement percentage of PT.
18. In the ****PWHT Req. %**** box, enter the requirement percentage of PWHT.
19. In the ****PMI Req. %**** box, enter the requirement percentage of PMI. [![image-1651127866481.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651127866481.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651127866481.png)**Note**: The RT, UT, MT, PT, PWHT, and PMI Requirements (%) should be filled with valid numerical numbers. The joint testing will be performed based on the value given by you, for example, if you enter 100 % of requirement, which means 100 % of the joints will be tested. If you enter 0 %, none of joints will be tested.
20. Click ****Save.****The ISO drawing is successfully added and listed in the **ISO** page.

#### **3.5.2 Add Revision for ISO Drawing**

Once you have added the ISO drawing, the **ISO** page shows [![image-1651127997956.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651127997956.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651127997956.png) (Revision icon) for the added ISO drawing. You can add multiple revisions for the added ISO by using this revision icon.

1. Click [![image-1651128029530.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128029530.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128029530.png) (Revision icon) of the respective ISO drawing.
    
    The **Add Revision** box opens.
    
    [![image-1651128056098.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128056098.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128056098.png)
2. In the ****Revision Number**** box, enter the revision number.
3. Click ****Add****. The revision for the ISO drawing will be added and listed in the **ISO** page.

#### **3.5.3 Edit an ISO Drawing**

If you want to edit any existing ISO drawing in the **ISO** page,

1. Click [![image-1651128135468.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128135468.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128135468.png)(Edit icon) of the respective sub system. See Fig 3.5.
    
    The **ISO** page shows the details of the selected ISO drawing.
    
    [![image-1651128166066.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128166066.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128166066.png)
2. Edit the details where you want.
3. Click ****Save****.

#### **3.5.4 Delete an ISO Drawing**

If you want to delete any existing ISO drawing in the **ISO** page, you can use [![image-1651128248371.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128248371.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128248371.png) (Delete icon) provided in the **ISO** page. To know how to delete, see the topic, “[<u>Delete P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

#### **3.5.5 Export ISO Drawings List**

You can export a list of ISO drawings added in the **ISO** page in both the pdf and excel formats by using [![image-1651128300644.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128300644.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128300644.png) (**PDF** button) and [![image-1651128311204.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128311204.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128311204.png) (**Excel** button). To know how to export, see the topic, “[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **3.5.6 Filter an ISO Drawing**

If you want to filter any specific ISO drawing in the **ISO** page, you can use [![image-1651128397314.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128397314.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128397314.png) (**FILTER** button) provided on the **ISO** page. To know how to filter, see the topic, “[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

#### **3.5.7 Import Multiple ISO Drawings**

If you want to import multiple ISO drawings together, do the following,

1. Click [![image-1651128469532.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128469532.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128469532.png) (**TEMPLATE** button). See Fig 3.5.
    
    An excel worksheet will be downloaded with a predefined template to enter the details of ISO drawings.
    
    [![image-1651128508757.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128508757.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128508757.png)
2. Enter the required ISO drawing details in the respective columns of the excel worksheet.
3. Once you have added the ISO drawing details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651128544505.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128544505.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128544505.png) (**IMPORT** button). See Fig 3.5.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651128572672.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128572672.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128572672.png)
5. Click [![image-1651128597761.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128597761.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128597761.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651128627885.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128627885.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128627885.png) (**Upload** button) to export the ISO drawings that are added in the excel worksheet.
    
    The details of the ISO drawings in the worksheet will be displayed in the **ISO** page.

#### **3.5.8 Attach a File into an ISO Drawing**

If you want to attach any file with an ISO drawing listed in the **ISO** page, you can attach the file by using [![image-1651128675518.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128675518.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128675518.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.


### **3.6 Spools**

A spool refers to a section of a piping system that is pre-fabricated as smaller segments with flanges and fittings. If you want to navigate to **Spools**,

1. Click ****Spools**** in the ******Project Data.******The **Spools** page opens.
    
    [![image-1651128749796.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128749796.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128749796.png)
    
     **Figure 3.6: Spools page**

#### **3.6.1 Add a Spool**

If you want to add a new spool, do the following steps,

1. Click [![image-1651128843702.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128843702.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128843702.png) (**ADD** button) in the **Spools**  See Fig 3.6.
    
    A new window opens to add a new spool.
    
    [![image-1651128875173.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128875173.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128875173.png)
    
    [![image-1651128883299.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128883299.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128883299.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the ****ISO Drawing Number**** box, select the ISO drawing number from a drop-down list.
3. In the ****Spool Number**** box, enter the spool number for a spool you want to add.
4. In the ****Tag Id**** box, enter the tag id number of the spool.
5. In the ****Location**** box, select the location from a drop-down list.
6. In the ****Contractor** **Name**** box, enter the contractor name.
7. In the ****Remarks**** box, enter your remarks if any.
8. Click ****Save.****The spool is successfully added and listed in the **Spools** page.

#### **3.6.2 Edit a Spool**

If you want to edit any existing spool in the **Spools** page,

1. Click [![image-1651129026533.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651129026533.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651129026533.png)(Edit icon)of the respective spool. See Fig 3.6.
    
    The **Spools** page shows the details of the selected spool.
    
    [![image-1651129062410.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651129062410.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651129062410.png)
2. Edit the details where you want.
3. Click ****Save****.

#### **3.6.3 Delete a Spool**

If you want to delete any existing spool in the **Spools** page, you can use [![image-1651129124714.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651129124714.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651129124714.png) (Delete icon) provided in the **Spools** page. To know how to delete, see the topic, “[<u>Delete P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

#### **3.6.4 Export Spool List**

You can export a list of spools added in the **Spools** page in both the pdf and excel formats by using [![image-1651129164359.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651129164359.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651129164359.png) (**PDF** button) and (**Excel** button). To know how to export, see the topic, “[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **3.6.5 Filter a Spool**

If you want to filter any spool in the **Spools** page, you can use [![image-1651129229621.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651129229621.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651129229621.png) (**FILTER** button) provided on the **Spools** page. To know how to filter, see the topic, “[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

#### **3.6.6 Import Multiple Spools**

If you want to import multiple spools together, do the following,

1. Click (**TEMPLATE** button). See Fig 3.6.
    
    An excel worksheet will be downloaded with a predefined template to enter the details of spools.
    
    [![image-1651129313702.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651129313702.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651129313702.png)
2. Enter the required spool details in the respective columns of the excel worksheet.
3. Once you have added the spool details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651129406453.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651129406453.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651129406453.png) (**IMPORT** button). See Fig 3.6.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651129432805.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651129432805.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651129432805.png)
5. Click (****Browse**** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click (**Upload** button) to export the spool details that are added in the excel worksheet.
    
    The details of the spools in the worksheet will be displayed in the **Spools** page.


### **3.7 Joints**

A variety of joints are used in the assembly of pipes. Joints are the points where two or more pieces of materials for example pipes, are joined by welding. The **Joints** tab in the **Project Data** menu helps you add the joint details including joint number, material specification, welding type, and so on.

If you want to navigate to **Joints,**

1. Click **Joints** in the **Project Data** menu.
    
    The **Joints** page opens.
    
    <table border="0" style="border-collapse: collapse; width: 100%; background-color: #ecf0f1;"><tbody><tr><td style="width: 99.866%;">Due to insufficient space, the captured figure of the **Joints** page is split as four.
    
    </td></tr></tbody></table>
    
    [![image-1651130834723.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651130834723.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651130834723.png)
    
    [![image-1651130839151.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651130839151.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651130839151.png)
    
    [![image-1651130844522.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651130844522.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651130844522.png)
    
    [![image-1651130851996.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651130851996.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651130851996.png)
    
     **Figure 3.7: Joints page**

#### **3.7.1 Add a Joint**

If you want to add a new joint, do the following steps,

1. Click [![image-1651131075707.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651131075707.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651131075707.png) (****ADD**** button) in the ****Joints****  See Fig 3.7. A new window opens to add a new joint.
    
    [![image-1651131116014.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651131116014.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651131116014.png)
    
    [![image-1651131198398.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651131198398.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651131198398.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **ISO Drawing Number** box, select the ISO drawing number from a drop-down list.
3. In the ****Spools**** box, select the spool from a drop-down list.
4. In the ****Component (I)**** box, select the first component which you want to join.
5. In the ****Material**** box, select the material of the first component.
6. Enter the details of first component such as ****Material Spec****, ****Material Grade****, ****Material Desc****, ****Diameter (MM)****, ****Thickness (MM)****, ****Rating****, ****Diameter2****, and ****Thickness2****.
7. In the ****Component (II)**** box, select the second component which you want joint.
8. In the ****Material**** box, select the material of the second component.
9. Enter the details of second component such as ****Material Spec****, ****Material Grade****, ****Material Desc****, ****Diameter (MM)****, ****Thickness (MM)****, ****Rating****, ****Diameter2****, and ****Thickness2****.
10. If the component is other than pipe, enter the dimensions in ****Others****
11. In the ****Design Pressure**** box, enter the design pressure value.
12. In the ****Paint System**** box, enter the paint system name.
13. In the ****Design Temp**** box, enter the design temperature value.
14. In the ****Insulation System**** box, enter the insulation system name.
15. In the ****Joint Number**** box, enter the joint number.
16. In the ****Joint Size**** box, enter the joint size range.
17. In the ****Joint Thickness**** box, enter the joint thickness range.
18. In the ****Weld Type**** box, select the welding type from a drop-down list.
19. In the ****Joint Category**** box, select the joint category from a drop-down list.
20. In the ****Fixing Type**** box, select the fixing type from a drop-down list.
21. In the ****WPS Number**** box, select the WPS number from a drop-down list.
22. In the ****Electrode**** box, enter the electrode name.
23. In the ****Filler Rod**** box, enter the filler rod name.
24. If the NDT inspection is not required for the added joint, select the checkbox of the **NDT Not Required** option.
25. If the NDT inspection is required for the added joint, select the checkbox of the respective NDT types given for example **RT Required**, **UT Required**, and so on.
26. In the ****Remarks**** box, enter your remarks if any.
27. Click ****Save.****The joint is successfully added.
28. If you want view the added joint, select the respective drawing number from a drop-down list of the **Select Drawing Number** box in the upper side of the **Joints** page. and listed in the **Joints** page.
    
    [![image-1651131647160.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651131647160.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651131647160.png)
    
    The joint for the selected drawing number will be displayed in the **Joints** page.
    
    [![image-1651131660363.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651131660363.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651131660363.png)

#### **6.7.2 Clone a Joint**

The Clone option provided in the **Joints** page used to add a new joint from previously added joint. If a joint to be added is having the same specifications of any joint already listed in the **Joints** page, you can add the new joint by using [![image-1651131717921.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651131717921.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651131717921.png) (Clone icon).

1. In the ****Joints**** page, find out the joint you want to clone. [![image-1651131757866.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651131757866.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651131757866.png)
2. Click[![image-1651131989751.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651131989751.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651131989751.png)(Clone icon) of the respective joint.
    
    The **Joints** page shows the details of selected joint except joint number in the **Joint Number** box. See the below figure.
    
    [![image-1651132015191.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132015191.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132015191.png)
3. If you want to change any details, you can change in the respective boxes.
4. In the ****Joint Number**** box, enter the joint number for the new joint you want to add.
5. Click ****Save****. The new joint is successfully added and listed in the **Joints** page.
    
    [![image-1651132098303.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132098303.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132098303.png)

#### **3.7.3 Swap Clone Joint**

The Swap Clone option provided in the **Joints** page used to add a new joint from previously added joint. When you do swap clone of any joint, the first and second components in the joint will be swapped each other.

1. In the ****Joints**** page, find out the joint you want to swap clone. [![image-1651132194628.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132194628.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132194628.png)
2. Click [![image-1651132234131.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132234131.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132234131.png) (Swap Clone icon) of the respective joint. The **Joints** page shows the details of selected joint except joint number in the **Joint Number** box. The **Component (I)** and **Component (II)** will be swapped each other. See the below figure.
    
    [![image-1651132275715.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132275715.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132275715.png)
3. If you want to change any details, you can change in the respective boxes.
4. In the ****Joint Number**** box, enter the joint number for the new joint you want to add.
5. Click ****Save****. The new joint is successfully added and listed in the **Joints** page.
    
    [![image-1651132327179.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132327179.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132327179.png)

#### **3.7.4 Edit a Joint**

If you want to edit any existing joint in the **Joints** page,

1. Click (Edit icon) of the respective joint. See Fig 3.7. The **Joints** page shows the details of the selected joint.
    
    [![image-1651132455198.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132455198.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132455198.png)
2. Edit the details where you want.
3. Click ****Save****.

#### **3.7.5 Delete a Joint**

If you want to delete any existing joint in the **Joints** page, you can use [![image-1651132644809.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132644809.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132644809.png) (Delete icon) provided in the **Joints** page. To know how to delete, see the topic, “[<u>Delete P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

#### **3.7.6 Export Joints List**

You can export a list of joints added in the **Joints** page in both the pdf and excel formats by using [![image-1651132703793.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132703793.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132703793.png) (**PDF** button) and [![image-1651132724425.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132724425.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132724425.png) (**Excel** button). To know how to export, see the topic, “[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **3.7.7 Filter a Joint**

If you want to filter any joint in the **Joints** page, you can use [![image-1651132789692.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132789692.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132789692.png) (**FILTER** button) provided on the **Joints** page. To know how to filter, see the topic, “[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

#### **3.7.8 Import Multiple Joints**

If you want to import multiple joints together, do the following,

1. Click [![image-1651132953138.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132953138.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132953138.png) (**TEMPLATE** button). See Fig 3.7.
    
    An excel worksheet will be downloaded with a predefined template to enter the details of joints.
    
    [![image-1651132976303.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132976303.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132976303.png)
2. Enter the required joint details in the respective columns of the excel worksheet.
3. Once you have added the joint details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651133055006.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651133055006.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651133055006.png) (****IMPORT**** button). See Fig 3.7.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651133091897.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651133091897.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651133091897.png)
5. Click [![image-1651133119712.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651133119712.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651133119712.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651133155455.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651133155455.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651133155455.png) (****Upload**** button) to export the joint details that are added in the excel worksheet.
    
    The details of the joints in the worksheet will be displayed in the **Joints** page.


### **3.8 Drawing Bulk Edit**

The **Drawing Bulk Edit** tab in the **Project Data** menu helps you to make changes in all the added ISO drawings together, where the ISO drawings are added using the [**<u>ISO Drawings</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.5%C2%A0isometric-%28iso%29-) tab. This feature avoids the need to open each ISO drawing individually for making changes in the ISO drawings because you can make changes in all the ISO drawings together.

If you want to make changes in the ISO drawings together, do the following steps,

1. Click ****Drawing Bulk Edit**** in the ****Project Data**** menu. The **Drawing Bulk Edit** page opens with a list ISO drawing added in the **ISO Drawings** page.
    
    [![image-1651133300204.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651133300204.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651133300204.png)
    
     **Figure 3.8: Drawing Bulk Edit page**
2. If you want make changes in any ISO drawing details, click on the respective detail, and edit.
3. Click ****Save Changes****. The changes you have made here will be reflected in the respective ISO drawing in the [**<u>ISO</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.5%C2%A0isometric-%28iso%29-) page.
    
    [![image-1651133358768.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651133358768.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651133358768.png)**Note**: You can also add a new ISO drawing by using (**ADD** Button) provided in the upper side of the **Drawing Bulk Edit** page.

#### **3.8.1 Export Drawings After Editing**

After making changes in the ISO drawings, you can export a list of drawings in the **Drawing Bulk Edit** page in both the pdf and excel formats by using [![image-1651133450281.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651133450281.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651133450281.png) (**PDF** button) and [![image-1651133459839.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651133459839.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651133459839.png) (**Excel** button). To know how to export, see the topic, “[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **3.8.2 Filter a Drawing**

If you want to filter any ISO drawing in the **Drawing Bulk Edit** page, you can use (**FILTER** button) provided on the **Drawing Bulk Edit** page. To know how to filter, see the topic, “[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **3.9 Joints Bulk Edit**

The **Joints Bulk Edit** tab in the **Project Data** menu helps you to make changes in all the added joints together, where the joints are added using the [<u>Joints</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.-7%C2%A0joints) tab. This feature avoids the need to open each joint individually for making changes in the joint because you can make changes in all the joints together.

If you want to make changes in the joints together, do the following steps,

1. Click ****Joints Bulk Edit**** in the ******Project Data****** menu******.******The **Joints** page opens with a list joints added in the **Joints** page.
    
    [![image-1651133622102.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651133622102.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651133622102.png)
    
     **Figure 3.9: Joints page**
2. In the **Sheet No/Drawing No/Revision** box, select the drawing number from a drop-down list.
    
    The joints corresponding to the selected drawing number will be displayed in the **Joints** page.
    
    [![image-1651133679769.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651133679769.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651133679769.png)
3. If you want make changes in any joint, click on the respective joint detail, and edit.
4. Click ****Save Changes****. The changes you have made here will be reflected in the respective joints in the [**<u>Joints</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.-7%C2%A0joints) page.
    
    [![image-1651133717640.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651133717640.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651133717640.png)**Note**: You can also add a new joint by using provided in the upper right corner of the **Joints Bulk Edit** page.

#### **3.9.1 Export Joints After Editing**

After making changes in the joints, you can export a list of joints in the **Joints** page in both the pdf and excel formats by using [![image-1651133805751.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651133805751.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651133805751.png) (**PDF** button) and [![image-1651133820284.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651133820284.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651133820284.png) (**Excel** button). To know how to export, see the topic, “[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **3.9.2 Filter a Joint**

If you want to filter any joint in the **Joints** page, you can use [![image-1651133877947.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651133877947.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651133877947.png) (**FILTER** button) provided in the **Joints** page. To know how to filter, see the topic, “[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

#### **3.9.3 View Material Traceability Record (MTR)**

You can view the MTR for added joints by using [![image-1651133927232.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651133927232.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651133927232.png) (**MTR** button) provided in the **Joints** page. Once you click the **MTR** button, the page redirects you into the [<u>Material Traceability Record</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/materials/#bkmrk-4.10%C2%A0material-tracea) page.


### **3.10 Import from Excel - Masters**

The **Import from Excel – Masters** tab helps you to upload master data for all fields instead of uploading data for each field individually.

If you want to import master data for different fields, do the following,

1. Click ****Import from Excel – Masters**** in the ******Project Data******The **File Upload** page opens.
    
    [![image-1651134017306.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651134017306.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651134017306.png)
    
     **Figure 3.10: File Upload page**
2. Download a template by using [![image-1651134174669.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651134174669.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651134174669.png) (****TEMPLATE**** button) to enter the details of master data.
    
    An excel worksheet will be downloaded with a pre-defined template to the details.
    
    [![image-1651134236413.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651134236413.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651134236413.png)
3. Enter the relevant details in the respective column of the excel worksheet.
4. Click [![image-1651134292995.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651134292995.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651134292995.png) (Choose File button).
    
    Once the file has been uploaded successfully, you receive a message, “Successfully uploaded”
5. Click [![image-1651134343191.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651134343191.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651134343191.png)(Get Columns button).
    
    The columns added in the excel worksheet will be listed in the **Excel Column** field.
    
    [![image-1651134359459.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651134359459.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651134359459.png)**Note**: Make sure that the **Excel Column** field must have all the columns as in the **System Column** field.
6. To map the columns in the ****System Column**** and ****Excel Column**** fields, do one of the following, 
    1. If you want to map the columns Automatically, click [![image-1651134444969.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651134444969.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651134444969.png) (**AutoMap** button).
        
        The columns will be mapped automatically and displayed in the **Mapped Columns** field.
    2. If you want to map each column manually, select the respective columns in both the **System Columns** and Each **Excel Column** fields and then click [![image-1651134554716.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651134554716.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651134554716.png) (**Map** button). [![image-1651134545201.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651134545201.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651134545201.png)
7. To un-map the columns in the **Mapped Columns** field, select the respective column and then click [![image-1651134731173.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651134731173.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651134731173.png) (**UnMap** button).
    
    Once you have completed the mapping and un-mapping of columns, you must enter the range for uploading the data from the excel worksheet.
    
    [![image-1651134756458.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651134756458.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651134756458.png)**Note**: In the **Total Rows** field, the system indicates the total number of rows filled in the excel worksheet.
    
    [![image-1651134776943.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651134776943.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651134776943.png)**Tip**: You must enter the upload starting range as two in the **Upload Range From** field because a first row in the excel worksheet is having heading of the columns.
8. In the ****Upload Range From and To**** fields, enter the range of rows you want to upload from the excel worksheet.
9. Click [![image-1651134865782.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651134865782.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651134865782.png) (**Populate Values** button).
10. Click [![image-1651134884892.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651134884892.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651134884892.png) (**Process** button).
    
    The system processes all the uploaded data and displays in the **Excel Import** page.
    
    [![image-1651134915245.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651134915245.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651134915245.png)
11. Click [![image-1651134930979.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651134930979.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651134930979.png) (**Update** button) to import the uploaded data.
    
    The data will be successfully imported.

### **3.11 NDT Procedures**

The **NDT procedures** tab in the **Project Data** menu helps you to add an NDT procedure. Once you have added the NDT procedure details you can add revision for the added NDT procedure. If you want to add an NDT procedure, do the following steps,

1. Click ****NDT Procedures**** in the ****Project Data**** menu. The **NDT Procedure** page opens.
    
    [![image-1651135080005.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651135080005.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651135080005.png)
    
     **Figure 3.11: NDT Procedure page**

#### **3.11.1 Add an NDT procedure**

If you want to add an NDT procedure,

1. Click [![image-1651135146245.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651135146245.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651135146245.png) (**ADD** button) in the **NDT Procedure page. See Fig 3.11.
    
    A new window opens to add an NDT procedure.
    
    [![image-1651135200022.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651135200022.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651135200022.png)
2. In the ****NDT Procedure**** box, select the NDT procedure from a drop-down list.
3. In the ****NDT Procedure Title**** box, enter the NDT procedure title.
4. Click ****Save****. The NDT procedure is successfully added.

#### **3.11.2 Add Details of NDT Procedure** 

Once you have added the NDT procedure, you must add the details of the added NDT procedure.

1. Click[![image-1651135343723.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651135343723.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651135343723.png)(Edit icon) of the respective NDT procedure in the **NDT Procedure**  See Fig 3.11.
    
    The **NDT Procedure Revision** window opens.
    
    [![image-1651135384675.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651135384675.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651135384675.png)
2. Click [![image-1651135399350.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651135399350.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651135399350.png) (**ADD** button) in the **NDT Procedure Revision** window.
    
    A new window opens to add the NDT procedure details.
    
    [![image-1651135439130.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651135439130.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651135439130.png)
    
    [![image-1651135447542.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651135447542.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651135447542.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving. [![image-1651135477119.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651135477119.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651135477119.png)**Tip**: A report number for the revision will be updated automatically in the **Report Number/ Revision** box.
3. In the ****Description**** box, enter the description for the NDT procedure.
4. In the ****Prepared By**** box, enter the name a person who has prepared the NDT procedure.
5. In the ****Prepared Date**** box, enter the prepared date of the NDT procedure.
6. In the ****Reviewed By**** box, enter the name a person who has reviewed the NDT procedure.
7. In the ****Reviewed Date**** box, enter the reviewed date of the NDT procedure.
8. In the ****Approved By**** box, enter the name a person who has approved the NDT procedure.
9. In the ****Approved Date**** box, enter the approved date of the NDT procedure.
10. Click ****Save****. The NDT procedure details are successfully saved and listed in the **NDT Procedure Revision** window.

#### **3.11.3 Add Revision for NDT Procedure** 

Once you have added the NDT procedure details, you can add revision for the added NDT procedures. You can add multiple revisions for one NDT procedure. To add revision,

1. Click[![image-1651135631723.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651135631723.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651135631723.png)(Revision icon) of the respective NDT procedure.
    
    A new window opens with the details of existing NDT procedure.
    
    [![image-1651135665658.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651135665658.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651135665658.png)
2. Click **Save**.
    
    The revision for the selected NDT procedure is added.

#### **3.11.4 View an NDT Procedure Report**

If you want to view an NDT procedure report, click[![image-1651135739577.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651135739577.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651135739577.png) (print icon) provided in the **Print** column of the **NDT Procedure** page. See Fig 3.11.

#### **3.11.5 Attach a File into an NDT Procedure**

If you want to attach any file with a NDT procedure listed in the **NDT Procedure** page, you can attach the file by using [![image-1651135785176.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651135785176.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651135785176.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.


### **3.12 WPS in Project**

WPS is a written instruction that specifies materials, consumables and edge preparations for a given joint. The WPS lists the pre- and post-weld operations including heat treatments; machining, grinding, and dressing of the weld.

The **WPS in Project** tab in the **Project Data** menu helps you to add a WPS report and assign the WPS to a project.

1. Click ****WPS in Project**** tab in the ******Project Data****** menu. The WPS by projects page opens with two fields such as **WPS Summary** and **Assign WPS to Project**.
    
    [![image-1651135904499.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651135904499.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651135904499.png)
    
     **Figure 3.12: WPS in projects page**

#### **3.12.1 Add a WPS Summary Report**

If you want to add a new WPS summary report, do the following,

1. Click [![image-1651136003602.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136003602.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136003602.png) (**ADD** button) in the **WPS Summary** field. See Fig 3.12.
    
    A new window opens to add a WPS report.
    
    [![image-1651136040774.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136040774.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136040774.png)
    
    [![image-1651136053842.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136053842.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136053842.png)**Tip**: A report number for a new WPS report will be updated automatically in the **Report Number** box. If you want to change the report number, you can change.
2. In the ****Prepared By**** box, enter the name of a person who has prepared the WPS report.
3. In the ****Reviewed By**** box, enter the name of a person who has reviewed the WPS report.
4. In the ****Approved By**** box, enter the name of a person who has approved the WPS report.
5. In the ****Prepared Date**** box, choose the prepared date of the WPS report.
6. In the ****Reviewed Date**** box, choose the reviewed date of the WPS report.
7. In the ****Approved Date**** box, choose the approved date of the WPS report.
8. Click ****Save****. The WPS summary report is successfully added.

#### **3.12.2 View a WPS Summary Report**

If you want to view a WPS summary report, click (Print icon) provided in the **WPS Summary Report** column.

#### **3.12.3 View a WPS Summary Report with PQR**

If you want to view a WPS summary report with PQR, click (Print icon) provided in the **WPS Summary with PQR** column.

#### **3.12.4 Attach a File into a WPS Summary Report**

If you want to attach any file with any WPS summary report listed in the **WPS Summary** page, you can use [![image-1651136319442.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136319442.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136319442.png) (Attach icon) provided in the **Attachment** column for the respective WPS summary report. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **3.12.5 Export WPS Summary Reports List**

You can export a list of added WPS reports in the pdf and excel formats by using [![image-1651136377809.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136377809.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136377809.png) (**PDF** button) and [![image-1651136397341.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136397341.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136397341.png) (**Excel** button). To know how to export, see the topic, “[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **3.12.6 Assign a WPS to a Project**

The **Assign WPS to Project** field in the **WPS in projects** page allows you to assign the WPS to the project. If you want to assign any WPS to the project, do the following,

[![image-1651136449870.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136449870.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136449870.png)

In the **Assign WPS to Project** field, the **All WPS** box displays a list of available WPS. The **WPS in Project** box displays a list of WPS that has been already assigned for the project.

1. If you want to assign any WPS for the project, select the respective WPS in the ****ALL WPS**** box, and then click [![image-1651136506476.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136506476.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136506476.png) (Assign welder button). The selected WPS will be assigned to the project.
2. If you want to reject any WPS that has been assigned for the project, select the respective WPS in the ****WPS in Project**** box, and then click [![image-1651136568689.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136568689.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136568689.png) (Reject welder button).


### **3.13 Welders in Projects**

The **Welders in Projects** tab in the **Project Data** menu helps you to assign welders for a project. You can add a welder report by using this tab. This tab also helps you to view a welder list and WPQ details.

1. Click **Welders in Projects** tab in **Project Data** menu.
    
    The welders in projects page opens with four fields such as **Welder Report**, **Assign Welder to Project**, **Welder List**, and **WPQ Details**.
    
    [![image-1651136663917.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136663917.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136663917.png)
    
     **Figure 3.13: Welders in project page**

#### **3.13.1 Add a Welder Report**

If you want to add a welder report, do the following steps,

1. Click [![image-1651136796065.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136796065.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136796065.png) (**ADD** button) in the **Welder Report** See Fig 3.13.
    
    A new window opens to add a welder report.
    
    [![image-1651136830683.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136830683.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136830683.png)
    
    [![image-1651136863440.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136863440.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136863440.png)**Tip**: A report number for a new welder report will be updated automatically in the **Report Number** box.
2. In the ****Prepared By**** box, enter the name of welder who has prepared the welder report.
3. In the ****Received By**** box, enter the name of welder who has received the welder report.
4. In the ****Approved By**** box, enter the name of welder who has approved the welder report.
5. In the ****Prepared Date**** box, choose the prepared date of the welder report.
6. In the ****Received Date**** box, choose the received date of the welder report.
7. In the ****Approved Date**** box, choose the approved date of the welder report.
8. Click ****Save****. The welder report is successfully added.

#### **3.13.2 View a Welder Report**

If you want to view a welder report, click[![image-1651137043660.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137043660.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137043660.png)(Print icon) provided in the **Report** column.

#### **3.13.3 Attach a File into a Welder Report**

If you want to attach any file with any welder report listed in the **Welder Report** window, you can use[![image-1651137111900.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137111900.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137111900.png) (Attach icon) provided in the **Attachment** column for the respective welder report. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **3.13.4 Export Welder Reports List**

You can export a list of welder reports in the **Welder Report** field in both the pdf and excel formats by using [![image-1651137177474.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137177474.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137177474.png) (**PDF** button) and [![image-1651137189912.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137189912.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137189912.png) (**Excel** button). To know how to export, see the topic, “[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **3.13.5 Assign a Welder to a Project**

The **Assign Welder to Project** field in the welders in projects page allows you to assign any welder to the particular project. If you want to assign any welder to the project, do the following,

[![image-1651137252547.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137252547.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137252547.png)

1. In the **All Welders** box, if you want to view all the welders, click **ALL** otherwise select the respective company’s welder group from a drop-down list to view their welders list.
    
    Once you have selected the company’s welder group, the left-side box shows a list of welders. The right-side box shows a list of welders who has been already assigned for the project.
2. If you want to assign any welder for the project, select the respective welder in the left-side box, and then click [![image-1651137423048.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137423048.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137423048.png)(Assign welder button).
    
    The selected welder will be assigned to the project.
3. If you want to reject any welder who has been assigned for the project, select the respective welder in the right-side box, and then click [![image-1651137530725.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137530725.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137530725.png) (Reject welder button).

#### **3.13.6 Welder List**

The **Welder List** field in the welders in projects page shows the welder details such as welder name, welder number, NRIC, date of birth, and nationality. This field also helps you to assign the WPQs of welders to the project, and remove any WPQs from the project.

[![image-1651137630980.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137630980.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137630980.png)

If you click[![image-1651137642763.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137642763.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137642763.png)(Expand Icon) of the respective welder, the **All WPQ** box shows the details of all WPQs of the welder, and the **Assigned to Project** box shows any WPQ that has been assigned to a project.

[![image-1651137711680.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137711680.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137711680.png)

1. If you want to assign any WPQ for the project, select the respective WPQ in the **All WPQ** box, and then click [![image-1651137746447.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137746447.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137746447.png)
    
    (Assign WPQ button).
    
    The selected welder will be assigned to the project.
2. If you want to reject any WPQ that has been assigned for the project, select the respective WPQ in the **Assigned to Project** box, and then click [![image-1651137824244.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137824244.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137824244.png) (Reject WPQ button).

#### **3.13.7 WPQ Details**

The **WPQ details** field in the welders in projects page shows the WPQ details of each welder including welder’s name, welder number, welding process name, weld metal thickness, position, and so on.

[![image-1651138342512.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138342512.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138342512.png)

If you want to take a print of any WPQ details, click the checkbox provided in the **Print** Column.



### **3.14 Inspectors in Projects**

The **Inspectors in Projects** tab in the **Project Data** menu helps you to map inspectors for the specific project.

1. Click the **Inspectors in Projects** tab.
    
    The **Project Mapping – Inspectors** page opens
    
    [![image-1651138418263.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138418263.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138418263.png)
    
     **Figure 3.14: Project Mapping – Inspectors page**
    
    The **Project Mapping – Inspectors** page shows a list of inspectors, which is added in the **Master Data**. If you want to map any inspectors for a specific project, do the following,
2. Select a project you want from the ****Projects**** box. A list of available inspectors will be displayed.
3. Select the check box of the respective inspector which you want to map for the selected project.
    
    [![image-1651138500653.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138500653.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138500653.png)
4. Click [![image-1651138511507.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138511507.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138511507.png) (Map icon).
    
    The selected inspectors are mapped for the selected project.
    
    [![image-1651138535910.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138535910.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138535910.png)
    
    The **Inspector List** window shows the inspector’s name, login name, NRIC, and Date of birth.


### **3.15 WPQ Search**

The **WPQ Search** tab in the **Project Data** menu used to filter the specific WPQ result. To perform the WPQ search,

1. Click ****WPQ Search**** in the ******Project Data****** menu. The **WPQ Search** page opens with the **WPQ Results** window.
    
    [![image-1651143779007.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651143779007.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651143779007.png)
    
     **Figure 3.15: WPQ Search page**
2. In the ****Welding Process**** box, select a welding process from the given welding processes.
3. In the ****Welder Name**** box, enter the name of a welder.
4. In the ****Backing**** box, enter the backing details.
5. In the **Weld Metal Thk Max. in mm** box, enter the minimum and maximum thickness of the weld metal.
6. Click [![image-1651143902806.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651143902806.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651143902806.png) (**Search** button).
    
    The **WPQ Results** window shows the WPQ details based on the given data.

#### **3.15.1 Export WPQ Results**

You can export the WPQ results in the **WPQ Results** window in both the pdf and excel formats by using [![image-1651144003140.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651144003140.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651144003140.png) (**PDF** button) and [![image-1651144016905.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651144016905.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651144016905.png) (**Excel** button). To know how to export, see the topic, “[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **3.15.2 Filter WPQ Results**

If you want to filter any WPQ in the **WPQ Results** page, you can use [![image-1651144066532.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651144066532.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651144066532.png) (**FILTER** button) provided on the **WPQ Results page. To know how to filter, see the topic, “[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **3.16 Bill of Material**

Bill of Material is a comprehensive inventory of the raw materials, assembles, sub assembles, parts and components, as well as the quantity of each, needed to the piping fabrication.

The **Bill of Material** tab in the **Project Data** menu used to add a new bill of material.

1. Click **Bill of Material** in the **Project Data** menu.
    
    The **Bill of Material** page opens.
    
    [![image-1651144225149.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651144225149.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651144225149.png)
    
     **Figure 3.16: Bill of Material page**

#### **3.16.1 Add a Bill of Material**

If you want to add a bill of material,

1. In the ****ISO/Drawing No**** box, select the ISO drawing number from a drop-down list.
2. In the ****Material Type**** box, select a material type from a drop-down list.
3. Click [![image-1651144312247.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651144312247.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651144312247.png) (**Add** button).
    
    A new window opens to add the material details.
    
    [![image-1651144342917.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651144342917.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651144342917.png)
4. In the ****Stock Code**** box, enter the stock code.
5. In the ****Quantity**** box, enter the quantity of the material.
6. In the ****Component Details**** box, enter the component details.
7. In the ****Remarks**** box, enter your remarks if any.
8. If the materials are need to be fabricated, enable the checkbox of the ****Required to fabricate**** option.
9. Click ****Submit****. The bill of material is added.


### **3.17 Spools Location – Masters**

The **Spools Location – Masters** tab in the **Project Data** menu used to add the details of the spool location.

1. Click ****Spools Location – Masters**** in the ******Project Data****** menu. The **Spools Location** page opens.
    
    [![image-1651144550068.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651144550068.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651144550068.png)
    
     **Figure 3.17: Spools Location page**

#### **3.17.1 Add a Spool Location**

If you want to add a spool location, do the following steps,

1. Click [![image-1651144642384.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651144642384.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651144642384.png) (**ADD** button) in the **Spools Location** page. See Fig 3.17.
    
    A new window opens to add a new spool location.
    
    [![image-1651144676899.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651144676899.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651144676899.png)
2. In the ****Location Name**** box, enter the location name.
3. In the ****Location Code**** box, enter the location code.
4. In the ****Remarks**** box, enter your remarks if any.
5. Click ****Save.****The spool location is successfully added.

#### **3.17.2 Edit a Spool Location**

If you want to edit any existing spool location detail in the **Spools Location** page,

1. Click [![image-1651144815771.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651144815771.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651144815771.png)(Edit icon)of the respective spool location. See Fig 3.17.
    
    The **Spools Location** page shows the details of the selected location.
2. Edit the details where you want.
3. Click ****Save****.

#### **3.17.3 Delete a Spool Location** 

If you want to delete any existing spool location in the **Spools Location** page, you can use [![image-1651144951947.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651144951947.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651144951947.png) (Delete icon). To know how to delete, see the topic, “[<u>Delete P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

#### **3.17.4 Export Spool Location List**

You can export a list of spool location added in the **Spools Location** page in both the pdf and excel formats by using [![image-1651145002894.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651145002894.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651145002894.png) (**PDF** button) and [![image-1651145022584.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651145022584.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651145022584.png) (**Excel** button). To know how to export, see the topic, “[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **3.17.5 Filter a Spool Location**

If you want to filter any spool location in the **Spools Location** page, you can use [![image-1651145078005.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651145078005.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651145078005.png) (**FILTER** button) provided on the **Spools Location** page. To know how to filter, see the topic, “[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **3.18 Workflow Settings**

The **Workflow Settings** tab in the **Project Data** menu used to set a workflow in the **Piping** project.

1. Click **Workflow Settings** in the **Project Data** menu.
    
    The **Workflow** page opens.
    
    [![image-1651145159460.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651145159460.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651145159460.png)
    
     **Figure 3.18: Workflow page**

#### **3.18.1 Add a Workflow**

If you want to add a workflow,

1. Click [![image-1651145239059.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651145239059.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651145239059.png) (**ADD** button) in the **Workflow**  See Fig 3.18.
    
    The page shows a new window to add the category.
    
    [![image-1651145280544.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651145280544.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651145280544.png)
2. In the **Category** box, select a category from a drop-down list.
3. Click ****Save****. The added category will be listed in the **Workflow** page. See Fig 3.18.
4. Click [![image-1651145382522.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651145382522.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651145382522.png) (Add icon) of the respective category.
    
    The **Workflow Details** window opens.
    
    [![image-1651145419157.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651145419157.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651145419157.png)
5. Click [![image-1651145471636.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651145471636.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651145471636.png) (**ADD** button) in the **Workflow Details** window.
    
    [![image-1651145484842.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651145484842.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651145484842.png)
6. In the ****Role Name**** box, select a role name from a drop-down list.
7. In the ****Description**** box, enter the description for the role name.
8. Click ****Save****.

#### **3.18.2 Edit a Workflow**

If you want to edit any existing workflow in the **Workflow** page,

1. Click [![image-1651145609219.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651145609219.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651145609219.png)(Edit icon) of the respective workflow. See Fig 3.18.
    
    The **Workflow** page shows the details of the selected workflow.
2. Edit the details where you want.
3. Click ****Save****.

#### **3.18.3 Delete a Workflow**

If you want to delete any existing workflow in the **Workflow** page, you can use [![image-1651145702845.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651145702845.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651145702845.png) (Delete icon) provided in the **Workflow** page. To know how to delete, see the topic, “[**<u>Delete P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

#### **3.18.4 Export Workflow List**

You can export a list of workflows added in the **Workflow** page in both the pdf and excel formats by using [![image-1651145783334.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651145783334.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651145783334.png) (**PDF** button) and (**Excel** button). To know how to export, see the topic, **“**[<u>**Export P&amp;ID list**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **3.18.5 Filter a Workflow** 

If you want to filter any specific workflow, you can use [![image-1651145835186.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651145835186.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651145835186.png) (**FILTER** button) located on the **Workflow** page. To know how to filter, see the topic, **“**[<u>**Filter** **P&amp;ID**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **3.19 Inspection Requirements**

The **Inspection Requirements** tab in the **Project Data** menu used to add the requirement details for the inspection.

1. Click ****Inspection Requirements**** in the ******Project Data****** menu. The **Inspection Requirements** page opens.
    
    [![image-1651145927701.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651145927701.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651145927701.png)
    
     **Figure 3.19: Inspection Requirements page**

#### **3.19.1 Add an Inspection Requirement**

If you want to add an inspection requirement, do the following steps,

1. Click **Add Inspection Requirement**.
    
    The **Add New Inspection Requirement** window opens.
    
    [![image-1651146039326.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651146039326.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651146039326.png)
2. In the Inspection Type box, select an inspection type.
3. If you want to add the system detail, select the ****System**** option and choose a system from a drop-down list.
4. If you want to add the line number detail, select the ****Line Number**** option and choose a line number from a drop-down list.
5. In the ****Requirement**** box, enter the inspection requirement percentage.
6. In the ****Pressure Rating From**** and ****To**** box, enter the pressure rating range.
7. Click ****Create****. The inspection requirement details will be added and listed in the **Inspection Requirements** page.

#### **3.19.2 Edit an Inspection Requirement**

If you want to edit any added inspection requirement details,

1. Click[![image-1651146387262.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651146387262.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651146387262.png)(Edit icon) of the respective inspection requirement. See Fig 3.19.
    
    The added inspection requirement details open.
2. Edit the details where you want.
3. Click **Save**.


#### **3.19.3 Delete an Inspection Requirement**

If you want to delete any existing inspection requirement, you can use [![image-1651146563620.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651146563620.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651146563620.png) (Delete icon). To know how to delete, see the topic, “[**<u>Delete P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.


### **3.20 Template Check Sheets**

The **Template** **Check Sheets** tab in the **Project Data** menu helps you to add MC/SC – Check Record (CR)/Check Sheet (CS) templates. To navigate to the templates adding page,

1. Click ****Template**** ****Check Sheets**** in the ****Project Data**** menu. The **MC/SC – CR/CS Templates** page opens.
    
    [![image-1651146667275.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651146667275.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651146667275.png)
    
     **Figure 3.20: MC/SC – CR/CS Templates page**

#### **3.20.1 Add a CR/CS Template**

If you want to add a CR/CS template,

1. Click [![image-1651146753744.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651146753744.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651146753744.png) (**ADD** button) in the **MC/SC – CR/CS Templates** page. See Fig 3.20.
    
    The page opens a new window to add the details of a template.
    
    [![image-1651146797365.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651146797365.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651146797365.png)
    
    [![image-1651146807542.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651146807542.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651146807542.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.
2. In the ****CR/CS Name**** box, enter the name for CR/CS.
3. In the ****Template Type**** box, select a template whether CR or CS.
4. In the ****Description**** box, enter the description for CR/CS.
5. Click ****Save****. The template is successfully added and listed in the **MC/SC – CR/CS Templates** page. Once you have added the template details, you must import the respective template.

#### **3.20.2 Import a CR/CS Template**

If you want to import CR/CS template,

1. Click [![image-1651146963355.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651146963355.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651146963355.png)(Add icon) of the respective CR/CS name in the ****MC/SC – CR/CS Templates**** page.
    
    The **Check Records** window opens.
2. Click [![image-1651147006091.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147006091.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147006091.png) (**ADD** button) in the **Check Records**
    
    [![image-1651147035140.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147035140.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147035140.png)
3. In ****Items**** box, enter the details of items.
4. Browse and attach a CS/CR template you want to import.
5. Click ****Save****.

#### **3.20.3 Edit a CR/CS Template**

If you want to edit any added CR/CS template in the **MC/SC – CR/CS Templates** page,

1. Click[![image-1651147161197.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147161197.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147161197.png)(Edit icon) of the respective CR/CS template. See Fig 3.20
    
    The **MC/SC – CR/CS Templates** page shows the details of the selected CR/CS template.
2. Edit the details where you want.
3. Click **Save**.

#### **3.20.4 Delete a CR/CS Template**

If you want to delete any existing CR/CS template in the **MC/SC – CR/CS Templates** page, you can use [![image-1651147369017.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147369017.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147369017.png) (Delete icon) provided in the **MC/SC – CR/CS Templates** page. To know how to delete, see the topic, “[<u>**Delete P&amp;ID**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

#### **3.20.5 Export CR/CS Template list**

You can export a list of CR/CS templates added in the **MC/SC – CR/CS Templates** page in both the pdf and excel formats by using [![image-1651147415718.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147415718.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147415718.png) (**PDF** button) and [![image-1651147459655.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147459655.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147459655.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **3.20.6 Filter a CR/CS Template**

If you want to filter any specific CR/CS template in the **MC/SC – CR/CS Templates page, you can use [![image-1651147526981.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147526981.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147526981.png) (**FILTER** button) located on the **MC/SC – CR/CS Templates** page. To know how to filter, see the topic, “**[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)**”.

#### **3.20.7 Import Multiple CR/CS Templates**

If you want to import multiple CR/CS templates together, do the following,

1. Click [![image-1651147608905.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147608905.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147608905.png) (**TEMPLATE** button). See Fig 3.20.
    
    An excel worksheet will be downloaded with a predefined template to enter the details of CR/CS templates.
    
    [![image-1651147662917.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147662917.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147662917.png)
2. Enter the required CR/CS template details in the respective columns of the excel worksheet.
3. Once you have added the CR/CS template details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651147694510.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147694510.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147694510.png) (**IMPORT** button). See Fig 3.20.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651147759788.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147759788.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147759788.png)
5. Click [![image-1651147779396.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147779396.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147779396.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651147820331.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147820331.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147820331.png) (**Upload** button) to export the CR/CS template details that are included in the excel worksheet.

The details of the CR/CS templates in the worksheet will be displayed in the **MC/SC – CR/CS Templates page.


### **3.21 Certificate Template Check Sheets**

The **Certificate Template Check Sheets** tab in the **Project Data** menu used to add the details included in a certificate.

1. Click **Certificate Template Check Sheets** in the **Project Data.**
    
    The **Certificates** page opens.
    
    [![image-1651147963784.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147963784.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147963784.png)
    
     **Figure 3.21: Certificates page**

#### **3.21.1 Add a Certificate** 

If you want to add a certificate,

1. Click [![image-1651148035060.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651148035060.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651148035060.png) (**ADD** button) in the **Certificates**  See Fig 3.21.
    
    The page opens a new window to add the details of a certificate.
    
    [![image-1651148072326.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651148072326.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651148072326.png)
    
    [![image-1651148083309.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651148083309.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651148083309.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.
2. In the ****Certificate**** box, enter the name of the certificate.
3. In the ****Status**** box, select the status of the certificate.
4. In the ****Certificate Type**** box, enter the description for CR/CS.
5. In the ****Certificate Created Date**** box, select the created date of the certificate.
6. In the ****Sign off Date**** box, select the sign off date of the certificate.
7. Click ****Save****.

The certificate is successfully added and listed in the **Certificates** page. Once you have added the certificate details, you must import the respective certificate.

#### **3.21.2 Import a Certificate**

If you want to import a copy of the certificate,

1. Click [![image-1651148215594.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651148215594.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651148215594.png)(Import icon) of the respective certificate in the **Certificates** page.
2. Attach the copy of the certificate.

#### **3.21.3 Edit a Certificate**

If you want to edit any added certificate in the **Certificates** page,

1. Click[![image-1651148296607.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651148296607.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651148296607.png)(Edit icon) of the respective certificate. See Fig 3.21.
    
    The **Certificates** page shows the details of the selected certificate.
2. Edit the details where you want.
3. Click **Save**.

#### **3.21.4 Delete a Certificate**

If you want to delete any existing certificate in the **Certificates** page, you can use [![image-1651148377279.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651148377279.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651148377279.png) (Delete icon) provided in the **Certificates** page. To know how to delete, see the topic, “**[<u>Delete P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)**”.

#### **3.21.5 Export Certificate list**

You can export a list of certificates added in the **Certificates** page in both the pdf and excel formats by using [![image-1651148446776.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651148446776.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651148446776.png) (**PDF** button) and [![image-1651148459859.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651148459859.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651148459859.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **3.21.6 Filter a Certificate**

If you want to filter any specific certificate in the **Certificates** page, you can use [![image-1651148572959.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651148572959.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651148572959.png) (**FILTER** button) located on the **Certificates** page. To know how to filter, see the topic, “**[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)**”.

#### **3.21.7 Import Multiple Certificates** 

If you want to import multiple certificates together, do the following,

1. Click [![image-1651148641776.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651148641776.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651148641776.png) (**TEMPLATE** button). See Fig 3.21.
    
    An excel worksheet will be downloaded with a predefined template to enter the details of certificates.
2. Enter the required certificate details in the respective columns of the excel worksheet.
3. Once you have added the certificate details in the excel worksheet, save the excel worksheet on your computer.
4. Click[ ![image-1651148711944.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651148711944.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651148711944.png) (**IMPORT** button). See Fig 3.21.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651148762119.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651148762119.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651148762119.png)
5. Click [![image-1651148782202.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651148782202.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651148782202.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651148808859.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651148808859.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651148808859.png) (**Upload** button) to export the certificate details that are included in the excel worksheet.

The details of the certificates in the worksheet will be displayed in the **Certificates** page.


### **3.22 Welder Qualification Test Coupon**

The **Welder Qualification Test Coupon** tab in the **Project Data** menu used to add the welder qualification test coupon details.

If you want to add a welder qualification test coupon, do the following steps,

1. Click **Welder Qualification Test Coupon** in the **Project Data** menu.
    
    The **Welder Qualification Test Coupon** page opens.
    
    [![image-1651149235081.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651149235081.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651149235081.png)
    
     **Figure 3.22: Welder Qualification Test Coupon** **page**

#### **3.22.1 Add a Welder Qualification Test Coupon** 

If you want to add a welder qualification test coupon report,

1. Click [![image-1651149752001.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651149752001.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651149752001.png) (**ADD** button) in the **Welder Qualification Test Coupon** page. See Fig 3.22.
    
    A new window opens to add the welder qualification test coupon.
    
    [![image-1651149927306.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651149927306.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651149927306.png)
    
    [![image-1651149937676.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651149937676.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651149937676.png)**Tip**: A report number for a new welder qualification test coupon will be updated automatically in the **Report Number** box.
2. In the ****Test Date**** box, select the welder qualification test date.
3. In the ****Work Order**** box, enter the work order name.
4. Click **Save**.

The welder qualification test coupon will be added and listed in the **Welder Qualification Test Coupon.**

#### **3.22.2 Add Welder Qualification Test Coupon Details**

To add the welder qualification test coupon details,

1. Click[![image-1651150112351.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651150112351.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651150112351.png)(Add icon) of the respective test coupon. See Fig 3.22.
    
    The **WQTC Details** window opens.
    
    [![image-1651150153475.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651150153475.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651150153475.png)
2. Click [![image-1651150165836.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651150165836.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651150165836.png) (**ADD** button) in the **WQTC Details** window.
    
    A new window opens to enter the WQTC details.
    
    [![image-1651150217300.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651150217300.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651150217300.png)
3. In the **Welder Name** box, enter the welder name.
4. In the **Position** box, enter the position detail.
5. In the ****Welder No**** box, enter the welder number.
6. In the ****RT Report No**** box, enter the RT report number.
7. In the ****Work Permit**** box, enter the work permit detail.
8. In the ****Remarks**** box, enter your remarks if any.
9. In the ****FIN No**** box, enter the FIN number.
10. In the ****Department**** box, enter the department name.
11. In the ****Weld Type**** box, enter the welding type.
12. In the ****Process**** box, select the welding process.
13. In the ****Size**** box, enter the welding size.
14. In the ****Visual Result**** box, select the visual result.
15. In the ****Thickness**** box, enter the thickness of the welding.
16. In the **RT Result** box, select the RT result.
17. Click ****Save****.

#### **3.22.3 View a Welder Qualification Test Coupon Report**

To view a welder qualification test coupon report, click[![image-1651150484253.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651150484253.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651150484253.png)(Print icon) of the respective test coupon, which is provided in the **Report** column of the **Welder Qualification Test Coupon** page.

#### **3.22.4 Approve a Welder Qualification Test Coupon**

Once you have added the welder qualification test coupon details, you must approve the test coupon. To approve the test coupon,

1. Click [![image-1651154796800.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651154796800.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651154796800.png)(Submit icon) in the **Action** column.


#### **3.33.5 Export Welder Qualification Test Coupon List**

You can export a list of test coupons added in the **Welder Qualification Test Coupon** page in both the pdf and excel formats by using [![image-1651154857721.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651154857721.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651154857721.png) (**PDF** button) and [![image-1651154870961.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651154870961.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651154870961.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **3.33.6 Filter a Welder Qualification Test Coupon**

If you want to filter any specific test coupon in the **Welder Qualification Test Coupon** page, you can use [![image-1651154913038.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651154913038.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651154913038.png)(**FILTER** button) located on the page. To know how to filter, see the topic, “**[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)**”.


### **3.23 Valve List** 

The **Valve List** tab in the **Project Data** menu helps you add the valve details.

If you want to navigate to **Valve List,**

1. Click **Valve List** in the **Project Data** menu.
    
    The **Valve List** page opens.
    
    [![image-1651155000830.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651155000830.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651155000830.png)
    
     **Figure 3.23: Valve List page**


#### **3.23.1 Add a Valve**

If you want to add a new valve, do the following steps,

1. Click [![image-1651155090763.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651155090763.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651155090763.png) (**ADD** button) in the **Valve List** page. See Fig 3.23.
    
    A new window opens to add a new valve.
    
    [![image-1651155128670.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651155128670.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651155128670.png)
    
    [![image-1651155136829.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651155136829.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651155136829.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the ****Tag Number**** box, select the tag number of the valve.
3. In the ****Description**** box, enter the description for the valve.
4. In the ****Function**** box, enter the function name.
5. In the ****Sequence Number**** box, enter the sequence number of the valve.
6. In the ****Site Number**** box, enter the site number.
7. In the ****System**** box, select a system.
8. In the ****Area**** box****,**** enter the area name.
9. In the ****Location**** box, enter the location name.
10. In the ****PID**** box, enter the PID number.
11. In the ****Vendor PID**** box, enter the vendor PID number.
12. In the ****Layout**** box, enter the layout detail.
13. In the ****Parent tag**** box, enter the parent tag number.
14. In the ****Parent type**** box, enter the parent type.
15. In the ****Skid Number**** box, enter the skid number.
16. In the ****PO Number**** box, enter the PO number.
17. In the ****Manufacturer**** box, enter the manufacturer name.
18. In the ****Supplier**** box, enter the supplier name.
19. In the ****Model Number**** box, enter the model number of the valve.
20. In the ****Data Sheet**** box, enter the data sheet detail.
21. In the ****Procurement Status**** box, enter the procurement status detail.
22. In the ****Remarks**** box, enter your remarks if any.
23. Click ****Save.****The valve is successfully added.


#### **3.23.2 Clone a Valve**

The **Clone** option provided in the **Valve List** page used to add a new valve from previously added valve. If a valve to be added is having the same specifications of any valve already listed in the **Valve List** page, you can add the new valve by using [![image-1651155451936.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651155451936.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651155451936.png)(Clone icon).

1. In the **Valve List** page, find out the valve you want to clone.
2. Click [![image-1651155492842.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651155492842.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651155492842.png)(Clone icon) of the respective valve.
    
    The **Valve List** page shows the details of selected valve. See the below figure.
    
    [![image-1651155520510.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651155520510.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651155520510.png)
3. If you want to change any details, you can change in the respective boxes.
4. Click ****Save****. The new valve is successfully added and listed in the **Valve List** page.


#### **3.23.3 Edit a Valve**

If you want to edit any existing valve in the **Valve List** page,

1. Click [![image-1651155657115.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651155657115.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651155657115.png)(Edit icon) of the respective valve. See Fig 3.23.
    
    The **Valve List** page shows the details of the selected valve.
2. Edit the details where you want.
3. Click ****Save****.



#### **3.23.4 Delete a Valve**

If you want to delete any existing valve in the **Valve List** page, you can use [![image-1651155721171.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651155721171.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651155721171.png) (Delete icon) provided in the **Valve List** page. To know how to delete, see the topic, “**[<u>Delete P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)**”.


#### **3.23.5 Export Valve List**

You can export a list of valves added in the **Valve List** page in both the pdf and excel formats by using [![image-1651155777359.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651155777359.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651155777359.png) (**PDF** button) and [![image-1651155792745.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651155792745.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651155792745.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.


#### **3.23.6 Filter a Valve**

If you want to filter any valve in the **Valve List** page, you can use [![image-1651155842391.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651155842391.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651155842391.png) (**FILTER** button) provided on the **Valve List** page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


#### **3.23.7 Import Multiple Valves**

If you want to import multiple valves together, do the following,

1. Click [![image-1651155907259.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651155907259.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651155907259.png) (**TEMPLATE** button). See Fig 3.23.
    
    An excel worksheet will be downloaded with a predefined template to enter the details of joints.
2. Enter the required valve details in the respective columns of the excel worksheet.
3. Once you have added the valve details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651155991999.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651155991999.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651155991999.png) (****IMPORT**** button). See Fig 3.23.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651156015904.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651156015904.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651156015904.png)
5. Click [![image-1651156045571.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651156045571.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651156045571.png) (****Browse**** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651156067415.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651156067415.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651156067415.png) (**Upload** button)to export the valve details that are added in the excel worksheet.

The details of the valves in the worksheet will be displayed in the **Valve List** page.



### **3.24 Special Component** 

The **Special Component** tab in the **Project Data** menu used to add any special component to be used in the Piping project.

To add the details of special component, follow the same procedure given in the topic, “[**<u>Valve List</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.23%C2%A0valve-list%C2%A0)”.

# Materials

### **4.0 Materials**

The **Materials** menu in the home page of the ***cuteQM*** app used to add the material details such as material certificates, material inspection details, material import details, and material summary and traceability record. Once you click the **Materials** menu, the following tabs open,

[![image-1651160222152.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651160222152.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651160222152.png)

The **Materials** menu appears with four options such as **Material Certificates, Material Import, Material Inspection,** and **Reports**.

- The ****Material Certificates**** option helps you to add certificates details of the materials to be in the piping project.
- The ****Material Import**** option helps you to add the bulk materials.
- The ****Material Inspection**** option helps you to add material receiving and inspection report, and material summary by heat number.
- The **Reports** option used to add material traceability record.

### **4.1 Material Certificates**

Material certificate (Mill certificate) is a certificate document used to certify that the product is produced by manufacturing standards of the mill. The material certificate contains the following information: component name, manufacturer name, certification ID, component dimension and heat numbers. Once you have received the materials from the manufacturer, you must enter the details of material certificates.

The **Mill Certificates** tab used to add the received material certificate details. If you want to add material certificate details, do the following,

1. Click ****Material Certificates**** in the ****Materials**  menu. The **Mill Certificates** page opens.
    
    [![image-1651160657192.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651160657192.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651160657192.png)
    
     **Figure 4.1: Mill Certificates page**

#### **4.1.1 Add a Material Certificate**

If you want to add a material certificate, do the following,

1. Click [![image-1651160868230.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651160868230.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651160868230.png) (****ADD**** button) in the ****Mill Certificates****  See Fig 4.1.
    
    A new window opens to add a material certificate.
    
    [![image-1651160894268.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651160894268.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651160894268.png)
    
    [![image-1651160928288.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651160928288.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651160928288.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.
2. In the ****Component**** box, select the received component from a drop-down list.
3. In the ****Certification**** box, enter the certification number of the component.
4. In the ****Manufacturer**** box, enter the name of the manufacturer.
5. In the ****Mill Certificate Date**** box, choose the mill certificate date.
6. In the ****Delivery Order (DO) Number**** box, enter the delivery order number of the component.
7. In the **Purchase Order (PO)** Number box, enter the purchase order number of the component.
8. In the ****Size**** box, select the size of the received component.
9. In the ****Thickness**** box, select the thickness of the received component.
10. In the ****Class**** box, enter the class of the received component.
11. In the ****Material**** box, select the type of material where the component is made from.
12. In the ****Rating**** box, enter the rating of the component.
13. In the ****Expiry Date**** box, choose the expiry date of the component.
14. Click **Save**.

The material certificate is successfully added. Once you have added the mill certificate, you must add heat numbers for the added component.

#### **4.1.2 Add Heat Numbers of Material**

If you want to add heat numbers, do the following steps,

1. Click[![image-1651161203160.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651161203160.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651161203160.png) (Add icon) of the respective mill certificate.
    
    The **Heat Numbers** box opens.
    
    [![image-1651161228682.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651161228682.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651161228682.png)
    
     **Figure 4.1.1: Heat Numbers page**
2. Click [![image-1651161449804.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651161449804.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651161449804.png) (****ADD**** button) in the ****Heat Numbers**** box.
    
    A new window opens to add the heat number.
    
    [![image-1651161480411.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651161480411.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651161480411.png)
3. In the **planned Project** box, select a project you want from a drop-down list.
4. In the ****Heat Number**** box, enter the heat number.
5. In the ****Remarks**** box, enter your remarks if any.
6. Click ****Save****. The heat number is successfully added for the specific component.
    
    [![image-1651161542724.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651161542724.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651161542724.png)**Note**: You can edit and delete the added heat numbers by using the respective [![image-1651161565571.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651161565571.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651161565571.png)(Edit icon) and [![image-1651161576340.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651161576340.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651161576340.png) (Delete icon).

#### **4.1.3 Edit a Mill Certificate**

 If you want to edit any existing mill certificate in the **Mill Certificates** page, do the following,

1. Click [![image-1651161643799.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651161643799.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651161643799.png)(Edit icon) in the ****Edit**** column for the respective mill certificate. See Fig 4.1.
    
    A new window opens including the added mill certificate details.
    
    [![image-1651161683734.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651161683734.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651161683734.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **4.1.4 Delete a Mill Certificate**

If you want to delete any existing mill certificate in the **Mill Certificates** page, you can use (Delete icon) provided in the **Mill Certificates** page. To know how to delete, see the topic, “**[<u>Delete P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)**”.

#### **4.1.5 Export Mill Certificates List**

You can export a list of mill certificates added in the **Mill Certificates** page in both the pdf and excel formats by using [![image-1651161797978.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651161797978.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651161797978.png) (**PDF** button) and [![image-1651161814673.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651161814673.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651161814673.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **4.1.6 Filter a Mill Certificate**

If you want to filter any specific mill certificate in the **Mill Certificates** page,

- you can use the filter box [![image-1651161878235.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651161878235.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651161878235.png)
    
     provided in the upper side of the ****Mill Certificates**** To filter the mill certificate, enter the certification or heat number in the box and click ****Search****.
- you can also use [![image-1651161906470.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651161906470.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651161906470.png) (**FILTER** button) located on the **Mill Certificates  To know how to filter using the **Filter** button, see the topic, “**[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)**”.

#### **4.1.7 Import Multiple Mill Certificates**

If you want to import multiple mill certificates together, do the following,

1. Click [![image-1651161989979.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651161989979.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651161989979.png) (**TEMPLATE** button) on the **Mill Certificates** See Fig 4.1
    
    A template will be downloaded as an excel worksheet with a pre-defined template to enter the details of multiple mill certificates.
    
    [![image-1651162060142.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162060142.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162060142.png)
2. Enter the relevant details in the required columns on the excel worksheet.
3. Once you have added the mill certificates details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651162107209.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162107209.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162107209.png) (**IMPORT** button). See Fig 4.1.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651162134967.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162134967.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162134967.png)
5. Click [![image-1651162144397.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162144397.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162144397.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651162180854.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162180854.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162180854.png) (**Upload** button) to export the mill certificates that are included in the excel worksheet.
    
    The details of the mill certificates in the worksheet will be displayed in the **Mill Certificates** page.

#### **4.1.8 Attach a File into a Mill Certificate**

If you want to attach any file with a mill certificate listed in the **Mill Certificates** page, you can attach the file by using [![image-1651162256071.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162256071.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162256071.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

### **4.2 Test Equipments**

The **Test Equipments** tab in the **Materials** menu used to add the details of a test equipment to be used in the piping project. To add a test equipment,

1. Click ****Test Equipments**** in the ****Materials**  menu. The **Testing Equipments** page opens.
    
    [![image-1651162347946.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162347946.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162347946.png)
    
     **Figure 4.2: Testing Equipments page**

#### **4.2.1 Add a Test Equipment**

If you want to add a test equipment, do the following steps,

1. Click [![image-1651162410824.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162410824.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162410824.png) (**ADD** button) in the **Testing Equipments**  See Fig 4.2.
    
    A new window opens to add a test equipment.
    
    [![image-1651162460513.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162460513.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162460513.png)
    
    [![image-1651162503766.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162503766.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162503766.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.
2. In the **Category** box, enter the category of the test equipment.
3. In the ****Test Equipment**** box, enter the name of the test equipment.
4. In the ****Manufacturer**** box, enter the name of the manufacturer.
5. In the ****Asset Tag Number**** box, enter the asset tag number of the test equipment.
6. In the ****Serial Number**** box, enter the serial number of the test equipment.
7. In the ****Recommended Range**** box, enter the recommended range of test equipment.
8. In the ****Range**** box, enter the actual range of test equipment.
9. In the ****Least Count**** box, enter the least count of the test equipment.
10. In the ****Purpose**** box, enter the purpose of the test equipment.
11. In the **Calibration Frequency (in Months)** box, the calibration frequency duration will be updated automatically. If you want to change the duration you can change.
12. In the ****Alert Frequency****(in Days)**** box, the alert frequency duration will be updated automatically. If you want to change the duration you can change.
13. In the ****Acceptance Criteria**** box, enter the acceptance criteria.
14. In the ****Remarks**** box, enter your remarks if any.
15. In the ****Status**** box, select the status of the test equipment.
16. In the ****Location of Equipment**** box, enter the equipment location detail.
17. In the ****Description**** box, enter the description for the test equipment.
18. Click ****Save****. The test equipment is successfully saved.

#### **4.2.2 Update Calibration Details** 

Once you have added the test equipment, you must add the details of calibration, where the calibration is comparison between a standard measurement and the measurement using the test equipment. To add the calibration details,

1. Click [![image-1651162784258.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162784258.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162784258.png) (Add icon) of the respective test equipment.
    
    The **Calibration** window opens.
    
    [![image-1651162805576.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162805576.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162805576.png)
2. Click [![image-1651162823753.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162823753.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162823753.png) (**ADD** button) in the **Calibration** window.
    
    A new window opens to add the calibration details.
    
    [![image-1651162855335.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162855335.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162855335.png)
3. In the **Calibration Report Number** box, enter the calibration report number.
4. In the **Calibration Date** box, select the calibration date.
5. In the ****Calibration**** By box, enter the name of a person who has calculated the calibration.
6. In the ****Calibration Due Date**** box, select the due date of calibration.
7. In the **Preparation By** box, enter the name of a person who has prepared the calibration report.
8. In the ****Approved By**** box, enter the name of a person who has approved the calibration report.
9. Click ****Update****. The calibration details will be updated.
10. If you want to add additional data, click **Additional Data** option in the **Calibration** window.
    
    The **Additional Parameter** window opens.
    
    [![image-1651162953831.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162953831.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162953831.png)
    
    
    1. 1. Click [![image-1651162985360.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162985360.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162985360.png) (**ADD** button) in the **Additional Parameter**
        2. In the ****Nominal Value**** column, enter the nominal value.
        3. In the ****Measured Value**** column, enter the measured value.
        4. Click ****Save Changes****.
11. If you want to add pressure data, click **Pressure Data** option in the **Calibration** window.
    
    The **Pressure Recorder Data** window opens.
    
    [![image-1651163042694.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163042694.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163042694.png)
    
    
    1. 1. In the ****Additional Recorder Data**** field, enter the details of additional recorder data.
        2. Click [![image-1651163069039.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163069039.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163069039.png) (**ADD** button) in the **Pressure Recorder Data** window.
        3. In the ****Input**** and ****Output**** columns, enter the input and output values.
        4. In the ****Error**** column, enter the error value.
        5. Click **Save Changes**.
12. If you want to add temperature data, click ****Temperature Data**** option in the ******Calibration****** window. The **Temperature Recorder Data** window opens.
    
    [![image-1651163190830.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163190830.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163190830.png)
    
    
    1. 1. In the ****Additional Recorder Data**** field, enter the details of additional recorder data.
        2. Click [![image-1651163229408.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163229408.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163229408.png) (**ADD** button) in the **Temperature Recorder Data** window.
        3. In the ****0 Degrees C**** column, enter the calibration value at 0 degree.
        4. In the ****Ambient**** column, enter the ambience value.
        5. In the 4****0 Degrees C**** column, enter the calibration value at 40 degree.
        6. Click ****Save Changes****.

#### **4.2.3 Edit a Test Equipment**

If you want to edit any existing test equipment in the **Testing Equipments** page,

1. Click [![image-1651163343682.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163343682.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163343682.png) (Edit icon) of the respective test equipment. See Fig 4.2.
    
    The **Testing Equipment** page shows the details of the selected test equipment.
2. Edit the details where you want.
3. Click **Save**.

#### **4.2.4 Delete a Test Equipment**

If you want to delete any existing test equipment in the **Testing Equipment** page, you can use [![image-1651163416136.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163416136.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163416136.png) (Delete icon) provided in the **Testing Equipment** page. To know how to delete, see the topic, “[**<u>Delete P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

#### **4.2.5 Export Test Equipment list**

You can export a list of test equipments added in the **Test Equipment** page in both the pdf and excel formats by using [![image-1651163465862.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163465862.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163465862.png) (**PDF** button) and [![image-1651163476334.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163476334.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163476334.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **4.2.6 Filter a Test Equipment**

If you want to filter any specific test equipment in the **Testing Equipment** page,

1. you can use the category wise filter box [![image-1651163518308.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163518308.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163518308.png) provided in the upper side of the **Testing Equipment**  To filter the testing equipment, select the category from the drop-down list.
2. you can also use [![image-1651163568393.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163568393.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163568393.png) (**FILTER** button) located on the **Testing Equipment  To know how to filter using the **Filter** button, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

#### **4.2.7 Import Multiple Test Equipments**

If you want to import multiple test equipments together, do the following,

1. Click [![image-1651163686212.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163686212.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163686212.png) (**TEMPLATE** button). See Fig 4.2.
    
    An excel worksheet will be downloaded with a predefined template to enter the details of test equipments.
    
    [![image-1651163714989.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163714989.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163714989.png)
2. Enter the required test equipment details in the respective columns of the excel worksheet.
3. Once you have added the test equipment details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651163752394.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163752394.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163752394.png) (**IMPORT** button). See Fig 4.2.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651163782872.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163782872.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163782872.png)
5. Click [![image-1651163789045.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163789045.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163789045.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651163813900.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163813900.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163813900.png) (**Upload** button) to export the test equipment details that are included in the excel worksheet.
    
    The details of the test equipments in the worksheet will be displayed in the **Testing Equipment** page.

#### **4.2.8 Attach a File into a Test Equipment**

If you want to attach any file with any existing test equipment listed in the **Testing Equipment** page, you can attach the file by using [![image-1651163889766.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163889766.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163889766.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **4.2.9 View a Calibration History Card**

To view a calibration history card, click (Print icon) of the respective test equipment, which is provided in the **Report** column of the **Testing Equipment** page.

### **4.3 Material Receiving and Inspection (Heat Numbers)**

Material Receiving Inspection validates quality of purchased raw materials based on set acceptance criteria before the materials are used for the piping project.

The **Material Receiving and Inspection** tab in the **Materials** menu helps you to add an incoming material inspection report (MIR). Incoming MIR includes material name, material size, material specification, heat numbers, and material type.

If you want to add an incoming MIR, do the following,

1. Click the ****Material Receiving and Inspection**** tab in the ******Materials******The **Incoming Material Inspection Report** page opens.
    
    [![image-1651164044201.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651164044201.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651164044201.png)
    
     **Figure 4.3: Incoming Material Inspection Report page**

#### **4.3.1 Add an Incoming MIR**

If you want to add an incoming MIR,

1. Click [![image-1651164100256.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651164100256.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651164100256.png) (**ADD** button) in the **Incoming Material Inspection Report** page. See Fig 4.3.
    
    A new window opens to add an incoming MIR.
    
    [![image-1651164143568.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651164143568.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651164143568.png)
    
     [![image-1651164152732.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651164152732.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651164152732.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651164177224.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651164177224.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651164177224.png)**Tip**: A report number and a Request for Inspection (RFI) number for a new MIR will be updated automatically in the **Report Number** and the **RFI Number** boxes, respectively.
2. In the ****Delivery Order Number**** box, enter the material’s delivery order number.
3. If the materials are received from a client, select the ****SAN Incoming Materials**** option, and then enter the relevant details in the respective boxes. [![image-1651164323964.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651164323964.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651164323964.png)
    
    
    1. 1. In the **P**.****O. No**** box, enter the purchase order number.
        2. In the ****Dated**** box, choose the date of the purchase order.
        3. In the ****Received On**** box, select the received date of materials.
4. If the materials are purchased from outside, select the ****FREE Issued Incoming Materials**** option, and then enter the relevant details in the respective boxes. [![image-1651164391075.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651164391075.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651164391075.png)
    
    
    1. 1. In the **Packing List No** box, enter the packing list number.
        2. In the ****Dated**** box, choose the date of packing.
        3. In the ****Received On**** box, choose the received date of materials.
5. In the ****Inspection Date**** box, choose the date of inspection.
6. In the ****Vendor Name**** box, enter the vendor name.
7. In the ****Request Description**** box, enter the request description.
8. In the ****ITP Number**** box, select an ITP number.
9. In the ****Delivery Note**** box, enter the delivery note.
10. In the ****Location**** box, enter the location name.
11. In the ****Sub Contractor**** box, select the subcontractor name from a drop-down list.
12. Click ****Save****. The incoming MIR is successfully added. Once you have added the MIR, you must add the material details for the added MIR.

#### **4.3.2 Add Materials for an Incoming MIR**

If you want to add the details of materials for the added incoming MIR, do the following steps,

1. Click[![image-1651166446901.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651166446901.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651166446901.png)(Edit icon) in the **Edit MIR** column of the **Incoming Material Inspection Report** See Fig 4.3.
    
    The **Add/Edit - Materials** window opens.
    
    [![image-1651166494934.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651166494934.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651166494934.png)
    
     **Figure 4.3.1: Add/Edit – Materials window**
2. Click [![image-1651166566688.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651166566688.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651166566688.png) (**ADD** button) in the **Add/Edit - Materials** window,
    
    A new window opens to add the material details.
    
    [![image-1651166607288.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651166607288.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651166607288.png)
    
    [![image-1651166623989.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651166623989.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651166623989.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
3. In the ****Material Description**** box, enter the material description.
4. In the ****Material** **Size**** box, select the size of the material.
5. In the ****Material Specification**** box, enter the material specification.
6. In the ****Material Type**** box, enter the type of the material.
7. In the ****Quantity Required**** box, enter the required quantity of the material.
8. In the ****Item No**** box, enter the item number.
9. In the ****Weight**** box, enter the weight of the material.
10. In the ****Component**** box, select a component.
11. Click **Update**.
    
    Once you have added the material details, you must add the heat numbers for the added materials.

#### **4.3.3 Add Heat Numbers** 

1. Click[![image-1651166783881.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651166783881.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651166783881.png)(Add icon) of the respective material in the **Add/Edit - Materials** window. See Fig 4.3.1.
    
    The **Heat Numbers** window opens.
    
    [![image-1651166822333.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651166822333.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651166822333.png)
2. Click [![image-1651166831350.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651166831350.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651166831350.png) (**ADD** button) in the **Heat Numbers** window.
    
    A new window opens to add a heat number.
    
    [![image-1651166858067.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651166858067.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651166858067.png)
3. In the **Heat Number/Certificates** box, select the heat number from a drop-down list.
4. In the **Plate Number/Coil Number/ Tag Number** box, enter the plate number or coil number or tag number of the material.
5. In the ****Delivery Quantity (Total)**** box, enter the total delivery quantity of the material including UOM.
6. In the ****Delivery Quantity (Partial)**** box, enter the partial delivery quantity of the material including UOM.
7. In the ****Dimensions**** option, select ****Accepted**** or ****Rejected**** based on the inspection detail.
8. In the ****Visual**** option, select ****Accepted**** or ****Rejected**** based on the inspection detail.
9. In the ****Mill Test Certificates (MTC)**** option, select ****Accepted**** or ****Rejected**** based on the inspection detail.
10. In the ****Remarks**** box, enter your remarks if any.
11. If the heat treatment is required for the material, select ****YES**** in the ****Heat Treatment**** Otherwise select ****NO****.
12. In the NDE is required for the material, select ****YES**** in the ****NDE****  Otherwise select ****NO****.
13. Click **Update.**
    
    [![image-1651166988046.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651166988046.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651166988046.png)**Note**: If you want to manage the review material TC, click [![image-1651167005116.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651167005116.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651167005116.png) (Add icon). The Review Material TC window opens to add the material checklist detail.

#### **4.3.4 Add MIR Details**

If you want to add the details of MIR,

1. Click[![image-1651167084279.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651167084279.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651167084279.png)(Add icon) in the ****Add**** See Fig 4.3.
    
    The **MIR Details** window opens.
    
    [![image-1651167099492.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651167099492.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651167099492.png)
2. In the ****Manufacturer**** Name box, enter the manufacturer name.
3. In the ****Supplier**** box, enter the supplier name.
4. In the ****Unloaded**** box, enter the unloaded detail.
5. In the ****Date**** box, select the date of MIR.
6. In the ****Truck/Trailer No**** box, enter the truck/trailer number.
7. In the ****Defect Report No**** box, enter the defect report number.
8. In the ****Storage Area**** box, enter the storage area name.
9. In the ****Defect**** box, enter the defect detail.
10. In the ****Remarks**** box, enter your remarks if any.
11. Click **Save**.

#### **4.3.5 Print an Incoming MIR Report**

If you want to print an incoming MIR report, click[![image-1651167434292.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651167434292.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651167434292.png) (print icon) provided in the **Report** column of the **Incoming Material Inspection Report** page. See Fig 4.3.

#### **4.3.6 Print a Report with MTC**

If you want to print an incoming MIR report including MTC, click [![image-1651167444941.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651167444941.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651167444941.png)(print icon) provided in the **Report** **with MTC** column of the **Incoming Material Inspection Report** page. See Fig 4.3.

#### **4.3.7 Print a Report Raw Material Offer List**

If you want to print a report raw material offer list, click [![image-1651167451162.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651167451162.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651167451162.png) (print icon) provided in the **Report** **Raw Material Offer List** column of the **Incoming Material Inspection Report** page. See Fig 4.3.

#### **4.3.8 Print a MIR Summary Report**

If you want to print a MIR summary report, click [![image-1651167500026.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651167500026.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651167500026.png) (print icon) provided in the upper side of the **Incoming Material Inspection Report** page. See Fig 4.3.

#### **4.3.9 Attach a File into an Added Incoming MIR** 

If you want to attach any file with any incoming MIR listed in the **Incoming Material Inspection Report** page. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **4.3.10 Edit an Incoming MIR** 

If you want to edit any existing incoming MIR in the **Incoming Material Inspection Report** page, do the following,

1. Click [![image-1651167595678.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651167595678.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651167595678.png) (Edit icon)in the **Edit** column for the respective MIR. See Fig 4.3.
    
    A new window opens to edit the added incoming MIR.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **4.3.11 Delete an Incoming MIR**

If you want to delete any specific incoming MIR from the list of MIRs, you can use [![image-1651167673732.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651167673732.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651167673732.png) (Delete icon) provided in the **Delete** column of the **Incoming Material Inspection Report** page. To know how to delete, see the topic, “**[<u>Delete P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)**”.

#### **4.3.12 Filter an incoming MIR**

If you want to filter any incoming MIR from the list of MIRs in the **Incoming Material Inspection Report** page,

1. you can use the request status wise filter box [![image-1651167798180.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651167798180.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651167798180.png)
    
    provided in the upper side of the **Incoming Material Inspection Report** page.
2. you can also use [![image-1651167868058.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651167868058.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651167868058.png) (**FILTER** button) located on the **Incoming Material Inspection Report  To know how to filter using the **Filter** button, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

#### **4.3.13 Export incoming MIR list**

You can export a list of MIR added in the **Incoming Material Inspection Report** page in the pdf and excel formats by using [![image-1651167939332.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651167939332.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651167939332.png) (**PDF** button) and [![image-1651167951937.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651167951937.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651167951937.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.


### **4.4 MVR Inspection Request (Heat Numbers)**

MVR will be used while go for material inspection. The **Material Verification Report** tab in the **Materials** menu helps you to add an MVR inspection request. If you want to add an MVR inspection request, do the following steps,

1. Click **Material Verification Report** in the **Materials** menu.
    
    The **MVR Inspection Request** page opens.
    
    [![image-1651168035514.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651168035514.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651168035514.png)
    
     **Figure 4.4: MVR Inspection Request page**

#### **4.4.1 Add an MVR Inspection Request**

If you want to add an MVR inspection request,

1. Click [![image-1651168100181.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651168100181.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651168100181.png) (**ADD** button) in the **MVR Inspection Request** page. See Fig 4.4.
    
    A new window opens to add an MVR inspection request.
    
    [![image-1651168133266.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651168133266.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651168133266.png)
    
    [![image-1651168146411.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651168146411.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651168146411.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651168160833.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651168160833.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651168160833.png) **Tip**: A report number and an RFI report number for a new MVR will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.
2. In the ****Inspection Date**** box, choose the date of inspection.
3. In the ****Description**** box, enter the description for the MVR.
4. In the ****Location**** box, select a location from a drop-down list.
5. Click ****Save****. The MVR is successfully added. Once you have added the MVR, you must add the RFI data for the added MVR.

#### **4.4.2 Add RFI Data for an Added MVR Inspection Request**

If you want to add the details of RFI data for the added MVR inspection request, do the following,

1. Click[![image-1651168356717.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651168356717.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651168356717.png) (Edit icon) in the **RFI Data** column of the **MVR Inspection Request**  See Fig 4.4.
    
    The **RFI Inspection Request List** window opens.
    
    [![image-1651168393364.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651168393364.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651168393364.png)
2. In the **Inspection From** box, enter the detail from where the inspection should start.
3. In the ****Inspection To**** box, enter the detail to where the inspection should end.
4. In the ****Inspection Details**** option, select 1<sup>st</sup>Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the ****Others**** box, enter any other inspection related details.
6. In the ****Refer to Report No**** box, enter the report number for reference.
7. In the ****RFI Date**** box, choose the RFI date.
8. In the ****Inspection Result**** option, if the inspection result is accepted, select ****Accepted**** otherwise select ****Rejected****.
9. In the ****Remarks**** box, enter your remarks if any.
10. In the ****Inspected by**** box, enter the name of a person who has done inspection.
11. In the ****Inspected Date**** box, choose the date of inspection.
12. In the ****Witnessed By**** box, enter the name of the witnessed person.
13. In the ****Witnessed Date**** box, choose the date of witnessed.
14. In the ****PCML Rep Name**** box, enter the representative name of PCML.
15. In the ****PCML Rep Date**** box, choose the PCML rep date.
16. In the ****MEB Rep Name**** box, enter the representative name of MEB.
17. In the ****MEB Rep Date box****, choose MEB rep date.
18. Click **Save**.
    
    Once you have added the RFI data, you must add the result for the added MVR inspection request.

#### **4.4.3 View an RFI Report**

If you want to print an RFI report, click (print icon) provided in the **RFI** **Report** column of the **MVR Inspection Request** page. See Fig 4.4.

#### **4.4.4 Add Result for an Added MVR Inspection Request** 

1. Click[![image-1651168754411.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651168754411.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651168754411.png) (Add icon) of the respective report number.
    
    The **MVR Inspection Request Details** window opens.
    
    [![image-1651168778600.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651168778600.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651168778600.png)
2. Click [![image-1651168861985.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651168861985.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651168861985.png) (**ADD** button) in the **MVR Inspection Request Details** window.
    
    A new window opens to add result.
    
    [![image-1651168913891.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651168913891.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651168913891.png)
3. In the **Spool No** box, select the spool number from a drop-down list.
4. In the ****Heat Number / Certificates**** box, select the heat number from a drop-down list.
5. In the ****Size**** box, enter the size of the material.
6. In the ****Type of Material**** box, enter the type of material.
7. In the ****Remarks**** box, enter your remarks if any.
8. Click ****Save****. Once you have added the result for the MVR inspection request, you must submit and approve the MVR inspection request.

#### **4.4.5 Submit and Approve an MVR Inspection Report**

Once you have added the result, the **Submission** column in the **MVR Inspection Request** page is appeared with [![image-1651169026911.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169026911.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169026911.png) (Submit and Reject icons).

1. If you want to submit the MVR inspection request, click [![image-1651169136572.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169136572.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169136572.png)(Submit icon) in the **Submission** column. Otherwise click [![image-1651169148110.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169148110.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169148110.png) (Reject icon) to reject the request.
    
    Once you have submitted the MVR inspection request, the **Request Status** column in the **MVR Inspection Request** page is appeared with [![image-1651169081437.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169081437.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169081437.png) (Accept and Reject icons).
2. If you want to approve the MVR inspection request, click (Submit icon) in the **Request Status** column. Otherwise click
    
    [![image-1651169240161.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169240161.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169240161.png) (Reject icon) to reject the request.

#### **4.4.6 Print an MVR Inspection Report**

If you want to print an MVR inspection report, click [![image-1651169336507.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169336507.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169336507.png)(print icon) in the **Report** column of the **MVR Inspection Request** page. See Fig 4.4.

#### **4.4.7 Attach a File into an MVR Inspection Request**

If you want to attach any file with an existing MVR inspection request listed in the **MVR Inspection Request** page, you can attach the file by using [![image-1651169377053.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169377053.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169377053.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **4.4.8 Edit an MVR inspection request** 

If you want to edit any existing MVR inspection request in the **MVR Inspection Request** page, do the following,

1. Click[![image-1651169424709.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169424709.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169424709.png)(Edit icon)in the **Edit** column for the respective MVR inspection request. See Fig 4.4.
    
    A new window opens to edit the MVR inspection request.
    
    [![image-1651169459926.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169459926.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169459926.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **4.4.9 Filter an MVR inspection request**

If you want to filter any MVR request from the list of requests in the **MVR Inspection Request** page, you can use [![image-1651169546239.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169546239.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169546239.png) (**FILTER** button). To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

#### **4.4.10 Export MVR inspection request list**

You can export a list of MVR inspection requests added in the **MVR Inspection Request** page in the pdf and excel formats by using [![image-1651169584615.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169584615.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169584615.png) (**PDF** button) and [![image-1651169596010.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169596010.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169596010.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.


### **4.5 Material Summary**

The **Material Summary** tab in the **Materials** menu used to track the material summary details. If you want to track the summary details of the material, do the following steps,

1. Click the **Material Summary** tab in the **Materials** menu.
    
    The **Material Summary Details** page opens.
    
    [![image-1651169670133.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169670133.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169670133.png)
    
     **Figure 4.5: Material Summary Details page**
2. In the **Material Specification** box, enter the material specification.
3. In the **From** and **To** boxes, choose the from and to dates to get the material summary details.
4. Click **Search**.
    
    The summary details of the added material specification will be displayed for the selected period.

#### **4.5.1 Export Material Summary Details**

You can export the material summary details in the **Material Summary Details** page in both the pdf and excel formats by using [![image-1651169773552.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169773552.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169773552.png) (**PDF** button) and [![image-1651169789150.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169789150.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169789150.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.


### **4.6 Material Summary by Heat Number**

The **Summary by Heat Number** tab in the **Materials** menu used to track the material summary details by using the respective heat numbers. If you want to track the summary details of the material, do the following steps,

1. Click the **Summary by Heat Number** tab in the **Materials** menu.
    
    The **Material Summary Details (By Heat Number)** page opens.
    
    [![image-1651169845577.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169845577.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169845577.png)
    
     **Fig 4.6:** **Material Summary Details (By Heat Number)** **page**
2. In the **Heat Number** box, select the heat number from a drop-down list.
3. Click **Search**.
    
     The material summary details corresponding to the selected heat number will be displayed.

#### **4.6.1 Export Material Summary Details (by Heat Number)**

You can export the material summary details in the **Material Summary Details (By Heat Number)** page in both the pdf and excel formats by using [![image-1651169945083.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169945083.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169945083.png) (**PDF** button) and [![image-1651169954523.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169954523.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169954523.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.


### **4.7 Heat Number – Receiving vs Used**

You can view the history of received and used heat numbers of materials by using this **Heat Number – Receiving vs Used** tab in the **Materials** menu.

1. Click ****Heat Number – Receiving vs Used**** in the ****Materials**** menu. The **Material** **Heat Number – Receiving vs Used** page opens.
    
    [![image-1651170021878.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651170021878.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651170021878.png)
    
     **Figure 4.7:** **Material** **Heat Number – Receiving vs Used page**
    
    This page shows the details of component names, heat numbers, and number of quantities received and used.

#### **4.7.1 Export Material Heat Number Received vs Used History**

You can export the material heat number history in the **Material** **Heat Number – Receiving vs Used** page in both the pdf and excel formats by using [![image-1651170126530.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651170126530.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651170126530.png) (**PDF** button) and [![image-1651170135473.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651170135473.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651170135473.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **4.7.2 Filter Material Heat Number Received vs Used History**

If you want to view the received vs used history of any specific heat number, you can use the filter box provided in each column of the **Material** **Heat Number – Receiving vs Used** page.

[![image-1651170185810.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651170185810.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651170185810.png)

Enter the relevant detail in the respective column to view the received vs used history of heat number you want.


### **4.8 Welding Consumable**

Welding Consumables are products used to create strong joints between two or more parts while welding. Welding Consumable are segmented based on welding technique, welding consumable type, end-use industry, and region.

The **Welding Consumable** tab in the **Materials** menu used to add a weld consumable. If you want to add a welding consumable, do the following,

1. Click ****Welding Consumable**** in the ****Materials**** menu. The **Welding Consumable** page opens.
    
    [![image-1651170265897.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651170265897.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651170265897.png)
    
     **Figure 4.8: Welding Consumable page**

#### **4.8.1 Add a Welding Consumable**

If you want to add a welding consumable, do the following steps,

1. Click [![image-1651170357472.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651170357472.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651170357472.png) (**ADD** button) in the **Welding Consumable** page. See Fig 4.8.
    
    A new window opens to add a welding consumable.
    
    [![image-1651170395028.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651170395028.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651170395028.png)
    
    [![image-1651170403874.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651170403874.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651170403874.png) **Note**: A report number for a new welding consumable list will be updated automatically in the **Report Number** **/ Rev** box.
2. In the **Remarks** box, enter your remarks if any.
3. In the ****Supplier**** box, enter the name of a supplier of welding consumables.
4. In the ****Requested By**** box, enter the name of a person who has requested the welding consumable.
5. In the ****Reviewed By**** box, enter the name of a person who has reviewed the welding consumable.
6. In the ****Approved By**** box, enter the name of a person who has approved the welding consumable.
7. In the ****Requested Date**** box, choose the prepared date of the welding consumable.
8. In the ****Reviewed Date**** box, choose the reviewed date of the welding consumable.
9. In the ****Approved Date**** box, choose the approved date of the welding consumable list.
10. Click ****Save****. The welding consumable is successfully added. Once you have added the welding consumable, you must add the details of welding consumable.

#### **4.8.2 Add Welding Consumable Details for Added Consumable** 

If you want to add the details of welding consumables for the added consumable, do the following,

1. Click [![image-1651170705427.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651170705427.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651170705427.png) (Add icon) for the respective welding consumable. See Fig 4.8.
    
    A new window opens to add the welding consumable details.
    
    [![image-1651170726404.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651170726404.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651170726404.png)
2. In the ****Date**** box, select the date.
3. In the ****Product Description**** box, enter the product description detail.
4. In the **Brand** box, enter the brand name of welding consumable.
5. In the ****Type**** box, enter the type of the welding consumable.
6. In the ****Diameter**** box, enter the diameter of the welding consumable.
7. In the ****Batch No**** box, enter the batch number of the welding consumable.
8. In the ****Certificate No**** box, enter the certificate number.
9. In the ****Report No**** box, enter the report number.
10. In the ****Qty in Kg**** box, enter the quantity of the welding consumable.
11. Click ****Save****.

#### **4.8.3 Print a Welding Consumable Report**

If you want to print a welding consumable report, click [![image-1651171358797.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651171358797.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651171358797.png) (print icon) in the **Report** column of the **Welding Consumable** page. See Fig 4.8.

#### **4.8.4 Attach a File into a Welding Consumable** 

If you want to attach any file with an existing MVR inspection request listed in the **MVR Inspection Request** page, you can attach the file by using [![image-1651171409493.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651171409493.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651171409493.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **4.8.5 Edit a Welding Consumable** 

If you want to edit any existing welding consumable in the **Welding Consumable** page, do the following,

1. Click [![image-1651171474733.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651171474733.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651171474733.png) (Edit icon)in the **Edit** column for the respective welding consumable. See Fig 4.8.
    
    A new window opens and shows the added details of the welding consumable.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **4.8.6 Delete a Welding Consumable**

If you want to delete any specific welding consumable, you can use [![image-1651171566905.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651171566905.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651171566905.png) (Delete icon) provided in the **Delete** column of the **Welding Consumable** page, See Fig 7.8. To know how to delete, see the topic, “[**<u>Delete P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

#### **4.8.7 Export Welding Consumable**

You can export a list of welding consumable added in the **Welding consumable** page in the pdf and excel formats by using [![image-1651171609134.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651171609134.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651171609134.png) (**PDF** button) and [![image-1651171619038.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651171619038.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651171619038.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.



### **4.9 Import from Excel – Materials**

The **Import from Excel – Materials** tab helps you to upload various date related to materials for all fields included in the **Materials** menu instead of uploading data for each field individually.

If you want to import material data for different fields, do the following,

1. Click the **Import from Excel – Materials** tab in the **Materials** menu.
    
    The **File Upload** page opens.
    
    [![image-1651171825423.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651171825423.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651171825423.png)
2. Download a template by using the [![image-1651171841178.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651171841178.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651171841178.png) (**TEMPLATE** button) to enter the details of data.
    
    An excel worksheet will be downloaded.
    
    [![image-1651171873265.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651171873265.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651171873265.png)
3. Enter the relevant details in the respective column of the excel worksheet based on the columns listed in the **System Column** field.
4. Click [![image-1651171896537.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651171896537.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651171896537.png) (**Choose File** button).
    
    Once the file has been uploaded successfully, you receive a message, “**Successfully uploaded"**
5. Click [![image-1651171937423.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651171937423.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651171937423.png) (**Get Columns** button).
    
    The columns added in the excel worksheet will be listed in the **Excel Column** field. The system automatically maps the **Required Columns to Import** field and the **Excel Column** field and displays in the **Mapped Columns** field.
    
    [![image-1651171989832.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651171989832.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651171989832.png)
6. If you want to map any columns or to un-map any mapped columns, select the respective columns and then click [![image-1651172013521.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172013521.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172013521.png) (**Map** button) and [![image-1651172023634.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172023634.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172023634.png) (**UnMap** button) accordingly.
7. If you want to upload the data for specific MIR, select the respective MIR from the drop-down list otherwise select **BULK IMPORT**.
    
    [![image-1651172051172.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172051172.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172051172.png)
8. Once you have completed the mapping and un-mapping of columns, in the **Upload Range From** and **To** fields, enter the range of rows you want to upload from the excel worksheet.
    
    [![image-1651172073928.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172073928.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172073928.png) **Note**: In the **Total Rows** field, the system indicates the total number of rows filled in the excel worksheet.
    
    [![image-1651172097678.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172097678.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172097678.png)**Tip**: You must enter the upload starting range as two in the **Upload Range From** field because a first row in the excel worksheet is having heading of the columns.
9. Click [![image-1651172119340.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172119340.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172119340.png) (**Populate Value** button).
    
    The data added in the excel worksheet will be populated.
10. Click [![image-1651172144178.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172144178.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172144178.png) (**Process** button).
    
    Once you have clicked the **Process** button, the system processes the columns and displays in the **Excel Import** page.
    
    [![image-1651172173359.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172173359.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172173359.png)
11. Click [![image-1651172198729.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172198729.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172198729.png) (**Import** button) to import the data added in the excel worksheet.
    
    The data will be successfully imported.



### **4.10 Material Traceability Record (MTR)**

The **Material Traceability Record** tab in the **Materials** menu helps you to view the MTR for the piping project. The MTR lists material specification, material size, joint number, unique number, and MIR number. To view the MTR,

1. Click **Material Traceability Record** in the **Materials** menu.
    
    The **Piping Material Traceability Record** page opens.
    
    [![image-1651172270185.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172270185.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172270185.png)
2. In the ****ISO Drawing Number**** box, select an ISO drawing from a drop-down list. The **Piping Material Traceability Record** page shows the material details based on the selected ISO drawing number.
    
    [![image-1651172330086.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172330086.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172330086.png)

#### **4.10.1 Print an MTR** 

If you want to print an MTR, use [![image-1651172396029.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172396029.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172396029.png) and [![image-1651172405042.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172405042.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172405042.png) (print icons) provided in the **Piping Material Traceability Record** page.

1. If you want to print the current page of the MTR, click [![image-1651172424228.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172424228.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172424228.png) (print icon including the page number).
2. If you want to print all the pages of the MTR, click [![image-1651172442944.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172442944.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172442944.png) (print icon).

#### **4.10.2 Export an MTR** 

You can export the MTR report in various formats by using the option [![image-1651172484613.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172484613.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172484613.png) provided in the upper right corner of the **Piping Material Traceability Record** page.



### **4.11 Purchase Order (PO) Summary Report**

The **PO Summary Report** tab in the **Material** menu used to view the purchase order summary report. To view the PO summary report,

1. Click **PO Summary Report** in the **Material** menu.
    
    The **PO Summary Report** page opens.
    
    [![image-1651172743997.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172743997.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172743997.png)
    
     **Figure 7.11: PO Summary Report page**
2. In the **PO No** box, select the PO number.
3. In the **From Date** and **To Date** boxes, select the from and to dates to view the PO summary report.
4. Click ****Search****. The page shows the summary report for the purchase order.

#### **4.11.1 Print a PO Summary Report**

If you want to print the PO summary report, use and (print icons) provided in the DPWR page. See Fig 4.11.

1. If you want to print the current page of the PO summary report, click [![image-1651172944071.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172944071.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172944071.png) (print icon including the page number).
2. If you want to print all the pages of the PO summary report, click [![image-1651172966863.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172966863.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172966863.png) (print icon).

#### **4.11.2 Export a PO Summary Report** 

You can export the PO Summary Report in various formats by using the option [![image-1651173144994.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651173144994.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651173144994.png) provided in the upper right corner of the page.



### **4.12 MVR Summary by Drawing**

The **MVR Summary by Drawing** tab in the **Materials** menu used to view the MVR summary report. To view an MVR summary report,

1. Click ****MVR Summary by Drawing**** in the ****Materials**** menu. The **MVR Summary (Piping)** page opens.
    
    [![image-1651173372495.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651173372495.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651173372495.png)
    
     **Figure 4.12: MVR Summary (Piping) page**
2. In the ****ISO Drawing**** box, select an ISO drawing from a drop-down list.
3. Click ****Show Report****. The page shows the summary details for the MVR.

#### **4.12.1 Print an MVR Summary Report**

If you want to print the MVR summary report, use [![image-1651173465960.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651173465960.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651173465960.png)and [![image-1651173476881.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651173476881.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651173476881.png) (print icons) provided in the **MVR Summary (Piping)** page. See Fig 4.12.

1. If you want to print the current page of the MVR summary report, click [![image-1651173521311.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651173521311.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651173521311.png) (print icon including the page number).
2. If you want to print all the pages of the MVR summary report, click [![image-1651173546811.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651173546811.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651173546811.png) (print icon).

#### **4.12.2 Export an MVR Summary Report** 

You can export the MVR summary report in various formats by using the option [![image-1651173600742.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651173600742.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651173600742.png) provided in the upper right corner of the **MVR Summary (Piping)** page.



### **4.13 Unique Number Usage Details** 

The **Unique Number Usage Details** tab in the **Materials** menu used to view the usage details of the particular unique number.

1. Click **Unique Number Usage Details** in the **Materials** menu.
    
    The **Unique Number Usage Details** page opens.
    
    [![image-1651173656747.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651173656747.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651173656747.png)
    
     **Figure 4.13: Unique Number Usage Details page**
2. In the ****MIR Report Number**** box, enter the MIR report number.
3. In the ****Component Name**** box, enter the component name.
4. In the ****Heat Number**** box, enter the heat number.
5. In the ****Unique Number**** box, enter the unique number.
6. Click ****Get Details****. [![image-1651173727666.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651173727666.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651173727666.png)


### **4.14 RFI Material Substitution**

An RFI could be issued requesting for material substitutions if certain material is not available or cost exorbitantly high. Various subcontractors could be provided with these requests to find who has the best quality materials for the project.

You can add an RFI for material substitution by using the **RFI Material Substitution** tab in the **Materials** menu.

#### **4.14.1 Add an RFI Material Substitution Request**

If you want to add an RFI material substitution request, do the following steps,

1. Click **RFI Material Substitution** in the **Materials** menu.
    
    The **RFI Material Substitution** page opens.
    
    [![image-1651173849823.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651173849823.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651173849823.png)
    
     **Figure 7.14: RFI Material Substitution page**
2. In the ****Requested By**** box, enter the name of a person who has requested the material substitution.
3. In the **Sub Contractor** box, select a sub-contractor from a drop-down list.
4. In the ****Inspection Date &amp; Time**** box, select the inspection date and time.
5. In the ****Location**** box, enter the location name.
6. In the ****Center**** box, enter the center name.
7. In the ****Details of Work**** box, enter the work details.
8. In the ****Comments**** box, enter your comments if any. Before saving the added material substitution request, you must add the material substitution detail.
9. Click [![image-1651173943860.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651173943860.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651173943860.png) (**ADD** button) in the **Material Substitution Detail**
10. In the **Type** box, select the type of material substitution.
11. In the **Material** box, enter the name of the material.
12. In the **DWG.**  **Ref** box, enter the drawing reference number.
13. In the **Original Size** box, enter the original size of the material.
14. In the **Original Grade** box, enter the original grade of the material.
15. In the **Item** box, select an item.
16. In the **QTY** box, enter the quantity of the material.
17. Click ****Save.****The material substitution details will be added and listed in the **Material Substitution Detail** window.
    
    [![image-1651174091098.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651174091098.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651174091098.png)
    
    If you want to add the proposed material substitution detail,
18. Click [![image-1651174112890.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651174112890.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651174112890.png)(Add icon) in the **Material Substitution Detail** window.
    
    [![image-1651174124654.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651174124654.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651174124654.png)
19. Click [![image-1651174134786.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651174134786.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651174134786.png) (**ADD** button).
    
    [![image-1651174160563.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651174160563.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651174160563.png)
20. Enter the details of proposed material substitution.
21. Click **Save**.
    
    The request for material substitution will be added and listed in the **View RFI Material Substitution** page.



### **4.15 View RFI Material Substitution**

The **View RFI Material Substitution** tab helps you to view and edit the material substitution request, which is added by using the **RFI Material Substitution** tab. This tab also allows you to add a new material substitution request.

1. Click **View RFI Material Substitution** in the **Materials** menu. The **View RFI Material Substitution** page opens with a list of added material substitution requests.
    
    [![image-1651174251969.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651174251969.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651174251969.png)
    
     **Figure 4.15: View RFI Material Substitution page**

#### **4.15.1 Add an RFI Material Substitution Request**

If you want to add a material substitution request, do the following steps,

1. Click [![image-1651174312687.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651174312687.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651174312687.png) (**ADD** button) in the **View RFI Material Substitution page.
    
    The system redirects you to a new page to add a new material substitution request. To know how to add a material substitution request, See the topic, “[**<u>Add an RFI Material Substitution</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/materials/#bkmrk-4.14.1%C2%A0add-an-rfi-ma)”.

Once you have added the material substitution request, you must submit the added request to perform material substitution inspection.

#### **4.15.2 Edit an RFI Material Substitution Request** 

If you want to edit any existing material substitution inspection request in the **View RFI Material Substitution page, do the following,

1. Click [![image-1651174420374.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651174420374.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651174420374.png)(Edit icon) in the **Edit** column for the respective material substitution inspection request. See Fig 4.15.
    
    The **RFI Material Substitution** page opens with the details of the selected material substitution inspection request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **4.15.3 Submit and Approve an RFI Material Substitution Request**

Once you have added the material substitution inspection request, the **Submission** column in the **View RFI Material Substitution** page is appeared with [![image-1651174486749.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651174486749.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651174486749.png) (Submit and Reject icons).

1. If you want to submit the material substitution inspection request, click[![image-1651174511920.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651174511920.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651174511920.png) (Submit icon) in the ****Submission**** Otherwise click [![image-1651174535278.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651174535278.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651174535278.png) (Reject icon) to reject the request. Once you have submitted the material substitution inspection request, the **Request Status** column in the **View RFI Material Substitution** page is appeared with (Approve and Reject icons).
2. If you want to approve the material substitution inspection request, click[![image-1651174584110.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651174584110.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651174584110.png) (Approve icon) in the **Request Status** Otherwise click [![image-1651174601201.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651174601201.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651174601201.png) (Reject icon) to reject the request.

#### **4.15.4 Add Results of Material Substitution Inspection**

After completing the material inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click[![image-1651174675792.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651174675792.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651174675792.png)(Add icon) in the ****Results**** column of the respective request. The Result window opens with the details of proposed and original materials.
    
    [![image-1651174670502.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651174670502.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651174670502.png)
2. In the ****Result**** column, select the result of each material from the given result options in the drop-down list.
3. In the ****Remarks**** column, enter your remarks if any.
4. Click ****Approve All &amp;**** ****Save****.

#### **4.15.5 View a Material Substitution Report**

If you want to view a material substitution report, click [![image-1651176530008.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651176530008.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651176530008.png)(print icon) provided in the **Print** column of the **View RFI Material Substitution** page. See Fig 7.15.

#### **4.15.6 Attach a File into an RFI Material Substitution Request**

If you want to attach a file with any existing material substitution inspection request listed in the **View RFI Material Substitution** page, you can attach the file by using [![image-1651176569090.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651176569090.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651176569090.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **4.15.7 View Signature Details of Inspectors**

You can view the sign details of the inspectors such as QA, Sub contractor, Client, and Owner, once they completed the material substitution inspection and submitted the inspection result details including their signature. To view the signature details, click[![image-1651176617884.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651176617884.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651176617884.png) (Sign icon) in the **Sign Details** column in the **View RFI Material Substitution** page.

#### **4.15.8 Export an RFI Material Substitution List**

You can export a list of material substitution requests added in the **View RFI Material Substitution** page in both the pdf and excel formats by using [![image-1651176655486.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651176655486.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651176655486.png) (**PDF** button) and [![image-1651176664815.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651176664815.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651176664815.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **4.15.9 Filter an RFI Material Substitution Request**

If you want to filter any specific material substitution inspection request in the **View RFI Material Substitution** page, you can use [![image-1651176709098.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651176709098.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651176709098.png) (**FILTER** button) located on the **View RFI Material Substitution** page. To know how to filter, see the topic, “**[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)**”.



### **4.16 Material Verification Report (MVR) (Unique Numbers)**

Material Inspection is nothing but validating the quality of purchased raw materials based on the set acceptance criteria before the materials are used in the piping project.

Material Inspection is nothing but validating the quality of purchased raw materials based on the set acceptance criteria before the materials are used in the piping project.

If you want to add a MIR request, do the following,

1. Click ****Material Receiving and Inspection**** in the ****Materials**** menu. The **Material Verification Report** page opens.
    
    [![image-1651176827519.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651176827519.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651176827519.png)
    
     **Figure 4.16: Material Verification Report page**

#### **4.16.1 Add a MIR Request**

If you want to add a MIR request,

1. Click [![image-1651176899284.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651176899284.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651176899284.png) (**ADD** button) in the **Material Verification Report**  See Fig 4.16.
    
    A new window opens to add a MIR request.
    
    [![image-1651176933606.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651176933606.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651176933606.png)
    
    [![image-1651176948784.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651176948784.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651176948784.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651176965440.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651176965440.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651176965440.png)**Tip**: A report number and a Request for Inspection (RFI) number for a new MIR will be updated automatically in the **Report Number** and the **RFI Number** boxes, respectively.
2. In the ****Delivery Order Number**** box, enter the material’s delivery order number.
3. If the materials are received from a client, select the ****SAN Incoming Materials**** option, and then enter the relevant details in the respective boxes. [![image-1651177011912.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177011912.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177011912.png)
    
    
    1. 1. In the ****O. No/Material ID/M. R**** box, enter the purchase order/material id number/ material receiving number.
        2. In the ****Dated**** box, choose the date of the purchase order.
        3. In the ****Received On**** box, select the received date of materials.
4. If the materials are purchased from outside, select the **FREE Issued Incoming Materials** option, and then enter the relevant details in the respective boxes.
    
    [![image-1651177088895.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177088895.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177088895.png)
    
    
    1. 1. In the **Packing List No** box, enter the packing list number.
        2. In the ****Dated**** box, choose the date of packing.
        3. In the ****Received On**** box, choose the received date of materials.
5. In the ****Inspection Date**** box, choose the date of inspection.
6. In the ****Requested By**** box, enter the name of a person who has requested the MIR.
7. In the ****Vendor Name**** box, enter the vendor name.
8. In the ****Delivery Note**** box, enter the delivery note.
9. In the ****Drawing Reference**** box, enter the reference drawing detail.
10. In the ****Location**** box, enter the location name.
11. In the ****Sub System**** box, select a sub system from a drop-down list.
12. In the ****Description**** box, enter the description for the MIR.
13. In the ****Bar Code**** box, enter the bar code of the material.
14. Click ****Save****. The MIR request is successfully added. Once you have added the MIR request, you must add the material details for the added MIR.

#### **4.16.2 Add Materials for MIR**

To add the details of materials for the added MIR request, do the following steps,

1. Click[![image-1651177270374.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177270374.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177270374.png)(Edit icon) of the respective MIR. See Fig 4.16.
    
    The **Add/Edit - Materials** window opens.
    
    [![image-1651177298644.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177298644.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177298644.png)
    
     **Figure 4.16.1: Add/Edit – Materials window**
2. Click [![image-1651177327481.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177327481.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177327481.png) (**ADD** button) in the **Add/Edit - Materials** window.
    
    A new window opens to add the material details.
    
    [![image-1651177354826.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177354826.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177354826.png)
    
    [![image-1651177370583.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177370583.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177370583.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
3. In the ****Material Description**** box, select the material from a drop-down list and enter the component details.
4. In the ****Material Size**** box, select the size of the material from a drop-down list.
5. In the ****Material Specification**** box, enter the material specification.
6. In the **Material Type** box, select the type of material.
7. In the ****Quantity Required**** box, enter the required quantity of the material.
8. In the Unit of Measurement (****UOM****) box, enter the UOM detail.
9. In the ****Item No**** box, enter the item number.
10. In the ****Material Remarks**** box, enter your remarks if any.
11. Click ****Update****. The added material will be listed in the **Add/Edit – Materials** window.
    
    [![image-1651177485394.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177485394.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177485394.png)**Note**: If **Add/Edit – Materials** window shows the added material in the in red color means that the added component is not matched with the component list. See Fig 4.16.1.
    
    Once you have added the material details, you must add the heat numbers for the added materials.

#### **4.16.3 Add Heat/Unique numbers for materials**

To add heat numbers,

1. Click[![image-1651177615998.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177615998.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177615998.png) (Add icon) of the respective material in the ****Add/Edit - Materials**** See Fig 4.16.1. The **Heat Numbers** window opens.
    
    [![image-1651177647183.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177647183.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177647183.png)
2. Click [![image-1651177679829.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177679829.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177679829.png) (**ADD** button) in the **Heat Numbers** window.
    
    A new window opens to add a heat number.
    
    [![image-1651177708469.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177708469.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177708469.png)
3. In the ****Heat Number**** box, select the heat number from a drop-down list.
4. In the ****Certificates**** box, enter the certificate name.
5. In the ****Plate Number/Equipment Tag Number**** box, enter the plate number or equipment tag number of the material.
6. In the ****Delivery Quantity (Total)**** box, enter the total delivery quantity of the material.
7. In the ****Unique Number**** box, enter the unique number of the material.
8. In the ****Dimensions**** option, update the dimensions result by selecting ****Accepted**** or ****Rejected**** based on the inspection detail.
9. In the **Visual** option, update the visual result by selecting **Accepted** or **Rejected** based on the inspection detail.
10. In the ****Mill Test Certificates (MTC)**** option, update the mill test certificates result by selecting ****Accepted**** or ****Rejected**** based on the inspection detail.
11. In the **Remarks** option, enter your remarks if any.
12. Click **Update.**
    
    The heat numbers are updated. Once you have added the MIR request, you must submit the added request for inspection.

#### **4.16.4 Submit and Approve an MIR Request**

Once you have added the MIR request, the **Submission** column in the **Material Verification Report** page is appeared with [![image-1651177877286.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177877286.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177877286.png) (Submit and Reject icons).

1. If you want to submit the MIR request, click[![image-1651177929342.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177929342.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177929342.png) (Submit icon) in the ****Submission**** Otherwise click [![image-1651177949434.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177949434.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177949434.png) (Reject icon) to reject the request. Once you have submitted the MIR request, the **Request Status** column in the **Material Verification Report** page is appeared with [![image-1651177977558.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177977558.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177977558.png)(Approve and Reject icons).
2. If you want to approve the MIR request, click [![image-1651178010785.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178010785.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178010785.png)(Approve icon) in the **Request Status** column. Otherwise click [![image-1651178021406.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178021406.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178021406.png)(Reject icon) to reject the request.

The MIR request will be moved for MIR inspection.

#### **4.16.5 Edit an MIR Request**

If you want to edit any existing MIR request in the **Material Verification Report** page,

1. Click[![image-1651178096286.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178096286.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178096286.png)(Edit icon) of the respective MIR request. See Fig 4.16.
    
    The **Material Verification Report** page shows the details of the selected MIR request.
2. Edit the details where you want.
3. Click **Save**.

#### **4.16.6 Delete an MIR Request**

If you want to delete any existing MIR request in the **Material Verification Report** page, you can use [![image-1651178183446.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178183446.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178183446.png) (Delete icon) provided in the **Material Verification Report** page. To know how to delete, see the topic, “[**<u>Delete P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

#### **4.16.7 Export MIR List**

You can export a list of MIR requests added in the **Material Verification Report** page in both the pdf and excel formats by using [![image-1651178222326.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178222326.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178222326.png) (**PDF** button) and [![image-1651178236615.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178236615.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178236615.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **4.16.8 Filter an MIR Request**

If you want to filter any specific test equipment in the **Material Verification Report page,

- you can use the request status wise filter box [![image-1651178294205.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178294205.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178294205.png) provided in the upper side of the **Material Verification Report page.
- You can also use [![image-1651178339536.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178339536.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178339536.png) (****FILTER**** button) located on the ****Material Verification Report**  To know how to filter using the ****Filter**** button, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

#### **4.16.9 View a Material Receiving Inspection Report**

To view a material receiving inspection report, click [![image-1651178394403.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178394403.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178394403.png)(Print icon) provided in the **Report** column of the **Material Verification Report** page.

#### **4.16.10 View a Material Test Certificate (MTC) Report**

To view an MTC report, click (Print icon) provided in the **Report** **with MTC** column of the **Material Verification Report** page.

#### **4.16.11 View Signature Details of Inspectors**

You can view the sign details of the inspectors such as QA, Sub contractor, Client, and Owner, once they completed the MIR inspection and submitted the inspection result details including their signature. To view the signature details, click [![image-1651178480749.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178480749.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178480749.png)(Sign icon) in the **Sign Details** column in the **Material Verification Report** page.



### **4.17 Material Receiving and Inspection (Unique Numbers)**

The **Material Receiving and Inspection** tab in the **Materials** menu helps you to add an incoming material inspection report (MIR). Incoming MIR includes material name, material size, material specification, and material type.

If you want to add an incoming MIR, do the following,

1. Click the ****Material Receiving and Inspection**** tab in the ******Materials****** menu. The **Incoming Material Inspection Report** page opens.
    
    [![image-1651178572494.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178572494.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178572494.png)
    
     **Figure 4.17: Incoming Material Inspection Report page**

#### **4.17.1 Add an Incoming MIR**

If you want to add an incoming MIR,

1. Click [![image-1651178643329.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178643329.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178643329.png) (**ADD** button) in the **Incoming Material Inspection Report** page. See Fig 4.17.
    
    A new window opens to add an incoming MIR.
    
    [![image-1651178708770.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178708770.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178708770.png)
    
    [![image-1651178721984.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178721984.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178721984.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651178741438.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178741438.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178741438.png) **Tip**: A report number and an Request for Inspection (RFI) number for a new MIR will be updated automatically in the **Report Number** and the **RFI Number** boxes, respectively.
2. In the ****Delivery Order Number**** box, enter the material’s delivery order number.
3. If the materials are received from a client, select the ****DM Incoming Materials**** option, and then enter the relevant details in the respective boxes. [![image-1651178791116.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178791116.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178791116.png)
    
    
    1. 1. In the **P**.****O. No**** box, enter the purchase order number.
        2. In the ****Dated**** box, choose the date of the purchase order.
        3. In the ****Received On**** box, select the received date of materials.
4. If the materials are purchased from outside, select the ****FREE Issued Incoming Materials**** option, and then enter the relevant details in the respective boxes. [![image-1651178857813.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178857813.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178857813.png)
    
    
    1. 1. In the ****Packing List No**** box, enter the packing list number.
        2. In the ****Dated**** box, choose the date of packing.
        3. In the ****Received On**** box, choose the received date of materials.
5. In the ****Inspection Date**** box, choose the date of inspection.
6. In the ****Vendor Name**** box, enter the vendor name.
7. In the **Delivery Note** box, enter the delivery note.
8. In the **Location** box, enter the location name.
9. In the ****Sub Contractor**** box, select the subcontractor name from a drop-down list.
10. Click **Save**.
    
    The incoming MIR is successfully added. Once you have added the MIR, you must add the material details for the added MIR.

#### **4.17.2 Add materials for an incoming MIR**

If you want to add the details of materials for the added incoming MIR, do the following,

1. Click [![image-1651179000275.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651179000275.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651179000275.png) (Edit icon) in the **Edit MIR** column of the **Incoming Material Inspection Report** page. See Fig 4.17.
    
    The **Add/Edit - Materials** window opens.
    
    [![image-1651179041751.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651179041751.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651179041751.png)
    
     **Figure 4.17.1: Add/Edit – Materials window**
2. Click [![image-1651179073530.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651179073530.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651179073530.png) (**ADD** button) in the **Add/Edit - Materials** window.
    
    A new window opens to add the material details.
    
    [![image-1651179119233.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651179119233.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651179119233.png)
    
    [![image-1651179138535.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651179138535.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651179138535.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
3. In the ****Material**** box, select the name of the material from a drop-down list.
4. In the ****Quantity Required**** box, enter the required quantity of the material.
5. In the ****Certificate Number**** box, enter the certificate number.
6. In the ****PO No**** box, enter the purchase order number.
7. In the ****Non-Conformance Report (NCR) No**** box, enter the NCR number.
8. In the ****Size/Thickness**** box, select the size/thickness of the received material from a drop-down list.
9. In the ****Heat Number**** box, enter the heat number of the material.
10. In the ****CEQ**** box, enter the CEQ number.
11. In the ****DO**** box, enter the deliver order number.
12. In the ****TQ No**** box, enter the TQ number.
13. In the ****Length**** box, select the length of the material from a drop-down list.
14. In the ****Plate Number**** box, enter the plate number of the material.
15. In the ****Material Type**** box, enter the type of the material.
16. In the **CD Number** box, enter the CD number.
17. In the ****Status**** box, select the status of the received material.
18. In the ****Material Type**** box, select the type of material from a drop-down list.
19. In the ****Grade**** box, select the grade of the material.
20. In the ****Unique No**** box, enter the unique number of the material.
21. In the ****Remarks**** box, enter your remarks if any.
22. In the ****Client Item No**** box, enter the client item number.
23. In the ****Supply Condition**** box, enter the supply condition details of the material.
24. In the ****Material Description**** box, enter the material description.
25. Click ****Update****. Once you have added the material details, you must add the heat numbers for the added materials.

#### **4.17.3 Add Heat Numbers** 

1. Click[![image-1651199735802.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651199735802.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651199735802.png)(Add icon) of the respective material in the ****Add/Edit - Materials**** See Fig 4.17.1. The **Heat Numbers** window opens.
    
    [![image-1651199765779.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651199765779.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651199765779.png)
2. Click [![image-1651199799583.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651199799583.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651199799583.png) (**ADD** button) in the **Heat Numbers** window.
    
    A new window opens to add a heat number.
    
    [![image-1651199834687.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651199834687.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651199834687.png)
3. In the **Heat Number/Certificates** box, select the heat number from a drop-down list.
4. In the **Plate Number/Coil Number/ Tag Number** box, enter the plate number or coil number or tag number of the material.
5. In the ****Delivery Quantity (Total)**** box, enter the total delivery quantity of the material.
6. In the ****Delivery Quantity (Partial)**** box, enter the partial delivery quantity of the material.
7. In the ****CEQ**** box, enter the CEQ number.
8. In the ****CD Number**** box, enter the CD number.
9. In the ****Unique Number**** box, enter the unique number of the material.
10. In the ****Client Item Number**** box, enter the client item number.
11. In the ****Dimensions**** option, select ****Accepted**** or ****Rejected**** based on the inspection detail.
12. In the ****Visual**** option, select ****Accepted**** or ****Rejected**** based on the inspection detail.
13. In the ****Mill Test Certificates (MTC)**** option, select ****Accepted**** or ****Rejected**** based on the inspection detail.
14. In the ****Remarks**** option, enter your remarks if any.
15. If the heat treatment is required for the material, select **YES** in the **Heat Treatment** option. Otherwise select **NO**.
16. In the NDE is required for the material, select ****YES**** in the ****NDE****  Otherwise select ****NO****.
17. Click **Update**. Once you have added the heat numbers, you must add unique numbers for the material.

#### **4.17.4 Add Unique Numbers**

1. Click[![image-1651200085506.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651200085506.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651200085506.png) (Add icon) of the respective heat number in the [**<u>Heat Numbers </u>**<u>box</u>](#HN).
    
    The **Unique Numbers** box opens.
    
    [![image-1651200119677.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651200119677.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651200119677.png)
2. Click [![image-1651200132564.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651200132564.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651200132564.png) (**ADD** button) in the **Unique Numbers** window.
    
    A new window opens to add a unique number.
    
    [![image-1651200165681.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651200165681.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651200165681.png)
3. In the ****Unique Number**** box, enter a unique number for the respective heat number.
4. In the **Original Number** box, enter the original number of the material.
5. In the ****Size**** box, enter the size of the material.
6. Click **Update**.

#### **4.17.5 Print an Incoming MIR** 

If you want to print an incoming MIR report, click [![image-1651200271306.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651200271306.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651200271306.png)(print icon) provided in the **Report** column of the **Incoming Material Inspection Report** page. See Fig 4.17.

#### **4.17.6 Print a Report with MTC**

If you want to print an incoming MIR report including MTC, click[![image-1651200328292.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651200328292.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651200328292.png)(print icon) provided in the **Report** **with MTC** column of the **Incoming Material Inspection Report** page. See Fig 4.17.

#### **4.17.7 Attach a File into an Added Incoming MIR** 

If you want to attach any file with any incoming MIR listed in the **Incoming Material Inspection Report** page. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **4.17.8 Edit an Incoming MIR** 

If you want to edit any existing incoming MIR in the **Incoming Material Inspection Report** page, do the following,

1. Click[![image-1651200432832.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651200432832.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651200432832.png) (Edit icon)in the **Edit** column for the respective MIR. See Fig 4.17.
    
    A new window opens to edit the added incoming MIR.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **4.17.9 Delete an Incoming MIR**

If you want to delete any specific incoming MIR from the list of MIRs, you can use [![image-1651200514617.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651200514617.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651200514617.png) (Delete icon) provided in the **Delete** column of the **Incoming Material Inspection Report** page. To know how to delete, see the topic, “[**<u>Delete P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

#### **4.17.10 Filter an Incoming MIR**

If you want to filter any incoming MIR from the list of MIRs in the **Incoming Material Inspection Report** page,

- you can use the request status wise filter box [![image-1651200586384.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651200586384.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651200586384.png) provided in the upper side of the **Incoming Material Inspection Report** page.
- You can also use [![image-1651200611102.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651200611102.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651200611102.png) (****FILTER**** button) located on the ****Incoming Material Inspection Report**  To know how to filter using the ****Filter**** button, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

#### **4.17.11 Export Incoming MIR List**

You can export a list of MIR added in the **Incoming Material Inspection Report** page in the pdf and excel formats by using [![image-1651200717968.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651200717968.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651200717968.png) (**PDF** button) and (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

# Inspection

### **5.0 Inspection**

The **Inspection** menu in the home page of the ***cuteQM*** app used add a Request for Inspection (RFI) fit up request, an RFI weld VI request, an NDT inspection request, a spool release request, a dimensional inspection request, an RFI painting and blasting work, and other AFI requests.

#### **5.1 RFI Fit up Request (Heat Numbers)**

The RFI Fit up Request tab allows you add an RFI fit up request to check the fit-up quality of pipes and joints used in the piping project by a sub-contractor. To navigate to the RFI fit up request adding page,

1. Click ****RFI Fit up Request**** in the ****Inspection**** menu. The **RFI Fit up Request** page opens.
    
    [![image-1651200865318.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651200865318.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651200865318.png)
    
     **Figure 5.1: RFI Fit up Request page**

#### **5.1.1 Add an RFI Fit up Request**

If you want to add an RFI fit up request, do the following steps,

1. In the **Sub Contractor** box, select the sub-contractor from a drop-down list.
2. In the **Inspection Date and Time** box, select the inspection date and time.
    
    [![image-1651200945483.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651200945483.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651200945483.png)**Note:** The inspection date should be as current date or upcoming dates. The system will not accept if you have given the previous dates. The fit up inspection date should not be later than the RFI weld visual inspection date.
3. In the ****Location**** box, select a location from a drop-down list.
4. In the ****System**** box, select a system from a drop-down list. Before saving the added fit up request, you must add joints for the fit-up request.
    
    [![image-1651201027630.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201027630.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201027630.png)**Note**: You can add multiple joints for one request.
    
    The **RFI Fit up Request** page shows a list of joints for the corresponding line and drawing numbers including the component details. If you want to add joints for the RFI Fit up request, do the following, [![image-1651201059763.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201059763.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201059763.png)
5. Before adding joints, click the respective[![image-1651201091892.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201091892.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201091892.png) (Add component details icon) of the joints which you want to add. The **Component – I &amp; II** box opens.
    
    [![image-1651201190682.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201190682.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201190682.png)
6. Check and edit the details of first and second components. 
    1. 1. Check the first and second components name. If you want to change the component, you can change the component by using a drop-down list.
        2. In the ****Material**** box, select the material that is the components is made with.
        3. Check the material specifications and grade.
        4. In the ****Diameter (MM)**** and ****Thickness (MM)**** boxes, select the diameter and thickness of the components from the given values.
        5. Click ****Save****. The component details will be saved successfully.
7. Click[![image-1651201285984.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201285984.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201285984.png) (Add icon) of the respective joints you want to add. The added joints will be moved and listed in the right side of the page.
    
    [![image-1651201308335.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201308335.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201308335.png)
8. In the ****Heat No 1**** box, enter the heat number of the first component if you know.
9. In the ****Heat No 2**** box, enter the heat number of the second component if you know.
10. In the ****Fitter**** box, select the fitter from a drop-down list.
11. In the ****WPS**** box, select the WPS from a drop-down list. [![image-1651201433945.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201433945.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201433945.png) **Tip**: If you want to remove any added joint, click [![image-1651201449656.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201449656.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201449656.png)(**Remove** icon) of the respective joint.
12. In the ****Description/Note**** box, enter the description for the added RFI fit up request.
13. Click ****Save****.

The RFI fit up request is successfully added. If you want to view the added request, navigate to [**<u>View RFI Fit up</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.2-view-rfi-fit-up-).


### **5.2 View RFI Fit up (Heat Numbers)**

The **View RFI Fit up** tab helps you to view and edit the RFI fit up requests, which are added by using the **RFI Fit up Request** tab. This tab also allows you to add a new RFI fit up request.

1. Click the **View RFI Fit up** tab in the **Inspection** menu.
    
    The **RFI Fit up Request List** page opens with a list of added RFI fit up requests.
    
    [![image-1651201553190.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201553190.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201553190.png)
    
     **Figure 5.2: RFI Fit up Request List page**

#### **5.2.1 Add an RFI Fit up Request**

If you want to add an RFI fit up request, do the following,

1. Click [![image-1651201649669.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201649669.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201649669.png) (****ADD**** button) in the ******RFI Fit up Request List****** page. The system redirects you into **RFI Fit up Request** page. To know how to add an RFI fit up request, See the topic, “**[<u>Add an RFI Fit up Request</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.1.1-add-an-rfi-fit)**”.

Once you have added the RFI fit up request, you must submit the added request for inspection.

#### **5.2.2 Add Representative for Added RFI Fit up Request**

If you want to add a representative for any added RFI fit up request,

1. Click [![image-1651201749585.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201749585.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201749585.png)(Edit icon) in the ****Representative**** column for the respective RFI fit up request. The **Edit Form** window opens.
    
    [![image-1651201773894.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201773894.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201773894.png)
2. In the ****Representative**** box, enter the name of a representative.
3. In the ****Inspection Date**** box, select the date of inspection.
4. In the ****Remarks**** box, enter your remarks if any.
5. Click ****Save****.

#### **5.2.3 Edit an RFI Fit up Request** 

If you want to edit any existing RFI fit up request in the **RFI** **Fit up Request** page, do the following,

1. Click (Edit icon) in the ****Edit**** column for the respective RFI fit up request. See Fig 5.2. The **RFI Fit up Visual Request** page opens with the details of the selected RFI fit up request.
    
    [![image-1651201875898.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201875898.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201875898.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **5.2.4 Submit and Approve an RFI Fit up Request**

Once you have added the RFI fit up request, the **Submission** column in the **RFI Fit up Request Lists** page is appeared with[![image-1651201968441.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201968441.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201968441.png)(Submit and Reject icons). See Fig 5.2.

1. If you want to submit the RFI fit up request, click [![image-1651201981884.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201981884.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201981884.png)(Submit icon) in the **Submission** column. Otherwise click [![image-1651201995224.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201995224.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201995224.png)(Reject icon) to reject the request.
    
    Once you have submitted the RFI fit up request, the **Request Status** column in the **RFI Fit up Requests List** page is appeared with[![image-1651202048663.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202048663.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202048663.png)(Approve and Reject icons).
2. If you want to approve the RFI fit up request, click (Submit icon) in the ****Request Status**** Otherwise click [![image-1651202071851.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202071851.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202071851.png)(Reject icon) to reject the request.

The approved request will be moved to for inspection.

#### **5.2.5 Add Results of RFI Fit up Inspection**

After completing the RFI fit up inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click [![image-1651202154608.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202154608.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202154608.png) (Add icon) in the **Results** column of the respective request.
    
    The **RFI Fit up Request List** window opens with a list of joints.
    
    [![image-1651202170647.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202170647.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202170647.png)
2. If you want to update the heat numbers for both the components, click (Edit icon) of the respective component. The Heat Number window opens with a list of heat numbers and MIR numbers.
    
    [![image-1651202202766.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202202766.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202202766.png)
3. Select the heat numbers you want to update.
4. Click ****Save &amp; Close****. The heat numbers will be updated successfully.
5. If you want to update the WPS number in the **WPS Number** column, you can change the WPS number from a drop-down list.
6. Update the result for root gap by selecting ****Accepted**** or ****Rejected**** in the ****Root Gap**** column based on the inspection.
7. Update the result for straight/ alignment by selecting ****Accepted**** or ****Rejected**** in the ****Strgt/Align**** column based on the inspection.
8. In the ****Edge Prep**** column, select the type of the edge preparation from a drop-down list.
9. In the ****Result**** column, update the RFI fit up inspection result by selecting ****Pending****, ****Accepted****, ****Rejected****, or ****Cancelled****.
10. In the ****Remarks**** column, enter you remarks if any. [![image-1651202298446.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202298446.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202298446.png)**Note**: If you want to attach any document to add more information about the inspection results, click (Attach icon) and attach your document.

#### **5.2.6 View an RFI Fit up Report**

If you want to view an RFI fit up report, click [![image-1651202346789.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202346789.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202346789.png)(print icon) provided in the **Report** column of the **RFI Fit up Requests List** page. See Fig 5.2.

#### **5.2.7 View Signature Details of Inspectors**

You can view the sign details of the inspectors such as QA, Sub contractor, Client, and Owner, once they completed the RFI fit up inspection and submitted the inspection result details including their signature. To view the signature details, click[![image-1651202403131.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202403131.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202403131.png)(Sign icon) in the **Sign Details** column in the **RFI Fit up Requests List** page.

#### **5.2.8 Bulk Print the RFI Fit up Reports**

If you want to print all the RFI fit up reports added in the **RFI Fit up Requests List** page together, click [![image-1651202451564.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202451564.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202451564.png) (**Bulk Print** button). The Report page shows all the RFI fit up reports together.

#### **5.2.9 Attach a File into an RFI Fit up Request** 

If you want to attach a file with any existing RFI fit up request listed in the **RFI Fit up Requests List** page, you can attach the file by using [![image-1651202499153.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202499153.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202499153.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.2.10 Export RFI Fit up Request List**

You can export a list of RFI fit up requests added in the **RFI Fit up Requests List** page in both the pdf and excel formats by using [![image-1651202537414.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202537414.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202537414.png) (**PDF** button) and [![image-1651202548613.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202548613.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202548613.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **5.2.11 Filter an RFI Fit up Request**

If you want to filter any specific RFI fit up request in the **RFI Fit up Requests List** page,

- you can use the filter box [![image-1651202605997.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202605997.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202605997.png) provided in the upper side of the ****RFI Fit up Requests List****  To filter the any specific RFI fit up request, select the ****Drawing Number**** and ****Date**** in the boxes and click ****Search****. [![image-1651202632269.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202632269.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202632269.png)
- you can use [![image-1651202662798.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202662798.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202662798.png) (****FILTER**** button) located on the ****RFI Fit up Requests List**  To know how to filter, see the topic, “[<u>**Filter P&amp;ID**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **5.3 RFI Weld VI Request (Heat Numbers)**

The **RFI Weld VI Request** tab in the **Inspection** menu allows you to add an RFI weld VI request to perform visual inspection of welded pipes and joints used in the piping project. To navigate to the RFI weld VI request adding page,

1. Click **RFI Weld VI Request** in the **Inspection** menu.
    
    The **RFI Weld Visual Request** page opens.
    
    [![image-1651202730986.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202730986.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202730986.png)
    
     **Figure 5.3: RFI Weld Visual Request page**

#### **5.3.1 Add an RFI Weld VI Request**

If you want to add an RFI weld VI request, do the following steps,

1. In the ****Sub Contractor Name**** box, select the name of a sub-contractor from a drop-down list.
2. In the ****Inspection Date and Time**** box, select the inspection date and time. [![image-1651202807100.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202807100.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202807100.png) **Note:** The inspection date should be as current date or upcoming dates. The system will not accept if you have given the previous dates.
3. In the ****Location**** box, select a location from a drop-down list.
4. In the **System** box, select a system from a drop-down list. Before saving the added weld VI request, you must add joints for the weld VI request.
    
    [![image-1651202862835.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202862835.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202862835.png) **Note**: You can add multiple joints for one request.
    
    The **RFI Weld Visual Request** page shows a list of joints for the corresponding line and drawing numbers including the spool number. If you want to add joints for the RFI weld VI request, do the following steps,
    
    [![image-1651202894373.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202894373.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202894373.png)
5. Click [![image-1651202920056.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202920056.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202920056.png)(Add icon) of the respective joints you want to add.
    
    The added joints will be moved and listed in the right side of the page.
    
    [![image-1651202933599.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202933599.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202933599.png)
6. Update the welder details by using[![image-1651202963160.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202963160.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202963160.png)(Add icon) provided in the ****Welder Details****
    1. 1. Click[![image-1651202979402.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202979402.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202979402.png) (Add icon) of the respective joint number. The **Welder- Weld Layer- Weld Process** window opens.
            
            [![image-1651202999679.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202999679.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202999679.png)
        2. In the ****Date**** box, select the date.
        3. In the ****Group Name**** box, select the group name from a drop-down list.
        4. In the ****Weld Process**** field, select a weld process.
        5. In the ****Weld Position**** field, select the welding position.
        6. In the ****Weld Layers**** field, select the weld layers you want add.
        7. In the ****Welder Number/ Name**** field, select the welders you want to add.
        8. Click ****Add****. The selected welders will be added and listed in the below table. See the above figure.
        9. In the ****Weld Consumable**** box, select the weld consumable from a drop-down list.
        10. In the ****WPS Number**** box, select the WPS number from a drop-down list.
        11. Click ****Save****. [![image-1651203097946.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203097946.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203097946.png)**Tip**: If you want to remove any added joint, click (**Remove** icon) of the respective joint.
        12. In the ****Description**** box, enter the description for the added RFI weld VI request.
        13. Click ****Save****. The RFI weld VI request is successfully added. If you want to view the added request, navigate to [**<u>View RFI Weld VI</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.4-view-rfi-weld-vi).


### **5.4 View RFI Weld VI (Heat Numbers)**

The **View RFI Weld VI** tab helps you to view and edit the RFI weld VI request, which is added by using the **RFI Weld VI Request** tab. This tab also allows you to add a new RFI weld VI request.

1. Click the **View RFI Weld VI** tab in the **Inspection** menu.
    
    The **RFI Weld Visual Requests List** page opens with a list of added RFI weld VI requests.
    
    [![image-1651203226485.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203226485.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203226485.png)
    
     **Figure 5.4: RFI Weld Visual Requests List page**

#### **5.4.1 Add an RFI Weld VI Request**

If you want to add an RFI weld VI request, do the following,

1. Click [![image-1651203276886.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203276886.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203276886.png) (**ADD** button) in the **RFI Weld Visual Requests List** page.
    
    The system redirects you into **RFI Weld Visual Request** page. To know how to add an RFI weld VI request, See the topic, “[**<u>Add an RFI Weld VI Request</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.4-view-rfi-weld-vi)”.

Once you have added the RFI weld VI request, you must submit the added request for weld visual inspection.

#### **5.4.2 Add Representative for Added RFI Weld VI Request**

If you want to add a representative for any added RFI weld VI request,

1. Click [![image-1651203398654.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203398654.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203398654.png)(Edit icon) in the ****Representative**** column for the respective RFI weld VI request.
    
    The **Edit Form** window opens.
    
    [![image-1651203412706.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203412706.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203412706.png)
2. In the ****Representative**** box, enter the name of a representative.
3. In the ****Inspection Date**** box, select the date of inspection.
4. In the ****Remarks**** box, enter your remarks if any.
5. Click ****Save****.

#### **5.4.3 Edit an RFI Weld VI Request** 

If you want to edit any existing RFI weld VI request in the **RFI** **Weld Visual Requests List** page, do the following,

1. Click[![image-1651203594989.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203594989.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203594989.png)(Edit icon) in the **Edit** column for the respective RFI weld VI request. See Fig 5.4. The **RFI Weld Visual Request** page opens with the details of the selected RFI weld VI request.
    
    [![image-1651203621851.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203621851.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203621851.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **5.4.4 Submit an RFI Weld VI Request**

Once you have added the RFI weld VI request, the **Request Status** column in the **RFI Weld Visual Requests List** page is appeared [![image-1651203728786.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203728786.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203728786.png)with (Submit and Reject icons). See Fig 5.4.

1. If you want to submit the RFI weld VI request, click[![image-1651203762346.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203762346.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203762346.png) (Submit icon) in the ****Request Status**** Otherwise click [![image-1651203792080.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (Reject icon) to reject the request.

The submitted request will be moved to for RFI weld visual inspection.

#### **5.4.5 Add Results of RFI weld Visual Inspection**

After completing the RFI weld visual inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click [![image-1651204298494.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204298494.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204298494.png)(Add icon) in the **Results** column of the respective request. The **RFI Weld Visual Request List** window opens with a list of joints added for the particular request.
    
    [![image-1651204332633.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204332633.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204332633.png)
2. If you want to update the welder details, click[![image-1651204360463.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204360463.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204360463.png) (Add icon) of the respective joint. The **Welder-Weld Layer-Weld Process** window opens.
    
    [![image-1651204372371.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204372371.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204372371.png)
    
    [![image-1651204383612.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204383612.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204383612.png) **Note:** If you want to delete any added weld, click (Delete icon) of the respective welder.
    
    
    1. 1. In the ****Date**** box, select the date.
        2. In the ****Group Name**** box, select the group name from a drop-down list.
        3. In the ****Weld Process**** field, select a weld process.
        4. In the ****Weld Position**** field, select the welding position.
        5. In the ****Weld Layers**** field, select the weld layers you want add.
        6. In the ****Welder Number/ Name**** field, select the welders you want to add.
        7. Click ****Add****. The selected welders will be added and listed in the below table. See the above figure.
        8. In the ****Weld Consumable**** box, select the weld consumable from a drop-down list.
        9. In the ****WPS Number**** box, select the WPS number from a drop-down list.
        10. Click ****Save****.
3. In the ****Result**** column, select the result for each joint from the given result options in the drop-down list.
4. In the ****Remarks**** box, enter your remarks if any.
5. Click ****Save****.

#### **5.4.6 View an RFI Weld VI Report**

If you want to view an RFI weld VI report, click[![image-1651204648220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204648220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204648220.png)(print icon) provided in the **Report** column of the **RFI Weld Visual Requests List** page. See Fig 5.4.

#### **5.4.7 View Signature Details of Inspectors**

You can view the sign details of the inspectors such as QA, Sub contractor, Client, and Owner, once they completed the RFI weld visual inspection and submitted the inspection result details including their signature. To view the signature details, click[![image-1651204812728.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204812728.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204812728.png) (Sign icon) in the **Sign Details** column in the **RFI Weld Visual Requests List** page.

#### **5.4.8 Bulk Print RFI Weld VI Reports**

If you want to print all the RFI weld VI reports added in the **RFI Weld Visual Requests List** page together, click [![image-1651223226147.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223226147.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223226147.png) (**Bulk Print** button). The Report page shows all the RFI weld VI reports together.

#### **5.4.9 Attach a File into an RFI Weld VI Request** 

If you want to attach a file with any existing RFI weld VI request listed in the **RFI Weld Visual Requests List** page, you can attach the file by using [![image-1651223269890.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223269890.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223269890.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.4.10 Export RFI Weld VI Request List**

You can export a list of RFI weld VI requests added in the **RFI Weld Visual Requests List** page in both the pdf and excel formats by using [![image-1651223324463.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223324463.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223324463.png) (**PDF** button) and [![image-1651223333795.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223333795.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223333795.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **5.4.11 Filter an RFI Weld VI Request**

If you want to filter any specific RFI weld VI request in the **RFI Weld Visual Requests List** page,

- you can use the filter box [![image-1651223385499.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223385499.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223385499.png) provided in the upper side of the **RFI Weld Visual Requests List**  To filter the any specific RFI weld VI request, select the **Drawing Number** and **Date** in the boxes and click **Search**. [![image-1651223413564.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223413564.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223413564.png)
- you can use [![image-1651223433424.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223433424.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223433424.png) (**FILTER** button) located on the **RFI Weld Visual Requests List** page. To know how to filter, see the topic, “[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **5.5 NDT Inspection Request**

The **NDT Inspection Request** tab in the **Inspection** menu helps you to add an NDT inspection request to perform an NDT inspection. To navigate to the NDT inspection request adding page,

1. Click ****NDT Inspection Request**** in the ****Inspection**** menu. The **NDT Inspection Request** page opens.
    
    [![image-1651223631643.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223631643.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223631643.png)
    
     **Figure 5.5: NDT Inspection Request page**

#### **5.5.1 Add an NDT inspection request**

If you want to add an NDT inspection request, do the following

1. Click [![image-1651227156663.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227156663.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227156663.png) (**ADD** button) in the **NDT Inspection Request** page.
    
    A new page opens to add an NDT inspection request.
    
    [![image-1651227171999.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227171999.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227171999.png)
    
     **Figure 5.5: NDT Inspection Request page**
    
    [![image-1651227211421.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227211421.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227211421.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **Requested By** box, enter the name of person who has requested for the NDT inspection.
3. In the **To** box, select the name of a sub-contractor from a drop-down list.
4. In the **Description/ Spec. Ref. No** box, enter the description for the request.
5. In the **Inspection Date &amp; Time** box, select the date of inspection.
6. In the **Location** box, enter the location where the inspection to be done.
7. In the **Requisition** box, enter the requisition detail.
8. In the **Longitudinal** box, enter the longitudinal value.
9. In the **Drawing No** box, select the drawing number from a drop-down list.
10. In the **Designation** box, enter the designation detail.
11. In the **Cost Centre** box, enter the cost centre detail
12. In the **PWHT Request Type** box, select the PWHT request type from a drop-down list.
13. In the **System** box, select a system from a drop-down list.
14. In the **NDT Type** box, select the type of NDT you want to add. Before saving the added NDT request, you must add joints. You can add multiple joints for one NDT inspection request.
    
    [![image-1651227469136.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227469136.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227469136.png)**Note**: The page shows a list of added joints. If you want to view the joints for the specific ISO drawing, select the respective ISO drawing from a drop-down list.
15. Click[![image-1651227533159.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227533159.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227533159.png) (Add icon) of the respective joint which you want to add. The added joints will be moved to the right side of the page.
    
    [![image-1651227563727.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227563727.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227563727.png)
16. In the **Remarks** box, enter your remarks if any.
17. Click **Save NDT Request**. The added NDT inspection request will be listed in the **NDT Inspection Request** page.

#### **5.5.2 Edit an NDT Inspection Request** 

If you want to edit any existing NDT inspection request in the **NDT Inspection Request** page, do the following steps,

1. Click [![image-1651227654663.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227654663.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227654663.png) (Edit icon) in the **Edit** column for the respective NDT request. See Fig 5.5. The **NDT Inspection Request** page opens with the details of the selected NDT inspection request.
    
    [![image-1651227744309.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227744309.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227744309.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **5.5.3 Submit and Approve an NDT Inspection Request**

Once you have added the NDT inspection request, the **Submission** column in the **NDT Inspection Request** page is appeared with [![image-1651227804150.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227804150.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227804150.png) (Submit and Reject icons). See Fig 5.5.

1. If you want to submit the NDT inspection request, click[![image-1651227834918.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227834918.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227834918.png) (Submit icon) in the ****Submission**** Otherwise click [![image-1651227860032.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227860032.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227860032.png) (Reject icon) to reject the request. Once the NDT inspection request has been submitted, the **Request Status** column in the **NDT Inspection Request** page is appeared with [![image-1651227889337.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227889337.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227889337.png) (Approve and Reject icons).
2. If you want to accept the NDT inspection request, click [![image-1651227935228.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227935228.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227935228.png)(Approve icon) in the ****Request Status**** Otherwise click [![image-1651227956151.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227956151.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227956151.png)(Reject icon) to reject the request. The approved request will be moved to NDT inspection.

#### **5.5.4 View an NDT Inspection Report**

If you want to view an NDT inspection report, click [![image-1651228014197.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228014197.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228014197.png) (print icon) provided in the **Report** column of the **NDT Inspection Request** page. See Fig 5.5.

#### **5.5.5 Attach a File into an NDT Inspection Request** 

If you want to attach a file with any existing NDT inspection request listed in the **NDT Inspection Request** page, you can attach the file by using [![image-1651228062872.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228062872.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228062872.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.5.6 Export NDT Inspection Request List**

You can export a list of NDT inspection requests added in the **NDT Inspection Request** page in both the pdf and excel formats by using [![image-1651228119589.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228119589.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228119589.png) (**PDF** button) and [![image-1651228129539.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228129539.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228129539.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **5.5.7 Filter an NDT Inspection Request**

If you want to filter any specific NDT inspection request in the **NDT Inspection Request** page,

- you can use the filter box [![image-1651238548225.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651238548225.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651238548225.png) provided in the upper side of the **NDT Inspection Request** page. To filter the any specific NDT inspection request, select the request status in the **Request Status** box.
- you can use [ ![image-1651238729214.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651238729214.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651238729214.png) (****FILTER**** button) located on the ****NDT Inspection Request**  To know how to filter, see the topic, “**[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)**”.

#### **5.5.8 Import Multiple NDT Inspection Requests**

If you want to import multiple NDT inspection requests together, do the following,

1. Click [![image-1651239757314.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651239757314.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651239757314.png) (**TEMPLATE** button). See Fig 5.5.
    
    An excel worksheet will be downloaded with a predefined template to enter the details of NDT inspection requests.
    
    [![image-1651239899105.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651239899105.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651239899105.png)
2. Enter the required NDT inspection request details in the respective columns of the excel worksheet.
3. Once you have added the NDT inspection request details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651239958610.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651239958610.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651239958610.png) (****IMPORT**** button). See Fig 5.5. A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651240053690.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240053690.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240053690.png)
5. Click [![image-1651240063806.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240063806.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240063806.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651240093776.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240093776.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240093776.png) (****Upload**** button) to export the NDT inspection request that are included in the excel worksheet.

The details of the NDT inspection request in the worksheet will be displayed in the **NDT Inspection Request** page.


### **5.6 NDT Job Order**

The **NDT Job Order** tab in the **Inspection** menu allows you to add a job order for a specific NDT-contractor to carry out the NDT inspection. Once you have added the job order, you can add the NDT request including the quantity and schedule date to complete the NDT inspection.

1. Click **NDT Job Order** in the **Inspection** menu.
    
    The **Job Order** page opens.
    
    [![image-1651240218199.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240218199.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240218199.png)
    
    [![image-1651240228823.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240228823.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240228823.png)
    
     **Figure 5.6: Job Order page**

#### **5.6.1 Add an NDT Job Order**

If you want to add an NDT job order, do the following steps,

1. Click [![image-1651240354668.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240354668.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240354668.png) (**ADD** button) in the **Job Order** page. See Fig 5.6.
    
    A new window opens to add an NDT job order.
    
    [![image-1651240375655.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240375655.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240375655.png)
    
    [![image-1651240392759.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240392759.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240392759.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651240410621.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240410621.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240410621.png)**Tip**: A report number for a new job order will be updated automatically in the **Report Number** box.
2. In the ****NDT Contractor**** box, select the name of an NDT contractor from a drop-down list.
3. In the ****Attention**** box, enter any note if you want for attention.
4. In the ****Date**** box, select the date of adding an NDT job order.
5. In the **Requested By** box, enter the name of a person who has requested for an NDT job order.
6. In the ****Requested Date**** box, select the requested date of an NDT job order.
7. In the ****Supported By**** boxes, enter the name of a project lead and a HOD, respectively.
8. In the ****Supported Date**** box, select the supported date of an NDT job order.
9. Click ****Save****. The NDT job order is successfully added.

#### **5.6.2 Add an NDT Job Request** 

To add an NDT job request,

1. Click [![image-1651240583606.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240583606.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240583606.png)(Add icon) of the respective job order in the ****Add NDT Request**** column of the ****Job Order**** See Fig 5.6. A new window shows a list of added NDT request.
    
    [![image-1651240612206.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240612206.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240612206.png)
2. If you want to add any request, click [![image-1651240634566.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240634566.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240634566.png) (Add icon) of the respective request. The added NDT request will be assigned under the respective job order.
3. If you want to delete any request, click [![image-1651240675614.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240675614.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240675614.png) (Delete icon) of the respective request.

#### **5.6.3 Attach a File into an NDT Job Order** 

If you want to attach any file with any NDT job order listed in the **Job Order** page, you can attach the file by using [![image-1651240807174.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240807174.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240807174.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.6.4 View an NDT Job Order Report**

If you want to view an NDT job order report, click [![image-1651240896862.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240896862.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240896862.png) (print icon) provided in the **Report** column of the **Job Order** page. See Fig 5.6.

#### **5.6.5 Edit an NDT Job Order**

If you want to edit any existing NDT job order in the **Job Order** page, do the following,

1. Click [![image-1651241158257.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651241158257.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651241158257.png)(Edit icon) in the **Edit** column for the respective NDT job order. See Fig 5.6. A new window opens with the added details of NDT job order to edit the job order.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **5.6.6 Delete an NDT Job Order**

If you want to delete any specific NDT job order, you can use [![image-1651241233671.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651241233671.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651241233671.png) (Delete icon) provided in the **Delete** column of the **Job Order** page, See Fig 8.6. To know how to delete, see the topic, “[**<u>Delete P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

#### **5.6.7 Export NDT Job Order List**

You can export a list of NDT job order added in the **Job Order** page in the pdf and excel formats by using [![image-1651241460912.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651241460912.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651241460912.png) (**PDF** button) and [![image-1651241471852.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651241471852.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651241471852.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.


### **5.7 Spool Release Inspection Request**

The **Spool Release Request** tab in the **Inspection** menu helps you to add a spool release request. To navigate to the spool release inspection request adding page,

1. Click ****Spool Release Request**** in the ****Inspection**** menu. The **Spool Release Inspection Request** page opens.
    
    [![image-1651241577517.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651241577517.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651241577517.png)
    
     **Figure 5.7: Spool Release Inspection Request page**

#### **5.7.1 Add a Spool Release Inspection Request**

If you want to add a spool release inspection request, do the following steps in the **Spool Release Inspection Request p**age, See Fig 5.7.

1. In the ****Inspection Date**** box, select the date of spool inspection.
2. In the **Location** box, select the location where the spool inspection to be performed. Before saving the added spool release inspection request, you must add spools. You can add multiple spools for one spool release inspection request.
    
    [![image-1651241851538.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651241851538.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651241851538.png) **Note**: The page shows a list of added spools. If you want to view the specific spools, use the filter options provided in the **System**, **Line Number**, **Drawing Number**, and **Spool Number** columns.
3. Click [![image-1651241879363.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651241879363.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651241879363.png) (Add icon) of the respective spool which you want to add. The added spools will be moved to the right side of the page.
    
    [![image-1651241923753.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651241923753.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651241923753.png)
4. In the **Remarks** box, enter your remarks if any.
5. In the **Inspection Item** box, enter the details of inspection items.
6. In the **Subject Coverage** box, enter the details of subject coverage.
7. Click **Save**.

The spool release request will be added and listed in the **View** **Spool Release** page.


### **5.8 View Spool Release**

The **View Spool Release** tab helps you to view and edit the spool release inspection request, which is added by using the **Spool Release Inspection Request** tab. This tab also allows you to add a new spool release request.

1. Click **View Spool Release** in the **Inspection** menu.
    
    The **Spool Release List** page opens with a list of added spool release requests.
    
    [![image-1651242070121.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651242070121.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651242070121.png)
    
     **Figure 5.8: Spool Release List page**

#### **5.8.1 Add a Spool Release Inspection Request**

If you want to add a spool release request, do the following steps,

1. Click [![image-1651242215588.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651242215588.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651242215588.png) (**ADD** button) in the **Spool Release List** page.
    
    The system redirects you into **Spool Release Inspection Request** page. To know how to add a spool release inspection request, See the topic, “[**<u>Add a Spool Release Inspection Request</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.7.1%C2%A0add-a-spool-re)”.

Once you have added the spool release request, you must submit the added request to perform inspection in the piping spool.

#### **5.8.2 Add Representative for Added Spool Release Inspection Request**

If you want to add a representative for any added spool release request,

1. Click [![image-1651242358767.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651242358767.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651242358767.png)(Edit icon) in the **Representative** column for the respective spool release request. The **Edit Form** window opens.
    
    [![image-1651242414597.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651242414597.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651242414597.png)
2. In the ****Inspection Date**** box, select the date of inspection.
3. In the ****Representative**** box, enter the name of a representative.
4. Click ****Save****.

#### **5.8.3 Edit a Spool Release Inspection Request** 

If you want to edit any existing spool release request in the **Spool Release List** page, do the following,

1. Click [![image-1651242854925.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651242854925.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651242854925.png)(Edit icon) in the ****Edit**** column for the respective spool release request. See Fig 5.8. The **Spool Release Inspection Request** page opens with the details of the selected spool release request.
    
    [![image-1651242882181.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651242882181.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651242882181.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.8.4 Submit a Spool Release Inspection Request**

Once you have added the spool release request, the **Request Status** column in the **Spool Release List** page is appeared with [![image-1651243016713.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651243016713.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651243016713.png) (Submit and Reject icons). See Fig 5.8.

1. If you want to submit the spool release request, click [![image-1651243057735.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651243057735.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651243057735.png) (Submit icon) in the ****Request Status**** Otherwise click [![image-1651243077996.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651243077996.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651243077996.png)(Reject icon) to reject the request. The submitted request will be moved to for spool inspection.

#### **5.8.5 Add Results of Spool Release Inspection**

After completing the spool release inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click [![image-1651243199154.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651243199154.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651243199154.png) (Add icon) in the **Results** column of the respective request.
    
    The **Spool Release List** window opens with a list of spools added for the particular request.
    
    [![image-1651243221400.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651243221400.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651243221400.png)
2. In the **Result** column, select the result for each spool from the given result options in the drop-down list.
3. In the ****Remarks**** box, enter your remarks if any.
4. Click ****Save****.

#### **5.8.6 View a Piping Spool Release Report**

If you want to view a piping spool release report, click[![image-1651243293904.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651243293904.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651243293904.png) (print icon) provided in the **Print** column of the **Spool Release List** page. See Fig 5.8.

#### **5.8.7 Attach a File into a Spool Release Inspection Request** 

If you want to attach a file with any existing spool release request listed in the **Spool Release List** page, you can attach the file by using [![image-1651243363769.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651243363769.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651243363769.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.8.8 View Signature Details of Inspectors**

You can view the sign details of the inspectors such as QA, Sub contractor, Client, and Owner, once they completed the spool release inspection and submitted the inspection result details including their signature. To view the signature details, click [![image-1651243432221.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651243432221.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651243432221.png) (Sign icon) in the **Sign Details** column in the **Spool Release List** page.

#### **5.8.9 Export Spool Release Inspection Request List**

You can export a list of spool release requests added in the **Spool Release List** page in both the pdf and excel formats by using[![image-1651243526591.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651243526591.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651243526591.png) (**PDF** button) and [![image-1651243548643.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651243548643.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651243548643.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **5.8.10 Filter a Spool Release Inspection Request**

If you want to filter any specific spool release request in the **Spool Release List** page, you can use (**FILTER** button) located on the **Spool Release List** page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **5.9 Inspection Release Note**

The **Inspection Release Note** tab in the Inspection menu helps you to add an inspection release note. To navigate to the inspection release note adding page,

1. Click **Inspection Release Note** in the Inspection menu.
    
    The **Inspection Release Note** page opens.
    
    [![image-1651245058346.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651245058346.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651245058346.png)
    
     **Figure 5.9: Inspection Release Note page**

#### **5.9.1 Add an Inspection Release Note**

If you want to add an inspection release note, do the following steps,

1. In the **Inspection Date** box, select the date of inspection. See Fig 5.9.
2. In the ****Sub Contractor Name**** box, select a sub-contractor from a drop-down list.
3. In the ****Location**** box, select a location where the inspection to be held.
4. In the ****System/Area**** box, enter the name of area/system.
5. In the ****Sub System No**** box, enter the sub system number.
6. In the **Item to be Released** field, select the detail of the item to be released that is whether **Piping** or **Structural.** If another item means select the checkbox of **Others** and enter the item detail.
7. In the **Item to be Released** **for** field, select the reason of the item to be released for that is whether for **Pressure Test** or **Blasting &amp; Painting.** If any other reason means select the checkbox of **Others** and enter the reason.
8. Before saving the added inspection release note, you must add spools. You can add multiple spools for one inspection release note.
    
    [![image-1651245606753.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651245606753.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651245606753.png) **Note**: The page shows a list of added spools. If you want to view the specific spools, use the filter options provided in the **System**, **Line Number**, **Drawing Number**, **Sheet No &amp; Rev No** and **Spool Number** columns.
9. Click [![image-1651245665507.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651245665507.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651245665507.png)(Add icon) of the respective spool which you want to add. The added spools will be moved to the right side of the page.
10. In the **Remarks** box, enter your remarks if any.
11. In the **Inspection Item** box, enter the details of inspection items.
12. In the **Subject Coverage** box, enter the detail of subject coverage.
13. Click **Save**.

The inspection release note will be added and listed in the **View** **Inspection Release Note** page.


### **5.10 View Inspection Release Note**

The **View Inspection Release Note** tab helps you to view and edit the inspection release note, which is added by using the **Inspection Release Note** tab. This tab also allows you to add a new inspection release note.

1. Click ****View Inspection Release Note**** in the ******Inspection****** menu. The **Inspection Release Note** page opens with a list of added inspection release notes.
    
    [![image-1651245846288.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651245846288.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651245846288.png)
    
     **Figure 5.10: Inspection Release Note page**

#### **5.10.1 Add an Inspection Release Note**

If you want to add an inspection release note, do the following steps,

1. Click [![image-1651245954971.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651245954971.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651245954971.png) (**ADD** button) in the **Inspection Release Note** page. The system redirects you into **Inspection Release Note** page. To know how to add an inspection release note, See the topic, “[**<u>Add an Inspection Release Note</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.9.1-add-an-inspect)”.

Once you have added the inspection release note, you must submit the added note to perform the release note inspection.

#### **5.10.2 Add a Representative for Added Inspection Release Note**

If you want to add a representative for any added inspection release note,

1. Click [![image-1651246048357.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651246048357.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651246048357.png) (Edit icon) in the **Representative** column for the respective inspection release note.
    
    The **Edit Form** window opens.
    
    [![image-1651246074758.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651246074758.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651246074758.png)
2. In the ****Inspection Date**** box, select the date of inspection.
3. In the ****Representative**** box, enter the name of a representative.
4. Click ****Save****.

#### **5.10.3 Edit an Inspection Release Note**

If you want to edit any existing inspection release note in the **Inspection Release Note** page, do the following,

1. Click [![image-1651246148349.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651246148349.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651246148349.png) (Edit icon) in the ****Edit**** column for the respective inspection release note. See Fig 5.10. The **Inspection Release Note** page opens with the details of the selected inspection release note.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **5.10.4 Submit an Inspection Release Note**

Once you have added the inspection release note, the **Request Status** column in the **Inspection Release Note** page is appeared with (Submit and Reject icons). See Fig 5.10.

1. If you want to submit the inspection release note, click [![image-1651246272287.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651246272287.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651246272287.png) (Submit icon) in the ****Request Status**** Otherwise click [![image-1651246306387.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651246306387.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651246306387.png) Reject icon) to reject the request. The submitted request will be moved to for release note inspection.

#### **5.10.5 Add RFI Data for an Inspection Release Note**

If you want to add the details of RFI data for the added inspection release note, do the following steps,

1. Click (Edit icon) in the **RFI Data** column of the **Inspection Release Note** page. See Fig 5.10.
    
    The **RFI Inspection Request List** window opens.
    
    [![image-1651246399982.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651246399982.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651246399982.png)
2. In the ****Inspection From**** box, enter the detail from where the inspection should start.
3. In the ****Inspection To**** box, enter the detail to where the inspection should end.
4. In the ****Inspection Details**** option, select 1<sup>st</sup>Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the ****Others**** box, enter any other inspection related details.
6. In the ****Refer to Report No**** box, enter the report number for reference.
7. In the ****RFI Date**** box, choose the RFI date.
8. In the **Inspection Result** option, if the inspection result is accepted, select **Accepted** otherwise select **Rejected**.
9. In the ****Remarks**** box, enter your remarks if any.
10. In the ****Inspected by**** box, enter the name of a person who has done inspection.
11. In the ****Inspected Date**** box, choose the date of inspection.
12. In the ****Witnessed By**** box, enter the name of the witnessed person.
13. In the ****Witnessed Date**** box, choose the date of witnessed.
14. In the ****PCML Rep Name**** box, enter the representative name of PCML.
15. In the **PCML Rep Date** box, choose the PCML rep date.
16. In the ****MEB Rep Name**** box, enter the representative name of MEB.
17. In the ****MEB Rep Date box****, choose MEB rep date.
18. Click ****Save****.

The RFI data for the inspection release note is added successfully.

#### **5.10.6 Add Results of Inspection Release Note**

After completing the inspection for the added release note, you can add the inspection result details. To add results, do the following steps,

1. Click [![image-1651246749006.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651246749006.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651246749006.png) (Add icon) in the ****Results**** column of the respective request. The **INR List** window opens with a list of spools added for the particular request.
    
    [![image-1651246773082.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651246773082.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651246773082.png)
2. In the ****Result**** column, select the result for each spool from the given result options in the drop-down list.
3. In the ****Remarks**** box, enter your remarks if any.
4. Click ****Save****.

#### **5.10.7 View an RFI Report** 

If you want to view an RFI report, click[![image-1651246849368.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651246849368.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651246849368.png) (print icon) provided in the **RFI Report** column of the **Inspection Release Note** page. See Fig 5.10.

#### **5.10.8 View an Inspection Release Note Report**

If you want to view an inspection release note report, click[![image-1651246900096.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651246900096.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651246900096.png)(print icon) provided in the **Print** column of the **Inspection Release Note** page. See Fig 5.10.

#### **5.10.9 Attach a File into an Inspection Release Note** 

If you want to attach a file with any existing inspection release note listed in the **Inspection** **Release Note** page, you can attach the file by using [![image-1651246943706.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651246943706.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651246943706.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.10.10 View a Pipe Spool Release Summary**

If you want to view a pipe spool release summary report, click[![image-1651247026360.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651247026360.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651247026360.png) (print icon) provided in the upper side of the **Inspection Release Note** page. See Fig 5.10.

[![image-1651247021407.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651247021407.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651247021407.png)

#### **5.10.11 Export Inspection Release Note List**

You can export a list of inspection release notes added in the **Inspection Release Note** page in both the pdf and excel formats by using [![image-1651247100963.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651247100963.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651247100963.png) (**PDF** button) and [![image-1651247113589.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651247113589.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651247113589.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **5.10.12 Filter an Inspection Release Note**

If you want to filter any specific inspection release note in the **Inspection Release Note** page, you can use [![image-1651247158974.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651247158974.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651247158974.png) (**FILTER** button) located on the **Inspection Release Note** page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **5.11 Dimensional Inspection Request**

The **Dimensional Inspection Request** tab in the **Inspection** menu helps you to add a dimensional inspection request. To navigate to the dimensional inspection request adding page,

1. Click **Dimensional Inspection Request** in the **Inspection** menu.
    
    The **Dimensional Inspection Request** page opens.
    
    [![image-1651247677075.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651247677075.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651247677075.png)
    
     **Figure 5.11: Dimensional Inspection Request page**

#### **5.11.1 Add a Dimensional Inspection Request**

If you want to add a new dimensional inspection request, do the following steps.

1. In the **Inspection Date** box, select the date of dimensional inspection.
2. In the ****Location**** box, select the location where the dimensional inspection to be performed. Before saving the added dimensional inspection request, you must add spools. You can add multiple spools for one dimensional inspection request.
    
    [![image-1651248322032.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651248322032.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651248322032.png) **Note**: The page shows a list of added spools. If you want to view the specific spools, use the filter options provided in the **System**, **Line Number**, **Drawing Number**, and **Spool Number** columns.
3. Click [![image-1651248354041.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651248354041.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651248354041.png) (Add icon) of the respective spool which you want to add. The added spools will be moved to the right side of the page.
4. In the **Remarks** box, enter your remarks if any.
5. In the **Inspection Item** box, enter the details of inspection items.
6. Click **Save**.

The dimensional inspection request will be added and listed in the **Dimensional Inspection List** page.


### **5.12 Dimensional Inspection List**

The **Dimensional Inspection List** tab helps you to view and edit the dimensional inspection request, which is added by using the **Dimensional Inspection Request** tab. This tab also allows you to add a new dimensional inspection request.

1. Click ****Dimensional Inspection List**** in the ******Inspection****** menu. The **Dimensional Inspection List** page opens with a list of added dimensional inspection requests.
    
    [![image-1651248630722.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651248630722.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651248630722.png)
    
     **Figure 5.12: Dimensional Inspection List page**

#### **5.12.1 Add a Dimensional Inspection Request**

If you want to add a dimensional inspection request, do the following steps,

1. Click [![image-1651248827437.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651248827437.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651248827437.png) (**ADD** button) in the **Dimensional Inspection List** page.
    
    The system redirects you into the **Dimensional Inspection Request** page. To know how to add a dimensional inspection request, See the topic, “[**<u>Add a Dimensional Inspection Request</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.11.1-add-a-dimensi)”.

Once you have added the dimensional inspection request, you must submit the added request to perform the dimensional inspection.

#### **5.12.2 Add Representative for Added Dimensional Inspection Request**

If you want to add a representative for any added dimensional inspection request,

1. Click [![image-1651248912250.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651248912250.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651248912250.png)(Edit icon) in the ****Representative**** column for the respective spool release request. The **Edit Form** window opens.
    
    [![image-1651248941358.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651248941358.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651248941358.png)
2. In the ****Inspection Date**** box, select the date of inspection.
3. In the ****Representative**** box, enter the name of a representative.
4. Click ****Save****.

#### **5.12.3 Edit a Dimensional Inspection Request** 

If you want to edit any existing dimensional inspection request in the **Dimensional Inspection List** page, do the following,

1. Click [![image-1651249047665.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651249047665.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651249047665.png)(Edit icon) in the ****Edit**** column for the respective dimensional inspection request. See Fig 5.12. The page opens with the details of the selected dimensional inspection request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **5.12.4 Submit a Dimensional Inspection Request**

Once you have added the dimensional inspection request, the **Request Status** column in the **Dimensional Inspection List** page is appeared with[![image-1651249119857.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651249119857.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651249119857.png)(Submit and Reject icons). See Fig 5.12.

1. If you want to submit the dimensional inspection request, click [![image-1651249148290.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651249148290.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651249148290.png)(Submit icon) in the ****Request Status**** Otherwise click [![image-1651249175802.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651249175802.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651249175802.png) (Reject icon) to reject the request.

The submitted request will be moved to for the dimensional inspection.

#### **5.12.5 Add Results of Dimensional Inspection**

After completing the dimensional inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click[![image-1651249268524.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651249268524.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651249268524.png) (Add icon) in the **Results** column of the respective request.
    
    The **Dimensional Inspection List** window opens with a list of added spools.
    
    [![image-1651249285565.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651249285565.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651249285565.png)
2. In the ****Result**** column, select the result for each spool from the given result options.
3. In the ****Pipe Size**** column, select the result of pipe size.
4. In the ****Dimension**** column, select the result of pipe dimension.
5. In the ****Flange**** column, select the result of flange.
6. In the ****Orientation**** column, select the result of orientation.
7. In the ****Remarks**** box, enter your remarks if any.
8. Click ****Save****.

#### **5.12.6 View a Dimensional Inspection Report**

If you want to view a dimensional inspection report, click[![image-1651249434239.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651249434239.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651249434239.png) (print icon) provided in the **Print** column of the **Dimensional Inspection List** page. See Fig 5.12.

#### **5.12.7 Attach a File into a Dimensional Inspection Request** 

If you want to attach a file with an existing dimensional inspection request listed in the **Dimensional Inspection List** page, you can attach the file by using [![image-1651250022599.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651250022599.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651250022599.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”

#### **5.12.8 Export Dimensional Inspection Request List**

You can export a list of dimensional inspection requests added in the **Dimensional Inspection List** page in both the pdf and excel formats by using [![image-1651250180423.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651250180423.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651250180423.png) (**PDF** button) and [![image-1651250189837.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651250189837.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651250189837.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **5.12.9 Filter a Dimensional Inspection Request**

If you want to filter any dimensional inspection request in the **Dimensional Inspection List** page, you can use [![image-1651250230314.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651250230314.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651250230314.png) (**FILTER** button) located on the **Dimensional Inspection List** page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **5.13 RFI Hydro Pressure**

Hydro Pressure Inspection is the technique in which pipes are tested at required design pressure of the pipes to check the leak and strength. You can add a request for hydro pressure inspection by using the **RFI Hydro Pressure** tab in the **Inspection** menu.

#### **5.13.1 Add an RFI Hydro Pressure Request**

If you want to add an RFI hydro pressure request, do the following steps,

1. Click **RFI Hydro Pressure** in the **Inspection** menu.
    
    The **RFI Hydro Pressure** page opens.
    
    [![image-1651250531524.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651250531524.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651250531524.png)
    
     **Figure 5.13: RFI Hydro Pressure page**
2. In the ****Inspection Date &amp; Time**** box, select the inspection date and time.
3. In the ****Sub Contractor**** box, select a sub-contractor from a drop-down list.
4. In the ****Acceptance Code**** box, enter the acceptance code detail.
5. In the ****Designation**** box, enter the designation detail.
6. In the ****Test Temperature**** box, enter the test temperature value.
7. In the ****Test Medium**** box, select the test medium from the drop-down list.
8. In the ****Requested By**** box, enter the name of a person who has requested the hydro pressure inspection.
9. In the ****Classification**** box, enter the classification detail.
10. In the **Drawing No** box, select the drawing number from a drop-down list.
11. In the ****Work Scope**** box, enter the work scope detail.
12. In the ****Cost Centre**** box, enter the cost centre detail.
13. In the ****Holding Time**** box, enter the holding time range.
14. In the ****Pressure Gauge No**** box, enter the pressure gauge number.
15. In the ****Location**** box, select the location where the inspection to be performed.
16. In the ****System**** box, select a system from a drop-down list.
17. In the ****Procedure No**** box, enter the procedure number.
18. In the ****Design Pressure**** box, enter the design pressure range.
19. In the ****Test Pressure**** box, enter the test pressure range.
20. In the ****Instrument**** box, enter the instrument name.
21. In the ****P&amp;ID No**** box, enter the P&amp;ID number.
22. In the ****Remarks**** box, enter your remarks if any.
23. In the ****Description**** box, enter the description for the hydro pressure inspection. Before saving the added NDT request, you must add spools.
    
    [![image-1651250926040.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651250926040.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651250926040.png) **Note**: You can add multiple spools for one request.
    
    The **RFI Hydro Pressure** page shows a list of added spools. If you want to view the spools for the specific ISO drawing, select the respective ISO drawing from a drop-down list.
    
    [![image-1651250956304.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651250956304.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651250956304.png)
24. Click [![image-1651250973472.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651250973472.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651250973472.png) (Add icon) of the respective spool which you want to add. The added spools will be moved to the right side of the page.
    
    [![image-1651250993402.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651250993402.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651250993402.png)
25. Click **Save Request**.

The hydro pressure inspection request will be added and listed in the **RFI Hydro Pressure** page.


### **5.14 View RFI Hydro Pressure**

The **View RFI Hydro Pressure** tab helps you to view and edit the hydro pressure inspection request, which is added by using the **RFI Hydro Pressure** tab. This tab also allows you to add a new hydro pressure request.

1. Click **View RFI Hydro Pressure** in the **Inspection** menu.
    
    The **RFI Hydro Pressure** page opens with a list of added hydro pressure requests.
    
    [![image-1651251102133.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651251102133.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651251102133.png)
    
     **Figure 5.14: RFI Hydro Pressure page**

#### **5.14.1 Add a Hydro Pressure Inspection Request**

If you want to add a hydro pressure inspection request, do the following steps,

1. Click [![image-1651251169548.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651251169548.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651251169548.png) (**ADD** button) in the **RFI Hydro Pressure** page.
    
    The system redirects you to a new page to add a new hydro pressure inspection request. To know how to add a hydro pressure inspection request, See the topic, “[**<u>Add a Hydro Pressure Inspection Request</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.13.1%C2%A0add-an-rfi-hy)”.

Once you have added the hydro pressure inspection request, you must submit the added request to perform hydro pressure inspection.

#### **5.14.2 Add Representative for Hydro Pressure Inspection Request**

If you want to add a representative for any added hydro pressure inspection request,

1. Click [![image-1651251248556.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651251248556.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651251248556.png)(Edit icon) in the **Representative** column for the respective hydro pressure inspection request.
    
    The **Edit Form** window opens.
    
    [![image-1651251269633.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651251269633.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651251269633.png)
2. In the ****Representative**** box, enter the name of a representative.
3. In the ****Inspection Date**** box, select the date of inspection.
4. In the **Remarks** box, enter your remarks if any.
5. Click **Save**.

#### **5.14.3 Edit a Hydro Pressure Inspection Request** 

If you want to edit any existing hydro pressure inspection request in the **RFI Hydro Pressure page, do the following,

1. Click [![image-1651251445172.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651251445172.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651251445172.png) (Edit icon) in the ****Edit**** column for the respective hydro pressure inspection See Fig 5.14. The **RFI Hydro Pressure** page opens with the details of the selected hydro pressure inspection request.
    
    [![image-1651251470057.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651251470057.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651251470057.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **5.14.4 Submit and Approve a Hydro Pressure Inspection Request**

Once you have added the hydro pressure inspection request, the **Submission** column in the **RFI Hydro Pressure** page is appeared with [![image-1651251535766.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651251535766.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651251535766.png) (Submit and Reject icons).

1. If you want to submit the hydro pressure inspection request, click [![image-1651251564393.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651251564393.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651251564393.png) (Submit icon) in the ****Submission**** Otherwise click [![image-1651251581952.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651251581952.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651251581952.png) (Reject icon) to reject the request. Once you have submitted the hydro pressure inspection request, the **Request Status** column in the **RFI Hydro Pressure** page is appeared with [![image-1651251606585.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651251606585.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651251606585.png) (Approve and Reject icons).
2. If you want to approve the hydro pressure inspection request, click [![image-1651251658922.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651251658922.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651251658922.png) (Approve icon) in the **Request Status** Otherwise click [![image-1651251669174.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651251669174.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651251669174.png) (Reject icon) to reject the request. The hydro pressure inspection request will be moved for hydro pressure inspection.

#### **5.14.5 Add Results of Hydro Pressure Inspection**

After completing the hydro pressure inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click [![image-1651251727159.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651251727159.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651251727159.png) (Add icon) in the **Results** column of the respective request.
    
    The Result window opens a list of spools added for the particular request.
    
    [![image-1651251741652.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651251741652.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651251741652.png)
2. In the ****Result**** column, select the result of each spool from the given result options in the drop-down list.
3. In the ****Temperature**** column, enter the temperature value of each spool.
4. In the ****Start Time**** and ****End Time**** columns, enter the start and end times.
5. In the ****Hydrostatic Test Pressure**** column, enter the hydrostatic test pressure value.
6. In the ****Holding Time Duration**** column, enter the holding time duration.
7. In the ****Remarks**** column, enter your remarks if any.
8. In the ****Attachment**** column, you want to attach any document.
9. Click **Save**.

#### **5.14.6 View a Hydro Pressure Inspection Report**

If you want to view a hydro pressure inspection report, click [![image-1651287048018.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651287048018.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651287048018.png) (print icon) provided in the **Print** column of the **RFI Hydro Pressure** page. See Fig 5.14.

#### **5.14.7 Attach a File into a hydro pressure inspection Request** 

If you want o attach a file with any existing hydro pressure inspection request listed in the **RFI Hydro Pressure** page, you can attach the file by using [![image-1651287181565.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651287181565.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651287181565.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.14.8 View Signature Details of Inspectors**

You can view the sign details of the inspectors such as QA, Sub contractor, Client, and Owner, once they completed the hydro pressure inspection and submitted the inspection result details including their signature. To view the signature details, click [![image-1651287223020.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651287223020.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651287223020.png) (Sign icon) in the **Sign Details** column in the **RFI Hydro Pressure** page.

#### **5.14.9 Export Hydro Pressure Inspection Request List**

You can export a list of hydro pressure requests added in the **RFI Hydro Pressure** page in both the pdf and excel formats by using [![image-1651287259650.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651287259650.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651287259650.png) (**PDF** button) and [![image-1651287270024.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651287270024.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651287270024.png) (**Excel** button). To know how to export, see the topic, “[<u>**Export P&amp;ID list**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **5.14.10 Filter a Hydro Pressure Inspection Request**

If you want to filter any specific hydro pressure inspection request in the **RFI Hydro Pressure** page, you can use [![image-1651287313019.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651287313019.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651287313019.png) (**FILTER** button) located on the **RFI Hydro Pressure** page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **5.15 RFI Painting and Blasting**

The **RFI Painting and Blasting** tab in the **Inspection** menu helps you to add an inspection request for painting and blasting in the piping project. To navigate to the painting and blasting inspection request adding page,

1. Click **RFI Painting and Blasting** in the **Inspection** menu.
    
    The **Blasting and Painting Inspection Record** page opens.
    
    [![image-1651287371263.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651287371263.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651287371263.png)
    
     **Figure 5.15: Painting and blasting Inspection Request page**

#### **5.15.1 Add a Painting and Blasting Inspection Request**

If you want to add a new painting and blasting inspection request, do the following steps.

1. In the ****Sub Contractor Name**** box, select a sub-contractor from a drop-down list.
2. In the **Inspection Date** **and Time** box, select the date and time of painting and blasting inspection.
3. In the **Location** box, select the location where the painting and blasting inspection to be performed.
4. In the ****Drawing**** box, select a drawing from a drop-down list.
5. In the ****NDT Procedure**** box, select an NDT procedure from a drop-down list.
6. In the ****Coating P.O No**** box, enter the purchase order number of coating.
7. In the ****Shift**** box, enter the shit detail. Before saving the added painting and blasting request, you must add spools. You can add multiple spools for one painting and blasting request.
    
    [![image-1651287622339.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651287622339.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651287622339.png) **Note**: The page shows a list of added spools. If you want to view the specific spools, use the filter options provided in the **Line Number**, **Drawing Number**, and **Spool Number** columns.
8. Select the checkbox of the respective spool which you want to add.
9. In the **Prepared By** box, enter the name of a person who has prepared the painting and blasting request.
10. In the ****Prepared Date**** box, select the prepared date of the painting and blasting request.
11. In the ****Reviewed By**** box, enter the name of a person who has reviewed the painting and blasting request.
12. In the ****Reviewed Date**** box, select the reviewed date of the painting and blasting request.
13. In the ****Approved By**** box, enter the name of a person who has approved the painting and blasting request.
14. In the ****Approved Date**** box, select the approved date of the painting and blasting request.
15. In the **Remarks** box, enter your remarks if any.
16. Click **Send Request**.

The painting and blasting inspection request will be added and listed in the **Blasting and Painting Inspection List** page.


### **5.16 View Painting and Blasting**

The **View Painting and Blasting** tab helps you to view and edit the painting and blasting inspection request, which is added by using the **RFI Painting and Blasting** tab. This tab also allows you to add a new painting and blasting inspection request.

1. Click **View Painting and Blasting** in the **Inspection** menu.
    
    The **Blasting and Painting Inspection List** page opens with a list of added painting and blasting requests.
    
    [![image-1651287888234.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651287888234.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651287888234.png)
    
     **Figure 5.16: Blasting and Painting Inspection List page**

#### **5.16.1 Add a Painting and Blasting Inspection Request**

If you want to add a painting and blasting inspection request, do the following steps,

1. Click (**ADD** button) in the ****Blasting and Painting Inspection List**** page. The system redirects you to the **RFI Painting and Blasting** page to add a new painting and blasting inspection request. To know how to add a painting and blasting inspection request, See the topic, “[**<u>Add a Painting and Blasting Inspection Request</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.15.1-add-a-paintin)”.

Once you have added the painting and blasting inspection request, you must submit the added request to perform the painting and blasting inspection.

#### **5.16.2 Edit a Painting and Blasting Inspection Request** 

If you want to edit any existing painting and blasting inspection request in the **Blasting and Painting Inspection List page, do the following steps,

1. Click [![image-1651288073148.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651288073148.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651288073148.png) (Edit icon) in the **Edit** column for the respective painting and blasting inspection request. See Fig 5.16.
    
    The **RFI Painting and Blasting** page opens with the details of the selected painting and blasting inspection request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **5.16.3 Submit and Approve a Painting and Blasting Inspection Request**

Once you have added the painting and blasting inspection request, the **Submission** column in the **Blasting and Painting Inspection List** page is appeared with [![image-1651288752267.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651288752267.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651288752267.png) (Submit and Reject icons).

1. If you want to submit the painting and blasting inspection request, click [![image-1651288796183.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651288796183.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651288796183.png) (Submit icon) in the **Submission** Otherwise click [![image-1651288814438.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651288814438.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651288814438.png) (Reject icon) to reject the request. Once you have submitted the painting and blasting inspection request, the **Request Status** column in the **Blasting and Painting Inspection List** page is appeared with [![image-1651288827171.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651288827171.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651288827171.png)(Approve and Reject icons).
2. If you want to approve the painting and blasting inspection request, click [![image-1651288870796.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651288870796.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651288870796.png) (Approve icon) in the **Request Status** column. Otherwise click [![image-1651288880436.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651288880436.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651288880436.png) (Reject icon) to reject the request.
    
    The painting and blasting inspection request will be moved for painting and blasting inspection.

#### **5.16.4 Add RFI Data for Piping and Blasting Inspection**

If you want to add the details of RFI data for the added piping and blasting inspection request, do the following steps,

1. Click [![image-1651288950684.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651288950684.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651288950684.png)(Edit icon) in the ****RFI Data**** column of the ****Blasting and Painting Inspection List****  See Fig 5.16. The **RFI Inspection Request List** window opens.
    
    [![image-1651288975818.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651288975818.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651288975818.png)
2. In the ****Inspection From**** box, enter the detail from where the inspection should start.
3. In the ****Inspection To**** box, enter the detail to where the inspection should end.
4. In the ****Inspection Details**** option, select 1<sup>st</sup>Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the ****Others**** box, enter any other inspection related details.
6. In the ****Refer to Report No**** box, enter the report number for reference.
7. In the ****RFI Date**** box, choose the RFI date.
8. In the ****Inspection Result**** option, if the inspection result is accepted, select ****Accepted**** otherwise select ****Rejected****.
9. In the ****Remarks**** box, enter your remarks if any.
10. In the ****Inspected by**** box, enter the name of a person who has done inspection.
11. In the ****Inspected Date**** box, choose the date of inspection.
12. In the ****Witnessed By**** box, enter the name of the witnessed person.
13. In the ****Witnessed Date**** box, choose the date of witnessed.
14. In the ****PCML Rep Name**** box, enter the representative name of PCML.
15. In the ****PCML Rep Date**** box, choose the PCML rep date.
16. In the ****MEB Rep Name**** box, enter the representative name of MEB.
17. In the ****MEB Rep Date box****, choose MEB rep date.
18. Click ****Save****.

The RFI data for the painting and blasting inspection is added successfully.

#### **5.16.5 View a Painting and Blasting Inspection Report**

If you want to view a painting and blasting inspection report, click [![image-1651289673254.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651289673254.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651289673254.png) (print icon) provided in the **Print** column of the **Blasting and Painting Inspection List** page. See Fig 5.16.

#### **5.16.6 Attach a File into a Painting and Blasting Inspection Request** 

If you want to attach a file with any existing painting and blasting inspection request listed in the **Blasting and Painting Inspection List page, you can attach the file by using [![image-1651289717873.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651289717873.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651289717873.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.16.7 Export Painting and Blasting Inspection Request List**

You can export a list of painting and blasting requests added in the **Blasting and Painting Inspection List** page in both the pdf and excel formats by using [![image-1651290009919.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651290009919.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651290009919.png) (**PDF** button) and [![image-1651290023068.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651290023068.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651290023068.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **5.16.8 Filter a Painting and Blasting Inspection Request**

If you want to filter any specific painting and blasting inspection request in the **Blasting and Painting Inspection List** page, you can filter the request based on the **Spool No** filter box.

[![image-1651290067747.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651290067747.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651290067747.png)

#### **5.16.9 View a Painting and Blasting Summary Report**

If you want to view a painting and blasting summary report,

1. Click [![image-1651290126047.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651290126047.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651290126047.png)(print icon) provided in the upper side of the ******Blasting and Painting Inspection List****** page. The **Blasting &amp; Painting Summary Report** page opens.
2. In the ****ISO Drawing No**** box, select the ISO drawing number.
3. In the ****Spool No**** box, select the spool number.
4. Click ****Go****. The paining and blasting summary report detail opens.
    
    [![image-1651290187685.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651290187685.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651290187685.png)


### **5.17 Other Application for Inspection (AFI) Requests or RFI Request – PWHT/PMI/Hardness/Ferrite**

The **Other AFI Requests** tab in the **Inspection** menu helps you to add other AFI requests such as PWHT, PMI, Hardness and Ferrite requests.

1. Click **Other AFI Requests** in the **Inspection** menu. The **RFI Request for PWHT/PMI/Hardness/Ferrite** page opens.
    
    [![image-1651290253343.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651290253343.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651290253343.png)
    
     **Figure 5.17: RFI Request for PWHT/PMI/Hardness/Ferrite page**


#### **5.17 Add an AFI Request**

If you want to add an AFI request, do the following steps,

1. Click (**ADD** button) in the **RFI Request for PWHT/PMI/Hardness/Ferrite** page. The page opens a new window to add the details of the AFI request.
    
    [![image-1651290324578.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651290324578.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651290324578.png)
2. In the ****Requested By**** box, enter the name of a person who has requested the AFI inspection.
3. In the ****To**** box, select the sub-contractor for the AFI inspection.
4. In the **Location** box, select a location from a drop-down list.
5. In the ****Inspection Date and Time**** box, select the inspection date and time.
6. In the ****Requisition**** box, enter the requisition detail of the AFI inspection.
7. In the ****Drawing No**** box, select the drawing number from a drop-down list.
8. In the ****Designation**** box, enter the designation detail.
9. In the ****Cost Centre**** box, enter the cost centre detail.
10. In ****System**** box, select a system from a drop-down list.
11. In the ****Type**** box, select the type of AFI for which you want to add request.
12. In the ****Test Description**** box, enter the test description detail. Before saving the added request, you must add joints. You can add multiple joints for one request.
    
    [![image-1651290965332.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651290965332.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651290965332.png)**Note**: The page shows a list of added joints. If you want to view the joints for the specific isometric drawing, use the filter option.
    
    [![image-1651290979529.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651290979529.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651290979529.png)
13. Click [![image-1651290989725.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651290989725.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651290989725.png) (Add icon) of the respective joint which you want to add. The added joints will be moved to the right side of the page.
    
    [![image-1651291007916.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651291007916.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651291007916.png)
14. Click **Save**. The AFI inspection request will be added and listed in the **RFI Request for PWHT/PMI/ Hardness /Ferrite page. Once you have added the AFI inspection request, you must submit the added request to perform the respective inspection.

#### **5.17.2 Edit an AFI Inspection Request** 

If you want to edit any existing AFI inspection request in the **RFI Request for PWHT/PMI/ Hardness /Ferrite page, do the following steps,

1. Click [![image-1651291099821.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651291099821.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651291099821.png) (Edit icon) in the **Edit** column for the respective AFI request. See Fig 5.17.
    
    The page shows the details of the selected AFI request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **5.17.3 Submit and Approve an AFI Inspection Request**

Once you have added the AFI inspection request, the **Submission** column in the **RFI Request for PWHT/PMI/ Hardness /Ferrite** page is appeared with [![image-1651291175048.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651291175048.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651291175048.png) (Submit and Reject icons).

1. If you want to submit the AFI inspection request, click [![image-1651291235900.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651291235900.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651291235900.png)(Submit icon) in the ****Submission**** Otherwise click [![image-1651291244895.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651291244895.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651291244895.png) (Reject icon) to reject the request. Once you have submitted the AFI inspection request, the **Request Status** column in the **RFI Request for PWHT/PMI/ Hardness /Ferrite** page is appeared with (Approve and Reject icons).
2. If you want to approve the AFI inspection request, click [![image-1651291297042.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651291297042.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651291297042.png)(Approve icon) in the **Request Status** Otherwise click [![image-1651291311258.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651291311258.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651291311258.png)(Reject icon) to reject the request. The AFI inspection request will be moved for inspection.

#### **5.17.4 Add RFI Data for an AFI Inspection Request**

If you want to add the details of RFI data for the added AFI inspection request, do the following steps,

1. Click (Edit icon) in the **RFI Data** column of the **RFI Request for PWHT/PMI/ Hardness /Ferrite** page. See Fig 5.17. The **RFI Inspection Request List** window opens.
    
    [![image-1651294586880.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651294586880.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651294586880.png)
2. In the ****Inspection From**** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the **Inspection Details** option, select 1<sup>st</sup> Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the ****Others**** box, enter any other inspection related details.
6. In the ****Refer to Report No**** box, enter the report number for reference.
7. In the ****RFI Date**** box, choose the RFI date.
8. In the ****Inspection Result**** option, if the inspection result is accepted, select ****Accepted**** otherwise select ****Rejected****.
9. In the ****Remarks**** box, enter your remarks if any.
10. In the ****Inspected by**** box, enter the name of a person who has done inspection.
11. In the ****Inspected Date**** box, choose the date of inspection.
12. In the ****Witnessed By**** box, enter the name of the witnessed person.
13. In the ****Witnessed Date**** box, choose the date of witnessed.
14. In the ****PCML Rep Name**** box, enter the representative name of PCML.
15. In the ****PCML Rep Date**** box, choose the PCML rep date.
16. In the ****MEB Rep Date box****, choose MEB rep date.
17. Click ****Save****. The RFI data for the AFI inspection is added successfully.

#### **5.17.5 View an AFI Inspection Report**

If you want to view an AFI inspection report, click[![image-1651295130244.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651295130244.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651295130244.png) (print icon) provided in the **Print** column of the **RFI Request for PWHT/PMI/ Hardness /Ferrite** page. See Fig 5.17.

#### **5.17.6 Export AFI Inspection Request List**

You can export a list of AFI requests added in the **RFI Request for PWHT/PMI/ Hardness /Ferrite** page in both the pdf and excel formats by using (**PDF** button) and (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **5.17.7 Filter an AFI Inspection Request**

If you want to filter any specific AFI inspection request in the **RFI Request for PWHT/PMI/ Hardness /Ferrite** page, you can use [![image-1651295192194.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651295192194.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651295192194.png) (**FILTER** button) located on the **RFI Request for PWHT/PMI/ Hardness /Ferrite** page. To know how to filter, see the topic, “**[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)**”.


### **5.18 Painting &amp; Coasting FIR**

The **Painting Coasting FIR** tab in the Inspection menu helps you to add a painting &amp; coasting FIR.

To navigate to the painting and coating FIR adding page,

1. Click ****Painting Coasting FIR**** in the ****Inspection**** menu. The **Painting &amp; Coasting FIR** page opens.
    
    [![image-1651295417038.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651295417038.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651295417038.png)
    
     **Figure 5.18: Painting &amp; Coasting FIR page**

#### **5.18.1 Add a Painting and Coasting FIR**

If you want to add a new painting and coasting FIR, do the following steps.

1. In the **Sub Contractor Name** box, select a sub-contractor from a drop-down list.
2. In the **Inspection Date** **and Time** box, select the date and time of painting and blasting inspection.
3. In the ****Location**** box, select the location where the painting and coasting inspection to be performed.
4. In the ****Reference** **Drawing**** box, select a reference drawing from a drop-down list.
5. In the ****System**** box, select a system from a drop-down list.
6. In the ****No** **of Coat Applied**** box, enter the number of applied coating.
7. In the ****Shift**** box, enter the shift detail.
8. In the ****Specification**** box, enter the specification detail.
9. In the ****Job/Item Description**** box, enter the description for the job/item.
10. In the ****Painted Surface**** box, enter the painted surface detail.
11. In the ****Client Paint Specification**** box, enter the client paint specification detail.
12. In the ****Surface Preparation**** box, enter the surface preparation detail.
13. In the ****Painting/Coating Type**** box, enter the painting/coating type.
14. In the ****Visual Inspection**** box, enter the visual inspection detail.
15. In the ****Top Coat D.F.T**** box, enter the top coat detail.
16. In the ****Degree of Cured**** box, enter the degree of cured.
17. In the ****Pinhole Testing**** box, enter the pinhole testing detail.
18. In the ****Wet Sponge Method**** box, enter the wet sponge method detail.
19. In the ****Holiday Detection**** box, enter the holiday detection detail.
20. In the ****Brush Coil**** box, enter the brush coil detail.
21. In the ****V Setting (For Pipeline)****box, enter the K.V setting detail for pipeline. Before saving the added painting and coasting request, you must add spools. You can add multiple spools for one painting and coasting request.
    
    [![image-1651296172594.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651296172594.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651296172594.png)**Note**: The page shows a list of added spools. If you want to view the specific spools, use the filter options provided in the **Line Number**, **Drawing Number**, and **Spool Number** columns.
22. Select the checkbox of the respective spool which you want to add.
23. In the **Prepared By** box, enter the name of a person who has prepared the painting and coasting request.
24. In the ****Prepared Date**** box, select the prepared date of the painting and coasting request.
25. In the ****Reviewed By**** box, enter the name of a person who has reviewed the painting and coasting request.
26. In the ****Reviewed Date**** box, select the reviewed date of the painting and coasting request.
27. In the ****Approved By**** box, enter the name of a person who has approved the painting and coasting request.
28. In the **Approved Date** box, select the approved date of the painting and coasting request.
29. In the **Remarks** box, enter your remarks if any.
30. Click **Send Request**.

The painting and coasting inspection request will be added and listed in the **Panting and Coasting FIR** page.


### **5.19 View Painting &amp; Coasting FIR**

The **View Painting and Coasting** tab helps you to view and edit the painting and coasting FIR, which is added by using the **Painting &amp; Blasting FIR** tab. This tab also allows you to add a new painting and coasting inspection request.

1. Click **View Painting and Coasting** in the **Inspection** menu.
    
    The **Painting Coasting FIR** page opens with a list of added painting and coasting FIRs.
    
    [![image-1651296366319.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651296366319.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651296366319.png)
    
     **Figure 5.19: Painting Coasting FIR page**

#### **5.19.1 Add a Painting and Coasting FIR**

If you want to add a painting and coasting FIR, do the following steps,

1. Click [![image-1651296450154.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651296450154.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651296450154.png) (****ADD**** button) in the ****Painting Coasting FIR**** page. The system redirects you to the **Painting &amp; Coasting FIR** page to add a new painting and coasting request. To know how to add a painting and coasting inspection request, See the topic, “[**<u>Add a Painting and Coasting FIR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.18.1%C2%A0add-a-paintin)”.

Once you have added the painting and coasting inspection request, you must submit the added request to perform the painting and coasting inspection.

#### **5.19.2 Edit a Painting and Coasting FIR** 

If you want to edit any existing painting and coasting inspection request in the **Painting Coasting FIR** page, do the following steps,

1. Click [![image-1651296571420.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651296571420.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651296571420.png)(Edit icon) in the **Edit** column for the respective painting and coasting inspection request. See Fig 5.19.
    
    The **Painting and Coasting FIR** page opens with the details of the selected painting and coasting inspection request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.19.3 Submit and Approve a Painting and coasting FIR**

Once you have added the painting and coasting inspection request, the **Submission** column in the **Painting Coasting FIR** page is appeared with [![image-1651296641794.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651296641794.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651296641794.png)(Submit and Reject icons).

1. If you want to submit the painting and coasting inspection request, click [![image-1651296694368.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651296694368.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651296694368.png) (Submit icon) in the **Submission** column. Otherwise click [![image-1651296710718.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651296710718.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651296710718.png) (Reject icon) to reject the request.
    
    Once you have submitted the painting and coasting inspection request, the **Request Status** column in the **Painting Coasting FIR** page is appeared with [![image-1651296791263.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651296791263.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651296791263.png) (Approve and Reject icons).
2. If you want to approve the painting and coasting inspection request, click [![image-1651296823161.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651296823161.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651296823161.png)(Approve icon) in the **Request Status** column. Otherwise click [![image-1651296832797.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651296832797.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651296832797.png) (Reject icon) to reject the request.
    
    The painting and coasting inspection request will be moved for painting and coasting inspection.

#### **5.19.4 Add RFI Data for Painting and Coasting Inspection**

If you want to add the details of RFI data for the added painting and coasting inspection request, do the following steps,

1. Click[![image-1651297402429.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651297402429.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651297402429.png) (Edit icon) in the ****RFI Data**** column of the ****Painting Coasting FIR****  See Fig 5.19. The **RFI Inspection Request List** window opens.
    
    [![image-1651297427253.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651297427253.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651297427253.png)
2. In the **Inspection From** box, enter the detail from where the inspection should start.
3. In the ****Inspection To**** box, enter the detail to where the inspection should end.
4. In the ****Inspection Details**** option, select 1<sup>st</sup>Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the ****Others**** box, enter any other inspection related details.
6. In the ****Refer to Report No**** box, enter the report number for reference.
7. In the ****RFI Date**** box, choose the RFI date.
8. In the ****Inspection Result**** option, if the inspection result is accepted, select ****Accepted**** otherwise select ****Rejected****.
9. In the ****Remarks**** box, enter your remarks if any.
10. In the ****Inspected by**** box, enter the name of a person who has done inspection.
11. In the ****Inspected Date**** box, choose the date of inspection.
12. In the ****Witnessed By**** box, enter the name of the witnessed person.
13. In the ****Witnessed Date**** box, choose the date of witnessed.
14. In the ****PCML Rep Name**** box, enter the representative name of PCML.
15. In the ****PCML Rep Date**** box, choose the PCML rep date.
16. In the ****MEB Rep Name**** box, enter the representative name of MEB.
17. In the ****MEB Rep Date box****, choose MEB rep date.
18. Click ****Save****. The RFI data for the painting and coasting inspection is added successfully.

#### **5.19.5 View an RFI Report**

If you want to view an RFI report, click [![image-1651297756957.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651297756957.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651297756957.png)(print icon) provided in the **RFI Report** column of the **Painting Coasting FIR** page. See Fig 5.19.

#### **5.19.6 View a Painting and Coasting FIR Report**

If you want to view a painting and coasting FIR report, click [![image-1651297807548.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651297807548.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651297807548.png) (print icon) provided in the **Print** column of the **Painting Coasting FIR** page. See Fig 5.19.

#### **5.19.7 Attach a File into a Painting and Coasting FIR**

If you want to attach a file with any existing painting and coasting inspection request listed in the **Painting Coasting FIR** page, you can attach the file by using (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.19.8 Export Painting and Coasting FIR List**

You can export a list of painting and coasting requests added in the **Painting Coasting FIR** page in both the pdf and excel formats by using [![image-1651297892649.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651297892649.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651297892649.png) (**PDF** button) and [![image-1651297901162.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651297901162.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651297901162.png) (**Excel** button). To know how to export, see the topic, “[<u>**Export P&amp;ID list**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **5.19.9 Filter a Painting and Coasting FIR**

If you want to filter any specific painting and coasting inspection request in the **Painting Coasting FIR** page, you can filter the request based on the **Spool No** filter box. [![image-1651297953730.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651297953730.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651297953730.png)


### **5.20 Final Inspection Report**

The **Final Inspection Report** tab in the **Inspection** menu helps you to add a final inspection report. To navigate to the final inspection report adding page,

1. Click **Final Inspection Report** in the **Inspection** menu.
    
    The **Final Inspection Report** page opens with a **Weld Map Drawing Detail** window.
    
    [![image-1651298030230.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651298030230.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651298030230.png) **Figure 5.20: Final Inspection Report page**

#### **5.20.1 Add a Final Inspection Report**

If you want to add a new final inspection report, do the following steps,

1. In the **Sub Contractor Name** box, select a sub-contractor from a drop-down list.
2. In the ****Inspection Date** **and Time**** box, select the date and time of final inspection.
3. In the ****Location**** box, select the location where the final inspection to be performed.
4. In the ****Paint System No**** box, enter the paint system number.
5. In the ****System/Area**** box, enter the system/area name.
6. In the ****Sub System No**** box, enter the sub system number.
7. In the ****Shift**** box, enter the shift detail.
8. In the ****Specification**** box, enter the specification detail.
9. In the ****Job/Item Description**** box, enter the description for the job/item.
10. In the ****Painted Surface**** box, enter the painted surface detail.
11. In the ****Client Paint Specification**** box, enter the client paint specification detail.
12. In the ****Surface Preparation**** box, enter the surface preparation detail.
13. In the ****Painting/Coating Type**** box, enter the painting/coating type.
14. In the ****Visual Inspection**** box, enter the visual inspection detail.
15. In the ****Top Coat D.F.T**** box, enter the top coat detail.
16. In the ****Degree of Cured**** box, enter the degree of cured.
17. In the ****Pinhole Testing**** box, enter the pinhole testing detail.
18. In the ****Wet Sponge Method**** box, enter the wet sponge method detail.
19. In the ****Holiday Detection**** box, enter the holiday detection detail.
20. In the ****Brush Coil**** box, enter the brush coil detail.
21. In the ****V Setting (For Pipeline)**** box, enter the K.V setting detail for pipeline.
22. In the ****No of Coat Applied**** box, enter the number of coats applied. Before saving the added final inspection request, you must add weld map drawing detail.
23. Click [![image-1651298457300.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651298457300.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651298457300.png) (**ADD** button) in the **Weld Map Drawing Detail** window. See Figure 5.19.
    
    The **Edit Form** window shows a new window to add the details of weld map drawing.
    
    [![image-1651298474872.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651298474872.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651298474872.png)
24. In the **Weld Map Drawing No** box, enter the weld map drawing number.
25. In the **Sheet No** box, enter the sheet number.
26. In the **Revision** box, enter the revision for the weld map drawing.
27. In the **Description** box, enter the description for the weld map drawing.
28. In the **Quantity** box, enter the quantity of the weld map drawing.
29. In the **Remarks** box, enter your remarks if any.
30. Click **Update**.
    
    The weld map drawing is updated.
31. In the ****Prepared By**** box, enter the name of a person who has prepared the final inspection request.
32. In the ****Prepared Date**** box, select the prepared date of the final inspection request.
33. In the ****Reviewed By**** box, enter the name of a person who has reviewed the final inspection request.
34. In the ****Reviewed Date**** box, select the reviewed date of the final inspection request.
35. In the ****Approved By**** box, enter the name of a person who has approved the final inspection request.
36. In the ****Approved Date**** box, select the approved date of the final inspection request.
37. In the **Remarks** box, enter your remarks if any.
38. Click **Send Request**. The final inspection request will be added and listed in the **Final Inspection Report** page.


### **5.21 View Final Inspection Report**

The **View Final Inspection Report** tab helps you to view and edit the final inspection request, which is added by using the **Final Inspection Report** tab. This tab also allows you to add a new final inspection request.

1. Click **View Final Inspection Report** in the **Inspection** menu.
    
    The **Final Inspection Report** page opens with a list of added final inspection reports.
    
    [![image-1651298703752.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651298703752.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651298703752.png) **Figure 5.21: View Final Inspection Report page**

#### **5.21.1 Add a Final Inspection Report**

If you want to add a final inspection report, do the following steps,

1. Click [![image-1651298840283.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651298840283.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651298840283.png) (**ADD** button) in the **View** **Final Inspection Report** page.
    
    The system redirects you to the **Final Inspection Report** page to add a new final inspection report. To know how to add a final inspection report, See the topic, “[**<u>Add a Final Inspection Report</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.20.1%C2%A0add-a-final-i)”.

Once you have added the final inspection report, you must submit the added report to perform the final inspection.

#### **5.21.2 Edit a Final Inspection Report**

If you want to edit any existing final inspection report in the **Final Inspection Report** page, do the following steps,

1. Click [![image-1651298970266.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651298970266.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651298970266.png) (Edit icon) in the **Edit** column for the respective final inspection report. See Fig 5.21.
    
    The **Final Inspection Report** page opens with the details of the selected final inspection report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.21.3 Submit and Approve a Final Inspection Report**

Once you have added the final inspection report, the **Submission** column in the **Final Inspection Report** page is appeared with [![image-1651299063545.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651299063545.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651299063545.png) (Submit and Reject icons).

1. If you want to submit the final inspection report, click [![image-1651299100573.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651299100573.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651299100573.png)(Submit icon) in the **Submission** column. Otherwise click [![image-1651299113955.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651299113955.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651299113955.png)(Reject icon) to reject the request.
    
    Once you have submitted the final inspection report, the **Request Status** column in the **Final Inspection Report** page is appeared with [![image-1651299143065.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651299143065.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651299143065.png)(Approve and Reject icons).
2. If you want to approve the final inspection report, click (Approve icon) in the ****Request Status**** Otherwise click (Reject icon) to reject the request. The final inspection report will be moved for final inspection.

#### **5.21.4 Add RFI Data for a Final Inspection Report**

If you want to add the details of RFI data for the added final inspection report, do the following steps,

1. Click [![image-1651299842353.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651299842353.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651299842353.png) (Edit icon) in the ****RFI Data**** column of the ****Final Inspection Report****  See Fig 5.21. The **RFI Inspection Request List** window opens.
    
    [![image-1651300057471.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651300057471.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651300057471.png)
2. In the ****Inspection From**** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the **Inspection To** box, enter the detail to where the inspection should end.
5. In the **Others** box, enter any other inspection related details.
6. In the ****Refer to Report No**** box, enter the report number for reference.
7. In the ****RFI Date**** box, choose the RFI date.
8. In the ****Inspection Result**** option, if the inspection result is accepted, select ****Accepted**** otherwise select ****Rejected****.
9. In the ****Remarks**** box, enter your remarks if any.
10. In the ****Inspected by**** box, enter the name of a person who has done inspection.
11. In the **Inspected Date** box, choose the date of inspection.
12. In the ****Witnessed By**** box, enter the name of the witnessed person.
13. In the ****Witnessed Date**** box, choose the date of witnessed.
14. In the ****PCML Rep Name**** box, enter the representative name of PCML.
15. In the ****PCML Rep Date**** box, choose the PCML rep date.
16. In the ****MEB Rep Name**** box, enter the representative name of MEB.
17. In the ****MEB Rep Date box****, choose MEB rep date.
18. Click ****Save****. The RFI data for the final inspection report is added successfully.

#### **5.21.5 View an RFI Report**

If you want to view an RFI report, click [![image-1651300381418.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651300381418.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651300381418.png) (print icon) provided in the **RFI Report** column of the **Final Inspection Report** page. See Fig 5.21.

#### **5.21.6 View a Final Inspection Report**

If you want to view a final inspection report, click [![image-1651300440368.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651300440368.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651300440368.png)(print icon) provided in the **Print** column of the **Final Inspection Report** page. See Fig 5.21.

#### **5.21.7 Attach a File into a Final Inspection Report**

If you want to attach a file with any existing final inspection report listed in the **Final Inspection Report** page, you can attach the file by using [![image-1651300515525.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651300515525.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651300515525.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.21.8 Export Final Inspection Report List**

You can export a list of final inspection reports added in the **Final Inspection Report** page in both the pdf and excel formats by using [![image-1651300568875.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651300568875.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651300568875.png) (**PDF** button) and [![image-1651300578458.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651300578458.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651300578458.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.


### **5.22 Generate Daily Pipe Welder Record (DPWR)**

The **Generate Daily Pipe Welder Record** tab in the **Inspection** menu helps you to generate a DPWR.

1. Click ****Generate Daily Pipe Welder Record**** in the ****Inspection**** menu. The **Daily Pipe Welder Record** page opens.
    
    [![image-1651300910465.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651300910465.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651300910465.png)
    
     **Figure 5.22: Daily Pipe Welder Record** **page**

The **Daily Pipe Welder Record** page shows the list of welding completed on each day including the details of the welder, location, and report type.

- In this page, the welding completed details are grouped based on the respective date.
- Each group has a maximum of 20 number of welding.
- Each group is separated by different group number.
- You can generate a report for each group individually by using the respective report generating option provided in the ****Daily** **Pipe** **Welder Record**** page.

2\. If you want to generate report of DPWR for any group or date, click [![image-1651301045470.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651301045470.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651301045470.png) (**Generate Report** button) of the respective group or date.

The generated reports will be moved to the [**<u>Daily </u><u>Pipe</u><u> Welder Record</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.23%C2%A0daily-pipe-weld) page. To view the generated reports, navigate to the [**<u>Daily Pipe Welder Record</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.23%C2%A0daily-pipe-weld) tab.


### **5.23 Daily Pipe Welder Record (DWPR)**

The **Daily Pipe Welder Record** tab in the **Inspection** menu helps you to view a DPWR report, which is generated using the **Generate** **Daily Pipe Welder Record** tab. To view the generated report,

1. Click ****Daily** **Pipe** **Welder Record**** in the ****Inspection**** menu. The **Daily Pipe Welder Record** page opens including the generated DPWR reports.
    
    [![image-1651301244398.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651301244398.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651301244398.png)
    
     **Figure 5.23: Daily Pipe Welder Record page**
    
    The generated DPWR reports are listed based on the welding date.
2. If you want to view the DPWR report for any particular date, click (Expand icon) of the respective date.
    
    The **Reports** window opens including the report number and report type.
3. Click [![image-1651301402867.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651301402867.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651301402867.png)(****Print**** icon) in the ******Print******  column. The Report will be opened.
    
    [![image-1651301449911.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651301449911.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651301449911.png)


### **5.24 Individual Pipe Welder Record**

The **Individual Pipe Welder Record** tab in the **Inspection** menu used to view the completed pipe welding details of each welder individually.

1. Click **Individual Pipe Welder Record** in the **Inspection** menu.
    
    The **Individual Pipe Welder Record** page opens.
    
    [![image-1651301719384.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651301719384.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651301719384.png)
    
     **Figure 5.24: Individual Pipe Welder Record page**
2. In the **Welder** box, select a welder from a drop-down list.
3. In the **Joint Category** box, select a joint category from the given option.
    
    The completed welding details of selected welder will be displayed.


#### **5.25 Weekly Welders Performance Record**

If you want to view the performance record of welders on weekly basis, navigate to the **Weekly Welders Performance Record** tab in the **Inspection** menu.

1. Click ****Weekly Welders Performance Record**** in the ****Inspection**** menu. The **Weekly Welders Performance Record** page opens.
    
    [![image-1651301904025.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651301904025.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651301904025.png)
    
     **Figure 5.25: Weekly Welders Performance Record page**
2. If you want to view the performance record of welders for all the projects, select the checkbox of the **All Project** option.
3. In the **NDT Type** box, select the NDT type from a drop-down list.
4. In the ****Joint Category**** box, select the joint category of pipe whether ****Shop****, ****Field****, or ****All**** from a drop-down list.
5. In the ****From Date**** and ****To Date**** boxes, select the from and to dates.
6. Click ****Show Report****. The performance record of welders will be opened.
    
    [![image-1651304259967.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304259967.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304259967.png)

#### **5.25.1 Print a Weekly Welders Performance Record**

If you want to print a weekly welders performance record, use [![image-1651304335454.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304335454.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304335454.png) and [![image-1651304353011.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304353011.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304353011.png) (print icons) provided in the **Weekly Welders Performance Record** page.

1. If you want to print the current page of the weekly welder performance record, click [ ![image-1651304377904.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304377904.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304377904.png) (print icon including the page number).
2. If you want to print all the pages of the weekly welder performance record, click[![image-1651304426762.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304426762.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304426762.png) (print icon).

#### **5.25.2 Export a Weekly Welders Performance Record**

You can export the weekly welders performance record in various formats by using the option [![image-1651304479763.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304479763.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304479763.png) provided in the upper right corner of the **Weekly Welders Performance Record** page.


### **5.26 RFI and AFI Excel Import**

The **RFI and AFI Excel Import** tab in the **Inspection** menu helps you to upload various data related with RFI and AFI for different fields included in the **Project Data** menu instead of uploading data for each field individually. If you want to import data for different fields, do the following,

1. Click the ****RFI and AFI Excel Import**** tab in the ******Inspection****** menu. The **File Upload** page opens.
    
    [![image-1651304582162.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304582162.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304582162.png)
2. Download a template by clicking [![image-1651304618715.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304618715.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304618715.png) (****TEMPLATE**** button) to enter the details of RFI and AFI data. An excel worksheet will be downloaded as a pre-defined template.
3. Enter the relevant details in the respective column of the excel worksheet based on the columns listed in the ****System Column**** field.
4. Click [![image-1651304673383.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304673383.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304673383.png) (****Choose File**** button). Once the file has been uploaded successfully, you receive a message, “**Successfully uploaded**”
5. Click [![image-1651304786081.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304786081.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304786081.png) (**Get Columns** button).
    
    The columns added in the excel worksheet will be listed in the **Excel Column** field.
6. Click [![image-1651304832151.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304832151.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304832151.png). The system automatically maps the **System Column** field and the **Excel Column** field and displays in the **Mapped Columns** field.
    
    [![image-1651304860355.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304860355.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304860355.png)
7. If you want to map any columns or to unmap any mapped columns, select the respective columns and then click [![image-1651304881413.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304881413.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304881413.png) (****Map**** button) and [![image-1651304899901.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304899901.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304899901.png) (****UnMap**** button) accordingly. [![image-1651304929038.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304929038.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304929038.png) **Note**: If you want to unmap all columns, click [![image-1651304946162.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304946162.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304946162.png).
8. Once you have completed the mapping and un mapping of columns, in the **Upload Range From** and **To** fields, enter the range of rows you want to upload from the excel worksheet.
    
    [![image-1651304997061.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304997061.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304997061.png)**Note**: In the **Total Rows** field, the system indicates the total number of rows filled in the excel worksheet.
    
    [![image-1651305018953.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651305018953.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651305018953.png) **Tip**: You must enter the upload starting range as two in the **Upload Range From** field because a first row in the excel worksheet is having heading of the columns.
9. Click [![image-1651305592173.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651305592173.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651305592173.png) (****Populate Value**** button).
10. Click [![image-1651305624416.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651305624416.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651305624416.png) (**Process** button).
    
    Once you have clicked the Process button, the system processes the columns and displays in the **Excel Import** page.
    
    [![image-1651305449362.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651305449362.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651305449362.png)
11. Click [![image-1651305474379.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651305474379.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651305474379.png) (****Import**** button) to import the data added in the excel worksheet.

#### **5.27 RFI and AFI Joint Status**

The **RFI and AFI Joint Status** tab in the **Inspection** menu used to view the RFI and AFI fit up and weld inspection completed status for the joints.

1. Click **RFI and AFI Joint Status** in the ****Inspection.****The **RFI and AFI Joints Status** page opens.
    
    [![image-1651310952534.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651310952534.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651310952534.png)
    
     **Figure 5.27: RFI and AFI Joints Status page**

You can view the status of the joints by selecting one of the below options given in the page.

- Joints – RFI Fit up completed &amp; Ready for AFI Fit up
- Joints – AFI Fit up completed &amp; Ready for RFI Weld VI
- Joints – RFI Weld VI completed &amp; Ready for AFI Weld VI

For example, if you select the **Joints – AFI Fit up completed &amp; Ready for RFI Weld VI** option, then the system shows the list of joints which has completed the AFI fit up and are ready for RFI weld VI.

#### **5.27.1 Export the RFI and AFI Joints Status**

You can export the joint status including a list of joints in the **RFI and AFI Joints Status** page in both the pdf and excel formats by using [![image-1651336086938.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651336086938.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651336086938.png) (**PDF** button) and [![image-1651336097442.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651336097442.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651336097442.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.


### **5.28 RFI and AFI Status**

The **RFI and AFI Status** tab in the **Inspection** menu used to view and check the status of the RFI and AFI inspection status.

1. Click ****RFI and AFI Status**** in the ******Inspection****** menu. The **RFI and AFI Status** page opens.
    
    [![image-1651336176679.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651336176679.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651336176679.png)
    
     **Figure 5.28: RFI and AFI Status page**
    
    The page shows the total number of added RFI and AFI inspection requests, and also shows the number of completed and outstanding inspections.

#### **5.28.1 Export the RFI and AFI Status**

You can export the RFI and AFI status in both the pdf and excel formats by using [![image-1651336488936.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651336488936.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651336488936.png) (**PDF** button) and [![image-1651336500232.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651336500232.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651336500232.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.


### **5.29 Threaded Joint Report**

The **Threaded Joint Report** tab in the **Inspection** menu used to view and update the completed status of the threaded joints.

1. Click ****Threaded Joint Report**** in the ****Inspection**** menu. The **Threaded Joints** page opens.
    
    [![image-1651336585220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651336585220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651336585220.png)
    
     **Figure 5.29: Threaded Joints page**
2. In the ****Status**** column, select the status of the joints. If you select **Pending,** the page shows the details of the joints which are pending.
3. Click ****Search****.
4. In the ****Complete**** column, if the particular joint has completed then enable the checkbox of the respective joint.
5. In the ****Completed by**** box, enter the name of a person who has completed the joint work.
6. In the ****Completed Date**** box, select the completed date of the joint work.

#### **5.29.1 Export a Threaded Joint Report**

You can export the threaded joint report in both the pdf and excel formats by using [![image-1651336729349.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651336729349.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651336729349.png) (**PDF** button) and [![image-1651336739411.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651336739411.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651336739411.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.


### **5.30 Welder Performance Report**

The **Welder Performance Report** tab in the **Inspection** menu used to view the performance report of each welder for a particular project.

1. Click **Welder Performance Report** in the **Inspection** menu.
    
    The **Welder Performance Report** page opens.
    
    [![image-1651336819421.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651336819421.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651336819421.png)
    
     **Figure 5.30: Welder Performance Report page**
2. In the ****Project**** box, select a project from a drop-down list.
3. In the ****From Date**** and ****To Date**** boxes, select the from and to dates.
4. In the ****Joint Type**** box, select the joint type.
5. Click ****Load Report****.. The performance report for the selected project will be opened.
    
    [![image-1651336901427.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651336901427.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651336901427.png)

#### **5.30.1 Print a Welder Performance Report**

If you want to print a welder performance report, use [![image-1651336946103.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651336946103.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651336946103.png)and [![image-1651336961637.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651336961637.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651336961637.png) (print icons) provided in the **Welder Performance Report** page.

1. If you want to print the current page of the welder performance report, click [![image-1651336984177.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651336984177.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651336984177.png) (print icon including the page number).
2. If you want to print all the pages of the welder performance report, click [![image-1651337034498.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651337034498.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651337034498.png)(print icon).

#### **5.30.2 Export a Welder Performance Report**

You can export the welder performance report in various formats by using the option [![image-1651337120307.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651337120307.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651337120307.png) provided in the upper right corner of the **Welder Performance Report** page.


### **5.31 Create Auto Fit up and Visual Request**

If you want to create the new fit up and visual requests in both RFI and AFI automatically, you can create by using the **Create Auto Fit up and Visual Request** tab in the **Inspection** menu.

1. Click ****Create Auto Fit up and Visual Request**** in the ****Inspection**** menu. The **RFI and AFI Create** page opens.
    
    [![image-1651337211459.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651337211459.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651337211459.png)
    
     **Figure 5.31: RFI and AFI Create page**
2. In the ****Sub Contractor Name**** box, select a sub-contractor.
3. In the ****Inspection Date and Time**** box, select the inspection date and time.
4. In the ****Location**** box, select the location.
5. In the ****Select RFI/AFI**** box, if you want to create the fit up or visual request, select ****Fit up**** or ****Visual****. If you want to create both fit up and visual, select ****Both****. The page shows the list of drawing numbers, sheet numbers, and spool numbers.
6. Select the checkbox of the respective drawing, sheet and spool number which you want to add for creating the request.
7. Click ****Generate****. The selected RFI and AFI request will be added and moved into the respective requests page.


### **5.32 Weld Rejection Statistics Record**

If you want to view the statistics report of weld rejection rate, navigate to the **Weld Rejection Statistics Record** tab in the **Inspection** menu.

1. Click **Weld Rejection Statistics Record** in the **Inspection** menu. The **Weld Rejection Statistics Report** page opens.
    
    [![image-1651416424177.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651416424177.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651416424177.png)
    
     **Figure 5.32: Weld Rejection Statistics Report page**
2. In the ****Sub Contractor**** box, select a sub-contractor from a list.
3. In the ****From Date**** and ****To Date**** boxes, select the from and to dates.
4. Click ******Load Report**.****The statistics report of the weld rejection rate will be displayed.
    
    [![image-1651416494666.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651416494666.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651416494666.png)

#### **5.32.1 Print a Weld Rejection Statistics Record**

If you want to print the weld rejection statistics details, use [![image-1651416542790.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651416542790.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651416542790.png)and [![image-1651416556751.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651416556751.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651416556751.png) (print icons) provided in the **Weld Rejection Statistics Report** page.

1. If you want to print the current page of the weld rejection statistics record, click (print icon including the page number).
2. If you want to print all the pages of the weld rejection statistics record, click [![image-1651416633546.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651416633546.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651416633546.png)(print icon).

#### **5.32.2 Export a Weld Rejection Statistics Record**

You can export the weld rejection statistics details in various formats by using the option [![image-1651416683351.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651416683351.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651416683351.png) provided in the upper right corner of the **Weld Rejection Statistics Report** page.


### **5.33 View Spool Contractor**

The **View Spool Contractor** tab in the **Inspection** menu used to view and add the details of the spool installation contractor.

1. Click **View Spool Contractor** in the **Inspection** menu.
    
    The **Spool Installation Contractor** page opens.
    
    [![image-1651416742295.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651416742295.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651416742295.png)
    
     **Figure 5.33: Spool Installation Contractor page**
2. In the **Sheet No/ Drawing No/ Revision** box, select the respective sheet, drawing and revision numbers.
    
    The list of spools for the selected drawing number opens.
3. Enter the contractor name for the respective spools in the ****Contractor Name****
4. Click ****Save Changes****.


### **5.34 RFI Mechanical Completion Request**

Mechanical completion takes place through all phases of the piping project, starting at equipment supplier and continuing through fabrication up to commissioning phase. Mechanical completion encompasses all disciplines. If you want to add an RFI mechanical completion request,

1. Click ****RFI Mechanical Completion Request**** in the ****Inspection**** menu. The **RFI Mechanical Completion Request** page opens.
    
    [![image-1651416989995.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651416989995.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651416989995.png)
    
     **Figure 5.34: RFI Mechanical Completion Request page**

#### **5.34.1 Add an RFI Mechanical Completion Request**

If you want to add an RFI mechanical completion request, do the following steps,

1. In the **Sub Contractor** box, select a sub-contractor from a drop-down list.
2. In the ****Inspection Date**** box, select the date of inspection.
3. In the ****Location**** box, enter the name of the location. Before saving the added RFI mechanical completion request, you must add a system. You can add multiple system for one request.
    
    [![image-1651417125530.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651417125530.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651417125530.png) **Note**: The page shows a list of added systems. If you want to view the specific system, use the **Search by Test Pack No** filter box or use the filter options provided in the **System**, **Sub System**, **Test Pack**, and **Check Records** columns.
4. Select the checkbox of the respective system which you want to add.
5. In the **Remarks** box, enter your remarks if any.
6. In the **Description** box, enter the description for the request.
7. In the **Work Scope** box, enter the work scope detail.
8. Click **Save**. The RFI mechanical completion request will be added and listed in the **View RFI Mechanical Completion** page.


### **5.35 View RFI Mechanical Completion**

The **View RFI Mechanical Completion** tab helps you to view and edit the RFI mechanical completion request, which is added by using the **RFI Mechanical Completion Request** tab. This tab also allows you to add a new RFI mechanical completion request.

1. Click ****View RFI Mechanical Completion**** in the ****Inspection**** menu. The **View RFI Mechanical Completion List** page opens with a list of added RFI mechanical completion requests.
    
    [![image-1651417447008.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651417447008.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651417447008.png)
    
     **Figure 5.35: View RFI Mechanical Completion List page**

#### **5.35.1 Add an RFI Mechanical Completion Request**

If you want to add an RFI mechanical completion request, do the following steps,

1. Click (****ADD**** button) in the ****View RFI Mechanical Completion List**** page. The system redirects you to a new page to add a new RFI mechanical completion request. To know how to add an RFI mechanical completion request, See the topic, “[**<u>Add an RFI Mechanical Completion Request</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.34.1%C2%A0add-an-rfi-me)”.

Once you have added the RFI mechanical completion request, you must submit the added request to perform mechanical completion inspection.

#### **5.35.2 Edit an RFI Mechanical Completion Request** 

If you want to edit any existing mechanical completion request in the **View RFI Mechanical Completion List** page, do the following,

1. Click [![image-1651418870378.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651418870378.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651418870378.png) (Edit icon) in the ****Edit**** column for the respective RFI mechanical completion request. See Fig 8.35. The **RFI Mechanical Completion Request** page opens with the details of the selected RFI mechanical completion request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **5.35.3 Submit and Approve an RFI Mechanical Completion Request**

Once you have added the RFI mechanical completion request, the **Submission** column in the **RFI Mechanical Completion Request** page is appeared with [![image-1651418959326.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651418959326.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651418959326.png)(Submit and Reject icons).

1. If you want to submit the mechanical completion request, click [![image-1651418988857.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651418988857.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651418988857.png) (Submit icon) in the ****Submission**** Otherwise click [![image-1651419010008.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651419010008.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651419010008.png) (Reject icon) to reject the request.
    
    Once you have submitted the mechanical completion request, the **Request Status** column in the **View RFI Mechanical Completion List** page is appeared with [![image-1651419042833.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651419042833.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651419042833.png) (Approve and Reject icons).
2. If you want to approve the mechanical completion request, click [![image-1651419111744.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651419111744.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651419111744.png)(Approve icon) in the ****Request Status**** Otherwise click [![image-1651419129412.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651419129412.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651419129412.png) (Reject icon) to reject the request.

The mechanical completion request will be moved for mechanical completion inspection.

#### **5.35.4 Add Results of Mechanical Completion Inspection**

After completing the mechanical completion inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click [![image-1651419228291.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651419228291.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651419228291.png)(Add icon) in the **Results** column of the respective request.
    
    The Result window opens a list of test pack added for the particular request.
    
    [![image-1651419244562.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651419244562.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651419244562.png)
2. In the ****Result**** column, select the result of each test pack from the given result options in the drop-down list.
3. In the ****Remarks**** column, enter your remarks if any.
4. Click ****Approve All &amp;**** ****Save****.

#### **5.35.5 View a Mechanical Completion Inspection Report**

If you want to view a mechanical completion inspection report, click [![image-1651419343803.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651419343803.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651419343803.png)(print icon) provided in the **Print** column of the **View RFI Mechanical Completion List** page. See Fig 5.35.

#### **5.35.6 Attach a File into a Mechanical Completion inspection Request** 

If you want to attach a file with any existing mechanical completion inspection request listed in the **View RFI Mechanical Completion List** page, you can attach the file by using [![image-1651419396286.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651419396286.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651419396286.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.35.7 Export Mechanical Completion Inspection Request List**

You can export a list of mechanical completion inspection requests added in the **View RFI Mechanical Completion List** page in both the pdf and excel formats by using [![image-1651419463880.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651419463880.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651419463880.png) (**PDF** button) and [![image-1651419476238.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651419476238.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651419476238.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **5.35.8 Filter a Mechanical Completion Inspection Request**

If you want to filter any specific mechanical completion inspection request in the **View RFI Mechanical Completion List** page, you can use [![image-1651419532888.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651419532888.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651419532888.png) (**FILTER** button) located on the **View RFI Mechanical Completion List page. To know how to filter, see the topic, “**[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)**”.


### **5.36 RFI Static Commissioning**

Static Commissioning take place when Mechanical completion is completed for a system or part of a system. If you want to add an RFI static commissioning request,

1. Click **RFI Static Commissioning** in the **Inspection** menu. The **RFI Static Commissioning Request** page opens.
    
    [![image-1651419615186.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651419615186.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651419615186.png)
    
     **Figure 5.36: RFI Static Commissioning Request page**

#### **5.36.1 Add an RFI Static Commissioning Request**

If you want to add an RFI static commissioning request, do the following steps,

1. In the **Sub Contractor** box, select a sub-contractor from a drop-down list.
2. In the **Inspection Date** box, select the date of inspection.
3. In the **Location** box, enter the name of the location.
    
    Before saving the added RFI static commissioning request, you must add a system. You can add multiple systems for one request.
    
    [![image-1651419760307.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651419760307.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651419760307.png) **Note**: The page shows a list of added systems. If you want to view the specific system, use the **Search by Test Pack No** filter box or use the filter options provided in the **System**, **Sub System**, **Test Pack**, and **Check Records** columns.
4. Select the checkbox of the respective system which you want to add.
5. In the **Remarks** box, enter your remarks if any.
6. In the **Description** box, enter the description for the request.
7. In the **Work Scope** box, enter the work scope detail.
8. Click **Save**.

The RFI mechanical completion request will be added and listed in the **View RFI Static Commissioning** page.


### **5.37 View RFI Static Commissioning**

The **View RFI Static Commissioning** tab helps you to view and edit the RFI static commissioning request, which is added by using the **RFI Static Commissioning** tab. This tab also allows you to add a new RFI static commissioning request.

1. Click ****View RFI Static Commissioning**** in the ******Inspection****** menu. The **View RFI Static Commissioning List** page opens with a list of added RFI static commissioning requests.
    
    [![image-1651420065662.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651420065662.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651420065662.png)
    
     **Figure 5.37: View RFI Static Commissioning List page**

#### **5.37.1 Add an RFI Static Commissioning Request**

If you want to add an RFI static commissioning request, do the following steps,

1. Click [![image-1651420210211.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651420210211.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651420210211.png) (****ADD**** button) in the ******View RFI Static Commissioning List page.******The system redirects you to a new page to add a new RFI static commissioning request. To know how to add an RFI static commissioning request, See the topic, “[**<u>Add an RFI Static Commissioning Request</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.36.1-add-an-rfi-st)”.

Once you have added the RFI static commissioning request, you must submit the added request to perform the static commissioning.

#### **5.37.2 Edit an RFI Static Commissioning Request** 

If you want to edit any existing static commissioning request in the **View RFI Static Commissioning List** page, do the following,

1. Click (Edit icon) in the **Edit** column for the respective RFI static commissioning request. See Fig 5.37.
    
    The **RFI Static Commissioning Request** page opens with the details of the selected RFI request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.37.3 Submit and Approve an RFI Static Commissioning Request**

Once you have added the RFI static commissioning request, the **Submission** column in the **RFI Static Commissioning Request** page is appeared with [![image-1651423781694.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651423781694.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651423781694.png)(Submit and Reject icons).

1. If you want to submit the static commissioning request, click [![image-1651423771606.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651423771606.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651423771606.png) (Submit icon) in the **Submission** column. Otherwise click [![image-1651423800885.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651423800885.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651423800885.png)(Reject icon) to reject the request.
    
    Once you have submitted the static commissioning request, the **Request Status** column in the **View RFI Static Commissioning List** page is appeared with [![image-1651423822281.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651423822281.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651423822281.png) (Approve and Reject icons).
2. If you want to approve the static commissioning request, click [![image-1651423854611.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651423854611.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651423854611.png)(Approve icon) in the ****Request Status**** Otherwise click [![image-1651423867916.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651423867916.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651423867916.png) (Reject icon) to reject the request. The static commissioning request will be moved for static commissioning inspection.

#### **5.37.4 Add Results of Static Commissioning Inspection**

After completing the static commissioning inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click [![image-1651423936644.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651423936644.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651423936644.png) (Add icon) in the **Results** column of the respective request.
    
    The Result window opens a list of system added for the particular request.
    
    [![image-1651423955896.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651423955896.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651423955896.png)
2. In the **Result** column, select the result of each system from the given result options in the drop-down list.
3. In the **Remarks** column, enter your remarks if any.
4. Click **Approve All &amp;** **Save**.

#### **5.37.5 View a Static Commissioning Inspection Report**

If you want to view a static commissioning inspection report, click [![image-1651424025434.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651424025434.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651424025434.png)(print icon) provided in the **Print** column of the **View RFI Static Commissioning List** page. See Fig 5.37.

#### **5.37.6 Attach a File into a Static Commissioning Inspection Request** 

If you want to attach a file with any existing static commissioning inspection request listed in the **View RFI Static Commissioning List** page, you can attach the file by using [![image-1651424068516.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651424068516.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651424068516.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.37.7 Export Static Commissioning Inspection Request List**

You can export a list of static commissioning inspection requests added in the **View RFI Static Commissioning List** page in both the pdf and excel formats by using [![image-1651424111522.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651424111522.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651424111522.png) (**PDF** button) and [![image-1651424120464.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651424120464.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651424120464.png) (**Excel** button). To know how to export, see the topic, “[<u>**Export P&amp;ID list**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **5.37.8 Filter a Static Commissioning Inspection Request**

If you want to filter any specific static commissioning inspection request in the **View RFI Static Commissioning List** page, you can use [![image-1651424170119.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651424170119.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651424170119.png) (**FILTER** button) located on the **View RFI Static Commissioning List page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **5.38 RFI Fit up Generic**

The **RFI Fit up Request Generic** tab in the **Inspection** menu helps you to add a generic RFI fit up request.

1. Click **RFI Fit up Request Generic** in the **Inspection** menu.
    
    The **RFI Fit up Request Generic** page opens.
    
    [![image-1651424242470.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651424242470.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651424242470.png)
    
    [![image-1651424250282.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651424250282.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651424250282.png)
    
     **Figure 5.38: RFI Fit up Request Generic page**

#### **5.38.1 Add an RFI Fit up Request Generic**

If you want to add an RFI fit up request generic, do the following,

1. Click [![image-1651424343469.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651424343469.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651424343469.png) (**ADD** button) in the **RFI Fit up Request Generic** page. A new window opens to add an RFI fit up request generic.
    
    [![image-1651424374653.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651424374653.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651424374653.png)
    
    [![image-1651424383656.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651424383656.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651424383656.png)**Tip**: A report number for a new RFI fit up request generic will be updated automatically in the **Report Number** box.
2. In the **Description** box, enter the description for the RFI fit up request generic.
3. In the **System** box, select a system from a drop-down list.
4. In the **Inspection Date** box, choose the date of inspection.
5. In the **Frame No** box, enter the frame number.
6. In the **Elevation** box, enter the elevation value.
7. In the **Longitudinal** box, enter the longitudinal value.
8. In the **Location** box, enter the location where the inspection to be done.
9. In the **Drawing No** box, select the drawing number from a drop-down list.
10. In the **Sub Contractor** box, select the sub-contractor from a drop-down list.
11. In the **Remarks** box, enter your remarks if any.
12. Click **Save**. The RFI fit up request generic is inserted successfully. Once you have added the RFI fit up request generic, you must add the RFI data for the added request.

#### **8.38.2 Add RFI data for an Added RFI Fit up Request Generic**

If you want to add RFI data for the added RFI fit up request generic, do the following,

1. Click [![image-1651424546968.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651424546968.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651424546968.png)(Edit icon) in the **RFI Data** column of the **RFI Fit up Request Generic** page. See Fig 5.38. The **RFI Inspection Request List** window opens.
    
    [![image-1651424570282.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651424570282.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651424570282.png)
2. In the **Inspection From** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the **Inspection Details** option, select 1<sup>st</sup> Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the **Others** box, enter any other inspection related details.
6. In the **Refer to Report No** box, enter the report number for reference.
7. In the **RFI Date** box, choose the RFI date.
8. In the Inspection Result option, if the inspection result is accepted, select **Accepted** otherwise select **Rejected**.
9. In the **Remarks** box, enter your remarks if any.
10. In the **Inspected by** box, enter the name of a person who has done inspection.
11. In the **Inspected Date** box, choose the date of inspection.
12. In the **Witnessed By** box, enter the name of the witnessed person.
13. In the **Witnessed Date** box, choose the date of witnessed.
14. In the **PCML Rep Name** box, enter the representative name of PCML.
15. In the **PCML Rep Date** box, choose the PCML rep date.
16. In the **MEB Rep Name** box, enter the representative name of MEB.
17. In the **MEB Rep Date box**, choose MEB rep date.
18. Click **Save**. The RFI data is successfully added.

#### **5.38.3 Clone an RFI Fit up Request Generic** 

The **Clone** option in the **RFI Fit up Request Generic** page used to create a RFI weld VI generic request in the [**<u>RFI Weld VI Generic</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.39-rfi-weld-vi-gen) page, as a copy of RFI fit up request generic, See Fig 5.39.

If you click [![image-1651425124423.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651425124423.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651425124423.png) (Clone icon) in the **Clone** column of the **RFI Fit up Request Generic** page, an RFI weld VI generic request is added in the **RFI weld VI generic** page.

[![image-1651425139612.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651425139612.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651425139612.png)**Tip**: You can create multiple copies of RFI weld VI generic request for a single RFI fit up request generic.

#### **5.38.4 Print an RFI Report**

If you want to print an RFI report, click [![image-1651425274307.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651425274307.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651425274307.png) (print icon) provided in the **RFI** **Report** column of the **RFI Fit up Request Generic** page. See Fig 5.38.

#### **5.38.5 Submit an RFI Fit up Request Generic**

Once you have added the RFI fit up request generic, the **Submission** column in the **RFI Fit up Request Generic** page is appeared with [![image-1651425316951.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651425316951.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651425316951.png)(Submit and Reject icons).

1. If you want to submit the RFI fit up request generic, click [![image-1651425337798.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651425337798.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651425337798.png)(Submit icon) in the **Submission** Otherwise click [![image-1651425351825.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651425351825.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651425351825.png) (Reject icon) to reject the request.

#### **5.38.6 Print an RFI Fit up Request Generic Report**

If you want to print an RFI fit up request generic report, click [![image-1651425421742.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651425421742.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651425421742.png)(print icon) provided in the **Report** column of the **RFI Fit up Request Generic** page. See Fig 5.38.

#### **5.38.7 Attach a File into an RFI Fit up Request Generic**

If you want to attach any file with any RFI fit up request generic added in the **RFI Fit up Request Generic page, you can attach the file by using [![image-1651425478937.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651425478937.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651425478937.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.38.8 View Signature Details of QA User, Surveyor, and Client** 

Once the RFI fit up inspection has completed, the QA, surveyor, and client add their signature based on their corresponding roles. You can view their signature by using[![image-1651425527501.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651425527501.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651425527501.png) (Sign icon) in the **Sign Details** column in the **RFI Fit up Request Generic** page.

#### **5.38.9 Edit an RFI Fit up Request Generic**

If you want to edit any existing RFI weld VI generic in the **RFI Weld VI Generic** page, do the following,

1. Click[![image-1651425695691.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651425695691.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651425695691.png)(Edit icon) in the **Edit** column for the respective RFI weld VI generic. See Fig 5.39. A new window opens to edit the RFI weld VI generic.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.38.10 Export RFI Weld VI Generic List**

You can export a list of RFI weld VI generic added in the **RFI Weld VI Generic** page in the pdf and excel formats by using [![image-1651425771131.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651425771131.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651425771131.png) (**PDF** button) and [![image-1651425783009.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651425783009.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651425783009.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **5.38.11 Filter an RFI Weld VI Generic**

If you want to filter any RFI weld VI generic from the list of RFI weld VI generic in the **RFI Weld VI Generic** page, you can use [![image-1651425823936.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651425823936.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651425823936.png) (**FILTER** button) located on the **View RFI Mechanical Completion List page. To know how to filter, see the topic, “**[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)**”.

### **5.39 RFI Weld VI Generic**

Once the RFI fit up inspection process has completed, the materials are moved for weld inspection process. The **RFI Weld VI Generic** tab in the **Inspection** menu helps you to add a generic RFI weld VI request.

1. Click **RFI Weld VI Generic** in the **Inspection** menu.
    
    The **RFI Weld VI Generic** page opens.
    
    [![image-1651688032861.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651688032861.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651688032861.png)
    
    [![image-1651688043418.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651688043418.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651688043418.png)
    
    [![image-1651688057432.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651688057432.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651688057432.png)
    
     **Figure 5.39: RFI Weld VI Generic page**

#### **5.39.1 Add an RFI Weld VI Generic** 

If you want to add an RFI weld VI generic, do the following,

1. Click [![image-1651690492306.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651690492306.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651690492306.png) (**ADD** button) in the **RFI Weld VI Generic** page. A new window opens to add an RFI weld VI generic.
    
    [![image-1651690514499.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651690514499.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651690514499.png)
    
    [![image-1651690534288.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651690534288.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651690534288.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651690550149.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651690550149.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651690550149.png) **Tip**: A report number for a new RFI weld VI generic will be updated automatically in the **Report Number** box.
2. In the **Description** box, enter the description for the RFI weld VI generic.
3. In the **System** box, select a system from a drop-down list.
4. In the **Inspection Date** box, choose the date of inspection.
5. In the **Frame No** box, enter the frame number.
6. In the **Elevation** box, enter the elevation value.
7. In the **Longitudinal** box, enter the longitudinal value.
8. In the **Location** box, enter the location where the inspection to be done.
9. In the **Drawing No** box, select the drawing number from a drop-down list.
10. In the **Sub Contractor** box, select the sub-contractor from a drop-down list.
11. In the **Remarks** box, enter your remarks if any.
12. Click **Save**.

The RFI weld VI generic is added successfully. Once you have added the RFI weld VI generic, you must add the RFI data for the added request.

#### **5.39.2 Add RFI data for RFI Weld VI Generic**

If you want to add RFI data for the added RFI weld VI generic, do the following,

1. Click [![image-1651691833242.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651691833242.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651691833242.png)(Edit icon) in the **RFI Data** column of the **RFI Weld VI Generic** page. See Fig 5.39. The **RFI Inspection Request List** window opens.
    
    [![image-1651691864240.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651691864240.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651691864240.png)
2. In the **Inspection From** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the ****Inspection Details**** option, select 1<sup>st</sup>Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the **Others** box, enter any other inspection related details.
6. In the **Refer to Report No** box, enter the report number for reference.
7. In the **RFI Date** box, choose the RFI date.
8. In the Inspection Result option, if the inspection result is accepted, select **Accepted** otherwise select **Rejected**.
9. In the **Remarks** box, enter your remarks if any.
10. In the **Inspected by** box, enter the name of a person who has done inspection.
11. In the **Inspected Date** box, choose the date of inspection.
12. In the **Witnessed By** box, enter the name of the witnessed person.
13. In the **Witnessed Date** box, choose the date of witnessed.
14. In the **PCML Rep Name** box, enter the representative name of PCML.
15. In the **PCML Rep Date** box, choose the PCML rep date.
16. In the **MEB Rep Name** box, enter the representative name of MEB.
17. In the **MEB Rep Date box**, choose MEB rep date.
18. Click **Save**.

The RFI data is successfully added.

#### **5.39.3 Clone an RFI Weld VI Generic**

The **Clone** option in the **RFI Weld VI Generic** page used to create a vacuum test request, an air test request, a hydrostatic test request, and an NDT request, as a copy of RFI weld VI generic request.

1. Click [![image-1651692329078.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651692329078.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651692329078.png) (Clone icon) in the **Clone** column of the **RFI Weld VI Generic** page. The Clone box opens.
    
    [![image-1651692357401.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651692357401.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651692357401.png)
2. Select any test from the given list.
3. Click [![image-1651692384498.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651692384498.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651692384498.png) (**Add** button).
    
    A new request for the selected test will be added in the respective pages.

#### **5.39.4 Print an RFI Report**

If you want to print an RFI report, click[![image-1651693014480.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651693014480.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651693014480.png) (print icon) provided in the **RFI** **Report** column of the **RFI Weld VI Generic** page. See Fig 5.39.

#### **5.39.5 Submit an RFI Weld VI Generic**

Once you have added the RFI weld VI generic, the **Submission** column in the **RFI Weld VI Generic** page is appeared with[![image-1651693203082.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651693203082.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651693203082.png)(Submit and Reject icons).

1. If you want to submit the RFI weld VI generic, click[![image-1651693761189.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651693761189.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651693761189.png) (Submit icon) in the **Submission** Otherwise click[![image-1651693771139.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651693771139.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651693771139.png) (Reject icon) to reject the request.

#### **5.39.6 Print an RFI Weld VI Generic Report**

1. If you want to print an RFI weld VI generic report, click[![image-1651693864312.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651693864312.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651693864312.png)(print icon) provided in the **Report** column of the **RFI Weld VI Generic** See Fig 5.39.

#### **5.39.7 View Signature Details of QA User, Surveyor, and Client** 

Once the weld VI inspection has completed, the QA, surveyor, and client add their signature based on their corresponding roles. You can view their signature by using[![image-1651693985485.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651693985485.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651693985485.png)(Sign icon) in the **Sign Details** column in the **RFI Weld VI Generic** page.

#### **5.39.8 Attach a File into an RFI Weld VI Generic**

If you want to attach any file with any RFI weld VI generic added in the **RFI Weld VI Generic page, you can attach the file by using[![image-1651694073141.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651694073141.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651694073141.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.39.9 Edit an RFI Weld VI Generic**

If you want to edit any existing RFI weld VI generic in the **RFI Weld VI Generic** page, do the following,

1. Click[![image-1651694198554.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651694198554.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651694198554.png) (Edit icon) in the **Edit** column for the respective RFI weld VI generic. See Fig 5.39. A new window opens to edit the RFI weld VI generic.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.39.10 Export RFI Weld VI Generic List**

You can export a list of RFI weld VI generic added in the **RFI Weld VI Generic** page in the pdf and excel formats by using [![image-1651694318708.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651694318708.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651694318708.png)(**PDF** button) and [![image-1651694335286.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651694335286.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651694335286.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **5.39.11 Filter an RFI Weld VI Generic**

If you want to filter any RFI weld VI generic from the list of RFI weld VI generic in the **RFI Weld VI Generic** page, you can use[![image-1651694420929.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651694420929.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651694420929.png) (**FILTER** button) located on the **View RFI Mechanical Completion List page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.



### **5.40 NDT Inspection Generic**

NDT inspection used to find out welding defects of the materials. Once the fit up and welding process of the materials has completed, the materials will be moved for the NDT inspection. The currently following NDT inspection methods are RT, UT, MT, PT, Ultrasonic Thickness Gaging (UTG), Magnetic Particle Inspection (MPI) after load test, UT/MT, and PT after load test.

The **NDT Inspection Generic** tab in the **Inspection** menu helps you to add an NDT inspection generic. If you want to navigate the NDT inspection generic,

1. Click **NDT Inspection Generic** in the **Inspection** menu. The **NDT Inspection Generic** page opens.
    
    [![image-1651425901242.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651425901242.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651425901242.png)
    
    [![image-1651425909456.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651425909456.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651425909456.png)
    
    [![image-1651425918468.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651425918468.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651425918468.png)
    
     **Figure 5.40: NDT Inspection Generic page**

#### **5.40.1 Add an NDT Inspection Generic** 

If you want to add an NDT inspection generic, do the following,

1. Click [![image-1651425992025.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651425992025.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651425992025.png) (**ADD** button) in the **NDT Inspection Generic** page. A new window opens to add an NDT Inspection generic.
    
    [![image-1651426025961.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651426025961.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651426025961.png)
    
    [![image-1651426037257.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651426037257.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651426037257.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651426056877.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651426056877.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651426056877.png) **Tip**: A report number for a new NDT inspection generic will be updated automatically in the **Report Number** box.
2. In the **Description** box, enter the description for the NDT inspection generic.
3. In the **System** box, select a system from a drop-down list.
4. In the **Inspection Date** box, choose the date of inspection.
5. In the **Frame No** box, enter the frame number.
6. In the **Elevation** box, enter the elevation value.
7. In the **Longitudinal** box, enter the longitudinal value.
8. In the **Location** box, enter the location where the inspection to be done.
9. In the **Drawing No** box, select the drawing number from a drop-down list.
10. In the **Designation** box, enter the designation detail.
11. In the **Cost Centre** box, enter the cost centre detail.
12. In the **Requisition** box, select the type of request from a drop-down list.
13. In the **Welding Position** box, enter the position of welding.
14. In the **Weld Type** box, enter the type of welding.
15. In the **Thickness** box, enter the thickness of the welding.
16. In the **Sub Contractor** box, select the sub-contractor from a drop-down list.
17. In the **Welder** box, select the name of a welder from a drop-down list.
18. In the **WPS** box, enter the WPS detail.
19. In the **Process** box, select the welding process to be done from a specified category.
20. In the **NDT Type** box, select the type of NDT to be done from a specified category.
21. In the **Remarks** box, enter your remarks if any.
22. Click **Save**.

The NDT inspection generic is added successfully. Once you have added the NDT inspection generic, you must add the RFI data for the added NDT inspection generic.

#### **5.40.2 Add RFI Data for NDT Inspection Generic**

If you want to add RFI data for the added NDT inspection generic, do the following,

1. Click [![image-1651426269187.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651426269187.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651426269187.png) (Edit icon) in the **RFI Data** column of the **NDT Inspection Generic**  See Fig 5.40. The **RFI Inspection Request List** window opens.
    
    [![image-1651426306146.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651426306146.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651426306146.png)
2. In the **Inspection From** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the **Inspection Details** option, select 1<sup>st</sup>Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the **Others** box, enter any other inspection related details.
6. In the **Refer to Report No** box, enter the report number for reference.
7. In the **RFI Date** box, choose the RFI date.
8. In the **Inspection Result** option, if the inspection result is accepted, select **Accepted** otherwise select **Rejected**.
9. In the **Remarks** box, enter your remarks if any.
10. In the **Inspected by** box, enter the name of a person who has done inspection.
11. In the **Inspected Date** box, choose the date of inspection.
12. In the **Witnessed By** box, enter the name of the witnessed person.
13. In the **Witnessed Date** box, choose the date of witnessed.
14. In the **PCML Rep Name** box, enter the representative name of PCML.
15. In the **PCML Rep Date** box, choose the PCML rep date.
16. In the **MEB Rep Name** box, enter the representative name of MEB.
17. In the **MEB Rep Date box**, choose MEB rep date.
18. Click **Save**. The RFI data is successfully added.

#### **5.40.3 Print an RFI Report**

If you want to print an RFI report, click [![image-1651426624774.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651426624774.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651426624774.png)(print icon) provided in the **RFI** **Report** column of the **NDT Inspection Generic** page. See Fig 5.40.

#### **5.40.4 Submit an NDT Inspection Generic**

Once you have added the NDT inspection generic, the **Submission** column in the **NDT Inspection Generic** page is appeared with[![image-1651426709164.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651426709164.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651426709164.png)(Submit and Reject icons).

1. If you want to submit the added NDT inspection generic, click [![image-1651426946998.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651426946998.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651426946998.png)(Submit icon) in the **Submission** column. Otherwise click [![image-1651426992565.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651426992565.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651426992565.png) (Reject icon) to reject the request.

#### **5.40.5 Print an NDT Inspection Generic Report**

If you want to print an NDT inspection generic report, click[![image-1651427028783.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427028783.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427028783.png) (print icon) provided in the **Report** column of the **NDT Inspection Generic** page. See Fig 5.40.

#### **5.40.6 View Signature Details of QA User, Surveyor, and Client** 

Once the NDT inspection has completed, the QA, surveyor, and client add their signature based on their corresponding roles. You can view their signature by using [![image-1651427075870.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427075870.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427075870.png) (Sign icon) in the **Sign Details** column in the **NDT Inspection Generic** page.

#### **5.40.7 Attach a File into an NDT Inspection Generic**

If you want to attach any file with any NDT inspection generic added in the **NDT Inspection Generic page, you can attach the file by using [![image-1651427127824.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427127824.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427127824.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.40.8 Edit an NDT Inspection Generic**

If you want to edit any existing NDT inspection generic in the **NDT Inspection Generic** page, do the following,

1. Click [![image-1651427188344.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427188344.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427188344.png)(Edit icon) in the **Edit** column for the respective NDT inspection generic. See Fig 5.40. A new window opens to edit the NDT inspection generic.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.40.9 Export NDT Inspection Generic List**

You can export a list of NDT inspection generic added in the **NDT Inspection Generic** page in the pdf and excel formats by using [![image-1651427268813.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427268813.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427268813.png) (**PDF** button) and [![image-1651427281553.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427281553.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427281553.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **5.40.10 Filter an NDT Inspection Generic**

If you want to filter any NDT inspection generic from the list of NDT inspection generic in the **NDT Inspection Generic** page, you can use [![image-1651427325711.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427325711.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427325711.png) (**FILTER** button) located on the **NDT Inspection Generic** page. To know how to filter, see the topic, “[<u>**Filter P&amp;ID**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **5.41 View RFI Fit up (Unique Numbers)**

The **View RFI Fit up** tab helps you to add a new RFI fit up request. This tab also allows you to view and edit the added RFI fit up request.

1. Click **View RFI Fit up** in the **Inspection** menu.
    
    The **RFI Fit up Requests List** page opens.
    
    [![image-1651427384134.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427384134.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427384134.png)
    
     **Figure 5.41: RFI Fit up Requests List page**

#### **5.41.1 Add an RFI Fit up Request**

If you want to add an RFI fit up request, do the following,

1. Click [![image-1651427486684.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427486684.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427486684.png) (**ADD** button) in the **RFI Fit up Requests List** page. A new page opens to add an RFI fit up request.
    
    [![image-1651427529650.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427529650.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427529650.png)
    
     **Figure 5.41.1: A page for adding an RFI fit up request**
    
    [![image-1651427557166.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427557166.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427557166.png) **Tip**: A report number and an RFI number for a new RFI fit up request will be updated automatically in the **Report Number** and the **RFI Number** boxes, respectively.
2. In the **Sub Contractor** box, select the name of a sub-contractor from a drop-down list.
3. In the **Inspection Date &amp; Time** box, select the date of inspection. [![image-1651427598014.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427598014.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427598014.png) **Note**: The fit up inspection date should not be later than the RFI weld visual inspection date.
4. In the **Location** box, enter the location detail.
5. In the **Description** box, enter the description for the inspection.
    
    [![image-1651427630404.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427630404.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427630404.png) **Note**: Before saving the added RFI fit up request, you must add the joints. You can add multiple joints for any added fit up request by using a box provided in the left side of the page.
6. Click **Save**.

#### **5.41.2 Add Joints for an RFI Fit up Request**

If you want to add joints for any added RFI fit up request, do the following steps,

[![image-1651431118087.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651431118087.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651431118087.png)

1. Click the check box of the respective joints.
2. Click [![image-1651431150888.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651431150888.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651431150888.png) (**Add Selected Joints** button). The selected joints are moved into the **Added Joints** box located in the right side of the page.
    
    [![image-1651431179627.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651431179627.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651431179627.png)
3. If you want to update the unique numbers and WPS number for any joint, click the **Unique No** and **WPS Number** columns for the respective joints and then enter the unique numbers and select the WPS number from a drop-down list.
4. Click **Save**.
    
    The selected joints are successfully added for the RFI fit up request.

#### **5.41.3 Import Multiple Joints for an RFI Fit up Request**

If you want to import multiple joints together, do the following,

1. Click [![image-1651431257723.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651431257723.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651431257723.png) (**TEMPLATE** button) on the **Added Joints** box.
    
    A template will be downloaded as an excel worksheet to enter the details of multiple joints.
    
    [![image-1651431274316.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651431274316.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651431274316.png)
2. Enter the relevant details in the required columns on the excel worksheet.
3. Once you have added the joint details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651431307320.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651431307320.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651431307320.png) (**IMPORT** button). A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651431333144.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651431333144.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651431333144.png)
5. Click [![image-1651431352044.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651431352044.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651431352044.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651431376049.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651431376049.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651431376049.png) (**Upload** button) to export the joints that are included in the excel worksheet.

The details of the joints in the worksheet will be displayed in the page.

The RFI fit up request is added successfully. Once you have added the RFI fit up request, you must submit the added request for inspection.

#### **5.41.4 Submit an RFI Fit up Request**

Once you have added the RFI fit up request, the **Request Status** column in the **RFI Fit up Requests List** page is appeared with [![image-1651431487236.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651431487236.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651431487236.png) (Submit and Reject icons). See Fig 5.41.

1. If you want to submit the RFI fit up request, click [![image-1651431518451.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651431518451.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651431518451.png)(Submit icon) in the **Request Status** Otherwise click [![image-1651431532974.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651431532974.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651431532974.png)(Reject icon) to reject the request.

#### **5.41.5 Change a Representative for Any RFI Fit up Request**

If you want to change a representative for any added RFI fit up request,

1. Click [![image-1651431593336.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651431593336.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651431593336.png) (Edit icon) in the **Representative** column for the respective RFI fit up request.
    
    The **Edit Form** window opens.
    
    [![image-1651431606643.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651431606643.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651431606643.png)
2. In the **Representative** box, enter the name of a representative.
3. Click **Save**.

#### **5.41.6 Print an RFI Fit up Report**

If you want to print an RFI fit up report, click [![image-1651432298538.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432298538.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432298538.png) (print icon) provided in the **Report** column of the **RFI Fit up Requests List** page. See Fig 5.41.

#### **5.41.7 Add Result for an Added RFI Fit up Request** 

Once you have fit up inspection, you can add the results. To add results,

1. Click [![image-1651432356265.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432356265.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432356265.png) (Add icon) in the **Results** column of the **RFI Fit up Requests List** page.
    
    The Result window opens.
    
    [![image-1651432370139.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432370139.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432370139.png)
2. If you want to check and update the unique number details for both the components, click [![image-1651432391933.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432391933.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432391933.png)(Edit icon) in the **Update Unique Number 1** and **Update Unique Number 2** columns and update.
3. If you want to update the WPS number, select the respective number in the **WPS** column and change the WPS number from a drop-down list.
4. If you want to update the result, select the respective result in the **Result** column from a drop-down list.
5. In the **Remarks** box, enter your remarks if any.
6. Click **Save changes**.

#### **5.41.8 Attach a File into an RFI Fit up Request** 

If you want to attach any file with any RFI fit up request listed in the **RFI Fit up Requests List page, you can attach the file by using [![image-1651432486195.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432486195.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432486195.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.41.9 Edit an RFI Fit up Request** 

If you want to edit any existing RFI fit up request in the **RFI Fit up Requests List** page, do the following,

1. Click [![image-1651432542926.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432542926.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432542926.png) (Edit icon) in the **Edit** column for the respective RFI fit up request. See Fig 5.41. A new page opens to edit the RFI fit up request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.41.10 Export RFI Fit up Request List**

You can export a list of RFI fit up request added in the **RFI Fit up Requests List** page in the pdf and excel formats by using [![image-1651432628555.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432628555.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432628555.png) (**PDF** button) and [![image-1651432638077.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432638077.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432638077.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **5.41.11 Filter an RFI Fit Up Request** 

If you want to filter any RFI fit up request from the list of RFI fit up requests in the **RFI Fit up Requests List** page, you can use [![image-1651432698911.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432698911.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432698911.png) (**FILTER** button). To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **5.42 View RFI Weld VI (Unique Numbers)**

The **View RFI Weld VI** tab helps you to add a new RFI weld VI request. This tab also allows you to view and edit the added RFI weld VI request.

1. Click **View RFI Weld VI** in the **Inspection** menu.
    
    The **RFI Weld Visual Request List** page opens.
    
    [![image-1651432752542.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432752542.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432752542.png)
    
     **Figure 5.42: RFI Weld Visual Request List page**

#### **8.42.1 Add an RFI Weld VI Request**

If you want to add an RFI weld VI request, do the following,

1. Click [![image-1651432818954.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432818954.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432818954.png) (**ADD** button) in the **RFI Weld Visual Request List** Page. A new page opens to add an RFI weld VI request.
    
    [![image-1651432853375.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432853375.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432853375.png)
    
    [![image-1651432862747.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432862747.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432862747.png) **Tip**: A report number and an RFI number for a new RFI weld VI request will be updated automatically in the **Report Number** and the **RFI Number** boxes, respectively.
2. In the **Sub Contractor** box, select the name of a sub-contractor from a drop-down list.
3. In the **Inspection Date &amp; Time** box, select the date of inspection.
4. In the **Location** box, enter the location detail. [![image-1651432929724.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432929724.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432929724.png)**Note**: Before saving the added RFI weld VI request, you must add the joints. You can add multiple joints for any added RFI weld VI request by using a box provided in the left side of the **RFI Weld Visual Request** page.
5. Click **Save**.

#### **5.42.2 Add Joints for an RFI Weld VI Request**

If you want to add joints for any added RFI weld VI request, do the following,

[![image-1651433001485.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433001485.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433001485.png)

1. In the **RFI Report Number** box, select an RFI report number from a drop-down list. A list of joints including the ISO drawing and spool numbers opens for the selected RFI report number.
2. Click the check box of the respective joints.
3. Click [![image-1651433045501.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433045501.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433045501.png) (**Add Selected Joints** button). The selected joints are moved into the **Added Joints** box located in the right side of the page.
    
    [![image-1651433073627.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433073627.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433073627.png)
4. If you want to update the WPS number for any joint, click the **WPS Number** column for the respective joints and then select the WPS number from a drop-down list.
5. If you want to update the welder details, click [![image-1651433107494.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433107494.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433107494.png) (Add icon) in the Welder Details column.
    
    The **Weld-Weld Layer- Weld Process** window opens.
    
    [![image-1651433130267.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433130267.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433130267.png)
6. In the **Date** box, select the date of adding welder details.
7. In the **Weld Process** column, select a weld process.
8. In the **Weld Position** column, select a weld position.
9. In the **Weld Layers** column, select a weld layer. A list of welders will be displayed in the **Welder Number/Name** column for the selected criteria.
10. Select a welder you want to add.
11. Click [![image-1651433209333.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433209333.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433209333.png)(**Add** button). The selected welder details will be listed below.
    
    [![image-1651433231832.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433231832.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433231832.png) **Note**: If you want to add welder details for the next joint, click [![image-1651433248649.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433248649.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433248649.png) (**Next Joint** button).
12. Click **Save**. The selected joints are successfully added for the RFI weld VI request.

#### **5.42.3 Import Multiple joints for an RFI Weld VI Request**

You can import multiple joints together by using a pre-defined excel template given in the application. If you want to import multiple joints together, do the following,

1. Click [![image-1651433312393.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433312393.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433312393.png) (**TEMPLATE** button) on the **Added Joints** box. A template will be downloaded as an excel worksheet to enter the details of multiple joints.
    
    [![image-1651433356628.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433356628.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433356628.png)
2. Enter the relevant details in the required columns on the excel worksheet.
3. Once you have added the joint details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651433392459.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433392459.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433392459.png) (**IMPORT** button). A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651433415504.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433415504.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433415504.png)
5. Click [![image-1651433524821.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433524821.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433524821.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651433552075.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433552075.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433552075.png) (**Upload** button) to export the joints that are included in the excel worksheet. The details of the joints in the worksheet will be displayed in the page.

The RFI weld VI request is added successfully. Once you have added the RFI weld VI request, you must submit the added request for inspection.

#### **5.42.4 Submit an RFI Weld VI Request**

Once you have added the RFI weld VI request, the **Request Status** column in the **RFI Weld Visual Request List** page is appeared [![image-1651433666499.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433666499.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433666499.png)with (Submit and Reject icons). See Fig 5.42.

1. If you want to submit the RFI weld VI request, click [![image-1651433684525.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433684525.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433684525.png)(Submit icon) in the **Request Status** column. Otherwise click [![image-1651433697946.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433697946.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433697946.png) (Reject icon) to reject the request.

#### **5.42.5 Add a Representative for Any RFI Weld VI Request**

If you want to add a representative for any added RFI weld VI request,

1. Click [![image-1651433749565.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433749565.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433749565.png)(Edit icon) in the **Representative** column for the respective RFI weld VI request. The **Edit Form** window opens.
    
    [![image-1651433764540.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433764540.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433764540.png)
2. In the **Representative** box, enter the name of a representative.
3. Click **Save**.

#### **5.42.6 Add Result for an RFI Weld VI Request**

If you want to add for the added RFI weld VI inspection request, do the following,

1. Click [![image-1651433832495.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433832495.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433832495.png)(Add icon) in the **Results** column of the **RFI Weld Visual Request List** page, for the respective RFI weld VI request. See Fig 5.42. A new window opens including the line, drawing number, joint number and WPS number including welder details for the respective RFI weld VI request.
    
    [![image-1651433867422.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433867422.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433867422.png)
2. If you want to update the welder details, click [![image-1651433900284.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433900284.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433900284.png) (Add icon) in the **Welder Details** column and update the welder details.
3. In the **Visual OD** column, select the result for visual OD.
4. In the **Visual ID** column, select the result for visual ID.
5. In the **Debris** column, select the result for debris.
6. In the **Drift** column, select the result for drift.
7. In the **Result** column, select the results from a drop-down list based on your inspection.
8. In the **Remarks** column, enter your remarks if any.
9. Click **Save**.

#### **5.42.7 Print an RFI Weld VI Request**

If you want to print an RFI weld VI report, click [![image-1651434038428.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651434038428.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651434038428.png)(print icon) provided in the **Report** column of the **RFI Weld Visual Request List** page. See Fig 5.42.

#### **5.42.8 Attach a File into an RFI Weld VI Request**

If you want to attach any file with any RFI weld VI request listed in the **RFI Weld Visual Request List** page, you can attach the file by using [![image-1651434098004.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651434098004.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651434098004.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.42.9 Edit an RFI Weld VI Request**

If you want to edit any existing RFI weld VI request in the **RFI Weld Visual Request List** page, do the following,

1. Click [![image-1651434341071.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651434341071.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651434341071.png)(Edit icon) in the **Edit** column for the respective RFI weld VI request. See Fig 5.42.
    
    A new page opens to edit the RFI weld VI request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.42.10 Export RFI Weld VI Request List**

You can export a list of RFI weld VI request added in the **RFI Weld Visual Request List** page in the pdf and excel formats by using [![image-1651434503796.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651434503796.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651434503796.png) (**PDF** button) and [![image-1651434514726.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651434514726.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651434514726.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **5.42.11 Filter an RFI Weld VI Request**

If you want to filter any RFI weld VI request from the list of RFI weld VI requests in the **RFI Weld Visual Request List** page, you can use [![image-1651434833853.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651434833853.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651434833853.png) (**FILTER** button). To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **5.43 View AFI Fit up (Unique Numbers)**

The **View AFI Fit up** allows you to add a new AFI fit up request. This tab also helps you to view and edit the added AFI fit up request.

1. Click **View AFI Fit up** in the **Inspection** menu.
    
    The **AFI Fit up Request List** page opens.
    
    [![image-1651434885483.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651434885483.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651434885483.png)
    
     **Figure 5.43: AFI Fit up Request List page**


#### **5.43.1 Add an AFI Fit up Request**

If you want to add an AFI fit up request, do the following,

1. Click [![image-1651434960555.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651434960555.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651434960555.png) (**ADD** button) in the **AFI Fit up Request List** page.
    
    The **AFI Fit up Inspection Request** page opens to add an AFI fit up request.
    
    [![image-1651434976662.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651434976662.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651434976662.png)

[![image-1651434991128.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651434991128.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651434991128.png)**Tip**: A report number and RFI number for a new AFI fit up request will be updated automatically in the **Report Number** and **RFI Number** boxes.

2. In the **Representative (AI)** box, enter representative name for the application inspection and enter their email id and contact number in the **Email** and **Contact No** boxes, respectively.
3. In the **Representative (Client)** box, enter representative name from the client and enter their email id and contact number in the **Email** and **Contact No** boxes, respectively.
4. In the **Inspection Date** box, select the date of inspection.
5. In the **Representative (Contractor)** box, enter representative name from the contractor and enter their email id and contact number in the **Email** and **Contact No** boxes, respectively.
6. In the **Location** box, enter the location detail.
7. In the **Remarks** box, enter your remarks if any.
8. In the **Inspection Item** box, enter the details of items to be inspected.
9. In the **Subject Coverage** box, enter the subject coverage detail.
    
    [![image-1651435176622.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651435176622.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651435176622.png)**Note**: Before saving the added AFI fit up request, you must add the joints. You can add multiple joints for any added fit up request by using a box provided in the left side of the page.
10. Click **Save**.
    
    Once you enter the details to add an AFI fit up request, a list of joints including the joint numbers, sheet numbers, and spool and drawing numbers opens.

#### **5.43.2 Add Joints for an AFI Fit up Request**

If you want to add joints for any added AFI fit up request, do the following,

1. Click the check box of the respective joints.
2. Click [![image-1651435266493.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651435266493.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651435266493.png) (**Add Selected Joints** button). The selected joints are moved into the **Added Joints** box located in the right side of the page.
    
    [![image-1651435295850.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651435295850.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651435295850.png)

The selected joints are successfully added for the AFI fit up request.

Once you have added the RFI fit up request, you must submit the added request for inspection.

#### **5.43.3 Submit an AFI Fit up Request**

Once you have added the AFI fit up request, the **Request Status** column in the **AFI Fit up Request List page is appeared with [![image-1651435383249.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651435383249.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651435383249.png) (Submit and Reject icons). See Fig 5.43.

1. If you want to submit the AFI fit up request, click [![image-1651435414597.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651435414597.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651435414597.png) (Submit icon) in the **Request Status** Otherwise click [![image-1651435447388.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651435447388.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651435447388.png) (Reject icon) to reject the request.

#### **5.43.4 Change Representative for Any AFI Fit up Request**

If you want to change the added representative for any AFI fit up request,

1. Click [![image-1651435491352.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651435491352.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651435491352.png)(Edit icon) in the **Representative** column for the respective AFI fit up request. The **Edit Form** window opens.
    
    [![image-1651435515203.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651435515203.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651435515203.png)
2. In the **Representative** box, edit the name of a representative.
3. Click **Save**.

#### **5.43.5 Print an AFI Fit up Report**

If you want to print an AFI fit up report, click [![image-1651435586901.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651435586901.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651435586901.png)(print icon) provided in the **Report** column of the **AFI Fit up Request List** page. See Fig 5.43.

#### **5.43.6 Add Result of AFI Fit up Inspection**

If you want to update results for the AFI fit up inspection request, do the following,

1. Click [![image-1651435649572.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651435649572.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651435649572.png) (Add icon) in the **Results** column of the **AFI Fit up Request List** page. A new window opens.
    
    [![image-1651435668711.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651435668711.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651435668711.png)
2. In the **Result** column, select the results of AFI inspection from a drop-down list, for the respective drawing and joint numbers.
3. In the **Remarks** column, enter your remarks if any.
4. Click **Save**.

#### **5.43.7 Attach a File into an AFI Fit up Request** 

If you want to attach any file with any AFI fit up request listed in the **AFI Fit up Request List page, you can attach the file by using [![image-1651435747491.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651435747491.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651435747491.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.43.8 Edit an AFI Fit up Request** 

If you want to edit any existing AFI fit up request in the **AFI Fit up Request List page, do the following,

1. Click [![image-1651435798588.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651435798588.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651435798588.png)(Edit icon) in the **Edit** column for the respective AFI fit up request. See Fig 5.43.
    
    A new page opens to edit the AFI fit up request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.43.9 Export AFI Fit up Request List**

You can export a list of AFI fit up request added in the **AFI Fit up Request List** page in the pdf and excel formats by using [![image-1651435875820.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651435875820.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651435875820.png) (**PDF** button) and [![image-1651435886053.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651435886053.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651435886053.png) **Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

### **8.44 View AFI Weld VI (Unique Numbers)**

The **View AFI Weld VI** allows you to add a new AFI weld VI request. This tab also helps you to view and edit the added AFI weld VI request.

1. Click **View AFI Weld VI** in the **Inspection** menu.
    
    The **AFI** **Weld Visual Request List** page opens.
    
    [![image-1651435967663.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651435967663.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651435967663.png)
    
     **Figure 5.44: AFI** **Weld Visual Request List page**

#### **8.44.1 Add an AFI Weld VI Request**

If you want to add an AFI weld VI request, do the following,

1. Click [![image-1651436297680.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651436297680.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651436297680.png) (**ADD** button) in the **AFI** **Weld Visual Request List** page.
    
    The **AFI Weld Visual Inspection Request** page opens to add an AFI weld VI request.
    
    [![image-1651436319326.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651436319326.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651436319326.png)
    
    [![image-1651436334902.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651436334902.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651436334902.png)**Tip**: A report number and RFI number for a new AFI weld VI request will be updated automatically in the **Report Number** and **RFI Number** boxes.
2. In the **Representative (AI)** box, enter representative name for the application inspection and enter their email id and contact number in the **Email** and **Contact No** boxes, respectively.
3. In the **Representative (Client)** box, enter representative name from the client and enter their email id and contact number in the **Email** and **Contact No** boxes, respectively.
4. In the **Inspection Date** box, select the date of inspection.
5. In the **Representative (Contractor)** box, enter representative name from the contractor and enter their email id and contact number in the **Email** and **Contact No** boxes, respectively.
6. In the **Inspection Item** box, enter the details of items to be inspected.
7. In the **Subject Coverage** box, enter the subject coverage detail.
8. In the **Remarks** box, enter your remarks if any. [![image-1651436436044.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651436436044.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651436436044.png) **Note**: Before saving the added AFI weld VI request, you must add the joints. You can add multiple joints for any added weld VI request by using a box provided in the left side of the page.
9. Click **Save**.

#### **5.44.2 Add Joints for an AFI Weld VI Request**

If you want to add joints for any added AFI weld VI request, do the following,

1. Click the check box of the respective joints.
2. Click [![image-1651436528886.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651436528886.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651436528886.png) (**Add Selected Joints** button). The selected joints are moved into the **Added Joints** box located in the right side of the page.
    
    [![image-1651436578437.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651436578437.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651436578437.png)
3. Click **Save**.

The selected joints are successfully added for the AFI weld VI request.

The AFI weld VI request is successfully added. Once you have added the AFI weld VI request, you must submit the added weld VI request for inspection.

#### **5.44.3 Submit an AFI Weld VI Request**

Once you have added the AFI weld VI request, the **Request Status** column in the **AFI** **Weld Visual Request List page is appeared with [![image-1651436719301.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651436719301.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651436719301.png)(Submit and Reject icons). See Fig 5.44.

1. If you want to submit the RFI weld VI request, click [![image-1651436746891.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651436746891.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651436746891.png)(Submit icon) in the **Request Status** Otherwise click [![image-1651436761124.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651436761124.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651436761124.png) (Reject icon) to reject the request.

#### **5.44.4 Change a Representative for Any AFI Weld VI Request**

If you want to change a representative for any added AFI weld VI request,

1. Click [![image-1651436823162.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651436823162.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651436823162.png) (Edit icon) in the **Representative** column for the respective AFI weld VI request. The **Edit Form** window opens.
    
    [![image-1651436848432.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651436848432.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651436848432.png)
2. In the **Representative** box, enter the name of a representative.
3. Click **Save**.

#### **5.44.5 Add Result for an AFI Weld VI Inspection**

If you want to add result for the added AFI weld VI inspection, do the following,

1. Click [![image-1651436934741.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651436934741.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651436934741.png) (Add icon) in the **Results** column of the **AFI** **Weld Visual Request List** page, for the respective AFI weld VI request. See Fig 5.44. A new window opens including the line, drawing numbers and joint number for the respective AFI weld VI request.
    
    [![image-1651436964255.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651436964255.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651436964255.png)
2. In the **Result** column, select the results from a drop-down list based on your inspection.
3. In the **Remarks** column, enter your remarks if any.
4. Click **Save**.

#### **5.44.6 Print an AFI Weld VI Report**

If you want to print an AFI weld VI report, click[![image-1651437040171.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651437040171.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651437040171.png) (print icon) provided in the **Report** column of the **AFI** **Weld Visual Request List** page. See Fig 5.44.

#### **5.44.7 Attach a file into an AFI weld VI request** 

If you want to attach any file with any AFI weld VI request listed in the **AFI** **Weld Visual Request List** page, you can attach the file by using [![image-1651437108192.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651437108192.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651437108192.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.44.8 Edit an AFI Weld VI Request** 

If you want to edit any existing AFI weld VI request in the **AFI** **Weld Visual Request List** page, do the following steps,

1. Click [![image-1651437163743.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651437163743.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651437163743.png) (Edit icon) in the **Edit** column for the respective AFI weld VI request. See Fig 5.44.
    
    A new page opens to edit the AFI weld VI request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.44.9 Export AFI Weld VI Request List**

You can export a list of AFI weld VI request added in the **AFI** **Weld Visual Request List** page in the pdf and excel formats by using[![image-1651437237289.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651437237289.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651437237289.png) (**PDF** button) and [![image-1651437255234.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651437255234.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651437255234.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **5.44.10 Filter an AFI weld VI request** 

If you want to filter any AFI weld VI request from the list of AFI weld VI requests in the **AFI** **Weld Visual Request List** page, you can use [![image-1651437302567.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651437302567.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651437302567.png) (**FILTER** button). To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **5.45 RFI Line Walk**

The **RFI Line Walk** tab in the **Inspection** menu is used to add a request for line walk inspection.

#### **5.45.1 Add a Line Walk Inspection Request**

If you want to add a line walk inspection request, do the following steps,

1. Click **RFI Line Walk** in the **Inspection** menu. The **RFI Line Walk** page opens.
    
    [![image-1651437403080.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651437403080.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651437403080.png)
    
     **Figure 5.45: RFI Line Walk page**
2. In the **Requested By** box, enter the name of a person who has requested the line walk inspection.
3. In the **Location** box, select the location where the inspection to be performed.
4. In the **Inspection Date &amp; Time** box, select the inspection date and time.
5. In the **Classification** box, enter the classification detail.
6. In the **System** box, select a system from a drop-down list.
7. In the **Sub Contractor** box, select a sub-contractor from a drop-down list.
8. In the **Acceptance Code** box, enter the acceptance code detail.
9. In the **Designation** box, enter the designation detail.
10. In the **Test Temperature** box, enter the test temperature value.
11. In the **Test Medium** box, select the test medium from the drop-down list.
12. In the **Drawing No** box, select the drawing number from a drop-down list.
13. In the **Work Scope** box, enter the work scope detail.
14. In the **Cost Centre** box, enter the cost centre detail.
15. In the **Holding Time**box, enter the holding time range.
16. In the **Pressure Gauge No** box, enter the pressure gauge number.
17. In the **Procedure No** box, enter the procedure number.
18. In the **Design Pressure** box, enter the design pressure range.
19. In the **Test Pressure** box, enter the test pressure range.
20. In the **Instrument** box, enter the instrument name.
21. In the **P&amp;ID No** box, enter the P&amp;ID number.
22. In the **Remarks** box, enter your remarks if any.
23. In the **Description** box, enter the description for the line walk inspection. Before saving the added line walk inspection request, you must add spools.
    
    [![image-1651437670438.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651437670438.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651437670438.png) **Note**: You can add multiple spools for one request.
    
    The **RFI Line Walk** page shows a list of added spools. If you want to view the spools for the specific ISO drawing, select the respective ISO drawing from a drop-down list.
    
    [![image-1651437719674.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651437719674.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651437719674.png)
24. Click [![image-1651437736378.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651437736378.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651437736378.png) (Add icon) of the respective spool which you want to add. The added spools will be moved to the right side of the page.
25. Click **Save Request**.

The line walk inspection request will be added and listed in the **RFI Line Walk Report** page.

### **5.46 View RFI Line Walk**

The **View RFI Line Walk** tab helps you to view and edit the line walk inspection request, which is added by using the **RFI Line Walk** tab. This tab also allows you to add a new line walk inspection request.

1. Click **View RFI Line Walk** in the **Inspection** menu. The **RFI Line Walk Report** page opens with a list of added line walk inspection requests.
    
    [![image-1651437863575.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651437863575.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651437863575.png)
    
     **Figure 5.46: RFI Line Walk Report page**

#### **5.46.1 Add a Line Walk Inspection Request**

If you want to add a line walk inspection request, do the following steps,

1. Click (**ADD** button) in the **RFI Line Walk Report** page. The system redirects you to a new page to add a new line walk inspection request. To know how to add a line walk inspection request, See the topic, “[**<u>Add a Line Walk Inspection Request</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.45.1%C2%A0add-a-line-wa)”.

Once you have added the line walk inspection request, you must submit the added request to perform the line walk inspection.

#### **5.46.2 Add Representative for a Line Walk Inspection Request**

If you want to add a representative for any added line walk inspection request,

1. Click (Edit icon) in the **Representative** column for the respective line walk inspection request. The **Edit Form** window opens.
    
    [![image-1651438066675.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651438066675.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651438066675.png)
2. In the **Representative** box, enter the name of a representative.
3. In the **Inspection Date** box, select the date of inspection.
4. In the **Remarks** box, enter your remarks if any.
5. Click **Save**.

#### **5.46.3 Edit a Line Walk Inspection Request**

If you want to edit any existing line walk inspection request in the **RFI Line Walk Report** page, do the following,

1. Click [![image-1651438150399.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651438150399.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651438150399.png)(Edit icon) in the **Edit** column for the respective line walk inspection request. See Fig 5.46. The **RFI Line Walk Report** page opens with the details of the selected line walk inspection request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.46.4 Submit and Approve a Line Walk Inspection Request**

Once you have added the line walk inspection request, the **Submission** column in the **RFI Line Walk Report** page is appeared with [![image-1651438223698.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651438223698.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651438223698.png)(Submit and Reject icons).

1. If you want to submit the line walk inspection request, click[![image-1651438265792.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651438265792.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651438265792.png)(Submit icon) in the **Submission** column. Otherwise click [![image-1651438284282.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651438284282.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651438284282.png) (Reject icon) to reject the request.
    
    Once you have submitted the line walk inspection request, the **Request Status** column in the **RFI Line Walk Report** page is appeared with[![image-1651438309416.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651438309416.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651438309416.png)(Approve and Reject icons).
2. If you want to approve the line walk inspection request, click [![image-1651438364790.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651438364790.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651438364790.png)(Approve icon) in the **Request Status** Otherwise click [![image-1651438389182.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651438389182.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651438389182.png) (Reject icon) to reject the request.

The line walk inspection request will be moved for line walk inspection.

#### **5.46.5 Add RFI Data for a Line Walk Inspection Request**

If you want to add RFI data for the added line walk inspection request, do the following,

1. Click [![image-1651438469907.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651438469907.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651438469907.png)(Edit icon) in the **RFI Data** column of the **RFI Line Walk Report**  See Fig 5.46. The **RFI Inspection Request List** window opens.
    
    [![image-1651438496650.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651438496650.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651438496650.png)
2. In the **Inspection From** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the **Inspection Details** option, select 1<sup>st</sup> Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the **Others** box, enter any other inspection related details.
6. In the **Refer to Report No** box, enter the report number for reference.
7. In the **RFI Date** box, choose the RFI date.
8. In the **Inspection Result** option, if the inspection result is accepted, select **Accepted** otherwise select **Rejected**.
9. In the **Remarks** box, enter your remarks if any.
10. In the **Inspected by** box, enter the name of a person who has done inspection.
11. In the **Inspected Date** box, choose the date of inspection.
12. In the **Witnessed By** box, enter the name of the witnessed person.
13. In the **Witnessed Date** box, choose the date of witnessed.
14. In the **PCML Rep Name** box, enter the representative name of PCML.
15. In the **PCML Rep Date** box, choose the PCML rep date.
16. In the **MEB Rep Name** box, enter the representative name of MEB.
17. In the **MEB Rep Date box**, choose MEB rep date.
18. Click **Save**.

The RFI data is successfully added.

#### **5.46.6 View an RFI Report**

If you want to view an RFI report, click [![image-1651438717825.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651438717825.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651438717825.png)(print icon) provided in the **RFI Report** column of the **RFI Line Walk Report** page. See Fig 5.46.

#### **5.46.7 Add Results of Line Walk Inspection**

After completing the line walk inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click [![image-1651438803823.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651438803823.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651438803823.png) (Add icon) in the **Results** column of the respective request. The Result window opens a list of spools added for the particular request.
    
    [![image-1651438824876.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651438824876.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651438824876.png)
2. In the **Result** column, select the result of each spool from the given result options in the drop-down list.
3. In the **Temperature** column, enter the temperature value of each spool.
4. In the **Start Time** and **End Time** columns, enter the start and end times.
5. Click **Save**.

#### **5.46.8 Attach a File into a Line Walk Inspection Request**

If you want to attach a file with any existing line walk inspection request listed in the **RFI Line Walk Report** page, you can attach the file by using [![image-1651438934559.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651438934559.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651438934559.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.46.9 Export Line Walk Inspection Request List**

You can export a list of line walk inspection requests added in the **RFI Line Walk Report** page in both the pdf and excel formats by using [![image-1651438983474.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651438983474.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651438983474.png) (**PDF** button) and [![image-1651438995767.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651438995767.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651438995767.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **5.46.10 Filter a Line Walk Inspection Request**

If you want to filter any specific line walk inspection request in the **RFI Line Walk Report** page, you can use [![image-1651439037389.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651439037389.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651439037389.png) (**FILTER** button) located on the **RFI Line Walk Report** page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.



### **5.47 RFI Flushing**

The **RFI Flushing** tab in the **Inspection** menu is used to add a request for pipe flushing inspection.

#### **5.47.1 Add a Flushing Inspection Request**

If you want to add a flushing inspection request, do the following steps,

1. Click **RFI Flushing** in the **Inspection** menu. The **RFI Flushing** page opens.
    
    [![image-1651439162179.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651439162179.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651439162179.png)
    
     **Figure 5.47: RFI Flushing page**
2. In the **Requested By** box, enter the name of a person who has requested the flushing inspection.
3. In the **Location** box, select the location where the inspection to be performed.
4. In the **Inspection Date &amp; Time**box, select the inspection date and time.
5. In the **Classification** box, enter the classification detail.
6. In the **System** box, select a system from a drop-down list.
7. In the **Sub Contractor** box, select a sub-contractor from a drop-down list.
8. In the **Acceptance Code** box, enter the acceptance code detail.
9. In the **Designation** box, enter the designation detail.
10. In the **Test Temperature** box, enter the test temperature value.
11. In the **Test Medium** box, select the test medium from the drop-down list.
12. In the **Drawing No** box, select the drawing number from a drop-down list.
13. In the **Work Scope** box, enter the work scope detail.
14. In the **Cost Centre** box, enter the cost centre detail.
15. In the **Holding Time** box, enter the holding time range.
16. In the **Pressure Gauge No** box, enter the pressure gauge number.
17. In the **Procedure No** box, enter the procedure number.
18. In the **Design Pressure** box, enter the design pressure range.
19. In the **Test Pressure** box, enter the test pressure range.
20. In the **Instrument** box, enter the instrument name.
21. In the **P&amp;ID No** box, enter the P&amp;ID number.
22. In the **Remarks** box, enter your remarks if any.
23. In the **Description** box, enter the description for the flushing inspection.
    
    Before saving the added flushing inspection request, you must add spools.
    
    [![image-1651439356347.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651439356347.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651439356347.png) **Note**: You can add multiple spools for one request.
    
    The **RFI Flushing** page shows a list of added spools. If you want to view the spools for the specific ISO drawing, select the respective ISO drawing from a drop-down list. [![image-1651439397100.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651439397100.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651439397100.png)
24. Click [![image-1651439408070.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651439408070.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651439408070.png)(Add icon) of the respective spool which you want to add. The added spools will be moved to the right side of the page.
25. Click **Save Request**.

The flushing inspection request will be added and listed in the **RFI Flushing Report** page.


### **5.48 View RFI Flushing**

The **View RFI Flushing** tab helps you to view and edit the flushing inspection request, which is added by using the **RFI Flushing** tab. This tab also allows you to add a new flushing inspection request.

1. Click **View RFI Flushing** in the **Inspection** menu. The **RFI Flushing Report** page opens with a list of added flushing inspection requests.
    
    [![image-1651439509180.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651439509180.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651439509180.png)
    
     **Figure 5.48: RFI Flushing Report page**

#### **5.48.1 Add a Flushing Inspection Request**

If you want to add a flushing inspection request, do the following steps,

1. Click [![image-1651439613769.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651439613769.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651439613769.png) (**ADD** button) in the **RFI Flushing Report** page.
    
    The system redirects you to a new page to add a new flushing inspection request. To know how to add a flushing inspection request, See the topic, “[**<u>Add a Flushing Inspection Request</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.47.1%C2%A0add-a-flushin)”.

Once you have added the flushing inspection request, you must submit the added request to perform the flushing inspection.

#### **5.48.2 Add Representative for a Flushing Inspection Request**

If you want to add a representative for any added flushing inspection request,

1. Click [![image-1651439689832.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651439689832.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651439689832.png)(Edit icon) in the **Representative** column for the respective flushing inspection request. The **Edit Form** window opens.
    
    [![image-1651439718130.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651439718130.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651439718130.png)
2. In the **Representative** box, enter the name of a representative.
3. In the **Inspection Date** box, select the date of inspection.
4. In the **Remarks** box, enter your remarks if any.
5. Click **Save**.

#### **5.48.3 Edit a Flushing Inspection Request**

If you want to edit any existing flushing inspection request in the **RFI Flushing Report** page, do the following,

1. Click[![image-1651439822540.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651439822540.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651439822540.png)(Edit icon) in the **Edit** column for the respective flushing inspection See Fig 5.48. The **RFI Flushing Report** page opens with the details of the selected flushing inspection request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.48.4 Submit and Approve a Flushing Inspection Request**

Once you have added the flushing inspection request, the **Submission** column in the **RFI Flushing Report** page is appeared with [![image-1651439907831.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651439907831.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651439907831.png)(Submit and Reject icons).

1. If you want to submit the flushing inspection request, click [![image-1651439944247.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651439944247.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651439944247.png)(Submit icon) in the **Submission** Otherwise click [![image-1651439960920.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651439960920.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651439960920.png)(Reject icon) to reject the request. Once you have submitted the flushing inspection request, the **Request Status** column in the **RFI Flushing Report** page is appeared with [![image-1651439989387.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651439989387.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651439989387.png)(Approve and Reject icons).
2. If you want to approve the flushing inspection request, click[![image-1651440012735.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651440012735.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651440012735.png) (Approve icon) in the **Request Status** Otherwise click [![image-1651440030261.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651440030261.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651440030261.png)(Reject icon) to reject the request.

The flushing inspection request will be moved for flushing inspection.

#### **5.48.5 Add RFI Data for a Flushing Inspection Request**

If you want to add RFI data for the added flushing inspection request, do the following,

1. Click [![image-1651440122290.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651440122290.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651440122290.png)(Edit icon) in the **RFI Data** column of the **RFI Flushing Report**  See Fig 5.48. The **RFI Inspection Request List** window opens.
    
    [![image-1651440158830.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651440158830.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651440158830.png)
2. In the **Inspection From** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the **Inspection Details** option, select 1<sup>st</sup>Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the **Others** box, enter any other inspection related details.
6. In the **Refer to Report No** box, enter the report number for reference.
7. In the **RFI Date** box, choose the RFI date.
8. In the **Inspection Result** option, if the inspection result is accepted, select **Accepted** otherwise select **Rejected**.
9. In the **Remarks** box, enter your remarks if any.
10. In the **Inspected by** box, enter the name of a person who has done inspection.
11. In the **Inspected Date** box, choose the date of inspection.
12. In the **Witnessed By** box, enter the name of the witnessed person.
13. In the **Witnessed Date** box, choose the date of witnessed.
14. In the **PCML Rep Name** box, enter the representative name of PCML.
15. In the **PCML Rep Date** box, choose the PCML rep date.
16. In the **MEB Rep Name** box, enter the representative name of MEB.
17. In the **MEB Rep Date box**, choose MEB rep date.
18. Click **Save**.

The RFI data is successfully added.

#### **5.48.6 View an RFI Report**

If you want to view an RFI report, click [![image-1651440450815.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651440450815.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651440450815.png)(print icon) provided in the **RFI Report** column of the **RFI Flushing Report** page. See Fig 5.48.

#### **5.48.7 Add Results of Flushing Inspection**

After completing the flushing inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click [![image-1651440497663.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651440497663.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651440497663.png) (Add icon) in the **Results** column of the respective request.
    
    The Result window opens a list of spools added for the particular request.
    
    [![image-1651440518343.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651440518343.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651440518343.png)
2. In the **Result** column, select the result of each spool from the given result options in the drop-down list.
3. In the **Temperature** column, enter the temperature value of each spool.
4. In the **Start Time** and **End Time** columns, enter the start and end times.
5. Click **Save**.

#### **5.48.8 Attach a File into a Flushing Inspection Request**

If you want to attach a file with any existing flushing inspection request listed in the **RFI Flushing Report** page, you can attach the file by using [![image-1651440609417.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651440609417.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651440609417.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.48.9 Export Flushing Inspection Request List**

You can export a list of flushing inspection requests added in the **RFI Flushing Report** page in both the pdf and excel formats by using [![image-1651440650319.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651440650319.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651440650319.png) (**PDF** button) and [![image-1651440660942.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651440660942.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651440660942.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **5.48.10 Filter a Flushing Inspection Request**

If you want to filter any specific flushing inspection request in the **RFI Flushing Report** page, you can use [![image-1651440703497.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651440703497.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651440703497.png) (**FILTER** button) located on the **RFI Flushing Report** page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **5.49 RFI Chemical Cleaning**

The **RFI Chemical Cleaning** tab in the **Inspection** menu is used to add a request for the pipe chemical cleaning inspection.

#### **5.49.1 Add a Chemical Cleaning Inspection Request**

If you want to add a chemical cleaning inspection request, do the following steps,

1. Click **RFI Chemical Cleaning** in the **Inspection** menu. The **RFI Chemical Cleaning** page opens.
    
    [![image-1651440795617.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651440795617.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651440795617.png)
    
     **Figure 5.49: RFI Chemical Cleaning page**
2. In the ****Requested By**** box, enter the name of a person who has requested the chemical cleaning inspection.
3. In the ****Location**** box, select the location where the inspection to be performed.
4. In the **Inspection Date &amp; Time** box, select the inspection date and time.
5. In the **Classification** box, enter the classification detail.
6. In the **System** box, select a system from a drop-down list.
7. In the **Sub Contractor** box, select a sub-contractor from a drop-down list.
8. In the **Acceptance Code** box, enter the acceptance code detail.
9. In the **Designation** box, enter the designation detail.
10. In the **Test Temperature** box, enter the test temperature value.
11. In the **Test Medium** box, select the test medium from the drop-down list.
12. In the **Drawing No** box, select the drawing number from a drop-down list.
13. In the **Work Scope** box, enter the work scope detail.
14. In the **Cost Centre** box, enter the cost centre detail.
15. In the **Holding Time** box, enter the holding time range.
16. In the **Pressure Gauge No** box, enter the pressure gauge number.
17. In the **Procedure No** box, enter the procedure number.
18. In the **Design Pressure** box, enter the design pressure range.
19. In the **Test Pressure** box, enter the test pressure range.
20. In the **Instrument** box, enter the instrument name.
21. In the **P&amp;ID No** box, enter the P&amp;ID number.
22. In the **Remarks** box, enter your remarks if any.
23. In the **Description** box, enter the description for the chemical cleaning inspection. Before saving the added chemical cleaning inspection request, you must add spools.
    
    [![image-1651588915460.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651588915460.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651588915460.png)**Note**: You can add multiple spools for one request.
    
    The **RFI Chemical Cleaning** page shows a list of added spools. If you want to view the spools for the specific ISO drawing, select the respective ISO drawing from a drop-down list.
    
    [![image-1651588945673.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651588945673.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651588945673.png)
24. Click [![image-1651588986707.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651588986707.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651588986707.png)(Add icon) of the respective spool which you want to add. The added spools will be moved to the right side of the page.
25. Click **Save Request**.

The chemical cleaning inspection request will be added and listed in the **RFI Chemical Cleaning Report** page.

### **5.50 View RFI Chemical Cleaning**

The **View RFI Chemical Cleaning** tab helps you to view and edit the chemical cleaning inspection request, which is added by using the **RFI Chemical Cleaning** tab. This tab also allows you to add a new chemical cleaning inspection request.

1. Click **View RFI Chemical Cleaning** in the **Inspection** menu. The **RFI Chemical Cleaning Report** page opens with a list of added chemical cleaning inspection requests.
    
    [![image-1651589148449.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651589148449.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651589148449.png)
    
     **Figure 5.50: RFI Chemical Cleaning Report page**

#### **5.50.1 Add a Chemical Cleaning Inspection Request**

If you want to add a chemical cleaning inspection request, do the following steps,

1. Click [![image-1651589221375.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651589221375.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651589221375.png) (**ADD** button) in the **RFI Chemical Cleaning Report** page. The system redirects you to a new page to add a new chemical cleaning inspection request. To know how to add a chemical cleaning inspection request, See the topic, “[**<u>Add a </u><u>Chemical Cleaning </u><u>Inspection Request</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.49.1%C2%A0add-a-chemica)”.
    
    Once you have added the chemical cleaning inspection request, you must submit the added request to perform the chemical cleaning inspection.

#### **5.50.2 Add Representative for a Chemical Cleaning Inspection Request**

If you want to add a representative for any added chemical cleaning inspection request,

1. Click [![image-1651589308476.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651589308476.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651589308476.png)(Edit icon) in the **Representative** column for the respective chemical cleaning inspection request. The **Edit Form** window opens.
    
    [![image-1651589327829.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651589327829.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651589327829.png)
2. In the **Representative** box, enter the name of a representative.
3. In the **Inspection Date** box, select the date of inspection.
4. In the **Remarks** box, enter your remarks if any.
5. Click **Save**.

#### **5.50.3 Edit a Chemical Cleaning Inspection Request**

If you want to edit any existing chemical cleaning inspection request in the **RFI Chemical Cleaning Report** page, do the following,

1. Click [![image-1651589481941.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651589481941.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651589481941.png)(Edit icon) in the **Edit** column for the respective chemical cleaning inspection See Fig 5.50. The **RFI Chemical Cleaning Report** page opens with the details of the selected chemical cleaning inspection request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.50.4 Submit and Approve a Chemical Cleaning Inspection Request**

Once you have added the chemical cleaning inspection request, the **Submission** column in the **RFI Chemical Cleaning Report** page is appeared with [![image-1651589558239.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651589558239.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651589558239.png) (Submit and Reject icons).

1. If you want to submit the chemical cleaning inspection request, click [![image-1651589590074.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651589590074.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651589590074.png) (Submit icon) in the **Submission** Otherwise click [![image-1651589606094.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651589606094.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651589606094.png) (Reject icon) to reject the request. Once you have submitted the chemical cleaning inspection request, the **Request Status** column in the **RFI Chemical Cleaning Report** page is appeared with [![image-1651589625179.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651589625179.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651589625179.png) (Approve and Reject icons).
2. If you want to approve the chemical cleaning inspection request, click [![image-1651589653940.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651589653940.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651589653940.png)(Approve icon) in the ****Request Status**** Otherwise click [![image-1651589672065.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651589672065.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651589672065.png) (Reject icon) to reject the request. The chemical cleaning inspection request will be moved for chemical cleaning inspection.

#### **5.50.5 Add RFI Data for a Chemical Cleaning Inspection Request**

If you want to add RFI data for the added chemical cleaning inspection request, do the following,

1. Click [![image-1651589790180.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651589790180.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651589790180.png) (Edit icon) in the **RFI Data** column of the **RFI Chemical Cleaning Report**  See Fig 5.50. The **RFI Inspection Request List** window opens.
    
    [![image-1651589810916.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651589810916.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651589810916.png)
2. In the **Inspection From** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the ****Inspection Details**** option, select 1<sup>st</sup>Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the ****Others**** box, enter any other inspection related details.
6. In the ****Refer to Report No**** box, enter the report number for reference.
7. In the ****RFI Date**** box, choose the RFI date.
8. In the **Inspection Result** option, if the inspection result is accepted, select **Accepted** otherwise select **Rejected**.
9. In the ****Remarks**** box, enter your remarks if any.
10. In the ****Inspected by**** box, enter the name of a person who has done inspection.
11. In the ****Inspected Date**** box, choose the date of inspection.
12. In the ****Witnessed By**** box, enter the name of the witnessed person.
13. In the **Witnessed Date** box, choose the date of witnessed.
14. In the **PCML Rep Name** box, enter the representative name of PCML.
15. In the **PCML Rep Date** box, choose the PCML rep date.
16. In the **MEB Rep Name** box, enter the representative name of MEB.
17. In the **MEB Rep Date box**, choose MEB rep date.
18. Click **Save**.

The RFI data is successfully added.


#### **5.50.6 View an RFI Report**

If you want to view an RFI report, click[![image-1651590041754.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651590041754.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651590041754.png)(print icon) provided in the **RFI Report** column of the **RFI Chemical Cleaning Report** page. See Fig 5.50.

#### **5.50.7 Add Results of Chemical Cleaning Inspection**

After completing the chemical cleaning inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click [![image-1651590101313.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651590101313.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651590101313.png) (Add icon) in the **Results** column of the respective request. The Result window opens a list of spools added for the particular request.
    
    [![image-1651590122102.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651590122102.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651590122102.png)
2. In the **Result** column, select the result of each spool from the given result options in the drop-down list.
3. In the **Temperature** column, enter the temperature value of each spool.
4. In the **Start Time** and **End Time** columns, enter the start and end times.
5. Click **Save**.

#### **5.50.8 Attach a File into a Chemical Cleaning Inspection Request**

If you want to attach a file with any existing chemical cleaning inspection request listed in the **RFI Chemical Cleaning Report** page, you can attach the file by using [![image-1651590279773.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651590279773.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651590279773.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.50.9 Export Chemical Cleaning Inspection Request List**

You can export a list of chemical cleaning inspection requests added in the **RFI Chemical Cleaning Report** page in both the pdf and excel formats by using [![image-1651590339890.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651590339890.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651590339890.png) (**PDF** button) and [![image-1651590351607.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651590351607.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651590351607.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **5.50.10 Filter a Chemical Cleaning Inspection Request**

If you want to filter any specific chemical cleaning inspection request in the **RFI Chemical Cleaning Report** page, you can use [![image-1651590406512.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651590406512.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651590406512.png) (**FILTER** button) located on the **RFI Chemical Cleaning Report** page. To know how to filter, see the topic, “[<u>**Filter P&amp;ID**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

### **5.51 RFI Reinstatement**

The **RFI Reinstatement** tab in the **Inspection** menu is used to add a request for pipe reinstatement inspection.

#### **5.51.1 Add a Reinstatement Inspection Request**

If you want to add a reinstatement inspection request, do the following steps,

1. Click **RFI Reinstatement** in the **Inspection** menu. The **RFI Reinstatement** page opens.
    
    [![image-1651590505981.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651590505981.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651590505981.png)
    
     **Figure 5.51: RFI Reinstatement page**
2. In the ****Requested By**** box, enter the name of a person who has requested the reinstatement inspection.
3. In the ****Location**** box, select the location where the inspection to be performed.
4. In the **Inspection Date &amp; Time** box, select the inspection date and time.
5. In the **Classification** box, enter the classification detail.
6. In the **System** box, select a system from a drop-down list.
7. In the **Sub Contractor** box, select a sub-contractor from a drop-down list.
8. In the **Acceptance Code** box, enter the acceptance code detail.
9. In the **Designation** box, enter the designation detail.
10. In the **Test Temperature** box, enter the test temperature value.
11. In the **Test Medium** box, select the test medium from the drop-down list.
12. In the **Drawing No** box, select the drawing number from a drop-down list.
13. In the **Work Scope** box, enter the work scope detail.
14. In the **Cost Centre** box, enter the cost centre detail.
15. In the **Holding Time** box, enter the holding time range.
16. In the **Pressure Gauge No** box, enter the pressure gauge number.
17. In the **Procedure No** box, enter the procedure number.
18. In the **Design Pressure** box, enter the design pressure range.
19. In the **Test Pressure** box, enter the test pressure range.
20. In the **Instrument** box, enter the instrument name.
21. In the **P&amp;ID No** box, enter the P&amp;ID number.
22. In the **Remarks** box, enter your remarks if any.
23. In the **Description** box, enter the description for the reinstatement inspection.
    
    Before saving the added reinstatement inspection request, you must add spools.
    
    [![image-1651590679343.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651590679343.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651590679343.png) **Note**: You can add multiple spools for one request.
    
    The **RFI Reinstatement** page shows a list of added spools. If you want to view the spools for the specific ISO drawing, select the respective ISO drawing from a drop-down list.
    
    [![image-1651590705505.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651590705505.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651590705505.png)
24. Click [![image-1651590723201.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651590723201.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651590723201.png) (Add icon) of the respective spool which you want to add. The added spools will be moved to the right side of the page.
25. Click **Save Request**.

The reinstatement inspection request will be added and listed in the **RFI Reinstatement Report** page.

### **5.52 View RFI Reinstatement**

The **View RFI Reinstatement** tab helps you to view and edit the reinstatement inspection request, which is added by using the **RFI Reinstatement** tab. This tab also allows you to add a new reinstatement inspection request.

1. Click **View RFI Reinstatement** in the **Inspection** menu.
    
    The **RFI Reinstatement Report** page opens with a list of added reinstatement inspection requests.
    
    [![image-1651590896257.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651590896257.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651590896257.png)
    
     **Figure 5.52: RFI Reinstatement Report page**

#### **5.52.1 Add a Reinstatement Inspection Request**

If you want to add a reinstatement inspection request, do the following steps,

1. Click (**ADD** button) in the **RFI Reinstatement Report** page. The system redirects you to a new page to add a new reinstatement inspection request. To know how to add a reinstatement inspection request, See the topic, “[**<u>Add a Reinstatement Inspection Request</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.51.1%C2%A0add-a-reinsta)”.

Once you have added the reinstatement inspection request, you must submit the added request to perform the reinstatement inspection.

#### **5.52.2 Add Representative for a Reinstatement Inspection Request**

If you want to add a representative for any added reinstatement inspection request,

1. Click [![image-1651591073123.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591073123.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591073123.png)(Edit icon) in the **Representative** column for the respective reinstatement inspection request. The **Edit Form** window opens.
    
    [![image-1651591098312.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591098312.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591098312.png)
2. In the **Representative** box, enter the name of a representative.
3. In the **Inspection Date** box, select the date of inspection.
4. In the **Remarks** box, enter your remarks if any.
5. Click **Save**.

#### **5.52.3 Edit a Reinstatement Inspection Request**

If you want to edit any existing reinstatement inspection request in the **RFI Reinstatement Report** page, do the following,

1. Click [![image-1651591195935.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591195935.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591195935.png) (Edit icon) in the **Edit** column for the respective reinstatement inspection See Fig 5.52. The **RFI Reinstatement Report** page opens with the details of the selected reinstatement inspection request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **5.52.4 Submit and Approve a Reinstatement Inspection Request**

Once you have added the reinstatement inspection request, the **Submission** column in the **RFI Reinstatement Report** page is appeared with [![image-1651591272141.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591272141.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591272141.png) (Submit and Reject icons).

1. If you want to submit the reinstatement inspection request, click [![image-1651591301087.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591301087.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591301087.png) (Submit icon) in the **Submission** Otherwise click [![image-1651591317099.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591317099.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591317099.png) (Reject icon) to reject the request. Once you have submitted the reinstatement inspection request, the **Request Status** column in the **RFI Reinstatement Report** page is appeared with[![image-1651591351175.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591351175.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591351175.png) (Approve and Reject icons).
2. If you want to approve the reinstatement inspection request, click [![image-1651591377901.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591377901.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591377901.png) (Approve icon) in the ****Request Status**** Otherwise click [![image-1651591393637.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591393637.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591393637.png) (Reject icon) to reject the request. The reinstatement inspection request will be moved for reinstatement inspection.

#### **5.52.5 Add RFI Data for a Reinstatement Inspection Request**

If you want to add RFI data for the added reinstatement inspection request, do the following,

1. Click [![image-1651591477577.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591477577.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591477577.png)(Edit icon) in the **RFI Data** column of the **RFI Reinstatement Report**  See Fig 5.52. The **RFI Inspection Request List** window opens.
    
    [![image-1651591497373.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591497373.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591497373.png)
2. In the **Inspection From** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the ****Inspection Details**** option, select 1<sup>st</sup>Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the **Others** box, enter any other inspection related details.
6. In the **Refer to Report No** box, enter the report number for reference.
7. In the **RFI Date** box, choose the RFI date.
8. In the ****Inspection Result**** option, if the inspection result is accepted, select ****Accepted**** otherwise select ****Rejected****.
9. In the **Remarks** box, enter your remarks if any.
10. In the **Inspected by** box, enter the name of a person who has done inspection.
11. In the **Inspected Date** box, choose the date of inspection.
12. In the **Witnessed By** box, enter the name of the witnessed person.
13. In the **Witnessed Date** box, choose the date of witnessed.
14. In the **PCML Rep Name** box, enter the representative name of PCML.
15. In the **PCML Rep Date** box, choose the PCML rep date.
16. In the **MEB Rep Name** box, enter the representative name of MEB.
17. In the **MEB Rep Date box**, choose MEB rep date.
18. Click **Save**.

The RFI data is successfully added.


#### **5.52.6 View an RFI Report**

If you want to view an RFI report, click [![image-1651591702432.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591702432.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591702432.png) (print icon) provided in the **RFI Report** column of the **RFI Reinstatement Report** page. See Fig 5.52.

#### **5.52.7 Add Results of Reinstatement Inspection**

After completing the reinstatement inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click [![image-1651591768252.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591768252.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591768252.png) (Add icon) in the **Results** column of the respective request. The Result window opens a list of spools added for the particular request.
    
    [![image-1651591789927.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591789927.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591789927.png)
2. In the ****Result**** column, select the result of each spool from the given result options in the drop-down list.
3. In the ****Temperature**** column, enter the temperature value of each spool.
4. In the **Start Time** and **End Time** columns, enter the start and end times.
5. Click **Save**.

#### **5.52.8 Attach a File into a Reinstatement Inspection Request**

If you want to attach a file with any existing reinstatement inspection request listed in the **RFI Reinstatement Report** page, you can attach the file by using [![image-1651591888170.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591888170.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591888170.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.52.9 Export Reinstatement Inspection Request List**

You can export a list of reinstatement inspection requests added in the **RFI Reinstatement Report** page in both the pdf and excel formats by using [![image-1651591936770.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591936770.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591936770.png) (**PDF** button) and [![image-1651591950522.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591950522.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591950522.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **5.52.10 Filter a Reinstatement Inspection Request**

If you want to filter any specific reinstatement inspection request in the **RFI Reinstatement Report** page, you can use [![image-1651591997799.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591997799.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591997799.png) (**FILTER** button) located on the **RFI Reinstatement Report** page. To know how to filter, see the topic, “**[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)**”.


### **5.53 Inspection Requisition Summary Report**

The **Inspection Requisition Summary** tab in the **Inspection** menu used to view the inspection requisition summary report for a particular period.

1. Click **Inspection Requisition Summary** in the **Inspection** menu. The **Requisition Inspection Summary** page opens.
    
    [![image-1651592061350.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651592061350.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651592061350.png)
    
     **Figure 5.53: Requisition Inspection Summary page**
2. In the **Start Date** and **End Date** boxes, select the start and end dates.
3. Click **Get Report**.
    
    The inspection requisition summary report for the selected period will be opened.
    
    [![image-1651592115499.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651592115499.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651592115499.png)

#### **5.53.1 Print an Inspection Requisition Summary Report**

If you want to print an inspection requisition summary report, use[![image-1651592168087.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651592168087.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651592168087.png) and [![image-1651592178752.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651592178752.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651592178752.png) (print icons) provided in the **Requisition Inspection Summary** page.

1. If you want to print the current page of the inspection requisition summary report, click [![image-1651592202297.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651592202297.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651592202297.png) (print icon including the page number).
2. If you want to print all the pages of the inspection requisition summary report, click [![image-1651592256145.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651592256145.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651592256145.png)(print icon).

#### **5.53.2 Export an Inspection Requisition Summary Report**

You can export the inspection requisition summary report in various formats by using the option [![image-1651592398427.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651592398427.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651592398427.png) provided in the upper right corner of the **Requisition Inspection Summary** page.

# Piping

## **6.0 Piping**

The **Piping** menu in the home page of the ***cuteQM*** app used to add results after performing the piping related inspections. This menu also helps you to view the inspection reports.

### **6.1 Radiographic Testing (RT)** 

RT inspection method is one of the types of NDT inspection used to conduct inspection in the piping project by using either x-rays or gamma rays.

Once the NDT inspection request is added with the selection of RT type by using the [<u>**NDT Inspection Request**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.5%C2%A0ndt-inspection-r) tab, the added inspection request will be moved here. After completing RT inspection, you can add the RT inspection result details by using this RT tab.

To navigate to **Radiographic Testing (RT)**,

1. Click **Radiographic Testing (RT)** in the **Piping** menu.
    
    The **RT Report** page opens.
    
    [![image-1651456975125.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651456975125.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651456975125.png)
    
     **Figure 6.1: RT Report page**

### **6.11 Add an RT Report**

If you want to add an RT report, do the following steps,

1. Click (**ADD** button) in the **RT Report** page. See Fig 6.1.
    
    The **RT Report** page opens a new window to add an RT report.
    
    [![image-1651457045679.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457045679.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457045679.png)
    
    [![image-1651457054027.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457054027.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457054027.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651457074555.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457074555.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457074555.png)**Tip**: A report number for a new RT report will be updated automatically in the **Report Number** box. If you want change the report number, you can change.
2. In the ****NDT By**** box, select the requisition detail of NDT whether by third party or internal from a drop-down list.
3. In the ****NDT Request No**** box, select an RT request number from a drop-down list.
4. In the ****Prepared By**** box, enter the name of a person who has prepared the RT report.
5. In the ****Prepared Date**** box, select the prepared date of the RT report.
6. In the ****Reviewed By**** box, enter the name of a person who has reviewed the RT report.
7. In the ****Reviewed Date**** box, select the reviewed date of the RT report.
8. In the **Accepted/Approved By** boxes, enter the name of a person who has accepted/approved the RT report.
9. In the ****Accepted/Approved Date**** box, select the accepted/approved date of the RT report.
10. Click **Save**.

The RT report is successfully added. Once you have added the RT report, you must add RT inspection results.

#### **6.1.2 Add RT Inspection Results** 

If you want to add the RT inspection results for the added RT report, do the following steps,

1. Click the respective added RT report in the **RT Report** See Fig 6.1. The **RT Report** page shows **RT Results**, **Joint Results**, and **Report Photos** windows to add RT results.
    
    [![image-1651457210104.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457210104.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457210104.png)
    
     **Figure 6.1.1: RT Results page**
2. In the **Inspection Date** box, select the date of inspection.
3. In the ****Image Quality Indicator (IQI)**** box, select IQI from a drop-down list.
4. In the ****Source &amp; Size (MM)**** box, select the RT source and their size from a drop-down list.
5. In the ****Density**** box, enter the radiographic density range.
6. In the ****Code**** box, select the code of the material from a drop-down list.
7. In the ****Procedure Number**** box, select the procedure number from a drop-down list.
8. In the ****Sensitivity (%)****box, set the radiographic sensitivity by using up and down arrows.
9. In the ****Developing Time (Mins)****box, set the developing time by using up and down arrows.
10. In the ****Film/ Type**** box, select the name of a film including type from a drop-down list.
11. In the ****Acceptance Criteria**** box, select the acceptance criteria from a drop-down list.
12. In the **Source to Film Distance (SFD)** box, enter the distance range between the source and the film.
13. In the ****Focus Film Distance (FFD)****box, enter the focus film distance range.
14. In the ****Source**** box, select any one source option whether inside, outside, or other.
15. In the ****Technique**** box, select the radiographic technique from a drop-down list.
16. In the ****Examination Stage**** box, select the examination stage from the specified options.
17. In the ****Material**** box, select the material from a drop-down list.
18. In the ****Surface Condition**** box, select the condition of the surface from the specified options.
19. In the ****Placement of IQI**** box, select any one option from source side and film side.
20. In the ****Source Strength (Ci)****box, enter the source strength value.
21. In the ****Exposure Time (Mins)****box, set the exposure time by using up and down arrows.
22. In the ****Remarks**** box, enter your remarks if any.
23. Click **Save RT Details**.
    
    The RT details are successfully updated. Once you have updated the RT details, you must add marker results of added joints.

[![image-1651457424614.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457424614.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457424614.png)**Note**: Once you have added RT details, you can save the added RT details and reuse the saved details while you adding RT details for any other RT report.

[![image-1651457441877.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457441877.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457441877.png)

- To save the added RT details, enter any name in the **Set Default** box and click .
- If you want to add the same RT details for any other RT report, select the name in the **Get Default**.
    
    The saved details will be automatically updated in the respective boxes.

#### **6.1.2.1 Add Marker Results for Joints**

The **RT Results** window shows a list of joints added for the RT inspection. If you want to add marker results for the respective joints,

[![image-1651457522125.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457522125.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457522125.png)

1. Click [![image-1651457537910.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457537910.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457537910.png) (Add icon) for the respective joint. The **Marker Results** window opens with a list of markers of the respective joint.
    
    [![image-1651457553612.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457553612.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457553612.png)
2. If you want to add any additional markers, click [![image-1651457569760.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457569760.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457569760.png) (****ADD**** button). The **Marker Results** window shows a new window to add a new marker.
    
    [![image-1651457587529.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457587529.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457587529.png)
    
    
    1. 1. In the **Marker** box, enter the marker number.
        2. In the ****Sensitivity**** box, enter the sensitivity range.
        3. In the ****Result**** box, select the marker result from the given result options.
        4. In the ****Defect**** box, select the defect type if any.
        5. In the ****Defect Length (MM)****box, enter the defect length value.
        6. In the ****Remarks**** box, enter your remarks if any.
        7. Click **Save**. The marker is added and listed in the **Marker Results** window.
3. If you want to update marker results,
    
    
    1. 1. Click [![image-1651457705186.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457705186.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457705186.png)(Edit icon) in the ****Edit**** column for the respective marker results. A new window opens to edit the marker results.
            
            [![image-1651457723040.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457723040.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457723040.png)
        2. Click any box where you want to edit the details, and edit the marker results.
        3. Click **Save**.
4. If you want delete any existing marker results, click[![image-1651457759689.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457759689.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457759689.png)(Delete icon) for the respective marker results.

#### **9.1.2.2 Import Additional Joints**

If you want to import additional joints for the RT inspection,

1. Click [![image-1651457878755.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457878755.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457878755.png) (****Import Joints**** button) in the ****RT Results**** See Fig 6.1.1. The **Joints** window opens with a list of joints.
    
    [![image-1651457894177.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457894177.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457894177.png)
2. Select the joints you want to import.
3. Click [![image-1651457914402.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457914402.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457914402.png) (****Import Selected Joints**** button). The selected joints are imported for the respective RT inspection. Once you have imported the joints, you must perform the RT inspection and add the marker results for the added joints.

#### **6.1.2.3 Add Report Photos**

If you want to add any report photos for the updated RT results,

1. Click [![image-1651457976604.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457976604.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457976604.png) (****ADD**** button) in the ****Report Photos**** box in the ****RT Results**** See Fig 6.1.1. [![image-1651457998647.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457998647.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457998647.png)
2. Click [![image-1651458019569.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458019569.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458019569.png) (****Browse**** button) to browse a photo stored in your computer.
3. Click **Upload**.
    
    The selected photo will be updated.

#### **6.1.3 Attach a File into an RT Report**

If you want to attach any file with any RT report listed in the **RT Report** page, you can attach the file by using[![image-1651458091734.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458091734.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458091734.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **6.1.4 View an NDT – RT Report**

If you want to view an NDT - RT report, click[![image-1651458111372.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458111372.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458111372.png) (print icon) provided in the **Report** column of the **RT Report** page. See Fig 6.1.

#### **6.1.5 Edit an RT Report**

 If you want to edit any existing RT report in the **RT Report** page, do the following,

1. Click [![image-1651458157295.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458157295.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458157295.png)(Edit icon) in the ****Edit**** column for the respective RT report. See Fig 6.1. A new window opens to edit the RT report.
    
    [![image-1651458179837.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458179837.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458179837.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.
4. If you want to edit the RT inspection results of any report, click the respective report and change the results.

#### **6.1.6 Export RT Report List**

You can export a list of RT reports added in the **RT Report** page in both the pdf and excel formats by using [![image-1651458263661.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458263661.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458263661.png) (**PDF** button) and [![image-1651458275233.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458275233.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458275233.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **6.1.7 Filter an RT Report** 

If you want to filter any RT report, do one of the following,

[![image-1651458307102.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458307102.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458307102.png)

1. If you want to filter any RT report based on the report number, enter the corresponding report number in the **Report No** box in the **RT Report** page, and then Click **Search**.
2. If you want to filter any RT report based on the request number, enter the corresponding request number in the ****Request No**** box in the ****RT Report**** page, and then Click ****Search****.
3. If you want to filter any RT report based on the drawing number, enter the corresponding drawing number in the ****Drawing No**** box in the ****RT Report**** page, and then Click ****Search****.

### **6.2 Ultrasonic Testing (UT)** 

The UT method is one of the NDT inspection methods used for performing inspection in the piping project by using high frequency sound waves.

Once the NDT inspection request is added with the selection of UT type by using the [<u>**NDT Inspection Request**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.5%C2%A0ndt-inspection-r) tab, the added inspection request will be moved here. After completing UT inspection, you can add the UT inspection result details by using this UT tab.

To navigate to **Ultrasonic Testing (UT)**,

1. Click the **Ultrasonic Testing (UT)** tab in the **Piping** menu.
    
    The **UT Report** page opens.
    
    [![image-1651458397668.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458397668.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458397668.png)
    
     **Figure 6.2: UT Report page**

#### **6.2.1 Add an UT Report**

If you want to add an UT report, do the following,

1. Click [![image-1651458451141.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458451141.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458451141.png) (**ADD** button) in the U**T Report** page. See Fig 6.2.
    
    A new window opens to add an UT report.
    
    [![image-1651458470068.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458470068.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458470068.png)
    
    [![image-1651458479581.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458479581.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458479581.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651458494051.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458494051.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458494051.png)**Tip**: A report number for a new UT report will be updated automatically in the **Report Number** box.
2. In the ****NDT By**** box, select the requisition of NDT whether by third party or internal from a drop-down list.
3. In the **NDT** **Request No** box, select an UT request number from a drop-down list.
4. In the ****Prepared By**** box, enter the name of a person who has prepared the UT report.
5. In the ****Prepared Date**** box, select the prepared date of the UT report.
6. In the ****Reviewed By**** box, enter the name of a person who has reviewed the UT report.
7. In the ****Reviewed Date**** box, select the reviewed date of the UT report.
8. In the **Accepted/Approved By** boxes, enter the name of a person who has accepted/approved the UT report.
9. In the ****Accepted/Approved Date**** box, select the accepted/approved date of the UT report.
10. In the  ****Accept Date**** box, select the report accept date.
11. Click ****Save****.

The UT report is successfully added. Once you have added the UT report, you must add UT results for the respective added UT report.

#### **6.2.2 Add UT Results** 

If you want to add the UT results for the respective UT report, do the following,

1. Click the respective added UT report in the **UT Report** page. See Fig 6.2.
    
    The **UT Report** page shows **UT Results**, **Probe &amp; Cable Details**, **Reference Setting Details**, **UT Results**, and **Report Photos** windows.
    
    [![image-1651458661419.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458661419.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458661419.png)
    
    [![image-1651458667578.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458667578.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458667578.png)
    
     **Figure 6.2.1: UT Results page**
2. In the **Inspection Date** box, select the date of UT inspection.
3. In the **Test Method** box, select the test method from a drop-down list.
4. In the **Description** box, enter the description about the UT inspection.
5. In the **Material** box, select the material from a drop-down list.
6. In the **Test Equipment** box, select the test equipment from a drop-down list.
7. In the **Acceptance Criteria** box, select the acceptance criteria from a drop-down list.
8. In the **Couplant** box, select the couplant material from a drop-down list.
9. In the **Test** **Procedure No** box, select the test procedure number from a drop-down list.
10. In the **Simulation Blocks** box, enter the detail of simulation blocks.
11. In the **Ref. Hole Diameter** box, enter the diameter value of the reference hole.
12. In the **Sensitivity Setting** box, enter the information about the sensitivity setting.
13. In the **Sides Scanned** box, enter the details of the sides that are scanned.
14. In the **Special Equipment** box, enter the name of the special equipment if any.
15. In the **Computerized Program Name** box, enter the computerized program name.
16. In the **Surface Scanned** box, the details of the surfaces that are scanned.
17. In the **Scan Limitation** box, enter the limitation range of scanning.
18. In the **Code/Specification** box, select the specification from a drop-down list.
19. In the **Calibration Block** box, select the calibration block from a drop-down list.
20. In the **Technique** box, select the technique from a drop-down list.
21. In the **Examination Stage** box, select the examination stage from the specified options.
22. In the **Surface Condition** box, select the surface condition from the specified options.
23. In the **Remarks** box, enter your remarks if any.
24. Click **Save UT Details**.

The UT details are successfully updated. Once you have updated the UT details, you must add the probe and cable details for the UT inspection.

[![image-1651458828873.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458828873.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458828873.png)**Note**: Once you have added UT details, you can save the added UT details and reuse the saved details while you adding UT details for any other UT report.

[![image-1651458849409.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458849409.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458849409.png)

- To save the added UT details, enter any name in the ****Set Default**** box and click [![image-1651458875012.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458875012.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458875012.png). The added details will be saved in the given name.
- If you want to add the same UT details for any other UT report, select the name in the **Get Default**.

The saved details will be automatically updated in the respective boxes.

#### **6.2.2.1 Add Probe &amp; Cable Details**

If you want to add probe and cable details for the updated UT results,

1. Click (****Add Probe/ Cable**** button) in the ****Probe&amp; Cable Details**** See Fig 6.2.1. A new window opens to add the probe and cable details.
    
    [![image-1651459151707.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459151707.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459151707.png)
2. In the ****Probe**** box, select a probe from a drop-down list.
3. In the ****Cable**** box, select a cable from a drop-down list.
4. In the  ****dB**** box, enter the reference decibel range.
5. In the ****Surf Comp dB**** box, enter the decibel range of the surface component.
6. In the ****Test Range (MM)**** box, enter the test range in millimeters.
7. In the ****Reference Level**** box, enter the reference level detail.
8. In the ****Scanning dB**** box, enter the scanning decibel range.
9. In the ****TR Loss**** box, enter the transmission loss detail.
10. Click ****Save****.

The probe and cable details are successfully added. Once you have added the probe and cable details, you must add the reference setting details.

#### **6.2.2.2 Add Reference Setting Details**

If you want to add the reference setting details for the updated UT results,

1. Click [![image-1651459275518.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459275518.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459275518.png) (**Add Reference Setting** button) in the **Reference Setting Details** window. See Fig 6.2.1.
    
    A new window opens to add the reference setting details.
    
    [![image-1651459291934.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459291934.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459291934.png)
2. In the **Reference Block** box, select the reference block from a drop-down list.
3. In the **Probe Sr. No** box, select the serial number of the probe from a drop-down list.
4. In the **Reference** box, enter the reference detail.
5. In the **Eqpt Gain (dB)** box, enter the equipment gain in decibels.
6. In the **Damping** box, enter the damping ratio.
7. In the ****Rejection**** box, enter the rejection detail.
8. In the ****Amplitude Height**** box, enter the amplitude height range.
9. In the ****Skip**** box, enter the skip detail.
10. In the ****Beam Path**** box, enter the beam path detail.
11. In the **Range** box, enter the range detail.
12. Click **Save**.

The reference setting details are successfully added. Once you have added the reference setting details, you must add the inspection results for added joints.

#### **6.2.2.3 Add UT Results**

The **UT Results** window shows a list of joints added for the UT inspection. If you want to add UT results for joints,

1. Click [![image-1651459415594.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459415594.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459415594.png)(Edit icon) for the respective UT results listed in the **UT Results** window.
    
    The **UT Results** window opens with the added UT details.
    
    [![image-1651459427454.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459427454.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459427454.png)
2. In the ****Result**** box, update your UT inspection results whether ****Accepted****, ****Rejected****, or ****Cancelled****.
3. In the ****Remarks**** box, enter your remarks if any.
4. Click Save.

#### **6.2.2.4 Import Additional Joints**

If you want to add more joints, you can add by using the import joints option. To import joints,

1. Click [![image-1651459489964.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459489964.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459489964.png)(**Import Joints** button) in the **UT Results** See Fig 6.2.1. The **Joints** window opens with a list of joints.
    
    [![image-1651459509609.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459509609.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459509609.png)
2. Select the joints you want to import.
3. Click [![image-1651459530724.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459530724.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459530724.png)(****Import Selected Joints**** button).

The selected joints are imported for the respective UT and listed in the **UT Results** window. Once you have imported the joints, you must add the UT results for the imported joints.

#### **6.2.2.5 Add Report Photos**

If you want to add any report photos for the updated UT results,

1. Click [![image-1651459581706.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459581706.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459581706.png) (****ADD**** button) in the ****Report Photos**** box in the ****UT Results**** See Fig 6.2.1. [![image-1651459597770.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459597770.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459597770.png)
2. Click [![image-1651459614550.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459614550.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459614550.png) (****Browse**** button) to browse a photo stored in your computer.
3. Click **Upload**.
    
    The selected photo will be updated.

The UT results will be updated successfully.

#### **6.2.3 Attach a File into an UT Report**

If you want to attach any file with any UT report listed in the **UT Report** page, you can attach the file by using [![image-1651459668994.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459668994.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459668994.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **6.2.4 View an NDT – UT Report**

If you want to print an NDT - UT report, click [![image-1651459708135.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459708135.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459708135.png)(print icon) provided in the **Report** column of the **UT Report** page. See Fig 6.2.

#### **6.2.5 Edit an UT Report**

 If you want to edit any existing UT report in the **UT Report** page, do the following,

1. Click [![image-1651459752424.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459752424.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459752424.png)(Edit icon) in the ****Edit**** column for the respective UT report. See Fig 6.2. A new window opens to edit the UT report.
    
    [![image-1651459773622.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459773622.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459773622.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **6.2.6 Export UT Report List**

You can export a list of UT reports added in the **UT Report** page in both the pdf and excel formats by using [![image-1651459825907.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459825907.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459825907.png) (**PDF** button) and [![image-1651459839034.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459839034.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459839034.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **6.2.7 Filter an UT Report** 

If you want to filter any UT report, do one of the following,

[![image-1651459936550.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459936550.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459936550.png)

1. If you want to filter any UT report based on the report number, enter the corresponding report number in the ****Report No**** box in the ****UT Report**** page, and then Click ****Search****.
2. If you want to filter any UT report based on the request number, enter the corresponding request number in the **Request No** box in the **UT Report** page, and then Click **Search**.
3. If you want to filter any UT report based on the drawing number, enter the corresponding drawing number in the ****Drawing No**** box in the ****UT Report**** page, and then Click ****Search****.

### **6.3 Ultrasonic Thickness Testing (UTG)**

The UTG method is one of the NDT inspection methods used for performing inspection in the piping project.

Once the NDT inspection request is added with the selection of UTG type by using the [<u>**NDT Inspection Request**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.5%C2%A0ndt-inspection-r) tab, the added inspection request will be moved here. After completing UTG inspection, you can add the UTG inspection result details by using this UTG tab.

To navigate to **Ultrasonic Testing (UTG)**,

1. Click the ****Ultrasonic Testing (UTG)**** tab in the ****Piping**** menu. The **UTG Report** page opens.
    
    [![image-1651460058584.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651460058584.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651460058584.png)
    
     **Figure 6.3: UTG Report page**

#### **6.3.1 Add an UTG Report**

If you want to add an UTG report, do the following,

1. Click [![image-1651460196041.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651460196041.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651460196041.png) (**ADD** button) in the **UTG Report** page. See Fig 6.3.
    
    A new window opens to add an UTG report.
    
    [![image-1651460213845.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651460213845.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651460213845.png)
    
    [![image-1651460224352.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651460224352.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651460224352.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651460254211.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651460254211.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651460254211.png) **Tip**: A report number for a new UTG report will be updated automatically in the **Report Number** box.
2. In the **NDT By** box, select the requisition of NDT whether by third party or internal from a drop-down list.
3. In the ****NDT** **Request No**** box, select an UTG request number from a drop-down list.
4. In the ****Prepared By**** box, enter the name of a person who has prepared the UTG report.
5. In the ****Prepared Date**** box, select the prepared date of the UTG report.
6. In the ****Reviewed By**** box, enter the name of a person who has reviewed the UTG report.
7. In the ****Reviewed Date**** box, select the reviewed date of the UTG report.
8. In the ****Accepted/Approved By**** boxes, enter the name of a person who has accepted/approved the UTG report.
9. In the ****Accepted/Approved Date**** box, select the accepted/approved date of the UTG report.
10. In the  ****Accept Date**** box, select the report accept date.
11. Click **Save**.

The UTG report is successfully added. Once you have added the UTG report, you must add UTG results for the respective added UTG report.

#### **6.3.2 Add UTG Results** 

If you want to add the UTG results for the respective UT report, do the following steps,

1. Click the respective added UTG report in the ****UTG Report**** See Fig 6.3. The **UT Report** page shows **UTG Details**, **Probe &amp; Cable Details**, **Reference Setting Details**, **UTG Results**, and **Report Photos** windows.
    
    [![image-1651460391549.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651460391549.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651460391549.png)
    
     **Figure 6.3.1: UTG Results page**
2. In the ****Inspection Date**** box, select the date of UTG inspection.
3. In the ****Test Method**** box, select the test method from a drop-down list.
4. In the ****Description**** box, enter the description about the UTG inspection.
5. In the ****Material**** box, select the material from a drop-down list.
6. In the ****Test Equipment**** box, select the test equipment from a drop-down list.
7. In the ****Acceptance Criteria**** box, select the acceptance criteria from a drop-down list.
8. In the ****Couplant**** box, select the couplant material from a drop-down list.
9. In the ****Test** **Procedure No**** box, select the test procedure number from a drop-down list.
10. In the ****Simulation Blocks**** box, enter the detail of simulation blocks.
11. In the  ****Hole Diameter**** box, enter the diameter value of the reference hole.
12. In the ****Sensitivity Setting**** box, enter the information about the sensitivity setting.
13. In the ****Sides Scanned**** box, enter the details of the sides that are scanned.
14. In the ****Special Equipment**** box, enter the name of the special equipment if any.
15. In the **Computerized Program Name** box, enter the computerized program name.
16. In the ****Surface Scanned**** box, the details of the surfaces that are scanned.
17. In the ****Scan Limitation**** box, enter the limitation range of scanning.
18. In the ****Remarks**** box, enter your remarks if any.
19. Click **Save UTG Details**.

The UTG details are successfully updated. Once you have updated the UTG details, you must add the probe and cable details for the UTG inspection.

[![image-1651460552733.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651460552733.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651460552733.png)**Note**: Once you have added UTG details, you can save the added UTG details and reuse the saved details while you adding UTG details for any other UTG report.

[![image-1651460568853.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651460568853.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651460568853.png)

- To save the added UTG details, enter any name in the **Set Default** box and click . The added details will be saved in the given name.
- If you want to add the same UTG details for any other UTG report, select the name in the ****Get Default****.

The saved details will be automatically updated in the respective boxes.

#### **6.3.2.1 Add Probe &amp; Cable Details**

If you want to add probe and cable details for the updated UTG results,

1. Click [![image-1651460652486.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651460652486.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651460652486.png) (****Add Probe/ Cable**** button) in the ****Probe&amp; Cable Details**** See Fig 6.3.1. A new window opens to add the probe and cable details.
    
    [![image-1651460671701.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651460671701.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651460671701.png)
2. In the **Probe** box, select a probe from a drop-down list.
3. In the **Cable** box, select a cable from a drop-down list.
4. In the **Ref. dB** box, enter the reference decibel range.
5. In the **Surf Comp dB** box, enter the decibel range of the surface component.
6. In the **Test Range (MM)** box, enter the test range in millimeters.
7. In the **Reference Level** box, enter the reference level detail.
8. In the **Scanning dB** box, enter the scanning decibel range.
9. In the **TR Loss** box, enter the transmission loss detail.
10. Click **Save**.

The probe and cable details are successfully added. Once you have added the probe and cable details, you must add the reference setting details.

#### **6.3.22 Add Reference Setting Details**

If you want to add the reference setting details for the updated UTG results,

1. Click [![image-1651460825806.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651460825806.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651460825806.png) (**Add Reference Setting** button) in the **Reference Setting Details** window. See Fig 6.3.1.
    
    A new window opens to add the reference setting details.
    
    [![image-1651460865480.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651460865480.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651460865480.png)
2. In the ****Reference Block**** box, select the reference block from a drop-down list.
3. In the ****Probe Sr. No**** box, select the serial number of the probe from a drop-down list.
4. In the ****Reference**** box, enter the reference detail.
5. In the ****Eqpt Gain (dB)**** box, enter the equipment gain in decibels.
6. In the ****Damping**** box, enter the damping ratio.
7. In the ****Rejection**** box, enter the rejection detail.
8. In the ****Amplitude Height**** box, enter the amplitude height range.
9. In the ****Skip**** box, enter the skip detail.
10. In the ****Beam Path**** box, enter the beam path detail.
11. In the **Range** box, enter the range detail.
12. Click **Save**.

The reference setting details are successfully added. Once you have added the reference setting details, you must add the inspection results for added joints.

#### **6.3.2.3 Add UTG Results**

The **UTG Results** window shows a list of joints added for the UTG inspection. If you want to add UTG results for joints,

1. Click [![image-1651460993514.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651460993514.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651460993514.png)(Edit icon) for the respective UTG results listed in the **UTG Results** window. The **UTG Results** window opens with the added UTG details.
    
    [![image-1651461015609.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651461015609.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651461015609.png)
2. In the **Result** box, update your UTG inspection results whether **Accepted**, **Rejected**, or **Cancelled**.
3. In the **Remarks** box, enter your remarks if any.
4. Click Save.

#### **6.3.2.4 Import Additional Joints**

If you want to add more joints, you can add by using the import joints option. To import joints,

1. Click (**Import Joints** button) in the **UTG Results** See Fig 6.3.1. The **Joints** window opens with a list of joints.
    
    [![image-1651461090378.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651461090378.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651461090378.png)
2. Select the joints you want to import.
3. Click [![image-1651461111654.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651461111654.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651461111654.png) (**Import Selected Joints** button).

The selected joints are imported for the respective UTG and listed in the **UTG Results** window. Once you have imported the joints, you must add the UTG results for the imported joints.

#### **6.3.2.5 Add Report Photos**

If you want to add any report photos for the updated UTG results,

1. Click (**ADD** button) in the **Report Photos** box in the **UTG Results** window. See Fig 6.3.1.
    
    [![image-1651461205079.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651461205079.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651461205079.png)
2. Click [![image-1651461219859.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651461219859.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651461219859.png) (****Browse**** button) to browse a photo stored in your computer.
3. Click **Upload**.
    
    The selected photo will be updated.

The UTG results will be updated successfully.

#### **6.3.3 Attach a File into an UTG Report**

If you want to attach any file with any UTG report listed in the **UTG Report** page, you can attach the file by using [![image-1651461281438.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651461281438.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651461281438.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **6.3.4 View an NDT – UTG Report**

If you want to print an NDT - UTG report, click [![image-1651461321440.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651461321440.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651461321440.png)(print icon) provided in the **Report** column of the **UTG Report** page. See Fig 6.3.

#### **6.3.5 Edit an UTG Report**

 If you want to edit any existing UTG report in the **UTG Report** page, do the following,

1. Click (Edit icon) in the ****Edit**** column for the respective UTG report. See Fig 6.3. A new window opens to edit the UTG report.
    
    [![image-1651461367585.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651461367585.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651461367585.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.3.6 Export UTG Report List**

You can export a list of UTG reports added in the **UTG Report** page in both the pdf and excel formats by using[![image-1651461411002.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651461411002.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651461411002.png) (**PDF** button) and [![image-1651461419476.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651461419476.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651461419476.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **6.3.7 Filter an UTG Report** 

If you want to filter any UTG report, do one of the following,

[![image-1651461459776.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651461459776.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651461459776.png)

1. If you want to filter any UTG report based on the report number, enter the corresponding report number in the ****Report No**** box in the ****UTG Report**** page, and then Click ****Search****.
2. If you want to filter any UTG report based on the request number, enter the corresponding request number in the **Request No** box in the **UTG Report** page, and then Click **Search**.
3. If you want to filter any UTG report based on the drawing number, enter the corresponding drawing number in the ****Drawing No**** box in the ****UTG Report**** page, and then Click ****Search****.


### **6.4 Dye Penetrant Testing (PT)**

Dye Penetrant Testing **(**DPT) method is one of the oldest and simplest NDT inspection methods used for inspecting the materials in the piping project by using ultraviolet or white light, depending on the type of dye used - fluorescent or non fluorescent (visible). PT also called liquid penetrate inspection (LPI) or penetrant testing (PT).

Once the NDT inspection request is added with the selection of PT type by using the **[<u>NDT Inspection Request</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.5%C2%A0ndt-inspection-r)** tab, the added inspection request will be moved here. After completing PT inspection, you can add the PT inspection result details by using this PT tab.

To navigate to **Dye Penetrant Testing (PT)**,

1. Click **Dye Penetrant Testing (PT)** in the **Piping** menu.
    
    The **PT Report** page opens.
    
    [![image-1651461576408.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651461576408.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651461576408.png)
    
     **Figure 6.4: PT Report page**

#### **6.4.1 Add a PT Report**

If you want to add a PT report, do the following steps,

1. Click [![image-1651461626702.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651461626702.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651461626702.png)(**ADD** button) in the **PT Report** page. See Fig 6.4.
    
    The **PT Report** page opens a new window to add an PT report.
    
    [![image-1651461649609.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651461649609.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651461649609.png)
    
    [![image-1651461657621.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651461657621.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651461657621.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651461669928.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651461669928.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651461669928.png)**Tip**: A report number for a new PT report will be updated automatically in the **Report Number** box.
2. In the **NDT By** box, select the requisition detail of NDT whether by third party or internal from a drop-down list.
3. In the **NDT** **Request No** box, select an NDT request number from a drop-down list.
4. In the **Prepared By** box, enter the name of a person who has prepared the PT report.
5. In the **Prepared Date** box, select the prepared date of the PT report.
6. In the **Reviewed By** box, enter the name of a person who has reviewed the PT report.
7. In the **Reviewed Date** box, select the reviewed date of the PT report.
8. In the ****Accepted/Approved By**** boxes, enter the name of a person who has accepted/approved the PT report.
9. In the ****Accepted/Approved Date**** box, select the accepted/approved date of the PT report.
10. Click **Save**.

The PT report is successfully added and listed in the **PT Report** page. Once you have added the PT report, you must add PT results for the respective added PT report.

#### **6.4.2 Add PT Results** 

If you want to add the PT results for the respective PT report, do the following steps,

1. Click the respective added PT report in the ****PT Report**** See Fig 6.4. The **RT Report** page shows the **DPT Results** and **Report Photos** windows.
    
    [![image-1651461795280.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651461795280.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651461795280.png)
    
     **Figure 6.4.1: DPT Results page**
2. In the **Inspection Date** box, select the date of DPT inspection.
3. In the ****Inspection By**** box, enter the name of a person who has done the DPT inspection.
4. In the **Light Source** box, enter the light source detail.
5. In the **Description** box, enter the description.
6. In the **Test Procedure** box, select the test procedure from a drop-down list.
7. In the **Test Method** box, select the test method from a drop-down list.
8. In the **Acceptance Criteria** box, select the acceptance criteria from a drop-down list.
9. In the **Surface Condition** box, enter the condition of the surface.
10. In the **Dwell Time** box, enter dwell time range.
11. In the **Surface Temperature** box, enter the surface temperature value.
12. In the **Cleaner** box, select the cleaner from a drop-down list.
13. In the **Penetrant** box, select the penetrant from a drop-down list.
14. In the **Developer** box, select the developer from a drop-down list.
15. In the **Material Specification** box, enter the material specification.
16. In the **Material Thickness** box, enter the material thickness value.
17. In the **Development Time** box, enter the time for development.
18. In the **Extend of Scanning** box, enter the details of scanning extend.
19. In the **PWHT** box, enter the PWHT detail.
20. In the **Technique** box, select the PT technique from a drop-down list.
21. In the **Light Intensity** box, enter the light intensity value.
22. In the **Joint Preparation** box, enter the joint preparation detail.
23. In the **Certification** box, enter the certification detail.
24. In the **Reference Standard** box, enter the reference standard detail.
25. In the **Reference No** box, enter the reference number.
26. In the **Welding Process** box, enter the type of welding process.
27. In the **Code** box, enter the code detail.
28. In the **Examination Stage** box, select the examination stage from the specified options.
29. In the **Item Tested** box, select the tested items from the specified options.
30. In the **Inspection Method** box, select the inspection method from the specified options.
31. In the **Material** box, select the material from a drop-down list.
32. In the **Penetrant System** box, select the type of penetrant system.
33. In the **Lighting** box, select the type of lighting.
34. In the **Remarks/Drawing Title** box, enter your remarks if any.
35. Click **Save DPT Details**.

The DPT details are successfully updated. Once you have updated the DPT details, you must add DPT inspection results for the added joints.

[![image-1651462044014.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651462044014.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651462044014.png)**Note**: Once you have added DPT details, you can save the added DPT details and reuse the saved details while you adding DPT details for any other DPT report.

[![image-1651462057600.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651462057600.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651462057600.png)

- To save the added DPT details, enter any name in the **Set Default** box and click .
- If you want to add the same DPT details for any other DPT report, select the name in the ****Get Default****. The saved details will be automatically updated in the respective boxes.

#### **6.4.2.1 Add PT Results for Joints**

The **DPT Results** window shows a list of joints added for the PT inspection. If you want to add PT results for joints,

1. Click [![image-1651462136442.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651462136442.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651462136442.png)(Edit icon) for the respective joint listed in the ****DPT Results**** window. The **UT Results** window opens with the added UT details.
    
    [![image-1651462159549.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651462159549.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651462159549.png)
2. In the **Result** box, update your PT inspection results whether **Accepted**, **Rejected**, or **Cancelled**.
3. In the **Remarks** box, enter your remarks if any.
4. Click Save.

#### **6.4.2.2 Import Additional Joints**

If you want to add more joints, you can add by using the import joints option. To import joints,

1. Click [![image-1651462236651.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651462236651.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651462236651.png) (**Import Joints** button) in the **DPT Results** window. See Fig 6.4.1.
    
    The **Joints** window opens with a list of joints.
    
    [![image-1651462253710.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651462253710.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651462253710.png)
2. Select the joints you want to import.
3. Click [![image-1651462290676.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651462290676.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651462290676.png) (****Import Selected Joints**** button). The selected joints are imported and listed in the **DPT Results** window. Once you have added joints, you must update the DPT results for added joints.

#### **6.4.2.3 Add Report Photos**

If you want to add any report photos for the updated DPT results,

1. Click [![image-1651462362252.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651462362252.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651462362252.png) (****ADD**** button) in the ****Report Photos**** box in the ****DPT Results**** See Fig 6.4.1. [![image-1651462378894.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651462378894.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651462378894.png)
2. Click [![image-1651462395423.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651462395423.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651462395423.png) (**Browse** button) to browse a photo stored in your computer.
3. Click **Upload**.

The selected photo will be updated.

#### **6.4.3 Attach a File into a PT Report**

If you want to attach any file with any PT report listed in the P**T Report** page, you can attach the file by using [![image-1651462436780.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651462436780.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651462436780.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **6.4.4 View an NDT – PT Report**

If you want to view an NDT - PT report, click [![image-1651462480783.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651462480783.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651462480783.png)(print icon) provided in the **Report** column of the **PT Report** page. See Fig 6.4.

#### **6.4.5 Edit a PT Report**

If you want to edit any existing PT report in the **RT Report** page, do the following steps,

1. Click [![image-1651462525855.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651462525855.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651462525855.png)(Edit icon) in the ****Edit**** column for the respective DPT report. See Fig 6.4. The **RT Report** page shows the details of the selected PT report.
    
    [![image-1651462547666.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651462547666.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651462547666.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.4.6 Export PT Report List**

You can export a list of RT reports added in the **RT Report** page in both the pdf and excel formats by using[![image-1651462599355.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651462599355.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651462599355.png) (**PDF** button) and [![image-1651462608849.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651462608849.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651462608849.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **6.4.7 Filter a PT Report** 

If you want to filter any PT report, do one of the following,

[![image-1651462644477.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651462644477.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651462644477.png)

1. If you want to filter any DPT report based on the report number, enter the corresponding report number in the **Report No** box in the **PT Report** page, and then Click **Search**.
2. If you want to filter any DPT report based on the request number, enter the corresponding request number in the ****Request No**** box in the ****PT Report**** page, and then Click ****Search****.
3. If you want to filter any DPT report based on the drawing number, enter the corresponding drawing number in the ****Drawing No**** box in the ****PT Report**** page, and then Click ****Search****.

### **6.5 Magnetic Particle Testing (MT)**

Magnetic Particle Testing also referred to as Magnetic Particle Inspection is one of the NDT inspection methods used to detect defects or discontinuities such as cracks, at or near the surface in ferromagnetic metals such as iron, steel, nickel, cobalt and so on, in the piping project.

Once the NDT inspection request is added with the selection of MT type by using the [<u>**NDT Inspection Request**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.5%C2%A0ndt-inspection-r) tab, the added inspection request will be moved here. After completing the MT inspection, you can add the MT inspection result details by using this MT tab.

To navigate to **Magnetic Particle Testing (MT)**,

1. Click ****Magnetic Particle Testing (MT)****in the ****Piping**** menu. The **MT Report** page opens.
    
    [![image-1651463363441.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651463363441.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651463363441.png)
    
     **Figure 6.5: MT Report page**

#### **6.5.1 Add an MT Report**

If you want to add an MT report, do the following steps,

1. Click [![image-1651463425912.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651463425912.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651463425912.png) (**ADD** button) in the **MT Report** page. See Fig 6.5.
    
    The **MT Report** page shows a new window opens to add an MT report.
    
    [![image-1651463462784.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651463462784.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651463462784.png)
    
    [![image-1651463476191.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651463476191.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651463476191.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651463516998.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651463516998.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651463516998.png)**Tip**: A report number for a new MT report will be updated automatically in the **Report Number** box.
2. In the ****NDT By**** box, select the requisition detail of NDT inspection whether by third party or internal.
3. In the ****NDT** **Request No**** box, select an NDT request number from a drop-down list.
4. In the **Prepared By** box, enter the name of a person who has prepared the MT report.
5. In the ****Prepared Date**** box, select the prepared date of the MT report.
6. In the ****Reviewed By**** box, enter the name of a person who has reviewed the MT request.
7. In the ****Reviewed Date**** box, select the reviewed date of the MT report.
8. In the **Accepted/Approved By** boxes, enter the name of a person who has accepted/approved the MT report.
9. In the ****Accepted/Approved Date**** box, select the accepted/approved date of the MT report.
10. Click **Save**.

The MT report is successfully added and listed in the **MT Report** page. Once you have added the MT report, you must add MT results for the respective MT report.

#### **6.5.2 Add MT Results** 

If you want to add the MT results for the respective MT report, do the following,

1. Click the respective MT report in the **MT Report** page. See Fig 6.5. The **MT Report** page shows **MPT Results** and **Report Photos** window.
    
    [![image-1651463644963.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651463644963.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651463644963.png)
    
     **Figure 6.5.1: MT Results page**
2. In the **Inspection Date** box, select the date of inspection.
3. In the **Test Equipment** box, select the test equipment from a drop-down list.
4. In the **Description** box, enter the description.
5. In the **Test Procedure** box, select the test procedure from a drop-down list.
6. In the **Test Method** box, select the test method from a drop-down list.
7. In the **Black Magnetic Ink** box, select the type of black magnetic ink from a drop-down list.
8. In the **Surface Condition** box, enter the condition of the surface.
9. In the **Light Source** box, enter the light source detail.
10. In the **White Contrast Paint** box, select the type of white contrast paint.
11. In the **Material Specification** box, enter the material specification.
12. In the **Material Thickness** box, enter the material thickness value.
13. In the **Type of Current** box, enter the type of current.
14. In the **Lifting Capacity** box, select the lifting capacity value.
15. In the **Acceptance Criteria** box, select the acceptance criteria from a drop-down list.
16. In the **Yoke/ Prod Space** box, enter the relevant information.
17. In the **Particles Type** box, select the type of particles from a drop-down list.
18. In the **Particles Make &amp; model** box, enter the model of the particle including made of materials.
19. In the **Background Contrast &amp; Type** box, enter the type of background including contrast range.
20. In the ****Demagnetization**** box, if you want demagnetization select ****Yes**** otherwise select ****No****.
21. In the ****Magnetizing Technique**** box, enter the magnetizing technique.
22. In the **Surface Temperature** box, enter the surface temperature value.
23. In the **Code** box, enter the code detail.
24. In the **Color** box, select any color from the specified options.
25. In the **Suspension** box, select any suspension liquid from the specified options.
26. In the **Lighting** box, select any lighting from the specified options.
27. In the **Method** box, select any method from the specified options.
28. In the **Item Tested** box, select the tested items from the specified options.
29. In the **Examination Stage** box, select the examination stage from the specified options.
30. In the **Remarks** box, enter your remarks if any.
31. Click **Save MPT Details**.

The MT details are successfully updated. Once you have updated the MT details, you must add MT inspection results for the added joints.

[![image-1651463886205.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651463886205.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651463886205.png)**Note**: Once you have added MT details, you can save the added MT details and reuse the saved details while you adding MT details for any other MT report.

[![image-1651463903221.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651463903221.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651463903221.png)

- To save the added MT details, enter any name in the **Set Default** box and click. The added details will be saved in the given name.
- If you want to add the same MT details for any other MT report, select the name in the **Get Default**.

The saved details will be automatically updated in the respective boxes.

#### **6.5.2.1 Add MT Results for Joints**

The **MPT Results** window shows a list of joints added for the MT inspection. If you want to add MT results for joints,

1. Click [![image-1651467449934.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651467449934.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651467449934.png)(Edit icon) for the respective joint listed in the ****MPT Results**** window. The **MPT Results** window opens a new window with the added MT details.
    
    [![image-1651467485929.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651467485929.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651467485929.png)
2. In the **Result** box, update your MT inspection results whether **Accepted**, **Rejected**, or **Cancelled**.
3. In the ****Remarks**** box, enter your remarks if any.
4. Click **Save**.

#### **6.5.2.2 Import Additional joints**

If you want to import joints for the updated MPT results,

1. Click [![image-1651467647315.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651467647315.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651467647315.png) (**Import Joints** button) in the **MPT Results** window. See Fig 6.5.1.
    
    The **Joints** window opens with a list of joints.
    
    [![image-1651467668812.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651467668812.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651467668812.png)
2. Select the joints you want to import.
3. Click [![image-1651467741861.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651467741861.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651467741861.png) (****Import Selected Joints**** button). The selected joints are added and listed in the **MPT results** window. You must add the MT inspection results for the added joints.

#### **6.5.2.3 Add Report Photos**

If you want to add any report photos for the updated MT results,

1. Click (**ADD** button) in the **Report Photos** box in the **MPT Results** window. See Fig 6.5.1.
    
    [![image-1651467845780.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651467845780.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651467845780.png)
2. Click [![image-1651467878820.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651467878820.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651467878820.png) (**Browse** button) to browse a photo stored in your computer.
3. Click **Upload**.

The selected photo will be updated.

### **6.5.3 Attach a File into an MT Report**

If you want to attach any file with any MT report listed in the **MT Report** page, you can attach the file by using [![image-1651467978037.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651467978037.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651467978037.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

### **6.5.4 View an NDT – MT Report**

If you want to view an NDT - MT report, click [![image-1651468087425.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651468087425.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651468087425.png)(print icon) provided in the **Report** column of the **MT Report** page. See Fig 6.5.

### **6.5.5 Edit a MT Report**

 If you want to edit any existing MT report in the **MT Report** page, do the following steps,

1. Click [![image-1651468355189.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651468355189.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651468355189.png)(Edit icon) in the ****Edit**** column for the respective MT report. See Fig 6.5. A new window opens to edit the MT report.
    
    [![image-1651468379679.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651468379679.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651468379679.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

### **6.5.6 Export MT Report List**

You can export a list of RT reports added in the **RT Report** page in both the pdf and excel formats by using [![image-1651468439909.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651468439909.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651468439909.png)(**PDF** button) and [![image-1651468450780.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651468450780.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651468450780.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

### **6.5.7 Filter a MT Report** 

If you want to filter any MT report, do one of the following,

[![image-1651468483436.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651468483436.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651468483436.png)

1. If you want to filter any MT report based on the report number, enter the corresponding report number in the **Report No** box in the **MT Report** page, and then Click **Search**.
2. If you want to filter any MT report based on the request number, enter the corresponding request number in the ****Request No**** box in the ****MT Report**** page, and then Click ****Search****.
3. If you want to filter any MT report based on the drawing number, enter the corresponding drawing number in the ****Drawing No**** box in the ****MT Report**** page, and then Click ****Search****.

### **6.6 Phased Array Ultrasonic Testing (PAUT) Inspection**

PAUT is an advanced NDT inspection technique that utilizes multiple UT probes to inspect more complex geometries. PAUT used to inspect almost any material where traditional UT methods have been utilized for weld inspections and crack detection.

The **PAUT** tab in the **Piping** menu helps you to add a PAUT report. Once the NDT inspection request is added with the selection of PAUT type by using the [<u>**NDT Inspection Request**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.5%C2%A0ndt-inspection-r) tab, the added inspection request will be moved here.

After completing the PAUT inspection, you can add the PAUT inspection result details by using this **PAUT** tab. To navigate to **PAUT**,

1. Click **PAUT** in the **Piping** menu.
    
    The **PAUT Report** page opens.
    
    [![image-1651468857506.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651468857506.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651468857506.png)
    
    [![image-1651468864583.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651468864583.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651468864583.png)
    
     **Figure 6.6: PAUT Report page**

#### **6.6.1 Add a PAUT Report**

If you want to add a PAUT report, do the following steps,

1. Click [![image-1651469266450.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651469266450.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651469266450.png) (**ADD** button) in the **PAUT Report** page. See Fig 6.6. The **PAUT Report** page shows a new window to add the details of a PAUT report.
    
    [![image-1651469461920.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651469461920.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651469461920.png)
    
    [![image-1651469472224.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651469472224.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651469472224.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651469491662.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651469491662.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651469491662.png)**Tip**: A report number for a new PAUT report will be updated automatically in the **Report Number** box. If you want to change the report number, you can change.
2. In the **NDT By** box, select the requisition detail of NDT whether by third party or internal.
3. In the **NDT** **Request No** box, select an NDT request number from a drop-down list.
4. In the **Prepared By** box, enter the name of a person who has prepared the PAUT report.
5. In the **Prepared Date** box, select the prepared date of the PAUT report.
6. In the **Reviewed By** box, enter the name of a person who has reviewed the PAUT report.
7. In the **Reviewed Date** box, select the reviewed date of the PAUT report.
8. In the ****Accepted/ Approved By**** boxes, enter the name of a person who has approved the PAUT report.
9. In the **Accepted/ Approved Date** box, select the approved date of the PAUT report.
10. Click **Save**.

The PAUT report is successfully added and listed in the **PAUT Report** page. Once you have added the PAUT report, you must add PAUT inspection result details.

#### **6.6.2 Add PAUT Inspection Results**

If you want to add the PAUT results for the respective PAUT report, do the following steps,

1. Click the respective PAUT report in the **PAUT Report** page. See Fig 6.6.
    
    The **PAUT Report** page shows **Joint Results**, **PAUT Results**, and **Report Photos** windows.
    
    [![image-1651469637487.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651469637487.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651469637487.png)
    
     **Figure 6.6.1: PAUT Results adding page**
2. In the **Inspection Date** box, select the date of inspection.
3. In the **Material Thickness** box, enter the thickness of the material.
4. In the **Selection of IQI** box, select an IQI from a drop-down list.
5. In the **Source and Size (MM)** box, select a source from a drop-down list.
6. In the **Material** box, enter the name of the material.
7. In the **Density** box, enter the density value of the material.
8. In the **Acceptance Standard/Code** box, select the acceptance standard/code from a drop-down list.
9. In the **Procedure Number** box, select the procedure number from a drop-down list.
10. In the **Sensitivity** box, set the sensitivity value of the material.
11. In the **Developing Time (Mins)** box, set the developing time.
12. In the **Film Type** box, select the type of film.
13. In the **Surface Condition** box, enter the surface condition detail.
14. In the **Source to Object Distance (SOD)** box, enter the distance value from source to object.
15. In the **Placement of IQI** box, enter the placement detail of IQI.
16. In the **Lead Screens** box, enter the lead screens detail.
17. In the **Density through IQI** box, enter the density through IQI detail.
18. In the **Front** and **Back** boxes, enter the front and back details.
19. In the **Location Marker** box, enter the location marker detail.
20. In the **Densitometer Serial Number** box, enter the densitometer serial number.
21. In the **Visible Wire/Hole** box, enter the detail of visible wire/hole.
22. In the **Remarks** box, enter your remarks if any.
23. Click **Save PAUT Details**.

The PAUT details are successfully updated. Once you have updated the PAUT details, you must add the PAUT inspection results for joints in the **Joint Results** window.

[![image-1651469819519.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651469819519.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651469819519.png)**Note**: Once you have added PAUT details, you can save the added PAUT details and reuse the saved details while you adding PAUT details for any other PAUT report.

[![image-1651469836535.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651469836535.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651469836535.png)

- To save the added PAUT details, enter any name in the **Set Default** box and click . The added details will be saved in the given name.
- If you want to add the same PAUT details for any other PAUT report, select the name in the ****Get Default****.

The saved details will be automatically updated in the respective boxes.

#### **6.6.2.1 Add PAUT Results for Joints**

The **Joint Results** window shows a list of joints added for the PAUT inspection. If you want to add PAUT results for joints,

1. Click [![image-1651469915727.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651469915727.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651469915727.png) (Edit icon) for the respective joint listed in the ****Joint Results**** window. The **Joint Results** window opens a new window with the added joint details.
    
    [![image-1651469942131.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651469942131.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651469942131.png)
2. In the ****Result**** box, update your PWHT inspection results whether ****Accepted****, ****Rejected****, or ****Cancelled****.
3. In the **Remarks** box, enter your remarks if any.
4. Click **Save**.

#### **6.6.2.2 Add Report Photos**

If you want to add any report photos for the updated PAUT results,

1. Click [![image-1651470017102.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651470017102.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651470017102.png) (**ADD** button) in the **Report Photos** window. See Fig 6.6.1.
    
    [![image-1651470010993.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651470010993.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651470010993.png)
2. Click [![image-1651470038246.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651470038246.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651470038246.png) (****Browse**** button) to browse a photo stored in your computer.
3. Click **Upload**.

The selected photo will be updated.

#### **6.6.3 Attach a File into a PAUT Report**

If you want to attach any file with any PAUT report listed in the **PAUT Report** page, you can attach the file by using [![image-1651470394291.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651470394291.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651470394291.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **6.6.4 View a PAUT Report**

If you want to view a PAUT report, click [![image-1651470435010.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651470435010.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651470435010.png)(print icon) provided in the **Report** column of the **PAUT Report** page. See Fig 6.6.

#### **6.6.5 Edit a PAUT Report**

 If you want to edit any existing PAUT report in the **PAUT Report** page, do the following,

1. Click[![image-1651470484604.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651470484604.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651470484604.png)(Edit icon) in the **Edit** column for the respective PAUT report. See Fig 6.6. The **PAUT Report** page shows the details of the added PAUT report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.6.6 Export PAUT Report List**

You can export a list of PAUT reports added in the **PAUT Report** page in both the pdf and excel formats by using [![image-1651470557699.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651470557699.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651470557699.png) (**PDF** button) and [![image-1651470567609.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651470567609.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651470567609.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **6.6.7 Filter a PAUT Report** 

If you want to filter any PAUT report,

[![image-1651470602365.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651470602365.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651470602365.png)

1. If you want to filter any PAUT report based on the report number, enter the corresponding report number in the **Report No** box in the **PAUT Report** page, and then Click **Search**.
2. If you want to filter any PAUT report based on the request number, enter the corresponding request number in the ****Request No**** box in the ****PAUT Report**** page, and then Click ****Search****.
3. If you want to filter any PAUT report based on the drawing number, enter the corresponding drawing number in the ****Drawing No**** box in the ****PAUT Report**** page, and then Click ****Search****.

### **6.7 Time of Flight Diffraction (TOFD) Inspection**

TOFD is a reliable method of NDT- UT used to look for flaws in welds. TOFD uses the time of flight of an ultrasonic pulse to find the location of a reflector. TOFD can also be used for weld overlays in piping.

The **TOFD** tab in the **Piping** menu helps you to add a TOFD report. Once the NDT inspection request is added with the selection of TOFD type by using the [**<u>NDT Inspection Request</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.5%C2%A0ndt-inspection-r) tab, the added inspection request will be moved here.

After completing the TOFD inspection, you can add the TOFD inspection result details by using this **TOFD** tab. To navigate to **TOFD**,

1. Click **TOFD** in the **Piping** menu.
    
    The **TOFD Report** page opens.
    
    [![image-1651470727236.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651470727236.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651470727236.png)
    
    [![image-1651470736781.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651470736781.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651470736781.png)
    
     **Figure 6.7: TOFD Report page**

#### **6.7.1 Add a TOFD Report**

If you want to add a TOFD report, do the following steps,

1. Click [![image-1651470811053.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651470811053.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651470811053.png) (****ADD**** button) in the ****TOFD Report****  See Fig 6.7. The **TOFD Report** page shows a new window to add the details of a TOFD report.
    
    [![image-1651470833318.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651470833318.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651470833318.png)
    
    [![image-1651470838266.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651470838266.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651470838266.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651470857877.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651470857877.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651470857877.png)**Tip**: A report number for a new TOFD report will be updated automatically in the **Report Number** box. If you want to change the report number, you can change.
2. In the **NDT By** box, select the requisition detail of NDT whether by third party or internal.
3. In the **NDT** **Request No** box, select an NDT request number from a drop-down list.
4. In the **Prepared By** box, enter the name of a person who has prepared the TOFD report.
5. In the **Prepared Date** box, select the prepared date of the TOFD report.
6. In the **Reviewed By** box, enter the name of a person who has reviewed the TOFD report.
7. In the **Reviewed Date** box, select the reviewed date of the TOFD report.
8. In the **Accepted/ Approved By** boxes, enter the name of a person who has approved the TOFD report.
9. In the **Accepted/ Approved Date** box, select the approved date of the TOFD report.
10. Click **Save**.

The TOFD report is successfully added and listed in the **TOFD Report** page. Once you have added the TOFD report, you must add TOFD inspection result details.

#### **6.7.2 Add TOFD Inspection Results**

If you want to add the TOFD results for the respective TOFD report, do the following steps,

1. Click the respective TOFD report in the **TOFD Report** page. See Fig 6.7.
    
    The **TOFD Report** page shows **Joint Results**, **TOFD Results**, and **Report Photos** windows.
    
    [![image-1651470982952.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651470982952.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651470982952.png)
    
     **Figure 6.7.1: TOFD Results adding page**
2. In the **Inspection Date** box, select the date of inspection.
3. In the **Material Thickness** box, enter the thickness of the material.
4. In the **Selection of IQI** box, select an IQI from a drop-down list.
5. In the **Source and Size (MM)** box, select a source from a drop-down list.
6. In the **Material** box, enter the name of the material.
7. In the **Density** box, enter the density value of the material.
8. In the **Acceptance Standard/Code** box, select the acceptance standard/code from a drop-down list.
9. In the **Procedure Number** box, select the procedure number from a drop-down list.
10. In the **Sensitivity** box, set the sensitivity value of the material.
11. In the **Developing Time (Mins)** box, set the developing time.
12. In the **Film Type** box, select the type of film.
13. In the **Surface Condition** box, enter the surface condition detail.
14. In the **Source to Object Distance (SOD)** box, enter the distance value from source to object.
15. In the **Placement of IQI** box, enter the placement detail of IQI.
16. In the **Lead Screens** box, enter the lead screens detail.
17. In the **Density through IQI** box, enter the density through IQI detail.
18. In the **Remarks** box, enter your remarks if any.
19. Click **Save TOFD Details**.

The TOFD details are successfully updated. Once you have updated the TOFD details, you must add the TOFD inspection results for joints in the **Joint Results** window.

[![image-1651471174153.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471174153.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471174153.png)**Note**: Once you have added TOFD details, you can save the added TOFD details and reuse the saved details while you adding TOFD details for any other TOFD report.

[![image-1651471214319.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471214319.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471214319.png)

- To save the added TOFD details, enter any name in the **Set Default** box and click . The added details will be saved in the given name.
- If you want to add the same TOFD details for any other TOFD report, select the name in the ****Get Default****.

The saved details will be automatically updated in the respective boxes.

#### **6.7.2.1 Add TOFD Results for Joints**

The **Joint Results** window shows a list of joints added for the TOFD inspection. If you want to add TOFD results for joints,

1. Click [![image-1651471296024.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471296024.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471296024.png)(Edit icon) for the respective joint listed in the **Joint Results** window.
    
    The **Joint Results** window opens a new window with the added joint details.
    
    [![image-1651471307571.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471307571.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471307571.png)
2. In the **Result** box, update your PWHT inspection results whether **Accepted**, **Rejected**, or **Cancelled**.
3. In the ****Remarks**** box, enter your remarks if any.
4. Click **Save**.

#### **6.7.2.2 Add Report Photos**

If you want to add any report photos for the updated TOFD results,

1. Click [![image-1651471402733.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471402733.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471402733.png)(****ADD**** button) in the ****Report Photos**** See Fig 6.7.1. [![image-1651471395181.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471395181.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471395181.png)
2. Click [![image-1651471421838.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471421838.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471421838.png) (****Browse**** button) to browse a photo stored in your computer.
3. Click **Upload**.

The selected photo will be updated.

### **6.7.3 Attach a File into a TOFD Report**

If you want to attach any file with any TOFD report listed in the **TOFD Report** page, you can attach the file by using [![image-1651471473855.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471473855.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471473855.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

### **6.7.4 View a TOFD Report**

If you want to view a TOFD report, click[![image-1651471517482.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471517482.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471517482.png)(print icon) provided in the **Report** column of the **PAUT Report** page. See Fig 6.7.

### **6.7.5 Edit a TOFD Report**

 If you want to edit any existing TOFD report in the **TOFD Report** page, do the following,

1. Click [![image-1651471590133.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471590133.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471590133.png)(Edit icon) in the **Edit** column for the respective TOFD report. See Fig 6.7. The **TOFD Report** page shows the details of the added TOFD report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

### **6.7.6 Export TOFD Report List**

You can export a list of TOFD reports added in the **TOFD Report** page in both the pdf and excel formats by using [![image-1651471657278.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471657278.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471657278.png) (**PDF** button) and [![image-1651471667825.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471667825.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471667825.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

### **6.7.7 Filter a TOFD Report** 

If you want to filter any TOFD report,

[![image-1651471713753.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471713753.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471713753.png)

1. If you want to filter any TOFD report based on the report number, enter the corresponding report number in the **Report No** box in the **TOFD Report** page, and then Click **Search**.
2. If you want to filter any TOFD report based on the request number, enter the corresponding request number in the **Request No** box in the **TOFD Report** page, and then Click **Search**.
3. If you want to filter any TOFD report based on the drawing number, enter the corresponding drawing number in the ****Drawing No**** box in the ****TOFD Report**** page, and then Click ****Search****.

### **6.8 Post Weld Heat Treatment (PWHT)**

The **PWHT** tab in the **Piping** menu helps you to add a PWHT report. Once the NDT inspection request is added with the selection of PWHT type by using the **[<u>NDT Inspection Request</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.5%C2%A0ndt-inspection-r)** tab, the added inspection request will be moved here.

After completing the PWHT inspection, you can add the PWHT inspection result details by using this PWHT tab. To navigate to **PWHT**,

1. Click **PWHT** in the **Piping** menu. The **PWHT Report** page opens.
    
    [![image-1651471815374.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471815374.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471815374.png)
    
     **Figure 6.8: PWHT Report page**

#### **6.8.1 Add a PWHT Report**

If you want to add a PWHT report, do the following,

1. Click [![image-1651471876805.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471876805.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471876805.png) (****ADD**** button) in the ****PWHT Report****  See Fig 6.8. The **PWHT Report** page shows a new window to add a PWHT report.
    
    [![image-1651471893507.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471893507.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471893507.png)
    
    [![image-1651471904175.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471904175.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471904175.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651471919572.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471919572.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471919572.png)**Tip**: A report number for a new PWHT report will be updated automatically in the **Report Number** box. If you want to change the report number, you can change.
2. In the **NDT By** box, select the requisition detail of NDT whether by third party or internal.
3. In the ****Request Number**** box, select an NDT request number from a drop-down list.
4. In the ****Prepared By**** box, enter the name of a person who has prepared the PWHT report.
5. In the ****Prepared Date**** box, select the prepared date of the PWHT report.
6. In the ****Reviewed By**** box, enter the name of a person who has reviewed the PWHT report.
7. In the ****Reviewed Date**** box, select the reviewed date of the PWHT report.
8. In the ****Reviewed Date**** box, select the reviewed date of the PWHT report.
9. In the **Accepted/ Approved Date** box, select the approved date of the PWHT report.
10. Click **Save**.

The PWHT report is successfully added and listed in the **PWHT Report** page. Once you have added the PWHT report, you must add PWHT inspection result details.

#### **6.8.2 Add PWHT Results** 

If you want to add the PWHT results for the respective PWHT report, do the following steps,

1. Click the respective PWHT report in the **PWHT Report** See Fig 6.8. The **PWHT Report** page shows **PWHT Results**, **Joint Results**, and **Report Photos** windows.[![image-1651472107759.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651472107759.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651472107759.png) **Figure 9.8.1: PWHT Results page**
2. In the **Inspection Date** box, select the inspection date.
3. In the **Material Specification** box, enter the specification for the material.
4. In the **Governing Thickness** box, enter the governing thickness value.
5. In the **Governing Code/Specification** box, enter the governing code/specification.
6. In the **HT Procedure No** box, select the HT procedure number.
7. In the **No. of Thermo Couple** box, enter the number of thermo couple.
8. In the **Controlled** **Heating Rate** box, enter the controlled heating rate value.
9. In the **Heating Rate From (Temperature)** box, enter the heating rate starting range.
10. In the **Soaking Temperature** box, enter the soaking temperature value.
11. In the **Soaking Time** box, enter the soaking time value.
12. In the **Controlled Cooling Rate** box, enter the range of controlled cooling rate.
13. In the **Cooling Rate Up to (Temperature)** box, enter the cooling rate temperature range.
14. In the **Soaking Temperature** box, enter the soaking temperature value.
15. In the **Remarks** box, enter your remarks if any.
16. In the **Result** box, enter your PWHT result.
17. Click **Save PWHT Details**.

The PWHT details are successfully updated. Once you have updated the PWHT details, you must add the PWHT inspection results for joints in the **Joint Results** window.

[![image-1651472359339.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651472359339.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651472359339.png)**Note**: Once you have added PWHT details, you can save the added PWHT details and reuse the saved details while you adding PWHT details for any other PWHT report.

[![image-1651472395679.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651472395679.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651472395679.png)

- To save the added PWHT details, enter any name in the **Set Default** box and click . The added details will be saved in the given name.
- If you want to add the same PWHT details for any other PWHT report, select the name in the ****Get Default****.

The saved details will be automatically updated in the respective boxes.

#### **6.8.21 Add PWHT Results for Joints**

The **Joint Results** window shows a list of joints added for the PWHT inspection. If you want to add PWHT results for joints,

1. Click [![image-1651472469335.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651472469335.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651472469335.png)(Edit icon) for the respective joint listed in the ****Joint Results**** window. The **Joint Results** window opens a new window with the added joint details.
    
    [![image-1651472500428.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651472500428.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651472500428.png)
2. In the ****Result**** box, update your PWHT inspection results whether ****Accepted****, ****Rejected****, or ****Cancelled****.
3. In the **Remarks** box, enter your remarks if any.
4. Click **Save**.

#### **6.8.2.2 Add Report Photos**

If you want to add any report photos for the updated PWHT results,

1. Click (**ADD** button) in the **Report Photos** window. See Fig 6.8.1. [![image-1651475015929.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651475015929.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651475015929.png)
2. Click [![image-1651475034790.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651475034790.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651475034790.png) (****Browse**** button) to browse a photo stored in your computer.
3. Click **Upload**.

The selected photo will be updated.

### **6.8.3 Attach a File into a PWHT Report**

If you want to attach any file with any PWHT report listed in the **PWHT Report** page, you can attach the file by using [![image-1651475091390.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651475091390.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651475091390.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

### **6.8.4 View a PWHT Report**

If you want to view a PWHT report, click[![image-1651475142945.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651475142945.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651475142945.png)(print icon) provided in the **Report** column of the **PWHT Report** page. See Fig 6.8.

### **6.8.5 Edit a PWHT Report**

If you want to edit any existing PWHT report in the **PWHT Report** page, do the following,

1. Click [![image-1651475201757.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651475201757.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651475201757.png)(Edit icon) in the **Edit** column for the respective PWHT report. See Fig 6.8. The **PWHT Report** page shows the details of the added PWHT report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

### **6.8.6 Export PWHT Report List**

You can export a list of PWHT reports added in the **PWHT Report** page in both the pdf and excel formats by using [![image-1651475288882.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651475288882.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651475288882.png)(**PDF** button) and [![image-1651475311047.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651475311047.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651475311047.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

### **6.8.7 Filter a PWHT Report** 

If you want to filter any PWHT report,

- Use [![image-1651475359425.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651475359425.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651475359425.png) (**FILTER** button) in the **PWHT Report** page, See Fig 6.8. (OR)
- Do one of the following steps to filter the PWHT report,
    
    [![image-1651475377449.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651475377449.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651475377449.png)
    
    
    1. 1. If you want to filter any PWHT report based on the report number, enter the corresponding report number in the **Report No** box in the **PWHT Report** page, and then Click **Search**.
        2. If you want to filter any PWHT report based on the request number, enter the corresponding request number in the ****Request No**** box in the ****PWHT Report**** page, and then Click ****Search****.
        3. If you want to filter any PWHT report based on the drawing number, enter the corresponding drawing number in the ****Drawing No**** box in the ****PWHT Report**** page, and then Click ****Search****.

### **6.9 Positive Material Identification (PMI)**

PMI is one of the more specialized NDT methods. With positive material identification, the alloy composition of materials can be determined.

PMI is one of the more specialized NDT methods. With positive material identification, the alloy composition of materials can be determined.

After completing the PMI inspection, you can add the PMI inspection result details by using this **PMI** tab. To navigate to **PMI**,

1. Click ****PMI**** in the ******Piping****** menu. The **PMI Report** page opens.
    
    [![image-1651475539031.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651475539031.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651475539031.png)
    
     **Figure 6.9: PMI Report page**

#### **6.9.1 Add a PMI Report**

If you want to add a PMI report, do the following,

1. Click [![image-1651475655267.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651475655267.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651475655267.png) (**ADD** button) in the **PMI Report** page. See Fig 6.9.
    
    The **PMI Report** page shows a new window to add a new PMI report.
    
    [![image-1651475676855.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651475676855.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651475676855.png)
    
    [![image-1651475692787.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651475692787.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651475692787.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651475714260.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651475714260.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651475714260.png)**Tip**: A report number for a new PMI report will be updated automatically in the **Report Number** box. If you want to change the report number, you can change.
2. In the ****NDT By**** box, select the requisition detail of NDT whether by third party or internal.
3. In the ****Request No**** box, select an NDT request number from a drop-down list.
4. In the ****Prepared By**** box, enter the name of a person who has prepared the PMI report.
5. In the ****Prepared Date**** box, select the prepared date of the PMI report.
6. In the ****Reviewed By**** box, enter the name of a person who has reviewed the PMI report.
7. In the ****Reviewed Date**** box, select the reviewed date of the PMI report.
8. In the ****Accepted/ Approved By**** boxes, enter the name of a person who has approved the PMI report.
9. In the ****Accepted/ Approved Date**** box, select the approved date of the PMI report.
10. Click **Save**.

The PMI report is successfully added and listed in the **PMI Report** page. Once you have added the PMI report, you must add PMI inspection result details.

### **6.6.2 Add PMI Results** 

If you want to add the PMI results for the respective PMI report, do the following steps,

1. Click the respective PMI report in the ****PMI Report**** See Fig 6.9. The **PMI Report** page shows **PMI Results**, **PMI Elements, PMI** **Joint Details**, and **Report Photos** windows.
    
    [![image-1651475866923.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651475866923.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651475866923.png)
    
     **Figure 9.9.1: PMI Results page**
2. In the **Inspection Date** box, select the inspection date.
3. In the ****Test Equipment**** box, select the test equipment from a drop-down list.
4. In the **Material Spec** box, select the material specification from a drop-down list.
5. In the ****Text Range**** box, enter the detail of text range.
6. In the ****Examination Stage**** box, select the examination stage from the given options.
7. Click ****Save PMI Details****.

The PMI details are successfully updated. Once you have updated the PMI details, you must add the PMI inspection results for the added elements.

#### **6.9.2.1 Add PMI Results for Elements**

The **PMI Elements** window shows a list of elements added for the PMI inspection. If you want to add PMI results for elements,

1. Click [![image-1651476005640.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651476005640.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651476005640.png)(Edit icon) for the respective element listed in the **PMI Elements** window. The **PMI Elements** window opens a new window on each column with the added element details.
    
    [![image-1651476035438.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651476035438.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651476035438.png)
2. Enter the relevant details in each column.
3. In the ****Result**** column, update your PMI inspection results whether ****Accepted****, ****Rejected****, or ****Cancelled****.
4. Click ****Save****.

#### **6.9.2.2 Add More Elements**

If you want to add more elements, do the following steps,

1. Click **Add Element** in the **PMI Elements** window. A new window opens in each column of the **PMI Elements** window to add a new element.
    
    [![image-1651476117771.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651476117771.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651476117771.png)
2. Enter the relevant details in the respective columns.
3. Click **Save.**
    
    The element is successfully added.

#### **6.9.2.3 Add PMI Results for Joints**

The **PMI** **Joint Details** window shows a list of joints added for the PMI inspection. If you want to add PMI results for joints,

1. Click [![image-1651476186231.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651476186231.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651476186231.png)(Edit icon) for the respective joint listed in the **PMI Joint Details** window. The **PMI** **Joint Details** window opens a new window with the added joint details.
    
    [![image-1651476224471.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651476224471.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651476224471.png)
2. In the **Result** box, update your PMI inspection results whether **Accepted**, **Rejected**, or **Cancelled.**
3. In the ****Remarks**** box, enter your remarks if any.
4. Click ****Save****.

#### **6.9.2.4 Add Report Photos**

If you want to add any report photos for the updated PMI results,

1. Click [![image-1651476366836.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651476366836.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651476366836.png) (**ADD** button) in the **Report Photos** window. See Fig 6.9.1. [![image-1651476386070.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651476386070.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651476386070.png)
2. Click [![image-1651476406366.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651476406366.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651476406366.png) (****Browse**** button) to browse a photo stored in your computer.
3. Click **Upload**.
    
    The selected photo will be updated.

### **6.9.3 Attach a File into a PMI Report**

If you want to attach any file with any PMI report listed in the **PMI Report** page, you can attach the file by using [![image-1651476463151.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651476463151.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651476463151.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

### **6.9.4 View a PMI Report**

If you want to view a PMI report, click [![image-1651476502082.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651476502082.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651476502082.png)(print icon) provided in the **Report** column of the **PMI Report** page. See Fig 6.9.

### **6.9.5 Edit a PMI Report**

If you want to edit any existing PMI report in the **PMI Report** page, do the following,

1. Click [![image-1651476573380.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651476573380.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651476573380.png)(Edit icon) in the **Edit** column for the respective PMI report. See Fig 6.9. The **PMI Report** page shows the details of the added PMI report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

### **6.9.6 Export PMI Report List**

You can export a list of PMI reports added in the **PMI Report** page in both the pdf and excel formats by using [![image-1651476663846.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651476663846.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651476663846.png) (**PDF** button) and [![image-1651476682614.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651476682614.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651476682614.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

### **6.9.7 Filter a PMI Report** 

If you want to filter any PMI report,

- Use [![image-1651476737184.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651476737184.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651476737184.png) (**FILTER** button) in the **PMI Report** page, See Fig 6.9. (OR)
- Do one of the following steps to filter the PMI report,
    
    [![image-1651476758789.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651476758789.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651476758789.png)
    
    
    - 1. If you want to filter any PMI report based on the report number, enter the corresponding report number in the ****Report No**** box in the ****PMI Report**** page, and then Click ****Search****.
        2. If you want to filter any PMI report based on the request number, enter the corresponding request number in the ****Request No**** box in the ****PMI Report**** page, and then Click ****Search****.
        3. If you want to filter any PMI report based on the drawing number, enter the corresponding drawing number in the ****Drawing No**** box in the ****PMI Report**** page, and then Click ****Search****.

### **6.10 Ferrite**

Ferrite testing, also referred to as a ferrite scope test, is a rapid NDT method used to measure the amount of delta ferrite on materials used in the piping project.

The **Ferrite** tab in the **Piping** menu helps you to add a ferrite report. Once the NDT inspection request is added with the selection of ferrite type by using the **[<u>NDT Inspection Request</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.5%C2%A0ndt-inspection-r)** tab, the added inspection request will be moved here.

The **Ferrite** tab in the **Piping** menu helps you to add a ferrite report. Once the NDT inspection request is added with the selection of ferrite type by using the **[<u>NDT Inspection Request</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.5%C2%A0ndt-inspection-r)** tab, the added inspection request will be moved here.

1. Click **Ferrite** in the **Piping** menu. The **Ferrite Report** page opens.
    
    [![image-1651477113567.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651477113567.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651477113567.png)
    
     **Figure 6.10: Ferrite Report page**

#### **6.10.1 Add a Ferrite Report**

If you want to add a ferrite report, do the following steps,

1. Click [![image-1651477182875.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651477182875.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651477182875.png) (**ADD** button) in the **Ferrite Report** page. See Fig 6.10. The **Ferrite Report** page shows a new window to add a new ferrite report.
    
    [![image-1651477200421.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651477200421.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651477200421.png)
    
    [![image-1651477211722.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651477211722.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651477211722.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651477228893.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651477228893.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651477228893.png)**Tip**: The report number for a new ferrite report will be updated automatically in the **Report Number** box. If you want to change the report number, you can change.
2. In the ****NDT By**** box, select the requisition detail of NDT whether by third party or internal.
3. In the ****Request No**** box, select an NDT request number from a drop-down list.
4. In the **Prepared By** box, enter the name of a person who has prepared the ferrite report.
5. In the **Prepared Date** box, select the prepared date of the ferrite report.
6. In the **Reviewed By** box, enter the name of a person who has reviewed the ferrite report.
7. In the **Reviewed Date** box, select the reviewed date of the ferrite report.
8. In the ****Accepted/ Approved By**** boxes, enter the name of a person who has approved the ferrite report.
9. In the ****Accepted/ Approved Date**** box, select the approved date of the PMI report.
10. Click **Save**. The ferrite report is successfully added and listed in the **Ferrite Report** page. Once you have added the ferrite report, you must add ferrite inspection result details.

#### **6.10.2 Add Ferrite Inspection Results** 

If you want to add ferrite inspection results for the respective ferrite report, do the following steps,

1. Click the respective ferrite report in the ****Ferrite Report**** See Fig 6.10. The **Ferrite Report** page shows **Ferrite Results**, **Ferrite Inspection Details, Joint Results**, and **Report Photos** windows.
    
    [![image-1651477384949.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651477384949.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651477384949.png)
    
     **Figure 6.10.1: Ferrite Results page**
2. In the **Inspection Date** box, select the date of ferrite inspection.
3. In the **Test Equipment** box, select the test equipment from a drop-down list.
4. In the **Barcode** box, enter the barcode of the material.
5. In the **Inspection Item** box, enter the detail of inspection items.
6. In the **QCF No** box, enter the QCF number.
7. In the **Line No** box, enter the line number.
8. Click **Save Ferrite Details**.

The ferrite details are successfully updated. Once you have updated the ferrite details, you must add the ferrite inspection results.

#### **6.10.2.1 Add Ferrite Inspection Details**

If you want to add ferrite inspection details,

1. Click **Add Ferrite Inspection** in the **Ferrite Inspection Details** window.
    
    The **Ferrite Inspection Details** window opens a new window on each column.
    
    [![image-1651477824561.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651477824561.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651477824561.png)
2. Enter the relevant details in each column.
3. Click **Save**.

#### **6.10.2.2 Add Joint Results**

The **Joint Results** window shows a list of joints added for the ferrite inspection. If you want to add ferrite inspection results for joints,

[![image-1651477895948.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651477895948.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651477895948.png)

1. Click [![image-1651735737445.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651735737445.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651735737445.png)(Edit icon) for the respective joint listed in the **Joint Results** window. The **Joint Results** window opens a new window with the added joint details.
    
    [![image-1651477939840.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651477939840.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651477939840.png)
2. In the ****Result**** box, update your ferrite inspection results whether ****Accepted****, ****Rejected****, or ****Cancelled****.
3. In the ****Remarks**** box, enter your remarks if any.
4. Click **Save**.

#### **6.10.2.3 Import Joints**

If you want to import multiple joints,

1. Click (**Import Joints** button) in the **Joint Results** window. The **Joints** window opens.
    
    [![image-1651478017444.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651478017444.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651478017444.png)
2. Select the checkbox of the joints you want to import.
3. Click **Import Selected Joints**.
    
    The imported joints will be listed in the **Joint Results** window.

#### **6.10.2.4 Add Report Photos**

If you want to add any report photos for the updated ferrite inspection results,

1. Click [![image-1651480544542.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651480544542.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651480544542.png) (**ADD** button) in the **Report Photos** window. [![image-1651480555413.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651480555413.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651480555413.png)
2. Click [![image-1651480568969.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651480568969.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651480568969.png) (****Browse**** button) to browse a photo stored in your computer.
3. Click **Upload**.
    
    The selected photo will be updated.


### **6.10.3 Attach a File into a Ferrite Report**

If you want to attach any file with any ferrite report listed in the **Ferrite Report** page, you can attach the file by using [![image-1651480626457.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651480626457.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651480626457.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

### **6.10.4 View a Ferrite Report**

If you want to view a ferrite report, click[![image-1651480702173.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651480702173.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651480702173.png)(print icon) provided in the **Report** column of the **Ferrite Report** page. See Fig 6.10.

### **6.10.5 Edit a Ferrite Report**

 If you want to edit any existing ferrite report in the **Ferrite Report** page, do the following steps,

1. Click [![image-1651480780466.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651480780466.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651480780466.png) (Edit icon) in the **Edit** column for the respective ferrite report. See Fig 6.10. The **Ferrite Report** page shows the details of the added ferrite report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

### **6.10.6 Export Ferrite Report List**

You can export a list of ferrite reports added in the **Ferrite Report** page in both the pdf and excel formats by using [![image-1651480859460.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651480859460.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651480859460.png)(**PDF** button) and [![image-1651480871231.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651480871231.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651480871231.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

### **6.10.7 Filter a Ferrite Report**

If you want to filter any ferrite report,

- Use (**FILTER** button) in the **Ferrite Report** page, See Fig 9.10. (OR)
- Do one of the following steps to filter the ferrite report,[![image-1651481112722.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651481112722.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651481112722.png)
    
    
    - 1. If you want to filter any ferrite report based on the report number, enter the corresponding report number in the **Report No** box in the **Ferrite Report** page, and then Click **Search**.
        2. If you want to filter any ferrite report based on the request number, enter the corresponding request number in the ****Request No**** box in the ****Ferrite Report**** page, and then Click ****Search****.
        3. If you want to filter any ferrite report based on the drawing number, enter the corresponding drawing number in the ****Drawing No**** box in the ****Ferrite Report**** page, and then Click ****Search****.


### **6.11 Hardness**

Harness testing is one of the NDT type of inspection. Hardness testing is performed to evaluate the mechanical properties metal joints and other materials thus helps to ensure that the material meets a particular specification.

The **Hardness** tab in the **Piping** menu helps you to add a hardness report. Once the NDT inspection request is added with the selection of hardness type testing by using the [**<u>NDT Inspection Request</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.5%C2%A0ndt-inspection-r) tab, the added inspection request will be moved here.

After completing the hardness testing, you can add the hardness testing result details by using this **Hardness** tab. To navigate to **Hardness**,

1. Click **Hardness** in the **Piping** menu. The **Hardness Report** page opens.
    
    [![image-1651481281389.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651481281389.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651481281389.png)
    
     **Figure 6.11: Hardness Report page**

#### **6.11.1 Add a Hardness Report**

If you want to add a hardness report, do the following steps,

1. Click [![image-1651481375997.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651481375997.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651481375997.png) (**ADD** button) in the **Hardness Report**  See Fig 6.11. The **Hardness Report** page shows a new window to add a new hardness report.
    
    [![image-1651481397369.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651481397369.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651481397369.png)
    
    [![image-1651481408213.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651481408213.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651481408213.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651481421689.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651481421689.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651481421689.png)**Tip**: A report number for a new hardness report will be updated automatically in the **Report Number** box. If you want to change the report number, you can change.
2. In the **NDT By** box, select the requisition detail of NDT whether by third party or internal.
3. In the **Request No** box, select an NDT request number from a drop-down list.
4. In the **Prepared By** box, enter the name of a person who has prepared the hardness report.
5. In the **Prepared Date** box, select the prepared date of the hardness report.
6. In the **Reviewed By** box, enter the name of a person who has reviewed the hardness report.
7. In the **Reviewed Date** box, select the reviewed date of the hardness report.
8. In the **Accepted/ Approved By** boxes, enter the name of a person who has approved the hardness report.
9. In the **Accepted/ Approved Date** box, select the approved date of the hardness report.
10. Click **Save**.

The hardness report is successfully added and listed in the **Hardness Report** page. Once you have added the hardness report, you must add hardness testing result details.

#### **6.11.2 Add Harness Results** 

If you want to add the hardness testing results for the respective Hardness report, do the following steps,

1. Click the respective hardness report in the **Hardness Report** See Fig 6.11. The **Hardness Report** page shows **Hardness Results**, **Joint Results**, and **Report Photos** windows.
    
    [![image-1651481619145.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651481619145.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651481619145.png)
    
     **Figure 6.11.1: Hardness Results page**
2. In the **Inspection Date** box, select the date of hardness testing.
3. In the **Part Description** box, enter the description of a part to be tested for hardness.
4. In the **Weld Map No** box, enter the weld map drawing number.
5. In the **Material Spec &amp; Grade** box, enter the grade and description for the material.
6. In the **Instrument** box, enter the name of the instrument to be used for hardness testing.
7. In the **Instrument Make/ Model/ SL. No.** box, enter the instrument model or serial number.
8. In the **Intender Type** box, enter the type of intender.
9. In the **Result** box, enter the result of hardness test.
10. In the **Procedure No** box, select the procedure number from a drop-down list.
11. In the **Remarks** box, enter your remarks if any.
12. Click **Save Hardness Details**.

The hardness details are successfully updated. Once you have updated the hardness details, you must add the hardness inspection results for the joints.

#### **6.11.2.1 Add Hardness Testing Results of joints**

The **Joint Results** window shows a list of joints added for the hardness test. If you want to add hardness test results for joints,

1. Click [![image-1651481762609.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651481762609.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651481762609.png)(Edit icon) for the respective joint listed in the **Joint Results** window. The **Joint Results** window opens a new window for each column with the added joint details.
    
    [![image-1651481786724.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651481786724.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651481786724.png)
2. Update your hardness test details in all columns.
3. Click **Save**.

#### **6.11.2.2 Add Report Photos**

If you want to add any report photos for the updated hardness test results,

1. Click [![image-1651481861643.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651481861643.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651481861643.png) (**ADD** button) in the **Report Photos** window. [![image-1651481856617.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651481856617.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651481856617.png)
2. Click [![image-1651481889873.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651481889873.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651481889873.png) (**Browse** button) to browse a photo stored in your computer.
3. Click **Upload**.
    
    The selected photo will be updated.

#### **6.11.3 Attach a File into a Hardness Report**

If you want to attach any file with any hardness report listed in the **Hardness Report** page, you can attach the file by using[![image-1651481943631.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651481943631.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651481943631.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **6.11.4 View a Hardness Report**

If you want to view a hardness report, click[![image-1651481989772.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651481989772.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651481989772.png)(print icon) provided in the **Report** column of the **Hardness Report** page. See Fig 6.11.

#### **6.11.5 Edit a Hardness Report**

 If you want to edit any existing hardness report in the **Hardness Report** page, do the following steps,

1. Click [![image-1651482097945.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651482097945.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651482097945.png)(Edit icon) in the **Edit** column for the respective hardness report. See Fig 6.11. The **Hardness Report** page shows the details of the added hardness report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.11.6 Export Hardness Report List**

You can export a list of hardness reports added in the **Hardness Report** page in both the pdf and excel formats by using [![image-1651482171052.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651482171052.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651482171052.png) (**PDF** button) and [![image-1651482183501.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651482183501.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651482183501.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **6.11.7 Filter a Hardness Report** 

If you want to filter any hardness report,

- Use [![image-1651482237773.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651482237773.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651482237773.png) (**FILTER** button) in the **Hardness Report** page, See Fig 6.11. (OR)
- Do one of the following steps to filter the hardness report, [![image-1651482250782.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651482250782.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651482250782.png)
    
    
    - 1. If you want to filter any hardness report based on the report number, enter the corresponding report number in the **Report No** box in the **Hardness Report** page, and then Click **Search**.
        2. If you want to filter any hardness report based on the request number, enter the corresponding request number in the **Request No** box in the **Hardness Report** page, and then Click **Search**.
        3. If you want to filter any hardness report based on the drawing number, enter the corresponding drawing number in the **Drawing No** box in the **Hardness Report** page, and then Click **Search**.


### **6.12 RFI Hydro Pressure Report**

The **RFI Hydro Pressure Report** tab in the **Piping** menu helps you to add a hydro pressure report in piping project. To navigate to **RFI Hydro Pressure Report,**

1. Click **RFI Hydro Pressure Report** in the **Piping** menu. The **Pressure Report** page opens.
    
    [![image-1651482356392.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651482356392.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651482356392.png)
    
     **Figure 6.12: Pressure Report page**

#### **6.12.1 Add a Hydro Pressure Report**

If you want to add a hydro pressure report, do the following steps,

1. Click [![image-1651482424320.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651482424320.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651482424320.png) (**ADD** button) in the **Pressure Report** page. See Fig 6.12. The **Pressure Report** page shows a new window to add details of a new hydro pressure report.
    
    [![image-1651482444728.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651482444728.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651482444728.png)
    
    [![image-1651482457687.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651482457687.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651482457687.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651482472061.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651482472061.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651482472061.png)**Tip**: A report number for a new hydro pressure report will be updated automatically in the **Report Number** box. If you want to change the report number, you can change.
2. In the **Test Pack** box, select the test pack from a drop-down list.
3. In the **Prepared By** box, enter the name of a person who has prepared the hydro pressure report.
4. In the **Prepared Date** box, select the prepared date of the hydro pressure report.
5. In the **Reviewed By** box, enter the name of a person who has reviewed the hydro pressure report.
6. In the **Reviewed Date** box, select the reviewed date of the hydro pressure report.
7. In the **Approved By** boxes, enter the name of a person who has approved the hydro pressure report.
8. In the **Approved Date** box, select the approved date of the hydro pressure report.
9. Click **Save**.

The hydro pressure report is successfully added and listed in the **Pressure Report** page. Once you have added the hydro pressure report, you must add hydro pressure test details.

#### **6.12.2 Add Hydro Pressure Test Details**

If you want to add the hydro pressure test details, do the following steps,

1. Click [![image-1651482616086.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651482616086.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651482616086.png)(Edit icon) in the **Edit Report** column of the **Pressure Report** page. See Fig 6.12. The **Pressure Report** page shows **Test Parameters**, **Equipment Details**, and **Pressure Raise &amp; Reduce Records** windows.
    
    [![image-1651482634787.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651482634787.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651482634787.png)
    
     **Figure 6.12.1: Pressure Report page**
2. In the **Unit No** box, enter the unit number.
3. In the **Sub Contractor** box, enter the name of a sub-contractor.
4. In the **Test Zone** box, enter the detail of test zone.
5. In the **Isometric Drawing No** box, enter the isometric drawing number.
6. In the **Decision** box, select your decision whether confirm or non-confirm.
7. In the **Remarks** box, enter your remarks if any.

#### **6.12.2.1 Add Test Parameters**

If you want to add test parameters for the hydro pressure test, enter the following details in the **Test Parameters** window,

1. In the **Type of Test** box, select the test type from a drop-down list.
2. In the **Test Medium** box, select the test medium from a drop-down list.
3. In the **Test Temperature** box, enter the test temperature value.
4. In the **Procedure No** box, enter the procedure number.
5. In the **Test Date** box, select the test date.
6. In the **Start Time** and **End Time** boxes, enter the start time and end time of test.
7. In the **Duration** box, enter the duration of test.
8. In the **Operating Pressure** box, enter the operating pressure value.
9. In the **Design Pressure** box, enter the design pressure value.
10. In the **Recorded Test Pressure** box, enter the recorded test pressure value.
11. In the **Position** box, enter the position detail.
12. In the **Holding Time (Hrs)** box, enter the holding period in hours.
13. In the **Holding Time (Min)** box, enter the holding period in minutes.
14. In the **Remarks/Observations** box, enter your remarks/observations if any.
15. Click **Save**.

#### **6.12.2.2 Add Equipment Details**

If you want to add equipment details for the hydro pressure test,

1. Click (**ADD** button) in the **Equipment Details** window. [![image-1651482921383.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651482921383.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651482921383.png)
2. In the **Conducted By** box, select the method of conducting hydro pressure test whether **Internal** or
3. In the **Equipment Details** box, select an equipment from a drop-down list.
4. Click **Save**.
    
    The equipment is successfully added and listed in the **Equipment Details** window. Once you have added the equipment, you must add the calibration detail for the added equipment.
5. To add calibration detail, click [![image-1651483173602.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651483173602.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651483173602.png)(Edit icon) in the **Edit** column for the equipment.
    
    The **Equipment Details** windows shows a new window with added equipment details.
    
    [![image-1651483192710.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651483192710.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651483192710.png)
6. In the **Manufacturer** box, enter the name of the manufacturer.
7. In the **Last Calibration Date** box, select the last calibration date.
8. In the **Calibration Due Date** box, select the calibration due date.
9. In the **Calibration Report No** box, enter the calibration report number.
10. Click **Save**.

#### **6.12.2.3 Add Pressure Raise and Reduce Records**

If you want to add pressure raise and reduce records,

1. Click [![image-1651483274292.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651483274292.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651483274292.png) (**ADD** button) in the **Pressure Raise &amp; Reduce Records** window. The **Pressure Raise &amp; Reduce Records** window opens a new window to add the required details.
    
    [![image-1651483302755.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651483302755.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651483302755.png)
2. In the **Date** box, select the pressure testing date.
3. In the **Time** box, enter the time of pressure testing.
4. In the **Pressure** box, enter the pressure value.
5. In the **Remarks** box, enter your remarks if any.
6. Click **Save**.

#### **6.12.3 Attach a File into a Hydro Pressure report**

If you want to attach any file with any hydro pressure report listed in the **Pressure Report** page, you can attach the file by using [![image-1651483358342.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651483358342.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651483358342.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **6.12.4 View a Hydro Pressure Report**

If you want to view a hydro pressure report, click[![image-1651483489650.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651483489650.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651483489650.png)(print icon) provided in the **Report** column of the **Pressure Report** page. See Fig 6.12.

#### **6.12.5 Edit a Hydro Pressure Report**

 If you want to edit any existing hydro pressure report in the **Pressure Report** page, do the following steps,

1. Click[![image-1651483545628.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651483545628.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651483545628.png) (Edit icon) in the **Edit** column for the respective hydro pressure report. See Fig 6.12.
    
    The **Pressure Report** page shows the details of the added pressure report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.12.6 Export Hydro Pressure Report List**

You can export a list of hydro pressure reports added in the **Pressure Report** page in both the pdf and excel formats by using[![image-1651483749235.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651483749235.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651483749235.png) (**PDF** button) and [![image-1651483761023.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651483761023.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651483761023.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **6.12.7 Lock a Hydro Pressure Report** 

If you want to lock any hydro pressure report, select the checkbox of the respective hydro pressure report. See Fig 6.12.



### **6.13 PMI/Hardness Summary Report**

The **PMI/HARDNESS Summary Report** tab in the **Piping** menu helps you to view the PMI and hardness summary report. To view the report,

1. Click **PMI/HARDNESS Summary Report** in the **Piping** menu. The PMI and Hardness summary report page opens.
    
    [![image-1651483860313.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651483860313.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651483860313.png)
    
     **Figure 6.13: PMI/Hardness Summary Report page**
2. If you want to view the PMI summary report, click the **PMI** option. The PMI Summary Report opens.
3. If you want to view the hardness summary report, click the **HARDNESS** option. The Hardness Summary Report opens.

#### **6.13.1 Print a PMI and Hardness Summary Report**

If you want to print a PMI/Hardness summary report, use [![image-1651483966995.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651483966995.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651483966995.png) and [![image-1651483978597.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651483978597.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651483978597.png) (print icons) provided in the PMI and Hardness summary report page.

1. If you want to print the current page of the PMI and Hardness summary report, click[![image-1651484006858.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651484006858.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651484006858.png) (print icon including the page number).
2. If you want to print all the pages of the PMI and Hardness summary report, click[![image-1651484042994.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651484042994.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651484042994.png)(print icon).

#### **6.13.2 View a PMI and Hardness Summary Report** 

You can view the PMI and Hardness summary report in various formats by using the option [![image-1651488463299.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651488463299.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651488463299.png)provided in the upper right corner of the PMI and Hardness summary report page.


### **6.14 Preheat/PWHT Summary Report**

The **PREHEAT/PWHT Summary Report** tab in the **Piping** menu helps you to view the Preheat and PWHT summary report. To view the report,

1. Click **PREHEAT/PWHT Summary Report** in the **Piping** menu. The Preheat and PWHT summary report page opens.
    
    [![image-1651488516069.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651488516069.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651488516069.png)
    
     **Figure 6.14: Preheat/PWHT Summary Report page**
2. If you want to view the preheat summary report, click the ****PREHEAT**** option. The Preheat Summary Report opens.
3. If you want to view the PWHT summary report, click the **PWHT** option.
    
    The PWHT Summary Report opens.

#### **6.14.1 Print a Preheat and PWHT Summary Report**

If you want to print a Preheat/PWHT summary report, use [![image-1651488628251.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651488628251.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651488628251.png)and [![image-1651488642316.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651488642316.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651488642316.png) (print icons) provided in the Preheat and PWHT summary report page.

1. If you want to print the current page of the Preheat and PWHT summary report, click [![image-1651488689373.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651488689373.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651488689373.png) (print icon including the page number).
2. If you want to print all the pages of the Preheat and PWHT summary report, click [![image-1651488715490.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651488715490.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651488715490.png) (print icon).


#### **6.14.2 View a Preheat and PWHT Summary Report** 

You can view the preheat and PWHT summary report in various formats by using the option [![image-1651488787421.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651488787421.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651488787421.png)provided in the upper right corner of the Preheat and PWHT summary report page.


### **6.15 PAUT Summary Report**

The **PAUT Summary Report** tab in the **Piping** menu helps you to view the PAUT summary report. To view the report,

1. Click **PAUT Summary Report** in the **Piping** menu. The PAUT summary report page opens.
    
    [![image-1651491579262.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651491579262.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651491579262.png)
    
     **Figure 6.15: PAUT Summary Report page**

#### **6.15.1 Print a PAUT Summary Report**

If you want to print a PAUT summary report, use [![image-1651491656810.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651491656810.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651491656810.png)and [![image-1651491678343.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651491678343.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651491678343.png) (print icons) provided in the PAUT summary report page.

1. If you want to print the current page of the PAUT summary report, click [![image-1651491711275.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651491711275.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651491711275.png) (print icon including the page number).
2. If you want to print all the pages of the PAUT summary report, click[![image-1651491737978.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651491737978.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651491737978.png) (print icon).

#### **6.15.2 View a PAUT Summary Report** 

You can view the PAUT summary report in various formats by using the option [![image-1651491784222.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651491784222.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651491784222.png)provided in the upper right corner of the PAUT summary report page.


### **6.16 RT Summary Report**

The **RT Summary Report** tab in the **Piping** menu helps you to view the RT summary report. To view the report,

1. Click **RT Summary Report** in the **Piping** menu. The RT summary report page opens.
    
    [![image-1651491841782.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651491841782.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651491841782.png)
    
     **Figure 6.16: RT Summary Report page**

#### **6.16.1 Print a RT Summary Report**

If you want to print a RT summary report, use [![image-1651491902854.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651491902854.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651491902854.png)and [![image-1651491916423.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651491916423.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651491916423.png) (print icons) provided in the RT summary report page.

1. If you want to print the current page of the RT summary report, click [![image-1651491957064.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651491957064.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651491957064.png) (print icon including the page number).
2. If you want to print all the pages of the RT summary report, click[![image-1651491975666.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651491975666.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651491975666.png)(print icon).

#### **6.16.2 View a RT Summary Report** 

You can view the RT summary report in various formats by using the option [![image-1651492015362.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651492015362.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651492015362.png) provided in the upper right corner of the RT summary report page.


### **6.17 Welder Performance Record**

The **Welder Performance Record** tab in the **Piping** menu helps you to view a performance record of welders. To view the welder performance record,

1. Click **Welder Performance Record** in the **Piping** menu. The **Welder Performance Record** page opens.
    
    [![image-1651492255075.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651492255075.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651492255075.png)
    
     **Figure 6.17: Welder Performance Record page**

#### **6.17.1 Add a Welder Performance Record**

If you want to add a welder performance record, do the following steps,

1. Click [![image-1651492326718.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651492326718.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651492326718.png) (**ADD** button) in the **Welder Performance Record** page. The page opens a new window to add the details of the welder performance record.
    
    [![image-1651492362277.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651492362277.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651492362277.png)
    
    [![image-1651492375176.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651492375176.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651492375176.png)**Tip:** The **r**eport number for the welder performance record will be updated automatically. If you want to change the report number, you can change.
2. In the ****Start Date**** and ****End Date**** boxes, select the start and ending dates to view the welder performance record.
3. In the **Prepared By** box, enter the name a person who has prepared the welder performance record.
4. In the ****Prepared Date**** box, enter the prepared date of the welder performance record.
5. In the **Reviewed By** box, enter the name a person who has reviewed the welder performance record.
6. In the **Reviewed By** box, enter the name a person who has reviewed the welder performance record.
7. In the **Approved By** box, enter the name a person who has approved the welder performance record.
8. In the ****Approved Date**** box, enter the approved date of the welder performance record.
9. Click ****Save****. The welder performance record will be added and listed in the **Welder Performance Record** page.

#### **6.17.2 Edit a Welder Performance Record**

 If you want to edit any existing welder performance record in the **Welder Performance Record** page, do the following steps,

1. Click [![image-1651493134127.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651493134127.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651493134127.png)(Edit icon) in the **Edit** column for the respective welder performance record. See Fig 6.17. The **Welder Performance Record** page shows the details of the added welder performance record.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **6.17.3 View a Welder Performance Record**

If you want to view a welder performance record, click[![image-1651493230771.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651493230771.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651493230771.png)(print icon) provided in the **Welder Performance Record** page. See Fig 6.17.

#### **6.17.4 Attach a File into a Welder Performance Record**

If you want to attach any file with a welder performance record listed in the **Welder Performance Record** page, you can attach the file by using [![image-1651493270431.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651493270431.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651493270431.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **6.17.5 Export a Welder Performance Record**

You can export the welder performance in the **Welder Performance Record** page in both the pdf and excel formats by using[![image-1651493320700.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651493320700.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651493320700.png) (**PDF** button) and [![image-1651493333475.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651493333475.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651493333475.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.


### **6.18 Generate Weld Visual Report**

The **Generate Weld Visual Report** tab in the **Piping** menu helps you to generate a weld visual report.

1. Click **Generate Weld Visual Report** in the **Piping** menu. The **Daily Pipe Weld Visual Record** page opens.
    
    [![image-1651493397068.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651493397068.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651493397068.png)
    
     **Figure 6.18: Daily Pipe Weld Visual Record** **page**
    
    The **Daily Pipe Weld Visual Record** page shows the list of weld visual inspections completed on each day including the welding date, weld process name, location, pipe size, and drawing name.
    
    
    1. - The **Daily Pipe Weld Visual Record** page shows the list of weld visual inspections completed on each day including the welding date, weld process name, location, pipe size, and drawing name.
        - Each group has a maximum of 20 number of weld visual inspection.
        - Each group is separated by different group number.
        - You can generate a report for each group individually by using the respective report generating option provided in the ****Daily** **Pipe** **Weld Visual Record**** page.
2. If you want to generate report of DPWR for any group or date, click [![image-1651493577374.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651493577374.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651493577374.png) (****Generate Report**** button) of the respective group or date.

The generated reports will be moved to the [**<u>Weld Visual Report</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-6.19%C2%A0weld-visual-rep) page. To view the generated reports, navigate to the [**<u>Weld Visual Report</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-6.19%C2%A0weld-visual-rep) tab.



### **6.19 Weld Visual Report**

The **Weld Visual Report** tab in the **Piping** menu helps you to view a weld visual report. Once you have generated the weld visual report, the generated report will be moved here. You can view the respective report by using this tab. To view the weld visual report,

1. Click **Weld Visual Report** in the **Piping** menu. The **Weld Visual Report** page opens.
    
    [![image-1651493689271.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651493689271.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651493689271.png)
    
     **Figure 6.19: Weld Visual Report page**
    
    [![image-1651493758040.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651493758040.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651493758040.png)**Note**: If you want to view the welded joints, select the checkbox of the **Show Welded Joints** option provided in the page. The page shows the list of welded joints.

#### **6.19.1 Add Weld Visual Report**

If you want to add a weld visual report, do the following steps,

1. Click [![image-1651493813056.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651493813056.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651493813056.png) (**ADD** button) in the ****Weld Visual Report**** page. The page opens a new window to add the details of the weld visual report.
    
    [![image-1651493870645.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651493870645.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651493870645.png)
2. In the **Drawing Number** box, select the drawing number from a drop-down list.
    
    The field report number and shop report number will be updated automatically in the respective boxes.
3. Click **Save**.
    
    The weld visual report is successfully added and listed in the **Weld Visual Report** page.

#### **6.19.2 Edit a Weld Visual Report**

If you want to edit any existing weld visual report in the **Weld Visual Report** page, do the following steps,

1. Click [![image-1651493969060.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651493969060.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651493969060.png)(Edit icon) in the **Edit** column for the respective weld visual report. See Fig 6.19. The **Weld Visual Report** page shows the details of the added report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.19.3 Delete a Weld Visual Report**

If you want to delete any weld visual report in the **Weld Visual Report** page, you can use [![image-1651494056968.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651494056968.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651494056968.png) (Delete icon) provided in the **Weld Visual Report** page. To know how to delete, see the topic, “[<u>**Delete P&amp;ID**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

#### **6.19.4 View a Weld Visual Report**

- If you want to view a weld visual report related with the field inspection, click [![image-1651494130879.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651494130879.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651494130879.png)(print icon) provided in the **Field** column. See Fig 6.19.
- If you want to view a weld visual report related with the shop inspection, click [![image-1651494170970.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651494170970.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651494170970.png) (print icon) provided in the ****Shop****  See Fig 6.19.

#### **6.19.5 Filter a Weld Visual Report**

If you want to filter any weld visual report in the **Weld Visual Report** page, you can use [![image-1651494232278.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651494232278.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651494232278.png) (**FILTER** button) located on the **Weld Visual Report** page. To know how to filter, see the topic, “[<u>**Filter P&amp;ID**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

#### **6.19.6 Export a Weld Visual Report**

You can export the weld visual reports in the **Weld Visual Report** page in both the pdf and excel formats by using (**PDF** button) and (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.



### **6.20 Weld Joint Log Sheet**

The **Weld Joint Log sheet** tab in the Piping menu helps you to view a log sheet of pipe welding inspection. To view the log sheet,

1. Click **Weld Joint Log sheet** in the **Piping** menu. The pipe welding inspection log sheet page opens.
    
    [![image-1651494348611.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651494348611.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651494348611.png)
    
     **Figure 6.20: Pipe welding inspection log sheet page**
2. In the **Type** box, select the type of joint.
3. Do one of the following steps,
    
    
    1. 1. In the ****ISO Drawing Number**** box, select the isometric drawing number from a drop-down list.
        2. In the **Line Number** box, select the line number from a drop-down list.
        3. In the **System** box, select the system from a drop-down list.
4. Click **Go.**
5. If you want to open the log sheet in a threaded joint template, click the checkbox of the ****Open in Threaded Joint Template**** option.
6. If you want to open the log sheet in a threaded joint template, click the checkbox of the ******Open in Threaded Joint Template****** option. The pipe welding inspection log sheet opens for the selected option.
    
    [![image-1651494499475.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651494499475.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651494499475.png)

#### **6.20.1 Print a Weld Joint Log sheet**

If you want to print the weld joint log sheet, use [![image-1651494668204.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651494668204.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651494668204.png) and [![image-1651494691298.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651494691298.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651494691298.png) (print icons) provided in the Weld Joint Log sheet page.

1. If you want to print the current page of the Weld Joint Log sheet, click [![image-1651494755663.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651494755663.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651494755663.png) (print icon including the page number).
2. If you want to print all the pages of the Weld Joint Log sheet, click [![image-1651494789720.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651494789720.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651494789720.png) (print icon).

#### **6.20.2 View a Weld Joint Log sheet** 

You can view the weld joint log sheet in various formats by using the option[![image-1651494832436.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651494832436.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651494832436.png) provided in the upper right corner of the Weld Joint Log sheet page.


### **6.21 Joint Summary Report**

The **Joint Summary report** tab in the **Piping** menu used to view a joint summary report. If you want to see a joint summary report,

1. Click **Joint Summary Report** in the **Piping** menu.
    
    The **Joint Summary Report** page shows summary details of isometric drawing, joints, welders, components and so on.
    
    [![image-1651494915152.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651494915152.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651494915152.png)
    
     **Figure 9.21: Joint Summary Report page**

#### **6.21.1 Export a Joint Summary Report** 

You can export the joint summary report in both the pdf and excel formats by using [![image-1651494973329.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651494973329.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651494973329.png) (**PDF** button) and [![image-1651494982755.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651494982755.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651494982755.png) (**Excel** button) in the **Joint Summary Report** page. To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **6.21.2 View a Joint Summary Report**

If you want to view a joint summary report, click (print icon) provided in the **Joint Summary** **Report** page. See Fig 6.21.

### **6.22 Welding Application Report**

The **Welding Application Report** tab in the **Piping** menu shows a welding application report.

If you want to view a welding application report,

1. Click **Welding Application Report** in the **Piping** menu. The welding application report page opens with the details of welding application.
    
    [![image-1651495097652.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651495097652.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651495097652.png)
    
     **Figure 6.22: Welding Application Report page**


#### **6.22.1 Print a Welding Application Report**

If you want to print a welding application report, use [![image-1651497685540.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651497685540.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651497685540.png) and [![image-1651497698512.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651497698512.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651497698512.png) (print icons) provided in the **Welding Application Report** page. See Fig 6.22.

1. If you want to print the current page of the welding application report, click [![image-1651497718556.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651497718556.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651497718556.png) (print icon including the page number).
2. If you want to print all the pages of the welding application report, click [![image-1651497748592.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651497748592.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651497748592.png)(print icon).

#### **6.22.2 Export a Welding Application Report** 

You can export the welding application report in various formats by using the option [![image-1651497789166.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651497789166.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651497789166.png) provided in the upper right corner of the **Welding Application Report** page.


### **6.23 Weld Rejection Rate**

Weld Rejection Rate is the difference between the tested length and repair length of the welded material, which are calculated using RT and UT inspection. The Weld Rejection Rate is used to calculate the weld success rate.

The **Weld Rejection Rate** tab in the **Piping** menu shows a weld rejection rate report including weekly and cumulative weld success rate summary details.

If you want to view a weld rejection rate report,

1. Click **Weld Rejection Rate** in the Piping menu. The weld rejection rate report page opens.
    
    [![image-1651497859303.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651497859303.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651497859303.png)
    
     **Figure 6.23: Weld Rejection Rate Report page**
2. In the ****Project**** box, select a project for which you want to view a weld rejection rate report, from a drop-down list.
3. In the **From Date** and **To Date** boxes, select the from and to dates in respectively.
4. Click **Show Report**.

The weld rejection rate report opens for the selected project.

#### **6.23.1 Print a Weld Rejection Rate Report**

If you want to print a weld rejection rate report, use [![image-1651498088555.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651498088555.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651498088555.png) and [![image-1651498276432.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651498276432.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651498276432.png) (print icons) provided in the **Weld Rejection Rate** **Report** page. See Fig 6.23.

1. If you want to print the current page of the weld rejection rate report, click [![image-1651498310342.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651498310342.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651498310342.png) (print icon including the page number).
2. If you want to print all the pages of the weld rejection rate report, click [![image-1651498338237.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651498338237.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651498338237.png) (print icon).

#### **6.23.2 Export a Weld Rejection Rate Report** 

You can export the weld rejection rate report in various formats by using the option [![image-1651498407543.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651498407543.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651498407543.png) provided in the upper right corner of the **Weld Rejection Rate Report** page.


### **6.24 Weekly/Monthly DPWR**

The **Weekly/Monthly DPWR** tab in the **Piping** menu used to view a DPWR on a weekly or monthly basis. To view a DPWR,

1. Click **Weekly/Monthly DPWR** in the **Piping** menu.
    
    The DPWR page opens.
    
    [![image-1651498490263.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651498490263.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651498490263.png)
2. In the **Category** box, select the category from a drop-down list.
3. In the ****Start Date**** and ****End Date**** boxes, select the starting and ending date to view the DPWR.
4. Click ****Get Report****. The DPWR page shows the welder details for the selected category and period.
    
    [![image-1651498533151.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651498533151.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651498533151.png)

#### **6.24.1 Print a Weekly/Monthly DPWR**

If you want to print the DPWR, use [![image-1651498590658.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651498590658.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651498590658.png) and [![image-1651498606050.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651498606050.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651498606050.png) (print icons) provided in the DPWR page. See Fig 6.24.

1. If you want to print the current page of the DPWR, click [![image-1651498656599.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651498656599.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651498656599.png) (print icon including the page number).
2. If you want to print all the pages of the DPWR, click [![image-1651498675442.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651498675442.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651498675442.png) (print icon).

#### **6.24.2 Export a Weekly/Monthly DPWR** 

You can export the DPWR in various formats by using the option [![image-1651498737094.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651498737094.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651498737094.png)provided in the upper right corner of the DPWR page.


### **6.25 Piping Inspection Completion Status by System**

The **Status by System** tab in the **Piping** menu used to view the completed status of the piping inspection based on the system data. To view the status,

1. Click **Status by System** in the **Piping** menu. The **Piping Inspection Completion Status by System** page opens and shows the NDT inspection details.
    
    [![image-1651498832679.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651498832679.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651498832679.png)
    
     **Figure 6.25: Piping Inspection Completion Status by System page**

#### **6.25.1 Export Piping Inspection Completion Status by System**

You can export the piping inspection completion status in the **Piping Inspection Completion Status by System** page in both the pdf and excel formats by using [![image-1651498938174.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651498938174.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651498938174.png) (**PDF** button) and [![image-1651498947234.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651498947234.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651498947234.png) (**Excel** button). To know how to export, see the topic, “[<u>**Export P&amp;ID list**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **6.25.2 Filter Piping Inspection Completion Status by System**

If you want to filter any piping inspection completion status, you can use [![image-1651498997708.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651498997708.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651498997708.png) (**FILTER** button) in the **Piping Inspection Completion Status by System** page. To know how to filter, see the topic, “[<u>**Filter P&amp;ID**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **6.26 Piping Inspection Completion Status by Sub System**

The **Status by Sub System** tab in the **Piping** menu used to view the completed status of the piping inspection based on the sub system data. To view the status,

1. Click **Status by Sub System** in the **Piping** menu. The **Piping Inspection Completion Status by Sub System** page opens and shows the NDT inspection details.
    
    [![image-1651499055109.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651499055109.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651499055109.png)
    
     **Figure 6.26: Piping Inspection Completion Status by Sub System page**

#### **6.26.1 Export Piping Inspection Completion Status by Sub System**

You can export the piping inspection completion status in the **Piping Inspection Completion Status by Sub System** page in both the pdf and excel formats by using [![image-1651499115460.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651499115460.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651499115460.png) (**PDF** button) and [![image-1651499128218.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651499128218.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651499128218.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **6.26.2 Filter Piping Inspection Completion Status by Sub System**

If you want to filter any piping inspection completion status, you can use (**FILTER** button) in the **Piping Inspection Completion Status by Sub System** page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **6.27 Piping Inspection Completion Status by Line**

The **Status by Line** tab in the **Piping** menu used to view the completed status of the piping inspection based on the Lines data. To view the status,

1. Click **Status by Line** in the **Piping** menu. The **Piping Inspection Completion Status by Line** page opens and shows the NDT inspection details.
    
    [![image-1651499296156.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651499296156.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651499296156.png)
    
     **Figure 9.27: Piping Inspection Completion Status by Line page**

#### **6.27.1 Export Piping Inspection Completion Status by Line** 

You can export the piping inspection completion status in the **Piping Inspection Completion Status by Line** page in both the pdf and excel formats by using [![image-1651499475217.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651499475217.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651499475217.png) (**PDF** button) and [![image-1651499484705.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651499484705.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651499484705.png) (**Excel** button). To know how to export, see the topic, “[<u>**Export P&amp;ID list**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **6.27.2 Filter Piping Inspection Completion Status by Line** 

If you want to filter any piping inspection completion status, you can use [![image-1651499528945.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651499528945.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651499528945.png) (**FILTER** button) in the **Piping Inspection Completion Status by Line** page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.



### **6.28 Piping Inspection Completion Status by ISO**

The **Status by ISO** tab in the **Piping** menu used to view the completed status of piping inspection based on the isometric drawing data. To view the status,

1. Click **Status by ISO** in the **Piping** menu. The **Piping Inspection Completion Status by ISO** page opens and shows the drawing status and NDT inspection details.
    
    [![image-1651499583872.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651499583872.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651499583872.png)
    
     **Figure 6.28: Piping Inspection Completion Status by ISO page**

#### **6.28.1 Export Piping Inspection Completion Status by ISO** 

You can export the piping inspection completion status in the **Piping Inspection Completion Status by ISO** page in both the pdf and excel formats by using [![image-1651499648311.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651499648311.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651499648311.png) (**PDF** button) and [![image-1651499657976.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651499657976.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651499657976.png) (**Excel** button). To know how to export, see the topic, “[<u>**Export P&amp;ID list**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **6.28.2 Filter Piping Inspection Completion Status by ISO** 

If you want to filter any piping inspection completion status, you can use [![image-1651499693063.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651499693063.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651499693063.png) (**FILTER** button) in the **Piping Inspection Completion Status by ISO** page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **6.29 Piping Inspection Completion Status by Spools**

The **Status by Spools** tab in the **Piping** menu used to view the completed status of piping inspection based on the spool data. To view the status,

1. Click **Status by Spools** in the **Piping** menu.
    
    The **Piping Inspection Completion Status by Spools** page opens and shows the NDT inspection details.
    
    [![image-1651499754946.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651499754946.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651499754946.png)
    
     **Figure 6.29: Piping Inspection Completion Status by Spools page**

#### **6.29.1 Export Piping Inspection Completion Status by Spools**

You can export the piping inspection completion status in the **Piping Inspection Completion Status by Spools** page in both the pdf and excel formats by using [![image-1651499835714.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651499835714.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651499835714.png)(**PDF** button) and [![image-1651499844906.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651499844906.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651499844906.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **6.29.2 Filter Piping Inspection Completion Status by Spools** 

If you want to filter any piping inspection completion status, you can use [![image-1651499886062.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651499886062.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651499886062.png) (**FILTER** button) in the **Piping Inspection Completion Status by Spools** page. To know how to filter, see the topic, “**[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)**”.



### **6.30 Piping Inspection Completion Status by Test Pack**

The **Status by Test Pack** tab in the **Piping** menu used to view the completed status of piping inspection based on the test pack data. To view the status,

1. Click **Status by Test Pack** in the **Piping** menu. The **Piping Inspection Completion Status by Test Pack** page opens and shows the NDT inspection details.
    
    [![image-1651500138294.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651500138294.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651500138294.png)
    
     **Figure 6.30: Piping Inspection Completion Status by Test Pack page**

#### **6.30.1 Export Piping Inspection Completion Status by Test Pack**

You can export the piping inspection completion status in the **Piping Inspection Completion Status by Test Pack** page in both the pdf and excel formats by using [![image-1651500200778.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651500200778.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651500200778.png) (**PDF** button) and [![image-1651500211838.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651500211838.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651500211838.png) (**Excel** button). To know how to export, see the topic, “[<u>**Export P&amp;ID list**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **6.30.2 Filter Piping Inspection Completion Status by Test Pack**

If you want to filter any piping inspection completion status, you can use [![image-1651500261626.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651500261626.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651500261626.png) (**FILTER** button) in the **Piping Inspection Completion Status by Test Pack** page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

### **6.31 Outstanding Joints**

The **Outstanding Joints** tab in the **Piping** menu used to view and track the details of outstanding joints. To view the outstanding joints,

1. Click **Outstanding Joints** in the **Piping** menu. The **Outstanding Joints** page opens.
    
    [![image-1651500314780.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651500314780.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651500314780.png)
    
     **Figure 6.31: Outstanding Joints page**
2. Select the joint category from the given options such as All, Shop, and Field. The page shows the details of outstanding joints based on the selected category.
    
    [![image-1651500354229.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651500354229.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651500354229.png)

#### **6.3.11 Export Outstanding Joints**

You can export the list of outstanding joints in the **Outstanding Joints** page in both the pdf and excel formats by using [![image-1651500397743.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651500397743.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651500397743.png) (**PDF** button) and [![image-1651500406196.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651500406196.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651500406196.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **6.3.12 Filter Outstanding Joints**

If you want to filter any specific outstanding, you can use the filter box provided in each column of the **Outstanding Joints** page.

[![image-1651500443173.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651500443173.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651500443173.png)


### **6.32 Completed Drawings**

The **Completed Drawings** tab in the **Piping** menu used to view and track the details of completed drawings. To view the completed drawings details,

1. Click **Completed Drawings** in the **Piping** menu. The **Completed Drawings** page opens.
    
    [![image-1651500482247.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651500482247.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651500482247.png)
    
     **Figure 6.32: Completed Drawings page**
2. Select the joint category from the given options such as All, Shop, and Field. The page shows the details of completed drawings based on the selected category.
    
    [![image-1651500535524.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651500535524.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651500535524.png)

#### **6.32.1 Export Completed Drawings**

You can export the list of completed drawings in the **Completed Drawings** page in both the pdf and excel formats by using [![image-1651503197101.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651503197101.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651503197101.png) (**PDF** button) and [![image-1651503208116.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651503208116.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651503208116.png) (**Excel** button). To know how to export, see the topic, “[<u>**Export P&amp;ID list**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.


### **6.33 Weld Progress by Date**

The **Weld Progress by Date** tab in the **Piping** menu helps you to view the graphical representation of welding progress on a day basis. To view the welding progress detail,

1. Click **Weld Progress by Date** in the **Piping** menu. The **Welding Progress** page opens with a graphical representation.
    
    [![image-1651503271308.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651503271308.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651503271308.png)
    
    The chart shows the number of welding such as shop weld and field weld, performed on every day.
2. If you want to view the progress detail of welding performed in the shop, click **Shop Weld**. The chart shows the shop welding progress details.
3. If you want to view the progress detail of welding performed in the field, click ****Field Weld****. The chart shows the field welding progress details.

#### **6.33.1 Print a Welding Progress chart**

If you want to print the welding progress chart,

1. Click (menu icon) in the Weld Progress page. [![image-1651503459767.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651503459767.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651503459767.png)
2. Click **Print Chart**.
    
    The chart will be printed.

#### **6.33.2 Download a Welding Progress Chart**

You can download the welding progress chart in PNG image, JPEG image, SVG vector image, and PDF formats by using the respective options provided in the menu icon.


### **6.34 Inspection Request Summary Report**

The **Inspection Request Summary** tab in the **Piping** menu used to view the summary of inspection request. To view the inspection request summary report,

1. Click **Inspection Request Summary** in the **Piping** menu.
    
    The **Inspection Request Summary Report** page opens.
    
    [![image-1651503573328.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651503573328.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651503573328.png)
    
     **Figure 6.34: Inspection Request Summary Report page**
2. In the **Start Date** and **End Date** boxes, select the start and end dates.
3. Click **Search**.
    
    The page shows the details of inspection request.
    
    [![image-1651503620537.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651503620537.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651503620537.png)

#### **6.34.1 Export an Inspection Request Summary Report**

You can export the inspection request summary report in both the pdf and excel formats by using (**PDF** button) and (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **6.34.2 Filter an Inspection Request Summary** 

If you want to filter any inspection request detail, you can use [![image-1651505498979.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651505498979.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651505498979.png) (**FILTER** button) in the **Inspection Request Summary Report** page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.



### **6.35 Piping Progress Status Report**

The **Piping Progress Status Report** tab in the **Piping** menu used to view the piping progress status report. To view the piping progress status report,

1. Click **Piping Progress Status Report** in the **Piping** menu.
    
    The **Piping Progress Status Report** page opens.
    
    [![image-1651505560536.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651505560536.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651505560536.png)
    
     **Figure 9.35: Piping Progress Status Report page**
2. In the **From Date** and **To Date** boxes, select the from and to dates to view the piping progress status.
3. Click **Load Report**.
    
    The page shows the details of piping progress status.
    
    [![image-1651505637247.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651505637247.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651505637247.png)

#### **6.35.1 Print a Piping Progress Status Report**

If you want to print the piping progress status report, use [![image-1651505681173.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651505681173.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651505681173.png) and [![image-1651505696561.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651505696561.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651505696561.png) (print icons) provided in the **Piping Progress Status Report** page. See Fig 6.35.

1. If you want to print the current page of the piping progress status report, click [![image-1651505734940.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651505734940.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651505734940.png) (print icon including the page number).
2. If you want to print all the pages of the piping progress status report, click [![image-1651505759624.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651505759624.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651505759624.png)(print icon).

#### **6.35.2 Export a Piping Progress Status Report** 

You can export the piping progress status report in various formats by using the option [![image-1651505802195.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651505802195.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651505802195.png) provided in the upper right corner of the **Piping Progress Status Report** page.



### **6.36 Welder Defect Analysis Report** 

The **Welder Defect Analysis Report** tab in the **Piping** menu used to view the defect analysis report of the particular welder. To view the welder defect analysis report,

1. Click **Welder Defect Analysis Report** in the **Piping** menu.
    
    The **Welder Defect Analysis** page opens.
    
    [![image-1651505863398.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651505863398.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651505863398.png)
    
     **Figure 9.36: Welder Defect Analysis page**
2. In the **Select Welder** box, select a welder from the list of welders.
3. Click **Generate Report**.
    
    The page shows the defect analysis report of the selected welder.
    
    [![image-1651505908437.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651505908437.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651505908437.png)

#### **6.36.1 Print a Welder Defect Analysis Report**

If you want to print the welder defect analysis report, use [![image-1651505982090.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651505982090.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651505982090.png) and [![image-1651505991195.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651505991195.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651505991195.png) (print icons) provided in the **Welder Defect Analysis** page. See Fig 6.36.

1. If you want to print the current page of the welder defect analysis report, click [![image-1651506221443.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651506221443.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651506221443.png) (print icon including the page number).
2. If you want to print all the pages of the welder defect analysis report, click[![image-1651506250701.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651506250701.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651506250701.png) (print icon).

#### **6.36.2 Export a Welder Defect Analysis Report** 

You can export the welder defect analysis report in various formats by using the option [![image-1651506309296.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651506309296.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651506309296.png) provided in the upper right corner of the **Welder Defect Analysis Report** page.


#### **6.37 Weld Traceability Record**

The **Weld Traceability Record** tab in the **Piping** menu used to add a weld traceability record and track welding records.

If you want add a weld traceability record, do the following,

1. Click **Weld Traceability Record** in the **Piping** menu.
    
    The **Weld Traceability Record** page opens.
    
    [![image-1651506585145.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651506585145.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651506585145.png)
    
     **Figure 6.37: Weld Traceability Record page**

#### **6.37.1 Add a Weld Traceability Record**

If you want to add a weld traceability record, do the following,

1. Click [![image-1651508423614.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651508423614.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651508423614.png) (**ADD** button) in the **Weld Traceability Record** page. See Fig 6.37. The page opens a new window to add the details of a weld traceability record.
    
    [![image-1651508471580.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651508471580.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651508471580.png)
    
    [![image-1651508482284.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651508482284.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651508482284.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651512981166.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651512981166.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651512981166.png)**Tip**: A report number for a new weld traceability record will be updated automatically in the **Report Number** box. If you want to change the report number, you can change.
2. In the **Drawing Number** box, select a drawing number from a drop-down list.
3. In the **Date** box, enter the date of adding the weld traceability record.
4. In the **Prepared By** box, enter the name of a person who has prepared the weld traceability record.
5. In the **Prepared Date** box, select the prepared date of the weld traceability record.
6. In the **Reviewed By** box, enter the name of a person who has reviewed the weld traceability record.
7. In the **Reviewed Date** box, select the reviewed date of the weld traceability record.
8. In the **Approved By** boxes, enter the name of a person who has approved the weld traceability record.
9. In the **Approved Date** box, select the approved date of the weld traceability record.
10. Click **Save**.
    
    The weld traceability record is successfully added.

#### **6.37.2 View a Weld Traceability Report**

If you want to view a weld traceability report, click [![image-1651513252508.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651513252508.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651513252508.png) (print icon) provided in the **Report** column in the Weld Traceability Record page. See Fig 6.37.

#### **6.37.3 Attach a File into a Weld Traceability Record**

If you want to attach any file with a weld traceability record listed in the **Weld Traceability Record** page, you can attach the file by using [![image-1651513297696.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651513297696.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651513297696.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **6.37.4 Edit a Weld Traceability Record** 

If you want to edit any existing weld traceability record in the **Weld Traceability Record** page, do the following,

1. Click [![image-1651513427021.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651513427021.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651513427021.png) (Edit icon) in the **Edit** column for the respective weld traceability record. The page shows the added details of the weld traceability record.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.37.5 Delete a Weld Traceability Record**

If you want to delete any existing system in the **System** page, you can use [![image-1651513492123.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651513492123.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651513492123.png) (Delete icon) provided in the **System** page. To know how to delete, see the topic, **“**[<u>**Delete** **P&amp;ID**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.


### **6.38 Add Non-Conformance Report (NCR)**

NCR used to document the details of a non-conformance identified in a quality audit or other process review. The **Add** **NCR** tab in the **Piping** menu helps you to add an NCR in the Piping project. Do the following steps to add an NCR,

1. Click **Add NCR** in the **Piping** menu. The **NCR** page opens.
    
    [![image-1651513589335.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651513589335.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651513589335.png)
    
     **Figure 6.38: NCR page**
    
    [![image-1651513634624.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651513634624.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651513634624.png)**Tip**: A report number for a new NCR will be updated automatically in the **Report Number** box. If you want to change the report number, you can change.
2. In the **Type** box, select the type of non-conformance from a drop-down list.
3. In the **Classification** box, select whether minor classification or major classification from a drop-down list.
4. In the **Source/ Item** box, select the source of NCR from a drop-down list.
5. In the **NCR** box, enter the description for the identified deficiency of the selected non-conformance type.
6. In the **Reference Document** box, enter the reference document detail.
7. In the **Owner Reference Document** box, enter the owner reference document detail.
8. In the **Supplier Reference Document** box, enter the supplier reference document detail.
9. In the **NCR originator** box, enter the originator of NCR.
10. In the **Origin** **Date** box, select the origin date of NCR.
11. In the **NCR Accepted By** box, enter the name of a person who has accepted the NCR.
12. In the **NCR Accepted Date** box, select the NCR accepted date.
13. In the **Agreed Closure Date** box, select the agreed closure date.
14. In the **Issued By** box, select the company who has issued the NCR.
15. In the **Issued To** box, select the company for which the NCR has issued.
16. In the **Root Cause** box, enter the root cause detail.
17. If you want to add the corrective action detail, do the following, 
    1. 1. In the **Action** box, select any corrective action from the given options.
        2. In the **Corrective Action** box, enter the corrective action detail.
        3. In the **Proposed by** box, enter the name of a person who has proposed the corrective action.
        4. In the **Target Close-out Date** box, select the target close out date.
        5. In the **Preventive Action** box, enter the preventive actions.
        6. In the **Probability** box, select the probability percentage of non-conformance.
        7. In the **consequences** box, select the consequences level you have faced.
18. If you want to add any remarks, click **Remarks** option and enter your remarks, otherwise click **No Remarks** option.
19. In the **Verification** box, enter the verification detail on completion of corrective action/ preventive action.
20. In the **Inspected by QC Inspector**, and **Date** boxes, enter the name of the QC inspector who has inspected the NCR, and date, respectively.
21. In the **Inspected by QC Inspector**, and **Date** boxes, enter the name of the QC inspector who has inspected the NCR, and date, respectively.
22. In the **Supplier NCR Close out by**, and **Close Out Date** boxes, enter the name of a person who has closed the supplier NCR, and close out date, respectively.
23. In the **Owner NCR Close out by**, and **Close Out Date** boxes, enter the name of a person who has closed the owner NCR, and close out date, respectively.
24. In the **Approval Req** box, if you need approval, click **Yes,** otherwise click
25. If you have selected **Yes**, you must enter the reference detail in the **If Yes, Then Reference**
26. In the **Description** box, enter the description of proposal.
27. In the **Proposal Accepted by**, and **Date** boxes, enter the name of a person who has accepted the proposal, and date, respectively.
28. In the NCR Close Notes box, enter the NCR close notes.
29. In the **Disposition Completed by,** and **Date** boxes, enter the name of a person who has completed the disposition, and date, respectively.
30. Click **Save**.

The NCR is successfully added.

### **6.39 View NCR**

The **View NCR** tab helps you to view and edit the details of added NCR. You can also add a new NCR by using the add option. To navigate to **View NCR,**

1. Click **View NCR** in the **NCR** menu.
    
    The **View NCR** page opens with an added NCR.
    
    [![image-1651514495076.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651514495076.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651514495076.png)
    
     **Figure 6.39: View NCR page**

#### **6.39.1 Add an NCR**

If you want to add a new NCR, follow the same procedure in the topic, “[**<u>Add NCR</u>**](#bkmrk-6.38%C2%A0add-non-conform)”.

#### **6.39.2 View an NCR Log Summary Report**

If you want to view an NCR log summary report, click [![image-1651514642061.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651514642061.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651514642061.png) provided in the upper side of the **View NCR** page. See Fig 6.39.

#### **6.39.3 Attach a File into an NCR** 

If you want to attach any file with an NCR listed in the **View NCR** page, you can attach the file by using [![image-1651514734111.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651514734111.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651514734111.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **6.39.4 Update an NCR**

If you want to update any existing NCR in the **View** **NCR** page, click [![image-1651514809156.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651514809156.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651514809156.png)(Update icon) in the **Update** column for the respective NCR. Edit the details in the respective box you want.

#### **6.39.5 Export an NCR**

You can export a list of NCRs added in the **View NCR** page in both the pdf and excel formats by using [![image-1651514861183.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651514861183.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651514861183.png) (**PDF** button) and [![image-1651514876263.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651514876263.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651514876263.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **6.39.6 Delete an NCR**

If you want to delete any existing NCR in the **View NCR** page, you can use [![image-1651514921299.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651514921299.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651514921299.png) (Delete icon) provided in the **View NCR** page. To know how to delete, see the topic, “[**<u>Delete P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

### **6.40 Spools Generate Barcode &amp; QR Code**

By using the **Spools Generate Barcode &amp; QR Code** tab in the **Piping** menu, you can generate the bar code and QR code for the spools for which you have added.

1. Click **Spools Generate Barcode &amp; QR Code** in the **Piping** menu.
    
    The **Spools Generate Barcode** page opens.
    
    [![image-1651514986994.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651514986994.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651514986994.png)
    
     **Figure 6.40: Spools Generate Barcode page**
2. Select the checkbox of the spool for which you want to generate barcode and QR code.
3. If you want to generate the barcode, click [![image-1651515058621.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515058621.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515058621.png) (**Print Barcode** button).
    
    [![image-1651515048619.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515048619.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515048619.png)
4. If you want to generate the QR code, click [![image-1651515082114.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515082114.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515082114.png) (**Print QR code** button).
    
    [![image-1651515094715.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515094715.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515094715.png)

### **6.41 RT Weekly Report**

The **RT Weekly Report** tab in the **Piping** menu used to view the week wise RT inspection status. To view the RT inspection status,

1. Click **RT Weekly Report** in the **Piping** menu. The **RT Weekly Report** page opens and shows the RT inspection status.
    
    [![image-1651515152646.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515152646.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515152646.png)

#### **6.42 Weld Summary Sheet**

The **Weld Summary sheet** tab in the **Piping** menu used you to view a summary report of pipe welding inspection. To view the summary report,

1. Click **Weld Summary sheet** in the ****Piping menu.****The Piping Weld Inspection Log Sheet page opens.
    
    [![image-1651515211664.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515211664.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515211664.png)
    
     **Figure 9.42: Piping Weld Inspection Log Sheet page**
2. In the **Type** box, select the type of joint.
3. Do one of the following steps,
    
    
    1. 1. In the ****ISO Drawing Number**** box, select the isometric drawing number from a drop-down list.
        2. In the ****Line Number**** box, select the line number from a drop-down list.
        3. In the ****System**** box, select the system from a drop-down list.
4. In the ****Joints**** box, select a joint from a list of joints loaded based on the selected ISO.
5. Click **Go.**
6. If you want to open the log sheet in a threaded joint template, click the checkbox of the ****Open in Threaded Joint Template****
7. If you want to open the log sheet for Vendor supply pre-fabricated PTFE, click the checkbox of the ****VENDOR SUPPLY PRE-FABRICATED PTFE****
8. The pipe welding inspection log sheet opens for the selected option.[![image-1651515370972.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515370972.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515370972.png)

#### **6.42.1 Print a Weld Summary Sheet**

If you want to print the weld summary sheet, use [![image-1651515487359.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515487359.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515487359.png)and [![image-1651515499193.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515499193.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515499193.png) (print icons) provided in the Weld Summary Sheet page.

1. If you want to print the current page of the weld summary sheet, click [![image-1651515524036.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515524036.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515524036.png) (print icon including the page number).
2. If you want to print all the pages of the weld summary sheet, click[![image-1651515559599.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515559599.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515559599.png) (print icon).

#### **6.42.2 View a Weld Summary Sheet** 

You can view the weld summary sheet in various formats by using the option [![image-1651515622205.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515622205.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515622205.png) provided in the upper right corner of the Weld Summary Sheet page.

### **6.43 Inspection Status Report**

**Inspection Status Report** shows the overall inspection reports such as from fit-up inspection status to NDT inspection status.

If you want to view an inspection status report, do the following steps,

1. Click **Inspection Status Report** in the **Piping** menu. The **Inspection Status Report** page opens.
    
    [![image-1651515692671.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515692671.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515692671.png)
    
     **Figure 6.43: Inspection Status Report page**
2. In the **Start Date** and **End Date** boxes, select the start and end dates.
3. In the **Project** box, select the project from a drop-down list.
4. Click **Show Report**.
    
    The **Inspection Status Report** page shows the spool information, RFI fit-up, RFI weld VI, and NDT inspection status.

#### **6.43.1 Print an Inspection Status Report**

If you want to print the inspection status report, use [![image-1651515800569.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515800569.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515800569.png)and [![image-1651515811999.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515811999.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515811999.png) (print icons) provided in the **Inspection Status Report** page. See Fig 6.43.

1. If you want to print the current page of the inspection status report, click [![image-1651515848688.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515848688.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515848688.png) (print icon including the page number).
2. If you want to print all the pages of the inspection status report, click [![image-1651515867800.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515867800.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515867800.png) (print icon).

#### **6.43.2 Export an Inspection Status Report** 

You can export the inspection status report in various formats by using the option [![image-1651515926830.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515926830.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515926830.png) provided in the upper right corner of the **Inspection Status Report** page.

### **6.44 Surveillance Entry**

The **Surveillance Entry** tab in the **Piping** menu helps you to add the observation details of various category, which is done by an inspector.

If you want add a surveillance entry, do the following,

1. Click **Surveillance Entry** in the **Piping** menu.
    
    The **Surveillance** page opens.
    
    [![image-1651516003952.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651516003952.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651516003952.png)
    
     **Figure 6.44: Surveillance page**

#### **6.44.1 Add a Surveillance Entry**

If you want to add a surveillance entry, do the following,

1. Click [![image-1651516158029.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651516158029.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651516158029.png) (**ADD** button) in the **Surveillance** page. See Fig 6.44.
    
    A new window opens to add a surveillance entry.
    
    [![image-1651516182891.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651516182891.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651516182891.png)
    
    [![image-1651516196536.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651516196536.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651516196536.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **Surveillance Date** box, select the surveillance date.
3. In the **Category** box, select a surveillance category from a drop-down list.
4. In the **Location** box, select a location where the surveillance has done.
5. In the **Sub Contractor** box, select the sub-contractor from a drop-down list.
6. In the **Observation By Inspector** box, enter the name of the inspector who has done the observation.
7. In the **Action by (Supervisor)** box, enter the name of the supervisor who has done the action.
8. In the **Target Date to Close ou**t box, select the target date to close out the observation.
9. In the **Remarks** box, enter your remarks if any.
10. In the **Observation** box, enter the observation’s description.
11. In the **Action Taken To Close Observation** box, enter the actions to close out the observation.
12. In the **Status** box, select the status Open or Close based on the observation.
13. Click **Save**.

The surveillance entry is successfully added.

#### **6.44.2 Attach a File into a Surveillance Entry**

If you want to attach any file with the surveillance entry listed in the **Surveillance** page, you can attach the file by using [![image-1651516385393.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651516385393.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651516385393.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **6.44.3 Edit a Surveillance Entry**

 If you want to edit any existing surveillance entry in the **Surveillance** page, do the following,

1. Click [![image-1651516449133.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651516449133.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651516449133.png)(Edit icon) in the **Edit** column for the respective surveillance entry. See Fig 6.44.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.44.4 Delete a Surveillance Entry**

If you want to delete any from the list, you can use (Delete icon) provided in the **Delete** column of the **Surveillance** page, See Fig 6.44. To know how to delete, see the topic, “[**<u>Delete P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

#### **6.44.5 Export a Surveillance Entry**

You can export a list of surveillance entry added in the **Surveillance** page in the pdf and excel formats by using [![image-1651516595441.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651516595441.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651516595441.png)(**PDF** button) and [![image-1651516608147.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651516608147.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651516608147.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **6.44.6 Filter a Surveillance Entry**

If you want to filter any surveillance entry from the list in the **Surveillance** page, you can use [![image-1651516683319.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651516683319.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651516683319.png) (**FILTER** button) located on the **Surveillance** page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

### **6.45 Surveillance Report**

Once you have added the surveillance entry by using the **Surveillance Entry** tab, you can view a surveillance report by using the **Surveillance Report** tab in the **Piping** menu. If you want to view a surveillance report, do the following steps,

1. Click **Surveillance Report** in the **Piping** menu. The **Surveillance Report** page opens.
    
    [![image-1651516750293.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651516750293.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651516750293.png) **Figure 6.45: Surveillance Report** **page**
2. In the **Project** box, select a project from a drop-down list.
3. In the **Subcontractor** box, select a sub-contractor from a drop-down list.
4. In the **From Date** and **To Date** boxes, select the from and to dates in respectively.
5. In the **Status** box, select the status from a drop-down list.
6. Click **Preview Report**.
    
    The surveillance report will be displayed for the selected dates and status.

#### **6.45.1 Print a Surveillance Report**

If you want to print a surveillance report, use [![image-1651516884041.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651516884041.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651516884041.png)and [![image-1651516894340.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651516894340.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651516894340.png) (print icons) provided in the **Surveillance** **Report** page. See Fig 6.45.

1. If you want to print the current page of the surveillance report, click [![image-1651516946516.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651516946516.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651516946516.png) (print icon including the page number).
2. If you want to print all the pages of the surveillance report, click [![image-1651516967368.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651516967368.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651516967368.png)(print icon).

#### **6.45.2 Export a Surveillance Report**

You can export the surveillance report in various formats by using the option [![image-1651517050864.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651517050864.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651517050864.png) provided in the upper right corner of the **Surveillance** **Report** page.

### **6.46 Surveillance Category Report**

The **Surveillance Categories Report** tab in the **Piping** menu shows the surveillance report based on the category wise status.

1. Click **Surveillance Categories Report** in the **Piping** menu.
    
    The **Surveillance Category Wise Status Report** page opens.
    
    [![image-1651517111845.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651517111845.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651517111845.png)
    
     **Figure 6.46: Surveillance Report** **page**
2. In the **Project** box, select a project from a drop-down list.
3. In the **Subcontractor** box, select a sub-contractor from a drop-down list.
4. In the **From Date** and **To Date** boxes, select the from and to dates in respectively.
5. In the **Status** box, select the status from a drop-down list.
6. Click **Preview Report**.

The surveillance report will be displayed based on the category wise status.

### **6.46.1 Print a Surveillance Category Wise Status Report**

If you want to print a surveillance report, use [![image-1651517717973.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651517717973.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651517717973.png)and [![image-1651517728798.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651517728798.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651517728798.png) (print icons) provided in the **Surveillance** **Category Wise Status Report** page. See Fig 6.46.

1. If you want to print the current page of the surveillance report, click [![image-1651517821687.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651517821687.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651517821687.png) (print icon including the page number).
2. If you want to print all the pages of the surveillance report, click [![image-1651517848488.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651517848488.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651517848488.png)(print icon).

#### **6.46.2 Export a Surveillance Category Wise Status Report**

You can export the surveillance report in various formats by using the option [![image-1651517946300.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651517946300.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651517946300.png) provided in the upper right corner of the **Surveillance** **Category Wise Status Report** page.


### **6.47 Blasting and Painting View**

The **Blasting and Painting View** tab in the **Piping** menu used to add the blasting and painting inspection report.

1. Click **Blasting and Painting View** in the **Piping** menu.
    
    The **Blasting and Painting** page opens.
    
    [![image-1651518079348.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651518079348.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651518079348.png)
    
     **Figure 6.47: Blasting and Painting page**

#### **6.47.1 Add a Blasting and Painting Report**

If you want to add a blasting and painting report, do the following steps,

1. Click [![image-1651518173090.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651518173090.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651518173090.png) (**ADD** button) in the **Blasting and Painting** page. See Fig 6.47.
    
    The page opens a new window to add the details of the blasting and painting report.
    
    [![image-1651518193978.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651518193978.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651518193978.png)
2. In the **Requested by** box, enter the name of a person who has requested the blasting and painting report.
3. In the **Requested To** box, enter the name of a person for whom you want to send the blasting and painting report.
4. In the **Description / Spec,Ref.No** box, select the specification report number.
5. In the **Inspection Date &amp; Time** box, select the inspection date and time.
6. In the **Location** box, select the inspection location.
7. In the **Requisition** box, enter the requisition detail.
8. In the **System** box, select the system.
9. In the **Report Type** field, select the report type which you want to create.
    
    Before saving the added request, you must add the spools.
    
    [![image-1651518540053.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651518540053.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651518540053.png)**Note**: You can add multiple spools for one request.
    
    The page shows a list of spools. If you want to add spools for the request, do the following steps,
10. Click [![image-1651518577497.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651518577497.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651518577497.png)(Add icon) of the respective spools you want to add.
    
    The added spools will be moved and listed in the right side of the page.
11. Click **Save NDT Request**.
    
    The added report will be listed in the **Blasting and Painting** page.

#### **6.47.2 Edit a Blasting and Painting Report**

If you want to edit any existing blasting and painting report in the **Blasting and Painting** page, do the following steps,

1. Click [![image-1651518784195.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651518784195.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651518784195.png)(Edit icon) in the **Edit** column for the respective blasting and painting See Fig 6.47. The **Blasting and Painting** page opens with the details of the selected blasting and painting report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.47.3 Submit and Approve a Blasting and Painting Report**

Once you have added the blasting and painting report, the **Submission** column in the **Blasting and Painting** page is appeared with [![image-1651518880356.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651518880356.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651518880356.png) (Submit and Reject icons).

1. If you want to submit the blasting and painting report, click [![image-1651518909051.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651518909051.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651518909051.png)(Submit icon) in the **Submission** Otherwise click [![image-1651518932798.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651518932798.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651518932798.png) (Reject icon) to reject the request.
    
    Once you have submitted the blasting and painting report, the **Request Status** column in the **Blasting and Painting** page is appeared with [![image-1651518960906.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651518960906.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651518960906.png) (Approve and Reject icons).
2. If you want to approve the blasting and painting report, click [![image-1651519019335.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651519019335.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651519019335.png)(Approve icon) in the **Request Status** Otherwise click [![image-1651519038372.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651519038372.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651519038372.png)(Reject icon) to reject the request.

#### **6.47.4 Attach a File into a Blasting and Painting Report**

If you want to attach a file with any existing blasting and painting report listed in the **Blasting and Painting** page, you can attach the file by using [![image-1651519149148.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651519149148.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651519149148.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

### **6.48 NDT Summary Report**

The **NDT Summary Report** tab in the **Piping** menu shows the summary report of the NDT inspection.

1. Click **NDT Summary Report** in the **Piping** menu. The **NDT Summary Report** page opens.
    
    [![image-1651519234930.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651519234930.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651519234930.png)
    
     **Figure 6.48: NDT Summary Report page**

#### **6.48.1 Print an NDT Summary Report**

If you want to print an NDT summary report, click [![image-1651519304378.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651519304378.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651519304378.png) (print icon) provided in the upper side of the **NDT Summary Report** page. See Fig 6.48.

#### **6.48.2 Export an NDT Summary Report**

You can export a list of NDT summary report added in the **NDT Summary Report** page in the pdf and excel formats by using[![image-1651519349018.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651519349018.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651519349018.png) (**PDF** button) and [![image-1651519359507.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651519359507.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651519359507.png) (**Excel** button). To know how to export, see the topic, “[<u>**Export P&amp;ID list**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

### **6.49 Component Summary Report** 

Component Summary Report shows the component summary details. If you want to view a component summary report, do the following steps,

1. Click **Component Summary Report** in the **Piping** menu. The **Component Summary Report** page opens.
    
    [![image-1651519423625.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651519423625.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651519423625.png)
    
     **Figure 6.49: Component Summary Report page**
2. In the **From Date** and **To Date** boxes, select the from and to dates in respectively.
3. Click **Show Report**.
    
    The component summary report opens for the selected dates.

#### **6.49.1 Print a Component Summary Report**

If you want to print a component summary report, use [![image-1651519505815.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651519505815.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651519505815.png) and [![image-1651519529914.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651519529914.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651519529914.png) (print icons) provided in the **Component Summary Report** page. See Fig 6.49.

1. If you want to print the current page of the component summary report, click [![image-1651519561128.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651519561128.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651519561128.png) (print icon including the page number).
2. If you want to print all the pages of the component summary report, click[![image-1651519584698.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651519584698.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651519584698.png) (print icon).

#### **6.49.2 Export a Component Summary Report**

You can export the component summary report in various formats by using the option [![image-1651519634162.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651519634162.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651519634162.png) provided in the upper right corner of the **Component Summary Report** page.


### **6.50 NDT Performance Report (RT &amp; UT)**

NDT Performance Report shows the performance details of RT and UT. If you want to view an NDT performance report, do the following steps,

1. Click **NDT Performance Report** in the **Piping** menu. The **NDT Performance Report** page opens.
    
    [![image-1651595514807.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651595514807.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651595514807.png)
    
     **Figure 6.50: NDT Performance Report page**
2. In the **From Date** and **To Date** boxes, select the from and to dates in respectively.
3. Click **Show Report**.
    
    The NDT performance report opens for the selected dates.

#### **6.50.1 Print an NDT Performance Report**

If you want to print an NDT performance report, use [![image-1651595624122.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651595624122.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651595624122.png)and [![image-1651595636905.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651595636905.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651595636905.png) (print icons) provided in the **NDT Performance Report** page. See Fig 6.50.

1. If you want to print the current page of the NDT performance report, click [![image-1651595664046.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651595664046.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651595664046.png) (print icon including the page number).
2. If you want to print all the pages of the NDT performance report, click [![image-1651595712461.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651595712461.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651595712461.png)(print icon).

#### **6.50.2 Export NDT Performance Report**

You can export the NDT performance report in various formats by using the option [![image-1651595753441.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651595753441.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651595753441.png) provided in the upper right corner of the **NDT Performance Report** page.

### **6.51 Pipe Flushing Check List**

The **Pipe Flushing Check List** tab in the **Piping** menu used to add the pipe flushing check list detail.

1. Click **Pipe Flushing Check List** in the **Piping** menu.
2. The **Pipe Flushing Check List** page opens.
    
    [![image-1651595904511.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651595904511.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651595904511.png)
    
     **Figure 6.51: Pipe Flushing Check List page**

#### **6.51.1 Add a Pipe Flushing Check List**

1. Click [![image-1651606641935.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651606641935.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651606641935.png) (****ADD**** button) in the ****Pipe Flushing Check List**** See Fig 6.51. A new window opens to add a pipe flushing check list.
    
    [![image-1651606662976.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651606662976.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651606662976.png)
    
    [![image-1651606699982.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651606699982.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651606699982.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **User Report** box, enter the user report number.
3. In the **Client Ref** box, enter the client reference number.
4. In the **Survey Ref** box, enter the survey reference number.
5. In the **Drawing** box, select a drawing number.
6. In the **Inspection Date** box, select the inspection date.
7. In the **Work Scope** box, enter the work scope detail.
8. In the **Remarks** box, enter your remarks if any.
9. In the **Description** box, enter the description for check list.
10. In the **Location** box, enter the name of a location.
11. In the **Acceptance Code** box, enter the acceptance code.
12. In the **Flushing Pressure** box, enter the flushing pressure value.
13. In the **Flushing Temperature** box, enter the flushing temperature value.
14. In the **Flushing Time** box, select the flushing time.
15. In the **Flushing Medium** box, enter the flushing medium name.
16. In the **Instrument Serial No** box, enter the instrument serial number.
17. Click **Save**.

The pipe flushing checklist is successfully added.

#### **6.51.2 Edit a Pipe Flushing Check List**

 If you want to edit any existing pipe flushing check list in the **Pipe Flushing Check List** page, do the following steps,

1. Click [![image-1651606865709.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651606865709.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651606865709.png) (Edit icon) in the **Edit** column for the respective pipe flushing check list. See Fig 6.51. A new window opens with the added details of the pipe flushing check list.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.51.3 Export a Pipe Flushing Check List**

You can export a list of pipe flushing check list added in the **Pipe Flushing Check List** page in the pdf and excel formats by using [![image-1651606945375.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651606945375.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651606945375.png) (**PDF** button) and [![image-1651606956507.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651606956507.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651606956507.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>”**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li).

#### **6.51.4 Filter a Pipe Flushing Check List**

If you want to filter any pipe flushing check list, you can use (**FILTER** button) in the **Pipe Flushing Check List** page. To know how to filter, see the topic, “[<u>**Filter P&amp;ID**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

#### **6.51.5 Print a Pipe Flushing Check List**

If you want to print a pipe flushing check list, click (print icon) provided in the **Print** column of the **Pipe Flushing Check List** page. See Fig 6.51.

### **6.52 Pipe Inspection Check List**

The **Pipe Inspection Check List** tab in the **Piping** menu used to add the pipe inspection check list detail.

1. Click **Pipe Inspection Check List** in the **Piping** menu.
    
    The **Pipe Inspection Check List** page opens.
    
    [![image-1651646434211.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651646434211.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651646434211.png)
    
     **Figure 6.52: Pipe Inspection Check List page**

#### **6.52.1 Add a Pipe Inspection Check List**

1. Click [![image-1651646535308.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651646535308.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651646535308.png) (**ADD** button) in the **Pipe Inspection Check List** page. See Fig 6.52.
    
    A new window opens to add a pipe inspection check list.
    
    [![image-1651646567001.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651646567001.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651646567001.png)
    
    [![image-1651646577615.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651646577615.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651646577615.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **User Report Number** box, enter the user report number.
3. In the **Drawing** box, select a drawing number.
4. In the **Date** box, select the inspection date.
5. In the **Remarks** box, enter your remarks if any.
6. In the **Status** field, select the status of the check list.
7. In the **Report Type** box, select the report type of the check list.
8. Click **Save**.

The pipe inspection checklist is successfully added.

#### **6.52.2 Edit a Pipe Inspection Check List**

 If you want to edit any existing pipe inspection check list in the **Pipe Inspection Check List** page, do the following steps,

1. Click [![image-1651646995460.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651646995460.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651646995460.png) (Edit icon) in the **Edit** column for the respective pipe inspection check list. See Fig 6.52. A new window opens with the added details of the pipe inspection check list.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.52.3 Export a Pipe Inspection Check List**

You can export a list of pipe inspection check list added in the **Pipe Inspection Check List** page in the pdf and excel formats by using [![image-1651647082184.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651647082184.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651647082184.png) (**PDF** button) and [![image-1651647094292.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651647094292.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651647094292.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **6.52.4 Filter a Pipe Inspection Check List**

If you want to filter any pipe inspection check list, you can use [![image-1651647198790.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651647198790.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651647198790.png) (**FILTER** button) in the **Pipe Inspection Check List** page. To know how to filter, see the topic, “**[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)**”.

#### **6.52.5 Print a Pipe Inspection Check List**

If you want to print a pipe Inspection check list, click[![image-1651647888162.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651647888162.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651647888162.png)(print icon) provided in the **Print** column of the **Pipe Inspection Check List** page. See Fig 6.52.


### **6.53 Warning Letter**

The **Warning Letter Report** tab in the **Piping** menu helps you to add a warning letter that addresses the performance issue of a worker. The warning letter explains about the mistakes done by the worker. If you want to add a warning letter against any worker, do the following,

1. Click **Warning Letter** in the **Piping** menu. The **Warning Letter Report** page opens.
    
    [![image-1651647958957.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651647958957.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651647958957.png)
    
     **Figure 6.53: Warning Letter Report page**

#### **6.53.1 Add a Warning Letter Report**

If you want to add a warning letter report,

1. Click [![image-1651648021092.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651648021092.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651648021092.png) (**ADD** button) in the **Warning Letter Report**  See Fig 6.53. A new window opens to add a warning letter report.
    
    [![image-1651648052345.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651648052345.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651648052345.png)
    
    [![image-1651648063981.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651648063981.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651648063981.png)**Tip**: A report number for a new warning letter report will be updated automatically in the **Report Number** box.
2. In the ****Prepared By**** box, enter the name a person who has prepared the warning letter report.
3. In the **Prepared Date** box, enter the prepared date of the warning letter report.
4. In the **Reviewed By** box, enter the name a person who has reviewed the warning letter report.
5. In the **Reviewed Date** box, enter the reviewed date of the warning letter report.
6. In the **Approved By** box, enter the name a person who has approved the warning letter report.
7. In the **Approved Date** box, enter the approved date of the warning letter report.
8. Click **Save**.

The warning letter report is successfully added. Once you have added the warning letter report, you must add the warning letter details.

#### **6.53.2 Add Warning Letter Details** 

1. Click [![image-1651648227693.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651648227693.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651648227693.png)(Edit icon) in the **Edit Report** column of the **Warning Letter Report** page. See Fig 6.53. The **Warning Letter Details** window opens including a default warning letter template.
    
    [![image-1651648256254.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651648256254.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651648256254.png)
2. In the **Date** box, select the date of issuing the warning letter.
3. In the **From** box, enter the name of a person who issues the warning letter.
4. In the **To** box, enter the name of a person who receives the warning letter.
5. In the **Attention** box, enter the relevant detail.
6. In the **Subject** box, enter the subject of this warning letter.
7. In the **Remarks** box, enter your remarks if any.
8. In the **Content** box, if you want to change any information given in the template, you can change.
9. Click **Save Details**.

#### **6.53.3 Print a Warning Letter Report**

If you want to print a warning letter report, click [![image-1651648375313.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651648375313.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651648375313.png) (print icon) provided in the **Report** column of the **Warning Letter Report** page. See Fig 6.53.

[![image-1651648393478.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651648393478.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651648393478.png)**Tip**: If you want to lock any warning letter report, click the check box provided in the **Lock Report?** column of the **Warning Letter Report** page. See Fig 6.53.

#### **6.53.4 Attach a File into a Warning Letter Report**

If you want to attach any file with any warning letter report listed in the **Warning Letter Report** page. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

### **6.54 Welder Performance Summary**

The **Welder Performance Summary** tab in the **Piping** menu used to add welder performance record. To add the welder performance record,

1. Click **Welder Performance Summary** in the **Piping** menu. The **Welder Performance Record** page opens.
    
    [![image-1651648500690.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651648500690.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651648500690.png)
    
     **Figure 6.54: Welder Performance Record page**

#### **6.54.1 Add a Welder Performance Record**

1. Click [![image-1651648581903.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651648581903.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651648581903.png) (**ADD** button) in the **Welder Performance Record** See Fig 6.54. A new window opens to add a welder performance record.
    
    [![image-1651648598586.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651648598586.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651648598586.png)
    
    [![image-1651648608913.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651648608913.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651648608913.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **Start Date** and **End Date** boxes, select the start and end dates.
3. In the **Prepared By** box, enter the name a person who has prepared the welder performance record.
4. In the **Prepared Date** box, enter the prepared date of the welder performance record.
5. In the **Reviewed By** box, enter the name a person who has reviewed the welder performance record.
6. In the **Reviewed Date** box, enter the reviewed date of the welder performance record.
7. In the **Approved By** box, enter the name a person who has approved the welder performance record.
8. In the **Approved Date** box, enter the approved date of the welder performance record.
9. Click **Save**.

The welder performance record is successfully added.

#### **6.54.2 Edit a Welder Performance Record**

 If you want to edit any existing welder performance record in the **Welder Performance Record** page, do the following steps,

1. Click [![image-1651648730805.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651648730805.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651648730805.png) (Edit icon) in the **Edit** column for the respective welder performance record. See Fig 6.54. A new window opens with the added details of the welder performance record.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.54.3 Export a Welder Performance Record**

You can export a list of welder performance records added in the **Welder Performance Record** page in the pdf and excel formats by using [![image-1651648819810.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651648819810.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651648819810.png) (**PDF** button) and [![image-1651648833418.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651648833418.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651648833418.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **6.54.4 Filter a Welder Performance Record**

If you want to filter any welder performance record, you can use [![image-1651648960846.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651648960846.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651648960846.png) (**FILTER** button) in the **Welder Performance Record** page. To know how to filter, see the topic, “**[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)**”.

#### **6.54.5 Print a Welder Performance Record**

If you want to print a welder performance record, click [![image-1651648948027.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651648948027.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651648948027.png) (print icon) provided in the **Print** column of the **Welder Performance Record** page. See Fig 6.54.

#### **6.54.5 Attach a File into a Welder Performance Record**

If you want to attach a file with any existing welder performance record listed in the **Welder Performance Record** page, you can attach the file by using (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

### **6.55 Weld Repair Log Report**

Weld Repair Log Report shows the weld repair log details. If you want to view a weld repair log report, do the following steps,

1. Click **Weld Repair Log Report** in the **Piping** menu.
    
    The **Weld Repair Log Report** page opens.
    
    [![image-1651649042002.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651649042002.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651649042002.png)
    
     **Figure 6.55: Weld Repair Log Report page**

#### **6.55.1 Print a Weld Repair Log Report**

If you want to print a weld repair log report, use [![image-1651649142665.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651649142665.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651649142665.png) and [![image-1651649161776.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651649161776.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651649161776.png) (print icons) provided in the **Weld Repair Log Report** page. See Fig 6.55.

1. If you want to print the current page of the weld repair log report, click [![image-1651649126422.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651649126422.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651649126422.png) (print icon including the page number).
2. If you want to print all the pages of the weld repair log report, click [![image-1651649182964.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651649182964.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651649182964.png)(print icon).

#### **6.55.2 Export a Weld Repair Log Report**

You can export the weld repair log report in various formats by using the option provided in the upper right corner of the **Weld Repair Log Report** page.

### **6.56 AFI Report Status**

The **AFI Report** **Status** tab in the **Piping** menu shows the AFI report status.

1. Click **AFI Report** **Status** in the **Piping** menu. The **AFI Report** **Status** page opens.
    
    [![image-1651748426324.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651748426324.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651748426324.png)
    
     **Figure 6.56: AFI Report Status page**
2. In the **Project** box, select a project from a drop-down list.
3. In the **Category** box, select a category from a drop-down list.
4. In the **From Date** and **To Date** boxes, select the from and to dates in respectively.
5. Click **Show Report**.

The AFI report status will be displayed.

#### **6.56.1 Print an AFI Report Status**

If you want to print an AFI report status, use [![image-1651748531942.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651748531942.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651748531942.png) and [![image-1651748545338.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651748545338.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651748545338.png) (print icons) provided in the **AFI Report** **Status** page. See Fig 6.56.

1. If you want to print the current page of the AFI report status, click [![image-1651748585464.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651748585464.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651748585464.png) (print icon including the page number).
2. If you want to print all the pages of the AFI report status, click [![image-1651748602784.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651748602784.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651748602784.png) (print icon).

#### **6.56.2 Export an AFI Report Status**

You can export the AFI report status in various formats by using the option provided in the upper right corner of the **AFI Report** **Status** page.

### **6.57 Status by ISO for NDT Requirement**

The **Status by ISO for NDT Requirement** tab in the **Piping** menu used to view the ISO status for NDT requirement.

1. Click **Status by ISO for NDT Requirement** in the **Piping** menu. The page shows the status by ISO for NDT requirement.
    
    [![image-1651748698757.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651748698757.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651748698757.png)
    
     **Figure 6.57: Status by ISO for NDT Requirement page**

#### **6.57.1 Export Status by ISO for NDT Requirement**

You can export the status in the **Status by ISO for NDT Requirement** page in the pdf and excel formats by using (**PDF** button) and (**Excel** button). To know how to export, see the topic, **“**[<u>**Export P&amp;ID list**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.**

### **6.58 Piping Widget**

The **Piping Widget** tab in the **Piping** menu used to view overall summary of the piping NDT, NDT number of joint status, and overall welder rejected status.

[![image-1651748853334.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651748853334.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651748853334.png)

### **6.59 Welder Not Welded List**

The **Welder Not Welded List** tab in the **Piping** menu used to view the list of welders who has not performing the welding work for more than 15 days. If you want to view the welder list,

1. Click **Welder Not Welded List** in the **Piping** menu. The **Welder Recently Not Welded List** page shows a list of welders including their NRIC and welder numbers, last weld date, and no of days not performing welding.
    
    [![image-1651748920812.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651748920812.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651748920812.png)
    
     **Figure 6.59: Welder Recently Not Welded List page**

#### **6.59.1 Export Welder Not Welded List**

You can export the welder list in the **Welder Recently Not Welded List** page in the pdf and excel formats by using [![image-1651748992439.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651748992439.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651748992439.png)(**PDF** button) and (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

### **6.60 Daily Piping Production Log Report**

The **Daily Piping Production Log** **Report** tab in the **Piping** menu used to view the production details in the piping project on a daily basis. If you want to view the production log report,

1. Click **Daily Piping Production Log Report** in the **Piping** menu. The **Daily Piping Production Log** **Report** page shows production details in the piping project on a daily basis.
    
    [![image-1651749109366.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651749109366.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651749109366.png)
    
     **Figure 6.60: Daily Piping Production Log** **Report page**

#### **6.60.1 Print a Daily Piping Production Log Report**

If you want to print a daily piping production log report, use [![image-1651749213979.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651749213979.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651749213979.png) and [![image-1651749228663.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651749228663.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651749228663.png) (print icons) provided in the **Daily Piping Production Log** **Report** page. See Fig 6.60.

1. If you want to print the current page of the daily piping production log report, click [![image-1651749296303.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651749296303.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651749296303.png) (print icon including the page number).
2. If you want to print all the pages of the daily piping production log report, click [![image-1651749309040.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651749309040.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651749309040.png)(print icon).

#### **6.60.2 Export a Daily Piping Production Log Report**

You can export the daily piping production log report in various formats by using the option [![image-1651749373282.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651749373282.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651749373282.png) provided in the upper right corner of the **Daily Piping Production Log** **Report** page.

### **6.61 RFI Log Report**

### **6.62 NDT Log Report**

The **NDT Log** **Report** tab in the **Piping** menu used to view the NDT log report. If you want to view the NDT log report,

1. Click **NDT Log** **Report** in the **Piping** menu. The **NDT Log** **Report** page shows NDT log report.
2. In the **From Date** and **To Date** boxes, select the from and to dates.
3. Click **Load Report**.
    
    [![image-1651749488485.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651749488485.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651749488485.png)
    
     **Figure 6.62: NDT Log** **Report page**

#### **6.62.1 Print an NDT Log Report**

If you want to print an NDT log report, use [![image-1651750158863.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651750158863.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651750158863.png) and [![image-1651750176142.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651750176142.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651750176142.png) (print icons) provided in the **NDT Log** **Report** page. See Fig 6.62.

1. If you want to print the current page of the NDT log report, click [![image-1651750143974.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651750143974.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651750143974.png) (print icon including the page number).
2. If you want to print all the pages of the NDT log report, click [![image-1651750208764.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651750208764.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651750208764.png)(print icon).

#### **6.62.2 Export an NDT Log Report**

You can export the NDT log report in various formats by using the option [![image-1651750421993.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651750421993.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651750421993.png) provided in the upper right corner of the **NDT Log** **Report** page.

### **6.63 DB Summary Report**

The **DB Summary** **Report** tab in the **Piping** menu used to view the DB summary report. If you want to view the DB summary report,

1. Click **DB Summary Report** in the **Piping** menu. The **Total Piping DB Summary** page shows the DB summary report.
    
    [![image-1651750679864.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651750679864.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651750679864.png)
    
     **Figure 6.63: Total Piping DB Summary page**

#### **6.63.1 Print a DB Summary Report**

If you want to print a DB summary report, use [![image-1651750817968.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651750817968.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651750817968.png) and [![image-1651750873767.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651750873767.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651750873767.png) (print icons) provided in the **Total Piping DB Summary** page. See Fig 6.63.

1. If you want to print the current page of the DB summary report, click [![image-1651750895970.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651750895970.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651750895970.png) (print icon including the page number).
2. If you want to print all the pages of the DB summary report, click [![image-1651750923965.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651750923965.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651750923965.png) (print icon).

#### **6.63.2 Export a DB Summary Report**

You can export the DB summary report in various formats by using the option [![image-1651750964295.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651750964295.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651750964295.png) provided in the upper right corner of the **Total Piping DB Summary** page.

### **6.64 Weld Repair Report**

Weld Repair Report shows the weld repair details. If you want to view a weld repair report, do the following steps,

1. Click **Weld Repair Report** in the **Piping** menu.
    
    The **Weld Repair Report** page opens.
2. In the **Repair No** box, select the repair number.
3. In the ****ISO/Drawing Number**** box, select the ISO drawing number.
4. Click **Go**.
    
    The weld repair details open for the selected repair number.
    
    [![image-1651751146401.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651751146401.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651751146401.png)
    
     **Figure 6.64: Weld Repair Report page**

#### **6.64.1 Print a Weld Repair Report**

If you want to print a weld repair report, use [![image-1651751272809.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651751272809.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651751272809.png) and [![image-1651751530812.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651751530812.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651751530812.png) (print icons) provided in the **Weld Repair Report** page. See Fig 6.64.

1. If you want to print the current page of the weld repair report, click [![image-1651751510267.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651751510267.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651751510267.png) (print icon including the page number).
2. If you want to print all the pages of the weld repair report, click [![image-1651751567555.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651751567555.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651751567555.png)(print icon).

#### **6.64.2 Export a Weld Repair Report**

You can export the weld repair report in various formats by using the option [![image-1651751629536.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651751629536.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651751629536.png) provided in the upper right corner of the **Weld Repair Report** page.

### **6.65 Pending NDT Log Report**

Pending NDT Log Report shows the pending NDT log details. If you want to view the pending NDT log report, do the following steps,

1. Click **Pending NDT Log Report** in the **Piping** menu. The **Pending NDT Log** page opens.
2. In the **ISO/Drawing Number** box, select the ISO drawing number.
3. Click **Show Report**.
    
    The pending NDT log details open for the selected ISO drawing number.
    
    [![image-1651764468233.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651764468233.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651764468233.png)
    
     **Figure 6.65: Pending NDT Log page**

#### **6.65.1 Print a Pending NDT Log Report**

If you want to print a pending NDT log report, use [![image-1651764552316.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651764552316.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651764552316.png) and [![image-1651764568047.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651764568047.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651764568047.png) (print icons) provided in the **Pending NDT Log** page. See Fig 6.65.

1. If you want to print the current page of the pending NDT log report, click [![image-1651764598993.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651764598993.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651764598993.png) (print icon including the page number).
2. If you want to print all the pages of the pending NDT log report, click [![image-1651764620957.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651764620957.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651764620957.png) (print icon).

#### **6.65.2 Export a Pending NDT Log Report**

You can export the pending NDT log report in various formats by using the option [![image-1651764853813.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651764853813.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651764853813.png) provided in the upper right corner of the **Pending NDT Log** page.


### **6.66 RT Films Status Report**

The **RT Film Status Report** tab in the **Piping** menu used to view the RT film status. If you want to view the RT film status report,

1. Click **RT Film Status Report** in the **Piping** menu. The **RT Film Report** page shows the RT film status.
    
    [![image-1651764909212.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651764909212.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651764909212.png)
    
     **Figure 6.66: RT Film Status Report page**

#### **6.66.1 Print an RT Film Status Report**

If you want to print an RT film status report, use [![image-1651764981716.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651764981716.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651764981716.png) and [![image-1651764996485.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651764996485.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651764996485.png) (print icons) provided in the **RT Film Status Report** page. See Fig 6.66.

1. If you want to print the current page of the RT film status report, click [![image-1651765015334.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651765015334.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651765015334.png) (print icon including the page number).
2. If you want to print all the pages of the RT film status report, click [![image-1651765033658.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651765033658.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651765033658.png)(print icon).

#### **6.66.2 Export an RT Film Status Report**

You can export the RT film status report in various formats by using the option [![image-1651765119038.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651765119038.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651765119038.png) provided in the upper right corner of the **RT Film Status Report** page.

# Test Pack (ISO)

## **7.1 Test Pack (ISO)**

The **Test Pack (ISO)** tab in the **Test Pack** menu helps you to add a test back (ISO). To navigate to the test pack adding page,

1. Click **Test Pack (ISO)** in the **Test Pack** menu. The **Test Pack** page opens. [![image-1651543354232.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651543354232.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651543354232.png)
    
     **Figure 7.1: Test Pack (ISO) page**

#### **7.1.1 Add a Test Pack**

If you want to add a test pack, do the following steps,

1. Click [![image-1651543543330.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651543543330.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651543543330.png) (**ADD** button) in the **Test Pack** page. See Fig 7.1.
    
    The page opens a new window to add the details of a test pack.
    
    [![image-1651543565541.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651543565541.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651543565541.png)
    
    [![image-1651543577053.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651543577053.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651543577053.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651543595388.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651543595388.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651543595388.png)**Tip**: A report number for a new test pack will be updated automatically in the **Report Number** box. If you want to change the report number, you can change.
2. In the **System** box, select a system from a drop-down list.
3. In the **Name** box, enter the name of the test pack.
4. In the **Sub System** box, select a sub system from a drop-down list.
5. In the **Type of Test** box, enter the type of test.
6. In the **Test Medium** box, enter the name of a test medium.
7. In the **Test Pressure** box, enter the test pressure value.
8. In the **Test Area** box, enter the name of a test area.
9. In the **Hot Oil Flush** box, enter the detail of hot oil flush.
10. In the **Chem. Clean** box, enter the detail of chemical cleaning.
11. In the **Test Duration (Hours)** box, enter the duration of test.
12. Click **Save**.
    
    The test pack is successfully added and listed in the **Test Pack** page. Once you have added a test pack, you can manage the checklist of MCR and map ISO drawings/spool for the added test pack.

#### **7.1.2 Manage a Checklist**

If you want to manage the checklist of test pack,

1. Click (Add icon) in the **Manage Checklist** See Fig 7.1. The page redirects you to the **Checklist Name** page.
    
    [![image-1651543710003.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651543710003.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651543710003.png)
2. Click [![image-1651543727678.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651543727678.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651543727678.png) (**ADD** button) in the **Checklist Name** page.
    
    The page opens a new window to add the details of the checklist.
    
    [![image-1651543745781.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651543745781.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651543745781.png)
3. In the **Checklist** box, enter the checklist name.
4. In the **Status** box, select the status of the checklist.
5. In the **Completed by** box, enter the name of a person who has completed checklist.
6. In the **Completed Date** box, select the completed date of the checklist.
7. Click **Save**.
    
    The added checklist will be listed in the **Checklist Name** page.
8. If you want to manage the added checklist, click (Add icon) in the ****Manage Checklist**** column of the ****Checklist Name**** page. The **MCR Checklist** page opens for the selected checklist.
    
    [![image-1651543808517.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651543808517.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651543808517.png)
9. In the Description box, enter the description for the checklist you want to add.
10. In the Type box, select the checklist type and click [![image-1651543831025.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651543831025.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651543831025.png). The added checklist will be listed in the **MCR Checklist** window.
    
    [![image-1651543851553.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651543851553.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651543851553.png)
11. If you want to add the checklists from a template, in the ****Template**** box, select the template from a drop-down list and click [![image-1651543872691.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651543872691.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651543872691.png). The checklists in the template will be listed in the **MCR Checklist** window.
12. In the **Remarks** box, enter your remarks.
13. Click [![image-1651543897241.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651543897241.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651543897241.png).

#### **7.1.3 Map ISO**

If you want to map ISO drawings/ spool for the added test pack, do the following steps,

1. Click [![image-1651543951214.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651543951214.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651543951214.png)(Add icon) in the Map ISO column of the respective test pack. The **Map Drawings/Spool** window opens.
    
    [![image-1651543968426.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651543968426.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651543968426.png)
2. Click [![image-1651543986339.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651543986339.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651543986339.png) (**ADD** button) in the **Map Drawings/Spool** window. The window shows a list of drawing and their spools.
    
    [![image-1651544002519.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544002519.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544002519.png)
3. Do one of the following steps to add spools, 
    1. 1. If you want to add a spool, click[![image-1651544024461.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544024461.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544024461.png)(Add icon) provided in the **Add** column.
            
            The added spools will be moved to right side of the window.
        2. If you want to add all spools in the drawing, click[![image-1651544093925.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544093925.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544093925.png) (Add icon) provided in the ******Drawing Number****** column. The added spools will be moved to right side of the window.
4. Click **Save**.
    
    The added spools will be listed in the in the **Map Drawings/Spool** window.
    
    
    1. 1. If you want to view a weld inspection summary report, click [![image-1651544156692.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544156692.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544156692.png) (print icon) provided in the **Welding Summary** column.
        2. If you want to view a visual welding report, click [![image-1651544174998.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544174998.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544174998.png)(print icon) provided in the **Visual Welding Report** column.

#### **7.1.4 Edit a Test Pack**

If you want to edit any added test pack in the **Test Pack** page,

1. Click [![image-1651544227928.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544227928.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544227928.png) (Edit icon) of the respective test pack. See Fig 7.1. The **Test Pack** page shows the details of the selected test pack.
2. Edit the details where you want.
3. Click **Save**.

#### **7.1.5 Delete a Test Pack**

If you want to delete any existing test pack in the **Test Pack** page, you can use [![image-1651544304884.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544304884.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544304884.png) (Delete icon) provided in the **Test Pack** page. To know how to delete, see the topic, **“**[<u>**Delete** **P&amp;ID**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

#### **7.1.6 View a Test Pack Spool List Report**

If you want to view a test pack spool list report, click [![image-1651544333949.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544333949.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544333949.png) (print icon) provided in the **Spool** column.

#### **7.1.7 View a Drawing List Report**

If you want to view a drawing list report, click[![image-1651544367459.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544367459.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544367459.png)(print icon) provided in the **Drawing** column.

#### **7.1.8 View a Cover Page of Test Pack**

If you want to view a cover page of test pack, click [![image-1651544405303.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544405303.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544405303.png)(print icon) provided in the **Cover Page** column.

#### **7.1.9 View a Test Pack Report**

If you want to view a test pack report, click [![image-1651544435366.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544435366.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544435366.png)(print icon) provided in the **Test Pack** column.

#### **7.1.10 Export Test Pack list**

You can export a list of test packs added in the **Test Pack** page in both the pdf and excel formats by using [![image-1651544467667.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544467667.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544467667.png)(**PDF** button) and [![image-1651544475915.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544475915.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544475915.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

### **7.2 Test Pack (Spool)**

The **Test Pack (Spool)** tab in the **Test Pack** menu helps you to add a test back (Spool). To navigate to the test pack adding page,

1. Click **Test Pack (Spool)** in the **Test Pack** menu. The **Test Pack** page opens.
    
    [![image-1651544528920.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544528920.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544528920.png)
    
     **Figure 7.2: Test Pack page**

#### **7.2.1 Add a Test Pack**

If you want to add a test pack, do the following steps,

1. Click [![image-1651544580391.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544580391.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544580391.png) (**ADD** button) in the **Test Pack**  See Fig 7.2. The page opens a new window to add the details of a test pack.
    
    [![image-1651544599891.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544599891.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544599891.png)
    
    [![image-1651544614011.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544614011.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544614011.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651544626835.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544626835.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544626835.png)**Tip**: A report number for a new test pack will be updated automatically in the **Report Number** box. If you want to change the report number, you can change.
2. In the **System Name** box, select a system from a drop-down list.
3. In the **Name** box, enter the name of the test pack.
4. In the **Sub System** **Name** box, select a sub system from a drop-down list.
5. In the **Type of Test** box, enter the type of test.
6. In the **Templates** box, select a template from a drop-down list.
7. In the **Remarks** box, enter your remarks if any.
8. In the **Test Medium** box, enter the name of a test medium.
9. In the **Test Pressure** box, enter the test pressure value.
10. In the **Test Area** box, enter the name of a test area.
11. In the **Hot Oil Flush** box, enter the detail of hot oil flush.
12. In the **Chem. Clean** box, enter the detail of chemical cleaning.
13. In the **Test Duration (Hours)** box, enter the duration of test.
14. In the **Prepared By** box, enter the name of a person who has prepared the test pack.
15. In the **Test Pack Status** box, enter the status of the test pack.
16. Click **Save**.
    
    The test pack is successfully added and listed in the **Test Pack** page. Once you have added a test pack, you can manage the checklist and assign spools and components for the added test pack.
    
    [![image-1651544726989.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544726989.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544726989.png)**Note**: If you want to perform the above tasks, click [![image-1651544741313.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544741313.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544741313.png)(Add icon) in the **Assign Spool/ Components** column of the respective test pack.
    
    The page shows the **Manage Checklist**, **Assign Spool**, and **Assign Component** options.
    
    [![image-1651544756068.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544756068.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544756068.png)

#### **7.2.2 Manage a Checklist**

If you want to manage the test pack checklist, Click the **Manage Checklist** option.

The **Test Pack Checklist** window opens.

[![image-1651544795099.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544795099.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544795099.png)

If you want to edit any checklist, you can edit the checklist.

#### **7.2.3 Assign a Spool**

If you want to assign spool for the added test pack, do the following steps,

1. Select the **Assign Spool** option. The **Assign** **Spool** window opens.
    
    [![image-1651544837324.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544837324.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544837324.png)
2. Click [![image-1651544853964.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544853964.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544853964.png) (**ADD** button) in the **Assign Spool** window.
    
    The window shows a list of spools.
    
    [![image-1651544870561.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544870561.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544870561.png)
3. If you want to add a spool, click [![image-1651544887244.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544887244.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544887244.png) (Add icon) provided in the ****Add**** column.
4. Click **Save**.
    
    The added spools will be listed in the in the **Assign Spool** window.

#### **7.2.4 Assign a Component**

If you want to assign a component, click the **Assign Component** option.

The **Assign Component** window opens.

[![image-1651544945174.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544945174.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544945174.png)

#### **7.2.5 Add Test Pack Result**

After completing the spool test for the added test pack request, you can add the result details. To add results, do the following steps,

1. Click [![image-1651544980036.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544980036.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544980036.png)(Add icon) in the **Result** column of the **Test Pack**  See Fig 7.2. The **Test Package** window opens.
    
    [![image-1651544995255.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544995255.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544995255.png)
    
    [![image-1651545001001.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545001001.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545001001.png)
    
    The **Test Package** window contains the following options: **Index**, **Pre-Pressure Checklist**, **Pressure Test**, **Final Review**, **Flushing Test, Content, Work instruction, Pre-Checklist, Punch List, Weld Inspection, Hydro Test Report, Flushing Check, BP Test, Instrument List,** and **Post Checklist**.

##### **Index**

If you want to add index for the test pack,

1. Click **Index** option. The **Index** window opens with a list of contents.
    
    [![image-1651545049095.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545049095.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545049095.png)
2. Select the contents which you want to add in the Index.

##### **Pre-Pressure Checklist**

If you want to add pre-pressure checklist for the test pack,

1. Click **Pre-Pressure Checklist** option. The **Pre-Pressure Checklist** window opens with a list of checklists.
    
    [![image-1651545087165.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545087165.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545087165.png)
2. Select the checklists which you want to add.
    
    
    1. 1. If you want to add the checklist, select the checkbox in the **Yes** column for the respect checklist.
        2. If the checklist is not applicable, select the checkbox in the ****N/A**** column.
        3. If you do not want to any checklist, select the checkbox in the ****No**** column for the respect checklist.

##### **Pressure Test**

If you want to add pressure test results,

1. Click **Pressure Test** option. The **Pressure Test** window opens with the following boxes: **ISO List**, **Test Description**, and **Test Equipment**.
    
    [![image-1651545163781.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545163781.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545163781.png)
2. In the **Test Description** box, click [![image-1651545180020.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545180020.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545180020.png) (**ADD** button).
    
    The **Test Method** box opens.
    
    
    1. 1. In the **Design Pressure** box, enter the design pressure value.
        2. In the **Required Test Pressure** box, enter the required test pressure value.
        3. In the **Actual Test Pressure** box, enter the actual test pressure value.
        4. In the **Holding Time** box, enter the holding time range.
        5. In the **Start Time** box, enter the start time of the pressure test.
        6. In the **End Time** box, enter the end time of the pressure test.
        7. In the **Test Medium** box, enter the test medium name.
        8. In the ****Metal Temperature**** box, enter the metal temperature value.
        9. Click **Save**.
3. In the ****Result**** field, select the result of the pressure test whether ****Acceptable**** or ****Not Acceptable****.
4. Click **Save**.

##### **Final Review**

If you want to view the final review of the test pack,

1. Click **Final Review** option. The **Final Review** window opens with the final review report.
    
    [![image-1651545291024.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545291024.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545291024.png)
2. If you want to view the final review report, click [![image-1651545317403.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545317403.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545317403.png)(print icon).

##### **Flushing Test**

If you want to add flushing test results,

1. Click **Flushing Test** option. The **Flushing Test** window opens with the following boxes: **Test Description (Pipe Spool), Test Description**, and **Test Equipment**.
    
    [![image-1651545380776.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545380776.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545380776.png)
2. In the **Test Description (Others)** box, click [![image-1651545397156.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545397156.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545397156.png) (**ADD** button).
    
    The **General Information** box opens.
    
    
    1. 1. In the **Installation Area** box, enter the installation area value.
        2. In the **Hydrotest Area** box, enter the hydrotest area value.
        3. In the **Start Time** box, enter the start time of the flushing test
        4. In the **Time** **Finished** box, enter the finished time of the flushing test.
        5. In the **Test Date** box, select the date of flushing test.
        6. In the **Test Medium** box, enter the test medium name.
        7. Click **Save.**
3. In the ****Test** **Result**** field, select the result of the pressure test whether ****Acceptable**** or ****Not Acceptable****.
4. Click **Save**.

##### **Content**

If you want to add content for the test pack,

1. Click **Content** option.
    
    The **Contents** window opens with a list of contents.
    
    [![image-1651545498658.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545498658.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545498658.png)
2. Select the contents which you want to add in the Content.

##### **Work Instruction Sheet**

If you want to add the work instruction,

1. Click **Work Instruction Sheet** option. The **Work Instruction Sheet** window opens.
    
    [![image-1651545539441.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545539441.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545539441.png)
2. In the **Schedule** field, enter the work schedule details.
3. In the **Design Condition** field, enter the design condition details.
4. In the **Test Condition** field, enter the test condition details.
5. In the **Judgement** field, enter the judgement details.
6. Click **Save**.

##### **Pre-Test Checklist**

If you want to add pre-test checklist for the test pack,

1. Click **Pre-Test Checklist** option. The **Pre-Test Checklist** window opens with a list of checklists.
    
    [![image-1651545597768.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545597768.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545597768.png)
2. Select the checklists which you want to add. 
    1. 1. If you want to add the checklist, select the checkbox in the ****Yes**** column for the respect checklist.
        2. If the checklist is not applicable, select the checkbox in the **N/A** column.
        3. If you do not want to any checklist, select the checkbox in the ****No**** column for the respect checklist.

##### **Welding Inspection Record**

If you want to view the welding inspection record,

1. Click **Welding Inspection Record** option.
    
    The **Welding Inspection Record** window shows the welding inspection record.
    
    [![image-1651545671140.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545671140.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545671140.png)

##### **Hydro Test Report**

If you want to add the hydro test report,

1. Click **Hydro Test Report** option. The **Hydrostatic Test Report** window shows a new window to add the hydrostatic test report details.
    
    [![image-1651545712404.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545712404.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545712404.png)
2. In the **Test Fluid** box, enter the test fluid name.
3. In the **Type of Test** box, enter the test type.
4. In the **Test Gauge Range** box, enter the test gauge range.
5. In the **Test Gauge No** box, enter the test gauge number.
6. In the **Duration** **Test Start** box, enter the test starting time.
7. In the **Duration** **Test Finish** box, enter the test finishing time.
8. In the **Date of Test** box, select the test date.
9. In the **Test Pressure** box, enter the test pressure value.
10. In the **Actual Pressure** box, enter the actual pressure value.
11. Click **Save**.

##### **Flushing Check List**

If you want to add the flushing check list,

1. Click **Flushing Check List** option. The **Flushing Check List** window shows a new window to add the flushing check list details.
    
    [![image-1651545808835.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545808835.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545808835.png)
2. In the **Flushing Circuit No** box, enter the flushing circuit number.
3. In the **Origin** box, enter the origin name.
4. In the **Termination** box, enter the termination detail.
5. In the **Remarks** box, enter your remarks if any.
6. Select the appropriate checklist.
7. Click **Save**.

##### **BP List**

If you want to add the BP list detail,

1. Click **BP List** option. The **BP List** window shows a new window to add the BP list details.
    
    [![image-1651545873388.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545873388.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545873388.png)
2. Click [![image-1651545892274.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545892274.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545892274.png) (**ADD** button) in the **BP List** window.
3. In the **Location** box, enter the location name.
4. In the **Control No** box, enter the control number.
5. In the **Size** box, enter the size vale.
6. In the **Thickness** box, enter the thickness value.
7. In the **Gasket** box, enter the gasket detail.
8. Click **Save**.

##### **Instrument List**

If you want to add the instrument list detail,

1. Click **Instrument List** option. The **Instrument List** window shows a new window to add the instrument list details.
    
    [![image-1651545955999.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545955999.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545955999.png)
2. Click [![image-1651545968812.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545968812.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545968812.png) (**ADD** button) in the **Instrument List** window.
3. In the **Location** box, enter the location name.
4. In the **Tag No** box, enter the tag number.
5. In the **P&amp;I No** box, enter the P&amp;I number.
6. In the **Size** box, enter the size vale.
7. In the **Gasket** box, enter the gasket detail.
8. In the **Remarks** box, enter your remarks if any.
9. Click **Save**.

##### **Post-Test Checklist**

If you want to add post-test checklist for the test pack,

1. Click **Post-Test Checklist** option. The **Post-Test Checklist** window opens with a list of checklists.
    
    [![image-1651546053227.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546053227.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546053227.png)
2. Select the checklists which you want to add. 
    1. 1. If you want to add the checklist, select the checkbox in the ****Yes**** column for the respect checklist.
        2. If the checklist is not applicable, select the checkbox in the **N/A** column.
        3. If you do not want to any checklist, select the checkbox in the ****No**** column for the respect checklist.


#### **7.2.6 Edit a Test Pack**

If you want to edit any added test pack in the **Test Pack** page,

1. Click [![image-1651546164159.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546164159.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546164159.png)(Edit icon) of the respective test pack. See Fig 7.2.
    
    The **Test Pack** page shows the details of the selected test pack.
2. Edit the details where you want.
3. Click **Save**.

#### **7.2.7 Delete a Test Pack**

If you want to delete any existing test pack in the **Test Pack** page, you can use [![image-1651546226610.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546226610.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546226610.png) (Delete icon) provided in the **Test Pack** page. To know how to delete, see the topic, “[<u>**Delete P&amp;ID**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

#### **7.2.8 View a Test Pack MDR Report**

If you want to view a test pack MDR report, click [![image-1651546273073.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546273073.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546273073.png)(print icon) provided in the **Assign Spool/Components** column.

#### **7.2.9 Attach a File into a Test Pack**

If you want to attach any file with any test pack listed in the **Test Pack** page, you can attach the file by using (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **7.2.10 Export Test Pack list**

You can export a list of test packs added in the **Test Pack** page in both the pdf and excel formats by using [![image-1651546334034.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546334034.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546334034.png) (**PDF** button) and [![image-1651546341921.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546341921.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546341921.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **7.2.11 Filter a Test Pack**

If you want to filter any specific test pack in the **Test Pack** page, you can use [![image-1651546374497.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546374497.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546374497.png) (**FILTER** button) located on the **Test Pack** page. To know how to filter, see the topic, “**[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)**”.

#### **7.2.12 Import Multiple Test Packs**

If you want to import multiple test packs together, do the following,

1. Click [![image-1651546418940.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546418940.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546418940.png) (**TEMPLATE** button). See Fig 7.2. An excel worksheet will be downloaded with a predefined template to enter the details of systems.
    
    [![image-1651546438111.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546438111.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546438111.png)
2. Enter the required test pack details in the respective columns of the excel worksheet.
3. Once you have added the test pack details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651546461777.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546461777.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546461777.png) (**IMPORT** button). See Fig 7.2.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651546480404.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546480404.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546480404.png)
5. Click [![image-1651546491813.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546491813.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546491813.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651546518022.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546518022.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546518022.png) (**Upload** button) to export the test pack details that are included in the excel worksheet.

The details of the test packs in the worksheet will be displayed in the **Test Pack** page.

#### **7.2.13 View a Test Pack Summary Report**

If you want to view a test pack summary report, click (**Summary Report** icon) provided in the **Test Pack** page.

[![image-1651546673870.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546673870.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546673870.png)


### **7.3 Test Pack Checklist**

The **Test Pack Checklist** tab in the **Test Pack** menu helps you add the checklist items for the specific test pack. To add the checklist,

1. Click **Test Pack Checklist** in the **Test Pack** menu. The **MCR Checklist** page opens.
    
    [![image-1651546715359.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546715359.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546715359.png)
2. In the **Test Pack Name** box, select the test pack name from a drop-down list.
3. In the **Checklist Name** box, select a checklist from a drop-down list.
    
    The **Checklist Items** and **MCR Checklist** windows open.
    
    [![image-1651546760538.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546760538.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546760538.png)
4. In the Description box, enter the description for the checklist you want to add.
5. In the Type box, select the checklist type and click [![image-1651546780027.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546780027.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546780027.png).
    
    The added checklist will be listed in the **MCR Checklist** window.
    
    [![image-1651546802461.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546802461.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546802461.png)
6. If you want to add the checklists from a template, in the ****Template**** box, select the template from a drop-down list and click [![image-1651546817649.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546817649.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546817649.png). The checklists in the template will be listed in the **MCR Checklist** window.
7. In the **Remarks** box, enter your remarks.
8. Click [![image-1651546851304.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546851304.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546851304.png).



### **7.4 MCR Checklist Template**

The **MCR Checklist Template** tab in the **Test Pack** menu helps you to add MC/SC – Check Record (CR)/Check Sheet (CS) templates. To navigate to the templates adding page,

1. Click **MCR Checklist Template** in the **Test Pack** menu.
    
    The **MC/SC – CR/CS Templates** page opens.
    
    [![image-1651547076013.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547076013.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547076013.png)
    
     **Figure 7.4: MC/SC – CR/CS Templates page**

#### **7.4.1 Add a CR/CS Template**

If you want to add a CR/CS template,

1. Click [![image-1651547133354.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547133354.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547133354.png) (**ADD** button) in the **MC/SC – CR/CS Templates** page. See Fig 7.4.
    
    The page opens a new window to add the details of a test pack.
    
    [![image-1651547150827.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547150827.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547150827.png)
    
    [![image-1651547155894.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547155894.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547155894.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.
2. In the ****CR/CS Name**** box, enter the name for CR/CS.
3. In the ****Template Type**** box, select a template whether CR or CS.
4. In the **Description** box, enter the description for CR/CS.
5. Click **Save**.
    
    The template is successfully added and listed in the **MC/SC – CR/CS Templates** page. Once you have added the template details, you must import the respective template.

#### **7.4.2 Import a CR/CS Template**

If you want to import CR/CS template,

1. Click [![image-1651547260900.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547260900.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547260900.png)(Add icon) of the respective CR/CS name in the **MC/SC – CR/CS Templates** page. The **Check Records** window opens.
    
    [![image-1651547236749.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547236749.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547236749.png)
2. Click [![image-1651547248791.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547248791.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547248791.png) (**ADD** button) in the **Check Records** window.
    
    [![image-1651547276765.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547276765.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547276765.png)
3. In **Items** box, enter the details of items.
4. Browse and attach a CS/CR template you want to import.
5. Click **Save**.

#### **7.4.3 Edit a CR/CS Template**

If you want to edit any added CR/CS template in the **MC/SC – CR/CS Templates** page,

1. Click [![image-1651547336350.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547336350.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547336350.png)(Edit icon) of the respective CR/CS template. See Fig 7.4. The **MC/SC – CR/CS Templates** page shows the details of the selected CR/CS template.
2. Edit the details where you want.
3. Click **Save**.

#### **7.4.4 Delete a CR/CS Template**

If you want to delete any existing CR/CS template in the **MC/SC – CR/CS Templates** page, you can use [![image-1651547404028.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547404028.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547404028.png) (Delete icon) provided in the **MC/SC – CR/CS Templates** page. To know how to delete, see the topic, “[<u>**Delete P&amp;ID**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

#### **7.4.5 Export CR/CS Template list**

You can export a list of CR/CS templates added in the **MC/SC – CR/CS Templates** page in both the pdf and excel formats by using [![image-1651547446615.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547446615.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547446615.png) (**PDF** button) and [![image-1651547455236.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547455236.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547455236.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **7.4.6 Filter a CR/CS Template**

If you want to filter any specific CR/CS template in the **MC/SC – CR/CS Templates page, you can use [![image-1651547488133.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547488133.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547488133.png) (**FILTER** button) located on the **Test Pack** page. To know how to filter, see the topic, “[<u>**Filter P&amp;ID**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

#### **7.4.7 Import Multiple CR/CS Templates**

If you want to import multiple CR/CS templates together, do the following,

1. Click [![image-1651547526814.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547526814.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547526814.png) (**TEMPLATE** button). See Fig 7.4. An excel worksheet will be downloaded with a predefined template to enter the details of CR/CS templates.
    
    [![image-1651547550384.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547550384.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547550384.png)
2. Enter the required CR/CS template details in the respective columns of the excel worksheet.
3. Once you have added the CR/CS template details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651547573724.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547573724.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547573724.png) (****IMPORT**** button). See Fig 7.4. A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651547597892.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547597892.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547597892.png)
5. Click [![image-1651547607462.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547607462.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547607462.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651547629419.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547629419.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547629419.png) (**Upload** button) to export the CR/CS template details that are included in the excel worksheet.

The details of the CR/CS templates in the worksheet will be displayed in the **MC/SC – CR/CS Templates page.

### **7.5 Test Pack Contents**

The Test Pack Contents page used to view a list of reports of the documents included in the Test Pack. To view the test pack content’s report,

1. Click **Test Pack Contents** in the **Test Pack** menu. The **Test Pack Contents** page opens.
    
    [![image-1651547737967.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547737967.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547737967.png)
    
     **Figure 7.5: Test Pack Contents page**
2. In the **Test Pack Name** box, select a test pack from a drop-down list.
    
    The **Test Pack Contents** page shows a list of reports in the selected test pack.
    
    [![image-1651547775494.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547775494.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547775494.png)**Note**: If you want to view any specific report, click the respective (Print icon) in the **Print** column.

### **7.6 Joints Not in Any Test Pack Report**

The **Joints Not in Any Test Pack Report** tab in the **Test Pack** menu shows a list of joints not added in any test pack report. To view of the details of joints,

1. Click **Joints Not in Any Test Pack Report** in the **Test Pack** menu.
2. The **Joints Not in Any Test Pack Report** page opens with a list of joints, which are not added in any test pack report.
    
    [![image-1651547956061.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547956061.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547956061.png)


### **7.7 Overall Status** 

The **Overall Status** tab in the **Test Pack** menu helps you to view the overall status of NDT inspection, welding progress and piping. To view the overall status,

1. Click **Overall Status** in the **Test Pack** menu.
    
    The page shows the overall status.
    
    [![image-1651548098092.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651548098092.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651548098092.png)


### **7.8 Acid Pickling Certificate**

Pickling is a metal surface treatment used to remove impurities such as stains, inorganic contaminants, rust or scale from ferrous metals, copper, precious metals and aluminum alloys. A solution called pickle liquor, which usually contains acid, is used to remove the surface impurities.

The **Acid Pickling Certificate** tab in the **Test Pack** menu used to add the acid pickling certificate. To add the acid pickling certificate, do the following steps,

1. Click **Acid Pickling Certificate** in the **Test Pack** menu. The **View Acid Pickling Certificate** page opens.
    
    [![image-1651548179437.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651548179437.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651548179437.png)
    
     **Figure 7.8: View Acid Pickling Certificate page**

#### **7.8.1 Add an Acid Pickling Certificate**

If you want to add an acid pickling certificate, do the following steps,

1. Click [![image-1651548328208.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651548328208.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651548328208.png)(****ADD**** button) in the ****View Acid Pickling Certificate**** page. The **ACID PICKLING** page opens.
    
    [![image-1651548352396.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651548352396.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651548352396.png)
2. In the **Sub Contractor** box, select a sub-contractor from a drop-down list.
3. In the **Inspection Date &amp; Time** box, select the inspection date and time.
4. In the **Specification** box, enter the specification.
5. In the **Pickling Material** box, enter the name of the pickling material.
6. In the **System Material** box, select the system material.
7. In the **Procedure No** box, enter the procedure number.
8. If you use the chloride content of water for the acid pickling testing, select ****Yes**** in the ****Chloride Content of Water**** option otherwise select ****No****.
9. In the **Remarks** box, enter your remarks if any.
    
    Before saving the added acid pickling certificate, you must add joints for the acid pickling certificate.
    
    [![image-1651548413696.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651548413696.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651548413696.png)**Note**: You can add multiple joints for one acid pickling certificate.
    
    The **ACID PICKLING** page shows a list of joints for the corresponding line and drawing numbers including the spool number. If you want to add joints for the acid pickling certificate, do the following steps,
    
    [![image-1651548452133.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651548452133.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651548452133.png)
10. Click [![image-1651548467961.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651548467961.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651548467961.png)(Add icon) of the respective joints you want to add. The added joints will be moved and listed in the right side of the page.
    
    [![image-1651548483224.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651548483224.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651548483224.png)
11. Click **Save**.
    
    The acid pickling certificate will be added and listed in the **View Acid Pickling Certificate** page.

#### **7.8.2 Edit an Acid Pickling Certificate** 

If you want to edit any existing acid pickling certificate added in the **View Acid Picking Certificate page, do the following steps,

1. Click [![image-1651548538681.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651548538681.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651548538681.png)(Edit icon) in the ****Edit**** column for the respective acid pickling certificate. See Fig 10.8. The **ACID PICKLING** page opens with the details of the selected acid pickling certificate.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **7.8.3 Approve an Acid Pickling Certificate**

Once you have added the acid pickling certificate, the **Request Status** column in the **View Acid Pickling Certificate** page is appeared with[![image-1651548648350.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651548648350.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651548648350.png)(Approve and Reject icons).

1. If you want to approve the acid pickling certificate, click [![image-1651548669700.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651548669700.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651548669700.png)(Approve icon) in the **Request Status** column. Otherwise click [![image-1651548679681.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651548679681.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651548679681.png) (Reject icon) to reject the certificate.

#### **7.8.4 Add RFI Data for an Acid Pickling Certificate**

If you want to add the details of RFI data for the added acid pickling certificate, do the following steps,

1. Click [![image-1651548731406.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651548731406.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651548731406.png)(Edit icon) in the **RFI Data** column of the **View Acid Pickling Certificate**  See Fig 7.8. The **RFI Inspection Request List** window opens.
    
    [![image-1651548765056.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651548765056.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651548765056.png)
2. In the **Inspection From** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the ****Inspection Details**** option, select 1<sup>st</sup>Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the **Others** box, enter any other inspection related details.
6. In the **Refer to Report No** box, enter the report number for reference.
7. In the **RFI Date** box, choose the RFI date.
8. In the ****Inspection Result**** option, if the inspection result is accepted, select ****Accepted**** otherwise select ****Rejected****.
9. In the ****Remarks**** box, enter your remarks if any.
10. In the **Inspected by** box, enter the name of a person who has done inspection.
11. In the **Inspected Date** box, choose the date of inspection.
12. In the **Witnessed By** box, enter the name of the witnessed person.
13. In the **Witnessed Date** box, choose the date of witnessed.
14. In the **PCML Rep Name** box, enter the representative name of PCML.
15. In the **PCML Rep Date** box, choose the PCML rep date.
16. In the **MEB Rep Name** box, enter the representative name of MEB.
17. In the **MEB Rep Date box**, choose MEB rep date.
18. Click **Save**.

The RFI data for the acid pickling certificate is added successfully.

#### **7.8.5 View an RFI Report for Acid Pickling Certificate**

If you want to view an RFI report for the acid pickling certificate, click [![image-1651549018650.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651549018650.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651549018650.png) (print icon) provided in the **RFI Report** column of the **View Acid Pickling Certificate** page. See Fig 7.8.

#### **7.8.6 View an Acid Pickling Report**

If you want to view the acid pickling report, click [![image-1651549124084.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651549124084.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651549124084.png)(print icon) provided in the **Print** column of the **View Acid Pickling Certificate** page. See Fig 7.8.

#### **7.8.7 Add Result for Acid Pickling Test**

After completing the acid pickling test for the added request, you can add the result details. To add results, do the following steps,

1. Click [![image-1651549219239.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651549219239.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651549219239.png)(Edit icon) in the **RFI Data** column of the ****View Acid Pickling Certificate**** page. The Result window opens a list of systems added for the particular request.
    
    [![image-1651549260463.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651549260463.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651549260463.png)
2. In the **Result** column, select the result of each system from the given result options in the drop-down list.
3. In the **Remarks** column, enter your remarks if any.
4. Click **Save**.

#### **7.8.8 Attach a File into an Acid Pickling Certificate** 

If you want to attach a file with any acid pickling certificate listed in the **View** **Acid Pickling Certificate** page, you can attach the file by using [![image-1651549318288.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651549318288.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651549318288.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **7.8.9 Export Acid Pickling Certificate List**

You can export a list of acid pickling certificates added in the **View Acid Pickling Certificate** page in both the pdf and excel formats by using [![image-1651549363620.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651549363620.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651549363620.png) (**PDF** button) and [![image-1651549372379.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651549372379.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651549372379.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **7.8.10 Filter an Acid Pickling Certificate**

If you want to filter any specific acid pickling certificate in the **View Acid Pickling Certificate** page, you can use [![image-1651549409415.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651549409415.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651549409415.png)(**FILTER** button) located on the **View Acid Pickling Certificate** page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.



### **7.9 Valve Leak Test Record**

All valves are inspected and tested by the inspectors to ensure that they conform to the required valve leakage standards. Valve leakage is tested using either a hydrostatic test that is the test medium is a liquid, such as water or kerosene, or a pneumatic test that is the test medium is a gas, such as air or nitrogen.

The **Valve Leak Test Record** tab in the **Test Pack** menu used to add the valve leak test report. To add the valve leak test report, do the following steps,

1. Click **Valve Leak Test Record** in the **Test Pack** menu. The **Valve Leak Test** page opens.
    
    [![image-1651549479725.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651549479725.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651549479725.png)
    
     **Figure 7.9: Valve Leak Test page**

#### **7.9.1 Add a Valve Leak Test Report**

If you want to add a valve leak test report, do the following steps,

1. Click [![image-1651549542580.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651549542580.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651549542580.png) (**ADD** button) in the **Valve Leak Test** page. A new window opens to add the details of the valve leak test report.
    
    [![image-1651549562477.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651549562477.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651549562477.png)
    
    [![image-1651549570417.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651549570417.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651549570417.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651549585308.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651549585308.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651549585308.png)**Tip**: A report number for a new valve leak test report will be updated automatically in the **Report Number** box. If you want change the report number, you can change.
2. In the **Test Pack** box, select a test pack from a drop-down list.
3. In the **Specification** box, enter the specification.
4. In the ****Prepared By**** box, enter the name a person who has prepared the valve leak test report.
5. In the ****Prepared Date**** box, enter the prepared date of the valve leak test report.
6. In the ****Reviewed By**** box, enter the name a person who has reviewed the valve leak test report.
7. In the ****Reviewed Date**** box, enter the reviewed date of the valve leak test report.
8. In the **Approved By** box, enter the name a person who has approved the valve leak test report.
9. In the ****Approved Date**** box, enter the approved date of the valve leak test report.
10. Click **Save**.

The valve leak test report will be added and listed in the **Valve Leak Test** page.

#### **7.9.2 Edit a Valve Leak Test Report**

If you want to edit any existing valve leak test report added in the **Valve Leak Test page, do the following steps,

1. Click[ ![image-1651549840941.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651549840941.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651549840941.png) (Edit icon) in the **Edit** column for the respective valve leak test report. See Fig 7.9. The **Valve Leak Test page opens with the details of the selected valve leak test report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **7.9.3 Add Result for Valve Leak Test**

After completing the valve leak test, you can add the test result details. To add results, do the following steps,

1. Click [![image-1651549929056.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651549929056.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651549929056.png)(Edit icon) in the **Edit Report** column of the **Valve Leak Test** page. The Result window opens.
    
    [![image-1651549960391.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651549960391.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651549960391.png)
2. Click (**Add** button).
    
    [![image-1651549984582.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651549984582.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651549984582.png)
3. In the **Valve Type** box, enter the type of the valve.
4. In the **Location** box, enter the location of the valve.
5. In the **Size** box, enter the size of the valve.
6. In the **Rating** box, enter the rating of the valve.
7. In the **Tag Number** box, enter the tag number of the valve.
8. In the **Serial No** box, enter the serial number of the valve.
9. In the **Body Test (Hydro)** box, enter the detail of hydrostatic valve body test.
10. In the **Seat Test (Hydro)** box, enter the detail of the hydrostatic valve seat test.
11. In the **Body Test (Pneumatic)** box, enter the detail of pneumatic valve body test.
12. In the **Seat Test (Pneumatic)** box, enter the detail of the pneumatic valve seat test.
13. In the **Results** box, select the results whether Accepted or Rejected.
14. In the **Remarks** box, enter your remarks if any.
15. Click **Save**.

#### **7.9.4 View a Valve Leak Test Report**

If you want to view the valve leak test report, click [![image-1651550133251.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550133251.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550133251.png)(print icon) provided in the **Report** column of the **Valve Leak Test** page. See Fig 7.9.

#### **7.9.5 Attach a File into a Valve Leak Test Report**

If you want to attach a file with any valve leak test report listed in the **Valve Leak Test page, you can attach the file by using [![image-1651550176289.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550176289.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550176289.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **7.9.6 Export Valve Leak Test Report List**

You can export a list of valve leak test reports added in the **Valve Leak Test** page in both the pdf and excel formats by using [![image-1651550247104.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550247104.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550247104.png) (**PDF** button) and [![image-1651550270439.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550270439.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550270439.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.



### **7.10 ITR Register (Generic)**

The **ITR Register (Generic)** tab in the **Test Pack** menu used to add the ITR register.

1. Click **ITR Register (Generic)** in the **Test Pack** menu.
    
    The **ITR Register (Generic)** page opens.
    
    [![image-1651550315668.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550315668.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550315668.png)
    
     **Figure 10.10: ITR Register (Generic) page**

#### **7.10.1 Add an ITR Register**

If you want to add an ITR Register,

1. Click (**Add** button) in the **ITR Register (Generic)** page. The **ITR Register (Generic)** page opens a new window to add the details of the ITR register.
    
    [![image-1651550387415.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550387415.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550387415.png)
2. In the **System** box, enter the system name.
3. In the **Sub System** box, enter the subsystem name.
4. In the **Tag No** box, enter the tag number.
5. In the **Tag Type** box, enter the tag type.
6. In the **Tag Description** box, enter the tag description.
    
    The page shows three options such as **ITR-A Check Sheet (Construction)**, **ITR-B Check Sheet (Pre-Commissioning), ITR-C Check Sheet (Commissioning).**
    
     You must add the following details for each option individually.
7. In the **ITR No** box, enter the ITR number for each option.
8. In the **Prepared by MEB** box, select the prepared date of ITR register for each option.
9. In the **Submitted to Client** box, select the submitted date of ITR register for each option.
10. In the **Accepted to Client** box, select the accepted date of ITR register for each option.
11. Click **Save**.

The ITR register will be saved and listed in the **ITR Register (Generic)** page.

#### **7.10.2 Edit an ITR Register**

If you want to edit any existing ITR register in the **ITR Register (Generic)** page, do the following steps,

1. Click [![image-1651550519244.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550519244.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550519244.png)(Edit icon) in the **Edit** column for the respective ITR register. See Fig 7.10. The **ITR Register (Generic) page shows the details of the added ITR register.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **7.10.3 Delete an ITR Register** 

If you want to delete any ITR register in the **ITR Register (Generic) page, you can use [![image-1651550576420.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550576420.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550576420.png) (Delete icon) provided in the **ITR Register (Generic) page. To know how to delete, see the topic, “**[<u>Delete P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)**”.

#### **7.10.4 View an ITR Register Report**

If you want to view the ITR register report, click [![image-1651550619124.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550619124.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550619124.png)(print icon) provided in the upper side of the **ITR Register (Generic) page. See Fig 7.10.

#### **7.10.5 Filter an ITR Register**

If you want to filter any ITR register in the **ITR Register (Generic) page, you can use [![image-1651550692090.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550692090.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550692090.png) (**FILTER** button) located on the **ITR Register (Generic) page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

#### **7.10.6 Export an ITR Register**

You can export the ITR Register in the **ITR Register (Generic) page in both the pdf and excel formats by using [![image-1651550727042.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550727042.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550727042.png)(**PDF** button) and [![image-1651550741307.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550741307.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550741307.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **7.10.7 Import Multiple ITR Register**

If you want to import multiple ITR register together, do the following,

1. Click [![image-1651550797950.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550797950.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550797950.png) (**TEMPLATE** button). See Fig 7.10. An excel worksheet will be downloaded with a predefined template to enter the details of ITR register.
    
    [![image-1651550816720.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550816720.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550816720.png)
2. Enter the required ITR register details in the respective columns of the excel worksheet.
3. Once you have added the ITR register details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651550846438.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550846438.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550846438.png) (**IMPORT** button). See Fig 7.10.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651550862919.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550862919.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550862919.png)
5. Click [![image-1651550880711.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550880711.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550880711.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651550902330.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550902330.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550902330.png) (**Upload** button) to export the ITR register details that are included in the excel worksheet.

The details of the ITR register in the worksheet will be displayed in the **ITR Register (Generic)** page.


### **7.10 ITR Register Summary**

The **ITR Register Summary** tab in the **Test Pack** menu helps you to view the ITR register summary report. To view the report,

1. Click **ITR Register Summary** in the **Test Pack** menu. The **ITR Register (Generic) Summary** **Report** page opens.
    
    [![image-1651550965151.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550965151.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550965151.png)
    
     **Figure 10.11: ITR Register (Generic) Summary** **Report** **page**

#### **7.11.1 Print an ITR Register Summary Report**

If you want to print an ITR register summary report, use [![image-1651551026048.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551026048.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551026048.png) and [![image-1651551033551.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551033551.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551033551.png) (print icons) provided in the **ITR Register (Generic) Summary** **Report** page.

1. If you want to print the current page of the ITR register summary report, click [![image-1651551072179.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551072179.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551072179.png) (print icon including the page number).
2. If you want to print all the pages of the ITR register summary report, click[![image-1651551098549.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551098549.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551098549.png)(print icon).

#### **7.11.2 View an ITR Register Summary Report** 

You can view the ITR register summary report in various formats by using the option [![image-1651551137488.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551137488.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551137488.png) provided in the upper right corner of the **ITR Register (Generic) Summary** **Report** page.



### **7.12 Management of Change** 

Management of change (MOC) is a systematic approach to organizational changes with the aim of ensuring the continued safety of the workforce throughout the process. These systematic processes ensure that the change is dealt with in a proactive fashion.

The **Management of Change** tab in the **Test Pack** menu used to add the details of the management of change.

1. Click **Management of Change** in the **Test Pack** menu. The **Management of Change** page opens.
    
    [![image-1651551223562.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551223562.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551223562.png)
    
     **Figure 7.12: Management of Change page**

#### **7.12.1 Add the Details of Management of Change**

If you want to add the details of the management of change, do the following steps,

1. Click [![image-1651551284151.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551284151.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551284151.png) (**Add** button) in the **Management of Change** page. The page shows a new window to add the details of the management of change.
    
    [![image-1651551301517.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551301517.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551301517.png)
2. In the **MOC Number** box, enter the management of change number.
3. In the **Description** box, enter the description for the management of change.
4. In the **Status** box, enter the status of the management of change.
5. In the **Cleared by** box, enter the name of a person who has cleared the management of change.
6. In the **Cleared Date** box, select the cleared date of the management of change.
7. In the **Status Date** box, select the status date of the management of change.
8. In the **Document File Name** box, enter the document file name.
9. Click **Save**.
    
    The management of change is added and listed in the **Management of Change** page.

#### **7.12.2 Edit a Management of Change** 

If you want to edit any existing management of change in the **Management of Change** page, do the following steps,

1. Click [![image-1651551388920.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551388920.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551388920.png)(Edit icon) in the ****Edit**** column for the respective management of change. See Fig 7.12. The page opens with the details of the selected management of change.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **7.12.3 Attach a File into a Management of Change**

If you want to attach a file with any existing management of change listed in the **Management of Change** page, you can attach the file by using [![image-1651551485978.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551485978.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551485978.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **7.12.4 Export Management of Change List**

You can export a list of management of change added in the **Management of Change** page in both the pdf and excel formats by using [![image-1651551518634.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551518634.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551518634.png) (**PDF** button) and [![image-1651551526050.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551526050.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551526050.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **7.12.5 Filter a Management of Change**

If you want to filter any specific management of change in the **Management of Change** page, you can use [![image-1651551560189.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551560189.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551560189.png) (**FILTER** button) located on the **Management of Change** page. To know how to filter, see the topic, “**[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)**”.

#### **7.12.6 Import Multiple Management of Change**

If you want to import multiple management of change together, do the following,

1. Click [![image-1651551613579.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551613579.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551613579.png) (**TEMPLATE** button). See Fig 7.12.
    
    An excel worksheet will be downloaded with a predefined template to enter the details of management of change.
2. Enter the required management of change details in the respective columns of the excel worksheet.
3. Once you have added the management of change details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651551662245.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551662245.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551662245.png) (**IMPORT** button). See Fig 7.12.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651551683931.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551683931.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551683931.png)
5. Click [![image-1651551703407.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551703407.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551703407.png) (****Browse**** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651551732734.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551732734.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551732734.png) (****Upload**** button) to export the management of change that are included in the excel worksheet.

The details of the management of change in the worksheet will be displayed in the **Management of Change** page.



### **7.13 Technical Queries**

Technical queries are used by companies and their contractors to ask each other questions or to gather more information.

The **Technical Queries** tab in the **Test Pack** menu used to add the details of the technical query.

1. Click **Technical Queries** in the **Test Pack** menu. The **Technical Queries** page opens.
    
    [![image-1651551864443.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551864443.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551864443.png)
    
     **Figure 7.13: Technical Queries page**

#### **7.13.1 Add the Details of Technical Query**

If you want to add the details of the technical query, do the following steps,

1. Click [![image-1651551919764.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551919764.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551919764.png) (**Add** button) in the **Technical Queries page.
    
    The page shows a new window to add the details of the technical query.
    
    [![image-1651551960175.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551960175.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551960175.png)
2. In the **Document Number** box, enter the document number.
3. In the **Tag Number** box, enter the tag number.
4. In the **System** box, select a system.
5. In the **Unit** box, enter the name of a unit.
6. In the **Area** box, enter the name of an area.
7. In the **Department** box, enter the department name.
8. In the **Priority** box, enter the priority detail.
9. In the **Description** box, enter the description of the technical query.
10. In the **Document File Name** box, enter the document file name.
11. In the **Drawing** box, enter the drawing number.
12. In the **Issued on** box, enter the issued date of technical query.
13. In the **Status** box, enter the status of the technical query.
14. Click **Save**.
    
    The technical query is added and listed in the **Technical Queries** page.

#### **7.13.2 Edit a Technical Query** 

If you want to edit any existing technical query in the **Technical Queries** page, do the following steps,

1. Click [![image-1651552143603.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651552143603.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651552143603.png)(Edit icon) in the **Edit** column for the respective technical query. See Fig 7.13. The page opens with the details of the selected technical query.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **7.13.3 Attach a File into a Technical Query**

If you want to attach a file with any existing technical query listed in the **Technical Queries** page, you can attach the file by using [![image-1651554236401.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651554236401.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651554236401.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **7.13.4 Export Technical Queries List**

You can export a list of technical queries added in the **Technical Queries** page in both the pdf and excel formats by using [![image-1651554517256.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651554517256.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651554517256.png) (**PDF** button) and [![image-1651554533305.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651554533305.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651554533305.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **7.13.5 Filter a Technical Query**

If you want to filter any specific technical query in the **Technical Queries** page, you can use [![image-1651554696852.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651554696852.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651554696852.png) (**FILTER** button) located on the **Technical Queries** page. To know how to filter, see the topic, “**[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)**”.

#### **7.13.6 Import Multiple Technical Queries**

If you want to import multiple technical queries together, do the following,

1. Click [![image-1651554880246.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651554880246.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651554880246.png) (**TEMPLATE** button). See Fig 7.13. An excel worksheet will be downloaded with a predefined template to enter the details of technical query.
2. Enter the required technical query details in the respective columns of the excel worksheet.
3. Once you have added the technical query details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651554929323.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651554929323.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651554929323.png) (****IMPORT**** button). See Fig 7.13. A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651554955886.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651554955886.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651554955886.png)
5. Click [![image-1651554970806.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651554970806.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651554970806.png) (****Browse**** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651554999288.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651554999288.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651554999288.png) (**Upload** button) to export the technical query that are included in the excel worksheet.

The details of the technical query in the worksheet will be displayed in the **Technical Queries** page.


### **7.14 Site Instructions**

A site instruction is a formal instruction sent from the head contractor that contains directives for contractors working on a piping project.

The **Site Instructions** tab in the **Test Pack** menu used to add the details of the site instruction.

1. Click **Site Instructions** in the **Test Pack** menu. The **Site Instructions** page opens.
    
    [![image-1651555089022.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651555089022.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651555089022.png)

#### **7.14.1 Add the Details of Site Instructions**

If you want to add the details of the site instruction, do the following steps,

1. Click [![image-1651555271884.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651555271884.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651555271884.png) (**Add** button) in the **Site Instructions page. The page shows a new window to add the details of the site instruction.
    
    [![image-1651555329008.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651555329008.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651555329008.png)
2. In the **Item ID** box, enter the item id number.
3. In the **Tag Number** box, enter the tag number.
4. In the **System** box, select a system.
5. In the **Unit** box, enter the name of a unit.
6. In the **Area** box, enter the name of an area.
7. In the **Department** box, enter the department name.
8. In the **Priority** box, enter the priority detail.
9. In the **Description** box, enter the description of the technical query.
10. In the **Document File Name** box, enter the document file name.
11. In the **Drawing** box, enter the drawing number.
12. In the **Issued on** box, enter the issued date of technical query.
13. In the **Status** box, enter the status of the technical query.
14. Click **Save**.
    
    The site instruction is added and listed in the **Site Instructions page.

#### **7.14.2 Edit a Site Instruction**

If you want to edit any existing site instruction in the **Site Instructions** page, do the following steps,

1. Click [![image-1651555500701.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651555500701.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651555500701.png)(Edit icon) in the **Edit** column for the respective site instruction. See Fig 7.14. The page opens with the details of the selected site instruction.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **7.14.3 Attach a File into a Site Instruction**

If you want to attach a file with any existing site instruction listed in the **Site Instructions page, you can attach the file by using [![image-1651555568776.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651555568776.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651555568776.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **7.14.4 Export Site Instructions List**

You can export a list of site instructions added in the **Site Instructions** page in both the pdf and excel formats by using [![image-1651555749935.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651555749935.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651555749935.png) (**PDF** button) and [![image-1651555758977.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651555758977.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651555758977.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **7.14.5 Filter a Site Instruction**

If you want to filter any specific site instruction in the **Site Instructions** page, you can use [![image-1651556001499.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651556001499.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651556001499.png) (**FILTER** button) located on the **Site Instructions** page. To know how to filter, see the topic, “[<u>**Filter P&amp;ID**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

#### **7.14.6 Import Multiple Site Instructions**

If you want to import multiple site instructions together, do the following,

1. Click [![image-1651556042278.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651556042278.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651556042278.png) (**TEMPLATE** button). See Fig 7.14. An excel worksheet will be downloaded with a predefined template to enter the details of site instruction.
2. Enter the required site instruction details in the respective columns of the excel worksheet.
3. Once you have added the site instruction details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651556094848.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651556094848.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651556094848.png) (****IMPORT**** button). See Fig 7.14. A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651556114873.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651556114873.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651556114873.png)
5. Click [![image-1651556128442.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651556128442.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651556128442.png) (****Browse**** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651556153252.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651556153252.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651556153252.png) (**Upload** button) to export the site instruction that are included in the excel worksheet.

The details of the site instruction in the worksheet will be displayed in the **Site Instructions** page.


### **7.15 Test Pack Status Report**

**Test Pack Status Report** shows the status of test pack.

If you want to view a test pack status report, do the following steps,

1. Click **Test Pack Status Report** in the **Piping** menu. The **Test Pack Status Report** page opens.
    
    [![image-1651556242868.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651556242868.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651556242868.png)
    
     **Figure 7.15: Test Pack Status Report page**
2. In the **ISO/Drawing Number** box, select the ISO/drawing from a drop-down list.
3. In the ****Spool Number**** box, select the spool number from a drop-down list.
4. Click **Go**.

The **Test Pack Status Report** page shows the test pack number, subcontractor name, system/service information, and test pack status.

#### **7.15.1 Print a Test Pack Status Report**

If you want to print the test pack status report, use [![image-1651557077358.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651557077358.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651557077358.png) and [![image-1651557085627.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651557085627.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651557085627.png) (print icons) provided in the **Test Pack Status Report** page. See Fig 7.15.

1. If you want to print the current page of the test pack status report, click [![image-1651557112461.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651557112461.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651557112461.png) (print icon including the page number).
2. If you want to print all the pages of the test pack status report, click [![image-1651557131328.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651557131328.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651557131328.png)(print icon).

#### **7.15.2 Export a Test Pack Status Report** 

You can export the test pack status report in various formats by using the option provided in the upper right corner of the **Test Pack Status Report** page.

# Punch Lists

### **8.0 Punch List**

A punch list is a list of items or tasks that need to be done before a piping project is completed. The **Punch Lists** menu in the home page of the ***cuteQM*** app helps to create and view the punch lists in Piping project.

### **8.1 Create a New Punch List**

If you want to create a punch list, do the following steps,

1. Click **Create New Punch List** in the **Punch lists** menu. The **Create Punch** page opens.
    
    [![image-1651563761302.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651563761302.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651563761302.png)
    
     **Figure 8.1: Create Punch page**
2. In the **Modules** box, select a module from the given modules.
3. In the **Systems** box, select a system from a drop-down list.
4. In the **Sub-Systems** box, select a sub-system from a drop-down list.
5. In the **ITR No** box, enter the ITR number.
6. In the **Drawing No** box, enter the drawing number.
7. In the **Test Pack** box, select a test pack from a drop-down list.
8. In the **Tag No** box, enter the tag number.
9. In the **Reference Types** box, select the reference type from the given options.
10. In the **Select Project** box, select a project from a drop-down list.
11. In the **Category** box, select any category from the given categories such as **A**, **B**, and **C**.
    
    <table border="1" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.866%;">**A** - Item to be cleared before hydrostatic test.
    
    **B** - Item to be cleared after hydrostatic test.
    
    **C** - Item which can be cleared after hydrostatic test but before final acceptance of the whole plant.
    
    </td></tr></tbody></table>
12. In the **Type** box, select the type of punch such as whether internal or external.
13. In the ****Item**** box, enter the item details.
14. In the **Location** box, select a location from a drop-down list.
15. In the **Description/ Punch** box, enter the description for the punch list.
16. In the ****Punch Raised From**** box, select the detail such as from where the punch has been raised.
17. In the **Date Raised** box, select the date when the punch has been raised.
18. In the **Punch Raised** By box, enter the name of a person who has raised the punch.
19. In the **Responsible Dept** box, enter the department name, which is responsible for the punch.
20. In the **Responsible Person** box, enter the name of a person who is responsible for the punch.
21. In the **Expected Clearance** box, select the expected date of clearing the punch list.
22. Click **Save**.

The punch list is successfully added.

#### **8.1.1 Add Report Photos**

If you want to add any report photos for the punch list,

1. Click [![image-1651564332218.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564332218.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564332218.png) (**ADD** button) in the **Report Photos** box. [![image-1651564347455.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564347455.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564347455.png)
2. Click [![image-1651564367139.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564367139.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564367139.png) (**Browse** button) to browse a photo stored in your computer.
3. Click **Upload**.

The selected photo will be updated.

### **8.2 View Punch Lists**

The **View Punch Lists** tab helps you to view and edit the punch list, which is added by using the **Create New Punch List** tab.

1. Click **View Punch Lists** in the **Punch Lists** menu. The **Punch List** page opens with added punch lists.
    
    [![image-1651564439486.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564439486.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564439486.png)
    
     **Figure 8.2: Punch List page**
    
    [![image-1651564462498.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564462498.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564462498.png)**Note**: If you want to verify the added punch list item, click the checkbox provided in the **Verify** column.
    
     If you want to clear the added punch list item, click the checkbox provided in the **Clear** column.

#### **8.2.1 View a Punch List Report**

If you want to view a punch list report, click [![image-1651564523183.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564523183.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564523183.png) (**Print** button) provided in the upper side of the **Punch List** page. See Fig 11.2.

#### **8.2.2 View a Punch List Register**

If you want to view a punch list register, click [![image-1651564556647.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564556647.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564556647.png) (**Punch List Register** button) provided in the upper side of the **Punch List** page. See Fig 8.2.

[![image-1651564597790.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564597790.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564597790.png)

#### **8.2.3 View a Punch List Summary**

If you want to view a punch list summary, click [![image-1651564654001.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564654001.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564654001.png) (**Punch List Summary** button) provided in the upper side of the **Punch List** page. See Fig 8.2.

[![image-1651564665102.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564665102.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564665102.png)

#### **8.2.4 Attach a File into a Punch List** 

If you want to attach any file with any punch list listed in the **Punch List** page, you can attach the file by using [![image-1651564697424.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564697424.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564697424.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **8.2.5 Edit a Punch List**

If you want to edit any existing punch list in the **Punch List** page, click [![image-1651564736837.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564736837.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564736837.png)(Edit icon) in the **Edit** column for the respective punch list. See Fig 8.2. Edit the details in the respective box you want.

#### **8.2.6 Export Punch Lists**

You can export a list of punch lists added in the **Punch List** page in both the pdf and excel formats by using [![image-1651564790767.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564790767.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564790767.png) (**PDF** button) and [![image-1651564799808.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564799808.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564799808.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **8.2.7 Filter a Punch List**

If you want to filter any punch list in the **Punch List page, you can use [![image-1651564830901.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564830901.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564830901.png) (**FILTER** button) located on the **Punch List** page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

### **8.3 Punch List Detail Report**

The **Punch List Detail Report** tab in the **Punch Lists** menu helps you to view a detailed report of the punch lists. To view the punch list detail report,

1. Click **Punch List Detail Report** in the **Punch Lists** menu. The **Punch List Detail Report** page opens.
    
    [![image-1651564880865.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564880865.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564880865.png)
    
     **Figure 11.3: Punch List Detail Report page**
2. In the **Modules** field, select **Piping** from the given modules.
3. In the **Systems** box, select a system from a drop-down list.
4. In the **Sub Systems** box, select a sub-system from a drop-down list.
5. In the **ITR No** box, enter the ITR number.
6. In the **Drawing** box, enter the drawing number.
7. In the **Category** box, select a category from a list.
8. In the **Status** box, select a status from a drop-down list.
9. In the **Punch Raised From** box, select a person who has raised the punch list.
10. In the **Responsible Party** box, select a responsible party from a drop-down list.
11. In the **Test Pack** box, select a test pack from a drop-down list.
12. In the **Tag No** box, enter the tag number.
13. In the **Raised Date** box, select a raised date of the punch list.
    
    The punch list report opens based on the selected data.

#### **8.3.1 Print a Punch List Detail Report**

If you want to print the punch list detail report, use [![image-1651564984856.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564984856.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564984856.png) and [![image-1651564994571.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564994571.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564994571.png) (print icons) provided in the Punch List Detail Report page.

1. If you want to print the current page of the punch list detail report, click [![image-1651565010716.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565010716.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565010716.png) (print icon including the page number).
2. If you want to print all the pages of the punch list detail report, click [![image-1651565030275.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565030275.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565030275.png)(print icon).

#### **8.3.2 View a Punch List Detail Report** 

You can view the punch list detail report in various formats by using the option [![image-1651565072341.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565072341.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565072341.png) provided in the upper right corner of the punch list detail report page.


### **8.4 Punch List System Report**

The **Punch List System Report** tab in the **Punch Lists** menu helps you to view a punch list system report. To view the punch list system report,

1. Click **Punch List System Report** in the **Punch Lists** menu. The **Punch List System Report** page opens.
    
    [![image-1651565127081.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565127081.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565127081.png)
    
     **Figure 8.4: Punch List System Report page**
2. In the **Modules** field, select **Piping** from the given modules.
3. In the **Systems** box, select a system from a drop-down list.
4. In the **Sub Systems** box, select a sub-system from a drop-down list.
    
    The punch list system report opens based on the selected data.

#### **8.4.1 Print a Punch List System Report**

If you want to print the punch list system report, use [![image-1651565199162.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565199162.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565199162.png)and [![image-1651565209554.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565209554.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565209554.png) (print icons) provided in the Punch List system Report page.

1. If you want to print the current page of the punch list system report, click [![image-1651565231247.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565231247.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565231247.png) (print icon including the page number).
2. If you want to print all the pages of the punch list system report, click [![image-1651565251350.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565251350.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565251350.png) (print icon).

#### **8.4.2 View a Punch List System Report** 

You can view the punch list system report in various formats by using the option [![image-1651565284055.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565284055.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565284055.png)provided in the upper right corner of the punch list system report page.


### **8.5 Punch List Sub System Report**

The **Punch List Sub System Report** tab in the **Punch Lists** menu helps you to view a punch list sub system report. To view the punch list sub system report,

1. Click **Punch List Sub System Report** in the **Punch Lists** menu. The **Punch List Sub System Report** page opens.
    
    [![image-1651565349914.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565349914.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565349914.png)
    
     **Figure 8.5: Punch List Sub System Report page**
2. In the **Modules** field, select **Piping** from the given modules.
3. In the **Systems** box, select a system from a drop-down list.
4. In the **Sub Systems** box, select a sub-system from a drop-down list.
    
    The punch list sub system report opens based on the selected data.

#### **8.5.1 Print a Punch List Sub System Report**

If you want to print the punch list sub system report, use [![image-1651565494422.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565494422.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565494422.png) and [![image-1651565501892.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565501892.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565501892.png) (print icons) provided in the Punch List Sub System Report page.

1. If you want to print the current page of the punch list sub system report, click [![image-1651565520665.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565520665.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565520665.png) (print icon including the page number).
2. If you want to print all the pages of the punch list sub system report, click[![image-1651565540672.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565540672.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565540672.png) (print icon).

#### **8.5.2 View a Punch List Sub System Report** 

You can view the punch list sub system report in various formats by using the option [![image-1651565573134.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565573134.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565573134.png) provided in the upper right corner of the punch list sub system report page.

### **8.6 Punch List Category Report**

The **Punch List Category Report** tab in the **Punch Lists** menu helps you to view a punch list category report. To view the punch list category report,

1. Click **Punch List Category Report** in the **Punch Lists** menu. The **Punch List Category Report** page opens.
    
    [![image-1651565615247.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565615247.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565615247.png)
    
     **Figure 8.6: Punch List Category Report page**
2. In the **Modules** field, select **Piping** from the given modules.
3. In the **Systems** box, select a system from a drop-down list.
4. In the **Sub Systems** box, select a sub-system from a drop-down list.
    
    The punch list category report opens based on the selected data.

#### **8.6.1 Print a Punch List Category Report**

If you want to print the punch list category report, use [![image-1651565709840.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565709840.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565709840.png) and [![image-1651565719251.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565719251.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565719251.png) (print icons) provided in the Punch List Category Report page.

1. If you want to print the current page of the punch list category report, click [![image-1651565739157.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565739157.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565739157.png) (print icon including the page number).
2. If you want to print all the pages of the punch list category report, click [![image-1651565760598.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565760598.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565760598.png)(print icon).

#### **8.6.2 View a Punch List Category Report** 

You can view the punch list category report in various formats by using the option [![image-1651566069654.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651566069654.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651566069654.png) provided in the upper right corner of the punch list category report page.

# Documentation

### **9.0 Documentation**

The **Documentation** menu used to combine the number of files, which are attached to every menu of this ***cuteQM*** app. The combined files will be shown as a pdf file. This menu also used to attach a new file to a module that is not provided with an attachment option to attach any file.

### **9.1 Document Category**

The **Document Category** tab in the **Documentation** menu used to attach a file to any module which has no attachment option to attach the file. Before attaching a file for any module, you must add the relevant category name of the module.

#### **9.1.1 Add a Document Category**

1. Click **Document Category** in the **Documentation** menu. The **Document Category** page opens.
    
    [![image-1651570310375.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651570310375.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651570310375.png)
    
     **Figure 9.1: Document Category page**
2. Click [![image-1651570333634.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651570333634.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651570333634.png) (**ADD** button) in the **Document Category** page. A new window opens to add a document category.
    
    [![image-1651570506319.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651570506319.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651570506319.png)
3. In the **Category Name** box, enter the relevant category name for the module for which you want to attach a file.
4. In the **Description** box, enter the description for the added category.
5. Click **Save**.
    
     (OR)
6. If you want to import any document category from another vessel, Click ****Import from Another Vessel****. The **Import from Another Vessel** window opens.
    
    [![image-1651570554836.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651570554836.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651570554836.png)
    
    
    1. 1. In the **Equipment** box, select an equipment from a drop-down list.
        2. Click **Save**.
7. The added category name will be listed in the **Document Category** page. Once you have added the document category, you can attach any file to the added category.

#### **9.1.2 Attach a File into an Added Category**

If you want to attach any file with the added category listed in the **Document Category** page, you can attach the file by using [![image-1651570732592.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651570732592.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651570732592.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **9.1.3 Edit a Category**

If you want to edit any existing category in the **Document Category** page, click [![image-1651570769266.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651570769266.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651570769266.png)(Edit icon) for the respective category, and then edit the details in the respective box.

#### **9.1.4 Delete a category**

If you want to delete any specific added category from the list, you can use [![image-1651570809674.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651570809674.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651570809674.png) (Delete icon) provided in the **Delete** column of the **Document Category** page, See Fig 9.1.

### **9.2 Hierarchical Report**

The **Hierarchical Report** tab in the **Documentation** menu helps you to view a hierarchical report of a project. If you want to view the hierarchical report,

1. Click **Hierarchical Report** in the **Documentation** menu.
    
    The hierarchical report page opens.
    
    [![image-1651571079057.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651571079057.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651571079057.png)
2. In the **Project** box, select a project for which you want to view he hierarchical report.
3. Select a category that is whether **System**, **Sub-System**, or **Tag No**.
4. Click **Search**.
    
    The page shows the hierarchical report for the selected project and category.
    
    [![image-1651571105084.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651571105084.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651571105084.png)
    
    [![image-1651571114254.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651571114254.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651571114254.png)**Note**: If you want to export the hierarchical report as excel file, click **Export to Excel**.


### **9.3 Manufacture Data Report (MDR) Settings**

The **MDR** **Settings** tab in the **Documentation** menu helps you to do page setup for the pdf file which will be shown after combining the attached files.

1. Click the **MDR Settings** tab. The **MDR Settings** page opens.
    
    [![image-1651572679436.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651572679436.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651572679436.png)
    
     **Figure 9.3: MDR Settings page**
2. In the **Page Numbering** box, select the page numbering option that is whether **Section wise** or **Continuous**.
3. In the ****Page Number (Digits)**** box, select the page number displaying format from a drop-down list.
4. If you want to append the section number with the page number, click **Yes,** otherwise click **No** in the **Append Section number with Page number** box.
5. In the ****Page Number Template**** box, select the page number template from a drop-down list.
6. If you want to add the starting page numbers from TOC, click ****Yes,**** otherwise click ****No**** in the ****Page Number Starting From TOC?**** box.
7. If you want to add alphabet page numbers, click **Yes,** otherwise click **No** in the **Alphabet Page number?** box.
8. In the **Logo** box, attach your logo by using (**Browse** button).
9. Click **Save**.


### **9.4 One Click Documentation**

The **One Click Documentation** tab used to combine the attached file of the various module.

1. Click **One Click Documentation** in the **Documentation** menu. The **One Click Documentation** page opens.
    
    [![image-1651572938916.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651572938916.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651572938916.png)
    
     **Figure 9.4: One Click Documentation page**
    
    The **One Click Documentation** page shows a list of reports name of each module including the attachment file counts. This page also shows the list of document categories including their attachments, which are added using the [**<u>Document Category</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-9.1%C2%A0document-categor) tab.
    
    [![image-1651572973671.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651572973671.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651572973671.png)**Note**: If you want to edit any existing category in the **Document Category** page, click (Edit icon) for the respective category, and then edit the details in the respective box.
2. Click the check box of the respective reports which you want to combine.
3. Click **Generate MDR**.
    
    The system combines the selected files and shows as the pdf file in the left side of the **One Click Documentation** page, See Fig 9.4.

[![image-1651573017690.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651573017690.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651573017690.png)**Tip**: You can view the pdf file by clicking the respective pdf file. The file will be opened including the data in the combined files.


### **9.5 Document Upload**

The **Document Upload** tab in the **Documentation** menu used to upload documents for various process.

1. Click **Document Upload** in the **Documentation** menu. The **Upload Documents** page opens.
    
    [![image-1651573070510.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651573070510.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651573070510.png)
    
     **Figure 9.5: Upload Documents page**
2. Select a file which you want to upload by click **Select a file for upload**. The selected file will be added in the **File Upload** window.

# Structural



# User Management

### **1.1 Login**

To login into the ***cuteQM*** app,

1. Open your web browser.
2. Type the URL provided by your administrator, in the address bar of your web browser.

The login page appears.

[![image-1651599133649.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651599133649.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651599133649.png)

3. In the login page, enter your user name and password in the respective boxes.

 [![image-1651036214183.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651036214183.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651036214183.png)**Note**: If you forgot your password, click “**I can’t access my account**”. You will be redirected into a new web page. Enter your username to receive your password.

4. In the **Module** section, select **Structural**.
5. Click **Login**.

Once you have successfully logged in into the ***cuteQM*** app, the home page of the ***cuteQM*** app opens.

[![image-1651599178493.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651599178493.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651599178493.png)

 **Figure 1.1 Home page of *cuteQM app***

 [![image-1651036329129.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651036329129.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651036329129.png)**Note**: The user name you have entered, the project you have been assigned, and the module you have selected are displayed in the upper right corner of the home page.

### **1.2 Change Password**

If you want to change your current password,

1. Click your user name displayed on the quick access bar of the home page. See Fig 1.1. A drop-down list opens with multiple options.
    
    [![image-1651599229547.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651599229547.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651599229547.png)

2. Click the ****Change Password option.****The **Change Password** page opens.
    
    [![image-1651599263910.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651599263910.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651599263910.png)
    
    [![image-1651599296094.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651599296094.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651599296094.png)**Note**: Before changing your password read the conditions specified in the **Change Password** page.
3. In the **Password** box, enter your current password.
4. In the **New** **Password** box, enter your new password.
5. In the **Confirm** **New** **Password** box, enter your new password again.
6. Click **Change Password**.

Your password will be successfully changed.

### **1.3 Log Out**

If you want to log out from the app,

1. Click your user name displayed on the quick access bar of the home page. See Fig 1.1. A drop-down list opens with multiple options.
2. Click **Log out**.

Your current session ends now. The home page appears.

# Home

### **2.0 Home**

The home menu in the ***cuteQM*** app used to view a dashboard and a switch board of a project. This menu helps you to change project and module.

[![image-1651599843548.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651599843548.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651599843548.png)


### **2.1 Dashboard**

The **Dashboard** tab in the **Home** menu displays graphs, charts, and tables, which helps you to monitor and track the summary reports of various inspection and welding progress in the structural module.

[![image-1651599883883.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651599883883.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651599883883.png) **Note**: The dashboard displayed on the app is linked to a database that allows the report to be constantly updated.

[![image-1651600091378.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651600091378.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651600091378.png)

### **2.2 Switch Board**

The **Switch Board** tab in the **Home** menu show the consolidated view of various tabs listed in multiple menus in the menu bar.

Once you have successfully logged in into the ***cuteQM*** app, you can view the Home Page. In the Home Page, the menu bar appears with multiple menus, otherwise you can select the **Switch Board** tab to view all the menus.

To select the **Switch Board** tab,

1. Navigate to **Home**.
2. Click **Switch Board**.
    
    The **Switch Board** tab includes multiple options such as **Project Data, Materials, Inspection, Structural, MCR, Punch List, and Documentation.**
    
    [![image-1651600257635.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651600257635.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651600257635.png)

### **2.3 Switch Project**

The **Switch Project** tab in the **Home** menu helps you to add a new project/module and switch between various projects and modules added in the app.

#### **2.3.1 Switch Between Various Projects and Modules** 

1. Navigate to the **Home** menu.
2. Click **Switch Project**.
    
    The switch project window opens with a list of projects and modules that are already added in the web.
    
    [![image-1651600627811.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651600627811.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651600627811.png)
    
     **Figure 2.1: Switch project window**
3. If you want to switch between various projects and modules,
    
    
    1. 1. Select a project you want from multiple projects listed in the left side of the window.
            
            Once you have selected the project, a list of modules related to the project is displayed.
        2. Select a module you want from multiple modules listed in the right side of the window.
4. Click **Select**.

#### **2.3.2 Add a New Project** 

If you want to add a new project, do the following

<table border="1" id="bkmrk-if-you-want-to-add-a-0" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">If you want to add a new project, you must have been assigned as an administrator or a power user otherwise you cannot add any new project.

</td></tr></tbody></table>

1. Click **New Skid/ Module**. See Fig 2.1.
    
    The add project/module page opens with two options such as **Projects** and **Skid/ Module**.
    
    [![image-1651600807099.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651600807099.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651600807099.png)
    
     **Figure 2.2: Add project/module page**
2. Click **Projects**. The **Projects** page opens.
    
    [![image-1651600842482.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651600842482.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651600842482.png)
    
     **Figure 5.3: Projects page**
3. Click [![image-1651600928959.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651600928959.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651600928959.png) (**ADD** button) in the upper side of the **Projects** page.
    
    A new window opens to add a new project.
    
    [![image-1651600954477.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651600954477.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651600954477.png)
    
    [![image-1651600968111.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651600968111.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651600968111.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
      
    
    1. 1. In the **Project Number** box, enter the project number.
        2. In the **Project Name** box, enter a project name.
        3. In the **End User** box, select an end user from a drop-down list.
        4. In the **Client** box, select a client from a drop-down list.
        5. In the **AI/ Third Party** box, select an AI or a third party from a drop-down list.
            
            [![image-1651601039616.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651601039616.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651601039616.png)**Note**: If you want to add multiple third parties, add third parties by clicking [![image-1651601075885.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651601075885.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651601075885.png) (**Add TP** button) in the **Third party** column of the **Projects page**.
        6. In the **Purchase Order (PO) Number** box, enter the PO number.
        7. In the **Manufacturer Job Code** box, enter the manufacturer job code number.
        8. In the **Client Project** box, enter the client project code.
        9. In the **Client Job Code** box, enter the client job code.
        10. In the **Owner Project** box, enter the owner project code.
        11. In the **Owner Job** Code box, enter the owner job code.
        12. In the **Delivery Date** box, choose the delivery date.
        13. In the **Location** box, enter the location detail.
        14. In the **Non-Destructive Examination (NDE) Weld Length Limit** box, enter the length limit of NDE welding.
        15. If you need an external qualified welder, click the check box provided with the ****External Qualified Welder****
        16. In the **Weld Repair Allowance** box, enter the amount for weld repair.
4. Click **Save**.

A new project is added successfully.

#### **2.3.3 Edit Any project** 

If you want to edit any existing project details from the list of projects in the **Projects** page, do the following,

1. Click [![image-1651601251562.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651601251562.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651601251562.png)(Edit icon) in the **Edit** column for the respective project. See Fig 2.3. A new window opens to edit the project.
    
    [![image-1651601271857.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651601271857.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651601271857.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box in the ****Projects**** page.
3. Click **Save**.

#### **2.3.4 Delete Any project** 

If you want to delete any specific project from the list of projects, you can use [![image-1651602218165.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651602218165.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651602218165.png) (Delete icon) provided in the **Delete** column of the **Projects** page, See Fig 2.3.

1. Click [![image-1651602244261.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651602244261.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651602244261.png) (Delete icon) for the corresponding project.
    
    You receive a notification message “**Do you want to delete this row**?”.
2. Click **OK**.

#### **2.3.5 Export Projects List**

You can export a list of projects in the pdf and excel formats.

1. If you want to export the projects list in the pdf format, click [![image-1651602321019.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651602321019.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651602321019.png) (**PDF** button). See Fig 2.3. The project list will be downloaded in the pdf format.
2. If you want to export the projects list in the excel format, click [![image-1651602353412.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651602353412.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651602353412.png) (****Excel**** button). The project list will be downloaded in the excel format.

#### **2.3.6 Add a New Module**

If you want to add a new module, do the following

<table border="1" id="bkmrk-if-you-want-to-add-a-2" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">If you want to add a new module, you must have been assigned as an administrator or a power user otherwise you cannot add any new module.

</td></tr></tbody></table>

1. Click **New Skid/ Module**. See Fig 2.1. The add project/module page opens with two options such as **Projects** and **Skid/ Module**. See Fig 2.2.
2. Click **Skid/Module**.
    
    The **Skid/Module** page opens.
    
    [![image-1651602495767.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651602495767.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651602495767.png)
    
     **Figure 2.4: Skid/Module page**
3. Click [![image-1651602534609.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651602534609.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651602534609.png) (**ADD** button) in the upper side of the **Skid/Module** page.
    
    The skid/module box opens to add a new module.
    
    [![image-1651602551803.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651602551803.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651602551803.png)
    
    [![image-1651602565747.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651602565747.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651602565747.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    
    1. 1. In the **Master** **Project Name** box, enter the master project name from a drop-down list.
        2. In the **Skid/Module** box, enter a module name.
        3. In the **Abbreviation** box, enter the abbreviation for the added module.
        4. In the **Report Prefix** box, the report prefix will be entered automatically. If you want change, you can edit the report prefix.
        5. In the **Piping Class** box, enter the piping class name.
        6. In the **Delivery Date** box, choose the delivery date.
        7. In the **Project Type** box, select the type of project from a drop-down list.
        8. If you want to show this module in the ******cuteQM******mobile app, click the check box provided with the ****Show in Apps**** option.
        9. In the **Shift Start Time (24hr)** box, enter the shift starting time.
        10. In the **Shift End Time (24hr)** box, enter the shift ending time.
        11. In the **Break Time (mins)** box, enter the break time duration.
        12. If you want to enable the repair project flow option, select the check box provided with the ****Repair Project Flow**** column.
        13. If you want to enable the welder qualification restriction option, select the check box provided with the **Welder Qualification Restriction** column.
4. Click **Save**.

A new module is added successfully.

#### **2.3.7 Add a Surveyor, a Client or Other Role for Any Module**

If you want to add a surveyor, a client or other role for any added module,

1. Click a respective [![image-1651602765532.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651602765532.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651602765532.png)(Add icon) provided in the **Add Surveyor/Client** column. The **Add Surveyor/Client/Others** window opens.
    
    [![image-1651602780108.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651602780108.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651602780108.png)
2. Click [![image-1651602799574.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651602799574.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651602799574.png) (**ADD** button). A new window opens to enter the name and type of a role.
    
    [![image-1651602818857.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651602818857.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651602818857.png)
3. In the **Name** box, enter the name of the person to whom you want to add a role.
4. In the **Type** box, select the type of role from a drop-down list.
5. Click **Save**.

#### **2.3.7 Edit Any Module**

If you want to edit any existing module details from the list of modules in the **Skid/Module** page, do the following,

1. Click [![image-1651602885218.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651602885218.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651602885218.png)(Edit icon) in the ****Edit**** column for the respective module. See Fig 2.4. A new window opens to edit the module.
    
    [![image-1651602902625.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651602902625.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651602902625.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box in the ****Skid/Module**** page.
3. Click **Save**.

#### **2.3.8 Delete Any Module**

If you want to delete any specific module from the list of modules, you can use [![image-1651602973687.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651602973687.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651602973687.png) (Delete icon) provided in the **Delete** column of the **Skid/Module** page, See Fig 2.4.

1. Click [![image-1651602986271.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651602986271.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651602986271.png) (Delete icon) for the corresponding module. You receive a notification message “**Do you want to delete**?”.
2. Click **OK**.

#### **2.3.9 Export Modules List**

You can export a list of modules added in the **Skid/Module** page in the pdf and excel formats.

1. If you want to export the modules list in the pdf format, click [![image-1651603056401.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603056401.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603056401.png) (**PDF** button). See Fig 2.4. The modules list will be downloaded in the pdf format.
2. If you want to export the modules list in the excel format, click [![image-1651603100803.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603100803.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603100803.png) (**Excel** button).
    
    The modules list will be downloaded in the excel format.

#### **2.3.10 Close a Project** 

If you want to close any project from the app, do the following

<table border="1" id="bkmrk-make-sure-that-once-" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Make sure that once you have closed any project, you cannot even open or access the closed project.

</td></tr></tbody></table>

1. Click **Close Project** in the **Close Project** column for the corresponding module and project type. See Fig 2.4.
    
    You receive a notification message “**Are you sure want to close this project? You will not be able to access/reopen this project again**”.
2. Click **OK** to close the project.

# Project Data

### **3.0 Project Data**

The **Project Data** menu helps you to add the details of master data and personnel data when you started to do a project. This menu explains all the basic works of structural master drawing, weld map drawing, cutting plan drawing and import joints.

The **Project Data** menu appears with two options such as **Masters** and **Personnels**. The **Masters** option helps you to add master data for the structural project. The **Personnels** option helps you to add the details of persons for example welders and inspectors, who are all involved in the structural project.

### **3.1 Area** 

The **Area** tab in the **Project Data** menu helps you to add the details of area. If you want to add any area, do the following,

1. Click **Area** in the **Project Data** menu.
    
    The **Area** page opens.
    
    [![image-1651603589366.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603589366.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603589366.png)
    
     **Figure 3.1: Area page**

#### **3.1.1 Add an Area**

If you want to add an area, do the following,

1. Click [![image-1651603646996.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603646996.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603646996.png) (**ADD** button) in the **Area** page. See Fig 3.1. A new window opens to add an area.
    
    [![image-1651603661879.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603661879.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603661879.png)
    
    [![image-1651603678108.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603678108.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603678108.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.
2. In the **Area** box, enter the name of an area.
3. In the **Abbreviation** box, enter the abbreviation for the added area.
4. In the **Area No** box, enter the area number.
5. Click **Save**.
    
    The area is successfully added.

#### **3.1.2 Edit Any Area**

 If you want to edit any existing area in the **Area** page, do the following,

1. Click [![image-1651603749311.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603749311.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603749311.png)(Edit icon) in the **Edit** column for the respective area. See Fig 3.1. A new window opens to edit the area.
    
    [![image-1651603763233.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603763233.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603763233.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **3.1.3 Delete Any Area**

If you want to delete any specific area from the list of areas, you can use (Delete icon) provided in the **Delete** column of the **Area** page, See Fig 3.1.

1. Click [![image-1651603839749.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603839749.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603839749.png) (Delete icon) for the corresponding area.
    
    You receive a notification message “**Do you want to delete?**”.
2. Click **OK**.

#### **3.1.4 Export Areas List**

You can export a list of areas added in the **Area** page in the pdf and excel formats.

1. If you want to export the areas list in the pdf format, click [![image-1651603910416.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603910416.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603910416.png) (**PDF** button).
    
    The list will be downloaded in the pdf format.
2. If you want to export the areas list in the excel format, click [![image-1651603933698.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603933698.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603933698.png) (****Excel**** button). The list will be downloaded in the excel format.

#### **3.1.5 Filter Any Area**

If you want to filter any area from the list of areas in the **Area** page, do the following,

1. Click [![image-1651604010559.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604010559.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604010559.png) (**FILTER** button) located on the **Area** page. See Fig 5.1. Once you clicked the **Filter** button, the filter box opens for the **Area, Abbreviation,** and **Area No** columns.
    
    [![image-1651604031068.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604031068.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604031068.png)
2. Enter relevant detail in the respective column’s filter box to filter any area.

#### **3.1.6 Import Multiple Areas**

If you want to import multiple areas together, do the following,

1. Click [![image-1651604099263.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604099263.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604099263.png) (**TEMPLATE** button) on the **Area** page. See Fig 3.1.
    
    A template will be downloaded as an excel worksheet to enter the details of multiple areas.
    
    [![image-1651604115811.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604115811.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604115811.png)
2. Enter the relevant details in the required columns on the excel worksheet.
3. Once you have added the area details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651604149198.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604149198.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604149198.png) (**IMPORT** button). See Fig 3.1.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651604180432.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604180432.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604180432.png)
5. Click (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651604210730.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604210730.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604210730.png) (**Upload** button) to export the areas that are included in the excel worksheet.

The details of the areas in the worksheet will be displayed in the **Area** page.


### **3.2 Client Master Drawings**

Master drawing is a layout drawing provided to explain about the material such as plate and beam, and the material’s parameters used in the structural project. The **Client Master Drawings** tab helps you to add the client master drawing details.

If you want to add any client master drawing details, do the following,

1. Click **Client** **Master Drawings** in the **Project Data** menu. The **Client** **Master Drawings** page opens.
    
    [![image-1651604306591.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604306591.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604306591.png)
    
     **Figure 3.2 Client Master Drawings page**

#### **3.2.1 Add a Client Master Drawing**

If you want to add a client master drawing, do the following,

1. Click [![image-1651604374952.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604374952.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604374952.png) (**ADD** button) in the **Client Master Drawings** page. See Fig 3.2. A new window opens to add a client master drawing.
    
    [![image-1651604393459.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604393459.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604393459.png)
    
    [![image-1651604404786.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604404786.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604404786.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **Client** **Master Drawing No** box, enter the client master drawing number.
3. In the **Revision** box, enter the revision number.
4. In the **Level** box, enter the level number of the client master drawing.
5. If you want to enable the full traceability option, click the check box provided with the **Full Traceability?** column.
6. In the **Sub System** box, select the system and sub system numbers from a drop-down list.
7. In the **Issued Date** box, select the issued date of the client master drawing.
8. In the **Issued To** box, select the purpose of issuing the client mater drawing.
9. In the **Sheet Number** box, enter the sheet number of the client master drawing.
    
    [![image-1651604481413.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604481413.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604481413.png)**Note**: The sheet number is nothing but a page number of the master drawing sheet. If the master drawing is provided in single sheet, the **Sheet No** should be 1 of 1. If the drawing is stretched to two pages, then the **Sheet No** should be 1 of 2 and 2 of 2.
10. In the **Remarks/Description** box, enter your remarks or description if any.
11. Click **Save**.

The client master drawing is successfully added.

#### **3.2.2 Attach a File into a Client Master Drawing** 

If you want to attach any file with any client master drawing listed in the **Client** **Master Drawings** page,

1. Click [![image-1651604598247.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604598247.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604598247.png) (Attach icon) provided in the **Attachment** column for the respective client master drawing in the **Client** **Master Drawings** page. The **File Upload (Client Master Drawings)** page opens.
    
    [![image-1651604620635.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604620635.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604620635.png)
    
    [![image-1651604636291.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604636291.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604636291.png)**Note**: Before uploading any file, read the instructions given in the **File Upload (Client Master Drawings)** page.
2. Click [![image-1651604666691.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604666691.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604666691.png) (**Browse** button) to select a file to be uploaded.
3. Select any file which you want to upload, from your computer.
4. Click [![image-1651604686833.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604686833.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604686833.png) (**Upload** button) to attach the file.

The uploaded file will be displayed in the **File Upload** table.

#### **3.2.3 Edit Any Client Master Drawing**

If you want to edit any existing client master drawing in the **Client** **Master Drawings** page, do the following,

1. Click [![image-1651604753658.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604753658.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604753658.png)(Edit icon) in the **Edit** column for the respective client master drawing. See Fig 3.2. A new window opens to edit the client master drawing.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **3.2.4 Delete Any Client Master Drawing**

If you want to delete any specific client master drawing from the list of client master drawings, you can use [![image-1651604823360.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604823360.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604823360.png) (Delete icon) provided in the **Delete** column of the **Client** **Master Drawings** page, See Fig 6.2. To know how to delete, see the topic, “**Delete Any Area**”.

#### **3.2.5 Export Client Master Drawings List**

You can export a list of client master drawings added in the **Client** **Master Drawings** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **3.2.6 Filter Any Client Master Drawing**

If you want to filter any client master drawing from the list of client master drawings in the **Client** **Master Drawings** page, you can use the [![image-1651604922967.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604922967.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604922967.png) (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.

#### **3.2.7 Import Multiple Client Master Drawings**

If you want to import multiple client master drawings together, do the following,

1. Click [![image-1651605019573.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605019573.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605019573.png) (**TEMPLATE** button) on the **Client** **Master Drawings** See Fig 3.2. A template will be downloaded as an excel worksheet to enter the details of client master drawings.
    
    [![image-1651605039946.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605039946.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605039946.png)
2. Enter the relevant details in the required columns on the excel worksheet.
3. Once you have added the client master drawing details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651605092418.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605092418.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605092418.png)(****IMPORT**** button). See Fig 3.2. A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651605111596.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605111596.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605111596.png)
5. Click [![image-1651605133140.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605133140.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605133140.png) (****Browse**** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651605160791.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605160791.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605160791.png) (**Upload** button) to export the client master drawings that are included in the excel worksheet.

The details of the client master drawings in the worksheet will be displayed in the **Client** **Master Drawings** page.


### **3.3 Master Drawings**

The **Master Drawings** tab helps you to add the master drawing details. If you want to add any master drawing details, do the following,

1. Click **Master Drawings** in the **Project Data** menu.
    
    The **Master Drawings** page opens.
    
    [![image-1651605224694.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605224694.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605224694.png)
    
     **Figure 3.3 Master Drawings page**

#### **3.3.1 Add a Master Drawing**

If you want to add a master drawing, do the following,

1. Click [![image-1651605281438.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605281438.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605281438.png) (**ADD** button) in the **Master Drawings** page. See Fig 3.3. A new window opens to add a master drawing.
    
    [![image-1651605299698.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605299698.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605299698.png)
    
    [![image-1651605310452.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605310452.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605310452.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **Master Drawing No** box, enter the master drawing number.
3. In the **Client Master Drawing** box, select the client master drawing from a drop-down list.
4. In the **Revision** box, enter the revision number.
5. In the **Level** box, enter the level number of the master drawing.
6. In the **Area** box, select an area from a drop-down list.
7. If you want to enable the full traceability option, click the check box provided with the **Full Traceability?** column.
8. In the Sheet Number box, enter the sheet number of the master drawing.
    
    [![image-1651605377911.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605377911.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605377911.png) **Note**: The sheet number is nothing but a page number of the master drawing sheet. If the master drawing is provided in single sheet, the **Sheet No** should be 1 of 1. If the drawing is stretched to two pages, then the **Sheet No** should be 1 of 2 and 2 of 2.
9. In the **Issued Date** box, choose the issued date of the master drawing.
10. In the **Remarks/Description** box, enter your remarks or description if any.
11. In the **Issued To** box, select the purpose of issuing the master drawing, from a drop-down list.
12. Click **Save**.

The master drawing is successfully added.

#### **3.3.2 Attach a File into a Master Drawing** 

If you want to attach any file with any master drawing listed in the **Master Drawings** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **3.3.3 Edit Any Master Drawing**

 If you want to edit any existing master drawing in the **Master Drawings** page, do the following,

1. Click [![image-1651605573165.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605573165.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605573165.png)(Edit icon) in the **Edit** column for the respective master drawing. See Fig 3.3. A new window opens to edit the master drawing.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **3.3.4 Delete Any Master Drawing**

If you want to delete any specific master drawing from the list of master drawings, you can use (Delete icon) provided in the [![image-1651605636955.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605636955.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605636955.png)**Delete** column of the **Master Drawings** page, See Fig 3.3.

1. Click [![image-1651605663402.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605663402.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605663402.png) (Delete icon) for the corresponding master drawing.
    
    You receive a notification message “**Do you want to delete?**”.
2. Click **OK**.
    
    [![image-1651605783245.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605783245.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605783245.png)**Note**: If you receive a notification message “**Delete failed! Please delete dependency records.**”, you must delete the corresponding weld map drawing for the selected master drawing.
    
    [![image-1651605803967.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605803967.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605803967.png)
    
    To delete the corresponding weld map drawing,
3. Navigate to the [<u>Weld Map Drawings</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.4%C2%A0weld-map-drawing) tab.
4. Find out the weld map drawing for the respective master drawing.
    
    [![image-1651605853321.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605853321.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605853321.png)**Tip**: one master drawing has either a single or multiple weld map drawing.
5. Delete the corresponding weld map drawings.
6. Navigate to the ****Master Drawing**** tab, and then repeat the ****steps 1 and 2**** to delete the respective master drawing.

#### **3.3.5 Export Master Drawings List**

You can export a list of master drawings added in the **Master Drawings** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **3.3.6 Filter Any Master Drawing**

If you want to filter any master drawing from the list of master drawings in the **Master Drawings** page, you can use the (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.

#### **3.3.7 Import Multiple Master Drawings**

You can import multiple master drawing details together by using a pre-defined excel template given in the application. If you want to import multiple master drawings together, do the following,

1. Click (**TEMPLATE** button) on the **Master Drawings** page. See Fig 3.3. A template will be downloaded as an excel worksheet to enter the details of master drawings.
    
    [![image-1651605981435.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605981435.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605981435.png)
2. Enter the relevant details in the required columns on the excel worksheet.
3. Once you have added the master drawing details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651606009305.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651606009305.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651606009305.png) (****IMPORT**** button). See Fig 3.3. A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651606035510.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651606035510.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651606035510.png)
5. Click [![image-1651606047740.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651606047740.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651606047740.png) (****Browse**** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651606074760.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651606074760.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651606074760.png) (**Upload** button) to export the master drawings that are included in the excel worksheet.

The details of the master drawings in the worksheet will be displayed in the **Master Drawings** page.


### **3.4 Weld Map Drawings**

Weld map drawing is an isometric drawing that assists in identifying weld joints in the structural project. This drawing also shows areas that will be used for NDT once welding is completed. By using the weld map drawing, the welding cycle and lead times will be reduced accordingly.

If you want to add any weld map drawing details, do the following,

1. Click **Weld Map Drawings** in the **Project Data** menu. The **Weld Map Drawings** page opens.
    
    [![image-1651632961854.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651632961854.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651632961854.png)
    
     **Figure 3.4 Weld Map Drawings page**

#### **3.4.1 Add a Weld Map Drawing**

If you want to add a weld map drawing, do the following,

1. Click [![image-1651633165997.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651633165997.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651633165997.png) (**ADD** button) in the **Weld Map Drawings** page. See Fig 3.4. A new window opens to add a weld map drawing.
    
    [![image-1651633183108.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651633183108.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651633183108.png)
    
    [![image-1651633190623.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651633190623.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651633190623.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the ****Master Drawing No**** box, select a master drawing number from a drop-down list.
3. In the **Weld Map Drawing** **No** box, enter the weld map drawing number.
4. In the **Revision** box, enter the revision number.
5. In the **Drawing Prefix** box, enter the drawing prefix.
6. In the ****Radiographic Testing (RT) Requirement (%)**** box, enter the required percentage of RT.
7. In the ****Ultrasonic Testing (UT) Requirement (%)****box, enter the required percentage of UT.
8. In the ****Magnetic Particle Testing (MT) Requirement (%)**** box, enter the required percentage of MT.
9. In the ****Dye penetrant inspection****(****PT) Requirement (%)**** box, enter the required percentage of PT. <table border="1" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.866%;">The RT Requirement (%), UT Requirement (%), MT Requirement (%) and PT Requirement (%) should be filled with valid numerical numbers. The joint testing will be performed based on the value given by you for example, if you enter 100 % of requirement, which means 100 % of the joints will be tested. If you enter 0 %, none of joints will be tested.
    
    </td></tr></tbody></table>
10. If you want to do the magnetic particle inspection after load test, click the check box provided with the ****Magnetic Particle Inspection (MPI) After Load Test?****
11. If you want to do PT after test, click the check box provided with the **PT After Test?** option.
12. In the **code** option, select any one from American Welding Society (AWS) or American Society of Mechanical Engineers (ASME) or BOTH.
13. In the **Remarks** box, enter your remarks if any.
14. In the **Issued Date** box, choose the issued date of the weld map drawing.
15. In the **Issued To** box, select the purpose of issuing the weld map drawing, from a drop-down list.
16. In the **Description** box, enter the description for the added weld map drawing.
17. Click **Save**.

The weld map drawing is successfully added.

#### **3.4.2 Attach a File into a Weld Map Drawing** 

If you want to attach any file with any weld map drawing listed in the **Weld Map Drawings** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **3.4.3 Edit Any Weld Map Drawing**

 If you want to edit any existing weld map drawing in the **Weld Map Drawings** page, do the following,

1. Click [![image-1651634002562.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651634002562.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651634002562.png)(Edit icon) in the **Edit** column for the respective weld map drawing. See Fig 6.4. A new window opens to edit the weld map drawing.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **3.4.4 Delete Any Weld Map Drawing**

If you want to delete any specific weld map drawing from the list of weld map drawings, you can use [![image-1651634129105.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651634129105.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651634129105.png) (Delete icon) provided in the **Delete** column of the **Weld Map Drawings** page, See Fig 6.4. To know how to delete, see the topic, “**Delete Any Area**”.

#### **3.4.5 Export Weld Map Drawings List**

You can export a list of weld map drawings added in the **Weld Map Drawings** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **3.4.6 Filter Any Weld Map Drawing**

If you want to filter any weld map drawing from the list of weld map drawings in the **Weld Map Drawings** page, you can use the[![image-1651634647616.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651634647616.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651634647616.png) (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.

#### **3.4.7 Import Multiple Weld Map Drawings**

If you want to import multiple weld map drawings together, do the following,

1. Click [![image-1651634687248.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651634687248.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651634687248.png) (**TEMPLATE** button) on the **Weld Map Drawings** page. See Fig 3.4. A template will be downloaded as an excel worksheet to enter the details of weld map drawings.
    
    [![image-1651634704830.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651634704830.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651634704830.png)
2. Enter the relevant details in the required columns on the excel worksheet.
3. Once you have added the weld map drawing details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651634738378.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651634738378.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651634738378.png) (****IMPORT**** button). See Fig 3.4. A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651634764620.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651634764620.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651634764620.png)
5. Click [![image-1651634774866.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651634774866.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651634774866.png) (****Browse**** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651634799476.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651634799476.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651634799476.png) (**Upload** button) to export the weld map drawings that are included in the excel worksheet.

The details of the weld map drawings in the worksheet will be displayed in the **Weld Map Drawings** page.



### **3.5 Sheet Number**

The **Sheet No** tab in the **Project Data** menu helps you to add the sheet number for a weld map drawing. The sheet number is nothing but a page number of the weld map drawing.

<table border="1" id="bkmrk-if-the-weld-map-draw" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">If the weld map drawing is provided in single sheet, the **Sheet No** should be 1 of 1. If the drawing is stretched to two pages, then the **Sheet No** should be 1 of 2 and 2 of 2.

</td></tr></tbody></table>

If you want to add the sheet number, do the following,

1. Click **Sheet No** in the **Project Data** menu. The **Sheet No** page opens.
    
    [![image-1651634900307.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651634900307.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651634900307.png)
    
     **Figure 3.5 Sheet No page**

#### **3.5.1 Add a Sheet Number**

If you want to add a sheet number, do the following,

1. Click [![image-1651634979314.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651634979314.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651634979314.png) (**ADD** button) in the **Sheet No** page. See Fig 3.5. A new window opens to add the sheet number for a weld map drawing.
    
    [![image-1651634992523.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651634992523.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651634992523.png)
    
    [![image-1651635001747.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651635001747.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651635001747.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **Weld Map Drawing** **No** box, select the weld map drawing number from a drop-down list.
    
    [![image-1651635025090.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651635025090.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651635025090.png)**Note**: If you want to add the sheet number for any new weld map drawings. You must add the respective weld map drawing details by using the [<u>Weld Map Drawings</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.4%C2%A0weld-map-drawing) tab.
3. In the ****Sheet No**** box, enter the sheet number of the weld map drawing.
4. Click **Save**.

The sheet number for the corresponding weld map drawing is successfully added.

#### **3.5.2 Edit Any Sheet Number** 

 If you want to edit any existing sheet number for the weld map drawing number in the **Sheet No** page, do the following,

1. Click [![image-1651635089023.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651635089023.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651635089023.png)(Edit icon) in the **Edit** column for the respective weld map drawing number. See Fig 3.5. A new window opens to edit the sheet number for the weld map drawing number.
2. Click a box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **3.5.3 Delete Any Sheet Number**

If you want to delete any specific sheet number of the weld map drawing number from the list of sheet numbers, you can use [![image-1651635142996.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651635142996.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651635142996.png)(Delete icon) provided in the **Delete** column of the **Sheet No** page, See Fig 6.5. To know how to delete, see the topic, “**Delete Any Area**”.

#### **3.5.4 Export Sheet Number List**

You can export a list of sheet numbers of the weld map drawing numbers added in the **Sheet No** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **3.5.5 Filter Any Sheet Number**

If you want to filter any sheet number from the list of sheet numbers in the **Sheet No** page, you can use the (**FILTER** button). To know how to filter, see the topic ,”**Filter Any Area**”.

#### **3.5.6 Import Multiple Sheet Numbers**

If you want to import multiple sheet numbers together, do the following,

1. Click [![image-1651635255006.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651635255006.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651635255006.png) (**TEMPLATE** button) on the **Sheet No** page. See Fig 3.5. A template will be downloaded as an excel worksheet to enter the details of weld map drawing numbers including their sheet numbers.
    
    [![image-1651635270452.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651635270452.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651635270452.png)
2. Enter the relevant details in the required columns on the excel worksheet.
3. Once you have added the sheet number details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651635296198.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651635296198.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651635296198.png) (**IMPORT** button). See Fig 3.5.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651635315337.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651635315337.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651635315337.png)
5. Click [![image-1651635336390.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651635336390.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651635336390.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651635359602.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651635359602.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651635359602.png) (****Upload**** button) to export the sheet numbers that are included in the excel worksheet.

The details of the sheet numbers in the worksheet will be displayed in the **Sheet No** page.



### **3.6 Joints**

In structural project, joints are the points where two or more pieces of materials for example pipes, are joined by welding. The **Joints** tab in the **Project Data** helps you add the joint details including joint number, welding type, and piece mark number.

If you want to add any joint details, do the following,

1. Click **Joints** in the **Project Data** menu. The **Joints** page opens.
    
    [![image-1651635650649.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651635650649.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651635650649.png)
    
     **Figure 3.6 Joints page**

#### **3.6.1 Add a Joint**

If you want to add a joint, do the following,

1. Click [![image-1651639257068.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651639257068.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651639257068.png) (**ADD** button) in the **Joints** page. See Fig 3.6. A new window opens to add a joint.
    
    [![image-1651639273577.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651639273577.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651639273577.png)
    
    [![image-1651639316807.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651639316807.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651639316807.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the ****Weld Map Drawing No**** box, enter the weld map drawing number.
3. In the **Sheet Number** box, select a sheet number from a drop-down list.
4. In the **Joint Number** box, select the joint number from a drop-down list.
    
    [![image-1651639386354.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651639386354.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651639386354.png)**Note**: If you want to enter the range for the joint number, click [![image-1651639414040.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651639414040.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651639414040.png) and then enter the ranges in the **From** and **To** boxes, respectively.
5. In the **Weld Type** box, select a weld type from a drop-down list.
6. In the **Thickness Material 1** box, enter the thickness of the first material.
7. In the **Thickness Material 2** box, enter the thickness of the second material.
8. In the **Weld Length** box, enter the length of welding.
9. In the **Dia (INCH)** box, enter the diameter of the joint.
10. In the **Size** box, enter the size of the welding.
11. In the **Thickness** box, enter the thickness of the welding.
12. In the **Category** box, select the category from a drop-down list.
13. In the **Assembly Mark** box, enter the assembly mark details.
14. Select the NDT requirement from the following options such as **RT Required**, **PT Required**, **MT Required**, and **UT Required**.
15. Click **Save**.

The joint is successfully added.

#### **3.6.2 Assign Piece Mark Number**

If you want to assign the piece mark number for any joint number.

1. Click [![image-1651639593119.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651639593119.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651639593119.png) (**Assign Piece Mark** button) in the **Joints** page. The **Joint Piece Mark** window opens.
    
    [![image-1651639614977.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651639614977.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651639614977.png)
2. In the **Joint No** box, select the joint number from a drop-down list.
    
    Once you have selected the joint number, the piece mark numbers related with the selected joint number appear.
    
    [![image-1651639637027.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651639637027.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651639637027.png)
3. If you want to assign a new piece mark number for the selected joint number, in the **Piece Mark No** box, click and then select the piece mark number from a drop-down list. A new piece mark number will be listed along with the existing piece mark numbers.
    
    [![image-1651639664137.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651639664137.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651639664137.png)
4. Select the new piece mark number.
    
    Once you have selected the new piece mark number, the selected piece mark number is assigned to the respective joint number.
    
    [![image-1651639697650.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651639697650.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651639697650.png)**Note**: If you want to delete any piece mark number, select the respective piece mark and click (**Delete Piece Mark** button). Once you have deleted the piece mark number, the joints related with this piece mark number will also be deleted.

#### **3.6.3 Edit Any Joint**

 If you want to edit any existing joint in the **Joints** page, do the following,

1. Click [![image-1651639745309.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651639745309.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651639745309.png)(Edit icon) in the **Edit** column for the respective joint. See Fig 3.6. A new window opens to edit the joint.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **3.6.4 Delete Any Joint**

If you want to delete any specific joint from the list of joints, you can use [![image-1651639811206.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651639811206.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651639811206.png) (Delete icon) provided in the **Delete** column of the **Joins** page, See Fig 6.6. To know how to delete, see the topic, “**Delete Any Area**”.

#### **3.6.5 Export Joints List**

You can export a list of joints added in the **Joints** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **3.6.6 Filter Any Joint** 

If you want to filter any joint from the list of joints in the **Joints** page, you can use the (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.

#### **3.6.7 Import Multiple Joints**

You can import multiple joint details together by using a pre-defined excel template given in the application. If you want to import multiple joints together, do the following,

1. Click [![image-1651639907035.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651639907035.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651639907035.png) (**TEMPLATE** button) on the **Joints** page. See Fig 3.6. A template will be downloaded as an excel worksheet to enter the details of joints.
    
    [![image-1651639928318.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651639928318.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651639928318.png)
2. Enter the relevant details in the required columns on the excel worksheet.
3. Once you have added the joint details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651639964140.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651639964140.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651639964140.png) (**IMPORT** button). See Fig 3.6.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651640055220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651640055220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651640055220.png)
5. Click [![image-1651640072444.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651640072444.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651640072444.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651640095420.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651640095420.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651640095420.png) (**Upload** button) to export the joints that are included in the excel worksheet.

The details of the joints included in the worksheet will be displayed in the **Joints** page.


### **3.7 Cutting Plan Drawings**

Cutting plan drawing is provided for each master drawing. Usually the Cutting Plan Drawing is prepared in AutoCAD. The drawing portion of the cutting plan drawing will be screen captured. A cutting plan drawing report is generated for sending to the clients.

If you want to add any cutting plan drawing details, do the following,

1. Click **Cutting Plan Drawings** in the **Project Data** menu. The **Cutting Plan Drawings** page opens.
    
    [![image-1651640296443.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651640296443.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651640296443.png)
    
     **Figure 3.7 Cutting Plan Drawings page**

#### **3.7.1 Add a Cutting Plan Drawing**

If you want to add a cutting plan drawing, do the following,

1. Click [![image-1651640425228.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651640425228.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651640425228.png) (**ADD** button) in the **Cutting Plan Drawings** page. See Fig 3.7. A new window opens to add a cutting plan drawing.
    
    [![image-1651640414152.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651640414152.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651640414152.png)
    
    [![image-1651640458626.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651640458626.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651640458626.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **Master Drawing No** box, select a master drawing number from a drop-down list.
3. In the **Drawing Prefix** box, enter the drawing prefix.
4. In the **Cutting Plan Drawing No** box, enter a cutting plan drawing number.
5. In the **Revision** box, enter the revision number.
6. In the **Remarks** box, enter your remarks if any.
7. In the **Issued Date** box, choose the issued date of the cutting plan drawing.
8. In the **Issued To** box, select the purpose of issuing the cutting plan drawing, from a drop-down list.
9. In the **Description** box, enter the description for the added cutting plan drawing.
10. In the **(Computer Numerical Control) CNC Program** No box, enter the CNC program number.
11. In the **Assembly Mark** box, enter the assembly mark.
12. Click **Save**.

The cutting plan drawing is successfully added.

#### **3.7.2 Attach a File into a Cutting Plan Drawing** 

If you want to attach any file with any cutting plan drawing listed in the **Cutting Plan Drawings** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **3.7.3 Edit Any Cutting Plan Drawing**

If you want to edit any existing cutting plan drawing in the **Cutting Plan Drawings** page, do the following,

1. Click [![image-1651640778822.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651640778822.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651640778822.png)(Edit icon) in the **Edit** column for the respective cutting plan drawing. See Fig 3.7. A new window opens to edit the cutting plan drawing.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **3.7.4 Delete Any Cutting Plan Drawing**

If you want to delete any specific cutting plan drawing from the list of cutting plan drawings, you can use [![image-1651640909704.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651640909704.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651640909704.png) (Delete icon) provided in the **Delete** column of the **Cutting Plan Drawings** page, See Fig 6.7. To know how to delete, see the topic, “**Delete Any Area**”.

#### **3.7.5 Export Cutting Plan Drawings List**

You can export a list of cutting plan drawings added in the **Cutting Plan Drawings** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **3.7.6 Filter Any Cutting Plan Drawing**

If you want to filter any cutting plan drawing from the list of cutting plan drawings in the **Cutting Plan Drawings** page, you can use the (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.

#### **3.7.7 Import Multiple Cutting Plan Drawings**

If you want to import multiple cutting plan drawings together, do the following,

1. Click [![image-1651641028775.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651641028775.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651641028775.png) (**TEMPLATE** button) on the **Cutting Plan Drawings** See Fig 3.7. A template will be downloaded as an excel worksheet to enter the details of cutting plan drawings.
    
    [![image-1651641099315.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651641099315.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651641099315.png)
2. Enter the relevant details in the required columns on the excel worksheet.
3. Once you have added the weld map drawing details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651641144917.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651641144917.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651641144917.png) (**IMPORT** button). See Fig 3.7.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651641183876.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651641183876.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651641183876.png)
5. Click [![image-1651641201437.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651641201437.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651641201437.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651641228077.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651641228077.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651641228077.png) (**Upload** button) to export the cutting plan drawings that are included in the excel worksheet.

The details of the cutting plan drawings in the worksheet will be displayed in the **Cutting Plan Drawings** page.


### **3.8 Piece Mark number**

The materials used in the Structural Project are cut into multiple pieces by using the cutting plan drawings, where each piece is provided with respective unique number also known as piece mark number. The piece mark number is manually added by a user, and mapped later with weld joints.

The **Piece Mark Number** tab in the **Project Data** helps you add the piece mark number details including cutting plan drawing number. If you want to add any piece mark number details, do the following,

1. Click **Piece Mark Number** in the **Project Data** menu. The **Piece Mark Number** page opens.
    
    [![image-1651641369721.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651641369721.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651641369721.png)
    
     **Figure 3.8 Piece Mark Number page**
    
    <table border="1" style="border-collapse: collapse; width: 100%; height: 80.1719px;"><tbody><tr style="height: 80.1719px;"><td style="width: 99.866%; height: 80.1719px;">The **Master Drawing No** box and **Cutting Plan Drawing No** boxes provided in the upper right-side of the **Piece Mark Number** page including a drop-down arrow to easily sort the specific master drawing number and cutting plan drawing number. See Fig 3.8.
    
    </td></tr></tbody></table>

#### **3.8.1 Add a Piece Mark Number**

If you want to add a piece mark number, do the following,

1. Click [![image-1651641553160.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651641553160.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651641553160.png)(**ADD** button) in the **Piece Mark Number** page. See Fig 3.8. A new window opens to add a piece mark number.
    
    [![image-1651641582348.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651641582348.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651641582348.png)
    
    [![image-1651641595991.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651641595991.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651641595991.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **Cutting Plan Drawing No** box, select a cutting plan drawing number from a drop-down list.
3. In the **Piece Mark No** box, enter a piece mark number from a drop-down list.
4. In the **Material Description** box, select the material description from a drop-down list.
5. In the **Material Specification** box, select the material specification from a drop-down list.
6. In the **Size/Thickness/Diameter** box, enter the size/thickness/diameter of the material.
7. In the **Width** box, enter the width of the material.
8. In the **Length** box, enter the length of welding.
9. In the **Material Grade 1** box, enter the grade 1 material details.
10. Click **Save**.

The piece mark number is successfully added.

#### **3.8.2 Edit Any Piece Mark Number**

If you want to edit any existing piece mark number in the **Piece Mark Number** page, do the following,

1. Click [![image-1651641741157.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651641741157.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651641741157.png)(Edit icon) in the **Edit** column for the respective piece mark number. See Fig 3.8. A new window opens to edit the piece mark number.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **3.8.3 Delete Any Piece Mark Number**

If you want to delete any specific piece mark number from the list of piece mark numbers, you can use [![image-1651641869351.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651641869351.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651641869351.png) (Delete icon) provided in the **Delete** column of the **Piece Mark Number** page, See Fig 6.8. To know how to delete, see the topic, “**Delete Any Area**”.

#### **3.8.4 Export Piece Mark Numbers List**

You can export a list of piece mark numbers added in the **Piece Mark Number** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **3.8.5 Filter Any Piece Mark Number** 

If you want to filter any piece mark number from the list of piece mark numbers in the **Piece Mark Number** page, you can use the (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.

#### **3.8.6 Import Multiple Piece Mark Numbers**

You can import multiple piece mark numbers together by using a pre-defined template given in the application. If you want to import multiple piece mark numbers together, do the following,

1. Click [![image-1651642035085.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651642035085.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651642035085.png) (**TEMPLATE** button) on the **Piece Mark Number** See Fig 3.8. A template will be downloaded as an excel worksheet to enter the details of piece mark numbers.
    
    [![image-1651642124487.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651642124487.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651642124487.png)
2. Enter the relevant details in the required columns on the excel worksheet.
3. Once you have added the piece mark number details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651642151955.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651642151955.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651642151955.png) (**IMPORT** button). See Fig 3.8.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651642174784.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651642174784.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651642174784.png)
5. Click [![image-1651642190711.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651642190711.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651642190711.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651642214734.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651642214734.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651642214734.png) (**Upload** button) to export the piece mark numbers that are included in the excel worksheet.

The details of the piece mark numbers included in the worksheet will be displayed in the **Piece Mark Number** page.



### **3.9 Import Joints**

The **Import Joints** tab helps you to upload various data for different fields included in the **Project Data** menu instead of uploading data for each field individually. If you want to import data for different fields, do the following,

1. Click the **Import Joints** tab in the **Project Data** menu. The **Excel Import** page opens.
    
    [![image-1651643696076.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651643696076.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651643696076.png)
2. Download a template by clicking “**Click here to Download Sample Template**” to enter the details of data.
    
    An excel worksheet will be downloaded.
    
    [![image-1651643733739.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651643733739.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651643733739.png)
3. Enter the relevant details in the respective column of the excel worksheet based on the columns listed in the **Required Columns to Import** field.
4. Click [![image-1651643761031.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651643761031.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651643761031.png) (**Choose File** button).
    
    Once the file has been uploaded successfully, you receive a message, “**Successfully uploaded**”
5. Click [![image-1651643790936.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651643790936.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651643790936.png) (**Get Columns** button).
    
    The columns added in the excel worksheet will be listed in the **Excel Column** field. The system automatically maps the **Required Columns to Import** field and the **Excel Column** field and displays in the **Mapped Columns** field.
    
    [![image-1651643948582.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651643948582.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651643948582.png)
6. If you want to map any columns or to u map any mapped columns, select the respective columns and then click [![image-1651643862545.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651643862545.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651643862545.png)(**Map** button) and [![image-1651643881266.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651643881266.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651643881266.png) (**UnMap** button) accordingly.
7. Once you have completed the mapping and un mapping of columns, in the **Upload Range From** and **To** fields, enter the range of rows you want to upload from the excel worksheet.
    
    [![image-1651643971051.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651643971051.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651643971051.png)**Note**: In the **Total Rows** field, the system indicates the total number of rows filled in the excel worksheet.
    
    [![image-1651643983888.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651643983888.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651643983888.png) **Tip**: You must enter the upload starting range as two in the **Upload Range From** field because a first row in the excel worksheet is having heading of the columns.
8. Click [![image-1651644005233.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651644005233.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651644005233.png) (**Populate Value** button).
9. Click [![image-1651644019267.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651644019267.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651644019267.png) (**Process** button).
    
    Once you have clicked the Process button, the system processes the columns and displays in the **Excel Import** page.
    
    [![image-1651644083553.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651644083553.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651644083553.png)
10. Click (**Import** button) to import the data added in the excel worksheet.



### **3.10 Joints Bulk Edit**

The **Joints Bulk Edit** tab in the **Structural** menu used to hide the specific joints, which are added using the [**<u>Joints</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.6%C2%A0joints) tab.

<table border="1" id="bkmrk-once-the-joints-have" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Once the joints have been hidden, the joints will not be available while adding any fit-up request.

</td></tr></tbody></table>

If you want to hide any joints, do the following,

1. Click the **Joints Bulk Edit** tab. The **Joints Bulk Update** page opens with a list of added joints.
    
    [![image-1651644202743.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651644202743.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651644202743.png)
    
    The **Joints Bulk Update** page shows the weld map drawing number, sheet number, and piece mark number for the corresponding joint number.
2. If you want to hide any joints, select the checkbox of the respective joints, in the ****Hide Joint**** column of the ****Joints Bulk Update**** page.
3. Click **Save Changes**.

The selected joints will be hidden.

### **3.11 Assign Unique/ WPS No**

The **Assign Unique/WPS No** tab in the **Project Data** menu allows you to assign the unique and WPS numbers for the specific joint number, piece mark number, and weld map drawing number.

#### **3.11.1 Assign Unique No**

If you want to assign a unique number for any joint number, piece mark number, and weld map drawing number, do the following,

1. Click the **Assign Unique/WPS No** tab in the ****Project Data**** menu. The **Assign Unique/WPS No** page opens including a list of joint numbers, piece mark numbers, and weld map drawing numbers.
    
    [![image-1651644333210.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651644333210.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651644333210.png)
2. Click the **Assign Unique No** option.
    
    A list of unique numbers appears below the **Assign Unique No** option.
3. If you want to assign any unique number, select the respective unique number, and then select the respective check boxes of the joint numbers, piece mark numbers, and weld map drawing numbers provided in the ****Assign?****
4. Click **Save**.

#### **3.11.2 Assign WPS No**

If you want to assign a WPS number for any joint number, piece mark number, and weld map drawing number, do the following,

1. Click the **Assign WPS No** option in the **Assign Unique No/WPS No** page. [![image-1651644472175.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651644472175.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651644472175.png)
    
    A list of unique numbers appears below the **Assign WPS No** option.
2. If you want to assign any WPS number, select the respective WPS number, and then select the respective check boxes of the joint numbers, piece mark numbers, and weld map drawing numbers provided in the **Assign?** column.
3. Click **Save**.


### **3.12 Clone Project**

The **Clone Project** tab in the Project Data menu helps you to clone the items of any one project to another project. Once you have completed the project cloning, the items are copied into the selected project without need to uploading the items again. If you want to clone any project, do the following,

1. Click the **Clone Project** tab in the **Project Data** menu.
    
    The **CLONE PROJECT** page opens.
    
    [![image-1651644550370.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651644550370.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651644550370.png)
    
     **Figure 3.12: Clone Project page**
2. In the **From Project** box, select a project from which you want to clone the items, from a drop-down list.
3. In the **To Project** box, select a project to which you want to clone the items, from a drop-down list.
4. In the ****Items to clone**** box, select the items you want to clone.
5. Click **Clone**.



### **3.13 Welders in Projects**

The **Welders in Projects** tab in the **Project Data** menu helps you to assign welders for a project. You can add a welder report by using this tab. This tab also helps you to view a welder list and WPQ details.

1. Click the **Welders in Projects** tab in the **Project Data** menu. The welders in projects page opens with four fields such as **Welder Report**, **Assign Welder to Project**, **Welder List**, and **WPQ Details**.
    
    [![image-1651644658879.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651644658879.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651644658879.png)
    
     **Figure 3.13: Welders in project page**

#### **3.13.1 Add a Welder Report**

If you want to add a welder report, do the following,

1. Click [![image-1651644710412.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651644710412.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651644710412.png) (**ADD** button) in the **Welder Report** See Fig 3.13. A new window opens to add a welder report.
    
    [![image-1651644732514.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651644732514.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651644732514.png)
    
    [![image-1651644743645.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651644743645.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651644743645.png)**Tip**: A report number for a new welder report will be updated automatically in the **Report Number** box.
2. In the **Prepared By** box, enter the name of welder who has prepared the welder report.
3. In the **Received By** box, enter the name of welder who has received the welder report.
4. In the **Approved By** box, enter the name of welder who has approved the welder report.
5. In the **Prepared Date** box, choose the prepared date of the welder report.
6. In the **Received Date** box, choose the received date of the welder report.
7. In the **Approved Date** box, choose the approved date of the welder report.
8. Click **Save**.

The welder report is successfully added.

#### **3.13.2 Export Welder Reports List**

You can export a list of welder reports in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **3.13.3 Assign Welder to Project**

The **Assign Welder to Project** field in the welders in projects page allows you to assign any welder to the project. If you want to assign any welder to the project, do the following,

[![image-1651645184559.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651645184559.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651645184559.png)

1. In the **All Welders** box, if you want to view all the welders, click **ALL** otherwise select the respective company’s welder group from a drop-down list to view their welders list. Once you have selected the company’s welder group, the left-side box shows a list of welders. The right-side box shows a list of welders who has been already assigned for the project.
2. If you want to assign any welder for the project, select the respective welder in the left-side box, and then click (Assign welder button).
    
    The selected welder will be assigned to the project.
3. If you want to reject any welder who has been assigned for the project, select the respective welder in the right-side box, and then click (Reject welder button).

#### **3.13.4 Welder List**

The **Welder List** field in the welders in projects page shows the welder details such as welder name, welder number, NRIC, date of birth, and nationality. This field also helps you to assign the WPQs of welders to the project, and remove any WPQs from the project.

[![image-1651645297106.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651645297106.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651645297106.png)

If you click [![image-1651645314112.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651645314112.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651645314112.png)(Expand icon) of the respective welder, the **All WPQ** box shows the details of all WPQs of the welder, and the **Assigned to Project** box shows any WPQ that has been assigned to a project.

[![image-1651645325285.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651645325285.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651645325285.png)

1. If you want to assign any WPQ for the project, select the respective WPQ in the **All WPQ** box, and then click [![image-1651645366344.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651645366344.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651645366344.png) (Assign WPQ button). The selected welder will be assigned to the project.
2. If you want to reject any WPQ that has been assigned for the project, select the respective WPQ in the ****Assigned to Project**** box, and then click (Reject WPQ button).

#### **3.13.5 WPQ details**

The **WPQ details** field in the welders in projects page shows the WPQ details of each welder including welder’s name, welder number, welding process name, weld metal thickness, and position.

[![image-1651645423214.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651645423214.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651645423214.png)

If you want to take a print of any WPQ details, click the checkbox provided in the **Print** Column.


### **3.14 Inspectors in Projects**

The **Inspectors in Projects** tab in the **Project Data** menu helps you to map inspectors for the specific project.

1. Click the **Inspectors in Projects** tab. The **Project Mapping – Inspectors** page opens.
    
    [![image-1651645479240.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651645479240.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651645479240.png)
    
     **Figure 3.14: Project Mapping – Inspectors page**
    
     The **Project Mapping – Inspectors** page shows a list of inspectors, which is added in the **Master Data**. If you want to map any inspectors for a specific project, do the following,
2. Select a project you want from the **Projects** box.
    
    A list of available inspectors will be displayed.
3. Select the check box of the respective inspector which you want to map for the selected project.
    
    [![image-1651645606781.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651645606781.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651645606781.png)
4. Click [![image-1651645629170.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651645629170.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651645629170.png) (Map icon).
    
    The selected inspectors are mapped for the selected project.
    
    [![image-1651645646134.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651645646134.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651645646134.png)
    
    The **Inspector List** window shows the inspector’s name, login name, NRIC, and Date of birth.


### **3.15 WPS by Projects**

WPS is a written instruction that specifies materials, consumables and edge preparations for a given joint. The WPS lists the pre- and post-weld operations including heat treatments; machining, grinding, and dressing of the weld.

The **WPS by Projects** tab in the **Project Data** menu helps you to add a WPS report and assign the WPS to a project.

1. Click the **WPS by Projects** tab in the **Project Data** menu. The WPS by projects page opens with two fields such as **WPS Summary** and **Assign WPS to Project**.
    
    [![image-1651645760833.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651645760833.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651645760833.png)
    
     **Figure 3.15: WPS by projects page**

#### **3.15.1 Add a WPS Report**

If you want to add a new WPS report, do the following,

1. Click [![image-1651645825401.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651645825401.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651645825401.png) (**ADD** button) in the **WPS Summary** field. See Fig 3.15. A new window opens to add a WPS report.
    
    [![image-1651645840670.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651645840670.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651645840670.png)
    
    [![image-1651645851632.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651645851632.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651645851632.png)**Tip**: A report number for a new WPS report will be updated automatically in the **Report Number** box.
2. In the ****Prepared By**** box, enter the name of a person who has prepared the WPS report.
3. In the **Reviewed By** box, enter the name of a person who has reviewed the WPS report.
4. In the **Approved By** box, enter the name of a person who has approved the WPS report.
5. In the **Prepared Date** box, choose the prepared date of the WPS report.
6. In the **Reviewed Date** box, choose the reviewed date of the WPS report.
7. In the **Approved Date** box, choose the approved date of the WPS report.
8. Click **Save**.

The WPS report is successfully added.

#### **3.15.2 Export WPS Reports List**

You can export a list of added WPS reports in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **3.15.3 Assign WPS to Project**

The **Assign WPS to Project** field in the WPS in projects page allows you to assign the WPS to the project. If you want to assign any WPS to the project, do the following,

[![image-1651646002495.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651646002495.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651646002495.png)

In the **Assign WPS to Project** field, the **All WPS** box displays a list of available WPS. The **WPS in Project** box displays a list of WPS that has been already assigned for the project.

1. If you want to assign any WPS for the project, select the respective WPS in the **ALL WPS** box, and then click [![image-1651646036889.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651646036889.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651646036889.png)(Assign welder button). The selected WPS will be assigned to the project.
2. If you want to reject any WPS that has been assigned for the project, select the respective WPS in the ****WPS in Project**** box, and then click [![image-1651646070738.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651646070738.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651646070738.png) (Reject welder button).


### **3.16 Master Equipment**

The **Master Equipment** tab in the **Project Data** menu used to add a master equipment.

1. Click **Master Equipment** in the **Project Data** menu. The **Master Equipment** page opens.
    
    [![image-1651646129602.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651646129602.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651646129602.png)
    
     **Figure 3.16: Master Equipment**

#### **3.16.1 Add a Master Equipment**

If you want to add a master equipment,

1. Click (**ADD** button) in the **Master Equipment** page. See Fig 3.16. A new window opens to add a master equipment.
    
    [![image-1651658167523.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651658167523.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651658167523.png)
2. In the **Tag Number** box, enter the tag number.
3. In the **Description** box, enter the description for the master equipment.
4. In the **Sequence Number** box, enter the sequence number.
5. In the **Sub System** box, select a sub system.
6. In the **Area** box, enter the area name.
7. In the **Location** box, enter the location name.
8. In the **Vendor PID** box, enter the vendor PID number.
9. In the **Layout** box, enter the layout detail.
10. In the **Parent Tag** box, enter the parent tag number.
11. In the **PO Number** box, enter the PO number.
12. In the **Manufacturer** box, enter the manufacturer name.
13. In the **Supplier** box, enter the supplier name.
14. In the **Length** box, enter the length of the master equipment.
15. In the **Width** box, enter the width of the master equipment.
16. In the **Height** box, enter the height of the master equipment.
17. In the **Diameter** box, enter the diameter of the master equipment.
18. In the **Dry Weight** box, enter the dry weight of the master equipment.
19. In the **Operating Weight** box, enter the operating weight of the master equipment.
20. In the **Insulation Type** box, enter the insulation type.
21. In the **Serial Number** box, enter the serial number.
22. In the **Remarks** box, enter your remarks if any.
23. In the **Engineering Status** box, enter the engineering status.
24. Click **Save**.

The master equipment is successfully added.

#### **3.16.2 Map CR/CS**

If you want to map Check Record/Check Sheet (CR/CS) for any added master equipment,

1. Click [![image-1651658382695.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651658382695.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651658382695.png)(Add icon) provided in the **Map CR/CS** column. The **Map CR/CS** window opens.
    
    [![image-1651658397833.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651658397833.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651658397833.png)
2. Select the checkbox of the CR/CS which you want to map.
3. Click **Save/Close**.

#### **3.16.3 Clone a Master Equipment**

The **Clone** option in the **Clone** column of the **Master Equipment** page used to add a master equipment as a copy of the previously added master equipment, See Fig 3.16.

1. Click [![image-1651658530987.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651658530987.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651658530987.png) (Clone icon) in the **Clone** column of the **Master Equipment** page. A new window opens to add the master equipment.
2. Enter the details of the master equipment.
    
    The new master equipment will be added.

#### **3.16.4 Edit Any Master Equipment**

If you want to edit any master equipment in the **Master Equipment** page, do the following,

1. Click [![image-1651658605034.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651658605034.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651658605034.png)(Edit icon) in the **Edit** column for the respective master equipment. See Fig 3.16. The page shows the added details of the master equipment.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **3.16.5 Export Master Equipments List**

You can export a list of master equipment added in the **Master Equipment** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **3.16.6 Filter Any Master Equipment** 

If you want to filter any master equipment from the list of master equipments in the **Master Equipment** page, you can use the [![image-1651658691350.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651658691350.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651658691350.png) (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.

#### **3.16.7 Import Multiple Master Equipments**

You can import multiple master equipments together by using a pre-defined template given in the application. If you want to import multiple master equipments together, do the following,

1. Click [![image-1651658744474.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651658744474.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651658744474.png) (**TEMPLATE** button) on the **Master Equipment** See Fig 3.16. A template will be downloaded as an excel worksheet to enter the details of master equipment.
    
    [![image-1651658762614.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651658762614.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651658762614.png)
2. Enter the relevant details in the required columns on the excel worksheet.
3. Once you have added the master equipment details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651658794990.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651658794990.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651658794990.png) (****IMPORT**** button). See Fig 3.16. A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651658856308.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651658856308.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651658856308.png)
5. Click [![image-1651658877295.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651658877295.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651658877295.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651658895629.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651658895629.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651658895629.png) (**Upload** button) to export the piece mark numbers that are included in the excel worksheet.

The details of the master equipments included in the worksheet will be displayed in the **Master Equipment** page.


### **3.17 Systems**

You can add the details of systems to be used in the Structural project by using the **Systems** tab in the **Project Data** menu. If you want to navigate to **Systems,**

1. Click **Systems** in the **Project Data** menu. The **System** page opens.
    
    [![image-1651658984663.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651658984663.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651658984663.png)
    
     **Figure 3.17: System page**

#### **3.17.1 Add System**

If you want to add a new system, do the following steps,

1. Click [![image-1651659058478.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659058478.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659058478.png) (**ADD** button) in the **System** page. See Fig 3.17. A new window opens to add a new system.
    
    [![image-1651659080729.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659080729.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659080729.png)
    
    [![image-1651659093576.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659093576.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659093576.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **System** box, enter the system name.
3. In the **Abbreviation** box, enter the abbreviation for the system name.
4. In the **System Number** box, enter the system number.
5. Click **Save.**
    
    The system is successfully added and listed in the **System** page.
    
    [![image-1651659141800.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659141800.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659141800.png)**Note**: If you want to map cover page for any added system, click the respective [![image-1651659166560.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659166560.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659166560.png)(Add icon) provided in the **Map Cover Page** column and add the cover pages.
    
    If you want to map certificates for any added system, click the respective (Add icon) provided in the **Map Certificates** column and add the cover pages.
    
    If you want to map Check Record/Check Sheet (CR/CS) for any added system, click the respective (Add icon) provided in the **Map CR/CS** column and add the cover pages.

#### **3.17.2 Edit System**

If you want to edit any existing system in the **System** page,

1. Click [![image-1651659256503.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659256503.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659256503.png)(Edit icon) of the respective System. See Fig 3.17. The **System** page shows the details of the selected system.
2. Edit the details where you want.
3. Click **Save**.

#### **3.17.3 Delete System**

If you want to delete any existing system in the **System** page, you can use [![image-1651659320550.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659320550.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659320550.png) (Delete icon) provided in the **System** page. To know how to delete, see the topic, “**Delete Any Area**”.

#### **3.17.4 Export System List**

You can export a list of systems added in the **System** page in both the pdf and excel formats by using[![image-1651659355160.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659355160.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659355160.png) (**PDF** button) and [![image-1651659366247.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659366247.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659366247.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **3.17.5 Filter System**

If you want to filter any specific system in the **System** page, you can use [![image-1651659424215.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659424215.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659424215.png) (**FILTER** button) located on the **System** page. To know how to filter, see the topic, ”**Filter Any Area**”.

#### **3.17.6 Import Multiple Systems**

If you want to import multiple systems together, do the following,

1. Click [![image-1651659462780.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659462780.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659462780.png) (**TEMPLATE** button). See Fig 3.17. An excel worksheet will be downloaded with a predefined template to enter the details of systems.
    
    [![image-1651659480729.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659480729.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659480729.png)
2. Enter the required system details in the respective columns of the excel worksheet.
3. Once you have added the system details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651659510503.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659510503.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659510503.png) (**IMPORT** button). See Fig 3.17.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651659540075.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659540075.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659540075.png)
5. Click [![image-1651659552512.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659552512.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659552512.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651659573527.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659573527.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659573527.png) (**Upload** button) to export the systems that are included in the excel worksheet.

The details of the systems in the worksheet will be displayed in the **System** page.

#### **3.17.7 Attach a File into a System**

If you want to attach any file with any system listed in the **System** page, you can attach the file by using [![image-1651659636106.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659636106.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659636106.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)”.



### **3.18 Sub Systems**

The **Sub** **Systems** tab in the **Project Data** menu helps you to add the details of sub systems to be in used in the Structural Project. If you want to navigate to **Sub** **Systems,**

1. Click **Sub** **Systems** in the **Project Data** menu. The **Sub** **Systems** page opens.
    
    [![image-1651659685247.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659685247.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659685247.png)
    
     **Figure 3.18: Sub System page**

#### **3.18.1 Add Sub System**

If you want to add a new sub system, do the following steps,

1. Click [![image-1651659747623.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659747623.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659747623.png) (**ADD** button) in the **Sub** **System** page. See Fig 3.18. A new window opens to add a new sub system.
    
    [![image-1651659765371.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659765371.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659765371.png)
    
    [![image-1651659788121.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659788121.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659788121.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **System** box, select a system from a drop-down list.
3. In the **Sub** **System** box, select a sub system from a drop-down list.
4. In the **Abbreviation** box, enter the abbreviation for the sub system.
5. In the **Sub** **System Number** box, enter the sub system number.
6. If the added subsystem needs to be flushed, select ****Yes**** in the ****Flushing**** option otherwise select ****No****.
7. If there is need to perform the leakage test for the added subsystem, select **Yes** in the **Leak Test** option otherwise select **No**.
8. In the **Description** box, enter the description for the added sub system.
9. Click **Save.**

The sub system is successfully added and listed in the **Sub** **System** page.

#### **3.18.2 Edit Sub System**

If you want to edit any existing sub system in the **Sub** **System** page,

1. Click [![image-1651659889101.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659889101.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659889101.png)(Edit icon) of the respective sub system. See Fig 6.18.
    
    The **Sub System** page shows the details of the selected sub system.
2. Edit the details where you want.
3. Click **Save**.

#### **3.18.3 Delete Sub System**

If you want to delete any existing sub system in the **Sub System** page, you can use [![image-1651660397600.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660397600.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660397600.png) (Delete icon) provided in the **Sub** **System** page. To know how to delete, see the topic, “**Delete Any Area**”.

#### **3.18.4 Export Sub System List**

You can export a list of sub systems added in the **Sub System** page in both the pdf and excel formats by using [![image-1651660435867.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660435867.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660435867.png) (**PDF** button) and [![image-1651660447199.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660447199.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660447199.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **3.18.5 Filter Sub System**

If you want to filter any specific sub system in the **Sub System** page, you can use (**FILTER** button) located on the **Sub System** page. To know how to filter, see the topic, ”**Filter Any Area**”.

#### **3.18.6 Import Multiple Sub Systems**

If you want to import multiple sub systems together, do the following,

1. Click [![image-1651660524739.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660524739.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660524739.png) (**TEMPLATE** button). See Fig 3.18. An excel worksheet will be downloaded with a predefined template to enter the details of sub systems.
    
    [![image-1651660604610.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660604610.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660604610.png)
2. Enter the required sub system details in the respective columns of the excel worksheet.
3. Once you have added the sub system details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651660633001.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660633001.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660633001.png) (****IMPORT**** button). See Fig 3.18. A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651660653449.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660653449.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660653449.png)
5. Click [![image-1651660666611.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660666611.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660666611.png) (****Browse**** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651660691446.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660691446.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660691446.png) (**Upload** button) to export the sub systems that are included in the excel worksheet.
    
    The details of the sub systems in the worksheet will be displayed in the **Sub System** page.

#### **3.18.7 Attach a File into a Sub System**

If you want to attach any file with any sub system listed in the **Sub** **System** page, you can attach the file by using [![image-1651660738631.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660738631.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660738631.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)”.



### **3.19 Import from Excel – Masters**

The **Import from Excel – Masters** tab helps you to upload master data for all fields instead of uploading data for each field individually.

If you want to import master data for different fields, do the following,

1. Click **Import from Excel – Masters** in the **Project Data** menu. The **File Upload** page opens.
    
    [![image-1651660795562.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660795562.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660795562.png)
    
     **Figure 3.19: File Upload page**
2. Download a template by using [![image-1651660833226.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660833226.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660833226.png) (****TEMPLATE**** button) to enter the details of master data. An excel worksheet will be downloaded with a pre-defined template to the details.
    
    [![image-1651660852438.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660852438.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660852438.png)
3. Enter the relevant details in the respective column of the excel worksheet.
4. Click [![image-1651660872295.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660872295.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660872295.png) (Choose File button).
    
    Once the file has been uploaded successfully, you receive a message, “Successfully uploaded”
5. Click [![image-1651660894378.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660894378.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660894378.png) (Get Columns button).
    
    The columns added in the excel worksheet will be listed in the **Excel Column** field.
    
    [![image-1651660919098.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660919098.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660919098.png)**Note**: Make sure that the **Excel Column** field must have all the columns as in the **System Column** field.
6. To map the columns in the **System Column** and **Excel Column** fields, do one of the following,
    
    
    1. 1. If you want to map the columns automatically, click [![image-1651660951231.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660951231.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660951231.png) (****AutoMap**** button). The columns will be mapped automatically and displayed in the **Mapped Columns** field.
        2. If you want to map each column manually, select the respective columns in both the ****System Column****and ****Excel Column**** fields and then click [![image-1651660978678.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660978678.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660978678.png) (****Map**** button). The selected columns will be mapped and displayed in the **Mapped Columns** field.
            
            [![image-1651660997379.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660997379.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660997379.png)
7. To un-map the columns in the ****Mapped Columns**** field, select the respective column and then click [![image-1651661022156.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661022156.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661022156.png) (****UnMap**** button). Once you have completed the mapping and un-mapping of columns, you must enter the range for uploading the data from the excel worksheet.
    
    [![image-1651661050096.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661050096.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661050096.png)**Note**: In the **Total Rows** field, the system indicates the total number of rows filled in the excel worksheet.
    
    [![image-1651661067152.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661067152.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661067152.png)**Tip**: You must enter the upload starting range as two in the **Upload Range From** field because a first row in the excel worksheet is having heading of the columns.
8. In the **Upload Range From and To** fields, enter the range of rows you want to upload from the excel worksheet.
9. Click [![image-1651661097560.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661097560.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661097560.png) (**Populate Values** button).
    
    The data are populated.
10. Click [![image-1651661121751.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661121751.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661121751.png) (**Process** button). The system processes all the uploaded data and displays in the **Excel Import** page.
    
    [![image-1651661139834.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661139834.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661139834.png)
11. Click [![image-1651661155970.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661155970.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661155970.png) (**Update** button) to import the uploaded data. The data will be successfully imported.


### **3.20 Workflow Settings**

The **Workflow Settings** tab in the **Project Data** menu used to set a workflow in the **Structural** project.

1. Click **Workflow Settings** in the **Project Data** menu. The **Workflow** page opens.
    
    [![image-1651661209382.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661209382.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661209382.png)
    
     **Figure 3.20: Workflow page**

#### **3.20.1 Add a Workflow**

If you want to add a workflow,

1. Click [![image-1651661336807.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661336807.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661336807.png) (**ADD** button) in the **Workflow** page. See Fig 3.20. The page shows a new window to add the category.
    
    [![image-1651661351358.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661351358.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661351358.png)
2. In the **Category** box, select a category from a drop-down list.
3. Click **Save**.
    
    The added category will be listed in the **Workflow** page. See Fig 3.20.
4. Click [![image-1651661385763.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661385763.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661385763.png) (Add icon) of the respective category.
    
    The **Workflow Details** window opens.
    
    [![image-1651661414300.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661414300.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661414300.png)
5. Click [![image-1651661433296.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661433296.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661433296.png) (**ADD** button) in the **Workflow Details** window. [![image-1651661444807.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661444807.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661444807.png)
6. In the **Role Name** box, select a role name from a drop-down list.
7. In the **Description** box, enter the description for the role name.
8. Click **Save**.

#### **3.20.2 Edit a Workflow**

If you want to edit any existing workflow in the **Workflow** page,

1. Click [![image-1651661497735.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661497735.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661497735.png) (Edit icon) of the respective workflow. See Fig 3.20. The **Workflow** page shows the details of the selected workflow.
2. Edit the details where you want.
3. Click **Save**.

#### **3.20.3 Delete a Workflow**

If you want to delete any existing workflow in the **Workflow** page, you can use [![image-1651661550815.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661550815.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661550815.png) (Delete icon) provided in the **Workflow** page. To know how to delete, see the topic, “**Delete Any Area**”.

#### **3.20.4 Export Workflow List**

You can export a list of workflows added in the **Workflow** page in both the pdf and excel formats by using [![image-1651661587577.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661587577.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661587577.png) (**PDF** button) and [![image-1651661597068.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661597068.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661597068.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **3.20.5 Filter Any Workflow** 

If you want to filter any specific workflow, you can use (**FILTER** button) located on the **Workflow** page. To know how to filter, see the topic, ”**Filter Any Area**”.



### **3.21 Job Code**

Job codes are individualized sets of numbers assigned to different jobs in order to identify which class a position belongs to. The **Job Code** tab in the **Project Data** menu used to add a job code.

1. Click **Job Code** in the **Project Data** menu. The **Job Code** page opens.
    
    [![image-1651765401217.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651765401217.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651765401217.png)
    
     **Figure 3.21: Job Code page**

#### **3.21.1 Add a Job Code**

If you want to add a new job code, do the following steps,

1. Click [![image-1651765475784.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651765475784.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651765475784.png) (**ADD** button) in the **Job Code** page. See Fig 3.21. A new window opens to add a new job code.
    
    [![image-1651765490621.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651765490621.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651765490621.png)
    
    [![image-1651765515658.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651765515658.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651765515658.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **Description** box, enter the description for a job code you want to add.
3. In the **Item No** box, enter the item number.
4. In the **Job Code** box, enter the job code.
5. In the **VO No** box, enter the VO number.
6. Click **Save**.
    
    The job code is added and listed in the **Job Code** page.

#### **3.21.2 Edit Any Job Code**

If you want to edit any existing job code in the **Job Code** page,

1. Click [![image-1651765593941.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651765593941.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651765593941.png) (Edit icon) of the respective job code. See Fig 3.21.
    
    The **Job Code** page shows the details of the selected job code.
2. Edit the details where you want.
3. Click **Save**.

#### **3.21.3 Delete Any Job Code**

If you want to delete any existing job code in the **Job Code** page, you can use [![image-1651765816873.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651765816873.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651765816873.png) (Delete icon) provided in the **Job Code** page. To know how to delete, see the topic, “**Delete Any Area**”.

#### **3.21.4 Export Job Code List**

You can export a list of job codes added in the **Job Code** page in both the pdf and excel formats by using [![image-1651765854917.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651765854917.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651765854917.png) (**PDF** button) and [![image-1651765864111.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651765864111.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651765864111.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **3.21.5 Filter Any Job Code**

If you want to filter any specific job code in the **Job Code** page, you can use [![image-1651766144926.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651766144926.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651766144926.png) (**FILTER** button) located on the **Job Code** page. To know how to filter, see the topic, ”**Filter Any Area**”.

#### **3.21.6 Import Multiple Job Codes**

If you want to import multiple job codes together, do the following,

1. Click [![image-1651766197607.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651766197607.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651766197607.png) (**TEMPLATE** button). See Fig 3.21.
    
    An excel worksheet will be downloaded with a predefined template to enter the details of job code.
2. Enter the required job code details in the respective columns of the excel worksheet.
3. Once you have added the job code details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651766248525.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651766248525.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651766248525.png) (****IMPORT**** button). See Fig 3.21. A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651766283289.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651766283289.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651766283289.png)
5. Click [![image-1651766303105.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651766303105.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651766303105.png) (****Browse**** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651766330356.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651766330356.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651766330356.png) (****Upload**** button) to export the sub systems that are included in the excel worksheet.

The details of the job codes in the worksheet will be displayed in the **Job Code** page.


### **3.22 Inspection Test Plan (ITP)**

ITP is a document or series of documents used for quality assurance purposes. ITP outlines how the quality of a particular material will be ensured both at beginning and throughout the service life.

The **Inspection Test Plan** tab in the **Project Data** menu allows you to add the inspection test plan report. If you want to add the inspection test plan report, do the following,

1. Click the ****Inspection Test Plan**** tab in the ****Project Data**** menu. The **Inspection Test Plan (ITP)** page opens.
    
    [![image-1651766524487.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651766524487.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651766524487.png)
    
     **Figure 3.22: ITP page**
    
    [![image-1651766600973.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651766600973.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651766600973.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the ****Template**** box, select a template from a drop-down list appears on the ****Select from Templates**** box or the ****Select from Equipments**** box. [![image-1651768298928.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651768298928.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651768298928.png)**Tip**: A report number for the ITP report will be updated automatically in the **ITP** **Report Number** box.
3. In the **ITP Status** box, select the ITP status from a drop-down list.
4. In the **Date** box, choose the date of status update.
5. In the ****Non-Destructive Examination (NDE)****box, enter the NDE details.
6. In the **Remarks** box, enter your remark if any.
7. In the **Prepared By** box, enter the name of a person who has prepared the ITP report.
8. In the **Reviewed By** box, enter the name of a person who has reviewed the ITP report.
9. In the **Approved By** box, enter the name of a person who has approved the ITP report.
10. In the **Prepared Date** box, choose the prepared date of the ITP report.
11. In the **Reviewed Date** box, choose the reviewed date of the ITP report.
12. In the **Approved Date** box, choose the approved date of the ITP report.
13. Click **Save**.
    
    The ITP report is successfully added.

#### **3.22.1 Export ITP reports list**

You can export a list of added ITP reports in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.


### **3.23 Check List**

The Check List tab in the Project Data menu helps you to add a check list that will be used in adding a final visual test report.

1. Click the **Check List** tab in the **Project Data** menu. The **Check List** page opens.
    
    [![image-1651768493338.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651768493338.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651768493338.png)
    
     **Figure 3.23: Check List page**

#### **3.23.1 Add a Check List** 

If you want to add a check list,

1. Click [![image-1651768901952.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651768901952.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651768901952.png) (**ADD** button) in the **Check List** page. See Fig 3.23. A new window opens to add a check list.
    
    [![image-1651768922326.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651768922326.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651768922326.png)
    
    [![image-1651768935019.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651768935019.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651768935019.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that field before saving.
2. In the **Check List** box, enter the check list number.
3. In the **Comments** box, type your comments if any.
4. Click **Save**.
    
    The check list is added successfully.

#### **3.23.2 Export Check Lists**

You can export a list of added check lists in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.



### **3.24 NDT Procedures**

The NDT procedures tab in the **Project Data** menu helps you to add an NDT procedure. If you want to add an NDT procedure, do the following,

1. Click **NDT Procedures** in the **Project Data** menu. The **NDT Procedure** page opens.
    
    [![image-1651770484433.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651770484433.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651770484433.png)
    
     **Figure 3.24: NDT Procedure page**

#### **3.24.1 Add an NDT Procedure**

If you want to add an NDT procedure,

1. Click [![image-1651770610751.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651770610751.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651770610751.png) (**ADD** button) in the **NDT Procedure page. See Fig 3.24. A new window opens to add an NDT procedure.
    
    [![image-1651770632875.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651770632875.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651770632875.png)
2. In the **NDT Procedure** box, select the NDT procedure from a drop-down list.
3. In the **NDT Procedure Title** box, enter the NDT procedure title.
4. Click **Save**.

The NDT procedure is successfully added.

#### **3.24.2 Add NDT Procedure Revision**

Once you have added the NDT procedure, you must add the NDT procedure revision. You can add multiple revisions for one NDT procedure.

1. Click [![image-1651770736554.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651770736554.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651770736554.png) (Edit icon) in the **Revision** column of the **NDT Procedure**  See Fig 3.24. The **NDT Procedure Revision** window opens.
    
    [![image-1651770798745.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651770798745.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651770798745.png)
2. Click [![image-1651770813084.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651770813084.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651770813084.png) (**ADD** button) in the **NDT Procedure Revision** window.
    
    A new window opens to add the NDT revision procedure.
    
    [![image-1651770841809.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651770841809.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651770841809.png)
    
    [![image-1651770852416.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651770852416.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651770852416.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651770876640.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651770876640.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651770876640.png)**Tip**: A report number for the revision will be updated automatically in the **Report Number/ Revision** box.
3. In the **Description** box, enter the description for the NDT procedure revision.
4. In the **Prepared By** box, enter the name a person who has prepared the revision.
5. In the **Prepared Date** box, enter the prepared date of the revision.
6. In the **Reviewed By** box, enter the name a person who has reviewed the revision.
7. In the **Reviewed Date** box, enter the reviewed date of the revision.
8. In the **Approved By** box, enter the name a person who has approved the revision.
9. In the **Approved Date** box, enter the approved date of the revision.
10. Click **Save**.

#### **3.24.3 Print an NDT procedure report**

If you want to print an NDT procedure report, click[![image-1651770961609.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651770961609.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651770961609.png) (print icon) provided in the **Print** column of the **NDT Procedure** page. See Fig 3.24.

#### **3.24.4 Attach a File into an NDT Procedure**

If you want to attach any file with the NDT procedure listed in the **NDT Procedure** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

# Materials

### **4.0 Materials**

The **Materials** menu in the home page of the ***cuteQM*** app used to add the material details such as material certificates, material inspection details, material import details, and material summary and traceability record.

The **Materials** menu appears with four options such as **Material Certificates, Material Import, Material Inspection,** and **Reports**. The **Material Certificates** option helps you to add material certificates details for the structural project.

The **Material Import** option helps you to bulk add the materials. The **Material Inspection** option helps you to add material receiving report, material inspection, and material verification report.

The **Reports** option used to add material traceability record and material summary by using heat number.

### **4.1 Material Certificates**

Mill Certificate is a certificate document of the steel industry, which is used to certify the product is produced by manufacturing standards of the mill. Once you have received the materials from the manufacturer, you must enter the details of materials.

 The **Material Certificates (Mill Certificates)** tab used to add the received material details including mill certification ID and mill certification number. If you want to add material certificates, do the following,

1. Click **Material Certificates** in the **Materials** menu. The **Mill Certificates** page opens.
    
    [![image-1651771516977.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651771516977.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651771516977.png)
    
     **Figure 4.1: Mill Certificates page**

#### **4.1.1 Add a Material Certificate**

If you want to add a material certificate, do the following,

1. Click [![image-1651771611128.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651771611128.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651771611128.png) (**ADD** button) in the **Mill Certificates** page. See Fig 4.1. A new window opens to add a material certificate.
    
    [![image-1651771631111.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651771631111.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651771631111.png)
    
    [![image-1651771647910.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651771647910.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651771647910.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.
2. In the **Component** box, select a component from a drop-down list.
3. In the **Certification** box, enter the certification number of the material.
4. In the **Manufacturer** box, enter the name of the manufacturer.
5. In the **Mill Certificate Date** box, choose the mill certificate date.
6. In the **Delivery Order (DO) Number** box, enter the delivery order number of the component.
7. In the **Purchase Order (PO)** **Number** box, enter the purchase order number of the component.
8. In the **Size** box, select the size of the received component.
9. In the **Thickness** box, select the thickness of the received component.
10. In the **Class** box, enter the class of the received component.
11. In the **Material** box, select the type of material the component is made from.
12. In the **Rating** box, enter the rating of the component.
13. In the **Expiry Date** box, choose the expiry date of the component.
14. Click **Save**.

The material certificate is successfully added. Once you have added the mill certificate, you must add heat numbers for the added component.

#### **4.1.2 Add Heat Numbers**

If you want to add heat numbers, do the following steps,

1. Click [![image-1651772075895.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651772075895.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651772075895.png) (Add icon) of the respective mill certificate.
    
    The **Heat Numbers** box opens.
    
    [![image-1651772092801.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651772092801.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651772092801.png)
    
     **Figure 4.1.1: Heat Numbers page**
2. Click [![image-1651772349201.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651772349201.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651772349201.png) (****ADD**** button) in the ****Heat Numbers**** box. A new window opens to add the heat number.
    
    [![image-1651772393572.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651772393572.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651772393572.png)
3. In the **planned Project** box, select a project you want from a drop-down list.
4. In the **Heat Number** box, enter the heat number.
5. In the **Remarks** box, enter your remarks if any.
6. Click **Save**.

#### **4.1.3 Edit Any Heat Number**

If you want to edit any existing heat numbers,

1. Click [![image-1651772557789.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651772557789.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651772557789.png)(Edit icon) in the **Edit** column for the respective heat number.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **4.1.4 Delete Any Heat Number**

If you want to delete any heat number, you can use [![image-1651772612576.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651772612576.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651772612576.png) (Delete icon) provided in the **Delete** column of the **Heat Numbers** page, See Fig 4.1.1.

1. Click [![image-1651772645737.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651772645737.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651772645737.png) (Delete icon) for the corresponding heat number. You receive a notification message “**Confirm delete?**”.
2. Click **OK**.

#### **4.1.5 Print a Material Consumption Report**

If you want to print a material consumption report, click [![image-1651772717663.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651772717663.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651772717663.png)(print icon) provided in the **Report** column. See Fig 4.1.1.

#### **4.1.6 Attach a File into a Mill Certificate**

If you want to attach any file with the mill certificates listed in the **Mill Certificates** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **4.1.7 Edit Any Mill Certificates**

 If you want to edit any existing mill certificate in the **Mill Certificates** page, do the following,

1. Click [![image-1651772903048.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651772903048.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651772903048.png)(Edit icon) in the **Edit** column for the respective mill certificate. See Fig 4.1. A new window opens to edit the mill certificate.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **4.1.8 Delete Any Mill Certificate**

If you want to delete any specific mill certificate from the list of mill certificates, you can use [![image-1651772978730.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651772978730.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651772978730.png) (Delete icon) provided in the **Delete** column of the **Mill Certificates** page. To know how to delete, see the topic, “**Delete Any Area**”.

#### **4.1.9 Export Mill Certificates List**

You can export a list of mill certificates added in the **Mill Certificates** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **4.1.10 Filter Any Mill Certificate**

If you want to filter any mill certificate from the list of mill certificates in the **Mill Certificates** page, you can use the [![image-1651773528678.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651773528678.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651773528678.png)(**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.

#### **4.1.11 Import Multiple Mill Certificates**

If you want to import multiple mill certificates together, do the following,

1. Click (**TEMPLATE** button) on the **Mill Certificates** page. See Fig 4.1. A template will be downloaded as an excel worksheet to enter the details of multiple mill certificates.
    
    [![image-1651773684895.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651773684895.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651773684895.png)
2. Enter the relevant details in the required columns on the excel worksheet.
3. Once you have added the mill certificates details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651773727999.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651773727999.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651773727999.png) (**IMPORT** button). See Fig 4.1.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651773747649.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651773747649.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651773747649.png)
5. Click [![image-1651773772350.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651773772350.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651773772350.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651773919523.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651773919523.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651773919523.png) (**Upload** button) to export the mill certificates that are included in the excel worksheet.

The details of the mill certificates in the worksheet will be displayed in the **Mill Certificates**


### **4.2 Material Take Off** 

Material Take Off ((MTO) report refers to a list of a materials including quantities and grades that are required in the structural project.

 The **Material Take Off** tab helps you to add an MTO report. If you want to add an MTO report, do the following,

1. Click the **Material Take Off** tab in the **Materials** menu. The **MTO Report** page opens.
    
    [![image-1651774231233.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651774231233.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651774231233.png)
    
     **Figure 4.2: MTO Report page**

#### **4.2.1 Add an MTO Report**

1. Click [![image-1651774833807.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651774833807.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651774833807.png) (**ADD** button) in the **MTO Report** page. See Fig 4.2. A new window opens to add an MTO report.
    
    [![image-1651774856090.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651774856090.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651774856090.png)
    
    [![image-1651774872306.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651774872306.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651774872306.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651774896045.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651774896045.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651774896045.png)**Tip**: A report number for a new MTO report will be updated automatically in the **Report Number** box.
2. In the **Customer Name** box, select the name of a customer.
3. In the **Prepared By** box, enter the name of a person who has prepared the MTO report.
4. In the **Reviewed By** box, enter the name of a person who has reviewed the MTO report.
5. In the **Approved By** box, enter the name of a person who has approved the MTO report.
6. In the **Prepared Date** box, choose the prepared date of the MTO report.
7. In the **Reviewed Date** box, choose the reviewed date of the MTO report.
8. In the **Approved Date** box, choose the approved date of the MTO report.
9. Click **Save**.

The MTO report is successfully added. Once you have added the MTO report, you must add the material details for the added report.

#### **4.2.2 Add Material Details**

1. Click [![image-1651774992665.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651774992665.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651774992665.png)(Edit icon) in the **Edit Report** column of the **MTO Report** See Fig 4.2. The **Report Parameters** box opens.
    
    [![image-1651775008334.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651775008334.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651775008334.png)
2. Click [![image-1651775024992.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651775024992.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651775024992.png) (**ADD** button) in the **Report Parameters** box.
    
    A new window opens in the **Material Type** column.
3. Enter the material name in the **Material Type** column.
4. Enter the grade of the material in the **Material Grade** column.
5. Enter the relevant details in the respective columns of the **Report Parameters** box.
6. Click **Save**.
    
    [![image-1651775066443.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651775066443.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651775066443.png) **Tip**: If you want to delete the added material details, click [![image-1651775088982.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651775088982.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651775088982.png) (Delete icon) provided in the **Delete** column of the **Report Parameters** box.

#### **4.2.3 Edit Any MTO Reports**

 If you want to edit any existing MTO report in the **MTO Report** page, do the following,

1. Click [![image-1651775146278.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651775146278.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651775146278.png)(Edit icon) in the ****Edit**** column for the respective ****MTO Report**** See Fig 4.2. A new window opens to edit the MTO report.
    
    [![image-1651775171167.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651775171167.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651775171167.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **4.2.4 Attach a File into an MTO Report**

If you want to attach any file with the MTO reports listed in the **MTO Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **4.2.5 Print an MTO Report**

If you want to print an MTO report, click [![image-1651775665751.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651775665751.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651775665751.png) (print icon) provided in the **Report** column of the **MTO Report** page. See Fig 4.2.

#### **4.2.6 Export MTO Reports**

You can export a list of MTO reports added in the **MTO Report** page. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.



### **4.3 Material Receiving and Inspection (Heat Numbers)**

Material Receiving Inspection validates quality of purchased raw materials based on set acceptance criteria before the materials are used for the Structural project.

The **Material Receiving and Inspection** tab in the **Materials** menu helps you to add an incoming material inspection report (MIR). Incoming MIR includes material name, material size, material specification, heat numbers, and material type.

If you want to add an incoming MIR, do the following,

1. Click **Material Receiving and Inspection** in the **Materials** menu. The **Incoming Material Inspection Report** page opens.
    
    [![image-1651775803783.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651775803783.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651775803783.png)
    
     **Figure 4.3: Incoming Material Inspection Report page**

#### **4.3.1 Add an Incoming MIR**

If you want to add an incoming MIR,

1. Click [![image-1651775866163.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651775866163.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651775866163.png) (**ADD** button) in the **Incoming Material Inspection Report**  See Fig 4.3. A new window opens to add an incoming MIR.
    
    [![image-1651775876891.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651775876891.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651775876891.png)
    
    [![image-1651775887800.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651775887800.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651775887800.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651775901856.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651775901856.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651775901856.png)**Tip**: A report number and a Request for Inspection (RFI) number for a new MIR will be updated automatically in the **Report Number** and the **RFI Number** boxes, respectively.
2. In the **Delivery Order Number** box, enter the material’s delivery order number.
3. If the materials are received from a client, select the **MUHIBBAH Incoming Materials** option, and then enter the relevant details in the respective boxes.
    
    [![image-1651775937291.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651775937291.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651775937291.png)
    
    
    1. 1. In the **P.O. No** box, enter the purchase order number.
        2. In the **Dated** box, choose the date of the purchase order.
        3. In the **Received On** box, select the received date of materials.
4. If the materials are purchased from outside, select the ****FREE Issued Incoming Materials**** option, and then enter the relevant details in the respective boxes. [![image-1651776012317.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651776012317.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651776012317.png)
    
    
    1. 1. In the **Packing List No** box, enter the packing list number.
        2. In the **Dated** box, choose the date of packing.
        3. In the **Received On** box, choose the received date of materials.
5. In the **Inspection Date** box, choose the date of inspection.
6. In the **Vendor Name** box, enter the vendor name.
7. In the **Request Description** box, enter the request description.
8. In the **ITP Number** box, select an ITP number.
9. In the **Delivery Note** box, enter the delivery note.
10. In the **Location** box, enter the location name.
11. In the **Sub Contractor** box, select the subcontractor name from a drop-down list.
12. Click **Save**.

The incoming MIR is successfully added. Once you have added the MIR, you must add the material details for the added MIR.

#### **4.3.2 Add Materials for an Incoming MIR**

If you want to add the details of materials for the added incoming MIR, do the following steps,

1. Click [![image-1651776146029.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651776146029.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651776146029.png) (Edit icon) in the **Edit MIR** column of the **Incoming Material Inspection Report** See Fig 4.3. The **Add/Edit - Materials** window opens.
    
    [![image-1651776160778.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651776160778.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651776160778.png)
    
     **Figure 4.3.1: Add/Edit – Materials window**
2. Click [![image-1651776188690.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651776188690.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651776188690.png) (**ADD** button) in the **Add/Edit - Materials** window.
    
    A new window opens to add the material details.
    
    [![image-1651776202338.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651776202338.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651776202338.png)
    
    [![image-1651776212521.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651776212521.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651776212521.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
3. In the **Material Description** box, enter the material description.
4. In the **Material** **Size** box, select the size of the material.
5. In the **Material Specification** box, enter the material specification.
6. In the **Material Type** box, enter the type of the material.
7. In the **Quantity Required** box, enter the required quantity of the material.
8. In the **Item No** box, enter the item number.
9. In the **Weight** box, enter the weight of the material.
10. In the **Component** box, select a component.
11. Click **Update**.

Once you have added the material details, you must add the heat numbers for the added materials.

#### **4.3.3 Add Heat Numbers** 

1. Click [![image-1651776294719.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651776294719.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651776294719.png) (Add icon) of the respective material in the **Add/Edit - Materials** See Fig 4.3.1. The **Heat Numbers** window opens.
    
    [![image-1651776313050.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651776313050.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651776313050.png)
2. Click [![image-1651776552695.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651776552695.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651776552695.png) (**ADD** button) in the **Heat Numbers** window.
    
    A new window opens to add a heat number.
    
    [![image-1651776579466.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651776579466.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651776579466.png)
3. In the **Heat Number/Certificates** box, select the heat number from a drop-down list.
4. In the ****Plate Number/Coil Number/ Tag Number**** box, enter the plate number or coil number or tag number of the material.
5. In the **Delivery Quantity (Total)** box, enter the total delivery quantity of the material including UOM.
6. In the **Delivery Quantity (Partial)** box, enter the partial delivery quantity of the material including UOM.
7. In the **Dimensions** option, select **Accepted** or **Rejected** based on the inspection detail.
8. In the **Visual** option, select **Accepted** or **Rejected** based on the inspection detail.
9. In the **Mill Test Certificates (MTC)** option, select **Accepted** or **Rejected** based on the inspection detail.
10. In the **Remarks** box, enter your remarks if any.
11. If the heat treatment is required for the material, select ****YES**** in the ****Heat Treatment**** Otherwise select ****NO****.
12. In the NDE is required for the material, select **YES** in the **NDE** option. Otherwise select **NO**.
13. Click **Update.**

[![image-1651776667259.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651776667259.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651776667259.png) **Note**: If you want to manage the review material TC, click [![image-1651776689133.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651776689133.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651776689133.png) (Add icon). The Review Material TC window opens to add the material checklist detail.

#### **4.3.4 Add MIR Details**

If you want to add the details of MIR,

1. Click [![image-1651776763148.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651776763148.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651776763148.png) (Add icon) in the **Add** See Fig 4.3. The **MIR Details** window opens.
    
    [![image-1651776778783.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651776778783.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651776778783.png)
2. In the **Manufacturer** Name box, enter the manufacturer name.
3. In the **Supplier** box, enter the supplier name.
4. In the **Unloaded** box, enter the unloaded detail.
5. In the **Date** box, select the date of MIR.
6. In the **Truck/Trailer No** box, enter the truck/trailer number.
7. In the **Defect Report No** box, enter the defect report number.
8. In the **Storage Area** box, enter the storage area name.
9. In the **Defect** box, enter the defect detail.
10. In the **Remarks** box, enter your remarks if any.
11. Click **Save**.

#### **4.3.5 Print an Incoming MIR Report**

If you want to print an incoming MIR report, click [![image-1651776907903.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651776907903.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651776907903.png) (print icon) provided in the **Report** column of the **Incoming Material Inspection Report** page. See Fig 4.3.

#### **4.3.6 Print a Report with MTC**

If you want to print an incoming MIR report including MTC, click[![image-1651776939228.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651776939228.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651776939228.png) (print icon) provided in the **Report** **with MTC** column of the **Incoming Material Inspection Report** page. See Fig 4.3.

#### **4.3.7 Print a Report Raw Material Offer List**

If you want to print a report raw material offer list, click [![image-1651776978589.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651776978589.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651776978589.png) (print icon) provided in the **Report** **Raw Material Offer List** column of the **Incoming Material Inspection Report** page. See Fig 4.3.

#### **4.3.8 Print a MIR Summary Report**

If you want to print a MIR summary report, click (print icon) provided in the upper side of the **Incoming Material Inspection Report** page. See Fig 4.3.

#### **4.3.9 Attach a File into an Added Incoming MIR** 

If you want to attach any file with any incoming MIR listed in the **Incoming Material Inspection Report** page. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)”.

#### **4.3.10 Edit Any Incoming MIR** 

If you want to edit any existing incoming MIR in the **Incoming Material Inspection Report** page, do the following,

1. Click [![image-1651777154026.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651777154026.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651777154026.png)(Edit icon) in the **Edit** column for the respective MIR. See Fig 4.3. A new window opens to edit the added incoming MIR.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **4.3.11 Filter Any Incoming MIR**

If you want to filter any incoming MIR from the list of MIRs in the **Incoming Material Inspection Report** page,

- you can use the request status wise filter box [![image-1651777239636.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651777239636.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651777239636.png) provided in the upper side of the **Incoming Material Inspection Report**
- You can also use [![image-1651777252360.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651777252360.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651777252360.png) (****FILTER**** button) located on the ****Incoming Material Inspection Report**  To know how to filter, see the topic, ”****Filter Any Area****”.

#### **4.3.12 Export Incoming MIR list**

You can export a list of MIR added in the **Incoming Material Inspection Report** page in the pdf and excel formats by using [![image-1651777286334.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651777286334.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651777286334.png) (**PDF** button) and [![image-1651777297552.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651777297552.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651777297552.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)”.


### **4.4 Material Verification Report (MVR) (Heat Numbers)**

MVR will be used while go for material inspection. The **Material Verification Report** tab in the **Materials** menu helps you to add an MVR inspection request. If you want to add an MVR inspection request, do the following steps,

1. Click **Material Verification Report** in the **Materials** menu. The **MVR Inspection Request** page opens.
    
    [![image-1651777346632.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651777346632.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651777346632.png)
    
     **Figure 4.4: MVR Inspection Request page**

#### **4.4.1 Add an MVR Inspection Request**

If you want to add an MVR inspection request,

1. Click [![image-1651777400149.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651777400149.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651777400149.png) (**ADD** button) in the **MVR Inspection Request**  See Fig 4.4. A new window opens to add an MVR inspection request.
    
    [![image-1651777425573.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651777425573.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651777425573.png)
    
    [![image-1651777433487.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651777433487.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651777433487.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651777449029.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651777449029.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651777449029.png)**Tip**: A report number and an RFI report number for a new MVR will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.
2. In the **Inspection Date** box, choose the date of inspection.
3. In the **Description** box, enter the description for the MVR.
4. In the **Location** box, select a location from a drop-down list.
5. Click **Save**.

The MVR is successfully added. Once you have added the MVR, you must add the RFI data for the added MVR.

#### **4.4.2 Add RFI Data for an Added MVR Inspection Request**

If you want to add the details of RFI data for the added MVR inspection request, do the following,

1. Click [![image-1651777532538.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651777532538.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651777532538.png)(Edit icon) in the **RFI Data** column of the **MVR Inspection Request**  See Fig 4.4. The **RFI Inspection Request List** window opens.
    
    [![image-1651777882034.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651777882034.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651777882034.png)
2. In the ****Inspection From**** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the **Inspection Details** option, select 1<sup>st</sup> Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the **Others** box, enter any other inspection related details.
6. In the **Refer to Report No** box, enter the report number for reference.
7. In the **RFI Date** box, choose the RFI date.
8. In the ****Inspection Result**** option, if the inspection result is accepted, select ****Accepted**** otherwise select ****Rejected****.
9. In the **Remarks** box, enter your remarks if any.
10. In the **Inspected by** box, enter the name of a person who has done inspection.
11. In the **Inspected Date** box, choose the date of inspection.
12. In the **Witnessed By** box, enter the name of the witnessed person.
13. In the **Witnessed Date** box, choose the date of witnessed.
14. In the **PCML Rep Name** box, enter the representative name of PCML.
15. In the **PCML Rep Date** box, choose the PCML rep date.
16. In the **MEB Rep Name** box, enter the representative name of MEB.
17. In the **MEB Rep Date box**, choose MEB rep date.
18. Click **Save**.

Once you have added the RFI data, you must add the result for the added MVR inspection request.

#### **4.4.3 View an RFI Report**

If you want to print an RFI report, click [![image-1651778186115.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778186115.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778186115.png) (print icon) provided in the **RFI** **Report** column of the **MVR Inspection Request** page. See Fig 4.4.

#### **4.4.4 Add Result for an Added MVR Inspection Request** 

1. Click [![image-1651778219043.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778219043.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778219043.png) (Add icon) of the respective report number. The **MVR Inspection Request Details** window opens.
    
    [![image-1651778237598.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778237598.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778237598.png)
2. Click [![image-1651778259381.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778259381.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778259381.png) (**ADD** button) in the **MVR Inspection Request Details** window. A new window opens to add result.
    
    [![image-1651778267465.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778267465.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778267465.png)
3. In the **Piece Mark No** box, select the piece mark number from a drop-down list.
4. In the **Heat Number / Certificates** box, select the heat number from a drop-down list.
5. In the **Size** box, enter the size of the material.
6. In the **Type of Material** box, enter the type of material.
7. In the **Remarks** box, enter your remarks if any.
8. Click **Save**.

Once you have added the result for the MVR inspection request, you must submit and approve the MVR inspection request.

#### **4.4.5 Submit and Approve an MVR Inspection Report**

Once you have added the result, the **Submission** column in the **MVR Inspection Request** page is appeared with[![image-1651778360135.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778360135.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778360135.png) (Submit and Reject icons).

1. If you want to submit the MVR inspection request, click [![image-1651778413877.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778413877.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778413877.png)(Submit icon) in the **Submission** Otherwise click [![image-1651778423778.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778423778.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778423778.png) (Reject icon) to reject the request. Once you have submitted the MVR inspection request, the **Request Status** column in the **MVR Inspection Request** page is appeared with (Accept and Reject icons).
2. If you want to approve the MVR inspection request, click [![image-1651778460336.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778460336.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778460336.png) (Submit icon) in the ****Request Status**** Otherwise click [![image-1651778472369.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778472369.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778472369.png) (Reject icon) to reject the request.

#### **4.4.6 Print an MVR Inspection Report**

If you want to print an MVR inspection report, click [![image-1651778518861.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778518861.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778518861.png) (print icon) in the **Report** column of the **MVR Inspection Request** page. See Fig 4.4.

#### **4.4.7 Attach a File into an MVR Inspection Request**

If you want to attach any file with an existing MVR inspection request listed in the **MVR Inspection Request** page, you can attach the file by using [![image-1651778577305.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778577305.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778577305.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)”.

#### **4.4.8 Edit Any MVR Inspection Request** 

If you want to edit any existing MVR inspection request in the **MVR Inspection Request** page, do the following,

1. Click [![image-1651778630941.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778630941.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778630941.png) (Edit icon) in the **Edit** column for the respective MVR inspection request. See Fig 4.4. A new window opens to edit the MVR inspection request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **4.4.9 Filter Any MVR Inspection Request**

If you want to filter any MVR request from the list of requests in the **MVR Inspection Request** page, you can use [![image-1651778749912.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778749912.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778749912.png)(**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.

#### **4.4.10 Export MVR Inspection Request List**

You can export a list of MVR inspection requests added in the **MVR Inspection Request** page in the pdf and excel formats by using [![image-1651778797039.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778797039.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778797039.png) (**PDF** button) and [![image-1651778807609.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778807609.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778807609.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)”.


### **4.5 Welding Consumable Register List**

Welding Consumables are products used to create strong joints between two or more parts while welding. Welding Consumable are segmented based on welding technique, welding consumable type, end-use industry, and region.

The **Welding Consumable Register List tab** in the **Materials** menu used to add a weld consumable list. If you want to add a welding consumable list, do the following,

1. Click the **Welding Consumable Register List** tab in the **Materials** menu. The **Welding Consumable Register List** page opens.
    
    [![image-1651778866330.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778866330.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778866330.png)
    
     **Figure 4.5: Welding Consumable Register List page**

#### **4.5.1 Add a Welding Consumable List**

If you want to add a welding consumable list, do the following,

1. Click [![image-1651778915268.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778915268.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778915268.png) (**ADD** button) in the **Welding Consumable Register List**  See Fig 4.5. A new window opens to add a welding consumable list.
    
    [![image-1651778929256.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778929256.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778929256.png)
    
    [![image-1651778940121.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778940121.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778940121.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that field before saving.
    
    [![image-1651778955652.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778955652.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778955652.png) **Tip**: A report number for a new welding consumable list will be updated automatically in the **Report Number** **/ Rev** box.
2. In the **Buyer Name** box, enter the name of a buyer.
3. In the **Supplier** box, enter the name of a supplier of welding consumables.
4. In the ****Prepared By**** box, enter the name of a person who has prepared the welding consumable list.
5. In the ****Reviewed By**** box, enter the name of a person who has reviewed the welding consumable list.
6. In the ****Approved By**** box, enter the name of a person who has approved the welding consumable list.
7. In the ****Prepared Date**** box, choose the prepared date of the welding consumable list.
8. In the **Reviewed Date** box, choose the reviewed date of the welding consumable list.
9. In the ****Approved Date**** box, choose the approved date of the welding consumable list.
10. Click **Save**.

The welding consumable register list is successfully added. Once you have added the register list, you must add the consumable details for the added register list.

[![image-1651779051382.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651779051382.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651779051382.png)**Tip**: If you want to add a copy of added welding consumable register list, click **Revision** in the **Revision** column of the **Welding Consumable Register List** page.

#### **4.5.2 Add Welding Consumable Details for Added Consumable List**

If you want to add the details of welding consumables for the added list, do the following,

1. Click [![image-1651779097119.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651779097119.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651779097119.png)(Edit icon) in the **Edit Report** column of the **Welding Consumable Register List**  See Fig 4.5. A new window opens to add the welding consumable details.
    
    [![image-1651779113070.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651779113070.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651779113070.png)
2. In the **Welding Process** box, enter the type of welding process.
3. In the **Class** box, enter the class of welding consumable.
4. In the **Trade Name** box, enter the trade name of welding consumable.
5. In the **Lot Number** box, enter the lot number of the welding consumable.
6. In the **Number / Quantity (Kgs)** box, enter the number or quantity of the welding consumable.
7. In the **Dia** box, enter the diameter of the welding consumable.
8. In the **CIR Number** box, enter the CIR number of the welding consumable.
9. In the **Date of CIR** box, select the date of CIR.
10. In the **Certificate No** box, enter the certificate number.
11. In the **Remarks** box, enter your remarks if any
12. In the **Status** box, select **Accepted**, **Rejected** or **Hold** from a drop-down list.
13. Click **Save**.

Once you have added the welding consumable details, you must add the result for the added consumable list.

#### **4.5.3 Submit a Welding Consumable List**

Once you have added the welding consumable details, the **Submission** column in the **Welding Consumable Register List** page is appeared with[![image-1651779641885.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651779641885.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651779641885.png) (Submit and Reject icons).

1. If you want to submit the welding consumable list, click [![image-1651779662146.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651779662146.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651779662146.png)(Submit icon) in the **Submission** Otherwise click [![image-1651779673971.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651779673971.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651779673971.png)(Reject icon) to reject the request.

#### **4.5.4 Print a Welding Consumable Report**

If you want to print a welding consumable report, click (print icon) in the **Report** column of the **Welding Consumable Register List** page. See Fig 4.5.

#### **4.5.5 Attach a File into a Welding Consumable Register List**

If you want to attach any file with any welding consumable register list in the **Welding Consumable Register List** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **4.5.6 Edit Any Welding Consumable Register List** 

If you want to edit any existing welding consumable register list in the **Welding Consumable Register List** page, do the following,

1. Click [![image-1651779906526.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651779906526.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651779906526.png)(Edit icon) in the **Edit** column for the respective welding consumable register list. See Fig 4.5. A new window opens to edit the welding consumable register list.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **4.5.7 Export Welding Consumable Register List**

You can export a list of welding consumable register list added in the **Welding consumable Register List** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.


### **4.6 Import Materials**

The **Import from Excel - Materials** tab helps you to upload various data related to materials for different fields included in the **Materials** menu instead of uploading data for each field individually.

 If you want to import data for different fields, do the following,

1. Click the **Import from Excel – Materials** tab in the **Materials** menu. The **File Upload** page opens.
    
    [![image-1651780410958.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780410958.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780410958.png)
2. Download a template by using the (**TEMPLATE** button) to enter the details of data.
    
    An excel worksheet will be downloaded.
    
    [![image-1651780439095.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780439095.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780439095.png)
3. Enter the relevant details in the respective column of the excel worksheet based on the columns listed in the **System Column** field.
4. Click [![image-1651780473482.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780473482.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780473482.png) (**Choose File** button).
    
    Once the file has been uploaded successfully, you receive a message, “**Successfully uploaded**”
5. Click[![image-1651780514532.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780514532.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780514532.png) (**Get Columns** button).
    
    The columns added in the excel worksheet will be listed in the **Excel Column** field. The system automatically maps the **Required Columns to Import** field and the **Excel Column** field and displays in the **Mapped Columns** field.
    
    [![image-1651780536388.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780536388.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780536388.png)
6. If you want to map any columns or to unmap any mapped columns, select the respective columns and then click (****Map**** button) and (****UnMap**** button) accordingly.
7. Once you have completed the mapping and unmapping of columns, in the **Upload Range From** and **To** fields, enter the range of rows you want to upload from the excel worksheet.
    
    [![image-1651780570418.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780570418.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780570418.png) **Note**: In the **Total Rows** field, the system indicates the total number of rows filled in the excel worksheet.
    
    [![image-1651780585522.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780585522.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780585522.png)**Tip**: You must enter the upload starting range as two in the **Upload Range From** field because a first row in the excel worksheet is having heading of the columns.
8. Click [![image-1651780614878.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780614878.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780614878.png) (**Populate Value** button).
9. Click [![image-1651780623792.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780623792.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780623792.png)(**Process** button).
    
    Once you have clicked the Process button, the system processes the columns and displays in the **Excel Import** page.
    
    [![image-1651780643624.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780643624.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780643624.png)
10. Click [![image-1651780660434.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780660434.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780660434.png) (**Import** button) to import the data added in the excel worksheet.


### **4.7 Material Traceability Record**

The **Material Traceability Record** tab in the **Materials** menu used to track a material traceability record (MTR). If you want to add an MTR, do the following,

1. Click the **Material Traceability Record** tab in the **Materials** menu. The **Material Traceability Record** page opens.
    
    [![image-1651780728698.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780728698.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780728698.png)
    
     **4.7: Material Traceability Record page**
2. Click [![image-1651780761687.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780761687.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780761687.png) (**ADD** button) in the **Material Traceability Record** page. See Fig 4.7.
    
    A new window opens to add an MTR.
    
    [![image-1651780780745.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780780745.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780780745.png)
    
    [![image-1651780791350.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780791350.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780791350.png) **Tip**: A report number for a new MTR will be updated automatically in the **Report Number** box.
3. In the **Location** box, enter the location detail.

The MTR is added. Once you have added the MTR, you must add the cutting plan drawing details for the added MTR.

#### **4.7.1 Add a Cutting Plan Drawing for an MTR**

If you want to add a cutting plan drawing for the added MTR, do the following,

[![image-1651780844611.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780844611.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780844611.png)

1. Click [![image-1651780865668.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780865668.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780865668.png) (Add icon) provided in the **Add Cutting Plan Drawing** column of the **Material Traceability Record** page. The **Cutting Plan Drawing Details** box opens.
    
    [![image-1651780879765.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780879765.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780879765.png)
2. Click [![image-1651780894445.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780894445.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780894445.png) (**ADD** button) in the **Cutting Plan Drawing Details** box. A new window opens to add a master drawing number and a cutting plan drawing number.
    
    [![image-1651780908796.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780908796.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780908796.png)
3. In the **Cutting Plan Drawing Number** box, select the mater drawing and cutting plan drawing numbers from a drop-down list.
4. Click **Save**.

#### **4.7.2 Print an MTR report**

If you want to print an MTR report, click [![image-1652072191912.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652072191912.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652072191912.png) (print icon) in the **Report** column of the **Material Traceability Record** page. See Fig 4.7.

#### **4.7.3 Attach a File into an MTR**

If you want to attach any file with any MTR list in the **Material Traceability Record** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **4.7.4 Edit Any MTR**

If you want to edit any existing MTR in the **Material Traceability Record** page, do the following,

1. Click [![image-1652072247567.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652072247567.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652072247567.png)(Edit icon) in the **Edit** column for the respective MTR. See Fig 4.7. A new window opens to edit the MTR.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **4.7.5 Export MTR List**

You can export a list of MTRs added in the **Material Traceability Record** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **4.7.6 Filter Any MTR**

If you want to filter any MTR from the list of MTRs in the **Material Traceability Record** page, you can use the [![image-1652072324053.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652072324053.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652072324053.png) (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.



### **4.8 Material Summary**

The **Material Summary** tab in the **Materials** menu used to track the material summary details. If you want to trach the summary details of the material, do the following,

1. Click the **Material Summary** tab in the **Materials** menu. The **Material Summary Details** page opens.
    
    [![image-1652072371650.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652072371650.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652072371650.png)
    
     **Figure 7.8: Material Summary Details page**
2. In the **Material Specification** box, enter the material specification.
3. In the **From** and **To** boxes, choose the respective from and to dates to get the material summary details.
4. Click **Search**.

The summary details of the added material specification will be displayed for the selected period.

#### **4.8.1 Export Material Summary Details**

You can export a list of MTRs added in the **Material Summary Details** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.



### **4.9 Material Summary by Heat Number**

The **Summary by Heat Number** tab in the **Materials** menu used to track the material summary details by using the respective heat numbers. If you want to track the summary details of the material, do the following,

1. Click the **Summary by Heat Number** tab in the **Materials** menu. The **Material Summary Details (By Heat Number)** page opens.
    
    [![image-1652072488866.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652072488866.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652072488866.png)
    
     **Fig 4.9:** **Material Summary Details (By Heat Number)** **page**
2. In the **Heat Number** box, select the heat number from a drop-down list.
3. Click ****Search****.

 The material summary details corresponding to the selected heat number will be displayed.

#### **4.9.1 Export Material Summary Details (By Heat Number)**

You can export the material summary details in the **Material Summary Details (By Heat Number)** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.


### **4.10 Material Traceability Summary Report**

If you want to view the material traceability summary report, navigate to the **Material Traceability Summary Report** tab in the **Materials** menu.

1. Click **Material Traceability Summary Report** in the **Materials** menu. The **Material Traceability Summary Report** page opens.
    
    [![image-1652072581908.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652072581908.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652072581908.png)
    
     **Figure 4.10: Material Traceability Summary Report page**
2. In the **From Date** and **To Date** boxes, select the from and to dates.
3. Click **Show Report**.

The summary report for the selected date will be opened.

#### **4.10.1 Print Material Traceability Summary Report**

If you want to print a material traceability summary report, use [![image-1652072669995.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652072669995.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652072669995.png)and [![image-1652072687767.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652072687767.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652072687767.png) (print icons) provided in the **Material Traceability Summary Report** page.

1. If you want to print the current page of the summary report, click [![image-1652072744876.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652072744876.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652072744876.png) (print icon including the page number).
2. If you want to print all the pages of the summary report, click [![image-1652072736839.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652072736839.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652072736839.png)(print icon).

#### **4.10.2 Export Material Traceability Summary Report**

You can export the material traceability summary report in various formats by using the option [![image-1652072808282.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652072808282.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652072808282.png) provided in the upper right corner of the **Material Traceability Summary Report** page.



### **4.11 RFI Material Substitution**

An RFI could be issued requesting for material substitutions if certain material is not available or cost exorbitantly high. Various subcontractors could be provided with these requests to find who has the best quality materials for the project.

You can add an RFI for material substitution by using the **RFI Material Substitution** tab in the **Materials** menu.

#### **4.11.1 Add an RFI Material Substitution**

If you want to add an RFI material substitution, do the following steps,

1. Click **RFI Material Substitution** in the **Materials** menu. The **RFI Material Substitution** page opens.
    
    [![image-1652072889246.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652072889246.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652072889246.png)
    
     **Figure 4.11: RFI Material Substitution page**
2. In the ****Requested By**** box, enter the name of a person who has requested the material substitution.
3. In the **Sub Contractor** box, select a sub-contractor from a drop-down list.
4. In the **Inspection Date &amp; Time** box, select the inspection date and time.
5. In the **Location** box, enter the location name.
6. In the **Center** box, enter the center name.
7. In the **Details of Work** box, enter the work details.
8. In the **Comments** box, enter your comments if any.
    
    Before saving the added material substitution request, you must add the material substitution detail.
9. Click [![image-1652072954448.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652072954448.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652072954448.png) (**ADD** button) in the **Material Substitution Detail** window.
10. In the **Type** box, select the type of material substitution.
11. In the **Material** box, enter the name of the material.
12. In the **DWG. Ref** box, enter the drawing reference number.
13. In the **Original Size** box, enter the original size of the material.
14. In the **Original Grade** box, enter the original grade of the material.
15. In the **Item** box, select an item.
16. In the **QTY** box, enter the quantity of the material.
17. Click **Save.**
    
    The material substitution details will be added and listed in the **Material Substitution Detail** window.
    
    [![image-1652073010811.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073010811.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073010811.png)
    
    If you want to add the proposed material substitution detail,
18. Click [![image-1652073057659.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073057659.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073057659.png)(Add icon) in the **Material Substitution Detail** window.
    
    [![image-1652073068840.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073068840.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073068840.png)
19. Click [![image-1652073080388.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073080388.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073080388.png) (**ADD** button).
    
    [![image-1652073090757.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073090757.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073090757.png)
20. Enter the details of proposed material substitution.
21. Click **Save**.
    
    The request for material substitution will be added and listed in the **View RFI Material Substitution** page.


### **4.12 View RFI Material Substitution**

The **View RFI Material Substitution** tab helps you to view and edit the material substitution request, which is added by using the **RFI Material Substitution** tab. This tab also allows you to add a new material substitution request.

1. Click **View RFI Material Substitution** in the **Materials** menu. The **View RFI Material Substitution** page opens with a list of added material substitution requests.
    
    [![image-1652073226948.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073226948.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073226948.png)
    
     **Figure 4.12: View RFI Material Substitution page**

#### **4.12.1 Add an RFI Material Substitution**

If you want to add a material substitution request, do the following steps,

1. Click [![image-1652073318037.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073318037.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073318037.png) (**ADD** button) in the **View RFI Material Substitution page. The system redirects you to a new page to add a new material substitution request. To know how to add a material substitution request, See the topic, “[**<u>Add an RFI Material Substitution</u>**](http://wiki.cuteinfocomm.com/link/68#bkmrk-4.11.1%C2%A0add-an-rfi-ma)”.

Once you have added the material substitution request, you must submit the added request to perform material substitution inspection.

#### **4.12.2 Edit Any Material Substitution Inspection Request** 

If you want to edit any existing material substitution inspection request in the **View RFI Material Substitution page, do the following,

1. Click [![image-1652073460752.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073460752.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073460752.png)(Edit icon) in the **Edit** column for the respective material substitution inspection request. See Fig 4.12. The **RFI Material Substitution** page opens with the details of the selected material substitution inspection request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **4.12.3 Submit and Approve an RFI Material Substitution**

Once you have added the material substitution inspection request, the **Submission** column in the **View RFI Material Substitution** page is appeared with [![image-1652073551320.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073551320.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073551320.png) (Submit and Reject icons).

1. If you want to submit the material substitution inspection request, click [![image-1652073570922.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073570922.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073570922.png) (Submit icon) in the **Submission** column. Otherwise click [![image-1652073581301.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073581301.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073581301.png) (Reject icon) to reject the request. Once you have submitted the material substitution inspection request, the **Request Status** column in the **View RFI Material Substitution** page is appeared with (Approve and Reject icons).
2. If you want to approve the material substitution inspection request, click [![image-1652073633943.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073633943.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073633943.png) (Approve icon) in the ****Request Status**** Otherwise click [![image-1652073642921.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073642921.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073642921.png) (Reject icon) to reject the request. The material substitution inspection request will be moved for material substitution inspection.

#### **4.12.4 Add Results of Material Substitution Inspection**

After completing the material inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click [![image-1652073697054.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073697054.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073697054.png) (Add icon) in the **Results** column of the respective request. The Result window opens with the details of proposed and original materials.
    
    [![image-1652073708634.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073708634.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073708634.png)
2. In the ****Result**** column, select the result of each material from the given result options in the drop-down list.
3. In the **Remarks** column, enter your remarks if any.
4. Click **Approve All &amp;** **Save**.

#### **4.12.5 View a Material Substitution Report**

If you want to view a material substitution report, click [![image-1652073762390.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073762390.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073762390.png)(print icon) provided in the **Print** column of the **View RFI Material Substitution** page. See Fig 4.12.

#### **4.12.6 Attach a File into an RFI Material Substitution**

If you want to attach a file with any existing material substitution inspection request listed in the **View RFI Material Substitution** page, you can attach the file by using [![image-1652073793674.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073793674.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073793674.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)”.

#### **4.12.7 View Signature Details of Inspectors**

You can view the sign details of the inspectors such as QA, Sub contractor, Client, and Owner, once they completed the material substitution inspection and submitted the inspection result details including their signature. To view the signature details, click [![image-1652073826989.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073826989.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073826989.png)(Sign icon) in the **Sign Details** column in the **View RFI Material Substitution** page.

#### **4.12.8 Export an RFI Material Substitution List**

You can export a list of material substitution requests added in the **View RFI Material Substitution** page in both the pdf and excel formats by using [![image-1652073856152.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073856152.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073856152.png) (**PDF** button) and [![image-1652073863875.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073863875.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073863875.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)”.

#### **4.12.9 Filter Any RFI Material Substitution**

If you want to filter any specific material substitution inspection request in the **View RFI Material Substitution** page, you can use [![image-1652073892128.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073892128.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073892128.png) (**FILTER** button) located on the **View RFI Material Substitution** page. To know how to filter, see the topic, ”**Filter Any Area**”.



### **4.13 Material Receiving and Inspection (Unique Numbers)**

Material Receiving Inspection validates quality of purchased raw materials based on set acceptance criteria before the materials are used for the structural project.

The **Material Receiving and Inspection** tab in the **Materials** menu helps you to add an incoming material inspection report (MIR). Incoming MIR includes material name, material size, material specification, and material type.

If you want to add an incoming MIR, do the following,

1. Click the **Material Receiving and Inspection** tab in the **Materials** menu. The **Incoming Material Inspection Report** page opens.
    
    [![image-1652073958183.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073958183.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073958183.png)
    
     **Figure 4.13: Incoming Material Inspection Report page**

#### **4.13.1 Add an Incoming MIR**

If you want to add an incoming MIR,

1. Click [![image-1652074028338.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074028338.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074028338.png) (**ADD** button) in the **Incoming Material Inspection Report** page. See Fig 4.13. A new window opens to add an incoming MIR.
    
    [![image-1652074046198.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074046198.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074046198.png)
    
    [![image-1652074055620.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074055620.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074055620.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1652074068771.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074068771.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074068771.png)**Tip**: A report number and an Request for Inspection (RFI) number for a new MIR will be updated automatically in the **Report Number** and the **RFI Number** boxes, respectively.
2. In the **Delivery Order Number** box, enter the material’s delivery order number.
3. If the materials are received from a client, select the ****DM Incoming Materials**** option, and then enter the relevant details in the respective boxes. [![image-1652074097714.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074097714.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074097714.png)
    
    
    1. 1. 1. In the **P.O. No** box, enter the purchase order number.
            2. In the **Dated** box, choose the date of the purchase order.
            3. In the **Received On** box, select the received date of materials.
4. If the materials are purchased from outside, select the **FREE Issued Incoming Materials** option, and then enter the relevant details in the respective boxes.
    
    [![image-1652074132955.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074132955.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074132955.png)
    
    
    1. 1. 1. In the **Packing List No** box, enter the packing list number.
            2. In the **Dated** box, choose the date of packing.
            3. In the **Received On** box, choose the received date of materials.
5. In the **Inspection Date** box, choose the date of inspection.
6. In the **Vendor Name** box, enter the vendor name.
7. In the **Delivery Note** box, enter the delivery note.
8. In the **Location** box, enter the location name.
9. In the ****Sub Contractor**** box, select the subcontractor name from a drop-down list.
10. Click **Save**.

The incoming MIR is successfully added. Once you have added the MIR, you must add the material details for the added MIR.

#### **4.13.2 Add Materials for an Incoming MIR**

If you want to add the details of materials for the added incoming MIR, do the following,

1. Click [![image-1652074213914.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074213914.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074213914.png)(Edit icon) in the **Edit MIR** column of the **Incoming Material Inspection Report** See Fig 4.13. The **Add/Edit - Materials** window opens.
    
    [![image-1652074228247.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074228247.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074228247.png)
    
     **Figure 4.13.1: Add/Edit – Materials window**
2. Click [![image-1652074256935.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074256935.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074256935.png) (**ADD** button) in the **Add/Edit - Materials** window.
    
    A new window opens to add the material details.
    
    [![image-1652074267520.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074267520.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074267520.png)
    
    [![image-1652074275783.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074275783.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074275783.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
3. In the **Material** box, select the name of the material from a drop-down list.
4. In the **Quantity Required** box, enter the required quantity of the material.
5. In the **Certificate Number** box, enter the certificate number.
6. In the **PO No** box, enter the purchase order number.
7. In the **Non-Conformance Report (NCR) No** box, enter the NCR number.
8. In the **Size/Thickness** box, select the size/thickness of the received material from a drop-down list.
9. In the **Heat Number** box, enter the heat number of the material.
10. In the **CEQ** box, enter the CEQ number.
11. In the **DO** box, enter the deliver order number.
12. In the **TQ No** box, enter the TQ number.
13. In the **Length** box, select the length of the material from a drop-down list.
14. In the **Plate Number** box, enter the plate number of the material.
15. In the **Material Type** box, enter the type of the material.
16. In the **CD Number** box, enter the CD number.
17. In the **Status** box, select the status of the received material.
18. In the **Material Type** box, select the type of material from a drop-down list.
19. In the **Grade** box, select the grade of the material.
20. In the **Unique No** box, enter the unique number of the material.
21. In the **Remarks** box, enter your remarks if any.
22. In the **Client Item No** box, enter the client item number.
23. In the **Supply Condition** box, enter the supply condition details of the material.
24. In the **Material Description** box, enter the material description.
25. Click ****Update****.

Once you have added the material details, you must add the heat numbers for the added materials.

#### **4.13.3 Add Heat Numbers** 

1. Click [![image-1652074423045.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074423045.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074423045.png)(Add icon) of the respective material in the **Add/Edit - Materials** window. See Fig 4.13.1. The **Heat Numbers** window opens.
    
    [![image-1652074440463.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074440463.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074440463.png)
2. Click [![image-1652074457514.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074457514.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074457514.png) (**ADD** button) in the **Heat Numbers** window. A new window opens to add a heat number.
    
    [![image-1652074470694.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074470694.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074470694.png)
3. In the **Heat Number/Certificates** box, select the heat number from a drop-down list.
4. In the **Plate Number/Coil Number/ Tag Number** box, enter the plate number or coil number or tag number of the material.
5. In the **Delivery Quantity (Total)** box, enter the total delivery quantity of the material.
6. In the **Delivery Quantity (Partial)** box, enter the partial delivery quantity of the material.
7. In the **CEQ** box, enter the CEQ number.
8. In the **CD Number** box, enter the CD number.
9. In the **Unique Number** box, enter the unique number of the material.
10. In the **Client Item Number** box, enter the client item number.
11. In the ****Dimensions**** option, select ****Accepted**** or ****Rejected**** based on the inspection detail.
12. In the **Visual** option, select **Accepted** or **Rejected** based on the inspection detail.
13. In the ****Mill Test Certificates (MTC)**** option, select ****Accepted**** or ****Rejected**** based on the inspection detail.
14. In the **Remarks** option, enter your remarks if any.
15. If the heat treatment is required for the material, select ****YES**** in the ****Heat Treatment**** Otherwise select ****NO****.
16. In the NDE is required for the material, select **YES** in the **NDE** option. Otherwise select **NO**.
17. Click **Update.**

Once you have added the heat numbers, you must add unique numbers for the material.

#### **4.13.4 Add Unique Numbers**

1. Click [![image-1652074614590.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074614590.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074614590.png)(Add icon) of the respective heat number in the [**<u>Heat Numbers</u>**<u> box</u>](http://wiki.cuteinfocomm.com/link/68#bkmrk-4.13.3%C2%A0add-heat-numb). The **Unique Numbers** box opens.
    
    [![image-1652074623858.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074623858.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074623858.png)
2. Click [![image-1652074642125.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074642125.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074642125.png) (**ADD** button) in the **Unique Numbers** window. A new window opens to add a unique number.
    
    [![image-1652074652843.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074652843.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074652843.png)
3. In the **Unique Number** box, enter a unique number for the respective heat number.
4. In the **Original Number** box, enter the original number of the material.
5. In the **Size** box, enter the size of the material.
6. Click **Update**.

#### **4.13.5 Print an Incoming MIR** 

If you want to print an incoming MIR report, click [![image-1652074708958.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074708958.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074708958.png)(print icon) provided in the **Report** column of the **Incoming Material Inspection Report** page. See Fig 4.13.

#### **4.13.6 Print a Report with MTC**

If you want to print an incoming MIR report including MTC, click [![image-1652074743113.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074743113.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074743113.png) (print icon) provided in the **Report** **with MTC** column of the **Incoming Material Inspection Report** page. See Fig 4.13.

#### **4.13.7 Attach a File into an Added Incoming MIR**

If you want to attach any file with any incoming MIR listed in the **Incoming Material Inspection Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **4.13.7.1 Edit Any Incoming MIR** 

If you want to edit any existing incoming MIR in the **Incoming Material Inspection Report** page, do the following,

1. Click [![image-1652074812500.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074812500.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074812500.png)(Edit icon) in the **Edit** column for the respective MIR. See Fig 4.13. A new window opens to edit the added incoming MIR.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **4.13.8 Filter Any Incoming MIR**

If you want to filter any incoming MIR from the list of MIRs in the **Incoming Material Inspection Report** page,

- you can use the [![image-1652074876548.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074876548.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074876548.png) (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.
- If you want to filter any MIR based on the approval status of the MIR, click the **Request Status** box provided in the **Incoming Material Inspection Report** page and then select the appropriate option from a drop-down list.
    
    [![image-1652074894049.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074894049.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074894049.png)
- If you click the **All** option, the system shows a list of all MIRs.
- If you click the **Approved** option, the system shows a list of approved MIRs.
- If you click **Not Approved** option, the system shows a list of not approved MIRs.

#### **4.13.9 Export Incoming MIR List**

You can export a list of MIR added in the **Incoming Material Inspection Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.



### **4.14 Material Verification Report (MVR) (Unique Numbers)**

MVR will be used while go for material inspection. The **Material Verification Report** tab in the **Materials** menu helps you to add an MVR inspection request. If you want to add an MVR inspection request, do the following,

1. Click **Material Verification Report** in the **Materials** menu. The **MVR Inspection Request** page opens.
    
    [![image-1652075030937.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075030937.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075030937.png)
    
     **Figure 4.14: MVR Inspection Request page**

#### **4.14.1 Add an MVR Inspection Request**

If you want to add an MVR inspection request,

1. Click [![image-1652075082788.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075082788.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075082788.png) (**ADD** button) in the **MVR Inspection Request**  See Fig 4.14. A new window opens to add an MVR inspection request.
    
    [![image-1652075102430.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075102430.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075102430.png)
    
    [![image-1652075110359.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075110359.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075110359.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1652075125054.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075125054.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075125054.png)**Tip**: A report number and an RFI report number for a new MVR will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.
2. In the **Inspection Date** box, choose the date of inspection.
3. In the **Description** box, enter the description for the MVR.
4. In the **Location** box, select a location from a drop-down list.
5. Click ****Save****. The MVR is successfully added. Once you have added the MVR, you must add the RFI data for the added MVR.

#### **4.14.2 Add RFI Data for an Added MVR Inspection Request**

If you want to add the details of RFI data for the added MVR inspection request, do the following,

1. Click [![image-1652075211547.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075211547.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075211547.png)(Edit icon) in the **RFI Data** column of the **MVR Inspection Request** page. See Fig 4.14. The **RFI Inspection Request List** window opens.
    
    [![image-1652075245839.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075245839.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075245839.png)
2. In the **Inspection From** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the ****Inspection Details**** option, select 1<sup>st</sup>Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the **Others** box, enter any other inspection related details.
6. In the **Refer to Report No** box, enter the report number for reference.
7. In the **RFI Date** box, choose the RFI date.
8. In the ****Inspection Result**** option, if the inspection result is accepted, select ****Accepted**** otherwise select ****Rejected****.
9. In the **Remarks** box, enter your remarks if any.
10. In the **Inspected by** box, enter the name of a person who has done inspection.
11. In the **Inspected Date** box, choose the date of inspection.
12. In the **Witnessed By** box, enter the name of the witnessed person.
13. In the **Witnessed Date** box, choose the date of witnessed.
14. In the **PCML Rep Name** box, enter the representative name of PCML.
15. In the **PCML Rep Date** box, choose the PCML rep date.
16. In the **MEB Rep Name** box, enter the representative name of MEB.
17. In the **MEB Rep Date box**, choose MEB rep date.
18. Click ****Save****.

Once you have added the RFI data, you must add the result for the added MVR inspection request.

#### **4.14.3 Print an RFI Report**

If you want to print an RFI report, click [![image-1652075364404.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075364404.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075364404.png)(print icon) provided in the **RFI** **Report** column of the **MVR Inspection Request** page. See Fig 4.14.

#### **4.14.4 Add Result for an Added MVR Inspection Request** 

1. Click [![image-1652075396963.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075396963.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075396963.png) (Add icon) of the respective report number. The **MVR Inspection Request Details** window opens.
    
    [![image-1652075408052.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075408052.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075408052.png)
2. Click [![image-1652075426138.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075426138.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075426138.png) (**ADD** button) in the **MVR Inspection Request Details** window.
    
    A new window opens to add result.
    
    [![image-1652075436519.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075436519.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075436519.png)
3. In the **Piece Mark No** box, select the piece mark number from a drop-down list.
4. In the **Heat Number / Certificates** box, select the heat number from a drop-down list.
5. In the **Size** box, enter the size of the material.
6. In the **Type of Material** box, enter the type of material.
7. In the **Remarks** box, enter your remarks if any.
8. Click **Save**.
    
    Once you have added the result for the MVR inspection request, you must submit and approve the MVR inspection request.

#### **4.14.5 Submit and Approve an MVR Inspection Report**

Once you have added the result, the **Submission** column in the **MVR Inspection Request** page is appeared with [![image-1652075522012.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075522012.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075522012.png)(Submit and Reject icons).

1. If you want to submit the MVR inspection request, click [![image-1652075538064.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075538064.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075538064.png)(Submit icon) in the **Submission** column. Otherwise click [![image-1652075546818.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075546818.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075546818.png) (Reject icon) to reject the request. Once you have submitted the MVR inspection request, the **Request Status** column in the **MVR Inspection Request** page is appeared with[![image-1652075590310.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075590310.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075590310.png)(Accept and Reject icons).
2. If you want to approve the MVR inspection request, click [ ![image-1652075613526.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075613526.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075613526.png)(Submit icon) in the **Request Status** column. Otherwise click [![image-1652075628529.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075628529.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075628529.png) (Reject icon) to reject the request.

#### **4.14.6 Print an MVR Inspection Report**

1. If you want to print an MVR inspection report, click [![image-1652075667539.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075667539.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075667539.png)(print icon) in the **Report** column of the **MVR Inspection Request** See Fig 4.14.

#### **4.14.7 Attach a File into an MVR Inspection Request**

If you want to attach any file with any MVR inspection request listed in the **MVR Inspection Request** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **4.14.8 Edit Any MVR Inspection Request** 

If you want to edit any existing MVR inspection request in the **MVR Inspection Request** page, do the following,

1. Click [![image-1652075742403.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075742403.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075742403.png)(Edit icon) in the **Edit** column for the respective MVR inspection request. See Fig 4.14. A new window opens to edit the MVR inspection request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **4.14.9 Filter Any MVR Inspection Request**

If you want to filter any MVR request from the list of requests in the **MVR Inspection Request** page, you can use the [![image-1652075795575.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075795575.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075795575.png) (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.

#### **4.14.10 Export MVR Inspection Request List**

You can export a list of MVR inspection requests added in the **MVR Inspection Request** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

# Inspection

### **5.0 Inspection**

The **Inspection** menu in the home page of the ***cuteQM*** app used to add a Request for Inspection (RFI) fit up request, an RFI weld VI request, and an NDT inspection request.

#### **5.1 RFI Fit Up Request Generic**

If you want to add an RFI fit up request generic, do the following,

1. Click [![image-1651805620926.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651805620926.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651805620926.png) (**ADD** button) in the **RFI Fit up Request Generic** page. A new window opens to add an RFI fit up request generic.
    
    [![image-1651805632560.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651805632560.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651805632560.png)
    
    [![image-1651805679460.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651805679460.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651805679460.png) **Tip**: A report number for a new RFI fit up request generic will be updated automatically in the **Report Number** box.
2. In the **Description** box, enter the description for the RFI fit up request generic.
3. In the **System** box, select a system from a drop-down list.
4. In the **Inspection Date** box, choose the date of inspection.
5. In the **Frame No** box, enter the frame number.
6. In the **Elevation** box, enter the elevation value.
7. In the **Longitudinal** box, enter the longitudinal value.
8. In the **Location** box, enter the location where the inspection to be done.
9. In the **Drawing No** box, select the drawing number from a drop-down list.
10. In the **Sub Contractor** box, select the sub-contractor from a drop-down list.
11. In the **Remarks** box, enter your remarks if any.
12. Click **Save**.

The RFI fit up request generic is inserted successfully. Once you have added the RFI fit up request generic, you must add the RFI data for the added request.

#### **5.1.2 Add RFI Data for an Added RFI Fit Up Request Generic**

If you want to add RFI data for the added RFI fit up request generic, do the following,

1. Click [![image-1651805788288.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651805788288.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651805788288.png) (Edit icon) in the **RFI Data** column of the **RFI Fit up Request Generic**  See Fig 5.1. The **RFI Inspection Request List** window opens.
    
    [![image-1651805817685.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651805817685.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651805817685.png)
2. In the **Inspection From** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the ****Inspection Details**** option, select 1<sup>st</sup>Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the **Others** box, enter any other inspection related details.
6. In the **Refer to Report No** box, enter the report number for reference.
7. In the **RFI Date** box, choose the RFI date.
8. In the Inspection Result option, if the inspection result is accepted, select **Accepted** otherwise select **Rejected**.
9. In the **Remarks** box, enter your remarks if any.
10. In the **Inspected by** box, enter the name of a person who has done inspection.
11. In the **Inspected Date** box, choose the date of inspection.
12. In the **Witnessed By** box, enter the name of the witnessed person.
13. In the **Witnessed Date** box, choose the date of witnessed.
14. In the **PCML Rep Name** box, enter the representative name of PCML.
15. In the **PCML Rep Date** box, choose the PCML rep date.
16. In the **MEB Rep Name** box, enter the representative name of MEB.
17. In the **MEB Rep Date box**, choose MEB rep date.
18. Click **Save**.
    
    The RFI data is successfully added.

#### **5.1.3 Clone an RFI Fit Up Request Generic** 

The **Clone** option in the **RFI Fit up Request Generic** page used to create a RFI weld VI generic request in the [**<u>RFI Weld VI Generic</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.28%C2%A0view-applicatio) page, as a copy of RFI fit up request generic, See Fig 5.4.

If you click [![image-1651806045627.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651806045627.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651806045627.png) (Clone icon) in the **Clone** column of the **RFI Fit up Request Generic** page, an RFI weld VI generic request is added in the **RFI weld VI generic** page.

[![image-1651806061978.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651806061978.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651806061978.png) **Tip**: You can create multiple copies of RFI weld VI generic request for a single RFI fit up request generic.

#### **5.1.4 Print an RFI Report**

If you want to print an RFI report, click [![image-1651806095929.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651806095929.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651806095929.png) (print icon) provided in the **RFI** **Report** column of the **RFI Fit up Request Generic** page. See Fig 5.1.

#### **5.1.5 Submit an RFI Fit Up Request Generic**

Once you have added the RFI fit up request generic, the **Submission** column in the **RFI Fit up Request Generic** page is appeared with [![image-1651806136539.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651806136539.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651806136539.png) (Submit and Reject icons).

1. If you want to submit the RFI fit up request generic, click [![image-1651806160602.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651806160602.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651806160602.png) (Submit icon) in the **Submission** column. Otherwise click [![image-1651806171691.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651806171691.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651806171691.png) (Reject icon) to reject the request.

#### **5.1.6 Print an RFI Fit Up Request Generic Report**

If you want to print an RFI fit up request generic report, click[![image-1651806208317.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651806208317.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651806208317.png) (print icon) provided in the **Report** column of the **RFI Fit up Request Generic** page. See Fig 5.1.

#### **5.1.7 Attach a File into an RFI Fit Up Request Generic**

If you want to attach any file with any RFI fit up request generic added in the **RFI Fit up Request Generic page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **5.1.8 View Signature Details of QA User, Surveyor, and Client** 

Once the RFI fit up inspection has completed, the QA, surveyor, and client add their signature based on their corresponding roles. You can view their signature by using [![image-1651806406456.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651806406456.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651806406456.png) (Sign icon) in the **Sign Details** column in the **RFI Fit up Request Generic** page.

#### **5.1.9 Edit Any RFI Fit Up Request Generic**

If you want to edit any existing RFI fit up request generic in the **RFI Fit up Request Generic** page, do the following,

1. Click [![image-1651806477011.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651806477011.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651806477011.png)(Edit icon) in the **Edit** column for the respective RFI fit up request generic. See Fig 5.1. A new window opens to edit the RFI fit up request generic.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.1.10 Export RFI Fit Up Request Generic List**

You can export a list of RFI fit up request generic added in the **RFI Fit up Request Generic** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **5.1.11 Filter Any RFI Fit Up Request Generic**

If you want to filter any RFI fit up request generic from the list of RFI fit up request generic in the **RFI Fit up Request Generic** page, you can use the (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.

### **5.2 RFI Fit up Request (Heat Numbers)**

The **RFI Fit up Request** tab allows you add an RFI fit up request to check the fit-up quality of pipes and joints used in the Structural project by a sub-contractor. To navigate to the RFI fit up request adding page,

1. Click **RFI Fit up Request** in the **Inspection** menu. The **RFI Fit up Inspection Request** page opens.
    
    [![image-1651806657279.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651806657279.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651806657279.png)
    
     **Figure 4.2: RFI Fit up Inspection Request page**

#### **5.2.1 Add an RFI Fit Up Request**

If you want to add an RFI fit up request, do the following steps,

1. In the **Sub Contractor** box, select a sub-contractor from a drop-down list.
2. In the **Inspection Date** box, select the inspection date.
    
    [![image-1651806762299.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651806762299.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651806762299.png)**Note:** The inspection date should be as current date or upcoming dates. The system will not accept if you have given the previous dates.
3. In the **Location** box, select a location from a drop-down list.
4. In the **System** box, select a system from a drop-down list.
5. In the **Drawing No** box, select a drawing number.
6. In the **Description** box, enter the description for the RFI fit up request. Before saving the added fit up request, you must add joints for the fit-up request.
7. Click [![image-1651806862939.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651806862939.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651806862939.png)(Add icon) of the respective joints you want to add.
    
    The added joints will be moved and listed in the right side of the page.
    
    [![image-1651806950910.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651806950910.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651806950910.png)
8. In the **Heat No 1** box, enter the heat number of the first component if you know.
9. In the **Heat No 2** box, enter the heat number of the second component if you know.
    
    [![image-1651806967931.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651806967931.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651806967931.png)**Tip**: If you want to remove any added joint, click[![image-1651806983021.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651806983021.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651806983021.png)(**Remove** icon) of the respective joint.
10. Click **Save**.

The RFI fit up request is successfully added. If you want to view the added request, navigate to t the **View RFI Fit up** page.


### **5.3 View RFI Fit up (Heat Numbers)**

The **View RFI Fit up** tab helps you to view and edit the RFI fit up requests, which are added by using the **RFI Fit up Request** tab. This tab also allows you to add a new RFI fit up request.

1. Click **View RFI Fit up** in the **Inspection** menu. The **Request for Inspection** page opens with a list of added RFI fit up requests.
    
    [![image-1651807142281.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651807142281.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651807142281.png)
    
     **Figure 5.3: Request for Inspection page**

#### **5.3.1 Add an RFI Fit Up Request**

If you want to add an RFI fit up request, do the following,

1. Click [![image-1651807194442.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651807194442.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651807194442.png) (**ADD** button) in the **RFI Fit up Request List** page.
    
    The system redirects you into **RFI Fit up Inspection Request** page. To know how to add an RFI fit up request, See the topic, “[**<u>Add an RFI Fit up Request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.2.1-add-an-rfi-fit)”.

Once you have added the RFI fit up request, you must submit the added request for inspection.

#### **5.3.2 Add Representative for Added RFI Fit Up Request**

If you want to add a representative for any added RFI fit up request,

1. Click [![image-1651807855116.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651807855116.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651807855116.png) (Edit icon) in the **Representative** column for the respective RFI fit up request. The **Edit Form** window opens.
    
    [![image-1651807868464.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651807868464.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651807868464.png)
2. In the **Representative** box, enter the name of a representative.
3. In the **Inspection Date** box, select the date of inspection.
4. In the **Remarks** box, enter your remarks if any.
5. Click **Save**.

#### **5.3.3 Edit Any RFI Fit Up Request** 

If you want to edit any existing RFI fit up request in the **Request for Inspection** page, do the following,

1. Click [![image-1651807927297.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651807927297.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651807927297.png)(Edit icon) in the **Edit** column for the respective RFI fit up request. See Fig 5.3. The **RFI Fit up Inspection Request** page opens with the details of the selected RFI fit up request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.3.4 Submit and Approve an RFI Fit Up Request**

Once you have added the RFI fit up request, the **Submission** column in the **RFI Fit up Request Lists** page is appeared with [![image-1651808019268.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808019268.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808019268.png)(Submit and Reject icons). See Fig 5.3.

1. If you want to submit the RFI fit up request, click [![image-1651808071397.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808071397.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808071397.png)(Submit icon) in the **Submission** Otherwise click [![image-1651808080397.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808080397.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808080397.png) (Reject icon) to reject the request. Once you have submitted the RFI fit up request, the **Request Status** column in the **RFI Fit up Requests List** page is appeared with [![image-1651808114368.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808114368.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808114368.png) (Approve and Reject icons).
2. If you want to approve the RFI fit up request, click [![image-1651808166180.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808166180.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808166180.png) (Submit icon) in the ****Request Status**** Otherwise click [![image-1651808175651.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808175651.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808175651.png) (Reject icon) to reject the request.
    
    The approved request will be moved to for inspection.

#### **5.3.5 Add Results of RFI Fit Up Inspection**

After completing the RFI fit up inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click [![image-1651808356907.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808356907.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808356907.png)(Add icon) in the **Results** column of the respective request. The **RFI Fit up Request List** window opens with a list of joints.
    
    [![image-1651808378174.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808378174.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808378174.png)
2. If you want to update the heat numbers and piece mark details, click on the respective box and update.
3. If you want to update the WPS number in the **WPS Number** column, you can change the WPS number from a drop-down list.
4. Update the result for root gap by selecting ****Accepted**** or ****Rejected**** in the ****Root Gap**** column based on the inspection.
5. Update the result for straight/ alignment by selecting ****Accepted**** or ****Rejected**** in the ****Strgt/Align**** column based on the inspection.
6. In the **Edge Prep** column, select the type of the edge preparation from a drop-down list.
7. In the **Result** column, update the RFI fit up inspection result by selecting **Pending**, **Accepted**, **Rejected**, or **Cancelled**.
8. In the **Remarks** column, enter you remarks if any.

#### **5.3.6 View an RFI Fit Up Report**

If you want to view an RFI fit up report, click [![image-1651808508303.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808508303.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808508303.png) (print icon) provided in the **Report** column of the **Request for Inspection** page. See Fig 5.3.

#### **5.3.7 View Signature Details of Inspectors**

You can view the sign details of the inspectors such as QA, Sub contractor, Client, and Owner, once they completed the RFI fit up inspection and submitted the inspection result details including their signature. To view the signature details, click [![image-1651808856444.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808856444.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808856444.png)(Sign icon) in the **Sign Details** column in the **Request for Inspection** page.

#### **5.3.8 Attach a File into an RFI Fit up Request** 

If you want to attach a file with any existing RFI fit up request listed in the **RFI Fit up Requests List** page, you can attach the file by using[![image-1651814106867.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651814106867.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651814106867.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)”.

#### **5.3.9 Export RFI Fit up Request List**

You can export a list of RFI fit up requests added in the **RFI Fit up Requests List** page in both the pdf and excel formats by using [![image-1651814160755.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651814160755.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651814160755.png) (**PDF** button) and [![image-1651814170329.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651814170329.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651814170329.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)”.

#### **5.3.10 Filter RFI Fit up Request**

If you want to filter any specific RFI fit up request in the **RFI Fit up Requests List** page,

- you can use the filter box [![image-1651814511402.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651814511402.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651814511402.png) provided in the upper side of the **RFI Fit up Requests List**  To filter the any specific RFI fit up request, select the **Drawing Number** and **Date** in the boxes and click **Search**.
- you can use [![image-1651814541939.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651814541939.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651814541939.png) (FILTER button) located on the RFI Fit up Requests List page. To know how to filter, see the topic, ”****Filter Any Area****”.



### **5.4 RFI Weld VI Generic**

Once the RFI fit up inspection process has completed, the materials are moved for weld inspection process. The **RFI Weld VI Generic** tab in the **Inspection** menu helps you to add an RFI weld VI generic.

1. Click the ****RFI Weld VI Generic**** tab in the ******Inspection****** menu. The **RFI Weld VI Generic** page opens.
    
    [![image-1651818337672.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651818337672.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651818337672.png)
    
    [![image-1651818349509.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651818349509.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651818349509.png)
    
    [![image-1651818360288.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651818360288.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651818360288.png)
    
     **Figure 5.4: RFI Weld VI Generic page**

#### **5.4.1 Add an RFI Weld VI Generic**

If you want to add an RFI weld VI generic, do the following,

1. Click [![image-1651819746364.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651819746364.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651819746364.png) (**ADD** button) in the **RFI Weld VI Generic** page. A new window opens to add an RFI weld VI generic.
    
    [![image-1651819758491.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651819758491.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651819758491.png)
    
    [![image-1651819769739.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651819769739.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651819769739.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651819781665.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651819781665.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651819781665.png) **Tip**: A report number for a new RFI weld VI generic will be updated automatically in the **Report Number** box.
2. In the **Description** box, enter the description for the RFI weld VI generic.
3. In the **System** box, select a system from a drop-down list.
4. In the **Inspection Date** box, choose the date of inspection.
5. In the **Frame No** box, enter the frame number.
6. In the **Elevation** box, enter the elevation value.
7. In the **Longitudinal** box, enter the longitudinal value.
8. In the **Location** box, enter the location where the inspection to be done.
9. In the **Drawing No** box, select the drawing number from a drop-down list.
10. In the **Sub Contractor** box, select the sub-contractor from a drop-down list.
11. In the **Remarks** box, enter your remarks if any.
12. Click **Save**.

The RFI weld VI generic is added successfully. Once you have added the RFI weld VI generic, you must add the RFI data for the added request.

#### **5.4.2 Add RFI Data for the Added RFI Weld VI Generic**

If you want to add RFI data for the added RFI weld VI generic, do the following,

1. Click [![image-1651819888124.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651819888124.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651819888124.png) (Edit icon) in the **RFI Data** column of the **RFI Weld VI Generic**  See Fig 5.4. The **RFI Inspection Request List** window opens.
    
    [![image-1651820184413.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651820184413.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651820184413.png)
2. In the **Inspection From** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the **Inspection Details** option, select 1<sup>st</sup> Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the **Others** box, enter any other inspection related details.
6. In the **Refer to Report No** box, enter the report number for reference.
7. In the **RFI Date** box, choose the RFI date.
8. In the Inspection Result option, if the inspection result is accepted, select ****Accepted**** otherwise select ****Rejected****.
9. In the **Remarks** box, enter your remarks if any.
10. In the **Inspected by** box, enter the name of a person who has done inspection.
11. In the **Inspected Date** box, choose the date of inspection.
12. In the **Witnessed By** box, enter the name of the witnessed person.
13. In the **PCML Rep Name** box, enter the representative name of PCML.
14. In the **PCML Rep Date** box, choose the PCML rep date.
15. In the **MEB Rep Name** box, enter the representative name of MEB.
16. In the **MEB Rep Date box**, choose MEB rep date.
17. Click **Save**.

The RFI data is successfully added.

#### **5.4.3 Clone an RFI Weld VI Generic**

The **Clone** option in the **RFI Weld VI Generic** page used to create a vacuum test request, an air test request, a hydrostatic test request, and an NDT request, as a copy of RFI weld VI generic request.

1. Click [![image-1651820497116.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651820497116.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651820497116.png) (Clone icon) in the **Clone** column of the **RFI Weld VI Generic** page. The Clone box opens.
2. Select any test from the given list.
3. Click [![image-1652096451071.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652096451071.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652096451071.png) (**Add** button).
    
    A new request for the selected test will be added in the respective pages.

#### **5.4.4 Print an RFI Report**

If you want to print an RFI report, click [![image-1651820553875.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651820553875.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651820553875.png) (print icon) provided in the **RFI** **Report** column of the **RFI Weld VI Generic** page. See Fig 5.4.

#### **5.4.5 Submit an RFI Weld VI Generic**

Once you have added the RFI weld VI generic, the **Submission** column in the **RFI Weld VI Generic** page is appeared with [![image-1651820613399.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651820613399.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651820613399.png)(Submit and Reject icons).

1. If you want to submit the RFI weld VI generic, click [![image-1651820633241.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651820633241.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651820633241.png) (Submit icon) in the **Submission** column. Otherwise click[![image-1651820644265.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651820644265.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651820644265.png) (Reject icon) to reject the request.

#### **5.4.6 Print an RFI Weld VI Generic Report**

If you want to print an RFI weld VI generic report, click [![image-1651820676007.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651820676007.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651820676007.png) (print icon) provided in the **Report** column of the **RFI Weld VI Generic** page. See Fig 5.4.

#### **5.4.7 View Signature Details of QA User, Surveyor, and Client** 

Once the weld VI inspection has completed, the QA, surveyor, and client add their signature based on their corresponding roles. You can view their signature by using[![image-1651820729015.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651820729015.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651820729015.png) (Sign icon) in the **Sign Details** column in the **RFI Weld VI Generic** page.

#### **5.4.8 Attach a File into an RFI Weld VI Generic**

If you want to attach any file with any RFI weld VI generic added in the **RFI Weld VI Generic page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **5.4.9 Edit Any RFI Weld VI Generic**

If you want to edit any existing RFI weld VI generic in the **RFI Weld VI Generic** page, do the following,

1. Click [![image-1651822747960.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651822747960.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651822747960.png) (Edit icon) in the **Edit** column for the respective RFI weld VI generic. See Fig 5.4. A new window opens to edit the RFI weld VI generic.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.4.10 Export RFI Weld VI Generic List**

You can export a list of RFI weld VI generic added in the **RFI Weld VI Generic** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **5.4.11 Filter Any RFI Weld VI Generic**

If you want to filter any RFI weld VI generic from the list of RFI weld VI generic in the **RFI Weld VI Generic** page, you can use the [![image-1651822860270.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651822860270.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651822860270.png) (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.


### **5.5 RFI Weld VI Request (Heat Numbers)**

The **RFI Weld VI Request** tab in the **Inspection** menu allows you to add an RFI weld VI request to perform visual inspection of welded pipes and joints used in the Structural project. To navigate to the RFI weld VI request adding page,

1. Click **RFI Weld VI Request** in the **Inspection** menu. The **RFI Weld Visual Request** page opens.
    
    [![image-1651823246690.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651823246690.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651823246690.png)
    
     **Figure 5.5: RFI Weld Visual Request page**

#### **5.5.1 Add an RFI Weld VI Request**

If you want to add an RFI weld VI request, do the following steps,

1. In the **Sub Contractor** box, select the name of a sub-contractor from a drop-down list.
2. In the **Inspection Date** box, select the inspection date.
    
    [![image-1651823533393.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651823533393.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651823533393.png) **Note:** The inspection date should be as current date or upcoming dates. The system will not accept if you have given the previous dates.
3. In the **Location** box, select a location from a drop-down list.
4. In the **System** box, select a system from a drop-down list.
5. In the **Drawing No** box, select the drawing number from a drop-down list.
6. In the **Description** box, enter the description for the request.
    
    Before saving the added weld VI request, you must add joints for the weld VI request.
    
    [![image-1651823772249.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651823772249.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651823772249.png)**Note**: You can add multiple joints for one request.
    
    The **RFI Weld Visual Request** page shows a list of joints including the corresponding sheet and piece mark numbers. If you want to add joints for the RFI weld VI request, do the following steps,
    
    [![image-1651824001781.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651824001781.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651824001781.png)
7. Select the checkbox of the respective joints you want to add. The added joints will be moved and listed in the right side of the page.
    
    [![image-1651824182325.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651824182325.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651824182325.png)
8. Update the welder details by using (Add icon) provided in the ****Welder Details**** column. 
    1. 1. Click (Add icon) of the respective joint number.
            
            The **Welder- Weld Layer- Weld Process** window opens.
            
            [![image-1651824230871.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651824230871.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651824230871.png)
        2. In the **Date** box, select the date.
        3. In the **Group Name** box, select the group name from a drop-down list.
        4. In the **Weld Process** field, select a weld process.
        5. In the **Weld Position** field, select the welding position.
        6. In the **Weld Layers** field, select the weld layers you want add.
        7. In the **Welder Number/ Name** field, select the welders you want to add.
        8. Click **Add**.
            
            The selected welders will be added and listed in the below table. See the above figure.
        9. In the **Weld Consumable** box, select the weld consumable from a drop-down list.
        10. In the **WPS Number** box, select the WPS number from a drop-down list.
        11. Click **Save**.
            
            [![image-1651824304754.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651824304754.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651824304754.png)**Tip**: If you want to remove any added joint, click (**Remove** icon) of the respective joint.
9. Click **Save**.

The RFI weld VI request is successfully added. If you want to view the added request, navigate to **View RFI Weld VI**.


### **5.6 View RFI Weld VI (Heat Numbers)**

The **View RFI Weld VI** tab helps you to view and edit the RFI weld VI request, which is added by using the **RFI Weld VI Request** tab. This tab also allows you to add a new RFI weld VI request.

1. Click **View RFI Weld VI** in the **Inspection** menu. The **Request for Inspection** page opens with a list of added RFI weld VI requests.
    
    [![image-1651824518475.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651824518475.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651824518475.png)
    
     **Figure 5.6: Request for Inspection page**

#### **5.6.1 Add an RFI Weld VI Request**

If you want to add an RFI weld VI request, do the following,

1. Click [![image-1651824728863.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651824728863.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651824728863.png) (**ADD** button) in the **Request for Inspection** page. The system redirects you into **Request** **for Inspection** page. To know how to add an RFI weld VI request, See the topic, “**Add an RFI Weld VI Request**”.

Once you have added the RFI weld VI request, you must submit the added request for weld visual inspection.

#### **5.6.2 Add Representative for Added RFI Weld VI Request**

If you want to add a representative for any added RFI weld VI request,

1. Click [![image-1651824800467.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651824800467.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651824800467.png) (Edit icon) in the **Representative** column for the respective RFI weld VI request. The **Edit Form** window opens.
    
    [![image-1651824820417.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651824820417.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651824820417.png)
2. In the **Representative** box, enter the name of a representative.
3. In the **Inspection Date** box, select the date of inspection.
4. In the **Remarks** box, enter your remarks if any.
5. Click **Save**.

#### **5.6.3 Edit Any RFI Weld VI Request** 

If you want to edit any existing RFI weld VI request in the **Request for Inspection** page, do the following,

1. Click [![image-1651824877355.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651824877355.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651824877355.png) (Edit icon) in the **Edit** column for the respective RFI weld VI request. See Fig 5.6. The **Request** **for Inspection** page opens with the details of the selected RFI weld VI request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.6.4 Submit and Approve an RFI Weld VI Request**

Once you have added the RFI weld VI request, the **Submission** column in the **Requests for Inspection** page is appeared with [![image-1651824942944.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651824942944.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651824942944.png) (Submit and Reject icons). See Fig 5.6.

1. If you want to submit the RFI weld VI request, click [![image-1651824975040.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651824975040.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651824975040.png) (Submit icon) in the **Submission** column. Otherwise click [![image-1651824985927.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651824985927.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651824985927.png) (Reject icon) to reject the request.
    
    Once you have submitted the RFI weld VI request, the **Request Status** column in the **Request for Inspection** page is appeared with [![image-1651825025798.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825025798.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825025798.png) (Approve and Reject icons).
2. If you want to approve the RFI weld VI request, click [![image-1651825063577.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825063577.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825063577.png) (Submit icon) in the ****Request Status**** Otherwise click [![image-1651825073218.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825073218.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825073218.png) (Reject icon) to reject the request.

The approved request will be moved to for inspection.

#### **5.6.5 Add Results of RFI weld Visual Inspection**

After completing the RFI weld visual inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click [![image-1651825147956.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825147956.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825147956.png) (Add icon) in the **Results** column of the respective request. The **Request for Inspection** window opens with a list of joints added for the particular request.
    
    [![image-1651825174023.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825174023.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825174023.png)
2. In the ****Result**** column, select the result for each joint from the given result options in the drop-down list.
3. In the **Remarks** box, enter your remarks if any.
4. Click **Save**.

#### **5.6.6 View an RFI Weld VI Report**

If you want to view an RFI weld VI report, click [![image-1651825233051.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825233051.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825233051.png) (print icon) provided in the **Report** column of the **RFI Weld Visual Requests List** page. See Fig 5.6.

#### **5.6.7 View Signature Details of Inspectors**

You can view the sign details of the inspectors such as QA, Sub contractor, Client, and Owner, once they completed the RFI weld visual inspection and submitted the inspection result details including their signature. To view the signature details, click[![image-1651825274978.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825274978.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825274978.png) (Sign icon) in the **Sign Details** column in the **RFI Weld Visual Requests List** page.

#### **5.6.8 Attach a File into an RFI Weld VI Request** 

If you want to attach a file with any existing RFI weld VI request listed in the **RFI Weld Visual Requests List** page, you can attach the file by using [![image-1651825316304.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825316304.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825316304.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)”.

#### **5.6.9 Export RFI Weld VI Request List**

You can export a list of RFI weld VI requests added in the **RFI Weld Visual Requests List** page in both the pdf and excel formats by using [![image-1651825353910.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825353910.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825353910.png) (**PDF** button) and [![image-1651825365357.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825365357.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825365357.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)”.

#### **5.6.10 Filter RFI Weld VI Request**

If you want to filter any specific RFI weld VI request in the **RFI Weld Visual Requests List** page,

- you can use the filter box [![image-1651825412432.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825412432.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825412432.png) provided in the upper side of the **RFI Weld Visual Requests List**  To filter the any specific RFI weld VI request, select the **Drawing Number** and **Date** in the boxes and click **Search**.
- you can use [![image-1651825433459.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825433459.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825433459.png) (FILTER button) located on the RFI Weld Visual Requests List page. To know how to filter, see the topic ”Filter Any Area”.



### **5.7 NDT Inspection Generic**

NDT inspection used to find out welding defects of the materials. Once the fit up and welding process of the materials has completed, the materials will be moved for the NDT inspection. The currently following NDT inspection methods are RT, UT, MT, PT, Ultrasonic Thickness Gaging (UTG), Magnetic Particle Inspection (MPI) after load test, UT/MT, and PT after load test.

The **NDT Inspection Generic** tab in the **Inspection** menu helps you to add an NDT inspection generic. If you want to navigate the NDT inspection generic,

1. Click the **NDT Inspection Generic** in the **Inspection** menu. The **NDT Inspection Generic** page opens.
    
    [![image-1651825529646.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825529646.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825529646.png)
    
    [![image-1651825535975.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825535975.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825535975.png)
    
    [![image-1651825541098.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825541098.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825541098.png)
    
     **Figure 5.7: NDT Inspection Generic page**


#### **5.7.1 Add an NDT Inspection Generic** 

If you want to add an NDT inspection generic, do the following,

1. Click [![image-1651825641028.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825641028.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825641028.png) (**ADD** button) in the **NDT Inspection Generic** page. A new window opens to add an NDT Inspection generic.
    
    [![image-1651825651460.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825651460.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825651460.png)
    
    [![image-1651825674586.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825674586.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825674586.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651825686394.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825686394.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825686394.png)**Tip**: A report number for a new NDT inspection generic will be updated automatically in the **Report Number** box.
2. In the **Description** box, enter the description for the RFI weld VI generic.
3. In the **System** box, select a system from a drop-down list.
4. In the **Inspection Date** box, choose the date of inspection.
5. In the **Frame No** box, enter the frame number.
6. In the **Elevation** box, enter the elevation value.
7. In the **Longitudinal** box, enter the longitudinal value.
8. In the **Location** box, enter the location where the inspection to be done.
9. In the **Drawing No** box, select the drawing number from a drop-down list.
10. In the **Designation** box, enter the designation detail.
11. In the **Cost Centre** box, enter the cost centre detail.
12. In the **Requisition** box, select the type of request from a drop-down list.
13. In the **Welding Position** box, enter the position of welding.
14. In the **Weld Type** box, enter the type of welding.
15. In the **Thickness** box, enter the thickness of the welding.
16. In the **Sub Contractor** box, select the sub-contractor from a drop-down list.
17. In the **Welder** box, select the name of a welder from a drop-down list.
18. In the **WPS** box, enter the WPS detail.
19. In the **Process** box, select the welding process to be done from a specified category.
20. In the **NDT Type** box, select the type of NDT to be done from a specified category.
21. In the **Remarks** box, enter your remarks if any.
22. Click **Save**.

The NDT inspection generic is added successfully. Once you have added the NDT inspection generic, you must add the RFI data for the added NDT inspection generic.

#### **5.7.2 Add RFI Data for the Added NDT Inspection Generic**

If you want to add RFI data for the added NDT inspection generic, do the following,

1. Click [![image-1651825825779.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825825779.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825825779.png) (Edit icon) in the **RFI Data** column of the **NDT Inspection Generic**  See Fig 5.7. The **RFI Inspection Request List** window opens.
    
    [![image-1651825841901.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825841901.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825841901.png)
2. In the **Inspection From** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the **Inspection Details** option, select 1<sup>st</sup> Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the **Others** box, enter any other inspection related details.
6. In the **Refer to Report No** box, enter the report number for reference.
7. In the **RFI Date** box, choose the RFI date.
8. In the **Inspection Result** option, if the inspection result is accepted, select **Accepted** otherwise select **Rejected**.
9. In the **Remarks** box, enter your remarks if any.
10. In the **Inspected by** box, enter the name of a person who has done inspection.
11. In the **Inspected Date** box, choose the date of inspection.
12. In the **Witnessed By** box, enter the name of the witnessed person.
13. In the **Witnessed Date** box, choose the date of witnessed.
14. In the **PCML Rep Name** box, enter the representative name of PCML.
15. In the **PCML Rep Date** box, choose the PCML rep date.
16. In the **MEB Rep Name** box, enter the representative name of MEB.
17. In the **MEB Rep Date box**, choose MEB rep date.
18. Click **Save**.

The RFI data is successfully added.

#### **5.7.3 Print an RFI Report**

If you want to print an RFI report, click[![image-1651826055818.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651826055818.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651826055818.png) (print icon) provided in the **RFI** **Report** column of the **NDT Inspection Generic** page. See Fig 5.7.

#### **5.7.4 Submit an NDT Inspection Generic**

Once you have added the NDT inspection generic, the **Submission** column in the **NDT Inspection Generic** page is appeared with [![image-1651826167628.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651826167628.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651826167628.png) (Submit and Reject icons).

If you want to submit the added NDT inspection generic, click[![image-1651826214645.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651826214645.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651826214645.png) (Submit icon) in the **Submission** column. Otherwise click [![image-1651826225150.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651826225150.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651826225150.png)(Reject icon) to reject the request.

#### **5.7.5 Print an NDT Inspection Generic Report**

If you want to print an NDT inspection generic report, click[![image-1651826332425.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651826332425.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651826332425.png) (print icon) provided in the **Report** column of the **NDT Inspection Generic** page. See Fig 5.7.

#### **5.7.6 View Signature Details of QA User, Surveyor, and Client** 

Once the NDT inspection has completed, the QA, surveyor, and client add their signature based on their corresponding roles. You can view their signature by using [![image-1651826371886.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651826371886.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651826371886.png) (Sign icon) in the **Sign Details** column in the **NDT Inspection Generic** page.

#### **5.7.7 Attach a File into an NDT Inspection Generic**

If you want to attach any file with any NDT inspection generic added in the **NDT Inspection Generic page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **5.7.8 Edit Any NDT Inspection Generic**

If you want to edit any existing NDT inspection generic in the **NDT Inspection Generic** page, do the following,

1. Click [![image-1651826479141.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651826479141.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651826479141.png) (Edit icon) in the **Edit** column for the respective NDT inspection generic. See Fig 5.7. A new window opens to edit the NDT inspection generic.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.7.9 Export NDT Inspection Generic List**

You can export a list of NDT inspection generic added in the **NDT Inspection Generic** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **5.7.10 Filter Any NDT Inspection Generic**

If you want to filter any NDT inspection generic from the list of NDT inspection generic in the **NDT Inspection Generic** page, you can use the [![image-1651826596765.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651826596765.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651826596765.png) (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.




### **5.8 NDT Inspection Request**

The **NDT Inspection Request** tab in the **Inspection** menu helps you to add an NDT inspection request to perform the NDT inspection.

#### **5.8.1 Add an NDT Inspection Request**

If you want to add an NDT inspection request, do the following

1. Click the **NDT Inspection Request** tab in the **Inspection** menu. A new page opens to add an NDT inspection request.
    
    [![image-1651826755259.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651826755259.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651826755259.png)
    
     **Figure 5.8: NDT Inspection Request page**
    
    [![image-1651826778999.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651826778999.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651826778999.png) **Tip**: A report number and the request adding date for a new NDT inspection request will be updated automatically in the **Report Number** and the **Date** boxes, respectively.
    
    [![image-1651826800152.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651826800152.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651826800152.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **Requested By** box, enter the name of person who has requested for the inspection.
3. In the **To** box, select the name of a sub-contractor from a drop-down list.
4. In the **Attention** box, enter any note if you want for attention.
5. In the **Inspection Date &amp; Time** box, select the date of inspection.
6. In the **Location** box, enter the location where the inspection to be done.
7. In the **Designation** box, enter the designation detail.
8. In the **Cost Centre** box, enter the cost centre detail.
9. In the **Requisition** box, select the type of request from a drop-down list.
10. In the **Welding Position** box, enter the position of welding.
11. In the **Weld Type** box, enter the type of welding.
12. In the **Thickness** box, enter the thickness of the welding.
13. In the **NDT Procedure Number**, select the NDT procedure number from a drop-down list.
14. In the **Acceptance Criteria** box, enter the detail of acceptance criteria.
15. In the **Test Specification** box, enter the test specification detail.
16. In the **Construction Code** box, enter the construction code.
17. In the **NDT Type** box, select any type of NDT you want to add.
18. In the **Remarks** box, enter your remarks if any.
    
    [![image-1651826902770.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651826902770.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651826902770.png) **Note**: Before saving the added NDT request, you must add the details of joints. You can add multiple joints for any added NDT inspection request by using a box provided in the left side of the page. To know how to add joints, see the topic “[**<u>Add joints for an NDT inspection request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.8.2%C2%A0add-joints-for)”.
19. Click **Save**.

#### **5.8.2 Add Joints for an NDT Inspection Request**

If you want to add joints for any added NDT inspection request, do the following,

[![image-1651826974438.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651826974438.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651826974438.png)

1. Click the check box of the respective joints.
2. Click [![image-1651827303530.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651827303530.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651827303530.png) (**Add Selected Joints** button).
    
    The selected joints are moved into the **Added Joints** box located in the right side of the page.
    
    [![image-1651827318760.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651827318760.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651827318760.png)

The selected joints are successfully added for the NDT inspection request.


### **5.9 View NDT Request**

The **View NDT Request** tab helps you to view and edit the added NDT inspection request, which is added by using the **NDT Inspection Request** tab.

1. Click the **View NDT Request** tab in the **Inspection** menu. The **View NDT Inspection List** page opens with a list of added NDT inspection requests.
    
    [![image-1651827398000.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651827398000.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651827398000.png)
    
     **Figure 5.9: View NDT Inspection List page**

#### **5.9.1 Change the Inspection Date for Any Added NDT Inspection Request**

If you want to change the inspection date of any added NDT inspection request,

1. Click [![image-1651827458444.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651827458444.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651827458444.png) (Edit icon) in the ****Inspection Date**** column for the respective NDT inspection request, See Fig 5.9. The **Edit Form** window opens.
    
    [![image-1651827474618.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651827474618.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651827474618.png)
    
    
    1. 1. In the **Inspection Date** box, select the date of inspection.
        2. Click **Save**.

#### **5.9.2 Print an NDT Inspection Request Report**

If you want to print an NDT inspection request report, click[![image-1651827538972.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651827538972.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651827538972.png) (print icon) provided in the **Report** column of the **View NDT Inspection List** page. See Fig 5.9.

#### **5.9.3 Edit Any NDT Inspection Request** 

If you want to edit any existing NDT Inspection request in the **View NDT Inspection List** page, do the following,

1. Click [![image-1651827596549.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651827596549.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651827596549.png)(Edit icon) in the **Edit** column for the respective NDT inspection request. See Fig 5.9. The **NDT Inspection Request** page opens to edit the NDT Inspection request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.9.4 Export NDT Inspection Request List**

You can export a list of NDT inspection request added in the **View NDT Inspection List** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **5.9.5 Filter Any NDT Inspection Request** 

If you want to filter any NDT inspection request from the list of NDT inspection requests in the **View NDT Inspection List** page, you can use the [![image-1651827676180.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651827676180.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651827676180.png) (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.


### **5.10 RFI Request for Post Weld Heat Treatment (PWHT)**

PWHT is defined as a heat treatment after welding performed to strengthen the weld metal and heat affected zone. Thus, decreasing hardness and improving toughness, and decreasing the residual stresses associated with welding.

The **RFI Request** **for PWHT** tab in the **Inspection** menu used to add an RFI request for PWHT.

1. Click the **RFI Request** **for PWHT** tab in the **Inspection** menu. The **RFI Request** **for PWHT** page opens.
    
    [![image-1651827779135.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651827779135.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651827779135.png)
    
     **Figure 5.10: RFI Request** **for PWHT page**

#### **5.10.1 Add an RFI Request for PWHT**

If you want to add an RFI request for PWHT, do the following,

1. Click [![image-1651827838749.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651827838749.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651827838749.png) (**ADD** button) in the **RFI Request** **for PWHT** page. See Fig 5.10. A new window opens to add an RFI request for PWHT.
    
    [![image-1651827872721.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651827872721.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651827872721.png)
    
    [![image-1651827882542.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651827882542.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651827882542.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
3. In the **Location** box, enter a location where the inspection to be done.
4. In the **Inspection** **Date** box, select the date of inspection.
5. In the **NDT Type** box, select **PWHT**.
6. In the ****Search Joints List by ISO/ Drawing No**** box, select a drawing number from a drop-down list. The Joint numbers and the piece mark numbers will be listed for the selected drawing number.
7. If you want to add joints, click [![image-1651828471923.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651828471923.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651828471923.png)(****Add**** icon) of the respective joint number. The added joints will be moved into the left side window of the **RFI Request for PWHT** page.
8. Click **Save AFI Request**.
    
    The RFI request for PWHT is successfully added.

#### **5.10.2 Submit and Approve an RFI Request for PWHT**

Once you have added the RFI request for PWHT, the **Request Status** column in the **RFI Request for PWHT page is appeared with[![image-1651828599274.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651828599274.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651828599274.png) (Submit and Reject icons).

1. If you want to submit the RFI request for PWHT, click [![image-1651828645465.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651828645465.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651828645465.png) (Submit icon) in the **Request Status** column. Otherwise click [![image-1651828661988.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651828661988.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651828661988.png) (Reject icon) to reject the request.
    
    Once you have submitted the RFI request for PWHT, the **Completed Status** column in the **RFI Request for PWHT** page is appeared with [![image-1651828724896.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651828724896.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651828724896.png) (Accept and Reject icons).
2. If you want to approve the RFI request for PWHT, click [![image-1651828802200.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651828802200.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651828802200.png) (Submit icon) in the ****Completed Status**** Otherwise click [![image-1651828790594.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651828790594.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651828790594.png) (Reject icon) to reject the request.

#### **5.10.3 Attach a File into an RFI Request for PWHT**

If you want to attach any file with any RFI request for PWHT listed in the **RFI Request for PWHT** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **5.10.4 Print an RFI Request for PWHT Report**

If you want to print an RFI request for PWHT report, click [![image-1651828939299.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651828939299.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651828939299.png) (print icon) provided in the **Report** column of the **RFI Request for PWHT** page. See Fig 5.12.

#### **5.10.5 Edit Any RFI Request for PWHT**

 If you want to edit any existing RFI request for PWHT in the **RFI Request for PWHT** page, do the following,

1. Click [![image-1651829052996.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651829052996.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651829052996.png) (Edit icon) in the **Edit** column for the respective RFI request for PWHT. See Fig 5.10. A new window opens to edit the RFI request for PWHT.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save AFI Request**.

#### **5.10.6 Export RFI Request for PWHT**

You can export a list of RFI request for PWHT added in the **RFI Request for PWHT** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.


### **5.11 NDT Job Order**

The **NDT Job Order** tab in the **Inspection** menu allows you to add a job order for a specific NDT-contractor to carry out the NDT inspection. Once you have added the job order, you can add the NDT request including the quantity and schedule date to complete the NDT inspection.

If you want to navigate **NDT Job Order**,

1. Click the **NDT Job Order** tab in the **Inspection** menu.
    
    The **Job Order** page opens.
    
    [![image-1651829189141.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651829189141.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651829189141.png)
    
     **Figure 5.11: Job Order page**

#### **5.11.1 Add NDT Job Order**

If you want to add an NDT job order, do the following,

1. Click [![image-1651829306598.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651829306598.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651829306598.png) (**ADD** button) in the **Job Order** page. See Fig 5.11. A new window opens to add an NDT job order.
    
    [![image-1651829323945.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651829323945.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651829323945.png)
    
    [![image-1651829333579.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651829333579.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651829333579.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651829363867.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651829363867.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651829363867.png) **Tip**: A report number for a new job order will be updated automatically in the **Report Number** box.
2. In the **NDT Contractor** box, select the name of an NDT contractor from a drop-down list.
3. In the **Attention** box, enter any note if you want for attention.
4. In the **Date** box, select the date of adding an NDT job order.
5. In the **Job No** box, enter the job number.
6. In the **Requested By** box, enter the name of a person who has requested for an NDT job order.
7. In the **Requested Date** box, select requested date of an NDT job order.
8. In the **Supported By** boxes, enter the name of a project lead and a HOD, respectively.
9. Click **Save**.

The NDT job order is successfully added.

#### **5.11.2 Add an NDT request** 

1. Click [![image-1651829494834.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651829494834.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651829494834.png) (Add icon) of the respective job order in the **Add NDT Request** column of the **Job Order** See Fig 5.13. A new window shows a list of added NDT request.
    
    [![image-1651829512197.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651829512197.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651829512197.png)
2. If you want to add any request, click [![image-1651829567471.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651829567471.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651829567471.png) (Add icon) of the respective request.
    
    The added NDT request will be assigned under the respective job order.
3. If you want to delete any request, click [![image-1651829558594.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651829558594.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651829558594.png) (Delete icon) of the respective request.

#### **5.11.3 Attach a File into an NDT Job Order** 

If you want to attach any file with any NDT job order listed in the **Job Order** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **5.11.4 Print an NDT Job Order Report**

If you want to print an NDT job order report, click [![image-1651829685976.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651829685976.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651829685976.png) (print icon) provided in the **Report** column of the **Job Order** page. See Fig 5.11.

#### **5.11.5 Edit Any NDT Job Order**

 If you want to edit any existing NDT job order in the **Job Order** page, do the following,

1. Click [![image-1651829755981.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651829755981.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651829755981.png) (Edit icon) in the **Edit** column for the respective NDT job order. See Fig 5.11.
    
    A new window opens to edit the job order.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.11.6 Export NDT Job Order List**

You can export a list of NDT job order added in the **Job Order** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.



### **5.12 NDT Job Verification**

The **NDT Job Verification** tab helps you to add an NDT job verification request. This tab helps the NDT contractor to verify the quantity of job done based on the request issued. If you want to navigate **NDT Job Verification**,

1. Click the **NDT Job Verification** tab in the **Inspection** menu. The **Job Verification** page opens.
    
    [![image-1651829889189.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651829889189.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651829889189.png)
    
     **Figure 5.12: Job Verification page**

#### **5.12.1 Add NDT Job Verification**

If you want to add an NDT job verification, do the following,

1. Click [![image-1651829975202.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651829975202.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651829975202.png) (**ADD** button) in the **Job Verification** page. See Fig 5.12. A new window opens to add an NDT job verification request.
    
    [![image-1651829997771.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651829997771.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651829997771.png)
    
    [![image-1651830007041.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651830007041.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651830007041.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651830020667.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651830020667.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651830020667.png)**Tip**: A report number for a new job verification will be updated automatically in the **Report Number** box.
2. In the **NDT Contractor** box, select the name of an NDT contractor from a drop-down list.
3. In the **Date** box, select the date of adding an NDT job verification request.
4. In the **Job No** box, enter the job number.
5. In the **Prepared By** box, enter the name of a person who prepared the NDT job verification request.
6. In the **Prepared Date** box, select prepared date of the NDT job verification request.
7. In the **Checked By** box, enter the name of a person who has checked the request.
8. In the **Checked Date** box, select checked date of the request.
9. In the ****Verified By**** box, enter the name of a person who has verified the request.
10. Click **Save**.

The NDT job verification request is successfully added.

#### **5.12.2 Attach a File into an NDT Job Verification Request**

If you want to attach any file with any NDT job verification request listed in the **Job Verification** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **5.12.3 Print an NDT Job Verification Report**

If you want to print an NDT job verification report, click[![image-1651830207157.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651830207157.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651830207157.png) (print icon) provided in the **Report** column of the **Job Verification** page. See Fig 5.12.

#### **5.12.4 Edit Any NDT Job Verification Request**

 If you want to edit any existing NDT job verification request in the **Job Verification** page, do the following,

1. Click [![image-1651830268726.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651830268726.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651830268726.png) (Edit icon) in the **Edit** column for the respective NDT job verification request. See Fig 5.12. A new window opens to edit the job order.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.12.5 Export NDT Job Verification Request List**

You can export a list of NDT job verification request added in the **Job Verification** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.


### **5.13 Survey form**

The **Survey form** tab in the **Inspection** menu helps you to add a survey form. To navigate the **Survey form**,

1. Click the **Survey form** tab in the **Inspection** menu. The **Survey form** page opens.
    
    [![image-1651830448638.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651830448638.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651830448638.png)
    
     **Figure 5.13: Survey form page**

#### **5.13.1 Add a Survey Form**

If you want to add a survey form, do the following,

1. Click [![image-1651830510089.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651830510089.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651830510089.png) (**ADD** button) in the **Survey form** page. See Fig 5.13. A new window opens to add a survey form.
    
    [![image-1651830526378.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651830526378.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651830526378.png)
    
    [![image-1651830538113.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651830538113.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651830538113.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **Report Number** box, enter the report number of the survey form.
3. In the **Request** **Date** box, select the request date of the survey form.
4. In the **Part Number** box, enter the part number for the survey form.
5. In the **Part Description** box, enter the description for the added part number.
6. In the **Inspection Request Date** box, select the inspection request date.
7. In the **Location** box, enter the location where the inspection to be done.
8. In the **Batch Number** box, enter the batch number for the survey form.
9. In the **Drawing Number** box, enter the drawing number for the survey form.
10. In the **Inspection and Test Plan (ITP) Document Number** box, enter ITP document number.
11. In the **Section / Clause Number** box, enter the section / clause number.
12. In the **Reference Number** box, enter the reference number.
13. In the **Report Number** box, enter the report number.
14. In the **Report Number** box, enter the report number.
15. In the **Type of Inspection** option, select the required inspection types from the given inspection type list.
16. Click **Save**.

The survey form is successfully added.

#### **5.13.2 Attach a File into a Survey Form**

If you want to attach any file with any survey form added in the **Survey form** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **5.13.3 Submit and Approve a Survey Form**

Once you have added the surveyor, the **Submission** column in the **Survey form** page is appeared with [![image-1651830705341.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651830705341.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651830705341.png) (Submit and Reject icons).

1. If you want to submit the survey form, click [![image-1651830726910.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651830726910.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651830726910.png) (Submit icon) in the **Submission** column. Otherwise click [![image-1651830735618.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651830735618.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651830735618.png) (Reject icon) to reject the survey form.
    
    Once you have submitted the survey form, the **Approval** column in the **Survey form** page is appeared with [![image-1651830787696.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651830787696.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651830787696.png) (Accept and Reject icons).
2. If you want to approve the survey form, click [![image-1651830812125.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651830812125.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651830812125.png) (Submit icon) in the ****Approval****  Otherwise click [![image-1651830823985.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651830823985.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651830823985.png) (Reject icon) to reject the survey form.

#### **5.13.4 Print a Structural Survey Report**

If you want to print a structural survey report, click [![image-1651830878218.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651830878218.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651830878218.png) (print icon) provided in the **Report** column of the **Survey form** page. See Fig 5.13.

#### **5.13.5 Edit Any Survey Form**

 If you want to edit any existing survey form in the **Survey form** page, do the following,

1. Click [![image-1651830956172.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651830956172.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651830956172.png) (Edit icon) in the ****Edit**** column for the respective survey form. See Fig 5.13. A new window opens to edit the survey form.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.13.6 Export Survey Form List**

You can export a list of survey forms added in the **Survey Form** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.



### **5.14 Dimensional Inspection Request**

The **Dimensional Inspection Request** tab in the **Inspection** menu helps you to add a dimensional inspection request. To navigate to the dimensional inspection request adding page,

1. Click **Dimensional Inspection Request** in the **Inspection** menu. The **Dimensional Inspection Request** page opens.
    
    [![image-1651831183622.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651831183622.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651831183622.png)
    
     **Figure 5.14: Dimensional Inspection Request page**

#### **5.14.1 Add a Dimensional Inspection Request**

If you want to add a new dimensional inspection request, do the following steps.

1. In the **Inspection Date** box, select the date of dimensional inspection.
2. In the **Location** box, select the location where the dimensional inspection to be performed.
    
    Before saving the added dimensional inspection request, you must add spools. You can add multiple spools for one dimensional inspection request.
    
    [![image-1651831273703.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651831273703.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651831273703.png) **Note**: The page shows a list of added spools. If you want to view the specific spools, use the filter options provided in the **System**, **Line Number**, **Drawing Number**, and **Spool Number** columns.
3. Click [![image-1651831300876.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651831300876.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651831300876.png) (Add icon) of the respective spool which you want to add. The added spools will be moved to the right side of the page.
4. In the **Remarks** box, enter your remarks if any.
5. In the **Inspection Item** box, enter the details of inspection items.
6. Click **Save**.

The dimensional inspection request will be added and listed in the **Dimensional Inspection List** page.



### **5.15 Dimensional Inspection List**

The **Dimensional Inspection List** tab helps you to view and edit the dimensional inspection request, which is added by using the **Dimensional Inspection Request** tab. This tab also allows you to add a new dimensional inspection request.

1. Click **Dimensional Inspection List** in the **Inspection** menu. The **Dimensional Inspection List** page opens with a list of added dimensional inspection requests.
    
    [![image-1651831411887.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651831411887.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651831411887.png)
    
     **Figure 5.15: Dimensional Inspection List page**

#### **5.15.1 Add a Dimensional Inspection Request**

If you want to add a dimensional inspection request, do the following steps,

1. Click [![image-1651831537724.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651831537724.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651831537724.png) (**ADD** button) in the **Dimensional Inspection List** page. The system redirects you into the **Dimensional Inspection Request** page. To know how to add a dimensional inspection request, See the topic, “[**<u>Add a Dimensional Inspection Request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.14.1%C2%A0add-a-dimensi)”.

Once you have added the dimensional inspection request, you must submit the added request to perform the dimensional inspection.

#### **5.15.2 Add Representative for Added Dimensional Inspection Request**

If you want to add a representative for any added dimensional inspection request,

1. Click [![image-1651831627889.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651831627889.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651831627889.png) (Edit icon) in the **Representative** column for the respective spool release request. The **Edit Form** window opens.
    
    [![image-1651831641317.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651831641317.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651831641317.png)
2. In the **Inspection Date** box, select the date of inspection.
3. In the **Representative** box, enter the name of a representative.
4. Click **Save**.

#### **5.15.3 Edit Any Dimensional Inspection Request** 

If you want to edit any existing dimensional inspection request in the **Dimensional Inspection List** page, do the following,

1. Click [![image-1651831716330.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651831716330.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651831716330.png) (Edit icon) in the **Edit** column for the respective dimensional inspection request. See Fig 5.15. The page opens with the details of the selected dimensional inspection request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.15.4 Submit a Dimensional Inspection Request**

Once you have added the dimensional inspection request, the **Request Status** column in the **Dimensional Inspection List** page is appeared with[![image-1651831788208.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651831788208.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651831788208.png) (Submit and Reject icons). See Fig 5.15.

1. If you want to submit the dimensional inspection request, click [![image-1651831817658.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651831817658.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651831817658.png) (Submit icon) in the **Request Status** Otherwise click [![image-1651831830061.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651831830061.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651831830061.png) (Reject icon) to reject the request.

The submitted request will be moved to for the dimensional inspection.

#### **5.15.5 Add Results of Dimensional Inspection**

After completing the dimensional inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click [![image-1651832248438.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651832248438.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651832248438.png) (Add icon) in the **Results** column of the respective request. The **Dimensional Inspection List** window opens with a list of added spools.
    
    [![image-1651832262309.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651832262309.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651832262309.png)
2. In the **Result** column, select the result for each spool from the given result options.
3. In the **Pipe Size** column, select the result of pipe size.
4. In the **Dimension** column, select the result of pipe dimension.
5. In the **Flange** column, select the result of flange.
6. In the **Orientation** column, select the result of orientation.
7. In the **Remarks** box, enter your remarks if any.
8. Click **Save**.

#### **5.15.6 View a Dimensional Inspection Report**

If you want to view a dimensional inspection report, click (print icon) provided in the **Print** column of the **Dimensional Inspection List** page. See Fig 5.15.

#### **5.15.7 Attach a File into a Dimensional Inspection Request** 

If you want to attach a file with an existing dimensional inspection request listed in the **Dimensional Inspection List** page, you can attach the file by using [![image-1651832487057.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651832487057.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651832487057.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)”.

#### **5.15.8 Export Dimensional Inspection Request List**

You can export a list of dimensional inspection requests added in the **Dimensional Inspection List** page in both the pdf and excel formats by using [![image-1651832584178.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651832584178.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651832584178.png) (**PDF** button) and [![image-1651832593857.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651832593857.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651832593857.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)”.

#### **5.15.9 Filter Dimensional Inspection Request**

If you want to filter any dimensional inspection request in the **Dimensional Inspection List** page, you can use [![image-1651833096628.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651833096628.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651833096628.png) (**FILTER** button) located on the **Dimensional Inspection List** page. To know how to filter, see the topic, ”**Filter Any Area**”.

### **5.16 Inspection Release Note**

The **Inspection Release Note** tab in the **Inspection** menu helps you to add an inspection release note. If you want to navigate the inspection release note adding page,

1. Click **Inspection Release Note** in the **Inspection** menu. The **Inspection Release Note** page opens.
    
    [![image-1651833603254.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651833603254.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651833603254.png)
    
     **Figure 5.16: Inspection Release Note page**

#### **5.16.1 Add an Inspection Release Note** 

If you want to add an inspection release note, do the following,

1. Click [![image-1651844276065.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651844276065.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651844276065.png) (**ADD** button) in the **Inspection Release Note** page. A new window opens to add an Inspection release note.
    
    [![image-1651844288657.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651844288657.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651844288657.png)
    
    [![image-1651844353022.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651844353022.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651844353022.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **Sub Contractor Name** box, select a sub-contractor from a drop-down list.
3. In the **Inspection Date &amp; Time** box, select the date and time of inspection.
4. In the **Location** box, select a location where the inspection to be held.
5. In the **System/Area** box, enter the name of area/system.
6. In the **Sub System No** box, enter the sub system number.
7. In the ****Item to be Released**** field, select the detail of the item to be released that is whether ****Piping**** or ****Structural****. If another item means select the checkbox of ****Others**** and enter the item detail.
8. In the ****Item to be Released for**** field, select the reason of the item to be released for that is whether for ****Pressure Test**** or ****Blasting &amp; Painting****. If any other reason means select the checkbox of ****Others**** and enter the reason.
9. In the **Sheet No** box, enter the sheet number.
10. In the **Revision** box, enter the revision for the weld map drawing.
11. In the **Description** box, enter the description for the weld map drawing.
12. In the **Quantity** box, enter the quantity of the weld map drawing.
13. In the **Remarks** box, enter your remarks if any.
14. Click **Update**.
    
    The weld map drawing is updated.
15. In the **Prepared By** box, enter the name of a person who has prepared the inspection release note.
16. In the ****Prepared Date**** box, select the prepared date of the inspection release note.
17. In the **Reviewed By** box, enter the name of a person who has reviewed the inspection release note.
18. In the ****Reviewed Date**** box, select the reviewed date of the inspection release note.
19. In the ****Approved By**** box, enter the name of a person who has approved the inspection release note.
20. In the ****Approved Date**** box, select the approved date of the inspection release note.
21. In the **Remarks** box, enter your remarks if any.
22. Click **Send Request**.

The inspection release will be added and listed in the **Inspection Release Note** page.

#### **5.16.2 Add RFI Data for the Added Inspection Release Note**

If you want to add RFI data for the added inspection release note, do the following,

1. Click [![image-1651858047227.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651858047227.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651858047227.png)(Edit icon) in the **RFI Data** column of the **Inspection Release Note**  See Fig 5.16. The **RFI Inspection Request List** window opens.
    
    [![image-1651858070087.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651858070087.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651858070087.png)
2. In the **Inspection From** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the **Inspection Details** option, select 1<sup>st</sup> Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the **Others** box, enter any other inspection related details.
6. In the **Refer to Report No** box, enter the report number for reference.
7. In the **RFI Date** box, choose the RFI date.
8. In the ****Inspection Result**** option, if the inspection result is accepted, select ****Accepted**** otherwise select ****Rejected****.
9. In the **Remarks** box, enter your remarks if any.
10. In the **Inspected by** box, enter the name of a person who has done inspection.
11. In the **Inspected Date** box, choose the date of inspection.
12. In the **Witnessed By** box, enter the name of the witnessed person.
13. In the **Witnessed Date** box, choose the date of witnessed.
14. In the **PCML Rep Name** box, enter the representative name of PCML.
15. In the **PCML Rep Date** box, choose the PCML rep date.
16. In the **MEB Rep Name** box, enter the representative name of MEB.
17. In the **MEB Rep Date box**, choose MEB rep date.
18. Click **Save**.

The RFI data is successfully added.

#### **5.16.3 Submit and Approve an NDT Inspection Generic**

Once you have added the inspection release note, the **Submission** column in the **Inspection Release Note** page is appeared with [![image-1651858331817.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651858331817.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651858331817.png) (Submit and Reject icons).

1. If you want to submit the inspection release note, click [![image-1651858357053.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651858357053.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651858357053.png)(Submit icon) in the **Submission** Otherwise click [![image-1651858386272.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651858386272.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651858386272.png) (Reject icon) to reject the request. Once you have submitted the inspection release note, the **Request Status** column in the **Inspection Release Note** page is appeared with [![image-1651858509564.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651858509564.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651858509564.png) (Approve and Reject icons).
2. If you want to approve the inspection release note, click [![image-1651858544843.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651858544843.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651858544843.png) (Approve icon) in the ****Request Status**** Otherwise click [![image-1651858557369.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651858557369.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651858557369.png)(Reject icon) to reject the request.

#### **5.16.4 Print an RFI Report**

If you want to print an RFI report, click [![image-1651860449118.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651860449118.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651860449118.png) (print icon) provided in the **RFI** **Report** column of the **Inspection Release Note** page. See Fig 5.16.

#### **5.16.5 Print an Inspection Release Note**

If you want to print an inspection release note, click [![image-1651860488133.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651860488133.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651860488133.png) (print icon) provided in the **Print** column of the **Inspection Release Note** page. See Fig 5.16.

#### **5.16.6 Attach a File into an Inspection Release Note**

If you want to attach a file with an inspection release note added in the **Inspection Release Note** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **5.16.7 Edit Any Inspection Release Note**

If you want to edit any existing inspection release note in the **Inspection Release Note** page, do the following,

1. Click [![image-1651860584541.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651860584541.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651860584541.png) (Edit icon) in the ****Edit**** column for the respective NDT inspection generic. See Fig 5.16. A new window opens to edit the inspection release note.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.16.8 Export Inspection Release Note List**

You can export a list of inspection release notes added in the **Inspection Release Note** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.


### **5.17 Blasting and Painting Inspection Report**

The **Blasting and Painting** **Inspection Report** tab in the **Inspection** menu helps you to add a blasting and painting inspection report. If you want to navigate the blasting and painting inspection report adding page,

1. Click **Blasting and Painting** **Inspection Report** in the **Inspection** menu. The **Blasting and Painting** **Inspection** **List** page opens.
    
    [![image-1651860701743.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651860701743.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651860701743.png)
    
     **Figure 5.17: Blasting and Painting Inspection List page**

#### **5.17.1 Add a Blasting and Painting Inspection Report**

If you want to add a blasting and painting inspection report, do the following,

1. Click [![image-1651860755536.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651860755536.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651860755536.png) (**ADD** button) in the **Blasting and Painting** **Inspection** **List** page. A new window opens to add the blasting and painting inspection report details.
    
    [![image-1651860768979.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651860768979.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651860768979.png)
    
    [![image-1651860793508.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651860793508.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651860793508.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **Sub Contractor Name** box, select a sub-contractor from a drop-down list.
3. In the **Inspection Date &amp; Time** box, select the date and time of inspection.
4. In the **Location** box, select a location where the inspection to be held.
5. In the **Paint System No** box, enter the paint system number.
6. In the **System/Area** box, enter the name of area/system.
7. In the **Sub System No** box, enter the sub system number.
    
    Before saving the blasting and painting inspection report, you must add the weld map drawing detail.
8. Click [![image-1651860856192.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651860856192.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651860856192.png) (**ADD** button) in the **Weld Map Drawing Detail** window.
    
    The **Edit Form** window shows a new window to add the details of weld map drawing.
    
    [![image-1651860870946.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651860870946.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651860870946.png)
9. In the **Weld Map Drawing No** box, enter the weld map drawing number.
10. In the **Sheet No** box, enter the sheet number.
11. In the **Revision** box, enter the revision for the weld map drawing.
12. In the **Description** box, enter the description for the weld map drawing.
13. In the **Quantity** box, enter the quantity of the weld map drawing.
14. In the **Remarks** box, enter your remarks if any.
15. Click **Update**.
    
    The weld map drawing is updated.
16. In the ****Prepared By**** box, enter the name of a person who has prepared the blasting and painting inspection report.
17. In the **Prepared Date** box, select the prepared date of the blasting and painting inspection report.
18. In the **Reviewed By** box, enter the name of a person who has reviewed the blasting and painting inspection report.
19. In the **Reviewed By** box, enter the name of a person who has reviewed the blasting and painting inspection report.
20. In the **Approved By** box, enter the name of a person who has approved the blasting and painting inspection report.
21. In the **Approved Date** box, select the approved date of the blasting and painting inspection report.
22. In the **Remarks** box, enter your remarks if any.
23. Click **Send Request**.

The blasting and painting inspection report will be added and listed in the **Blasting and Painting Inspection List** page.

#### **5.17.2 Add RFI Data for the Added Blasting and Painting Inspection Report**

If you want to add RFI data for the added blasting and painting inspection report, do the following,

1. Click [![image-1651861075294.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651861075294.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651861075294.png)(Edit icon) in the **RFI Data** column of the **Blasting and Painting** **Inspection List**  See Fig 5.17. The **RFI Inspection Request List** window opens.
    
    [![image-1651861097600.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651861097600.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651861097600.png)
2. In the **Inspection From** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the ****Inspection Details**** option, select 1<sup>st</sup>Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the **Others** box, enter any other inspection related details.
6. In the **Refer to Report No** box, enter the report number for reference.
7. In the **RFI Date** box, choose the RFI date.
8. In the **Inspection Result** option, if the inspection result is accepted, select **Accepted** otherwise select **Rejected**.
9. In the **Remarks** box, enter your remarks if any.
10. In the **Inspected by** box, enter the name of a person who has done inspection.
11. In the **Inspected Date** box, choose the date of inspection.
12. In the **Witnessed By** box, enter the name of the witnessed person.
13. In the **Witnessed Date** box, choose the date of witnessed.
14. In the **PCML Rep Name** box, enter the representative name of PCML.
15. In the **PCML Rep Date** box, choose the PCML rep date.
16. In the **MEB Rep Name** box, enter the representative name of MEB.
17. In the **MEB Rep Date box**, choose MEB rep date.
18. Click **Save**.

The RFI data is successfully added.

#### **5.17.3 The RFI data is successfully added.**

Once you have added the blasting and painting inspection report, the **Submission** column in the **Blasting and Painting Inspection List** page is appeared with [![image-1651861264888.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651861264888.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651861264888.png) (Submit and Reject icons).

1. If you want to submit the blasting and painting inspection report, click [![image-1651861284811.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651861284811.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651861284811.png) (Submit icon) in the **Submission** Otherwise click [![image-1651861296625.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651861296625.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651861296625.png) (Reject icon) to reject the request. Once you have submitted the blasting and painting inspection report, the **Request Status** column in the **Blasting and Painting** **Inspection List** page is appeared with (Approve and Reject icons).
2. If you want to approve the blasting and painting inspection report, click [![image-1651861369071.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651861369071.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651861369071.png)(Approve icon) in the ****Request Status**** Otherwise click [![image-1651861379239.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651861379239.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651861379239.png) (Reject icon) to reject the request. Once you have approved the blasting and painting inspection report, the **Result** column will be enabled with (Add icon) to add the blasting and painting inspection results.
    
    [![image-1651861421664.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651861421664.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651861421664.png)

#### **517.4 Add Blasting and Painting Inspection Results**

If you want to add the blasting and painting inspection results,

1. Click [![image-1651861496065.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651861496065.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651861496065.png) (Add icon) in the **Result** column of the **Blasting and Painting** **Inspection List** page. The page shows a new window.
    
    [![image-1651861530088.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651861530088.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651861530088.png)
2. Click [![image-1651861556306.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651861556306.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651861556306.png) (Edit icon) in the ****Edit**** column. The page shows the **Surface Preparation**, **Paint Preparation**, and **Paint Application** windows.
    
    [![image-1651861585452.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651861585452.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651861585452.png)
3. In the **Surface Profile Height** box, enter the surface profile height value.
4. In the **Cleaning Method** box, enter the cleaning method detail.
5. In the **Surface Cleanliness** box, select the surface cleanliness level.
6. In the **Abrasive Manufacturer** box, enter the abrasive manufacturer detail.
7. In the **Abrasive Type** box, enter the type name of abrasive.
8. In the **Abrasive Grade** box, enter the grade level of abrasive.
9. In the **Date &amp; Time** box, select the date and time.
10. Click **Save**.
11. In the ****Paint Preparation**** window, enter the detail of 1<sup>st</sup> coat, 2<sup>nd</sup> coat and 3<sup>rd</sup> coat in the respective columns.
12. Click **Save changes**.
13. In the **Airless Spray** box, enter the airless spray method detail.
14. In the **Conventional Spray** box, enter the conventional spray method detail.
15. In the **Roller/Brush** box, enter the roller/brush detail.
16. Click **Save**.
17. In the **Paint Application** window, enter the detail of 1<sup>st</sup> coat, 2<sup>nd</sup> coat and 3<sup>rd</sup> coat in the respective columns.
18. Click **Save changes**.
19. In the **Description** box, enter the description for the inspection.
20. In the **1<sup>st</sup> Coat Date &amp; Time** box, select the date and time of 1<sup>st</sup> coat.
21. In the **2<sup>nd</sup>** **Coat Date &amp; Time** box, select the date and time of 2<sup>nd</sup> coat.
22. In the **3<sup>rd</sup>** **Coat Date &amp; Time** box, select the date and time of 3<sup>rd</sup> coat.
23. Click **Save**.

#### **5.17.5 Print an RFI Report**

If you want to print an RFI report, click [![image-1651861750015.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651861750015.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651861750015.png) (print icon) provided in the **RFI** **Report** column of the **Blasting and Painting** **Inspection List page. See Fig 5.17.

#### **5.17.6 Print a Blasting and Painting Inspection Report**

If you want to print a blasting and painting inspection report, click [![image-1651862511970.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651862511970.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651862511970.png) (print icon) provided in the **Print** column of the **Blasting and Painting** **Inspection List** page. See Fig 5.17.

#### **5.17.7 Attach a File into a Blasting and Painting Inspection Report**

If you want to attach a file with a blasting and painting inspection report added in the **Blasting and Painting** **Inspection List page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **5.17.8 Edit Any Blasting and Painting Inspection Report**

If you want to edit any existing blasting and painting inspection report in the **Blasting and Painting** **Inspection List** page, do the following,

1. Click [![image-1651862700242.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651862700242.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651862700242.png)(Edit icon) in the **Edit** column for the respective blasting and painting inspection report. See Fig 5.17. A new window opens to edit the blasting and painting inspection report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.17.9 Export Blasting and Painting Inspection Report List**

You can export a list of blasting and painting inspection reports added in the **Blasting and Painting** **Inspection List** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.



### **5.18 Painting and Coating Final Inspection Report**

The **Painting** **and Coating FIR** tab in the **Inspection** menu helps you to add a painting and coating inspection report. If you want to navigate the painting and coating inspection report adding page,

1. Click **Painting** **and Coating FIR** in the **Inspection** menu. The **Painting** **and Coating FIR** page opens.
    
    [![image-1651864383761.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651864383761.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651864383761.png)
    
     **Figure 5.18: Painting and Coating FIR page**

#### **5.18.1 Add a Painting and Coating FIR** 

If you want to add a painting and coating FIR, do the following,

1. Click [![image-1651864502478.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651864502478.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651864502478.png)(**ADD** button) in the **Painting and Coating FIR** page. A new window opens to add the painting and coating inspection report details.
    
    [![image-1651864517097.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651864517097.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651864517097.png)
    
    [![image-1651864529431.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651864529431.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651864529431.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the ****Sub Contractor Name**** box, select a sub-contractor from a drop-down list.
3. In the ****Sub Contractor Name**** box, select a sub-contractor from a drop-down list.
4. In the **Location** box, select the location where the painting and coating inspection to be performed.
5. In the ****Reference** **Drawing**** box, select a reference drawing from a drop-down list.
6. In the **System** box, select a system from a drop-down list.
7. In the **No** **of Coat Applied** box, enter the number of applied coating.
8. In the **Shift** box, enter the shift detail.
9. In the **Specification** box, enter the specification detail.
10. In the **Job/Item Description** box, enter the description for the job/item.
11. In the **Painted Surface** box, enter the painted surface detail.
12. In the **Client Paint Specification** box, enter the client paint specification detail.
13. In the **Surface Preparation** box, enter the surface preparation detail.
14. In the **Painting/Coating Type** box, enter the painting/coating type.
15. In the **Visual Inspection** box, enter the visual inspection detail.
16. In the **Top Coat D.F.T** box, enter the top coat detail.
17. In the **Degree of Cured** box, enter the degree of cured.
18. In the **Pinhole Testing** box, enter the pinhole testing detail.
19. In the **Wet Sponge Method** box, enter the wet sponge method detail.
20. In the **Holiday Detection** box, enter the holiday detection detail.
21. In the **Brush Coil** box, enter the brush coil detail.
22. In the **K.V Setting (For Pipeline)** box, enter the K.V setting detail for pipeline.
    
    Before saving the painting and coating inspection report, you must add the weld map drawing detail.
23. Click [![image-1651864680218.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651864680218.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651864680218.png) (****ADD**** button) in the ******Weld Map Drawing Detail******The **Edit Form** window shows a new window to add the details of weld map drawing.
    
    [![image-1651864722745.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651864722745.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651864722745.png)
24. In the **Weld Map Drawing No** box, enter the weld map drawing number.
25. In the **Sheet No** box, enter the sheet number.
26. In the **Revision** box, enter the revision for the weld map drawing.
27. In the **Description** box, enter the description for the weld map drawing.
28. In the **Quantity** box, enter the quantity of the weld map drawing.
29. In the **Remarks** box, enter your remarks if any.
30. Click **Update**.
    
    The weld map drawing is updated.
31. In the **Prepared By** box, enter the name of a person who has prepared the painting and coating inspection report.
32. In the **Prepared By** box, enter the name of a person who has prepared the painting and coating inspection report.
33. In the ****Reviewed By**** box, enter the name of a person who has reviewed the painting and coating inspection report.
34. In the ****Reviewed Date**** box, select the reviewed date of the painting and coating inspection report.
35. In the **Approved By** box, enter the name of a person who has approved the painting and coating inspection report.
36. In the ****Approved Date**** box, select the approved date of the painting and coating inspection report.
37. In the **Remarks** box, enter your remarks if any.
38. Click **Send Request**.

The painting and coating inspection report will be added and listed in the **Painting and Coating FIR** page.

#### **5.18.2 Add RFI Data for the Added Painting and Coating FIR**

If you want to add RFI data for the added painting and coating inspection report, do the following,

1. Click [![image-1651864905115.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651864905115.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651864905115.png) (Edit icon) in the **RFI Data** column of the **Painting** **and Coating** **FIR** page. See Fig 5.18. The **RFI Inspection Request List** window opens.
    
    [![image-1651864924449.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651864924449.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651864924449.png)
2. In the **Inspection From** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the **Inspection Details** option, select 1<sup>st</sup>Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the **Others** box, enter any other inspection related details.
6. In the **Refer to Report No** box, enter the report number for reference.
7. In the **RFI Date** box, choose the RFI date.
8. In the ****Inspection Result**** option, if the inspection result is accepted, select ****Accepted**** otherwise select ****Rejected****.
9. In the **Remarks** box, enter your remarks if any.
10. In the **Inspected by** box, enter the name of a person who has done inspection.
11. In the **Inspected Date** box, choose the date of inspection.
12. In the **Witnessed By** box, enter the name of the witnessed person.
13. In the **Witnessed Date** box, choose the date of witnessed.
14. In the **PCML Rep Name** box, enter the representative name of PCML.
15. In the **PCML Rep Date** box, choose the PCML rep date.
16. In the **MEB Rep Name** box, enter the representative name of MEB.
17. In the **MEB Rep Date box**, choose MEB rep date.
18. Click **Save**.

The RFI data is successfully added.

#### **5.18.3 Submit and Approve a Painting and Coating FIR** 

Once you have added the painting and coating inspection report, the **Submission** column in the **Painting and Coating FIR** page is appeared with[![image-1651865091527.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651865091527.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651865091527.png)(Submit and Reject icons).

1. If you want to submit the painting and coating inspection report, click [![image-1651865125002.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651865125002.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651865125002.png) (Submit icon) in the **Submission** column. Otherwise click [![image-1651865135401.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651865135401.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651865135401.png) (Reject icon) to reject the request. Once you have submitted the painting and coating inspection report, the **Request Status** column in the **Painting** **and Coating** **FIR** page is appeared with [![image-1651865188380.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651865188380.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651865188380.png) (Approve and Reject icons).
2. If you want to approve the painting and coating inspection report, click [![image-1651865231804.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651865231804.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651865231804.png) (Approve icon) in the **Request Status** Otherwise click [![image-1651865240711.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651865240711.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651865240711.png) (Reject icon) to reject the request.

#### **5.18.4 Print an RFI report**

If you want to print an RFI report, click[![image-1651865297442.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651865297442.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651865297442.png) (print icon) provided in the **RFI** **Report** column of the **Painting** **and Coating** **FIR** page. See Fig 5.18.

#### **5.18.5 Print a Painting and Coating FIR**

If you want to print a painting and coating inspection report, click [![image-1651865335098.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651865335098.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651865335098.png) (print icon) provided in the **Print** column of the **Painting** **and Coating** **FIR** page. See Fig 5.18.

#### **5.18.6 Attach a File into a Painting and Coating Inspection Report**

If you want to attach a file with a painting and coating inspection report added in the **Painting and Coating FIR** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **5.18.7 Edit Any Painting and Coating FIR**

If you want to edit any existing painting and coating inspection report in the **Painting** **and Coating** **FIR** page, do the following,

1. Click [![image-1651865437635.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651865437635.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651865437635.png)(Edit icon) in the **Edit** column for the respective painting and coating inspection report. See Fig 5.18. A new window opens to edit the painting and coating inspection report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.18.8 Export Painting and Coating FIR list**

You can export a list of painting and coating inspection reports added in the **Painting and Coating FIR** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **5.18.9 Filter Painting and Coating FIR**

If you want to filter any specific painting and blasting inspection request in the **Painting and Coating FIR** page, you can filter the request based on the **Spool No** filter box. [![image-1651865549340.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651865549340.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651865549340.png)


### **5.19 RFI Hydro Pressure**

Hydro Pressure Inspection is the technique in which pipes used in the structural project, are tested at required design pressure of the pipes to check the leak and strength. You can add a request for hydro pressure inspection by using the **RFI Hydro Pressure** tab in the **Inspection** menu.

#### **5.19.1 Add an RFI Hydro Pressure Request**

If you want to add an RFI hydro pressure request, do the following steps,

1. Click **RFI Hydro Pressure** in the **Inspection** menu. The **RFI Hydro Pressure** page opens.
    
    [![image-1651865631016.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651865631016.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651865631016.png)
    
     **Figure 5.19: RFI Hydro Pressure page**
2. In the **Inspection Date &amp; Time** box, select the inspection date and time.
3. In the **Description** box, enter the description for the hydro pressure inspection.
4. In the **Drawing No** box, select a drawing number.
5. In the **System** box, select a system.
6. In the **Test Type** box, select a test type.
7. In the **Test Pressure** box, enter the test pressure value.
8. In the **Design Pressure** box, enter the design pressure value.
9. In the **Classification** box, enter the classification detail.
10. In the **Holding Time** box, enter the holding time range.
11. In the **Test Medium** box, enter the test medium detail.
12. In the **Job Code** box, enter the job code.
13. In the **Remarks** box, enter your remarks if any.
    
    Before saving the added NDT request, you must add the pressure gauge details.
14. Click [![image-1651865718338.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651865718338.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651865718338.png) (**ADD** button) in the **Pressure Gauge Details** window.
    
    [![image-1651865728886.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651865728886.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651865728886.png)
15. In the **Type of Test** box, select a type of test.
16. In the **Description** box, enter the description detail.
17. In the **Serial No** box, enter the serial number.
18. In the **Certificate No** box, enter the certificate number.
19. In the **Calibration Date** box, select the calibration date.
20. In the **Expiry Date** box, select the expiry date.
21. Click **Save Request**.

The hydro pressure inspection request will be added and listed in the **RFI Hydro Pressure** page.


### **5.20 View RFI Hydro Pressure**

The **View RFI Hydro Pressure** tab helps you to view and edit the hydro pressure inspection request, which is added by using the **RFI Hydro Pressure** tab. This tab also allows you to add a new hydro pressure request.

1. Click **View RFI Hydro Pressure** in the **Inspection** menu. The **RFI Hydro Pressure** page opens with a list of added hydro pressure requests.
    
    [![image-1651865816283.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651865816283.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651865816283.png)
    
     **Figure 5.20: RFI Hydro Pressure page**

#### **5.20.1 Add a Hydro Pressure Inspection Request**

If you want to add a hydro pressure inspection request, do the following steps,

1. Click [![image-1651865874271.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651865874271.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651865874271.png) (**ADD** button) in the **RFI Hydro Pressure** page. The system redirects you to a new page to add a new hydro pressure inspection request. To know how to add a hydro pressure inspection request, See the topic, “[**<u>Add a Hydro Pressure Inspection Request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.19.1%C2%A0add-an-rfi-hy)”.

The system redirects you to a new page to add a new hydro pressure inspection request. To know how to add a hydro pressure inspection request, See the topic, “[**<u>Add a Hydro Pressure Inspection Request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.19.1%C2%A0add-an-rfi-hy)”.

#### **5.20.2 Edit Any Existing Hydro Pressure Inspection Request** 

If you want to edit any existing hydro pressure inspection request in the **RFI Hydro Pressure page, do the following,

1. Click [![image-1651865959322.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651865959322.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651865959322.png) (Edit icon) in the **Edit** column for the respective hydro pressure inspection request. See Fig 5.20. The **RFI Hydro Pressure** page opens with the details of the selected hydro pressure inspection request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.20.3 Submit and Approve a Hydro Pressure Inspection Request**

Once you have added the hydro pressure inspection request, the **Submission** column in the **RFI Hydro Pressure** page is appeared with[![image-1651866095070.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866095070.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866095070.png) (Submit and Reject icons).

1. If you want to submit the hydro pressure inspection request, click [![image-1651866113296.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866113296.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866113296.png) (Submit icon) in the **Submission** Otherwise click [![image-1651866125621.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866125621.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866125621.png) (Reject icon) to reject the request. Once you have submitted the hydro pressure inspection request, the **Request Status** column in the **RFI Hydro Pressure** page is appeared with [![image-1651866145893.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866145893.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866145893.png) (Approve and Reject icons).
2. If you want to approve the hydro pressure inspection request, click [![image-1651866163849.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866163849.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866163849.png) (Approve icon) in the ****Request Status**** Otherwise click [![image-1651866172603.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866172603.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866172603.png) (Reject icon) to reject the request.

The hydro pressure inspection request will be moved for hydro pressure inspection.

#### **5.20.4 View a Hydro Pressure Inspection Report**

If you want to view a hydro pressure inspection report, click [![image-1651866246126.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866246126.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866246126.png) (print icon) provided in the **Print** column of the **RFI Hydro Pressure** page. See Fig 5.20.

#### **5.20.5 Attach a File into a hydro pressure inspection Request** 

If you want to attach a file with any existing hydro pressure inspection request listed in the **RFI Hydro Pressure** page, you can attach the file by using [![image-1651866291793.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866291793.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866291793.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)”.

#### **5.20.6 View Signature Details of Inspectors**

You can view the sign details of the inspectors such as QA, Sub contractor, Client, and Owner, once they completed the hydro pressure inspection and submitted the inspection result details including their signature. To view the signature details, click [![image-1651866335073.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866335073.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866335073.png)(Sign icon) in the **Sign Details** column in the **RFI Hydro Pressure** page.

#### **5.20.7 Export Hydro Pressure Inspection Request List**

You can export a list of hydro pressure requests added in the **RFI Hydro Pressure** page in both the pdf and excel formats by using [![image-1651866375958.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866375958.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866375958.png) (**PDF** button) and [![image-1651866384994.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866384994.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866384994.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)”.

#### **5.20.8 Filter Hydro Pressure Inspection Request**

If you want to filter any specific hydro pressure inspection request in the **RFI Hydro Pressure** page, you can use [![image-1651866418962.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866418962.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866418962.png) (**FILTER** button) located on the **RFI Hydro Pressure** page. To know how to filter, see the topic, ”**Filter Any Area**”.


### **5.21 RFI Mechanical Completion Request**

Mechanical completion takes place through all phases of the piping project, starting at equipment supplier and continuing through fabrication up to commissioning phase. Mechanical completion encompasses all disciplines. If you want to add an RFI mechanical completion request,

1. Click **RFI Mechanical Completion Request** in the **Inspection** menu. The **RFI Mechanical Completion Request** page opens.
    
    [![image-1651866475456.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866475456.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866475456.png)
    
     **Figure 5.21: RFI Mechanical Completion Request page**

#### **5.21.1 Add an RFI Mechanical Completion Request**

If you want to add an RFI mechanical completion request, do the following steps,

1. In the **Sub Contractor** box, select a sub-contractor from a drop-down list.
2. In the **Inspection Date** box, select the date of inspection.
3. In the **Location** box, enter the name of the location.
    
    Before saving the added RFI mechanical completion request, you must add a system. You can add multiple system for one request.
    
    [![image-1651866553268.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866553268.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866553268.png) **Note**: The page shows a list of added systems. If you want to view the specific system, use the filter options provided in the **System**, **Sub System**, **Drawing Number**, **Equipment Number** and **Check Records** columns.
4. Select [![image-1651866579615.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866579615.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866579615.png) (Add icon) of the respective system which you want to add.
    
    The added system will be moved into the right side of the page.
5. In the **Remarks** box, enter your remarks if any.
6. In the **Description** box, enter the description for the request.
7. In the **Work Scope** box, enter the work scope detail.
8. Click **Save**.

The RFI mechanical completion request will be added and listed in the **View RFI Mechanical Completion** page.


### **5.22 View RFI Mechanical Completion** 

The **View RFI Mechanical Completion** tab helps you to view and edit the RFI mechanical completion request, which is added by using the **RFI Mechanical Completion Request** tab. This tab also allows you to add a new RFI mechanical completion request.

1. Click **View RFI Mechanical Completion** in the **Inspection** menu. The **View RFI Mechanical Completion List** page opens with a list of added RFI mechanical completion requests.
    
    [![image-1651866702007.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866702007.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866702007.png)
    
     **Figure 5.22: View RFI Mechanical Completion List page**

#### **5.22.1 Add an RFI Mechanical Completion Request**

If you want to add an RFI mechanical completion request, do the following steps,

1. Click [![image-1651866758888.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866758888.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866758888.png) (**ADD** button) in the **View RFI Mechanical Completion List** page. The system redirects you to a new page to add a new RFI mechanical completion request. To know how to add an RFI mechanical completion request, See the topic, “[**<u>Add an RFI Mechanical Completion Request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.21.1%C2%A0add-an-rfi-me)”.

Once you have added the RFI mechanical completion request, you must submit the added request to perform mechanical completion inspection.

#### **5.22.2 Edit Any RFI Mechanical Completion Request** 

If you want to edit any existing mechanical completion request in the **View RFI Mechanical Completion List** page, do the following,

1. Click [![image-1651866861961.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866861961.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866861961.png) (Edit icon) in the **Edit** column for the respective RFI mechanical completion request. See Fig 5.22. The **RFI Mechanical Completion Request** page opens with the details of the selected RFI mechanical completion request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.22.3 Submit and Approve an RFI Mechanical Completion Request**

Once you have added the RFI mechanical completion request, the **Submission** column in the **RFI Mechanical Completion Request** page is appeared with [![image-1651866943782.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866943782.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866943782.png) (Submit and Reject icons).

1. If you want to submit the mechanical completion request, click [![image-1651866972041.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866972041.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866972041.png) (Submit icon) in the **Submission** Otherwise click [![image-1651866984816.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866984816.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866984816.png)(Reject icon) to reject the request. Once you have submitted the mechanical completion request, the **Request Status** column in the **View RFI Mechanical Completion List** page is appeared with [![image-1651867037163.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651867037163.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651867037163.png) (Approve and Reject icons).
2. If you want to approve the mechanical completion request, click [![image-1651867068229.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651867068229.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651867068229.png) (Approve icon) in the ****Request Status**** Otherwise click [![image-1651867079600.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651867079600.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651867079600.png) (Reject icon) to reject the request. The mechanical completion request will be moved for mechanical completion inspection.

#### **5.22.4 Add Results of Mechanical Completion Inspection**

After completing the mechanical completion inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click [![image-1651867139655.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651867139655.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651867139655.png) (Add icon) in the **Results** column of the respective request. The Result window opens a list of test pack added for the particular request.
    
    [![image-1651867153258.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651867153258.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651867153258.png)
2. In the ****Result**** column, select the result of each test pack from the given result options in the drop-down list.
3. In the **Remarks** column, enter your remarks if any.
4. Click **Approve All &amp;** **Save**.

#### **5.22.5 View a Mechanical Completion Inspection Report**

If you want to view a mechanical completion inspection report, click [![image-1651867211491.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651867211491.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651867211491.png) (print icon) provided in the **Print** column of the **View RFI Mechanical Completion List** page. See Fig 5.22.

#### **5.22.6 Attach a File into a Mechanical Completion inspection Request** 

If you want to attach a file with any existing mechanical completion inspection request listed in the **View RFI Mechanical Completion List** page, you can attach the file by using [![image-1651867252315.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651867252315.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651867252315.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)”.

#### **5.22.7 Export Mechanical Completion Inspection Request List**

You can export a list of mechanical completion inspection requests added in the **View RFI Mechanical Completion List** page in both the pdf and excel formats by using [![image-1651867296920.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651867296920.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651867296920.png) (**PDF** button) and [ ![image-1651867307893.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651867307893.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651867307893.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)”

#### **5.22.8 Filter Any Mechanical Completion Inspection Request**

If you want to filter any specific mechanical completion inspection request in the **View RFI Mechanical Completion List** page, you can use [![image-1651867357204.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651867357204.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651867357204.png) (**FILTER** button) located on the **View RFI Mechanical Completion List page. To know how to filter, see the topic, ”**Filter Any Area**”.


### **5.23 RFI Static Commissioning** 

Static Commissioning take place when Mechanical completion is completed for a system or part of a system. If you want to add an RFI static commissioning request,

1. Click **RFI Static Commissioning** in the **Inspection** menu. The **RFI Static Commissioning Request** page opens.
    
    [![image-1651890708264.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651890708264.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651890708264.png)
    
     **Figure 5.23: RFI Static Commissioning Request page**

#### **8.23.1 Add an RFI Static Commissioning Request**

If you want to add an RFI static commissioning request, do the following steps,

1. In the **Sub Contractor** box, select a sub-contractor from a drop-down list.
2. In the **Inspection Date** box, select the date of inspection.
3. In the **Location** box, enter the name of the location.
    
    Before saving the added RFI static commissioning request, you must add a system. You can add multiple systems for one request.
    
    [![image-1651890813732.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651890813732.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651890813732.png)**Note**: The page shows a list of added systems. If you want to view the specific system, use the filter options provided in the **System**, **Sub System**, **Drawing Number**, **Equipment Number** and **Check Records** columns.
4. Select the checkbox of the respective system which you want to add. The added systems will be moved into the right side of the page.
5. In the **Remarks** box, enter your remarks if any.
6. In the **Description** box, enter the description for the request.
7. In the **Work Scope** box, enter the work scope detail.
8. Click **Save**.

The RFI mechanical completion request will be added and listed in the **View RFI Static Commissioning** page.



### **5.24 View RFI Static Commissioning**

The **View RFI Static Commissioning** tab helps you to view and edit the RFI static commissioning request, which is added by using the **RFI Static Commissioning** tab. This tab also allows you to add a new RFI static commissioning request.

1. Click **View RFI Static Commissioning** in the **Inspection** menu. The **View RFI Static Commissioning List** page opens with a list of added RFI static commissioning requests.
    
    [![image-1651890938822.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651890938822.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651890938822.png)
    
     **Figure 5.24: View RFI Static Commissioning List page**

#### **5.24.1 Add an RFI Static Commissioning Request**

If you want to add an RFI static commissioning request, do the following steps,

1. Click [![image-1651891011183.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651891011183.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651891011183.png) (**ADD** button) in the **View RFI Static Commissioning List** page. The system redirects you to a new page to add a new RFI static commissioning request. To know how to add an RFI static commissioning request, See the topic, “[**<u>Add an RFI Static Commissioning Request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-8.23.1%C2%A0add-an-rfi-st)”.

Once you have added the RFI static commissioning request, you must submit the added request to perform the static commissioning.

#### **5.24.2 Edit Any RFI Static Commissioning Request** 

If you want to edit any existing static commissioning request in the **View RFI Static Commissioning List** page, do the following,

1. Click [![image-1651891392942.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651891392942.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651891392942.png)(Edit icon) in the **Edit** column for the respective RFI static commissioning request. See Fig 5.24. The **RFI Static Commissioning Request** page opens with the details of the selected RFI request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.24.3 Submit and Approve an RFI Static Commissioning Request**

Once you have added the RFI static commissioning request, the **Submission** column in the **RFI Static Commissioning Request** page is appeared with[![image-1651891502533.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651891502533.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651891502533.png) (Submit and Reject icons).

1. If you want to submit the static commissioning request, click [![image-1651891520406.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651891520406.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651891520406.png) (Submit icon) in the **Submission** Otherwise click [![image-1651891531767.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651891531767.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651891531767.png) (Reject icon) to reject the request. Once you have submitted the static commissioning request, the **Request Status** column in the **View RFI Static Commissioning List** page is appeared with [![image-1651891557433.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651891557433.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651891557433.png)(Approve and Reject icons).
2. If you want to approve the static commissioning request, click [![image-1651891583630.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651891583630.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651891583630.png) (Approve icon) in the **Request Status** Otherwise click [![image-1651891596391.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651891596391.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651891596391.png) (Reject icon) to reject the request.

The static commissioning request will be moved for static commissioning inspection.

#### **5.24.4 Add Results of Static Commissioning Inspection**

After completing the static commissioning inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click [![image-1651891931990.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651891931990.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651891931990.png) (Add icon) in the **Results** column of the respective request. The Result window opens a list of system added for the particular request.
    
    [![image-1651891944579.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651891944579.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651891944579.png)
2. In the **Result** column, select the result of each system from the given result options in the drop-down list.
3. In the **Remarks** column, enter your remarks if any.
4. Click **Approve All &amp;** **Save**.

#### **5.24.5 View a Static Commissioning Inspection Report**

If you want to view a static commissioning inspection report, click [![image-1651892038656.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651892038656.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651892038656.png)(print icon) provided in the **Print** column of the **View RFI Static Commissioning List** page. See Fig 5.24.

#### **5.24.6 Attach a File into a Static Commissioning Inspection Request** 

If you want to attach a file with any existing static commissioning inspection request listed in the **View RFI Static Commissioning List** page, you can attach the file by using [![image-1651892198883.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651892198883.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651892198883.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)”.

#### **5.24.7 Export Static Commissioning Inspection Request List**

You can export a list of static commissioning inspection requests added in the **View RFI Static Commissioning List** page in both the pdf and excel formats by using [![image-1651892445010.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651892445010.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651892445010.png) **PDF** button) and [![image-1651892453652.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651892453652.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651892453652.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)”.

#### **5.24.8 Filter Any Static Commissioning Inspection Request**

If you want to filter any specific static commissioning inspection request in the **View RFI Static Commissioning List** page, you can use [![image-1651892495629.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651892495629.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651892495629.png) (**FILTER** button) located on the **View RFI Static Commissioning List page. To know how to filter, see the topic, ”**Filter Any Area**”.


### **5.25 Weekly Welders Performance Record**

The **Weekly Welders Performance Record** tab in the **Inspection** menu helps you to view the welders performance record on a weekly basis. To view the report,

1. Click **Weekly Welders Performance Record** in the **Inspection** menu. The **Weekly Welders Performance Record** page opens.
    
    [![image-1651892594158.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651892594158.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651892594158.png)
    
     **Figure 5.25: Weekly Welders Performance Record page**
2. If you want to view the weekly welders performance record for all project, select the checkbox of the **All Project** option.
3. In the **NDT Type** box, select an NDT type.
4. In the **Joint Category** box, select a joint category.
5. In the ****From Date**** and ****To Date**** boxes, select the from and to dates.
6. Click **Show Report**.

#### **5.25.1 Print Weekly Welders Performance Record**

If you want to print a weekly welders performance record, use [![image-1651892686181.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651892686181.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651892686181.png) and [![image-1651892698067.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651892698067.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651892698067.png) (print icons) provided in the **Weekly Welders Performance Record** page.

1. If you want to print the current page of the weekly welders performance record, click [![image-1651892719058.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651892719058.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651892719058.png) (print icon including the page number).
2. If you want to print all the pages of the weekly welders performance record, click [![image-1651892737106.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651892737106.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651892737106.png) (print icon).

#### **5.25.2 View Weekly Welders Performance Record** 

You can view the weekly welders performance record in various formats by using the option [![image-1651892780272.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651892780272.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651892780272.png) provided in the upper right corner of the **Weekly Welders Performance Record** page.


### **5.26 RFI Fit up Request (Unique Numbers)**

The **RFI Fit up Request** tab in the **Inspection** menu allows you to add an RFI fit up request to check the fit-up quality of pipes and joints used in the structural project by a sub-contractor.

#### **5.26.1 Add an RFI Fit up Request**

If you want to add an RFI fit up request, do the following

1. Click the **RFI Fit up Request** tab in the **Inspection** menu. A new page opens to add an RFI fit up request.
    
    [![image-1651892856893.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651892856893.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651892856893.png)
    
     **Figure 5.26: A page for adding an RFI fit up request**
    
    [![image-1651892885747.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651892885747.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651892885747.png) **Tip**: A report number and an RFI number for a new RFI fit up request will be updated automatically in the **Report Number** and the **RFI Number** boxes, respectively.
2. In the **Sub Contractor** box, select the name of a sub-contractor from a drop-down list.
3. In the **Inspection Date &amp; Time** box, select the date of inspection.
4. In the **Location** box, enter the location detail.
5. In the **Description** box, enter the description for the inspection.
    
    [![image-1651892928906.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651892928906.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651892928906.png)**Note**: Before saving the added RFI fit up request, you must add the details of joints. You can add multiple joints for any added fit up request by using a box provided in the left side of the page. To know how to add joints, see the topic “[**<u>Add joints for an RFI fit up request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.26.2%C2%A0add-joints-fo)”.
6. Click **Save**.

#### **5.26.2 Add Joints for an RFI Fit up Request**

This page shows a list of joints for the corresponding weld map drawing. If you want to add joints for any added RFI Fit up request, do the following,

[![image-1651892978672.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651892978672.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651892978672.png)

1. In the **Weld Map Drawing** box, select a weld map drawing number from a drop-down list. A list of joints including the piece mark numbers opens for the selected weld map drawing.
2. Click the check box of the respective joints.
3. Click [![image-1651893058080.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893058080.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893058080.png) (**Add Selected Joints** button).
    
    The selected joints are moved into the **Added Joints** box located in the right side of the page.
    
    [![image-1651893075968.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893075968.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893075968.png)
4. To update WPS number and unique number for the added joints, do one of the following steps, 
    1. 1. If you want to update the WPS number for any joint, click the **WPS Number** column for the respective joint and then select the WPS number from a drop-down list.
            
            [![image-1651893103848.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893103848.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893103848.png)
        2. Enter the unique number for the corresponding joint number in the respective **Unique Number** column. [![image-1651893141188.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893141188.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893141188.png)**Note**: If you want to update the same WPS number of first joint to other joints, click (**Update WPS No** button). The WPS number for the first joint will be updated for other joints.
5. If you want to update the WPS number, unique number, piece mark number details together, do the following,
    
    
    1. 1. Click [![image-1651893176716.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893176716.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893176716.png) (**TEMPLATE** button) on the **Added Joints** box.
            
            An excel worksheet will be downloaded with a pre-defined template. The template contains a list of added joints.
            
            [![image-1651893194594.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893194594.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893194594.png)
        2. Enter the relevant details in the required columns on the excel worksheet.
        3. Once you have added the WPS, piece mark and other details in the excel worksheet, save the excel worksheet on your computer.
        4. Click [![image-1651893220607.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893220607.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893220607.png) (**IMPORT** button).
            
            A new window opens for importing the excel worksheet saved on your computer.
            
            [![image-1651893239309.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893239309.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893239309.png)
        5. Click [![image-1651893252738.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893252738.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893252738.png) (**Browse** button) to select the excel worksheet to be uploaded.
        6. Select the excel worksheet you want to upload from your computer.
        7. Click [![image-1651893273707.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893273707.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893273707.png) (****Upload**** button) to export the joint details that are included in the excel worksheet.  The details of the joints in the worksheet will be updated.
        8. Click **Save**.
            
            The RFI Fit up request is successfully added and moved to the **View RFI Fit up** tab.


### **5.27 View RFI Fit up (Unique Numbers)**

The **View RFI Fit up** tab helps you to view and edit the RFI fit up request, which added by using the **RFI Fit up Request** tab. This tab also allows you to add a new RFI fit up request.

1. Click the **View RFI Fit up** tab in the **Inspection** menu. The **REQUEST FOR INSPECTION** page opens with a list of added RFI fit up requests.
    
    [![image-1651893381842.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893381842.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893381842.png)
    
     **Figure 5.27: Request for Inspection page**

#### **5.27.1 Add an RFI Fit up Request**

If you want to add an RFI fit up request, do the following,

1. Click [![image-1651893453168.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893453168.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893453168.png) (**ADD** button) in the **REQUEST FOR INSPECTION** page. A new page opens to add an RFI fit up request. To know how to add an RFI fit up request, see the topic, “[**<u>Add an RFI fit up request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.26.1%C2%A0add-an-rfi-fi)”.

Once you have added the RFI fit up request, you must submit the added request for inspection.

#### **5.27.2 Submit an RFI Fit up Request**

Once you have added the RFI fit up request, the **Request Status** column in the **REQUEST FOR INSPECTION** page is appeared with [![image-1651893507020.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893507020.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893507020.png) (Submit and Reject icons). See Fig 5.27.

1. If you want to submit the RFI fit up request, click [![image-1651893531324.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893531324.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893531324.png) (Submit icon) in the **Request Status** Otherwise click [![image-1651893541233.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893541233.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893541233.png) (Reject icon) to reject the request.

#### **5.27.3 Add a Representative for Any RFI Fit up Request**

If you want to add a representative for any added RFI fit up request,

1. Click [![image-1651893618434.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893618434.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893618434.png) (Edit icon) in the **Representative** column for the respective RFI fit up request. The **Edit Form** window opens.
    
    [![image-1651893635634.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893635634.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893635634.png)
2. In the **Representative** box, enter the name of a representative.
3. Click **Save**.

#### **5.27.4 Print an RFI Fit up Report**

If you want to print an RFI fit up report, click [![image-1651893686121.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893686121.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893686121.png) (print icon) provided in the **Report** column of the **REQUEST FOR INSPECTION** page. See Fig 5.27.

#### **5.27.5 Add Result Details of RFI Fit up Inspection**

If you want to add the inspection results details of an added RFI fit up inspection request, do the following,

1. Click [![image-1651893728587.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893728587.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893728587.png) (Add icon) in the **Results** column of the **REQUEST FOR INSPECTION** page. The **Joint Details** window opens.
    
    [![image-1651893740838.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893740838.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893740838.png)
2. If you want to check and update the joint details automatically, click (Check and update button).
3. If you want to update the joint details manually, do the following steps, 
    1. 1. Click the respective number in the ****WPS Number**** column and change the WPS number from a drop-down list.
        2. Click the respective number in the ****Unique Number**** column and change the unique number from a drop-down list.
        3. Click **Save changes**.

#### **5.27.6 Attach a File into an RFI Fit up Request** 

If you want to attach any file with any RFI fit up request listed in the **REQUEST FOR INSPECTION** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **5.27.7 Edit Any RFI Fit up Request** 

If you want to edit any existing RFI fit up request in the **REQUEST FOR INSPECTION** page, do the following,

1. Click [![image-1651893868567.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893868567.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893868567.png) (Edit icon) in the **Edit** column for the respective RFI fit up request. See Fig 5.27. The page shows the added details of the RFI fit up request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **5.27.8 Export RFI Fit up Request List**

You can export a list of RFI fit up request added in the **REQUEST FOR INSPECTION** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **5.27.9 Filter Any RFI Fit up Request** 

If you want to filter any RFI fit up request from the list of RFI fit up requests in the **REQUEST FOR INSPECTION** page, you can use [![image-1651893957189.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893957189.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893957189.png) the (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.



### **5.28 View Application for Inspection (AFI) Fit up (Unique Numbers)**

The **View AFI Fit up** allows you to add a new AFI fit up request. This tab also helps you to view and edit the added AFI fit up request.

1. Click the **View AFI Fit up** tab in the **Inspection** menu. The **INSPECTION REQUEST (AFI)** page opens.
    
    [![image-1651894010107.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651894010107.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651894010107.png)
    
     **Figure 5.28: INSPECTION REQUEST (AFI) page**

#### **5.28.1 Add an AFI Fit up Request**

If you want to add an AFI fit up request, do the following,

1. Click [![image-1651894061003.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651894061003.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651894061003.png) (**ADD** button) in the **INSPECTION REQUEST (AFI)** page. The **AFI Request** page opens to add an AFI fit up request.
    
    [![image-1651894082333.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651894082333.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651894082333.png)
    
    [![image-1651894091654.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651894091654.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651894091654.png) **Tip**: A report number and RFI number for a new AFI fit up request will be updated automatically in the **Report Number** and **RFI Number** boxes.
2. In the **Representative (AI)** box, enter representative name for the application inspection and enter their email id and contact number in the **Email** and **Contact No** boxes, respectively.
3. In the **Representative (Client)** box, enter representative name from the client and enter their email id and contact number in the **Email** and **Contact No** boxes, respectively.
4. In the **Inspection Date** box, select the date of inspection.
5. In the **Representative (Contractor)** box, enter representative name from the contractor and enter their email id and contact number in the **Email** and **Contact No** boxes, respectively.
6. In the **Activity Code As Per ITP** box, select the activity code as per ITP from a drop-down list.
7. In the **Activity Code As Per Client** box, select the activity code as per client from a drop-down list.
8. In the **Location** box, enter the location detail.
9. In the **Description** box, enter the description for the inspection.
10. In the **Inspection Item** box, enter the details of items to be inspected.
11. In the **Subject Coverage** box, enter the subject coverage detail.
12. In the **Comments** box, enter your comments if any.
    
    [![image-1651894246216.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651894246216.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651894246216.png) **Note**: Before saving the added AFI fit up request, you must add the details of joints. You can add multiple joints for any added fit up request by using a box provided in the left side of the page. To know how to add joints, see the topic “[**<u>Add joints for an AFI fit up request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.28.2-add-joints-fo)”.
13. Click **Save**.

#### **5.28.2 Add Joints for an AFI Fit up Request**

If you want to add joints for any added AFI fit up request, do the following,

[![image-1651894295511.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651894295511.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651894295511.png)

Once you enter the details to add an AFI fit up request, a list of joints including the joint numbers, sheet numbers, and drawing numbers opens.

1. Click the check box of the respective joints.
2. Click [![image-1651894335943.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651894335943.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651894335943.png) (**Add Selected Joints** button).
    
    The selected joints are moved into the **Added Joints** box located in the right side of the page.
    
    [![image-1651894360466.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651894360466.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651894360466.png)
3. Click **Save**.

The selected joints are successfully added for the AFI fit up request.

Once you have added the RFI fit up request, you must submit the added request for inspection.

#### **5.28.3 Submit an AFI Fit up Request**

Once you have added the AFI fit up request, the **Request Status** column in the **INSPECTION** **REQUEST (AFI)** page is appeared with[![image-1651894423857.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651894423857.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651894423857.png)(Submit and Reject icons). See Fig 5.28.

1. If you want to submit the AFI fit up request, click [![image-1651894443922.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651894443922.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651894443922.png) (Submit icon) in the **Request Status** Otherwise click [![image-1651894476196.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651894476196.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651894476196.png) (Reject icon) to reject the request.

#### **5.28.4 Change the Added Representative for Any AFI Fit up Request**

If you want to change the added representative for any AFI fit up request,

1. Click [![image-1651894514557.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651894514557.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651894514557.png) (Edit icon) in the **Representative** column for the respective AFI fit up request. The **Edit Form** window opens.
    
    [![image-1651894531476.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651894531476.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651894531476.png)
2. In the **Representative** box, edit the name of a representative.
3. Click **Save**.

#### **5.28.5 Print an AFI Fit up Report**

If you want to print an AFI fit up report, click [![image-1651894691736.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651894691736.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651894691736.png) (print icon) provided in the **Report** column of the **INSPECTION** **REQUEST (AFI)** page. See Fig 5.28.

#### **5.28.6 Add Result Details of AFI Fit up Inspection**

If you want to update results for the AFI fit up inspection request, do the following,

1. Click [![image-1651894733695.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651894733695.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651894733695.png) (Add icon) in the **Results** column of the **INSPECTION** **REQUEST (AFI)** page. A new window opens.
    
    [![image-1651894753035.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651894753035.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651894753035.png)
2. In the ****Result**** column, select the results of AFI inspection from a drop-down list, for the respective drawing and joint numbers.
3. In the **Remarks** column, enter your remarks if any.
4. Click **Save**.

#### **5.28.7 Attach a File into an AFI Fit up Request** 

If you want to attach any file with any AFI fit up request listed in the **INSPECTION REQUEST (AFI)** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **5.28.8 Edit Any AFI Fit up Request** 

If you want to edit any existing AFI fit up request in the **INSPECTION** **REQUEST (AFI)** page, do the following,

1. Click [![image-1651894888603.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651894888603.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651894888603.png) (Edit icon) in the **Edit** column for the respective AFI fit up request. See Fig 5.28. The page shows the added details of the AFI fit up request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.28.9 Export AFI Fit up Request List**

You can export a list of AFI fit up request added in the **INSPECTION REQUEST (AFI)** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **5.28.10 Filter Any AFI Fit up Request** 

If you want to filter any AFI fit up request from the list of AFI fit up requests in the **INSPECTION** **REQUEST (AFI)** page, you can use the (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.


### **5.29 RFI Weld VI Request (Unique Numbers)**

The **RFI Weld VI Request** tab in the **Inspection** menu allows you to add an RFI weld VI request to perform visual inspection of welded pipes and joints used in the structural project by a sub-contractor.

#### **5.29.1 Add an RFI weld VI request**

If you want to add an RFI weld VI request, do the following,

1. Click the **RFI Weld VI Request** tab in the **Inspection** menu. The **REQUEST FOR INSPECTION** page opens to add an RFI weld VI request.
    
    [![image-1651895029877.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895029877.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895029877.png)
    
     **Figure 5.29: REQUEST FOR INSPECTION** **page**
    
    [![image-1651895055512.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895055512.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895055512.png)**Tip**: A report number and an RFI number for a new RFI weld VI request will be updated automatically in the **Report Number** and the **RFI Number** boxes, respectively.
2. In the **Sub Contractor** box, select the name of a sub-contractor from a drop-down list.
3. In the **Inspection Date &amp; Time** box, select the date of inspection.
4. In the **Location** box, enter the location detail.
5. In the **Description** box, enter the description for the inspection.
    
    [![image-1651895100657.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895100657.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895100657.png) **Note**: Before saving the added RFI weld VI request, you must add the details of joints. You can add multiple joints for any added RFI weld VI request by using a box provided in the left side of the **REQUEST FOR INSPECTION** page. To know how to add joints, see the topic “[**<u>Add joints for an RFI weld VI request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.29.2%C2%A0add-joints-fo)”.
6. Click **Save**.

#### **5.29.2 Add Joints for an RFI Weld VI Request**

This page shows a list of joints for the corresponding weld map drawing. If you want to add joints for any added RFI weld VI request, do the following,

[![image-1651895145225.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895145225.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895145225.png)

1. In the **Weld Map Drawing** box, select a weld map drawing number from a drop-down list. A list of joints including the piece mark numbers opens for the selected weld map drawing.
2. Click the check box of the respective joints.
3. Click [![image-1651895193011.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895193011.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895193011.png) (**Add Selected Joints** button).
    
    The selected joints are moved into the **Added Joints** box located in the right side of the page.
    
    [![image-1651895210681.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895210681.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895210681.png)
4. To update WPS number and unique number for the added joints, do one of the following steps,
    
    
    1. 1. If you want to update the WPS number for any joint, click the **WPS Number** column for the respective joint and then select the WPS number from a drop-down list.
            
            [![image-1651895250281.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895250281.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895250281.png)
        2. Enter the unique number for the corresponding joint number in the respective **Unique Number column.**
            
            [![image-1651895276427.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895276427.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895276427.png) **Note**: If you want to update the same WPS number of first joint to other joints, click [![image-1651895290875.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895290875.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895290875.png) (**Update WPS No** button). The WPS number for the first joint will be updated for other joints.
5. If you want to update the WPS number, unique number, piece mark number details together, do the following, 
    1. 1. Click [![image-1651895391280.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895391280.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895391280.png) (**TEMPLATE** button) on the **Added Joints** box.
            
            An excel worksheet will be downloaded with a pre-defined template. The template contains a list of added joints.
            
            [![image-1651895420922.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895420922.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895420922.png)
        2. Enter the relevant details in the required columns on the excel worksheet.
        3. Once you have added the WPS, piece mark and other details in the excel worksheet, save the excel worksheet on your computer.
        4. Click [![image-1651895442768.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895442768.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895442768.png) (**IMPORT** button).
            
            A new window opens for importing the excel worksheet saved on your computer.
            
            [![image-1651895457563.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895457563.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895457563.png)
        5. Click [![image-1651895475955.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895475955.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895475955.png) (**Browse** button) to select the excel worksheet to be uploaded.
        6. Select the excel worksheet you want to upload from your computer.
        7. Click [![image-1651895497148.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895497148.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895497148.png) (**Upload** button) to export the joint details that are included in the excel worksheet.
            
            The details of the joints in the worksheet will be updated.
6. Click **Save**.

The RFI weld VI request is successfully added.


### **5.30 View RFI Weld VI (Unique Numbers)**

The **View RFI Weld VI** tab helps you to view and edit the RFI weld VI request, which added by using the **RFI Weld VI Request** tab. This tab also allows you to add a new RFI weld VI request.

1. Click the **View RFI Weld VI** tab in the **Inspection** menu. The **REQUEST FOR INSPECTION** page opens with a list of added RFI weld VI requests.
    
    [![image-1651895579880.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895579880.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895579880.png)
    
     **Figure 5.30: REQUEST FOR INSPECTION page**

#### **5.30.1 Add an RFI Weld VI Request**

If you want to add an RFI weld VI request, do the following,

1. Click [![image-1651895641312.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895641312.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895641312.png) (**ADD** button) in the **REQUEST FOR INSPECTION** page. A new page opens to add an RFI weld VI request. To know how to add an RFI weld VI request, see the topic, “[**<u>Add an RFI weld VI request</u>**](#_Add_an_RFI_1)”.

Once you have added the RFI weld VI request, you must submit the added request for inspection.

#### **5.30.2 Submit an RFI Weld VI Request**

Once you have added the RFI weld VI request, the **Request Status** column in the **REQUEST FOR INSPECTION** page is appeared with[![image-1651895696598.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895696598.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895696598.png) (Submit and Reject icons). See Fig 5.30.

1. If you want to submit the RFI weld VI request, click [![image-1651895715617.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895715617.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895715617.png)(Submit icon) in the **Request Status** Otherwise click [![image-1651895724147.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895724147.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895724147.png) (Reject icon) to reject the request.

#### **5.30.3 Add a Representative for Any RFI Weld VI Request**

If you want to add a representative for any added RFI weld VI request,

1. Click [![image-1651895780942.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895780942.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895780942.png)(Edit icon) in the **Representative** column for the respective RFI weld VI request. The **Edit Form** window opens.
    
    [![image-1651896527099.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651896527099.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651896527099.png)
2. In the **Representative** box, enter the name of a representative.
3. Click **Save**.

#### **5.30.4 Add Result for an RFI Weld VI Request**

If you want to add for the added RFI weld VI inspection request, do the following,

1. Click [![image-1651896588550.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651896588550.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651896588550.png) (Add icon) in the **Results** column of the **REQUEST FOR INSPECTION** page, for the respective RFI weld VI request. See Fig 5.30. A new window opens including the drawing number, joint number and WPS number for the respective RFI weld VI request.
    
    [![image-1651896617342.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651896617342.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651896617342.png)
2. In the **Result** column, select the results from a drop-down list based on your inspection.

#### **5.30.5 Print an RFI Weld VI Report**

If you want to print an RFI weld VI report, click [![image-1651896655616.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651896655616.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651896655616.png)(print icon) provided in the **Report** column of the **REQUEST FOR INSPECTION** page. See Fig 5.30.

#### **5.30.6 Attach a File into an RFI Weld VI Request** 

If you want to attach any file with any RFI weld VI request listed in the **REQUEST FOR INSPECTION** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **5.30.7 Edit Any RFI Weld VI Request** 

If you want to edit any existing RFI weld VI request in the **REQUEST FOR INSPECTION** page, do the following,

1. Click [![image-1651896744473.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651896744473.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651896744473.png)(Edit icon) in the **Edit** column for the respective RFI weld VI request. See Fig 5.30. The page shows the added details of the RFI weld VI request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.30.8 Export RFI Weld VI Request List**

You can export a list of RFI weld VI request added in the **REQUEST FOR INSPECTION** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **5.30.9 Filter Any RFI Weld VI Request** 

If you want to filter any RFI weld VI request from the list of RFI weld VI requests in the **REQUEST FOR INSPECTION** page, you can use the [![image-1651897196423.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651897196423.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651897196423.png) (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.


### **5.31 View AFI Weld VI (Unique Numbers)**

The **View AFI Weld VI** allows you to add a new AFI weld VI request. This tab also helps you to view and edit the added AFI weld VI request.

1. Click the **View AFI Weld VI** tab in the **Inspection** menu. The **WELD VI** **INSPECTION REQUEST** page opens.
    
    [![image-1651897246840.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651897246840.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651897246840.png)
    
     **Figure 5.31: WELD VI INSPECTION REQUEST page**

#### **5.31.1 Add an AFI Weld VI Request**

If you want to add an AFI weld VI request, do the following,

1. Click [![image-1651897318313.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651897318313.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651897318313.png)(**ADD** button) in the **WELD VI INSPECTION REQUEST** page. The **WELD VI** **- AFI Request** page opens to add an AFI weld VI request.
    
    [![image-1651897340537.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651897340537.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651897340537.png)
    
    [![image-1651897358028.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651897358028.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651897358028.png) **Tip**: A report number and RFI number for a new AFI weld VI request will be updated automatically in the **Report Number** and **RFI Number** boxes.
2. In the **Representative (AI)** box, enter representative name for the application inspection and enter their email id and contact number in the **Email** and **Contact No** boxes, respectively.
3. In the **Representative (Client)** box, enter representative name from the client and enter their email id and contact number in the **Email** and **Contact No** boxes, respectively.
4. In the **Inspection Date** box, select the date of inspection.
5. In the **Representative (Contractor)** box, enter representative name from the contractor and enter their email id and contact number in the **Email** and **Contact No** boxes, respectively.
6. In the **Activity Code As Per ITP** box, select the activity code as per ITP from a drop-down list.
7. In the **Activity Code As Per Client** box, select the activity code as per client from a drop-down list.
8. In the **Examination Area** box, enter the detail of examination area.
9. In the **Viewing Condition** box, enter the viewing condition detail.
10. In the **Project Specification** box, enter the project specification detail.
11. In the **Instrument** box, select an instrument from a drop-down list.
12. In the **Surface Condition** box, enter the surface condition detail.
13. In the **Location** box, enter the location detail.
14. In the **Description/ Code Acceptance** box, enter the description or the code acceptance detail for the inspection.
15. In the **Inspection Item/ Technique Used** box, enter the details of items to be inspected or used technique detail.
16. In the **Subject Coverage/ Object** box, enter the subject coverage or object detail.
17. In the **Comments** box, enter your comments if any.
    
    [![image-1651897515969.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651897515969.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651897515969.png)**Note**: Before saving the added AFI weld VI request, you must add the details of joints. You can add multiple joints for any added weld VI request by using a box provided in the left side of the page. To know how to add joints, see the topic “[**<u>Add joints for an AFI fit up request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.28.2-add-joints-fo)”.
18. Click **Save**.

#### **5.31.2 Add Joints for an AFI Weld VI Request**

If you want to add joints for any added AFI weld VI request, do the following,

[![image-1651897564408.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651897564408.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651897564408.png)

Once you enter the details to add an AFI weld VI request, a list of joints including the joint numbers, sheet numbers, and drawing numbers opens.

1. Click the check box of the respective joints.
2. Click [![image-1651897598754.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651897598754.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651897598754.png) (**Add Selected Joints** button). The selected joints are moved into the **Added Joints** box located in the right side of the page.
    
    [![image-1651897618995.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651897618995.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651897618995.png)
3. Click **Save**.

The selected joints are successfully added for the AFI weld VI request.

The AFI weld VI request is successfully added. Once you have added the AFI weld VI request, you must submit the added weld VI request for inspection.

#### **5.31.3 Submit an AFI Weld VI Request**

Once you have added the AFI weld VI request, the **Request Status** column in the **WELD VI** **INSPECTION** **REQUEST** page is appeared with[![image-1651897679303.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651897679303.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651897679303.png) (Submit and Reject icons). See Fig 5.31.

1. If you want to submit the RFI weld VI request, click [![image-1651897705144.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651897705144.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651897705144.png) (Submit icon) in the **Request Status** column. Otherwise click [![image-1651897725095.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651897725095.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651897725095.png) (Reject icon) to reject the request.

#### **5.31.4 Change a Representative for Any AFI Weld VI Request**

If you want to change a representative for any added AFI weld VI request,

1. Click [![image-1651897769209.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651897769209.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651897769209.png) (Edit icon) in the **Representative** column for the respective AFI weld VI request. The **Edit Form** window opens.
    
    [![image-1651897786502.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651897786502.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651897786502.png)
2. In the **Representative** box, enter the name of a representative.
3. Click **Save**.

#### **5.31.5 Add Result for an AFI Weld VI Request**

If you want to add result for the added AFI weld VI inspection request, do the following,

1. Click [![image-1651897840474.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651897840474.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651897840474.png) (Add icon) in the **Results** column of the **WELD VI INSPECTION** **REQUEST** page, for the respective AFI weld VI request. See Fig 5.31. A new window opens including the drawing number and joint number for the respective AFI weld VI request.
    
    [![image-1651897861414.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651897861414.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651897861414.png)
2. In the **Result** column, select the results from a drop-down list based on your inspection.
3. Click **Save**.

#### **5.31.6 Print an AFI Weld VI Report**

If you want to print an AFI weld VI report, click[![image-1651897913191.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651897913191.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651897913191.png) (print icon) provided in the **Report** column of the **WELD VI INSPECTION** **REQUEST** page. See Fig 5.31.

#### **5.31.7 Attach a File into an AFI Weld VI Request** 

If you want to attach any file with any AFI weld VI request listed in the **WELD VI INSPECTION REQUEST** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **5.31.8 Edit Any AFI Weld VI Request** 

If you want to edit any existing AFI weld VI request in the **WELD VI INSPECTION** **REQUEST** page, do the following,

1. Click [![image-1651898065391.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651898065391.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651898065391.png)(Edit icon) in the **Edit** column for the respective AFI weld VI request. See Fig 5.31. The page shows the added details of the AFI weld VI request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.31.9 Export AFI weld VI Request List**

You can export a list of AFI weld VI request added in the **WELD VI INSPECTION REQUEST** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **5.31.10 Filter Any AFI Weld VI Request** 

If you want to filter any AFI weld VI request from the list of AFI weld VI requests in the **WELD VI INSPECTION** **REQUEST** page, you can use the [![image-1651898185092.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651898185092.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651898185092.png) (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.


### **5.32 Dust Level**

Dust level test is performed to check the dust level. The **Dust Level** tab in the **Inspection** menu used to perform the dust level in the **Structural** project.

1. Click **Dust Level** in the **Inspection** menu. The **Dust Level** page opens.
    
    [![image-1651898231679.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651898231679.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651898231679.png)
    
     **Figure 5.32: Dust Level page**

#### **5.32.1 Add a Dust Level**

If you want to add a dust level,

1. Click [![image-1651898288939.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651898288939.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651898288939.png) (**ADD** button) in the **Dust Level**  See Fig 5.32. The page shows a new window to add the details of the dust level.
    
    [![image-1651898305216.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651898305216.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651898305216.png)
2. In the **Painting System** box, enter the painting system name.
3. In the **Item No** box, enter the item number.
4. In the **Date of Testing** box, select the dust level testing date.
5. In the **Abrasives Used** box, enter the detail of abrasives used in the dust level testing.
6. In the **Equipment Used** box, enter the detail of equipment used in the dust level testing.
7. In the **Acceptable Level** box, enter the acceptable level detail.
8. Click **Save**.
    
    The added dust level test will be listed in the **Dust Level** page.

#### **5.32.2 Edit a Dust Level**

If you want to edit any existing dust level in the **Dust Level** page,

1. Click [![image-1651898391905.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651898391905.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651898391905.png) (Edit icon) of the respective dust level. See Fig 5.32. The **Dust Level** page shows the details of the selected dust level.
2. Edit the details where you want.
3. Click **Save**.

#### **5.32.3 Delete a Dust Level**

If you want to delete any existing dust level in the **Dust Level** page, you can use [![image-1651898442682.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651898442682.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651898442682.png) (Delete icon) provided in the **Dust Level** page. To know how to delete, see the topic, “**Delete Any Area**”.

#### **5.32.4 Attach a File into a Dust Level**

If you want to attach any file with any dust level listed in the **Dust Level** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **5.32.5 Print a Dust Level Report**

If you want to print a dust level report, click[![image-1651901548669.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651901548669.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651901548669.png) (print icon) provided in the **Report** column of the **Dust Level** page. See Fig 5.32.

#### **5.32.6 Export Dust Level List**

You can export a list of dust levels added in the **Dust Level** page in both the pdf and excel formats by using [![image-1651901624609.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651901624609.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651901624609.png) (**PDF** button) and [![image-1651901641936.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651901641936.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651901641936.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **5.32.7 Filter Any Dust Level**

If you want to filter any specific dust level, you can use [![image-1651901682828.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651901682828.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651901682828.png) (**FILTER** button) located on the **Dust Level** page. To know how to filter, see the topic, ”**Filter Any Area**”.



### **5.33 Blotter Test**

Blotter test is used to check the cleanliness of the compressed air, where the compressed air free from any form of contaminants is necessary before its usage. The **Blotter Test** tab in the **Inspection** menu helps you to add the results of blotter test.

1. Click **Blotter Test** in the **Inspection** menu. The **Blotter Test** page opens.
    
    [![image-1651901737456.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651901737456.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651901737456.png)
    
     **Figure 5.33: Blotter Test page**

#### **5.33.1 Add a Blotter Test Report**

If you want to add a blotter test report, do the following steps,

1. Click [![image-1651901793616.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651901793616.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651901793616.png) (**ADD** button) in the **Blotter Test** page. The page shows a new window to add the details of the blotter test report.
    
    [![image-1651901814469.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651901814469.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651901814469.png)
2. In the **Location** box, enter the location name.
3. In the **Date of Testing** box, select the date of blotter test.
4. In the **Test Method** box, enter the test method detail.
5. In the **Acceptable Level** box, enter the acceptable level detail.
6. In the **Remarks** box, enter your remarks if any.
7. Click **Save**.

The blotter test report will be added and listed in the **Blotter Test** page. Once you have added the blotter test report, you must add the results of blotter test.

#### **5.33.2 Add Results of Blotter Test**

After completing the blotter test, you can add the blotter test result details. To add results, do the following steps,

1. Click [![image-1651901892500.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651901892500.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651901892500.png) (Add icon) in the **Results** column of the respective report. The Result window opens with the test readings.
    
    [![image-1651901906016.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651901906016.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651901906016.png)
2. In the **Result** column, select the result of each test reading from the given result options in the drop-down list.
3. In the **Remarks** column, enter your remarks if any.
4. Click **Save**.

#### **5.33.3 Edit Any Blotter Test Report** 

If you want to edit any existing blotter test report in the **Blotter Test** page, do the following,

1. Click [![image-1651901964504.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651901964504.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651901964504.png)(Edit icon) in the **Edit** column for the respective blotter test report. See Fig 5.33. The **Blotter Test** page opens with the details of the selected blotter test report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.33.4 View a Blotter Test Report**

If you want to view a blotter test report, click[![image-1651902047167.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651902047167.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651902047167.png) (print icon) provided in the **Print** column of the **Blotter Test** page. See Fig 5.33.

#### **5.33.5 Attach a File into a Blotter Test Report** 

If you want to attach a file with any existing blotter test report listed in the **Blotter Test** page, you can attach the file by using [![image-1651902100292.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651902100292.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651902100292.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)”.

#### **5.33.6 Export Blotter Test Report List**

You can export a list of blotter test report list added in the **Blotter Test** page in both the pdf and excel formats by using (**PDF** button) and (**Excel** button). To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)”.

#### **5.33.7 Filter Any Blotter Test Report**

If you want to filter any specific blotter test report in the **Blotter Test** page, you can use [![image-1651902178629.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651902178629.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651902178629.png) (**FILTER** button) located on the **Blotter Test** page. To know how to filter, see the topic, ”**Filter Any Area**”.


### **5.34 Fairing Report**

The **Fairing Report** tab in the **Inspection** menu helps you to add the results of fairing test.

1. Click **Fairing Report** in the **Inspection** menu. The **Fairing Report** page opens.
    
    [![image-1651902229076.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651902229076.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651902229076.png)
    
     **Figure 5.34: Fairing Report page**

#### **5.34.1 Add a Fairing Report**

If you want to add a fairing report, do the following steps,

1. Click [![image-1651902347564.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651902347564.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651902347564.png)(**ADD** button) in the **Fairing Report** page. The page shows a new window to add the details of the fairing report.
    
    [![image-1651902368876.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651902368876.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651902368876.png)
2. In the **Inspection** **Date** box, select the date of inspection.
3. In the **Prepared By** box, enter the name of a person who has prepared the fairing report.
4. In the **Prepared Date** box, select the prepared date of the fairing report.
5. In the **Reviewed By** box, enter the name of a person who has reviewed the fairing report.
6. In the **Reviewed Date** box, select the reviewed date of the fairing report.
7. In the **Approved By** box, enter the name of a person who has approved the fairing report.
8. In the **Approved Date** box, select the approved date of the fairing report.
9. Click **Save**.

The fairing report will be added and listed in the **Fairing Report** page. Once you have added the fairing report, you must add the results of fairing test.

#### **5.34.2 Add Results of Fairing Test**

After completing the fairing test, you can add the fairing test result details. To add results, do the following steps,

1. Click [![image-1651912474698.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651912474698.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651912474698.png) (Add icon) in the **Results** column of the respective report. The **Fairing Request Details** window opens.
    
    [![image-1651912488947.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651912488947.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651912488947.png)
2. Click [![image-1651912521284.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651912521284.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651912521284.png) (**ADD** button) in the **Fairing Request Details** window.
    
    [![image-1651912549936.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651912549936.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651912549936.png)
3. In the **Description** box, enter the description for the fairing test.
4. In the **Drawing No** box, enter the drawing number.
5. In the **Temperature** box, enter the temperature value.
6. In the **Deformation Status** box, enter the deformation status detail.
7. In the **Structural Thickness** box, enter the structural thickness value.
8. In the **Structural Thickness** box, enter the structural thickness value.
9. In the **Type of Material** box, enter the type of material.
10. Click **Save**.

#### **5.34.3 Edit Any Fairing Report** 

If you want to edit any existing fairing report in the **Fairing Report** page, do the following,

1. Click [![image-1651912698020.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651912698020.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651912698020.png)(Edit icon) in the **Edit** column for the respective fairing report. See Fig 5.34. The **Fairing Report** page opens with the details of the selected fairing report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.34.4 View a Fairing Report**

If you want to view a fairing report, click [![image-1651912778699.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651912778699.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651912778699.png) (print icon) provided in the **Print** column of the **Fairing Report** page. See Fig 5.34.

#### **5.34.5 Attach a File into a Fairing Report** 

If you want to attach a file with any existing fairing report listed in the **Fairing Report** page, you can attach the file by using (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)”.

#### **5.34.6 Export Fairing Report List**

You can export a list of fairing report list added in the **Fairing Report** page in both the pdf and excel formats by using [![image-1651912857186.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651912857186.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651912857186.png) (**PDF** button) and [![image-1651912925607.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651912925607.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651912925607.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)”.

#### **5.34.7 Filter Any Fairing Report**

If you want to filter any specific fairing report in the **Fairing Report** page, you can use [![image-1651913154457.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651913154457.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651913154457.png) (**FILTER** button) located on the **Fairing Report** page. To know how to filter, see the topic, ”**Filter Any Area**”.


### **5.35 Chloride Test**

The **Chloride Test** tab in the **Inspection** menu helps you to add the results of chloride test.

1. Click **Chloride Test** in the **Inspection** menu. The **Chloride Test** page opens.
    
    [![image-1651913236408.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651913236408.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651913236408.png)
    
     **Figure 5.35: Chloride Test page**

#### **5.35.1 Add a Chloride Test Report**

If you want to add a chloride test report, do the following steps,

1. Click [![image-1651913308606.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651913308606.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651913308606.png) (**ADD** button) in the **Chloride Test** page. The page shows a new window to add the details of the chloride test report.
    
    [![image-1651913322779.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651913322779.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651913322779.png)
2. In the **Surface Preparation** box, enter the surface preparation detail.
3. In the **Location** box, enter the location detail.
4. In the **Date of Testing** box, select the date of chloride test.
5. In the **Test Method** box, enter the test method detail.
6. In the **Acceptance Level** box, enter the acceptance level detail.
7. In the **Remarks** box, enter your remarks if any.
8. Click **Save**.

The chloride test report will be added and listed in the **Chloride Test** page. Once you have added the chloride test report, you must add the results of chloride test.

#### **5.35.2 Add Results of Chloride Test**

After completing the chloride test, you can add the chloride test result details. To add results, do the following steps,

1. Click [![image-1651913429145.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651913429145.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651913429145.png) (Add icon) in the **Results** column of the respective report. The **Chloride Request Details** window opens.
    
    [![image-1651913575631.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651913575631.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651913575631.png)
2. Click [![image-1651913590897.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651913590897.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651913590897.png) **ADD** button) in the **Chloride Request Details** window.
    
    [![image-1651913611112.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651913611112.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651913611112.png)
3. In the **Test Reading** box, enter the test reading detail.
4. In the **Position** box, enter the position detail.
5. In the **Result** box, select the result of the chloride test.
6. Click **Save**.

#### **5.35.3 Edit Any Chloride Test Report** 

If you want to edit any existing chloride test report in the **Chloride Test** page, do the following,

1. Click [![image-1651913730100.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651913730100.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651913730100.png)(Edit icon) in the **Edit** column for the respective chloride test report. See Fig 5.35. The **Chloride Test** page opens with the details of the selected chloride test report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.35.4 View a Chloride Test Report**

If you want to view a chloride test report, click [![image-1651913826379.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651913826379.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651913826379.png) (print icon) provided in the **Print** column of the **Chloride Test** page. See Fig 5.34.

#### **5.35.5 Attach a File into a Chloride Test Report** 

If you want to attach a file with any existing chloride test report listed in the **Chloride Test** page, you can attach the file by using [![image-1651913869575.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651913869575.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651913869575.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)”.

#### **5.35.6 Export Chloride Test Report List**

You can export a list of chloride test report list added in the **Chloride Test** page in both the pdf and excel formats by using [![image-1651914072033.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651914072033.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651914072033.png)(**PDF** button) and [![image-1651914092636.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651914092636.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651914092636.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)”.

#### **5.35.7 Filter Any Chloride Test Report**

If you want to filter any specific chloride test report in the **Chloride Test** page, you can use [![image-1651914209307.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651914209307.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651914209307.png) (**FILTER** button) located on the **Chloride Test** page. To know how to filter, see the topic, ”**Filter Any Area**”.


### **5.36 Inspection Requisition Summary Report**

The **Inspection Requisition Summary** tab in the **Inspection** menu used to view the inspection requisition summary report for a particular period.

1. Click **Inspection Requisition Summary** in the **Inspection** menu. The **Requisition Inspection Summary** page opens.
    
    [![image-1651914291795.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651914291795.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651914291795.png)
    
     **Figure 5.36: Requisition Inspection Summary page**
2. In the **Start Date** and **End Date** boxes, select the start and end dates.
3. Click **Get Report**.
    
    The inspection requisition summary report for the selected period will be opened.
    
    [![image-1651914343114.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651914343114.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651914343114.png)

#### **5.36.1 Print an Inspection Requisition Summary Report**

If you want to print an inspection requisition summary report, use [![image-1651914395188.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651914395188.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651914395188.png) and [![image-1651914414647.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651914414647.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651914414647.png) (print icons) provided in the **Requisition Inspection Summary** page.

1. If you want to print the current page of the inspection requisition summary report, click [![image-1651914484636.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651914484636.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651914484636.png) (print icon including the page number).
2. If you want to print all the pages of the inspection requisition summary report, click [![image-1651914505680.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651914505680.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651914505680.png)(print icon).

#### **5.36.2 Export an Inspection Requisition Summary Report**

You can export the inspection requisition summary report in various formats by using the option [![image-1651914626034.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651914626034.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651914626034.png) provided in the upper right corner of the **Requisition Inspection Summary** page.

# Structural

### **6.0 Structural**

The Structural menu in the home page of the ***cuteQM*** app used to add result after performing structural related inspections. This menu also helps you to view structural reports, graphical reports, and other reports.

### **6.1 Radiographic Testing (RT)** 

The RT method is one of the NDT inspection methods used for inspecting the materials in the structural project by using either x-rays or gamma rays. Once the RT inspection request added in the [**<u>NDT Inspection Request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.8-ndt-inspection-r) tab, you can add the RT inspection result details by using this **Radiographic Testing (RT)** tab**.**

If you want to navigate **Radiographic Testing (RT)**,

1. Click the **Radiographic Testing (RT)** tab in the **Structural** menu. The **RT Report** page opens.
    
    [![image-1651915359832.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651915359832.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651915359832.png)
    
     **Figure 6.1: RT Report page**

#### **6.1.1 Add an RT Report**

If you want to add an RT report, do the following,

1. Click [![image-1651915422152.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651915422152.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651915422152.png) (**ADD** button) in the **RT Report** page. See Fig 6.1. A new window opens to add an RT report.
    
    [![image-1651915452611.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651915452611.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651915452611.png)
    
    [![image-1651915460726.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651915460726.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651915460726.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651915484902.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651915484902.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651915484902.png) **Tip**: A report number for a new RT report will be updated automatically in the **Report Number** box.
2. In the ****NDT By**** box, select the creation of NDT whether by third party or internal from a drop-down list.
3. In the **Request Number** box, select an RT request number from a drop-down list.
4. In the **Prepared By** box, enter the name of a person who has prepared the RT report.
5. In the **Prepared Date** box, select the prepared date of the RT report.
6. In the **Reviewed By** box, enter the name of a person who has reviewed the RT report.
7. In the **Reviewed Date** box, select the reviewed date of the RT report.
8. In the **Approved By** boxes, enter the name of a person who has approved the RT report.
9. In the **Approved Date** box, select the approved date of the RT report.
10. In the **Rep. Accept Date** box, select the report accept date.
11. In the **Inspection Date** box, select the date of inspection.
12. In the **Job Done Report Number** box, enter the report number of completed inspection job.
13. In the **Job Completed Date** box, select the completed date of the inspection job.
14. Click **Save**.

The RT report is successfully added. Once you have added the RT report, you must add RT results for the respective added RT report.

#### **6.1.2 Add RT Results** 

If you want to add the RT results for the respective RT report, do the following,

1. Click the respective added RT report in the **RT Report** page. See Fig 6.1. The RT Results window opens.
    
    [![image-1651915646092.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651915646092.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651915646092.png)
    
     **Figure 6.1.1: RT Results page**
2. In the **Image Quality Indicator (IQI)** box, select IQI from a drop-down list.
3. In the **Source &amp; Size (MM)** box, select the RT source and their size from a drop-down list.
4. In the **Density** box, enter the radiographic density range.
5. In the **Code** box, select the code of the material from a drop-down list.
6. In the **Procedure Number** box, select the procedure number from a drop-down list.
7. In the **Sensitivity (%)** box, set the radiographic sensitivity by using up and down arrows.
8. In the **Approved By** boxes, enter the name of a person who has approved the RT report.
9. In the **Approved Date** box, select the approved date of the RT report.
10. In the **Rep. Accept Date** box, select the report accept date.
11. In the **Inspection Date** box, select the date of inspection.
12. In the **Job Done Report Number** box, enter the report number of completed inspection job.
13. In the **Job Completed Date** box, select the completed date of the inspection job.
14. Click **Save**.

The RT report is successfully added. Once you have added the RT report, you must add RT results for the respective added RT report.

#### **6.1.2 Add RT Results** 

If you want to add the RT results for the respective RT report, do the following,

1. Click the respective added RT report in the **RT Report** page. See Fig 6.1. The RT Results window opens.
    
    [![image-1651983962662.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651983962662.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651983962662.png)
    
     **Figure 6.1.1: RT Results page**
2. In the **Image Quality Indicator (IQI)** box, select IQI from a drop-down list.
3. In the **Source &amp; Size (MM)** box, select the RT source and their size from a drop-down list.
4. In the **Density** box, enter the radiographic density range.
5. In the **Code** box, select the code of the material from a drop-down list.
6. In the **Procedure Number** box, select the procedure number from a drop-down list.
7. In the **Sensitivity (%)** box, set the radiographic sensitivity by using up and down arrows.
8. In the **Developing Time (Mins)** box, set the developing time by using up and down arrows.
9. In the **Film/ Type** box, select the name of a film including type from a drop-down list.
10. In the **Placement of IQI** box, select any one option from source side and film side.
11. In the **Source to Object Distance (SOD)** box, enter the distance range between the source and the object.
12. In the **Screens Type** box, enter the type of screens.
13. In the **Visible Wire/ Hole** box, enter the relevant detail.
14. In the **Acceptance Criteria** box, select the acceptance criteria from a drop-down list.
15. In the ****Source to Film Distance (SFD)****box, enter the distance range between the source and the film.
16. In the **Focus Film Distance (FFD)** box, enter the focus film distance range.
17. In the **Source** box, select any one source option whether inside, outside, or other.
18. In the **Technique** box, select the radiographic technique from a drop-down list.
19. In the **Examination Stage** box, select the examination stage from the specified options.
20. In the **Material** box, select the material from a drop-down list.
21. In the **Surface Condition** box, select the condition of the surface from the specified options.
22. In the **Source Strength** box, enter the source strength range.
23. In the **Exposure Time (Mins)** box, set the exposure time by using up and down arrows.
24. In the **Note** box, enter any note if you want.
25. Click **Save RT Details**.

The RT results are successfully updated. Once you have updated the RT results, you must import joints added for the RT inspection.

#### **6.1.3 Import Joints**

If you want to import joints for the updated RT results,

1. Click [![image-1651984603138.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651984603138.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651984603138.png) (**Import Joints** button) in the **RT Results** See Fig 6.1.1. The **Joints** window opens with a list of joints.
    
    [![image-1651984618657.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651984618657.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651984618657.png)
2. Select the joints you want to import.
3. Click [![image-1651984648770.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651984648770.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651984648770.png) (**Import Selected Joints** button).
    
    The selected joints are imported for the respective RT results. Once you have imported the joints, you must add the marker results.

#### **6.1.4 Add Marker Results**

If you want to add marker results for the respective RT results,

[![image-1651984688412.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651984688412.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651984688412.png)

1. Click [![image-1651984710955.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651984710955.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651984710955.png) (Add icon) for the respective RT results. The **Marker Results** window opens.
    
    [![image-1651984728723.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651984728723.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651984728723.png)
2. If you want to add any additional markers,
    
    
    1. 1. Set the number in the **No. of Additional Markers** box by using up and down arrows.
        2. Click [![image-1651984771433.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651984771433.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651984771433.png) (**ADD** button).
3. If you want edit any existing marker results, 
    1. 1. Click [![image-1651984794840.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651984794840.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651984794840.png) (Edit icon) in the **Edit** column for the respective marker results.
            
            A new window opens to edit the marker results.
            
            [![image-1651984835180.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651984835180.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651984835180.png)
        2. Click any box where you want to edit the details, and edit the marker results.
        3. Click **Save**.
4. If you want delete any existing marker results, click (Delete icon) for the respective marker results.

#### **6.1.5 Add Report Photos**

If you want to add any report photos for the updated RT results,

1. Click [![image-1651984922206.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651984922206.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651984922206.png) (**ADD** button) in the **Report Photos** box in the **RT Results** window. See Fig 6.1.1. [![image-1651984944230.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651984944230.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651984944230.png)
2. Click [![image-1651984959950.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651984959950.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651984959950.png) (****Browse**** button) to browse a photo stored in your computer.
3. Click **Upload**.

The selected photo will be updated.

#### **6.1.6 Attach a File into an RT Report**

If you want to attach any file with any RT report listed in the **RT Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.1.7 Print an NDT – RT report**

If you want to print an NDT - RT report, click [![image-1651985039630.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651985039630.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651985039630.png) (print icon) provided in the **Report** column of the **RT Report** page. See Fig 6.1.

#### **6.1.8 Edit Any RT Report**

 If you want to edit any existing RT report in the **RT Report** page, do the following,

1. Click [![image-1651985091602.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651985091602.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651985091602.png) (Edit icon) in the **Edit** column for the respective RT report. See Fig 6.1. A new window opens to edit the RT report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.1.9 Export RT Report List**

You can export a list of RT reports added in the **RT Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **6.1.10 Filter Any RT Report** 

If you want to filter any RT report, do one of the following, [![image-1651985206408.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651985206408.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651985206408.png)

1. If you want to filter any RT report based on the report number, enter the corresponding report number in the **Report No** box in the **RT Report** page, and then Click **Search**.
2. If you want to filter any RT report based on the request number, enter the corresponding request number in the **Request No** box in the **RT Report** page, and then Click **Search**.
3. If you want to filter any RT report based on the drawing number, enter the corresponding drawing number in the ****Drawing No**** box in the ****RT Report**** page, and then Click ****Search****.



### **6.2 Ultrasonic Testing (UT)** 

The UT method is one of the NDT inspection methods used for inspecting the materials in the structural project by using high frequency sound waves. Once the UT inspection request added in the[<u> </u>**<u>NDT Inspection Request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.8-ndt-inspection-r) tab, you can add the UT inspection result details by using this **Ultrasonic Testing (UT)** tab**.** If you want to navigate **Ultrasonic Testing (UT)**,

1. Click the **Ultrasonic Testing (UT)** tab in the **Structural** menu. The **UT Report** page opens.
    
    [![image-1651985300157.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651985300157.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651985300157.png)
    
     **Figure 6.2: UT Report page**

#### **6.2.1 Add an UT Report**

If you want to add an UT report, do the following,

1. Click [![image-1651985351149.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651985351149.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651985351149.png) (**ADD** button) in the U**T Report** page. See Fig 6.2. A new window opens to add an UT report.
    
    [![image-1651985371929.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651985371929.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651985371929.png)
    
    [![image-1651985395804.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651985395804.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651985395804.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651985407432.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651985407432.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651985407432.png)**Tip**: A report number for a new UT report will be updated automatically in the **Report Number** box.
2. In the ****NDT By**** box, select the creation of NDT whether by third party or internal from a drop-down list.
3. In the **Request Number** box, select an UT request number from a drop-down list.
4. In the **Prepared By** box, enter the name of a person who has prepared the UT report.
5. In the **Prepared Date** box, select the prepared date of the UT report.
6. In the ****Reviewed By**** box, enter the name of a person who has reviewed the UT report.
7. In the **Reviewed Date** box, select the reviewed date of the UT report.
8. In the **Approved By** boxes, enter the name of a person who has approved the UT report.
9. In the **Approved Date** box, select the approved date of the UT report.
10. In the **Rep. Accept Date** box, select the report accept date.
11. In the **Inspection Date** box, select the date of inspection.
12. In the **Job Done Report Number** box, enter the report number of completed inspection job.
13. In the **Job Completed Date** box, select the completed date of the inspection job.
14. Click **Save**.

The UT report is successfully added. Once you have added the UT report, you must add UT results for the respective added UT report.

#### **6.2.2 Add UT Results** 

If you want to add the UT results for the respective UT report, do the following,

1. Click the respective added UT report in the **UT Report** page. See Fig 6.2. The UT Results window opens.
    
    [![image-1651985545268.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651985545268.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651985545268.png)
    
    [![image-1651985556004.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651985556004.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651985556004.png)
    
    [![image-1651985564176.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651985564176.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651985564176.png)
    
     **Figure 6.2.1: UT Results page**
2. In the **Test Method** box, select the test method from a drop-down list.
3. In the **Description** box, enter the description about the UT inspection.
4. In the **Material** box, select the material from a drop-down list.
5. In the **Test Equipment** box, select the test equipment from a drop-down list.
6. In the **Acceptance Criteria** box, select the acceptance criteria from a drop-down list.
7. In the **Couplant** box, select the couplant material from a drop-down list.
8. In the **Test** **Procedure Number** box, select the test procedure number from a drop-down list.
9. In the **Simulation Blocks** box, enter the detail of simulation blocks.
10. In the **Ref. Hole Diameter** box, enter the diameter value of the reference hole.
11. In the **Sensitivity Setting** box, enter the information about the sensitivity setting.
12. In the **Sides Scanned** box, enter the details of the sides that are scanned.
13. In the **Special Equipment** box, enter the name of the special equipment if any.
14. In the **Computerized Program Name** box, enter the computerized program name.
15. In the **Surface Scanned** box, the details of the surfaces that are scanned.
16. In the **Flaw Detector** box, select a flaw detector from a drop-down list.
17. In the **Scan Limitation** box, enter the limitation range of scanning.
18. In the **Bevel Type** box, enter the type of the bevel.
19. In the **Specification** box, select the specification from a drop-down list.
20. In the **Calibration Block** box, select the calibration block from a drop-down list.
21. In the **Remarks** box, enter your remarks if any.
22. In the **Technique** box, select the technique from a drop-down list.
23. In the **Examination Stage** box, select the examination stage from the specified options.
24. In the **Surface Condition** box, select the surface condition from the specified options.
25. Click **Save UT Details**.

The UT results are successfully updated. Once you have updated the UT results, you must add the probe and cable details for the UT inspection.

#### **6.2.3 Add Probe and Cable details** 

If you want to add probe and cable details for the updated UT results,

1. Click [![image-1651985830317.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651985830317.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651985830317.png) (**Add Probe/ Cable** button) in the **Probe&amp; Cable Details** window. See Fig 6.2.1. A new window opens to add the probe and cable details.
    
    [![image-1651985848658.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651985848658.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651985848658.png)
2. In the **Probe** box, select a probe from a drop-down list.
3. In the **Cable** box, select a cable from a drop-down list.
4. In the **Ref. dB** box, enter the reference decibel range.
5. In the **Surf Comp dB** box, enter the decibel range of the surface component.
6. In the **Test Range (MM)** box, enter the test range in millimeters.
7. In the **Reference Level** box, enter the reference level detail.
8. In the **Scanning dB** box, enter the scanning decibel range.
9. In the **TR Loss** box, enter the transmission loss detail.
10. Click **Save**.

The probe and cable details are successfully added. Once you have added the probe and cable details, you must add the reference setting details.

#### **6.2.4 Add Reference Setting details** 

If you want to add the reference setting details for the updated UT results,

1. Click [ ![image-1651985956553.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651985956553.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651985956553.png) (**Add Reference Setting** button) in the **Reference Setting Details** See Fig 6.2.1. A new window opens to add the reference setting details.
    
    [![image-1651985982525.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651985982525.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651985982525.png)
2. In the **Reference Block** box, select the reference block from a drop-down list.
3. In the **Probe Sr. No** box, select the serial number of the probe from a drop-down list.
4. In the **Reference** box, enter the reference detail.
5. In the **Eqpt Gain (dB)** box, enter the equipment gain in decibels.
6. In the **Damping** box, enter the damping ratio.
7. In the **Rejection** box, enter the rejection detail.
8. In the **Amplitude Height** box, enter the amplitude height range.
9. In the **Skip** box, enter the skip detail.
10. In the **Beam Path** box, enter the beam path detail.
11. In the **Range** box, enter the range detail.
12. Click **Save**.

The reference setting details are successfully added. Once you have added the reference setting details, you must import joints for the updated UT results.

#### **6.2.5 Import Joints for UT**

If you want to import joints for the updated UT results,

1. Click [![image-1651986113562.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651986113562.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651986113562.png) (**Import Joints** button) in the U**T Results** See Fig 6.2.1. The **Joints** window opens with a list of joints.
    
    [![image-1651986185110.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651986185110.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651986185110.png)
2. Select the joints you want to import.
3. Click [![image-1651986242236.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651986242236.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651986242236.png) (**Import Selected Joints** button).

The selected joints are imported for the respective UT results. Once you have imported the joints, you must add the UT detail results.

#### **6.2.6 Add UT Results**

If you want to add UT detail results for the respective UT results,

[![image-1651986280609.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651986280609.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651986280609.png)

1. Click [![image-1651986301680.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651986301680.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651986301680.png) (Add icon) for the respective UT results. The **UT Detail Results** window opens.
    
    [![image-1651986314412.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651986314412.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651986314412.png)
2. Click [![image-1651986326534.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651986326534.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651986326534.png) (**ADD** button) in the **UT Detail Results** window.
    
    A new window opens in the **Probes** column.
    
    [![image-1651986344825.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651986344825.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651986344825.png)
3. Select the probe from a drop-down list.
4. Enter other details in the respective columns.
5. Click **Save**.

#### **6.2.7 Add Report Photos**

If you want to add any report photos for the updated UT results,

1. Click [![image-1651986389344.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651986389344.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651986389344.png) (**ADD** button) in the **Report Photos** box in the **UT Results** See Fig 6.2.1. [![image-1651986402335.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651986402335.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651986402335.png)
2. Click [![image-1651986417627.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651986417627.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651986417627.png) (**Browse** button) to browse a photo stored in your computer.
3. Click **Upload**.

The selected photo will be updated.

#### **6.2.8 Attach a File into an UT Report**

If you want to attach any file with any UT report listed in the **UT Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.2.9 Print an NDT – UT Report**

If you want to print an NDT - UT report, click[![image-1651986568467.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651986568467.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651986568467.png)(print icon) provided in the **Report** column of the **UT Report** page. See Fig 6.2.

#### **6.2.10 Edit Any UT report**

 If you want to edit any existing UT report in the U**T Report** page, do the following,

1. Click [![image-1651986610066.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651986610066.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651986610066.png) (Edit icon) in the **Edit** column for the respective UT report. See Fig 6.2. A new window opens to edit the UT report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.2.11 Export UT Report List**

You can export a list of UT reports added in the **UT Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **6.2.12 Filter Any UT Report** 

If you want to filter any UT report, do one of the following,[![image-1651987820280.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651987820280.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651987820280.png)

1. If you want to filter any UT report based on the report number, enter the corresponding report number in the **Report No** box in the **UT Report** page, and then Click **Search**.
2. If you want to filter any UT report based on the request number, enter the corresponding request number in the ****Request No**** box in the ****UT Report**** page, and then Click ****Search****.

If you want to filter any UT report based on the drawing number, enter the corresponding drawing number in the **Drawing No** box in the **UT Report** page, and then Click **Search**.


### **6.3 Dye Penetrant Testing (DPT)**

The DPT method is one of the oldest and simplest NDT inspection methods used for inspecting the materials in the structural project by using ultraviolet or white light, depending on the type of dye used - fluorescent or non fluorescent (visible). PT also called liquid penetrate inspection (LPI) or penetrant testing (PT).

Once the UT inspection request added in the [**<u>NDT Inspection Request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.8-ndt-inspection-r) tab, you can add the UT inspection result details by using this **Dye Penetrant Testing (DPT)** tab**.** If you want to navigate **Dye Penetrant Testing (DPT)**,

1. Click the **Dye Penetrant Testing (DPT)** tab in the **Structural** menu. The **PT Report** page opens.
    
    [![image-1651987913649.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651987913649.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651987913649.png)
    
     **Figure 6.3: PT Report page**

#### **6.3.1 Add a DPT Report**

If you want to add a DPT report, do the following,

1. Click [![image-1651987980001.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651987980001.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651987980001.png) (**ADD** button) in the **PT Report** page. See Fig 6.3. A new window opens to add an PT report.
    
    [![image-1651988268574.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651988268574.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651988268574.png)
    
    [![image-1651988283988.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651988283988.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651988283988.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651988299424.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651988299424.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651988299424.png)**Tip**: A report number for a new PT report will be updated automatically in the **Report Number** box.
2. In the **NDT By** box, select the creation of NDT whether by third party or internal from a drop-down list.
3. In the **Request Number** box, select an PT request number from a drop-down list.
4. In the **Prepared By** box, enter the name of a person who has prepared the PT report.
5. In the **Prepared Date** box, select the prepared date of the PT report.
6. In the **Reviewed By** box, enter the name of a person who has reviewed the PT report.
7. In the **Reviewed Date** box, select the reviewed date of the PT report.
8. In the **Approved By** boxes, enter the name of a person who has approved the PT report.
9. In the **Approved Date** box, select the approved date of the PT report.
10. In the **Rep. Accept Date** box, select the report accept date.
11. In the **Inspection Date** box, select the date of inspection.
12. In the **Job Done Report Number** box, enter the report number of completed inspection job.
13. In the **Job Completed Date** box, select the completed date of the inspection job.
14. Click **Save**.

The PT report is successfully added. Once you have added the PT report, you must add PT results for the respective added PT report.

#### **6.3.2 Add DPT Results** 

If you want to add the DPT results for the respective PT report, do the following,

1. Click the respective added PT report in the **PT Report** page. See Fig 6.3. The DPT Results window opens.
    
    [![image-1651988667279.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651988667279.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651988667279.png)
    
    [![image-1651988674053.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651988674053.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651988674053.png)
    
     **Figure 6.3.1: DPT Results page**
2. In the **Light Source** box, enter the light source detail.
3. In the **Description** box, enter the description.
4. In the **Test Procedure** box, select the test procedure from a drop-down list.
5. In the **Test Method** box, select the test method from a drop-down list.
6. In the **Acceptance Criteria** box, select the acceptance criteria from a drop-down list.
7. In the **Surface Condition** box, enter the condition of the surface.
8. In the **Dwell Time** box, enter dwell time range.
9. In the **Surface Temperature** box, enter the surface temperature value.
10. In the **Cleaner** box, select the cleaner from a drop-down list.
11. In the **Penetrant** box, select the penetrant from a drop-down list.
12. In the **Developer** box, select the developer from a drop-down list.
13. In the **Material Specification** box, enter the material specification.
14. In the **Material Thickness** box, enter the material thickness value.
15. In the **Development Time** box, enter the time for development.
16. In the **Welding Process** box, enter the type of welding process.
17. In the **Code** box, enter the code detail.
18. In the **Examination Stage** box, select the examination stage from the specified options.
19. In the **Item Tested** box, select the tested items from the specified options.
20. In the **Inspection Method** box, select the inspection method from the specified options.
21. In the **Material** box, select the material from a drop-down list.
22. In the **Remarks** box, enter your remarks if any.
23. Click **Save DPT Details**.

The DPT results are successfully updated. Once you have updated the DPT results, you must import joints added for the DPT inspection results.

#### **6.3.3 Import Joints for DPT**

If you want to import joints for the updated DPT results,

1. Click [![image-1651988870782.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651988870782.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651988870782.png) (**Import Joints** button) in the **DPT Results** window. See Fig 6.3.1. The **Joints** window opens with a list of joints.
    
    [![image-1651988896812.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651988896812.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651988896812.png)
2. Select the joints you want to import.
3. Click [![image-1651988911579.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651988911579.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651988911579.png) (**Import Selected Joints** button).
    
    The selected joints are imported for the respective DPT results.

#### **6.3.4 Add Report Photos**

If you want to add any report photos for the updated DPT results,

1. Click [![image-1651988951316.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651988951316.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651988951316.png) (**ADD** button) in the **Report Photos** box in the **DPT Results** window. See Fig 6.3.1. [![image-1651988976728.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651988976728.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651988976728.png)
2. Click [![image-1651988988048.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651988988048.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651988988048.png) (**Browse** button) to browse a photo stored in your computer.
3. Click **Upload**.
    
    The selected photo will be updated.

#### **6.3.5 Attach a File into a DPT Report**

If you want to attach any file with any DPT report listed in the **PT Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.3.6 Print an NDT – DPT report**

If you want to print an NDT - PT report, click [![image-1651989107514.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651989107514.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651989107514.png)(print icon) provided in the **Report** column of the **PT Report** page. See Fig 6.3.

#### **6.3.7 Edit Any DPT report**

 If you want to edit any existing DPT report in the **RT Report** page, do the following,

1. Click [![image-1651989141539.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651989141539.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651989141539.png) (Edit icon) in the **Edit** column for the respective DPT report. See Fig 6.3. A new window opens to edit the DPT report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.3.8 Export DPT Report List**

You can export a list of DPT reports added in the **PT Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **6.3.9 Filter Any DPT Report** 

If you want to filter any DPT report, do one of the following,[![image-1651989245911.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651989245911.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651989245911.png)

1. If you want to filter any DPT report based on the report number, enter the corresponding report number in the **Report No** box in the **PT Report** page, and then Click **Search**.
2. If you want to filter any DPT report based on the report number, enter the corresponding report number in the **Report No** box in the **PT Report** page, and then Click **Search**.

If you want to filter any DPT report based on the report number, enter the corresponding report number in the **Report No** box in the **PT Report** page, and then Click **Search**.



### **6.4 PT After Load Test**

The **PT After Load Test** tab in the **Structural** menu helps you to add PT results while performing the PT inspection after completing the load test.

Once the PT after load test inspection request added in the [**<u>NDT Inspection Request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.8-ndt-inspection-r) tab, you can add the PT result details by using this **PT After Load Test** tab**.** If you want to navigate **PT After Load Test**,

1. Click the **PT After Load Test** tab in the **Structural** menu. The **PT After Load Test Report** page opens. [![image-1651989380363.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651989380363.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651989380363.png)
    
     **Figure 6.4: PT After Load Test Report page**

#### **6.4.1 Add a PT after load test report**

If you want to add a PT after load test report, do the following,

1. Click [![image-1651989429583.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651989429583.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651989429583.png) (**ADD** button) in the **PT After Load Test Report** page. See Fig 6.4. A new window opens to add a PT after load test report.
    
    [![image-1651989443350.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651989443350.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651989443350.png)
    
    [![image-1651989462745.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651989462745.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651989462745.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651989704531.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651989704531.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651989704531.png)**Tip**: A report number for a new PT report will be updated automatically in the **Report Number** box.
2. In the **NDT By** box, select the creation of NDT whether by third party or internal from a drop-down list.
3. In the **Request Number** box, select an PT request number after load test from a drop-down list.
4. In the **Prepared By** box, enter the name of a person who has prepared the PT report after load test.
5. In the ****Prepared Date**** box, select the prepared date of the PT report after load test.
6. In the ****Reviewed By**** box, enter the name of a person who has reviewed the PT report after load test.
7. In the ****Reviewed Date**** box, select the reviewed date of the PT report after load test.
8. In the ****Approved By**** boxes, enter the name of a person who has approved the PT report after load test.
9. In the ****Approved Date**** box, select the approved date of the PT report after load test.
10. In the **Rep. Accept Date** box, select the report accept date.
11. In the **Inspection Date** box, select the date of inspection.
12. In the **Job Done Report Number** box, enter the report number of completed inspection job.
13. In the **Job Completed Date** box, select the completed date of the inspection job.
14. Click **Save**.

The PT report after load test is successfully added. Once you have added the PT report, you must add PT results for the respective PT report.

#### **6.4.2 Add PT Results** 

If you want to add the PT results for the respective PT report after load test, do the following,

1. Click the respective added PT report in the **PT After Load Test Report** page. See Fig 6.4. The **PT After Load Test Results** page opens.
    
    [![image-1651991710992.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651991710992.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651991710992.png)
    
     **Figure 6.4.1: PT After Load Test Results** **page**
2. In the **Light Source** box, enter the light source detail.
3. In the **Description** box, enter the description.
4. In the **Test Procedure** box, select the test procedure from a drop-down list.
5. In the **Test Method** box, select the test method from a drop-down list.
6. In the **Acceptance Criteria** box, select the acceptance criteria from a drop-down list.
7. In the **Surface Condition** box, enter the condition of the surface.
8. In the **Dwell Time** box, enter dwell time range.
9. In the **Surface Temperature** box, enter the surface temperature value.
10. In the **Cleaner** box, select the cleaner from a drop-down list.
11. In the **Penetrant** box, select the penetrant from a drop-down list.
12. In the **Developer** box, select the developer from a drop-down list.
13. In the **Material Specification** box, enter the material specification.
14. In the **Material Thickness** box, enter the material thickness value.
15. In the **Development Time** box, enter the time for development.
16. In the **Welding Process** box, enter the type of welding process.
17. In the **Examination Stage** box, select the examination stage from the specified options.
18. In the **Remarks** box, enter your remarks if any.
19. Click **Save PTLT Details**.

The PT after load test results are successfully updated. Once you have updated the PT results, you must import joints added for the PT after load test inspection results.

#### **6.4.3 Import Joints for PT After Load Test**

If you want to import joints for the updated PT after load test results,

1. Click [![image-1651991888610.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651991888610.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651991888610.png) (**Import Joints** button) in the **PT After Load Test Results** window. See Fig 6.4.1. The **Joints** window opens with a list of joints.
    
    [![image-1651991913384.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651991913384.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651991913384.png)
2. Select the joints you want to import.
3. Click [![image-1651991932082.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651991932082.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651991932082.png) (**Import Selected Joints** button).
    
    The selected joints are imported for the respective DPT results.

#### **6.4.4 Add Report Photos**

If you want to add any report photos for the updated PT after load test results,

1. Click [![image-1651991965975.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651991965975.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651991965975.png) (**ADD** button) in the **Report Photos** box in the **PT After Load Test Results** See Fig 6.4.1. [![image-1651991982159.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651991982159.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651991982159.png)
2. Click [![image-1651992000367.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992000367.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992000367.png) (**Browse** button) to browse a photo stored in your computer.
3. Click **Upload**.
    
    The selected photo will be updated.

#### **6.4.5 Attach a file into a PT After Load Test Report**

If you want to attach any file with any PT report listed in the **PT After Load Test Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.4.6 Print an NDT – PT After Load Test Report**

If you want to print an NDT – PT after load test report, click[![image-1651992108377.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992108377.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992108377.png)(print icon) provided in the **Report** column of the **PT After Load Test Report** page. See Fig 6.4.

#### **6.4.7 Edit Any PT After Load Test Report**

 If you want to edit any existing PT report in the **PT After Load Test Report** page, do the following,

1. Click [![image-1651992194889.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992194889.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992194889.png)(Edit icon) in the **Edit** column for the respective PT report. See Fig 6.4. A new window opens to edit the PT report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.4.8 Export PT after load test report list**

You can export a list of PT reports added in the **PT After Load Test Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **6.4.9 Filter Any PT After Load Test Report** 

If you want to filter any PT report, do one of the following,[![image-1651992271777.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992271777.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992271777.png)

1. If you want to filter any PT report based on the report number, enter the corresponding report number in the **Report No** box in the **PT After Load Test Report** page, and then Click **Search**.
2. If you want to filter any PT report based on the request number, enter the corresponding request number in the **Request No** box in the **PT After Load Test Report** page, and then Click **Search**.

If you want to filter any PT report based on the drawing number, enter the corresponding drawing number in the **Drawing No** box in the **PT After Load Test Report** page, and then Click **Search**.



### **6.5 Magnetic Particle Testing (MPT)**

MPT also referred to as Magnetic Particle Inspection is one of the NDT inspection methods used to detect defects or discontinuities such as cracks, at or near the surface in ferromagnetic metals such as iron, steel, nickel, cobalt and so on.

Once the MPT inspection request added in the [**<u>NDT Inspection Request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.8-ndt-inspection-r) tab, you can add the MPT inspection result details by using this **Magnetic Particle Testing (MPT)** tab**.** If you want to navigate **Magnetic Particle Testing (MPT)**,

1. Click the **Magnetic Particle Testing (MPT)** tab in the **Structural** menu. The **MT Report** page opens.
    
    [![image-1651992414838.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992414838.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992414838.png) **Figure 6.5: MT Report page**

#### **6.5.1 Add an MPT Report**

If you want to add an MPT report, do the following,

1. Click [![image-1651992467914.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992467914.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992467914.png) (**ADD** button) in the **MT Report** page. See Fig 6.5. A new window opens to add an MPT report.
    
    [![image-1651992480844.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992480844.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992480844.png)
    
    [![image-1651992491566.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992491566.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992491566.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651992511163.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992511163.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992511163.png) **Tip**: A report number for a new MPT report will be updated automatically in the **Report Number** box.
2. In the **NDT By** box, select the creation of NDT whether by third party or internal from a drop-down list.
3. In the **Request Number** box, select an MPT request number from a drop-down list.
4. In the **Prepared By** box, enter the name of a person who has prepared the MPT report.
5. In the **Prepared Date** box, select the prepared date of the MPT report.
6. In the **Reviewed By** box, enter the name of a person who has reviewed the MPT report.
7. In the **Reviewed Date** box, select the reviewed date of the MPT report.
8. In the **Approved By** boxes, enter the name of a person who has approved the MPT report.
9. In the **Approved Date** box, select the approved date of the MPT report.
10. In the **Rep. Accept Date** box, select the report accept date.
11. In the **Inspection Date** box, select the date of inspection.
12. In the **Job Done Report Number** box, enter the report number of completed inspection job.
13. In the **Job Completed Date** box, select the completed date of the inspection job.
14. Click **Save**.

The MPT report is successfully added. Once you have added the MPT report, you must add MPT results for the respective MPT report.

#### **6.5.2 Add MPT Results** 

If you want to add the MPT results for the respective MPT report, do the following,

1. Click the respective MPT report in the **MT Report** page. See Fig 6.5. The MPT Results window opens.
    
    [![image-1651992626683.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992626683.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992626683.png)
    
    [![image-1651992634124.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992634124.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992634124.png)
    
    [![image-1651992642609.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992642609.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992642609.png)
    
     **Figure 6.5.1: MPT Results page**
2. In the **Test Equipment** box, select the test equipment from a drop-down list.
3. In the **Description** box, enter the description.
4. In the **Test Procedure** box, select the test procedure from a drop-down list.
5. In the **Test Method** box, select the test method from a drop-down list.
6. In the **Black Magnetic Ink** box, select the type of black magnetic ink from a drop-down list.
7. In the **Surface Condition** box, enter the condition of the surface.
8. In the **Light Source** box, enter the light source detail.
9. In the **White Contrast Paint** box, select the type of white contrast paint.
10. In the **Material Specification** box, enter the material specification.
11. In the **Material Thickness** box, enter the material thickness value.
12. In the **Type of Current** box, enter the type of current.
13. In the **Lifting Capacity** box, select the lifting capacity value.
14. In the **Acceptance Criteria** box, select the acceptance criteria from a drop-down list.
15. In the **Yoke/ Prod Space** box, enter the relevant information.
16. In the **Particles Type** box, select the type of particles from a drop-down list.
17. In the **Particles Make &amp; model** box, enter the model of the particle including made of materials.
18. In the **Background Contrast &amp; Type** box, enter the type of background including contrast range.
19. In the ****Demagnetization**** box, if you want demagnetization select ****Yes**** otherwise select ****No****.
20. In the **Magnetizing Technique** box, enter the magnetizing technique.
21. In the **Surface Temperature** box, enter the surface temperature value.
22. In the **Calibration Sensitivity** box, enter the calibration sensitivity range.
23. In the **Method of Inspection** box, enter the inspection method.
24. In the **Code** box, enter the code detail.
25. In the **Color** box, select any color from the specified options.
26. In the **Suspension** box, select any suspension liquid from the specified options.
27. In the **Lighting** box, select any lighting from the specified options.
28. In the **Method** box, select any method from the specified options.
29. In the **Item Tested** box, select the tested items from the specified options.
30. In the **Examination Stage** box, select the examination stage from the specified options.
31. Click **Save MPT Details**.

The MPT results are successfully updated. Once you have updated the MPT results, you must import joints added for the MPT inspection results.

#### **6.5.3 Import Joints for MPT** 

If you want to import joints for the updated MPT results,

1. Click [![image-1651992843501.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992843501.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992843501.png) (**Import Joints** button) in the **MPT Results** See Fig 6.5.1. The **Joints** window opens with a list of joints.
    
    [![image-1651992855632.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992855632.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992855632.png)
2. Select the joints you want to import.
3. Click [![image-1651992877171.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992877171.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992877171.png) (**Import Selected Joints** button).
    
    The selected joints are imported for the respective MPT results.

#### **6.5.4 Add Report Photos**

If you want to add any report photos for the updated MPT results,

1. Click [![image-1651992927758.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992927758.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992927758.png) (**ADD** button) in the **Report Photos** box in the **MPT Results** window. See Fig 6.5.1. [![image-1651992937159.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992937159.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992937159.png)
2. Click [![image-1651992952724.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992952724.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992952724.png) (**Browse** button) to browse a photo stored in your computer.
3. Click **Upload**.

The selected photo will be updated.

#### **6.5.5 Attach a File into an MPT Report**

If you want to attach any file with any MPT report listed in the **MT Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.5.6 Print an NDT – MPT Report**

If you want to print an NDT - MPT report, click [![image-1651993041568.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651993041568.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651993041568.png) (print icon) provided in the **Report** column of the **MT Report** page. See Fig 6.5.

#### **6.5.7 Edit Any MPT Report**

 If you want to edit any existing MPT report in the **MT Report** page, do the following,

1. Click [![image-1651993088249.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651993088249.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651993088249.png)(Edit icon) in the **Edit** column for the respective MPT report. See Fig 6.5. A new window opens to edit the MPT report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.5.8 Export MPT Report List**

You can export a list of MPT reports added in the **MT Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **6.5.9 Filter Any MPT Report** 

If you want to filter any MPT report, do one of the following,[![image-1651993352168.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651993352168.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651993352168.png)

1. If you want to filter any MPT report based on the report number, enter the corresponding report number in the **Report No** box in the **MT Report** page, and then Click **Search**.
2. If you want to filter any MPT report based on the report number, enter the corresponding report number in the ****Report No**** box in the ****MT Report**** page, and then Click ****Search****.

If you want to filter any MPT report based on the drawing number, enter the corresponding drawing number in the **Drawing No** box in the **MT Report** page, and then Click **Search**.


### **6.6 MPI After Load Test (MPI)**

The **MPI After Load Test (MPI)** tab in the **Structural** menu helps you to add MPI results while performing the MPI inspection after completing the load test.

Once the MPI after load test inspection request added in the [**<u>NDT Inspection Request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.8-ndt-inspection-r) tab, you can add the MPI result details by using this **MPI After Load Test (MPI) tab**.** If you want to navigate **MPI After Load Test (MPI)**,

1. Click the **MPI After Load Test (MPI)** tab in the **Structural** menu. The **MPI Report** page opens.
    
    [![image-1652024082308.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652024082308.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652024082308.png)
    
     **Figure 6.6: MPI Report page**

#### **3.6.1 Add an MPI After Load Test Report**

If you want to add an MPI after load test report, do the following,

1. Click [![image-1652024140271.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652024140271.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652024140271.png) (**ADD** button) in the **MPI Report** page. See Fig 6.6. A new window opens to add an MPI after load test report.
    
    [![image-1652024153566.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652024153566.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652024153566.png)
    
    [![image-1652024165147.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652024165147.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652024165147.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1652024178795.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652024178795.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652024178795.png) **Tip**: A report number for a new MPI report will be updated automatically in the **Report Number** box.
2. In the ****NDT By**** box, select the creation of NDT whether by third party or internal from a drop-down list.
3. In the **Request Number** box, select an MPI request number after load test from a drop-down list.
4. In the ****Prepared By**** box, enter the name of a person who has prepared the MPI report after load test.
5. In the ****Prepared Date**** box, select the prepared date of the MPI report after load test.
6. In the ****Reviewed By**** box, enter the name of a person who has reviewed the MPI report after load test.
7. In the ****Reviewed Date**** box, select the reviewed date of the MPI report after load test.
8. In the ****Approved By**** boxes, enter the name of a person who has approved the MPI report after load test.
9. In the ****Approved Date**** box, select the approved date of the MPI report after load test.
10. In the **Rep. Accept Date** box, select the report accept date.
11. In the **Inspection Date** box, select the date of inspection.
12. In the **Job Done Report Number** box, enter the report number of completed inspection job.
13. In the **Job Completed Date** box, select the completed date of the inspection job.
14. Click **Save**.

The MPI report after load test is successfully added. Once you have added the MPI report, you must add MPI results for the respective MPI report.

#### **6.6.2 Add MPI Results** 

If you want to add the MPI results for the respective MPI report after load test, do the following,

1. Click the respective MPI report in the **MPI Report** page. See Fig 6.6. The MPI Results page opens.
    
    [![image-1652024590451.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652024590451.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652024590451.png)
    
    [![image-1652024601471.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652024601471.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652024601471.png)
    
     **Figure 6.6.1: MPI Results page**
2. In the **Test Equipment** box, select the test equipment from a drop-down list.
3. In the **Description** box, enter the description.
4. In the **Test Procedure** box, select the test procedure from a drop-down list.
5. In the **Test Method** box, select the test method from a drop-down list.
6. In the **Black Magnetic Ink** box, select the type of black magnetic ink from a drop-down list.
7. In the **Surface Condition** box, enter the condition of the surface.
8. In the **Light Source** box, enter the light source detail.
9. In the **White Contrast Paint** box, select the type of white contrast paint.
10. In the **Material Specification** box, enter the material specification.
11. In the **Material Thickness** box, enter the material thickness value.
12. In the **Type of Current** box, enter the type of current.
13. In the **Lifting Capacity** box, select the lifting capacity value.
14. In the **Acceptance Criteria** box, select the acceptance criteria from a drop-down list.
15. In the **Yoke/ Prod Space** box, enter the relevant information.
16. In the **Particles Type** box, select the type of particles from a drop-down list.
17. In the **Particles Make &amp; model** box, enter the model of the particle including made of materials.
18. In the **Background Contrast &amp; Type** box, enter the type of background including contrast range.
19. In the **Demagnetization** box, if you want demagnetization select **Yes** otherwise select **No**.
20. In the **Magnetizing Technique** box, enter the magnetizing technique.
21. In the **Surface Temperature** box, enter the surface temperature value.
22. In the **Remarks** box, enter your remarks if any.
23. Click **Save MPI Details**.

The MPI results are successfully updated. Once you have updated the MPI results, you must import joints added for the MPI inspection results.

#### **6.6.3 Import Joints for MPI**

If you want to import joints for the updated MPI results,

1. Click [![image-1652024814416.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652024814416.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652024814416.png) (**Import Joints** button) in the **MPI Results** See Fig 6.6.1. The **Joints** window opens with a list of joints.
    
    [![image-1652024827712.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652024827712.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652024827712.png)
2. Select the joints you want to import.
3. Click [![image-1652024850661.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652024850661.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652024850661.png) (**Import Selected Joints** button).
    
    The selected joints are imported for the respective MPI results.

#### **6.6.4 Add Report Photos**

If you want to add any report photos for the updated MPI results,

1. Click [![image-1652024937690.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652024937690.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652024937690.png) (**ADD** button) in the **Report Photos** box in the **MPI Results** See Fig 6.6.1. [![image-1652024947546.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652024947546.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652024947546.png)
2. Click [![image-1652024965904.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652024965904.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652024965904.png) (**Browse** button) to browse a photo stored in your computer.
3. Click **Upload**.
    
    The selected photo will be updated.

#### **6.6.5 Attach a File into an MPI Report**

If you want to attach any file with any MPI report listed in the **MPI Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.6.6 Print an NDT – MPI Report**

If you want to print an NDT - MPI report, click [![image-1652025151954.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652025151954.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652025151954.png) (print icon) provided in the **Report** column of the **MPI Report** page. See Fig 6.6.

#### **6.6.7 Edit Any MPI Report**

 If you want to edit any existing MPI report in the **MPI Report** page, do the following,

1. Click [![image-1652025191428.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652025191428.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652025191428.png) (Edit icon) in the **Edit** column for the respective MPI report. See Fig 6.6. A new window opens to edit the MPI report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.6.8 Export MPI Report List**

You can export a list of MPI reports added in the **MPI Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **6.6.9 Filter any MPI report** 

If you want to filter any MPI report, do one of the following,[![image-1652025264711.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652025264711.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652025264711.png)

1. If you want to filter any MPI report based on the report number, enter the corresponding report number in the **Report No** box in the **MPI Report** page, and then Click **Search**.
2. If you want to filter any MPI report based on the request number, enter the corresponding request number in the ****Request No**** box in the ****MPI Report**** page, and then Click ****Search****.
3. If you want to filter any MPI report based on the drawing number, enter the corresponding drawing number in the ****Drawing No**** box in the ****MPI Report**** page, and then Click ****Search****.



### **6.7 PWHT**

The **PWHT** tab in the **Structural** menu helps you to add a PWHT report after completing the PWHT inspection process. If you want to add a PWHT report, do the following,

Once the RFI request for PWHT added using the [<u>RFI Request for PWHT</u>](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.10%C2%A0-rfi-request-fo) tab, you can add the PWHT result details by using this **PWHT tab**.** If you want to navigate **PWHT**,

1. Click the **PWHT** tab in the **Structural** menu. The **PWHT Report** page opens.
    
    [![image-1652025363945.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652025363945.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652025363945.png)
    
     **Figure 6.7: PWHT Report page**

#### **9.7.1 Add a PWHT Report**

If you want to add a PWHT report, do the following,

1. Click [![image-1652025737782.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652025737782.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652025737782.png) (**ADD** button) in the **PWHT Report** page. See Fig 6.7. A new window opens to add a PWHT report.
    
    [![image-1652025753803.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652025753803.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652025753803.png)
    
    [![image-1652025807967.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652025807967.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652025807967.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1652025824772.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652025824772.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652025824772.png)**Tip**: A report number for a new PWHT report will be updated automatically in the **Report Number** box.
2. In the **NDT By** box, select the creation of NDT whether by third party or internal from a drop-down list.
3. In the **Request Number** box, select an RFI request for PWHT number from a drop-down list.
4. In the **Prepared By** box, enter the name of a person who has prepared the PWHT report.
5. In the **Prepared Date** box, select the prepared date of the PWHT report.
6. In the **Reviewed By** box, enter the name of a person who has reviewed the PWHT report.
7. In the **Reviewed Date** box, select the reviewed date of the PWHT report.
8. In the ****Accepted/ Approved By**** boxes, enter the name of a person who has approved the PWHT report.
9. In the **Accepted/ Approved Date** box, select the approved date of the PWHT report.
10. Click **Save**.

The PWHT report is successfully added. Once you have added the PWHT report, you must add PWHT result details for the respective PWHT report.

#### **6.7.2 Add PWHT Results** 

If you want to add the PWHT results for the respective PWHT report, do the following,

1. Click the respective PWHT report in the **PWHT Report** page. See Fig 6.7. The **PWHT Results** page opens.
    
    [![image-1652025939153.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652025939153.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652025939153.png)
    
     **Figure 6.7.1: PWHT Results page**
2. In the **Inspection Date** box, select the inspection date.
3. In the **Material Specification** box, enter the specification for the material.
4. In the **Speed** box, enter the speed range.
5. In the **HT Procedure No** box, select the HT procedure number.
6. In the **Heating Rate** box, enter the heating rate value.
7. In the **Holding (Temperature)** box, enter the holding temperature.
8. In the **Holding Time** box, enter the holding time value.
9. In the **Cooling Rate** box, enter the cooling rate value.
10. In the **Remarks** box, enter your remarks if any.
11. Click **Save PWHT Details**.

The PWHT results are successfully updated. Once you have updated the PWHT results, you can edit the joints added for the PWHT inspection results in the **Joint Results** window.

#### **6.7.3 Add Report Photos**

If you want to add any report photos for the updated PWHT results,

1. Click [![image-1652026076553.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652026076553.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652026076553.png) (**ADD** button) in the **Report Photos** box in the **PWHT Results** See Fig 6.7.1. [![image-1652026087869.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652026087869.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652026087869.png)
2. Click [![image-1652026109369.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652026109369.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652026109369.png) (**Browse** button) to browse a photo stored in your computer.
3. Click **Upload**.

The selected photo will be updated.

#### **6.7.4 Attach a File into a PWHT Report**

If you want to attach any file with any PWHT report listed in the **PWHT Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.7.5 Print a PWHT Report**

If you want to print a PWHT report, click [![image-1652026175817.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652026175817.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652026175817.png) (print icon) provided in the **Report** column of the **PWHT Report** page. See Fig 6.7.

#### **6.7.6 Edit Any PWHT Report**

 If you want to edit any existing PWHT report in the **PWHT Report** page, do the following,

1. Click [![image-1652026236129.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652026236129.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652026236129.png)(Edit icon) in the **Edit** column for the respective PWHT report. See Fig 6.7. A new window opens to edit the PWHT report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.7.7 Export PWHT Report List**

You can export a list of PWHT reports added in the **PWHT Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **6.7.8 Filter Any PWHT Report** 

If you want to filter any PWHT report, use [![image-1652026324516.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652026324516.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652026324516.png) (**FILTER** button) in the **PWHT Report** page, See Fig 6.7 or do one of the following, [![image-1652026338211.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652026338211.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652026338211.png)

1. If you want to filter any PWHT report based on the report number, enter the corresponding report number in the **Report No** box in the **PWHT Report** page, and then Click **Search**.
2. If you want to filter any PWHT report based on the request number, enter the corresponding request number in the ****Request No**** box in the ****PWHT Report**** page, and then Click ****Search****.
3. If you want to filter any PWHT report based on the drawing number, enter the corresponding drawing number in the **Drawing No** box in the **PWHT Report** page, and then Click **Search**.



### **6.8 Hydrostatic Report**

Hydrostatic testing is a type of pressure test where the materials are tested for strength and leaks. The **Hydrostatic Report** tab in the **Structural** menu helps you to add a hydrostatic pressure test report after completing the hydrostatic testing in the structural project.

If you want to add a hydrostatic pressure test report, do the following,

1. Click the **Hydrostatic Report** Tab. The **Hydrostatic Pressure Test Report** page opens.
    
    [![image-1652026453734.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652026453734.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652026453734.png)
    
     **Figure 6.8: Hydrostatic Pressure Test Report** **page**

#### **6.8.1 Add a Hydrostatic Pressure Test Report**

If you want to add a hydrostatic pressure test report,

1. Click [![image-1652026525840.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652026525840.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652026525840.png) (**ADD** button) in the **Hydrostatic Pressure Test Report** page. See Fig 6.8. A new window opens to add a hydrostatic pressure test report.
    
    [![image-1652026540997.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652026540997.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652026540997.png)
    
    [![image-1652026550510.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652026550510.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652026550510.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1652026565074.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652026565074.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652026565074.png)**Tip**: A report number for a new hydrostatic pressure test report will be updated automatically in the **Report Number** box.
2. In the **Drawing** box, select the drawing from a drop-down list.
3. In the ****Prepared By**** box, enter the name of a person who has prepared the hydrostatic pressure test report.
4. In the **Prepared Date** box, select the preparation date of the report.
5. In the ****Reviewed By**** box, enter the name of a person who has reviewed the hydrostatic pressure test report.
6. In the **Reviewed Date** box, select the reviewed date of the report.
7. In the **Approved By** box, enter the name of a person who has approved the hydrostatic pressure test report.
8. In the **Approved Date** box, select the approved date of the report.
9. Click **Save**.

The hydrostatic pressure test report is successfully added. Once you have added the hydrostatic pressure test report, you must add the pressure test result details for the added report.

#### **6.8.2 Add Pressure Test Results for an Added Hydrostatic Pressure Test Report**

If you want to add the details of pressure test results for the added hydrostatic pressure test report, do the following,

1. Click [![image-1652026694611.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652026694611.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652026694611.png) (Edit icon) in the **Edit Report** column of the **Hydrostatic Pressure Test Report** See Fig 6.8. Multiple windows open.
    
    [![image-1652026708096.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652026708096.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652026708096.png)
    
     **Figure 6.8.1: Pressure test results page**
2. If you want to add test parameters, do the following steps,
    
    
    1. 1. Navigate to the **Test Parameters** window. See Fig 6.8.1.
        2. In the **Test Pressure** box, enter the test pressure value.
        3. In the **Test Temperature** box, enter the test temperature value.
        4. In the **Item/Part** box, select any item/part from a drop-down list.
        5. In the **Test Medium** box, enter the test medium information.
        6. In the **Holding Period** box, enter the holding period value.
        7. In the **Design Pressure** box, enter the design pressure value.
        8. In the **Test Date** box, select the test date.
        9. In the **Position** box, enter the position detail.
        10. In the **Operating Pressure** box, enter the operating pressure value.
        11. In the **Hydrostatic Test (HT) Procedure No** box, enter the hydrostatic test procedure number.
        12. In the **Maximum Allowable Working Pressure (MAWP)** box, enter the maximum allowable working pressure value.
        13. In the ****Design Temperature**** box, enter the design temperature value.
        14. In the ****Maximum Allowable Pressure (MAP)****box, enter the maximum allowable pressure value.
        15. In the ****Results/ Remarks**** box, select the result from a drop-down list.
        16. In the **Chloride** box, enter the chloride value.
        17. In the **Actual Test Pressure** box, enter the actual test pressure value.
        18. In the **Test Location** box, enter the test location detail.
        19. In the **Test Observation** box, enter the test observation detail.
        20. In the **Test Code** box, select the test code from the specified options.
        21. Click **Save**.
            
            The test parameters are successfully added.
3. If you want to add equipment details, do the following steps, 
    1. 1. Navigate to the **Equipment Details** window. See Fig 6.8.1.
        2. In the ****Conducted By**** box, select any one option whether internal or external from a drop-down list.
        3. In the **Position** box, select the position from a drop-down list.
        4. In the **Equipment Details** box, select the equipment from a drop-down list.
        5. Click **Save**.
            
            The equipment details are successfully added.
4. If you want to add test record, do the following,
    
    
    1. 1. Navigate to the **Test Records** window. See Fig 6.8.1.
        2. In the **Time** box, enter the time duration of testing.
        3. In the **PG- Bottom** box, enter the pressure value in the bottom of the bars.
        4. In the **PG- Top** box, enter the pressure value in the top of the bars.
        5. In the **Water** box, enter the temperature of the water.
        6. In the **Air** box, enter the temperature of the air.
        7. In the **Remarks** box, enter your remarks if any.
        8. Click **Save**.
            
            The test records are added successfully.
5. If you want to add report photos, do the following,
    
    
    1. 1. Navigate to the **Report Photos** window. See Fig 6.8.1.
        2. Click [![image-1652027036155.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027036155.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027036155.png) (**ADD** button) in the **Report Photos** window.
            
            [![image-1652027053497.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027053497.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027053497.png)
        3. Click (****Browse**** button) to browse a photo stored in your computer.
        4. Click **Upload**.
            
            The selected photo will be updated.

#### **6.8.3 Print a Hydrostatic Pressure Test Report**

If you want to print a hydrostatic pressure test report, click[![image-1652027120652.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027120652.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027120652.png) (print icon) provided in the **Report** column of the **Hydrostatic Pressure Test Report** page. See Fig 6.8.

#### **6.8.4 Print a Hydrostatic Pressure Test Report with Certificates**

If you want to print a hydrostatic pressure test report with certificates, click [![image-1652027156165.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027156165.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027156165.png)(print icon) provided in the **Report** **with Certificates** column of the **Hydrostatic Pressure Test Report** page. See Fig 6.8.

#### **6.8.5 Attach a File into a Hydrostatic Pressure Test Report**

If you want to attach any file with any hydrostatic pressure test report listed in the **Hydrostatic Pressure Test Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.8.6 Edit Any Hydrostatic Pressure Test Report**

If you want to edit any existing hydrostatic pressure test report in the **Hydrostatic Pressure Test Report** page, do the following,

1. Click [![image-1652027232973.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027232973.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027232973.png)(Edit icon) in the **Edit** column for the respective hydrostatic pressure test report. See Fig 6.8.
    
    A new window opens to edit the hydrostatic pressure test report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.



### **6.9 Vacuum Test**

Vacuum test performed to check for the existence of any leak in the materials utilized in the Structural project. The **Vacuum Test** tab in the **Structural** menu helps you to add a vacuum test report once the vacuum test has completed.

If you want to add a vacuum test report, do the following,

1. Click the **Vacuum Test** Tab. The **Vacuum Test** page opens.
    
    [![image-1652027304515.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027304515.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027304515.png)
    
     **Figure 6.9: Vacuum Test** **page**

#### **6.9.1 Add a Vacuum Test Report**

If you want to add a vacuum test report,

1. Click [![image-1652027605837.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027605837.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027605837.png) (**ADD** button) in the **Vacuum Test Report** page. See Fig 6.9. A new window opens to add a vacuum test report.
    
    [![image-1652027640696.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027640696.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027640696.png)
    
    [![image-1652027661534.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027661534.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027661534.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1652027680045.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027680045.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027680045.png) **Tip**: A report number for a new vacuum test report will be updated automatically in the **Report Number** box.
2. In the **Description** box, enter the description for the vacuum test.
3. In the **Sub-System** box, select the sub-system from a drop-down list.
4. In the **Inspection Date** box, select the inspection date.
5. In the **Frame No** box, enter the frame number.
6. In the **Elevation** box, enter the elevation detail.
7. In the **Longitudinal** box, enter the longitudinal detail.
8. In the **Location** box, enter the location where the vacuum test is performed.
9. In the **Drawing No** box, select the drawing number from a drop-down list.
10. In the **Sub Contractor** box, select the sub-contractor from a drop-down list.
11. In the **Remarks** box, enter your remarks if any.
12. Click **Save**.

The vacuum test report is successfully added.

#### **6.9.2 Submit and Approve a Vacuum Test Report**

Once you have added the vacuum test report, the **Submission** column in the **Vacuum Test** page is appeared with [![image-1652027790673.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027790673.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027790673.png) (Submit and Reject icons).

1. If you want to submit the vacuum test report, click [![image-1652027811581.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027811581.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027811581.png) (Submit icon) in the **Submission** column. Otherwise click [![image-1652027820882.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027820882.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027820882.png)(Reject icon) to reject the request. Once you have submitted the vacuum test report, the **Request Status** column in the **Vacuum Test** page is appeared with [![image-1652027841004.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027841004.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027841004.png)(Accept and Reject icons).
2. If you want to approve the vacuum test report, click [![image-1652027878917.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027878917.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027878917.png) (Submit icon) in the ****Request Status**** Otherwise click [![image-1652027887313.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027887313.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027887313.png)(Reject icon) to reject the request.

#### **6.9.3 Print a Vacuum Test Report**

If you want to print a vacuum test report, click [![image-1652027921149.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027921149.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027921149.png) (print icon) provided in the **Report** column of the **Vacuum Test Report** page. See Fig 6.9.

#### **6.9.4 Attach a File into a Vacuum Test Report**

If you want to attach any file with any vacuum test report listed in the **Vacuum Test** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.9.5 Edit Any Vacuum Test Report**

If you want to edit any existing vacuum test report in the **Vacuum Test** page, do the following,

1. Click [![image-1652027997598.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027997598.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027997598.png)(Edit icon) in the **Edit** column for the respective vacuum test report. See Fig 6.9. A new window opens to edit the vacuum test report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.9.6 Export Vacuum Test Report List**

You can export a list of vacuum test reports added in the **Vacuum Test** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **6.9.7 Filter Any Vacuum Test Report**

If you want to filter any vacuum test report from the list of in the **Vacuum Test** page, you can use the [![image-1652028071435.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028071435.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028071435.png) (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.


### **6.10 Back-Gouging**

Back-gouging is a removing process performed to remove weld metal and base metal from the weld root side by grinding, gas cutting or by using gouging electrode.

The **Back-Gouging** tab in the **Structural** menu helps you to add a back-gouging report once the back-gouging process has completed. If you want to add a back-gouging report, do the following,

1. Click the **Back-Gouging** Tab. The **Back-Gouging** page opens.
    
    [![image-1652028169487.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028169487.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028169487.png)
    
     **Figure 6.10: Back-Gouging page**

#### **6.10.1 Add a Back-Gouging Report**

If you want to add a back-gouging report,

1. Click [![image-1652028254343.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028254343.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028254343.png) (**ADD** button) in the B**ack-Gouging** page. See Fig 6.10. A new window opens to add a back-gouging report.
    
    [![image-1652028276185.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028276185.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028276185.png)
    
    [![image-1652028285653.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028285653.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028285653.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1652028301208.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028301208.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028301208.png) **Tip**: A report number for a new back-gouging report will be updated automatically in the **Report Number** box.
2. In the **Description** box, enter the description for the back-gouging.
3. In the **Sub-System** box, select the sub-system from a drop-down list.
4. In the **Inspection Date** box, select the inspection date.
5. In the **Frame No** box, enter the frame number.
6. In the **Elevation** box, enter the elevation detail.
7. In the **Longitudinal** box, enter the longitudinal detail.
8. In the **Location** box, enter the location where the back-gouging is performed.
9. In the **Drawing No** box, select the drawing number from a drop-down list.
10. In the **Sub Contractor** box, select the sub-contractor from a drop-down list.
11. In the **Remarks** box, enter your remarks if any.
12. Click **Save**.

The back-gouging report is successfully added.

#### **6.10.2 Add Back-Gouging Report Photos**

1. Click [![image-1652028400682.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028400682.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028400682.png) (Edit icon) in the **Edit Report** column of the **Back-Gouging** page. See Fig 6.10. The **Report Photos** box opens.
    
    [![image-1652028419255.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028419255.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028419255.png)
2. Click [![image-1652028432824.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028432824.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028432824.png) (**ADD** button) in the **Report Parameters** box.
    
    [![image-1652028468290.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028468290.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028468290.png)
3. Click [![image-1652028486070.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028486070.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028486070.png) (**Browse** button) to browse a photo stored in your computer.
4. Click **Upload**.

The selected photo will be updated.

#### **6.10.3 Submit and Approve a Back-Gouging Report**

Once you have added the back-gouging report, the **Submission** column in the **Back-Gouging** page is appeared with [![image-1652028570280.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028570280.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028570280.png)(Submit and Reject icons).

1. If you want to submit the back-gouging report, click [![image-1652028589685.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028589685.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028589685.png)(Submit icon) in the **Submission** column. Otherwise click [![image-1652028599840.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028599840.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028599840.png) (Reject icon) to reject the request.
    
    Once you have submitted the back-gouging report, the **Request Status** column in the **Back-Gouging** page is appeared with (Accept and Reject icons).
2. If you want to approve the back-gouging report, click [![image-1652028628364.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028628364.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028628364.png)(Submit icon) in the ****Request Status**** Otherwise click [![image-1652028636624.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028636624.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028636624.png)(Reject icon) to reject the request.

#### **6.10.4 Print a Back-Gouging Report**

If you want to print a back-gouging report, click[![image-1652028668149.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028668149.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028668149.png)(print icon) provided in the **Report** column of the **Back-Gouging** page. See Fig 6.10.

#### **6.10.5 View the Back-Gouging Signature Details** 

If you want to view the signature details of the persons who has completed the back-gouging, click [![image-1652028713712.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028713712.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028713712.png)(Sign icon) provided in the **Sign Details** column of the **Back-Gouging** page. See Fig 6.10.

#### **6.10.6 Attach a File into a Back-Gouging Report**

If you want to attach any file with any back-gouging report listed in the **Back-Gouging** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.10.7 Edit Any Back-Gouging Report**

If you want to edit any existing back-gouging report in the **Back-Gouging** page, do the following,

1. Click [![image-1652028803775.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028803775.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028803775.png)(Edit icon) in the **Edit** column for the respective back-gouging report. See Fig 6.10. A new window opens to edit the back-gouging report.
    
    [![image-1652028821255.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028821255.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028821255.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.10.8 Export Back-Gouging Report List**

You can export a list of back-gouging reports added in the **Back-Gouging** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **6.10.9 Filter Any Back-Gouging Report**

If you want to filter any back-gouging report from the list of in the **Back-Gouging** page, you can use the (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.


### **6.11 Final Visual** 

Visual testing is one of methods of NDT of optical type. Final visual testing is usually performed with the naked eye or with magnifying glasses (magnifiers) with magnification up to 7x.

The **Final Visual** tab in the **Structural** menu helps you to add a final visual test report after completing the final visual test. If you want to add a final visual test report, do the following,

1. Click the **Final Visual** Tab. The **Final Visual Test** page opens.
    
    [![image-1652028936757.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028936757.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028936757.png)
    
     **Figure 6.11: Final Visual Test page**

#### **6.11.1 Add a Final Visual Test Report**

If you want to add a final visual test report,

1. Click [![image-1652028997630.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028997630.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028997630.png) (**ADD** button) in the **Final Visual Test page. See Fig 6.11. A new window opens to add a final visual test report.
    
    [![image-1652029012910.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652029012910.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652029012910.png)
    
    [![image-1652029023886.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652029023886.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652029023886.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **Report Number** box, enter the report number for the final visual test.
3. In the **Description** box, enter the description for the final visual test.
4. In the **System** box, select the system from a drop-down list.
5. In the **Inspection Date** box, select the inspection date.
6. In the **Frame No** box, enter the frame number.
7. In the **Elevation** box, enter the elevation detail.
8. In the **Longitudinal** box, enter the longitudinal detail.
9. In the **Location** box, enter the location where the final visual test is performed.
10. In the **Drawing No** box, select the drawing number from a drop-down list.
11. In the **Assessment Checklist** box, enter the assessment checklist detail.
12. In the **Checklist No** box, select the check list number from a drop-down list.
13. In the **Discipline** box, enter the discipline detail.
14. In the **Site** box, enter the site detail.
15. In the **Contractor** box, enter the name of a contractor.
16. In the **Sub Contractor** box, select the sub-contractor from a drop-down list.
17. In the **Module No** box, enter the module number.
18. In the **Area/ Component** box, enter the area/ component detail.
19. In the **Stage of Completion** box, select the stage of completion of visual test from the given options.
20. In the **Document Type** box, enter the type of document.
21. In the **Class** box, enter the class detail.
22. In the **Status** box, enter the status of the visual test.
23. In the **Rev. Date** box, enter the revision date of the visual test.
24. In the **Contractor Document Number** box, enter the document number of the contractor.
25. In the **Equipment** box, enter the equipment name.
26. In the **Inspector/ Representative** box, enter the name of inspector/ representative.
27. In the **Detail Description/Tagging** box, enter the detail description.
28. In the **Remarks** box, enter your remarks if any.
29. Click **Save**.
    
    The final visual test report is successfully added.

#### **6.11.2 View Checklist Details**

If you want to view the check list details, do the following,

1. Click [![image-1652029207861.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652029207861.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652029207861.png) (Add icon) in the **Edit** column for the respective final visual test report in the **Final Visual Test**  See Fig 6.11. The **Check List Details** window opens.
    
    [![image-1652029227467.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652029227467.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652029227467.png)
    
    The **Check List Details** window shows a list of added check lists using the [<u>Check List</u>](#_Check_List) tab. This window also shows the results of check list whether accepted or not.

#### **6.11.3 Submit and Approve a Final Visual Test Report**

Once you have added the visual test report, the **Request Status** column in the **Final** **Visual Test** page is appeared with[![image-1652029276973.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652029276973.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652029276973.png)(Submit and Reject icons).

1. If you want to submit the visual test report, click [![image-1652029305930.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652029305930.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652029305930.png)(Submit icon) in the **Request Status** column. Otherwise click [![image-1652029319325.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652029319325.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652029319325.png) (Reject icon) to reject the request.
    
    Once you have submitted the visual test report, the **Completed Status** column in the **Final Visual Test** page is appeared with [![image-1652029334379.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652029334379.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652029334379.png)(Accept and Reject icons).
2. If you want to approve the visual test report, click [![image-1652034360649.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652034360649.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652034360649.png)(Submit icon) in the ****Completed Status**** Otherwise click [![image-1652034368986.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652034368986.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652034368986.png)(Reject icon) to reject the request.

#### **6.11.4 Print a Final Visual Checklist Report**

If you want to print a final visual checklist report, click[![image-1652034420278.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652034420278.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652034420278.png)(print icon) provided in the **Checklist** **Report** column of the **Final Visual Test** page. See Fig 6.11.

#### **6.11.5 Print a General Visual Checklist Report**

If you want to print a general visual checklist report, click [![image-1652034456172.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652034456172.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652034456172.png)(print icon) provided in the **General Report** column of the **Final Visual Test** page. See Fig 6.11.

#### **6.11.6 Print a Final Visual Test Report**

If you want to print a final visual test report, click[![image-1652034511305.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652034511305.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652034511305.png)(print icon) provided in the **Report** column of the **Final Visual Test** page. See Fig 6.11.

#### **6.11.7 Attach a File into a Final Visual Test Report**

If you want to attach any file with any final visual test report listed in the **Final Visual Test** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.11.8 Edit Any Final Visual Test Report**

If you want to edit any existing final visual test report in the **Final Visual Test** page, do the following,

1. Click [![image-1652034604746.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652034604746.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652034604746.png)(Edit icon) in the **Edit** column for the respective final visual test report. See Fig 6.11. A new window opens to edit the final visual test report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.11.9 Export Final Visual Test Report List**

You can export a list of final visual test reports added in the **Final Visual Test** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **6.11.10 Filter Any Final Visual Test Report**

If you want to filter any visual test report from the list of in the **Final Visual Test** page, you can use the (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.


### **6.12 Machining Report**

The **Machining Report** tab in the **Structural** menu used to add a machining report once the machining process has completed. If you want to add a machining report, do the following,

1. Click the **Machining Report** Tab. The **Machining** page opens.
    
    [![image-1652034801414.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652034801414.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652034801414.png)
    
     **Figure 6.12: Machining page**

#### **6.12.1 Add a Machining Report**

If you want to add a machining report,

1. Click [![image-1652034863719.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652034863719.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652034863719.png) (**ADD** button) in the **Machining** page. See Fig 6.12. A new window opens to add a machining report.
    
    [![image-1652034883455.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652034883455.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652034883455.png)
    
    [![image-1652034896342.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652034896342.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652034896342.png) **Tip**: A report number for a new machining report will be updated automatically in the **Report Number** box.
2. In the **Remarks** box, enter your remarks if any.
3. Click **Save**.

The machining report is successfully added.

#### **6.12.2 Add Machining Report Details**

1. Click [![image-1652034965359.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652034965359.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652034965359.png)(Edit icon) in the **Edit Report** column of the **Machining** page. See Fig 6.12. The **Machining Report Details** window opens.
    
    [![image-1652034981315.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652034981315.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652034981315.png)
2. Click [![image-1652035004879.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035004879.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035004879.png) (**ADD** button) in the **Machining Report Details** window.
    
    A new window opens in the **Drawing No** column.
    
    [![image-1652035021483.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035021483.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035021483.png)
3. In the ****Drawing No**** column, select the drawing number from a drop-down list.
4. In the **Piece Mark No** column, click and select the piece mark number from a drop-down list.
5. In the **Description** column, click and enter the description.
6. In the **Material Grade** column, click and enter the material grade.
7. In the ****Hole Before Line Boring (mm)****column, enter the size of a hole made before line boring.
8. In the **Hole After Line Boring (mm)** column, enter the size of a hole made after line boring.
9. In the **Deviation** column, enter the deviation between holes.
10. In the **Inspection Date** column, select the inspection date.
11. In the **Remarks** column, enter your remarks if any.
12. Click **Save**.

The added machining report details will be updated.

#### **6.12.3 Submit and Approve a Machining Report**

Once you have added the machining report details, the **Submission** column in the **Machining** page is appeared with[![image-1652035192415.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035192415.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035192415.png) (Submit and Reject icons).

1. If you want to submit the machining report, click [![image-1652035161967.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035161967.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035161967.png) (Submit icon) in the **Submission** Otherwise click [![image-1652035182259.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035182259.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035182259.png)(Reject icon) to reject the request. Once you have submitted the machining report, the **Request Status** column in the **Machining** page is appeared with
    
    [![image-1652035259166.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035259166.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035259166.png)(Accept and Reject icons).
2. If you want to approve the machining report, click [![image-1652035273434.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035273434.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035273434.png)(Submit icon) in the **Request Status** column. Otherwise click
    
    [![image-1652035284857.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035284857.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035284857.png) (Reject icon) to reject the request.
3. If you have completed the machining report, click [![image-1652035313097.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035313097.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035313097.png)(Completed icon) in the **Completed** **Status** column. If incomplete, click [![image-1652035325959.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035325959.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035325959.png) (Incomplete icon).

#### **6.12.4 Print a Machining Report**

If you want to print a machining report, click[![image-1652035362855.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035362855.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035362855.png)(print icon) provided in the **Report** column of the **Machining** page. See Fig 6.12.

#### **6.12.5 Attach a File into a Machining Report**

If you want to attach any file with any machining report listed in the **Machining** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.12.6 Edit Any Machining Report**

If you want to edit any existing machining report in the **Machining** page, do the following,

1. Click [![image-1652035434175.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035434175.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035434175.png)(Edit icon) in the **Edit** column for the respective machining report. See Fig 6.12. A new window opens to edit the machining report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.12.7 Export Machining Report List**

You can export a list of machining reports added in the **Machining** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **6.12.8 Filter any machining report**

If you want to filter any machining report from the list in the **Machining** page, you can use the (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.



### **6.13 Load Test Report**

The **Load Test Report** tab in the **Structural** menu used to add a load test report once the load test has completed. If you want to add a load test report, do the following,

1. Click the **Load Test Report** Tab. The **Load Test Report** page opens.
    
    [![image-1652035600195.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035600195.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035600195.png)
    
     **Figure 6.13: Load Test Report page**

#### **6.13.1 Add a Load Test Report**

If you want to add a load test report,

1. Click [![image-1652035688811.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035688811.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035688811.png) (**ADD** button) in the **Load Test Report** page. See Fig 6.13. A new window opens to add a load test report.
    
    [![image-1652035715846.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035715846.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035715846.png)
    
    [![image-1652035726023.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035726023.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035726023.png) **Tip**: A report number for a new load test report will be updated automatically in the **Report Number** box.
2. In the **Prepared By** box, enter the name a person who has prepared the load test report.
3. In the **Prepared Date** box, enter the prepared date of the load test report.
4. In the **Reviewed By** box, enter the name a person who has reviewed the load test report.
5. In the **Reviewed Date** box, enter the reviewed date of the load test report.
6. In the **Approved By** box, enter the name a person who has approved the load test report.
7. In the **Approved Date** box, enter the approved date of the load test report.
8. Click **Save**.

The load test report is successfully added. Once you have added the load test report, you must add the details for the added report.

#### **6.13.2 Add Load Test Report Details** 

1. Click [![image-1652035815704.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035815704.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035815704.png)(Edit icon) in the **Edit Report** column of the **Load Test Report**  See Fig 6.14. The **Load Test Parameters**, **Equipment Details**, and **Report Photos** windows open in the **Load Test Report** page.
    
    [![image-1652035839349.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035839349.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035839349.png)
2. If you want to add the load test parameters in the ****Load Test Parameters**** window, do the following, 
    1. 1. 1. In the **Load Test Pressure Required** box, enter the required range of load test pressure.
            2. In the **Test Load** box, enter the test load detail.
            3. In the **Test Duration** box, enter the load test time duration.
            4. In the **Pressure Gauge Reading** box, enter the pressure gauge reading value.
            5. In the **Hydraulic Jack System S/N** box, enter the hydraulic jack system detail.
            6. In the **Pull up Jack Capacity** box, enter the value of pull up jack capacity.
            7. In the **Document Procedure No** box, select the document procedure number from a drop-down list.
            8. In the **Description of Items** box, enter the item description.
            9. In the **Reference Drawing** box, enter the reference drawing detail.
            10. In the **Client Reference Drawing No** box, enter the client reference drawing number.
            11. In the **Load Test Pressure Requirement** box, enter the requirement for load test pressure.
            12. In the **Actual Pressure Requirement** box, enter the requirement for actual pressure.
            13. In the **Holding Time** box, enter the holding time duration.
            14. In the **Result** box, select the result from a drop-down list.
            15. Click **Save**.
3. If you want to add the equipment details in the ****Equipment Details**** window, do the following, 
    1. 1. 1. Click [![image-1652035992474.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035992474.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035992474.png) (****ADD**** button) in the ****Equipment Details**** window. A new window opens to add the equipment details.
                
                [![image-1652036038406.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652036038406.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652036038406.png)
            2. In the **Conducted By** box, select **Internal** if the load test is conducted internally or select **External** if the load test is conducted externally.
            3. In the **Equipment Details** box, select the equipment from a drop-down list.
            4. Click **Save**.
4. If you want to add the report photos in the **Report Photos** window, do the following, 
    1. 1. 1. Click [![image-1652036087252.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652036087252.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652036087252.png) (**ADD** button) in the **Report Photos** window.
                
                [![image-1652036081886.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652036081886.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652036081886.png)
            2. Click [![image-1652036107417.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652036107417.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652036107417.png) (**Browse** button) to browse a photo stored in your computer.
            3. Click **Upload**.
                
                The selected photo will be updated.

#### **6.13.3 Print a Load Test Report**

If you want to print a load test report, click [![image-1652036218554.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652036218554.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652036218554.png)(print icon) provided in the **Report** column of the **Load Test Report** page. See Fig 6.13.

[![image-1652036232278.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652036232278.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652036232278.png) **Tip**: If you want to lock any load test report, click the check box provided in the **Lock Report?** column of the **Load Test Report** page. See Fig 6.13.

#### **6.13.4 Attach a File into a Load Test Report**

If you want to attach any file with any load test report listed in the **Load Test Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](#_Attach_a_file)” in the **Client Master Drawing** section.

#### **6.13.5 Edit Any Load Test Report**

If you want to edit any existing load test report in the **Load Test Report** page, do the following,

1. Click [![image-1652036689318.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652036689318.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652036689318.png)(Edit icon) in the **Edit** column for the respective load test report. See Fig 6.13. A new window opens to edit the load test report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **6.13.6 Export Load Test Report List**

You can export a list of load test reports added in the **Load Test Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](#_Export_areas_list)” in the **Area** option.

### **6.14 Survey Booking**

Survey Booking is an enhanced survey booking process, which helps the surveyors to manage their survey requirements more efficiently with respect to time and scope.

The **Survey Booking** tab in the **Structural** menu helps in adding a survey booking once the survey booking process has completed.

If you want to add a survey booking, do the following,

1. Click the **Survey Booking** Tab. The **Survey Booking** page opens.
    
    [![image-1652036984277.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652036984277.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652036984277.png)
    
     **Figure 6.14: Survey Booking page**

#### **6.14.1 Add a Survey Booking**

If you want to add a survey booking,

1. Click [![image-1652037090632.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652037090632.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652037090632.png) (**ADD** button) in the **Survey Booking** page. See Fig 6.15. A new window opens to add a survey booking.
    
    [![image-1652037226578.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652037226578.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652037226578.png)
2. In the **Surveyor** box, enter the name of a surveyor.
3. In the ****Survey Date**** box, select the survey date from a drop-down list.
4. In the **Authority** box, enter the name of authority person.
5. In the **Client Rep** box, enter the name of the client representative.
6. In the **Location** box, enter the location where the survey to be performed.
7. Click **Save**.

The survey booking is successfully added.

#### **6.14.2 Add Survey Booking Details**

1. Click [![image-1652037653290.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652037653290.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652037653290.png) (Edit icon) in the **Edit Report** column of the **Survey Booking**  See Fig 6.14. The **Survey Booking Details** window opens.
    
    [![image-1652037676250.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652037676250.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652037676250.png)
2. Click [![image-1652037732440.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652037732440.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652037732440.png) (**ADD** button) in the **Survey Booking Details** window.
    
    A new window opens to add the survey booking details.
    
    [![image-1652037763898.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652037763898.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652037763898.png)
3. In the **Time** box, select the survey time.
4. In the **Description** box, enter the description for the survey booking.
5. In the ****Trade**** box, enter the trade detail.
6. In the ****Type**** box, enter the type of survey.
7. In the ****QC Code**** box, enter the QC code.
8. In the ****Location**** box, enter the location where the survey is to be performed.
9. In the ****Drawing No**** box, select the drawing number from a drop-down list.
10. In the ****For CTR**** box, enter the CTR detail.
11. In the ****For RG/ CA**** box, enter the RG/ CA detail.
12. In the ****Requested By**** box, enter the name of a person who has requested for the survey booking.
13. In the ****For CPY**** box, enter the CPY detail.
14. In the **Sub Contractor** box, select the sub-contractor name from a drop-down list.
15. In the **Remarks** column, enter your remarks if any.
16. Click **Save**.

The survey booking details will be updated.

#### **6.14.3 Print a Survey Booking Report**

If you want to print a survey booking report, click [![image-1652038207770.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652038207770.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652038207770.png)(print icon) provided in the **Report** column of the **Survey Booking** page. See Fig 6.14.

#### **6.14.4 Attach a File into a Survey Booking**

If you want to attach any file with any survey booking listed in the **Survey Booking** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](#_Attach_a_file)” in the **Client Master Drawing** section.

#### **6.14.5 Edit Any Survey Booking**

If you want to edit any existing survey booking in the **Survey Booking** page, do the following,

1. Click [![image-1652038274986.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652038274986.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652038274986.png) (Edit icon) in the **Edit** column for the respective survey booking. See Fig 6.14. A new window opens to edit the survey booking.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.14.6 Export Survey Booking List**

You can export a list of survey booking added in the **Survey Booking** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](#_Export_areas_list)” in the **Area** option.

#### **6.14.7 Filter Any Survey Booking**

If you want to filter any survey booking from the list in the **Survey Booking** page, you can use the [![image-1652038364954.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652038364954.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652038364954.png) (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.


### **6.15 Dimensional Control Report**

Dimensional control used to determine part-to-part variation and clearance between two parts of material. By applying Dimensional Control, accurate three-dimensional information can be determined and mapped at various stages throughout the Structural project.

The **Dimensional Control Report** tab in the **Structural** menu used to add a dimensional control report once the dimensional control has completed. If you want to add a dimensional control report, do the following,

1. Click the **Dimensional Control Report** Tab. The **Dimensional Control Report** page opens.
    
    [![image-1652038426047.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652038426047.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652038426047.png)
    
     **Figure 6.15: Dimensional Control Report page**

#### **6.15.1 Add a dimensional control report**

If you want to add a dimensional control report,

1. Click [![image-1652038481610.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652038481610.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652038481610.png) (**ADD** button) in the **Dimensional Control Report**  See Fig 6.15. A new window opens to add a dimensional control report.
    
    [![image-1652038499123.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652038499123.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652038499123.png)
    
    [![image-1652038517464.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652038517464.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652038517464.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1652038529623.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652038529623.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652038529623.png) **Tip**: A report number for a new dimensional control report will be updated automatically in the **Report Number** box.
2. In the **Drawing** box, select the drawing from a drop-down list.
3. In the **Prepared By** box, enter the name a person who has prepared the dimensional control report.
4. In the **Prepared Date** box, enter the prepared date of the dimensional control report.
5. In the **Reviewed By** box, enter the name a person who has reviewed the dimensional control report.
6. In the **Reviewed Date** box, enter the reviewed date of the dimensional control report.
7. In the **Approved By** box, enter the name a person who has approved the dimensional control report.
8. In the **Approved Date** box, enter the approved date of the dimensional control report.
9. Click **Save**.

The dimensional control report is successfully added. Once you have added the dimensional control report, you must add the details for the added dimensional control report.

#### **6.15.2 Add Dimensional Control Report Details** 

1. Click [![image-1652038626257.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652038626257.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652038626257.png) (Edit icon) in the **Edit Report** column of the **Dimensional Control Report**  See Fig 6.15. The **<u>D</u>imensional Control Parameters**, **<u>D</u>imensional Control Details**, and **Report Photos** windows open in the **<u>D</u>imensional Control Report** page.
    
    [![image-1652038646861.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652038646861.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652038646861.png)
    
    [![image-1652038661379.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652038661379.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652038661379.png)
    
    [![image-1652038672058.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652038672058.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652038672058.png) **Tip**: If you want to add any notes for dimensional control report, you can add in the **Notes** window provided in the **<u>D</u>imensional Control Report** page.
2. If you want to add the dimensional control parameters in the ****D****imensional Control Parameters**** window, do the following, 
    1. 1. 1. In the **Date of Survey** box, enter the survey date.
            2. In the **Time** box, enter the survey time.
            3. In the **Weather** box, enter the weather details.
            4. In the **Temp C** box, enter the temperature control value.
            5. In the ****Location**** box, enter the location where the dimensional control is to be performed
            6. In the **Instrument** box, select the instrument from a drop-down list.
            7. In the **Description** box, enter the description for dimensional control.
            8. In the **Status** box, enter the status for dimensional control.
            9. Click **Save**.
3. If you want to add the dimensional control details in the **Dimensional Control Details** window, do the following,
    
    
    1. 1. 1. Click [![image-1652038799188.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652038799188.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652038799188.png) (****ADD**** button) in the ****Dimensional Control Details**** window. Boxes opens in the respective columns to add the dimensional control details.
                
                [![image-1652038880049.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652038880049.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652038880049.png)
                
                [![image-1652038915645.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652038915645.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652038915645.png) **Tip**: You can add multiple dimensional control result details by using the **ADD** button. If you want to order the added details, use the up and down symbols in the **Order By** column.
            2. In the **Symbol/ Description** column, enter the symbol or description for the dimensional control.
            3. In the **Drawing** column, enter the drawing detail.
            4. In the **Tolerance** column, enter the tolerance value.
            5. In the **Actual** column, enter the actual value.
            6. In the **Result** column, enter the result for the dimensional control.
            7. In the **Remarks** column, enter your remarks if any.
            8. Click **Save Changes**.
4. If you want to add the report photos in the ****Report Photos**** window, do the following, 
    1. 1. 1. Click [![image-1652038993773.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652038993773.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652038993773.png) (**ADD** button) in the **Report Photos** window.
                
                [![image-1652039009541.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652039009541.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652039009541.png)
            2. Click [![image-1652039023301.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652039023301.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652039023301.png) (**Browse** button) to browse a photo stored in your computer.
            3. Click **Upload**.
                
                The selected photo will be updated.

#### **6.15.3 Print a Dimensional Control Report**

If you want to print a dimensional control report, click [![image-1652039097349.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652039097349.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652039097349.png)(print icon) provided in the **Report** column of the **Dimensional Control** **Report** page. See Fig 6.15.

#### **6.15.4 Attach a File into a Dimensional Control Report**

If you want to attach any file with any dimensional control report listed in the **Dimensional Control** **Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.15.5 Edit Any Dimensional Control Report**

If you want to edit any existing dimensional control report in the **Dimensional Control** **Report** page, do the following,

1. Click [![image-1652039222474.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652039222474.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652039222474.png)(Edit icon) in the **Edit** column for the respective dimensional control report. See Fig 6.15. A new window opens to edit the dimensional control report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.15.6 Export Dimensional Control Report List**

You can export a list of dimensional control reports added in the **Dimensional Control** **Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.


### **6.16 Trail Fit Report**

Trail Fit report prepared to send the trail fit-up photos once the trail fit-up has completed. The **Trail Fit Report** tab in the **Structural** menu used to add a trail fit report. If you want to add a trail fit report, do the following,

1. Click **Trail Fit Report** in the **Structural** menu. The **Trail Fit Report** page opens. [![image-1652039316791.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652039316791.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652039316791.png)
    
     **Figure 6.16: Trail Fit Report page**

#### **6.16.1 Add a Trail Fit Report**

If you want to add a trail fit report,

1. Click [![image-1652039377787.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652039377787.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652039377787.png) (**ADD** button) in the **Trail Fit Report** page. See Fig 6.16. A new window opens to add a trail fit report.
    
    [![image-1652039414571.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652039414571.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652039414571.png)
    
    [![image-1652039430813.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652039430813.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652039430813.png) **Tip**: A report number for a new trail fit report will be updated automatically in the **Report Number** box.
2. In the ****Prepared By**** box, enter the name a person who has prepared the trail fit report.
3. In the **Prepared Date** box, enter the prepared date of the trail fit report.
4. In the **Reviewed By** box, enter the name a person who has reviewed the trail fit report.
5. In the **Reviewed Date** box, enter the reviewed date of the trail fit report.
6. In the **Approved By** box, enter the name a person who has approved the trail fit report.
7. In the **Approved Date** box, enter the approved date of the trail fit report.
8. Click **Save**.

The trail fit report is successfully added. Once you have added the trail fit report, you must add the trail fit details for the added trail fit report.

#### **6.16.2 Add Trail Fit Report Details** 

1. Click [![image-1652039531457.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652039531457.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652039531457.png) (Edit icon) in the **Edit Report** column of the **Trail Fit** **Report**  See Fig 6.16. The **Report Photos** window opens in the **Trail Fit** **Report** page.
    
    [![image-1652039547712.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652039547712.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652039547712.png)
    
    [![image-1652039569533.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652039569533.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652039569533.png) **Tip**: If you want to add any remarks for trail fit report, you can add in the **Remarks** window provided in the **Trail Fit** **Report** page.
2. If you want to add the report photos in the **Report Photos** window, do the following,
    
    
    1. 1. Click [![image-1652039599062.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652039599062.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652039599062.png) (**ADD** button) in the **Report Photos** window.
            
            [![image-1652039609077.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652039609077.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652039609077.png)
        2. Click [![image-1652039632753.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652039632753.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652039632753.png) (**Browse** button) to browse a photo stored in your computer.
        3. Click **Upload**.
            
            The selected photo will be updated.

#### **6.16.3 Print a Trail Fit Report**

If you want to print a trail fit report, click [![image-1652039696442.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652039696442.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652039696442.png) (print icon) provided in the **Report** column of the **Trail Fit** **Report** page. See Fig 6.16.

[![image-1652039751225.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652039751225.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652039751225.png) **Tip**: If you want to lock any trail fit report, click the check box provided in the **Lock Report?** column of the **Trail Fit Report** page. See Fig 6.16.

#### **6.16.4 Attach a File into a Trail Fit Report**

If you want to attach any file with any trail fit report listed in the **Trail Fit Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.16.5 Edit Any Trail Fit Report**

If you want to edit any existing trail fit report in the **Trial Fit Report** page, do the following,

1. Click [![image-1652039899804.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652039899804.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652039899804.png)(Edit icon) in the **Edit** column for the respective trail fit report. See Fig 3.16. A new window opens to edit the trail fit report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.16.6 Export Trail Fit Report List**

You can export a list of trail fit reports added in the **Trail Fit Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.


### **6.17 Heat Straightening Report**

Heat straightening is a repair procedure in which controlled heat is applied in specific patterns to the plastically deformed regions of damaged material in repetitive heating and cooling cycles to gradually straighten the material.

The **Heat Straightening Report** tab in the **Structural** menu used to add a heat straightening report once the heat straightening process has completed. If you want to add a heat straightening report, do the following,

1. Click the **Heat Straightening Report** Tab. The **Heat Straightening Report** page opens.
    
    [![image-1652040040963.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652040040963.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652040040963.png)
    
     **Figure 6.17: Heat Straightening Report page**

#### **6.17.1 Add a Heat Straightening Report**

If you want to add a heat straightening report,

1. Click [![image-1652040202665.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652040202665.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652040202665.png) (**ADD** button) in the **Heat Straightening Report**  See Fig 6.17. A new window opens to add a heat straightening report.
    
    [![image-1652040215343.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652040215343.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652040215343.png)
    
    [![image-1652040226440.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652040226440.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652040226440.png) **Tip**: A report number for a new heat straightening report will be updated automatically in the **Report Number** box.
2. In the **Description** box, enter the description for the heat straightening report.
3. In the **Description** box, enter the description for the heat straightening report.
4. In the **Prepared Date** box, enter the prepared date of the heat straightening report.
5. In the **Prepared Date** box, enter the prepared date of the heat straightening report.
6. In the **Reviewed Date** box, enter the reviewed date of the heat straightening report.
7. In the **Approved By** box, enter the name a person who has approved the heat straightening report.
8. In the ****Approved Date**** box, enter the approved date of the heat straightening
9. Click **Save**.

The heat straightening report is successfully added. Once you have added the heat straightening report, you must add the heat straightening details for the added report.

#### **6.17.2 Add Heat Straightening Details** 

1. Click [![image-1652040473971.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652040473971.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652040473971.png)(Edit icon) in the **Edit Report** column of the **Heat Straightening Report** page. See Fig 6.17. The **Report Parameters** and **Report Photos** windows open in the **Heat Straightening Report** page.
    
    [![image-1652040495655.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652040495655.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652040495655.png)
2. If you want to add the report parameters in the **Report Parameters** window, do the following, 
    1. 1. Click [![image-1652040588764.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652040588764.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652040588764.png) (**ADD** button) in the **Report Parameters** window.
        2. In the **Description** box, enter the description for heat straightening.
        3. In the **Size** box, enter the thickness of the material.
        4. In the **Start** **Time** box, enter the start time of heat straightening.
        5. In the **End Time** box, enter the end time of heat straightening.
        6. In the **Temperature** box, enter the temperature range for heat straightening.
        7. In the **Length** box, enter the length of material to do heat straightening.
        8. In the **Heating Speed** box, enter the heating speed of heat straightening.
        9. In the **Cycle** box, enter the detail of heat straightening cycle.
        10. In the **Remarks** box, enter your remarks if any.
        11. Click **Save**.
3. If you want to add the report photos in the **Report Photos** window, do the following,
    
    
    1. 1. Click [![image-1652040633894.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652040633894.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652040633894.png) (**ADD** button) in the **Report Photos** window.
            
            [![image-1652040643621.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652040643621.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652040643621.png)
        2. Click [![image-1652040661294.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652040661294.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652040661294.png) (**Browse** button) to browse a photo stored in your computer.
        3. Click **Upload**.
            
            The selected photo will be updated.

#### **6.17.3 Print a Heat Straightening Report**

If you want to print a heat straightening report, click[![image-1652040740042.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652040740042.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652040740042.png)(print icon) provided in the **Report** column of the **Heat Straightening Report** page. See Fig 6.17.

#### **6.17.4 Attach a File into a Heat Straightening Report**

If you want to attach any file with any heat straightening report listed in the **Heat Straightening Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

### **6.17.5 Edit Any Heat Straightening Report**

If you want to edit any existing heat straightening report in the **Heat Straightening Report** page, do the following,

1. Click [![image-1652040830944.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652040830944.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652040830944.png) (Edit icon) in the **Edit** column for the respective heat straightening report. See Fig 6.17. A new window opens to edit the heat straightening report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.17.6 Export Heat Straightening Report List 

You can export a list of heat straightening reports added in the **Heat Straightening Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.


### **6.18 Inspection Release Note**

Inspection Release Note is a written announcement which is issued by QC contractor to denote the successful completion of the inspection.

The **Inspection Release Note** tab in the **Structural** menu used to add an inspection release note after completion of the inspection. If you want to add an inspection release note, do the following,

1. Click the **Inspection Release Note** Tab. The **Release Form** page opens.
    
    [![image-1652040963563.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652040963563.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652040963563.png)
    
     **Figure 6.18: Release Form page**

#### **6.18.1 Add an Inspection Release Note**

If you want to add an inspection release note,

1. Click [![image-1652041151175.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652041151175.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652041151175.png) (**ADD** button) in the **Release Form** page. See Fig 6.18. A new window opens to add an inspection release note.
    
    [![image-1652041167463.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652041167463.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652041167463.png)
    
    [![image-1652041183324.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652041183324.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652041183324.png) **Tip**: A report number for a new inspection release note will be updated automatically in the **Report Number** box.
2. In the **Activity** box, select the activity from a drop-down list.
3. In the **Prepared By** box, enter the name a person who has prepared the inspection release note.
4. In the **Prepared Date** box, enter the prepared date of the inspection release note.
5. In the **Reviewed By** box, enter the name a person who has reviewed the inspection release note.
6. In the **Reviewed Date** box, enter the reviewed date of the inspection release note.
7. In the **Approved By** box, enter the name a person who has approved the inspection release note.
8. In the ****Approved Date**** box, enter the approved date of the inspection release note.
9. Click **Save**.

The inspection release note is successfully added. Once you have added the inspection release note, you must add the details for the added note.

#### **6.18.2 Add Inspection Release Note Details** 

1. Click [![image-1652041374618.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652041374618.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652041374618.png)(Edit icon) in the **Edit Report** column of the **Release Form**  See Fig 6.18. The **Release Form Parameters**, **Details**, and **Report Photos** windows open in the **Release Form** page.
    
    [![image-1652041408835.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652041408835.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652041408835.png)
2. If you want to add the release form parameters in the ****Release Form Parameters**** window, do the following, 
    1. 1. In the **Test Package No** box, enter the test package number.
        2. In the **Tag ID** box, enter the tag ID number.
        3. In the **Activity** box, enter the activity detail.
        4. In the ****Comments**** box, enter any comments relevant to the inspection release note.
        5. Click **Save**.
3. If you want to add the release note details in the ****Details**** window, do the following, 
    1. 1. Click [![image-1652041487140.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652041487140.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652041487140.png) (**ADD** button) in the **Details** window.
            
            A new window opens to add the release note details.
            
            [![image-1652041519404.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652041519404.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652041519404.png)
        2. In the **Description** box, enter the description for the inspection release note.
        3. If the company’s QC contractor issues the inspection release note, select the check box provided with the **QC Contractor/ Company** and select the date in the respective **Date** box.
        4. If the company’s QC contractor issues the inspection release note, select the check box provided with the **QC Contractor/ Company** and select the date in the respective **Date** box.
        5. Click **Save**.
4. If you want to add the report photos in the ****Report Photos**** window, do the following, 
    1. 1. Click [![image-1652041617005.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652041617005.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652041617005.png) (**ADD** button) in the **Report Photos** window.
            
            [![image-1652041643105.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652041643105.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652041643105.png)
        2. Click [![image-1652041659019.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652041659019.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652041659019.png) (****Browse**** button) to browse a photo stored in your computer.
        3. Click **Upload.**

The selected photo will be updated.

#### **6.18.3 Print an Inspection Release Form Report**

If you want to print an inspection release form report, click [![image-1652041726928.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652041726928.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652041726928.png)(print icon) provided in the **Report** column of the **Release Form** page. See Fig 6.18.

[![image-1652041741059.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652041741059.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652041741059.png) **Tip**: If you want to lock any inspection release note, click the check box provided in the **Lock Report?** column of the **Release Form** page. See Fig 6.18.

#### **6.18.4 Attach a File into an Inspection Release Note**

If you want to attach any file with any inspection release note listed in the **Release Form** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.18.5 Edit Any Inspection Release Note**

If you want to edit any existing inspection release note in the **Release Form** page, do the following,

1. Click [![image-1652041888095.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652041888095.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652041888095.png) (Edit icon) in the **Edit** column for the respective inspection release note. See Fig 6.18. A new window opens to edit the inspection release note.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.18.6 Export Inspection Release Note List**

You can export a list of inspection release notes added in the **Release Form** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **6.19 Shell Plate Rolling Report**

Shell Plate Rolling is a process of rolling different kinds of metal plates into a round or conical shape by using a plate rolling machine in the Structural project.

The **Shell Plate Rolling Report** tab in the **Structural** menu used to add a shell plate rolling report once the shell plate rolling process has completed. If you want to add a shell plate rolling report, do the following,

1. Click the **Shell Plate Rolling Report** Tab. The **Shell Plate Rolling Report page opens.
    
    [![image-1652042003752.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652042003752.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652042003752.png)
    
     **Figure 6.19: Shell Plate Rolling Report page.**

#### **6.19.1 Add a Shell Plate Rolling Report**

If you want to add a shell plate rolling report,

1. Click [![image-1652042137837.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652042137837.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652042137837.png) (**ADD** button) in the **Shell Plate Rolling** **Report**  See Fig 6.19. A new window opens to add a shell plate rolling report.
    
    [![image-1652042165785.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652042165785.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652042165785.png)
    
    [![image-1652042180519.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652042180519.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652042180519.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1652042209049.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652042209049.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652042209049.png) **Tip**: A report number for a new shell plate rolling report will be updated automatically in the **Report Number** box.
2. In the **Drawing** box, select the drawing from a drop-down list.
3. In the **Prepared By** box, enter the name a person who has prepared the shell plate rolling report.
4. In the **Prepared Date** box, enter the prepared date of the shell plate rolling report.
5. In the **Prepared Date** box, enter the prepared date of the shell plate rolling report.
6. In the **Reviewed By** box, enter the name a person who has reviewed the shell plate rolling report.
7. In the ****Reviewed Date**** box, enter the reviewed date of the shell plate rolling report.
8. In the ****Approved By**** box, enter the name a person who has approved the shell plate rolling report.
9. In the **Approved Date** box, enter the approved date of the shell plate rolling report.
10. Click **Save**.

The shell plate rolling report is successfully added. Once you have added the shell plate rolling report, you must add the details for the added report.

#### **6.19.2 Add Shell Plate Rolling Report Details** 

1. Click [![image-1652042478858.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652042478858.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652042478858.png)(Edit icon) in the **Edit Report** column of the **Shell Plate Rolling Report** page. See Fig 6.19. The **Shell Plate Rolling** **Details** and **Report Photos** windows open in the **Shell Plate Rolling** **Report** page.
    
    [![image-1652042500387.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652042500387.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652042500387.png)
    
    [![image-1652042516881.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652042516881.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652042516881.png)**Tip**: If you want to add any notes for the shell plate rolling report, you can add in the **Notes** window provided in the **Shell Plate Rolling** **Report** page.
2. If you want to add the shell plate rolling details in the ****Shell Plate Rolling Details**** window, do the following, 
    1. 1. 1. Click [![image-1652042564607.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652042564607.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652042564607.png) (****ADD**** button) in the ******Shell Plate Rolling Details window.******Boxes opens in the respective columns to add the shell plate rolling details.
                
                [![image-1652042590993.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652042590993.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652042590993.png)
            2. In the **PLATE HEAT NO** column, enter the heat number of the plate.
            3. In the **DATE** column, select the date when the shell plate rolling process is performed.
            4. In the **(S)** **EXTREME CURVATURE** column, enter the extreme curvature value for the respective **A SIDE** and **B SIDE** of the rolling plate.
            5. In the **(R)** **CURVATURE** column, enter the radius curvature value of the rolling plate.
            6. In the **LENGTH** column, enter the length of **C SIDE** and **D SIDE** of the rolling plate.
            7. In the **EDGE- PREPARATION** column, enter the root and angle values for **A, B, C,** and **D** **SIDES**, respectively.
            8. Click **Save Changes**.
3. If you want to add the report photos in the **Report Photos** window, do the following,
    
    
    1. 1. 1. Click [![image-1652042689944.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652042689944.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652042689944.png) (**ADD** button) in the **Report Photos** window.
                
                [![image-1652042706147.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652042706147.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652042706147.png)
            2. Click (****Browse**** button) to browse a photo stored in your computer.
            3. Click **Upload.**
                
                The selected photo will be updated.

#### **6.19.3 Print a Shell Plate Rolling Report**

If you want to print a shell plate rolling report, click[![image-1652042776179.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652042776179.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652042776179.png)(print icon) provided in the **Report** column of the **Shell Plate Rolling** **Report** page. See Fig 6.19.

#### **6.19.4 Attach a File into a Shell Plate Rolling Report**

If you want to attach any file with any shell plate rolling report listed in the **Shell Plate Rolling** **Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.19.5 Edit Any Shell Plate Rolling Report**

If you want to edit any existing shell plate rolling report in the **Shell Plate Rolling** **Report** page, do the following,

1. Click [![image-1652042866288.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652042866288.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652042866288.png) (Edit icon) in the **Edit** column for the respective shell plate rolling report. See Fig 6.19. A new window opens to edit the shell plate rolling report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.19.6 Export Shell Plate Rolling Report List**

You can export a list of shell plate rolling reports added in the **Shell Plate Rolling** **Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.



### **6.20 Deviation Request Report**

Deviation Report used to find out any deviations in the materials utilized in the Structural project. The **Deviation Request Report** tab in the **Structural** menu helps you to add a deviation request report.

If you want to add a deviation request report, do the following,

1. Click the **Deviation Request Report** Tab. The **Deviation Request Report page opens.
    
    [![image-1652043019256.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652043019256.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652043019256.png)
    
     **Figure 6.20: Deviation Request Report page**

#### **6.20.1 Add a Deviation Request Report** 

If you want to add a deviation request report,

1. Click [![image-1652043095016.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652043095016.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652043095016.png) (**ADD** button) in the **Deviation Request Report  See Fig 6.20. A new window opens to add a deviation request report.
    
    [![image-1652043111365.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652043111365.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652043111365.png)
    
    [![image-1652043125157.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652043125157.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652043125157.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1652043138881.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652043138881.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652043138881.png) **Tip**: A report number for a new deviation request report will be updated automatically in the **Report Number** box.
2. In the **Inspection Date** box, select the inspection date of the deviation request report.
3. In the ****Prepared By**** box, enter the name a person who has prepared the deviation request report.
4. In the **Prepared Date** box, enter the prepared date of the deviation request report.
5. In the ****Reviewed By**** box, enter the name a person who has reviewed the deviation request report.
6. In the **Reviewed Date** box, enter the reviewed date of the deviation request report.
7. In the **Reviewed Date** box, enter the reviewed date of the deviation request report.
8. In the **Approved Date** box, enter the approved date of the deviation request report.
9. Click **Save**.

The deviation request report is successfully added. Once you have added the deviation request report, you must add the details for the added deviation request.

[![image-1652043228212.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652043228212.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652043228212.png)**Tip**: If you want to add a copy of added deviation request report, click **Revision** in the **Revision** column of the **Deviation Request Report** page.

#### **6.20.2 Add Deviation Request Details** 

1. Click [![image-1652043298916.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652043298916.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652043298916.png)(Edit icon) in the **Edit Report** column of the **Deviation Request Report  See Fig 6.20. The **Material Clarification, Ref. Documents, Query Description, Attachments, Proposed Solutions,** and **Technip Response** windows open in the **Deviation Request Report** page.
    
    [![image-1652043333938.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652043333938.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652043333938.png)
    
    [![image-1652043347497.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652043347497.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652043347497.png)
    
    [![image-1652043360441.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652043360441.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652043360441.png)
    
    [![image-1652043369867.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652043369867.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652043369867.png)
2. To add the material clarification details, do the following,
    
    
    1. 1. 1. In the ****From**** and ****To**** boxes, enter details of deviation occurred up to which material.
            2. In the ****Impact**** box, if the deviation leads to the cost impact then select ****Cost Impact**** or if the deviation leads to the schedule impact then select ****Schedule Impact****.
            3. In the ****Criticality**** box, if there is need to correct the deviation in the materials immediately then select ****Urgent**** otherwise select ****Routine**** based on the deviation criticality.
            4. In the **Classification** box, if the classification of deviation is mandatory then select **Mandatory** otherwise select **Non- Mandatory**.
            5. In the ****Requirements**** box, if you need clarification for the deviations occurred then select ****Clarification**** otherwise select ****Change to Project Requirement****.
            6. Click **Save**.
3. To add reference documents of the material deviations,
    
    
    1. 1. 1. Click [![image-1652043488794.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652043488794.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652043488794.png) (****ADD**** button) in the  ****Documents**** window. A new window opens in the **Technip Document No** column to add the reference document number.
            2. Enter the revision detail for the reference document number in the ****Revision**** column.
            3. Enter the vendor document number in the **Vendor Document No** column.
            4. Enter the revision detail for the vendor document number in the **Revision** column.
            5. Click **Save Changes**.
4. If you want to add query description, you can add in the **Query Description** window.
5. To add any attachment for the deviation request report,
    
    
    1. 1. 1. Click [![image-1652043596005.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652043596005.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652043596005.png) (**ADD** button) in the **Attachments** window.
                
                A new window opens in the **Document No** column to add the number of a document to be attached.
            2. Enter the revision detail for the document number in the **Revision** column.
            3. Enter the title of the document in the **Title** column.
            4. Click **Save Changes**.
6. If you want to add the proposed solution details for the material deviation, you can add in the **Proposed Solutions** window.
7. If you want to add the proposed solution details for the material deviation, you can add in the **Proposed Solutions** window.

#### **6.20.3 Print a Deviation Request Report**

If you want to print a deviation request report, click[![image-1652043691026.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652043691026.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652043691026.png) (print icon) provided in the **Report** column of the **Deviation Request Report** page. See Fig 6.20.

#### **6.20.4 Attach a File into a Deviation Request Report**

If you want to attach any file with any deviation request report listed in the **Deviation Request Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.20.5 Edit Any Deviation Request Report**

If you want to edit any existing deviation request report in the **Deviation Request Report** page, do the following,

1. Click [![image-1652043784079.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652043784079.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652043784079.png)(Edit icon) in the **Edit** column for the respective deviation request report. See Fig 6.20. A new window opens to edit the deviation request report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.20.6 Export Deviation Request Report List**

You can export a list of deviation request reports added in the **Deviation Request** **Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.


### **6.21 Technical Query Report**

Technical query usually raised to get clarification on technical fault, which is occurred in the execution of the Structural project. The Technical query can be raised between site operations of the contractor and engineering team of the contractor.

The **Technical Query Report** tab in the **Structural** menu used to add a technical query report. If you want to add a technical query report, do the following,

1. Click the **Technical Query Report** Tab. The **Technical Query Report page opens.
    
    [![image-1652043929311.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652043929311.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652043929311.png)
    
     **Figure 6.21: Technical Query Report page**

#### **6.21.1 Add a Technical Query Report** 

If you want to add a technical query report,

1. Click [![image-1652044006507.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652044006507.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652044006507.png) (**ADD** button) in the **Technical Query Report page. See Fig 6.21. A new window opens to add a technical query report.
    
    [![image-1652044027139.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652044027139.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652044027139.png)
    
    [![image-1652044040343.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652044040343.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652044040343.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving. [![image-1652044196130.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652044196130.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652044196130.png)**Tip**: A report number for a new technical query report will be updated automatically in the **Report Number** box.
2. In the **Inspection Date** box, select the inspection date of the technical query report.
3. In the **Prepared By** box, enter the name a person who has prepared the technical query report.
4. In the ****Prepared Date**** box, enter the prepared date of the technical query report.
5. In the ****Reviewed By**** box, enter the name a person who has reviewed the technical query report.
6. In the ****Reviewed Date**** box, enter the reviewed date of the technical query report.
7. In the **Approved By** box, enter the name a person who has approved the technical query report.
8. In the ****Approved Date**** box, enter the approved date of the deviation request report.
9. Click ****Save.****

The technical query report is successfully added. Once you have added the technical query report, you must add the details for the added report.

[![image-1652044315613.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652044315613.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652044315613.png)**Tip**: If you want to add a copy of added technical query report, click **Revision** in the **Revision** column of the **Technical Query** **Report** page.

#### **6.21.2 Add Technical Query Report Details** 

1. Click [![image-1652044403145.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652044403145.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652044403145.png)(Edit icon) in the **Edit Report** column of the **Technical Query** **Report** See Fig 6.21. The **Material Clarification, Ref. Documents, Query Description, Attachments, Proposed Solutions,** and **Technip Response** windows open in the **Technical Query** **Report** page.
    
    [![image-1652044447645.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652044447645.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652044447645.png)[![image-1652044460024.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652044460024.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652044460024.png)
    
    [![image-1652044493495.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652044493495.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652044493495.png)
2. To add the material clarification details, do the following,
    
    
    1. 1. 1. In the **From** and **To** boxes, enter details of technical fault.
            2. In the ****Impact**** box, if the technical fault leads to the cost impact then select ****Cost Impact**** or if the technical fault leads to the schedule impact then select ****Schedule Impact****.
            3. In the ****Impact**** box, if the technical fault leads to the cost impact then select ****Cost Impact**** or if the technical fault leads to the schedule impact then select ****Schedule Impact****.
            4. In the ****Criticality**** box, if there is need to correct the technical fault immediately then select ****Urgent**** otherwise select ****Routine**** based on the technical fault criticality.
            5. In the ****Classification**** box, if the classification of technical fault is mandatory then select ****Mandatory**** otherwise select ****Non- Mandatory****.
            6. In the ****Requirements**** box, if you need clarification for the technical fault occurred then select ****Clarification**** otherwise select ****Change to Project Requirement****.
            7. Click **Save**.
3. To add reference documents of the technical fault,
    
    
    1. 1. 1. Click [![image-1652044678729.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652044678729.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652044678729.png) (**ADD** button) in the **Ref. Documents** window.
                
                A new window opens in the **Technip Document No** column to add the reference document number.
            2. Enter the revision detail for the reference document number in the **Revision** column.
            3. Enter the vendor document number in the **Vendor Document No** column.
            4. Enter the revision detail for the vendor document number in the **Revision** column.
            5. Click **Save Changes**.
4. If you want to add query description for technical fault, you can add in the ****Query Description**** window.
5. To add any attachment for the technical query report,
    
    
    1. 1. Click [![image-1652044785199.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652044785199.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652044785199.png) (**ADD** button) in the **Attachments** window.
            
            A new window opens in the **Document No** column to add the number of a document to be attached.
        2. Enter the revision detail for the document number in the **Revision** column.
        3. Enter the title of the document in the **Title** column.
        4. Click **Save Changes**.
6. If you want to add the proposed solution details for the technical fault, you can add in the **Proposed Solutions** window.
7. If you want to add the Technip response for the technical fault, you can add in the **Technip Response** window.

#### **6.21.3 Print a Technical Query Report**

If you want to print a technical query report, click[![image-1652044903649.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652044903649.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652044903649.png) (print icon) provided in the **Report** column of the **Technical Query** **Report** page. See Fig 6.22.

#### **6.21.4 Attach a File into a Technical Query Report**

If you want to attach any file with any technical query report listed in the **Technical Query Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.21.5 Edit Any Technical Query Report**

If you want to edit any existing technical query report in the **Technical Query Report** page, do the following,

1. Click [![image-1652045036774.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652045036774.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652045036774.png) (Edit icon) in the **Edit** column for the respective technical query report. See Fig 6.21. A new window opens to edit the technical query report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.21.6 Export Technical Query Report List**

You can export a list of technical query reports added in the Technical Query Report page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.



### **6.22 Electrical Continuity Report**

Electrical continuity test is a technique to check and verify the current flow in the metal paths. The **Electrical Continuity Report** tab in the **Structural** menu used to add an electrical continuity report after the completion of electrical continuity test.

If you want to add an electrical continuity report, do the following,

1. Click the **Electrical Continuity Report** Tab. The **Electrical Continuity Report page opens.
    
    [![image-1652045163507.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652045163507.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652045163507.png)
    
     **Figure 6.22: Electrical Continuity Report page**

#### **6.22.1 Add an Electrical Continuity Report**

If you want to add an electrical continuity report,

1. Click [![image-1652045230351.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652045230351.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652045230351.png) (**ADD** button) in the **Electrical Continuity Report**  See Fig 6.22. A new window opens to add an electrical continuity report.
    
    [![image-1652045286986.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652045286986.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652045286986.png)
    
    [![image-1652045317440.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652045317440.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652045317440.png) **Tip**: A report number for a new electrical continuity report will be updated automatically in the **Report Number** box.
2. In the ****Prepared By**** box, enter the name a person who has prepared the electrical continuity report.
3. In the **Prepared Date** box, enter the prepared date of the electrical continuity report.
4. In the ****Reviewed By**** box, enter the name a person who has reviewed the electrical continuity report.
5. In the **Reviewed Date** box, enter the reviewed date of the electrical continuity report.
6. In the **Approved By** box, enter the name a person who has approved the electrical continuity report.
7. In the ****Approved Dat e****box, enter the approved date of the electrical continuity report.
8. Click **Save**.

The electrical continuity report is successfully added. Once you have added the electrical continuity report, you must add the details for the added report.

#### **6.22.2 Add Electrical Continuity Report Details** 

1. Click [![image-1652045470699.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652045470699.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652045470699.png) (Edit icon) in the **Edit Report** column of the **Electrical Continuity** **Report**  See Fig 6.22. The **Electrical Continuity Parameters**, **Electrical Continuity**, and **Report Photos** windows open in the **Electrical Continuity** **Report** page.
    
    [![image-1652045492051.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652045492051.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652045492051.png)
    
    [![image-1652045508125.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652045508125.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652045508125.png) **Tip**: If you want to add any notes for the electrical continuity report, you can add in the **Notes** window provided in the **Electrical Continuity** **Report** page.
2. If you want to add the electrical continuity parameters in the ****Electrical Continuity Parameters**** window, do the following, 
    1. 1. 1. In the ****Item Measured**** box, enter the number of items, which are measured for electrical continuity.
            2. In the **Procedure No** box, enter the electrical continuity procedure number.
            3. Click **Save**.
3. If you want to add the electrical continuity details in the **Electrical Continuity** window, do the following, 
    1. 1. 1. Click [![image-1652045597409.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652045597409.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652045597409.png) (****ADD**** button) in the ******Electrical Continuity****** window. Boxes opens in the respective columns to add the electrical continuity details.
                
                [![image-1652046520219.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652046520219.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652046520219.png)
            2. In the **Location Test** column, enter the location test detail.
            3. In the ****Reading**** column, enter the electrical continuity reading values for the respective ****Reading 1**** and ****Reading 2****.
            4. In the ****Average Reading 1 and 2****columns, enter the average reading value.
            5. In the **Specification Requirement** column, enter the specification requirement detail.
            6. In the **Result** column, enter the result of the electrical continuity test.
            7. In the **Remarks** column, enter you remarks if any.
            8. Click **Save Changes**.
4. If you want to add the report photos in the ****Report Photos**** window, do the following, 
    1. 1. 1. Click [![image-1652046594768.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652046594768.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652046594768.png) (**ADD** button) in the **Report Photos** window.
                
                [![image-1652046606117.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652046606117.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652046606117.png)
            2. Click [![image-1652046623106.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652046623106.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652046623106.png) (**Browse** button) to browse a photo stored in your computer.
            3. Click **Upload**.
                
                The selected photo will be updated.

#### **6.22.3 Print an Electrical Continuity Report**

If you want to print an electrical continuity report, click[![image-1652046700590.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652046700590.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652046700590.png) (print icon) provided in the **Report** column of the **Electrical Continuity** **Report** page. See Fig 6.22.

#### **6.22.4 Attach a File into an Electrical Continuity Report**

If you want to attach any file with any electrical continuity report listed in the **Electrical Continuity Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.22.5 Edit Any Electrical Continuity Report**

If you want to edit any existing electrical continuity report in the **Electrical Continuity Report** page, do the following,

1. Click [![image-1652046842113.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652046842113.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652046842113.png)(Edit icon) in the **Edit** column for the respective electrical continuity report. See Fig 6.22. A new window opens to edit the electrical continuity report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.22.6 Export Electrical Continuity Report List**

You can export a list of electrical continuity reports added in the **Electrical Continuity Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.


### **6.23 Joint Summary Report**

The **Joint Summary report** tab in the **Structural** menu used to view a joint summary report. If you want to see a joint summary report,

1. Click the **Joint Summary Report** tab. A list of joint summary reports opens.
    
    [![image-1652046962819.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652046962819.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652046962819.png)
    
     **Figure 6.23: Joint Summary Report page**
    
    [![image-1652046988847.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652046988847.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652046988847.png) **Tip**: If you want to view a joint summary report for all projects, click the check box provided with the **All Projects** option.

#### **6.23.1 Export Joint Summary Report List**

You can export a list of joint summary reports in the **Joint Summary Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.


### **6.24 Joint Status Report (Skid)**

The **Joint Status Report (Skid)** tab in the **Structural** menu helps you to view a joint status report (Skid) based on an inspection status report.

If you want to view a joint status report (Skid),

1. Click the **Joint Status Report** **(Skid)** tab. A joint status report (Skid) opens.
    
    [![image-1652047103519.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652047103519.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652047103519.png)
    
     **Figure 6.24: Joint Status Report (Skid)** **page**

#### **6.24.1 Print a Joint Status Report (Skid)**

If you want to print a joint status report (Skid), use [![image-1652047182625.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652047182625.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652047182625.png) and [![image-1652047193157.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652047193157.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652047193157.png) (print icons) provided in the **Joint Status** **Report (Skid)** page. See Fig 6.24.

1. If you want to print the current page of the joint status report (Skid), click [![image-1652047219242.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652047219242.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652047219242.png) (print icon including the page number).
2. If you want to print all the pages of the joint status report (Skid), click [![image-1652047240540.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652047240540.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652047240540.png)(print icon).

#### **6.24.2 Export Joint Status Report (Skid) List**

You can export a joint status report (Skid) in the **Joint Status Report (Skid)** page in various formats by using the option [![image-1652047294521.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652047294521.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652047294521.png) provided in the upper right corner of the **Joint Status Report (Skid)** page.


### **6.25 Joint Status Report (Project)**

The **Joint Status Report (Project)** tab in the **Structural** menu helps you to view a joint status report (project) depends on the project type.

If you want to view a joint status report (project),

1. Click the **Joint Status Report** **(Project)** tab. A joint status report (project) opens.
    
    [![image-1652047361864.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652047361864.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652047361864.png)
    
     **Figure 9.25: Joint Status Report (Project) page**
2. In the **Project** box, select a project for which you want to view a joint status report (project), from a drop-down list.
    
    A joint status report (project) opens for the selected project.

#### **6.25.1 Print a Joint Status Report (Project)**

If you want to print a joint status report (project), use[![image-1652047446876.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652047446876.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652047446876.png) and [![image-1652047459582.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652047459582.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652047459582.png) (print icons) provided in the **Joint Status** **Report** **(Project)** page. See Fig 6.25.

1. If you want to print the current page of the joint status report (project), click [![image-1652047492141.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652047492141.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652047492141.png)(print icon including the page number).
2. If you want to print all the pages of the joint status report (project), click [![image-1652047511343.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652047511343.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652047511343.png)(print icon).

#### **6.25.2 Export Joint Status Report (Project) List**

You can export a joint status report (project) in the **Joint Status Report (Project)** page in various formats by using the option[![image-1652047561730.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652047561730.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652047561730.png) provided in the upper right corner of the **Joint Status Report (Project)** page.


### **6.26 Joint Status Report (Weekly)**

The **Joint Status Report (Weekly)** tab in the **Structural** menu helps you to view a joint status report (Weekly) on a weekly basis.

If you want to view a joint status report (Weekly),

1. Click the **Joint Status Report** **(Weekly)** tab. A joint status report (Weekly) opens.
    
    [![image-1652047779006.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652047779006.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652047779006.png)
    
     **Figure 6.26: Joint Status Report (Weekly) page**
2. In the **From Date** and **To Date** boxes, select the from and to dates in respectively.
3. Click **Go**.
    
    A joint status report (Weekly) opens for the selected dates.

#### **6.26.1 Print a Joint Status Report (Weekly)**

If you want to print a joint status report (Weekly), use [![image-1652047892172.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652047892172.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652047892172.png)and [![image-1652047908641.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652047908641.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652047908641.png) (print icons) provided in the **Joint Status** **Report** **(Weekly)** page. See Fig 6.26.

1. If you want to print the current page of the joint status report (Weekly), click [![image-1652047938697.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652047938697.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652047938697.png) (print icon including the page number).
2. If you want to print all the pages of the joint status report (Weekly), click [![image-1652047961932.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652047961932.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652047961932.png)(print icon).

#### **6.26.2 Export Joint Status Report (Weekly) List**

You can export a joint status report (Weekly) in the **Joint Status Report (Weekly)** page in various formats by using the option [![image-1652048047107.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652048047107.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652048047107.png) provided in the upper right corner of the **Joint Status Report (Weekly)** page.



### **6.27 Inspection Status Report**

Inspection Status Report shows the overall inspection reports such as from fit-up inspection status to NDT inspection status.

If you want to view an inspection status report, do the following,

1. Click the **Inspection Status Report** tab. The **Inspection Status Report** page opens.
    
    [![image-1652048124122.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652048124122.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652048124122.png)
    
    [![image-1652048131033.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652048131033.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652048131033.png)
    
    [![image-1652048138243.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652048138243.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652048138243.png)
    
    [![image-1652048143835.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652048143835.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652048143835.png)
    
     **Figure 6.27: Inspection Status Report page**
    
    The **Inspection Status Report** page contains joint information, RFI fit-up, RFI weld VI, and NDT inspection status.
2. In the **From Date** and **To Date** boxes, select the from and to dates in respectively.
3. Click **Search**.
    
    The inspection status report opens for the selected dates.
    
    [![image-1652048214170.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652048214170.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652048214170.png) **Tip**: If you want to view the inspection status report including the weld and NDT inspection date, click the check box provided with the **Weld Date/ NDT Date** option.

#### **6.27.1 Print an Inspection Status Report** 

If you want to print an inspection status report, use[![image-1652048273665.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652048273665.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652048273665.png) (print icon) provided in the **Inspection Status** **Report** page. See Fig 6.27.

#### **6.27.2 Export Inspection Status Report List**

You can export a list of inspection status report in the **inspection Status Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.



### **6.28 Weld Traceability Record**

The **Weld Traceability Record** tab in the **Structural** menu used to add and track a weld traceability record.

If you want add a weld traceability record, do the following,

1. Click the **Weld Traceability Record** tab. The **Weld Traceability Record** page opens.
    
    [![image-1652048387272.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652048387272.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652048387272.png)
    
     **Figure 6.28: Weld Traceability Record page**

#### **6.28.1 Add a Weld Traceability Record**

If you want to add a weld traceability record, do the following,

1. Click [![image-1652048479543.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652048479543.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652048479543.png) (**ADD** button) in the **Weld Traceability Record** page. See Fig 6.28. A new window opens to add a weld traceability record.
    
    [![image-1652048494833.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652048494833.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652048494833.png)
    
    [![image-1652048507407.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652048507407.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652048507407.png) **Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1652048538854.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652048538854.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652048538854.png) **Tip**: A report number for a new weld traceability record will be updated automatically in the **Report Number** box.
2. In the **Drawing Number** box, select a drawing number from a drop-down list.
3. In the **Date** box, enter the date of adding the weld traceability record.
4. In the **Prepared By** box, enter the name of a person who has prepared the weld traceability record.
5. In the **Prepared Date** box, select the prepared date of the weld traceability record.
6. In the **Reviewed By** box, enter the name of a person who has reviewed the weld traceability record.
7. In the **Reviewed Date** box, select the reviewed date of the weld traceability record.
8. In the **Approved By** boxes, enter the name of a person who has approved the weld traceability record.
9. In the ****Approved Date**** box, select the approved date of the weld traceability record.
10. If you want to display Not Applicable (NA) in any field instead of leaving as an empty one, select the **Is NA?** check box.
11. In the **Remarks** box, enter your remarks if any.
12. In the **Comments** box, enter your comments if any.
13. Click **Save**.
    
    The weld traceability record is successfully added.

#### **6.28.2 Print a Weld Traceability Report**

If you want to print a weld traceability report, click[![image-1652048718116.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652048718116.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652048718116.png) (print icon) provided in the **Report** column in the Weld Traceability Record page. See Fig 6.28.

#### **6.28.3 Attach a File into a Weld Traceability Record**

If you want to attach any file with the weld traceability record listed in the **Weld Traceability Record** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.28.4 Edit Any Weld Traceability Record** 

 If you want to edit any existing weld traceability record in the **Weld Traceability Record** page, do the following,

1. Click [![image-1652048863926.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652048863926.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652048863926.png)(Edit icon) in the **Edit** column for the respective weld traceability record. See Fig 6.28. A new window opens to edit the weld traceability record.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.28.5 Export Weld Traceability Record List**

You can export a list of weld traceability record added in the **Weld Traceability Record** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **6.28.6 Filter Any Weld Traceability Record**

If you want to filter any weld traceability record from the list in the **Weld Traceability Record** page, you can use the [![image-1652048966742.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652048966742.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652048966742.png) (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.



### **6.29 Weld Rejection Rate**

In Structural project, Weld Rejection Rate is the difference between the tested length and repair length of the welded material, which are calculated using RT and UT inspection. The Weld Rejection Rate is used to calculate the weld success rate.

The **Weld Rejection Rate** tab in the **Structural** menu shows a weld rejection rate report including weekly and cumulative weld success rate summary details.

If you want to view a weld rejection rate report,

1. Click the **Weld Rejection Rate** tab. The weld rejection rate report page opens.
    
    [![image-1652049050613.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049050613.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049050613.png)
    
     **Figure 9.29: Weld Rejection Rate Report page**
2. In the **Project** box, select a project for which you want to view a weld rejection rate report, from a drop-down list.
3. In the **From Date** and **To Date** boxes, select the from and to dates in respectively.
4. Click **Show Report**.
    
    The weld rejection rate report opens for the selected project.

#### **6.29.1 Print a Weld Rejection Rate Report**

If you want to print a weld rejection rate report, use[![image-1652049203474.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049203474.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049203474.png) and [![image-1652049212838.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049212838.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049212838.png) (print icons) provided in the **Weld Rejection Rate** **Report** page. See Fig 6.29.

1. If you want to print the current page of the weld rejection rate report, click [![image-1652049246147.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049246147.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049246147.png) (print icon including the page number).
2. If you want to print all the pages of the weld rejection rate report, click [![image-1652049266955.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049266955.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049266955.png) (print icon).

#### **6.29.2 Export Weld Rejection Rate Report** 

You can export the weld rejection rate report in various formats by using the option [![image-1652049322650.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049322650.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049322650.png) provided in the upper right corner of the **Weld Rejection Rate Report** page.


### **6.30 Weld Rejection Rate (MPI)**

In Structural project, Weld Rejection Rate (MPI) is the difference between the tested length of and repair length of the Complete Joint Penetration (CJP) and Fillet welding materials, which are calculated using MPI inspection. The Weld Rejection Rate is used to calculate the weld success rate.

The **Weld Rejection Rate** **(MPI)** tab in the **Structural** menu shows a weld rejection rate report including weekly and cumulative weld success rate summary details.

If you want to view a weld rejection rate report,

1. Click the **Weld Rejection Rate (MPI)** tab. The **Weld Rejection Rate Report** page opens.
    
    [![image-1652049397923.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049397923.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049397923.png)
2. In the **Project** box, select a project for which you want to view a weld rejection rate report, from a drop-down list.
3. In the **Report Type** box, select the report type from a drop-down list.
4. In the **From Date** and **To Date** boxes, select the from and to dates in respectively.
5. Click **Show Report**.
    
    The weld rejection rate report opens for the selected project.

#### **6.30.1 Print a Weld Rejection Rate Report**

If you want to print a weld rejection rate report, use [![image-1652049461136.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049461136.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049461136.png) and [![image-1652049473558.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049473558.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049473558.png) (print icons) provided in the **Weld Rejection Rate** **Report** page. See Fig 6.30.

1. If you want to print the current page of the weld rejection rate report, click [![image-1652049499294.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049499294.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049499294.png) (print icon including the page number).
2. If you want to print all the pages of the weld rejection rate report, click [![image-1652049520253.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049520253.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049520253.png) (print icon).

#### **6.30.2 Export Weld Rejection Rate Report** 

You can export the weld rejection rate report in various formats by using the option [![image-1652049571075.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049571075.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049571075.png) provided in the upper right corner of the **Weld Rejection Rate Report** page.


### **6.31 Inspection Progress Status Report**

The **Inspection Progress Status Report** tab in the **Structural** menu helps you to view an inspection progress status report depends on the project type.

If you want to view an inspection progress status report,

1. Click the **Inspection Progress Status Report** tab. The inspection progress status report page opens.
    
    [![image-1652049627996.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049627996.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049627996.png)
    
     **Figure 6.31: Inspection Progress Status Report page**
2. In the **Project** box, select a project for which you want to view an inspection progress status report, from a drop-down list.
3. Click **Show Report**.
    
    The inspection progress status report opens for the selected project.

#### **6.31.1 Print an Inspection Progress Status Report**

If you want to print an inspection progress status report, use [![image-1652049726649.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049726649.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049726649.png) and [![image-1652049737678.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049737678.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049737678.png) (print icons) provided in the **Inspection Progress Status** **Report** page. See Fig 6.31.

1. If you want to print the current page of the inspection progress status report, click [![image-1652049767881.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049767881.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049767881.png) (print icon including the page number).
2. If you want to print all the pages of the inspection progress status report, click [![image-1652049799140.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049799140.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049799140.png) (print icon).

#### **6.31.2 Export Inspection Progress Status Report** 

You can export the inspection progress status report in the **Inspection Progress Status Report** page in various formats by using the option [![image-1652049858780.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049858780.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049858780.png) provided in the upper right corner of the **Inspection Progress Status Report** page.


### **6.32 Welder Performance Report**

Welder performance report used to view the welder performance details. If you want to view a welder performance report, do the following,

1. Click the **Welder Performance** tab. The **Welder Performance Report** page opens.
    
    [![image-1652049909338.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049909338.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049909338.png)
    
     **Figure 6.32: Welder Performance Report page**
2. In the **Project** box, select a project for which you want to view a welder performance report, from a drop-down list.
3. In the **From Date** and **To Date** boxes, select the from and to dates in respectively.
4. In the **Joint type** box, select the joint type from a drop-down list.
5. Click **Load Report**.

The welder performance report opens for the selected project.

#### **6.32.1 Print a Welder Performance Report**

If you want to print a welder performance report, use [![image-1652050004576.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652050004576.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652050004576.png) and [![image-1652050014487.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652050014487.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652050014487.png) (print icons) provided in the **Welder Performance Report** page. See Fig 6.32.

1. If you want to print the current page of the welder performance report, click [![image-1652050038083.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652050038083.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652050038083.png) (print icon including the page number).
2. If you want to print all the pages of the welder performance report, click (print icon).

#### **6.32.2 Export Welder Performance Report** 

You can export the welder performance report in various formats by using the option [![image-1652050086168.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652050086168.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652050086168.png) provided in the upper right corner of the **Welder Performance Report** page.


### **6.33 Welder Statistic Report**

Welder Statistics Report shows the statistical data of the welders. If you want to view a welder statistics report, do the following,

1. Click the **Welder Statistic Report** tab in the **Structural** meu. The **Welder Statistic Report** page opens.
    
    [![image-1652050195567.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652050195567.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652050195567.png)
    
     **Figure 9.33: Welder Statistic Report page**
2. In the **From Date** and **To Date** boxes, select the from and to dates in respectively.
3. Click **Load Report**.

The welder statistic report opens for the selected dates.

#### **6.33.1 Print a Welder Statistic Report**

If you want to print a welder statistic report, use [![image-1652050275812.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652050275812.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652050275812.png)and [![image-1652050288670.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652050288670.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652050288670.png) (print icons) provided in the **Welder Statistic Report** page. See Fig 6.33.

1. If you want to print the current page of the welder statistic report, click [![image-1652050320148.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652050320148.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652050320148.png) (print icon including the page number).
2. If you want to print all the pages of the welder statistic report, click [![image-1652050340084.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652050340084.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652050340084.png)(print icon).

#### **6.33.2 Export Welder Statistic Report**

You can export the welder statistic report in various formats by using the option [![image-1652050401231.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652050401231.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652050401231.png)provided in the upper right corner of the **Welder Statistic Report** page.


### **6.34 Joint Summary Report (Detailed)**

Joint Summary Report (Detailed) used to track the detailed weld joints summary. Do the following steps to view a joint summary report,

1. Click the **Joint Summary Report (Detailed)** tab. The **Welding Summary Report** page opens. [![image-1652050462332.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652050462332.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652050462332.png)
    
    [![image-1652050476776.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652050476776.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652050476776.png)
    
     **Figure 6.34: Welding Summary Report page**

#### **6.34.1 Edit Joint Details**

If you want to edit the joint details in the welding summary details,

1. Click the respective joint number in the **Joint No** column of the **Welding Summary Report** page. The Joint Details window opens
    
    [![image-1652050572704.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652050572704.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652050572704.png)
2. Click [![image-1652050595820.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652050595820.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652050595820.png)(Edit icon) in the **Edit** column for the respective joint numbers of the columns where you want to make changes in the thickness of the weld joint, piece mark number, and heat number.
3. Edit the details in the respective columns.
4. Click **Save**.

#### **6.34.2 Print a Welding Summary Report**

If you want to print a welding summary report, use [![image-1652051286060.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652051286060.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652051286060.png) (print icon) provided in the **Welding Summary Report** page. See Fig 6.35.

#### **6.34.3 Export Welding Summary Report List**

You can export a list of welding summary reports added in the **Welding Summary Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

# Punch Lists

### **7.0 Punch Lists**

A punch list is a list of items or tasks that need to be done before a project is completed. The **Punch Lists** menu in the home page of the ***cuteQM*** app helps to create and view the punch lists in Structural project.

#### **7.1 Create a New Punch List**

If you want to create a punch list, do the following,

1. Click the **Create New Punch List** in the **Punch lists** menu. The **Create Punch** page opens. [![image-1652051542829.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652051542829.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652051542829.png)
    
     **Figure 7.1: Create Punch page**
2. In the **Modules** box, select any module from the given modules.
3. In the **Systems** box, select a system from a drop-down list.
4. In the **Sub-Systems** box, select a sub-system from a drop-down list.
5. In the **ITR No** box, enter the ITR number.
6. In the **Drawing No** box, enter the drawing number.
7. In the **Test Pack** box, select a test pack from a drop-down list.
8. In the **Tag No** box, enter the tag number.
9. In the **Reference Types** box, select the reference type from the given options.
10. In the **Select Project** box, select a project from a drop-down list.
11. In the **Category** box, select any category from the given categories such as **A**, **B**, and **C**.
    
    <table border="1" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.866%;">**A** - Item to be cleared before hydrostatic test.
    
    **B** - Item to be cleared after hydrostatic test.
    
    **C** - Item which can be cleared after hydrostatic test but before final acceptance of the whole plant.
    
    </td></tr></tbody></table>
12. In the **Type** box, select the type of punch such as whether internal or external.
13. In the **Item** box, enter the item details.
14. In the **Location** box, select a location from a drop-down list.
15. In the **Description/ Punch** box, enter the description for the punch list.
16. In the **Punch Raised From** box, select the detail such as from where the punch has been raised.
17. In the **Date Raised** box, select the date when the punch has been raised.
18. In the **Punch Raised** By box, enter the name of a person who has raised the punch.
19. In the **Responsible Dept** box, enter the department name, which is responsible for the punch.
20. In the **Responsible Person** box, enter the name of a person who is responsible for the punch.
21. In the **Expected Clearance** box, select the expected date of clearing the punch list.
22. Click **Save**.

The punch list is successfully added.

#### **7.1.11 Add report photos**

If you want to add any report photos for the punch list,

1. Click [![image-1652051763264.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652051763264.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652051763264.png) (**ADD** button) in the **Report Photos** box. [![image-1652051776205.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652051776205.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652051776205.png)
2. Click [![image-1652051794306.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652051794306.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652051794306.png) (**Browse** button) to browse a photo stored in your computer.
3. Click **Upload**.
    
    The selected photo will be updated.

### **7.2 View Punch Lists**

The **View Punch Lists** tab helps you to view and edit the punch list, which is added by using the **Create New Punch List** tab.

1. Click the **View Punch Lists** tab in the **Punch Lists** menu. The **Punch List** page opens with added punch lists.
    
    [![image-1652051850423.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652051850423.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652051850423.png)
    
     **Figure 7.2: Punch List page**
    
    [![image-1652051874994.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652051874994.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652051874994.png)**Note**: If you want to verify the added punch list item, click the check box provided in the **Verify** column.
    
     If you want to clear the added punch list item, click the check box provided in the **Clear** column.

#### **7.2.1 Print a Punch List Report**

If you want to print a punch list report, click (**Print** button) provided in the upper side of the **Punch List** page. See Fig 7.2.

#### **7.2.2 Attach a File into a Punch List**

If you want to attach any file with any punch list listed in the **Punch List** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **7.2.3 Edit Any Punch List**

If you want to edit any existing punch list in the **Punch List** page, click (Edit icon) in the **Edit** column for the respective punch list. See Fig 7.2. Edit the details in the respective box you want.

#### **7.2.4 Export Punch Lists**

You can export the punch lists added in the **Punch List** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **7.2.5 Filter Any Punch List**

If you want to filter any punch list in the **Punch List** page, you can use the [![image-1652052137050.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652052137050.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652052137050.png) (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.



### **7.3 Punch List Detail Report**

The **Punch List Detail Report** tab in the **Punch Lists** menu helps you to view a detailed report of the punch lists. To view the punch list detail report,

1. Click **Punch List Detail Report** in the **Punch Lists** menu. The **Punch List Detail Report** page opens.
    
    [![image-1652052208862.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652052208862.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652052208862.png)
    
     **Figure 7.3: Punch List Detail Report page**
2. In the **Modules** field, select **Piping** from the given modules.
3. In the **Systems** box, select a system from a drop-down list.
4. In the **Sub Systems** box, select a sub-system from a drop-down list.
5. In the **ITR No** box, enter the ITR number.
6. In the **Drawing** box, enter the drawing number.
7. In the **Category** box, select a category from a list.
8. In the **Status** box, select a status from a drop-down list.
9. In the **Punch Raised From** box, select a person who has raised the punch list.
10. In the **Responsible Party** box, select a responsible party from a drop-down list.
11. In the **Test Pack** box, select a test pack from a drop-down list.
12. In the **Tag No** box, enter the tag number.
13. In the **Raised Date** box, select a raised date of the punch list.
    
    The punch list report opens based on the selected data.

#### **7.3.1 Print Punch List Detail Report**

If you want to print the punch list detail report, use [![image-1652069116379.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652069116379.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652069116379.png)and [![image-1652069124035.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652069124035.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652069124035.png) (print icons) provided in the Punch List Detail Report page.

- If you want to print the current page of the punch list detail report, click [![image-1652069099724.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652069099724.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652069099724.png) (print icon including the page number).
- If you want to print all the pages of the punch list detail report, click [![image-1652069107885.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652069107885.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652069107885.png)(print icon).

#### **7.3.2 View Punch List Detail Report** 

You can view the punch list detail report in various formats by using the option [![image-1652069160264.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652069160264.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652069160264.png) provided in the upper right corner of the punch list detail report page.


### **7.4 Punch List System Report**

The **Punch List System Report** tab in the **Punch Lists** menu helps you to view a punch list system report. To view the punch list system report,

1. Click **Punch List System Report** in the **Punch Lists** menu. The **Punch List System Report** page opens.
    
    [![image-1652069207961.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652069207961.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652069207961.png)
    
     **Figure 7.4: Punch List System Report page**
2. In the **Modules** field, select **Piping** from the given modules.
3. In the **Systems** box, select a system from a drop-down list.
4. In the **Sub Systems** box, select a sub-system from a drop-down list.
    
    The punch list system report opens based on the selected data.

#### **7.4.1 Print Punch List System Report**

If you want to print the punch list system report, use [![image-1652069265200.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652069265200.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652069265200.png) and [![image-1652069273966.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652069273966.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652069273966.png)(print icons) provided in the Punch List system Report page.

1. If you want to print the current page of the punch list system report, click [![image-1652069306220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652069306220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652069306220.png) (print icon including the page number).
2. If you want to print all the pages of the punch list system report, click [![image-1652069321325.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652069321325.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652069321325.png)(print icon).

#### **7.4.2 View Punch List System Report** 

You can view the punch list system report in various formats by using the option [![image-1652069359546.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652069359546.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652069359546.png) provided in the upper right corner of the punch list system report page.


### **7.5 Punch List Sub System Report**

The **Punch List Sub System Report** tab in the **Punch Lists** menu helps you to view a punch list sub system report. To view the punch list sub system report,

1. Click **Punch List Sub System Report** in the ****Punch Lists**** menu. The **Punch List Sub System Report** page opens.
    
    [![image-1652070042852.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070042852.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070042852.png)
    
     **Figure 7.5: Punch List Sub System Report page**
2. In the **Modules** field, select **Piping** from the given modules.
3. In the **Systems** box, select a system from a drop-down list.
4. In the **Sub Systems** box, select a sub-system from a drop-down list.
    
    The punch list sub system report opens based on the selected data.

#### **7.5.1 Print Punch List Sub System Report**

If you want to print the punch list sub system report, use[![image-1652070103449.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070103449.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070103449.png) and [![image-1652070111749.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070111749.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070111749.png) (print icons) provided in the Punch List Sub System Report page.

1. If you want to print the current page of the punch list sub system report, click [![image-1652070128856.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070128856.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070128856.png) (print icon including the page number).
2. If you want to print all the pages of the punch list sub system report, click [![image-1652070145170.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070145170.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070145170.png)(print icon).

#### **7.5.2 View Punch List Sub System Report** 

You can view the punch list sub system report in various formats by using the option [![image-1652070185592.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070185592.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070185592.png) provided in the upper right corner of the punch list sub system report page.



### **7.6 Punch List Category Report**

The **Punch List Category Report** tab in the **Punch Lists** menu helps you to view a punch list category report. To view the punch list category report,

1. Click **Punch List Category Report** in the **Punch Lists** menu. The **Punch List Category Report** page opens.
    
    [![image-1652070229263.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070229263.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070229263.png)
    
     **Figure 7.6: Punch List Category Report page**
2. In the **Modules** field, select **Piping** from the given modules.
3. In the **Systems** box, select a system from a drop-down list.
4. In the **Sub Systems** box, select a sub-system from a drop-down list.
    
    The punch list category report opens based on the selected data.

#### **7.6.1 Print Punch List Category Report**

If you want to print the punch list category report, use [![image-1652070296448.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070296448.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070296448.png) and [![image-1652070305892.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070305892.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070305892.png) (print icons) provided in the Punch List Category Report page.

1. If you want to print the current page of the punch list category report, click [![image-1652070314649.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070314649.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070314649.png) (print icon including the page number).
2. If you want to print all the pages of the punch list category report, click [![image-1652070328140.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070328140.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070328140.png) (print icon).

#### **7.6.2 View Punch List Category Report** 

You can view the punch list category report in various formats by using the option [![image-1652070389962.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070389962.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070389962.png)provided in the upper right corner of the punch list category report page.

# Non-Conformance Report (NCR)

### **8.0 Non-Conformance Report (NCR)** 

NCR used to document the details of a non-conformance identified in a quality audit or other process review. The **NCR** menu helps to add an NCR in the Structural project. Once you click the **NCR** menu, the following tabs open,

[![image-1652070434784.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070434784.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070434784.png)

### **8.1 Add NCR**

The **Add NCR** tab in the **NCR** menu used to add an NCR. Do the following steps to add an NCR,

1. Click the **Add NCR** tab. The **NCR** page opens.
    
    [![image-1652070485758.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070485758.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070485758.png)
    
    [![image-1652070492845.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070492845.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070492845.png)
    
    [![image-1652070505269.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070505269.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070505269.png)
    
    [![image-1652070513900.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070513900.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070513900.png)
    
    [![image-1652070525879.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070525879.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070525879.png)
    
     **Figure 8.1: NCR page**
    
    [![image-1652070550378.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070550378.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070550378.png) **Tip**: A report number for a new NCR will be updated automatically in the **Report Number** box.
2. In the **Type** box, select the type of non-conformance from a drop-down list.
3. In the **Classification** box, select whether minor classification or major classification from a drop-down list.
4. In the **Source/ Item** box, select the source of NCR from a drop-down list.
5. To add controlling/ reference documents,
    
    [![image-1652070579007.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070579007.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070579007.png)
    
    
    1. 1. 1. Click [ ![image-1652070606962.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070606962.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070606962.png) (**ADD** button) in the **Controlling/ Reference documents** box.
                
                A new window opens in the **Doc No** column.
            2. Enter the document number in the new window of the **Doc No** column.
            3. Enter the description for the document in a box of the **Description of document** column.
            4. Enter the section reference number in a box of the **Section ref No** column.
            5. Click **Save**.
6. In the ****NCR**** box, enter the description for the identified deficiency of the selected non-conformance type.
7. In the **Reference Document** box, enter the reference document detail.
8. In the **Owner Reference Document** box, enter the owner reference document detail.
9. In the **Supplier Reference Document** box, enter the supplier reference document detail.
10. In the **NCR originator** box, enter the originator of NCR.
11. In the **Origin** **Date** box, select the origin date of NCR.
12. In the **NCR Accepted By** box, enter the name of a person who has accepted the NCR.
13. In the **NCR Accepted Date** box, select the NCR accepted date.
14. In the **Agreed Closure Date** box, select the agreed closure date.
15. In the **Issued By** box, select the company who has issued the NCR.
16. In the **Issued To** box, select the company for which the NCR has issued.
17. In the **Root Cause** box, enter the root cause detail.
18. If you want to add the corrective action detail, do the following,
    
    
    1. 1. 1. In the **Action** box, select any corrective action from the given options.
            2. In the **Corrective Action** box, enter the corrective action detail.
            3. In the **Proposed by** box, enter the name of a person who has proposed the corrective action.
            4. In the **Target Close-out Date** box, select the target close out date.
            5. In the **Preventive Action** box, enter the preventive actions.
            6. In the **Probability** box, select the probability percentage of non-conformance.
            7. In the **consequences** box, select the consequences level you have faced.
19. If you want to add any remarks, click ****Remarks**** option and enter your remarks, otherwise click ****No Remarks**** option.
20. In the ****Verification**** box, enter the verification detail on completion of corrective action/ preventive action.
21. In the **Inspected by QC Inspector**, and **Date** boxes, enter the name of the QC inspector who has inspected the NCR, and date, respectively.
22. In the **Verified and NCR closed by**, and **Date** boxes, enter the name of a person who has verified and closed the NCR, and date, respectively.
23. In the ****Supplier NCR Close out by****, and ****Close Out Date**** boxes, enter the name of a person who has closed the supplier NCR, and close out date, respectively.
24. In the ****Owner NCR Close out by****, and ****Close Out Date**** boxes, enter the name of a person who has closed the owner NCR, and close out date, respectively.
25. In the ****Approval Req**** box, if you need approval, click ****Yes,**** otherwise click **NO.**
26. If you have selected ****Yes****, you must enter the reference detail in the ****If Yes, Then Reference****
27. In the **Description** box, enter the description of proposal.
28. In the **Proposal Accepted by**, and **Date** boxes, enter the name of a person who has accepted the proposal, and date, respectively.
29. In the NCR Close Notes box, enter the NCR close notes.
30. In the ****Disposition Completed by,**** and ****Date**** boxes, enter the name of a person who has completed the disposition, and date, respectively.
31. Click **Save**.

The NCR is successfully added.

### **8.2 View NCR**

The **View NCR** tab helps you to add, view, and edit the NCR, which is added by using the **Add NCR** tab.

1. Click the **View NCR** tab in the **NCR** menu. The **View NCR** page opens with added NCR.
    
    [![image-1652070974200.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070974200.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070974200.png)
    
     **Figure 8.2: View NCR page**

#### **8.2.1 Add an NCR**

If you want to add an NCR, do the following,

1. Click [![image-1652071020947.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652071020947.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652071020947.png) (**ADD** button) in the **View NCR** page. The **View NCR** page redirects you into the **NCR** page. Follow the same procedure in the topic, “[**<u>Add NCR</u>**](http://wiki.cuteinfocomm.com/link/72#bkmrk-8.1-add-ncr)” to add an NCR.

#### **8.2.2 Print an NCR**

If you want to print an NCR, click [![image-1652071063247.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652071063247.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652071063247.png) (**Print** button) provided in the upper side of the **View NCR** page. See Fig 8.2.

#### **8.2.3 Attach a File into an NCR** 

If you want to attach any file with any NCR listed in the **View NCR** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **8.2.4 Update Any NCR**

If you want to update any existing NCR in the **View** **NCR** page, click [![image-1652071121785.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652071121785.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652071121785.png) (Update icon) in the **Update** column for the respective NCR. See Fig 8.2. Edit the details in the respective box you want.

#### **8.2.5 Export NCR**

You can export the NCR added in the **View NCR** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **8.2.6 Delete NCR**

If you want to delete any NCR in the **View NCR** page, click[![image-1652071182518.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652071182518.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652071182518.png) (Delete icon) provided in the **Delete** column of the **View NCR** page, See Fig 8.2.

# Documentation

### **9.0 Documentation**

The **Documentation** menu used to combine the number of files, which are attached to every menu of this ***cuteQM*** app. The combined files will be shown as a pdf file. This menu also used to attach a new file to a module that is not provided with an attachment option to attach any file.

### **9.1 Document Upload**

The **Document Upload** tab in the **Documentation** menu used to upload documents for various process.

1. Click **Document Upload** in the **Documentation** menu. The **Upload Documents** page opens.
    
    [![image-1652071269981.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652071269981.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652071269981.png)
    
     **Figure 9.1: Upload Documents page**
2. Select a file which you want to upload by click **Select a file for upload**.
    
    The selected file will be added in the **File Upload** window.


### **9.2 Manufacture Data Report (MDR) Settings**

The **MDR** **Settings** tab in the **Documentation** menu helps you to do page setup for the pdf file which will be shown after combining the attached files.

1. Click the **MDR Settings** tab. The **MDR Settings** page opens.
    
    [![image-1652071331435.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652071331435.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652071331435.png)
    
     **Figure 9.2: MDR Settings page**
2. In the **Page Numbering** box, select the page numbering option that is whether **Section wise** or **Continuous**.
3. In the **Page Number (Digits)** box, select the page number displaying format from a drop-down list.
4. If you want to append the section number with the page number, click ****Yes,**** otherwise click ****No**** in the ****Append Section number with Page number**** box.
5. In the **Page Number Template** box, select the page number template from a drop-down list.
6. If you want to add the starting page numbers from TOC, click ****Yes,**** otherwise click ****No**** in the ****Page Number Starting From TOC ?****
7. If you want to add alphabet page numbers, click **Yes,** otherwise click **No** in the **Alphabet Page number?** box.
8. In the **Logo** box, attach your logo by using [![image-1652071404328.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652071404328.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652071404328.png) (**Browse** button).
9. Click **Save**.


### **9.3 Document Category**

The **Document Category** tab in the **Documentation** menu used to attach a file to any module that is not provided with an attachment option to attach any file. Before attaching a file for any module, you must add the relevant category name of the module.

#### **9.3.1 Add a Document Category**

1. Click the **Document Category** tab. The **Document Category** page opens.
    
    [![image-1652071469441.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652071469441.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652071469441.png)
    
     **Figure 9.3: Document Category page**
2. Click [![image-1652071496313.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652071496313.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652071496313.png)(**ADD** button) in the **Document Category** page. A new window opens to add a document category.
    
    [![image-1652071506965.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652071506965.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652071506965.png)
3. In the **Category Name** box, enter the relevant category name for the module for which you want to attach a file.
4. In the **Description** box, enter the description for the added category.
5. Click ****Save****. (OR)
6. If you want to import any document category from another vessel, Click ****Import from Another Vessel****. The **Import from Another Vessel** window opens.
    
    [![image-1652071555479.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652071555479.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652071555479.png)
    
      
    
    1. 1. 1. In the **Equipment** box, select an equipment from a drop-down list.
            2. Click **Save**.

The added category name will be listed in the **Document Category** page. Once you have added the document category, you can attach any file to the added category.

#### **9.3.2 Attach a File into an Added Document Category**

If you want to attach any file with the added category listed in the **Document Category** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **9.3.3 Edit Any Document Category**

If you want to edit any existing category in the **Document Category** page, click [![image-1652071641422.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652071641422.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652071641422.png)(Edit icon) for the respective category, and then edit the details in the respective box.

#### **9.3.4 Delete Any Document Category**

If you want to delete any specific added category from the list, you can use [![image-1652071676082.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652071676082.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652071676082.png)(Delete icon) provided in the **Delete** column of the **Document Category** page, See Fig 9.3.



### **9.4 One Click Documentation**

The **One Click Documentation** tab used to combine the attached file of the various module.

1. Click the **One Click Documentation** tab. The **One Click Documentation** page opens.
    
    [![image-1652071745375.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652071745375.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652071745375.png)
    
     **Figure 9.4: One Click Documentation page**
    
    The **One Click Documentation** page shows a list of reports name of each module including the attachment file counts. This page also shows the list of document categories including their attachments, which are added using the [**<u>Document Category</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/documentation-O15/#bkmrk-9.3%C2%A0document-categor) tab. [![image-1652071777626.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652071777626.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652071777626.png) **Note**: If you want to edit any existing category in the **Document Category** page, click [![image-1652071796556.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652071796556.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652071796556.png) (Edit icon) for the respective category, and then edit the details in the respective box.
2. Click the check box of the respective reports which you want to combine.
3. Click **Generate MDR**.
    
    The system combines the selected files and shows as the pdf file in the left side of the **One Click Documentation** page, See Fig 9.4.
    
    [![image-1652071832723.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652071832723.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652071832723.png)**Tip**: You can view the pdf file by clicking the respective pdf file. The file will be opened including the data in the combined files.

# Pressure Vessel & Heat Exchangers



# Introduction

Welcome to **cuteQM Pressure Vessel Module**, a comprehensive digital solution designed to simplify and standardize the management of pressure vessels fabrication across their entire lifecycle. This module is a part of the cuteQM platform, tailored to meet the stringent requirements of safety, compliance, and operational efficiency in industries that rely on pressure equipment.

Pressure vessels are critical assets, and ensuring their integrity requires consistent inspection, documentation, and regulatory compliance. The cuteQM Pressure Vessel Module provides organizations with an intuitive, centralized system to track, monitor, and manage all pressure vessel–related activities. From material receiving and inspection scheduling to compliance reports and release notes, the module ensures that all information is accurate, accessible, and audit-ready.

This manual will guide you through the features, workflows, and best practices of the module, enabling you to:

- Streamline inspection and documentation processes
- Ensure compliance with international standards and safety regulations
- Enhance transparency and accountability with digital records
- Improve decision-making with real-time dashboards and reports

Whether you are a plant manager, quality manager, quality engineer or production supervisor, the cuteQM Pressure Vessel Module is built to support your role with reliable tools that reduce manual effort and improve confidence in equipment safety.

- - - - - -

## Who Should Use This Manual

This manual is intended for all professionals involved in the lifecycle management of pressure vessels. Typical users include:

- **QA/QC Engineers** – to oversee quality checks, inspection records, and release documentation
- **Engineers** – to update updates design drawings and update the BOM etc
- **Production Team** – to ensure make efficient request for inspection enter very little data as possible
- **Plant Operators and Supervisors** – to monitor vessel progress and operate safety in real time
- **Management Teams** – to review performance dashboards and support informed decision-making

By following the guidance in this manual, users can maximize the benefits of the cuteQM Pressure Vessel Module and maintain the highest standards of safety and reliability for their operations.

The below is the overall flow of the system

[![image-1755956930645.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1755956930645.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1755956930645.png)

# User Login

To login into the ***cuteQM*** application,

1. Open your web browser.
2. Type the cuteQM URL provided by your administrator / received in the user account creation email, in the address bar of your web browser.

The login page appears.

[![image-1651036135880.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651036135880.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651036135880.png)

3. In the login page, enter your user name and password in the respective boxes.

 [![image-1651036214183.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651036214183.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651036214183.png)**Note**: If you forgot your password, click “**I can’t access my account**”. You will be redirected into a new web page. Enter your username to receive your password.

4. In the **Module** section, select **Pressure Vessel**.
5. Click **Login**.

Once you have successfully logged in into the ***cuteQM*** application, the home page of the ***cuteQM*** app opens.

[![image-1755939030890.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1755939030890.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1755939030890.png)

**Figure 1.1 Home page of *cuteQM application***

 [![image-1651036329129.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651036329129.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651036329129.png)**Note**: The user name you have entered, the project you have been assigned, and the module you have selected are displayed in the upper right corner of the home page.

### Change Password

If you want to change your current password,

1. Click your user name displayed on the quick access bar of the home page. See Fig 1.1.

A drop-down list opens with multiple options.

[![image-1651036373583.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651036373583.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651036373583.png)

2. Click the **Change Password**

The **Change Password** page opens.

[![image-1651036428593.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651036428593.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651036428593.png)

 [![image-1651036439155.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651036439155.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651036439155.png)**Note**: Before changing your password read the conditions specified in the **Change Password** page.

3. In the **Password** box, enter your current password.
4. In the **New** **Password** box, enter your new password.
5. In the **Confirm** **New** **Password** box, enter your new password again.
6. Click **Change Password**.

Your password will be successfully changed.

### Log Out

If you want to log out from the application,

1. Click your user name displayed on the quick access bar of the home page. See Fig 1.1.

A drop-down list opens with multiple options.

2. Click **Log out**.

Your current session ends now. The home page appears.

# Home & Project

The home menu in the ***cuteQM*** used to provide access to view the dashboard and switch board of a project. This menu also helps you to change project to work on. Also some of the approval dashboards and daily operational job issuance menu items are shown here for easy access.

All users assigned with any roles can view **Switch Board** and access **Switch Project** in the **Home** menu.

#### **Switch Board**

The **Switch Board** tab in the **Home** menu show the consolidated view of various tabs listed in multiple menus in the menu bar.

Once you have successfully logged in into the ***cuteQM***, you can view the Home Page. In the Home Page, the menu bar appears with multiple menus, otherwise you can select the **Switch Board** tab to view all the menus.

To select the **Switch Board** tab,

1. Navigate to **Home**.
2. Click **Switch Board**.

The **Switch Board** tab includes multiple options such as **Welder &amp; WPQ, Calibration, Engineering, Inspection, Stage Inspection, NDE &amp; Other NDE Reports, and Reports.**

[![image-1756000025736.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756000025736.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756000025736.png)

The menu will be shown are accessible. For users with limited access, they will see limited items in the switch board and menu too.

[![image-1756090545205.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756090545205.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756090545205.png)

#### **Switch Project**

 The **Switch Project** tab in the **Home** menu helps you to add a new project/equipment and switch between various projects and equipment added in the app.

#### **Switch between Various Projects and** <span style="font-size: 23.324px;">**Equipment's**</span> 

1. Navigate to the **Home**
2. Click **Switch Project**.

The switch project window opens with a list of projects and equipment's that are already added in the web.

[![image-1651037564931.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651037564931.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651037564931.png)

**Figure 2.1: Switch project window**

3\. If you want to switch between various projects and equipments,

 a. Select a project you want from multiple projects listed in the left side of the window.

 Once you have selected the project, a list of equipments related to the project is displayed.

 b. Select an equipment you want from multiple equipments listed in the right side of the window.

4\. Click **Select**.

To know how to add a new project, see the topic, “[Projects](https://wiki.cuteinfocomm.com/books/cuteqm/page/master-data#bkmrk-3.6-projects "Projects")”.   
To know how to add a new equipment, see the topic, “[**<u>Equipments</u>**](https://wiki.cuteinfocomm.com/books/cuteqm/page/master-data#bkmrk-3.7-equipments "Equipments")”.

# Projects and Equipments

### **Master Data**

Master data is typically shared by multiple users and groups across a project. Master data includes data about Clients, End users, Third party, Projects, Sub-contractors, and Locations.

<table border="1" id="bkmrk-users-assigned-with-" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">[![image-1651039906305.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651039906305.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651039906305.png) Users assigned with **cuteQM\_Power User** role only can access the **Master Data** menu and their functionalities.

</td></tr></tbody></table>

#### **1.0 Clients**

In the Pressure Vessel module, clients are created so that when creating project they can be selected as Client. The **Clients** tab in the **Master Data** menu helps you to add the details of clients. If you want to add any new client,

Click **Clients** in the **Master Data** menu.

The **Clients** page opens.

[![image-1651038981611.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651038981611.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651038981611.png)

**Figure 1.1: Clients page**

#### **Add a Client**

If you want to add a client, do the following steps,

 1. Click [![image-1651039059221.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651039059221.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651039059221.png) (**ADD** button) in the **Clients** page. See Fig 1.1.

The page shows a new box to add the details of a client.

[![image-1651039098211.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651039098211.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651039098211.png)

[![image-1651039119706.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651039119706.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651039119706.png)**Note**: The fields notified with the symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.

2\. In the **Name** box, enter the name of a client.

3\. In the **Abbreviation** box, enter the abbreviation for the added client.

4\. If you want to add a logo, click [![image-1651039215712.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651039215712.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651039215712.png) (**Browse** button) provided with the **Logo** box, and then add the logo of the client.

5\. Click **Save**.

The client is successfully added.

#### **Edit a Client**

 If you want to edit any existing client in the **Clients** page, do the following,

1\. Click[![image-1651039346963.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651039346963.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651039346963.png) (Edit icon) in the **Edit** column for the respective client. See Fig 3.1.

 The page shows the details of added client.

[![image-1651039368651.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651039368651.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651039368651.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **Delete a Client**

If you want to delete any specific client from the list of clients, you can use [![image-1651039430200.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651039430200.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651039430200.png) (Delete icon) provided in the **Delete** column of the **Clients** page, See Fig 3.1.

1. Click [![image-1651039430200.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651039430200.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651039430200.png) (Delete icon) for the corresponding client. You receive a notification message “**Do you want to delete this row**?”.
2. Click ****OK****. The selected client will be deleted.

#### **Export Clients List**

You can export a list of clients in the pdf and excel formats.

1\. If you want to export the clients list in the pdf format, click [![image-1651039614212.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651039614212.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651039614212.png) (**PDF** button). See Fig 3.1.

 The clients list will be downloaded in the pdf format.

2\. If you want to export the clients list in the excel format, click [![image-1651039668111.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651039668111.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651039668111.png) (**Excel** button).

 The clients list will be downloaded in the excel format.

#### **2.0 End Users**

End User is an entity who will be using the Pressure Vessel being fabricated. Sometimes, the end user can be same as client for you. The **End Users** tab in the **Master Data** menu helps you to add the details of end users. If you want to add any end user, do the following steps,

1. Click **End Users** in the **Master Data** menu.

 The **End Users** page opens.

[![image-1651039756087.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651039756087.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651039756087.png)

**Figure 2.1: End Users page**

#### **Add an End User**

If you want to add an end user,

1\. Click [![image-1651039862728.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651039862728.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651039862728.png) (**ADD** button) in the **End Users** page. See Fig 2.1.

The page shows a new box opens to add the details of an end user.

[![image-1651039885629.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651039885629.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651039885629.png)

[![image-1651039906305.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651039906305.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651039906305.png)**Note**: The fields notified with the symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.

2\. In the **Name** box, enter the name of an end user.

3\. In the **Abbreviation** box, enter the abbreviation for the added end user.

4\. If you want to add a logo, click [![image-1651039956634.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651039956634.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651039956634.png) (**Browse** button) provided with the **Logo** box, and add the logo of the end user.

5\. Click **Save**.

 The end user is successfully added.

#### **Edit an End User**

If you want to edit any existing end user in the **End Users** page, do the following,

1\. Click [![image-1651040718465.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651040718465.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651040718465.png)(Edit icon) in the **Edit** column for the respective end user. See Fig 6.2.

 The page shows the details of the selected end user.

[![image-1651040745669.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651040745669.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651040745669.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **Delete an End User**

If you want to delete any specific end user from the list of end users, you can use [![image-1651040809742.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651040809742.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651040809742.png) (Delete icon) provided in the **Delete** field of the **End Users** page.

#### **Export End Users List**

You can export a list of end users added in the **End Users** page in the pdf and excel formats by using [![image-1651040857920.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651040857920.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651040857920.png) (**PDF** button) and

[![image-1651040869702.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651040869702.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651040869702.png) (**Excel** button).

#### **3.0 Third Party**

A Third Party Inspector is an independent inspector, usually from a certification body or inspection agency, who verifies that fabrication, testing, and documentation meet the client’s requirements, international codes, and sometimes statutory regulations. The **Third Parties** tab in the **Master Data** menu helps you to add the details of third parties. If you want to add a third party,

1\. Click **Third Parties** in the **Master Data** menu.

 The **Third Parties** page opens.

[![image-1651040938528.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651040938528.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651040938528.png)

**Figure 3.1: Third Parties page**

#### **Add a Third Party**

If you want to add a third party, do the following steps,

1\. Click (**ADD** button) in the **Third Parties** page. See Fig 3.1.

The page shows a new box to add the details of a third party.

[![image-1651041015142.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651041015142.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651041015142.png)

[![image-1651041029750.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651041029750.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651041029750.png)**Note**: The fields notified with the symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.

2\. In the **Name** box, enter the name of a third party.

3\. In the **Abbreviation** box, enter the abbreviation for the added third party.

4\. If you want to add a logo, click [![image-1651041076993.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651041076993.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651041076993.png) (**Browse** button) provided with the **Logo** box, and then add the logo of the third party.

5\. Click **Save**.

The third party is successfully added.

#### **Edit a Third Party**

If you want to edit any existing third party in the **Third Parties** page, do the following,

1\. Click [![image-1651041143353.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651041143353.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651041143353.png)(Edit icon) in the **Edit** column for the respective third party.

 The **Third Parties** page shows the details of added third party.

[![image-1651041167494.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651041167494.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651041167494.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **Delete a Third Party**

If you want to delete any specific third party from the list of third parties, you can use [![image-1651041265089.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651041265089.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651041265089.png)(Delete icon) provided in the **Delete** field of the **Third Parties** page.

#### **Export Third Parties List**

You can export a list of third parties added in the **Third Parties** page in the pdf and excel formats by using [![image-1651041313727.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651041313727.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651041313727.png) (**PDF** button) and [![image-1651041329458.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651041329458.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651041329458.png) (**Excel** button).

#### **4.0 Authorised Inspectors (AI)**

An Authorised Inspector is specifically an inspector **certified and authorised under a regulatory code**, most notably **ASME Section VIII (for pressure vessels)**. They represent the jurisdiction or regulatory authority to ensure compliance with code rules..

The **Authorized Inspectors** tab in the **Master Data** menu helps you to add the details of authorized inspectors. If you want to add an authorized inspector,

1\. Click **Authorized Inspectors** in the **Master Data**

The **Authorized Inspectors** page opens.

[![image-1651041410918.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651041410918.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651041410918.png)

**Figure 4.1: Authorized Inspectors page**

#### **Add an Authorized Inspector**

If you want to add an authorized inspector, do the following steps,

1\. Click [![image-1651041651056.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651041651056.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651041651056.png)(**ADD** button) in the **Authorized Inspectors** See Fig 4.1.

The page shows a new box to add the details of an authorized inspector.

[![image-1651041671594.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651041671594.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651041671594.png)

[![image-1651041688409.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651041688409.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651041688409.png)Note: The fields notified with the symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.

2\. In the **Name** box, enter the name of an authorized inspector.

3\. In the **Abbreviation** box, enter the abbreviation for the added authorized inspector.

4\. If you want to add a logo, click [![image-1651041751402.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651041751402.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651041751402.png)(Browse button) provided with the Logo box, and then add the logo of the authorized inspector.

5\. Click **Save**.

The authorized inspector is successfully added.

#### **Edit an Authorized Inspector**

If you want to edit any existing authorized inspector in the **Authorized Inspectors** page, do the following,

1\. Click [![image-1651041936698.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651041936698.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651041936698.png)(Edit icon) in the **Edit** column for the respective authorized inspector.

 The page shows the details of added authorized inspector.

[![image-1651041957037.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651041957037.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651041957037.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click Save.

#### **Delete an Authorized Inspector**

If you want to delete any specific authorized inspector from the list of authorized inspectors, you can use [![image-1651042018368.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651042018368.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651042018368.png)(Delete icon) provided in the **Delete** field of the **Authorized Inspectors** page.

#### **Export Authorized Inspectors List**

You can export a list of authorized inspectors added in the **Authorized Inspectors** page in the pdf and excel formats by using

[![image-1651042069227.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651042069227.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651042069227.png) (PDF button) and [![image-1651042078236.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651042078236.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651042078236.png) (Excel button).

#### **5.0 Subcontractors**

Subcontractor is an entity which has taken a portion of contract from a principal contractor such as your firm or from another subcontractor for Pressure Vessel module.

1\. Click **Subcontractors** in the **Companies and Projects

The **Subcontractors** page opens.

[![image-1651042249300.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651042249300.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651042249300.png)

**Figure 5.1: Subcontractors page**

#### **Add a Subcontractor**

If you want to add a subcontractor, do the following steps,

1\. Click [![image-1651042309193.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651042309193.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651042309193.png)(**ADD** button) in the **Subcontractors** See Fig 3.5.

 The page shows a new box to add the details of a subcontractor.

[![image-1651042337627.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651042337627.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651042337627.png)

[![image-1651042352612.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651042352612.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651042352612.png)**Note**: The fields notified with the symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.

2\. In the **Name** box, enter the name of a subcontractor.

3\. In the **Abbreviation** box, enter the abbreviation for the added subcontractor.

4\. If you want to add a logo, click [![image-1651042409656.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651042409656.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651042409656.png)(**Browse** button) provided with the **Logo** box, and then add the logo of the subcontractor.

5\. Click **Save**.

The subcontractor is successfully added.

#### **Edit a Subcontractor**

If you want to edit any existing subcontractor in the **Subcontractors** page, do the following,

1\. Click [![image-1651042471376.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651042471376.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651042471376.png)(Edit icon) in the **Edit** column for the respective subcontractor.

 The **Subcontractors** page shows the details of added subcontractor.

[![image-1651042491600.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651042491600.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651042491600.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **Delete a Subcontractor**

If you want to delete any specific subcontractor from the list of subcontractors, you can use [![image-1651042554160.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651042554160.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651042554160.png) (Delete icon) provided in the **Delete** field of the **Subcontractors** page.

#### **Export Subcontractors List**

You can export a list of subcontractors added in the **Subcontractors** page in the pdf and excel formats by using [![pdf.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/pdf.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651042598355.png)(**PDF** button) and [![excelimg.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/0fxexcelimg.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651042610812.png) (**Excel** button).

#### **6.0 NDT Inspectors**

NDT (Non-Destructive Testing) Inspectors provide NDT inspection services to the clients who involved in fabrication, construction and maintenance of the Pressure Vessel.

The **NDT Inspectors** tab in the **Master Data** menu used to add an NDT inspector. If you want to add an NDT inspector, do the following steps,

1\. Click **NDT Inspectors** in the **Master Data**

 The **NDT Inspectors** page opens.

[![image-1651045421309.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651045421309.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651045421309.png)

**Figure 6.1: NDT Inspectors page**

#### **Add an NDT Inspector**

If you want to add an NDT inspector, do the following steps,

1\. Click [![image-1651045484448.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651045484448.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651045484448.png)(**ADD** button) in the **NDT Inspectors**  See Fig 6.1.

 The page shows a new box to add the details of an NDT inspector.

[![image-1651045503852.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651045503852.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651045503852.png)

[![image-1651045518638.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651045518638.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651045518638.png)**Note**: The fields notified with the symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.

2\. In the **Name** box, enter the name of the NDT inspector.

3\. In the  **No** box, enter the employee number of the NDT inspector.

4\. If you want to add a photo of the NDT inspector, click (**Browse** button) provided with the **Photo** box, and then add the photo of the NDT inspector.

5\. If the NDT inspector is working currently, select the checkbox of the **Is Active**

6\. Click **Save**.

The NDT inspector is successfully added.

#### **Add NDT Certificates of NDT Inspector**

If you want to add NDT certificate details of any NDT inspector,

1\. Click [![image-1651045608570.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651045608570.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651045608570.png)(Add icon) of the respective NDT inspector.

 The **Certificates** window opens.

[![image-1651045631425.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651045631425.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651045631425.png)

2\. Click **Add Certificate**.

The window shows a new box to add the details of certificate.

[![image-1651045654966.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651045654966.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651045654966.png)

3\. In the **Body** box, enter the body of the NDT qualification.

4\. In the **Level** box, select the level of NDT qualification.

5\. In the **Method** box, select the method of NDT qualification.

6\. In the **Certificate Number** box, enter the certificate number.

7\. In the **Certificate Start Date** box, select the staring date of certificate.

8\. In the **Certificate Expiry Date** box, select the expiry date of certificate.

9\. In the **Technical Start Date** box, select the technical staring date.

10\. In the **Technical Expire Date** box, select the technical expiry date.

11\. Click **Update**.

The certificates details will be updated.

#### **Edit an NDT Inspector**

If you want to edit any existing NDT inspector in the **NDT Inspectors** page, do the following,

1\. Click[![image-1651045790090.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651045790090.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651045790090.png)(Edit icon) in the **Edit** column for the respective NDT inspector.

 The **NDT Inspectors** page shows the details of added NDT inspector.

[![image-1651045811576.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651045811576.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651045811576.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **Attach a File into an NDT Inspector**

If you want to attach a file with any NDT inspector listed in the **NDT Inspectors** page,

1\. Click [![image-1651045873896.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651045873896.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651045873896.png)(Attach icon) provided in the **Attachment** column for the respective NDT inspector in the **NDT Inspectors**

The **File Upload (NDT Inspector)** page opens.

[![image-1651045893030.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651045893030.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651045893030.png)

[![image-1651045906944.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651045906944.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651045906944.png)**Note**: Before uploading any file, read the instructions given in the **File Upload (NDT Inspector)** page.

2\. Click [![image-1651045929623.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651045929623.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651045929623.png)(**Browse** button) to select a file to be uploaded.

3\. Select any file which you want to upload, from your computer.

4\. Click [![image-1651045960993.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651045960993.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651045960993.png)(**Upload** button) to attach the file.

The uploaded file will be displayed in the **File Upload** table.

#### **Delete an NDT Inspector**

If you want to delete any specific NDT inspector from the list of added NDT inspectors, you can use [![image-1651046015115.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651046015115.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651046015115.png) (Delete icon) provided in the **Delete** field of the **NDT Inspectors** page.

#### **Export NDT Inspectors List**

You can export a list of NDT inspectors added in the **NDT Inspectors** page in the pdf and excel formats by using [![pdf.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/pdf.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651046053587.png)(**PDF** button) and [![excelimg.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/0fxexcelimg.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651046073489.png)(**Excel** button).

#### **7.0 Projects**

When a new project is awarded to the company, it needs to be created in the system so that all parties can use it to manage the data and documents.

The **Projects** tab in the **Master Data** menu used to add a new project.

<table border="1" id="bkmrk-you-can-add-a-new-pr" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">You can add a new project if you have been assigned with **Power User** roles only.

</td></tr></tbody></table>

To navigate into the **Projects** page,

1\. Click **Projects** in the **Master Data**

 The **Projects** page opens.

[![image-1651043046113.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651043046113.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651043046113.png)

**Figure 7.1: Projects page**

#### **Add a New Project** 

If you want to add a new project, do the following

1\. Click [![image-1651043133166.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651043133166.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651043133166.png)(**ADD** button) in the **Projects** page. See Fig 3.6.

 The page shows a new box to add the details of a new project.

[![image-1651043152307.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651043152307.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651043152307.png)

[![image-1651043170218.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651043170218.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651043170218.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.

2\. In the **Project Number** box, enter the project number.

3\. In the **Project Name** box, enter a project name.

4\. In the **End User** box, select an end user from a drop-down list.

5\. In the **Client** box, select a client from a drop-down list.

6\. In the **AI/ Third Party** box, select an AI or a third party from a drop-down list.

[![image-1651043227075.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651043227075.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651043227075.png)**Note**: If you want to add multiple third parties, add third parties by clicking[![image-1651043236114.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651043236114.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651043236114.png) (**Add TP** button) in the **Third party** column of the **Projects page**. This can be done after creating the project.

7\. In the **Purchase Order (PO) Number** box, enter the purchase order number.

8\. In the **Manufacturer Job Code** box, enter the manufacturer job code number.

9\. In the **Client Project** box, enter the client project code.

10 In the **Client Job Code** box, enter the client job code.

11\. In the **Owner Project** box, enter the owner project code.

12\. In the **Owner Job** Code box, enter the owner job code.

13\. In the **Delivery Date** box, choose the delivery date.

14\. In the **Location/Position** box, enter the location/position detail.

15\. In the **Cladding Material** box, enter the cladding material detail.

16\. In the **Non-Destructive Examination (NDE) Weld Length Limit/RT Requirement** box, enter the length limit of NDE welding or the RT requirements.

17\. If you need an external qualified welder, click the check box provided with the **External Qualified Welder**

18\. In the **Bill of Quantities** **(BOQ)** box, enter the BOQ detail.

19\. In the **Spool Count** box, enter the spool count.

20\. Click **Save**.

A new project is added successfully.

#### **Edit a Project** 

If you want to edit any existing project details from the list of projects in the **Projects** page, do the following,

1\. Click [![image-1651043414875.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651043414875.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651043414875.png)(Edit icon) in the **Edit** column for the respective project. See Fig 3.6.

 The page shows the added details of the selected project.

[![image-1651043430360.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651043430360.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651043430360.png)

2\. Click any box where you want to edit the details, and then edit the details in the respective box in the **Projects**

3\. Click **Save**.

#### **Delete a Project** 

If you want to delete any specific project from the list of projects, you can use [![image-1651043486671.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651043486671.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651043486671.png)(Delete icon) provided in the **Delete** field of the **Projects** page.

#### **Export Projects List**

You can export a list of projects added in the **Projects** page in the pdf and excel formats by using [![pdf.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/pdf.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651043529632.png) (**PDF** button) and

[![excelimg.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/0fxexcelimg.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651043538816.png) (**Excel** button).

#### **8.0 Equipments**

Each project will have one or more equipments. Each equipment will be used to track and manage the details and documentation.

The **Equipments** tab in the **Master Data** menu used to add a new equipment under a project.

<table border="1" id="bkmrk-you-can-add-a-new-eq" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">You can add a new equipment if you have been assigned with **Admin** and **Power User** roles only.

</td></tr></tbody></table>

To navigate into the **Equipments** page,

1\. Click **Equipments** in the **Master Data**

 The **Equipments** page opens.

[![image-1651043924746.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651043924746.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651043924746.png)

**Figure 8.1: Equipments page**

#### **Add a New Equipment**

If you want to add a new equipment, do the following steps,

1\. Click (**ADD** button) in the upper side of the **Equipments**

 The **Equipments** page shows a new box to add the details of a new equipment.

[![image-1651043992217.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651043992217.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651043992217.png)

[![image-1651044005105.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651044005105.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651044005105.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.

2\. In the **Master Project Name** box, enter the master project name from a drop-down list.

3\. In the **Equipment** box, enter the equipment name.

4\. In the **Equipment Serial Number** box, enter the equipment serial number.

5\. In the **Report Prefix** box, the report prefix will be entered automatically. If you want change, you can edit the report prefix.

6\. In the **Tag Number** box, enter the tag number.

7\. In the **Delivery Date** box, choose the delivery date.

8\. In the **Drawing Number** box, enter the drawing number.

9\. In the **Applicable Code** box, enter the applicable code.

10\. In the **Equipment Type** box, select the equipment type.

11\. In the **Material** box, enter the material name.

12\. In the **Weight (Kg)**box, enter the weight of the equipment.

13\. In the **QC** box, select the QC type.

14\. In the **Sub Contractor** box, select the sub-contractor from a drop-down list.

15\. In the **Specification** box, enter the specification detail.

16\. In the **Coded Vessel** box, select the coded vessel from a drop-down list.

17\. In the **Location/Position** box, enter the location/position name.

18\. In the  **of Equipment** box, enter the number of equipment.

19\. In the **DIMENSION** field, enter the inner diameter and length value.

20\. In the **THICKNESS** field, enter the thickness of the shell and head.

21\. In the **SPECIFIC REQUIREMENT** field, enter the PWHT, MDMT, HIC, and RT requirement detail.

22\. Click **Save**.

A new equipment is added successfully.

#### **Edit an Equipment**

If you want to edit any existing equipment details from the list of equipments in the **Equipments** page, do the following,

1\. Click [![image-1651044781890.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651044781890.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651044781890.png)(Edit icon) in the **Edit** column for the respective equipment. See Fig 3.7.

 The page shows the added details of the equipment.

[![image-1651044799632.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651044799632.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651044799632.png)

2\. Click any box where you want to edit the details, and then edit the details in the respective box in the **Equipments**

3\. Click **Save**.

#### **Delete an Equipment**

If you want to delete any specific equipment from the list of equipments, you can use [![image-1651044850707.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651044850707.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651044850707.png) (Delete icon) provided in the **Delete** field of the **Equipments** page.

#### **Export Equipments List**

You can export a list of equipments added in the **Equipments** page in the pdf and excel formats by using [![pdf.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/pdf.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651044887932.png)

(**PDF** button) and [![excelimg.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/0fxexcelimg.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651044897448.png) (**Excel** button).

#### **Print Equipments List**

If you want to print equipments list, click [![image-1651044935485.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651044935485.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651044935485.png) (Print icon) of the respective equipment in the **Equipments** page. The equipment list report will be opened.

#### **Stage status**

Here we can customize,which are the stages required for the equipment .Click the[![image-1778668549881.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778668549881.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778668549881.png)icon to set the stages required.Select the required stages and click save icon .Stage status of the equipment saved successfully.

[![image-1778668595891.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778668595891.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778668595891.png)

#### **9.0 Location**

Each company may have multiple locations or bays to fabricate equipments. Carbon steel and Stainless steel material are strictly managed in different locations.

The **Location** tab in the **Master Data** menu helps you to add the details of location. If you want to add any location,

1\. Click **Location** in the **Master Data

 The **Locations** page opens.

[![image-1651045013501.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651045013501.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651045013501.png)

**Figure 9.1: Locations page**

#### **Add a Location**

If you want to add a location, do the following steps,

1\. Click [![image-1651045069288.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651045069288.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651045069288.png) (**ADD** button) in the **Locations**  See Fig 9.1.

 The page shows a new box to add the details of a location.

[![image-1651045091120.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651045091120.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651045091120.png)

[![image-1651045105266.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651045105266.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651045105266.png)**Note**: The fields notified with the symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.

2\. In the **Location** box, enter the location name.

3\. In the **Priority** box, set the priority of the location.

4\. Click **Save**.

The location is successfully added.

#### **Edit a Location**

If you want to edit any existing location in the **Locations** page, do the following,

1\. Click[![image-1651045174907.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651045174907.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651045174907.png)(Edit icon) in the **Edit** column for the respective location. See Fig 6.8.

 The page shows the details of added location.

[![image-1651045193782.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651045193782.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651045193782.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **Delete a Location**

If you want to delete any specific location from the list of added locations, you can use [![image-1651045249984.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651045249984.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651045249984.png) (Delete icon) provided in the **Delete** field of the **Locations** page.

#### **Export Locations List**

You can export a list of locations added in the **Locations** page in the pdf and excel formats by using [![pdf.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/pdf.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651045290172.png) (**PDF** button) and[![excelimg.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/0fxexcelimg.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651045302075.png) (**Excel** button).

# Manage Users

User Management helps you to add new users for Pressure Vessel module, and manage multiple number of users and their roles. You can assign the projects for the added users.

<table border="1" id="bkmrk-users-assigned-with-" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Users assigned with **Admin** role only can access the **Manage User** menu and their functionalities.

</td></tr></tbody></table>

#### **1.0 Users List**

The **Assign User Roles** tab in the **Manage User** menu used to add and manage the user account details and assign roles for the users. If you want to add a user account, do the following steps,

1\. Click **Manage User** menu and the **Users** page opens.

[![image-1756012212968.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756012212968.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756012212968.png)

**Figure 1.1: Users page**

#### **Add a User Account**

If you want to add a new user account,

1\. Click [![image-1651046978830.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651046978830.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651046978830.png)(**ADD** button) in the **Users**

 The page shows a new box to add the account details of the user.

[![image-1651047001012.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651047001012.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651047001012.png)

2\. In the **Login Details** window,

 a. In the **Login ID** box, enter the login id for the user account.

 b. In the **Email** box, enter the email of the user.

3\. In the **User Name** box, enter the user name for the user account.

4\. In the **Designation** box, enter the designation of the user.

5\. In the **Comments** box, enter your comments if any.

6\. In the **Mobile Number** box, enter the mobile number of the user.

7\. In the **Office Contact Number** box, enter the office contact number of the user.

8\. In the **Expiry Date** box, select the expiry date of the user account.

9\. In the **Roles** box, select the checkbox of the roles which you want to assign for the user.

 To know about the roles with their access details, see the topic, “[**<u>User Access Overview in Pressure Vessel Module</u>**](#_User_Access_Overview)”.

[![image-1651047123072.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651047123072.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651047123072.png)**Note**: Once you have assigned the roles for the user, the user can get access to the respective functionalities based on the assigned roles.

10 Click **Save**.

The user account is successfully added and listed in the **Users** page. An email containing the user name and password to login the ***cuteQM*** app will be sent to the given email id of the user.

**[![image-1651047123072.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651047123072.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651047123072.png)Note**: The password received through the email can be used only once. So, the user must change their password while login into the app for the first time.


#### **Reset Password for any User Account**

Once you have added a user account including the login id for any user, you can set password for the respective login id. To set password,

1\. Click [![image-1651047401232.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651047401232.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651047401232.png)(Password icon) in the **Reset Password** column for the respective user. See Fig 4.1.

The **Reset Password** window opens with the login id name.

[![image-1651047425267.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651047425267.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651047425267.png)

2\. Click **Reset Password**.

The password will be reset and sent to the respective email id of the user.


#### **Lock a User Account**

The user account can get locked by the user management team or it can also get locked automatically when there are too many incorrect password attempts. (default is 10 times incorrect attempts).

If you want to lock any existing user account,

1\. Enable the checkbox in the **Locked** column for the respective user account. See Fig 4.1.

 The selected user account will be locked.

**[![image-1651047123072.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651047123072.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651047123072.png)Note**: You can also unlock the respective user account by disabling the checkbox of the user account.

Similarly, the same check box can be used to unlock an account.


#### **Deactivate a User Account**

If you want to deactivate any user account,

1\. Disable the checkbox in the **Active** column for the respective user account. See Fig 1.1.

 The selected user account will be deactivated.

**[![image-1651047123072.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651047123072.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651047123072.png)Note**: You can also activate the respective user account by enabling the checkbox of the user account.


#### **Edit a User Account**

If you want to edit any existing user account in the **Users** page, do the following,

1\. Click[![image-1651047597340.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651047597340.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651047597340.png)(Edit icon) in the **Edit** column for the respective user account.

 The **Users** page shows the details of added user account.

[![image-1651047610105.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651047610105.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651047610105.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.


#### **Delete a User Account**

If you want to delete any specific user account from the list of added user accounts, you can use [![image-1651047665144.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651047665144.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651047665144.png)(Delete icon) provided in the **Delete** field of the **Users** page.

#### **Export User Accounts List**

You can export a list of user accounts added in the **Users** page in the pdf and excel formats by using [![image-1651047703985.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651047703985.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651047703985.png)(**PDF** button) and

[![image-1651047717127.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651047717127.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651047717127.png)(**Excel** button).

#### **Filter a User Account**

If you want to filter any specific user account in the **Users** page, do the following,

1\. Click [![image-1651047765266.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651047765266.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651047765266.png)(**FILTER** button) located on the **Users  See Fig 4.1.

Once you clicked the **Filter** button, the filter box opens in each column of the **Users** page.

[![image-1651047784022.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651047784022.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651047784022.png)

2\. Enter relevant detail in the respective column’s filter box to filter any user account.

#### **2.0 Roles Management**

If you want to add a new role,

1\. Click [![image-1651047270555.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651047270555.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651047270555.png)(**ROLES** Button) in the **Users**

 The **Roles** window opens.

[![image-1651047291867.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651047291867.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651047291867.png)

2\. Click [![image-1651047310864.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651047310864.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651047310864.png)(**ADD** button) in the **Roles**

[![image-1651047321642.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651047321642.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651047321642.png)

3\. In the Role **Name** box, enter the role name.

4\. Click **Save**.

The role is added and listed in the **Roles** window.

**Roles and Access definition** This is common roles defined in the cuteQM. But it can be customized by clients needs.

<table border="1" id="bkmrk-admin-%C2%A0the-admin-rol" style="border-collapse: collapse; width: 100%; height: 524.011px;" width="686"><tbody><tr style="height: 96.625px;"><td style="width: 22.61%; height: 96.625px;">Admin</td><td style="width: 23.7244%; height: 96.625px;">The Admin role has full access to the system. Do not assign this to any one who really does not require. </td><td style="width: 53.6244%; height: 96.625px;">  
Full Access to the system.</td></tr><tr style="height: 158.573px;"><td style="width: 22.61%; height: 158.573px;">cuteQM\_Document</td><td style="width: 23.7244%; height: 158.573px;">The Document Controller role manages access to inspection-related documentation across various modules. It includes viewing and managing key records for traceability and audit purposes</td><td style="width: 53.6244%; height: 158.573px;">Access to Below Inspection Menus:  
1.WPS and Weld Details  
2. Project Data ( like Joint, Drawing etc.)  
3.Materials management  
4.Fit-up &amp; NDT records  
5.Stage-wise inspection  
6. Documentation </td></tr><tr style="height: 113.865px;"><td style="width: 22.61%; height: 113.865px;">cuteQM\_PowerUser</td><td style="width: 23.7244%; height: 113.865px;">This role is designed for power users responsible for setting up new projects and managing critical administrative tasks across the cuteQM. </td><td style="width: 53.6244%; height: 113.865px;">Access to Below Inspection Menus:  
1. Project and Company creation  
2. Manage User</td></tr><tr style="height: 63.0417px;"><td style="width: 22.61%; height: 63.0417px;">cuteQM\_WeldProduction</td><td style="width: 23.7244%; height: 63.0417px;">This role user only able to fitup/weld production activity</td><td style="width: 53.6244%; height: 63.0417px;">This role user only able to fitup/weld production activity</td></tr><tr style="height: 63.0417px;"><td style="width: 22.61%; height: 63.0417px;">cuteQM\_WeldInspection</td><td style="width: 23.7244%; height: 63.0417px;">This role user only able to fitup/weld Inspection activity</td><td style="width: 53.6244%; height: 63.0417px;">This role user only able to fitup/weld Inspection activity</td></tr></tbody></table>


#### **3.0 Assign Projects**

The **Assign Projects** tab in the **Manage User** menu used to assign the projects for users. Once you have assigned the projects for any user, the user can get access to the assigned project. To navigate to the project assigning page,

1\. Click **Assign Projects** in the **Manage User**

The **Assign Projects/Users** page opens with the **Assign by User** and **Assign for Project** options.

[![image-1651047854510.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651047854510.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651047854510.png)

**Figure 3.1: Assign Projects/Users page**

#### **Assign Projects for Users**

If you want to assign projects for any user, do the following steps,

1\. Click **Assign by User** in the **Assign Projects/Users**

The page shows a list of users in the left side and a list of projects in the right side.

[![image-1651048106899.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651048106899.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651048106899.png)

2\. Select a user for whom you want to assign the projects.

3\. Select the checkbox of the respective projects you want to assign.

4\. Click **Save**.

 The selected projects will be assigned for the user.

#### **Assign Multiple Users for Any Project**

If you want to assign multiple users for any specific project, do the following steps,

1\. Click **Assign for Project** in the **Assign Projects/Users**

 The page shows a list of projects in the left side and a list of users in the right side.

[![image-1651048200254.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651048200254.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651048200254.png)

2\. Select a project for which you want to assign the users.

3\. Select the checkbox of the respective users you want to assign.

4\. Click **Save**.

The selected users will be assigned for the project.


#### **4.0 Assign Email Alerts**

Assign Email Alerts is the process of assigning an email for a specific project to send any alert related with the project. The **Assign Email Alerts** tab in the **Manage User** menu used to add an email for a specific project to send any alert related with the project. To navigate to the email adding page,

1\. Click **Assign Email Alerts** in the **Manage User**

The **Manage Alert Configuration** page opens.

[![image-1651048491077.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651048491077.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651048491077.png)

2\. In the **Select Alert Module** box, select a module from a drop-down list.

3\. In the **Email Address** box, enter the email address.

4\. In the **Project** box, select a project from a drop-down list.

5\. Click **Save**.

The email id is added and assigned for the selected module and project.


#### **5.0 Assign Widgets**

The **Assign Widgets** tab in the **Manage User** menu used to assign the widgets to users. Once you have assigned the widgets to any user, the user can access the assigned widget. To navigate to the widget assigning page,

1\. Click **Assign Widgets** in the **Manage User**

The **Assign Widgets to User** page opens.

[![image-1651048569529.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651048569529.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651048569529.png)

2\. In the **Module Name** box, select the respective module name.

 The page shows a list of users in the left side and a list of widgets in the right side corresponding to the selected module.

3\. Select a user for whom you want to assign the widgets.

4\. Select the checkbox of the respective widgets you want to assign.

5\. Click **Save**.

The selected widgets will be assigned to the user.

# Calibration

Calibration is the act of ensuring that a testing instrument used in measurement will produce accurate results. Calibration is comparison between a standard measurement and the measurement using the test instrument.

#### **Testing Instruments**

Each testing instrument used in the Pressure Vessel module have calibration, which needs to be registered with following data as Calibration Report Number, Last Calibration Date, Calibration By, and Calibration Due Date.

To add a testing instrument, do the following steps,

1\. Click **Testing Instruments** in the **Calibration**

 The **Testing Instruments** page opens.

[![image-1651049013109.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651049013109.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651049013109.png)

**Figure 1.1: Testing Instruments page**

#### **Add a Testing Instrument**

If you want to add a testing instrument, do the following steps,

1\. Click [![image-1651049069577.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651049069577.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651049069577.png)(**ADD** button) in the **Testing Instruments**  See Fig 1.1.

 The page shows a new box to add the details of a testing instrument.

[![image-1779958921899.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1779958921899.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1779958921899.png)

[![image-1651049107445.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651049107445.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651049107445.png)**Note**: The fields notified with the symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.

2\. In the **Category** box, select the category name from a drop-down list.

3\. In the **Test Equipment** box, enter the test equipment name.

4\. In the **Manufacturer** box, enter the manufacturer name of the test equipment.

5\. In the **Asset Tag Number** box, enter the asset tag number of the test equipment.

6\. In the **Serial Number** box, enter the serial number of the test equipment.

7\. In the **Recommended Range** box, enter the recommended range of the test equipment.

8\. In the **Purpose/Model** box, enter the model of the test equipment.

9\. In the **Calibration Frequency (In Months)**box, enter the calibration frequency of the test equipment.

10\. In the **Alert Frequency (In Days)**box, enter the alert frequency of the test equipment.

11\. In the **Acceptance Criteria** box, enter the acceptance criteria detail.

12.Select **location** from the location dropdown

13\. In the **Remarks** box, enter your remarks if any.

14\. In the **Status/Condition** box, select the status/condition of the test equipment.

15.Enter **range**

16.Enter all the other fields

Click **Save**.

The testing equipment is successfully added.

#### **Add Calibration Data for a Testing Instrument**

Once you have added the testing instrument, you can add the calibration data for the added testing instrument.

1\. Click [![image-1651049255472.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651049255472.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651049255472.png)(Add icon) for the respective testing instrument. See Fig 1.1.

 The **Calibration** window opens.

[![image-1651049273087.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651049273087.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651049273087.png)

2\. Click [![image-1651049291182.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651049291182.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651049291182.png)(**ADD** button) in the **Calibration** window.

 The window shows a new box to add the calibration data.

[![image-1651049336785.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651049336785.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651049336785.png)

3\. In the **Calibration Report Number** box, enter the calibration report number.

4\. In the **Calibration Date** box, select the calibration date.

5\. In the **Calibration By** box, enter the name of a person who has done the calibration.

6\. In the **Calibration Issued To** box, enter the name of a person to whom the calibration details to be issued.

7\. In the **Calibration Due Date** box, select the calibration due date.

8\. In the **Calibration Issued Date** box, select the calibration issued date.

9\. In the **Location** box, enter the name of the location where the calibration has done.

10\. In the **Contact Number** box, enter the contact number of the person who has done the calibration.

11\. Click **Save**.

The calibration data is added successfully.

#### **Edit a Testing Instrument**

If you want to edit any existing testing instrument in the **Testing Instruments** page,

1\. Click (Edit icon) of the respective testing instrument. See Fig 1.1.

 The **Testing Instruments** page shows the details of the selected test instrument.

[![image-1651049475386.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651049475386.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651049475386.png)

2\. Edit the details where you want.

3\. Click **Save**.

#### **Delete a Testing Instrument**

If you want to delete any specific testing instrument from the list of added testing instrument, you can use [![image-1651049520675.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651049520675.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651049520675.png) (Delete icon) provided in the **Delete** field of the **Testing Instruments** page. To know how to delete, see the topic, “[**<u>Delete Any Client</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/master-data#bkmrk-3.1.3-delete-a-clien)”.

#### **Export Testing Instruments List**

You can export a list of testing instruments added in the **Testing Instruments** page in the pdf and excel formats by using [![pdf.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/pdf.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651049560295.png) (**PDF** button) and [![excelimg.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/0fxexcelimg.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651049572144.png)(**Excel** button). To know how to export, see the topic, “[**<u>Export Clients List</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/master-data#bkmrk-3.1.4-export-clients)”.

#### **View an Equipment Master List**

If you want to view an equipment master list, click [![image-1651049604971.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651049604971.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651049604971.png) (Print icon) provided in the upper side of the **Testing Instruments** page.

#### **Filter a Testing Instrument**

If you want to filter any specific testing instrument in the **Testing Instruments** page,

- you can use the category wise filter box [![image-1651049654447.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651049654447.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651049654447.png) provided in the upper side of the **Testing Instruments**  To filter the testing equipment, select the category from the drop-down list
- You can also use [![image-1651049779588.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651049779588.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651049779588.png) (****FILTER**** button) located on the ****Testing Instruments**  To know how to filter using the ****Filter**** button, see the topic, “[**<u>Filter Any User Account</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/manage-user#bkmrk-4.1.9-filter-a-user-)”.

#### **Import Multiple Testing Instruments**

If you want to import multiple testing instruments together, do the following,

1\. Click [![image-1651049917738.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651049917738.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651049917738.png)(**TEMPLATE** button). See Fig 1.1.

An excel worksheet will be downloaded with a predefined template to enter the details of test instruments.

[![image-1651049940642.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651049940642.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651049940642.png)

2\. Enter the required test instrument details in the respective columns of the excel worksheet.

3\. Once you have added the testing instrument details in the excel worksheet, save the excel worksheet on your computer.

4\. Click [![image-1651049977748.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651049977748.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651049977748.png)(**IMPORT** button). See Fig 1.1.

A new box opens for importing the excel worksheet saved on your computer.

[![image-1651049994692.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651049994692.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651049994692.png)

5\. Click [![image-1651050013701.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651050013701.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651050013701.png)(**Browse** button) to select the excel worksheet to be uploaded.

6\. Select the excel worksheet you want to upload from your computer.

7\. Click [![image-1651050047167.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651050047167.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651050047167.png)(**Upload** button) to export the testing instrument details that are included in the excel worksheet.

The details of the testing instruments in the worksheet will be displayed in the **Testing Instruments** page.

#### **View a Calibration History Card**

To view a calibration history card, click [![image-1651050092895.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651050092895.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651050092895.png)(Print icon) of the respective testing instrument, which is provided in the **Report** column of the **Testing Instruments** page.

# Welding

Welding is a part of the Pressure Vessel manufacturing process. Welding on pressure vessels must be extremely high quality to withstand working conditions. Properly preparing for welding can reduce or even eliminate reworking.

#### **1 Preliminary Welding Procedure Specification (PWPS)**

A **pWPS (Preliminary Welding Procedure Specification)** is a preliminary or draft welding procedure prepared before the actual qualification of a welding process. It is mainly used as a guideline for conducting welding during the Procedure Qualification stage. In industries such as pressure vessels, piping, structural fabrication, offshore, and oil &amp; gas, welding procedures must be qualified and approved before they can be used for production welding. The pWPS is the first step in this qualification process.

[![image-1778669640416.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778669640416.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778669640416.png)

The **PWPS** tab in the **WPS &amp; Weld Details** menu used to add the details of pwps.

Click **PWPS** menu under **WPS &amp; Weld Details.PWPS** list screen opens

[![image-1778671385422.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778671385422.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778671385422.png)

#### **Add a PWPS**

If you want to add aPWPS, do the following steps,

1\. Click [![image-1651051940077.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651051940077.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651051940077.png) (**ADD** button) in the **pwps** See below fig

 The page shows a new box to add the details of a pwps.

[![image-1778672293897.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778672293897.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778672293897.png)

[![image-1651051995136.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651051995136.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651051995136.png)**Note**: The fields notified with the symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.

2\. In the **PWPS Name** box, enter the name of a PWPS. If not entered, the system will create a new number in a systematic manner.

3.Select the **PWPS level** (Global or Project)

4.Enter **PQR number**

5.Enter **PQR date**

6\. In the **Processes** field, select the welding process that you want to do.

7.Select the appropriate **code** from dropdown list

8.Select the **PWPS date**

9.Select **material 1 and material 2**

10.Enter **section** name

11.Enter **P No 1 and 2**

12.Enter **Group no 1 &amp;2**

13.Select the PWPS for as pressure vesse

14.Enter **revision number**

15.Enter **Remarks**

16.Select **pwps type**

17.Select **subcontractor** name-if any

After all mandatory fields entered,click **save** button.

**PWPS created successfully.**

Once you have added the pwps, you can add the pwps parameters.

#### **Add PWPS Parameters**

To add parameters for the added PWPS,

1\. Click [![image-1651052170498.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651052170498.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651052170498.png)(Edit icon) in the **Edit PWPS** column. See Fig below

<div class="pointer-container" id="bkmrk-%C2%A0-0"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--132" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div> The page redirects you to another page to add the PWPS parameters.

[![image-1778677651640.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778677651640.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778677651640.png)

[![image-1778677728088.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778677728088.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778677728088.png)

Enter all the parameter values for all the sections and save.

#### **Edit a PWPS**

If you want to edit any existing PWPS in the **PWPS** page, do the following,

1\. Click [![image-1651052827737.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651052827737.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651052827737.png)(Edit icon) in the **Edit** column for the respectivePWPS.

 The page shows the details of added PWPS.

[![image-1778677997706.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778677997706.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778677997706.png)

2\. Click on any field where you want to update the details, and enter the value.

3\. Click **Save**.

PWPS updated successfully.

#### **Delete a PWPS**

If you want to delete any specific PWPS from the list of added PWPS, you can use [![image-1651052947614.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651052947614.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651052947614.png)(Delete icon) provided in the **Delete** field of the **PWPS** page. T

#### **Print a PWPS Report**

If you want to print a PWPS report, click [![image-1651053025423.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651053025423.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651053025423.png)(Print icon) provided in the **Print PWPS** column.

#### **Attach a File into a PWPS**

If you want to attach any file with any PWPS listed in the **PWPS** page,

1\. Click [![image-1651054331095.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651054331095.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651054331095.png) provided in the **Attachment** column for the respective PWPS

The **File Upload (PWPS)** page opens.

[![image-1778678325396.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778678325396.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778678325396.png)

[![image-1651053085116.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651053085116.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651053085116.png)**Note**: Before uploading any file, read the instructions given in the **File Upload (PWPS)** page.

2.Enter the category of the attachment.

3\. Click [![image-1651053106655.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651053106655.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651053106655.png)(**Browse** button) to select a file to be uploaded.

4\. Select any file which you want to upload, from your computer.

5\. Click [![image-1651053137932.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651053137932.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651053137932.png)(**Upload** button) to attach the file.

 The uploaded file will be displayed in the screen.

####  Export PWPS List**

You can export a list of PWPS added in the **PWPS** page in the pdf and excel formats by using [![pdf.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/pdf.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651053186509.png) (**PDF** button) and

<div class="pointer-container" id="bkmrk-%C2%A0-1"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--133" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>[![excelimg.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/0fxexcelimg.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651053198607.png) (**Excel** button).

#### **PWPS Clone**

 You can clone a pwps by clicking clone button[![image-1778731704551.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778731704551.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778731704551.png)in clone column of the pwps list screen.

[![image-1778731742712.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778731742712.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778731742712.png)

1.Once clone button clicked, new add screen will be opened with all the fields filled with existing data.

[![image-1778731896002.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778731896002.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778731896002.png)

2.Do the changes if required

3.Click **Save** button.

#### **PWPS Workflow**

Once pwps created, it will goes to the three level approval workflow with respect to the clients.

1.After all the parameters entered, click send for approval[![image-1778730533245.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778730533245.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778730533245.png)button in Action column.

[![image-1778730488693.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778730488693.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778730488693.png)

2.Once PWPS send for approval, we cant edit/update/delete/attach the pwps details.

3.Reveiwer and Approver will do their approval in their dashboard screen.

4.Once the approver approves the PWPS, if any modification or revision is required, click the Reset Workflow button, make the necessary changes, and then send it again for approval.

[![image-1778730779386.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778730779386.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778730779386.png)

**Note :** The Approved pwps only can be used in the **PQR**.

#### **2 Procedure Qualification Record (PQR)**

A Procedure Qualification Record (PQR) is required when it is necessary to demonstrate that your company can produce welds with the required mechanical and metallurgical properties. A welding procedure must be qualified in accordance with the requirements of the applicable welding procedure standard (such as ASME Section IX, ISO 15614, etc.).

Each welder is separately qualified for a particular welding process, position, and range of parameters through a Welder Performance Qualification (WPQ). Therefore, weld testing for procedure qualification is typically performed by a competent welder, while individual welder qualification tests are carried out to ensure each welder meets the acceptance criteria for the process.

[![image-1778732157954.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778732157954.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778732157954.png)

The **PQR** tab in the **WPS &amp; Weld Details** menu used to add the details of PQR. To navigate to PQR,

1\. Click **PQR**

 The **PQR** page opens.

[![image-1651051890584.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651051890584.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651051890584.png)

**Figure 1.1: PQR Page**

#### **Add a PQR**

If you want to add a PQR, do the following steps,

1\. Click [![image-1651051940077.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651051940077.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651051940077.png) (**ADD** button) in the **PQR**  See Fig 1.1.

 The page shows a new box to add the details of a PQR.

[![image-1778730878981.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778730878981.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778730878981.png)

[![image-1651051995136.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651051995136.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651051995136.png)**Note**: The fields notified with the symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.

2\. In the **PQR Name** box, enter the name of a PQR. If not entered, the system will create a new number in a systematic manner.

3\. In the **Processes** field, select the welding process that you want to do.

Once you have selected the weld process, the page shows the **Process and Type** box for the selected welding process.

[![image-1651052030273.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651052030273.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651052030273.png)

a. In the **Process and Type** box, select the type of weld process from a drop-down list.

4\. In the **Overlay** box, if you want to conduct the weld overlay process select **Yes** else select **No**.

5\. Select the tests you want to conduct from the list of Required Properties Tests and Weld Quality Tests.

6\. In the **Temperature** box, enter the heat temperature value.

7\. In the **Time**box, enter the heating time.

8\. Enter the minimum impact value details in the  **Impact Value** field.

9\. Enter the maximum harness details in the  **Hardness** field.

10\. In the **Remarks** box, enter your remarks if any.

11.Enter **group number**

12.Select the **subcontractor**

13.Select the **code**

14.Select the **PQR type**

15\. Click **Save**.

The PQR is successfully added and will be listed in the **PQR** page. Once you have added the PQR, you can add the PQR parameters.

#### **Add PQR Parameters**

To add parameters for the added PQR,

1\. Click [![image-1651052170498.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651052170498.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651052170498.png)(Edit icon) in the **Edit PQR** column. See Fig 1.1.

 The page redirects you to another PQR page to add the PQR parameters.

[![image-1756213098524.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756213098524.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756213098524.png)

[![image-1756213125517.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756213125517.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756213125517.png)

[![image-1756213146876.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756213146876.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756213146876.png)

[![image-1756213184980.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756213184980.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756213184980.png)

[![image-1756213204884.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756213204884.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756213204884.png)

[![image-1756213223958.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756213223958.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756213223958.png)

[![image-1756213246441.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756213246441.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756213246441.png)

[![image-1756213272927.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756213272927.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756213272927.png)

[![image-1756213290535.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756213290535.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756213290535.png)

2\. If you want add any image, click **Browse** and add the image.

3\. In the **Notes** box, enter the notes.

4\. Click **Save**.

5\. In the **Joint Details** window, enter the relevant details the respective boxes.

6\. Click **Save**.

7 .In the **Base Material** window, enter the details of material 1 and material 2.

8\. In the **Diameter of Test Coupon** box, enter the diameter value of test coupon.

9\. In the **Maximum Pass Thickness** box, enter the maximum value of pass thickness.

10\. In the **Notes** box, enter your notes.

11\. Click **Save**.

12\. In the **Filler Material** window, enter the details of filler material.

13\. Click **Save**.

14\. In the **Position** window, enter the position detail.

15\. In the **Notes** box, enter your notes if any.

16\. Click **Save**.

17\. In the **PREHEAT** window, enter the preheat details and click **Save**.

18\. In the **POSTWELD HEAT TREATMENT** window, enter the post weld heat treatment details.

19\. Click **Save**.

20\. In the **ELECTRICAL CHARACTERISTICS** window, enter the electrical characteristics.

21\. Click **Save**.

22\. In the **TECHNIQUE** box, enter the technique details.

23\. Click **Save**.

24\. In the **WELDING PROCEDURE PARAMETERS** window, click [![image-1651052530778.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651052530778.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651052530778.png) (**ADD** button).

The window opens a new box to add the WPQ parameters.

[![image-1651052542040.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651052542040.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651052542040.png)

25\. Enter the weld parameters details and click **Update**.

26\. Click **Save**.

27\. In the **TENSILE TEST** window, click [![image-1651052585068.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651052585068.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651052585068.png)(**ADD** button).

 The window opens a new box to add the tensile test details.

[![image-1756251687524.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756251687524.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756251687524.png)

[![image-1651052594574.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651052594574.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651052594574.png)

28\. Enter the tensile test details and click **Update**.

29\. Click **Save**.

30\. In the **GUIDED BEND TEST** window, click [![image-1651052634217.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651052634217.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651052634217.png)(**ADD** button).

 The window opens a new box to add the guided bend test details.

[![image-1756251718577.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756251718577.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756251718577.png)

[![image-1651052645348.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651052645348.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651052645348.png)

31\. Enter the guided bend test details and click **Update**.

32\. Click **Save**.

33\. In the **TOUGHNESS TESTS** window, click [![image-1651052683281.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651052683281.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651052683281.png)(**ADD** button).

 The window opens a new box to add the toughness test details.

[![image-1756251757390.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756251757390.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756251757390.png)

34\. Enter the toughness test details and click **Update**.

35\. Click **Save**.

36\. In the **Fillet Weld Test** window, enter the details of fillet weld test.

37\. Click **Save**.

39\. In **Other Tests** window, enter the details of any other test you performed.

40\. In the **Report Details** window, enter the report details.

41\. Click **Save All**.

The PQR parameters are successfully added.

#### **Edit a PQR**

If you want to edit any existing PQR in the **PQR** page, do the following,

1\. Click [![image-1651052827737.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651052827737.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651052827737.png)(Edit icon) in the **Edit** column for the respective PQR. See Fig 6.1.

 The page shows the details of added PQR.

[![image-1778731520721.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778731520721.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778731520721.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **Delete a PQR**

If you want to delete any specific PQR from the list of added PQRs, you can use [![image-1651052947614.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651052947614.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651052947614.png)(Delete icon) provided in the **Delete** field of the **PQR** page. To know how to delete, see the topic, “[**<u>Delete Any Client</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/master-data#bkmrk-3.1.3-delete-a-clien)”.

#### **Print a PQR Report**

If you want to print a PQR report, click [![image-1651053025423.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651053025423.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651053025423.png)(Print icon) provided in the **Print PQR** column.

#### **Attach a File into a PQR**

If you want to attach any file with any PQR listed in the **PQR** page,

1\. Click [![image-1651054331095.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651054331095.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651054331095.png) provided in the **Attachment** column for the respective PQR in the **PQR list.**

The **File Upload (PQR)** page opens.

[![image-1778741800621.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778741800621.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778741800621.png)

[![image-1651053085116.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651053085116.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651053085116.png)**Note**: Before uploading any file, read the instructions given in the **File Upload (PQR)** page.

2.Enter the category of the attachment.

3\. Click [![image-1651053106655.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651053106655.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651053106655.png)(**Browse** button) to select a file to be uploaded.

4\. Select any file which you want to upload, from your computer.

5 Click [![image-1651053137932.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651053137932.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651053137932.png)(**Upload** button) to attach the file.

 The uploaded file will be displayed in the **File Upload** table.

####  Export PQRs List**

You can export a list of PQRs added in the **PQR** page in the pdf and excel formats by using [![pdf.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/pdf.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651053186509.png) (**PDF** button) and

[![excelimg.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/0fxexcelimg.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651053198607.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Clients List</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/master-data#bkmrk-3.1.4-export-clients)”.

#### **Filter a PQR**

If you want to filter any specific PQR in the **PQR** page, you can use [![image-1651053238386.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651053238386.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651053238386.png)(**FILTER** button) provided in the **PQR** page.

#### **Import Multiple PQRs**

If you want to import multiple PQRs together, do the following,

1\. Click [![image-1651053287925.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651053287925.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651053287925.png)(**TEMPLATE** button) on the **PQR** See Fig 6.1.

 A template will be downloaded as an excel worksheet to enter the details of PQR.

[![image-1651053309774.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651053309774.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651053309774.png)

2\. Enter the relevant details in the required columns on the excel worksheet.

3\. Once you have added the PQR details in the excel worksheet, save the excel worksheet on your computer.

4\. Click [![image-1651053359432.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651053359432.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651053359432.png)(**IMPORT** button). See Fig 6.1.

A new box opens for importing the excel worksheet saved on your computer.

[![image-1651053375166.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651053375166.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651053375166.png)

5\. Click [![image-1651053392623.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651053392623.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651053392623.png)(**Browse** button) to select the excel worksheet to be uploaded.

6\. Select the excel worksheet you want to upload from your computer.

7\. Click [![image-1651053429207.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651053429207.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651053429207.png)(**Upload** button) to export the PQR details that are included in the excel worksheet.

The details of the PQR in the worksheet will be displayed in the **PQR** page.

#### **PQR Clone**

 You can clone a PQR by clicking clone button[![image-1778731704551.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778731704551.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778731704551.png)in clone column of the PQR list screen.

[![image-1778732918377.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778732918377.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778732918377.png)

1.Once clone button clicked, new add screen will be opened with all the fields filled with existing data.

[![image-1778732945552.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778732945552.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778732945552.png)

2.Do the changes if required

<div class="pointer-container" id="bkmrk-%C2%A0-4"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--134" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>3.Click **Save** button.

#### **3 Welder Procedure Specification (WPS)**

A Welding Procedure Specification (WPS) provides direction to welders and welding operators for producing sound and quality welds in accordance with code requirements. Each welder is certified through a qualification test, documented in a Welder Performance Qualification (WPQ or WQTR), which demonstrates that the welder has the required skill and ability to deposit weld metal following the specified WPS.

A WPS must be supported by a Procedure Qualification Record (PQR), which proves that the procedure can produce welds with the necessary mechanical properties. The WPQ/WQTR, on the other hand, validates the welder’s ability to follow the WPS.

The **WPS** in the **Weld &amp; Weld Details** menu used to add the details of WPS. To navigate to WPS,

1\. Click **WPS** in the **Welding menu.**

 The **WPS** page opens.

[![image-1778744816209.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778744816209.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778744816209.png)

**Figure 1.2: WPS page**

#### **Add a WPS**

If you want to add a WPS, do the following steps,

1\. Click [![image-1651053609623.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651053609623.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651053609623.png)(**ADD** button) in the **WPS**  See Fig 1.2.

 The page shows a new box to add the details of a WPS.

[![image-1778744244696.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778744244696.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778744244696.png)

[![image-1651053646501.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651053646501.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651053646501.png)**Note**: The fields notified with the symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.

2\. In the **WPS Number** box, enter the name of a WPS otherwise system will auto generate wps number.

3\. In the **WPS Level** box, select the level of WPS whether **Global** or **Project**.

4\. In the **PQR** box, select the PQR number from a drop-down list.

5\. In the **Processes** field, select the welding process that you want to do.

Once you have selected the weld process, the page shows the **Process and Type** box and **Root Weld Process** box for the selected welding process.

[![image-1651053689892.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651053689892.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651053689892.png)

a. In the **Root Weld Process** box, select the root weld process type.

b. In the **Process and Type** box, select the type of weld process from a drop-down list.

6\. In the **Material 1**and **Material 2** boxes, select the material 1 and 2 from a drop-down list.

7\. In the **Overlay** box, if you want to conduct the weld overlay process select **Yes** else select **No**.

8\. In the **Date** box, select the date of adding WPS.

9\. In the **code** box, select the appropriate code from dropdown list

10.Enter P.No 1&amp;2

11.Enter Group Number 1&amp;2

12.In the wps for box,select the module

13\. In the **Remarks** box, enter your remarks if any.

14\. In the **subcontractor** box, select the subcontractor from a drop-down list.

15.In the PWHT box, select appropriate value

16.In the Revision box,enter the revision number

17.In the Type box,select the type of the wps

18.In the welding consumable box, select the appropriate consumable from dropdown list

19\. Click **Save**.

The WPS is successfully added and will be listed in the **WPS** page. Once you have added the WPS, you can add the WPS parameters.

#### **Add WPS Parameters**

To add parameters for the added WPS,

1\. Click [![image-1651053857881.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651053857881.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651053857881.png)(Edit icon) in the **Edit WPS**  See Fig 1.2.

 The page redirects you to another WPS page to add the WPS parameters.

[![image-1756252226725.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756252226725.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756252226725.png)

[![image-1756252305966.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756252305966.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756252305966.png)

[![image-1756252332152.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756252332152.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756252332152.png)

[![image-1756252357953.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756252357953.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756252357953.png)

[![image-1756252375591.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756252375591.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756252375591.png)

[![image-1756252393295.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756252393295.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756252393295.png)

[![image-1756252409707.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756252409707.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756252409707.png)

[![image-1756252435104.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756252435104.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756252435104.png)

[![image-1756252453699.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756252453699.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756252453699.png)

2\. If you want add any image, click **Browse** and add the image.

3\. In the **Joint Details** window, enter the relevant joint details the respective boxes.

4\. Click **Save**.

5\. In the **Base Material** window, enter the details of material 1 and material 2.

6\. In the **Thickness Range** box, enter the thickness range details.

7\. In the **Notes** box, enter your notes.

8\. Click **Save**.

9\. In the **Filler Material** window, enter the details of filler material.

10\. Click **Save**.

11\. In the **Position** window, enter the position detail.

12\. In the **Notes** box, enter your notes if any.

13\. Click **Save**.

14\. In the **PREHEAT** window, enter the preheat details and click **Save**.

15 .In the **POSTWELD HEAT TREATMENT** window, enter the post weld heat treatment details.

16\. Click **Save**.

17\. In the **GAS (GMAW)**window, enter the details of GMAW process.

18\. In the **GAS (GTAW)**window, enter the details of GTAW process.

19\. In the **GAS (FCAW)**window, enter the details of FCAW process.

20\. In the **ELECTRICAL CHARACTERISTICS** window, enter the electrical characteristics.

21\. Click **Save**.

22\. In the **TECHNIQUE** box, enter the technique details.

23\. Click **Save**.

24\. In the **WELDING PROCEDURE PARAMETERS** window, click [![image-1651054100491.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651054100491.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651054100491.png) (**ADD** button).

The window opens a new box to add the WPQ parameters.

[![image-1651054120136.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651054120136.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651054120136.png)

25\. Enter the weld parameters details and click **Update**.

26\. In the **Notes** box, enter your notes if any.

27\. Click **Save All**.

The WPS parameters are successfully added.

#### **Edit a WPS**

If you want to edit any existing WPS in the **WPS** page, do the following,

1\. Click[![image-1651054193350.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651054193350.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651054193350.png)(Edit icon) in the **Edit** column for the respective WPS. See Fig 6.2.

 The page shows the details of added WPS.

[![image-1756252631202.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756252631202.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756252631202.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **Delete a WPS**

If you want to delete any specific WPS from the list of added WPSs, you can use [![image-1651054253930.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651054253930.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651054253930.png)(Delete icon) provided in the **Delete** field of the **WPS** page. To know how to delete, see the topic, “[**<u>Delete Any Client</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/master-data#bkmrk-3.1.3-delete-a-clien)”.

#### **View a WPS Report**

If you want to view a WPS report, click[![image-1651054289309.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651054289309.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651054289309.png) (Print icon) provided in the **Print WPS** column.

#### **Attach a File into a WPS**

If you want to attach any file with any WPS listed in the **WPS** page,

1\. Click [![image-1651054331095.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651054331095.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651054331095.png) provided in the **Attachment** column for the respective WPS

The **File Upload (WPS)** page opens.

[![image-1778741673014.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778741673014.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778741673014.png)

[![image-1651053085116.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651053085116.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651053085116.png)**Note**: Before uploading any file, read the instructions given in the **File Upload (WPS)** page.

2.Enter the category of the attachment.

3\. Click [![image-1651053106655.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651053106655.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651053106655.png)(**Browse** button) to select a file to be uploaded.

4\. Select any file which you want to upload, from your computer.

5\. Click [![image-1651053137932.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651053137932.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651053137932.png)(**Upload** button) to attach the file.

<div class="pointer-container" id="bkmrk-%C2%A0-6"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--135" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div> The uploaded file will be displayed in the screen.

#### **Export WPS List**

You can export a list of WPSs added in the **WPS** page in the pdf and excel formats by using [![pdf.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/pdf.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651054366660.png) (**PDF** button) and [![excelimg.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/0fxexcelimg.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651054375928.png) (**Excel** button).

#### **Filter a WPS**

If you want to filter any specific WPS in the **WPS** page, you can use [![image-1651055146822.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651055146822.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651055146822.png) (**FILTER** button) provided in the **WPS** page.

#### **WPS Clone**

 You can clone a wps by clicking clone button[![image-1778731704551.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778731704551.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778731704551.png)in clone column of the wps list screen.

[![image-1778740937144.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778740937144.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778740937144.png)

1.Project wps can be cloned

2.Once clone button clicked, new add screen will be opened with all the fields filled with existing data.

[![image-1778741144078.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778741144078.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778741144078.png)

3.Do the changes if required

4.Select the appropriate work order no

5.Click **Save** button.

#### **WPS Workflow**

Once pwps created, it will goes to the three level approval workflow with respect to the clients.

1.After all the parameters entered, click send for approval[![image-1778730533245.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778730533245.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778730533245.png)button in Action column.

[![image-1778741193130.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778741193130.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778741193130.png)

2.Once WPS send for approval, we cant edit/update/delete/attach the pwps details.

3.Reveiwer and Approver will do their approval in their dashboard screen.

4.Once the approver approves the WPS, if any modification or revision is required, click the Reset Workflow button, make the necessary changes, and then send it again for approval.

[![image-1778730779386.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778730779386.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778730779386.png)

<div class="pointer-container" id="bkmrk-%C2%A0-7"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--136" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>**Note :** The Approved wps only can be used in the welder qualification.

#### **Import Multiple WPSs**

If you want to import multiple WPSs together, do the following,

1\. Click [![image-1651055230759.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651055230759.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651055230759.png) (**TEMPLATE** button) on the **WPS** See Fig 6.2.

 A template will be downloaded as an excel worksheet to enter the details of WPS.

[![image-1651055246374.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651055246374.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651055246374.png)

2\. Enter the relevant details in the required columns on the excel worksheet.

3\. Once you have added the WPS details in the excel worksheet, save the excel worksheet on your computer.

4\. Click [![image-1651055290415.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651055290415.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651055290415.png)(**IMPORT** button). See Fig 6.2.

 A new box opens for importing the excel worksheet saved on your computer.

[![image-1651055307091.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651055307091.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651055307091.png)

5\. Click [![image-1651055328077.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651055328077.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651055328077.png)(**Browse** button) to select the excel worksheet to be uploaded.

6\. Select the excel worksheet you want to upload from your computer.

7\. Click [![image-1651055368680.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651055368680.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651055368680.png)(**Upload** button) to export the WPS details that are included in the excel worksheet.

The details of the WPS in the worksheet will be displayed in the **WPS** page.

#### **4 AI Dodument Extract**

This AI dodumnet extract helps us to capture data from pdf files of PQR/WPS and stored this in the cuteqm.

[![image-1778743164075.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778743164075.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778743164075.png)

1.Click AI Document Extract menu.It redirected to new page where pdf file to be uploaded.

2.Select the **type - PQR/WPS**

3.Click **Browse**[![image-1778743655820.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778743655820.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778743655820.png)button and upload the pdf file of PQR/WPS from the local

4.Click **Extract**[![image-1778743627668.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778743627668.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778743627668.png)button.

5.Wait for few seconds.The pdf file will be extracted successfully.

6.Go to the PQR/WPS screen to see the extracted PQR/WPS.

[![image-1778743548400.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778743548400.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778743548400.png)

#### **5.WQT Request**

It is a request raised to conduct a welding qualification test for a welder to verify whether the welder is capable of performing welding as per required codes/standards.

[![image-1778747766525.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778747766525.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778747766525.png)

##### **Add a WQT Request**

1.Click Add icon[![image-1778748051279.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778748051279.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778748051279.png)at the top of the WQT list screen.

[![image-1778748099668.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778748099668.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778748099668.png)

2.In the **Project** field,select the project number from dropdown list

3.Select the **Module** from dropdown list

4.**WQT Type**- Select fromthe dropdown list

5.**Tested date**- Select the date of test

6.**Issues date**-Select the issue date

7.**Applicable code**-Enter applicable code for the request

8.**Code**-Enter the code/year

9.**Witnessed by**-Enter the witness name

10.Click **save** button

**WQT request created successfully.**

##### **Edit WQT Request**

If you want to edit any existing WQT Request , do the following,

1\. Click (Edit icon) in the **Edit** column for the respective WQT Request.

 The page shows the details of addedWQT Requests.

[![image-1778762087336.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778762087336.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778762087336.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

##### **Delete a WQT Request**

<div class="pointer-container" id="bkmrk-%C2%A0-8"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--137" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>If you want to delete any specific WQT from the list of added WQTs, you can use [![image-1651059962918.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651059962918.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651059962918.png) (Delete icon) provided in the **Delete** field of the **WQT Request** page.

##### **Attach a File into a WQT**

If you want to attach any file with any WPQ listed in the **WQT Request** page, you can use[![image-1651060055839.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651060055839.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060055839.png) (Attach icon) provided in the **Attachment** column for the respective WQT .

#####  Export WQT List**

You can export a list of WQTs added in the **WQT Request** page in the pdf and excel formats by using [![pdf.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/pdf.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060103221.png) (**PDF** button) and [![excelimg.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/0fxexcelimg.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060118007.png) (**Excel** button).

##### **Filter a WQT**

If you want to filter any specific WQT in the **WQT Request** page, you can use [![image-1651060172466.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651060172466.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060172466.png) (**FILTER** button) provided in the screen.

##### **Import Multiple WQTs**

If you want to import multipleWQT's together, do the following,

1\. Click [![image-1651060218811.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651060218811.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060218811.png)(**TEMPLATE** button) on the WQTrequest screen.

A template will be downloaded as an excel worksheet to enter the details of WQT .

[![image-1778763081400.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778763081400.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778763081400.png)

2\. Enter the relevant details in the required columns on the excel worksheet.

3\. Once you have added the WQT details in the excel worksheet, save the excel worksheet on your computer.

4.Click [![image-1651060280068.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651060280068.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060280068.png)(**IMPORT** button).

A new box opens for importing the excel worksheet saved on your computer.

[![image-1651060298245.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651060298245.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060298245.png)

5\. Click [![image-1651060318134.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651060318134.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060318134.png)(**Browse** button) to select the excel worksheet to be uploaded.

6\. Select the excel worksheet you want to upload from your computer.

7\. Click [![image-1651060350938.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651060350938.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060350938.png)(**Upload** button) to export the WQT details that are included in the excel worksheet.

The details of theWQT in the worksheet will be displayed in the **WQT Request** page.

##### **Add WQT Details**

Once WQT Request created, we can add WQT details against the request.

[![image-1778749698942.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778749698942.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778749698942.png)

1.Click the[![image-1778749404055.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778749404055.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778749404055.png)icon in the result column to view/add the WQT details.This will redirected to new screen.

[![image-1778753535276.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778753535276.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778753535276.png)

2.Click the Add icon to qualify welder details.

[![image-1778753955008.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778753955008.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778753955008.png)

3.Select New welder or Existing welder

If New welder selected

4.**Welder name**-Enter the name of the welder

5.**Aadhaar No-**Enter aadhaar number of the welder

6.**Subcontractor(Qualified)**-Select the subcontractor from the dropdown list

7.**WPS**-Select the wps from the dropdown list

8.**Process**-Select the process which needs to qualify for the welder

9.**Material description**-Enter material description in the text box

10.**Backing**-Select Yes/No

11.**Material**-Select the material from the dropdown list

12.**Weld type**-Select the weld type

13.**Test position**-Select the position

14.**Visual**-Select the visual result

15.**Pipe size**-Enter the pipe size

16.**Specimen thick**-Enter the thickness

17.**Plate size** -Enter the size of the plate

18.**Joint type** -Enter joint type

19.**RT/Mechanical testing** -Select the result

20.**Code**-Enter the code

21.**RT report number**-Enter the RT report numer

22.**Qulaification type**-Select the type in the dropdown list

23.**Qualification date**-Select the qulaified date

24.**Remarks**-Enter remarks(if any)

Click **save** button .

WQT Details saved successfully.

##### **Edit WQT Details**

**1.**Click edit icon[![image-1778756445486.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778756445486.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778756445486.png)on the WQT details screen

[![image-1778756417105.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778756417105.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778756417105.png)

2.Update the fields which needs to modify

3.Click **Save** button.

WQT Details updated successfully.

##### **Update welder certificate details**

1.Click certificate[![image-1778759017796.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778759017796.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778759017796.png)icon on the welder certificate column of the list screen.

[![image-1778759052270.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778759052270.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778759052270.png)

2.Fill the parameters in the welder certificate popup

[![image-1778760604780.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778760604780.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778760604780.png)

3.Click **save** button.

**Welder certificates updated successfully.**

##### **WQT Workflow**

**1.**Once the weld result and RT results are accepted and welder certificates filled,then the workflow button will enable.

[![image-1778760784814.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778760784814.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778760784814.png)

2.Click send for approval button.Once workflow button triggered,then edit/delete icons will be disappeared in the screen.

3.Reviewer and Approver will complete the workflow in their dashboard.

4.Once workflow approved, this details will be automatically saved in WPQ welder qualification screen.

5.If any modification or revision is required, click the Reset Workflow button, make the necessary changes, and then send it again for approval.

[![image-1778761286306.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778761286306.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778761286306.png)

#### **6 Welders**

Welder is a person whose job is to weld materials together. This functionality has provided to add new welders who has going to work in the Pressure Vessel, and to maintain existing users.

The **Welders** tab in the **Welding** menu helps you to add the welders. To navigate to **Welders**,

1\. Click **Welders** in the **Welding** The **Welders** page opens.

[![image-1651057072358.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651057072358.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651057072358.png)

**Figure 1.3: Welders page**

#### **Add a Welder**

If you want to add a new welder, do the following steps,

1\. Click [![image-1651057128620.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651057128620.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651057128620.png)(**ADD** button) in the **Welders**  See Fig 1.3.

The page shows a new box to add the details of a welder.

[![image-1651057145293.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651057145293.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651057145293.png)

[![image-1651057170204.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651057170204.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651057170204.png)**Note**: The fields notified with the symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.

2\. In the **Name** box, enter the name of a welder.

3\. In the **Employee ID/Pass ID** box, enter the employee id.

4\. In the **NRIC/Passport** box, enter the NRIC/Passport number.

5\. In the **Nationality** box, select the nationality of the welder.

6\. In the **Welder No/ID** box, enter the welder ID number.

7\. In the **Welder Group** box, select the welder group from a drop-down list.

8\. In the **Qualification Company Name** box, enter the qualification company name.

9\. In the **Photo** box, browse and attach the photo of the welder.

10\. Click **Save**.

The welder is successfully added and will be listed in the **Welders** page. Once you have added the welder, you can add the certificates of the welder.

#### **Add Certificates of Welder**

To add certificates of welder,

1\. Click [![image-1651058098497.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651058098497.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651058098497.png)(Expand icon) of the respective welder. See Fig 1.3.

The **Certificates** window opens to add the certificates.

[![image-1651058143906.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651058143906.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651058143906.png)

2\. Click [![image-1651058227223.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651058227223.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651058227223.png)(**ADD** button).

The window shows a box to add the certificate.

[![image-1651058247486.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651058247486.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651058247486.png)

3\. In the **About Certificate** box, enter the name of the certificate.

4\. In the **Certificate** box, browse and attach the certificate of the welder.

5\. Click **Update**.

The welder’s certificate is successfully added.

[![image-1651058294968.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651058294968.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651058294968.png)**Note**: If you want to inactivate any welder, select the checkbox provided in the **InActive** column for the respective welder.

#### **Edit a Welder**

If you want to edit any existing welder in the **Welders** page, do the following,

1\. Click [![image-1651058375872.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651058375872.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651058375872.png)(Edit icon) in the **Edit** column for the respective welder. See Fig 6.3.

 The page shows the details of added welder.

[![image-1651058388757.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651058388757.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651058388757.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **Delete a Welder**

If you want to delete any specific welder from the list of added welders, you can use [![image-1651058445376.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651058445376.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651058445376.png)(Delete icon) provided in the **Delete** field of the **Welders** page.

#### **View a Welder Log**

If you want to view a Welder log, click[![image-1651058508903.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651058508903.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651058508903.png) (Print icon) provided in the **Welder Log** column.

#### **Export Welders List**

You can export a list of welders added in the **Welders** page in the pdf and excel formats by using [![pdf.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/pdf.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651058548216.png)(**PDF** button) and

[![excelimg.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/0fxexcelimg.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651058559583.png) (**Excel** button).

#### **Filter a Welder**

If you want to filter any specific welder in the **Welders** page, you can use [![image-1651058590924.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651058590924.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651058590924.png)(**FILTER** button) provided in the **Welders** page. See Fig 1.3.

#### **Import Multiple Welders**

If you want to import multiple welders together, do the following,

1\. Click [![image-1651058641510.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651058641510.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651058641510.png)(**TEMPLATE** button) on the **Welders** See Fig 1.3.

A template will be downloaded as an excel worksheet to enter the details of welders.

[![image-1756255564615.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756255564615.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756255564615.png)

2\. Enter the relevant details in the required columns on the excel worksheet. Red color highlighted Name and Welder Number are mandatory.

3\. Once you have added the welder details in the excel worksheet, save the excel worksheet on your computer.

4\. Click [![image-1651058700326.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651058700326.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651058700326.png)(**IMPORT** button). See Fig 6.3.

A new box opens for importing the excel worksheet saved on your computer.

[![image-1651058718926.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651058718926.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651058718926.png)

5\. Click [![image-1651058738184.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651058738184.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651058738184.png) (**Browse** button) to select the excel worksheet to be uploaded.

6\. Select the excel worksheet you want to upload from your computer.

7\. Click [![image-1651058769319.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651058769319.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651058769319.png)(**Upload** button) to export the welder details that are included in the excel worksheet.

The details of the welder in the worksheet will be displayed in the **Welders** page.

#### **7 Welder Qualification (WPQ)**

A Welder Qualification Test (WQT) is the process of verifying and certifying a welder’s ability to produce welds that meet prescribed quality and code requirements.

The **WQT** tab in the **Welding** menu used to add the WQT details of the welder. To navigate to the **WQT**,

1\. Click **WQT** in the **Welding** menu.

 The **Welder Qualification** page opens.

[![image-1651058905260.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651058905260.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651058905260.png)

**Figure 1.4: Welder Qualification page**

<table border="1" id="bkmrk-the-welder-qualifica" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">The welder qualification data in Yellow color shows that the welder qualification data are about to expire within 15 days. So, you must requalify the welder.

The welder qualification data in Red color shows that the welder qualification data has expired. So, you must requalify the welder. To know how to requalify the welder, see the topic, “[**<u>Requalify the Added WPQ of Welder</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.4.4-requalify-the-)”.

</td></tr></tbody></table>

#### **Add a WPQ**

If you want to add working qualifications test details of for any added welder, do the following steps,

1\. Click [![image-1651058979629.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651058979629.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651058979629.png)(**ADD** button) in the **Welders**  See Fig 1.4.

The page shows a new box to add the qualification details of a welder.

[![image-1651058996127.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651058996127.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651058996127.png)

2\. In the **Welder Name** box, select the welder name from a drop-down list.

3\. In the **WPS Weld Process** box, select the WPS weld process from a drop-down list.

4\. In the **Qualified Positions** box, enter the detail of qualified positions.

5\. In the **Weld Type** box, select a weld type from the given weld types.

6\. In the **Weld Position** box, select a weld position from the given weld positions.

7\. In the **Code Standard** box, select the code standard from a drop-down list.

8\. In the **Qualify Date** box, select the qualified date.

9\. In the **Last Weld Date** box, select the last weld date.

10\. In the **Certificate No/Report Number** box, enter the certificate/ report number.

11\. If the welder is external qualified, select the checkbox of the **External Qualified**

12\. If the welder is disqualified, select the checkbox of the **Disqualified**

13\. Click **Update.**

The qualification of the welder is successfully updated. Once you have added welder qualification, you can add the WPQ search parameters and WPQ details of the welder.

#### **Add WPQ Parameters**

To add the WPQ search parameters,

1\. Click[![image-1651059142388.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651059142388.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651059142388.png)(Edit icon) in the **Search**  See Fig 1.4.

The **WPQ Search Parameters** window opens.

[![image-1651059156799.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651059156799.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651059156799.png)

2\. In the **Backing** column, enter the backing detail whether true or false.

3\. In the  **No** column, enter the pipe number.

4\. In the  **No** column, enter the fillet number.

5\. In the **Weld Metal Thk** column, enter the groove and fillet thickness.

6\. In the **Position** column, enter the position detail of pipe and fillet.

7\. Click **Save**.

The WPQ search parameters are successfully added.

#### **Add WPQ Details**

To add WPQ details,

1\. Click[![image-1651059261643.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651059261643.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651059261643.png)(Edit icon) in the **Edit WPQ** column of the respective welder. See Fig 1.4.

 The **WPQ** page opens.

[![image-1651059296939.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651059296939.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651059296939.png)

2\. In the **Testing Variables and Qualification Limits** window, enter the testing variables and qualification limits values in the respective boxes.

[![image-1651059541340.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651059541340.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651059541340.png)**Note**: The **Testing Variables and Qualification Limits** window has **Actual Values** and **Range Qualified** columns. The **Actual Values** column shows the values, which you have entered. The **Range Qualified** column shows the values, which are calculated based on the pre-defined criteria.

3\. In the **Testing Results** field, enter the testing results details.

4\. Click **Save All**.

The WPQ details are successfully added.

#### **Requalify the Added WPQ of Welder**

If the added welder qualification details have expired, you can re-qualify the welder by using this **Re-Qualify** option.

1\. Click [![image-1651059611574.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651059611574.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651059611574.png)(Add icon) of the respective welder.

The window shows the welding history of the respective welder if there are any welds done by welder.

[![image-1651059631026.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651059631026.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651059631026.png)

2\. To requalify the welder’s certificate using latest weld done by this welder,

a. Navigate to the **Latest Weld done by this Welder** window.

b. Select the welds you want to requalify.

c. Click **Update**.

The system requalifies the welder and updates the date and changes the requalified welder’s row from **Red** color to **White** color.

3\. To requalify the welderusing production test coupen.

a. Select the **Production Test Coupon** if there is any click Requalify**.**

4\. To requalify the welder’s certificate manually enter the weld date and click Add.

a. In the **Weld Date** box, select the weld date.

b. Click[![image-1651059790975.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651059790975.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651059790975.png) (**Add** button).

Now, the welder will be requalified, and the system automatically changes the requalified welder`s row from **Red** color to **White** color.

##### **Auto requalification**

We shall configure the auto requalification using welds performed and this will be sent in an email prior to automatically requalifying the welder.

#### **Edit a WPQ**

If you want to edit any existing welder qualification in the **Welder Qualification** page, do the following,

1\. Click (Edit icon) in the **Edit** column for the respective welder qualification. See Fig 6.4.

 The page shows the details of added welder qualification.

[![image-1651059912400.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651059912400.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651059912400.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **Delete a WPQ**

If you want to delete any specific WPQ from the list of added WPQs, you can use [![image-1651059962918.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651059962918.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651059962918.png) (Delete icon) provided in the **Delete** field of the **Welder Qualification** page. To know how to delete, see the topic, “[**<u>Delete Any Client</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/master-data#bkmrk-3.1.3-delete-a-clien)”.

#### **View a Welder Pass**

If you want to view a welder pass, click [![image-1651059995496.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651059995496.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651059995496.png)(Print icon) provided in the **Welder Pass** column.

#### **View a WPQ Report**

If you want to view a WPQ report, click [![image-1651059995496.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651059995496.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651059995496.png) (Print icon) provided in the **Print** column.

#### **Attach a File into a WPQ**

If you want to attach any file with any WPQ listed in the **Welder Qualification** page, you can use[![image-1651060055839.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651060055839.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060055839.png) (Attach icon) provided in the **Attachment** column for the respective WPQ in the **Welder Qualification** page.

#### **6.4.10 Export WPQ List**

You can export a list of WPQs added in the **Welder Qualification** page in the pdf and excel formats by using [![pdf.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/pdf.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060103221.png) (**PDF** button) and [![excelimg.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/0fxexcelimg.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060118007.png) (**Excel** button). T

#### **6.4.11 Filter a WPQ**

If you want to filter any specific WPQ in the **Welder Qualification** page, you can use [![image-1651060172466.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651060172466.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060172466.png) (**FILTER** button) provided in the **Welder Qualification** page. See Fig 1.4.

#### **6.4.12 Import Multiple WPQs**

If you want to import multiple welder qualifications together, do the following,

1\. Click [![image-1651060218811.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651060218811.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060218811.png)(**TEMPLATE** button) on the **Welders** See Fig 1.4.

A template will be downloaded as an excel worksheet to enter the details of welders qualifications.

[![image-1651060238096.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651060238096.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060238096.png)

2\. Enter the relevant details in the required columns on the excel worksheet.

3\. Once you have added the WPQ details in the excel worksheet, save the excel worksheet on your computer.

4.Click [![image-1651060280068.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651060280068.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060280068.png)(**IMPORT** button). See Fig 1.4.

A new box opens for importing the excel worksheet saved on your computer.

[![image-1651060298245.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651060298245.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060298245.png)

5\. Click [![image-1651060318134.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651060318134.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060318134.png)(**Browse** button) to select the excel worksheet to be uploaded.

6\. Select the excel worksheet you want to upload from your computer.

7\. Click [![image-1651060350938.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651060350938.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060350938.png)(**Upload** button) to export the welder details that are included in the excel worksheet.

The details of the welder qualification in the worksheet will be displayed in the **Welder Qualification** page.

#### **View a Welder Registration and Tracking Record**

If you want to view a welder registration and tracking record, click [![image-1651060430238.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651060430238.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060430238.png) (Print icon) provided in the upper side of the **Welder Qualification** page.

#### **8 WPS in Projects**

The **WPS in Project** tab in the **Welding** menu helps you to add a WPS report and assign the WPS to a project.

1\. Click **WPS in Project** tab in the ****Welding**** menu.

 The WPS by projects page opens with two fields such as **WPS Summary** and **Assign WPS to Project**.

[![image-1651060523400.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651060523400.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060523400.png)

**Figure 6.5: WPS in projects page**

#### **8.1 Add a WPS Report**

If you want to add a new WPS report, do the following,

1\. Click [![image-1651060599967.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651060599967.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060599967.png)(**ADD** button) in the **WPS Summary**  See Fig 6.5.

 A new box opens to add a WPS report.

[![image-1651060621095.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651060621095.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060621095.png)

[![image-1651060639105.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651060639105.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060639105.png)**Tip**: A report number for a new WPS report will be updated automatically in the **Report Number** box. If you want to change the report number, you can change.

2\. In the Prepared By box, enter the name of a person who has prepared the WPS report.

3\. In the Reviewed By box, enter the name of a person who has reviewed the WPS report.  
   
4\. In the Approved By box, enter the name of a person who has approved the WPS report.

5\. In the Prepared Date box, choose the prepared date of the WPS report.

6 .In the Reviewed Date box, choose the reviewed date of the WPS report.

7\. In the Approved Date box, choose the approved date of the WPS report.

8\. Click Save.

The WPS report is successfully added.

#### **8.2 View a WPS Summary Report**

If you want to view a WPS summary report, click [![image-1651060739526.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651060739526.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060739526.png)(Print icon) provided in the **WPS Summary Report** column.

#### **8.3 View a WPS Summary Report with PQR**

If you want to view a WPS summary report with PQR, click [![image-1651060739526.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651060739526.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060739526.png) (Print icon) provided in the **WPS Summary with PQR** column.

#### **8.4 Attach a File into a WPS Summary Report**

If you want to attach any file with any WPS summary report listed in the **WPS Summary** window, you can use [![image-1651060820105.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651060820105.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060820105.png) (Attach icon) provided in the **Attachment** column for the respective WPS summary report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **8.5 Export WPS Summary Reports List**

You can export a list of WPS summary reports added in the **WPS Summary** window in the pdf and excel formats by using

[![pdf.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/pdf.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060863203.png) (**PDF** button) and [![excelimg.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/0fxexcelimg.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060872705.png)(**Excel** button). To know how to export, see the topic, “[**<u>Export Clients List</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/master-data#bkmrk-3.1.4-export-clients)”.

#### **8.6 Assign WPS to Any Project**

The **Assign WPS to Project** field in the **WPS in projects** page allows you to assign the WPS to the project. If you want to assign any WPS to the project, do the following,

[![image-1651060904370.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651060904370.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060904370.png)

In the **Assign WPS to Project** field, the **All WPS** box displays a list of available WPS. The **WPS in Project** box displays a list of WPS that has been already assigned for the project.

1\. If you want to assign any WPS for the project, select the respective WPS in the **ALL WPS** box, and then click [![image-1651060930140.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651060930140.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060930140.png)

(Assign welder button).

2\. Click **Save**.

3\. If you want to reject any WPS that has been assigned for the project, select the respective WPS in the **WPS in Project** box, and then click [![image-1651060967816.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651060967816.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060967816.png) (Reject welder button).

#### **9 Welders in Projects**

The **Welders in Projects** tab in the **Welding** menu helps you to assign welders for a project. You can add a welder report by using this tab. This tab also helps you to view a welder list.

1\. Click **Welders in Projects** tab in **Welding**

 The welders in projects page opens with four fields such as **Welder Report**, **Assign Welder to Project**, and **Welder List**.

[![image-1651061591891.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651061591891.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651061591891.png)

**Figure 6.6: Welders in project page**

#### **9.1 Add a Welder Report**

If you want to add a welder report, do the following steps,

1\. Click [![image-1651062430517.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651062430517.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651062430517.png)(**ADD** button) in the **Welder Report** See Fig 6.6.

 A new box opens to add a welder report.

[![image-1651062461730.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651062461730.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651062461730.png)

[![image-1651062477442.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651062477442.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651062477442.png)**Tip**: A report number for a new welder report will be updated automatically in the **Report Number** box.

2\. In the Prepared By box, enter the name of welder who has prepared the welder report.

3\. In the Received By box, enter the name of welder who has received the welder report.

4\. In the Approved By box, enter the name of welder who has approved the welder report.

5\. In the Prepared Date box, choose the prepared date of the welder report.

6\. In the Received Date box, choose the received date of the welder report.

7\. In the Approved Date box, choose the approved date of the welder report.  
   
8\. Click Save.

The welder report is successfully added.

#### **9.2 View a Welder Report**

If you want to view a welder report, click [![image-1651062573843.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651062573843.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651062573843.png)(Print icon) provided in the **Report** column.

#### **9.3 Attach a File into a Welder Report**

If you want to attach any file with any welder report listed in the **Welder Report** window, you can use [![image-1651062616953.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651062616953.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651062616953.png)(Attach icon) provided in the **Attachment** column for the respective welder report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **9.4 Export Welder Reports List**

You can export a list of welder reports added in the **Welder Report** window in the pdf and excel formats by using [![pdf.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/pdf.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651062661621.png)

 (**PDF** button) and [![excelimg.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/0fxexcelimg.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651062671453.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Clients List</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/master-data#bkmrk-3.1.4-export-clients)”.

#### **9.5 Assign Welder to Project**

The **Assign Welder to Project** field in the welders in projects page allows you to assign any welder to the particular project. If you want to assign any welder to the project, do the following,

[![image-1651062705179.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651062705179.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651062705179.png)

1\. In the **All Welders** box, if you want to view all the welders, click **ALL** otherwise select the respective company’s welder group from a drop-down list to view their welders list.

Once you have selected the company’s welder group, the left-side box shows a list of welders. The right-side box shows a list of welders who has been already assigned for the project.

2\. If you want to assign any welder for the project, select the respective welder in the left-side box, and then click [![image-1651062743461.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651062743461.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651062743461.png)

(Assign welder button).

The selected welder will be assigned to the project.

3\. If you want to reject any welder who has been assigned for the project, select the respective welder in the right-side box, and then click [![image-1651062780635.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651062780635.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651062780635.png)(Reject welder button).

#### **9.6 Welder List**

The **Welder List** field in the welders in projects page shows the welder details such as welder name, welder number, NRIC, date of birth, and nationality. This field also helps you to assign the WPQs of welders to the project, and remove any WPQs from the project.

[![image-1651062813793.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651062813793.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651062813793.png)

If you click[![image-1651062829466.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651062829466.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651062829466.png)(Expand icon) of the respective welder, the **All WPQ** box shows the details of all WPQs of the welder, and the **Assigned to Project** box shows any WPQ that has been assigned to a project.

[![image-1651062838787.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651062838787.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651062838787.png)

1\. If you want to assign any WPQ for the project, select the respective WPQ in the **All WPQ** box, and then click [![image-1651062861875.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651062861875.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651062861875.png) (Assign WPQ button).

The selected welder will be assigned to the project.

2\. If you want to reject any WPQ that has been assigned for the project, select the respective WPQ in the **Assigned to Project** box, and then click [![image-1651062911574.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651062911574.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651062911574.png) (Reject WPQ button).

#### **10 Weld Map**

Weld mapping is the process of assigning information to a weld joint to enable easy identification of its design (WPS), production (welders, their qualifications, date welded), quality (visual inspection, NDT) and traceability (heat numbers of materials joined &amp; welding consumables).

The **Weld Map** tab in the **Tag Data** menu used to add a weld map.

[![image-1778822207935.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778822207935.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778822207935.png)

1\. Click **Weld Map menu**

 The **Weld Map** page opens.

[![image-1778822293498.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778822293498.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778822293498.png)

**Figure 6.7: Weld Map page**

#### **10.1 Add a Weld Map**

If you want to add a weld map, do the following steps,

1\. Click **weldmap** menu  See Fig 6.7.

2.An Add page will opens .

The page shows a new box to add the details of the weld map.

[![image-1778822401895.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778822401895.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778822401895.png)

[![image-1651063190363.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651063190363.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651063190363.png)**Tip**: A report number for a new weld map will be updated automatically in the **Report Number** box.

3\. In the Prepared By box, enter the name of welder who has prepared the weld map.

4\. In the Reviewed By box, enter the name of welder who has received the weld map.

5\. In the Approved By box, enter the name of welder who has approved the weld map.

6\. In the Prepared Date box, choose the prepared date of the weld map.

7\. In the Reviewed Date box, choose the reviewed date of the weld map.

8\. In the Approved Date box, choose the approved date of the weld map.

9\. Click **Save**.

The weld map is successfully added.

#### **10.2 Edit a Weld Map**

If you want to edit any existing weld map in the **Weld Map** page, do the following,

1\. Click[![image-1651063271576.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651063271576.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651063271576.png)(Edit icon) in the **Edit** column for the respective weld map. See Fig 6.7.

 The page shows the details of added weld map.

[![image-1778822513307.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778822513307.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778822513307.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **10.3 Attach a File into a Weld Map**

If you want to attach a file with any weld map listed in the **Weld Map** page, you can use[![image-1651063332140.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651063332140.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651063332140.png) (Attach icon) provided in the **Attachment** column for the respective weld map. To know how to attach, see the topic, “[**<u>Attach a file into a PWPS</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **10.4 Export Weld Maps List**

You can export a list of weld maps added in the **Weld Map** page in the pdf and excel formats by using [![pdf.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/pdf.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651063374584.png) (**PDF** button) and

[![excelimg.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/0fxexcelimg.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651063384993.png) (**Excel** button).

#### **10.5 Filter Any Weld Map**

If you want to filter any weld map in the **Weld Map** page, you can use [![image-1651063416907.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651063416907.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651063416907.png) (**FILTER** button) provided in the **Weld Map** page. See Fig 9.7. To know how to filter, see the topic, “[**<u>Filter Any User Account</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/manage-user#bkmrk-4.1.9-filter-a-user-)”.

#### **10.6.Print a Weld Map**

If you want to print a weldmap then click **print** icon[![image-1778823358162.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778823358162.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778823358162.png)on the weldmap screen.

Weldmap print gives a clear details of the weld plan and Test plan.

[![image-1778823565916.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778823565916.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778823565916.png)

#### **10.7 Weld Book,Weld Plan,Test Plan**

Weld and Test Plan is a document detailing a systematic approach to forming a weld joint by welding two or more workpieces (metal or plastic) according to a particular geometry. A welding joint is a point or edge where two or more pieces of metal or plastic are joined together.

[![image-1778823713596.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778823713596.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778823713596.png)

If you want to print weld book,weld plan and test plan, click the correcponding print button at the top as shown above.

#### **10.8 Revise weldmap**

To revise a weldmap, click Revise button placed in the revise column of the weldmap.(If workflow enabled,revise button will enable only after the workflow approval)

[![image-1779946343387.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1779946343387.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1779946343387.png)

# ITP and Test Procedures

The **Inspection Test Procedure Document** menu in the app has the functionality to add and manage the Inspection Test Plan (ITP), NDT requirements, and NDT procedures.

#### **1 Inspection Test Plan**

An Inspection and Test Plan (ITP) or test plan is a document detailing a systematic approach to testing a system or product to perform visual inspection, dimension inspection, welding inspection, function test, and factory acceptance test.

[![image-1756256389360.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756256389360.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756256389360.png)

The **Inspection Test Plan** tab in the **Inspection Document** menu helps you to prepare the inspection test plan. If you want to add the inspection test plan, do the following steps,

1\. Click the **Inspection Test Plan** tab in the **Project Data**

The **Inspection Test Plan (ITP)** page opens. If there are no ITP already created, system will automatically expands and show the below

[![image-1651149057214.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651149057214.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651149057214.png)

**Figure 1.1: Inspection Test Plan (ITP) page**

[![image-1651149085479.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651149085479.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651149085479.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.

2\. In the **Template** box, select a template from a drop-down list appears on the **Select from Templates** box or the **Select from Equipments** box. If templates are predefined earlier, use it. If you want to copy the ITP from another equipment choose the equipment.

**[![image-1651136863440.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136863440.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136863440.png)Tip**: A report number for the ITP report will be updated automatically in the **ITP** **Report Number** box.

3\. In the ITP Status box, select the ITP status from a drop-down list.  
   
4\. In the Date box, choose the date of status update.

5\. In the Non-Destructive Examination (NDE) box, enter the NDE details.  
   
6\. In the Remarks box, enter your remark if any.  
   
7\. In the Prepared By box, enter the name of a person who has prepared the ITP.  
   
8\. In the Reviewed By box, enter the name of a person who has reviewed the ITP.  
   
9\. In the Approved By box, enter the name of a person who has approved the ITP.  
   
10\. In the Prepared Date box, choose the prepared date of the ITP.

11\. In the Reviewed Date box, choose the reviewed date of the ITP.  
   
12\. In the Approved Date box, choose the approved date of the ITP report.  
   
13\. Click Save.

The ITP is successfully added.

#### Edit ITP [![image-1756257200982.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756257200982.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756257200982.png)

[![image-1756257170125.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756257170125.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756257170125.png)

Click on the [![image-1756257230497.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756257230497.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756257230497.png)edit ITP icon and the section below opens up.

Click to Add section as required.

Each section can be added with activities.

[![image-1756257695382.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756257695382.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756257695382.png)

Each activity can be edited and responsibilities of each party can be defined.

Enter the party Name here for making it available in each activity.

[![image-1756257769713.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756257769713.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756257769713.png)

Once all sections, activities are ready, Click the Print icon to print the ITP.

If workflow is enabled, it can sent for approval.

[![image-1778763697002.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778763697002.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778763697002.png)

#### **Export ITP list**

You can export a list of ITPs added in the **Inspection Test Plan (ITP)** page in the pdf and excel formats by using [![image-1651148446776.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651148446776.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651148446776.png) (**PDF** button) and [![image-1651148459859.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651148459859.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651148459859.png)(**Excel** button).

#### **IMPORT ITP**

**1.**Click **import** button in ITP screen as shown below

[![image-1778763833599.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778763833599.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778763833599.png)

2.It will navigate to import page.

3.Click template button[![image-1778764003472.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778764003472.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778764003472.png)to download the excel template.

[![image-1778764050399.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778764050399.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778764050399.png)

4.Fill the excel template with appropriate parameters.

5.Click **browse** button[![image-1778764290062.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778764290062.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778764290062.png)and browse the filled excel file from the local

6.Click **upload** button[![image-1778764311244.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778764311244.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778764311244.png)to upload the filled template

7.Click **auto map** button[![image-1778764337114.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778764337114.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778764337114.png)to map system and excel columns

8.Click **populate** values[![image-1778764380134.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778764380134.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778764380134.png)button

9.Click **process**[![image-1778765087480.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778765087480.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778765087480.png)button to populate the column values

10.Click **import** button to import the template into the ITP.

**ITP records imported successfully.**

#### **2 Inspection and Test Procedures**

The **Inspection and Test procedures** tab in the **Project Data** menu helps you to add an NDT and other test procedures and prepare the cover page. If you want to add a procedure, do the following steps,

1\. Click **Inspection and Test Procedures** in the **Project Data** menu.

The **Procedures** page opens.

[![image-1756260313771.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756260313771.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756260313771.png)

**Figure 1.2: Test Procedure page**

#### **Add a Test Procedure**

If you want to add a Test procedure,

1\. Click [![image-1651150165836.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651150165836.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651150165836.png)(**ADD** button) in the **Test Procedure  See Fig 1.2.

A new box opens to add an NDT procedure.

[![image-1651150864825.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651150864825.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651150864825.png)

2\. In the **NDT Procedure** box, select the NDT procedure from a drop-down list.

3\. In the **NDT Procedure Title** box, enter the NDT procedure title.

4\. Click **Save**.

The NDT procedure is successfully added.

#### **Add Test Procedure Revision**

Once you have added the NDT procedure, you must add the NDT procedure revision. You can manage multiple revisions for one NDT procedure based on client feedback.

1\. Click [![image-1651144645654.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651144645654.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651144645654.png)(Edit icon) in the **Revision** column of the **Test Procedure**  See Fig 1.2.

The **Test Procedure Revision** window opens.

[![image-1651150970231.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651150970231.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651150970231.png)

2\. Click [![image-1651150165836.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651150165836.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651150165836.png)(**ADD** button) in the **Test Procedure Revision**

A new box opens to add the NDT revision procedure.

[![image-1756260997411.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756260997411.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756260997411.png)

**[![image-1651149085479.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651149085479.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651149085479.png)Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.

**[![image-1651149937676.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651149937676.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651149937676.png)Tip**: A report number for the revision will be updated automatically in the **Report Number/ Revision** box.

3\. In the **Description** box, enter the description for the NDT procedure revision.

4\. In the **Prepared By** box, enter the name a person who has prepared the revision.

5\. In the Prepared Date box, enter the prepared date of the revision.  
   
6\. In the Reviewed By box, enter the name a person who has reviewed the revision.  
   
7\. In the Reviewed Date box, enter the reviewed date of the revision.

8\. In the Approved By box, enter the name a person who has approved the revision.  
   
9\. In the Approved Date box, enter the approved date of the revision.

10\. Click Save.

#### **Print an Test procedure Cover Page report**

If you want to print an NDT procedure report, click [![image-1651150484253.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651150484253.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651150484253.png)(print icon) provided in the **Print** column of the **Test Procedure** page. See Fig 9.3

#### **Attach a File into an Test Procedure**

If you want to attach a file with any Test procedure in the **Test Procedure** page, you can use [![image-1651136867158.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136867158.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136867158.png) (Attach icon) provided in the **Attachment** column for the respective Test procedure.

The signed copy of the cover page and the actual procure to be uploaded here. Later they will be used while compiling the final dozier.

#### **3 Inspection Code Requirements**

Select **Inspection Code Requirements** menu select the codes so that later this will be automatically selected in NDT requests etc. [![image-1756263973605.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756263973605.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756263973605.png)

#### **4 Inspection Requirements**

The **Inspection Requirements** menu used to add the NDT inspection type to be performed against various groups of joints. NDT can be performed Before Fit up, Back Chipping, Before PWHT, After PWHT, and After Hydrostatic test etc.

Once you have added the required NDT inspection type, the added NDT inspection will be displayed in the NDT Requirement section while adding the welding joints. To know in detail about adding joints, see the topic, “[**<u>Joints</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/engineering#bkmrk-7.3-joints)”.

[![image-1756264119958.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756264119958.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756264119958.png)

To add the Inspection requirements,

1\. Click **Inspection Requirements** in the **Inspection Document**

The **Inspection Inspection Requirement** page opens.

2\. Click Add

[![image-1756268483511.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756268483511.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756268483511.png)

2\. Select the checkbox of the group given in the page based on your requirement.

Once you have selected , the NDT inspection type will be added.

See the section below to add new group if you don't see anything in the list initially.

3\. Click edit and Select the checkbox of the respective NDT type which you want to add additionally if there is a change.

4\. Click **Save**.

##### Master NDT requirements 

The master list of NDT requirements are defined by company QA Manager and it is derived here for each project and gets modified. To manage the master list of NDT requirements, navigate to "NDT Inspection Requirements" page in Inspection/NDT Masters

[![image-1756267777112.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756267777112.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756267777112.png)

The below window opens up and click Add to create a new requirements group.

[![image-1756267860567.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756267860567.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756267860567.png)

Enter New Group Name and Select the Joint Type for which it is applicable.

Select the general NDT requirements and Clock Save.

This will be available later in the equipment to use and change as required.

# Engineering

The **Engineering** team can add the pressure vessel drawings, bill of material, and joints to the system.

#### **1 Drawings**

The **Drawings** tab in the **Data** menu used to add the drawings related with the pressure vessel.

1\. Click **Drawings**

 The **Drawings** page opens.

[![image-1651064647999.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651064647999.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651064647999.png)

**Figure 1.1: Drawings page**

#### **Add a Drawing**

If you want to add a drawing, do the following steps,

1\. Click [![image-1651064711391.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651064711391.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651064711391.png)(**ADD** button) in the **Drawings**  See Fig 1.1.

 The page shows a new box to add the details of the drawing.

[![image-1651064732879.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651064732879.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651064732879.png)

2\. In the Drawing Number box, enter the drawing number.

3\. In the Description box, enter the description for the added drawing.

4\. In the Revision box, enter the revision number of the drawing.

5\. In the Approved box, if the drawing has approved, select Yes otherwise select No. If there is no need for approval means select NA.

6\. In the Sheets box, enter the sheet number.

7\. In the Remarks box, enter your remarks if any.

8\. Click Save.

The drawing is successfully added.

#### **Edit a Drawing**

If you want to edit any existing drawing in the **Drawings** page, do the following,

1\. Click[![image-1651064824216.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651064824216.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651064824216.png)(Edit icon) in the **Edit** column for the respective drawing. See Fig 7.1.

 The page shows the details of added drawing.

[![image-1651064843327.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651064843327.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651064843327.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

*Production users will be notified if there are any changes to the drawing.*

#### **Delete a Drawing**

If you want to delete any specific drawing from the list of drawings, you can use [![image-1651064894508.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651064894508.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651064894508.png) (Delete icon) provided in the **Delete** field of the **Drawings** page.

#### **Attach a File into a Drawing**

If you want to attach a file with any drawing listed in the **Drawings** page, you can use [![image-1651065007115.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651065007115.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651065007115.png) (Attach icon) provided in the **Attachment** column for the respective drawing.

#### **Attach a File into a Pressure Vessel Built Drawing**

If you want to attach a file with any pressure vessel built drawing listed in the **Drawings** page, you can use [![image-1651065007115.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651065007115.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651065007115.png) (Attach icon) provided in the **As Built Drawing** column for the respective drawing.

#### **Export Drawings List**

You can export a list of drawings added in the **Drawings** page in the excel formats by using [![excelimg.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/0fxexcelimg.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651065075211.png)(**Excel** button).

#### **2 Bill of Material**

Bill of Material is a comprehensive inventory of the raw materials, assembles, sub assembles, parts and components, as well as the quantity of each, needed to the pressure vessel module.

The **Bill of Material** menu used to add the bill of material details.

1\. Click **Bill of Material**

 The **Bill of Materials** page opens.

[![image-1651065130907.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651065130907.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651065130907.png)

**Figure 1.2: Bill of Materials page**

#### **Add a Bill of Material**

If you want to add a bill of material, do the following steps,

1\. Click [![image-1651065190556.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651065190556.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651065190556.png) (**ADD** button) in the **Bill of Materials**  See Fig 7.2.

 The page shows a new box to add the details of the bill of material.

[![image-1651065209995.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651065209995.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651065209995.png)

2\. In the Drawing Number box, select the drawing number from a drop-down list.  
   
3\. In the Part No box, enter the part number.

4\. In the Material Description box, enter the description for the bill of material.  
   
5\. In the Material Specification box, select the material specification.

6\. In the Material Dimension box, enter the material dimension.

7\. In the Qty box, enter the quantity of the material.

8\. In the Remarks box, enter your remarks if any.

9\. If the material is cut from a plate, select the checkbox of the Cutting from Plate? option.

10\. In the **Group** box, select the group from a drop-down list.

11\. In the **Point of Sale (POS)**box, select the POS from a drop-down list.

12\. Click **Save**.

The bill of material is successfully added.

#### **Edit a Bill of Material**

If you want to edit any existing bill of material in the **Bill of Materials** page, do the following,

1\. Click [![image-1651065349619.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651065349619.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651065349619.png)(Edit icon) in the **Edit** column for the respective bill of material. See Fig 7.2.

 The page shows the details of added bill of material.

[![image-1651065372737.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651065372737.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651065372737.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **Clone a Bill of Material**

The **Clone** option in the **Clone** column of the **Bill of Materials** page used to add a bill of material as a copy of the previously added bill of material, See Fig 7.2.

1\. Click[![image-1651065434502.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651065434502.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651065434502.png)(Clone icon) in the **Clone** column of the **Bill of Materials**

 A new box opens to add the bill of material.

2\. Enter the details of the bill of material.

 The new bill of material will be added.

#### **Delete a Bill of Material**

If you want to delete any specific bill of material from the list of bill of materials, you can use [![image-1651065500695.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651065500695.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651065500695.png) (Delete icon) provided in the **Delete** field of the **Bill of Materials** page.

#### **Export Bill of Materials List**

You can export a list of bill of materials added in the **Bill of Materials** page in the excel formats by using [![excelimg.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/0fxexcelimg.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651065538977.png) (**Excel** button).

#### **Import Multiple Bill of Materials**

If you want to import multiple bill of materials together, do the following,

1\. Click [![image-1651065599643.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651065599643.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651065599643.png)(**TEMPLATE** button) on the **Bill of Materials**  See Fig 1.2.

 A template will be downloaded as an excel worksheet to enter the details of bill of materials.

[![image-1651065633244.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651065633244.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651065633244.png)

2\. Enter the relevant details in the required columns on the excel worksheet.

3\. Once you have added the bill of materials details in the excel worksheet, save the excel worksheet on your computer.

4\. Click [![image-1651065675933.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651065675933.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651065675933.png)(**IMPORT** button). See Fig 1.2.

A new box opens for importing the excel worksheet saved on your computer.

[![image-1651065695574.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651065695574.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651065695574.png)

5\. Click [![image-1651065714372.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651065714372.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651065714372.png)(**Browse** button) to select the excel worksheet to be uploaded.

6\. Select the excel worksheet you want to upload from your computer.

7\. Click [![image-1651065749637.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651065749637.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651065749637.png) (**Upload** button) to export the bill of materials details that are included in the excel worksheet.

The details of the bill of materials in the worksheet will be displayed in the **Bill of Materials** page.

#### **3 Joints**

In Pressure Vessel, joints are formed by welding two or more workpieces (metal or plastic) according to a particular geometry. If you want to add a joint,

The **Joints** tab in the **Engineering** menu used to the weld joints.

1\. Click **Joints** in the **Engineering**

 The **Weld Joints** page opens.

[![image-1756270505958.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756270505958.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756270505958.png)

**Figure 1.3: Weld Joints page**

#### **Add a Weld Joint**

If you want to add a weld joint, do the following steps,

1\. Click [![image-1651066760205.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651066760205.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651066760205.png)(**ADD** button) in the **Weld Joints**

 The page shows a new box to add the details of the weld joint.

[![image-1756270541511.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756270541511.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756270541511.png)

2\. In the Joint Group box, select the joint group name.

3\. In the Joint Number box, enter the joint number.

4\. In the Joint Type box, select the joint type.

5\. In the **WPS Number** box, select the WPS number from a drop-down list and click

[![image-1756270644471.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756270644471.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756270644471.png)either Primary or Alternate or Repair as type.

The selected WPS number will be added.

6\. In the NDT Group box, select the NDT Group name.

7\. In the Location box, enter the location name.

8\. In the Nozzle Details box, enter the nozzle details.  
   
9\. In the Joint Length (mm) box, enter the joint length.

10\. In the Material 1 box, select the first material and enter their group number, thickness and part number in the respective boxes.

11\. In the Material 2 box, select the second material and enter their group number, thickness and part number in the respective boxes.

12\. In the **Position** box, select the position of the weld joint.

13\. If the joint to be done is T joint, select the checkbox of the **Is T Joint**

14\. In the **Remarks** box, enter your remarks if any.

15\. Click **Save**.

17\. Select the NDE Plan Tab and if required change the NDT to be performed in the Before Fit up, Back Chipping, Before PWHT, PWHT, and Other NDT fields.

[![image-1756270893949.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756270893949.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756270893949.png)

[![image-1651067048222.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651067048222.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651067048222.png)**Note**: The NDT type displayed in all above fields can be modified based on your requirement. For example, you can add and remove the NDT type by navigating into the **NDT Requirements** tab. To know in detail, see the topic, “[**<u>NDT Requirements</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection-document#bkmrk-9.2-ndt-requirements)”.

<table border="1" id="bkmrk-before-fit-up%C2%A0%E2%80%93-if-y" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">**Before Fit up** – If you select any NDT type listed in the **Before Fit up** option for a joint, the selected NDT type should be completed before adding the Fit up inspection request for the joint. For example, if you select both **RT** and **MT,** you must do both RT and MT.

**Back Chipping** - If you select any NDT type listed in the **Back Chipping** option for a joint, the selected NDT type should be completed before adding the weld visual inspection request for the joint.

**NDT** - If you select any NDT type listed in the **NDT** option for a joint, the selected NDT type should be completed after performing the weld visual inspection for the joint.

**PWHT** - If you select any NDT type listed in the **PWHT** option for a joint, the selected NDT type should be completed after performing the above NDT.

**Other NDT** - If you select any NDT type listed in the **Other NDT** option for a joint, the selected NDT type should be completed after performing the above PWHT.

</td></tr></tbody></table>

The weld joint is successfully added.

#### **Edit a Weld Joint**

If you want to edit any existing weld joint in the **Weld Joints** page, do the following,

1\. Click on the joint number for the respective weld joint to edit. See Fig 1.3.

 The page shows the details of added weld joint.

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **Duplicate a Weld Joint**

If you want to duplicate any existing weld joint,

1\. Click [![image-1651067307747.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651067307747.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651067307747.png)(Add icon) of the respective weld joint.

 The selected weld joint will be added as duplicated one including the revised joint number.

#### **Delete a Weld Joint**

If you want to delete any specific weld joint from the list of added weld joints, you can use [![image-1651067347468.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651067347468.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651067347468.png) (Delete icon) provided in the **Delete** field of the **Weld Joints** page.

#### **View Welding Work Instruction Detail**

If you want to view the welding work instruction detail, click [![image-1651067382140.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651067382140.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651067382140.png) (Print icon) provided in the **Report** column.

#### **Export Weld Joints List**

You can export a list of weld joints added in the **Weld Joints** page in the excel formats by using [![excelimg.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/0fxexcelimg.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651067432616.png) (**Excel** button).

#### **Import Weld Joints from Another Vessel**

You can import the weld joints of another vessel into the current vessel by using the specific functionality given in the **Weld Joints** page.

1\. Click **Import from Another Vessel** option in the **Weld Joints**

 The **Import from Another Vessel** window opens.

[![image-1651067481564.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651067481564.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651067481564.png)

2\. If you want to import the pressure vessel joints from current project, select **Current Projects** or if you want to import the pressure vessel joints from any other project, select **All** **Projects**.

3\. In the **Equipment** box, select an equipment from which you want to import the joints.

4\. Click **OK**.

The joints of the selected equipment will be added in the **Weld Joints** page.

# Production - Fitup Request & QA Inspection

Production shall make the fitup request using the system in a very simple manner.

The production users has limited access to the system.

They have read only access to drawing, joints, ITP, weld Map etc.

When the fitup is completed, they need to call for inspection to QA/QC. It can be done in a very simpler manner in cuteQM.

Navigate to Fitup in menu and in the list of joints choose the joint which you want to call for inspection, click Edit.

[![image-1756281614909.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756281614909.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756281614909.png)

Click the button Fit-Up Completed.

The Fit-Up date will appear automatically todays date.

Optionally choose Tack Welder

Click Save.

This will send a notification to the project QA/QC inspector for inspection.

# Production – RFI

### 8.0 **Production – RFI**

The **Production – RFI** menu in the app used to add the requests for adding various request related with the production of Pressure Vessel.

<table border="1" id="bkmrk-users-assigned-with-" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Users assigned with **Production** role only can view and access the **Production - RFI** menu and their functionalities.

</td></tr></tbody></table>

#### **8.1 Fit up – Request**

Fit up is joining of various joints. This has two stages of process: fitting the joints and inspecting the fitted joints.

Once Fit up has completed, before welding the Fit up Inspection is carried out in accordance with the Inspection Test Plan (ITP) by a person who has assigned with Inspection role.

To record the fit up inspection details,

1\. Navigate to **Fit up – Request** tab in the **Production – RFI**

 The **Fit up Inspection** page opens and shows all the joints which are added in the Joint Master.

[![image-1651067686662.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651067686662.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651067686662.png)

**Figure 8.1: Fit up Inspection page**

<table border="1" id="bkmrk-the-joints-in-yellow" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">The joints in Yellow color shows that the Before Fit up/PT/MT/EP are not completed for the respective joints. Note that the

[![image-1651067733730.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651067733730.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651067733730.png) (Edit icon) will not be enabled before you complete the Before Fit up.

The joints in Red color shows that the Fit up is rejected for the respective joints.

</td></tr></tbody></table>

#### **8.1.1 Add an NDT Inspection request Before Fit up for the Added Joint**

For the added joint, if you have selected any NDT type to be performed before fit up, you must add the NDT request for the added joint to perform the NDT inspection before Fit up. Do the following steps to add the NDT request,

1\. Navigate to **NDT Request – RFI** tab in the **Production – RFI**

 The **NDT Request** page opens.

[![image-1651067779570.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651067779570.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651067779570.png)

**Figure 8.1.1: NDT Request page**

To know how to add NDT request, see the topic, “[**<u>NDT Request – RFI</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/production-rfi#bkmrk-8.3-ndt-request-%E2%80%93-rf)”.

#### **8.1.2 Update NDT Inspection Results for the Added Request**

To update the the NDT inspection result for the selected joint, do the following steps,

For example, if you have added the MT request, navigate to the MT inspection result adding page.

1\. Navigate to **MT Report** in the **NDT**

 The **MT Report** page opens.

[![image-1651067843401.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651067843401.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651067843401.png)

**Figure 8.1.2: MT Report page**

To know how to add MT inspection result, see the topic, “[**<u>MT Report</u>**](#_MT_Report)”

[![image-1651067916708.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651067916708.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651067916708.png)**Note**: If you want to update the inspection result for any other added NDT type, you must navigate to the corresponding report page in the [**<u>NDT</u>**](#_NDT) menu and follow the same procedure given in the respective pages.

Once you have updated the NDT results, the[![image-1651067941946.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651067941946.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651067941946.png) (Edit icon) for the respective joint in the **Fit up Inspection** page will be enabled to add the fit up details. See the Fig 8.1.

[![image-1651067953799.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651067953799.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651067953799.png)

#### **8.1.3 Add Fit up Completion Details**

To add the fit up completion details, do the following steps,

1\. Navigate to the **Fit up Inspection** page and find the joint for which you have completed the NDT.

[![image-1651068003326.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651068003326.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651068003326.png)

2\. Click[![image-1651068025147.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651068025147.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651068025147.png)(Edit icon) for the respective joint.

 The page shows the **Fit up** window to add the fit up details.

[![image-1651068045974.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651068045974.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651068045974.png)

<table border="1" id="bkmrk-users-assigned-with--0" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Users assigned with **Production** role only can view the **Fit up** window.

</td></tr></tbody></table>

3\. If the fit up is completed, select the checkbox of the Fit-Up Completed option.

4\. In the Fit up Date box, select the fit up inspection completed date.

5\. In the Material 1 Heat No box, select the heat number of the first material.

6\. In the Material 2 Heat No box, select the heat number of the second material.

7\. In the Comments box, enter your comments if any.

8\. In the Drawing No box, select the drawing number from a drop-down list.

9\. Click Save.  
 The fit up completion details are saved successfully. Once the fit up is completed, the fit up will be moved for inspection.

#### **8.1.4 Add Fit up Inspection Details**

Fit up inspection will be carried out by the person who has assigned with the inspection role after completing the Fit up process. To add the fit up inspection details,

<table border="1" id="bkmrk-users-assigned-with--1" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Users assigned with **cuteQM\_QAQC** role only can view and access the **Inspection** **– Quality** menu and their functionalities.

</td></tr></tbody></table>

1\. Navigate to **Fit up Report** in the **Inspection** **– Quality**

 The **Fit up Inspection** page opens to add the **Mechanical** and **Pre-welding** inspection details.

[![image-1651068186014.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651068186014.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651068186014.png)

**Figure 8.1.4: Fit up Inspection page**

To know how to add the fit up inspection details, see the topic, “[**<u>Fit up Report</u>**](#_Fit_up_Report)”.

#### **8.2 Weld Visual - Request** 

The fitted joints will be moved for weld visual inspection after completing the Fit up inspection. The **Weld Visual – Request** in the **Production – RFI** menu used add the weld visual inspection request to perform the weld visual inspection.

1\. Navigate to **Weld Visual – Request** in the **Production – RFI**

 The **Weld Visual Inspection** page opens.

[![image-1651068307320.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651068307320.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651068307320.png)

**Figure 8.2: Weld Visual Inspection page**

The page shows all the fit up inspection completed joints.

<table border="1" id="bkmrk-the-joints-in-red-co" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">The joints in Red color shows that the respective joints are rejected in NDT (RT/UT/PT/MT).

For example, if J1 joint is rejected in RT then the joint will be created as J1R1 in the Weld visual page. If the same joint is rejected again in RT then the joint will be created as J1R2. Even after two times if the joint is rejected again in RT then the cut-out joint RW1 created as a new joint in the Fit up page.

Note that the created J1R1 and J1R2 joints will be shown in Orange color.

</td></tr></tbody></table>

#### **8.2.1 Add an NDT Inspection request for the Joint in Weld Visual**

For the added joint, if you have selected any NDT type to be performed in Back Chipping, you must add the NDT request for the added joint to perform the NDT inspection before adding the weld visual inspection request. Do the following steps to add the NDT request,

1\. Navigate to **NDT Request – RFI** tab in the **Production – RFI**

 The **NDT Request** page opens.

[![image-1651068402953.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651068402953.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651068402953.png)

**Figure 8.2.1: NDT Request page**

To know how to add NDT request, see the topic, “[**<u>NDT Request – RFI</u>**](#_NDT_Request_%E2%80%93)”.

#### **8.2.2 Update NDT Inspection Results for the Added Request**

To update the the NDT inspection result for the selected joint, do the following steps,

For example, if you have added the MT request, navigate to the MT inspection result adding page.

1\. Navigate to **MT Report** in the **NDT**

 The **MT Report** page opens.

[![image-1651068471287.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651068471287.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651068471287.png)

**Figure 8.2.2: MT Report page**

To know how to add MT inspection result, see the topic, “[**<u>MT Report</u>**](#_MT_Report)”.

[![image-1651068511607.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651068511607.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651068511607.png)**Note**: If you want to update the inspection result for any other added NDT type, you must navigate to the corresponding report page in the [**<u>NDT</u>**](#_NDT) menu and follow the same procedure given in the respective pages.

Once you have updated the NDT results, the [![image-1651068532820.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651068532820.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651068532820.png)(Edit icon) for the respective joint in the **Weld Visual Inspection** page will be enabled to add the weld visual production details. See the Fig 8.2.

[![image-1651068543550.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651068543550.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651068543550.png)

#### **8.2.3 Add Weld Visual Production Details**

To add the weld visual production details, do the following steps,

1\. Navigate to the **Weld Visual Request** page in the **Production** menu and find the joint for which you have completed the NDT.

[![image-1651068598296.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651068598296.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651068598296.png)

2\. Click (Edit icon) for the respective joint.

 The page shows the **Production** window to add the welding details.

[![image-1651068621505.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651068621505.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651068621505.png)

<table border="1" id="bkmrk-users-assigned-with--2" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Users assigned with **Production** role only can view the **Production** window.

</td></tr></tbody></table>

3\. In the Select WPS box, select the WPS from a drop-down list.

4\. In the Add Welder box, click (Add icon) and add welder details.

5\. If the welding is completed, select the checkbox of the Completed option.

6\. In the Completed Date box, select the completed date.

7\. In the Remarks box, enter your remarks if any.

8\. Click Save.

 The weld visual production details are saved successfully. Once the welding is completed, the welded joint will be moved for weld visual inspection.

#### **8.2.4 Add Weld Visual Inspection Details**

Weld Visual inspection will be carried out by the person who has assigned with the inspection role after completing the welding process. To add the weld visual inspection details,

<table border="1" id="bkmrk-users-assigned-with--3" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Users assigned with **cuteQM\_QAQC** role only can view and access the **Inspection** **– Quality** menu and their functionalities.

</td></tr></tbody></table>

1\. Navigate to **Weld Visual Report** in the **Inspection** **– Quality**

 The **Weld Visual Inspection** page opens to add the inspection details.

[![image-1651068742731.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651068742731.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651068742731.png)

**Figure 8.2.4: Fit up Inspection page**

To know how to add the weld visual inspection details, see the topic, “[**<u>Weld Visual Report</u>**](#_Weld_Visual_Report)”.

#### **8.3 NDT Request – RFI**

The **NDT Request – RFI** tab in the **Production – RFI** menu used to add NDT request based on the NDT requirement and type. To add NDT request,

1\. Click **NDT Request – RFI** tab in the **Production – RFI**

 The **NDT Request** page opens.

[![image-1651121471307.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121471307.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121471307.png)

**Figure 8.3: NDT Request page**

#### **8.3.1 Add an NDT Request**

If you want to add an NDT request, do the following steps,

1\. Click [![image-1651121534845.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121534845.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121534845.png) (**ADD** button) in the **NDT Request**

 The page redirects you into a new page to add the details of NDT type selected for the respective joint.

[![image-1651121557354.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121557354.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121557354.png)

2\. In the Requested By and Date boxes, the details are updated automatically.

3\. In the To box, select a subcontractor from a drop-down list.

4\. In the Site Location box, select a site location from a drop-down list.

5\. In the PO Number box, select a PO number from a drop-down list.

6\. In the Material Type box, select the material type from a drop-down list.

7\. In the Inspection Date box, select the inspection date.

8\. In the Material Specification box, enter the material specification.

9\. In the Attention box, select a person to whom you want to create attention.

10\. In the NDT Req field, select any NDT requirement.

 The Type of NDT field shows the NDT type which you have selected in the NDT Inspection Requirement page, see the topic, “NDT Requirements”.

 For example, if you have selected Before Fit up, The Type of NDT field shows the NDT type selected for the Before Fit up.

[![image-1651121630920.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121630920.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121630920.png)

11.Select the NDT type in **Type of NDT**

 For example, if you have selected **MT**, the page shows a list of joints related with the **MT** in the **Selected Joints** window.

[![image-1651121686898.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121686898.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121686898.png)

12\. In the Code field, select a code.

13\. In the Additional Notes box, enter your additional notes if any.

14\. In the Acceptance Criteria box, enter the acceptance criteria detail.

15\. In the Selected Joints window, select the checkbox of the joint for which you want to perform the MT inspection.

**[![image-1651121376559.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121376559.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121376559.png)Note**: you can select the multiple joints together to perform the MT inspection.

16\. In the Remarks column, enter your remarks if any.

17\. In the Description column, enter the description for the selected joint.

18\. In the Joint Description column, select the joint description from a drop-down list.

19\. Click Save NDT Request.

The MT request for the respective joint is added and listed in the **NDT Request** page. Now navigate to the [**<u>MT Report</u>**](#_MT_Report) page and update the MT inspection result for the respective joint.

**[![image-1651121376559.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121376559.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121376559.png)Note**: If you want to add NDT request for any other NDT requirement, follow the above steps.

#### **8.3.2 Edit Any NDT Request**

<table border="1" id="bkmrk-note-that-if-the-ins" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Note that If the inspection results for any added NDT request has been updated, you cannot edit the respective NDT request.

</td></tr></tbody></table>

If you want to edit any existing NDT request in the **NDT Request - RFI** page, do the following,

1\. Click[![image-1651121904013.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121904013.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121904013.png)(Edit icon) in the **Edit** column for the respective NDT request. See Fig 8.3.

 The page shows the details of added NDT request.

[![image-1651121918712.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121918712.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121918712.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save NDT Request**.

#### **8.3.3 Reject an NDT Request**

<table border="1" id="bkmrk-if-the-inspection-re" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">If the inspection results for any added NDT request has been updated, you cannot reject the respective NDT request.

</td></tr></tbody></table>

If you want to reject any added NDT request, click[![image-1651121971930.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121971930.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121971930.png) (Reject icon) of the respective NDT request.

#### **8.3.4 Filter an NDT Request**

If you want to filter any NDT request in the **NDT Request - RFI** page, you can use [![image-1651122008810.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651122008810.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651122008810.png) (**FILTER** button) provided in the **NDT Request - RFI** page. See Fig 8.3. To know how to filter, see the topic, “[**<u>Filter Any User Account</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/manage-user#bkmrk-4.1.9-filter-a-user-)”.

#### **8.4 Final Dimensional – RFI**

The **Final Dimensional – RFI** tab in the **Production – RFI** menu used to add the final dimensional inspection request. To add the final dimensional inspection request,

1\. Click **Final Dimensional – RFI** in the **Production – RFI**

 The **Final Dimensional Report** page opens.

[![image-1651122057352.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651122057352.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651122057352.png)

**Figure 8.4: Final Dimensional Report page**

#### **8.4.1 Add a Final Dimensional Request**

If you want to add a final dimensional request, do the following steps,

1\. Click [![image-1651121534845.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121534845.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121534845.png)(**ADD** button) in the **Final Dimensional Report**

 The page shows a new window to add the details of the final dimensional request.

[![image-1651122128972.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651122128972.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651122128972.png)

[![image-1651122165031.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651122165031.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651122165031.png)**Tip**: A report number and an RFI number for a new final dimensional report will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.

2\. In the Drawing box, select a drawing from a drop-down list.

3\. In the Prepared By box, enter the name of a person who has prepared the final dimensional request.

4\. In the Reviewed By box, enter the name of a person who has reviewed the final dimensional request.

5\. In the Approved By box, enter the name of a person who has approved the final dimensional request.

6\. In the Prepared Date box, choose the prepared date of the final dimensional request.

7\. In the Reviewed Date box, choose the reviewed date of the final dimensional request.

8\. In the Approved Date box, choose the approved date of the final dimensional request.

9\. In the Is PWHT box, select Before PWHT or After PWHT based on the requirement.

10\. Click Save.

The final dimensional request is added and listed in the **Final Dimensional Report** page.

#### **8.4.2 Submit a Final Dimensional Request**

Once you have added the final dimensional inspection request, the **Submission** column in the **Final** **Dimensional Report** page is appeared with[![image-1651122285475.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651122285475.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651122285475.png) (Submit and Reject icons). See Fig 8.4.

1\. If you want to submit the final dimensional inspection request, click[![image-1651122318760.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651122318760.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651122318760.png)(Submit icon) in the **Submission** Otherwise click

[![image-1651122330086.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651122330086.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651122330086.png) (Reject icon) to reject the request.

The submitted request will be moved to for the final dimensional inspection. The request submitted status will be updated in the **Submitted** column. Once the final dimensional inspection results are updated, the completed status will be updated in the **Completed** column.

#### **8.4.3 Edit a Final Dimensional Request**

<table border="1" id="bkmrk-note-that-if-the-fin" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Note that if the final dimensional request has been submitted, you cannot edit the respective request.

</td></tr></tbody></table>

If you want to edit any existing final dimensional request in the **Final Dimensional Report** page, do the following steps,

1\. Click[![image-1651122396009.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651122396009.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651122396009.png)(Edit icon) in the **Edit** column for the respective final dimensional request. See Fig 8.4.

 The page shows the details of added final dimensional request.

[![image-1651122423675.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651122423675.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651122423675.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **8.4.4 Add RFI Data for a Final Dimensional Request**

If you want to add the details of RFI data for the added final dimensional request, do the following steps,

1\. Click (Add icon) in the **RFI Data** column of the **Final Dimensional Report**  See Fig 8.4.

 The **RFI Inspection Request List** window opens.

[![image-1651122776249.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651122776249.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651122776249.png)

2\. In the Inspection To box, enter the detail to where the inspection should end.

3\. In the Inspection Details option, select what type of inspection to be performed based on your requirement.  
   
4\. In the NDT Inspection box, enter the NDT inspection detail.  
   
5\. In the Description box, enter the description for the inspection request.  
   
6\. In the RFI Date box, choose the RFI date.

7\. In the Remarks box, enter your remarks if any.

8\. Click Save.

#### **8.4.5 View RFI Report for a Final Dimensional Request**

If you want to view the RFI report for the final dimensional request, click[![image-1651122848791.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651122848791.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651122848791.png) (Print icon) provided in the **RFI** **Report** column.

#### **8.4.6 Attach a File into a Final Dimensional Request**

If you want to attach a file with any final dimensional request listed in the **Final Dimensional Report** page, you can use [![image-1651122883239.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651122883239.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651122883239.png)

(Attach icon) provided in the **Attachment** column for the respective final dimensional request. To know how to attach, see the

topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **8.5 Nozzle Marking – RFI**

In Pressure Vessels, nozzles are attached for various purposes. These nozzles are attached with to the Pressure Vessel by marking a nozzle cut out on the Pressure Vessel. Geometrical parameters of nozzle are considered while marking a cut out on shell. The nozzle marking inspection is to be performed to check the nozzle marking cut out.

This **Nozzle Marking – RFI** tab in the **Production – RFI** menu used to add the nozzle marking inspection request.

1\. Click **Nozzle Marking – RFI** in the **Production – RFI**

 The **Nozzle Marking Inspection** page opens.

[![image-1651123091650.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123091650.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123091650.png)

**Figure 8.5: Nozzle Marking Inspection page**

#### **8.5.1 Add a Nozzle Marking Inspection Request**

If you want to add a nozzle marking inspection request, do the following steps,

1\. Click [![image-1651123142939.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123142939.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123142939.png)(**ADD** button) in the **Nozzle Marking Inspection**

 The page shows a new window to add the details of the nozzle marking inspection request.

[![image-1651123157458.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123157458.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123157458.png)

[![image-1651123170612.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123170612.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123170612.png)**Tip**: A report number and an RFI number for a new nozzle marking inspection request will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.

2\. In the Drawing box, select a drawing from a drop-down list.

3\. In the Prepared By box, enter the name of a person who has prepared the nozzle marking inspection request.

4\. In the Reviewed By box, enter the name of a person who has reviewed the nozzle marking inspection request.  
   
5\. In the Approved By box, enter the name of a person who has approved the nozzle marking inspection request.

6\. In the Prepared Date box, choose the prepared date of the nozzle marking inspection request.

7\. In the Reviewed Date box, choose the reviewed date of the nozzle marking inspection request.

8\. In the Approved Date box, choose the approved date of the nozzle marking inspection request.

9\. Click Save.

The nozzle marking inspection request is added and listed in the **Nozzle Marking Inspection** page.

#### **8.5.2 Submit a Nozzle Marking Inspection Request**

Once you have added the nozzle marking inspection request, the **Submission** column in the **Nozzle Marking Inspection** page is appeared with [![image-1651123344452.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123344452.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123344452.png)(Submit and Reject icons). See Fig 8.5.

1\. If you want to submit the nozzle marking inspection request, click [![image-1651123364640.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123364640.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123364640.png)(Submit icon) in the **Submission** Otherwise click

[![image-1651123375950.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123375950.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123375950.png)(Reject icon) to reject the request.

The submitted request will be moved to for the nozzle marking inspection. The request submitted status will be updated in the **Submitted** column. Once the nozzle marking inspection results are updated, the completed status will be updated in the **Completed** column.

#### **8.5.3 Edit a Nozzle Marking Inspection Request**

<table border="1" id="bkmrk-note-that-if-the-noz" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Note that if the nozzle marking inspection request has been submitted, you cannot edit the respective request.

</td></tr></tbody></table>

If you want to edit any existing nozzle marking inspection request in the **Nozzle Marking Inspection** page, do the following steps,

1\. Click (Edit icon) in the **Edit** column for the respective nozzle marking inspection See Fig 8.5.

 The page shows the details of added nozzle marking inspection request.

[![image-1651124427595.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651124427595.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651124427595.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **8.5.4 Add RFI Data for a Nozzle Marking Inspection Request**

If you want to add the details of RFI data for the added nozzle marking inspection request, do the following steps,

1\. Click[![image-1651124494373.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651124494373.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651124494373.png)(Add icon) in the **RFI Data** column of the **Nozzle Marking Inspection** See Fig 8.5.

 The **RFI Inspection Request List** window opens.

[![image-1651124515870.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651124515870.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651124515870.png)

2\. In the Inspection To box, enter the detail to where the inspection should end.  
   
3\. In the Inspection Details option, select what type of inspection to be performed based on your requirement.  
   
4\. In the NDT Inspection box, enter the NDT inspection detail.

5\. In the Description box, enter the description for the inspection request.  
   
6\. In the RFI Date box, choose the RFI date.

7\. In the Remarks box, enter your remarks if any.

8\. Click Save.

#### **8.5.5 View RFI Report for a Nozzle Marking Inspection Request**

If you want to view the RFI report for the nozzle marking inspection request, click[![image-1651124578437.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651124578437.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651124578437.png) (Print icon) provided in the **RFI** **Report** column.

#### **8.5.6 Attach a File into a Nozzle Marking Inspection Request**

If you want to attach a file with any nozzle marking inspection request listed in the **Nozzle Marking Inspection** page, you can use

[![image-1651124617118.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651124617118.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651124617118.png) (Attach icon) provided in the **Attachment** column for the respective nozzle marking inspection request. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **8.6 Alignment Reading – RFI**

The **Alignment Reading – RFI** tab in the **Production – RFI** menu used to add the alignment reading inspection request. To add the alignment reading inspection request,

1\. Click **Alignment Reading – RFI** in the **Production – RFI**

 The **Alignment Reading Report** page opens.

[![image-1651125045206.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651125045206.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651125045206.png)

**Figure 8.6: Alignment Reading Report page**

#### **8.6.1 Add an Alignment Reading Inspection Request**

If you want to add an alignment reading inspection request, do the following steps,

1\. Click [![image-1651124269606.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651124269606.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651124269606.png)(**ADD** button) in the **Alignment Reading Report**

The page shows a new window to add the details of the alignment reading request.

[![image-1651125116464.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651125116464.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651125116464.png)

**[![image-1651123170612.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123170612.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123170612.png)Tip**: A report number and an RFI number for a new alignment reading report will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.

2\. In the Drawing box, select a drawing from a drop-down list.

3\. In the Prepared By box, enter the name of a person who has prepared the alignment reading request.  
   
4\. In the Reviewed By box, enter the name of a person who has reviewed the alignment reading request.  
   
5\. In the Approved By box, enter the name of a person who has approved the alignment reading request.  
   
6\. In the Prepared Date box, choose the prepared date of the alignment reading request.

7\. In the Reviewed Date box, choose the reviewed date of the alignment reading request.  
   
8\. In the Approved Date box, choose the approved date of the alignment reading request.

9\. In the Is PWHT box, select Before PWHT or After PWHT based on the requirement.

10\. Click Save.

The alignment reading request is added and listed in the **Alignment Reading Report** page.

#### **8.6.2 Submit an Alignment Reading Inspection Request**

Once you have added the alignment reading inspection request, the **Submission** column in the **Alignment Reading Report** page is appeared with [![image-1651125252113.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651125252113.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651125252113.png)(Submit and Reject icons). See Fig 8.6.

1\. If you want to submit the alignment reading inspection request, click[![image-1651125285170.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651125285170.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651125285170.png)(Submit icon) in the **Submission** Otherwise click

[![image-1651125296543.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651125296543.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651125296543.png)(Reject icon) to reject the request.

The submitted request will be moved to for the alignment reading inspection. The request submitted status will be updated in the **Submitted** column. Once the alignment reading inspection results are updated, the completed status will be updated in the **Completed** column.

#### **8.6.3 Edit a Alignment Reading Inspection Request**

<table border="1" id="bkmrk-note-that-if-the-ali" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Note that if the alignment reading request has been submitted, you cannot edit the respective request.

</td></tr></tbody></table>

If you want to edit any existing alignment reading request in the **Alignment Reading Report** page, do the following steps,

1\. Click[![image-1651128824966.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128824966.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128824966.png)(Edit icon) in the **Edit** column for the respective alignment reading request. See Fig 8.6.

 The page shows the details of added alignment reading request.

[![image-1651128845505.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128845505.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128845505.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **8.6.4 Add RFI Data for an Alignment Reading Inspection Request**

If you want to add the details of RFI data for the added alignment reading request, do the following steps,

1\. Click[![image-1651128913623.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128913623.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128913623.png)(Add icon) in the **RFI Data** column of the **Alignment Reading Report**  See Fig 8.6.

 The **RFI Inspection Request List** window opens.

[![image-1651128928351.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128928351.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128928351.png)

2\. In the Inspection To box, enter the detail to where the inspection should end.  
   
3\. In the Inspection Details option, select what type of inspection to be performed based on your requirement.

4\. In the NDT Inspection box, enter the NDT inspection detail.

5\. In the Description box, enter the description for the inspection request.

6\. In the RFI Date box, choose the RFI date.

7\. In the Remarks box, enter your remarks if any.

8\. Click Save.

#### **8.6.5 View RFI Report for an Alignment Reading Inspection Request**

If you want to view the RFI report for the alignment reading request, click [![image-1651129011423.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651129011423.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651129011423.png)(Print icon) provided in the **RFI** **Report** column.

#### **8.6.6 Attach a File into an Alignment Reading Inspection Request**

If you want to attach a file with any alignment reading request listed in the **Alignment Reading Report** page, you can use [![image-1651129042833.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651129042833.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651129042833.png)(Attach icon) provided in the **Attachment** column for the respective alignment reading request. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **8.7 Ovality Reading**

The **Ovality Reading – RFI** tab in the **Production – RFI** menu used to add the ovality reading inspection request. To add the ovality reading inspection request,

1\. Click **Ovality Reading – RFI** in the **Production – RFI**

 The **Ovality Reading Report** page opens.

[![image-1651129783066.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651129783066.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651129783066.png)

**Figure 8.7: Ovality Reading Report page**

#### **8.7.1 Add an Ovality Reading Inspection Request**

If you want to add an ovality reading inspection request, do the following steps,

1\. Click [![image-1651129842465.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651129842465.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651129842465.png)(**ADD** button) in the **Ovality Reading Report**

 The page shows a new window to add the details of the ovality reading request.

[![image-1651129855877.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651129855877.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651129855877.png)

**[![image-1651123170612.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123170612.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123170612.png)Tip**: A report number and an RFI number for a new ovality reading report will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.

2\. In the Drawing box, select a drawing from a drop-down list.

3\. In the Prepared By box, enter the name of a person who has prepared the ovality reading request.

4\. In the Reviewed By box, enter the name of a person who has reviewed the ovality reading request.  
   
5\. In the Approved By box, enter the name of a person who has approved the ovality reading request.

6\. In the Prepared Date box, choose the prepared date of the ovality reading request.

7\. In the Reviewed Date box, choose the reviewed date of the ovality reading request.

8\. In the Approved Date box, choose the approved date of the ovality reading request.

9\. In the Is PWHT box, select Before PWHT or After PWHT based on the requirement.

10\. Click Save.

The ovality reading request is added and listed in the **Ovality Reading Report** page.

#### **8.7.2 Submit an Ovality Reading Inspection Request**

Once you have added the ovality reading inspection request, the **Submission** column in the **Ovality Reading Report** page is appeared with [![image-1651130106082.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651130106082.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651130106082.png)(Submit and Reject icons). See Fig 8.7.

1\. If you want to submit the ovality reading inspection request, click[![image-1651130131176.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651130131176.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651130131176.png)(Submit icon) in the **Submission** Otherwise click

[![image-1651130150600.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651130150600.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651130150600.png) (Reject icon) to reject the request.

The submitted request will be moved to for the ovality reading inspection. The request submitted status will be updated in the **Submitted** column. Once the ovality reading inspection results are updated, the completed status will be updated in the **Completed** column.

#### **8.7.3 Edit an Ovality Reading Inspection Request**

<table border="1" id="bkmrk-note-that-if-the-ova" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Note that if the ovality reading request has been submitted, you cannot edit the respective request.

</td></tr></tbody></table>

If you want to edit any existing ovality reading request in the **Ovality Reading Report** page, do the following steps,

1\. Click[![image-1651130227892.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651130227892.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651130227892.png)(Edit icon) in the **Edit** column for the respective ovality reading request. See Fig 8.7.

 The page shows the details of added ovality reading request.

[![image-1651130248406.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651130248406.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651130248406.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **8.7.4 Add RFI Data for an Ovality Reading Inspection Request**

If you want to add the details of RFI data for the added ovality reading request, do the following steps,

1\. Click (Add icon) in the **RFI Data** column of the **Ovality Reading Report**  See Fig 8.7.

 The **RFI Inspection Request List** window opens.

[![image-1651130346715.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651130346715.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651130346715.png)

2\. In the Inspection To box, enter the detail to where the inspection should end.

3\. In the Inspection Details option, select what type of inspection to be performed based on your requirement.  
   
4\. In the NDT Inspection box, enter the NDT inspection detail.

5\. In the Description box, enter the description for the inspection request.

6\. In the RFI Date box, choose the RFI date.

7\. In the Remarks box, enter your remarks if any.

8\. Click Save.

#### **8.7.5 View RFI Report for an Ovality Reading Inspection Request**

If you want to view the RFI report for the ovality reading request, click [![image-1651124578437.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651124578437.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651124578437.png)(Print icon) provided in the **RFI** **Report** column.

#### **8.7.6 Attach a File into an Ovality Reading Inspection Request**

If you want to attach a file with any ovality reading request listed in the **Ovality Reading Report** page, you can use[![image-1651130801967.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651130801967.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651130801967.png)(Attach icon) provided in the **Attachment** column for the respective ovality reading request. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **8.8 Thickness – RFI**

The **Thickness – RFI** tab in the **Production – RFI** menu used to add the thickness reading inspection request. To add the thickness inspection request,

1\. Click **Thickness – RFI** in the **Production – RFI** The **Thickness Report** page opens.

[![image-1651130860903.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651130860903.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651130860903.png)

**Figure 8.8: Thickness Report page**

#### **8.8.1 Add a Thickness Inspection Request**

If you want to add a thickness inspection request, do the following steps,

1\. Click [![image-1651131060299.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651131060299.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651131060299.png)(**ADD** button) in the **Thickness Report**

 The page shows a new window to add the details of the thickness request.

[![image-1651131916169.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651131916169.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651131916169.png)

[![image-1651131967080.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651131967080.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651131967080.png)**Tip**: A report number and an RFI number for a new thickness report will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.

2\. In the Drawing box, select a drawing from a drop-down list.

3\. In the Prepared By box, enter the name of a person who has prepared the thickness request.  
   
4\. In the Reviewed By box, enter the name of a person who has reviewed the thickness request.  
   
5\. In the Approved By box, enter the name of a person who has approved the thickness request.

6\. In the Prepared Date box, choose the prepared date of the thickness request.

7\. In the Reviewed Date box, choose the reviewed date of the thickness request.  
   
8\. In the Approved Date box, choose the approved date of the thickness request.

9\. In the Is PWHT box, select Before PWHT or After PWHT based on the requirement.

10\. Click Save.

The thickness request is added and listed in the **Thickness Report** page.

#### **8.8.2 Submit a Thickness Inspection Request**

Once you have added the thickness inspection request, the **Submission** column in the **Thickness Report** page is appeared with

[![image-1651132050524.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132050524.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132050524.png) (Submit and Reject icons). See Fig 8.8.

1\. If you want to submit the thickness inspection request, click[![image-1651132080159.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132080159.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132080159.png)(Submit icon) in the **Submission** Otherwise click [![image-1651132091955.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132091955.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132091955.png)

(Reject icon) to reject the request.

The submitted request will be moved to for the thickness inspection. The request submitted status will be updated in the **Submitted** column. Once the thickness inspection results are updated, the completed status will be updated in the **Completed** column.

#### **8.8.3 Edit a Thickness Inspection Request**

<table border="1" id="bkmrk-note-that-if-the-thi" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Note that if the thickness request has been submitted, you cannot edit the respective request.

</td></tr></tbody></table>

If you want to edit any existing thickness request in the **Thickness Report** page, do the following steps,

1\. Click[![image-1651132156256.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132156256.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132156256.png)(Edit icon) in the **Edit** column for the respective thickness request. See Fig 8.8.

The page shows the details of added thickness request.

[![image-1651132179358.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132179358.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132179358.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **8.8.4 Add RFI Data for a Thickness Inspection Request**

If you want to add the details of RFI data for the added thickness request, do the following steps,

1\. Click[![image-1651132231673.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132231673.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132231673.png)(Add icon) in the **RFI Data** column of the **Thickness Report**  See Fig 8.8.

The **RFI Inspection Request List** window opens.

[![image-1651132245285.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132245285.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132245285.png)

2\. In the Inspection To box, enter the detail to where the inspection should end.

3\. In the Inspection Details option, select what type of inspection to be performed based on your requirement.  
   
4\. In the NDT Inspection box, enter the NDT inspection detail.

5\. In the Description box, enter the description for the inspection request.  
   
6\. In the RFI Date box, choose the RFI date.

7\. In the Remarks box, enter your remarks if any.

8\. Click Save.

#### **8.8.5 View RFI Report for a Thickness Inspection Request**

If you want to view the RFI report for the thickness request, click [![image-1651129011423.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651129011423.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651129011423.png) (Print icon) provided in the **RFI** **Report** column.

#### **8.8.6 Attach a File into a Thickness Inspection Request**

If you want to attach a file with any thickness request listed in the **Thickness Report** page, you can use [![image-1651132357387.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132357387.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132357387.png)(Attach icon) provided in the **Attachment** column for the respective thickness request. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **8.9 Vapour Phase Corrosion Inhibitor (VPCI) – RFI**

VPCI also known as Volatile Corrosion Inhibitors (VCI) used for protecting the Pressure Vessel from rust and corrosion to ensure the integrity of a metal surface of the Pressure Vessel.

The **VPCI – RFI** tab in the **Production – RFI** menu used to add the VPCI inspection request. To add the VPCI inspection request,

1\. Click **VPCI – RFI** in the **Production – RFI**

 The **VPCI Report** page opens.

[![image-1651132665529.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132665529.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132665529.png)

**Figure 8.9: VPCI Report page**

#### **8.9.1 Add a VPCI Inspection Request**

If you want to add a VPCI inspection request, do the following steps,

1\. Click [![image-1651129842465.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651129842465.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651129842465.png)(**ADD** button) in the **VPCI Report**

 The page shows a new window to add the details of the VPCI request.

[![image-1651132740686.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132740686.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132740686.png)

**[![image-1651131967080.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651131967080.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651131967080.png)Tip**: A report number and an RFI number for a new VPCI report will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.

2\. In the **Drawing** box, select a drawing from a drop-down list.

3\. In the **Prepared By** box, enter the name of a person who has prepared the VPCI request.

4\. In the **Reviewed By** box, enter the name of a person who has reviewed the VPCI request.

5\. In the Approved By box, enter the name of a person who has approved the VPCI request.

6\. In the Prepared Date box, choose the prepared date of the VPCI request.  
   
7\. In the Reviewed Date box, choose the reviewed date of the VPCI request.  
   
8\. In the Approved Date box, choose the approved date of the VPCI request.

9\. Click Save.

The VPCI request is added and listed in the **VPCI Report** page.

#### **8.9.2 Submit a VPCI Inspection Request**

Once you have added the VPCI inspection request, the **Submission** column in the **VPCI Report** page is appeared with[![image-1651132847033.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132847033.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132847033.png) (Submit and Reject icons). See Fig 8.9.

If you want to submit the VPCI inspection request, click [![image-1651132869296.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132869296.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132869296.png)(Submit icon) in the **Submission** column. Otherwise click[![image-1651132880399.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132880399.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132880399.png)

 (Reject icon) to reject the request.

The submitted request will be moved to for the VPCI inspection. The request submitted status will be updated in the **Submitted** column. Once the VPCI inspection results are updated, the completed status will be updated in the **Completed** column.

#### **8.9.3 Edit a VPCI Inspection Request**

<table border="1" id="bkmrk-note-that-if-the-vpc" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Note that if the VPCI request has been submitted, you cannot edit the respective request.

</td></tr></tbody></table>

If you want to edit any existing VPCI request in the **VPCI Report** page, do the following steps,

1\. Click (Edit icon) in the **Edit** column for the respective VPCI request. See Fig 8.9.

 The page shows the details of added VPCI request.

[![image-1651133041434.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651133041434.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651133041434.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **8.9.4 Add RFI Data for a VPCI Inspection Request**

If you want to add the details of RFI data for the added VPCI request, do the following steps,

1\. Click (Add icon) in the **RFI Data** column of the **VPCI Report**  See Fig 8.9.

 The **RFI Inspection Request List** window opens.

[![image-1651133103944.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651133103944.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651133103944.png)

2\. In the Inspection To box, enter the detail to where the inspection should end.

3\. In the Inspection Details option, select what type of inspection to be performed based on your requirement.   
   
4\. In the NDT Inspection box, enter the NDT inspection detail.  
   
5\. In the Description box, enter the description for the inspection request.

6\. In the RFI Date box, choose the RFI date.

7\. In the Remarks box, enter your remarks if any.

8\. Click Save.

#### **8.9.5 View RFI Report for a VPCI Inspection Request**

If you want to view the RFI report for the VPCI request, click [![image-1651129011423.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651129011423.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651129011423.png) (Print icon) provided in the **RFI** **Report** column.

#### **8.9.6 Attach a File into a VPCI Inspection Request**

If you want to attach a file with any VPCI request listed in the **VPCI Report** page, you can use[![image-1651133257259.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651133257259.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651133257259.png) (Attach icon) provided in the **Attachment** column for the respective VPCI request. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file- "Master Data")”.

#### **8.10 Leak Test – RFI**

In Pressure Vessel, Leak Test is performed to identify any leakage.

The **Leak Test – RFI** tab in the **Production – RFI** menu used to add the leak test request. To add the leak test request,

1\. Click **Leak Test – RFI** in the **Production – RFI** The **Leak Test Report** page opens.

[![image-1651136015022.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136015022.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136015022.png)

**Figure 8.10: Leak Test Report page**

#### **8.10.1 Add a Leak Test Request**

If you want to add a leak test request, do the following steps,

1\. Click [![image-1651136003602.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136003602.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136003602.png)(**ADD** button) in the **Leak Test Report**

 The page shows a new window to add the details of the leak test request.

[![image-1651136079878.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136079878.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136079878.png)

**[![image-1651136053842.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136053842.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136053842.png)Tip**: A report number and an RFI number for a new leak test report will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.

2\. In the Drawing box, select a drawing from a drop-down list.

3\. In the Prepared By box, enter the name of a person who has prepared the leak test request.

4\. In the Reviewed By box, enter the name of a person who has reviewed the leak test request.  
   
5\. In the Approved By box, enter the name of a person who has approved the leak test request.  
   
6\. In the Prepared Date box, choose the prepared date of the leak test request.  
   
7\. In the Reviewed Date box, choose the reviewed date of the leak test request.

8\. In the Approved Date box, choose the approved date of the leak test request.

9\. Click Save.

The leak test request is added and listed in the **Leak Test Report** page.

#### **8.10.2 Submit a Leak Test Request**

Once you have added the leak test request, the **Submission** column in the **Leak Test Report** page is appeared with[![image-1651136180721.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136180721.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136180721.png)

 (Submit and Reject icons). See Fig 8.10.

1\. If you want to submit the leak test inspection request, click[![image-1651136213519.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136213519.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136213519.png)(Submit icon) in the **Submission** Otherwise click[![image-1651136223364.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136223364.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136223364.png) (Reject icon) to reject the request.

The submitted request will be moved to for the leak test. The request submitted status will be updated in the **Submitted** column. Once the leak test results are updated, the completed status will be updated in the **Completed** column.

#### **8.10.3 Edit a Leak Test Request**

<table border="1" id="bkmrk-note-that-if-the-lea" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Note that if the leak test request has been submitted, you cannot edit the respective request.

</td></tr></tbody></table>

If you want to edit any existing leak test request in the **Leak Test Report** page, do the following steps,

1\. Click (Edit icon) in the **Edit** column for the respective leak test request. See Fig 8.10.

 The page shows the details of added leak test request.

[![image-1651136679457.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136679457.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136679457.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **8.10.4 Add RFI Data for a Leak Test Request**

If you want to add the details of RFI data for the added leak test request, do the following steps,

1\. Click[![image-1651136741761.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136741761.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136741761.png)(Add icon) in the **RFI Data** column of the **Leak Test Report**  See Fig 8.10.

 The **RFI Inspection Request List** window opens.

[![image-1651136758191.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136758191.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136758191.png)

2\. In the Inspection To box, enter the detail to where the inspection should end.  
   
3\. In the Inspection Details option, select what type of inspection to be performed based on your requirement.  
   
4\. In the NDT Inspection box, enter the NDT inspection detail.  
   
5\. In the Description box, enter the description for the inspection request.  
   
6\. In the RFI Date box, choose the RFI date.

7\. In the Remarks box, enter your remarks if any.

8\. Click Save.

#### **8.10.5 View RFI Report for Leak Test Request**

If you want to view the RFI report for the leak test request, click [![image-1651135739577.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651135739577.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651135739577.png) (Print icon) provided in the **RFI** **Report** column.

#### **8.10.6 Attach a File into a Leak Test Request**

If you want to attach a file with any leak test request listed in the **Leak Test Report** page, you can use[![image-1651136867158.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136867158.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136867158.png) (Attach icon) provided in the **Attachment** column for the respective leak test request. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **8.11 Hydrostatic Test – RFI**

Hydrostatic Test is a way in which pressure vessels can be tested for strength and leaks. The test involves filling the vessel with a liquid, usually water, which may be dyed to aid in visual leak detection, and pressurization of the vessel to the specified test pressure.

The **Hydrostatic Test – RFI** tab in the **Production – RFI** menu used to add the hydrostatic pressure test request. To add the hydrostatic pressure test request,

1\. Click **Hydrostatic Test – RFI** in the **Production – RFI**

 The **Hydrostatic Pressure Test Report** page opens.

[![image-1651136962955.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136962955.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136962955.png)

**Figure 8.11: Hydrostatic Pressure Test Report page**

#### **8.11.1 Add a Hydrostatic Pressure Test Request**

If you want to add a hydrostatic pressure test request, do the following steps,

1\. Click (**ADD** button) in the **Hydrostatic Pressure Test Report**

 The page shows a new window to add the details of the hydrostatic pressure test request.

[![image-1651137075959.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137075959.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137075959.png)

**[![image-1651136863440.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136863440.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136863440.png)Tip**: A report number and an RFI number for a new hydrostatic pressure test report will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.

2\. In the Drawing box, select a drawing from a drop-down list.

3\. In the Prepared By box, enter the name of a person who has prepared the hydrostatic pressure test request.

4\. In the Reviewed By box, enter the name of a person who has reviewed the hydrostatic pressure test request.

5\. In the Approved By box, enter the name of a person who has approved the hydrostatic pressure test request.  
   
6\. In the Prepared Date box, choose the prepared date of the hydrostatic pressure test request.

7\. In the Reviewed Date box, choose the reviewed date of the hydrostatic pressure test request.  
   
8\. In the Approved Date box, choose the approved date of the hydrostatic pressure test request.

9\. Click Save.

The hydrostatic pressure test request is added and listed in the **Hydrostatic Pressure Test Report** page.

#### **8.11.2 Submit a Hydrostatic Pressure Test Request**

Once you have added the hydrostatic pressure test request, the **Submission** column in the **Hydrostatic Pressure Test Report** page is appeared with[![image-1651137163779.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137163779.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137163779.png) (Submit and Reject icons). See Fig 8.11.

1\. If you want to submit the hydrostatic pressure test inspection request, click[![image-1651137192600.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137192600.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137192600.png)(Submit icon) in the **Submission** Otherwise click [![image-1651137200689.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137200689.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137200689.png)(Reject icon) to reject the request.

The submitted request will be moved to for the hydrostatic pressure test. The request submitted status will be updated in the **Submitted** column. Once the hydrostatic pressure test results are updated, the completed status will be updated in the **Completed** column.

#### **8.11.3 Edit a Hydrostatic Pressure Test Request**

<table border="1" id="bkmrk-note-that-if-the-hyd" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Note that if the hydrostatic pressure test request has been submitted, you cannot edit the respective request.

</td></tr></tbody></table>

If you want to edit any existing hydrostatic pressure test request in the **Hydrostatic Pressure Test Report** page, do the following steps,

1\. Click [![image-1651132156256.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132156256.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132156256.png)(Edit icon) in the **Edit** column for the respective hydrostatic pressure test request. See Fig 8.11.

 The page shows the details of added hydrostatic pressure test request.

[![image-1651137286730.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137286730.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137286730.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **8.11.4 Add RFI Data for a Hydrostatic Pressure Test Request**

If you want to add the details of RFI data for the added hydrostatic pressure test request, do the following steps,

1\. Click[![image-1651137349211.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137349211.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137349211.png)(Add icon) in the **RFI Data** column of the **Hydrostatic Pressure Test Report**  See Fig 8.11.

 The **RFI Inspection Request List** window opens.

[![image-1651137365212.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137365212.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137365212.png)

2\. In the Inspection To box, enter the detail to where the inspection should end.  
   
3\. In the Inspection Details option, select what type of inspection to be performed based on your requirement.  
   
4\. In the NDT Inspection box, enter the NDT inspection detail.  
   
5\. In the Description box, enter the description for the inspection request.  
   
6\. In the RFI Date box, choose the RFI date.

7\. In the Remarks box, enter your remarks if any.

8\. Click Save.

#### **8.11.5 View RFI Report for Hydrostatic Pressure Test Request**

If you want to view the RFI report for the hydrostatic pressure test request, click [![image-1651137043660.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137043660.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137043660.png)(Print icon) provided in the **RFI** **Report** column.

#### **8.11.6 Attach a File into a Hydrostatic Pressure Test Request**

If you want to attach a file with any hydrostatic pressure test request listed in the **Hydrostatic Pressure Test Report** page, you can use [![image-1651137111900.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137111900.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137111900.png)(Attach icon) provided in the **Attachment** column for the respective hydrostatic pressure test request. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **8.12 Shell Side Hydrostatic – RFI**

After manufacturing completion of the Pressure Vessel, the heat exchange shell side will be subjected to the hydrostatic testing.

The **Shell Side** **Hydrostatic– RFI** tab in the **Production – RFI** menu used to add the shell side hydrostatic pressure test request. To add the shell side hydrostatic pressure test request,

1\. Click **Shell Side Hydrostatic Test – RFI** in the **Production – RFI**

 The **Shell Hydrostatic Pressure Test Report** page opens.

[![image-1651137657863.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137657863.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137657863.png)

**Figure 8.12: Shell Hydrostatic Pressure Test Report page**

#### **8.12.1 Add a Shell Side Hydrostatic Pressure Test Request**

If you want to add a shell side hydrostatic pressure test request, do the following steps,

1\. Click [![image-1651136771828.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136771828.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136771828.png)(**ADD** button) in the **Shell Hydrostatic Pressure Test Report**

 The page shows a new window to add the details of the shell side hydrostatic pressure test request.

[![image-1651137727450.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137727450.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137727450.png)

**[![image-1651136863440.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136863440.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136863440.png)Tip**: A report number and an RFI number for a new shell side hydrostatic pressure test report will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.

  
2\. In the Drawing box, select a drawing from a drop-down list.

3\. In the Prepared By box, enter the name of a person who has prepared the shell side hydrostatic pressure test request.  
   
4\. In the Reviewed By box, enter the name of a person who has reviewed the shell side hydrostatic pressure test request.  
   
5\. In the Approved By box, enter the name of a person who has approved the shell side hydrostatic pressure test request.  
   
6\. In the Prepared Date box, choose the prepared date of the shell side hydrostatic pressure test request.  
   
7\. In the Reviewed Date box, choose the reviewed date of the shell side hydrostatic pressure test request.  
   
8\. In the Approved Date box, choose the approved date of the shell side hydrostatic pressure test request.

9\. Click Save.

The shell side hydrostatic pressure test request is added and listed in the **Shell** **Hydrostatic Pressure Test Report** page.

#### **8.12.2 Submit a Shell Side Hydrostatic Pressure Test Request**

Once you have added the shell side hydrostatic pressure test request, the **Submission** column in the **Shell** **Hydrostatic Pressure Test Report** page is appeared with[![image-1651138706541.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138706541.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138706541.png) (Submit and Reject icons). See Fig 8.12.

1\. If you want to submit the shell side hydrostatic pressure test inspection request, click[![image-1651138736807.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138736807.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138736807.png)(Submit icon) in the **Submission** Otherwise click[![image-1651138748570.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138748570.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138748570.png) (Reject icon) to reject the request.

The submitted request will be moved to for the shell side hydrostatic pressure test. The request submitted status will be updated in the **Submitted** column. Once the shell side hydrostatic pressure test results are updated, the completed status will be updated in the **Completed** column.

#### **8.12.3 Edit a Shell Side Hydrostatic Pressure Test Request**

<table border="1" id="bkmrk-note-that-if-the-she" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Note that if the shell side hydrostatic pressure test request has been submitted, you cannot edit the respective request.

</td></tr></tbody></table>

If you want to edit any existing shell side hydrostatic pressure test request in the **Shell** **Hydrostatic Pressure Test Report** page, do the following steps,

1\. Click[![image-1651138832767.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138832767.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138832767.png)(Edit icon) in the **Edit** column for the respective shell side hydrostatic pressure test request. See Fig 8.12.

 The page shows the details of added shell side hydrostatic pressure test request.

[![image-1651138843138.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138843138.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138843138.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **8.12.4 Add RFI Data for a Shell Side Hydrostatic Pressure Test Request**

If you want to add the details of RFI data for the added shell side hydrostatic pressure test request, do the following steps,

1\. Click[![image-1651138916147.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138916147.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138916147.png)(Add icon) in the **RFI Data** column of the **Hydrostatic Pressure Test Report**  See Fig 8.12.

 The **RFI Inspection Request List** window opens.

[![image-1651138929122.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138929122.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138929122.png)

2\. In the Inspection To box, enter the detail to where the inspection should end.

3\. In the Inspection Details option, select what type of inspection to be performed based on your requirement.  
   
4\. In the NDT Inspection box, enter the NDT inspection detail.  
   
5\. In the Description box, enter the description for the inspection request.

6\. In the RFI Date box, choose the RFI date.

7\. In the Remarks box, enter your remarks if any.

8\. Click Save.

#### **8.12.5 View RFI Report for a Shell Side Hydrostatic Pressure Test Request**

If you want to view the RFI report for the shell side hydrostatic pressure test request, click [![image-1651137043660.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137043660.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137043660.png) (Print icon) provided in the **RFI** **Report** column.

#### **8.12.6 Attach a File into a Shell Side Hydrostatic Pressure Test Request**

If you want to attach a file with any shell side hydrostatic pressure test request listed in the **Shell** **Hydrostatic Pressure Test Report** page, you can use [![image-1651137111900.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137111900.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137111900.png) (Attach icon) provided in the **Attachment** column for the respective shell side hydrostatic pressure test request. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **8.13 Pneumatic Pressure – RFI**

In Pressure Vessel, Pneumatic test is a type of pressure test for checking system integrity under the pressurized condition. A pneumatic test uses air, nitrogen, or any non-flammable and non-toxic gas.

The **Pneumatic Pressure – RFI** tab in the **Production – RFI** menu used to add the pneumatic pressure test request. To add the pneumatic pressure test request,

1\. Click **Pneumatic Pressure – RFI** in the **Production – RFI**

 The **Pneumatic Pressure Test Report** page opens.

[![image-1651139231665.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651139231665.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651139231665.png)

**Figure 8.13: Pneumatic Pressure Test Report page**

#### **8.13.1 Add a Pneumatic Pressure Test Request**

If you want to add a pneumatic pressure test request, do the following steps,

1\. Click [![image-1651136771828.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136771828.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136771828.png)(**ADD** button) in the **Pneumatic Pressure Test Report**

 The page shows a new window to add the details of the pneumatic pressure test request.

[![image-1651139313140.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651139313140.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651139313140.png)

**[![image-1651136863440.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136863440.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136863440.png)Tip**: A report number and an RFI number for a new pneumatic pressure test report will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.

2\. In the Drawing box, select a drawing from a drop-down list.

3\. In the Prepared By box, enter the name of a person who has prepared the pneumatic pressure test request.  
   
4\. In the Reviewed By box, enter the name of a person who has reviewed the pneumatic pressure test request.  
   
5\. In the Approved By box, enter the name of a person who has approved the pneumatic pressure test request.  
   
6\. In the Prepared Date box, choose the prepared date of the pneumatic pressure test request.  
   
7\. In the Reviewed Date box, choose the reviewed date of the pneumatic pressure test request.  
   
8\. In the Approved Date box, choose the approved date of the pneumatic pressure test request.

9\. In the Is PWHT box, select Before PWHT or After PWHT based on the requirement.

10\. Click Save.

The pneumatic pressure test request is added and listed in the **Pneumatic Pressure Test Report** page.

#### **8.13.2 Submit a Pneumatic Pressure Test Request**

Once you have added the pneumatic pressure test request, the **Submission** column in the **Pneumatic Pressure Test Report** page is appeared with [![image-1651139427180.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651139427180.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651139427180.png)(Submit and Reject icons). See Fig 8.13.

1\. If you want to submit the pneumatic pressure test request, click [![image-1651138736807.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138736807.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138736807.png)(Submit icon) in the **Submission** Otherwise click [![image-1651138748570.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138748570.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138748570.png) (Reject icon) to reject the request.

The submitted request will be moved to for the pneumatic pressure test. The request submitted status will be updated in the **Submitted** column. Once the pneumatic pressure test results are updated, the completed status will be updated in the **Completed** column.

#### **8.13.3 Edit a Pneumatic Pressure Test Request**

<table border="1" id="bkmrk-note-that-if-the-pne" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Note that if the pneumatic pressure test request has been submitted, you cannot edit the respective request.

</td></tr></tbody></table>

If you want to edit any existing pneumatic pressure test request in the **Pneumatic Pressure Test Report** page, do the following steps,

1\. Click [![image-1651138832767.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138832767.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138832767.png)(Edit icon) in the **Edit** column for the respective pneumatic pressure test See Fig 11.13.

The page shows the details of added pneumatic pressure test request.

[![image-1651139536391.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651139536391.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651139536391.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **8.13.4 Add RFI Data for a Pneumatic Pressure Test Request**

If you want to add the details of RFI data for the added pneumatic pressure test request, do the following steps,

1\. Click [![image-1651138916147.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138916147.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138916147.png)(Add icon) in the **RFI Data** column of the **Pneumatic Pressure Test Report**  See Fig 8.13.

The **RFI Inspection Request List** window opens.

[![image-1651139600274.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651139600274.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651139600274.png)

2\. In the Inspection To box, enter the detail to where the inspection should end.  
   
3\. In the Inspection Details option, select what type of inspection to be performed based on your requirement.  
   
4\. In the NDT Inspection box, enter the NDT inspection detail.  
   
5\. In the Description box, enter the description for the inspection request.  
   
6\. In the RFI Date box, choose the RFI date.

7\. In the Remarks box, enter your remarks if any.

8\. Click Save.

#### **8.13.5 View RFI Report for a Pneumatic Pressure Test Request**

If you want to view the RFI report for the pneumatic pressure test request, click [![image-1651137043660.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137043660.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137043660.png)(Print icon) provided in the **RFI** **Report** column.

#### **8.13.6 Attach a File into a Pneumatic Pressure Test Request**

If you want to attach a file with any pneumatic pressure test request listed in the **Pneumatic Pressure Test Report** page, you can use [![image-1651137111900.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137111900.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137111900.png) (Attach icon) provided in the **Attachment** column for the respective pneumatic pressure test request. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **8.14 Flange Face Inspection – RFI**

The **Flange Face Inspection – RFI** tab in the **Production – RFI** menu used to add the flange face inspection request. To add the flange face inspection request,

1\. Click **Flange Face Inspection – RFI** in the **Production – RFI**

 The **Flange Face Inspection Report** page opens.

[![image-1651139857566.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651139857566.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651139857566.png)

**Figure 8.14: Flange Face Inspection Report page**

#### **8.14.1 Add a Flange Face Inspection Request**

If you want to add a flange face inspection request, do the following steps,

1\. Click [![image-1651136796065.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136796065.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136796065.png)(**ADD** button) in the **Flange Face Inspection Report**

 The page shows a new window to add the details of the flange face inspection request.

[![image-1651139979451.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651139979451.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651139979451.png)

**[![image-1651136863440.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136863440.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136863440.png)Tip**: A report number and an RFI number for a new flange face inspection report will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.

2\. In the Drawing box, select a drawing from a drop-down list.

3\. In the Prepared By box, enter the name of a person who has prepared the flange face inspection request.  
   
4\. In the Reviewed By box, enter the name of a person who has reviewed the flange face inspection request.  
   
5\. In the Approved By box, enter the name of a person who has approved the flange face inspection request.

6\. In the Prepared Date box, choose the prepared date of the flange face inspection request.  
   
7\. In the Reviewed Date box, choose the reviewed date of the flange face inspection request.  
   
8\. In the Approved Date box, choose the approved date of the flange face inspection request.

9\. In the Title box, enter the title for the request.

10\. In the Remarks box, enter your remarks if any.

11\. Click Save.

The flange face inspection request is added and listed in the **Flange Face Inspection Report** page.

#### **8.14.2 Submit a Flange Face Inspection Request**

Once you have added the flange face inspection request, the **Submission** column in the **Flange Face Inspection Report** page is appeared with [![image-1651139427180.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651139427180.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651139427180.png) (Submit and Reject icons). See Fig 8.14.

1\. If you want to submit the flange face inspection request, click [![image-1651138736807.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138736807.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138736807.png)(Submit icon) in the **Submission** Otherwise click [![image-1651138748570.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138748570.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138748570.png) (Reject icon) to reject the request.

The submitted request will be moved to for the flange face inspection. The request submitted status will be updated in the **Submitted** column. Once the flange face inspection results are updated, the completed status will be updated in the **Completed** column.

#### **8.14.3 Edit a Flange Face Inspection Request**

<table border="1" id="bkmrk-note-that-if-the-fla" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Note that if the flange face inspection request has been submitted, you cannot edit the respective request.

</td></tr></tbody></table>

If you want to edit any existing flange face inspection request in the **Flange Face Inspection Report** page, do the following steps,

1\. Click [![image-1651138832767.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138832767.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138832767.png)(Edit icon) in the **Edit** column for the respective flange face inspection See Fig 11.14.

 The page shows the details of added flange face inspection request.

[![image-1651140315918.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651140315918.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651140315918.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **8.14.4 Add RFI Data for a Flange Face Inspection Request**

If you want to add the details of RFI data for the added flange face inspection request, do the following steps,

1\. Click [![image-1651138916147.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138916147.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138916147.png)(Add icon) in the **RFI Data** column of the **Flange Face Inspection Report**  See Fig 11.14.

 The **RFI Inspection Request List** window opens.

[![image-1651140387435.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651140387435.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651140387435.png)

2\. In the Inspection To box, enter the detail to where the inspection should end.  
   
3\. In the Inspection Details option, select what type of inspection to be performed based on your requirement.  
   
4\. In the NDT Inspection box, enter the NDT inspection detail.  
   
5\. In the Description box, enter the description for the inspection request.  
   
6\. In the RFI Date box, choose the RFI date.

7\. In the Remarks box, enter your remarks if any.

8\. Click Save.

#### **8.14.5 View RFI Report for a Flange Face Inspection Request**

If you want to view the RFI report for the flange face inspection request, click [![image-1651137043660.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137043660.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137043660.png) (Print icon) provided in the **RFI** **Report** column.

#### **8.14.6 Attach a File into a Flange Face Inspection Request**

If you want to attach a file with any flange face inspection request listed in the **Flange Face Inspection Report** page, you can use [![image-1651137111900.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137111900.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137111900.png) (Attach icon) provided in the **Attachment** column for the respective flange face inspection request. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **8.15 Drining and Dring – RFI**

The **Drining and Dring – RFI** tab in the **Production – RFI** menu used to add the drining and dring inspection request. To add the drining and dring inspection request,

1\. Click **Drining and Dring – RFI** in the **Production – RFI**

 The **Drining and Dring Report** page opens.

[![image-1651140588776.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651140588776.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651140588776.png)

**Figure 8.15: Drining and Dring Report page**

#### **8.15.1 Add a Drining and Dring Inspection Request**

If you want to add a drining and dring inspection request, do the following steps,

1\. Click [![image-1651136796065.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136796065.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136796065.png)(**ADD** button) in the **Drining and Dring Report**

 The page shows a new window to add the details of the drining and dring inspection request.

[![image-1651140668917.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651140668917.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651140668917.png)

**[![image-1651136863440.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136863440.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136863440.png)Tip**: A report number and an RFI number for a new drining and dring inspection report will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.

2\. In the Drawing box, select a drawing from a drop-down list.

3\. In the Prepared By box, enter the name of a person who has prepared the drining and dring inspection request.

4\. In the Reviewed By box, enter the name of a person who has reviewed the drining and dring inspection request.  
   
5\. In the Approved By box, enter the name of a person who has approved the drining and dring inspection request.  
   
6\. In the Prepared Date box, choose the prepared date of the drining and dring inspection request.  
   
7\. In the Reviewed Date box, choose the reviewed date of the drining and dring inspection request.

8\. In the Approved Date box, choose the approved date of the drining and dring inspection request.

9\. In the Title box, enter the title for the request.

10\. In the Remarks box, enter your remarks if any.  
   
11\. Click Save.

The drining and dring inspection request is added and listed in the **Drining and Dring Report** page.

#### **8.15.2 Submit a Drining and Dring Inspection Request**

Once you have added the drining and dring inspection request, the **Submission** column in the **Drining and Dring Report** page is appeared with [![image-1651139427180.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651139427180.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651139427180.png)(Submit and Reject icons). See Fig 8.15.

1\. If you want to submit the drining and dring inspection request, click [![image-1651138736807.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138736807.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138736807.png)(Submit icon) in the **Submission** Otherwise click [![image-1651138748570.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138748570.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138748570.png)(Reject icon) to reject the request.

The submitted request will be moved to for the drining and dring inspection. The request submitted status will be updated in the **Submitted** column. Once the drining and dring inspection results are updated, the completed status will be updated in the **Completed** column.

#### **8.15.3 Edit a Drining and Dring Inspection Request**

<table border="1" id="bkmrk-note-that-if-the-dri" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Note that if the drining and dring inspection request has been submitted, you cannot edit the respective request.

</td></tr></tbody></table>

If you want to edit any existing drining and dring inspection request in the **Drining and Dring Report** page, do the following steps,

1\. Click [![image-1651138832767.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138832767.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138832767.png)(Edit icon) in the **Edit** column for the respective drining and dring inspection See Fig 8.15.

 The page shows the details of added drining and dring inspection request.

[![image-1651140910034.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651140910034.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651140910034.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **8.15.4 Add RFI Data for a Drining and Dring Inspection Request**

If you want to add the details of RFI data for the added drining and dring inspection request, do the following steps,

1\. Click [![image-1651138916147.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138916147.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138916147.png)(Add icon) in the **RFI Data** column of the **Drining and Dring Report**  See Fig 8.15.

The **RFI Inspection Request List** window opens.

[![image-1651140986495.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651140986495.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651140986495.png)

2\. In the Inspection To box, enter the detail to where the inspection should end.  
   
3\. In the Inspection Details option, select what type of inspection to be performed based on your requirement.  
   
4\. In the NDT Inspection box, enter the NDT inspection detail.  
   
5\. In the Description box, enter the description for the inspection request.  
   
6\. In the RFI Date box, choose the RFI date.

7\. In the Remarks box, enter your remarks if any.

8\. Click Save.

#### **8.15.5 View RFI Report for a Drining and Dring Inspection Request**

If you want to view the RFI report for the drining and dring inspection request, click [![image-1651137043660.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137043660.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137043660.png)(Print icon) provided in the **RFI** **Report** column.

#### **8.15.6 Attach a File into a Drining and Dring Inspection Request**

If you want to attach a file with any drining and dring inspection request listed in the **Drining and Dring Report** page, you can use [![image-1651137111900.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137111900.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137111900.png) (Attach icon) provided in the **Attachment** column for the respective drining and dring inspection request. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **8.16 Shipment Report – RFI**

The **Shipment Report – RFI** tab in the **Production – RFI** menu used to add the shipment inspection request. To add the shipment inspection request,

1\. Click **Shipment Report – RFI** in the **Production – RFI**

 The **Shipment Report** page opens.

[![image-1651141226202.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651141226202.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651141226202.png)

**Figure 8.16: Shipment Report page**

#### **8.16.1 Add a Shipment Inspection Request**

If you want to add a shipment inspection request, do the following steps,

1\. Click [![image-1651136771828.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136771828.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136771828.png)(**ADD** button) in the **Shipment Report**

 The page shows a new window to add the details of the shipment inspection request.

[![image-1651141293256.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651141293256.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651141293256.png)

**[![image-1651136863440.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136863440.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136863440.png)Tip**: A report number and an RFI number for a new shipment inspection report will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.

2\. In the Drawing box, select a drawing from a drop-down list.

3\. In the Prepared By box, enter the name of a person who has prepared the shipment inspection request.  
   
4\. In the Reviewed By box, enter the name of a person who has reviewed the shipment inspection request.

5\. In the Approved By box, enter the name of a person who has approved the shipment inspection request.

6\. In the Prepared Date box, choose the prepared date of the shipment inspection request.  
   
7\. In the Reviewed Date box, choose the reviewed date of the shipment inspection request.

8\. In the Approved Date box, choose the approved date of the shipment inspection request.

9\. In the Title box, enter the title detail.

10\. In the Remarks box, enter your remarks if any.

11\. Click Save.

The shipment inspection request is added and listed in the **Shipment Inspection Report** page.

#### **8.16.2 Submit a Shipment Inspection Request**

Once you have added the shipment inspection request, the **Submission** column in the **Shipment Inspection Report** page is appeared with [![image-1651139427180.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651139427180.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651139427180.png)(Submit and Reject icons). See Fig 8.16.

1\. If you want to submit the shipment inspection request, click [![image-1651138736807.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138736807.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138736807.png)(Submit icon) in the **Submission** Otherwise click [![image-1651138748570.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138748570.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138748570.png)(Reject icon) to reject the request.

The submitted request will be moved to for the shipment inspection. The request submitted status will be updated in the **Submitted** column. Once the shipment inspection results are updated, the completed status will be updated in the **Completed** column.

#### **8.16.3 Edit a Shipment Inspection Request**

<table border="1" id="bkmrk-note-that-if-the-shi" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Note that if the shipment inspection request has been submitted, you cannot edit the respective request.

</td></tr></tbody></table>

If you want to edit any existing shipment inspection request in the **Shipment Inspection Report** page, do the following steps,

1\. Click [![image-1651132156256.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132156256.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132156256.png)(Edit icon) in the **Edit** column for the respective shipment inspection See Fig 8.16.

 The page shows the details of added shipment inspection request.

[![image-1651141525424.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651141525424.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651141525424.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **8.16.4 Add RFI Data for a Shipment Inspection Request**

If you want to add the details of RFI data for the added shipment inspection request, do the following steps,

1\. Click [![image-1651138916147.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138916147.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138916147.png)(Add icon) in the **RFI Data** column of the **Shipment Inspection Report**  See Fig 8.16.

 The **RFI Inspection Request List** window opens.

[![image-1651141598651.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651141598651.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651141598651.png)

2\. In the Inspection To box, enter the detail to where the inspection should end.  
   
3\. In the Inspection Details option, select what type of inspection to be performed based on your requirement.  
   
4\. In the NDT Inspection box, enter the NDT inspection detail.  
   
5\. In the Description box, enter the description for the inspection request.  
   
6\. In the RFI Date box, choose the RFI date.

7\. In the Remarks box, enter your remarks if any.

8\. Click Save.

#### **8.16.5 View RFI Report for a Shipment Inspection Request**

If you want to view the RFI report for the shipment inspection request, click [![image-1651135739577.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651135739577.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651135739577.png)(Print icon) provided in the **RFI** **Report** column.

#### **8.16.6 Attach a File into a Shipment Inspection Request**

If you want to attach a file with any shipment inspection request listed in the **Shipment Inspection Report** page, you can use [![image-1651136867158.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136867158.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136867158.png) (Attach icon) provided in the **Attachment** column for the respective shipment inspection request. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **8.17 Name Plate – RFI**

The **Name Plate Report – RFI** tab in the **Production – RFI** menu used to add the name plate inspection request. To add the name plate inspection request,

1\. Click **Name plate Report – RFI** in the **Production – RFI**

 The **Name plate Report** page opens.

[![image-1651141849249.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651141849249.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651141849249.png)

**Figure 8.17: Name Plate Report page**

#### **8.17.1 Add a Name Plate Inspection Request**

If you want to add a name plate inspection request, do the following steps,

1\. Click [![image-1651136796065.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136796065.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136796065.png)(**ADD** button) in the **Name plate Report**

The page shows a new window to add the details of the name plate inspection request.

[![image-1651141912465.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651141912465.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651141912465.png)

**[![image-1651136863440.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136863440.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136863440.png)Tip**: A report number and an RFI number for a new name plate inspection report will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.

2\. In the Drawing box, select a drawing from a drop-down list.

3\. In the Prepared By box, enter the name of a person who has prepared the name plate inspection request.  
   
4\. In the Reviewed By box, enter the name of a person who has reviewed the name plate inspection request.  
   
5\. In the Approved By box, enter the name of a person who has approved the name plate inspection request.  
   
6\. In the Prepared Date box, choose the prepared date of the name plate inspection request.  
   
7\. In the Reviewed Date box, choose the reviewed date of the name plate inspection request.  
   
8\. In the Approved Date box, choose the approved date of the name plate inspection request.

9\. In the Title box, enter the title detail.

10\. In the Remarks box, enter your remarks if any.

11\. Click Save.

The name plate inspection request is added and listed in the **Name Plate Report** page.

#### **8.17.2 Submit a Name Plate Inspection Request**

Once you have added the name plate inspection request, the **Submission** column in the **Name Plate Report** page is appeared [![image-1651139427180.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651139427180.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651139427180.png)with (Submit and Reject icons). See Fig 8.17.

1\. If you want to submit the name plate inspection request, click [![image-1651138736807.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138736807.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138736807.png)(Submit icon) in the **Submission** Otherwise click [![image-1651138748570.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138748570.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138748570.png) (Reject icon) to reject the request.

The submitted request will be moved to for the name plate inspection. The request submitted status will be updated in the **Submitted** column. Once the name plate inspection results are updated, the completed status will be updated in the **Completed** column.

#### **8.17.3 Edit a Name Plate Inspection Request**

<table border="1" id="bkmrk-note-that-if-the-nam" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Note that if the name plate inspection request has been submitted, you cannot edit the respective request.

</td></tr></tbody></table>

If you want to edit any existing name plate inspection request in the **Name plate Report** page, do the following steps,

1\. Click [![image-1651138832767.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138832767.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138832767.png)(Edit icon) in the **Edit** column for the respective name plate inspection See Fig 8.17.

 The page shows the details of added name plate inspection request.

[![image-1651142150710.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651142150710.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651142150710.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **8.17.4 Add RFI Data for a Name Plate Inspection Request**

If you want to add the details of RFI data for the added name plate inspection request, do the following steps,

1\. Click [![image-1651138916147.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138916147.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138916147.png)(Add icon) in the **RFI Data** column of the **Name Plate Report**  See Fig 8.17.

 The **RFI Inspection Request List** window opens.

[![image-1651142225511.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651142225511.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651142225511.png)

2\. In the Inspection To box, enter the detail to where the inspection should end.  
   
3\. In the Inspection Details option, select what type of inspection to be performed based on your requirement.  
   
4\. In the NDT Inspection box, enter the NDT inspection detail.  
   
5\. In the Description box, enter the description for the inspection request.  
   
6\. In the RFI Date box, choose the RFI date.

7\. In the Remarks box, enter your remarks if any.

8\. Click Save.

#### **8.17.5 View RFI Report for a Name Plate Inspection Request**

If you want to view the RFI report for the name plate inspection request, click [![image-1651137043660.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137043660.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137043660.png)(Print icon) provided in the **RFI** **Report** column.

#### **8.17.6 Attach a File into a Name Plate Inspection Request**

If you want to attach a file with any name plate inspection request listed in the **Name Plate Report** page, you can use [![image-1651136867158.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136867158.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136867158.png)(Attach icon) provided in the **Attachment** column for the respective name plate inspection request. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **8.18 Stamp Verification/Others – RFI**

The **Stamp Verification/Others– RFI** tab in the **Production – RFI** menu used to add the stamp verification inspection request. To add the stamp verification inspection request,

1\. Click **Stamp Verification/Others – RFI** in the **Production – RFI**

 The **Stamp Verification Report** page opens.

[![image-1651142560698.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651142560698.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651142560698.png)

**Figure 8.18: Stamp Verification Report page**

#### **8.18.1 Add a Stamp Verification Inspection Request**

If you want to add a stamp verification inspection request, do the following steps,

1\. Click [![image-1651136796065.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136796065.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136796065.png)(**ADD** button) in the **Stamp Verification Report**

 The page shows a new window to add the details of the stamp verification inspection request.

[![image-1651142630789.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651142630789.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651142630789.png)

**[![image-1651136863440.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136863440.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136863440.png)Tip**: A report number and an RFI number for a new stamp verification inspection report will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.

2\. In the Drawing box, select a drawing from a drop-down list.

3\. In the Prepared By box, enter the name of a person who has prepared the stamp verification inspection request.  
   
4\. In the Reviewed By box, enter the name of a person who has reviewed the stamp verification inspection request.  
   
5\. In the Approved By box, enter the name of a person who has approved the stamp verification inspection request.  
   
6\. In the Prepared Date box, choose the prepared date of the stamp verification inspection request.  
   
7\. In the Reviewed Date box, choose the reviewed date of the stamp verification inspection request.  
   
8\. In the Approved Date box, choose the approved date of the stamp verification inspection request.

9\. In the Title box, enter the title detail.

10.In the Remarks box, enter your remarks if any.

11\. Click Save.

The stamp verification inspection request is added and listed in the **Stamp Verification Report** page.

#### **8.18.2 Submit a Stamp Verification Inspection Request**

Once you have added the stamp verification inspection request, the **Submission** column in the **Stamp Verification Report** page is appeared with [![image-1651139427180.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651139427180.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651139427180.png) (Submit and Reject icons). See Fig 8.18.

1\. If you want to submit the stamp verification inspection request, click [![image-1651138736807.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138736807.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138736807.png)(Submit icon) in the **Submission** Otherwise click [![image-1651138748570.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138748570.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138748570.png) (Reject icon) to reject the request.

The submitted request will be moved to for the stamp verification inspection. The request submitted status will be updated in the **Submitted** column. Once the stamp verification inspection results are updated, the completed status will be updated in the **Completed** column.

#### **8.18.3 Edit a Stamp Verification Inspection Request**

<table border="1" id="bkmrk-note-that-if-the-sta" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Note that if the stamp verification inspection request has been submitted, you cannot edit the respective request.

</td></tr></tbody></table>

If you want to edit any existing stamp verification inspection request in the **Stamp Verification Report** page, do the following steps,

1\. Click [![image-1651138832767.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138832767.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138832767.png)(Edit icon) in the **Edit** column for the respective stamp verification inspection See Fig 8.18.

 The page shows the details of added stamp verification inspection request.

[![image-1651142856691.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651142856691.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651142856691.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **8.18.4 Add RFI Data for a Stamp verification Inspection Request**

If you want to add the details of RFI data for the added stamp verification inspection request, do the following steps,

1\. Click [![image-1651138916147.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138916147.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138916147.png)(Add icon) in the **RFI Data** column of the **Stamp verification Report**  See Fig 8.18.

 The **RFI Inspection Request List** window opens.

[![image-1651142931359.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651142931359.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651142931359.png)

2\. In the Inspection To box, enter the detail to where the inspection should end.  
   
3\. In the Inspection Details option, select what type of inspection to be performed based on your requirement.  
   
4\. In the NDT Inspection box, enter the NDT inspection detail.  
   
5\. In the Description box, enter the description for the inspection request.  
   
6\. In the RFI Date box, choose the RFI date.

7\. In the Remarks box, enter your remarks if any.

8\. Click Save.

#### **8.18.5 View RFI Report for a Stamp Verification Inspection Request**

If you want to view the RFI report for the stamp verification inspection request, click [![image-1651137043660.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137043660.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137043660.png) (Print icon) provided in the **RFI** **Report** column.

#### **8.18.6 Attach a File into a Stamp Verification Inspection Request**

If you want to attach a file with any stamp verification inspection request listed in the **Stamp Verification Report** page, you can use [![image-1651137111900.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137111900.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137111900.png) (Attach icon) provided in the **Attachment** column for the respective stamp verification inspection request. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **8.19 Dishend Dimension – RFI**

The **Dishend Dimension – RFI** tab in the **Production – RFI** menu used to add the dishend dimension inspection request. To add the dishend dimension inspection request,

1\. Click **Dishend Dimension – RFI** in the **Production – RFI**

 The **Dishend Dimension Report** page opens.

[![image-1651143135980.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651143135980.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651143135980.png)

**Figure 8.19: Dishend Dimension Report page**

#### **8.19.1 Add a Dishend Dimension Inspection Request**

If you want to add a dishend dimension inspection request, do the following steps,

1\. Click [![image-1651136771828.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136771828.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136771828.png)(**ADD** button) in the **Dishend dimension Report**

The page shows a new window to add the details of the dishend dimension inspection request.

[![image-1651143203438.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651143203438.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651143203438.png)

**[![image-1651136863440.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136863440.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136863440.png)Tip**: A report number and an RFI number for a new dishend dimension inspection report will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.

2\. In the Drawing box, select a drawing from a drop-down list.

3\. In the Prepared By box, enter the name of a person who has prepared the dishend dimension inspection request.  
   
4\. In the Reviewed By box, enter the name of a person who has reviewed the dishend dimension inspection request.  
   
5\. In the Approved By box, enter the name of a person who has approved the dishend dimension inspection request.  
   
6\. In the Prepared Date box, choose the prepared date of the dishend dimension inspection request.  
   
7\. In the Reviewed Date box, choose the reviewed date of the dishend dimension inspection request.  
   
8\. In the Approved Date box, choose the approved date of the dishend dimension inspection request.

9\. Click Save.

The dishend dimension inspection request is added and listed in the **Dishend Dimension Report** page.

#### **8.19.2 Submit a Dishend Dimension Inspection Request**

Once you have added the dishend dimension inspection request, the **Submission** column in the **Dishend dimension Report** page is appeared with [![image-1651139427180.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651139427180.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651139427180.png)(Submit and Reject icons). See Fig 8.19.

1\. If you want to submit the dishend dimension inspection request, click [![image-1651138736807.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138736807.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138736807.png)(Submit icon) in the **Submission** Otherwise click[![image-1651138748570.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138748570.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138748570.png) (Reject icon) to reject the request.

The submitted request will be moved to for the dishend dimension inspection. The request submitted status will be updated in the **Submitted** column. Once the dishend dimension inspection results are updated, the completed status will be updated in the **Completed** column.

#### **8.19.3 Edit a Dishend Dimension Inspection Request**

<table border="1" id="bkmrk-note-that-if-the-dis" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Note that if the dishend dimension inspection request has been submitted, you cannot edit the respective request.

</td></tr></tbody></table>

If you want to edit any existing dishend dimension inspection request in the **Dishend Dimension Report** page, do the following steps,

1\. Click [![image-1651132156256.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132156256.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132156256.png)(Edit icon) in the **Edit** column for the respective dishend dimension inspection See Fig 8.19.

 The page shows the details of added dishend dimension inspection request.

[![image-1651143482509.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651143482509.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651143482509.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **8.19.4 Add RFI Data for a Dishend Dimension Inspection Request**

If you want to add the details of RFI data for the added dishend dimension inspection request, do the following steps,

1\. Click [![image-1651138916147.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138916147.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138916147.png)(Add icon) in the **RFI Data** column of the **Dishend dimension Report**  See Fig 8.19.

 The **RFI Inspection Request List** window opens.

[![image-1651143564635.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651143564635.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651143564635.png)

2\. In the Inspection To box, enter the detail to where the inspection should end.  
   
3\. In the Inspection Details option, select what type of inspection to be performed based on your requirement.  
   
4\. In the NDT Inspection box, enter the NDT inspection detail.  
   
5\. In the Description box, enter the description for the inspection request.  
   
6\. In the RFI Date box, choose the RFI date.

7\. In the Remarks box, enter your remarks if any.

8\. Click Save.

#### **8.19.5 View RFI Report for a Dishend Dimension Inspection Request**

If you want to view the RFI report for the dishend dimension inspection request, click [![image-1651137043660.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137043660.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137043660.png) (Print icon) provided in the **RFI** **Report** column.

#### **8.19.6 Attach a File into a Dishend Dimension Inspection Request**

If you want to attach a file with any dishend dimension inspection request listed in the **Dishend Dimension Report** page, you can use [![image-1651137111900.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137111900.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137111900.png) (Attach icon) provided in the **Attachment** column for the respective dishend dimension inspection request. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **8.20 Dishend Thickness – RFI**

The **Dishend Thickness – RFI** tab in the **Production – RFI** menu used to add the dishend thickness inspection request. To add the dishend thickness inspection request,

1\. Click **Dishend Thickness – RFI** in the **Production – RFI**

 The **Dishend Thickness Report** page opens.

[![image-1651143775491.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651143775491.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651143775491.png)

**Figure 8.20: Dishend Thickness Report page**

#### **8.20.1 Add a Dishend Thickness Inspection Request**

If you want to add a dishend thickness inspection request, do the following steps,

1\. Click [![image-1651136796065.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136796065.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136796065.png)(**ADD** button) in the **Dishend Thickness Report**

 The page shows a new window to add the details of the dishend thickness inspection request.

[![image-1651143850522.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651143850522.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651143850522.png)

**[![image-1651136863440.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136863440.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136863440.png)Tip**: A report number and an RFI number for a new dishend thickness inspection report will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.

2\. In the Drawing box, select a drawing from a drop-down list.

3\. In the Prepared By box, enter the name of a person who has prepared the dishend thickness inspection request.

4\. In the Reviewed By box, enter the name of a person who has reviewed the dishend thickness inspection request.  
   
5\. In the Approved By box, enter the name of a person who has approved the dishend thickness inspection request.

6\. In the Prepared Date box, choose the prepared date of the dishend thickness inspection request.  
   
7\. In the Reviewed Date box, choose the reviewed date of the dishend thickness inspection request.  
   
8\. In the Approved Date box, choose the approved date of the dishend thickness inspection request.

9\. Click Save.

The dishend thickness inspection request is added and listed in the **Dishend Thickness Report** page.

#### **8.20.2 Submit a Dishend Thickness Inspection Request**

Once you have added the dishend thickness inspection request, the **Submission** column in the **Dishend thickness Report** page is appeared with [![image-1651139427180.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651139427180.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651139427180.png)(Submit and Reject icons). See Fig 8.20.

1\. If you want to submit the dishend thickness inspection request, click [![image-1651138736807.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138736807.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138736807.png)(Submit icon) in the **Submission** Otherwise click[![image-1651138748570.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138748570.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138748570.png) (Reject icon) to reject the request.

The submitted request will be moved to for the dishend thickness inspection. The request submitted status will be updated in the **Submitted** column. Once the dishend thickness inspection results are updated, the completed status will be updated in the **Completed** column.

#### **8.20.3 Edit a Dishend Thickness Inspection Request**

<table border="1" id="bkmrk-note-that-if-the-dis-0" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Note that if the dishend thickness inspection request has been submitted, you cannot edit the respective request.

</td></tr></tbody></table>

If you want to edit any existing dishend thickness inspection request in the **Dishend Thickness Report** page, do the following steps,

1\. Click [![image-1651138832767.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138832767.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138832767.png)(Edit icon) in the **Edit** column for the respective dishend thickness inspection See Fig 8.20.

 The page shows the details of added dishend thickness inspection request.

[![image-1651144055041.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651144055041.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651144055041.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **8.20.4 Add RFI Data for a Dishend Thickness Inspection Request**

If you want to add the details of RFI data for the added dishend thickness inspection request, do the following steps,

1\. Click [![image-1651138916147.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138916147.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138916147.png)(Add icon) in the **RFI Data** column of the **Dishend Thickness Report**  See Fig 8.20.

 The **RFI Inspection Request List** window opens.

[![image-1651144123749.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651144123749.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651144123749.png)

2\. In the Inspection To box, enter the detail to where the inspection should end.  
   
3\. In the Inspection Details option, select what type of inspection to be performed based on your requirement.  
   
4\. In the NDT Inspection box, enter the NDT inspection detail.  
   
5\. In the Description box, enter the description for the inspection request.  
   
6\. In the RFI Date box, choose the RFI date.

7\. In the Remarks box, enter your remarks if any.

8\. Click Save.

#### **8.20.5 View RFI Report for a Dishend Thickness Inspection Request**

If you want to view the RFI report for the dishend thickness inspection request, click [![image-1651135739577.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651135739577.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651135739577.png) (Print icon) provided in the **RFI** **Report** column.

#### **8.20.6 Attach a File into a Dishend Thickness Inspection Request**

If you want to attach a file with any dishend thickness inspection request listed in the **Dishend Thickness Report** page, you can use [![image-1651137111900.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137111900.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137111900.png)(Attach icon) provided in the **Attachment** column for the respective dishend thickness inspection request. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **8.21 Blasting and Painting – RFI**

The **Blasting and Painting – RFI** tab in the **Production – RFI** menu used to add the blasting and painting inspection request. To add the blasting and painting inspection request,

1\. Click **Blasting and Painting – RFI**in the **Production – RFI**

The **Blasting and Painting Report** page opens.

[![image-1651144484197.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651144484197.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651144484197.png)

**Figure 8.21: Blasting and Painting Report page**

#### **8.21.1 Add a Blasting and Painting Inspection Request**

If you want to add a blasting and painting inspection request, do the following steps,

1\. Click [![image-1651136778297.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136778297.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136778297.png)(**ADD** button) in the **Blasting and Painting Report**

The page shows a new window to add the details of the blasting and painting inspection request.

[![image-1651144529141.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651144529141.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651144529141.png)

**[![image-1651136863440.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136863440.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136863440.png)Tip**: A report number and an RFI number for a new blasting and painting inspection report will be updated automatically in the **Report Number** and the **RFI Number** boxes, respectively.

2\. In the Inspection Date box, select the inspection date.

3\. In the Time box, select the inspection time.

4\. In the Prepared By box, enter the name of a person who has prepared the blasting and painting inspection request.  
   
5\. In the Approved By box, enter the name of a person who has approved the blasting and painting inspection request.  
   
6\. In the Prepared Date box, choose the prepared date of the blasting and painting inspection request.  
   
7\. In the Approved Date box, choose the approved date of the blasting and painting inspection request.

8\. Click Save.

The blasting and painting inspection request is added and listed in the **Blasting and Painting Report** page.

#### **8.21.2 Edit MRR for a Blasting and Painting Inspection Request**

If you want to edit the MRR details of any existing blasting and painting inspection request in the **Blasting and Painting Report** page, do the following steps,

1\. Click[![image-1651144645654.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651144645654.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651144645654.png)(Edit icon)in the **Edit** column for the respective blasting and painting inspection See Fig 8.21.

The page shows a new window to add the MRR details of added blasting and painting inspection request.

[![image-1651144663016.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651144663016.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651144663016.png)

2\. In the SURFACE PREPARATION field, enter the surface preparation details.

3\. In the ABRASIVE BLASTING field, enter the abrasive preparation details.  
   
4\. In the Painting First Coat field, enter the details of first coat painting.  
   
5\. In the Intermediate Coat field, enter the details of intermediate coat.

6\. In the Top Coat field, enter the details of top coat.

#### **8.21.3 Submit a Blasting and Painting Inspection Request**

Once you have added the blasting and painting inspection request, the **Submission** column in the **Blasting and Painting Report** page is appeared with [![image-1651139427180.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651139427180.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651139427180.png) (Submit and Reject icons). See Fig 8.21.

1\. If you want to submit the blasting and painting inspection request, click [![image-1651138736807.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138736807.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138736807.png) (Submit icon) in the **Submission** Otherwise click [![image-1651138748570.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138748570.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138748570.png) (Reject icon) to reject the request.

The submitted request will be moved to for the blasting and painting inspection. The request submitted status will be updated in the **Submitted** column. Once the blasting and painting inspection results are updated, the completed status will be updated in the **Completed** column.

#### **8.21.4 Add RFI Data for a Blasting and Painting Inspection Request**

If you want to add the details of RFI data for the added blasting and painting inspection request, do the following steps,

1\. Click [![image-1651138916147.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138916147.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138916147.png)(Add icon) in the **RFI Data** column of the **Blasting and Painting Report**  See Fig 8.21.

The **RFI Inspection Request List** window opens.

[![image-1651144841634.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651144841634.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651144841634.png)

2\. In the Inspection To box, enter the detail to where the inspection should end.  
   
3\. In the Inspection Details option, select what type of inspection to be performed based on your requirement.  
   
4\. In the NDT Inspection box, enter the NDT inspection detail.  
   
5\. In the Description box, enter the description for the inspection request.  
   
6\. In the RFI Date box, choose the RFI date.

7\. In the Remarks box, enter your remarks if any.

8\. Click Save.

#### **8.21.5 View RFI Report for a Blasting and Painting Inspection Request**

If you want to view the RFI report for the blasting and painting inspection request, click [![image-1651137043660.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137043660.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137043660.png) (Print icon) provided in the **RFI** **Report** column.

#### **8.21.6 View a Blasting and Painting Report for a Blasting and Painting Inspection Request**

If you want to view the blasting and painting report, click [![image-1651137043660.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137043660.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137043660.png) (Print icon) provided in the **Report** column.

#### **8.21.7 Attach a File into a Blasting and Painting Inspection Request**

If you want to attach a file with any blasting and painting inspection request listed in the **Blasting and Painting Report** page, you can use [![image-1651137111900.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137111900.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137111900.png) (Attach icon) provided in the **Attachment** column for the respective blasting and painting inspection request. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **8.22 Miscellaneous – RFI**

The **Miscellaneous – RFI** tab in the **Production – RFI** menu used to add the vessel NDT inspection request. To add the vessel NDT inspection request,

1\. Click **Miscellaneous – RFI** in the **Production – RFI**

The **Vessel NDT Report** page opens.

[![image-1651145101093.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651145101093.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651145101093.png)

**Figure 8.22: Vessel NDT Report page**

#### **8.22.1 Add a Vessel NDT Inspection Request**

If you want to add a vessel NDT inspection request, do the following steps,

1\. Click [![image-1651144642384.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651144642384.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651144642384.png)(**ADD** button) in the **Vessel NDT Report**

The page shows a new window to add the details of the vessel NDT inspection request.

[![image-1651145169793.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651145169793.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651145169793.png)

**[![image-1651136863440.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136863440.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136863440.png)Tip**: A report number and an RFI number for a new vessel NDT inspection report will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.

2\. In the Drawing box, select a drawing from a drop-down list.

3\. In the Type box, select the NDT type.

4\. In the Part No box, enter the part number.

5\. In the Prepared By box, enter the name of a person who has prepared the vessel NDT inspection request.  
   
6\. In the Reviewed By box, enter the name of a person who has reviewed the vessel NDT inspection request.  
   
7\. In the Approved By box, enter the name of a person who has approved the vessel NDT inspection request.  
   
8\. In the Prepared Date box, choose the prepared date of the vessel NDT inspection request.  
   
9\. In the Reviewed Date box, choose the reviewed date of the vessel NDT inspection request.  
   
10\. In the Approved Date box, choose the approved date of the vessel NDT inspection request.

11\. Click Save.

The vessel NDT inspection request is added and listed in the **Vessel NDT Report** page.

#### **8.22.2 Submit a Vessel NDT Inspection Request**

Once you have added the vessel NDT inspection request, the **Submission** column in the **Vessel NDT Report** page is appeared with [![image-1651139427180.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651139427180.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651139427180.png) (Submit and Reject icons). See Fig 8.22.

1\. If you want to submit the vessel NDT inspection request, click [![image-1651138736807.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138736807.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138736807.png)(Submit icon) in the **Submission** Otherwise click [![image-1651138748570.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138748570.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138748570.png)(Reject icon) to reject the request.

The submitted request will be moved to for the vessel NDT inspection. The request submitted status will be updated in the **Submitted** column. Once the vessel NDT inspection results are updated, the completed status will be updated in the **Completed** column.

#### **8.22.3 Edit a Vessel NDT Inspection Request**

<table border="1" id="bkmrk-note-that-if-the-ves" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Note that if the vessel NDT inspection request has been submitted, you cannot edit the respective request.

</td></tr></tbody></table>

If you want to edit any existing vessel NDT inspection request in the **Vessel NDT Report** page, do the following steps,

1\. Click [![image-1651144815771.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651144815771.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651144815771.png)(Edit icon) in the **Edit** column for the respective vessel NDT inspection See Fig 8.22.

The page shows the details of added vessel NDT inspection request.

[![image-1651145415756.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651145415756.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651145415756.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **8.22.4 Add RFI Data for a Vessel NDT Inspection Request**

If you want to add the details of RFI data for the added vessel NDT inspection request, do the following steps,

1\. Click [![image-1651138916147.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138916147.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138916147.png)(Add icon) in the **RFI Data** column of the **Vessel NDT Report**  See Fig 8.22.

The **RFI Inspection Request List** window opens.

[![image-1651145503764.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651145503764.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651145503764.png)

2\. In the Inspection To box, enter the detail to where the inspection should end.  
   
3\. In the Inspection Details option, select what type of inspection to be performed based on your requirement.  
   
4\. In the NDT Inspection box, enter the NDT inspection detail.  
   
5\. In the Description box, enter the description for the inspection request.  
   
6\. In the RFI Date box, choose the RFI date.

7\. In the Remarks box, enter your remarks if any.

8\. Click Save.

#### **8.22.5 View RFI Report for a Vessel NDT Inspection Request**

If you want to view the RFI report for the vessel NDT inspection request, click [![image-1651137043660.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137043660.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137043660.png) (Print icon) provided in the **RFI** **Report** column.

#### **8.22.6 Attach a File into a Vessel NDT Inspection Request**

If you want to attach a file with any vessel NDT inspection request listed in the **Vessel NDT Report** page, you can use [![image-1651137111900.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137111900.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137111900.png) (Attach icon) provided in the **Attachment** column for the respective vessel NDT inspection request. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **8.23 Post Weld Heat Treatment (PWHT) – RFI**

The **PWHT Report – RFI** tab in the **Production – RFI** menu used to add the PWHT inspection request. To add the PWHT inspection request,

1\. Click **PWHT Report – RFI** in the **Production – RFI**

The **PWHT Report** page opens.

[![image-1651146982433.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651146982433.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651146982433.png)

**Figure 8.23: PWHT Report page**

#### **8.23.1 Add a PWHT Inspection Request**

If you want to add a PWHT inspection request, do the following steps,

1\. Click [![image-1651146993042.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651146993042.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651146993042.png)(**ADD** button) in the **PWHT Report**

The page shows a new window to add the details of the PWHT inspection request.

[![image-1651147040303.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147040303.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147040303.png)

**[![image-1651136863440.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136863440.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136863440.png)Tip**: A report number and an RFI number for a new PWHT inspection report will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.

2\. In the Drawing box, select a drawing from a drop-down list.

3\. In the Prepared By box, enter the name of a person who has prepared the PWHT inspection request.  
   
4\. In the Reviewed By box, enter the name of a person who has reviewed the PWHT inspection request.  
   
5\. In the Approved By box, enter the name of a person who has approved the PWHT inspection request.  
   
6\. In the Prepared Date box, choose the prepared date of the PWHT inspection request.  
   
7\. In the Reviewed Date box, choose the reviewed date of the PWHT inspection request.  
   
8\. In the Approved Date box, choose the approved date of the PWHT inspection request.

9\. In the Title box, enter the title detail.

10\. In the Remarks box, enter your remarks if any.

11\. Click Save.

The PWHT inspection request is added and listed in the **PWHT Inspection Report** page.

#### **8.23.2 Submit a PWHT Inspection Request**

Once you have added the PWHT inspection request, the **Submission** column in the **PWHT Inspection Report** page is appeared with [![image-1651139427180.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651139427180.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651139427180.png)(Submit and Reject icons). See Fig 8.23.

1\. If you want to submit the PWHT inspection request, [![image-1651138736807.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138736807.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138736807.png)click (Submit icon) in the **Submission** Otherwise click [![image-1651138748570.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138748570.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138748570.png)(Reject icon) to reject the request.

The submitted request will be moved to for the PWHT inspection. The request submitted status will be updated in the **Submitted** column. Once the PWHT inspection results are updated, the completed status will be updated in the **Completed** column.

#### **8.23.3 Edit a PWHT Inspection Request**

<table border="1" id="bkmrk-note-that-if-the-pwh" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Note that if the PWHT inspection request has been submitted, you cannot edit the respective request.

</td></tr></tbody></table>

If you want to edit any existing PWHT inspection request in the **PWHT Inspection Report** page, do the following steps,

1\. Click (Edit icon) in the **Edit** column for the respective PWHT inspection See Fig 8.23.

The page shows the details of added PWHT inspection request.

[![image-1651147287612.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147287612.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147287612.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **8.23.4 Add RFI Data for a PWHT Inspection Request**

If you want to add the details of RFI data for the added PWHT inspection request, do the following steps,

1\. Click [![image-1651137349211.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137349211.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137349211.png)(Add icon) in the **RFI Data** column of the **PWHT Inspection Report**  See Fig 8.23.

The **RFI Inspection Request List** window opens.

[![image-1651147359971.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147359971.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147359971.png)

2\. In the Inspection To box, enter the detail to where the inspection should end.  
   
3\. In the Inspection Details option, select what type of inspection to be performed based on your requirement.  
   
4\. In the NDT Inspection box, enter the NDT inspection detail.  
   
5\. In the Description box, enter the description for the inspection request.  
   
6\. In the RFI Date box, choose the RFI date.

7\. In the Remarks box, enter your remarks if any.

8\. Click Save.

#### **8.23.5 View RFI Report for a PWHT Inspection Request**

If you want to view the RFI report for the PWHT inspection request, click [![image-1651137043660.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137043660.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137043660.png) (Print icon) provided in the **RFI** **Report** column.

#### **8.23.6 Attach a File into a PWHT Inspection Request**

If you want to attach a file with any PWHT inspection request listed in the **PWHT Inspection Report** page, you can use [![image-1651137111900.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137111900.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137111900.png) (Attach icon) provided in the **Attachment** column for the respective PWHT inspection request. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **8.24 Pre-welding Inspection - RFI**

The **Pre-welding – RFI** tab in the **Production – RFI** menu used to add the pre-welding inspection request. To add the pre-welding inspection request,

1\. Click **Pre-welding – RFI** in the **Production – RFI**

The **Pre-welding Inspection Report** page opens.

[![image-1651147591808.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147591808.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147591808.png)

**Figure 8.24: Pre-welding Inspection Report page**

#### **8.24.1 Add a Pre-welding Inspection Request**

If you want to add a pre-welding inspection request, do the following steps,

1\. Click [![image-1651147006091.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147006091.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147006091.png)(**ADD** button) in the **Pre-welding Inspection Report**

The page shows a new window to add the details of the pre-welding inspection request.

[![image-1651147643873.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147643873.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147643873.png)

**[![image-1651136863440.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136863440.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136863440.png)Tip**: A report number and an RFI number for a new pre-welding inspection report will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.

2\. In the Drawing box, select a drawing from a drop-down list.

3\. In the Type box, select the NDT type.

4\. In the Part No box, enter the part number.

5\. In the Prepared By box, enter the name of a person who has prepared the pre-welding inspection request.  
   
6\. In the Reviewed By box, enter the name of a person who has reviewed the pre-welding inspection request.  
   
7\. In the Approved By box, enter the name of a person who has approved the pre-welding inspection request.

8\. In the Prepared Date box, choose the prepared date of the pre-welding inspection request.  
   
9\. In the Reviewed Date box, choose the reviewed date of the pre-welding inspection request.  
   
10\. In the Approved Date box, choose the approved date of the pre-welding inspection request.

11\. Click Save.

The pre-welding inspection request is added and listed in the **Pre-welding Inspection Report** page.

#### **8.24.2 Submit a Pre-welding Inspection Request**

Once you have added the pre-welding inspection request, the **Submission** column in the **Pre-welding Inspection Report** page is appeared with [![image-1651139427180.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651139427180.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651139427180.png) (Submit and Reject icons). See Fig 8.24.

1\. If you want to submit the pre-welding inspection request, click [![image-1651138736807.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138736807.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138736807.png)(Submit icon) in the **Submission** Otherwise click [![image-1651138748570.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138748570.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138748570.png) (Reject icon) to reject the request.

The submitted request will be moved to for the pre-welding inspection. The request submitted status will be updated in the **Submitted** column. Once the pre-welding inspection results are updated, the completed status will be updated in the **Completed** column.

#### **8.24.3 Edit a Pre-welding Inspection Request**

<table border="1" id="bkmrk-note-that-if-the-pre" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Note that if the pre-welding inspection request has been submitted, you cannot edit the respective request.

</td></tr></tbody></table>

If you want to edit any existing pre-welding inspection request in the **Pre-welding Inspection Report** page, do the following steps,

1\. Click [![image-1651147161197.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147161197.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147161197.png)(Edit icon) in the **Edit** column for the respective pre-welding inspection See Fig 8.24.

The page shows the details of added pre-welding inspection request.

[![image-1651147892323.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147892323.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147892323.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **8.24.4 Add RFI Data for a Pre-welding Inspection Request**

If you want to add the details of RFI data for the added pre-welding inspection request, do the following steps,

1\. Click [![image-1651138916147.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138916147.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138916147.png)(Add icon) in the **RFI Data** column of the **Pre-welding Inspection Report**  See Fig 8.24.

The **RFI Inspection Request List** window opens.

[![image-1651147964317.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147964317.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147964317.png)

2\. In the Inspection To box, enter the detail to where the inspection should end.  
   
3\. In the Inspection Details option, select what type of inspection to be performed based on your requirement.  
   
4\. In the NDT Inspection box, enter the NDT inspection detail.  
   
5\. In the Description box, enter the description for the inspection request.  
   
6\. In the RFI Date box, choose the RFI date.

7\. In the Remarks box, enter your remarks if any.

8\. Click Save.

#### **8.24.5 View RFI Report for a Pre-welding Inspection Request**

If you want to view the RFI report for the pre-welding inspection request, click [![image-1651135739577.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651135739577.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651135739577.png) (Print icon) provided in the **RFI** **Report** column.

#### **8.24.6 Attach a File into a Pre-welding Inspection Request**

If you want to attach a file with any pre-welding inspection request listed in the **Pre-welding Inspection Report** page, you can use [![image-1651136867158.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136867158.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136867158.png) (Attach icon) provided in the **Attachment** column for the respective pre-welding inspection request. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

# Inspection – Quality

<div id="bkmrk-"></div>### 10.0 **Inspection – Quality**

The **Inspection - Quality** menu in the app used to add the NDT inspection details for the added NDT requests.

<table border="1" id="bkmrk-users-assigned-with-"><tbody><tr><td>Users assigned with **cuteQM\_QAQC** role only can view and access the **Inspection - Quality menu and their functionalities.

</td></tr></tbody></table>

#### **10.1 Fit up Report**

Once you have added the Fit up inspection request, the added request will be moved here to update the fit up inspection details. Fit up inspection will be carried out by the person who has assigned with the inspection role.

To add the fit up inspection details, do the following steps,

1\. Click **Fit up Report** in the **Inspection** **– Quality**

The **Fit up Inspection** page opens.

[![image-1651151763497.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651151763497.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651151763497.png)

**Figure 10.1: Fit up Inspection page**

#### **10.1.1 Add Mechanical Inspection Details**

<table border="1" id="bkmrk-users-assigned-with--0"><tbody><tr><td>Users assigned with **cuteQM\_MechInspection** role only can view the **Mechanical Inspection** window and add the mechanical inspection details.

</td></tr></tbody></table>

1\. Click [![image-1651148296607.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651148296607.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651148296607.png)(Edit icon) of the respective joint for which you want to add the mechanical inspection details.

The **Mechanical Inspection** window opens with the added Fit up details.

[![image-1651151834744.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651151834744.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651151834744.png)

**[![image-1651149085479.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651149085479.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651149085479.png)Note**: You cannot edit the data in the **Fit up** window.

2\. If the mechanical inspection is completed, select the checkbox of the Inspected option in the Mechanical Inspection window.

3\. In the Inspection Date box, select the mechanical inspection date.

4\. In the Result box, select the result of the mechanical inspection.

5\. In the Material 1 Heat No box, select the heat number of the first material.

6\. In the Material 2 Heat No box, select the heat number of the second material.

7\. In the Comments box, enter your comments if any.

8\. In the Insp. Party field, if the AI, Client or Owner hold or Clear the inspection, select the respective checkbox.  
   
9\. Click Save.

The mechanical inspection details will be added successfully. Once the mechanical inspection is completed, the Pre-welding inspection details needs to be added.

#### **10.1.2 Add Pre-welding Inspection Details**

<table border="1" id="bkmrk-users-assigned-with--1"><tbody><tr><td>Users assigned with **cuteQM\_WeldInspection** role only can view the **Pre-Welding Inspection** window to add the pre-welding inspection details.

</td></tr></tbody></table>

1\. Click [![image-1651148296607.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651148296607.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651148296607.png)(Edit icon) of the respective joint for which you want to add the pre-welding inspection details.

The **Pre-welding Inspection** window opens with the added Fit up and mechanical inspection details.

[![image-1651151955463.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651151955463.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651151955463.png)

**[![image-1651149085479.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651149085479.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651149085479.png)Note**: You cannot edit the data in the **Fit up** and **Mechanical Inspection** windows.

2\. If the pre-welding inspection is completed, select the checkbox of the Inspected option in the Pre-welding Inspection window.

3\. In the Inspection Date box, select the inspection date.

4\. In the Result box, select the result of the pre-welding inspection.

5\. In the Comments box, enter your comments if any.

6\. Click Save.

The pre-welding inspection details are updated successfully. Once the pre-welding inspection has completed for the joint, the respective joint will be moved for the weld visual inspection.

#### **10.1.3 Add Mechanical RFI Data for Any Fit up Inspection Report**

If you want to add mechanical RFI data for any fit up inspection report,

1\. Click [![image-1651138916147.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138916147.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138916147.png)(Add icon) in the **Mech** **RFI Data** column of the **Fit up Inspection

The **RFI Inspection Request List** window opens.

[![image-1651152108909.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651152108909.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651152108909.png)

2\. In the **ITP Ref** box, enter the ITP reference detail.

3\. In the **Inspection Result** field, select the inspection result whether **Accepted** or **Rejected**.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

#### **10.1.4 Add RFI Data for Any Fit up Inspection Report**

If you want to add RFI data for any fit up inspection report,

1\. Click [![image-1651138916147.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138916147.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138916147.png)(Add icon) in the **RFI Data** column of the **Fit up Inspection

The **RFI Inspection Request List** window opens.

[![image-1651152225572.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651152225572.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651152225572.png)

2\. In the **ITP Ref** box, enter the ITP reference detail.

3\. In the **Inspection Result** field, select the inspection result whether **Accepted** or **Rejected**.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

#### **10.1.5 Add Dimensional Inspection Result Details**

If you want to add the dimensional inspection result details for any joint,

1\. Click [![image-1651138916147.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138916147.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138916147.png)(Add icon) in the **Report Details** column of the **Fit up Inspection

The **Dimensional Details** window opens.

[![image-1651152287800.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651152287800.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651152287800.png)

2\. Click [![image-1651150165836.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651150165836.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651150165836.png)(**ADD** button) in the **Dimensional Details**

[![image-1651152316224.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651152316224.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651152316224.png)

3\. In the Description box, enter the description for the dimensional inspection.

4\. In the Actual Dimension box, enter the actual dimension value.

5\. In the Required Dimension box, enter the required dimension value.

6\. In the Result box, select the result of dimensional inspection.

7\. In the Remarks box, enter your remarks if any.

8\. Click Save.

#### **10.1.6 View a Mechanical RFI Report**

If you want to view the mechanical RFI report, click [![image-1651150484253.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651150484253.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651150484253.png)(Print icon) provided in the **Mech** **RFI** **Report** column.

#### **10.1.7 View an RFI Report for Any Fit up Inspection Report**

If you want to view the RFI report for any request, click [![image-1651150484253.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651150484253.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651150484253.png)(Print icon) provided in the **RFI** **Report** column.

#### **10.1.8 View a Mechanical Inspection Report**

If you want to view the mechanical inspection report for any request, click [![image-1651150484253.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651150484253.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651150484253.png) (Print icon) provided in the **Mech** **Report** column.

#### **10.1.9 View a Fit up Inspection Report**

If you want to view the fit up inspection report for any request, click [![image-1651150484253.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651150484253.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651150484253.png)(Print icon) provided in the **Report** column.

#### **10.1.10 Attach a File into a Fit up Inspection report**

If you want to attach a file with any fit up inspection report in the **Fit up Inspection** page, you can use [![image-1651137111900.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137111900.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137111900.png) (Attach icon) provided in the **Attachment** column for the respective joint. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **10.1.11 Export Fit up Inspection List**

<div class="pointer-container" id="bkmrk-%C2%A0"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--96" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>You can export a list of fit up inspection in the **Fit up Inspection** page in the pdf and excel formats by using [![image-1651148446776.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651148446776.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651148446776.png) (**PDF** button) [![image-1651148459859.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651148459859.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651148459859.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Clients List</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/master-data#bkmrk-3.1.4-export-clients)”.

#### **10.2 Weld Visual Report** 

Once you have added the weld visual inspection request, the added request will be moved here to update the weld visual inspection details. Weld visual inspection will be carried out by the person who has assigned with the inspection role.

To add the weld visual inspection details, do the following steps,

1\. Click **Weld Visual Report** in the **Inspection** **– Quality**

The **Weld Visual Inspection** page opens.

[![image-1651200991684.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651200991684.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651200991684.png)

**Figure 10.2: Weld Visual Inspection page**

#### **10.2.1 Add Weld Visual Inspection Details**

<table border="1" id="bkmrk-users-assigned-with--2" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Users assigned with **cuteQM\_QAQC** role only can view the **Inspection** window and add the weld visual inspection details.

</td></tr></tbody></table>

1\. Click [![image-1651200432832.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651200432832.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651200432832.png)(Edit icon) of the respective joint for which you want to add the weld visual inspection details.

The **Inspection** window opens with the added production details.

[![image-1651201057185.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201057185.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201057185.png)

**[![image-1651201027630.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201027630.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201027630.png)Note**: You cannot edit the data in the **Production** window.

2\. If the weld visual inspection is completed, select the checkbox of the Inspected option in the Inspection window.

3\. In the Inspection Date box, select the weld visual inspection date.

4\. In the Result box, select the result of the weld visual inspection.

5\. In the Reinforce Height field, enter the Cap and Root detail.

6\. In the Remarks box, enter your remarks if any.

7\. Click Save.

The weld visual inspection details will be added successfully.

#### **10.2.2 Add RFI Data for Any Weld Visual Inspection Report**

If you want to add RFI data for any weld visual inspection report,

1\. Click[![image-1651201176003.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201176003.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201176003.png)(Add icon) in the **RFI Data** column of the **Weld Visual Inspection

The **RFI Inspection Request List** window opens.

[![image-1651201188757.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201188757.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201188757.png)

2\. In the ITP Ref box, enter the ITP reference detail.

3\. In the Inspection Result field, select the inspection result whether Accepted or Rejected.

4\. In the Remarks box, enter your remarks if any.

5\. Click Save.

#### **10.2.3 View an RFI Report for Any Weld Visual Inspection Report**

If you want to view the RFI report for any weld visual inspection report, click [![image-1651200271306.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651200271306.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651200271306.png) (Print icon) provided in the **RFI** **Report** column.

#### **10.2.4 View a Weld Visual Inspection Report**

If you want to view the weld visual inspection report, click [![image-1651200271306.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651200271306.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651200271306.png) (Print icon) provided in the **Report** column.

#### **10.2.5 Attach a File into a Weld Visual Inspection report**

If you want to attach a file with any weld visual inspection report in the **Weld Visual Inspection** page, you can use [![image-1651169377053.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169377053.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651176569090.png) (Attach icon) provided in the **Attachment** column for the respective joint. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **10.2.6 Export Weld Visual Inspection List**

You can export a list of weld visual inspection in the **Weld Visual Inspection** page in the pdf and excel formats by using [![image-1651200717968.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651200717968.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651200717968.png) (**PDF** button) [![image-1651178236615.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178236615.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178236615.png)(**Excel** button). To know how to export, see the topic, “[**<u>Export Clients List</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/master-data#bkmrk-3.1.4-export-clients)”.

#### **10.3 Final Dimensional Report** 

The **Final Dimensional Report** tab in the **Inspection – Quality** menu used to add the final dimensional inspection result for added request.

1\. Click **Final Dimensional Report** in the **Inspection – Quality**

The **Final Dimensional Report** page opens.

[![image-1651202840936.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202840936.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202840936.png)

**Figure 10.3: Final Dimensional Report page**

The page shows a list of added final dimensional requests.

#### **10.3.1 Add Final Dimension Report Details**

If you want to add the final dimension report details,

1\. Click [![image-1651179000275.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651179000275.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651179000275.png)(Edit icon) in the **Edit Report** column for the respective request.

The **Final Dimension Report** window opens.

[![image-1651202916689.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202916689.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202916689.png)

2\. Click [![image-1651200132564.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651200132564.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651200132564.png)(**ADD** button) in the **Final Dimension Report**

[![image-1651202955873.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202955873.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202955873.png)

3\. In the Item box, select an item from a drop-down list.

4\. In the Joint No/Nozzle box, enter the joint number or nozzle number.

5\. In the Description box, enter the description for the request.

6\. In the Projection Reqd box, enter the required projection value.

7\. In the Projection Actual box, enter the actual projection value.

8\. In the Projection Result box, select the projection result.

9\. In the Elevation Reqd box, enter the required elevation value.

10\. In the Elevation Actual box, enter the actual elevation value.

11\. In the Elevation Result box, select the elevation result.

12\. In the Orientation Reqd box, enter the required orientation value.

13\. In the Orientation Actual box, enter the actual orientation value.

14\. In the Orientation Result box, select the orientation result.

15\. In the Item box, select an item from a drop-down list.

16\. In the Required box, enter the required dimension.

17\. In the Actual box, enter the actual dimension.

18\. In the Result box, select the result of final dimension inspection.  
   
19\. In the Remarks box, enter your remarks if any.

20\. Click Save.

#### **10.3.2 Add Final Dimension Inspection Result Details**

If you want to add the final dimension inspection result details,

1\. Click[![image-1651203066030.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203066030.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203066030.png)(Add icon) in the **RFI Data** column for the respective request.

The **RFI Inspection Request List** window opens.

[![image-1651203078083.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203078083.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203078083.png)

2\. In the **ITP Ref** box, enter the ITP reference detail.

3\. In the **Inspection Result** field, select the inspection result.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

#### **10.3.3 Submit Final Dimension Inspection Result**

Once you have added the final dimension inspection result, the **Request Status** column in the **Final Dimensional Report** page is appeared with[![image-1651203142109.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203142109.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203142109.png) (Submit and Reject icons). See Fig 10.3.

1\. If you want to submit the final dimension inspection result, click [![image-1651201981884.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201981884.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201981884.png) (Submit icon) in the **Request Status** Otherwise click [![image-1651201995224.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201995224.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201995224.png) (Reject icon) to reject the request.

Once the final dimension inspection result is updated, the completed status will be updated in the **Completed** column.

#### **10.3.4 View an RFI Report for Final Dimension Inspection**

If you want to view the RFI report for any final dimension inspection, click [![image-1651200328292.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651200328292.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651200328292.png) (Print icon) provided in the **RFI** **Report** column.

#### **10.3.5 View a Final Dimension Inspection Report**

If you want to view the final dimension inspection report, click [![image-1651200328292.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651200328292.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651200328292.png) (Print icon) provided in the **Report** column.

#### **10.3.6 Attach a file into a Final Dimension Inspection Report**

If you want to attach a file with any final dimension inspection report in the **Final Dimension Report** page, you can use[![image-1651203290576.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203290576.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203290576.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **10.4 Nozzle Marking Report** 

The **Nozzle Marking Report** tab in the **Inspection – Quality** menu used to add the nozzle marking inspection result for added request.

1\. Click **Nozzle Marking Report** in the **Inspection – Quality**

The **Nozzle Marking Inspection** page opens.

[![image-1651211426053.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651211426053.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651211426053.png)

**Figure 10.4: Nozzle Marking Inspection page**

The page shows a list of added nozzle marking inspection requests.

#### **10.4.1 Add Nozzle Marking Report Details**

1\. Click [![image-1651179000275.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651179000275.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651179000275.png)(Edit icon) in the **Edit Report** column for the respective request.

The **Nozzle Marking Result** and **Report Photos** windows open.

[![image-1651211527358.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651211527358.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651211527358.png)

2\. Click (**ADD** button) in the **Nozzle Marking Result**

[![image-1651211545665.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651211545665.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651211545665.png)

3\. In the Nozzle box, select a nozzle from a drop-down list.

4\. In the Description box, enter the description for the request.

5\. Enter the projection, orientation, and elevation value.  
   
6\. In the Result box, select the result.  
   
7\. In the Remarks box, enter your remarks if any.

8\. Click Save.

9\. In the Report Photos window, click [![image-1651203276886.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203276886.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203276886.png) (ADD button) and attach a photo.

#### **10.4.2 Add Nozzle Marking Inspection Result Details**

If you want to add the nozzle marking inspection result details,

1\. Click [![image-1651204360463.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204360463.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204360463.png)(Add icon) in the **RFI Data** column for the respective request.

The **RFI Inspection Request List** window opens.

[![image-1651211639977.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651211639977.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651211639977.png)

2\. In the **ITP Ref** box, enter the ITP reference detail.

3\. In the **Inspection Result** field, select the inspection result.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

#### **10.4.3 Submit Nozzle Marking Inspection Result**

Once you have added the nozzle marking inspection result, the **Request Status** column in the **Nozzle Marking Inspection page is appeared with[![image-1651211729645.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651211729645.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651211729645.png) (Submit and Reject icons). See Fig 10.4.

1\. If you want to submit the nozzle marking inspection result, click [![image-1651203762346.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203762346.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203762346.png) (Submit icon) in the **Request Status** Otherwise click [![image-1651203792080.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (Reject icon) to reject the request.

Once the nozzle marking inspection result is updated, the completed status will be updated in the **Completed** column.

#### **10.4.4 View an RFI Report for Nozzle Marking Inspection**

If you want to view the RFI report for any nozzle marking inspection, click [![image-1651204648220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204648220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204648220.png)(Print icon) provided in the **RFI** **Report** column.

#### **10.4.5 View a Nozzle Marking Inspection Report**

If you want to view the nozzle marking inspection report, click [![image-1651204648220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204648220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204648220.png) (Print icon) provided in the **Report** column.

#### **10.4.6 Attach a file into a Nozzle Marking Inspection Report**

If you want to attach a file with any nozzle marking inspection report in the **Nozzle Marking Inspection** page, you can use [![image-1651203290576.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203290576.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203290576.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **10.5 Alignment Reading Report**

The **Alignment Reading Report** tab in the **Inspection – Quality** menu used to add the alignment reading inspection result for added request.

1\. Click **Alignment Reading Report** in the **Inspection – Quality**

The **Alignment Reading Inspection** page opens.

[![image-1651212471824.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651212471824.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651212471824.png)

**Figure 10.5: Alignment Reading Inspection page**

The page shows a list of added alignment reading inspection requests.

#### **10.5.1 Add Alignment Reading Report Details**

If you want to add the alignment reading report details,

1\. Click [![image-1651177270374.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177270374.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177270374.png)(Edit icon) in the **Edit Report** column for the respective request.

The **Alignment Reading Report** window opens.

[![image-1651212555150.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651212555150.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651212555150.png)

1\. Click [![image-1651203276886.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203276886.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203276886.png)(**ADD** button) in the **Alignment Reading Report**

[![image-1651212591626.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651212591626.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651212591626.png)

2\. In the **Shell Number** box, enter the shell number.

3\. Enter the orientation level in 0, 90,180 and 270 degrees.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

#### **10.5.2 Add Alignment Reading Inspection Result Details**

If you want to add the alignment reading inspection result details,

1\. Click [![image-1651204360463.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204360463.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204360463.png)(Add icon) in the **RFI Data** column for the respective request.

The **RFI Inspection Request List** window opens.

[![image-1651212672576.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651212672576.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651212672576.png)

2\. In the **ITP Ref** box, enter the ITP reference detail.

3\. In the **Inspection Result** field, select the inspection result.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

#### **10.5.3 Submit Alignment Reading Inspection Result**

Once you have added the alignment reading inspection result, the **Request Status** column in the **Alignment Reading Report** page is appeared with [![image-1651211729645.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651211729645.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651211729645.png) (Submit and Reject icons). See Fig 10.5.

1\. If you want to submit the alignment reading inspection result, click [![image-1651203762346.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203762346.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203762346.png)(Submit icon) in the **Request Status** Otherwise click [![image-1651203792080.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (Reject icon) to reject the request.

Once the alignment reading inspection result is updated, the completed status will be updated in the **Completed** column.

#### **10.5.4 View an RFI Report for Alignment Reading Inspection**

If you want to view the RFI report for any alignment reading inspection, click [![image-1651204648220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204648220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204648220.png) (Print icon) provided in the **RFI** **Report** column.

#### **10.5.5 View an Alignment Reading Inspection Report**

If you want to view the alignment reading inspection report, click [![image-1651204648220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204648220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204648220.png) (Print icon) provided in the **Report** column.

#### **10.5.6 Attach a file into an Alignment Reading Inspection Report**

If you want to attach a file with any alignment reading inspection report in the **Alignment Reading Report** page, you can use [![image-1651203290576.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203290576.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203290576.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **10.6 Ovality Reading Report**

The **Ovality Reading Report** tab in the **Inspection – Quality** menu used to add the ovality reading inspection result for added request.

1\. Click **Ovality Reading Report** in the **Inspection – Quality**

The **Ovality Reading Report** page opens.

[![image-1651213267017.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651213267017.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651213267017.png)

**Figure 10.6: Ovality Reading Report page**

The page shows a list of added ovality reading inspection requests.

#### **10.6.1 Add Ovality Reading Report Details**

If you want to add the ovality reading report details,

1\. Click [![image-1651177270374.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177270374.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177270374.png)(Edit icon) in the **Edit Report** column for the respective request.

The **Ovality Reading Details** window and the **Ovality Reading Report** window opens.

[![image-1651213334472.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651213334472.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651213334472.png)

2\. In the **Applicable Code** box, select the applicable code.

3\. In the **Shell ID** box, enter the shell id.

4\. Click **Save**.

5\. Click [![image-1651203276886.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203276886.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203276886.png)(**ADD** button) in the **Ovality Reading Report**

[![image-1651213375649.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651213375649.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651213375649.png)

6\. In the **Shell1** to **Shell7** boxes, enter the shell numbers.

7\. In the **Remarks** box, enter your remarks if any.

8\. Click **Save**.

#### **10.6.2 Add Ovality Reading Inspection Result Details**

If you want to add the ovality reading inspection result details,

1\. Click [![image-1651204360463.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204360463.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204360463.png)(Add icon) in the **RFI Data** column for the respective request.

The **RFI Inspection Request List** window opens.

[![image-1651213453536.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651213453536.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651213453536.png)

2\. In the **ITP Ref** box, enter the ITP reference detail.

3\. In the **Inspection Result** field, select the inspection result.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

#### **10.6.3 Submit Ovality Reading Inspection Result**

Once you have added the ovality reading inspection result, the **Request Status** column in the **Ovality Reading Report** page is appeared with[![image-1651213505186.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651213505186.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651213505186.png) (Submit and Reject icons). See Fig 10.6.

1\. If you want to submit the ovality reading inspection result, click (Submit icon) in the **Request Status** Otherwise click [![image-1651203762346.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203762346.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203762346.png) (Reject icon) [![image-1651203792080.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png)to reject the request.

Once the ovality reading inspection is updated, the completed status will be updated in the **Completed** column.

#### **10.6.4 View an RFI Report for Ovality Reading Inspection**

If you want to view the RFI report for any ovality reading inspection, click [![image-1651204648220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204648220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204648220.png) (Print icon) provided in the **RFI** **Report** column.

#### **10.6.5 View an Ovality Reading Inspection Report**

If you want to view the ovality reading inspection report, click [![image-1651204648220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204648220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204648220.png) (Print icon) provided in the **Report** column.

#### **10.6.6 Attach a file into an Ovality Reading Inspection Report**

If you want to attach a file with any ovality reading inspection report in the **Ovality Reading Report** page, you can use [![image-1651203290576.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203290576.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203290576.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **10.7 Thickness Report**

The **Thickness Report** tab in the **Inspection – Quality** menu used to add the thickness inspection result for added request.

1\. Click **Thickness Report** in the **Inspection – Quality**

The **Thickness Report** page opens.

[![image-1651218460464.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651218460464.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651218460464.png)

**Figure 10.7: Thickness Report page**

The page shows a list of added thickness inspection requests.

#### **10.7.1 Add Thickness Inspection Report Details**

If you want to add the thickness inspection report details,

1\. Click [![image-1651177270374.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177270374.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177270374.png)(Edit icon) in the **Edit Report** column for the respective request.

The **Probe Details** window and the **Thickness Report** **Details** window opens.

[![image-1651219369003.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651219369003.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651219369003.png)

2\. In the **Probe No** box, enter the probe number.

3\. In the **Serial No** box, enter the serial number.

4\. Click **Save**.

5\. Click [![image-1651203276886.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203276886.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203276886.png)(**ADD** button) in the **Thickness Report** **Details**

[![image-1651219411346.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651219411346.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651219411346.png)

5\. In the **Description** box, enter the description for the thickness report.

6\. In the **REQ-THK** box, enter the required thickness value.

7\. In the **Spot-1** to**Spot-8** boxes, enter the spot details.

8\. Click **Save**.

#### **10.7.2 Add Thickness Inspection Result Details**

If you want to add the thickness inspection result details,

1\. Click[![image-1651219494300.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651219494300.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651219494300.png)(Add icon) in the **RFI Data** column for the respective request.

The **RFI Inspection Request List** window opens.

[![image-1651219509707.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651219509707.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651219509707.png)

2\. In the **ITP Ref** box, enter the ITP reference detail.

3\. In the **Inspection Result** field, select the inspection result.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

#### **10.7.3 Submit Thickness Inspection Result**

Once you have added the thickness inspection result, the **Request Status** column in the **Thickness Report** page is appeared with

[![image-1651219582993.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651219582993.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651219582993.png) (Submit and Reject icons). See Fig 10.7.

1\. If you want to submit the thickness inspection result, click [![image-1651203762346.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203762346.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203762346.png)(Submit icon) in the **Request Status** Otherwise click [![image-1651203792080.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (Reject icon) to reject the request.

Once the thickness inspection is updated, the completed status will be updated in the **Completed** column.

#### **10.7.4 View an RFI Report for Thickness Inspection**

If you want to view the RFI report for any thickness inspection, click [![image-1651204648220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204648220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204648220.png) (Print icon) provided in the **RFI** **Report** column.

#### **10.7.5 View a Thickness Inspection Report**

If you want to view the thickness inspection report, click [![image-1651204648220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204648220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204648220.png)(Print icon) provided in the **Report** column.

#### **10.7.6 Attach a file into a Thickness Inspection Report**

If you want to attach a file with any thickness inspection report in the **Thickness Report** page, you can use[![image-1651203290576.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203290576.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203290576.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **10.8 VPCI Report**

The **VPCI Report** tab in the **Inspection – Quality** menu used to add the VPCI inspection result for added request.

1\. Click **VPCI Report** in the **Inspection – Quality**

The **VPCI Report** page opens.

[![image-1651219801840.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651219801840.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651219801840.png)

**Figure 10.8: VPCI Report page**

The page shows a list of added VPCI inspection requests.

#### **10.8.1 Add VPCI Inspection Report Details**

If you want to add the VPCI inspection report details,

1\. Click [![image-1651177270374.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177270374.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177270374.png)(Edit icon) in the **Edit Report** column for the respective request.

The **VPCI Report Details** window and the **VPCI Report** window opens.

[![image-1651220934387.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651220934387.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651220934387.png)

2\. Check and edit the VPCI report details in the **VPCI Report Details**

3\. Click **Save**.

4\. Click [![image-1651203276886.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203276886.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203276886.png)(**ADD** button) in the **VPCI Report**

[![image-1651220972946.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651220972946.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651220972946.png)

5\. In the **Observation** box, enter the observation detail for VPCI.

6\. Click **Save**.

#### **10.8.2 Add VPCI Inspection Result Details**

If you want to add the VPCI inspection result details,

1\. Click [![image-1651219494300.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651219494300.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651219494300.png)(Add icon) in the **RFI Data** column for the respective request.

The **RFI Inspection Request List** window opens.

[![image-1651221050287.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651221050287.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651221050287.png)

2\. In the **ITP Ref** box, enter the ITP reference detail.

3\. In the **Inspection Result** field, select the inspection result.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

#### **10.8.3 Submit VPCI Inspection Result**

Once you have added the VPCI inspection result, the **Request Status** column in the **VPCI Report** page is appeared with [![image-1651219582993.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651219582993.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651219582993.png) (Submit and Reject icons). See Fig 10.8.

1\. If you want to submit the VPCI inspection result, click[![image-1651203762346.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203762346.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203762346.png)(Submit icon) in the **Request Status** Otherwise click [![image-1651203792080.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png)(Reject icon) to reject the request.

Once the VPCI inspection is updated, the completed status will be updated in the **Completed** column.

#### **10.8.4 View an RFI Report for VPCI Inspection**

If you want to view the RFI report for any VPCI inspection, click [![image-1651204648220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204648220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204648220.png) (Print icon) provided in the **RFI** **Report** column.

#### **10.8.5 View a VPCI Inspection Report**

If you want to view the VPCI inspection report, click [![image-1651204648220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204648220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204648220.png) (Print icon) provided in the **Report** column.

#### **10.8.6 Attach a file into a VPCI Inspection Report**

If you want to attach a file with any VPCI inspection report in the **VPCI Report** page, you can use [![image-1651203290576.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203290576.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203290576.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **10.9 Leak Test Report**

The **Leak Test Report** tab in the **Inspection – Quality** menu used to add the leak test result for added request.

1\. Click **Leak Test Report** in the **Inspection – Quality**

The **Leak Test Report** page opens.

[![image-1651221384881.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651221384881.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651221384881.png)

**Figure 10.9: Leak Test Report page**

The page shows a list of added leak test requests.

#### **10.9.1 Add Leak Test Report Details**

If you want to add the leak test report details,

1\. Click[![image-1651221439581.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651221439581.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651221439581.png)(Edit icon) in the **Edit Report** column for the respective request.

The **Test Parameters** window and the **Equipment Details** window opens.

[![image-1651221450600.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651221450600.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651221450600.png)

2\. In the **Inspection Date** box, select the inspection date.

3\. Check and edit the leak test report details in the **Test Parameters**

4\. Click **Save**.

5\. Click [![image-1651203276886.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203276886.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203276886.png)(**ADD** button) in the **Equipment Details**

[![image-1651221498074.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651221498074.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651221498074.png)

6\. In the **Conducted By** box, select whether the leak test is conducted Internally or Externally.

7\. In the **Equipment Details** box, select the equipment detail from a drop-own list.

8\. In the **Position** box, select a position from a drop-down list.

9\. Click **Save**.

#### **10.9.2 Add Leak Test Result Details**

If you want to add the leak test result details,

1\. Click [![image-1651219494300.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651219494300.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651219494300.png)(Add icon) in the **RFI Data** column for the respective request.

The **RFI Inspection Request List** window opens.

[![image-1651221579809.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651221579809.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651221579809.png)

2\. In the **ITP Ref** box, enter the ITP reference detail.

3\. In the **Inspection Result** field, select the inspection result.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

#### **10.9.3 Submit Leak Test Result**

Once you have added the leak test result, the **Request Status** column in the **Leak Test Report** page is appeared with [![image-1651219582993.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651219582993.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651219582993.png) (Submit and Reject icons). See Fig 10.9.

1\. If you want to submit the leak test result, click [![image-1651203762346.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203762346.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203762346.png) (Submit icon) in the **Request Status** Otherwise click [![image-1651203792080.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (Reject icon) to reject the request.

Once the leak test result is updated, the completed status will be updated in the **Completed** column.

#### **10.9.4 View an RFI Report for Leak Test** 

If you want to view the RFI report for any leak test, click [![image-1651204648220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204648220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204648220.png) (Print icon) provided in the **RFI** **Report** column.

#### **10.9.5 View a Leak Test Report**

If you want to view the leak test report, click [![image-1651204648220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204648220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204648220.png) (Print icon) provided in the **Report** column.

#### **10.9.6 Attach a file into a Leak Test Report**

If you want to attach a file with any leak test report in the **Leak Test Report** page, you can use [![image-1651203290576.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203290576.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203290576.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **10.10 Hydrostatic Test Report**

The **Hydrostatic Test Report** tab in the **Inspection – Quality** menu used to add the hydrostatic test result for added request.

1\. Click **Hydrostatic Test Report** in the **Inspection – Quality**

The **Hydrostatic Pressure Test Report** page opens.

[![image-1651222480322.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651222480322.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651222480322.png)

**Figure 10.10: Hydrostatic Pressure Test Report page**

The page shows a list of added hydrostatic test requests.

#### **10.10.1 Add Hydrostatic Test Report Details**

If you want to add the hydrostatic test report details,

1\. Click [![image-1651221439581.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651221439581.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651221439581.png)(Edit icon) in the **Edit Report** column for the respective request.

The **Test Parameters** window, **Metal Details** window, and the **Equipment Details** window open.

[![image-1651222545069.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651222545069.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651222545069.png)

2\. In the **Inspection Date** box, select the inspection date.

3\. In the **Test Parameters** window, enter the test parameter data.

4\. In the **Metal Details** window, enter the metal details.

5\. Click **Save**.

6\. Click [![image-1651203276886.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203276886.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203276886.png)(**ADD** button) in the **Equipment Details**

[![image-1651222597340.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651222597340.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651222597340.png)

7\. In the **Conducted By** box, select whether the hydrostatic test is conducted Internally or Externally.

8\. In the **Equipment Details** box, select the equipment detail from a drop-own list.

9\. In the **Position** box, select a position from a drop-down list.

10\. Click **Save**.

#### **10.10.2 Add Hydrostatic Test Result Details**

If you want to add the hydrostatic test result details,

1\. Click [![image-1651219494300.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651219494300.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651219494300.png)(Add icon) in the **RFI Data** column for the respective request.

The **RFI Inspection Request List** window opens.

[![image-1651222681623.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651222681623.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651222681623.png)

2\. In the **ITP Ref** box, enter the ITP reference detail.

3\. In the **Inspection Result** field, select the inspection result.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

#### **10.10.3 Submit Hydrostatic Test Result**

Once you have added the hydrostatic test result, the **Request Status** column in the **Hydrostatic Pressure Test Report** page is appeared with[![image-1651222752918.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651222752918.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651222752918.png) (Submit and Reject icons). See Fig 10.10.

1\. If you want to submit the hydrostatic test result, click [![image-1651203762346.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203762346.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203762346.png)(Submit icon) in the **Request Status** Otherwise click [![image-1651203792080.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (Reject icon) to reject the request.

Once the hydrostatic test result is updated, the completed status will be updated in the **Completed** column.

#### **10.10.4 View an RFI Report for Hydrostatic Test** 

If you want to view the RFI report for any hydrostatic test, click [![image-1651204648220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204648220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204648220.png) (Print icon) provided in the **RFI** **Report** column.

#### **10.10.5 View a Hydrostatic Test Report**

If you want to view the hydrostatic test report, click [![image-1651204648220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204648220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204648220.png) (Print icon) provided in the **Report** column.

#### **10.10.6 Attach a file into a Hydrostatic Test Report**

If you want to attach a file with any hydrostatic test report in the **Hydrostatic Pressure Test Report** page, you can use[![image-1651222916893.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651222916893.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651222916893.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **10.11 Shell Side Hydrostatic Report**

The **Shell Side** **Hydrostatic Report** tab in the **Inspection – Quality** menu used to add the shell side hydrostatic test result for added request.

1\. Click **Shell Side Hydrostatic Report** in the **Inspection – Quality**

The **Shell Side** **Hydrostatic Pressure Test Report** page opens.

[![image-1651222989750.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651222989750.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651222989750.png)

**Figure 10.11: Shell Side** **Hydrostatic Pressure Test Report page**

The page shows a list of added shell side hydrostatic test requests.

#### **10.11.1 Add Shell Side Hydrostatic Test Report Details**

If you want to add the shell side hydrostatic test report details,

1\. Click[![image-1651223051914.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223051914.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223051914.png)(Edit icon) in the **Edit Report** column for the respective request.

The **Test Parameters** window, **Metal Details** window, and the **Equipment Details** window open.

[![image-1651223064509.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223064509.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223064509.png)

2\. In the **Inspection Date** box, select the inspection date.

3\. In the **Test Parameters** window, enter the test parameter data.

4\. In the **Metal Details** window, enter the metal details.

5\. Click **Save**.

6\. Click[![image-1651223107411.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223107411.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223107411.png)(**ADD** button) in the **Equipment Details**

[![image-1651223116859.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223116859.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223116859.png)

7\. In the **Conducted By** box, select whether the hydrostatic test is conducted Internally or Externally.

8\. In the **Equipment Details** box, select the equipment detail from a drop-own list.

9\. In the **Position** box, select a position from a drop-down list.

10\. Click **Save**.

#### **10.11.2 Add Shell Side Hydrostatic Test Result Details**

If you want to add the shell side hydrostatic test result details,

1\. Click[![image-1651223191062.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223191062.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223191062.png)(Add icon) in the **RFI Data** column for the respective request.

The **RFI Inspection Request List** window opens.

[![image-1651223201131.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223201131.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223201131.png)

2\. In the **ITP Ref** box, enter the ITP reference detail.

3\. In the **Inspection Result** field, select the inspection result.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

#### **10.11.3 Submit Shell Side Hydrostatic Test Result**

Once you have added the shell side hydrostatic test result, the **Request Status** column in the **Shell Side** **Hydrostatic Pressure Test Report** page is appeared with[![image-1651223280837.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223280837.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223280837.png) (Submit and Reject icons). See Fig 10.11.

1\. If you want to submit the shell side hydrostatic test result, click[![image-1651223302767.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223302767.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223302767.png)(Submit icon) in the **Request Status** Otherwise click [![image-1651203792080.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (Reject icon) to reject the request.

Once the shell side hydrostatic test result is updated, the completed status will be updated in the **Completed** column.

#### **10.11.4 View an RFI Report for Shell Side Hydrostatic Test** 

If you want to view the RFI report for any shell side hydrostatic test, click [![image-1651204648220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204648220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204648220.png) (Print icon) provided in the **RFI** **Report** column.

#### **10.11.5 View a Shell Side Hydrostatic Test Report**

If you want to view the shell side hydrostatic test report, click [![image-1651204648220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204648220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204648220.png) (Print icon) provided in the **Report** column.

#### **10.11.6 Attach a file into a Shell Side Hydrostatic Test Report**

If you want to attach a file with any shell side hydrostatic test report in the **Shell Side** **Hydrostatic Pressure Test Report** page, you can use[![image-1651223548242.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223548242.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223548242.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **10.12 Pneumatic Pressure Report**

The **Pneumatic Test Report** tab in the **Inspection – Quality** menu used to add the pneumatic pressure test result for added request.

1\. Click **Pneumatic Test Report** in the **Inspection – Quality**

The **Pneumatic Pressure Test Report** page opens.

[![image-1651223654238.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223654238.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223654238.png)

**Figure 10.12: Pneumatic Pressure Test Report page**

The page shows a list of added pneumatic pressure test requests.

#### **10.12.1 Add Pneumatic Test Report Details**

If you want to add the pneumatic pressure test report details,

1\. Click[![image-1651223723031.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223723031.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223723031.png)(Edit icon) in the **Edit Report** column for the respective request.

The **Test Parameters** window and the **Equipment Details** window open.

[![image-1651223732696.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223732696.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223732696.png)

2\. In the **Inspection Date** box, select the inspection date.

3\. Check and edit the pneumatic pressure test report details in the **Test Parameters**

4\. Click **Save**.

5\. Click [![image-1651223107411.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223107411.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223107411.png)(**ADD** button) in the **Equipment Details** window.

[![image-1651223880978.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223880978.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223880978.png)

2\. In the **Conducted By** box, select whether the pneumatic pressure test is conducted Internally or Externally.

3\. In the **Equipment Details** box, select the equipment detail from a drop-own list.

4\. In the **Position** box, select a position from a drop-down list.

5\. Click **Save**.

#### **10.12.2 Add Pneumatic Pressure Test Result Details**

If you want to add the pneumatic pressure test result details,

1\. Click [![image-1651223191062.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223191062.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223191062.png)(Add icon) in the **RFI Data** column for the respective request.

The **RFI Inspection Request List** window opens.

[![image-1651223954321.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223954321.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223954321.png)

2\. In the **ITP Ref** box, enter the ITP reference detail.

3\. In the **Inspection Result** field, select the inspection result.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

#### **10.12.3 Submit Pneumatic Pressure Test Result**

Once you have added the pneumatic pressure test result, the **Request Status** column in the **Pneumatic Pressure** **Test Report** page is appeared with[![image-1651224025039.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651224025039.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651224025039.png) (Submit and Reject icons). See Fig 10.12.

1\. If you want to submit the pneumatic pressure test result, click [![image-1651223302767.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223302767.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223302767.png)(Submit icon) in the **Request Status** Otherwise click [![image-1651203792080.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png)(Reject icon) to reject the request.

Once the pneumatic pressure test result is updated, the completed status will be updated in the **Completed** column.

#### **10.12.4 View an RFI Report for Pneumatic Pressure Test** 

If you want to view the RFI report for any pneumatic pressure test, click [![image-1651204648220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204648220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204648220.png) (Print icon) provided in the **RFI** **Report** column.

#### **10.12.5 View a Pneumatic Pressure Test Report**

If you want to view the pneumatic pressure test report, click [![image-1651204648220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204648220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204648220.png) (Print icon) provided in the **Report** column.

#### **10.12.6 Attach a file into a Pneumatic Pressure Test Report**

If you want to attach a file with any pneumatic pressure test report in the **Pneumatic Pressure** **Test Report** page, you can use[![image-1651223548242.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223548242.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223548242.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **10.13 Flange Face Inspection Report**

The **Flange Face Inspection Report** tab in the **Inspection – Quality** menu used to add the flange face inspection test result for added request.

1\. Click **Flange Face Inspection Report** in the **Inspection – Quality**

The **Flange Face Inspection Report** page opens.

[![image-1651224240868.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651224240868.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651224240868.png)

**Figure 10.13: Flange Face Inspection Report page**

The page shows a list of added flange face inspection requests.

#### **10.13.1 Add Flange Face Inspection Report Details**

If you want to add the flange face inspection report details,

1\. Click [![image-1651223723031.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223723031.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223723031.png)(Edit icon) in the **Edit Report** column for the respective request.

The **Report Photos** window opens.

[![image-1651225402385.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651225402385.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651225402385.png)

2\. Add report photos.

#### **10.13.2 Add Flange Face Inspection Result Details**

If you want to add the flange face inspection result details,

1\. Click[![image-1651225457141.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651225457141.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651225457141.png)(Add icon) in the **RFI Data** column for the respective request.

The **RFI Inspection Request List** window opens.

[![image-1651225469533.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651225469533.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651225469533.png)

2\. In the **ITP Ref** box, enter the ITP reference detail.

3\. In the **Inspection Result** field, select the inspection result.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

#### **10.13.3 Submit Flange Face Inspection Test Result**

Once you have added the flange face inspection test result, the **Request Status** column in the **Flange Face Inspection** **Report** page is appeared with[![image-1651225511583.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651225511583.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651225511583.png) (Submit and Reject icons). See Fig 10.13.

1\. If you want to submit the flange face inspection result, click[![image-1651223302767.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223302767.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223302767.png) (Submit icon) in the **Request Status** Otherwise click[![image-1651203792080.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (Reject icon) to reject the request.

Once the flange face inspection result is updated, the completed status will be updated in the **Completed** column.

#### **10.13.4 View an RFI Report for Flange Face Inspection Test** 

If you want to view the RFI report for any flange face inspection, click [![image-1651204648220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204648220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204648220.png) (Print icon) provided in the **RFI** **Report** column.

#### **10.13.5 View a Flange Face Inspection Report**

If you want to view the flange face inspection report, click [![image-1651204648220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204648220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204648220.png) (Print icon) provided in the **Report** column.

#### **10.13.6 Attach a file into a Flange Face Inspection Report**

If you want to attach a file with any flange face inspection report in the F**lange Face Inspection** **Report** page, you can use [![image-1651223548242.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223548242.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223548242.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **10.14 Drining and Dring Report**

The **Drining and Dring Report** tab in the **Inspection – Quality** menu used to add the drining and dring inspection test result for added request.

1\. Click **Drining and Dring Report**in the **Inspection – Quality**

The **Drining and Dring Report** page opens.

[![image-1651226008395.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651226008395.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651226008395.png)

**Figure 10.14: Drining and Dring Report page**

The page shows a list of added drining and dring inspection requests.

#### **10.14.1 Add Drining and Dring Inspection Report Details**

If you want to add the drining and dring inspection report details,

1\. Click [![image-1651223723031.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223723031.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223723031.png)(Edit icon) in the **Edit Report** column for the respective request.

The **Report Photos** window opens.

[![image-1651225402385.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651225402385.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651225402385.png)

2\. Add report photos.

#### **10.14.2 Add Drining and Dring Inspection Result Details**

If you want to add the drining and dring inspection result details,

1\. Click[![image-1651225457141.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651225457141.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651225457141.png) (Add icon) in the **RFI Data** column for the respective request.

The **RFI Inspection Request List** window opens.

[![image-1651226136268.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651226136268.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651226136268.png)

2\. In the **ITP Ref** box, enter the ITP reference detail.

3\. In the **Inspection Result** field, select the inspection result.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

#### **10.14.3 Submit Drining and Dring Inspection Test Result**

Once you have added the drining and dring inspection test result, the **Request Status** column in the **Drining and Dring** **Report** page is appeared with[![image-1651226186089.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651226186089.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651226186089.png) (Submit and Reject icons). See Fig 10.14.

1\. If you want to submit the drining and dring inspection result, click [![image-1651223302767.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223302767.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223302767.png)(Submit icon) in the **Request Status** Otherwise click[![image-1651203792080.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (Reject icon) to reject the request.

Once the drining and dring inspection result is updated, the completed status will be updated in the **Completed** column.

#### **10.14.4 View an RFI Report for Drining and Dring Inspection Test** 

If you want to view the RFI report for any drining and dring inspection, click [![image-1651204648220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204648220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204648220.png) (Print icon) provided in the **RFI** **Report** column.

#### **10.14.5 View a Drining and Dring Inspection Report**

If you want to view the drining and dring inspection report, click [![image-1651204648220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204648220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204648220.png) (Print icon) provided in the **Report** column.

#### **10.14.6 Attach a file into a Drining and Dring Inspection Report**

If you want to attach a file with any drining and dring inspection report in the **Drining and Dring** **Report** page, you can use[![image-1651223548242.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223548242.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223548242.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **10.15 Shipment Report**

The **Shipment Report** tab in the **Inspection – Quality** menu used to add the shipment inspection test result for added request.

1\. Click **Shipment Report** in the **Inspection – Quality**

The **Shipment** **Report** page opens.

[![image-1651226800968.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651226800968.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651226800968.png)

**Figure 10.15: Shipment** **Report page**

The page shows a list of added Shipment inspection requests.

#### **10.15.1 Add Shipment Inspection Report Details**

If you want to add the Shipment inspection report details,

1\. Click [![image-1651223723031.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223723031.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223723031.png)(Edit icon) in the **Edit Report** column for the respective request.

The **Report Photos** window opens.

[![image-1651225402385.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651225402385.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651225402385.png)

2\. Add report photos.

#### **10.15.2 Add Shipment Inspection Result Details**

If you want to add the shipment inspection result details,

1\. Click[![image-1651226899346.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651226899346.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651226899346.png)(Add icon) in the **RFI Data** column for the respective request.

The **RFI Inspection Request List** window opens.

[![image-1651226910236.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651226910236.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651226910236.png)

2\. In the **ITP Ref** box, enter the ITP reference detail.

3\. In the **Inspection Result** field, select the inspection result.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

#### **10.15.3 Submit Shipment Inspection Result**

Once you have added the shipment inspection result, the **Request Status** column in the **Shipment Report** page is appeared with

[![image-1651226962227.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651226962227.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651226962227.png) (Submit and Reject icons). See Fig 10.15.

1\. If you want to submit the shipment inspection result, click [![image-1651223302767.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223302767.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223302767.png)(Submit icon) in the **Request Status** Otherwise click [![image-1651203792080.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (Reject icon) to reject the request.

Once the shipment inspection result is updated, the completed status will be updated in the **Completed** column.

#### **10.15.4 View an RFI Report for Shipment Inspection Test** 

If you want to view the RFI report for any shipment inspection, click [![image-1651204648220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204648220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204648220.png) (Print icon) provided in the **RFI** **Report** column.

#### **10.15.5 View a Shipment Inspection Report**

If you want to view the shipment inspection report, click [![image-1651204648220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204648220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204648220.png) (Print icon) provided in the **Report** column.

#### **10.15.6 Attach a file into a Shipment Inspection Report**

If you want to attach a file with any shipment inspection report in the **Shipment** **Report** page, you can use[![image-1651223548242.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223548242.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223548242.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **10.16 Name Plate Report**

The **Name Plate Report** tab in the **Inspection – Quality** menu used to add the name plate test result for added request.

1\. Click **Name Plate Report** in the **Inspection – Quality**

The **Name Plate Report** page opens.

[![image-1651227343280.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227343280.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227343280.png)

**Figure 10.16: Name Plate** **Report page**

The page shows a list of added name plate inspection requests.

#### **10.16.1 Add Name Plate Inspection Report Details**

If you want to add the name plate inspection report details,

1\. Click [![image-1651223723031.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223723031.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223723031.png)(Edit icon) in the **Edit Report** column for the respective request.

The **Report Photos** window opens.

[![image-1651225402385.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651225402385.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651225402385.png)

2\. Add report photos.

#### **10.16.2 Add Name Plate Inspection Result Details**

If you want to add the name plate inspection result details,

1\. Click[![image-1651226899346.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651226899346.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651226899346.png) (Add icon) in the **RFI Data** column for the respective request.

The **RFI Inspection Request List** window opens.

[![image-1651226910236.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651226910236.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651226910236.png)

2\. In the **ITP Ref** box, enter the ITP reference detail.

3\. In the **Inspection Result** field, select the inspection result.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

#### **10.16.3 Submit Name Plate Inspection Result**

Once you have added the name plate inspection result, the **Request Status** column in the **Name Plate Report** page is appeared with [![image-1651226962227.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651226962227.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651226962227.png) (Submit and Reject icons). See Fig 10.16.

1\. If you want to submit the name plate inspection result, click[![image-1651223302767.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223302767.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223302767.png) (Submit icon) in the **Request Status** Otherwise click [![image-1651203792080.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (Reject icon) to reject the request.

Once the name plate inspection result is updated, the completed status will be updated in the **Completed** column.

#### **10.16.4 View an RFI Report for Name Plate Inspection Test** 

If you want to view the RFI report for any name plate inspection, click [![image-1651204648220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204648220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204648220.png) (Print icon) provided in the **RFI** **Report** column.

#### **10.16.5 View a Name Plate Inspection Report**

If you want to view the name plate inspection report, click [![image-1651204648220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204648220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204648220.png) (Print icon) provided in the **Report** column.

#### **10.16.6 Attach a file into a Name Plate Inspection Report**

If you want to attach a file with any name plate inspection report in the **Name Plate** **Report** page, you can use [![image-1651223548242.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223548242.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223548242.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”

#### **10.17 Stamp Verification/Others Report**

The **Stamp Verification Report** tab in the **Inspection – Quality** menu used to add the stamp verification result for added request.

1\. Click **Stamp Verification Report** in the **Inspection – Quality**

The **Stamp Verification Report** page opens.

[![image-1651228297227.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228297227.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228297227.png)

**Figure 10.17: Stamp Verification Report page**

The page shows a list of added stamp verification requests.

#### **10.17.1 Add Stamp Verification Report Details**

If you want to add the stamp verification report details,

1\. Click [![image-1651223723031.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223723031.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223723031.png)(Edit icon) in the **Edit Report** column for the respective request.

The **Stamp Verification Result** window opens.

[![image-1651228365148.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228365148.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228365148.png)

2\. Click [![image-1651227156663.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227156663.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227156663.png)(**ADD** button) in the **Stamp Verification Result**

[![image-1651228388857.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228388857.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228388857.png)

3\. In the Component box, select a component from a drop-down list.

4\. In the Plate No box, enter the plate number.

5\. In the Heat No box, enter the heat number.

6\. In the Remarks box, enter your remarks if any.

7\. Click Save.

#### **10.17.2 Add Stamp Verification Result Details**

If you want to add the stamp verification result details,

1\. Click[![image-1651226899346.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651226899346.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651226899346.png) (Add icon) in the **RFI Data** column for the respective request.

The **RFI Inspection Request List** window opens.

[![image-1651226910236.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651226910236.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651226910236.png)

2\. In the **ITP Ref** box, enter the ITP reference detail.

3\. In the **Inspection Result** field, select the inspection result.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

#### **10.17.3 Submit Stamp Verification Result**

Once you have added the stamp verification result, the **Request Status** column in the **Stamp Verification Report** page is appeared with[![image-1651228495861.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228495861.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228495861.png) (Submit and Reject icons). See Fig 10.17.

1\. If you want to submit the stamp verification result, click[![image-1651223302767.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223302767.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223302767.png) (Submit icon) in the **Request Status** Otherwise click[![image-1651228530724.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228530724.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228530724.png)

 (Reject icon) to reject the request.

Once the stamp verification result is updated, the completed status will be updated in the **Completed** column.

#### **10.17.4 View an RFI Report for Stamp Verification** 

If you want to view the RFI report for any stamp verification inspection, click [![image-1651204648220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204648220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204648220.png) (Print icon) provided in the **RFI** **Report** column.

#### **10.17.5 View a Stamp Verification Report**

If you want to view the stamp verification report, click [![image-1651204648220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204648220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204648220.png) (Print icon) provided in the **Report** column.

#### **10.17.6 Attach a file into a Stamp Verification Report**

If you want to attach a file with any stamp verification report in the **Stamp Verification** **Report** page, you can use[![image-1651228619212.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228619212.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228619212.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **10.18 Dishend Dimension Report**

The **Dishend Dimension Report** tab in the **Inspection – Quality** menu used to add the dishend dimension inspection test result for added request.

1\. Click **Dishend Dimension Report** in the **Inspection – Quality**

The **Dishend Dimension Report** page opens.

[![image-1651228748190.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228748190.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228748190.png)

**Figure 10.18: Dishend Dimension Report page**

The page shows a list of added dishend dimension inspection requests.

#### **10.18.1 Add Dishend Dimension Inspection Report Details**

If you want to add the dishend dimension inspection report details,

1\. Click [![image-1651223723031.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223723031.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223723031.png)(Edit icon) in the **Edit Report** column for the respective request.

The **Dishend Dimension Details, Required Dimension, Checked Dimension,** and **Report Photos** window opens.

[![image-1651228832216.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228832216.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228832216.png)

2\. Check and edit the details in the **Dishend Dimension Details**

3\. Click [![image-1651227156663.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227156663.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227156663.png) (**ADD** button) in the **Required Dimension**

[![image-1651228895398.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228895398.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228895398.png)

4\. In the Inside Diameter (ID) box, enter the inside diameter value.  
   
5\. In the Circumference Inside box, enter the inside circumference value.

6\. In the Height Inside box, enter the inside height value.

7\. In the Minimum Thickness box, enter the minimum thickness value.

8\. In the Average Thickness box, enter the average thickness value.

9\. In the Crown Radius box, enter the crown radius value.

10\. In the Knuckle Radius box, enter the knuckle radius value.

11\. In the Ovality box, enter the ovality value.

12\. Click Save.

 The required dimension details are saved.

13\. Click [![image-1651227156663.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227156663.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227156663.png) (**ADD** button) in the **Checked Dimension**

[![image-1651229000555.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651229000555.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651229000555.png)

14\. Enter the checked dimension details in the **Checked Dimension**

15\. Add report photos.

#### **10.18.2 Add Dishend Dimension Inspection Result Details**

If you want to add the dishend dimension inspection result details,

1\. Click[![image-1651226899346.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651226899346.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651226899346.png) (Add icon) in the **RFI Data** column for the respective request.

The **RFI Inspection Request List** window opens.

[![image-1651226910236.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651226910236.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651226910236.png)

2\. In the **ITP Ref** box, enter the ITP reference detail.

3\. In the **Inspection Result** field, select the inspection result.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

#### **10.18.3 Submit Dishend Dimension Inspection Test Result**

Once you have added the dishend dimension inspection test result, the **Request Status** column in the **Dishend Dimension Report** page is appeared with[![image-1651229135661.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651229135661.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651229135661.png) (Submit and Reject icons). See Fig 10.18.

1\. If you want to submit the dishend dimension inspection result, click [![image-1651229159865.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651229159865.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651229159865.png)(Submit icon) in the **Request Status** Otherwise click

[![image-1651229170372.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651229170372.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651229170372.png) (Reject icon) to reject the request.

Once the dishend dimension inspection result is updated, the completed status will be updated in the **Completed** column.

#### **10.18.4 View an RFI Report for Dishend Dimension Inspection Test** 

If you want to view the RFI report for any dishend dimension inspection, click [![image-1651204648220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204648220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204648220.png) (Print icon) provided in the **RFI** **Report** column.

#### **10.18.5 View a Dishend Dimension Inspection Report**

If you want to view the dishend dimension inspection report, click [![image-1651204648220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204648220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204648220.png) (Print icon) provided in the **Report** column.

#### **10.18.6 Attach a file into a Dishend Dimension Inspection Report**

If you want to attach a file with any dishend dimension inspection report in the **Dishend Dimension Report** page, you can use [![image-1651228619212.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228619212.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228619212.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **10.19 Dishend Thickness Report**

The **Dishend Thickness Report** tab in the **Inspection – Quality** menu used to add the dishend thickness inspection test result for added request.

1\. Click **Dishend Thickness Report** in the **Inspection – Quality**

The **Dishend Thickness Report** page opens.

[![image-1651229330064.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651229330064.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651229330064.png)

**Figure 10.19: Dishend Thickness Report page**

The page shows a list of added dishend thickness inspection requests.

#### **10.19.1 Add Dishend Thickness Inspection Report Details**

If you want to add the dishend thickness inspection report details,

1\. Click [![image-1651223723031.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223723031.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223723031.png)(Edit icon) in the **Edit Report**column for the respective request.

The **Dishend Thickness Details** and **Required Thickness** windows open.

[![image-1651229394019.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651229394019.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651229394019.png)

2\. Check and edit the details in the **Dishend Thickness Details**

3\. Click [![image-1651227156663.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227156663.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227156663.png) (**ADD** button) in the **Required Thickness**

[![image-1651229425862.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651229425862.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651229425862.png)

4\. In the **Numbers** box, enter the number value.

5\. In the **Readings** box, enter the readings value.

6\. Click **Save**.

The required thickness details are saved.

#### **10.19.2 Add Dishend Thickness Inspection Result Details**

If you want to add the dishend thickness inspection result details,

1\. Click[![image-1651226899346.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651226899346.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651226899346.png) (Add icon) in the **RFI Data** column for the respective request.

The **RFI Inspection Request List** window opens.

[![image-1651226910236.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651226910236.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651226910236.png)

2\. In the **ITP Ref** box, enter the ITP reference detail.

3\. In the **Inspection Result** field, select the inspection result.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

#### **10.19.3 Submit Dishend Thickness Inspection Test Result**

Once you have added the dishend thickness inspection test result, the **Request Status** column in the **Dishend Thickness Report** page is appeared with [![image-1651229135661.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651229135661.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651229135661.png) (Submit and Reject icons). See Fig 10.19.

1\. If you want to submit the dishend thickness inspection result, click [![image-1651229159865.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651229159865.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651229159865.png)(Submit icon) in the **Request Status** Otherwise click[![image-1651229170372.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651229170372.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651229170372.png) (Reject icon) to reject the request.

Once the dishend thickness inspection result is updated, the completed status will be updated in the **Completed** column.

#### **10.19.4 View an RFI Report for Dishend Thickness Inspection Test** 

If you want to view the RFI report for any dishend thickness inspection, click [![image-1651228014197.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228014197.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228014197.png) (Print icon) provided in the **RFI** **Report** column.

#### **10.19.5 View a Dishend Thickness Inspection Report**

If you want to view the dishend thickness inspection report, click [![image-1651228014197.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228014197.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228014197.png) (Print icon) provided in the **Report** column.

#### **10.19.6 Attach a file into a Dishend Thickness Inspection Report**

If you want to attach a file with any dishend thickness inspection report in the **Dishend Thickness Report** page, you can use [![image-1651228062872.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228062872.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228062872.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **10.20 Blasting and Painting Report**

The **Blasting and Painting Report** tab in the **Inspection – Quality** menu used to add the blasting and painting inspection test result for added request.

1\. Click **Blasting and Painting Report** in the **Inspection – Quality**

The **Blasting and Painting Report** page opens.

[![image-1651229941645.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651229941645.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651229941645.png)

**Figure 10.20: Blasting and Painting Report page**

The page shows a list of added blasting and painting inspection requests.

#### **10.20.1 Add Blasting and Painting Inspection Report Details**

If you want to add the blasting and painting inspection report details,

1\. Click[![image-1651230006726.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651230006726.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651230006726.png)(Edit icon) in the **Edit Report** column for the respective request.

The page shows a new window to add the result details.

[![image-1651230016724.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651230016724.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651230016724.png)

2\. In the **SURFACE PREPARATION** field, enter the inspection details for surface preparation.  
   
3\. In the **ABRASIVE BLASTING** field, enter the inspection details for abrasive preparation.

4\. In the **Painting First Coat** field, enter the inspection details for first coat painting.  
   
5\. In the **Intermediate Coat** field, enter the inspection details for intermediate coat.

6\. In the **Top Coat** field, enter the inspection details for top coat.

#### **10.20.2 Add Blasting and Painting Inspection Result Details**

If you want to add the blasting and painting inspection result details,

1\. Click[![image-1651226899346.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651226899346.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651226899346.png) (Add icon) in the **RFI Data** column for the respective request.

The **RFI Inspection Request List** window opens.

[![image-1651226910236.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651226910236.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651226910236.png)

2\. In the **ITP Ref** box, enter the ITP reference detail.

3\. In the **Inspection Result** field, select the inspection result.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

#### **10.20.3 Submit Blasting and Painting Inspection Result**

Once you have added the blasting and painting inspection result, the **Request Status** column in the **Blasting and Painting Report** page is appeared with [![image-1651229135661.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651229135661.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651229135661.png) (Submit and Reject icons). See Fig 10.20.

1\. If you want to submit the blasting and painting inspection result, click [![image-1651229159865.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651229159865.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651229159865.png)(Submit icon) in the **Request Status** Otherwise click[![image-1651229170372.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651229170372.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651229170372.png) (Reject icon) to reject the request.

Once the blasting and painting inspection result is updated, the completed status will be updated in the **Completed** column.

#### **10.20.4 View an RFI Report for Blasting and Painting Inspection Test** 

If you want to view the RFI report for any blasting and painting inspection, click [![image-1651228014197.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228014197.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228014197.png) (Print icon) provided in the **RFI** **Report** column.

#### **10.20.5 View a Blasting and Painting Inspection Report**

If you want to view the blasting and painting inspection report, click [![image-1651228014197.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228014197.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228014197.png) (Print icon) provided in the **Report** column.

#### **10.20.6 Attach a file into a Blasting and Painting Inspection Report**

If you want to attach a file with any blasting and painting inspection report in the **Blasting and Painting Report** page, you can use[![image-1651228619212.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228619212.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228619212.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **10.21 Miscellaneous Report**

The **Miscellaneous Report** tab in the **Inspection – Quality** menu used to add the vessel NDT inspection test result for added request.

1\. Click **Miscellaneous Report** in the **Inspection – Quality**

The **Vessel NDT Report** page opens.

[![image-1651230815067.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651230815067.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651230815067.png)

**Figure 10.21: Vessel NDT Report page**

The page shows a list of added vessel NDT inspection requests.

#### **10.21.1 Add Vessel NDT Inspection Result Details**

If you want to add the vessel NDT inspection result details,

1\. Click[![image-1651226899346.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651226899346.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651226899346.png) (Add icon) in the **RFI Data** column for the respective request.

The **RFI Inspection Request List** window opens.

[![image-1651226910236.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651226910236.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651226910236.png)

2\. In the **ITP Ref** box, enter the ITP reference detail.

3\. In the **Inspection Result** field, select the inspection result.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

#### **10.21.2 Submit Vessel NDT Inspection Result**

Once you have added the vessel NDT inspection result, the **Request Status** column in the **Vessel NDT Report** page is appeared with [![image-1651228495861.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228495861.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228495861.png) (Submit and Reject icons). See Fig 10.21.

1\. If you want to submit the vessel NDT inspection result, click [![image-1651229159865.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651229159865.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651229159865.png)(Submit icon) in the **Request Status** Otherwise click [![image-1651229170372.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651229170372.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651229170372.png) (Reject icon) to reject the request.

Once the vessel NDT inspection result is updated, the completed status will be updated in the **Completed** column.

#### **10.21.3 View an RFI Report for Vessel NDT Inspection** 

If you want to view the RFI report for any vessel NDT inspection, click [![image-1651228014197.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228014197.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228014197.png) (Print icon) provided in the **RFI** **Report** column.

#### **10.21.4 Attach a file into a Vessel NDT Inspection Report**

If you want to attach a file with any vessel NDT inspection report in the **Vessel NDT Report** page, you can use [![image-1651228619212.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228619212.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228619212.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **10.22 PWHT Report**

The **PWHT Report** tab in the **Inspection – Quality** menu used to add the PWHT inspection result for added request.

1\. Click **PWHT Report** in the **Inspection – Quality**

The **PWHT Report** page opens.

[![image-1651231087172.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651231087172.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651231087172.png)

**Figure 10.22: PWHT Report page**

The page shows a list of added PWHT inspection requests.

#### **10.22.1 Add PWHT Inspection Report Details**

If you want to add the PWHT inspection report details,

1\. Click[![image-1651231175586.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651231175586.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651231175586.png)(Edit icon) in the **Edit Report** column for the respective request.

The page shows the **Test Parameters** and **PWHT Test Result** windows.

[![image-1651231187710.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651231187710.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651231187710.png)

2\. In the **Test Parameters** window, check and edit the test parameters data.

3\. Click [![image-1651227156663.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227156663.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227156663.png)(**ADD** button) in the **PWHT Test Result** window.

[![image-1651231230388.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651231230388.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651231230388.png)

4\. In the Heating Rate box, enter the heating rate.

5\. In the Temp box, enter the temperature value.

6\. In the Holding Time box, enter the holding time range.

7\. In the Cooling Rate box, enter the cooling rate value.

8\. In the Parameter box, enter the parameter value.

9\. Click Save.

#### **10.22.2 Add PWHT Inspection Result Details**

If you want to add the PWHT inspection result details,

1\. Click[![image-1651226899346.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651226899346.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651226899346.png) (Add icon) in the **RFI Data** column for the respective request.

The **RFI Inspection Request List** window opens.

[![image-1651226910236.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651226910236.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651226910236.png)

2\. In the **ITP Ref** box, enter the ITP reference detail.

3\. In the **Inspection Result** field, select the inspection result.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

#### **10.22.3 Submit PWHT Inspection Result**

Once you have added the PWHT inspection result, the **Request Status** column in the **PWHT Report** page is appeared with [![image-1651229135661.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651229135661.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651229135661.png) (Submit and Reject icons). See Fig 10.22.

1\. If you want to submit the PWHT inspection result, click[![image-1651229159865.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651229159865.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651229159865.png) (Submit icon) in the **Request Status** Otherwise click [![image-1651228530724.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228530724.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228530724.png) (Reject icon) to reject the request.

Once the PWHT inspection result is updated, the completed status will be updated in the **Completed** column.

#### **10.22.4 View an RFI Report for PWHT Inspection Test** 

If you want to view the RFI report for any PWHT inspection, click [![image-1651228014197.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228014197.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228014197.png) (Print icon) provided in the **RFI** **Report** column.

#### **10.22.5 View a PWHT Inspection Report**

If you want to view the PWHT inspection report, click [![image-1651228014197.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228014197.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228014197.png) (Print icon) provided in the **Report** column.

#### **10.22.6 Attach a file into a PWHT Inspection Report**

If you want to attach a file with any PWHT inspection report in the **PWHT Report** page, you can use [![image-1651228619212.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228619212.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228619212.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **10.23 Pre-welding Inspection Report**

The **Pre-welding Inspection Report** tab in the **Inspection – Quality** menu used to add the pre-welding inspection result for added request.

1\. Click **Pre-welding Inspection Report** in the **Inspection – Quality**

The **Pre-welding Inspection Report** page opens.

[![image-1651231586207.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651231586207.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651231586207.png)

**Figure 10.23: Pre-welding Inspection Report page**

The page shows a list of added pre-welding inspection requests.

#### **10.23.1 Add Pre-welding Inspection Result Details**

If you want to add the pre-welding inspection result details,

1\. Click[![image-1651226899346.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651226899346.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651226899346.png) (Add icon) in the **RFI Data** column for the respective request.

The **RFI Inspection Request List** window opens.

[![image-1651226910236.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651226910236.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651226910236.png)

2\. In the **ITP Ref** box, enter the ITP reference detail.

3\. In the **Inspection Result** field, select the inspection result.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

#### **10.23.2 Submit Pre-welding Inspection Result**

Once you have added the pre-welding inspection result, the **Request Status** column in the **Pre-welding Inspection Report** page is appeared with[![image-1651231678805.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651231678805.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651231678805.png) (Submit and Reject icons). See Fig 10.23.

1\. If you want to submit the pre-welding inspection result, click [![image-1651229159865.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651229159865.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651229159865.png)(Submit icon) in the **Request Status** Otherwise click [![image-1651229170372.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651229170372.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651229170372.png) (Reject icon) to reject the request.

Once the pre-welding inspection result is updated, the completed status will be updated in the **Completed** column.

#### **10.23.3 View an RFI Report for Pre-welding Inspection** 

If you want to view the RFI report for any pre-welding inspection, click [![image-1651228014197.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228014197.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228014197.png)(Print icon) provided in the **RFI** **Report** column.

#### **10.23.4 Attach a file into a Pre-welding Inspection Report**

If you want to attach a file with any pre-welding inspection report in the **Pre-welding Inspection Report** page, you can use [![image-1651228619212.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228619212.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228619212.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

# NDT

# 11.0 **NDT**

The **NDT** menu in the app used to add the inspection results after performing the various NDT inspections based on the added request. This menu also helps you to view the inspection reports.

<table border="1" id="bkmrk-users-assigned-with-" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Users assigned with **cuteQM\_NDT** role only can view and access the **NDT menu and their functionalities.

</td></tr></tbody></table>

#### **11.1 RT Report**

If you have chosen the NDT request type as RT while adding NDT request in the [**<u>NDT Request – RFI</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/production-rfi#bkmrk-8.3-ndt-request-%E2%80%93-rf) tab, the RT inspection request will be added here.

The **RT Report** tab in the **NDT** menu used to add the RT inspection result for the added request.

1\. Click **RT Report** in the **NDT**

The **RT Report** page opens.

[![image-1651232224798.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651232224798.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651232224798.png)

**Figure 11.1: RT Report page**

#### **11.1.1 Add an RT Report**

If you want to add an RT report, do the following steps,

1\. Click [![image-1651227156663.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227156663.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227156663.png)(**ADD** button) in the **RT Report**

The page shows a new window to add the details of RT report.

[![image-1651232303407.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651232303407.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651232303407.png)

**[![image-1651227211421.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227211421.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227211421.png)Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.

[![image-1651232336302.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651232336302.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651232336302.png)**Tip**: A report number for a new RT report will be updated automatically in the **Report Number** box. If you want change the report number, you can change.

2\. In the **NDT By** box, select who has requested the NDT whether by third party or internal from a drop-down list.

3\. In the **Joints** box, select a joint from a drop-down list.

4\. In the **Prepared By** box, enter the name of a person who has prepared the RT report.

5\. In the **Prepared Date** box, select the prepared date of the RT report.

6\. In the **Reviewed By** box, enter the name of a person who has reviewed the RT report.

7\. In the **Reviewed Date** box, select the reviewed date of the RT report.

8\. In the **Accepted/Approved By** boxes, enter the name of a person who has accepted/approved the RT report.

9\. In the **Accepted/Approved Date** box, select the accepted/approved date of the RT report.

10\. Click **Save**

The RT report is successfully added. Once you have added the RT report, you must add RT inspection results.

**[![image-1651227469136.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227469136.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227469136.png)Note**: If you want to lock any RT report, click the respective checkbox provided in the **Lock Report?** column.

#### **11.1.2 Add RT Inspection Result**

If you want to add the RT inspection result details,

1\. Click[![image-1651232503873.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651232503873.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651232503873.png)(Edit icon) in the **Edit Report** column for the respective request.

The **Joint Results**, **RT Results**, and **Report Photos** windows open.

[![image-1651232512617.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651232512617.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651232512617.png)

The **Joint Results** window shows a list of added joints for the RT request.

2\. If you want to edit the joint length, click[![image-1651232535722.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651232535722.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651232535722.png)(Edit icon) of the respective joint and change the joint length.

3\. To add the RT inspection result, click[![image-1651232555419.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651232555419.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651232555419.png)(Add icon) of the respective joint.

 The **Marker Results** window opens.

[![image-1651232568967.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651232568967.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651232568967.png)

4\. Click [![image-1651232590796.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651232590796.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651232590796.png)(**ADD** button) in the **Marker Results**

[![image-1651232601137.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651232601137.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651232601137.png)

5\. In the **Marker** box, enter the marker number.

6\. In the **Sensitivity** box, enter the sensitivity value.

7\. In the **Result** box, select the result of RT inspection.

<table border="1" id="bkmrk-accepted%C2%A0%E2%80%93-if-you-se" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">**Accepted** – If you select **Accepted**, the respective joint will be moved for further process.

**Rejected** – If you select **Rejected**, the respective joint will be rejected in the [**<u>NDT Request – RFI</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/production-rfi#bkmrk-8.3-ndt-request-%E2%80%93-rf) page and moved to [**<u>Weld visual</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/production-rfi#bkmrk-8.2-weld-visual---re) page with the sub name of suffix 'R1', for example if the joint J1 means it will be added as J1 R1.

**Reshoot** – If you select **Reshoot**, the respective joint will be moved into the [**<u>NDT Request – RFI</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/production-rfi#bkmrk-8.3-ndt-request-%E2%80%93-rf) page.

</td></tr></tbody></table>

8\. In the **Defect** box, select the defect detail.

9\. In the **Defect Length** box, enter the defect length.

10\. In the **Remarks** box, enter your remarks if any.

11\. Click **Save**.

12\. In the **RT Results** window, enter the RT result details.

13\. Click **Save RT Details**.

14\. In the **Report Photos** window, click [![image-1651232590796.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651232590796.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651232590796.png) (**ADD** button) and add the report photos.

#### **11.1.3 View a RT Inspection Report**

If you want to view the RT inspection report, click[![image-1651232871882.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651232871882.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651232871882.png) (Print icon) provided in the **Report** column.

#### **11.1.4 Attach a File into a RT inspection Report**

If you want to attach a file with any RT inspection report in the **RT Report** page, you can use [![image-1651228619212.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228619212.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228619212.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **11.2 UT Report**

If you have chosen the NDT request type as UT while adding NDT request in the [**<u>NDT Request – RFI</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/production-rfi#bkmrk-8.3-ndt-request-%E2%80%93-rf) tab, the UT inspection request will be added here.

The **UT Report** tab in the **NDT** menu used to add the UT inspection result for the added request.

1\. Click **UT Report** in the **NDT**

The **UT Report** page opens.

[![image-1651233377265.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651233377265.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651233377265.png)

**Figure 11.2: UT Report page**

#### **11.2.1 Add an UT Report**

If you want to add an UT report, do the following steps,

1\. Click [![image-1651233433723.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651233433723.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651233433723.png) (**ADD** button) in the **UT Report**

The page shows a new window to add the details of UT report.

[![image-1651233451666.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651233451666.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651233451666.png)

 **[![image-1651227211421.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227211421.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227211421.png)Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.

[![image-1651233488980.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651233488980.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651233488980.png)**Tip**: A report number for a new UT report will be updated automatically in the **Report Number** box. If you want change the report number, you can change.

2\. In the **NDT By** box, select who has requested the NDT whether by third party or internal from a drop-down list.

3\. In the **Joints** box, select a joint from a drop-down list.

4\. In the **Prepared By** box, enter the name of a person who has prepared the UT report.

5\. In the **Prepared Date** box, select the prepared date of the UT report.

6\. In the **Reviewed By** box, enter the name of a person who has reviewed the UT report.

7\. In the **Reviewed Date** box, select the reviewed date of the UT report.

8\. In the **Accepted/Approved By** boxes, enter the name of a person who has accepted/approved the UT report.

9\. In the **Accepted/Approved Date** box, select the accepted/approved date of the UT report.

10\. Click **Save**.

The UT report is successfully added. Once you have added the UT report, you must add UT inspection results.

**[![image-1651227469136.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227469136.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227469136.png)Note**: If you want to lock any UT report, click the respective checkbox provided in the **Lock Report?** column.

#### **11.2.2 Add UT Inspection Result**

If you want to add the UT inspection result details,

1\. Click (Edit icon) in the **Edit Report** column for the respective request.

The **Probe &amp; Cable Details**, **Reference Setting Details, UT Results**, and **Report Photos** windows open.

[![image-1651233679146.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651233679146.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651233679146.png)

The **UT Results** window shows a list of added joints for the UT request.

2\. Click [![image-1651233433723.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651233433723.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651233433723.png) (**ADD** button) in the **Probe &amp; Cable Details** window.

3\. Enter the probe and cable details and click **Save**.

4\. Click [![image-1651233433723.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651233433723.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651233433723.png) (**ADD** button) in the **Reference Setting Details** window.

[![image-1651233742174.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651233742174.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651233742174.png)

5\. Enter the reference setting details and click **Save**.

6\. Click [![image-1651233433723.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651233433723.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651233433723.png)(**ADD** button) in the **UT Results**

[![image-1651233779002.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651233779002.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651233779002.png)

7\. Enter the UT result details.

8\. In the **Result** box, select the result for UT inspection.

<table border="1" id="bkmrk-accepted%C2%A0%E2%80%93-if-you-se-0" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">**Accepted** – If you select **Accepted**, the respective joint will be moved for further process.

**Rejected** – If you select **Rejected**, the respective joint will be rejected in the [**<u>NDT Request – RFI</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/production-rfi#bkmrk-8.3-ndt-request-%E2%80%93-rf) page and moved to [**<u>Weld visual</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/production-rfi#bkmrk-8.2-weld-visual---re) page with the sub name of suffix 'R1', for example if the joint J1 means it will be added as J1 R1.

</td></tr></tbody></table>

9\. Click **Save**.

10\. In the **UT Results** window, enter the UT result details.

11\. Click **Save UT Details**.

12\. In the **Report Photos** window, click (**ADD** button) and add the report photos.

#### **11.2.3 View an UT Inspection Report**

If you want to view the UT inspection report, click[![image-1651233956698.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651233956698.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651233956698.png) (Print icon) provided in the **Report** column.

#### **11.2.4 Attach a File into an UT inspection Report**

If you want to attach a file with any UT inspection report in the **UT Report** page, you can use [![image-1651228619212.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228619212.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228619212.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **11.3 MT Report**

If you have chosen the NDT request type as MT while adding NDT request in the [**<u>NDT Request – RFI</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/production-rfi#bkmrk-8.3-ndt-request-%E2%80%93-rf) tab, the MT inspection request will be added here.

The **MT Report** tab in the **NDT** menu used to add the MT inspection result for the added request.

1\. Click **MT Report** in the **NDT**

The **MT Report** page opens.

[![image-1651234569057.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651234569057.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651234569057.png)

**Figure 11.3: MT Report page**

#### **11.3.1 Add a MT Report**

If you want to add a MT report, do the following steps,

1\. Click [![image-1651233433723.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651233433723.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651233433723.png)(**ADD** button) in the **MT Report**

The page shows a new window to add the details of MT report.

[![image-1651234673813.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651234673813.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651234673813.png)

**[![image-1651227211421.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227211421.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227211421.png)Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.

**[![image-1651233488980.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651233488980.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651233488980.png)Tip**: A report number for a new MT report will be updated automatically in the **Report Number** box. If you want change the report number, you can change.

2\. In the **NDT By** box, select who has requested the NDT whether by third party or internal from a drop-down list.

3\. In the **Joints** box, select a joint from a drop-down list.

4\. In the **Prepared By** box, enter the name of a person who has prepared the MT report.

5\. In the **Prepared Date** box, select the prepared date of the MT report.

6\. In the **Reviewed By** box, enter the name of a person who has reviewed the MT report.

7\. In the **Reviewed Date** box, select the reviewed date of the MT report.

8\. In the **Accepted/Approved By** boxes, enter the name of a person who has accepted/approved the MT report.

9\. In the **Accepted/Approved Date** box, select the accepted/approved date of the MT report.

10\. Click **Save**.

The MT report is successfully added. Once you have added the MT report, you must add MT inspection results.

**[![image-1651227211421.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227211421.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227211421.png)Note**: If you want to lock any MT report, click the respective checkbox provided in the **Lock Report?** column.

#### **11.3.2 Add MT Inspection Result**

If you want to add the MT inspection result details,

1\. Click (Edit icon) in the **Edit Report** column for the respective request.

 The **MPT Results** and **Report Photos** windows open.

[![image-1651234921729.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651234921729.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651234921729.png)

The **MPT Results** window shows a list of added joints for the MT request.

2\. Click [![image-1651232535722.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651232535722.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651232535722.png)(Edit icon) in the **MPT Results**

[![image-1651235044494.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651235044494.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651235044494.png)

3\. Enter the MPT result details

4\. In the **Result** box, select the result for MT inspection.

<table border="1" id="bkmrk-accepted%C2%A0%E2%80%93-if-you-se-1" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">**Accepted** – If you select **Accepted**, the respective joint will be moved for further process.

**Rejected** – If you select **Rejected**, the respective joint will be rejected in the [**<u>NDT Request – RFI</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/production-rfi#bkmrk-8.3-ndt-request-%E2%80%93-rf) page and moved to [**<u>Weld visual</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/production-rfi#bkmrk-8.2-weld-visual---re) page with the sub name of suffix 'R1', for example if the joint J1 means it will be added as J1 R1.

</td></tr></tbody></table>

5\. In the **MPT Results** window, enter the MPT result details.

6\. Click **Save MPT Details**.

7 In the **Report Photos** window, click [![image-1651233433723.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651233433723.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651233433723.png) (**ADD** button) and add the report photos.

#### **11.3.3 View a MT Inspection Report**

If you want to view the MT inspection report, click [![image-1651233956698.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651233956698.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651233956698.png) (Print icon) provided in the **Report** column.

#### **11.3.4 Attach a File into a MT inspection Report**

If you want to attach a file with any MT inspection report in the **MT Report** page, you can use[![image-1651235261366.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651235261366.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651235261366.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **11.4 PT Report**

If you have chosen the NDT request type as PT while adding NDT request in the [**<u>NDT Request – RFI</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/production-rfi#bkmrk-8.3-ndt-request-%E2%80%93-rf) tab, the PT inspection request will be added here.

The **PT Report** tab in the **NDT** menu used to add the PT inspection result for the added request.

1\. Click **PT Report** in the **NDT**

The **PT Report** page opens.

[![image-1651235416886.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651235416886.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651235416886.png)

**Figure 11.4: PT Report page**

#### **11.4.1 Add a PT Report**

If you want to add a PT report, do the following steps,

1\. Click [![image-1651233433723.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651233433723.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651233433723.png) (**ADD** button) in the **PT Report** page.

The page shows a new window to add the details of PT report.

[![image-1651235471323.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651235471323.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651235471323.png)

**[![image-1651227211421.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227211421.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227211421.png)Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.

**[![image-1651233488980.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651233488980.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651233488980.png)Tip**: A report number for a new PT report will be updated automatically in the **Report Number** box. If you want change the report number, you can change.

2\. In the **NDT By** box, select who has requested the NDT whether by third party or internal from a drop-down list.

3\. In the **Joints** box, select a joint from a drop-down list.

4\. In the **Prepared By** box, enter the name of a person who has prepared the PT report.  
   
5\. In the **Prepared Date** box, select the prepared date of the PT report.

6\. In the **Reviewed By** box, enter the name of a person who has reviewed the PT report.

7\. In the **Reviewed Date** box, select the reviewed date of the PT report.

8\. In the **Accepted/Approved By** boxes, enter the name of a person who has accepted/approved the PT report.

9\. In the **Accepted/Approved** Date box, select the accepted/approved date of the PT report.

10\. Click **Save**.

The PT report is successfully added. Once you have added the PT report, you must add PT inspection results.

**[![image-1651227211421.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227211421.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227211421.png)Note**: If you want to lock any PT report, click the respective checkbox provided in the **Lock Report?** column.

#### **11.4.2 Add PT Inspection Result**

If you want to add the PT inspection result details,

1\. Click [![image-1651232503873.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651232503873.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651232503873.png)(Edit icon) in the **Edit Report** column for the respective request.

The **DPT Results** and **Report Photos** windows open.

[![image-1651236433204.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651236433204.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651236433204.png)

The **DPT Results** window shows a list of added joints for the PT request.

2\. Click (Edit icon) in the **DPT Results** window

[![image-1651236454697.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651236454697.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651236454697.png)

3\. Enter the DPT result details.

4\. In the **Result** box, select the result for PT inspection.

<table border="1" id="bkmrk-accepted%C2%A0%E2%80%93-if-you-se-2" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">**Accepted** – If you select **Accepted**, the respective joint will be moved for further process.

**Rejected** – If you select **Rejected**, the respective joint will be rejected in the [**<u>NDT Request – RFI</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/production-rfi#bkmrk-8.3-ndt-request-%E2%80%93-rf) page and moved to [**<u>Weld visual</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/production-rfi#bkmrk-8.2-weld-visual---re) page with the sub name of suffix 'R1', for example if the joint J1 means it will be added as J1 R1.

</td></tr></tbody></table>

5\. In the **DPT Results** window, enter the DPT result details.

6\. Click **Save DPT Details**.

7\. In the **Report Photos** window, click (**ADD** button) and add the report photos.

#### **11.4.3 View a PT Inspection Report**

If you want to view the PT inspection report, click[![image-1651236568831.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651236568831.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651236568831.png) (Print icon) provided in the **Report** column.

#### **11.4.4 Attach a File into a PT inspection Report**

If you want to attach a file with any PT inspection report in the **PT Report** page, you can use [![image-1651235261366.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651235261366.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651235261366.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **11.5 PMI Report**

If you have chosen the NDT request type as PMI while adding NDT request in the [**<u>NDT Request – RFI</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/production-rfi#bkmrk-8.3-ndt-request-%E2%80%93-rf) tab, the PMI inspection request will be added here.

The **PMI Report** tab in the **NDT** menu used to add the PMI inspection result for the added request.

1\. Click **PMI Report** in the **NDT**

The **PMI Report** page opens.

[![image-1651237275232.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651237275232.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651237275232.png)

**Figure 11.5: PMI Report page**

#### **11.5.1 Add a PMI Report**

If you want to add a PMI report, do the following steps,

1\. Click [![image-1651233433723.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651233433723.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651233433723.png)(**ADD** button) in the **PMI Report**

The page shows a new window to add the details of PMI report.

[![image-1651237332900.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651237332900.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651237332900.png)

**[![image-1651227469136.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227469136.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227469136.png)Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.

**[![image-1651233488980.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651233488980.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651233488980.png)Tip**: A report number for a new PMI report will be updated automatically in the **Report Number** box. If you want change the report number, you can change.

2\. In the **NDT By** box, select who has requested the NDT whether by third party or internal from a drop-down list.  
   
3\. In the **Joints** box, select a joint from a drop-down list.

4\. In the **Prepared By** box, enter the name of a person who has prepared the PMI report.  
   
5\. In the **Prepared Date** box, select the prepared date of the PMI report.  
   
6\. In the **Reviewed By** box, enter the name of a person who has reviewed the PMI report.

7\. In the **Reviewed Date** box, select the reviewed date of the PMI report.

8\. In the **Accepted/Approved** By boxes, enter the name of a person who has accepted/approved the PMI report.

9\. In the **Accepted/Approved** **Date** box, select the accepted/approved date of the PMI report.

10\. Click **Save**.

The PMI report is successfully added. Once you have added the PMI report, you must add PMI inspection results.

**[![image-1651227469136.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227469136.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227469136.png)Note**: If you want to lock any PMI report, click the respective checkbox provided in the **Lock Report?** column.

#### **11.5.2 Add PMI Inspection Result**

If you want to add the PMI inspection result details,

1\. Click[![image-1651232503873.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651232503873.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651232503873.png) (Edit icon) in the **Edit Report** column for the respective request.

The **PMI Elements, PMI Joint Details, PMI Results,** and **Report Photos** windows open.

[![image-1651237542221.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651237542221.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651237542221.png)

The **PMI Joint Details** window shows a list of added joints for the PMI request.

2\. In the **PMI Elements** window, click [![image-1651233433723.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651233433723.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651233433723.png) (**ADD** button) and add the PMI elements.

3\. Click [![image-1651232535722.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651232535722.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651232535722.png) (Edit icon) in the **PMI Joint Details** window.

[![image-1651237600868.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651237600868.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651237600868.png)

4\. Enter the joint number.

5\. In the **Result** box, select the result for PMI inspection.

<table border="1" id="bkmrk-accepted%C2%A0%E2%80%93-if-you-se-3" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">**Accepted** – If you select **Accepted**, the respective joint will be moved for further process.

**Rejected** – If you select **Rejected**, the respective joint will be rejected in the [**<u>NDT Request – RFI</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/production-rfi#bkmrk-8.3-ndt-request-%E2%80%93-rf) page and moved to [**<u>Weld visual</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/production-rfi#bkmrk-8.2-weld-visual---re) page with the sub name of suffix 'R1', for example if the joint J1 means it will be added as J1 R1.

</td></tr></tbody></table>

6\. In the **PMI Results** window, enter the PMI result details.

7\. Click **Save PMI Details**.

8\. In the **Report Photos** window, click [![image-1651233433723.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651233433723.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651233433723.png) (**ADD** button) and add the report photos.

#### **11.5.3 View a PMI Inspection Report**

If you want to view the PMI inspection report, click [![image-1651236568831.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651236568831.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651236568831.png) (Print icon) provided in the **Report** column.

#### **11.5.4 Attach a File into a PMI inspection Report**

If you want to attach a file with any PMI inspection report in the **PMI Report** page, you can use [![image-1651235261366.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651235261366.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651235261366.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **11.6 PAUT Report**

If you have chosen the NDT request type as PAUT while adding NDT request in the [**<u>NDT Request – RFI</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/production-rfi#bkmrk-8.3-ndt-request-%E2%80%93-rf) tab, the PAUT inspection request will be added here.

The **PAUT Report** tab in the **NDT** menu used to add the PAUT inspection result for the added request.

1\. Click **PAUT Report** in the **NDT**

The **PAUT Report** page opens.

[![image-1651239012014.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651239012014.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651239012014.png)

**Figure 11.6: PAUT Report page**

#### **11.6.1 Add a PAUT Report**

If you want to add a PAUT report, do the following steps,

1\. Click [![image-1651233433723.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651233433723.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651233433723.png)(**ADD** button) in the **PAUT Report**

The page shows a new window to add the details of PAUT report.

[![image-1651239078914.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651239078914.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651239078914.png)

**[![image-1651227469136.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227469136.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227469136.png)Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.

**[![image-1651233488980.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651233488980.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651233488980.png)Tip**: A report number for a new PAUT report will be updated automatically in the **Report Number** box. If you want change the report number, you can change.

2\. In the **NDT By** box, select who has requested the NDT whether by third party or internal from a drop-down list.  
   
3\. In the **Joints** box, select a joint from a drop-down list.

4\. In the **Prepared By** box, enter the name of a person who has prepared the PAUT report.  
   
5\. In the **Prepared Date** box, select the prepared date of the PAUT report.

6\. In the **Reviewed By** box, enter the name of a person who has reviewed the PAUT report.

7\. In the **Reviewed Date** box, select the reviewed date of the PAUT report.  
   
8\. In the **Accepted/Approved** By boxes, enter the name of a person who has accepted/approved the PAUT report.

9\. In the **Accepted/Approved Date** box, select the accepted/approved date of the PAUT report.

10\. Click **Save**.

The PAUT report is successfully added. Once you have added the PAUT report, you must add PAUT inspection results.

 **[![image-1651227469136.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227469136.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227469136.png)Note**: If you want to lock any PAUT report, click the respective checkbox provided in the **Lock Report?** column.

#### **11.6.2 Add PAUT Inspection Result**

If you want to add the PAUT inspection result details,

1\. Click [![image-1651232503873.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651232503873.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651232503873.png)(Edit icon) in the **Edit Report** column for the respective request.

The **Joint Results**, **PAUT Results**, and **Report Photos** windows open.

[![image-1651239296890.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651239296890.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651239296890.png)

The **Joint Results** window shows a list of added joints for the PAUT request.

2\. If you want to edit the joint length, click [![image-1651232535722.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651232535722.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651232535722.png) (Edit icon) of the respective joint and change the joint length.

3\. To add the PAUT inspection result, click [![image-1651232555419.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651232555419.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651232555419.png)(Add icon) of the respective joint.

 The **Marker Results** window opens.

[![image-1651239369321.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651239369321.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651239369321.png)

4\. Click [![image-1651232590796.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651232590796.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651232590796.png) (**ADD** button) in the **Marker Results** window.

[![image-1651239398286.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651239398286.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651239398286.png)

5\. In the **Marker** box, enter the marker number.

6\. In the **Sensitivity** box, enter the sensitivity value.

7\. In the **Result** box, select the result of PAUT inspection.

<table border="1" id="bkmrk-accepted%C2%A0%E2%80%93-if-you-se-4" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">**Accepted** – If you select **Accepted**, the respective joint will be moved for further process.

**Rejected** – If you select **Rejected**, the respective joint will be rejected in the [**<u>NDT Request – RFI</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/production-rfi#bkmrk-8.3-ndt-request-%E2%80%93-rf) page and moved to [**<u>Weld visual</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/production-rfi#bkmrk-8.2-weld-visual---re) page with the sub name of suffix 'R1', for example if the joint J1 means it will be added as J1 R1.

</td></tr></tbody></table>

8\. In the **Defect** box, select the defect detail.

9\. In the **Defect Length** box, enter the defect length.

10\. In the **Remarks** box, enter your remarks if any.

11\. Click **Save**.

12\. In the **PAUT Results** window, enter the PAUT result details.

13\. Click **Save PAUT Details**.

14\. In the **Report Photos** window, click (**ADD** button) and add the report photos.

#### **11.6.3 View a PAUT Inspection Report**

If you want to view the PAUT inspection report, click [![image-1651236568831.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651236568831.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651236568831.png) (Print icon) provided in the **Report** column.

#### **11.6.4 Attach a File into a PAUT inspection Report**

If you want to attach a file with any PAUT inspection report in the **PAUT Report** page, you can use [![image-1651235261366.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651235261366.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651235261366.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **11.7 PWHT Report**

If you have chosen the NDT request type as PWHT while adding NDT request in the [**<u>NDT Request – RFI</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/production-rfi#bkmrk-8.3-ndt-request-%E2%80%93-rf) tab, the PWHT inspection request will be added here.

The **PWHT Report** tab in the **NDT** menu used to add the PWHT inspection result for the added request.

1\. Click **PWHT Report** in the **NDT**

 The **PWHT Report** page opens.

[![image-1651239776320.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651239776320.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651239776320.png)

**Figure 11.7: PWHT Report page**

#### **11.7.1 Add a PWHT Report**

If you want to add a PWHT report, do the following steps,

1\. Click [![image-1651233433723.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651233433723.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651233433723.png)(**ADD** button) in the **PWHT Report** page.

 The page shows a new window to add the details of PWHT report.

[![image-1651239863303.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651239863303.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651239863303.png)

**[![image-1651227469136.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227469136.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227469136.png)Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.

**[![image-1651233488980.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651233488980.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651233488980.png)Tip**: A report number for a new PWHT report will be updated automatically in the **Report Number** box. If you want change the report number, you can change.

2\. In the **NDT By** box, select who has requested the NDT whether by third party or internal from a drop-down list.  
   
3\. In the **Joints** box, select a joint from a drop-down list.

4\. In the **Prepared By** box, enter the name of a person who has prepared the PWHT report.  
   
5\. In the **Prepared Date** box, select the prepared date of the PWHT report.  
   
6\. In the **Reviewed By** box, enter the name of a person who has reviewed the PWHT report.

7\. In the **Reviewed Date** box, select the reviewed date of the PWHT report.  
   
8\. In the **Accepted/Approved** By boxes, enter the name of a person who has accepted/approved the PWHT report.

9\. In the **Accepted/Approved Date** box, select the accepted/approved date of the PWHT report.  
   
10\. Click **Save**.

The PWHT report is successfully added. Once you have added the PWHT report, you must add PWHT inspection results.

**[![image-1651227469136.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227469136.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227469136.png)Note**: If you want to lock any PWHT report, click the respective checkbox provided in the **Lock Report?** column.

#### **11.7.2 Add PWHT Inspection Result**

If you want to add the PWHT inspection result details,

1\. Click [![image-1651232503873.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651232503873.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651232503873.png)(Edit icon) in the **Edit Report** column for the respective request.

The **Joint Results, PWHT Results,** and **Report Photos** windows open.

[![image-1651240062685.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240062685.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240062685.png)

The **Joint Results** window shows a list of added joints for the PWHT request.

2\. Click [![image-1651232535722.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651232535722.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651232535722.png) (Edit icon) in the **Joint Results** window.

[![image-1651240098076.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240098076.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240098076.png)

3\. Enter the PWHT result details.

4\. In the **Result** box, select the result for PWHT inspection.

<table border="1" id="bkmrk-accepted%C2%A0%E2%80%93-if-you-se-5" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">**Accepted** – If you select **Accepted**, the respective joint will be moved for further process.

**Rejected** – If you select **Rejected**, the respective joint will be rejected in the [**<u>NDT Request – RFI</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/production-rfi#bkmrk-8.3-ndt-request-%E2%80%93-rf) page and moved to [**<u>Weld visual</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/production-rfi#bkmrk-8.2-weld-visual---re) page with the sub name of suffix 'R1', for example if the joint J1 means it will be added as J1 R1.

</td></tr></tbody></table>

5\. In the **PWHT Results** window, enter the PWHT result details.

6\. Click **Save PWHT Details**.

7\. In the **Report Photos** window, click [![image-1651233433723.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651233433723.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651233433723.png) (**ADD** button) and add the report photos.

#### **11.7.3 View a PWHT Inspection Report**

If you want to view the PWHT inspection report, click [![image-1651236568831.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651236568831.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651236568831.png) (Print icon) provided in the **Report** column.

#### **11.7.4 Attach a File into a PWHT inspection Report**

If you want to attach a file with any PWHT inspection report in the **PWHT Report** page, you can use [![image-1651235261366.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651235261366.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651235261366.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **11.8 TOFD Report**

If you have chosen the NDT request type as TOFD while adding NDT request in the [**<u>NDT Request – RFI</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/production-rfi#bkmrk-8.3-ndt-request-%E2%80%93-rf) tab, the TOFD inspection request will be added here.

The **TOFD Report** tab in the **NDT** menu used to add the TOFD inspection result for the added request.

1\. Click **TOFD Report** in the **NDT**

The **TOFD Report** page opens.

[![image-1651240385928.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240385928.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240385928.png)

**Figure 11.8: TOFD Report page**

#### **11.8.1 Add a TOFD Report**

If you want to add a TOFD report, do the following steps,

1\. Click [![image-1651240354668.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240354668.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240354668.png)(**ADD** button) in the **TOFD Report**

The page shows a new window to add the details of TOFD report.

[![image-1651240449061.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240449061.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240449061.png)

**[![image-1651240392759.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240392759.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240392759.png)Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.

**[![image-1651240410621.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240410621.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240410621.png)Tip**: A report number for a new TOFD report will be updated automatically in the **Report Number** box. If you want change the report number, you can change.

2\. In the **NDT By** box, select who has requested the NDT whether by third party or internal from a drop-down list.

3\. In the **Joints** box, select a joint from a drop-down list.

4\. In the **Prepared By** box, enter the name of a person who has prepared the TOFD report.  
   
5\. In the **Prepared Date** box, select the prepared date of the TOFD report.

6\. In the **Reviewed By** box, enter the name of a person who has reviewed the TOFD report.

7\. In the **Reviewed Date** box, select the reviewed date of the TOFD report.

8\. In the **Accepted/Approved By** boxes, enter the name of a person who has accepted/approved the TOFD report.

9\. In the **Accepted/Approved Date** box, select the accepted/approved date of the TOFD report.

10\. Click **Save**.

The TOFD report is successfully added. Once you have added the TOFD report, you must add TOFD inspection results.

**[![image-1651240392759.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240392759.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240392759.png)Note**: If you want to lock any TOFD report, click the respective checkbox provided in the **Lock Report?** column.

#### **11.8.2 Add TOFD Inspection Result**

If you want to add the TOFD inspection result details,

1\. Click[![image-1651232503873.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651232503873.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651232503873.png)(Edit icon) in the **Edit Report** column for the respective request.

The **Joint Results**, **TOFD** **Results**, and **Report Photos** windows open.

[![image-1651240663389.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240663389.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240663389.png)

The **Joint Results** window shows a list of added joints for the TOFD request.

2\. If you want to edit the joint length, click [![image-1651232535722.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651232535722.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651232535722.png) (Edit icon) of the respective joint and change the joint length.

3\. To add the TOFD inspection result, click [![image-1651232555419.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651232555419.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651232555419.png)(Add icon) of the respective joint.

The **Segment Details** window opens.

[![image-1651240721773.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240721773.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240721773.png)

4\. Click [![image-1651240354668.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240354668.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240354668.png) (**ADD** button) in the **Segment Details** window.

[![image-1651240745628.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240745628.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240745628.png)

5\. In the **Segment** box, enter the segment number.

6\. In the **Sensitivity** box, enter the sensitivity value.

7\. In the **Result** box, select the result of TOFD inspection.

<table border="1" id="bkmrk-accepted%C2%A0%E2%80%93-if-you-se-6" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">**Accepted** – If you select **Accepted**, the respective joint will be moved for further process.

**Rejected** – If you select **Rejected**, the respective joint will be rejected in the [**<u>NDT Request – RFI</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/production-rfi#bkmrk-8.3-ndt-request-%E2%80%93-rf) page and moved to [**<u>Weld visual</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/production-rfi#bkmrk-8.2-weld-visual---re) page with the sub name of suffix 'R1', for example if the joint J1 means it will be added as J1 R1.

</td></tr></tbody></table>

8\. In the **Defect** box, select the defect detail.

9\. In the **Defect Length** box, enter the defect length.

10\. In the **Remarks** box, enter your remarks if any.

11\. Click **Save**.

12\. In the **TOFD Results** window, enter the TOFD result details.

13\. Click **Save TOFD Details**.

14\. In the **Report Photos** window, click [![image-1651240354668.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240354668.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240354668.png) (**ADD** button) and add the report photos.

#### **11.8.3 View a TOFD Inspection Report**

If you want to view the TOFD inspection report, click [![image-1651240896862.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240896862.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240896862.png) (Print icon) provided in the **Report** column.

#### **11.8.4 Attach a File into a TOFD inspection Report**

If you want to attach a file with any TOFD inspection report in the **TOFD Report** page, you can use [![image-1651240807174.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240807174.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240807174.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **11.9 Ferrite Report**

If you have chosen the NDT request type as ferrite while adding NDT request in the [**<u>NDT Request – RFI</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/production-rfi#bkmrk-8.3-ndt-request-%E2%80%93-rf) tab, the ferrite inspection request will be added here.

The **Ferrite Report** tab in the **NDT** menu used to add the ferrite inspection result for the added request.

1\. Click **Ferrite Report** in the **NDT**

The **Ferrite Report** page opens.

[![image-1651292790049.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651292790049.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651292790049.png)

**Figure 11.9: Ferrite Report page**

#### **11.9.1 Add a Ferrite Report**

If you want to add a ferrite report, do the following steps,

1\. Click [![image-1651251169548.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651251169548.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651251169548.png)(**ADD** button) in the **Ferrite Report** page.

The page shows a new window to add the details of ferrite report.

[![image-1651292860438.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651292860438.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651292860438.png)

**[![image-1651290965332.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651290965332.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651290965332.png)Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.

**[![image-1651240410621.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240410621.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240410621.png)Tip**: A report number for a new ferrite report will be updated automatically in the **Report Number** box. If you want change the report number, you can change.

2\. In the **NDT By** box, select who has requested the NDT whether by third party or internal from a drop-down list.

3\. In the **Joints** box, select a joint from a drop-down list.  
   
4\. In the **Prepared By** box, enter the name of a person who has prepared the ferrite report.  
   
5\. In the **Prepared Date** box, select the prepared date of the ferrite report.

6\. In the **Reviewed By** box, enter the name of a person who has reviewed the ferrite report.

7\. In the **Reviewed Date** box, select the reviewed date of the ferrite report.  
   
8\. In the **Accepted/Approved** By boxes, enter the name of a person who has accepted/approved the ferrite report.

9\. In the **Accepted/Approved Date** box, select the accepted/approved date of the ferrite report.  
   
10\. Click **Save**.

The ferrite report is successfully added. Once you have added the ferrite report, you must add ferrite inspection results.

**[![image-1651290965332.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651290965332.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651290965332.png)Note**: If you want to lock any ferrite report, click the respective checkbox provided in the **Lock Report?** column.

#### **11.9.2 Add Ferrite Inspection Result**

If you want to add the ferrite inspection result details,

1\. Click [![image-1651288950684.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651288950684.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651288950684.png)(Edit icon) in the **Edit Report** column for the respective request.

The **Ferrite Inspection Details**, **Joint Results**, **Ferrite Results**, and **Report Photos** windows open.

[![image-1651293528374.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651293528374.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651293528374.png)

The **Joint Results** window shows a list of added joints for the ferrite request.

2\. In the **Ferrite Inspection Details** window, click [![image-1651251169548.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651251169548.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651251169548.png) (**ADD** button) and add the ferrite inspection details.

3\. In the **Joint Results** window, click [![image-1651291099821.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651291099821.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651291099821.png) (Edit icon) of the respective joint.

[![image-1651293585007.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651293585007.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651293585007.png)

4\. In the **Result** box, select the result of ferrite inspection.

<table border="1" id="bkmrk-accepted%C2%A0%E2%80%93-if-you-se-7" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">**Accepted** – If you select **Accepted**, the respective joint will be moved for further process.

**Rejected** – If you select **Rejected**, the respective joint will be rejected in the [**<u>NDT Request – RFI</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/production-rfi#bkmrk-8.3-ndt-request-%E2%80%93-rf) page and moved to [**<u>Weld visual</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/production-rfi#bkmrk-8.2-weld-visual---re) page with the sub name of suffix 'R1', for example if the joint J1 means it will be added as J1 R1.

</td></tr></tbody></table>

5\. Click **Save**.

6\. In the **Ferrite Results** window, enter the ferrite result details.

7\. Click **Save Ferrite Details**.

8\. In the **Report Photos** window, click [![image-1651251169548.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651251169548.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651251169548.png) (**ADD** button) and add the report photos.

#### **11.9.3 View a Ferrite Inspection Report**

If you want to view the ferrite inspection report, click [![image-1651295130244.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651295130244.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651295130244.png) (Print icon) provided in the **Report** column.

#### **11.9.4 Attach a File into a Ferrite inspection Report**

If you want to attach a file with any ferrite inspection report in the **Ferrite Report** page, you can use [![image-1651287181565.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651287181565.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651287181565.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **11.10 Hardness Report**

If you have chosen the NDT request type as Hardness while adding NDT request in the [**<u>NDT Request – RFI</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/production-rfi#bkmrk-8.3-ndt-request-%E2%80%93-rf) tab, the hardness inspection request will be added here.

The **Hardness Report** tab in the **NDT** menu used to add the hardness inspection result for the added request.

1\. Click **Hardness Report** in the **NDT**

The **Hardness Report** page opens.

[![image-1651297266436.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651297266436.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651297266436.png)

**Figure 11.10: Hardness Report page**

#### **11.10.1 Add a hardness Report**

If you want to add a hardness report, do the following steps,

1\. Click [![image-1651296450154.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651296450154.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651296450154.png)(**ADD** button) in the **Hardness Report**

The page shows a new window to add the details of hardness report.

[![image-1651297331318.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651297331318.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651297331318.png)

**[![image-1651296172594.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651296172594.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651296172594.png)Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.

**[![image-1651240410621.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240410621.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240410621.png)Tip**: A report number for a new hardness report will be updated automatically in the **Report Number** box. If you want change the report number, you can change.

2\. In the **NDT By** box, select who has requested the NDT whether by third party or internal from a drop-down list.  
   
3\. In the **Joints** box, select a joint from a drop-down list.

4\. In the **Prepared By** box, enter the name of a person who has prepared the hardness report.  
   
5\. In the **Prepared Date** box, select the prepared date of the hardness report.  
   
6\. In the **Reviewed By** box, enter the name of a person who has reviewed the hardness report.

7\. In the **Reviewed Date** box, select the reviewed date of the hardness report.

8\. In the **Accepted/Approved By** boxes, enter the name of a person who has accepted/approved the hardness report.

9\. In the **Accepted/Approved Date** box, select the accepted/approved date of the hardness report.

10\. Click **Save**.

The hardness report is successfully added. Once you have added the hardness report, you must add hardness inspection results.

**[![image-1651296172594.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651296172594.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651296172594.png)Note**: If you want to lock any hardness report, click the respective checkbox provided in the **Lock Report?** column.

#### **11.10.2 Add Hardness Inspection Result**

If you want to add the hardness inspection result details,

1\. Click [![image-1651297402429.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651297402429.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651297402429.png)(Edit icon) in the **Edit Report** column for the respective request.

The **Joint Results, Hardness Results,** and **Report Photos** windows open.

[![image-1651297808269.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651297808269.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651297808269.png)

The **Joint Results** window shows a list of added joints for the hardness request.

2\. Click [![image-1651296571420.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651296571420.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651296571420.png)(Edit icon) in the **Joint Results** window and add the joint details.

3\. In the **Hardness Results** window, enter the hardness result details.

4\. In the **Result** box, enter the result for hardness inspection.

<table border="1" id="bkmrk-accepted%C2%A0%E2%80%93-if-you-se-8" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">**Accepted** – If you select **Accepted**, the respective joint will be moved for further process.

**Rejected** – If you select **Rejected**, the respective joint will be rejected in the [**<u>NDT Request – RFI</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/production-rfi#bkmrk-8.3-ndt-request-%E2%80%93-rf) page and moved to [**<u>Weld visual</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/production-rfi#bkmrk-8.2-weld-visual---re) page with the sub name of suffix 'R1', for example if the joint J1 means it will be added as J1 R1.

</td></tr></tbody></table>

5\. Click **Save Hardness Details**.

6\. In the **Report Photos** window, click [![image-1651296450154.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651296450154.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651296450154.png) (**ADD** button) and add the report photos.

#### **11.10.3 View a Hardness Inspection Report**

If you want to view the hardness inspection report, click [![image-1651297756957.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651297756957.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651297756957.png) (Print icon) provided in the **Report** column.

#### **11.10.4 Attach a File into a Hardness inspection Report**

If you want to attach a file with any hardness inspection report in the **Hardness Report** page, you can use [![image-1651289717873.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651289717873.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651289717873.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **11.11 RT Summary Report**

If you want to view the RT summary report, navigate to the **RT Summary Report** tab in the **NDT** menu.

1\. Click **RT Summary Report** in the **NDT**

The **NDT – RT Summary Report** page opens.

[![image-1651299063912.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651299063912.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651299063912.png)

**Figure 11.11: RT Summary Report page**

#### **11.11.1 Print RT Summary Report**

If you want to print the RT summary report, use [![image-1651299105601.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651299105601.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651299105601.png) and [![image-1651299122483.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651299122483.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651299122483.png) (print icons) provided in the **RT Summary Report** page.

1\. If you want to print the current page of the summary report, click [![image-1651299122483.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651299122483.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651299122483.png)(print icon including the page number).

2\. If you want to print all the pages of the summary report, click[![image-1651299105601.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651299105601.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651299105601.png) (print icon).

#### **11.11.2 Export RT Summary Report**

You can export the RT summary report in various formats by using the option[![image-1651299184747.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651299184747.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651299184747.png) provided in the upper right corner of the **RT Summary Report** page.

#### **11.12 PT Summary Report**

If you want to view the PT summary report, navigate to the **PT Summary Report** tab in the **NDT** menu.

1\. Click **PT Summary Report** in the **NDT**

The **NDT – PT Summary Report** page opens.

[![image-1651299361056.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651299361056.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651299361056.png)

**Figure 11.12: PT Summary Report page**

#### **11.12.1 Print PT Summary Report**

If you want to print the PT summary report, use [![image-1651299105601.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651299105601.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651299105601.png) and [![image-1651299122483.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651299122483.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651299122483.png) (print icons) provided in the **PT Summary Report** page.

1\. If you want to print the current page of the summary report, click[![image-1651299122483.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651299122483.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651299122483.png) (print icon including the page number).

2\. If you want to print all the pages of the summary report, click[![image-1651299105601.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651299105601.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651299105601.png) (print icon).

#### **11.12.2 Export PT Summary Report**

You can export the PT summary report in various formats by using the option [![image-1651299184747.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651299184747.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651299184747.png) provided in the upper right corner of the **PT Summary Report** page.

#### **11.13 NDT Summary Report**

If you want to view the NDT summary report, navigate to the **NDT Summary Report** tab in the **NDT** menu.

1\. Click **NDT Summary Report** in the **NDT**

The **NDT Summary Report** page opens.

[![image-1651299523279.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651299523279.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651299523279.png)

**Figure 11.13: NDT Summary Report page**

#### **11.13.1 Print NDT Summary Report**

If you want to print the NDT summary report, use [![image-1651299105601.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651299105601.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651299105601.png) and [![image-1651299122483.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651299122483.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651299122483.png) (print icons) provided in the **NDT Summary Report** page.

1\. If you want to print the current page of the summary report, click[![image-1651299122483.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651299122483.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651299122483.png) (print icon including the page number).

2\. If you want to print all the pages of the summary report, click [![image-1651299105601.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651299105601.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651299105601.png)(print icon).

#### **11.13.2 Export NDT Summary Report**

You can export the NDT summary report in various formats by using the option [![image-1651299184747.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651299184747.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651299184747.png) provided in the upper right corner of the **NDT Summary Report** page.

# Heat Exchanger

### 12.0 **Heat Exchanger**

A Heat Exchanger is a device used with the Pressure Vessel to transfer heat between two or more fluids. Heat exchangers are used in both cooling and heating processes. The fluids may be separated by a solid wall to prevent mixing or they may be in direct contact.

The **Heat Exchanger** menu in the app used to add the various inspection requests to be done in the Heat exchanger, and also add the inspection result after completing the inspection based on the request.

<table border="1" id="bkmrk-users-assigned-with-" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Users assigned with **Production** role only can view and access the following **RFI** functionalities in the **Heat Exchanger** menu, and can add the following inspection requests.

</td></tr></tbody></table>

#### **12.1 Final Dimensional Report – RFI** 

The **Final Dimensional Report – RFI** tab in the **Heat Exchanger** menu used to add the final dimensional inspection request. To add the final dimensional inspection request,

1\. Click **Final Dimensional Report – RFI** in the **Heat Exchanger**

The **Final Dimensional Report** page opens.

[![image-1651303329224.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651303329224.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651303329224.png)

**Figure 12.1: Final Dimensional Report page**

#### **12.1.1 Add a Final Dimensional Request**

If you want to add a final dimensional request, do the following steps,

1\. Click[![image-1651298840283.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651298840283.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651298840283.png) (**ADD** button) in the **Final Dimensional Report**

The page shows a new window to add the details of the final dimensional request.

[![image-1651303393850.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651303393850.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651303393850.png)

[![image-1651303432242.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651303432242.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651303432242.png)**Tip**: A report number and an RFI number for a new final dimensional report will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.

2\. In the **Drawing** box, select a drawing from a drop-down list.

3\. In the **Prepared By** box, enter the name of a person who has prepared the final dimensional request.

4\. In the **Reviewed By** box, enter the name of a person who has reviewed the final dimensional request.

5\. In the **Approved By** box, enter the name of a person who has approved the final dimensional request.

6\. In the **Prepared Date** box, choose the prepared date of the final dimensional request.

7\. In the **Reviewed Date** box, choose the reviewed date of the final dimensional request.

8\. In the **Approved Date** box, choose the approved date of the final dimensional request.

9\. In the **Title** box, enter the title name.

10\. Click **Save**.

The final dimensional request is added and listed in the **Final Dimensional Report** page.

#### **12.1.2 Submit a Final Dimensional Request**

Once you have added the final dimensional inspection request, the **Submission** column in the **Final** **Dimensional Report** page is appeared with[![image-1651303522169.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651303522169.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651303522169.png) (Submit and Reject icons). See Fig 12.1.

1\. If you want to submit the final dimensional inspection request, click [![image-1651299100573.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651299100573.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651299100573.png)(Submit icon) in the **Submission** Otherwise click [![image-1651299113955.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651299113955.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651299113955.png) (Reject icon) to reject the request.

The submitted request will be moved to for the final dimensional inspection. The request submitted status will be updated in the **Submitted** column. Once the final dimensional inspection results are updated, the completed status will be updated in the **Completed** column.

#### **12.1.3 Edit a Final Dimensional Request**

<table border="1" id="bkmrk-note-that-if-the-fin" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Note that if the final dimensional request has been submitted, you cannot edit the respective request.

</td></tr></tbody></table>

If you want to edit any existing final dimensional request in the **Final Dimensional Report** page, do the following steps,

1\. Click [![image-1651296571420.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651296571420.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651296571420.png)(Edit icon) in the **Edit** column for the respective final dimensional request. See Fig 12.1.

The page shows the details of added final dimensional request.

[![image-1651303630044.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651303630044.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651303630044.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **12.1.4 Add RFI Data for a Final Dimensional Request**

If you want to add the details of RFI data for the added final dimensional request, do the following steps,

1\. Click (Add icon) in the **RFI Data** column of the **Final Dimensional Report**  See Fig 12.1.

The **RFI Inspection Request List** window opens.

[![image-1651303721513.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651303721513.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651303721513.png)

2\. In the **Inspection To** box, enter the detail to where the inspection should end.

3\. In the **Inspection Details** option, select what type of inspection to be performed based on your requirement.

4\. In the **NDT Inspection** box, enter the NDT inspection detail.

5\. In the **Description** box, enter the description for the inspection request.

6\. In the **RFI Date** box, choose the RFI date.

7\. In the **Remarks** box, enter your remarks if any.

8\. Click **Save**.

#### **12.1.5 View RFI Report for a Final Dimensional Request**

If you want to view the RFI report for the final dimensional request, click [![image-1651301402867.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651301402867.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651301402867.png) (Print icon) provided in the **RFI** **Report** column.

#### **12.1.6 Attach a File into a Final Dimensional Request**

If you want to attach a file with any final dimensional request listed in the **Final Dimensional Report** page, you can use (Attach icon) provided in the **Attachment** column for the respective final dimensional request. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **12.2 Nozzle Marking Report – RFI**

This **Nozzle Marking Report – RFI** tab in the **Heat Exchanger** menu used to add the nozzle marking inspection request.

1\. Click **Nozzle Marking Report – RFI** in the **Heat Exchanger**

The **Nozzle Marking Inspection** page opens.

[![image-1651303921808.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651303921808.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651303921808.png)

**Figure 12.2: Nozzle Marking Inspection page**

#### **12.2.1 Add a Nozzle Marking Inspection Request**

If you want to add a nozzle marking inspection request, do the following steps,

1\. Click[![image-1651298457300.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651298457300.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651298457300.png) (**ADD** button) in the **Nozzle Marking Inspection page**

The page shows a new window to add the details of the nozzle marking inspection request.

[![image-1651304008081.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304008081.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304008081.png)

**[![image-1651303432242.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651303432242.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651303432242.png)Tip**: A report number and an RFI number for a new nozzle marking inspection request will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.

2\. In the **Drawing** box, select a drawing from a drop-down list.

3\. In the **Prepared By** box, enter the name of a person who has prepared the nozzle marking inspection

4\. In the **Reviewed By** box, enter the name of a person who has reviewed the nozzle marking inspection

5\. In the **Approved By** box, enter the name of a person who has approved the nozzle marking inspection

6\. In the **Prepared Date** box, choose the prepared date of the nozzle marking inspection request.

7\. In the **Reviewed Date** box, choose the reviewed date of the nozzle marking inspection

8\. In the **Approved Date** box, choose the approved date of the nozzle marking inspection

9\. Click **Save**.

The nozzle marking inspection request is added and listed in the **Nozzle Marking Inspection** page.

#### **12.2.2 Submit a Nozzle Marking Inspection Request**

Once you have added the nozzle marking inspection request, the **Submission** column in the **Nozzle Marking Inspection** page is appeared with[![image-1651304147921.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304147921.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304147921.png) (Submit and Reject icons). See Fig 12.2.

1\. If you want to submit the nozzle marking inspection request, click[![image-1651304169614.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304169614.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304169614.png)(Submit icon) in the **Submission** Otherwise click[![image-1651304178122.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304178122.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304178122.png)

 (Reject icon) to reject the request.

The submitted request will be moved to for the nozzle marking inspection. The request submitted status will be updated in the **Submitted** column. Once the nozzle marking inspection results are updated, the completed status will be updated in the **Completed** column.

#### **12.2.3 Edit a Nozzle Marking Inspection Request**

<table border="1" id="bkmrk-note-that-if-the-noz" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Note that if the nozzle marking inspection request has been submitted, you cannot edit the respective request.

</td></tr></tbody></table>

If you want to edit any existing nozzle marking inspection request in the **Nozzle Marking Inspection** page, do the following steps,

1\. Click [![image-1651296571420.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651296571420.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651296571420.png)(Edit icon) in the **Edit** column for the respective nozzle marking inspection See Fig 12.2.

The page shows the details of added nozzle marking inspection request.

[![image-1651304475305.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304475305.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304475305.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **12.2.4 Add RFI Data for a Nozzle Marking Inspection Request**

If you want to add the details of RFI data for the added nozzle marking inspection request, do the following steps,

1\. Click [![image-1651304534386.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304534386.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304534386.png)(Add icon) in the **RFI Data** column of the **Nozzle Marking Inspection** page. See Fig 12.2.

The **RFI Inspection Request List** window opens.

[![image-1651304551340.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304551340.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304551340.png)

2\. In the **Inspection To** box, enter the detail to where the inspection should end.

3\. In the **Inspection Details** option, select what type of inspection to be performed based on your requirement.

4\. In the **NDT Inspection** box, enter the NDT inspection detail.

5\. In the **Description** box, enter the description for the inspection request.

6\. In the **RFI Date** box, choose the RFI date.

7\. In the **Remarks** box, enter your remarks if any.

8\. Click **Save**.

#### **12.2.5 View RFI Report for a Nozzle Marking Inspection Request**

If you want to view the RFI report for the nozzle marking inspection request, click[![image-1651304335454.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304335454.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304335454.png) (Print icon) provided in the **RFI** **Report column.

#### **12.2.6 Attach a File into a Nozzle Marking Inspection Request**

If you want to attach a file with any nozzle marking inspection request listed in the **Nozzle Marking Inspection** page, you can use [![image-1651300515525.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651300515525.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651300515525.png) (Attach icon) provided in the **Attachment** column for the respective nozzle marking inspection request. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **12.3 Shell Side Hydrostatic – RFI**

The **Shell Side** **Hydrostatic– RFI** tab in the **Heat Exchange** menu used to add the shell side hydrostatic pressure test request. To add the shell side hydrostatic pressure test request,

1\. Click **Shell Side Hydrostatic Test – RFI** in the **Heat Exchange**

The **Shell Hydrostatic Pressure Test Report** page opens.

[![image-1651304741803.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304741803.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304741803.png)

**Figure 12.3: Shell Hydrostatic Pressure Test Report page**

#### **12.3.1 Add a Shell Side Hydrostatic Pressure Test Request**

If you want to add a shell side hydrostatic pressure test request, do the following steps,

1\. Click [![image-1651298840283.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651298840283.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651298840283.png)(**ADD** button) in the **Shell Hydrostatic Pressure Test Report**

The page shows a new window to add the details of the shell side hydrostatic pressure test request.

[![image-1651304808647.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304808647.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304808647.png)

**[![image-1651303432242.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651303432242.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651303432242.png)Tip**: A report number and an RFI number for a new shell side hydrostatic pressure test report will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.

2\. In the **Drawing** box, select a drawing from a drop-down list.

3\. In the **Prepared By** box, enter the name of a person who has prepared the shell side hydrostatic pressure test request.

4\. In the **Reviewed By** box, enter the name of a person who has reviewed the shell side hydrostatic pressure test request.

5\. In the **Approved By** box, enter the name of a person who has approved the shell side hydrostatic pressure test request.

6\. In the **Prepared Date** box, choose the prepared date of the shell side hydrostatic pressure test request.

7\. In the **Reviewed Date** box, choose the reviewed date of the shell side hydrostatic pressure test request.

8\. In the **Approved Date** box, choose the approved date of the shell side hydrostatic pressure test request.

9\. Click **Save**.

The shell side hydrostatic pressure test request is added and listed in the **Shell** **Hydrostatic Pressure Test Report** page.

#### **12.3.2 Submit a Shell Side Hydrostatic Pressure Test Request**

Once you have added the shell side hydrostatic pressure test request, the **Submission** column in the **Shell** **Hydrostatic Pressure Test Report** page is appeared with[![image-1651304946508.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304946508.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304946508.png) (Submit and Reject icons). See Fig 12.3.

1\. If you want to submit the shell side hydrostatic pressure test inspection request, click [![image-1651304169614.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304169614.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304169614.png)(Submit icon) in the **Submission** Otherwise click [![image-1651304178122.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304178122.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304178122.png) (Reject icon) to reject the request.

The submitted request will be moved to for the shell side hydrostatic pressure test. The request submitted status will be updated in the **Submitted** column. Once the shell side hydrostatic pressure test results are updated, the completed status will be updated in the **Completed** column.

#### **12.3.3 Edit a Shell Side Hydrostatic Pressure Test Request**

<table border="1" id="bkmrk-note-that-if-the-she" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Note that if the shell side hydrostatic pressure test request has been submitted, you cannot edit the respective request.

</td></tr></tbody></table>

If you want to edit any existing shell side hydrostatic pressure test request in the **Shell** **Hydrostatic Pressure Test Report** page, do the following steps,

1\. Click [![image-1651296571420.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651296571420.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651296571420.png)(Edit icon) in the **Edit** column for the respective shell side hydrostatic pressure test request. See Fig 12.3.

The page shows the details of added shell side hydrostatic pressure test request.

[![image-1651305070598.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651305070598.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651305070598.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **12.3.4 Add RFI Data for a Shell Side Hydrostatic Pressure Test Request**

If you want to add the details of RFI data for the added shell side hydrostatic pressure test request, do the following steps,

1\. Click [![image-1651304534386.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304534386.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304534386.png)(Add icon) in the **RFI Data** column of the **Hydrostatic Pressure Test Report**  See Fig 12.3.

The **RFI Inspection Request List** window opens.

[![image-1651305136228.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651305136228.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651305136228.png)

2\. In the **Inspection To** box, enter the detail to where the inspection should end.

3\. In the **Inspection Details** option, select what type of inspection to be performed based on your requirement.

4\. In the **NDT Inspection** box, enter the NDT inspection detail.

5\. In the **Description** box, enter the description for the inspection request.

6\. In the **RFI Date** box, choose the RFI date.

7\. In the **Remarks** box, enter your remarks if any.

8\. Click **Save**.

#### **12.3.5 View RFI Report for a Shell Side Hydrostatic Pressure Test Request**

If you want to view the RFI report for the shell side hydrostatic pressure test request, click [![image-1651304426762.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304426762.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304426762.png) (Print icon) provided in the **RFI** **Report** column.

#### **12.3.6 Attach a File into a Shell Side Hydrostatic Pressure Test Request**

If you want to attach a file with any shell side hydrostatic pressure test request listed in the **Shell** **Hydrostatic Pressure Test Report** page, you can use[![image-1651305250414.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651305250414.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651305250414.png) (Attach icon) provided in the **Attachment** column for the respective shell side hydrostatic pressure test request. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **12.4 Leak Test – RFI**

In Heat Exchanger, Leak Test is performed to identify any leakage.

The **Leak Test – RFI** tab in the **Heat Exchanger** menu used to add the leak test request. To add the leak test request,

1\. Click **Leak Test – RFI** in the **Heat Exchanger**

The **Leak Test Report** page opens.

[![image-1651306965504.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651306965504.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651306965504.png)

**Figure 12.4: Leak Test Report page**

#### **12.4.1 Add a Leak Test Request**

If you want to add a leak test request, do the following steps,

1\. Click [![image-1651298840283.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651298840283.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651298840283.png) (**ADD** button) in the **Leak Test Report** page.

The page shows a new window to add the details of the leak test request.

[![image-1651307033935.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651307033935.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651307033935.png)

[![image-1651307056175.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651307056175.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651307056175.png)**Tip**: A report number and an RFI number for a new leak test report will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.

2\. In the **Drawing** box, select a drawing from a drop-down list.

3\. In the **Prepared By** box, enter the name of a person who has prepared the leak test request.

4\. In the **Reviewed By** box, enter the name of a person who has reviewed the leak test request.

5\. In the **Approved By** box, enter the name of a person who has approved the leak test request.

6\. In the **Prepared Date** box, choose the prepared date of the leak test request.

7\. In the **Reviewed Date** box, choose the reviewed date of the leak test request.

8\. In the **Approved Date** box, choose the approved date of the leak test request.

9\. Click **Save**.

The leak test request is added and listed in the **Leak Test Report** page.

#### **12.4.2 Submit a Leak Test Request**

Once you have added the leak test request, the **Submission** column in the **Leak Test Report** page is appeared with[![image-1651307553208.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651307553208.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651307553208.png) (Submit and Reject icons). See Fig 12.4.

1\. If you want to submit the leak test inspection request, click [![image-1651304169614.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304169614.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304169614.png)(Submit icon) in the **Submission** Otherwise click [![image-1651304178122.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304178122.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304178122.png) (Reject icon) to reject the request.

The submitted request will be moved to for the leak test. The request submitted status will be updated in the **Submitted** column. Once the leak test results are updated, the completed status will be updated in the **Completed** column.

#### **12.4.3 Edit a Leak Test Request**

<table border="1" id="bkmrk-note-that-if-the-lea" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Note that if the leak test request has been submitted, you cannot edit the respective request.

</td></tr></tbody></table>

If you want to edit any existing leak test request in the **Leak Test Report** page, do the following steps,

1\. Click [![image-1651298970266.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651298970266.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651298970266.png)(Edit icon) in the **Edit** column for the respective leak test request. See Fig 12.4.

The page shows the details of added leak test request.

[![image-1651307703333.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651307703333.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651307703333.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **12.4.4 Add RFI Data for a Leak Test Request**

If you want to add the details of RFI data for the added leak test request, do the following steps,

1\. Click[![image-1651307770208.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651307770208.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651307770208.png)(Add icon) in the **RFI Data** column of the **Leak Test Report**  See Fig 12.4.

The **RFI Inspection Request List** window opens.

[![image-1651307782366.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651307782366.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651307782366.png)

2\. In the **Inspection To** box, enter the detail to where the inspection should end.

3\. In the **Inspection Details** option, select what type of inspection to be performed based on your requirement.

4\. In the **NDT Inspection** box, enter the NDT inspection detail.

5\. In the **Description** box, enter the description for the inspection request.

6\. In the **RFI Date** box, choose the RFI date.

7\. In the **Remarks** box, enter your remarks if any.

8\. Click **Save**.

#### **12.4.5 View RFI Report for Leak Test Request**

If you want to view the RFI report for the leak test request, click [![image-1651304426762.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304426762.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304426762.png) (Print icon) provided in the **RFI** **Report** column.

#### **12.4.6 Attach a File into a Leak Test Request**

If you want to attach a file with any leak test request listed in the **Leak Test Report** page, you can use [![image-1651305250414.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651305250414.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651305250414.png) (Attach icon) provided in the **Attachment** column for the respective leak test request. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **12.5 Tube Expansion – RFI**

The **Tube Expansion – RFI** tab in the **Heat Exchanger** menu used to add the tube expansion inspection request. To add the tube expansion inspection request,

1\. Click **Tube Expansion – RFI** in the **Heat Exchanger**

The **Tube Expansion Report** page opens.

[![image-1651308533960.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651308533960.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651308533960.png)

**Figure 12.5: Tube Expansion Report page**

#### **12.5.1 Add a Tube Expansion Inspection Request**

If you want to add a tube expansion inspection request, do the following steps,

1\. Click[![image-1651298457300.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651298457300.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651298457300.png) (**ADD** button) in the **Tube Expansion Report**

The page shows a new window to add the details of the tube expansion inspection request.

[![image-1651308604156.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651308604156.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651308604156.png)

[![image-1651307056175.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651307056175.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651307056175.png) **Tip**: A report number and an RFI number for a new tube expansion inspection report will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.

2\. In the **Drawing** box, select a drawing from a drop-down list.

3\. In the **Prepared By** box, enter the name of a person who has prepared the tube expansion inspection request.

4\. In the **Reviewed By** box, enter the name of a person who has reviewed the tube expansion inspection request.

5\. In the **Approved By** box, enter the name of a person who has approved the tube expansion inspection request.

6\. In the **Prepared Date** box, choose the prepared date of the tube expansion inspection request.

7\. In the **Reviewed Date** box, choose the reviewed date of the tube expansion inspection request.

8\. In the **Approved Date** box, choose the approved date of the tube expansion inspection request.

9\. In the **Title** box, enter the title of the request.

10\. Click **Save**.

The tube expansion inspection request is added and listed in the **Tube Expansion Report** page.

#### **12.5.2 Submit a Tube Expansion Inspection Request**

Once you have added the tube expansion inspection request, the **Submission** column in the **Tube Expansion Report** page is appeared with[![image-1651308732404.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651308732404.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651308732404.png) (Submit and Reject icons). See Fig 12.5.

1\. If you want to submit the tube expansion inspection request, [![image-1651304169614.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304169614.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304169614.png)click (Submit icon) in the **Submission** Otherwise click[![image-1651304178122.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304178122.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304178122.png) (Reject icon) to reject the request.

The submitted request will be moved to for the tube expansion inspection. The request submitted status will be updated in the **Submitted** column. Once the tube expansion inspection results are updated, the completed status will be updated in the **Completed** column.

#### **12.5.3 Edit a Tube Expansion Inspection Request**

<table border="1" id="bkmrk-note-that-if-the-tub" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Note that if the tube expansion inspection request has been submitted, you cannot edit the respective request.

</td></tr></tbody></table>

If you want to edit any existing tube expansion inspection request in the **Tube Expansion Report** page, do the following steps,

1\. Click[![image-1651298970266.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651298970266.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651298970266.png) (Edit icon) in the **Edit** column for the respective tube expansion inspection request. See Fig 12.5.

The page shows the details of added tube expansion inspection request.

[![image-1651308849410.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651308849410.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651308849410.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **12.5.4 Add RFI Data for a Tube Expansion Inspection Request**

If you want to add the details of RFI data for the added tube expansion inspection request, do the following steps,

1\. Click[![image-1651308916929.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651308916929.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651308916929.png)(Add icon) in the **RFI Data** column of the **Tube Expansion Report**  See Fig 12.5.

The **RFI Inspection Request List** window opens.

[![image-1651308929600.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651308929600.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651308929600.png)

2\. In the **Inspection To** box, enter the detail to where the inspection should end.

3\. In the **Inspection Details** option, select what type of inspection to be performed based on your requirement.

4\. In the **NDT Inspection** box, enter the NDT inspection detail.

5\. In the **Description** box, enter the description for the inspection request.

6\. In the **RFI Date** box, choose the RFI date.

7\. In the **Remarks** box, enter your remarks if any.

8\. Click **Save**.

#### **12.5.5 View RFI Report for Tube Expansion Inspection Request**

If you want to view the RFI report for the tube expansion inspection request, click [![image-1651304426762.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304426762.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304426762.png) (Print icon) provided in the **RFI** **Report** column.

#### **12.5.6 Attach a File into a Tube Expansion Inspection Request**

If you want to attach a file with any tube expansion inspection request listed in the **Tube Expansion Report** page, you can use[![image-1651305250414.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651305250414.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651305250414.png) (Attach icon) provided in the **Attachment** column for the respective tube expansion inspection request. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **12.6 Tube Mock Up – RFI**

The **Tube Mock Up – RFI** tab in the **Heat Exchanger** menu used to add the tube mock up inspection request. To add the tube mock up inspection request,

1\. Click **Tube Mock Up – RFI** in the **Heat Exchanger**

The **Tube Mock Up Report** page opens.

[![image-1651309729535.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651309729535.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651309729535.png)

**Figure 12.6: Tube Mock Up Report page**

#### **12.6.1 Add a Tube Mock Up Inspection Request**

If you want to add a tube mock up inspection request, do the following steps,

1\. Click [![image-1651298457300.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651298457300.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651298457300.png)(**ADD** button) in the **Tube Mock Up Report**

The page shows a new window to add the details of the tube mock up inspection request.

[![image-1651309807215.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651309807215.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651309807215.png)

[![image-1651307056175.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651307056175.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651307056175.png) **Tip**: A report number and an RFI number for a new tube mock up inspection report will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.

2\. In the **Drawing** box, select a drawing from a drop-down list.

3\. In the **Prepared By** box, enter the name of a person who has prepared the tube mock up inspection request.

4\. In the **Reviewed By** box, enter the name of a person who has reviewed the tube mock up inspection request.

5\. In the **Approved By** box, enter the name of a person who has approved the tube mock up inspection request.

6\. In the **Prepared Date** box, choose the prepared date of the tube mock up inspection request.

7\. In the **Reviewed Date** box, choose the reviewed date of the tube mock up inspection request.

8\. In the **Approved Date** box, choose the approved date of the tube mock up inspection request.

9\. In the **Title** box, enter the title of the request.

10\. Click **Save**.

The tube mock up inspection request is added and listed in the **Tube Mock UP Report** page.

#### **12.6.2 Submit a Tube Mock Up Inspection Request**

Once you have added the tube mock up inspection request, the **Submission** column in the **Tube Mock Up Report** page is appeared with[![image-1651309965263.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651309965263.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651309965263.png) (Submit and Reject icons). See Fig 12.6.

1\. If you want to submit the tube mock up inspection request, click[![image-1651304169614.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304169614.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304169614.png) (Submit icon) in the **Submission** Otherwise click [![image-1651299113955.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651299113955.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651299113955.png)(Reject icon) to reject the request.

The submitted request will be moved to for the tube mock up inspection. The request submitted status will be updated in the **Submitted** column. Once the tube mock up inspection results are updated, the completed status will be updated in the **Completed** column.

#### **12.6.3 Edit a Tube Mock Up Inspection Request**

<table border="1" id="bkmrk-note-that-if-the-tub-0" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Note that if the tube mock up inspection request has been submitted, you cannot edit the respective request.</td></tr></tbody></table>

If you want to edit any existing tube mock up inspection request in the **Tube Mock Up Report** page, do the following steps,

1\. Click (Edit icon) in the **Edit** column for the respective tube mock up inspection request. See Fig 12.6.

The page shows the details of added tube mock up inspection request.

[![image-1651310151999.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651310151999.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651310151999.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **12.6.4 Add RFI Data for a Tube Mock Up Inspection Request**

If you want to add the details of RFI data for the added tube mock up inspection request, do the following steps,

1\. Click (Add icon) in the **RFI Data** column of the **Tube Expansion Report**  See Fig 12.6.

The **RFI Inspection Request List** window opens.

[![image-1651310232846.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651310232846.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651310232846.png)

2\. In the **Inspection To** box, enter the detail to where the inspection should end.

3\. In the **Inspection Details** option, select what type of inspection to be performed based on your requirement.

4\. In the **NDT Inspection** box, enter the NDT inspection detail.

5\. In the **Description** box, enter the description for the inspection request.

6\. In the **RFI Date** box, choose the RFI date.

7\. In the **Remarks** box, enter your remarks if any.

9\. Click **Save**.

#### **12.6.5 View RFI Report for Tube Mock Up Inspection Request**

If you want to view the RFI report for the tube mock up inspection request, click[![image-1651310367967.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651310367967.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651310367967.png) (Print icon) provided in the **RFI** **Report** column.

#### **12.6.6 Attach a File into a Tube Mock Up Inspection Request**

If you want to attach a file with any tube mock up inspection request listed in the **Tube Mock Up Report** page, you can use [![image-1651305250414.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651305250414.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651305250414.png) (Attach icon) provided in the **Attachment** column for the respective tube mock up inspection request. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **12.7 Pickling and Passivation – RFI**

The **Pickling and Passivation – RFI** tab in the **Heat Exchange** menu used to add the pickling and passivation inspection request. To add the pickling and passivation inspection request,

1\. Click **Pickling and Passivation – RFI** in the **Heat Exchange**

The **Pickling and Passivation Report** page opens.

[![image-1651310573877.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651310573877.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651310573877.png)

**Figure 12.7: Pickling and Passivation Report page**

#### **12.7.1 Add a Picking and Passivation Inspection Request**

If you want to add a pickling and passivation inspection request, do the following steps,

1\. Click [![image-1651298457300.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651298457300.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651298457300.png)(**ADD** button) in the **Pickling and Passivation Report**

The page shows a new window to add the details of the pickling and passivation inspection request.

[![image-1651310651298.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651310651298.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651310651298.png)

**[![image-1651307056175.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651307056175.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651307056175.png)Tip**: A report number and an RFI number for a new pickling and passivation inspection report will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.

2\. In the **Drawing** box, select a drawing from a drop-down list.

3\. In the **Prepared By** box, enter the name of a person who has prepared the pickling and passivation inspection request.

4\. In the **Reviewed By** box, enter the name of a person who has reviewed the pickling and passivation inspection request.

5\. In the **Approved By** box, enter the name of a person who has approved the pickling and passivation inspection request.

6\. In the **Prepared Date** box, choose the prepared date of the pickling and passivation inspection request.

7\. In the **Reviewed Date** box, choose the reviewed date of the pickling and passivation inspection request.

8\. In the **Approved Date** box, choose the approved date of the pickling and passivation inspection request.

9\. Click **Save**.

The pickling and passivation inspection request is added and listed in the **Picking and Passivation Report** page.

#### **12.7.2 Submit a Picking and Passivation Inspection Request**

Once you have added the pickling and passivation inspection request, the **Submission** column in the **Picking and Passivation Report page is appeared with [![image-1651309965263.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651309965263.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651309965263.png) (Submit and Reject icons). See Fig 12.7.

If you want to submit the pickling and passivation inspection request, click [![image-1651304169614.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304169614.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304169614.png) (Submit icon) in the **Submission** column. Otherwise click [![image-1651304178122.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304178122.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304178122.png)(Reject icon) to reject the request.

The submitted request will be moved to for the pickling and passivation inspection. The request submitted status will be updated in the **Submitted** column. Once the pickling and passivation inspection results are updated, the completed status will be updated in the **Completed** column.

#### **12.7.3 Edit a Picking and Passivation Inspection Request**

<table border="1" id="bkmrk-note-that-if-the-pic" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Note that if the pickling and passivation inspection request has been submitted, you cannot edit the respective request.

</td></tr></tbody></table>

If you want to edit any existing pickling and passivation inspection request in the **Picking and Passivation Report** page, do the following steps,

1\. Click [![image-1651298970266.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651298970266.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651298970266.png)(Edit icon) in the **Edit** column for the respective pickling and passivation inspection request. See Fig 12.7.

The page shows the details of added pickling and passivation inspection request.

[![image-1651310885328.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651310885328.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651310885328.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **12.7.4 Add RFI Data for a Picking and Passivation Inspection Request**

If you want to add the details of RFI data for the added picking and passivation inspection request, do the following steps,

1\. Click[![image-1651310965215.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651310965215.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651310965215.png)(Add icon) in the **RFI Data** column of the **Picking and Passivation Report**  See Fig 12.7.

The **RFI Inspection Request List** window opens.

[![image-1651310976034.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651310976034.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651310976034.png)

2\. In the **Inspection To** box, enter the detail to where the inspection should end.

3\. In the **Inspection Details** option, select what type of inspection to be performed based on your requirement.

4\. In the **NDT Inspection** box, enter the NDT inspection detail.

5\. In the **Description** box, enter the description for the inspection request.

6\. In the **RFI Date** box, choose the RFI date.

7\. In the **Remarks** box, enter your remarks if any.

8\. Click **Save**.

#### **12.7.5 View RFI Report for a Picking and Passivation Inspection Request**

If you want to view the RFI report for the pickling and passivation inspection request, click[![image-1651311051801.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651311051801.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651311051801.png) (Print icon) provided in the **RFI** **Report** column.

#### **12.7.6 Attach a File into a Picking and Passivation Inspection Request**

If you want to attach a file with any pickling and passivation inspection request listed in the **Picking and Passivation Report** page, you can use[![image-1651311084335.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651311084335.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651311084335.png) (Attach icon) provided in the **Attachment** column for the respective pickling and passivation inspection request. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **12.8 Baffle/Support Plate/Tube Sheet Inspection Report – RFI**

The **Baffle/Support Plate/Tube Sheet Inspection Report – RFI** tab in the **Heat Exchange** menu used to add the baffle/support plate/tube sheet inspection request. To add the baffle/support plate/tube sheet inspection request,

1\. Click **Baffle/Support Plate/Tube Sheet Inspection Report – RFI** in the **Heat Exchange**

The **Baffle/Support Plate/Tube Sheet Inspection Report** page opens.

[![image-1651313761944.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651313761944.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651313761944.png)

**Figure 12.8: Baffle/Support Plate/Tube Sheet Inspection Report page**

#### **12.8.1 Add a Baffle/Support Plate/Tube Sheet Inspection Request**

If you want to add a baffle/support plate/tube sheet inspection request, do the following steps,

1\. Click [![image-1651298840283.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651298840283.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651298840283.png)(**ADD** button) in the **Baffle/Support Plate/Tube Sheet Inspection Report

The page shows a new window to add the details of the baffle/support plate/tube sheet inspection request.

[![image-1651313831415.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651313831415.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651313831415.png)

 [![image-1651307056175.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651307056175.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651307056175.png)**Tip**: A report number and an RFI number for a new baffle/support plate/tube sheet inspection report will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.

2\. In the **Drawing** box, select a drawing from a drop-down list.

3\. In the **Prepared By** box, enter the name of a person who has prepared the baffle/support plate/tube sheet inspection request.

4\. In the **Reviewed By** box, enter the name of a person who has reviewed the baffle/support plate/tube sheet inspection request.

5\. In the **Approved By** box, enter the name of a person who has approved the baffle/support plate/tube sheet inspection request.

6\. In the **Prepared Date** box, choose the prepared date of the baffle/support plate/tube sheet inspection request.

7\. In the **Reviewed Date** box, choose the reviewed date of the baffle/support plate/tube sheet inspection request.

8\. In the **Approved Date** box, choose the approved date of the baffle/support plate/tube sheet inspection request.

9\. Click **Save**.

The baffle/support plate/tube sheet inspection request is added and listed in the **Baffle/Support Plate/Tube Sheet Inspection Report** page.

#### **12.8.5 Submit a Baffle/Support Plate/Tube Sheet Inspection Request**

Once you have added the baffle/support plate/tube sheet inspection request, the **Submission** column in the **Baffle/Support Plate/Tube Sheet Inspection Report** page is appeared with [![image-1651309965263.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651309965263.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651309965263.png) (Submit and Reject icons). See Fig 12.8.

1\. If you want to submit the baffle/support plate/tube sheet inspection request, click [![image-1651304169614.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304169614.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304169614.png)(Submit icon) in the **Submission** Otherwise click [![image-1651304178122.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304178122.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304178122.png) (Reject icon) to reject the request.

The submitted request will be moved to for the baffle/support plate/tube sheet inspection. The request submitted status will be updated in the **Submitted** column. Once the baffle/support plate/tube sheet inspection results are updated, the completed status will be updated in the **Completed** column.

#### **12.8.6 Edit a Baffle/Support Plate/Tube Sheet Inspection Request**

<table border="1" id="bkmrk-note-that-if-the-baf" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Note that if the baffle/support plate/tube sheet inspection request has been submitted, you cannot edit the respective request.

</td></tr></tbody></table>

If you want to edit any existing baffle/support plate/tube sheet inspection request in the **Baffle/Support Plate/Tube Sheet Inspection Report** page, do the following steps,

1\. Click (Edit icon) in the **Edit** column for the respective baffle/support plate/tube sheet inspection request. See Fig 12.8.

The page shows the details of added baffle/support plate/tube sheet inspection request.

[![image-1651314033055.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651314033055.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651314033055.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **12.8.4 Add RFI Data for a Baffle/Support Plate/Tube Sheet Inspection Request**

If you want to add the details of RFI data for the added baffle/support plate/tube sheet inspection request, do the following steps,

1\. Click[![image-1651314091490.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651314091490.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651314091490.png)(Add icon) in the **RFI Data** column of the **Baffle/Support Plate/Tube Sheet Inspection Report** See Fig 12.8.

The **RFI Inspection Request List** window opens.

[![image-1651314103093.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651314103093.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651314103093.png)

2\. In the **Inspection To** box, enter the detail to where the inspection should end.

3\. In the **Inspection Details** option, select what type of inspection to be performed based on your requirement.

4\. In the **NDT Inspection** box, enter the NDT inspection detail.

5\. In the **Description** box, enter the description for the inspection request.

6\. In the **RFI Date** box, choose the RFI date.

7\. In the **Remarks** box, enter your remarks if any.

8\. Click **Save**.

#### **12.8.5 View RFI Report for a Baffle/Support Plate/Tube Sheet Inspection Request**

If you want to view the RFI report for the baffle/support plate/tube sheet inspection request, click [![image-1651314178308.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651314178308.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651314178308.png)(Print icon) provided in the **RFI** **Report** column.

#### **12.8.6 Attach a File into a Baffle/Support Plate/Tube Sheet Inspection Request**

If you want to attach a file with any baffle/support plate/tube sheet inspection request listed in the **Baffle/Support Plate/Tube Sheet Inspection Report** page, you can use[![image-1651314214149.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651314214149.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651314214149.png) (Attach icon) provided in the **Attachment** column for the respective baffle/support plate/tube sheet inspection request. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **12.9 Tube Bundle Skeleton Inspection Report – RFI**

The **Tube Bundle Skeleton Inspection Report – RFI** tab in the **Heat Exchanger** menu used to add the tube bundle skeleton inspection request. To add the tube bundle skeleton inspection request,

1\. Click **Tube Bundle Skeleton Inspection Report – RFI** in the **Heat Exchanger**

The **Tube Bundle Skeleton Inspection Report** page opens.

[![image-1651314409945.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651314409945.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651314409945.png)

**Figure 12.9: Tube Bundle Skeleton Inspection Report page**

#### **12.9.1 Add a Tube Bundle Skeleton Inspection Request**

If you want to add a tube bundle skeleton inspection request, do the following steps,

1\. Click [![image-1651298840283.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651298840283.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651298840283.png)(**ADD** button) in the **Tube Bundle Skeleton Inspection Report**

The page shows a new window to add the details of the tube bundle skeleton inspection request.

[![image-1651314478900.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651314478900.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651314478900.png)

[![image-1651314490771.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651314490771.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651314490771.png)**Tip**: A report number and an RFI number for a new tube bundle skeleton inspection report will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.

2\. In the **Drawing** box, select a drawing from a drop-down list.

3\. In the **Prepared By** box, enter the name of a person who has prepared the tube bundle skeleton inspection request.

4\. In the **Reviewed By** box, enter the name of a person who has reviewed the tube bundle skeleton inspection request.

5\. In the **Approved By** box, enter the name of a person who has approved the tube bundle skeleton inspection request.

6\. In the **Prepared Date** box, choose the prepared date of the tube bundle skeleton inspection request.

7\. In the **Reviewed Date** box, choose the reviewed date of the tube bundle skeleton inspection request.

8\. In the **Approved Date** box, choose the approved date of the tube bundle skeleton inspection request.

9\. Click **Save**.

The tube bundle skeleton inspection request is added and listed in the **Tube Bundle Skeleton Inspection Report** page.

#### **12.9.2 Submit a Tube Bundle Skeleton Inspection Request**

Once you have added the tube bundle skeleton inspection request, the **Submission** column in the **Tube Bundle Skeleton Inspection Report page is appeared with[![image-1651314599040.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651314599040.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651314599040.png) (Submit and Reject icons). See Fig 12.9.

1\. If you want to submit the tube bundle skeleton inspection request, click[![image-1651314618155.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651314618155.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651314618155.png)(Submit icon) in the **Submission** Otherwise click

[![image-1651314628102.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651314628102.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651314628102.png) (Reject icon) to reject the request.

The submitted request will be moved to for the tube bundle skeleton inspection. The request submitted status will be updated in the **Submitted** column. Once the tube bundle skeleton inspection results are updated, the completed status will be updated in the **Completed** column.

#### **12.9.3 Edit a Tube Bundle Skeleton Inspection Request**

<table border="1" id="bkmrk-note-that-if-the-tub-1" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Note that if the tube bundle skeleton inspection request has been submitted, you cannot edit the respective request.

</td></tr></tbody></table>

If you want to edit any existing tube bundle skeleton inspection request in the **Tube Bundle Skeleton Inspection Report page, do the following steps,

1\. Click [![image-1651296571420.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651296571420.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651296571420.png)(Edit icon) in the **Edit** column for the respective tube bundle skeleton inspection request. See Fig 12.9.

The page shows the details of added leak test request.

[![image-1651314731353.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651314731353.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651314731353.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **12.9.4 Add RFI Data for a Tube Bundle Skeleton Inspection Request**

If you want to add the details of RFI data for the added tube bundle skeleton inspection request, do the following steps,

1\. Click[![image-1651314783860.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651314783860.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651314783860.png)(Add icon) in the **RFI Data** column of the **Tube Bundle Skeleton Inspection Report** See Fig 12.9.

The **RFI Inspection Request List** window opens.

[![image-1651314816744.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651314816744.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651314816744.png)

2\. In the **Inspection To** box, enter the detail to where the inspection should end.

3\. In the **Inspection Details** option, select what type of inspection to be performed based on your requirement.

4\. In the **NDT Inspection** box, enter the NDT inspection detail.

5\. In the **Description** box, enter the description for the inspection request.

6\. In the **RFI Date** box, choose the RFI date.

7\. In the **Remarks** box, enter your remarks if any.

8\. Click **Save**.

#### **12.9.5 View RFI Report for a Tube Bundle Skeleton Inspection Request**

If you want to view the RFI report for the tube bundle skeleton inspection request, click[![image-1651314890625.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651314890625.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651314890625.png) (Print icon) provided in the **RFI** **Report** column.

#### **12.9.6 Attach a File into a Tube Bundle Skeleton Inspection Request**

If you want to attach a file with any tube bundle skeleton inspection request listed in the **Tube Bundle Skeleton Inspection Report** page, you can use[![image-1651314928135.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651314928135.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651314928135.png) (Attach icon) provided in the **Attachment** column for the respective tube bundle skeleton inspection request. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **12.10 Tube Bundle Final Dimension Report – RFI**

The **Tube Bundle Final Dimension Report – RFI** tab in the **Heat Exchanger** menu used to add the tube bundle final dimension inspection request. To add the tube bundle final dimension inspection request,

1\. Click **Tube Bundle Final Dimension Report – RFI** in the **Heat Exchanger**

The **Tube Bundle Final Dimension Report** page opens.

[![image-1651315003530.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651315003530.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651315003530.png)

**Figure 12.10: Tube Bundle Final Dimension Report page**

#### **12.10.1 Add a Tube Bundle Final Dimension Inspection Request**

If you want to add a tube bundle final dimension inspection request, do the following steps,

1\. Click [![image-1651315054849.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651315054849.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651315054849.png)(**ADD** button) in the **Tube Bundle Final Dimension Report**

The page shows a new window to add the details of the tube bundle final dimension inspection request.

[![image-1651315068561.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651315068561.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651315068561.png)

**[![image-1651314490771.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651314490771.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651314490771.png)Tip**: A report number and an RFI number for a new tube bundle final dimension inspection report will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.

2\. In the **Drawing** box, select a drawing from a drop-down list.

3\. In the **Prepared By** box, enter the name of a person who has prepared the tube bundle final dimension inspection request.

4\. In the **Reviewed By** box, enter the name of a person who has reviewed the tube bundle final dimension inspection request.

5\. In the **Approved By** box, enter the name of a person who has approved the tube bundle final dimension inspection request.

6\. In the **Prepared Date** box, choose the prepared date of the tube bundle final dimension inspection request.

7\. In the **Reviewed Date** box, choose the reviewed date of the tube bundle final dimension inspection request.

8\. In the **Approved Date** box, choose the approved date of the tube bundle final dimension inspection request.

9\. Click **Save**.

The tube bundle final dimension inspection request is added and listed in the **Tube Bundle Final Dimension Report** page.

#### **12.10.2 Submit a Tube Bundle Final Dimension Inspection Request**

Once you have added the tube bundle final dimension inspection request, the **Submission** column in the **Tube Bundle Final Dimension Report page is appeared with[![image-1651315171257.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651315171257.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651315171257.png) (Submit and Reject icons). See Fig 12.10.

1\. If you want to submit the tube bundle final dimension inspection request, click[![image-1651315191555.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651315191555.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651315191555.png)(Submit icon) in the **Submission** Otherwise click[![image-1651315199438.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651315199438.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651315199438.png) (Reject icon) to reject the request.

The submitted request will be moved to for the tube bundle final dimension inspection. The request submitted status will be updated in the **Submitted** column. Once the tube bundle final dimension inspection results are updated, the completed status will be updated in the **Completed** column.

#### **12.10.3 Edit a Tube Bundle Final Dimension Inspection Request**

<table border="1" id="bkmrk-note-that-if-the-tub-2" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 100%;">Note that if the tube bundle final dimension inspection request has been submitted, you cannot edit the respective request.

</td></tr></tbody></table>

If you want to edit any existing tube bundle final dimension inspection request in the **Tube Bundle Final Dimension Report page, do the following steps,

1\. Click[![image-1651315259124.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651315259124.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651315259124.png)(Edit icon) in the **Edit** column for the respective tube bundle final dimension inspection request. See Fig 12.10.

The page shows the details of added leak test request.

[![image-1651315269543.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651315269543.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651315269543.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **12.10.4 Add RFI Data for a Tube Bundle Final Dimension Inspection Request**

If you want to add the details of RFI data for the added tube bundle final dimension inspection request, do the following steps,

1\. Click[![image-1651315340295.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651315340295.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651315340295.png)(Add icon) in the **RFI Data** column of the **Tube Bundle Final Dimension Report** See Fig 12.10.

The **RFI Inspection Request List** window opens.

[![image-1651315350005.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651315350005.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651315350005.png)

2\. In the **Inspection To** box, enter the detail to where the inspection should end.

3\. In the **Inspection Details** option, select what type of inspection to be performed based on your requirement.

4\. In the **NDT Inspection** box, enter the NDT inspection detail.

5\. In the **Description** box, enter the description for the inspection request.

6\. In the **RFI Date** box, choose the RFI date.

7\. In the **Remarks** box, enter your remarks if any.

8\. Click **Save**.

#### **12.10.5 View RFI Report for a Tube Bundle Final Dimension Inspection Request**

If you want to view the RFI report for the tube bundle final dimension inspection request, click[![image-1651315437033.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651315437033.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651315437033.png) (Print icon) provided in the **RFI** **Report** column.

#### **12.10.6 Attach a File into a Tube Bundle Final Dimension Inspection Request**

If you want to attach a file with any tube bundle final dimension inspection request listed in the **Tube Bundle Final Dimension Report** page, you can use[![image-1651315474806.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651315474806.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651315474806.png) (Attach icon) provided in the **Attachment** column for the respective tube bundle final dimension inspection request. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

<table border="1" id="bkmrk-users-assigned-with--0" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Users assigned with **cuteQM\_QAQC** role only can view and access the following **Report** functionalities in the **Heat Exchanger** menu.

</td></tr></tbody></table>

#### **12.11 Final Dimensional Report**

The **Final Dimensional Report** tab in the **Heat Exchanger** menu used to add the final dimensional inspection result for added request.

1\. Click **Final Dimensional Report** in the **Heat Exchanger**

The **Final Dimensional Report** page opens.

[![image-1651316077043.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651316077043.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651316077043.png)

**Figure 12.11: Final Dimensional Report page**

The page shows a list of added final dimensional requests.

#### **12.11.1 Add Final Dimension Report Details**

If you want to add the final dimension report details,

1\. Click[![image-1651316142574.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651316142574.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651316142574.png)(Edit icon) in the **Edit Report** column for the respective request.

The **Final Dimension Variables** and **Final Dimension Result** windows open.

[![image-1651316153455.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651316153455.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651316153455.png)

2\. In the **Note** box, enter your notes.

3\. Click [![image-1651315054849.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651315054849.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651315054849.png)(**ADD** button) in the **Final Dimension Result**

[![image-1651316186541.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651316186541.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651316186541.png)

4\. In the **Item** box, select an item from a drop-down list.

5\. In the **Joint No/Nozzle** box, enter the joint number or nozzle number.

6\. In the **Description** box, enter the description for the request.

7\. In the **Projection Reqd** box, enter the required projection value.

8\. In the **Projection Actual** box, enter the actual projection value.

9\. In the **Projection Result** box, select the projection result.

10\. In the **Elevation Reqd** box, enter the required elevation value.

11\. In the **Elevation Actual** box, enter the actual elevation value.

12\. In the **Elevation Result** box, select the elevation result.

13\. In the **Orientation Reqd** box, enter the required orientation value.

14\. In the **Orientation Actual** box, enter the actual orientation value.

15\. In the **Orientation Result** box, select the orientation result.

16\. In the **Item** box, select an item from a drop-down list.

17\. In the **Required** box, enter the required dimension.

18\. In the **Actual** box, enter the actual dimension.

19\. In the **Result** box, select the result of final dimension inspection.

20\. In the **Remarks** box, enter your remarks if any.

21\. Click **Save**.

#### **12.11.2 Add Final Dimension Inspection Result Details**

If you want to add the final dimension inspection result details,

1\. Click[![image-1651316358058.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651316358058.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651316358058.png)(Add icon) in the **RFI Data** column for the respective request.

The **RFI Inspection Request List** window opens.

[![image-1651316367948.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651316367948.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651316367948.png)

2\. In the **ITP Ref** box, enter the ITP reference detail.

3\. In the **Inspection Result** field, select the inspection result.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

#### **12.11.3 Submit Final Dimension Inspection Result**

Once you have added the final dimension inspection result, the **Request Status** column in the **Final Dimensional Report** page is appeared with[![image-1651316433562.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651316433562.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651316433562.png) (Submit and Reject icons). See Fig 12.11.

1\. If you want to submit the final dimension inspection result, click[![image-1651316458073.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651316458073.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651316458073.png)(Submit icon) in the **Request Status** Otherwise click

[![image-1651316466104.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651316466104.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651316466104.png) (Reject icon) to reject the request.

Once the final dimension inspection result is updated, the completed status will be updated in the **Completed** column.

#### **12.11.4 View an RFI Report for Final Dimension Inspection**

If you want to view the RFI report for any final dimension inspection, click[![image-1651316531099.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651316531099.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651316531099.png) (Print icon) provided in the **RFI** **Report** column.

#### **12.11.5 View a Final Dimension Inspection Report**

If you want to view the final dimension inspection report, click [![image-1651316531099.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651316531099.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651316531099.png)(Print icon) provided in the **Report** column.

#### **12.11.6 Attach a file into a Final Dimension Inspection Report**

If you want to attach a file with any final dimension inspection report in the **Final Dimension Report** page, you can use [![image-1651315474806.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651315474806.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651315474806.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **12.12 Nozzle Marking Report**

The **Nozzle Marking Report** tab in the **Heat Exchanger** menu used to add the nozzle marking inspection result for added request.

1\. Click **Nozzle Marking Report** in the **Heat Exchanger** menu.

The **Nozzle Marking Inspection** page opens.

[![image-1651316653453.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651316653453.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651316653453.png)

**Figure 12.12: Nozzle Marking Inspection page**

The page shows a list of added nozzle marking inspection requests.

#### **12.12.1 Add Nozzle Marking Report Details**

If you want to add the nozzle marking report details,

1\. Click[![image-1651316720878.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651316720878.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651316720878.png)(Edit icon) in the **Edit Report** column for the respective request.

The **Nozzle Marking Result** and **Report Photos** windows open.

[![image-1651316730746.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651316730746.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651316730746.png)

2\. Click [![image-1651316752474.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651316752474.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651316752474.png)(**ADD** button) in the **Nozzle Marking Result**

[![image-1651316763342.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651316763342.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651316763342.png)

3\. In the **Nozzle** box, select a nozzle from a drop-down list.

4\. In the **Description** box, enter the description for the request.

5\. Enter the projection, orientation, and elevation value.

6\. In the **Result** box, select the result.

7\. In the **Remarks** box, enter your remarks if any.

8\. Click **Save**.

9\. In the **Report Photos** window, click [![image-1651316752474.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651316752474.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651316752474.png) (**ADD** button) and attach a photo.

#### **12.12.2 Add Nozzle Marking Inspection Result Details**

If you want to add the nozzle marking inspection result details,

1\. Click [![image-1651316868315.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651316868315.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651316868315.png)(Add icon) in the **RFI Data** column for the respective request.

The **RFI Inspection Request List** window opens.

[![image-1651316878467.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651316878467.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651316878467.png)

2\. In the **ITP Ref** box, enter the ITP reference detail.

3\. In the **Inspection Result** field, select the inspection result.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

#### **12.12.3 Submit Nozzle Marking Inspection Result**

Once you have added the nozzle marking inspection result, the **Request Status** column in the **Nozzle Marking Inspection page is appeared with[![image-1651316944644.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651316944644.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651316944644.png) (Submit and Reject icons). See Fig 12.12.

1\. If you want to submit the nozzle marking inspection result, click [![image-1651316458073.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651316458073.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651316458073.png)(Submit icon) in the **Request Status** Otherwise click[![image-1651316466104.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651316466104.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651316466104.png) (Reject icon) to reject the request.

Once the nozzle marking inspection result is updated, the completed status will be updated in the **Completed** column.

#### **12.12.4 View an RFI Report for Nozzle Marking Inspection**

If you want to view the RFI report for any nozzle marking inspection, click[![image-1651317007761.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651317007761.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651317007761.png) (Print icon) provided in the **RFI** **Report** column.

#### **12.12.5 View a Nozzle Marking Inspection Report**

If you want to view the nozzle marking inspection report, click [![image-1651317007761.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651317007761.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651317007761.png) (Print icon) provided in the **Report** column.

#### **12.12.6 Attach a file into a Nozzle Marking Inspection Report**

If you want to attach a file with any nozzle marking inspection report in the **Nozzle Marking Inspection** page, you can use [![image-1651315474806.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651315474806.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651315474806.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **12.13 Shell Side Hydrostatic Report**

The **Shell Side** **Hydrostatic Report** tab in the **Heat Exchanger** menu used to add the shell side hydrostatic test result for added request.

1\. Click **Shell Side Hydrostatic Report** in the **Heat Exchanger**

The **Shell Side** **Hydrostatic Pressure Test Report** page opens.

[![image-1651317132681.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651317132681.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651317132681.png)

**Figure 12.13: Shell Side** **Hydrostatic Pressure Test Report page**

The page shows a list of added shell side hydrostatic test requests.

#### **12.13.1 Add Shell Side Hydrostatic Test Report Details**

If you want to add the shell side hydrostatic test report details,

1\. Click (Edit icon) in the **Edit Report** column for the respective request.

The **Test Parameters** window, **Metal Details** window, and the **Equipment Details** window open.

[![image-1651317202605.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651317202605.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651317202605.png)

2\. In the **Inspection Date** box, select the inspection date.

3\. In the **Test Parameters** window, enter the test parameter data.

4\. In the **Metal Details** window, enter the metal details.

5\. Click **Save**.

6\. Click [![image-1651317244942.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651317244942.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651317244942.png)(**ADD** button) in the **Equipment Details**

[![image-1651317255435.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651317255435.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651317255435.png)

7\. In the **Conducted By** box, select whether the hydrostatic test is conducted Internally or Externally.

8\. In the **Equipment Details** box, select the equipment detail from a drop-own list.

9\. In the **Position** box, select a position from a drop-down list.

10\. Click **Save**.

#### **12.13.2 Add Shell Side Hydrostatic Test Result Details**

If you want to add the shell side hydrostatic test result details,

1\. Click[![image-1651317339753.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651317339753.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651317339753.png)(Add icon) in the **RFI Data** column for the respective request.

The **RFI Inspection Request List** window opens.

[![image-1651317351389.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651317351389.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651317351389.png)

2\. In the **ITP Ref** box, enter the ITP reference detail.

3\. In the **Inspection Result** field, select the inspection result.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

#### **12.13.3 Submit Shell Side Hydrostatic Test Result**

Once you have added the shell side hydrostatic test result, the **Request Status** column in the **Shell Side** **Hydrostatic Pressure Test Report** page is appeared with[![image-1651317437739.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651317437739.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651317437739.png) (Submit and Reject icons). See Fig 12.13.

1\. If you want to submit the shell side hydrostatic test result, click[![image-1651317458311.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651317458311.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651317458311.png)(Submit icon) in the **Request Status** Otherwise click

[![image-1651317467535.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651317467535.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651317467535.png) (Reject icon) to reject the request.

Once the shell side hydrostatic test result is updated, the completed status will be updated in the **Completed** column.

#### **12.13.4 View an RFI Report for Shell Side Hydrostatic Test** 

If you want to view the RFI report for any shell side hydrostatic test, click [![image-1651317007761.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651317007761.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651317007761.png) (Print icon) provided in the **RFI** **Report** column.

#### **12.13.5 View a Shell Side Hydrostatic Test Report**

If you want to view the shell side hydrostatic test report, click[![image-1651317539424.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651317539424.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651317539424.png) (Print icon) provided in the **Report** column.

#### **12.13.6 Attach a file into a Shell Side Hydrostatic Test Report**

If you want to attach a file with any shell side hydrostatic test report in the **Shell Side** **Hydrostatic Pressure Test Report** page, you can use[![image-1651317576795.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651317576795.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651317576795.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **12.14 Leak Test Report**

The **Leak Test Report** tab in the **Heat Exchanger** menu used to add the leak test result for added request.

1\. Click **Leak Test Report** in the **Heat Exchanger** menu.

The **Leak Test Report** page opens.

[![image-1651317652344.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651317652344.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651317652344.png)

**Figure 12.14: Leak Test Report page**

The page shows a list of added leak test requests.

#### **12.14.1 Add Leak Test Report Details**

If you want to add the leak test report details,

1\. Click[![image-1651317708859.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651317708859.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651317708859.png)(Edit icon) in the **Edit Report** column for the respective request.

The **Test Parameters** window and the **Equipment Details** window opens.

[![image-1651317718739.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651317718739.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651317718739.png)

2\. In the **Inspection Date** box, select the inspection date.

3\. Check and edit the leak test report details in the **Test Parameters**

4\. Click **Save**.

5\. Click [![image-1651317244942.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651317244942.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651317244942.png)(**ADD** button) in the **Equipment Details**

[![image-1651317759576.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651317759576.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651317759576.png)

6\. In the **Conducted By** box, select whether the leak test is conducted Internally or Externally.

7\. In the **Equipment Details** box, select the equipment detail from a drop-own list.

8\. In the **Position** box, select a position from a drop-down list.

9\. Click **Save**.

#### **12.14.2 Add Leak Test Result Details**

If you want to add the leak test result details,

1\. Click[![image-1651317827405.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651317827405.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651317827405.png)(Add icon) in the **RFI Data** column for the respective request.

The **RFI Inspection Request List** window opens.

[![image-1651317836497.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651317836497.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651317836497.png)

2\. In the **ITP Ref** box, enter the ITP reference detail.

3\. In the **Inspection Result** field, select the inspection result.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

#### **12.14.3 Submit Leak Test Result**

Once you have added the leak test result, the **Request Status** column in the **Leak Test Report** page is appeared with[![image-1651317895811.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651317895811.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651317895811.png)

 (Submit and Reject icons). See Fig 12.14.

1\. If you want to submit the leak test result, click[![image-1651317914303.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651317914303.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651317914303.png)(Submit icon) in the **Request Status** Otherwise click[![image-1651317924352.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651317924352.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651317924352.png) (Reject icon) to reject the request.

Once the leak test result is updated, the completed status will be updated in the **Completed** column

#### **12.14.4 View an RFI Report for Leak Test** 

If you want to view the RFI report for any leak test, click[![image-1651317970431.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651317970431.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651317970431.png) (Print icon) provided in the **RFI** **Report** column.

#### **12.14.5 View a Leak Test Report**

If you want to view the leak test report, click [![image-1651317970431.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651317970431.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651317970431.png) (Print icon) provided in the **Report** column.

#### **12.14.6 Attach a file into a Leak Test Report**

If you want to attach a file with any leak test report in the **Leak Test Report** page, you can use[![image-1651318044612.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651318044612.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651318044612.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **12.15 Tube Expansion Report**

The **Tube Expansion Report** tab in the **Heat Exchanger** menu used to add the tube expansion inspection result for added request.

1\. Click **Tube Expansion Report** in the **Heat Exchanger**

The **Tube Expansion Report** page opens.

[![image-1651318097337.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651318097337.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651318097337.png)

**Figure 12.15: Tube Expansion Report page**

The page shows a list of added tube expansion inspection requests.

#### **12.15.1 Add Tube Expansion Inspection Report Details**

If you want to add the tube expansion inspection report details,

1\. Click [![image-1651317708859.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651317708859.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651317708859.png)(Edit icon) in the **Edit Report** column for the respective request.

The **Tube Expansion Variables** window and the **Tube Expansion Report Details** window opens.

[![image-1651318164253.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651318164253.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651318164253.png)

2\. In the **Tube Expansion Variables** window, enter the tube expansion variables detail.

3\. Click **Save**.

4\. Click [![image-1651318211587.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651318211587.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651318211587.png)(**ADD** button) in the **Tube Expansion Report Details** window and add the tube expansion report details.

#### **12.15.2 Add Tube Expansion Inspection Result Details**

If you want to add the tube expansion inspection result details,

1\. Click[![image-1651318268056.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651318268056.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651318268056.png)(Add icon) in the **RFI Data** column for the respective request.

The **RFI Inspection Request List** window opens.

[![image-1651318277177.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651318277177.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651318277177.png)

2\. In the **ITP Ref** box, enter the ITP reference detail.

3\. In the **Inspection Result** field, select the inspection result.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

#### **12.15.3 Submit Tube Expansion Inspection Result**

Once you have added the tube expansion inspection result, the **Request Status** column in the **Tube Expansion Report** page is appeared with[![image-1651318350316.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651318350316.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651318350316.png) (Submit and Reject icons). See Fig 12.15.

1\. If you want to submit the tube expansion inspection result, click[![image-1651318376039.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651318376039.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651318376039.png)(Submit icon) in the **Request Status** Otherwise click

[![image-1651318386250.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651318386250.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651318386250.png) (Reject icon) to reject the request.

Once the tube expansion inspection result is updated, the completed status will be updated in the **Completed** column.

#### **12.15.4 View an RFI Report for Tube Expansion Inspection**

If you want to view the RFI report for any tube expansion inspection, click[![image-1651318427137.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651318427137.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651318427137.png) (Print icon) provided in the **RFI** **Report** column.

#### **12.15.5 View a Tube Expansion Inspection Report**

If you want to view the tube expansion inspection report, click [![image-1651318427137.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651318427137.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651318427137.png) (Print icon) provided in the **Report** column.

#### **12.15.6 Attach a file into a Tube Expansion Inspection Report**

If you want to attach a file with any tube expansion inspection report in the **Tube Expansion Report** page, you can use[![image-1651318491440.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651318491440.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651318491440.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **12.16 Tube Mock Up Report** 

The **Tube Mock Up Report** tab in the **Heat Exchanger** menu used to add the tube mock up inspection result for added request.

1\. Click **Tube Mock Up Report** in the **Heat Exchanger**

The **Tube Mock Up Report** page opens.

[![image-1651318597189.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651318597189.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651318597189.png)

**Figure 12.16: Tube Mock Up Report page**

The page shows a list of added tube mock up inspection requests.

#### **12.16.1 Add Tube Mock Up Inspection Report Details**

If you want to add the tube mock up inspection report details,

1\. Click (Edit icon) in the **Edit Report** column for the respective request.

The **Tube Expansion Variables** window and the **Tube Expansion Report Details** window opens.

[![image-1651318671813.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651318671813.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651318671813.png)

2\. In the **Tube Expansion Variables** window, enter the tube expansion variables detail.

3\. Click **Save**.

4\. Click [![image-1651318698591.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651318698591.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651318698591.png) (**ADD** button) in the **Tube Expansion Report Details** window and add the tube expansion report details.

#### **12.16.2 Add Tube Mock Up Inspection Result Details**

If you want to add the tube mock up inspection result details,

1\. Click[![image-1651318747178.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651318747178.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651318747178.png)(Add icon) in the **RFI Data** column for the respective request.

The **RFI Inspection Request List** window opens.

[![image-1651318757259.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651318757259.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651318757259.png)

2\. In the **ITP Ref** box, enter the ITP reference detail.

3\. In the **Inspection Result** field, select the inspection result.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

#### **12.16.3 Submit Tube Mock Up Inspection Result**

Once you have added the tube mock up inspection result, the **Request Status** column in the **Tube Mock Up Report** page is appeared with[![image-1651318825200.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651318825200.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651318825200.png) (Submit and Reject icons). See Fig 12.16.

1\. If you want to submit the tube mock up inspection result, click[![image-1651318851118.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651318851118.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651318851118.png)(Submit icon) in the **Request Status** Otherwise click[![image-1651318863765.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651318863765.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651318863765.png) (Reject icon) to reject the request.

Once the tube mock up inspection result is updated, the completed status will be updated in the **Completed** column.

#### **12.16.4 View an RFI Report for Tube Mock Up Inspection**

If you want to view the RFI report for any tube mock up inspection, click[![image-1651318909317.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651318909317.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651318909317.png) (Print icon) provided in the **RFI** **Report** column.

#### **12.16.5 View a Tube Mock Up Inspection Report**

If you want to view the tube mock up inspection report, click [![image-1651318909317.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651318909317.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651318909317.png) (Print icon) provided in the **Report** column.

#### **12.16.6 Attach a file into a Tube Mock Up Inspection Report**

If you want to attach a file with any tube mock up inspection report in the **Tube Mock Up Report** page, you can use[![image-1651319011428.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651319011428.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651319011428.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **12.17 Pickling and Passivation Report**

The **Pickling and Passivation Report** tab in the **Heat Exchanger** menu used to add the pickling and passivation inspection result for added request.

1\. Click **Pickling and Passivation Report** in the **Heat Exchanger**

The **Pickling and Passivation Report** page opens.

[![image-1651319227928.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651319227928.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651319227928.png)

**Figure 12.17: Pickling and Passivation Report page**

The page shows a list of added pickling and passivation inspection requests.

#### **12.17.1 Add Pickling and Passivation Inspection Report Details**

If you want to add the pickling and passivation inspection report details,

1\. Click (Edit icon) in the **Edit Report** column for the respective request.

The **Pickling and Passivation Details** window opens.

[![image-1651319288726.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651319288726.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651319288726.png)

2\. Click [![image-1651318698591.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651318698591.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651318698591.png)(**ADD** button) in the **Pickling and Passivation Details**

[![image-1651319322474.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651319322474.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651319322474.png)

3\. In the **Pickling Time**box, enter the pickling time range.

4\. In the **Date of Test** box, select the date of test.

5\. In the **Temperature** box, enter the temperature range.

6\. In the **PH value of Water** box, enter the PH value of water.

7\. Click **Save**.

#### **12.17.2 Add Pickling and Passivation Inspection Result Details**

If you want to add the pickling and passivation inspection result details,

1\. Click[![image-1651319409257.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651319409257.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651319409257.png)(Add icon) in the **RFI Data** column for the respective request.

The **RFI Inspection Request List** window opens.

[![image-1651319419522.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651319419522.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651319419522.png)

2\. In the **ITP Ref** box, enter the ITP reference detail.

3\. In the **Inspection Result** field, select the inspection result.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

#### **12.17.3 Submit Pickling and Passivation Inspection Result**

Once you have added the pickling and passivation inspection result, the **Request Status** column in the **Pickling and Passivation Report** page is appeared with[![image-1651319510110.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651319510110.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651319510110.png) (Submit and Reject icons). See Fig 12.17.

1\. If you want to submit the pickling and passivation inspection result, click[![image-1651319531371.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651319531371.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651319531371.png)(Submit icon) in the **Request Status** Otherwise click[![image-1651319542224.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651319542224.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651319542224.png) (Reject icon) to reject the request.

Once the pickling and passivation inspection result is updated, the completed status will be updated in the **Completed** column.

#### **12.17.4 View an RFI Report for Pickling and Passivation Inspection**

If you want to view the RFI report for any pickling and passivation inspection, click[![image-1651319580668.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651319580668.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651319580668.png) (Print icon) provided in the **RFI** **Report** column.

#### **12.17.5 View a Pickling and Passivation Inspection Report**

If you want to view the pickling and passivation inspection report, click [![image-1651319580668.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651319580668.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651319580668.png) (Print icon) provided in the **Report** column.

#### **12.17.6 Attach a file into a Pickling and Passivation Inspection Report**

If you want to attach a file with any pickling and passivation inspection report in the **Pickling and Passivation Report** page, you can use[![image-1651319642245.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651319642245.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651319642245.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **12.18 Baffle/Support Plate/Tube Sheet Inspection Report**

The **Baffle/Support Plate/Tube Sheet Inspection Report** tab in the **Heat Exchanger** menu used to add the baffle/support plate/tube sheet inspection result for added request.

1\. Click **Baffle/Support Plate/Tube Sheet Inspection Report** in the **Heat Exchanger**

The **Baffle/Support Plate/Tube Sheet Inspection Report** page opens.

[![image-1651319700257.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651319700257.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651319700257.png)

**Figure 12.18: Baffle/Support Plate/Tube Sheet Inspection Report page**

The page shows a list of added baffle/support plate/tube sheet inspection requests.

#### **12.18.1 Add Baffle/Support Plate/Tube Sheet Inspection Report Details**

If you want to add the baffle/support plate/tube sheet inspection report details,

1\. Click[![image-1651319763426.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651319763426.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651319763426.png)(Edit icon) in the **Edit Report** column for the respective request.

The **Baffle/Support Plate/Tube Sheet Inspection Details** window opens.

[![image-1651319772404.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651319772404.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651319772404.png)

2\. Click[![image-1651319786869.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651319786869.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651319786869.png)(**ADD** button) and edit the inspection details.

#### **12.18.2 Add Baffle/Support Plate/Tube Sheet Inspection Result Details**

If you want to add the baffle/support plate/tube sheet inspection result details,

1\. Click[![image-1651319827011.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651319827011.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651319827011.png)(Add icon) in the **RFI Data** column for the respective request.

The **RFI Inspection Request List** window opens.

[![image-1651319836699.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651319836699.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651319836699.png)

2\. In the **ITP Ref** box, enter the ITP reference detail.

3\. In the **Inspection Result** field, select the inspection result.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

#### **12.18.3 Submit Baffle/Support Plate/Tube Sheet Inspection Result**

Once you have added the baffle/support plate/tube sheet inspection result, the **Request Status** column in the **Baffle/Support Plate/Tube Sheet Inspection Report** page is appeared with[![image-1651319898871.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651319898871.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651319898871.png) (Submit and Reject icons). See Fig 12.18.

1\. If you want to submit the baffle/support plate/tube sheet inspection result, click[![image-1651319918859.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651319918859.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651319918859.png) (Submit icon) in the **Request Status** column. Otherwise click[![image-1651319928860.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651319928860.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651319928860.png) (Reject icon) to reject the request.

Once the baffle/support plate/tube sheet inspection result is updated, the completed status will be updated in the **Completed** column.

#### **12.18.4 View an RFI Report for Baffle/Support Plate/Tube Sheet Inspection**

If you want to view the RFI report for any baffle/support plate/tube sheet inspection, click[![image-1651319964394.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651319964394.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651319964394.png) (Print icon) provided in the **RFI** **Report** column.

#### **12.18.5 View a Baffle/Support Plate/Tube Sheet Inspection Report**

If you want to view the baffle/support plate/tube sheet inspection report, click [![image-1651319964394.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651319964394.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651319964394.png) (Print icon) provided in the **Report** column.

#### **12.18.6 Attach a file into a Baffle/Support Plate/Tube Sheet Inspection Report**

If you want to attach a file with any baffle/support plate/tube sheet inspection report in the **Baffle/Support Plate/Tube Sheet Inspection Report** page, you can use[![image-1651320023494.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651320023494.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651320023494.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **12.19 Tube Bundle Skeleton Inspection Report**

The **Tube Bundle Skeleton Inspection Report** tab in the **Heat Exchanger** menu used to add the tube bundle skeleton inspection result for added request.

1\. Click **Tube Bundle Skeleton Inspection Report** in the **Heat Exchanger**

The **Tube Bundle Skeleton Inspection Report** page opens.

[![image-1651320080736.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651320080736.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651320080736.png)

**Figure 12.19: Tube Bundle Skeleton Inspection Report page**

The page shows a list of added tube bundle skeleton inspection requests.

#### **12.19.1 Add Tube Bundle Skeleton Inspection Report Details**

If you want to add the tube bundle skeleton inspection report details,

1\. Click[![image-1651320144344.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651320144344.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651320144344.png)(Edit icon) in the **Edit Report** column for the respective request.

The **Tube Bundle Skeleton Inspection Details** window opens.

[![image-1651320153827.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651320153827.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651320153827.png)

2\. Click [![image-1651319786869.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651319786869.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651319786869.png)(**ADD** button) and edit the inspection details.

#### **12.19.2 Add Tube Bundle Skeleton Inspection Result Details**

If you want to add the tube bundle skeleton inspection result details,

1\. Click[![image-1651320206949.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651320206949.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651320206949.png)(Add icon) in the **RFI Data** column for the respective request.

The **RFI Inspection Request List** window opens.

[![image-1651320216358.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651320216358.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651320216358.png)

2\. In the **ITP Ref** box, enter the ITP reference detail.

3\. In the **Inspection Result** field, select the inspection result.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

#### **12.19.3 Submit Tube Bundle Skeleton Inspection Result**

Once you have added the tube bundle skeleton inspection result, the **Request Status** column in the **Tube Bundle Skeleton Inspection Report** page is appeared with[![image-1651320271774.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651320271774.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651320271774.png) (Submit and Reject icons). See Fig 12.19.

1\. If you want to submit the tube bundle skeleton inspection result, click[![image-1651320291934.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651320291934.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651320291934.png)(Submit icon) in the **Request Status** Otherwise click[![image-1651320301859.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651320301859.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651320301859.png) (Reject icon) to reject the request.

Once the tube bundle skeleton inspection result is updated, the completed status will be updated in the **Completed** column.

#### **12.19.4 View an RFI Report for Tube Bundle Skeleton Inspection**

If you want to view the RFI report for any tube bundle skeleton inspection, click[![image-1651320339374.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651320339374.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651320339374.png) (Print icon) provided in the **RFI** **Report** column.

#### **12.19.5 View a Tube Bundle Skeleton Inspection Report**

If you want to view the tube bundle skeleton inspection report, click [![image-1651320339374.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651320339374.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651320339374.png) (Print icon) provided in the **Report** column.

#### **12.19.6 Attach a file into a Tube Bundle Skeleton Inspection Report**

If you want to attach a file with any tube bundle skeleton inspection report in the **Tube Bundle Skeleton Inspection Report** page, you can use[![image-1651320399528.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651320399528.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651320399528.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **12.20 Tube Bundle Final Dimension Report**

The **Tube Bundle Final Dimension Inspection Report** tab in the **Heat Exchanger** menu used to add the tube bundle final dimension inspection result for added request.

1\. Click **Tube Bundle Final Dimension Inspection Report** in the **Heat Exchanger**

The **Tube Bundle Final Dimension Inspection Report** page opens.

[![image-1651320772294.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651320772294.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651320772294.png)

**Figure 12.20: Tube Bundle Final Dimension Inspection Report page**

The page shows a list of added tube bundle final dimension inspection requests.

#### **12.20.1 Add Tube Bundle Final Dimension Inspection Report Details**

If you want to add the tube bundle final dimension inspection report details,

1\. Click[![image-1651320836947.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651320836947.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651320836947.png)(Edit icon) in the **Edit Report** column for the respective request.

The **Tube Bundle Final Dimension Inspection Details** window opens.

[![image-1651320845583.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651320845583.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651320845583.png)

2\. Click [![image-1651319786869.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651319786869.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651319786869.png) (**ADD** button) and edit the inspection details.

#### **12.20.2 Add Tube Bundle Final Dimension Inspection Result Details**

If you want to add the tube bundle final dimension inspection result details,

1\. Click[![image-1651320904934.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651320904934.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651320904934.png)(Add icon) in the **RFI Data** column for the respective request.

The **RFI Inspection Request List** window opens.

[![image-1651320914106.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651320914106.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651320914106.png)

2\. In the **ITP Ref** box, enter the ITP reference detail.

3\. In the **Inspection Result** field, select the inspection result.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

#### **12.20.3 Submit Tube Bundle Final Dimension Inspection Result**

Once you have added the tube bundle final dimension inspection result, the **Request Status** column in the **Tube Bundle Final Dimension Inspection Report** page is appeared with[![image-1651320981156.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651320981156.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651320981156.png) (Submit and Reject icons). See Fig 12.20.

1\. If you want to submit the tube bundle final dimension inspection result, click[![image-1651321003247.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651321003247.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651321003247.png)(Submit icon) in the **Request Status** Otherwise click[![image-1651321012456.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651321012456.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651321012456.png) (Reject icon) to reject the request.

Once the tube bundle final dimension inspection result is updated, the completed status will be updated in the **Completed** column.

#### **12.20.4 View an RFI Report for Tube Bundle Final Dimension Inspection**

If you want to view the RFI report for any tube bundle final dimension inspection, click[![image-1651321042243.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651321042243.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651321042243.png) (Print icon) provided in the **RFI** **Report** column.

#### **12.20.5 View a Tube Bundle Final Dimension Inspection Report**

If you want to view the tube bundle final dimension inspection report, click [![image-1651321042243.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651321042243.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651321042243.png) (Print icon) provided in the **Report** column.

#### **12.20.6 Attach a file into a Tube Bundle Final Dimension Inspection Report**

If you want to attach a file with any tube bundle final dimension inspection report in the **Tube Bundle Final Dimension Inspection Report** page, you can use[![image-1651321116868.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651321116868.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651321116868.png) (Attach icon) provided in the **Attachment** column for the respective report. To know how to attach, see the topic, “[**<u>Attach a file into a PQR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

# Weldmap

#### **Weld Map**

Weld mapping is the process of assigning information to a weld joint to enable easy identification of its design (WPS), production (welders, their qualifications, date welded), quality (visual inspection, NDT) and traceability (heat numbers of materials joined &amp; welding consumables).

The **Weld Map** tab in the **Tag Data** menu used to add a weld map.

[![image-1778822207935.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778822207935.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778822207935.png)

1\. Click **Weld Map menu**

 The **Weld Map** page opens.

[![image-1778822293498.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778822293498.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778822293498.png)

**Figure 6.7: Weld Map page**

#### **10.1 Add a Weld Map**

If you want to add a weld map, do the following steps,

1\. Click **weldmap** menu  See Fig 6.7.

2.An Add page will opens .

The page shows a new box to add the details of the weld map.

[![image-1778822401895.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778822401895.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778822401895.png)

[![image-1651063190363.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651063190363.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651063190363.png)**Tip**: A report number for a new weld map will be updated automatically in the **Report Number** box.

3\. In the Prepared By box, enter the name of welder who has prepared the weld map.

4\. In the Reviewed By box, enter the name of welder who has received the weld map.

5\. In the Approved By box, enter the name of welder who has approved the weld map.

6\. In the Prepared Date box, choose the prepared date of the weld map.

7\. In the Reviewed Date box, choose the reviewed date of the weld map.

8\. In the Approved Date box, choose the approved date of the weld map.

9\. Click **Save**.

The weld map is successfully added.

####  Edit a Weld Map**

If you want to edit any existing weld map in the **Weld Map** page, do the following,

1\. Click[![image-1651063271576.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651063271576.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651063271576.png)(Edit icon) in the **Edit** column for the respective weld map. See Fig 6.7.

 The page shows the details of added weld map.

[![image-1778822513307.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778822513307.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778822513307.png)

2\. Click on any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **Attach a File into a Weld Map**

If you want to attach a file with any weld map listed in the **Weld Map** page, you can use[![image-1651063332140.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651063332140.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651063332140.png) (Attach icon) provided in the **Attachment** column for the respective weld map. To know how to attach, see the topic, “[**<u>Attach a file into a PWPS</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **Export Weld Maps List**

You can export a list of weld maps added in the **Weld Map** page in the pdf and excel formats by using [![pdf.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/pdf.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651063374584.png) (**PDF** button) and

[![excelimg.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/0fxexcelimg.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651063384993.png) (**Excel** button).

#### **Filter Any Weld Map**

If you want to filter any weld map in the **Weld Map** page, you can use [![image-1651063416907.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651063416907.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651063416907.png) (**FILTER** button) provided in the **Weld Map** page. See Fig 9.7. To know how to filter, see the topic, “[**<u>Filter Any User Account</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/manage-user#bkmrk-4.1.9-filter-a-user-)”.

#### **Print a Weld Map**

If you want to print a weldmap then click **print** icon[![image-1778823358162.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778823358162.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778823358162.png)on the weldmap screen.

Weldmap print gives a clear details of the weld plan and Test plan.

[![image-1778823565916.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778823565916.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778823565916.png)

#### **Weld Book,Weld Plan,Test Plan**

Weld and Test Plan is a document detailing a systematic approach to forming a weld joint by welding two or more workpieces (metal or plastic) according to a particular geometry. A welding joint is a point or edge where two or more pieces of metal or plastic are joined together.

[![image-1778823713596.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778823713596.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778823713596.png)

If you want to print weld book,weld plan and test plan, click the correcponding print button at the top as shown above.

#### **Revise weldmap**

To revise a weldmap, click Revise button placed in the revise column of the weldmap.(If workflow enabled,revise button will enable only after the workflow approval)

[![image-1779946343387.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1779946343387.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1779946343387.png)

# Welding Jobcard and weld spot check

### **1.Welding job card**

A welding job card is a document used in fabrication and welding works to provide detailed instructions and records for a specific welding activity or joint. It acts as a work order and tracking sheet for welders, inspectors, and supervisors.

Welding job card menu placed under the Home menu as shown below

[![image-1779965746896.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1779965746896.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1779965746896.png)

#### **Add a welding job card**

If you want to add a welding job card, do the following steps,

1\. Click **welding job card** menu

2,Click **Add**[![image-1779968008186.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1779968008186.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1779968008186.png)button placed at top

[![image-1779966385585.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1779966385585.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1779966385585.png)

[![image-1779966946010.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1779966946010.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1779966946010.png)

3.Select the **date**

4.Select the **project** of the job card

4.Select **shift** from the dropdown

5.Select the **supervisor** from the dropdown

6.Select the **type** from the dropdown selection

7.Joint-Select the **joint** which is going to weld(Fitup inspection completed joints will be shown in the dropdown)

8.Select the **wps** for the joint

9.Weld layer-Select the **layer** from the dropdown

10.Welder-Select the appropriate **welde**r and click the **+** icon to save the welder

11.Select the **welding paramete**r from the list at the bottom

12.Click **save** button

**Welding job card created successfully.**

#### **Edit a welding job card**

[![image-1779967423948.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1779967423948.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1779967423948.png)

1.If you want to edit a welding job card,click[![image-1779967652928.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1779967652928.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1779967652928.png)**edit** button placed at the leftside of the job card.

2.Update the fileds which required

3.Click **save** button.

**Welding jobcard updated successfully.**

[![image-1779967461199.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1779967461199.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1779967461199.png)

#### **Delete a welding job card**

If you want to delete a welding job card,do the following steps

1.Click[![image-1779968334208.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1779968334208.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1779968334208.png)**delete** icon placed at the welding job card

[![image-1779968243457.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1779968243457.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1779968243457.png)

2.Select ok to the confirm delete.

[![image-1779968286538.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1779968286538.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1779968286538.png)

**3.Welding job card deleted successfully.**

#### **Approve a welding job card**

If you want to approve a welding job card,

[![image-1779968633341.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1779968633341.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1779968633341.png)

1.Click **welding job card menu**

2.Here all the welding job cards will be listed

3.Click the[![image-1779968568456.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1779968568456.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1779968568456.png)**Approve** button placed against the job card (cuteQM\_weldinspection role users can approve the job card)

**4.Welding job card approved successfully.**

#### **Attach a File into a Welding job card**

If you want to attach a file with any welding job card l, you can use[![image-1651063332140.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651063332140.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651063332140.png) (Attach icon) provided in the **Attachment** column for the respective job card. To know how to attach, see the topic, “[**<u>Attach a file into a PWPS</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **Export Welding job card List**

[![image-1779969120593.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1779969120593.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1779969120593.png)

You can export a list of job cards added in the **Welding job card** page in the pdf and excel formats by using [![pdf.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/pdf.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651063374584.png) (**PDF** button) and

[![excelimg.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/0fxexcelimg.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651063384993.png) (**Excel** button).

#### **Filter Any Welding job card**

If you want to filter any job card in the **Welding job card** page, you can use [![image-1651063416907.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651063416907.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651063416907.png) (**FILTER** button) provided in the page. . To know how to filter, see the topic, “[**<u>Filter Any User Account</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/manage-user#bkmrk-4.1.9-filter-a-user-)”.

#### **Print a Welding job card**

If you want to print a welding job card then click **print** icon[![image-1778823358162.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778823358162.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778823358162.png)on the welding job card screen.

Welding job card print gives a clear details .

[![image-1779969212903.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1779969212903.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1779969212903.png)

[![image-1779969378355.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1779969378355.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1779969378355.png)

### **Weld spot check**

A weld spot check is a random or selective inspection carried out on certain weld joints to verify welding quality, instead of inspecting every single weld completely.

Weld spot check menu placed under the Home menu as shown below

[![image-1779969785608.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1779969785608.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1779969785608.png)

#### **Add a weld spot check**

If you want to add a weld spot check, do the following steps,

[![image-1779970008127.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1779970008127.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1779970008127.png)

1\. Click **weld spot check** menu

<div class="pointer-container" id="bkmrk-%C2%A0-4"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--28" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>2.Click **Add**[![image-1779968008186.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1779968008186.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1779968008186.png)button placed at top

3.**Report number**-Automatically generated and we can modify this,if required

4.**Job card**-Select the job card which is going to the weld spot check(Approved job cards will be listed in the dropdown)

5.Click **save** button

**Weld spot check created successfully.**

#### **Update Results of a weld spot check**

1.To update the results of a weld spot check ,**click**[![image-1779970254902.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1779970254902.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1779970254902.png)icon in the list screen

[![image-1779970472680.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1779970472680.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1779970472680.png)

2.A popup will be open to enter the observations.

3.Enter the observations in the text boxes shown below

[![image-1779970583919.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1779970583919.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1779970583919.png)

4.Click **save** button.

**Weld spot check observations updated successfuly.**

#### **Edit a weld spot check**

[![image-1779970748033.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1779970748033.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1779970748033.png)

1.If you want to edit a weldingspot check,click[![image-1779967652928.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1779967652928.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1779967652928.png)**edit** button placed at the leftside of the job card.

2.Update the fileds which required

3.Click **save** button.

**Weld spot check updated successfully.**

[![image-1779970790716.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1779970790716.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1779970790716.png)

#### **Delete a weld spot check**

If you want to delete a weld,do the following steps

1.Click[![image-1779968334208.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1779968334208.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1779968334208.png)**delete** icon placed at the weld spot check

[![image-1779970851131.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1779970851131.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1779970851131.png)

2.Select ok to the **confirm delete**.

[![image-1779970866006.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1779970866006.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1779970866006.png)

<div class="pointer-container" id="bkmrk-%C2%A0-5"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--29" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>**Weld spot check deleted successfully.**

#### **Attach a File into a Weld spot check**

If you want to attach a file with any weld spot check , you can use[![image-1651063332140.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651063332140.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651063332140.png) (Attach icon) provided in the **Attachment** column for the respective spot check. To know how to attach, see the topic, “[**<u>Attach a file into a PWPS</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/welding#bkmrk-6.1.6-attach-a-file-)”.

#### **Export Weld spot check List**

[![image-1779970996200.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1779970996200.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1779970996200.png)

You can export a list of weld spot checks added in the  page in the pdf and excel formats by using [![pdf.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/pdf.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651063374584.png) (**PDF** button) and

[![excelimg.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/0fxexcelimg.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651063384993.png) (**Excel** button).

#### **Filter Any Weld spot check**

If you want to filter anyweld spot check in the page, you can use [![image-1651063416907.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651063416907.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651063416907.png) (**FILTER** button) provided in the page. . To know how to filter, see the topic, “[**<u>Filter Any User Account</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/manage-user#bkmrk-4.1.9-filter-a-user-)”.

#### **Print a Weld spot check**

If you want to **print** a weld spot check then click **print** icon[![image-1778823358162.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1778823358162.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1778823358162.png)on the weld spot check screen.

Weld spot check print gives a clear details .

[![image-1779971113622.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1779971113622.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1779971113622.png)

[![image-1779971137722.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/scaled-1680-/image-1779971137722.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-05/image-1779971137722.png)

# Ship structural

Manage all the inspections related to Ship Structural Module

# Ship Structural

###  **Hull**

**1.**Click **Ship Structural** module at the top.

[![image-1724214135183.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724214135183.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724214135183.png)

The **Hull** menu in the ***cuteQM*** app helps you to add the master data. Once you click the Hull menu, the following tabs open, Master, Inspection, and Reports.

[![image-1710230832076.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710230832076.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710230832076.png)  
  
 Fig 1 Ship Structural Hull

##### **1.0 Master** 

The Hull menu in the ***cute QM*** app helps you to add the master data. Once you click the Hull menu, the following tabs open, Master, Inspection, and Reports.

1.Click Hull in the menu,  
The Master page opens.

#####   
**1.1.0 Block**

You can add the details of Block to be used in the Ship Structural project by using the Block tab in the Hull menu. If you  
want to navigate to Block Master,  
1.Click **Block** in the Hull menu,  
The Block Master page opens.

[![image-1710233444832.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710233444832.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710233444832.png) Fig 1.1.0 Block in Ship Structural

#####   
  
**1.1.1 Add a Block Master** 

If you want to add a block, do the following steps,  
1\. Click [![image-1651659058478.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659058478.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659058478.png) (ADD button) in the Block Master page. See Fig 1.1.1

A new window opens to add a new Block Master.

[![image-1710234682463.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710234682463.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710234682463.png)  
 Fig 1.1.1 Add a block Master.

1. Enter **Block number.**
2. Enter **revision** details of the block number
3. In the **Subcontractor** box, select from the drop-down list.The subcontractor data must match with actual subcontractor who will creating the QIF to avoid disappear.
4. [![image-1651659093576.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659093576.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659093576.png) Note: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
5. Click **Save**.
    
    The **Block Master** is successfully added and listed in the Block page.

##### **1.1.2 Edit a Block Master**

If you want to **edit** any existing Block master in the Block master page,

[![image-1710235539536.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710235539536.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710235539536.png) Fig 1.1.2 Edit a Block Master

1. Click [![image-1651659256503.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659256503.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659256503.png)(Edit icon) of the respective Block. Fig See 1.1.2 The Block page shows the details of the selected Block.
    
    [![image-1710235642296.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710235642296.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710235642296.png)

1. Edit the details of **Block no,Revision no and Subcontrator**  as required
2. Click **Save**.  
     **Block updated successfully.**

##### **1.1.3 Delete a Block Master** 

1. If you want to delete any existing block in the Block page, you can use [![image-1651659320550.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659320550.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659320550.png) (Delete icon) provided in the Block page. By click confirm delete
    
    [![image-1710235946300.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710235946300.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710235946300.png)
    
    
    1. Click [![image-1651603839749.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603839749.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603839749.png) (Delete icon) for the corresponding area.
        
        You receive a notification message “Confirm Delete?”.
    2. Click **OK**.   
        **The Block is deleted successfully.**

##### **1.1.4 Export a Block Master**

You can export a list of Block added in the Block Master page in both the pdf and excel formats by using[![image-1651659355160.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659355160.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659355160.png) (PDF button) and [![image-1651659366247.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659366247.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659366247.png) (Excel button). Fig See 1.1.4 page.

[![image-1710236150444.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710236150444.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710236150444.png) Fig 1.1.4 Export in Block

##### **1.1.5 Filter a Block Master**

If you want to filter any specific Block in the Block Master page, you can use [![image-1651659424215.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659424215.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659424215.png) (FILTER button) located on the block page.[![image-1710236427983.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710236427983.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710236427983.png) Fig 1.1.5 Filter a Block page.

#### **1.2 Frames &amp; Panels** 

The Frames &amp; Panels tab in the Hull menu helps you to add the details of Frames &amp; Pannels to be in used in the Ship structural. If you want to navigate to Frames &amp; Pannels,

[![image-1710236731319.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710236731319.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710236731319.png)  
 Fig 1.2 Frames &amp; Pannels Page

#####   
**1.2.1 Add a Frames and Pannels** 

If you want to add a Frames &amp; Pannels, do the following steps,  
1\. Click [![image-1651659058478.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659058478.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659058478.png) (ADD button) in the Frames &amp; Pannels page. See Fig 1.2.1

A new window opens to add a Frames &amp; Pannels.[![image-1710236981130.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710236981130.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710236981130.png) Fig 1.2.1 Add a Frames &amp; Pannels

1. [![image-1651659093576.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659093576.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659093576.png) Note: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **Block** box, select from the drop-down list.
3. In the **Frame and Pannel Number**, entre the Frame and Pannel number.
4. In the **subcontractor** box,select the subcontractor from dropdown list.The subcontractor data must match with actual subcontractor who will creating the QIF to avoid disappear.
5. Click **Save**.
    
    **The Frame is successfully added** and listed in the Frames page.

##### **1.2.2 Edit a Frame &amp; Panel**

If you want to **edit** any existing Frame &amp; Panel master in the Frame &amp; Panels page,[![image-1710237379897.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710237379897.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710237379897.png) Fig 1.2.2 Edit a Frames and panel Master

1. Click [![image-1651659256503.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659256503.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659256503.png)(Edit icon) of the respective Frame. Fig See 1.2.2 The Frame &amp; Pannels page shows the details of the selected Frame.
    
    [![image-1710237557847.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710237557847.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710237557847.png)

1. Edit the details of **Block no,Frames and panel no and Subcontractor** as required.
2. Click **Save**.  
     **Frames updated successfully.**

##### **1.2.3 Delete a Frames &amp; Panels** 

If you want to delete any existing frames in the Frames &amp; Panels page, you can use [![image-1651659320550.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659320550.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659320550.png) (Delete icon) provided in the Frames &amp; Pannels page. By click confirm delete

[![image-1710237716037.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710237716037.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710237716037.png)

1. 1. Click [![image-1651603839749.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603839749.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603839749.png) (Delete icon) for the corresponding area.
        
        You receive a notification message “Confirm Delete?”.
    2. Click **OK**.   
        The **Frames &amp; Panel** deleted successfully.

##### **1.2.4 Export in Frames &amp; Panels**

You can export a list of Frames &amp; Panels added in the Frames page in both the pdf and excel formats by using[![image-1651659355160.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659355160.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659355160.png) (PDF button) and [![image-1651659366247.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659366247.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659366247.png) (Excel button). Fig See 1.2.4 page[![image-1710530492728.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710530492728.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710530492728.png)[ ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710236150444.png) Fig 1.2.4 PDF &amp; Excel in Frames &amp; Pannels

##### **1.2.5 Filter a Frames &amp; Panels**

If you want to filter any specific Frames in the Frames and Panels page, you can use [![image-1651659424215.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659424215.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659424215.png) (FILTER button) located on the Frames page.

[![image-1710238428305.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710238428305.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710238428305.png)  
 Fig 1.2.5 Filter a Frames &amp; Pannels Page.

#### **1.3 Hull Parts**  
  


The Hull Parts tab in the Hull menu helps you to add the details of Hull Parts to be in used in the Ship structural. If you want to navigate to Hull Parts,

[![image-1710239176479.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710239176479.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710239176479.png)  
 Fig 1.3 Hull Parts Page

##### **1.3.1 Add a Hull Parts** 

If you want to add a Hull Parts, do the following steps,  
1\. Click [![image-1651659058478.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659058478.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659058478.png) (ADD button) in the Hull Pages page. See Fig 1.3.1  
A new window opens to add a Hull Parts. [![image-1710240360474.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710240360474.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710240360474.png)  
[![image-1651659093576.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659093576.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659093576.png) Note: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.

1. In the **Block** box, select from the drop-down list.
2. In the **Frame and Pannel Number**, entre the Frame and Pannel number.
3. In the Part Code box, enter the Part code number.
4. In the Party Type box, enter the part type number.
5. In the Area box, enter the area number.
6. In the Length box, enter the Length number.
7. Click **Save**.
    
    The Hull Parts is successfully added and listed in the Hull page.

##### **1.3.2 Edit a Hull Parts**

If you want to **edit** any existing Hull Parts in the Hull,[![image-1710241263840.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710241263840.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710241263840.png)

 Fig 1.3.2 Edit a Hull Parts

1. Click [![image-1651659256503.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659256503.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659256503.png)(Edit icon) of the respective Frame. Fig See 1.3.2 The Hull Parts shows the details of the selected Hull Parts.
    
    [![image-1710241558777.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710241558777.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710241558777.png)
    
    Edit the details where you want.
2. Click Save.  
     Hull Parts updated successfully.


##### **1.3.3 Delete a Hull Part** 

If you want to delete any existing hull part in the Hull Parts page, you can use [![image-1651659320550.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659320550.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659320550.png) (Delete icon) provided in the Hull Parts page. By click confirm delete

[![image-1712032707087.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1712032707087.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1712032707087.png)

1. 1. Click [![image-1651603839749.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603839749.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603839749.png) (Delete icon) for the corresponding area.
        
        You receive a notification message “Confirm Delete?”.
    2. Click **OK**.   
        The Hull Parts deleted successfully.

##### **1.3.4 Export in Hull Parts** 

You can export a list of Hull added in the Hull Part page in both the pdf and excel formats by using[![image-1651659355160.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659355160.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659355160.png) (PDF button) and [![image-1651659366247.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659366247.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659366247.png) (Excel button). Fig See 1.3.4 page[![image-1710258867742.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710258867742.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710258867742.png)[ ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710236150444.png) Fig 1.3.4 Export a Hull Parts

##### **1.3.5 Filter a Hull Part**

If you want to filter any specific Hull in the Hull Parts of page, you can use [![image-1651659424215.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659424215.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659424215.png) (FILTER button) located on the Hull page.[![image-1710258966828.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710258966828.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710258966828.png) Fig 1.5.5 Filter a Hull Parts Page.

##### **1.3.6 Import Hull Parts** 

If you want to **Import** multiple Hull parts together, do the following steps,[![image-1705426378596.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705426378596.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705426378596.png)

<div class="pointer-container" id="bkmrk-%C2%A0-1"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--176" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>1. Click [![image-1651604149198.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604149198.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604149198.png) (**IMPORT** button) in the Basic drawing screen. Refer above fig
2. It will redirected to import page
3. Click [![image-1651120365377.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120365377.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120365377.png) (**TEMPLATE** button) . An excel worksheet will be downloaded with a predefined template to enter the details of Basic Drawing details.[![image-1705593670101.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705593670101.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705593670101.png)
4. Once you have added the details in the excel worksheet, save the excel worksheet on your computer.[![image-1710259515345.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710259515345.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710259515345.png)
5. After saved the excel, browse and upload the excel,
6. **Automap** -This function is used to map system columns and excel columns automatically.
7. **Map** - This function is used to map each system and excel columns manually
8. **Unmap** - This is used to remove the mapped column
9. **Unmap all** -This is used to remove the all mapped columns
10. Click **populate values ,process and Import** buttons. Refer below fig
11. [![image-1705593998835.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705593998835.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705593998835.png)

**Hull parts imported successfully.**

##### **1.3.7 View Log Hull Parts** 

You can also use [![image-1707098008638.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707098008638.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707098008638.png) (View Log button) located on the Equipment list.

1. 1. Click [![image-1710260108561.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710260108561.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710260108561.png)(View Log button). See Fig1.3.7
        
        [![image-1710260060157.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710260060157.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710260060157.png)
    2. A new window opens for Log Details.Herewe can see the imported Hull part details
        
        [![image-1710260281731.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710260281731.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710260281731.png)


### **2. Inspection**  
  


The Hull menu in the ***cuteQM*** app helps you to add the Inspection data. Once you click the **Hull** menu, the following tabs open,   
RFI Hull Fabrication, RFI Hull Assembly, RFI Hull Erection, Other Inspection and View Other Inspection.

[![image-1710261335069.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710261335069.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710261335069.png)  
 Fig 2. Inspection in Hull

##### **2.1.0 RFI Hull Fabrication List**   
  


The RFI Hull Fabrication tab in the Hull menu helps you to add the details of RFI Hull Fabrication List to be in used in the Ship structural. If you want to navigate to RFI Hull Fabrication List,

[![image-1724419765493.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724419765493.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724419765493.png)

 Fig 2.1.0 RFI Hull Fabrication List Page.

##### **2.1.1 Add RFI Hull Fabrication List** 

**CuteQM\_Production role user can add/edit RFI Hull Fabrication**

If you want to add a Hull RFI Hull Fabrication List , do the following steps,  
1\. Click [![image-1651659058478.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659058478.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659058478.png) (ADD button) in the RFI Hull Pages. See Fig 2.1.1  
A new window opens to add a RFI Hull Fabrications List.

[![image-1724419807301.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724419807301.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724419807301.png)

  
 Fig 2.1.1 Add a Hull Fabrication List Page

Click[![image-1651201285984.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201285984.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201285984.png) (Add Selected Hull Parts) of the respective block you want to add.  
[![image-1710320801697.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710320801697.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710320801697.png)  
 Fig 2.1.1 RFI Hull Fabrication request Page

1. In the **Inspection Date and Time** box, select the inspection date and time.
2. In the **Subcontractor** box, select a subcontractor from a drop-down list.
3. Select **Inspection type**
4. In the **Description** box, type the description. [![image-1710322222923.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710322222923.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710322222923.png)
    
    Click[![image-1651201285984.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201285984.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201285984.png) (Add Selected System) of the respective system you want to add. 
    The added Hull parts will be moved and listed in the right side of the page.
    
    
    1. [![image-1651201433945.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201433945.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201433945.png) **Tip**: If you want to remove any added block, click [![image-1651201449656.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201449656.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201449656.png)(**Remove** icon) of the respective block.
    2. In the **Description** box, enter the description for the added RFI Hull Fabrication Request.
    3. Click **Save**.
    
    The RFI Hull Fabrication list request is successfully added.
    
    #####  **2.1.2 Edit a RFI Hull Fabrication List**
    
    If you want to edit any existing RFI Hull Fabrication up request in the **RFI** **Hull Fabrication** page, do the following,
    
    Click (Edit icon) in the **Edit** column for the respective RFI Hull Fabrication Request. See Fig 2.1.2
    
    [![image-1724419848313.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724419848313.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724419848313.png)
    
      
    The **RFI Hull Fabrication Request page** opens with the details of the selected RFI Hull Fabrication list.
    
    [![image-1710323343727.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710323343727.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710323343727.png)
    
      
     Fig 2.1.2 Edit a RFI Hull Fabrication Request Page
    
    
    1. Add/remove any hull parts
    2. Click **Save**.

##### **2.1.3 Submit a RFI Hull Fabrication List**

Once you have added the RFI Hull fabrication request, the **Submission** column in the **RFI Hull fabrication List** page is appeared with[![image-1651201968441.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201968441.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201968441.png)(Submit and Reject icons). See Fig 2.1.3

[![image-1710323957178.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710323957178.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710323957178.png) Fig 2.1.3 Submit &amp; Approve a RFI Hull Fabrication List Page

1. If you want to submit the RFI Hull Fabrication list, click [![image-1651201981884.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201981884.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201981884.png)(Submit icon) in the **Submit** column. Otherwise click [![image-1651201995224.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201995224.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201995224.png)(Reject icon) to reject the request.
    
    Once you have submitted the RFI Hull Fabrication list request, in the **Confirm** **Status** column in the **RFI Hull Fabrication List** page is appeared with[![image-1651202048663.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202048663.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202048663.png)(Confirm and Reject icons).

The approved request will be moved to for inspection.

##### **2.1.4 Approve RFI Hull Fabrication Request**

**cuteQM\_Licensee\_QA user only can approve the RFI request.**

1. If you want to approve the RFI **Hull Fabrication** request, click[![image-1651203762346.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203762346.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203762346.png) (confirm icon) in the **Confirm Status** Otherwise click [![image-1651203792080.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (Reject icon) to reject the request.  
    2. Once RFI Hull Fabrication list [![image-1706614735279.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706614735279.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706614735279.png) icon will be enabled to put result. [![image-1710324211212.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710324211212.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710324211212.png)
    
      
    3. Click icon ￼[![image-1706632325743.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706632325743.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706632325743.png) result popup will open.   
    [![image-1710324271205.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710324271205.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710324271205.png)
    
    [![image-1710324515602.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710324515602.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710324515602.png)  
     Fig 2.1.4 Approve RFI Hull Fabrication Result Page
2. Click **Save**
3. RFI result is updated successfully.
4. If RFI Accepts with comments given as result then punch list will be created, and this will be shown in view punch list screen.
5. If need to upload documents against Hull part, then click attachment icon at the result popup and upload documents.

##### **2.1.5 Print RFI Hull fabrication list** 

If you want to print an RFI Hull Fabrication list, click [![image-1651808508303.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808508303.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808508303.png) (print icon) provided in the **Report** column of the RFI Hull Fabrication List

**In the print, user can see the signature of both the production user and QC . Requestor signature mapped with Production and Inspector signature mapped with QC.**

[**Click here to find the steps to upload Digital signature**](https://wiki.cuteinfocomm.com/books/cuteqm/page/user-management-qg8#bkmrk-1.3%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0-log-ou "Steps to upload Digital signature")

[![image-1710324876331.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710324876331.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710324876331.png)

  
 Fig 2.1.5 View a RFI Hull Fabrication List Page[![image-1710324918760.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710324918760.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710324918760.png)

[![image-1724217479214.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724217479214.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724217479214.png)

##### **2.1.6 Attach a File into a RFI Hull Fabrication List** 

If you want to attach a file with any existing RFI hull fabrication list listed in the **RFI Hill Fabrication List** page, you can attach the file by using [![image-1651202499153.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202499153.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202499153.png) (Attach icon) in the **Attachment** column.

[![image-1710324999319.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710324999319.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710324999319.png)  
A new window opens for file upload.  
In the **category** box, select the category from drop-down list.  
Select Browse and upload the documents.

[![image-1710325074521.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710325074521.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710325074521.png)

##### **2.1.7 Export a RFI Hull Fabrication list** 

You can export a list of RFI Hull Fabrication list requests added in the **RFI Hull Fabrication List** page in both the pdf and excel formats by using [![image-1651202537414.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202537414.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202537414.png) (**PDF** button) and [![image-1651202548613.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202548613.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202548613.png) (**Excel** button).

[![image-1710325475648.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710325475648.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710325475648.png) Fig 2.1.7 Export a RFI Hull Fabrication list

##### **2.1.8 Filter a RFI Hull Fabrication List**

If you want to filter any specific RFI fit hull fabrication list in the RFI Hull fabrication list page,

you can use [![image-1651202662798.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202662798.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202662798.png) (**FILTER** button) located on the **RFI Hull Fabrication list. ￼**[![image-1710325546780.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710325546780.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710325546780.png)

#### **2.2.0 RFI Hull Assembly** 

Click HULL in the inspection menu.  
The **RFI Hull Assembly List** page opens. ￼

[![image-1724419931911.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724419931911.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724419931911.png)

 Fig 2.2.0 RFI Hull Assembly List Page

##### **2.2.1 Add a RFI Hull Assembly List** 

cuteQM\_Production role users can create RFI request.If you want to add an RFI Hull Assembly list request, do the following,

[![image-1724419961262.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724419961262.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724419961262.png)

 Fig 2.2.1 Add an RFI Hull Assembly List Page

1. Click [![image-1651427486684.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427486684.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427486684.png) (**ADD** button) in the **RFI Hull Assembly List** page. A new page opens to add an RFI Hull Assembly request.
    
    [![image-1710326409587.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710326409587.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710326409587.png)
    
    [![image-1710326560185.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710326560185.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710326560185.png)
    
    
    1. In the **Subcontractor** box, select the name of a sub-contractor from a drop-down list.
    2. In the **Inspection Date &amp; Time** box, select the date of inspection.
    3. Select inspection type (Fitup/Weld visual)
    4. In the **Description** box, enter the description for the inspection.
    5. Click the check box of the respective frames
    6. Click [![image-1706197735824.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706197735824.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706197735824.png) (**Add Selected Hull** button).
    7. Click Remove if you want to remove it.

##### **2.2.2 Edit a RFI Hull Assembly list.**

If you want to edit any existing RFI Hull Assembly request in the **RFI** **Hull Assembly** page, do the following,

Click[![image-1710336147346.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710336147346.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710336147346.png)(Edit icon) in the **Edit** column for the respective RFI Hull Assembly Request. See Fig 2.2.2

[![image-1724419990926.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724419990926.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724419990926.png)

The **RFI Hull Assembly request page** opens with the details of the selected RFI Hull Assembly request list. ￼[![image-1710336099364.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710336099364.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710336099364.png)

  
 Fig 2.2.2 Edit a RFI Hull Assembly Request Page

1. 1. Edit the details in the respective box.And add/remove any hull part
    2. Click **Save**.
    3. RFI Hull assembly request updated successfully.

##### **2.2.3 Submit a RFI Hull Assembly List**

Once you have added the RFI Hull Assembly List, **RFI Hull Assembly List** page is appeared with[![image-1651201968441.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201968441.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201968441.png)(Submit and Reject icons). See Fig 2.2.3[![image-1710334173537.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710334173537.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710334173537.png) Fig 2.2.3 Submit a RFI Hull Assembly List

1. If you want to submit the RFI Hull Assembly request, click [![image-1651201981884.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201981884.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201981884.png)(Submit icon) in the **Submit** column. Otherwise click [![image-1651201995224.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201995224.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201995224.png)(Reject icon) to reject the request.

The submitted request will be moved to for inspection.

##### **2.2.4 Approve RFI Hull Assembly Request**

**cuteQM\_LisenceeQA role user only can approve the RFI request.**

1. If you want to approve the RFI **Hull assembly** request, click[![image-1651203762346.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203762346.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203762346.png) (confirm icon) in the **Confirm Status** Otherwise click [![image-1651203792080.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (Reject icon) to reject the request.  
    2. Once RFI request approved [![image-1706614735279.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706614735279.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706614735279.png) icon will be enabled to put result. [![image-1710334483132.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710334483132.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710334483132.png)
    
      
    3. Click icon ￼[![image-1706632325743.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706632325743.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706632325743.png) result popup will open.   
    [![image-1710334514273.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710334514273.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710334514273.png)
    
    [![image-1710334608173.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710334608173.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710334608173.png)
    
     Fig 2.2.4 Approve RFI Hull Assembly List Page
2. Click **Save**
3. RFI result is updated successfully.
4. If Accepted with comments given then punch list will be created, and this will be shown in view punch list screen.
5. If need to upload documents against system No, then click attachment icon at the result popup and upload documents.

##### **2.2.5 Print RFI Hull Assembly List**

If you want to Print a RFI Hull Assembly list request, click [![image-1651808508303.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808508303.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808508303.png) (print icon) provided in the **Report** column of the RFI Hull Assembly List page. See Fig 2.2.4 View a RFI Hull Assembly list.

 **In the print,user can see the signature of both production user and QC. Requestor signature mapped with Production user and Inspector signature mapped with QC .**

[**Click here to find the steps to upload Digital signature**](https://wiki.cuteinfocomm.com/books/cuteqm/page/user-management-qg8#bkmrk-1.3%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0-log-ou "Steps to upload Digital signature")

[![image-1710334700171.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710334700171.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710334700171.png)

[![image-1724217566134.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724217566134.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724217566134.png)

##### **2.2.6 Attach a File into a RFI Hull Assembly List**

If you want to attach a file with any existing RFI hull assembly list listed in the **RFI Hull Assembly List** page, you can attach the file by using [![image-1651202499153.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202499153.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202499153.png) (Attach icon) in the **Attachment** column.[![image-1710335377616.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710335377616.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710335377616.png)

A new window opens for file upload.  
In the **category** box, select the category from drop-down list.  
Select Browse and upload the documents.[![image-1710335422510.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710335422510.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710335422510.png)  
 Fig 2.2.6 Attach a RFI Hull Assembly List



##### **2.2.7 Export a RFI Hull Assembly List**

You can export a list of RFI Hull Assembly list visual list requests added in the RFI Hull Assembly list page in both the pdf and excel formats by using [![image-1651202537414.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202537414.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202537414.png) (**PDF** button) and [![image-1651202548613.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202548613.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202548613.png) (**Excel** button).

[![image-1710334883778.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710334883778.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710334883778.png)

 Fig 2.2.7 Export a RFI Hull Assembly List.

##### **2.2.8 Filter a RFI Hull Assembly list**

If you want to filter any RFI Hull Assembly List request from the list of RFI requests in the **RFI Hull Assembly List** page, you can use [![image-1651432698911.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432698911.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432698911.png) (**FILTER** button). [![image-1710335064797.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710335064797.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710335064797.png)  
 Fig 2.2.8 Filter a RFI Hull Assembly List

#### **2.3.0 RFI Hull Erection** 

Click HULL in the inspection menu.  
The **RFI Hull Erection List** page opens. ￼

[![image-1710754563096.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710754563096.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710754563096.png)

 Fig 2.3.0 RFI Hull Erection List Page

##### **2.3.1 Add a RFI Hull Erection List** 

.CuteQM\_Production role user only can add/edit RFI requests. If you want to add an RFI Hull Erection list request, do the following,

[![image-1724219781729.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724219781729.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724219781729.png)

[ ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710390345401.png) Fig 2.3.1 Add an RFI Hull Erection List Page

1. Click [![image-1651427486684.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427486684.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427486684.png) (**ADD** button) in the **RFI Hull Erection List** page. A new page opens to add an RFI Hull Erection request.
    
    [![image-1710390554665.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710390554665.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710390554665.png)
    
    [![image-1710390711120.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710390711120.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710390711120.png)
    
    
    1. In the **Subcontractor** box, select the name of a sub-contractor from a drop-down list.
    2. In the **Inspection Date &amp; Time** box, select the date of inspection.
    3. In the **Inspection Type** box, choose an inspection type from given list.
    4. In the **Description** box, enter the description for the inspection.
    5. Click the check box of the respective compartments.
    6. Click [![image-1706197735824.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706197735824.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706197735824.png) (**Add Selected blocks** button).
    7. Click Remove if you want to remove it.
    8. Click save buttion.
    9. RFI Hull erection request created successfully.

##### **2.3.2 Edit a RFI Hull Erection List**

If you want to edit any existing RFI Hull Erection list up request in the **RFI** **Hull erection** page, do the following,

Click[![image-1710336147346.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710336147346.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710336147346.png)(Edit icon) in the **Edit** column for the respective RFI Hull erection list. See Fig 2.3.2

[![image-1710391044096.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710391044096.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710391044096.png)

The **RFI Hull Erection request page** opens with the details of the selected RFI Hull erection request list.

[![image-1710400470287.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710400470287.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710400470287.png) Fig 2.3.2 Edit a RFI Hull Erection List Page

1. 1. Edit the details in the respective box.
    2. Click **Save**.

##### **2.3.3 Submit a RFI Hull Erection List**

Once you have added the RFI Hull Erection List, the **result** column in the **RFI Hull Erection List** page is appeared with[![image-1651201968441.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201968441.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201968441.png)(Submit and Reject icons). See Fig 2.3.3 [![image-1710400673101.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710400673101.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710400673101.png) Fig 2.3.3 Submit a RFI Hull Erection List

1. If you want to submit the RFI Hull Erection List request, click [![image-1651201981884.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201981884.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201981884.png)(Submit icon) in the **Submit** column. Otherwise click [![image-1651201995224.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201995224.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201995224.png)(Reject icon) to reject the request.

The submitted request will be moved to for inspection.

##### **2.3.4 Approve RFI Hull Erection Request**

**cuteQM\_Lisencee QA role user only can approve the RFI request.**

1. If you want to approve the RFI **Hull Erection** request, click[![image-1651203762346.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203762346.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203762346.png) (confirm icon) in the **Confirm Status** Otherwise click [![image-1651203792080.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (Reject icon) to reject the request.  
    2. Once RFI request approved [![image-1706614735279.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706614735279.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706614735279.png) icon will be enabled to put result. [![image-1710400928860.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710400928860.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710400928860.png)
    
      
    3. Click icon ￼[![image-1706632325743.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706632325743.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706632325743.png) result popup will open.   
    [![image-1710401095299.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710401095299.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710401095299.png)
    
    [![image-1710401122817.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710401122817.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710401122817.png)
    
     Fig 2.3.4 Approve RFI Hull Erection List Page
2. Click **Save**
3. RFI result is updated successfully.
4. If Accept with comments given as result,then punch list will be created, and this will be shown in view punch list screen.
5. If need to upload documents against system No, then click attachment icon at the result popup and upload documents.

##### **2.3.5 Print a RFI Hull Erection List**

If you want to Print an RFI Hull Erection List, click [![image-1651808508303.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808508303.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808508303.png) (print icon) provided in the **Report** column of the RFI Hull erection list page.

**In the print,user can see the signature of both production user and QC. Requestor signature mapped with Production user and Inspector signature mapped with QC .**

**[Click here to find the steps to upload Digital signature](https://wiki.cuteinfocomm.com/books/cuteqm/page/user-management-qg8#bkmrk-1.3%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0-log-ou "Steps to upload Digital signature")**

[![image-1710755090032.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710755090032.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710755090032.png)

 See Fig 2.3.5 Print a RFI Hull Erection List.

[![image-1710403166199.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710403166199.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710403166199.png)

 [![image-1724217741617.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724217741617.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724217741617.png)

##### **2.3.6 Attach a File into RFI Hull Erection List**

If you want to attach a file with any existing RFI hull Erection list listed in the **RFI Hull Erection List** page, you can attach the file by using [![image-1651202499153.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202499153.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202499153.png) (Attach icon) in the **Attachment** column.

[![image-1710403345764.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710403345764.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710403345764.png)

A new window opens for file upload.  
In the **category** box, select the category from drop-down list.  
Select Browse and upload the documents. ￼[![image-1710403503460.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710403503460.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710403503460.png) Fig 2.3.6 Attach a RFI Hull Erection List.



##### **2.3.7 Export a RFI Hull Erection List**

You can export a list of RFI Hull Erection List requests added in the **RFI Hull erection list** page in both the pdf and excel formats by using [![image-1651202537414.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202537414.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202537414.png) (**PDF** button) and [![image-1651202548613.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202548613.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202548613.png) (**Excel** button).

[![image-1710403658758.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710403658758.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710403658758.png)

 Fig 2.3.7 Export a RFI Hull Erection list Page.

##### **2.3.8 Filter a RFI Hull Erection List**

If you want to filter any RFI Hull erection List request from the list of RFI requests in the **RFI Hull Erection List** page, you can use [![image-1651432698911.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432698911.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432698911.png) (**FILTER** button). [![image-1710403743219.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710403743219.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710403743219.png) Fig 2.3.8 Filter a RFI Hull Erection List Page

#### **2.4.0 Other Inspection**

Click **Hull** in the inspection menu.  
The Other Inspection page opens. ￼

[![image-1724420094541.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724420094541.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724420094541.png)

 Fig 3.0 Other Inspection Page  
  
[![image-1710408204683.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710408204683.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710408204683.png)  
1\. To add Inspection type select any Inspection type from the drop-down list  
2\. Select the Block Number.  
3\. Click [![image-1710408468882.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710408468882.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710408468882.png)￼ RFQ Inspection  
4\. A new window opens for **Inspection** to enter the data and time.  
5\. In the **Description** box, enter the description for the inspection.  
6\. Click **Save.  
[![image-1710408431213.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710408431213.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710408431213.png)**

[![image-1710408571983.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710408571983.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710408571983.png)

##### **2.4.1 View Other Inspection.** 


If you want to view a View Other Inspection. click view other inspection menu.

[![image-1724420109300.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724420109300.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724420109300.png)

  
 Fig 2.4.1 View an Other Inspection page.

##### **2.4.2 Submit an Other Inspection**  
  


**cuteQM\_Production role user only can submit RFI request.**

[![image-1710433002445.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710433002445.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710433002445.png)  
 Fig 2.4.2 Submit a View Other Inspection

[![image-1710433109223.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710433109223.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710433109223.png)

Once you have added the View Other Inspection request list, the **Submit** column in the View other Inspection page is appeared [![image-1651203728786.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203728786.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203728786.png)with (Submit and Reject icons).

1. If you want to submit the View Other Inspection request, click[![image-1651203762346.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203762346.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203762346.png) (Submit icon) in the **Request Status** Otherwise click [![image-1651203792080.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (cancel icon) to cancel the request.

The submitted request will be moved to for View Other Inspection.

##### **2.4.3 Approve a Other Inspection** 

**cuteQM\_Lisencee QA role user only can approve the RFI request.**

1. If you want to approve the view other inspection request, click[![image-1651203762346.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203762346.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203762346.png) (confirm icon) in the **Confirm Status** Otherwise click [![image-1651203792080.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (Reject icon) to reject the request.  
    2. Once RFI request approved [![image-1706614735279.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706614735279.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706614735279.png) icon will be enabled to put result. [![image-1710433558727.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710433558727.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710433558727.png)
    
      
    3. Click icon ￼[![image-1706632325743.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706632325743.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706632325743.png) result popup will open.   
    [![image-1710433580765.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710433580765.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710433580765.png)
    
    [![image-1710433601756.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710433601756.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710433601756.png)
    
     Fig 2.4.3 Approve View Other Inspection Page
2. Click **Save**
3. Result is updated successfully.
4. If Accept with comments given as result, then punch list will be created, and this will be shown in view punch list screen.
5. If need to upload documents against system No, then click attachment icon at the result popup and upload documents.

##### **2.4.4 Print an other inspection.**

If you want to print other Inspection, click [![image-1651808508303.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808508303.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808508303.png) (print icon) provided in the **Report** column of the view other inspection list page.

 **In the print,user can see the signature of both production user and** **QC. Requestor signature mapped with Production user and Inspector signature mapped with QC .**

**[Click here to find the steps to upload Digital signature](https://wiki.cuteinfocomm.com/books/cuteqm/page/user-management-qg8#bkmrk-1.3%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0-log-ou "Steps to upload Digital signature")**

[![image-1710433986481.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710433986481.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710433986481.png)

 See Fig 2.4.4 Print an Other Inspection Page

[![image-1710755687912.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710755687912.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710755687912.png)

[![image-1724217861166.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724217861166.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724217861166.png)

##### **2.4.5 Attach a File for other Inspection.** 

If you want to attach a file with any existing view other inspection list in the other inspection page, you can attach the file by using [![image-1651202499153.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202499153.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202499153.png) (Attach icon) in the **Attachment** column.[![image-1710434225265.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710434225265.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710434225265.png)

A new window opens for file upload.  
In the **category** box, select the category from drop-down list.  
Select Browse and upload the documents. ￼

[![image-1710434312951.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710434312951.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710434312951.png)

##### **2.4.6 Export an Other Inspection request**

<div class="pointer-container" id="bkmrk-%C2%A0-13"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--180" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>You can export a list of View other Inspection requests added in the View Other Inspection **List** page in both the pdf and excel formats by using [![image-1651202537414.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202537414.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202537414.png) (**PDF** button) and [![image-1651202548613.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202548613.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202548613.png) (**Excel** button).

[![image-1710434544524.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710434544524.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710434544524.png)  
 Fig 2.4.6 Export a View other Inspection

##### **2.4.7 Filter a View Other Inspection request** 

If you want to filter any specific filter a view other inspection in view other inspection List page,

[![image-1710434772075.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710434772075.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710434772075.png)

- you can use the filter box provided in the upper side of the Filter a View other Inspection **To** filter the any View Other Inspection request, select the Report Number, Inspection Date and **Date** in the boxes and click.
- you can use [![image-1651202662798.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202662798.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202662798.png) (**FILTER** button) located on the View Other Inspection**.**

##### **2.5 Hull Parts Summary** 

**We can see the summary of all the RFI requests for all the Hull parts here.**

You can export a list of hull parts summary added in the Hull Parts Summary page in both the pdf and excel formats by using [![image-1651202537414.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202537414.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202537414.png) (**PDF** button) and [![image-1651202548613.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202548613.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202548613.png) (**Excel** button).

[![image-1710520602150.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710520602150.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710520602150.png)

##### **2.5.1 Filter a Hull Parts Summary** 

If you want to filter any specific Hull Parts Summary in the Hull Parts Summary page, [![image-1710520935520.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710520935520.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710520935520.png)

#### **3.0 Outfitting Area** 

Click **Outfitting** in the Master menu.  
The **Outfitting** page opens. ￼[![image-1710405686230.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710405686230.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710405686230.png) Fig 3.0 Out Fitting Page

##### **3.1 Add an Outfitting Area**

If you want to add an Outfitting Area, do the following steps,  
Click [![image-1651427486684.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427486684.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427486684.png) (**ADD** button) in the Outfitting area **List.**

A new page opens to add an Outfitting area request. ￼[![image-1710405798790.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710405798790.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710405798790.png)

1. In the **Area** box, enter an area number.
2. In the **Description** box, enter the description for the inspection.
3. Click **Save.**  
    [![image-1710406271926.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710406271926.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710406271926.png)  
    The Area is successfully added in Outfitting area page.

##### **3.1.2 Edit an Outfitting Area.**

[![image-1710435044305.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710435044305.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710435044305.png)

1.Click [![image-1651659256503.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659256503.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659256503.png)(Edit icon) of the respective Fig See 3.1.2

The page shows the details of the selected Area.  
1\. Edit Are and description as required.  
2\. Click **Save**.

##### **3.1.3 Delete an Outfitting Area** 

[![image-1710435427995.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710435427995.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710435427995.png)

If you want to delete any existing system in the Outfitting Area page, you can use [![image-1651659320550.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659320550.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659320550.png) (Delete icon) provided in the Outfitting page. By click confirm delete

[![image-1710435477249.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710435477249.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710435477249.png)

1. Click [![image-1651603839749.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603839749.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603839749.png) (Delete icon) for the corresponding area.
    
    You receive a notification message “Confirm Delete?”.
2. Click **OK**. The Outfitting Area deleted successfully.

##### **3.1.4 Export a Outfitting Area**

  
You can export a list of outfitting area added in the outfitting page in both the pdf and excel formats by using[![image-1651659355160.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659355160.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659355160.png) (PDF button) and [![image-1651659366247.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659366247.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659366247.png) (Excel button). Fig See35.1.4 page

[![image-1710756818871.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710756818871.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710756818871.png)

  
 Fig 3.1.4 Export a painting work page

##### **3.1.5 Filter an outfitting area**

If you want to filter any specific outfitting area in the outfitting area page, you can use [![image-1651659424215.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659424215.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659424215.png) (FILTER button) located on the outfitting area page.

[![image-1711966462484.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711966462484.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711966462484.png)  
 Fig 3.1.5 Filter an outfitting area page

#### **3.2 Outfitting Work** 

Click **Outfitting** in the Master menu.  
The **Outfitting** page opens.

[![image-1711943489548.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711943489548.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711943489548.png)  
 3.2 Out Fitting Work Page

##### **3.2.1 Add an Outfitting Work**

If you want to add an Outfitting Work, do the following steps,  
Click [![image-1651427486684.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427486684.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427486684.png) (**ADD** button) in the Outfitting work **List.**

[![image-1711943596084.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711943596084.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711943596084.png)  
A new page opens to add an Outfitting work request. ￼  
[![image-1711943664122.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711943664122.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711943664122.png)

1. In the **Frames and Panel** box, enter an area number.
2. In the **Drawing Number** box, enter the drawing number.
3. **In the Area Box select for the drop-down list.**
4. In the **Description Item** box, enter the description item.
5. Click **Save**.  
    [![image-1711944489610.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711944489610.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711944489610.png)
    
    The Outfitting work is successfully added in Outfitting work page.

##### **3.2.2 Edit an Outfitting work.**

[![image-1711944558121.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711944558121.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711944558121.png)

[![image-1711944591854.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711944591854.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711944591854.png)

1.Click [![image-1651659256503.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659256503.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659256503.png)(Edit icon) of the respective Fig See 3.2.2

The page shows the details of the selected work.  
1\. In work box, enter an area number.  
2\. Click **Save**.Outfitting work updated successfully.

##### **3.2.3 Delete an Outfitting work.** 

[![image-1711944677684.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711944677684.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711944677684.png)

If you want to delete any existing system in the Outfitting work page, you can use [![image-1651659320550.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659320550.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659320550.png) (Delete icon) provided in the Outfitting page. By click confirm delete

[![image-1711944733250.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711944733250.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711944733250.png)

1. Click [![image-1651603839749.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603839749.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603839749.png) (Delete icon) for the corresponding work.
    
    You receive a notification message “Confirm Delete?”.
2. Click **OK**. The Outfitting work is deleted successfully.

##### **3.2.4 Export an Outfitting Work**

  
You can export a list of outfitting work added in the outfitting page in both the pdf and excel formats by using[![image-1651659355160.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659355160.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659355160.png) (PDF button) and [![image-1651659366247.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659366247.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659366247.png) (Excel button). Fig See3.2.4 page

[![image-1711944805569.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711944805569.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711944805569.png)

  
 Fig 3.2.4 Export an Outfitting Work page

##### **3.2.5 Filter an outfitting Work**

If you want to filter any specific outfitting work in the outfitting work page, you can use [![image-1651659424215.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659424215.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659424215.png) (FILTER button) located on the outfitting work page.

[![image-1711944864359.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711944864359.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711944864359.png)

##### **3.2.6 Import an Outfitting Work** 

If you want to **Import** multiple work parts together, do the following steps,

[![image-1711945194335.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711945194335.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711945194335.png)

<div class="pointer-container" id="bkmrk-%C2%A0-21"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--181" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>1. Click [![image-1651604149198.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604149198.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604149198.png) (**IMPORT** button) in the outfitting work. Refer above fig3.2.6
2. It will redirected to import page
3. Click [![image-1651120365377.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120365377.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120365377.png) (**TEMPLATE** button) . An excel worksheet will be downloaded with a predefined template to enter the details of.  
    [![image-1711945271328.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711945271328.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711945271328.png)
4. Once you have added the outfitting details in the excel worksheet, save the excel worksheet on your computer. [![image-1711945419539.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711945419539.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711945419539.png)
5. After saved the excel, browse and upload the excel.
6. Automap -This function is used to map system columns and excel columns automatically.
7. Map - This function is used to map each system and excel columns manually
8. Unmap - This is used to remove the mapped column
9. Unmap all -This is used to remove the all the mapped columns
10. Click populate values ,process and Import buttons. Refer below fig 
    1. [![image-1705593998835.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705593998835.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705593998835.png)
    2. Outfitting details imported successfully.

#### **3.3 RFI Fabrication** 

Click **Outfitting** in the Master menu.  
The RFI Fabrication page opens.

[![image-1711949156998.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711949156998.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711949156998.png)

  
 Fig 3.2 RFI Fabrication Page

##### **3.3.1 Add a RFI Fabrication**

cuteQM\_Production role user only can add RFI request.If you want to add an RFI Fabrication, do the following steps,  
Click [![image-1651427486684.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427486684.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427486684.png) (**ADD** button) in the Outfitting work **List.**

[![image-1724396682611.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724396682611.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724396682611.png)

  
A new page opens to add a RFI fabrication request. ￼[![image-1711949854530.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711949854530.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711949854530.png)

1. In the **Inspection Date &amp; Time box, select the inspection date and time.**
2. **In the Subcontractor box, select the subcontractor from the drop-down list.**
3. In the **Inspection Type box**, choose by selecting anyone.
4. In the **Description Item** box, enter the description.

[![image-1711950376008.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711950376008.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711950376008.png)

1. Click[![image-1651201285984.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201285984.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201285984.png) (Add Selected Outfitting) of the respective outfitting you want to add.

The added outfitting will be moved and listed in the right side of the page.

1. [![image-1651201433945.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201433945.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201433945.png) **Tip**: If you want to remove any added outfitting, click [![image-1651201449656.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201449656.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201449656.png)(**Remove** icon) of the respective joint.
2. In the **Description** box, enter the description for the added RFI fabrication request.
3. Click **Save**.

The RFI Fabrication request is successfully added.

##### **3.3.2 Edit a RFI Fabrication list**

[![image-1711950765201.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711950765201.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711950765201.png)

1.Click [![image-1651659256503.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659256503.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659256503.png)(Edit icon) of the respective Fig See 3.3.2

[![image-1711950866896.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711950866896.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711950866896.png)

The page shows the details of the selected Outfitting.  
1\. In the **Subcontractor box**, select the subcontractor from the drop-down list.   
2\. Click **Save**.

[![image-1711951049622.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711951049622.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711951049622.png)

1\. If you want to edit an Inspection date, then you can click [![image-1711951108704.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711951108704.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711951108704.png)edit button to edit inspection date.  
2\. Click **Save**.

##### **3.3.3 Submit a RFI Fabrication List**

Once you have added the RFI fabrication request, the **Submission** column in the **RFI Fabrication Lists** page is appeared with[![image-1651201968441.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201968441.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201968441.png)(Submit and Reject icons). See Fig 3.3.3

[![image-1711951594483.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711951594483.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711951594483.png)

  
 Fig 3.3.3 Submit &amp; Approve a RFI Fabrication Page

1. If you want to submit the RFI fabrication request, click [![image-1651201981884.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201981884.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201981884.png)(Submit icon) in the **Submit** column. Otherwise click [![image-1651201995224.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201995224.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201995224.png)(Reject icon) to reject the request.
    
    Once you have submitted the RFI fabrication list request, in the **Confirm** **Status** column in the **RFI Fabrication List** page is appeared with[![image-1651202048663.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202048663.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202048663.png)(Confirm and Reject icons).

<div class="pointer-container" id="bkmrk-%C2%A0-24"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--182" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>The approved request will be moved to for inspection.

##### **3.3.4 Approve RFI Fabrication List.**

**cuteQM\_Licensee\_QA user only can approve the RFI request.**

<div class="pointer-container" id="bkmrk-%C2%A0-26"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--183" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>1. If you want to approve the RFI **Fabrication list** request, click[![image-1651203762346.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203762346.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203762346.png) (confirm icon) in the **Confirm Status** Otherwise click [![image-1651203792080.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (Reject icon) to reject the request.  
    2. Once RFI request approved [![image-1706614735279.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706614735279.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706614735279.png) icon will be enabled to put result. [![image-1711951834454.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711951834454.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711951834454.png)
    
      
    3. Click icon ￼[![image-1706632325743.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706632325743.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706632325743.png) result popup will open.   
    [![image-1711951854733.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711951854733.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711951854733.png)
    
    [![image-1711951902169.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711951902169.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711951902169.png)
    
     Fig 3.3.4 Approve RFI Fabrication Page
2. Click **Save**
3. RFI result is updated successfully.
4. If Accepted with comments given as result, then punch list will be created, and this will be shown in view punch list screen.
5. If need to upload documents against system No, then click attachment icon at the result popup and upload documents.  
    [![image-1711951944948.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711951944948.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711951944948.png)
    
      
    ##### **3.3.5 Print RFI Fabrication list report.**
    
    If you want to print an RFI fabrication report, click [![image-1651808508303.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808508303.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808508303.png) (print icon) provided in the **Report** column of the RFI Fabrication page.

 **In the print,user can see the signature of both production user and** **QC. Requestor signature mapped with Production user and Inspector signature mapped with QC .**

**[ Click here to find the steps to upload Digital signature](https://wiki.cuteinfocomm.com/books/cuteqm/page/user-management-qg8#bkmrk-1.3%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0-log-ou "Steps to upload Digital signature")**

[![image-1711952131914.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711952131914.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711952131914.png)

<div class="pointer-container" id="bkmrk-%C2%A0-51"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--184" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>  
 Fig 3.3.5 View a RFI Fabrication page.

[![image-1724218072257.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724218072257.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724218072257.png)

[ ![image-1724218003081.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724218003081.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724218003081.png)

  
 Fig 3.3.5 RFI Fabrication print Page

##### **3.3.6 Attach a File into a RFI Fabrication**

If you want to attach a file with any existing RFI fabrication list listed in the **RFI Fabrication** page, you can attach the file by using [![image-1651202499153.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202499153.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202499153.png) (Attach icon) in the **Attachment** column.

[![image-1711952414437.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711952414437.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711952414437.png)

[![image-1711952439688.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711952439688.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711952439688.png)

 Fig 3.3.6 Attach a RFI Fabrication Page

##### **3.3.3 Export a RFI Fabrication list** 

  
You can export a list of RFI Fabrication added in the outfitting page in both the pdf and excel formats by using[![image-1651659355160.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659355160.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659355160.png) (PDF button) and [![image-1651659366247.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659366247.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659366247.png) (Excel button). Fig See3.3.3 page

[![image-1711952825859.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711952825859.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711952825859.png)

  
 Fig 3.3.3 Export an RFI Fabrication List Page

##### **3.3.4 Filter a RFI Fabrication**

If you want to filter any specific outfitting work in the outfitting work page, you can use [![image-1651659424215.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659424215.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659424215.png) (FILTER button) located on the outfitting work page.

[![image-1711952900472.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711952900472.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711952900472.png)  
 Fig 3.3.4 Filter a RFI fabrication Page.

#### **3.4 RFI Installation** 

Click **Outfitting** in the Master menu.  
The RFI Installation page opens.

[![image-1711949156998.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711949156998.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711949156998.png)

  
 Fig 3.2 RFI Installation Page

##### **3.4.1 Add a RFI Installation list** 

**cuteQM\_Production** role user can add RFI request.If you want to add an RFI Installation, do the following steps,  
Click [![image-1651427486684.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427486684.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427486684.png) (**ADD** button) in the RFI installation **List.**

[![image-1724396773223.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724396773223.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724396773223.png)

  
A new page opens to add a RFI Installation request. ￼

[![image-1711953311061.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711953311061.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711953311061.png)

1. In the **Inspection Date &amp; Time box,** select the inspection date and time.
2. In the **Subcontractor box,** select the subcontractor from the drop down list**.**
3. In the **Inspection Type box**, choose by selecting anyone.
4. In the **Description Item** box, enter the description.

[![image-1711953381293.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711953381293.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711953381293.png)

[![image-1711953779448.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711953779448.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711953779448.png)

1. Click[![image-1651201285984.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201285984.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201285984.png) (Add Selected Outfitting) of the respective outfitting you want to add.

The added outfitting will be moved and listed in the right side of the page.  
[![image-1651201433945.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201433945.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201433945.png) **Tip**: If you want to remove any added outfitting, click [![image-1651201449656.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201449656.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201449656.png)(**Remove** icon) of the respective outfitting work.

1. In the **Description** box, enter the description for the added RFI installation request.
2. Click **Save**.

The RFI Installation request is successfully added.

##### **3.4.2 Edit a RFI Installation List** 

1.Click [![image-1651659256503.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659256503.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659256503.png)(Edit icon) of the respective Fig See 3.4.2

[![image-1711953680378.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711953680378.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711953680378.png)

[![image-1711953797162.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711953797162.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711953797162.png)

The page shows the details of the selected Outfitting.  
1\. In the **Subcontractor box**, select the subcontractor from the drop-down list.   
2\. Click **Save**.[![image-1711953835979.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711953835979.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711953835979.png)

1\. If you want to edit an Inspection date, then you can click [![image-1711951108704.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711951108704.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711951108704.png)(edit button) to edit inspection date.  
2\. Click **Save**.

##### **3.4.3 Submit a RFI Installation List**

Once you have added the RFI installation request, the **Submission** column in the **RFI Installation Lists** page is appeared with[![image-1651201968441.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201968441.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201968441.png)(Submit and Reject icons). See Fig 3.4.3

[![image-1711954311640.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711954311640.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711954311640.png)

 Fig 3.3.3 Submit &amp; Approve a RFI Installation Page

1. If you want to submit the RFI Installation request, click [![image-1651201981884.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201981884.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201981884.png)(Submit icon) in the **Submit** column. Otherwise click [![image-1651201995224.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201995224.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201995224.png)(Reject icon) to reject the request.
    
    Once you have submitted the RFI Installation list request, in the **Confirm** **Status** column in the **RFI Installation List** page is appeared with[![image-1651202048663.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202048663.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202048663.png)(Confirm and Reject icons).

<div class="pointer-container" id="bkmrk-%C2%A0-30"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--185" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>The approved request will be moved to for inspection.

##### **3.4.4 Approve RFI Installation List.**

**cuteQM\_Licensee\_QA user only can approve the RFI request.**

<div class="pointer-container" id="bkmrk-%C2%A0-32"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--186" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>1. f you want to approve the RFI **Installation list** request, click[![image-1651203762346.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203762346.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203762346.png) (confirm icon) in the **Confirm Status** Otherwise click [![image-1651203792080.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (Reject icon) to reject the request.  
    2. Once RFI Installation request approved [![image-1706614735279.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706614735279.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706614735279.png) icon will be enabled to put result. [![image-1711954564136.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711954564136.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711954564136.png)
    
      
    3. Click icon ￼[![image-1706632325743.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706632325743.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706632325743.png) result popup will open.   
    [![image-1711954696949.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711954696949.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711954696949.png)
    
     Fig 3.4.4 Approve RFI In Page
2. Click **Save**
3. RFI result is updated successfully.
4. If Accepted with coments given as result, then punch list will be created, and this will be shown in view punch list screen.
5. If need to upload documents against system No, then click attachment icon at the result popup and upload documents.  
    [![image-1711954734822.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711954734822.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711954734822.png)
    
      
    ##### **3.4.5 Print a RFI Installation**
    
    If you want to print an RFI fabrication report, click [![image-1651808508303.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808508303.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808508303.png) (print icon) provided in the **Report** column of the RFI Fabrication page.
    
    **In the print,user can see the signature of both production user and** **QC. Requestor signature mapped with Production user and Inspector signature mapped with QC .**

**[ Click here to find the steps to upload Digital signature](https://wiki.cuteinfocomm.com/books/cuteqm/page/user-management-qg8#bkmrk-1.3%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0-log-ou "Steps to upload Digital signature")**

1. [![image-1711954839059.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711954839059.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711954839059.png)
    
    <div class="pointer-container" id="bkmrk-%C2%A0-52"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--187" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>  
     Fig 3.4.5 View a RFI Installation page.
    
    [![image-1724218269453.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724218269453.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724218269453.png)
    
      
     Fig 3.4.5 RFI Installation print Page
    
    #####  **3.4.6 Attach a File into a RFI Installation List.**
    
    If you want to attach a file with any existing RFI Installation list listed in the **RFI Installation** page, you can attach the file by using [![image-1651202499153.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202499153.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202499153.png) (Attach icon) in the **Attachment** column.
    
    [![image-1711955132396.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711955132396.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711955132396.png)
    
    [![image-1711955155246.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711955155246.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711955155246.png)
    
     Fig 3.4.6 Attach a RFI Installation Page

##### **3.4.7 Export a RFI Installation list** 

  
You can export a list of RFI Installation added in the outfitting page in both the pdf and excel formats by using[![image-1651659355160.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659355160.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659355160.png) (PDF button) and [![image-1651659366247.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659366247.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659366247.png) (Excel button). Fig See3.4.7 page

[![image-1711955248775.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711955248775.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711955248775.png)

  
 Fig 3.4.7 Export an RFI Installation List Page

##### **3.4.8 Filter a RFI Installation list**

If you want to filter any specific RFI Installation in the Inspection page, you can use [![image-1651659424215.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659424215.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659424215.png) (FILTER button) located on the outfitting page.

[![image-1711955353101.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711955353101.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711955353101.png)

  
 Fig 3.4.8 Filter a RFI Installation Page.

#### **4.0 Outfitting Summary**  
  


Click **Outfitting** in the **Outfitting** menu.  
The **Outfitting Summary** page opens. ￼Here we can see the summary of all the outfitting works.

[![image-1711966917095.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711966917095.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711966917095.png)  
 Fig 4.0 Outfitting Summary page

##### **4.1 Export an Outfitting Summary list** 

You can export a list of Outfitting Summary added in the outfitting page in both the pdf and excel formats by using[![image-1651659355160.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659355160.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659355160.png) (PDF button) and [![image-1651659366247.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659366247.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659366247.png) (Excel button). Fig See4.1 page

[![image-1711967639883.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711967639883.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711967639883.png)

  
 Fig 4.1 Export an Outfitting Summary Page

##### **4.2 Filter an Outfitting Summary List**

<div class="pointer-container" id="bkmrk-%C2%A0-38"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--188" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>If you want to filter any specific in the Outfitting Summary page, [![image-1706620114904.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706620114904.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706620114904.png)  
 Fig 4.2 Filter an Outfitting Summary List Page.



#### **5.0 Painting**

The Ship Structural menu in the ***cute QM*** app helps you to add the master data. Once you click the Painting menu, the following tabs opens Master (Painting Work) Inspection (RFI Coat) Reports (Painting Summary)

1.Click Painting in the menu,  
The Master page opens.

[![image-1710521610662.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710521610662.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710521610662.png)

##### **5.1.1 Add a Painting Work** 

Click [![image-1651427486684.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427486684.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427486684.png) (**ADD** button) in the Painting Work page.

A new page opens to add Painting work List request. ￼[![image-1710522209320.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710522209320.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710522209320.png)

[![image-1710522248197.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710522248197.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710522248197.png)  
 Fig 5.1.1 Add a Painting Work Page

1. In the **Painting Item** box, enter the painting item number.
2. In the **Area** box, enter the painting area
3. In the **Number of Coat** box, select a number of coats from a drop-down list.
4. In the **surface preperation** box,enter the surface preperation
5. In the **Subcontractor** box, select a subcontractor from drop down list.

Click **Save.** The Painting is added successfully.

##### **5.1.2 Edit a Painting Work** 

If you want to edit any existing painting in the painting page,

[![image-1710523155355.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710523155355.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710523155355.png)  
 Fig 5.1.2 Edit a Painting Page

1\. Click [![image-1651659256503.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659256503.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659256503.png)(Edit icon) of the respective paintings. Fig See 5.1.2

The Painting page shows the details of the selected Painting. ￼[![image-1710523071559.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710523071559.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710523071559.png)

1. Edit the details of Painting item,area,Number of coat,surface preperation and subcontractor as required.
2. Click **Save.**

 Painting updated successfully.

##### **5.1.3 Delete a Painting master.**



If you want to delete any existing in the Painting works page, you can use [![image-1651659320550.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659320550.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659320550.png) (Delete icon) provided in the painting work's page. By click confirm delete

[![image-1710523627647.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710523627647.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710523627647.png)

<div class="pointer-container" id="bkmrk-%C2%A0-40"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--189" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>1. Click [![image-1651603839749.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603839749.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603839749.png) (Delete icon) for the corresponding area.
    
    You receive a notification message “Confirm Delete?”.

 Click **OK**. Painting work deleted successfully.

##### **5.1.4 Export a Painting Works**

  
You can export a list of Paintings added in the Painting Works page in both the pdf and excel formats by using[![image-1651659355160.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659355160.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659355160.png) (PDF button) and [![image-1651659366247.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659366247.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659366247.png) (Excel button). Fig See 5.1.4 page

[![image-1710525117026.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710525117026.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710525117026.png)  
 Fig 5.1.4 Export a painting work page

##### **5.1.5 Filter a Painting Works**

If you want to filter any specific Painting in the Painting page, you can use [![image-1651659424215.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659424215.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659424215.png) (FILTER button) located on the painting page.

[![image-1710523984073.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710523984073.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710523984073.png) Fig 5.1.5 Filter a Painting Works Page.

##### **5.1.6 Import Multiple Painting Works**

If you want to import multiple Painting works together, do the following.

1. Once you have added the painting details in the excel worksheet, save the excel worksheet on your computer.
2. Click [![image-1651659510503.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659510503.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659510503.png) (IMPORT button). See Fig 5.1.6
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1711122603090.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711122603090.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711122603090.png)
3. Click [![image-1651659552512.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659552512.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659552512.png) (Browse button) to select the excel worksheet to be uploaded.
4. Select the excel worksheet you want to upload from your computer.
5. Click [![image-1651659573527.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659573527.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659573527.png) (Upload button) to export the systems that are included in the excel worksheet.
    
    Click [![image-1651659462780.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659462780.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659462780.png) (TEMPLATE button). See Fig 5.1.6
    
    An excel worksheet will be downloaded with a predefined template to enter the details of painting.
    
    [![image-1710524097798.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710524097798.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710524097798.png)
    
    
    1. Enter the required painting details in the respective columns of the excel worksheet.
    2. After saved the excel, browse and upload the excel.
    3. Automap -This function is used to map system columns and excel columns automatically.
    4. Map - This function is used to map each system and excel columns manually
    5. Unmap - This is used to remove the mapped column
    6. Unmap all -This is used to remove the all mapped columns
    7. Click populate values ,process and Import buttons. Refer below fig 
        1. [![image-1705593998835.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705593998835.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705593998835.png)
        2. Painting details imported successfully.

<div class="pointer-container" id="bkmrk-%C2%A0-41"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--191" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>##### **5.1.7 View Log a Painting Works** 

If you want to view a painting report, click[![image-1710524518740.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710524518740.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710524518740.png) (view log detail icon) provided in the Excel Import page.

[![image-1710524659699.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710524659699.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710524659699.png)

Once you click **View Log detail**  
New window open with **Log Details**  [![image-1710524559764.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710524559764.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710524559764.png)

In the **Log details** click **View details to get Painting Item list.**

#### **5.2 RFI Coat Inspection**

[![image-1724396850280.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724396850280.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724396850280.png)

  
 Fig 5.2 RFI Coat Inspection Page.

##### **5.2.1 Add a RFI Coat Inspection**

**cuteQM\_Production** role user only can add RFI request.If you want to add a RFI Coat Inspection list, do the following steps,

[![image-1710525927652.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710525927652.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710525927652.png)

1\. Click [![image-1651162410824.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162410824.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162410824.png) (**ADD** button) in the RFI paint Coat Request See Fig 5.2.1  
A new window opens to add a RFI Paint Coat request.[![image-1710525844400.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710525844400.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710525844400.png)

1. In the **Inspection Date and Time** box, select the inspection date and time.
2. In the **Subcontractor** box, select a subcontractor from a drop-down list.
3. in the Inspection Type box, choose the inspection type.
4. In the **Description** box, enter the description for the added RFI Painting Coat is request.

You can add multiple Coats for one request. ￼[![image-1710526321385.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710526321385.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710526321385.png)

1. Click[![image-1651201285984.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201285984.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201285984.png) (Add Selected Coats) of the respective RFI Coat inspection you want to add.

The added Coats will be moved and listed in the right side of the page.

[![image-1651201433945.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201433945.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201433945.png) **Tip**: If you want to remove any added Coats, click [![image-1651201449656.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201449656.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201449656.png)(**Remove** icon) of the respective Painting.

1. In the **Description** box, enter the description for the added RFI Coat Request.
2. Click **Save**.

The RFI Paint Coat list request is successfully added.

##### **5.2.2 Edit a RFI Coat Inspection**

  
If you want to edit any existing a coat in the RFI Paint Coat inspection request page,[![image-1710526805168.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710526805168.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710526805168.png)  
 Click [![image-1651163343682.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163343682.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163343682.png) (Edit icon) of the respective RFI Coat Inspection Request page opens. See Fig 5.2.2[![image-1710526727902.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710526727902.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710526727902.png)

[![image-1710526919594.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710526919594.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710526919594.png)

2\. Edit the details where you want.  
3\. Click **Save**.

The RFI Paint Inspection list is successfully updated.

##### **5.2.3 Submit RFI Coat Inspection**

Once you have added the RFI Coat inspection request, the **Submission** column in the **RFI Coat inspection** page is appeared with[![image-1651201968441.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201968441.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201968441.png)(Submit and Reject icons). See Fig 5.2.3

[![image-1710527141758.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710527141758.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710527141758.png)

  
 Fig 5.2.3 Submit RFI Coat Inspection

If you want to submit the RFI Coat Inspection request, click [![image-1651201981884.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201981884.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201981884.png)(Submit icon) in the **Submit** column. Otherwise click [![image-1651201995224.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201995224.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201995224.png)(Reject icon) to reject the request.

1. Once you have submitted the RFI Coat Inspection request, in the **Confirm** **Status** column in the **RFI coat inspection request List** page is appeared with[![image-1651202048663.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202048663.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202048663.png)(Confirm and Reject icons).

The approved request will be moved to for inspection.

##### **5.2.4 Approve RFI Coat Inspection**

**cuteQM\_Licensee\_QA user only can approve the RFI request.**

<div class="pointer-container" id="bkmrk-%C2%A0-42"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--192" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>1. f you want to approve the RFI **Coat Inspection** request, click[![image-1651203762346.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203762346.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203762346.png) (confirm icon) in the **Confirm Status** Otherwise click [![image-1651203792080.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (Reject icon) to reject the request.  
    2. Once RFI coat inspection request approved [![image-1706614735279.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706614735279.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706614735279.png) icon will be enabled to put result. [![image-1711968251747.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711968251747.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711968251747.png)
    
      
    3. Click icon ￼[![image-1706632325743.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706632325743.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706632325743.png) result popup will open.   
    [![image-1711968304343.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711968304343.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711968304343.png)
    
     Fig 5.2.4 Approve RFI Inspection Page
2. Click **Save**
3. RFI result is updated successfully.
4. If Remarks given then painting list will be created, and this will be shown in view painting list screen.
5. If need to upload documents against system No, then click attachment icon at the result popup and upload documents.  
    [![image-1711968365194.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1711968365194.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1711968365194.png)

##### **5.2.5 View result of RFI Coat Inspection**

<div class="pointer-container" id="bkmrk-%C2%A0-44"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--193" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>If you want to view an RFI Coat inspection report, click[![image-1710527772244.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710527772244.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710527772244.png) (add) provided in the **Report** column of the RFI Coat Inspection page.

[![image-1710527662611.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710527662611.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710527662611.png)  
Click icon ￼[![image-1706632325743.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706632325743.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706632325743.png) result popup will open. [![image-1710527973278.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710527973278.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710527973278.png)Click icon [![image-1710528060952.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710528060952.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710528060952.png) file upload popup will open.[![image-1710528029167.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710528029167.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710528029167.png)  
 Fig 5.2.5 File upload for RFI Coat inspection page

1. Click **Save**
2. RFI result is updated successfully.
3. If Accepted with comments given as result,then punch list will be created, and this will be shown in view punch list screen.

If need to upload documents against system No, then click attachment icon at the result popup and upload documents.

##### **5.2.6 Print a RFI Coat Inspection**

If you want to view an RFI Coat Inspection, click [![image-1651808508303.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808508303.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808508303.png) (print icon) provided in the **Report** column of the RFI Coat Inspection List

**Signature of production user and QC also shown in the print. Requestor signature mapped with Production user and Inspector signature mapped with QC .**

**[Click here to find the steps to upload Digital signature](https://wiki.cuteinfocomm.com/books/cuteqm/page/user-management-qg8#bkmrk-1.3%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0-log-ou "Steps to upload Digital signature")**

<div class="pointer-container" id="bkmrk-%C2%A0-45"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--194" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>[![image-1710528321895.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710528321895.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710528321895.png)  
 Fig 5.2.6 View a RFI Coat Inspection Page

[![image-1724218636836.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724218636836.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724218636836.png)

[![image-1724218736723.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724218736723.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724218736723.png)

##### **5.2.7 Attach a File into a RFI Coat Inspection**

If you want to attach a file with any existing RFI Coat inspection list listed in the **RFI Coat inspection List** page, you can attach the file by using [![image-1651202499153.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202499153.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202499153.png) (Attach icon) in the **Attachment** column.

[![image-1710528604379.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710528604379.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710528604379.png)

  
A new window opens for file upload.  
In the **category** box, select the category from drop-down list.  
Select[![image-1710528712393.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710528712393.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710528712393.png)(Browse button) and upload the documents.

<div class="pointer-container" id="bkmrk-%C2%A0-46"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--195" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>[![image-1710528688342.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710528688342.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710528688342.png)  
 Fig 5.2.7 Attach a file RFI Coat Inspection

##### **5.2.8 Export a RFI Coat Inspection 

You can export a list of RFI Coat Inspection requests added in the **RFI Fit coat Inspection** page in both the pdf and excel formats by using [![image-1651202537414.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202537414.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202537414.png) (**PDF** button) and [![image-1651202548613.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202548613.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202548613.png) (**Excel** button).[![image-1710529055518.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710529055518.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710529055518.png) Fig 5.2.8 Export a RFI Coat Inspection Page.

##### **5.2.9 Filter a RFI Coat Inspection**

If you want to filter any specific RFI Coat Inspection list in the RFI Coat Inspection page,

<div class="pointer-container" id="bkmrk-%C2%A0-47"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--196" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>you can use [![image-1651202662798.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202662798.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202662798.png) (**FILTER** button) located on the **RFI Coat Inspection.**[![image-1710529192482.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710529192482.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710529192482.png) Fig 5.2.9 Filter a RFI Coat inspection.

##### **5.3.0 Painting Works Summary** 

**We can see the summary of all the painting RFI details here.**

You can export a Painting Works Summary requests added in the painting work summary page in both the pdf and excel formats by using [![image-1651202537414.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202537414.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202537414.png) (**PDF** button) and [![image-1651202548613.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202548613.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202548613.png) (**Excel** button).[![image-1710529370562.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710529370562.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710529370562.png) Fig 5.3.0 Painting Work Summary Page

##### **5.3.1 Export an Painting Summary list** 

You can export a list of Painting Summary added in the painting page in both the pdf and excel formats by using[![image-1651659355160.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659355160.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659355160.png) (PDF button) and [![image-1651659366247.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659366247.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659366247.png) (Excel button).

[![image-1712035447304.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1712035447304.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1712035447304.png)

##### **5.3.2 Filter a Painting Works Summary**

<div class="pointer-container" id="bkmrk-%C2%A0-48"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--197" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>If you want to filter any specific painting work summary in the paintings page, you can use [![image-1651659424215.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659424215.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659424215.png) (FILTER button) located on the Hull page.[![image-1710529728972.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710529728972.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710529728972.png)

 Fig 5.3.1 Filter a Painting Works Summary Page

#####  

<span style="color: #222222; font-size: 1.666em; font-weight: 400;"> </span>

# Electrical and Instrumentation

Electrical and Instrumentation

# Electrical

### 1. Project Data

The **Project Data** menu in the ***cuteQM*** app helps you to add the master data. Once you click the **Project Data** menu, the following tabs open,[![image-1705845133069.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705845133069.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705845133069.png)


#### **1.0 Systems**

You can add the details of systems to be used in the Electrical project by using the Systems tab in the Project Data menu. If you  
want to navigate to Systems,

1.Click **Systems** in the **Project Data** menu,  
The **System** page opens.[![image-1705848048461.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705848048461.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705848048461.png) Fig 1.0 Systems Page

##### **1.1.1 Add a System**

  
If you want to add a new system, do the following steps,  
1\. Click [![image-1651659058478.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659058478.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659058478.png) (ADD button) in the **System** page. See Fig 1.1.1

A new window opens to add a new system.[![image-1705848201964.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705848201964.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705848201964.png)  
 Fig 1.1.1 Add a System Page

1. [![image-1651659093576.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659093576.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659093576.png) Note: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **System** box, enter the system name.
3. In the **Abbreviation** box, enter the abbreviation for the system name.
4. In the **System Number** box, enter the system number.
5. Click **Save**.
    
    The **system** is successfully added and listed in the System page.
    
    [![image-1705848480733.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705848480733.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705848480733.png)
6. [![image-1651659141800.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659141800.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659141800.png)Note: If you want to map cover page for any added system, click the respective [![image-1651659166560.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659166560.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659166560.png)(Add icon) provided in the Map Cover Page column and add the cover pages.
7. If you want to map certificates for any added system, click the respective (Add icon) provided in the Map Certificates column and add the cover pages.
8. If you want to map Check Record/Check Sheet (CR/CS) for any added system, click the respective (Add icon) provided in the Map CR/CS column and add the cover pages.

##### **1.1.2 Edit a System**

If you want to edit any existing system in the System page,[![image-1706597639457.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706597639457.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706597639457.png)  
 Fig 1.1.2 Edit a System Page

1. Click [![image-1651659256503.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659256503.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659256503.png)(Edit icon) of the respective System. Fig See 1.1.2 The System page shows the details of the selected system.
    
    [![image-1706597575286.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706597575286.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706597575286.png)
2. Edit the details of system,Abbreviation and System number as required.
3. Click Save. System updated successfully.

##### **1.1.3 Delete a System**

If you want to delete any existing system in the System page, you can use [![image-1651659320550.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659320550.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659320550.png) (Delete icon) provided in the System page. By click confirm delete

[![image-1706597344901.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706597344901.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706597344901.png)  
 Fig 1.1.3 Delete a System Page

1. Click [![image-1651603839749.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603839749.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603839749.png) (Delete icon) for the corresponding area.
    
    You receive a Alert message “Confirm Delete?”.
2. Click **OK**. System deleted successfully.

##### **1.1.4 Export in System List**

You can export a list of systems added in the System page in both the pdf and excel formats by using[![image-1651659355160.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659355160.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659355160.png) (PDF button) and [![image-1651659366247.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659366247.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659366247.png) (Excel button). Fig See 1.1.4 page [![image-1706629649819.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706629649819.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706629649819.png)  
 Fig 1.1.4 Export System List Page

##### **1.1.5 Filter a System**

If you want to filter any specific system in the System page, you can use [![image-1651659424215.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659424215.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659424215.png) (FILTER button) located on the System page.[![image-1706629846392.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706629846392.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706629846392.png)  
 Fig 1.1.5 Filter a System Page

##### **1.1.6 Import Multiple Systems**

If you want to import multiple systems together, do the following,

1. Click [![image-1651659462780.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659462780.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659462780.png) (TEMPLATE button). See Fig 1.1.6 An excel worksheet will be downloaded with a predefined template to enter the details of systems.
    
    [![image-1651659480729.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659480729.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659480729.png)
2. Enter the required system details in the respective columns of the excel worksheet.
3. Once you have added the system details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651659510503.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659510503.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659510503.png) (IMPORT button). See Fig
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651659540075.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659540075.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659540075.png)
5. Click [![image-1651659552512.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659552512.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659552512.png) (Browse button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651659573527.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659573527.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659573527.png) (Upload button) to export the systems that are included in the excel worksheet.

The details of the systems in the worksheet will be displayed in the System page.

##### **1.1.7 Attach a File into a System**

If you want to attach any file with any system listed in the System page, you can attach the file by using [![image-1651659636106.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659636106.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659636106.png) (Attach icon) in the Attachment column.[![image-1706629975839.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706629975839.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706629975839.png)

#### **1.2 Sub Systems**

The Sub Systems tab in the Project Data menu helps you to add the details of sub systems to be in used in the Electrical Project. If you want to navigate to Sub Systems,[![image-1705850290245.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705850290245.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705850290245.png)  
 Fig 1.2 Sub System Page.

##### **1.2.1 Add a Sub System**

  
If you want to add a **new sub system**, do the following steps,  
Click [![image-1651659747623.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659747623.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659747623.png) (ADD button) in the Sub System page. See Fig 1.2.1  
A new window opens to add a **new sub system**.[![image-1705850498394.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705850498394.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705850498394.png)  
 Fig 1.2.1 Add a Sub System  
[![image-1651659788121.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659788121.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659788121.png)Note: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.

1. In the System box, select a system from a drop-down list.
2. In the Sub System box, select a sub system from a drop-down list.
3. In the Abbreviation box, enter the abbreviation for the sub system.
4. In the Sub System Number box, enter the sub system number.
5. If the added subsystem needs to be flushed, select Yes in the Flushing option otherwise select No.
6. If there is need to perform the leakage test for the added subsystem, select Yes in the Leak Test option otherwise select No.
7. In the Description box, enter the description for the added sub system.
8. Click Save.  
    The sub system is successfully added and listed in the Sub System page.

##### **1.2.2 Edit a Sub System**

If you want to edit any existing sub system in the Sub System page,[![image-1706611974111.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706611974111.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706611974111.png)  
 Fig 1.2.2 Edit a Sub System

1. Click [![image-1651659889101.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659889101.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659889101.png)(Edit icon) of the respective sub system. See Fig 1.2.2
    
    [![image-1706597538423.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706597538423.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706597538423.png)
    
    The Sub System page shows the details of the selected sub system.
2. Edit the details of system,subsystem,abbreviation and sub system number as required.
3. Click Save.

##### **1.2.3 Delete a Sub System**

If you want to delete any existing sub system in the Sub System page, you can use [![image-1651660397600.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660397600.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660397600.png) (Delete icon) provided in the Sub System page.  
[![image-1707094228276.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707094228276.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707094228276.png)

1. Click [![image-1651603839749.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603839749.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603839749.png) (Delete icon) for the corresponding area.
    
    You receive a notification message “Confirm Delete?”.
2. Click **OK**.   
    Sub System deleted successfully

##### **1.2.4 Import a Multiple Sub Systems**

If you want to import multiple sub systems together, do the following,

<div class="pointer-container" id="bkmrk-%C2%A0-2"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--148" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>Click [![image-1651660524739.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660524739.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660524739.png) (TEMPLATE button). See Fig 1.2.4

An excel worksheet will be downloaded with a predefined template to enter the details of sub systems.

[![image-1651660604610.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660604610.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660604610.png)

1. Enter the required sub system details in the respective columns of the excel worksheet.
2. Once you have added the sub system details in the excel worksheet, save the excel worksheet on your computer.
3. Click [![image-1651660633001.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660633001.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660633001.png) (IMPORT button). See Fig 1.2.4 A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651660653449.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660653449.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660653449.png)
4. Click [![image-1651660666611.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660666611.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660666611.png) (Browse button) to select the excel worksheet to be uploaded.
5. Select the excel worksheet you want to upload from your computer.
6. Click [![image-1651660691446.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660691446.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660691446.png) (Upload button) to export the sub systems that are included in the excel worksheet.
    
    The details of the sub systems in the worksheet will be displayed in the Sub System page.

##### **1.2.5 Attach a File into a Sub System**

If you want to attach any file with any sub system listed in the Sub System page, you can attach the file by using [![image-1651660738631.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660738631.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660738631.png) (Attach icon) in the Attachment column. [![image-1706630367610.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706630367610.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706630367610.png)

#### **1.3 Cabel Master**

The Cabel Master tab in the Project Data menu helps you to add the details of cable master to be in used in the Electrical Project. If you want to navigate to Cabel Master, ￼[![image-1705851376330.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705851376330.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705851376330.png)  
 Fig 1.3 Cable Master Page

##### **1.3.0 Cabel List**

  
The **Cabel List tab** in the Project Data menu helps you to add the details of **Cabel List** to be in used in the Electrical Project. If you want to navigate to C**abel list.**[![image-1705853630871.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705853630871.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705853630871.png)  
 Fig 1.3.0 Cable List Page

##### **1.3.1 Add a Cabel List**

If you want to add a new cable list, do the following steps,  
Click [![image-1651659747623.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659747623.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659747623.png) (ADD button) in cable list page. See Fig 1.3.1  
A new window opens to add a new cable list.[![image-1705853516128.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705853516128.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705853516128.png)  
 Fig 1.31 Add Cable List Page

1. [![image-1651633190623.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651633190623.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651633190623.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **System Name** box, select a system name from a drop-down list.
3. In the **Revision** **No** box, select a system no from the drop-down list.
4. In the **Cable No** box, enter the cable number.
5. In the **Cable Length** box, select a system name from a drop-down list.
6. In the **Cabel Size** box, enter the cable size number.
7. in the **From Equipment** box, select a system name from a drop-down list.
8. In the **To Equipment** box, select a system name from a drop-down list.
9. Click **Save**.

The Cable List is successfully added.

#####  **1.3.2 Edit a Cable List**

 If you want to edit any existing Cable List in Edit Cable List page, do the following,[![image-1706598083803.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706598083803.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706598083803.png)  
 Fig 1.3.2 Edit a Cable List

1. Click [![image-1651605573165.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605573165.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605573165.png)(Edit icon) in the **Edit** column for the respective cable list. See Fig 3.3. A new window opens to edit the cable list.
    
    [![image-1706598196594.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706598196594.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706598196594.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**. The Cable List is successfully updated.

#####  **1.3.3 Delete a Cable List** 

If you want to delete any specific **Cable List** from the list of **cable list**, you can use (Delete icon) provided in the [![image-1651605636955.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605636955.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605636955.png)**Delete** column of the **Cable List** page, [![image-1706598359854.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706598359854.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706598359854.png)

1. Click [![image-1651605663402.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605663402.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605663402.png) (Delete icon) for the corresponding master drawing.
    
    You receive a notification message “**Confirm delete?**”.
2. Click **OK**. The Cable List is successfully deleted.

##### **1.3.4 Clone a Cable list**

  
The Clone option provided in the Cable master page used to add a new clone from previously added clone. If a clone to be added  
is having the same specifications of any clone already listed in the clone page, you can add the new clone by using [![image-1651131717921.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651131717921.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651131717921.png) (Clone icon).  
1\. Click[![image-1651131989751.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651131989751.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651131989751.png)(Clone icon) of the respective Clone.[![image-1706598484453.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706598484453.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706598484453.png)

  
2\. If you want to change any details, you can change in the respective boxes.  
3\. Click **Save**  
The new clone is successfully added and listed in the Clone page.

##### **1.3.5 Add a Map CR/CS**

If you want to map CR/CS, do the following steps,  
[![image-1651659141800.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659141800.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659141800.png)Note: If you want to map cover page for any added system, click the respective [![image-1651659166560.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659166560.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659166560.png)(Add icon) provided in the Map Cover Page column and add the cover pages.[![image-1706598709815.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706598709815.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706598709815.png)  
 Fig 1.3.5 Add a Map CR/ CS Page

1. If you want to map certificates for any added cable master, click the respective (Add icon) provided in the Map Certificates column and add the cover pages.
2. If you want to map Check Record/Check Sheet (CR/CS) for any added cable master, click the respective (Add icon) provided in the Map CR/CS column and add the cover pages.

##### **1.3.6 Export a Cable List**

You can export a list of cable added in the cable page in both the pdf and excel formats by using[![image-1651659355160.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659355160.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659355160.png) (PDF button) and [![image-1651659366247.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659366247.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659366247.png) (Excel button).  
[![image-1706713361267.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706713361267.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706713361267.png)

##### **1.3.7 Filter a Cable List**

If you want to filter any specific Cable list in the Cable master page, you can use [![image-1651659424215.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659424215.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659424215.png) (FILTER button) located on the Cable list page.[![image-1705940291282.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705940291282.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705940291282.png)

##### **1.3.7 Import Multiple Cable list**

If you want to import multiple cable list together, do the following,

1. Click [![image-1651128469532.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128469532.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128469532.png) (**TEMPLATE** button).
    
    An excel worksheet will be downloaded with a predefined template to enter the details of cable no.
    
    [![image-1705940625349.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705940625349.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705940625349.png)
2. Enter the required cable no details in the respective columns of the excel worksheet.
3. Once you have added the cable list details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651128544505.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128544505.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128544505.png) (**IMPORT** button).   
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651128572672.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128572672.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128572672.png)
5. Click [![image-1651128597761.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128597761.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128597761.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651128627885.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128627885.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128627885.png) (**Upload** button) to export the cable list that are added in the excel worksheet.
    
    The details of the cable list in the worksheet will be displayed in the cable list page.

#### **1.4 Type**

  
The **Type** tab in the Project Data (Electrical) menu helps you add the **type** details.  
If you want to navigate to **Type List,**

1\. Click Type **List** in the **Project Data (Electrical)** menu.  
The Type **List** page opens.[![image-1705941360918.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705941360918.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705941360918.png) Fig 1.4 Type Page

##### **1.4.1 Add a Type** 

If you want to add a new **type**, do the following steps,  
1\. Click [![image-1651659058478.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659058478.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659058478.png) (ADD button) in the **type** of page. See Fig 1.4.1  
A new window opens to add a new **Type** ￼[![image-1705947569533.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705947569533.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705947569533.png)  
 Fig 1.4.1 Add A Type Page

1. **[![image-1651155136829.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651155136829.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651155136829.png)Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **Type** box, enter the type .
3. In the **Description** box, enter the description for the type.
4. Click ****Save.****The type is successfully added.

##### **1.4.2 Edit a Type** 

If you want to edit any existing type in the type of page,[![image-1706615709735.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706615709735.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706615709735.png)  
 Fig 1.4.2 Edit Page

1. Click [![image-1651155657115.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651155657115.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651155657115.png)(Edit icon) of the respective valve.
    
    The **Type List** page shows the details of the selected type.
    
    [![image-1706599720125.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706599720125.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706599720125.png)
2. Edit the details of Type and description as required.
3. Click **Save**.
4. The type is successfully updated.

##### **1.4.3 Delete a Type**

If you want to delete any specific **Type** from the list of Type you can use (Delete icon) provided in the [![image-1651605636955.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605636955.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605636955.png)**Delete** column of the **Type** page,   
[![image-1706599807618.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706599807618.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706599807618.png)

1. Click [![image-1651605663402.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605663402.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605663402.png) (Delete icon) for the corresponding type.
    
    You receive a notification message “**Confirm delete?**”.
    
    [![image-1706615816554.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706615816554.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706615816554.png)
2. Click **OK**.
3. The type is successfully deleted.

##### **1.4.4 Export a Type** 

You can export a list of Type added in the Type List page in both the pdf and excel formats by using [![image-1651155777359.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651155777359.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651155777359.png) (PDF button) and [![image-1651155792745.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651155792745.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651155792745.png) (Excel button). [![image-1706616096319.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706616096319.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706616096319.png)

##### **1.4.5Filter a Type**

If you want to filter any type in the Type List page, you can use [![image-1651155842391.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651155842391.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651155842391.png) (FILTER button) provided on the Type List page. [![image-1706616173982.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706616173982.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706616173982.png)

#### **1.5 Equipements List** 

The Equipements tab in the Project Data menu used to add the details of equipment to be used in the Electrical project. To add equipment,

1\. Click **Equipements List** in the Project Data menu.  
The **Equipements** page opens[![image-1705949438958.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705949438958.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705949438958.png)  
 Fig 1.5 Equipements List

##### **1.5.1 Add an Equipment**

If you want to add an equipment list, do the following steps,  
1\. Click [![image-1651162410824.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162410824.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162410824.png) (**ADD** button) in the **Equipements List** See Fig 1.5.1  
A new window opens to add an equipment List.[![image-1705949677843.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705949677843.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705949677843.png)  
 Fig 1.5.1 Add an Equipment List

1. [![image-1651162503766.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162503766.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162503766.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.
2. In the **Name** box, enter the name of the equipment list.
3. In the **Location** box, enter the location of the equipment list.
4. In the **Tag Number** box, enter the number of the equipment list.
5. In the **Type** box, select the type of the equipment list.
6. Click ****Save****. The equipment list is successfully saved.

##### **1.5.2 Edit an Equipment List**

  
If you want to edit any existing an equipment in the **Equipment List** page,[![image-1706600230078.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706600230078.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706600230078.png)  
 Fig 1.5.2 Edit an Equipment List

1\. Click [![image-1651163343682.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163343682.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163343682.png) (Edit icon) of the respective test equipment. See Fig 1.5.2[![image-1706616323083.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706616323083.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706616323083.png)  
2\. Edit the details of equipment name,location,tag number and type as required where you want.  
3\. Click **Save**.

The equipment list is successfully updated.

##### **1.5.3 Delete an Equipment List** 

If you want to delete any existing an equipment list in the Equipment list page, you can use [![image-1651163416136.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163416136.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163416136.png) (Delete icon) provided in the Equipment List page.[![image-1706613183000.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706613183000.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706613183000.png)

1. Click [![image-1651603839749.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603839749.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603839749.png) (Delete icon) for the corresponding Equipment.
    
    You receive a confirmation message “**Confirm** **delete?**”.
2. Click **OK .** Selected Equipment List deleted successfully.

##### **1.5.4 Clone an Equipment List** 

1\. Click[![image-1651131989751.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651131989751.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651131989751.png)(Clone icon) of the respective Clone.  
[![image-1706613398621.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706613398621.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706613398621.png)  
 Fig 1.5.4 Clone an Equipment List

  
2\. If you want to change any details, you can change in the respective boxes. ￼[![image-1706613482445.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706613482445.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706613482445.png)3. Click **Save**  
The new clone is successfully added and listed in the Clone Equipment list page.

##### **1.5.5 Add a Map CR/CS**

If you want to add a new Map, do the following steps,

[![image-1706602507928.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706602507928.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706602507928.png)

  
[![image-1651659141800.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659141800.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659141800.png)Note: If you want to map cover page for any added equipment click the respective [![image-1651659166560.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659166560.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659166560.png)(Add icon) provided in the Map Cover Page column and add the cover pages.

1. If you want to map certificates for any added equipment master, click the respective (Add icon) provided in the Map Certificates column and add the cover pages.
2. If you want to map Check Record/Check Sheet (CR/CS) for any added equipment master, click the respective (Add icon) provided in the Map CR/CS column and add the cover pages.

##### **1.5.6 Export an Equipment List**

You can export a list of test equipment list added in the **Equipment List** page in both the pdf and excel formats by using [![image-1651163465862.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163465862.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163465862.png) (**PDF** button) and [![image-1651163476334.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163476334.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163476334.png) (**Excel** button).[![image-1706616597122.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706616597122.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706616597122.png)

##### **1.5.7 Filter an Equipment List**

You can also use [![image-1651163568393.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163568393.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163568393.png) (FILTER button) located on the Equipment list.[![image-1706616871638.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706616871638.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706616871638.png)

##### **1.5.8 Import Multiple Equipment List**

If you want to import multiple equipment list together, do the following,

<div class="pointer-container" id="bkmrk-%C2%A0-23"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--149" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>1. Click [![image-1651163686212.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163686212.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163686212.png) (**TEMPLATE** button). See Fig1.5.8
2. An excel worksheet will be downloaded with a predefined template to enter the details of equipment list.
    
    
    1. Enter the required equipment details in the respective columns of the excel worksheet.
    2. Once you have added the equipment details in the excel worksheet, save the excel worksheet on your computer.
    3. Click [![image-1651163752394.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163752394.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163752394.png) (**IMPORT** button). See Fig 1.5.8
        
        A new window opens for importing the excel worksheet saved on your computer.
        
        [![image-1651163782872.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163782872.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163782872.png)
    4. Click [![image-1651163789045.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163789045.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163789045.png) (**Browse** button) to select the excel worksheet to be uploaded.
    5. Select the excel worksheet you want to upload from your computer.
    6. Click [![image-1651163813900.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163813900.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163813900.png) (**Upload** button) to export the equipment list details that are included in the excel worksheet.
        
        The details of the equipment list in the worksheet will be displayed in the **Equipment List** page.

#### **1.6 Drawings** 

  
Drawing can be added through ADD or import of Drawing Master command.  
  
1\. Click Drawing Master in the Project Data menu.  
The Drawing Master page opens[![image-1706617148248.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706617148248.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706617148248.png)  
 Fig 1.6 Drawing Page

##### **1.6.1 Add a Drawing Master** 

If you want to Add Drawing Master, do the following steps.

<div class="pointer-container" id="bkmrk-%C2%A0-25"><div class="pointer anim "><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--150" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div></div></div>1. Click [![image-1651119261792.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651119261792.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651119261792.png) (**ADD** button) in the **Drawing type** page. See Fig 1.6.1 A new window opens to add a new Drawing Master. [![image-1706094108880.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706094108880.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706094108880.png)
    
    [ ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705028582770.png) **Figure 1.6.1 Drawing Master page.**  
    [![image-1651603678108.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603678108.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603678108.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.
2. In the **Drawing Number** box, you must enter the drawing number.
3. In the **Drawing Name** box, enter the drawing name.
4. In the **Revision Number** box, enter the revision number.
5. Click **Save**. The **Drawing Master** is successfully added.

##### **1.6.2 Edit a Drawing Type  


If you want to edit any existing Drawing master in the **Drawing master page**, do the following, steps

<div class="pointer-container" id="bkmrk-%C2%A0-27"><div class="pointer anim "><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--151" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div></div></div>1. Click [![image-1651603749311.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603749311.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603749311.png)(Edit icon) in the **Edit** column for the respective drawing master. See Fig 1.6.2 A new window opens to edit the saved one. [![image-1706094543858.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706094543858.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706094543858.png)  
     Fig 1.6.2 Edit a Drawing Type
2. **Edit** the details of Drawing number,Drawing name,Revision number,No of sheet and remarks as required.
3. Click **Save**. Selected Drawing Master updated successfully.

##### **1.6.3 Delete a Drawing Master**

If you want to delete any specific drawing from the drawing master, you can use (Delete icon) provided in the Delete column of the Drawing master page.

1. Click [![image-1651603839749.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603839749.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603839749.png) (Delete icon) for the corresponding Drawing master.
    
    [![image-1706617277694.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706617277694.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706617277694.png)
    
    You receive a confirmation message “**Confirm** **delete?**”.
2. Click **OK .** Selected Drawing master deleted successfully.

##### **1.6.4 Clone**

1\. Click[![image-1651131989751.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651131989751.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651131989751.png)(Clone icon) of the respective Clone.[![image-1706602925869.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706602925869.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706602925869.png)

  
2\. If you want to change any details, you can change in the respective boxes.  
3\. Click **Save**  
The new clone is successfully added and listed in the Clone drawing master page.

##### **1.6.5 Attachments**

User can upload multiple documents through attachment screen. ￼[![image-1706096676782.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706096676782.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706096676782.png)  
2\. It will be redirected to new attachment screen. [![image-1706096508586.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706096508586.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706096508586.png)  
3\. Here user can select category of the document and browse &amp; upload the document.  
4\. Document successfully downloaded

##### **1.6.6 Export a Drawing master list**

You can export a list of drawing master list added in the Drawing master **List** page in both the pdf and excel formats by using [![image-1651163465862.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163465862.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163465862.png) (**PDF** button) and [![image-1651163476334.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163476334.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163476334.png) (**Excel** button).[![image-1706617354744.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706617354744.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706617354744.png)

##### **1.6.7 Filter a Drawing Master**

[![image-1706617426864.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706617426864.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706617426864.png)<span style="font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 14px; font-style: normal; font-variant-ligatures: normal; font-variant-caps: normal; font-weight: 400;">1. Click </span>[![image-1651604010559.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604010559.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604010559.png)<span style="font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 14px; font-style: normal; font-variant-ligatures: normal; font-variant-caps: normal; font-weight: 400;"> (</span>**FILTER**<span style="font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 14px; font-style: normal; font-variant-ligatures: normal; font-variant-caps: normal; font-weight: 400;"> button) located on the Drawing Master</span> <span style="font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 14px; font-style: normal; font-variant-ligatures: normal; font-variant-caps: normal; font-weight: 400;">page.</span>  
<span style="font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 14px; font-style: normal; font-variant-ligatures: normal; font-variant-caps: normal; font-weight: 400;">Once you clicked the </span>**Filter** <span style="font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 14px; font-style: normal; font-variant-ligatures: normal; font-variant-caps: normal; font-weight: 400;">button, the filter box opens for the Drawing Number</span>**, Drawing Name, Revision number** <span style="font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 14px; font-style: normal; font-variant-ligatures: normal; font-variant-caps: normal; font-weight: 400;">columns.</span><span style="outline-color: var(--color-primary); font-style: normal; font-variant-ligatures: normal; font-variant-caps: normal; font-size: 14px; font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif;"> </span>If you want to filter any Drawing master from the list of Drawing master , do the following steps,

##### **1.6.8 Import Multiple Drawing Master**

  
 If you want to import multiple Drawing master together, do the following steps,[![image-1706095868688.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706095868688.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706095868688.png)

1. Click [![image-1651120365377.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120365377.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120365377.png) (**TEMPLATE** button). See Fig 1.6.8
2. An excel worksheet will be downloaded with a predefined template to enter the details of Drawing master.
3. Enter the required Drawing master and category details in the respective columns of the excel worksheet.
4. Once you have added the details in the excel worksheet, save the excel worksheet on your computer.
5. Click [![image-1651604149198.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604149198.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604149198.png) (**IMPORT** button). See Fig 1.6.8
6. A new window opens for importing the excel worksheet saved on your computer.[![image-1651604180432.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604180432.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604180432.png)
7. Click [![image-1651120579811.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120579811.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120579811.png) (**Browse** button) to select the excel worksheet to be uploaded.
8. Click [![image-1651604210730.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604210730.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604210730.png) (**Upload** button) to export the drawing master that are included in the excel worksheet.

 Imported successfully. The details of the Drawing master in the worksheet will be displayed in the Drawing master page.

<div class="pointer-container" id="bkmrk-%C2%A0-34"><div class="pointer anim "><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--152" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div></div></div>#### **1.7 Tags**

  
1\. Click **Tags** in the **Project Data** menu.  
The **Tags** page opens.  
[![image-1706618033509.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706618033509.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706618033509.png)  
 Fig 1.7 Tags Page

##### **1.7.1 Add a Tags**

If you want to add a material certificate, do the following,

Click [![image-1651160868230.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651160868230.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651160868230.png) (**ADD** button) in the **Tags** See Fig 1.7.1  
A new window opens to add a Tags.[![image-1706097369477.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706097369477.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706097369477.png)  
 Fig 1.7.1 Add Tags Page

1. [![image-1651160928288.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651160928288.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651160928288.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.
2. In the **Fit up Subcontractor box**, select the component from a drop-down list.
3. In the **Visual Subcontractor** box, select the number from the drop-down list.
4. In the **Drawing Number** box, select the number from the drop- down list.
5. In the **Tag number** box, enter the Tag number.
6. In the **Type** box, select the type from the drop-down list.
7. In the **Size** box enter the size.
8. In the **Material** box, select the number from the drop-down list
9. In the **Weight** box, enter the weight number.
10. In the **Length** box, enter the Length number.
11. In the **Remarks**, enter the remarks iif any.
12. Click **Save**.  
    The Tags is successfully saved.

##### **1.7.2 Edit a Tags**

[![image-1706098139953.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706098139953.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706098139953.png)  
 Fig 1.7.2 Edit a Tags

If you want to edit any existing Tags in the Tags page,

<div class="pointer-container" id="bkmrk-%C2%A0-36"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--153" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>1. Click [![image-1651163343682.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163343682.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163343682.png) (Edit icon) of the respective test equipment. See Fig
    
    The **Tags** page shows the details of the selected Tags.
2. **Edit** the details of Fitup subcontractor,visual subcontractor,Drawing number,Tag number,type,size,material,weight,length and remarks as required.
3. Click **Save**.
4. Tags is successfully updated.
    
    ##### **1.7.3 Delete a Tags**
    
    If you want to delete any existing tags in the Tags page, you can use [![image-1651163416136.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163416136.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163416136.png)<span style="color: #444444;"> (Delete icon) provided in the Tags page</span>**<span style="color: #444444;">.  
    </span>**
    
    [![image-1706617571578.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706617571578.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706617571578.png)
    
    
    1. Click [![image-1651603839749.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603839749.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603839749.png) (Delete icon) for the corresponding Tags.
        
        You receive a confirmation message “**Confirm** **delete?**”.
    2. Click **OK .** Selected Tags is deleted successfully.
    
      
      
    ##### **1.7.4 Export a Tag** 
    
    You can export a list of Tags added in the Tags page in both the pdf and excel formats by using [![image-1651163465862.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163465862.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163465862.png) (PDF button) and [![image-1651163476334.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163476334.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163476334.png) (Excel button).   
    [![image-1706617773256.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706617773256.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706617773256.png)

##### **1.7.5 Import Multiple Tags**

If you want to import multiple Tags together, do the following,

 Click [![image-1651787100130.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651787100130.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651787100130.png) (**IMPORT** button).

[![image-1724253107681.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724253107681.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724253107681.png)

The **Excel Import** page opens. ￼[![image-1706099104713.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706099104713.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706099104713.png)  
1\. Click [![image-1651787173258.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651787173258.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651787173258.png) (**TEMPLATE** button).[![image-1706099646334.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706099646334.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706099646334.png)

1. An excel worksheet will be downloaded with a predefined template to enter the details of Tags.
2. Enter the required Tags details in the respective columns of the excel worksheet.
3. Once you have added the Tags details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651787198325.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651787198325.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651787198325.png) (**Browse** button) to select the excel worksheet to be uploaded.
5. Select the excel worksheet you want to upload from your computer.
6. Click [![image-1651787225797.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651787225797.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651787225797.png) (**Upload** button) to export the Tags details that are included in the excel worksheet.
7. <div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--155" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div>
8. Automap -This function is used to map system columns and excel columns automatically.
9. Map - This function is used to map each system and excel columns manually
10. Unmap - This is used to remove the mapped column
11. Unmap all -This is used to remove the all mapped columns
12. Click populate values ,process and Import buttons. [![image-1724253232493.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724253232493.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724253232493.png)
13. Tags imported successfully.

#### **1.8 Compartment** 

1\. Click **Compartment** in the Project Data menu.  
The **Compartment** page opens. ￼[![image-1706618165226.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706618165226.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706618165226.png)  
 Fig 1.8 Compartment Page

##### **1.8.1 Add a Compartment**

If you want to add a material certificate, do the following,

1. Click [![image-1651160868230.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651160868230.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651160868230.png) (**ADD** button) in the Compartment See Fig 1.8.1
    
    A new window opens to add a compartment.
    
    [![image-1706100864067.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706100864067.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706100864067.png)  
     Fig 1.8.1 Add a Compartment Page
    
    
    1. [![image-1651160928288.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651160928288.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651160928288.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.
    2. In the **Compartment Item** box, enter the compartment item.
    3. In the **Subcontractor** box, select the subcontractor from the drop-down list.
    4. Click **Save**.  
        The Compartment is successfully added.
    
      
    [![image-1651161542724.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651161542724.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651161542724.png)**Note**: You can edit and delete the added Compartment by using the respective [![image-1651161565571.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651161565571.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651161565571.png)(Edit icon) and [![image-1651161576340.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651161576340.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651161576340.png) (Delete icon).

##### **1.8.2 Export a Compartment**

You can export a list of drawing master list added in the compartment page in both the pdf and excel formats by using [![image-1651163465862.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163465862.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163465862.png) (**PDF** button) and [![image-1651163476334.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163476334.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163476334.png) (**Excel** button). See Fig 1.8.2[![image-1706618310336.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706618310336.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706618310336.png)

##### **1.8.3 Filter a Compartment**[![image-1706101494242.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706101494242.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706101494242.png)

<span style="font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 14px; font-style: normal; font-variant-ligatures: normal; font-variant-caps: normal; font-weight: 400;">1. Click </span>[![image-1651604010559.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604010559.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604010559.png)<span style="font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 14px; font-style: normal; font-variant-ligatures: normal; font-variant-caps: normal; font-weight: 400;"> (</span>**FILTER**<span style="font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 14px; font-style: normal; font-variant-ligatures: normal; font-variant-caps: normal; font-weight: 400;"> button) located on the compartment</span> <span style="font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 14px; font-style: normal; font-variant-ligatures: normal; font-variant-caps: normal; font-weight: 400;">page.</span>  
<span style="font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 14px; font-style: normal; font-variant-ligatures: normal; font-variant-caps: normal; font-weight: 400;">Once you clicked the </span>**Filter** <span style="font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 14px; font-style: normal; font-variant-ligatures: normal; font-variant-caps: normal; font-weight: 400;">button, the filter box opens for the **Compartment Item**</span>**, Subcontractor <span style="font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Oxygen, Ubuntu, Roboto, Cantarell, 'Fira Sans', 'Droid Sans', 'Helvetica Neue', sans-serif; font-size: 14px; font-style: normal; font-variant-ligatures: normal; font-variant-caps: normal; font-weight: 400;">columns.</span> If you want to filter any compartment from the list of Compartment, do the following steps,  
2\. Click **Save**.

##### **1.8.4 Import Multiple Compartments**

If you want to import multiple Compartments together, do the following,

 Click [![image-1651787100130.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651787100130.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651787100130.png) (**IMPORT** button). See Fig 1.8.4[![image-1706101795489.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706101795489.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706101795489.png)

The **Excel Import** page opens. ￼  
1\. Click [![image-1651787173258.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651787173258.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651787173258.png) (**TEMPLATE** button).[![image-1706101830274.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706101830274.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706101830274.png)

1. An excel worksheet will be downloaded with a predefined template to enter the details of Compartment Item.
2. Enter the required compartment item details in the respective columns of the excel worksheet.
3. Once you have added the compartment item details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651787198325.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651787198325.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651787198325.png) (**Browse** button) to select the excel worksheet to be uploaded.
5. Select the excel worksheet you want to upload from your computer.
6. Click [![image-1651787225797.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651787225797.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651787225797.png) (**Upload** button) to export the Tags details that are included in the excel worksheet.
7. Automap -This function is used to map system columns and excel columns automatically.
8. Map - This function is used to map each system and excel columns manually
9. Unmap - This is used to remove the mapped column
10. Unmap all -This is used to remove the all mapped columns
11. Click populate values ,process and Import buttons. [![image-1724253484235.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724253484235.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724253484235.png)
12. Compartment imported successfully.

#### **1.9 Test Equipment**

The Test Equipment's tab in the Materials menu used to add the details of a test equipment to be used in the Electrical project. To add a test equipment,

1\. Click **Test Equipment's** in the **Materials menu**.  
 The **Testing Equipment's** page opens.[![image-1706618461785.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706618461785.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706618461785.png)  
 Fig 1.9 Test Equipment Page

##### **1.9.1 Add a Test Equipment**

If you want to add a test equipment, do the following steps,

Click [![image-1651162410824.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162410824.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162410824.png) (**ADD** button) in the **Testing Equipment's** See Fig 1.9.1  
A new window opens to add a test equipment.[![image-1706102303677.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706102303677.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706102303677.png)  
 Fig 1.9.1 Add a Test Equipment Page

1. [![image-1651162503766.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162503766.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162503766.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.
2. In the **Category** box, enter the category of the test equipment.
3. In the **Test Equipment** box, enter the name of the test equipment.
4. In the **Manufacturer** box, enter the name of the manufacturer.
5. In the **Asset Tag Number** box, enter the asset tag number of the test equipment.
6. In the **Recommended Range** box, enter the recommended range of test equipment.
7. In the **Range** box, enter the actual range of test equipment.
8. In the **Least Count** box, enter the least count of the test equipment.
9. In the **Purpose** box, enter the purpose of the test equipment.
10. In the **Alert Frequency (in Days)** box, the alert frequency duration will be updated automatically. If you want to change the duration you can change.
11. In the **Acceptance Criteria** box, enter the acceptance criteria.
12. In the **Remarks** box, enter your remarks if any.
13. In the **Status** box, select the status of the test equipment.
14. In the **Location of Equipment** box, enter the equipment location detail.
15. In the **Description** box, enter the description for the test equipment.
16. In the **Equipment Batch no** box, enter the equipment batch no location detail.
17. In the **Model No** box, enter the model no.
18. Click **Save**. The test equipment is successfully saved.

##### **1.9.2 Edit a Test Equipment**

  
If you want to edit any existing test equipment in the **Testing Equipment** page,

<div class="pointer-container" id="bkmrk-%C2%A0-44"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--156" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>1. Click [![image-1651163343682.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163343682.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163343682.png) (Edit icon) of the respective test equipment.
    
    The **Testing Equipment** page shows the details of the selected test equipment.
    
    [![image-1706604193830.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706604193830.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706604193830.png)  
     Fig 1.9.2 Edit a Test Equipment Page
2. Edit the details where you want.
3. Click **Save**.

##### **1.9.3 Delete a Test Equipment**

<div class="pointer-container" id="bkmrk-%C2%A0-46"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--158" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>If you want to delete any existing test equipment in the **Testing Equipment** page, you can use [![image-1651163416136.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163416136.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163416136.png) (Delete icon) provided in the **Testing Equipment** page. See Fig 1.9.3[![image-1706618719588.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706618719588.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706618719588.png)

1. Click [![image-1651603839749.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603839749.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603839749.png) (Delete icon) for the corresponding Test Equipment  
    Selected deleted Test Equipment successfully.

##### **1.9.4 Export Test Equipment list**

<div class="pointer-container" id="bkmrk-%C2%A0-47"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--159" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>You can export a list of test equipment's added in the **Test Equipment** page in both the pdf and excel formats by using [![image-1651163465862.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163465862.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163465862.png) (**PDF** button) and [![image-1651163476334.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163476334.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163476334.png) (**Excel** button). See Fig 1.9.4[![image-1706618988603.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706618988603.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706618988603.png)

##### **1.9.5 Filter a Test Equipment**

If you want to filter any specific test equipment in the **Testing Equipment** page, See Fig 1.9.5

<div class="pointer-container" id="bkmrk-%C2%A0-48"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--160" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>1. you can use the category wise filter box [![image-1651163518308.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163518308.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163518308.png) provided in the upper side of the **Testing Equipment**  To filter the testing equipment, select the category from the drop-down list.
2. you can also use [![image-1651163568393.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163568393.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163568393.png) (**FILTER** button) located on the **Testing Equipment.**
    
    [![image-1706619022931.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706619022931.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706619022931.png)

##### **1.9.6 Import Multiple Test Equipements**

If you want to import multiple test equipment together, do the following,

<div class="pointer-container" id="bkmrk-%C2%A0-50"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--161" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>1. Click [![image-1651163686212.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163686212.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163686212.png) (**TEMPLATE** button). See Fig 1.9.6
    
    An excel worksheet will be downloaded with a predefined template to enter the details of test equipments.
    
    [![image-1706102898255.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706102898255.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706102898255.png)
2. Enter the required test equipment details in the respective columns of the excel worksheet.
3. Once you have added the test equipment details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651163752394.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163752394.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163752394.png) (**IMPORT** button). See Fig 1.9.6
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651163782872.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163782872.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163782872.png)
5. Click [![image-1651163789045.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163789045.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163789045.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651163813900.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163813900.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163813900.png) (**Upload** button) to export the test equipment details that are included in the excel worksheet.
    
    The details of the test equipment's in the worksheet will be displayed in the **Testing Equipment** page.

##### **1.9.7 Attach a File into a Test Equipment**

If you want to attach any file with any existing test equipment listed in the Testing Equipment page, you can attach the file by using [![image-1651163889766.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163889766.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163889766.png)(Attach icon) in the Attachment column.

### **2.0 RFI**

  
  
The **RFI** menu in the home page of the ***cuteQM*** app used add a Request for RFI Glanding &amp; Termination List, RFI fit up visual, Cable dressing and banding request, Torque request, Compound Filling and MCT Packing, RFI Equipment Megger Test.


#### **2.1 RFI Glanding and termination List**

  
  
The **RFI Glanding and termination List** up Request tab allows you add an **RFI Glanding and termination** request to check the fit-up quality of pipes and joints used in the piping project by a sub-contractor. To navigate to the **RFI Glanding and Termination** **List** up request adding page.

1\. Click **RFI Glanding and Termination List** in the **RFI** menu.  
The **RFI Glanding and Termination** page opens. ￼[![image-1706619206905.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706619206905.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706619206905.png)  
 Fig 2.0 RFI Glanding and Termination List

#####  **2.1.1 Add a RFI Glanding and Termination request.**

If you want to add an RFI Glanding and Termination request, do the following steps,[![image-1706631803099.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706631803099.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706631803099.png)  
 Fig 2.1.1 Add a RFI Glanding &amp; Termination List

<div class="pointer-container" id="bkmrk-%C2%A0-72"><div class="pointer anim "><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--162" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div></div></div>1. cuteQM\_Production role user only can add a RFI request
2. Click add button.Refer fig.2.1.1 above
3. In the **Inspection Date and Time** box, select the inspection date and time.
4. In the **Subcontractor** box, select a subcontractor from a drop-down list.
5. In the **Calibration details** box, select a calibration detail from a drop-down list. Before saving the added RFI Glanding &amp; Termination request, you must add joints for the for the RFI Glanding and termination list request.
    
    [![image-1651201027630.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201027630.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201027630.png)**Note**: You can add multiple cables for one request.

Click[![image-1651201285984.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201285984.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201285984.png) (Add Selected Cables) of the respective joints you want to add.

The added cables will be moved and listed in the right side of the page. ￼[![image-1706166334849.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706166334849.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706166334849.png)  
The added cable will be moved and listed in the right side of the page[![image-1706166727431.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706166727431.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706166727431.png)

1. [![image-1651201433945.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201433945.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201433945.png) **Tip**: If you want to remove any added joint, click [![image-1651201449656.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201449656.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201449656.png)(**Remove** icon) of the respective joint.
2. In the **Description** box, enter the description for the added RFI Glanding &amp; Termination request.
3. Click **Save**.
4. RFI Glanding &amp; Termination Request created successfully.

##### **2.1.2 Edit a RFI Glanding &amp; Termination List**

If you want to edit any existing RFI Glanding &amp; Termination request in the **RFI** glanding &amp; Termination list page, do the following,[![image-1706619412490.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706619412490.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706619412490.png)  
 Fig 2.1.2 Edit a RFI Glanding &amp; Termination Page

<div class="pointer-container" id="bkmrk-%C2%A0-73"><div class="pointer anim "><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--163" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div></div></div>Click[![image-1706339797366.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706339797366.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706339797366.png)(Edit icon) in the **Edit** column for the respective RFI Glanding &amp; Termination List. See Fig 2.1.2

The **RFI Glanding &amp; Termination list** page opens with the details of the selected RFI Glanding &amp; Termination list.  
[![image-1706619279164.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706619279164.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706619279164.png)

1. Click any box where you want to edit the details, and then edit the details in the respective box.  
    Click Save.
2. RFI Glanding &amp; Termination Request updated successfully.

##### **2.1.3 Submit a RFI Glanding &amp; Termination List**

 [![image-1706169423191.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706169423191.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706169423191.png)  
 Fig 2.1.3 Submit a RFI Glanding and Termination List

Once you have added the **RFI Glanding &amp; Termination list** request list, the **Submit** column in the **RFI Glanding &amp; Termination Requests List** page is appeared [![image-1651203728786.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203728786.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203728786.png)with (Submit and Reject icons).

1. If you want to submit the **RFI Glanding &amp; Termination list** request, click[![image-1651203762346.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203762346.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203762346.png) (Submit icon) in the **Request Status** Otherwise click [![image-1651203792080.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (cancel icon) to cancel the request.

The submitted request will be moved to for **RFI Glanding &amp; Termination list** inspection.

<div class="pointer-container" id="bkmrk-%C2%A0-75"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--165" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>##### **2.1.4 Approve a RFI Glanding &amp; Termination List**

**cuteQM\_Licensee\_QA user only can approve the RFI request.**

1. If you want to approve the **RFI Glanding &amp; Termination list** request, click[![image-1651203762346.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203762346.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203762346.png) (confirm icon) in the **Request Status** Otherwise click [![image-1651203792080.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (Reject icon) to reject the request.  
    2. Once RFI request approved [![image-1706614735279.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706614735279.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706614735279.png) icon will be enabled to put result.   
    3. Click icon ￼[![image-1706632325743.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706632325743.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706632325743.png) result popup will open. Refer below fig ##### [![image-1706698141408.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706698141408.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706698141408.png)
    
      
    4. User can update the result (Accept/Reject) and Description,L1,L2,L3,Remarks[![image-1706615099833.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706615099833.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706615099833.png)  
     Fig 2.1.4 Approve a RFI Glanding &amp; Termination List
2. Click **Save.**
3. RFI result is updated successfully.
4. If Accepted with comments selected then punch list will be created, and this will be shown in view punch list screen.
5. If need to upload documents against equipment's, then click attachment icon at the result popup and upload documents.

#### **2.1.5 View a RFI Glanding &amp; Termination List Report**

<div class="pointer-container" id="bkmrk-%C2%A0-79"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--167" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>If you want to view an RFI Glanding &amp; Termination report, click [![image-1651808508303.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808508303.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808508303.png) (print icon) provided in the **Result** column of the RFI Glanding &amp; Termination List page.

**In the print, user can see the signature of both the production user and QC . Requestor signature mapped with Production and Inspector signature mapped with QC**

**[Click here to find the steps to upload Digital signature](https://wiki.cuteinfocomm.com/books/cuteqm/page/user-management-qg8#bkmrk-1.3%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0-log-ou "Steps to upload Digital signature")**

[![image-1706935851178.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1706935851178.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1706935851178.png)  
 Fig 2.1.5 View a RFI Glanding and Termination List

[![image-1706695570186.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706695570186.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706695570186.png)

 [![image-1724300107434.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724300107434.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724300107434.png)

##### **2.1.6 Attach a File into an RFI Glanding &amp; Termination list.**

<div class="pointer-container" id="bkmrk-%C2%A0-81"><div class="pointer anim "><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--168" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div></div></div>If you want to attach a file with any existing RFI glanding &amp; termination listed in the **RFI Glanding &amp; Termination List** page, you can attach the file by using [![image-1651223269890.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223269890.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223269890.png) (Attach icon) in the **Attachment** column. [![image-1706694064683.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706694064683.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706694064683.png)

#####  **2.1.7 Export a RFI Glanding &amp; Termination Request**

You can export a list of RFI glanding &amp; Termination requests added in the **RFI Glanding &amp; Termination Requests List** page in both the pdf and excel formats by using [![image-1651202537414.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202537414.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202537414.png) (**PDF** button) and [![image-1651202548613.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202548613.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202548613.png) (**Excel** button).[![image-1706619943312.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706619943312.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706619943312.png)  
 Fig 2.1.7 Export a RFI Glanding &amp; Termination List

#####  **2.1.8 Filter a RFI Glanding &amp; Termination Request**

If you want to filter any specific RFI glanding and termination in the **RFI glanding and termination List** page, [![image-1706620114904.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706620114904.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706620114904.png)

- you can use the filter box provided in the upper side of the **RFI Glanding &amp; Termination List To** filter the any specific RFI Glanding and Termination request, select the Report Number, Inspection Date and **Date** in the boxes and click.
- you can use [![image-1651202662798.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202662798.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202662798.png) (**FILTER** button) located on the **RFI Glanding &amp; Termination List.**


#### **2.2 RFI Fit up/ Visual List**   
  


The RFI Fit up/ Visual List tab allows you add an RFI fit up/ Visual List to check the fit-up quality of pipes and joints used in the piping project by a sub-contractor. To navigate to the RFI fit up / Visual List adding page,

Click **RFI Fit up Request** in the **RFI** menu.  
The **RFI Fit up / Visual list** page opens. ￼[![image-1706632704495.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706632704495.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706632704495.png)  
 Fig 2.2 RFI Fit up / Visual Page

#### **2.2.1 Add a RFI Fit up/ Visual List** 

If you want to add an RFI fit up / Visual list, do the following steps,

[cuteQM\_Production role user only can Add a RFI request![image-1706632593436.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706632593436.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706632593436.png)  
 Fig 2.2.1 Add a RFI Fit up / Visual List

1. Click [![image-1651427486684.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427486684.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427486684.png) (**ADD** button) in the **RFI fit up / Visual List** page. A new page opens to add an RFI fit up / Visual request. ￼
    
    [![image-1712044638634.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1712044638634.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1712044638634.png)

<div class="pointer-container" id="bkmrk-%C2%A0-83"><div class="pointer anim "><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--169" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div></div></div>1. In the **Inspection Date and Time** box, select the inspection date and time.
2. In the **Subcontractor** box, select a subcontractor from a drop-down list.
3. In the **Inspection Type** box, choose an inspection type from given list. Before saving the added fit up request, you must add joints for the fit-up / visual list request.
    
    [![image-1651201027630.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201027630.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201027630.png)**Note**: You can add multiple System for one request.
    
    Click[![image-1651201285984.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201285984.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201285984.png) (Add Selected System) of the respective system you want to add.

The added compartment will be moved and listed in the right side of the page.

1. [![image-1651201433945.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201433945.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201433945.png) **Tip**: If you want to remove any added system, click [![image-1651201449656.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201449656.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201449656.png)(**Remove** icon) of the respective joint.
2. In the **Description** box, enter the description for the added RFI fit up request.
3. Click **Save**.

The RFI fit up / visual list request is successfully added.

#### **2.2.2 Edit a RFI Fit up / Visual Request** 

If you want to edit any existing RFI fit up request in the **RFI** **Fit up / Visual list** page, do the following,

<div class="pointer-container" id="bkmrk-%C2%A0-84"><div class="pointer anim "><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--170" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div></div></div>Click (Edit icon) in the **Edit** column for the respective RFI fit up request. See Fig 2.2.2

[![image-1706936136420.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1706936136420.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1706936136420.png)

The **RFI Fit up Visual list** page opens with the details of the selected RFI fit up visual page list.

[![image-1706195407680.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706195407680.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706195407680.png)  
 Fig 2.2.2 Edit a RFI Fit up / Visual Page

1. Click any box where you want to edit the details, and then edit the details in the respective box.
2. Click **Save**.

##### **2.2.3 Submit an RFI Fit up Request.**

Once you have added the RFI fit up request, the **Submission** column in the **RFI Fit up visual Lists** page is appeared with[![image-1651201968441.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201968441.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201968441.png)(Submit and Reject icons). See Fig 2.2.3[![image-1706195636354.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706195636354.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706195636354.png)  
 Fig 2.2.3 Submit &amp; Approve a RFI Fit up / Visual Page

1. If you want to submit the RFI fit up request, click [![image-1651201981884.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201981884.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201981884.png)(Submit icon) in the **Submit** column. Otherwise click [![image-1651201995224.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201995224.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201995224.png)(Reject icon) to reject the request.
    
    Once you have submitted the RFI fit up visual list request, in the **Confirm** **Status** column in the **RFI Fit up visual List** page is appeared with[![image-1651202048663.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202048663.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202048663.png)(Confirm and Reject icons).

The approved request will be moved to for inspection.

##### **2.2.4 Approve RFI Fit up visual List**

**cuteQM\_Licensee\_QA user only can approve the RFI request.**

1. If you want to approve the  **RFI Fit up visual list** request, click[![image-1651203762346.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203762346.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203762346.png) (confirm icon) in the **Confirm Status** Otherwise click [![image-1651203792080.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (Reject icon) to reject the request.  
    2. Once RFI request approved [![image-1706614735279.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706614735279.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706614735279.png) icon will be enabled to put result. [![image-1706936227503.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1706936227503.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1706936227503.png)
    
      
    3. Click icon ￼[![image-1706632325743.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706632325743.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706632325743.png) result popup will open.   
    [![image-1706698360568.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706698360568.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706698360568.png)
    
     Fig 2.2.4 Approve RFI Fit up / Visual List page.
2. Click **Save**
3. RFI result is updated successfully.
4. If Accepted with comments given as result, then punch list will be created, and this will be shown in view punch list screen.
5. If need to upload documents against system No, then click attachment icon at the result popup and upload documents.

##### **2.2.5 Print a RFI Fit Up / Visual list report.**

<div class="pointer-container" id="bkmrk-%C2%A0-87"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--171" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>If you want to view an RFI fit up report, click [![image-1651808508303.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808508303.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808508303.png) (print icon) provided in the **Report** column of the RFI Fit up / Visual page.

**In the print, user can see the signature of both the production user and QC . Requestor signature mapped with Production and Inspector signature mapped with QC**

**[Click here to find the steps to upload Digital signature](https://wiki.cuteinfocomm.com/books/cuteqm/page/user-management-qg8#bkmrk-1.3%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0-log-ou "Steps to upload Digital signature")**

[![image-1706936103593.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1706936103593.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1706936103593.png)  
 Fig 2.2.5 Print a RFI Fit up / Visual Page

 [![image-1706695488214.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706695488214.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706695488214.png)

 [![image-1724300084247.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724300084247.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724300084247.png)

##### **2.2.6 Attach a File into a RFI Fit up Visual List** 

If you want to attach a file with any existing RFI fit up visual list listed in the **RFI Fit up visual List** page, you can attach the file by using [![image-1651202499153.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202499153.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202499153.png) (Attach icon) in the **Attachment** column.[![image-1706697070366.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706697070366.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706697070366.png)

##### **2.2.7 Export a RFI Fit up Visual List** 

You can export a list of RFI fit up visual list requests added in the **RFI Fit up visual List** page in both the pdf and excel formats by using [![image-1651202537414.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202537414.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202537414.png) (**PDF** button) and [![image-1651202548613.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202548613.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202548613.png) (**Excel** button).[![image-1706697342637.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706697342637.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706697342637.png)  
 Fig 2.2.7 Export a RFI Glanding &amp; Termination List

##### **2.2.8 Filter a RFI Fit up Visual List**

If you want to filter any specific RFI fit up request in the RFI Fit up Requests List page,

- you can use [![image-1651202662798.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202662798.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202662798.png) (**FILTER** button) located on the **RFI Fit up visual List. [![image-1706714109739.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706714109739.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706714109739.png)

#### **2.3 RFI Cable Dressing &amp; Banding Request** 

Click **RFI Cable Dressing &amp; Banding Request** in the RFI menu.  
The **RFI Fit up Requests List** page opens. ￼[![image-1706196442648.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706196442648.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706196442648.png)  
 Fig 2.3 RFI Cable Dressing &amp; Banding Request Page

##### **2.3.1 Add a RFI Cable Dressing &amp; Banding Request** 

If you want to add an RFI Cable Dressing &amp; Banding request, do the following,

[cuteQM\_Production role user only can Add a RFI request.![image-1706633206536.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706633206536.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706633206536.png)  
 Fig 2.3.1 Add an RFI Cable Dressing &amp; banding request Page

<div class="pointer-container" id="bkmrk-%C2%A0-90"><div class="pointer anim "><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--172" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div></div></div>1. Click [![image-1651427486684.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427486684.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427486684.png) (**ADD** button) in the **RFI Cable dressing &amp; Banding request List** page. A new page opens to add an RFI Cable Dressing &amp; Banding request.
2. [![image-1706936409084.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1706936409084.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1706936409084.png)
    
    
    1. [![image-1651427557166.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427557166.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427557166.png) **Tip**: A report number and an RFI number for a new RFI Cable Dressing &amp; Banding request will be updated automatically
    2. In the **Subcontractor** box, select the name of a sub-contractor from a drop-down list.
    3. In the **Inspection Date &amp; Time** box, select the date of inspection.
    4. In the **Description** box, enter the description for the inspection.
    5. Click the check box of the respective compartments.
    6. Click [![image-1706197735824.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706197735824.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706197735824.png) (**Add Selected Systems** button).
    7. Click **Save**.

##### **2.3.2 Submit a Cable Dressing &amp; Banding Request**

Once you have added the RFI Cable Dressings, the **result** column in the **RFI Cable Dressing &amp; Banding request** page is appeared with[![image-1651201968441.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201968441.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201968441.png)(Submit and Reject icons). See Fig 2.3.2[![image-1706698804696.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706698804696.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706698804696.png)  
 Fig 2.3.2 RFI Cable Dressing &amp; Banding Request Page

1. If you want to submit the RFI fit up request, click [![image-1651201981884.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201981884.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201981884.png)(Submit icon) in the **Submit** column. Otherwise click [![image-1651201995224.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201995224.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201995224.png)(Reject icon) to reject the request.

The submitted request will be moved to for inspection.

##### **2.3.3 Approve RFI Cable Dressing &amp; banding request List**

**cuteQM\_Licensee\_QA user only can approve the RFI request.**

1. If you want to approve the RFI **Cable Dressing &amp; Banding** request, click[![image-1651203762346.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203762346.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203762346.png) (confirm icon) in the **Confirm Status** Otherwise click [![image-1651203792080.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (Reject icon) to reject the request.  
    2. Once RFI request approved [![image-1706614735279.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706614735279.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706614735279.png) icon will be enabled to put result. ##### [![image-1706698425048.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706698425048.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706698425048.png)
    
      
    3. Click icon ￼[![image-1706632325743.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706632325743.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706632325743.png) result popup will open.   
    [![image-1706699816693.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706699816693.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706699816693.png)
    
     Fig 2.3.3 Approve RFI Cable Dressing &amp; Banding request List
2. Click **Save**
3. RFI result is updated successfully.
4. If Accepted with comments given as result, then punch list will be created, and this will be shown in view punch list screen.
5. If need to upload documents against system No, then click attachment icon at the result popup and upload documents.

##### **2.3.4 View a RFI Cable Dressing &amp; Banding Report**

<div class="pointer-container" id="bkmrk-%C2%A0-92"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--174" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>If you want to view an RFI Cable Dressing &amp; Banding request, click [![image-1651808508303.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808508303.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808508303.png) (print icon) provided in the **Report** column of the RFI Cable dressing &amp; Banding request page. See Fig 2.3.4 View a RFI Cable Dressing &amp; Banding Report

**In the print, user can see the signature of both the production user and QC . Requestor signature mapped with Production and Inspector signature mapped with QC**

**[Click here to find the steps to upload Digital signature](https://wiki.cuteinfocomm.com/books/cuteqm/page/user-management-qg8#bkmrk-1.3%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0-log-ou "Steps to upload Digital signature")**

[![image-1706700155175.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706700155175.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706700155175.png)

 [![image-1724300059051.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724300059051.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724300059051.png)


##### **2.3.5 Export a RFI Cable Dressing &amp; Banding request List**

You can export a list of RFI Cable Dressing &amp; banding list visual list requests added in the **RFI Cable Dressing &amp; banding request** page in both the pdf and excel formats by using [![image-1651202537414.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202537414.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202537414.png) (**PDF** button) and [![image-1651202548613.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202548613.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202548613.png) (**Excel** button).[![image-1706707558784.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706707558784.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706707558784.png) Fig 2.3.5 Export a CabIe Dressing &amp; Banding request Page.

<span style="color: #444444;"> </span>

##### **2.3.6 Filter a RFI Cable dressing &amp; Banding request List**

<div class="pointer-container" id="bkmrk-%C2%A0-100"><div class="pointer anim "><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--175" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div></div></div>If you want to filter any RFI Cable dressing &amp; Banding request from the list of RFI requests in the **RFI Cable dressing &amp; Banding request List** page, you can use [![image-1651432698911.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432698911.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432698911.png) (**FILTER** button). [![image-1706714379307.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706714379307.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706714379307.png)  
 Fig 2.3.6 Filter a RFI Cable Dressing &amp; Banding request Page

#### **2.4 RFI Torque Request** 

  
Click **RFI Torque Request** in the **RFI** menu.  
The RFI Torque Request page opens.[![image-1706633404834.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706633404834.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706633404834.png)  
 Fig 2.4 Torque Tightening Page

##### **2.4.1 Add a RFI Torque Request**

If you want to add an RFI Torque request, do the following steps,

[cuteQM\_Production role user only can ADD a RFI request.![image-1706633336348.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706633336348.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706633336348.png)  
 Fig 2.4.1 Add a RFI Torque Request page.

1. Click [![image-1651427486684.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427486684.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427486684.png) (**ADD** button) in the **RFI Torque request page** A new page opens to add an RFI fit Torque request. ￼[![image-1706202045236.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706202045236.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706202045236.png)

<div class="pointer-container" id="bkmrk-%C2%A0-101"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--176" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>1. In the **Inspection Date and Time** box, select the inspection date and time.
2. In the **Subcontractor** box, select a subcontractor from a drop-down list.
3. In the **Calibration Details** box, select a calibration detail from a drop-down list.
4. In the **Description** box, enter the description for the inspection.  
    Before saving the added RFI Torque request, you must equipment **list** request.

[![image-1651201027630.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201027630.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201027630.png)**Note**: You can add multiple equipment for one request.

[![image-1706202518388.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706202518388.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706202518388.png)  
1\. Click[![image-1651201285984.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201285984.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201285984.png) (Add Selected Equipment) of the respective equipment you want to add.

The added equipment will be moved and listed in the right side of the page.

1. [![image-1651201433945.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201433945.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201433945.png) **Tip**: If you want to remove any added equipment, click [![image-1651201449656.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201449656.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201449656.png)(**Remove** icon) of the respective equipment.
2. In the **Description** box, enter the description for the added RFI Torque request.
3. Click **Save**.

##### **2.4.2 Edit a RFI Torque Request**

If you want to edit any existing RFI torque request in the **RFI** torque request page, do the following,[![image-1706604581743.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706604581743.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706604581743.png)  
 Fig 2.4.2 Edit a RFI Torque Request Page

Click (Edit icon) in the **Edit** column for the respective RFI torque request.

The **RFI Torque request** page opens with the details of the selected RFI torque request page list.[![image-1706604720626.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706604720626.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706604720626.png)

Click **Save.**

##### **2.4.3 Submit a RFI Torque Request**

Once you have added the RFI Cable Dressings, the **result** column in the **RFI** torque request page is appeared with[![image-1651201968441.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201968441.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201968441.png)(Submit and Reject icons). See Fig 2.4.3[![image-1706708306106.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706708306106.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706708306106.png)  
 Fig 2.4.3 Submit RFI torque Request Page

1. If you want to submit the RFI torque request, click [![image-1651201981884.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201981884.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201981884.png)(Submit icon) in the **Submit** column. Otherwise click [![image-1651201995224.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201995224.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201995224.png)(Reject icon) to reject the request.
    
    Once you have submitted the RFI torque request visual list request, in the **Confirm** **Status** column in the **RFI Cable Dressing &amp; banding request List** page is appeared with[![image-1651202048663.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202048663.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202048663.png)(Confirm and Reject icons).

The submitted request will be moved to for inspection.

##### **2.4.4 Approve a RFI Torque Request**

**cuteQM\_Licensee\_QA user only can approve the RFI request.**

1. If you want to approve the **RFI **torque request List** <span style="color: #444444;">page</span>** request, click[![image-1651203762346.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203762346.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203762346.png) (confirm icon) in the **Request Status** Otherwise click [![image-1651203792080.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (Reject icon) to reject the request.  
    2. Once RFI request approved [![image-1706614735279.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706614735279.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706614735279.png) icon will be enabled to put result. ##### [![image-1706698141408.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706698141408.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706698141408.png)
    
      
    3. Click icon ￼[![image-1706632325743.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706632325743.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706632325743.png) result popup will open.   
    [![image-1706708773256.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706708773256.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706708773256.png)
    
     Fig 2.4.4 Approve a RFI<span style="color: #444444;"> torque request List </span><span style="color: #444444;">page.</span>
2. Click **Save.**
3. RFI result is updated successfully.
4. If Accepted with comments givenas result then punch list will be created, and this will be shown in view punch list screen.
5. If need to upload documents against equipment's, then click attachment icon at the result popup and upload documents.

##### **2.4.5 Print a RFI Torque request Report**

<div class="pointer-container" id="bkmrk-%C2%A0-96"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--179" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>If you want to view an RFI torque request List page, click [![image-1651808508303.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808508303.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808508303.png) (print icon) provided in the **Result** column of the RFI torque request List page.

**In the print, user can see the signature of both the production user and QC . Requestor signature mapped with Production and Inspector signature mapped with QC**

**[Click here to find the steps to upload Digital signature](https://wiki.cuteinfocomm.com/books/cuteqm/page/user-management-qg8#bkmrk-1.3%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0-log-ou "Steps to upload Digital signature")**

[![image-1706936955793.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1706936955793.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1706936955793.png)  
 Fig 2.4.5 View a RFI RFI torque request.

[![image-1706709302230.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706709302230.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706709302230.png)

 [![image-1724300029054.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724300029054.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724300029054.png)

##### **2.4.6 Attach a File into an RFI Torque request Result.**

<div class="pointer-container" id="bkmrk-%C2%A0-98"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--180" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>If you want to attach a file with any existing RFI Torgue request listed in the **RFI **torque request List** <span style="color: #444444;">page</span>**, you can attach the file by using [![image-1651223269890.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223269890.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223269890.png) (Attach icon) in the **Attachment** column. [![image-1706694064683.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706694064683.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706694064683.png)

##### **2.4.7 Export RFI Torque Request**


<span style="color: #444444;">You can export a list of RFI torque requests added in the </span><span style="color: #444444;">RFI Torque Requests List </span><span style="color: #444444;">page in both the pdf and excel formats by using </span>[![image-1651202537414.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202537414.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202537414.png)<span style="color: #444444;"> (</span><span style="color: #444444;">PDF</span><span style="color: #444444;"> button) and </span>[![image-1651202548613.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202548613.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202548613.png)<span style="color: #444444;"> (</span><span style="color: #444444;">Excel</span><span style="color: #444444;"> button).</span>[![image-1706714541535.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706714541535.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706714541535.png)  
 Fig 2.4.7 Export RFI Torque Request Page

<span style="color: #444444;"> </span>

##### **2.4.8 Filter an RFI Torque Request** 

<div class="pointer-container" id="bkmrk-%C2%A0-103"><div class="pointer anim "><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--181" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div></div></div>If you want to filter any RFI Torque request from the list of RFI fit up requests in the **RFI Torque Requests List** page, you can use [![image-1651432698911.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432698911.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432698911.png) (**FILTER** button). [![image-1706714642597.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706714642597.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706714642597.png)

#### **2.5 RFI Compound filling / MCT Packing** 

Click **RFI Compound filling / MCT Packing** in the **RFI** menu.  
The **RFI compound filling / MCT packing** page opens.[![image-1706633905099.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706633905099.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706633905099.png)  
 Fig 2.5 RFI Compound Filling / MCT Packing page

##### **2.5.1 Add a RFI Compound filling / MCT Packing**

If you want to add an RFI Compounding filling / MCT Packing, do the following steps,

cuteQM\_Production role users only can ADD a RFI request  
[![image-1706203922272.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706203922272.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706203922272.png)  
 Fig 2.5.1 Add A RFI Compound Filling / MCT packing Page.

1. Click [![image-1651427486684.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427486684.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427486684.png) (**ADD** button) in the **RFI Compound Filling / MCT Packing page.**  
    A new page opens to add an RFI compound filling / MCT packing request. ￼[![image-1706204011234.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706204011234.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706204011234.png)

1. In the **Inspection Date and Time** box, select the inspection date and time.
2. In the **Subcontractor** box, select a subcontractor from a drop-down list.
3. In the **Description** box, enter the description for the inspection.  
    Before saving the added RFI compound filling / MCT Packing, you must add Compartments list request.

[![image-1651201027630.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201027630.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201027630.png)**Note**: You can add multiple compartments for one request.

[![image-1706204232093.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706204232093.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706204232093.png)

1\. Click[![image-1651201285984.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201285984.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201285984.png) (Add Selected Compartments) of the respective joints you want to add.

The added compartments will be moved and listed in the right side of the page.

1. [![image-1651201433945.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201433945.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201433945.png) **Tip**: If you want to remove any addedcompartment, click [![image-1651201449656.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201449656.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201449656.png)(**Remove** icon) of the respective joint.
2. In the **Description** box, enter the description for the added RFI fit up request.
3. Click **Save**.

##### **2.5.2 Edit a RFI Compound Filling / MCT Packing**

If you want to edit any existing RFI Compound filling / MCT packing request in the **RFI** Compound filling / MCT packing request page, do the following,

<div class="pointer-container" id="bkmrk-%C2%A0-105"><div class="pointer anim "><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--182" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div></div></div>Click (Edit icon) in the **Edit** column for the respective RFI torque request. [![image-1706604922373.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706604922373.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706604922373.png)  
 Fig 2.5.2 Edit a RFI Compound Filling / MCT Packing Page

The **RFI Compound Filling / MCT Packing** page opens with the details of the selected RFI Compound Filling / MCT Packing page list.[![image-1706605042816.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706605042816.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706605042816.png)  
Click **Save**.

##### **2.5.3 Submit a RFI Compound Filling / MCT Packing**

[![image-1706169423191.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706169423191.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706169423191.png)  
 Fig 2.5.3 Submit a RFI Compound Filling / MCT Packing list.

Once you have added the **RFI Compound Filling / MCT Packing** request list, the **Submit** column in the **RFI Compound Filling / MCT Packing page is appeared [![image-1651203728786.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203728786.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203728786.png)with (Submit and Reject icons).

1. If you want to submit the **RFI Compound Filling / MCT Packing** request, click[![image-1651203762346.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203762346.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203762346.png) (Submit icon) in the **Request Status** Otherwise click [![image-1651203792080.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (cancel icon) to cancel the request.

<div class="pointer-container" id="bkmrk-%C2%A0-107"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--183" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>The submitted request will be moved to for **RFI Compound Filling / MCT Packing** inspection.

##### **2.5.4 Approve a RFI Compound Filling / MCT Packing**

**cuteQM\_Licensee\_QA user only can approve the RFI request.**

1. If you want to approve the **RFI Glanding &amp; Termination list** request, click[![image-1651203762346.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203762346.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203762346.png) (confirm icon) in the **Request Status** Otherwise click [![image-1651203792080.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (Reject icon) to reject the request.  
    2. Once RFI request approved [![image-1706614735279.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706614735279.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706614735279.png) icon will be enabled to put result. ##### [![image-1706710397911.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706710397911.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706710397911.png)
    
      
    3. Click icon ￼[![image-1706632325743.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706632325743.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706632325743.png) result popup will open.   
    4. User can update the result and Description, Remarks  
    [![image-1706710868058.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706710868058.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706710868058.png)
    
     Fig 2.5.4 Approve a RFI Compound Filling / MCT Packing
2. Click **Save.**

##### **2.5.5Print a RFI Compound Filling / MCT Packing Report**

<div class="pointer-container" id="bkmrk-%C2%A0-111"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--186" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>If you want to view an RFI Compound Filling / MCT Packing report, click [![image-1651808508303.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808508303.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808508303.png) (print icon) provided in the **Result** column of the RFI Compound Filling / MCT Packing List page.

**In the print, user can see the signature of both the production user and QC . Requestor signature mapped with Production and Inspector signature mapped with QC**

**[Click here to find the steps to upload Digital signature](https://wiki.cuteinfocomm.com/books/cuteqm/page/user-management-qg8#bkmrk-1.3%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0-log-ou "Steps to upload Digital signature")**

[![image-1706937131290.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1706937131290.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1706937131290.png)  
 See Fig 2.5.5 Print RFI Compound Filling/ MCT Packing Report

[![image-1706711360346.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706711360346.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706711360346.png)

 [![image-1724300009807.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724300009807.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724300009807.png)

##### **2.5.6 Attach a File into RFI Compound Filling / MCT Packing**

<div class="pointer-container" id="bkmrk-%C2%A0-113"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--187" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>If you want to attach a file with any existing <span style="color: #444444;">RFI compound filling / MCT Packing requests</span> in the <span style="color: #444444;">RFI compound filling / MCT Packing requests </span> **List** page, you can attach the file by using [![image-1651223269890.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223269890.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223269890.png) (Attach icon) in the **Attachment** column. [![image-1706715659831.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706715659831.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706715659831.png) Fig 2.5.6 Attach RFI Compound Filling / MCT Packing Page


##### **2.5.7 Export RFI Compound Filling / MCT Packing**

<span style="color: #444444;">You can export a list of RFI compound filling / MCT Packing requests added in the </span><span style="color: #444444;">RFI compound Filling / MCT Packing List </span><span style="color: #444444;">page in both the pdf and excel formats by using </span>[![image-1651202537414.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202537414.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202537414.png)<span style="color: #444444;"> (</span><span style="color: #444444;">PDF</span><span style="color: #444444;"> button) and </span>[![image-1651202548613.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202548613.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202548613.png)<span style="color: #444444;"> (</span><span style="color: #444444;">Excel</span><span style="color: #444444;"> button).</span>[![image-1706711530604.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706711530604.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706711530604.png)  
 See Fig 2.5.7 Export RFI Compound Filling/ MCT Packing Report

<span style="color: #444444;"> </span>

##### **2.5.8 Filter a RFI Compound Filling / MCT Packing**

<span style="color: #444444;">If you want to filter any RFI compound filling / MCT Packing request from the list of RFI compound filling / MCT Packing in the </span><span style="color: #444444;">RFI compound filling / MCT Packing List</span><span style="color: #444444;"> page, you can use </span>[![image-1651432698911.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432698911.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432698911.png)<span style="color: #444444;"> (</span><span style="color: #444444;">FILTER</span><span style="color: #444444;"> button).</span><span style="color: #444444;"> </span>[![image-1706711656089.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706711656089.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706711656089.png)

<span style="color: #444444;"> </span>

#### **2.6 RFI Equipment Megger List**

  
Click **RFI** **Equipment Megger List** in the **RFI** menu.  
The RFI Equipment Megger List page opens.[![image-1706634150577.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706634150577.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706634150577.png) Fig 2.6 RFI Equpment Megger List Page.

##### **2.6.1 Add a RFI Equipment Megger List**

If you want to add an RFI Equipment Megger List, do the following steps,

[cuteQM\_Production user only can ADD a RFI request.![image-1706205191379.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706205191379.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706205191379.png)  
 Fig 2.6.1 Add RFI Equipment Megger List Page

1. Click [![image-1651427486684.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427486684.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427486684.png) (**ADD** button) in the **RFI Equipment Megger List.**  
    A new page opens to add an RFI Equipment Megger request. ￼[![image-1706337773839.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706337773839.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706337773839.png)

1. In the **Inspection Date and Time** box, select the inspection date and time.
2. In the **Subcontractor** box, select a subcontractor from a drop-down list.
3. In the **Description** box, enter the description for the inspection.

Before saving the added RFI Equipment Megger request, you must add Equipment list request.

[![image-1651201027630.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201027630.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201027630.png)**Note**: You can add multiple Equipment for one request.

[![image-1706205796508.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706205796508.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706205796508.png)

1\. Click[![image-1651201285984.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201285984.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201285984.png) (Add Selected Equipements) of the respective equipment you want to add.

The added equipment will be moved and listed in the right side of the page.

1. [![image-1651201433945.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201433945.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201433945.png) **Tip**: If you want to remove any added equipments, click [![image-1651201449656.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201449656.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201449656.png)(**Remove** icon) of the respective joint.
2. In the **Description** box, enter the description for the added RFI equipment megger request.
3. Click **Save**.

#### **2.6.2 Edit a RFI Equipment Megger List**

If you want to edit any existing RFI Equipment Megger List request in the RFI Equipment Megger request page, do the following,[![image-1706609071467.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706609071467.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706609071467.png)  
 Fig 2.6.2 Edit RFI Equipment Megger List page.

<div class="pointer-container" id="bkmrk-%C2%A0-116"><div class="pointer anim "><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--188" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div></div></div>Click (Edit icon) in the **Edit** column for the respective RFI Equipment Megger. See Fig 2.6.2

The **RFI Equipment Megger** page opens with the details of the selected RFI Equipment Megger page list.[![image-1706609187069.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706609187069.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706609187069.png)  
Click **Save**.

##### **2.6.3 Submit a RFI Equipment Megger List**

[![image-1706169423191.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706169423191.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706169423191.png)  
 Fig 2.6.3 Submit a RFI Equipment Megger List

Once you have added the **RFI Equipment Megger** request list, the **Submit** column in the **RFI Equipment Megger List** page is appeared [![image-1651203728786.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203728786.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203728786.png)with (Submit and Reject icons).

1. If you want to submit the **RFI Equipment Megger** request, click[![image-1651203762346.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203762346.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203762346.png) (Submit icon) in the **Request Status** Otherwise click [![image-1651203792080.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (cancel icon) to cancel the request.

<div class="pointer-container" id="bkmrk-%C2%A0-117"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--189" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>The submitted request will be moved to for **RFI Equipment Megger** inspection.

##### **2.6.4 Approve a RFI Equipment Megger List**

**cuteQM\_Licensee\_QA user only can approve the RFI request.**

<div class="pointer-container" id="bkmrk-%C2%A0-118"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--190" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>1. If you want to approve the **Equipment Megger** request, click[![image-1651203762346.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203762346.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203762346.png) (confirm icon) in the **Request Status** Otherwise click [![image-1651203792080.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (Reject icon) to reject the request.  
    2. Once RFI request approved [![image-1706614735279.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706614735279.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706614735279.png) icon will be enabled to put result. ##### [![image-1706698141408.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706698141408.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706698141408.png)
    
      
    3. Click icon ￼[![image-1706632325743.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706632325743.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706632325743.png) result popup will open.   
    4. User can update the result (Accept/Reject) and Description,L1,L2,L3,Remarks  
    [![image-1706712518207.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706712518207.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706712518207.png)
    
      
     Fig 2.6.4 Approve a RFI Equipment Megger List page
2. Click **Save.**
3. RFI result is updated successfully.
4. If Acceped with comments given as result then punch list will be created, and this will be shown in view punch list screen.
5. If need to upload documents against equipment's, then click attachment icon at the result popup and upload documents.

#### **2.6.5 View a RFI Equipment Megger List Report** 

If you want to view an **RFI Equipment Megger**, click [![image-1651808508303.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808508303.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808508303.png) (print icon) provided in the Result column of the **RFI Equipment Megger** List page.

**In the print, user can see the signature of both the production user and QC . Requestor signature mapped with Production and Inspector signature mapped with QC**

**[Click here to find the steps to upload Digital signature](https://wiki.cuteinfocomm.com/books/cuteqm/page/user-management-qg8#bkmrk-1.3%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0-log-ou "Steps to upload Digital signature")**

[![image-1706937277595.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1706937277595.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1706937277595.png)

[![image-1706712754278.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706712754278.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706712754278.png)

 [![image-1724299962645.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724299962645.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724299962645.png)

##### **2.6.6 Attach a File into an RFI Equipment Megger List**

<div class="pointer-container" id="bkmrk-%C2%A0-119"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--192" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>If you want to attach a file with any existing RFI Equipment listed in the **RFI Equipment Megger List** page, you can attach the file by using [![image-1651223269890.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223269890.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223269890.png) (Attach icon) in the **Attachment** column. [![image-1706713051531.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706713051531.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706713051531.png)  
 Fig 2.6.6 Attach file RFI Equipment Megger List

##### **2.6.7 Export a RFI Equipment Megger List**

<span style="color: #444444;">You can export a list of RRFI Equipment Megger requests added in the RFI Equipment Megger</span><span style="color: #444444;"> List </span><span style="color: #444444;">page in both the pdf and excel formats by using </span>[![image-1651202537414.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202537414.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202537414.png)<span style="color: #444444;"> (</span><span style="color: #444444;">PDF</span><span style="color: #444444;"> button) and </span>[![image-1651202548613.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202548613.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202548613.png)<span style="color: #444444;"> (</span><span style="color: #444444;">Excel</span><span style="color: #444444;"> button).</span>[![image-1706715881910.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706715881910.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706715881910.png)  
 Fig 2.6.7 Export RFI Equipment Megger List

<span style="color: #444444;"> </span>

<span style="color: #444444;"> </span>

<span style="color: #444444;"> </span>

##### **2.6.8 Filter a RFI Equipment Megger List**

<span style="color: #444444;">If you want to filter any RFI Equipment Megge request from the list of RFI Equipment Megge in the RFI Equipment Megger</span><span style="color: #444444;"> </span><span style="color: #444444;">page, you can use </span>[![image-1651432698911.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432698911.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432698911.png)<span style="color: #444444;"> (</span><span style="color: #444444;">FILTER</span><span style="color: #444444;"> button).</span><span style="color: #444444;"> </span>[![image-1706715965505.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706715965505.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706715965505.png)  
 Fig 2.6.8 Filter RFI Equipment Megger List.

<span style="color: #444444;"> </span>

<span style="color: #444444;"> </span>

####  


#####  

####  


###   
  

# Mechanical

This section covers the inspections and data management related to mechanical module.

# Mechanical

This section covers the inspections and data management related to mechanical module.

### **1. Project Data**   
 

Select Mechanicalmodule at the top

[![image-1724246382152.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724246382152.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724246382152.png)

The **Project Data** menu in the ***cuteQM*** app helps you to add the master data. Once you click the **Project Data** menu, Equipment list master screen to be shown as below

[![image-1712038655464.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1712038655464.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1712038655464.png)


#### **1.1 Equipment List**

  
You can add the details of equipment to be used in the Mechanical project by using the Equipment List tab in the Project Data menu. If you  
want to navigate to Systems,

[![image-1712039522245.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1712039522245.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1712039522245.png)

  
 Fig 1.3 Equipment List

##### **1.1.1 Equipment List**

The Equipements tab in the Project Data menu used to add the details of equipment to be used in the Mechanical project. To add equipment,

1.Click Equipment List in the **Project Data** menu,  
The **Equipment List** page opens.

[![image-1707095925872.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707095925872.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707095925872.png)  
 Fig1.3.1 Equipment List Page

##### **1.1.2 Add an Equipment**

If you want to add an equipment list, do the following steps,  
1\. Click [![image-1651162410824.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162410824.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162410824.png) (**ADD** button) in the **Equipements List** See Fig 1.3.2  
A new window opens to add an equipment List.

[![image-1707096200302.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707096200302.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707096200302.png) Fig 1.3.2 Add an Equipment List

1. [![image-1651162503766.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162503766.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162503766.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.
2. In the Equipment Name box, enter the name of the equipment list.
3. In the Tag Number box, enter the Tag Number of the equipment list.
4. In the Location box, enter the location of the equipment

Click **Save**.

The equipment list is successfully saved.

##### **1.1.3 Edit an Equipment List**

  
If you want to edit any existing an equipment in the **Equipment List** page,

[![image-1707096595389.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707096595389.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707096595389.png) Fig 1.1.3 Edit an Equipment List

1\. Click [![image-1651163343682.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163343682.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163343682.png) (Edit icon) of the respective test equipment. See Fig 1.1.3

[![image-1707096649473.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707096649473.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707096649473.png)2. Edit the details where you want.  
3\. Click **Save**.

The equipment list is successfully updated.

**1.1.4 Delete an Equipment List**

#####  

If you want to delete any existing an equipment list in the Equipment list page, you can use [![image-1651163416136.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163416136.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163416136.png) (Delete icon) provided in the Equipment List page.

[![image-1707096735569.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707096735569.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707096735569.png)

1. Click [![image-1651603839749.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603839749.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603839749.png) (Delete icon) for the corresponding Equipment.
    
    You receive a confirmation message “**Confirm** **delete?**”.
2. Click **OK .**  Equipment List deleted successfully.


##### **1.1.5 Clone an Equipment List** 

1\. Click[![image-1651131989751.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651131989751.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651131989751.png)(Clone icon) of the respective Clone.  
[![image-1706613398621.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706613398621.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706613398621.png)  
 Fig 1.3.5 Clone an Equipment List

  
2\. If you want to change any details, you can change in the respective boxes. ￼[![image-1707096909158.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707096909158.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707096909158.png)

3\. Click **Save**  
The new clone is successfully added and listed in the Equipment list page.

##### **1.1.6 Add a Map CR/CS**

If you want to add a new Map, do the following steps,[![image-1707097012737.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707097012737.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707097012737.png)

  
[![image-1651659141800.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659141800.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659141800.png)Note: If you want to map cover page for any added equipment click the respective [![image-1651659166560.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659166560.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659166560.png)(Add icon) provided in the Map Cover Page column and add the cover pages.

If you want to map Check Record/Check Sheet (CR/CS Name) Type or CR/CS Count for any added equipment List, ￼[![image-1651659166560.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659166560.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659166560.png)(click the respective (Add icon) provided in the Map CR/CS column and add the cover pages.

[![image-1707097200852.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707097200852.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707097200852.png)  
 Fig 1.3.6 Add Map CR/CS page.

##### **1.1.7 Export an Equipment List**

You can export a list of test equipment list added in the **Equipment List** page in both the pdf and excel formats by using [![image-1651163465862.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163465862.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163465862.png) (**PDF** button) and [![image-1651163476334.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163476334.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163476334.png) (**Excel** button).

[![image-1707097387680.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707097387680.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707097387680.png)  
 Fig 1.3.7 Export an Equipment List

##### **1.1.8 Filter an Equipment List**

You can also use [![image-1651163568393.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163568393.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163568393.png) (FILTER button) located on the Equipment list.

[![image-1707097475502.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707097475502.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707097475502.png)  
 Fig 1.3.8 Filter an Equipment List

##### **1.1.9 Import Multiple Equipment List**

If you want to import multiple equipment list together, do the following,

<div class="pointer-container" id="bkmrk-%C2%A0-23"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--148" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>1. Click [![image-1651163686212.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163686212.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163686212.png) (**TEMPLATE** button). See Fig1.3.9
    
    [![image-1707097622967.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707097622967.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707097622967.png)
2. An excel worksheet will be downloaded with a predefined template to enter the details of equipment list.
    
    
    1. Enter the required equipment details in the respective columns of the excel worksheet.
    2. Once you have added the equipment details in the excel worksheet, save the excel worksheet on your computer.
    3. Click [![image-1651163752394.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163752394.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163752394.png) (**IMPORT** button). See Fig 1.3.9
        
        A new window opens for importing the excel worksheet saved on your computer.
        
        [![image-1651163782872.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163782872.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163782872.png)
    4. Click [![image-1651163789045.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163789045.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163789045.png) (**Browse** button) to select the excel worksheet to be uploaded.
    5. Select the excel worksheet you want to upload from your computer.

Click [![image-1651163813900.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163813900.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163813900.png) (**Upload** button) to export the equipment list details that are included in the excel worksheet.Equipment lists imported successfully.

The details of the equipment list in the worksheet will be displayed in the **Equipment List** page.

#####   
  
**1.1.10 View Log**

1. You can also use [![image-1707098008638.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707098008638.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707098008638.png) (View Log button) located on the Equipment list.Here last imported details to be shown.
    
    <div class="pointer-container" id="bkmrk-%C2%A0-37"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--101" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>
    1. Click [![image-1707098008638.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707098008638.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707098008638.png) (View Log button). See Fig1.3.10

[![image-1707097913871.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707097913871.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707097913871.png)

### **2.0 RFI**

  
The **RFI** menu in the home page of the ***cuteQM*** app used add a RFI pre- alignment, Alignment Machining, Torque Tightening and Visual.

[![image-1707100455561.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707100455561.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707100455561.png)

#### **2.1 Pre- Alignment** 

Click[ ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707100831153.png)Pre-Alignment List in the RFI menu.  
The Pre-Alignment page opens. ￼

[![image-1707236021718.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707236021718.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707236021718.png)

 Fig 2.1 Pre- Alignment

##### **2.1.1 Add a Pre-Alignment RFI** 

1.cuteQM\_Production role user only can add RFI request.

2.If you want to add an RFI Pre- Alignment, do the following steps,

[![image-1707236701497.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707236701497.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707236701497.png)

[![image-1707101034695.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707101034695.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707101034695.png)

1. Click Add icon in RFI Pre Alignment Request.
2. In the **Inspection Date and Time** box, select the inspection date and time.
3. In the **Subcontractor** box, select a subcontractor from a drop-down list.  
    [![image-1651201027630.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201027630.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201027630.png)**Note**: You can add multiple cables for one request.

Click[![image-1651201285984.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201285984.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201285984.png) (Add Selected Cables) of the respective equipment you want to add.

The added cables will be moved and listed in the right side of the page. ￼

[![image-1707237298355.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707237298355.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707237298355.png)

The added equipment will be moved and listed in the right side of the page

1. [![image-1651201433945.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201433945.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201433945.png) **Tip**: If you want to remove any added joint, click [![image-1651201449656.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201449656.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201449656.png)(**Remove** icon) of the respective equipment.
2. In the **Description** box, enter the description for the added RFI Pre- Alignment request.
3. Click **Save**.
4. RFI Pre-Alignment Request created successfully.


##### **2.1.2.Edit a Pre-Alignment RFI**

If you want to edit any existing Pre-Alignment RFI request in the **list** page, do the following,

Click (Edit icon) in the **Edit** column for the respectivePre-Alignment Request. See Fig 2.1.2

[![image-1712040226606.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1712040226606.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1712040226606.png)

The **Pre-Alignment Request page** opens with the details of the selected equipment list.

[![image-1712040143342.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1712040143342.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1712040143342.png)

  
 Fig 2.1.2 Edit a Pre-Alignment Request Page

<div class="pointer-container" id="bkmrk-%C2%A0-4"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--102" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>1. Add/remove any equipments
2. Click **Save**.Pre-Alignmnet RFI request updated successfully.

#####    


##### **2.1.3 Submit RFI Pre- alignment Request.**

Once you have added the RFI fit up request, the **Submission** column in the **RFI Fit up visual Lists** page is appeared with[![image-1651201968441.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201968441.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201968441.png)(Submit and Reject icons). See Fig 2.1.3[![image-1709450588835.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709450588835.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709450588835.png)

  
 Fig 2.1.3 Submit RFI Pre-Alignment Request

1. If you want to submit the RFI pre-alignment request, click [![image-1651201981884.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201981884.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201981884.png)(Submit icon) in the **Submit** column. Otherwise click [![image-1651201995224.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201995224.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201995224.png)(Reject icon) to reject the request.
    
    Once you have submitted the RFI Pre-Alignment request, in the **Confirm** **Status** column in the **RFI pre- alignment request List** page is appeared with[![image-1651202048663.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202048663.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202048663.png)(Confirm and Reject icons).

The approved request will be moved to for inspection.

##### **2.1.4 Approve RFI pre- alignment request**

**cuteQM\_Licensee\_QA user only can approve the RFI request.**

1. If you want to approve the  **RFI pre- alignment request** , click[![image-1651203762346.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203762346.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203762346.png) (confirm icon) in the **Confirm Status** Otherwise click [![image-1651203792080.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (Reject icon) to reject the request.  
    2. Once RFI pre- alignment request approved [![image-1706614735279.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706614735279.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706614735279.png) icon will be enabled to put result. [![image-1709450892622.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709450892622.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709450892622.png)
    
      
    3. Click icon ￼[![image-1706632325743.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706632325743.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706632325743.png) result popup will open. [![image-1709450945110.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709450945110.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709450945110.png)
    
     Fig 2.1.4 Approve RFI Pre-alignment request.
2. Click **Save**
3. RFI result is updated successfully.
4. If Accept with comments given then punch list will be created, and this will be shown in view punch list screen.
5. If need to upload documents against equipment, then click attachment icon at the result popup and upload document.

##### **2.1.5 Attach a images into a RFI pre- alignment request**

<div class="pointer-container" id="bkmrk-%C2%A0-5"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--104" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>If you want to attach a image with any existing RFI pre-alignment listed in the **RFI pre-alignment request** page, you can attach the file by using[![image-1709451389767.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709451389767.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709451389767.png) (Attach icon) in the **Attach images** column.[![image-1709451460002.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709451460002.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709451460002.png)

New popup window will open. once you click Add icon ￼ You can Attach images ￼[![image-1709451659807.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709451659807.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709451659807.png)

##### **2.1.6 Print RFI Pre alignment request**

If you want to Print an RFI pre alignment report, click [![image-1651808508303.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808508303.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808508303.png) (print icon) provided in the **Report** column of the RFI pre alignment page.

**Signature of the production user and QC user will be shown in the report. Requestor signature mapped with Production user and Inspector signature mapped with QC .**

**[Click here to find the steps to upload Digital signature](https://wiki.cuteinfocomm.com/books/cuteqm/page/user-management-qg8#bkmrk-1.3%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0-log-ou "Steps to upload Digital signature")**

[![image-1709452531053.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709452531053.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709452531053.png)

  
 Fig 2.1.7 View a RFI pre alignment request. [![image-1709452584880.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709452584880.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709452584880.png)

 [![image-1724246288155.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724246288155.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724246288155.png)

##### **2.1.7 Attach a File into a RFI pre alignment request**

If you want to attach a file with any existing RFI fit up visual list listed in the **RFI pre alignment request** page, you can attach the file by using [![image-1651202499153.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202499153.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202499153.png) (Attach icon) in the **Attachment** column.[![image-1706697070366.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706697070366.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706697070366.png)  
  
New window will open . you can upload document's [![image-1709452779874.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709452779874.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709452779874.png)

##### **2.1.8 Export a RFI Pre-Alignment**

You can export a list of RFI pre-alignment list requests added in the **RFI Pre-Alignment List** page in both the pdf and excel formats by using [![image-1651202537414.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202537414.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202537414.png) (**PDF** button) and [![image-1651202548613.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202548613.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202548613.png) (**Excel** button).[![image-1707237896365.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707237896365.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707237896365.png) Fig 2.1.2 Export a RFI Pre-Alignment List Page

#####  **2.1.9 Filter a RFI Pre-Alignment** 

If you want to filter any specific RFI Pre-Alignment in the **RFI Pre- Alignment List** page, [![image-1707238111313.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707238111313.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707238111313.png)

- you can use the filter box provided in the upper side of the **RFI Pre- Alignment To** filter the any specific RFI Pre-Alignment and request, select the Report Number, Inspection Date, Subcontractor and **Date** in the boxes and click.
- you can use [![image-1651202662798.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202662798.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202662798.png) (**FILTER** button) located on the **RFI Pre-Alignment List.**

#### **2.2 RFI Alignment** 

1\. Click **RFI Alignment** in the **RFI** menu.  
 The **RFI Alignment** page opens. ￼[![image-1707238694576.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707238694576.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707238694576.png)  
 Fig 2.2 RFI Alignment Page

##### **2.2.1 RFI Alignment List**

Click [![image-1651427486684.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427486684.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427486684.png) (**ADD** button) in the **RFI Alignment List** page.

A new page opens to add an RFI Alignment List request. ￼  
[![image-1707238920836.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707238920836.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707238920836.png)  
 Fig 2.2.1 Alignment List Page

##### **2.2.2 Add RFI Alignment** 

  
1.Click [![image-1651427486684.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427486684.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427486684.png) (**ADD** button) in the **RFI Alignment List** page.cuteQM\_Production role user only can add RFI request.

A new page opens to add an RFI Alignment List request. ￼

[![image-1707239390919.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707239390919.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707239390919.png)

1. Click [![image-1651427486684.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427486684.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427486684.png) (**ADD** button) in the **RFI Alignment List** page. A new page opens to add an RFI Alignment request. ￼
    
    [![image-1707239556092.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707239556092.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707239556092.png)

<div class="pointer-container" id="bkmrk-%C2%A0-83"><div class="pointer anim "><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--168" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div></div></div>1. In the **Inspection Date and Time** box, select the inspection date and time.
2. In the **Subcontractor** box, select a subcontractor from a drop-down list.
3. In the **Description** box, enter the description for the added RFI Alignment request.  
    Before saving the added RFI Alignment list, you must add equipment for the RFI Aligment list request.
    
    [![image-1651201027630.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201027630.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201027630.png)**Note**: You can add multiple Equipment for one request.
    
    [![image-1707239987211.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707239987211.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707239987211.png)
    
    Click[![image-1651201285984.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201285984.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201285984.png) (Add Selected System) of the respective system you want to add.

The added system will be moved and listed in the right side of the page.

1. [![image-1651201433945.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201433945.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201433945.png) **Tip**: If you want to remove any added system, click [![image-1651201449656.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201449656.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201449656.png)(**Remove** icon) of the respective joint.
2. In the **Description** box, enter the description for the added RFI Alignment request.
3. Click **Save**.

The RFI Alignment list request is successfully added.

##### **2.2.3.Edit a Alignment RFI**

If you want to edit any existing Alignment RFI request in the **list** page, do the following,

Click (Edit icon) in the **Edit** column for the respectiveAlignment Request. See Fig 2.2.3

[![image-1712041107412.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1712041107412.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1712041107412.png)

The **Alignment Request page** opens with the details of the selected equipment list.

[![image-1712040143342.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1712040143342.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1712040143342.png)

  
 Fig 2.2.3 Edit a Alignment RFI Request Page

<div class="pointer-container" id="bkmrk-%C2%A0-7"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--106" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>1. Add/remove any equipments
2. Click **Save**.Alignment RFI request updated successfully.

##### **2.2.4 Submit RFI Alignment request**

Once you have added the RFI pre-alignment request, the **Submission** column in the **RFI alignment re** page is appeared with[![image-1651201968441.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201968441.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201968441.png)(Submit and Reject icons). See Fig 2.2.5

[![image-1709454122275.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709454122275.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709454122275.png)

  
 Fig 2.1.4 Submit RFI Alignment Request

1. If you want to submit the RFI alignment request, click [![image-1651201981884.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201981884.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201981884.png)(Submit icon) in the **Submit** column. Otherwise click [![image-1651201995224.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201995224.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201995224.png)(Reject icon) to reject the request.
    
    Once you have submitted the RFI Alignment request, in the **Confirm** **Status** column in the **RFI Alignment request List** page is appeared with[![image-1651202048663.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202048663.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202048663.png)(Confirm and Reject icons).

The submitted request will be moved to for inspection.

##### **2.2.6 Approve RFI Alignment request**

**cuteQM\_Licensee\_QA user only can approve the RFI request.**

1. If you want to approve the  **RFI pre- alignment request** , click[![image-1651203762346.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203762346.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203762346.png) (confirm icon) in the **Confirm Status** Otherwise click [![image-1651203792080.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (Reject icon) to reject the request.  
    2. Once RFI pre- alignment request approved [![image-1706614735279.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706614735279.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706614735279.png) icon will be enabled to put result. [![image-1709450892622.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709450892622.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709450892622.png)
    
      
    3. Click icon ￼[![image-1706632325743.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706632325743.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706632325743.png) result popup will open. [![image-1709450945110.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709450945110.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709450945110.png)
    
     Fig 2.2.6 Approve RFI Pre-alignment request.
2. Click **Save**
3. RFI result is updated successfully.
4. If Accepted with comments given as result,then punch list will be created, and this will be shown in view punch list screen.
5. If need to upload documents against equipment, then click attachment icon at the result popup and upload document.

##### **2.2.7 Attach a images into a RFI alignment request**

<div class="pointer-container" id="bkmrk-%C2%A0-12"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--113" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>If you want to attach an image with any existing RFI alignment listed in the **RFI alignment request** page, you can attach the file by using[![image-1709451389767.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709451389767.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709451389767.png) (Attach icon) in the **Attach images** column.

[![image-1709454229606.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709454229606.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709454229606.png)

New popup window will open. once you click Add icon ￼ You can Attach images ￼[![image-1709451659807.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709451659807.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709451659807.png)


##### **2.2.8 Print RFI Alignment request**

If you want to Print an RFI alignment report, click [![image-1651808508303.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808508303.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808508303.png) (print icon) provided in the **Report** column of the RFI alignment page.

**Signature of the production user and QC user will be shown in the report. Requestor signature mapped with Production user and Inspector signature mapped with QC .**

**[Click here to find the steps to upload Digital signature](https://wiki.cuteinfocomm.com/books/cuteqm/page/user-management-qg8#bkmrk-1.3%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0-log-ou "Steps to upload Digital signature")**

[![image-1709454572929.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709454572929.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709454572929.png)

  
 Fig 2.1.7 View a RFI Alignment request.

[![image-1709454624393.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709454624393.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709454624393.png)

 [![image-1724246270796.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724246270796.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724246270796.png)

##### **2.2.9 Attach a File into a RFI Alignment request**

If you want to attach a file with any existing RFI fit up visual list listed in the **RFI pre alignment request** page, you can attach the file by using [![image-1651202499153.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202499153.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202499153.png) (Attach icon) in the **Attachment** column.

[![image-1709454690235.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709454690235.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709454690235.png)

  
  
New window will open . you can upload document's

[![image-1709454711621.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709454711621.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709454711621.png)

#####  **2.2.10 Export a RFI Alignment**

You can export a list of RFI Alignment added in the **RFI Alignment List** page in both the pdf and excel formats by using [![image-1651202537414.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202537414.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202537414.png) (**PDF** button) and [![image-1651202548613.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202548613.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202548613.png) (**Excel** button). [![image-1707240200995.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707240200995.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707240200995.png) Fig 2.2.3 Export a RFI Pre-Alignment List Page

##### **2.2.11 Filter a RFI Alignment List**

If you want to filter any specific RFI Alignment in the **RFI Alignment List** page, [![image-1707238111313.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707238111313.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707238111313.png)  
 Fig 2.2.11 Filter a RFI Alignment List Page

- you can use the filter box provided in the upper side of the **RFI Alignment To** filter the any specific RFI Alignment and request, select the Report Number, Inspection Date, Subcontractor and **Date** in the boxes and click.
- you can use [![image-1651202662798.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202662798.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202662798.png) (**FILTER** button) located on the **RFI Alignment List.**

#### **2.3 Machining** 

1\. Click **RFI Machining** in the **RFI** menu.  
 The **RFI Machining** page opens. ￼[![image-1707240706489.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707240706489.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707240706489.png) Fig 2.3 RFI Machining List Page

##### **2.3.1 RFI Machining List**

Click [![image-1651427486684.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427486684.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427486684.png) (**ADD** button) in the **RFI Machining List** page.(cuteQM\_Production role user only can add RFI request)

A new page opens to add an **RFI Machining List** request. ￼

[![image-1707240900644.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707240900644.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707240900644.png)

  
 Fig 2.3.1 RFI Machining List Page

##### **2.3.2 Add a RFI Machining** 

  
1.Click [![image-1651427486684.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427486684.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427486684.png) (**ADD** button) in the **RFI Machining List** page.

A new page opens to add an **RFI Machining List** request. ￼

[![image-1707241066886.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707241066886.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707241066886.png)

1. Click [![image-1651427486684.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427486684.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427486684.png) (**ADD** button) in the **RFI Machining List** page. A new page opens to add an RFI Machining List request. ￼
    
    [![image-1707241267865.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707241267865.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707241267865.png)

<div class="pointer-container" id="bkmrk-%C2%A0-14"><div class="pointer anim "><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--115" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div></div></div>1. In the **Inspection Date and Time** box, select the inspection date and time.
2. In the **Subcontractor** box, select a subcontractor from a drop-down list.
3. In the **Description** box, enter the description for the added RFI Alignment request.  
    Before saving the added RFI machining list, you must add equipment for the RFI machining request list request.
    
    [![image-1651201027630.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201027630.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201027630.png)**Note**: You can add multiple Equipment for one request.
    
    [![image-1707241383014.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707241383014.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707241383014.png)
    
    Click[![image-1651201285984.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201285984.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201285984.png) (Add Selected System) of the respective system you want to add.

The added system will be moved and listed in the right side of the page.

1. [![image-1651201433945.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201433945.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201433945.png) **Tip**: If you want to remove any added system, click [![image-1651201449656.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201449656.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201449656.png)(**Remove** icon) of the respective joint.
2. In the **Description** box, enter the description for the added RFI Machining request.
3. Click **Save**.

The RFI Machining list request is successfully added.

##### **2.3.3.Edit a Machining RFI**

If you want to edit any existing Machining RFI request in the **list** page, do the following,

Click (Edit icon) in the **Edit** column for the respective Machining RFI Request. See Fig 2.3.3

[![image-1712042264043.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1712042264043.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1712042264043.png)

The **Machining RFI Request page** opens with the details of the selected equipment list.

[![image-1712042320396.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1712042320396.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1712042320396.png)

  
 Fig 2.3.3 Edit a Machining RFI Request Page

<div class="pointer-container" id="bkmrk-%C2%A0-15"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--122" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>1. Add/remove any equipments
2. Click **Save**.Machining RFI request updated successfully.

#####    
  
  


##### **2.3.4 Submit RFI Machining request.**

Once you have added the RFI machining request, the **Submission** column in the **RFI Machining request** page is appeared with[![image-1651201968441.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201968441.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201968441.png)(Submit and Reject icons). See Fig 2.3.5

[![image-1709454949071.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709454949071.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709454949071.png)

  
 Fig 2.3.4 Submit RFI Machining Request

1. If you want to submit the RFI alignment request, click [![image-1651201981884.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201981884.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201981884.png)(Submit icon) in the **Submit** column. Otherwise click [![image-1651201995224.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201995224.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201995224.png)(Reject icon) to reject the request.
    
    Once you have submitted the RFI Alignment request, in the **Confirm** **Status** column in the **RFI Alignment request List** page is appeared with[![image-1651202048663.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202048663.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202048663.png)(Confirm and Reject icons).

The submitted request will be moved to for inspection.

##### **2.3.5 Approve RFI Machining request**

**cuteQM\_Licensee\_QA user only can approve the RFI request.**

1. If you want to approve the  **RFI Machining request** , click[![image-1651203762346.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203762346.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203762346.png) (confirm icon) in the **Confirm Status** Otherwise click [![image-1651203792080.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (Reject icon) to reject the request.  
    2. Once RFI Machining request approved [![image-1706614735279.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706614735279.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706614735279.png) icon will be enabled to put result. [![image-1712042746203.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1712042746203.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1712042746203.png)
    
      
    3. Click icon ￼[![image-1706632325743.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706632325743.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706632325743.png) result popup will open. [![image-1709450945110.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709450945110.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709450945110.png)
    
     Fig 2.3.5 Approve RFI Machining request.
2. Click **Save**
3. RFI result is updated successfully.
4. If Accepted with comments given as result,then punch list will be created, and this will be shown in view punch list screen.
5. If need to upload documents against equipment, then click attachment icon at the result popup and upload document.

##### **2.3.6 Attach a images into a RFI machining request.**

<div class="pointer-container" id="bkmrk-%C2%A0-17"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--124" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>If you want to attach an image with any existing RFI machining listed in the **RFI machining request** page, you can attach the file by using[![image-1709451389767.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709451389767.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709451389767.png) (Attach icon) in the **Attach images** column.

[![image-1709455007648.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709455007648.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709455007648.png)

New popup window will open. once you click Add icon ￼ You can Attach images ￼[![image-1709451659807.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709451659807.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709451659807.png)


##### **2.3.7 Print RFI Machining request**

If you want to view an RFI machining report, click [![image-1651808508303.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808508303.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808508303.png) (print icon) provided in the **Report** column of the RFI Machining page.

**Signature of the production user and QC user will be shown in the report. Requestor signature mapped with Production user and Inspector signature mapped with QC .**

**[Click here to find the steps to upload Digital signature](https://wiki.cuteinfocomm.com/books/cuteqm/page/user-management-qg8#bkmrk-1.3%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0-log-ou "Steps to upload Digital signature")**

[![image-1709455054389.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709455054389.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709455054389.png)

  
 Fig 2.3.7 View a RFI machining request.

[![image-1709455112518.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709455112518.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709455112518.png)

 [![image-1724246252789.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724246252789.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724246252789.png)

##### **2.3.8 Attach a File into a RFI Machining request**

If you want to attach a file with any existing RFI listed in the **RFI machining request** page, you can attach the file by using [![image-1651202499153.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202499153.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202499153.png) (Attach icon) in the **Attachment** column.

[![image-1709455327682.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709455327682.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709455327682.png)

  
  
New window will open. you can upload document's.

[![image-1709455356812.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709455356812.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709455356812.png)

##### **2.3.9 Export a RFI Machining List**

You can export a list of RFI Machining added in the **RFI Machining List** page in both the pdf and excel formats by using [![image-1651202537414.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202537414.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202537414.png) (**PDF** button) and [![image-1651202548613.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202548613.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202548613.png) (**Excel** button).[![image-1707241526647.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707241526647.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707241526647.png) Fig 2.3.9 Export a RFI Machining List Page

##### **2.3.10 Filter a RFI Machining List**

If you want to filter any specific RFI Machining in the **RFI Machining List** page, [![image-1707241621140.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707241621140.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707241621140.png) Fig 2.3.10 Filter a RFI Machining List Page

- you can use the filter box provided in the upper side of the **RFI Machining List** to filter the any specific RFI Alignment and request, select the Report Number, Inspection Date, Subcontractor and **Date** in the boxes and click.

you can use [![image-1651202662798.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202662798.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202662798.png) (**FILTER** button) located on the **RFI Machining List.**

#### **2.4 RFI Torque Tightening** 

1\. Click **RFI Torque Tightening** in the **RFI** menu.  
 The **RFI Torque Tightening** page opens. ￼

[![image-1707242097927.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707242097927.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707242097927.png)

 Fig 2.4 RFI Torque Tightening request Page

##### **2.4.1 RFI Torque Tightening Request**

Click [![image-1651427486684.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427486684.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427486684.png) (**ADD** button) in the **RFI Torque Tightening request** page.

A new page opens to add an **RFI Torque Tightening request**. ￼

[![image-1707242182170.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707242182170.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707242182170.png)

  
 Fig 2.4.1 RFI Torque tightening request Page

##### **2.4.2 Add a Torque Tightening Request**

  
1.Click [![image-1651427486684.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427486684.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427486684.png) (**ADD** button) in the **RFI Torque Tightening request** page.

A new page opens to add an **RFI Torque Tightening** request. ￼

[![image-1707242357698.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707242357698.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707242357698.png)

1. Click [![image-1651427486684.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427486684.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427486684.png) (**ADD** button) in the **RFI Torque Tightening request page. A new page opens to add an RFI Torque Tightening request. ￼
    
    [![image-1707242498326.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707242498326.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707242498326.png)

<div class="pointer-container" id="bkmrk-%C2%A0-21"><div class="pointer anim "><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--131" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div></div></div>1. In the **Inspection Date and Time** box, select the inspection date and time.
2. In the **Subcontractor** box, select a subcontractor from a drop-down list.
3. In the **Description** box, enter the description for the added RFI Alignment request.  
    Before saving the added RFI Torque Tightening request , you must add equipment for the Torque Tightening request list request.
    
    [![image-1651201027630.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201027630.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201027630.png)**Note**: You can add multiple Equipment for one request.
    
    [![image-1707242588333.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707242588333.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707242588333.png)
    
    Click[![image-1651201285984.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201285984.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201285984.png) (Add Selected System) of the respective system you want to add.

The added system will be moved and listed in the right side of the page.

1. [![image-1651201433945.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201433945.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201433945.png) **Tip**: If you want to remove any added system, click [![image-1651201449656.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201449656.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201449656.png)(**Remove** icon) of the respective joint.
2. In the **Description** box, enter the description for the added RFI Torque Tightening request.
3. Click **Save**.

The RFI Torque Tightening request is successfully added.

##### **2.4.3.Edit a Torque Tightening RFI**

If you want to edit any existing Torque Tightening RFI request in the **list** page, do the following,

Click (Edit icon) in the **Edit** column for the respective Torque Tightening RFI Request. See Fig 2.4.3

[![image-1712042264043.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1712042264043.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1712042264043.png)

The **Torque Tightening RFI Request page** opens with the details of the selected equipment list.

[![image-1712042320396.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1712042320396.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1712042320396.png)

  
 Fig 2.4.3 Edit a Torque Tightening RFI Request Page

<div class="pointer-container" id="bkmrk-%C2%A0-24"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--132" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>1. Add/remove any equipments
2. Click **Save**.Torque Tightening RFI request updated successfully.

#####    


##### **2.4.4 Submit RFI Torque Tightening request.**

Once you have added the RFI machining request, the **Submit** column in the **RFI Torque tightening request** page is appeared with[![image-1651201968441.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201968441.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201968441.png)(Submit and Reject icons).

[![image-1709455522274.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709455522274.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709455522274.png)

  
 Fig 2.4.4 Submit RFI torque tightening Request

1. If you want to submit the RFI torque tightening request, click [![image-1651201981884.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201981884.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201981884.png)(Submit icon) in the **Submit** column. Otherwise click [![image-1651201995224.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201995224.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201995224.png)(Reject icon) to reject the request.
    
    Once you have submitted the RFI Alignment request, in the **Confirm** **Status** column in the **RFI Torque Tightening request List** page is appeared with[![image-1651202048663.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202048663.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202048663.png)(Confirm and Reject icons).

The approved request will be moved to for inspection.

##### **2.4.5 Approve RFI Torque Tightening request**

**cuteQM\_Licensee\_QA user only can approve the RFI request.**

1. If you want to approve the  **RFI Torque Tightening request** , click[![image-1651203762346.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203762346.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203762346.png) (confirm icon) in the **Confirm Status** Otherwise click [![image-1651203792080.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (Reject icon) to reject the request.  
    2. Once RFI Torque Tightening request approved [![image-1706614735279.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706614735279.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706614735279.png) icon will be enabled to put result. [![image-1712043670601.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1712043670601.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1712043670601.png)
    
      
    3. Click icon ￼[![image-1706632325743.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706632325743.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706632325743.png) result popup will open. [![image-1709450945110.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709450945110.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709450945110.png)
    
     Fig 2.3.5 Approve RFI Torque Tightening request.
2. Click **Save**
3. RFI result is updated successfully.
4. If Accepted with comments given as result,then punch list will be created, and this will be shown in view punch list screen.
5. If need to upload documents against equipment, then click attachment icon at the result popup and upload document.

##### **2.4.6 Attach a images into a RFI Torque tightening request.**

<div class="pointer-container" id="bkmrk-%C2%A0-26"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--133" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>If you want to attach an image with any existing RFI Torque tightening listed in the **RFI torque tightening request** page, you can attach the file by using[![image-1709451389767.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709451389767.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709451389767.png) (Attach icon) in the **Attach images** column.

[![image-1709455758797.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709455758797.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709455758797.png)

New popup window will open. once you click Add icon ￼ You can Attach images ￼[![image-1709451659807.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709451659807.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709451659807.png)


##### **2.4.7 Print RFI Torque tightening request**

If you want to view an RFI torque tightening report, click [![image-1651808508303.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808508303.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808508303.png) (print icon) provided in the **Report** column of the RFI Torque tightening page.

**Signature of the production user and QC user will be shown in the report. Requestor signature mapped with Production user and Inspector signature mapped with QC .**

**[Click here to find the steps to upload Digital signature](https://wiki.cuteinfocomm.com/books/cuteqm/page/user-management-qg8#bkmrk-1.3%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0-log-ou "Steps to upload Digital signature")**

[![image-1709455852926.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709455852926.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709455852926.png)

  
 Fig 2.4.7 View a RFI Torque tightening request.

[![image-1709456038820.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709456038820.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709456038820.png)

 [![image-1724246233919.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724246233919.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724246233919.png)

##### **2.4.8 Attach a File into a RFI torque tightening request.**

If you want to attach a file with any existing RFI listed in the **RFI torque tightening request** page, you can attach the file by using [![image-1651202499153.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202499153.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202499153.png) (Attach icon) in the **Attachment** column.

[![image-1709456083548.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709456083548.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709456083548.png)

  
  
New window will open. you can upload document's.

[![image-1709455356812.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709455356812.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709455356812.png)

##### **2.4.9 Export a RFI Torque Tightening Request**

You can export a list of RFI Machining added in the **RFI Torque Tightening request** page in both the pdf and excel formats by using [![image-1651202537414.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202537414.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202537414.png) (**PDF** button) and [![image-1651202548613.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202548613.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202548613.png) (**Excel** button).[![image-1707242815826.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707242815826.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707242815826.png)

 Fig 2.4.3 Export a RFI Torque tightening request Page

##### **2.4.10 Filter a RFI Torque tightening List**

If you want to filter any specific RFI Machining in the **RFI Machining List** page,

[![image-1707242946892.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707242946892.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707242946892.png)

 Fig 2.4.10 Filter RFI Torque tightening request Page

- you can use the filter box provided in the upper side of the **RFI Torque Tightening Request** to filter the any specific RFI Alignment and request, select the Report Number, Inspection Date, Subcontractor and **Date** in the boxes and click.
- you can use [![image-1651202662798.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202662798.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202662798.png) (**FILTER** button) located on the **RFI Torque tightening request.**

#### **2.5 Visual** 

Click **RFI Visual**  in the **RFI** menu.  
 The **RFI Visual** page opens. ￼[![image-1707243531273.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707243531273.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707243531273.png)

 Fig 2.5 RFI Visual request Page

##### **2.5.1 RFI Visual**

Click [![image-1651427486684.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427486684.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427486684.png) (**ADD** button) in the RFI Visual **request** page.

A new page opens to add an **RFI visual request**. ￼

[![image-1707243714839.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707243714839.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707243714839.png)

  
 Fig 2.5.1 RFI Visual Page

##### **2.5.2 Add a Visual**

1.Click [![image-1651427486684.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427486684.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427486684.png) (**ADD** button) in the **RFI Visual** page.

A new page opens to add an **RFI Visual** request. ￼

[![image-1707243851719.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707243851719.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707243851719.png)

1. Click [![image-1651427486684.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427486684.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427486684.png) (**ADD** button) in the **RFI Visual page. A new page opens to add an RFI Visual. ￼
    
    [![image-1707243924371.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707243924371.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707243924371.png)

<div class="pointer-container" id="bkmrk-%C2%A0-33"><div class="pointer anim "><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--134" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div></div></div>1. In the **Inspection Date and Time** box, select the inspection date and time.
2. In the **Subcontractor** box, select a subcontractor from a drop-down list.
3. In the **Description** box, enter the description for the added RFI visual request.  
    Before saving the added RFI visual request , you must add equipment for the RFI Visual list request.
    
    [![image-1651201027630.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201027630.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201027630.png)**Note**: You can add multiple Equipment for one request.
    
    [![image-1707244063714.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707244063714.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707244063714.png)
    
    Click[![image-1651201285984.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201285984.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201285984.png) (Add Selected System) of the respective system you want to add.

The added equipment will be moved and listed in the right side of the page.

1. [![image-1651201433945.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201433945.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201433945.png) **Tip**: If you want to remove any added system, click [![image-1651201449656.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201449656.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201449656.png)(**Remove** icon) of the respective joint.
2. In the **Description** box, enter the description for the add RFI Visual.
3. Click **Save**.

The RFI Visual is successfully added.

##### **2.5.3.Edit a Visual RFI**

If you want to edit any existing Visual RFI request in the **list** page, do the following,

Click (Edit icon) in the **Edit** column for the respective Visual RFI Request. See Fig 2.4.3

[![image-1712043970902.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1712043970902.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1712043970902.png)

The **Visual RFI Request page** opens with the details of the selected equipment list.

[![image-1712043995182.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1712043995182.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1712043995182.png)

  
 Fig 2.4.3 Edit a Visual RFI Request Page

<div class="pointer-container" id="bkmrk-%C2%A0-34"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--135" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>1. Add/remove any equipments
2. Click **Save**.Visual RFI request updated successfully.

#####    
 2.5.3 Submit RFI Visual request.**

Once you have added the RFI Visual request, the **Submit** column in the **RFI Visual request** page is appeared with[![image-1651201968441.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201968441.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201968441.png)(Submit and Reject icons).

[![image-1709456511252.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709456511252.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709456511252.png)

 Fig 2.5.3 Submit RFI Visual Request

1. If you want to submit the RFI Visual request, click [![image-1651201981884.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201981884.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201981884.png)(Submit icon) in the **Submit** column. Otherwise click [![image-1651201995224.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201995224.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201995224.png)(Reject icon) to reject the request.
    
    Once you have submitted the RFI Visual request, in the **Confirm** **Status** column in the **RFI Visual request List** page is appeared with[![image-1651202048663.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202048663.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202048663.png)(Confirm and Reject icons).

The submitted request will be moved to inspection.

##### **2.5.4 Approve RFI Visual request**

**cuteQM\_Licensee\_QA user only can approve the RFI request.**

1. If you want to approve the  **RFI Torque Tightening request** , click[![image-1651203762346.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203762346.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203762346.png) (confirm icon) in the **Confirm Status** Otherwise click [![image-1651203792080.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (Reject icon) to reject the request.  
    2. Once RFI Visual request approved [![image-1706614735279.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706614735279.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706614735279.png) icon will be enabled to put result. [![image-1712044094631.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1712044094631.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1712044094631.png)
    
      
    3. Click icon ￼[![image-1706632325743.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706632325743.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706632325743.png) result popup will open. [![image-1709450945110.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709450945110.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709450945110.png)
    
     Fig 2.5.4 Approve RFI Visual request.
2. Click **Save**
3. RFI result is updated successfully.
4. If Accepted with comments given as result,then punch list will be created, and this will be shown in view punch list screen.
5. If need to upload documents against equipment, then click attachment icon at the result popup and upload document.

##### **2.5.5 Attach a images into a RFI Visual request.**

<div class="pointer-container" id="bkmrk-%C2%A0-36"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--136" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>If you want to attach an image with any existing RFI Visual listed in the **RFI Visual request** page, you can attach the file by using[![image-1709451389767.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709451389767.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709451389767.png) (Attach icon) in the **Attach images** column.[![image-1709456565405.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709456565405.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709456565405.png)

New popup window will open. once you click Add icon ￼ You can Attach images ￼[![image-1709451659807.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709451659807.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709451659807.png)


##### **2.5.6 Print a RFI Visual request**

If you want to view an RFI Visual report, click [![image-1651808508303.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808508303.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808508303.png) (print icon) provided in the **Report** column of the RFI Visual page.

**Signature of the production user and QC user will be shown in the report. Requestor signature mapped with Production user and Inspector signature mapped with QC .**

**[Click here to find the steps to upload Digital signature](https://wiki.cuteinfocomm.com/books/cuteqm/page/user-management-qg8#bkmrk-1.3%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0-log-ou "Steps to upload Digital signature")**

[![image-1709456791451.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709456791451.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709456791451.png)

  
 Fig 2.5.7 Print a RFI Visual request.

[![image-1709456830213.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709456830213.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709456830213.png)

 [![image-1724246208568.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724246208568.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724246208568.png)

##### **2.5.7 Attach a File into a RFI Visual request.**

If you want to attach a file with any existing RFI listed in the **RFI Visual request** page, you can attach the file by using [![image-1651202499153.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202499153.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202499153.png) (Attach icon) in the **Attachment** column.

[![image-1709456083548.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709456083548.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709456083548.png)

New window will open. you can upload document's. [![image-1709456915706.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1709456915706.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1709456915706.png)

##### **2.5.8 Export a RFI Visual** 

You can export a list of RFI visual added in the **RFI Visual** page in both the pdf and excel formats by using [![image-1651202537414.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202537414.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202537414.png) (**PDF** button) and [![image-1651202548613.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202548613.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202548613.png) (**Excel** button).[![image-1707244665426.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707244665426.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707244665426.png)

 Fig 2.5.8 Export a RFI Visual Page

##### **2.5.9 Filter a RFI Visual**

If you want to filter any specific RFI Machining in the **RFI Visual List** page,[![image-1707244828745.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/scaled-1680-/image-1707244828745.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-02/image-1707244828745.png) Fig 2.5.9 Filter RFI Visual Page

- you can use the filter box provided in the upper side of the **RFI Visual** to filter the any specific RFI visual and request, select the Report Number, Inspection Date, Subcontractor and **Date** in the boxes and click.
- you can use [![image-1651202662798.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202662798.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202662798.png) (**FILTER** button) located on the **RFI Visual**

# HVAC

This section covers the inspections and data management related to HVAC module.

# HVAC

#### **PROJECT DATA**

##### **1. Item Master** 

The HVAC Switchboard menu in the ***cuteQM*** app helps you to add the Item master. Once you click the project data menu, the following tabs open Item Master

**1.Click Project Data in the menu,**  
**The Item Master page opens.**

[![image-1711005140446.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711005140446.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711005140446.png)

  
 Fig 1. Item Master in HVAC Switch Board Page

##### **1.0 Item Master**  
  


The Project Data menu in the *cute QM* app helps you to add the Insert Items data. Once you click the HVAC menu, the following tabs open Item Master.

1.Click Project Data in the HVAC menu,  
The Item Master opens.  
[![image-1711019300886.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711019300886.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711019300886.png)  
 Fig 1.0 Item Master Page

##### **1.1.1 Add an Item Master**

You can add the details of Item master to be used in the HVAC project by using the Items Master tab in the Project data menu. If you want to navigate to Item master,  
1.Click Item Master in the Project data menu,  
The Item Master page opens.[![image-1711019503929.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711019503929.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711019503929.png)

 Fig 1.1.1 Add an Item Master page.

If you want to add an Item, do the following steps,  
1\. Click [![image-1651659058478.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659058478.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659058478.png) (ADD button) in the Item Master page. See Fig 1.1.1

A new window opens to add a new Item Master.

[![image-1711019637453.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711019637453.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711019637453.png)

1. [![image-1651659093576.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659093576.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659093576.png) Note: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the Item box, enter item number.
3. Click Save.

The Item Master is successfully added and listed in the HVAC page.

##### **1.1.2 Edit an Item**

If you want to edit any existing Item master in the Item master page,

[![image-1711020146226.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711020146226.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711020146226.png)

 Fig 1.1.2 Edit an Item Master

[![image-1711020669594.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711020669594.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711020669594.png)

1. Click [![image-1651659256503.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659256503.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659256503.png)(Edit icon) of the respective Item. Fig See 1.1.2 The Item page shows the details of the selected Item.
    
    1. Edit the details where you want.  
    Click Save.

 Item updated successfully.

##### **1.1.3 Delete an Item Master**

1. If you want to delete any existing block in the Item page, you can use [![image-1651659320550.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659320550.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659320550.png) (Delete icon) provided in the Item page. By click confirm delete
    
    [![image-1711020996860.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711020996860.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711020996860.png)
    
    
    1. Click [![image-1651603839749.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603839749.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603839749.png) (Delete icon) for the corresponding area.
        
        You receive a notification message “Confirm Delete?”.  
        Click OK.

The Item is deleted successfully.

##### **1.1.4 Export an Item Master**

You can export a list of Item added in the Item Master page in both the pdf and excel formats by using[![image-1651659355160.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659355160.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659355160.png) (PDF button) and [![image-1651659366247.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659366247.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659366247.png) (Excel button). Fig See 1.1.4 page.

[![image-1711021410246.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711021410246.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711021410246.png)  
[ ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710236150444.png) Fig 1.1.4 Export in Items

##### **1.1.5 Filter an Item Master**

If you want to filter any specific Item in the Item Master page, you can use [![image-1651659424215.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659424215.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659424215.png) (FILTER button) located on the Item page.

[![image-1711021692152.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711021692152.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711021692152.png)

##### **1.1.6 Import Multiple Systems**

If you want to import multiple Items together, do the following,

1. Click [![image-1651659462780.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659462780.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659462780.png) (TEMPLATE button). See Fig 1.1.6 An excel worksheet will be downloaded with a predefined template to enter the details of Items.
    
    [![image-1711025662820.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711025662820.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711025662820.png)
2. Enter the required Item details in the respective columns of the excel worksheet.
3. Once you have added the system details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651659510503.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659510503.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659510503.png) (IMPORT button). See Fig 1.1.6
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651659540075.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659540075.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659540075.png)
5. Click [![image-1651659552512.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659552512.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659552512.png) (Browse button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651659573527.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659573527.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659573527.png)￼ (Upload button) to export the systems that are included in the excel worksheet.

The details of the Item in the worksheet will be displayed in the Item page.

### **2.0 RFI**

The RFI menu in the home page of the *cuteQM* app used add a RFI, once you click RFI, the following Tabs will open RFI Fit up inspection, Visual Inspection, view other inspection opens.

[![image-1711031123823.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711031123823.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711031123823.png)  
 Fig 2.0 RFI page

##### **2.1.0 RFI Fit up Inspection.**

Click [![image-1651427486684.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427486684.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427486684.png) (ADD button) in the RFI Fit up Inspection page.(cuteQM\_Production role user only can add RFI request)

A new page opens to add an RFI Fit up List request. ￼

[![image-1711031662021.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711031662021.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711031662021.png)  
 Fig 2.1.0 RFI Fit up Inspection Page

##### **2.1.1 Add a RFI Fit up Inspection.**

1.Click [![image-1651427486684.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427486684.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427486684.png) (ADD button) in the RFI Fit up Inspection List page.

A new page opens to add an RFI Fit up Inspection List request. ￼

[![image-1711032011430.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711032011430.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711032011430.png)

1. Click [![image-1651427486684.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427486684.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427486684.png) (ADD button) in the RFI Fit up Inspection List page. A new page opens to add an RFI Fit up Inspection List request. ￼
    
    [![image-1711032115903.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711032115903.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711032115903.png)

1. In the Inspection Date and Time box, select the inspection date and time.
2. In the Subcontractor box, select a subcontractor from a drop-down list.
3. In the Description box, enter the description for the added RFI Fit up request.  
    Before saving the added RFI Fit up list, you must add items for the RFI Fit up request list request.
    
    [![image-1651201027630.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201027630.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201027630.png)Note: You can add multiple items for one request.
    
    [![image-1711032408042.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711032408042.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711032408042.png)
    
    Click[![image-1651201285984.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201285984.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201285984.png) (Add Selected item) of the respective Item you want to add.

The added item will be moved and listed in the right side of the page.

1. [![image-1651201433945.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201433945.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201433945.png) Tip: If you want to remove any added item, click [![image-1651201449656.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201449656.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201449656.png)(Remove icon) of the respective item.
2. In the Description box, enter the description for the added RFI Fit up request.
3. Click Save.

The RFI Fit up list request is successfully added.

##### **2.1.2 Edit a RFI Fit up**

If you want to edit any existing RFI Fit up request in the RFI Fit up page, do the following,

Click (Edit icon) in the Edit column for the respective RFI Fit up. See Fig 2.1.2[![image-1711034159690.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711034159690.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711034159690.png)

The RFI Fit up page opens with the details of the selected RFI Fit up list.

[![image-1711034338948.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711034338948.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711034338948.png) Fig 2.1.2 Edit a RFI Fit up Page


[![image-1711034453470.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711034453470.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711034453470.png)

1. Add/edit any item.  
    Click Save.Fitup inspection updated successfully.

##### **2.1.3 Submit a RFI Fit up.** 

Once you have added the RFI Fit up request, the Submission column in the RFI Fit up page is appeared with[![image-1651201968441.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201968441.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201968441.png)(Submit and Reject icons). See Fig 2.1.5[![image-1711034640449.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711034640449.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711034640449.png) Fig 2.1.3 Submit &amp; Approve a RFI Fit up Page

1. If you want to submit the RFI Fit up list, click [![image-1651201981884.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201981884.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201981884.png)(Submit icon) in the Submit column. Otherwise click [![image-1651201995224.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201995224.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201995224.png)(Reject icon) to reject the request.
    
    Once you have submitted the RFI Fit up list request, in the Confirm Status column in the RFI Fit up List page is appeared with[![image-1651202048663.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202048663.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202048663.png)(Confirm and Reject icons).

The submitted request will be moved to for inspection.

##### **2.1.4 Approve RFI Fit up** 

**cuteQM\_Licensee\_QA user only can approve the RFI request.**

1. If you want to approve the RFI Fit up request, click[![image-1651203762346.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203762346.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203762346.png) (confirm icon) in the Confirm Status Otherwise click [![image-1651203792080.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (Reject icon) to reject the request.  
    2. Once RFI Fit up list [![image-1706614735279.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706614735279.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706614735279.png) icon will be enabled to put result. **[![image-1711035149230.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711035149230.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711035149230.png)**
    
      
    **3. Click icon ￼[![image-1706632325743.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706632325743.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706632325743.png) result popup will open.**   
    **[![image-1711035218517.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711035218517.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711035218517.png)**
    
    **[![image-1711035278679.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711035278679.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711035278679.png)**
    
     Fig 2.1.4 Approve RFI Fit up Result Page
2. **C**lick Save
3. RFI result is updated successfully.
4. If RFI Accepts with comments given as result then punch list will be created, and this will be shown in view punch list screen.
5. If need to upload documents against item part, then click attachment icon at the result popup and upload documents.

##### **2.1.5 Print RFI Fit up**

If you want to print an RFI Fit up, click [![image-1651808508303.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808508303.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808508303.png) (print icon) provided in the Report column of the RFI Fit up List.

**In the print, user can see the signature of both the production user and QC . Requestor signature mapped with Production and Inspector signature mapped with QC**

**[Click here to find the steps to upload Digital signature](https://wiki.cuteinfocomm.com/books/cuteqm/page/user-management-qg8#bkmrk-1.3%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0-log-ou "Steps to upload Digital signature")**

**[![image-1711035584861.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711035584861.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711035584861.png)**  
  Fig 2.1.5 Print a RFI fit up Inspection Page.

**[![image-1711035635551.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711035635551.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711035635551.png)**

##### **2.1.6 Attach a File into a RFI Fit up** 

If you want to attach a file with any existing RFI Fit up listed in the RFI Fit up page, you can attach the file by using [![image-1651202499153.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202499153.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202499153.png) (Attach icon) in the Attachment column.

**[![image-1711035905569.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711035905569.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711035905569.png)**

A new window opens for file upload.  
In the category box, select the category from drop-down list.  
Select Browse and upload the documents. ￼**[![image-1711035946920.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711035946920.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711035946920.png)**

##### **2.1.7 Export a RFI Fit up** 

You can export a list of RFI added in the RFI Fit up page in both the pdf and excel formats by using [![image-1651202537414.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202537414.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202537414.png) (PDF button) and [![image-1651202548613.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202548613.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202548613.png) (Excel button).[![image-1711033268785.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711033268785.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711033268785.png)

 Fig 2.1.7 Export a RFI Fit up Page.

##### **2.1.8 Filter a RFI Fit up**

If you want to filter any specific RFI in the RFI Fit up page

[![image-1711033515649.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711033515649.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711033515649.png), Fig 2.1.8 Filter a RFI Fit up Page

- you can use the filter box provided in the upper side of the RFI Fit up to filter the any specific RFI Fit up and request, select the Report Number, Inspection Date, Subcontractor and Date in the boxes and click.
- you can use [![image-1651202662798.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202662798.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202662798.png) (FILTER button) located on the RFI Fit up.

#### **2.2.0 RFI Visual Inspection**  
  


Click RFI Visual Inspection in the RFI menu.  
The RFI Visual Inspection page opens. ￼**[![image-1711040633939.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711040633939.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711040633939.png)**  
 **Fig 2.2.0 RFI Visual Inspection Page**

##### **2.2.1 Add a RFI Visual Inspection** 

If you want to add an RFI Visual Inspection request, do the following,[![image-1711040713391.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711040713391.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711040713391.png)  
 **Fig 2.2.1 Add a RFI Visual Inspection Page**

1. Click [![image-1651427486684.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427486684.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427486684.png) (ADD button) in the RFI Visual page. A new page opens to add an RFI Visual request.
    
    **[![image-1711040929171.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711040929171.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711040929171.png)**
    
    **[![image-1711041336463.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711041336463.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711041336463.png)**
    
    
    1. In the Subcontractor box, select the name of a sub-contractor from a drop-down list.
    2. In the Inspection Date &amp; Time box, select the date of inspection
    3. In the Description box, enter the description for the inspection.
    4. Click the check box of the respective frames.
    5. Click [![image-1706197735824.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706197735824.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706197735824.png) (Add Selected Equipment button).
    6. In the WPS Number box, select from the drop- down list.
    7. Click ￼[![image-1711041900664.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711041900664.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711041900664.png)Welder details to add Welder details.
        
          
        **A new page opens to add Welder-Weld Layer Weld Process**
        
        **[![image-1711042261626.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711042261626.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711042261626.png)**
        
          
        In the Welder Layers box select the welder layers.  
        In the Weld Consumable box, select the weld consumable from the given drop-down list.
        
        In the WPS Number box, select the WPS Number from the given drop-down list.   
        Click Save.  
        **[![image-1711042702461.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711042702461.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711042702461.png)**

##### **2.2.2 Edit a RFI Visual** 

If you want to edit any existing RFI Fit up request in the RFI visual page, do the following,

Click (Edit icon) in the Edit column for the respective RFI visual. See Fig 2.2.2

[![image-1712045655083.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1712045655083.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1712045655083.png)

The RFI visual page opens with the details of the selected RFI visual list.

[![image-1712045704081.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1712045704081.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1712045704081.png)

 Fig 2.2.2 Edit a RFI Fit up Page


[![image-1711034453470.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711034453470.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711034453470.png)

1. Add/edit any item.  
    Click Save.visual inspection updated successfully.

##### **2.2.3 Submit a RFI Visual.** 

Once you have added the RFI visual request, the Submission column in the RFI Visual page is appeared with[![image-1651201968441.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201968441.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201968441.png)(Submit and Reject icons). See Fig 2.2.3

[![image-1712045735816.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1712045735816.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1712045735816.png)

 Fig 2.2.3 Submit &amp; Approve a RFI visual Page

1. If you want to submit the RFI Visual list, click [![image-1651201981884.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201981884.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201981884.png)(Submit icon) in the Submit column. Otherwise click [![image-1651201995224.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201995224.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201995224.png)(Reject icon) to reject the request.
    
    Once you have submitted the RFI Visual list request, in the Confirm Status column in the RFIVisual List page is appeared with[![image-1651202048663.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202048663.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202048663.png)(Confirm and Reject icons).

The submitted request will be moved to for inspection.

##### **2.2.4 Approve RFI Visual**

**cuteQM\_Licensee\_QA user only can approve the RFI request.**

1. If you want to approve the RFI Visual request, click[![image-1651203762346.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203762346.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203762346.png) (confirm icon) in the Confirm Status Otherwise click [![image-1651203792080.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (Reject icon) to reject the request.  
    2. Once RFI Visual list [![image-1706614735279.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706614735279.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706614735279.png) icon will be enabled to put result. [![image-1712045766969.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1712045766969.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1712045766969.png)
    
      
    **3. Click icon ￼[![image-1706632325743.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706632325743.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706632325743.png) result popup will open.**   
    **[![image-1711035218517.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711035218517.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711035218517.png)**
    
     Fig 2.2.4 Approve RFI Visual Result Page
2. **C**lick Save
3. RFI result is updated successfully.
4. If Accepts with comments given as result then punch list will be created, and this will be shown in view punch list screen.
5. If need to upload documents against item part, then click attachment icon at the result popup and upload documents.

##### **2.2.5 Print RFI Visual**

If you want to print an RFI Visual, click [![image-1651808508303.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808508303.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808508303.png) (print icon) provided in the Report column of the RFI Visual List.

**In the print, user can see the signature of both the production user and QC . Requestor signature mapped with Production and Inspector signature mapped with QC**

**[Click here to find the steps to upload Digital signature](https://wiki.cuteinfocomm.com/books/cuteqm/page/user-management-qg8#bkmrk-1.3%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0-log-ou "Steps to upload Digital signature")**

[![image-1712045976064.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1712045976064.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1712045976064.png)

  
  Fig 2.2.5 Print a RFI Visual Inspection Page.

[![image-1712045859792.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1712045859792.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1712045859792.png)

##### **2.2.6 Attach a File into a RFI Visual**

If you want to attach a file with any existing RFI Visual listed in the RFI Fit up page, you can attach the file by using [![image-1651202499153.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202499153.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202499153.png) (Attach icon) in the Attachment column.

[![image-1712045938838.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/scaled-1680-/image-1712045938838.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-04/image-1712045938838.png)

A new window opens for file upload.  
In the category box, select the category from drop-down list.  
Select Browse and upload the documents. ￼**[![image-1711035946920.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711035946920.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711035946920.png)**

  
 **Fig 2.2.6 Add a RFI Visual Page**

##### **2.2.7 Export a RFI Visual**

You can export a list of RFI Visual list visual list requests added in the RFI Fit Visual page in both the pdf and excel formats by using [![image-1651202537414.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202537414.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202537414.png) (PDF button) and [![image-1651202548613.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202548613.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202548613.png) (Excel button).**[![image-1711042992326.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711042992326.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711042992326.png) Fig 2.2.7 Export a RFI Visual Page.**

##### **2.2.8 Filter a RFI Visual** 

<div class="pointer-container" id="bkmrk-%C2%A0-4"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block">**<input id="bkmrk--36" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button>**</div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>If you want to filter any RFI Visual request from the list of RFI requests in the RFI Visual page, you can use [![image-1651432698911.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432698911.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432698911.png) (FILTER button). **[![image-1710335064797.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710335064797.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710335064797.png)**  
 **Fig 2.2.8 Filter a RFI Visual Page**

##### **2.3.0 View Other Inspection**   
  


Click **View Other Inspection** in the RFI menu.  
The **View Other Inspection** page opens. ￼

**[![image-1711043333765.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711043333765.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711043333765.png)**  
 Fig 2.3.0 View Other Inspection Page

#####   
**2.3.1 Add a Other Inspection**

If you want to add other inspection, do the following steps,  
1\. Click [![image-1651659058478.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659058478.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659058478.png) (ADD button) in the view other inspection page. See Fig 2.3.0

A new window opens to add a new Other Inspection. ￼**[![image-1711043592879.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711043592879.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711043592879.png)**  
 **Fig 2.3.1 Add a Other Inspection Page.**

  
2.Select the items to be added for RFI request.

3.Click RFQ inspection button as shown below

**[![image-1711043816488.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711043816488.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711043816488.png)**  
**Once you click RFQ Inspection a new window opens.**  
**Click Save.**

**[![image-1711043855736.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711043855736.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711043855736.png)**


##### **2.3.2 Submit a View Other Inspection**

Once you have added the view other inspection, the **result** column in the view other inspection page is appeared with[![image-1651201968441.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201968441.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201968441.png)(Submit and Reject icons). See Fig 2.2.3 [![image-1710400673101.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1710400673101.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710400673101.png) Fig 2.3.3 Submit a Other Inspection request

1. If you want to submit the view other inspection request, click [![image-1651201981884.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201981884.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201981884.png)(Submit icon) in the **Submit** column. Otherwise click [![image-1651201995224.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201995224.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201995224.png)(Reject icon) to reject the request.

The submitted request will be moved to for inspection.

##### **2.3.3 Approve View other Inspection.**

**cuteQM\_Lisencee QA role user only can approve the RFI request.**

<div class="pointer-container" id="bkmrk-%C2%A0-6"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--37" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>1. If you want to approve the view other inspection request, click[![image-1651203762346.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203762346.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203762346.png) (confirm icon) in the **Confirm Status** Otherwise click [![image-1651203792080.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (Reject icon) to reject the request.  
    2. Once RFI request approved [![image-1706614735279.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706614735279.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706614735279.png) icon will be enabled to put result. [![image-1711044727049.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711044727049.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711044727049.png)
    
      
    3. Click icon ￼[![image-1706632325743.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1706632325743.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1706632325743.png) result popup will open.   
    [![image-1711044767125.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711044767125.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711044767125.png)
    
    [![image-1711044784338.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711044784338.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711044784338.png)
    
     Fig 2.3.3 Approve View Other Inspection Page
2. Click **Save**
3. RFI result is updated successfully.
4. If accept with comments given then punch list will be created, and this will be shown in view punch list screen.
5. If need to upload documents against system No, then click attachment icon at the result popup and upload documents.

##### **2.3.4 Print a View other Inspection.**

If you want to Print and view other inspection, click [![image-1651808508303.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808508303.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808508303.png) (print icon) provided in the **Report** column of the View Other inspection page.

**In the print, user can see the signature of both the production user and QC . Requestor signature mapped with Production and Inspector signature mapped with QC**

**[Click here to find the steps to upload Digital signature](https://wiki.cuteinfocomm.com/books/cuteqm/page/user-management-qg8#bkmrk-1.3%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0%C2%A0-log-ou "Steps to upload Digital signature")**

[![image-1711044996163.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711044996163.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711044996163.png)  
 See Fig 2.3.5 Print a View Other Inspection page.

[![image-1711045074566.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711045074566.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711045074566.png)

##### **2.3.5 Attach a File into View other Inspection**

If you want to attach a file with any existing View other inspection in the view other inspection page, you can attach the file by using [![image-1651202499153.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202499153.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202499153.png) (Attach icon) in the **Attachment** column.

[![image-1711045808480.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711045808480.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711045808480.png)

<div class="pointer-container" id="bkmrk-%C2%A0-7"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--40" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>A new window opens for file upload.  
In the **category** box, select the category from drop-down list.  
Select Browse and upload the documents. ￼

[![image-1711045880962.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711045880962.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711045880962.png) Fig 2.3.5 Attach a View other Inspection Page

##### **2.3.6 Export an Other Inspection**

You can export a list of view other inspection requests added in the View Other Inspection page in both the pdf and excel formats by using [![image-1651202537414.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202537414.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202537414.png) (**PDF** button) and [![image-1651202548613.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202548613.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202548613.png) (**Excel** button).

[![image-1711046032394.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711046032394.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711046032394.png)

 Fig 2.3.6 Export a View Other Inspection Page

##### **2.3.7 Filter a Other Inspection**

<div class="pointer-container" id="bkmrk-%C2%A0-8"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--45" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>If you want to filter any view other inspection request from the list of RFI requests in the View other inspection page, you can use [![image-1651432698911.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432698911.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432698911.png) (**FILTER** button).

[![image-1711046156949.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711046156949.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711046156949.png)

[ ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1710403743219.png) Fig 2.3.7 Filter a View other Inspection Page.

#### **2.4.0 Reports** 

Click HVAC in the report's menu.  
The report opens. ￼[![image-1711046417541.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711046417541.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711046417541.png)   
 Fig 2.4.0 Reports in HVAC

##### **2.4.1 Item Master Summary**

  
Click Reports in the report's menu.Here we can see the summary of all the items.  
The Item master Summary opens. ￼[![image-1711046632272.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711046632272.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711046632272.png) Fig 2.4.1 Item Master Summary Page

##### **2.4.2 To View Item History** 

Click[![image-1711046903316.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711046903316.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711046903316.png)(add button) an Item History to view Fit up Summary/ Visual summary/Other Inspection summary.

[![image-1711046884316.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711046884316.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711046884316.png)  
Click icon [![image-1711047065520.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711047065520.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711047065520.png)result popup will open .[<span style="color: #000000;"> </span>![image-1711046957744.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711046957744.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711046957744.png)

##### **2.4.3 Export an Item Summary Report**

You can export a list of item summary report added in the Item Summary report in both the pdf and excel formats by using [![image-1651202537414.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202537414.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202537414.png) (**PDF** button) and [![image-1651202548613.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202548613.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202548613.png) (**Excel** button).

<div class="pointer-container" id="bkmrk-%C2%A0-10"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--46" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>[![image-1711047303001.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711047303001.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711047303001.png)

 Fig 2.4.3 Export an Item Summary Report

#####  **2.4.5 Filter an Item Summary Report**

If you want to filter any specific Item Summary report in the Item Summary report page,

<div class="pointer-container" id="bkmrk-%C2%A0-11"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--47" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="https://www.w3.org/2000/svg"></svg></div></div>you can use [![image-1651202662798.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202662798.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202662798.png) (**FILTER** button) located on the Item Summary Item **￼**[![image-1711047427954.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/scaled-1680-/image-1711047427954.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-03/image-1711047427954.png)

 Fig 2.4.5 Filter an Item Summary Report Page.

#####  

# Document Progress

Document Progress

# Document Progress

### **1.0 Document Progress**

<div class="pointer-container" id="bkmrk-%C2%A0"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--91" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>The document progress menu in the ***cuteQM*** app helps you to add collection of drawings or the documents which can be approved in multiple levels. Once you click the **Document Progress menu**, the following tabs open,

#### **1.1 Drawing Type**

Drawing type can be added through ADD or import of Drawing Type command.

1\. Click Drawing Type in the **Document Progress** menu.  
 The **Drawing Type** page opens.

[![image-1705027322984.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705027322984.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705027322984.png)  
 **Figure 1.1: Drawing Type page**

##### **1.1.1 Add a Drawing Type** 

If you want to Add Drawing type, do the following steps

1. Click [![image-1651119261792.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651119261792.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651119261792.png) (**ADD** button) in the **Drawing type** page. See Fig 1.1.1 A new window opens to add a new Drawing type. [![image-1705640112298.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705640112298.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705640112298.png)
    
    [ ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705028582770.png) **Figure 1.1.1 Drawing Type page** [![image-1651603678108.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603678108.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603678108.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.
2. In the **Category** box, you must select the drawing category.
3. In the **Drawing Type** box, enter the drawing type.
4. Click **Save**. The Drawing type is successfully added.

##### **1.1.2 Edit a Drawing Type  


If you want to edit any existing Drawing type in the **Drawing Type page**, do the following, steps

1. Click [![image-1651603749311.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603749311.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603749311.png)(Edit icon) in the **Edit** column for the respective drawing type. See Fig 1.1.2 A new window opens to edit the saved one. [![image-1705639647476.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705639647476.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705639647476.png)
    
     **Figure 1.1:2 Edit Page**[![image-1705029714304.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705029714304.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705029714304.png)
2. Click any box where you want to edit the details, and then update the details in the respective box.
3. Click **Save**. Selected Drawing type updated successfully.

##### **1.1.3 Delete a Drawing Type**

If you want to delete any specific drawing from the list of drawing, you can use (Delete icon) provided in the <span style="font-weight: bold;">Delete </span>column of the Drawing Type<span style="font-weight: bold;"> </span>page. See Fig below

**[![image-1705403147510.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705403147510.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705403147510.png)**

1. Click [![image-1651603839749.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603839749.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603839749.png) (Delete icon) for the corresponding Drawing type.
    
    You receive a confirmation message “**Confirm** **delete?**”.
2. Click **OK .** Selected Drawing type deleted successfully.

##### **1.1.4 Export Drawing Type**

You can export a list of Drawing type added in the Drawing type page in both the pdf and excel formats.

<div class="pointer-container" id="bkmrk-%C2%A0-2"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--92" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>1. If you want to export the Drawing type list in the pdf format, click [![image-1651119905005.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651119905005.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651119905005.png)(**PDF** button).
    
    The Drawing type list will be downloaded as a pdf file.
2. If you want to export the Drawing type list in the excel format, click [![image-1651119961686.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651119961686.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651119961686.png) (**Excel** button).
    
    The Drawing type will be downloaded as an excel file.

[![image-1705640414332.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705640414332.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705640414332.png)

##### **1.1.5 Filter a Drawing Type**

  
If you want to filter any category and drawing Type from the list of Drawing Type in the page, do the following,

1\. Click [![image-1651604010559.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604010559.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604010559.png) (FILTER button) located on the Drawing Type. See Fig below

 Once you clicked the **Filter** button, the filter box opens for the **Category,** and **Drawing Type** columns. [![image-1705403991661.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705403991661.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705403991661.png)<span style="color: #206ea7;"><span style="color: #000000;">2.</span> <span style="color: #000000;">Enter</span></span> relevant detail in the respective column’s filter box to filter any Category or Drawing type.

##### **1.1.6 Import Multiple Drawing Types**

  
 If you want to import multiple Drawing Types together, do the following steps,

1. Click [![image-1651120365377.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120365377.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120365377.png) (**TEMPLATE** button).
2. An excel worksheet will be downloaded with a predefined template to enter the details of Drawing types.[![image-1705640875664.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705640875664.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705640875664.png)
3. Enter the required Drawing type and category details in the respective columns of the excel worksheet.
4. Once you have added the details in the excel worksheet, save the excel worksheet on your computer.
5. Click [![image-1651604149198.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604149198.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604149198.png) (**IMPORT** button).
6. A new window opens for importing the excel worksheet saved on your computer.[![image-1651604180432.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604180432.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604180432.png)
7. Click [![image-1651120579811.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120579811.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120579811.png) (**Browse** button) to select the excel worksheet to be uploaded.
8. Click [![image-1651604210730.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604210730.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604210730.png) (**Upload** button) to export the drawing type that are included in the excel worksheet.

 Imported successfully. The details of the Drawing Type in the worksheet will be displayed in the Drawing Type page.

#### **1.2 Basic Drawings**

DPM\_Basic role users can add Basic drawings and can create revisions.

#####  **1.2.1 Add a Basic Drawing**

  
If you want to add a **Basic Drawing**, do the following steps,

[![image-1705641583946.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705641583946.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705641583946.png)

Click [![image-1651604374952.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604374952.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604374952.png) (**ADD** button) in the **Add Basic Drawings.** See Fig 1.2.1[![image-1705423608913.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705423608913.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705423608913.png) **Figure 1.2. 1 Add Basic drawing page**

[![image-1651604404786.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604404786.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604404786.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.

1. **DPM\_Basic** role user only can add Basic drawings
2. In the **Basic Drawings** box, enter the Drawing Type number.
3. In the **Revision** box, enter the revision number.
4. In the **Drawing Number** box, enter the drawing number of the basic drawing.
5. In the **Planned AFC/Delivery Date** box, select the delivery date from drop-down list.
6. In the **Description** box, enter your description if any.
7. Click Save.

##### **1.2.2.Edit a Basic Drawing**

If you want to edit any existing Basic drawing in the **Basic drawing list** page, do the following steps

1. Click [![image-1651603749311.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603749311.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603749311.png)(Edit icon) in the **Edit** column for the respective drawing. See Fig 1.2.2 A new window opens to edit the saved one. [![image-1705642072803.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705642072803.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705642072803.png)
    
     ****Figure 1.2:2 Edit Page****[![image-1705642162067.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705642162067.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705642162067.png)
2. Click any box where you want to edit the details, and then update the details in the respective box.
3. Click **Save**. Selected Basic drawing updated successfully.

##### **1.2.3.Delete a Basic Drawing**

If you want to delete any specific Basic drawing from the list of drawings, you can use (Delete icon) provided in the <span style="font-weight: bold;">Delete </span>column of the Basic Drawing<span style="font-weight: bold;"> </span>page. See Fig below

[![image-1705642386892.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705642386892.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705642386892.png)

1. Click [![image-1651603839749.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603839749.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603839749.png) (Delete icon) for the corresponding Basic Drawing .
    
    You receive a confirmation message “**Confirm** **delete?**”.
2. Click **OK .** Selected Basic Drawing deleted successfully.

##### **1.2.4.Export Basic Drawing**

You can export a list of Basic Drawings added in the Basic drawing page in both the pdf and excel formats.

<div class="pointer-container" id="bkmrk-%C2%A0-4"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--93" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>1. If you want to export the Basic Drawings list in the pdf format, click [![image-1651119905005.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651119905005.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651119905005.png)(**PDF** button).
    
    The Basic Drawings list will be downloaded as a pdf file.
2. If you want to export the Basic Drawings list in the excel format, click [![image-1651119961686.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651119961686.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651119961686.png) (**Excel** button).
    
    The Basic Drawings will be downloaded as an excel file.
    
    [![image-1705642569365.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705642569365.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705642569365.png)

##### **1.2.5 Filter a Basic Drawing**

If you want to filter any Basic Drawings from the list of Basic Drawing , do the following steps,  
Click [![image-1651604010559.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604010559.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604010559.png) (**FILTER** button) located on the Basic Drawing page. See Fig below  
Once you clicked the **Filter** button, the filter box opens for the Drawing Type**, Drawing Number,Description** and **Revision** columns. [![image-1705425555312.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705425555312.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705425555312.png)

##### **1.2.6 Import multiple Basic Drawings** 

If you want to **Import** multiple Basic drawings together, do the following steps,[![image-1705426378596.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705426378596.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705426378596.png)

1. Click [![image-1651604149198.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604149198.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604149198.png) (**IMPORT** button) in the Basic drawing screen. Refer above fig
2. It will redirected to import page
3. Click [![image-1651120365377.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120365377.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120365377.png) (**TEMPLATE** button) . An excel worksheet will be downloaded with a predefined template to enter the details of Basic Drawing details.[![image-1705593670101.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705593670101.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705593670101.png)
4. Enter the required Drawing type and category details in the respective columns of the excel worksheet.
5. Once you have added the details in the excel worksheet, save the excel worksheet on your computer.[![image-1705593775731.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705593775731.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705593775731.png)
6. After saved the excel, browse and upload the excel,
7. Click populate values ,process and Import buttons. Refer below fig
8. [![image-1705593998835.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705593998835.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705593998835.png)
9. Imported successfully, imported data will be shown in Basic drawings list screen

#### **1.3.Basic Drawings Workflow Approval**

 Multiple workflow levels are there to approve Basic drawings. DPM\_Basic role users only can initiate the workflow by creating basic drawings. See Fig 1.2.6

[![image-1705580913489.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705580913489.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705580913489.png)**Fig 1.2.6 Workflow approvals of Basic drawings**

##### **1.3.1.Basic Approval**  
  


1. DPM\_Basic role users can do Basic approval
2. Login as DPM\_Basic role user and click Manage button placed against the basic drawing. It will redirected to details screen of the basic drawing. Refer below fig[![image-1705581637526.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705581637526.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705581637526.png)
3. Upload the Basic drawing which is going to approve. Refer below Fig.[![image-1705581948326.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705581948326.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705581948326.png)
4. User can add comments and additional documents in this details screen. Refer below fig.[![image-1705582695399.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705582695399.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705582695399.png)
5. User can submit the added basic drawing by click the submit button placed at the top right.After Refer below fig.[![image-1705583071496.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705583071496.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705583071496.png)
6. After submission, status of the basic drawing will be changed to **Waiting for Owner Approval/Classification Approval.**Then we can do **Parallel approval for Owner/client approval or Classification approval .**
7. Email notification will be sent to Owner and classification users

##### **1.3.2.Owner/Client Approval**

1. **DPM\_Owner** role users can do Owner/Client approval.
2. Login as **DPM\_Owner** user and click [![image-1705583630675.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705583630675.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705583630675.png)manage button to view the drawing details
3. Now user can see **Owner/client approve** and **Return** buttons at the top. Refer below fig[![image-1705584248874.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705584248874.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705584248874.png)
4. If **Return** [![image-1705584335789.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705584335789.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705584335789.png)clicked it will redirected to popup window to enter return comments, priority and attachments.Refer below fig.[![image-1705584763755.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705584763755.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705584763755.png)
5. After entering mandatory fields click **save** button. Refer above fig. Then **New revision** will be created for that drawing.
6. Status will be changed to **New** and email notification will be sent to **Creator** user to submit the drawing.
7. If **Owner/Client approve** [![image-1705585264891.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705585264891.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705585264891.png)clicked, then status will be changed to **Waiting for Classification Approval.**
8. Email notification will be sent to **DPM\_Classification** role users to approve the drawing

##### **1.3.3.Classification Approval**

1. **DPM\_Classification** role users can do classification approval.
2. Login as **DPM\_Classification** role user and click [![image-1705583630675.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705583630675.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705583630675.png)manage button to view the drawing details .
3. Now user can see **Classification approve** and **Return** buttons at the top.Refer below fig.[![image-1705588858326.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705588858326.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705588858326.png)
4. If **Return** [![image-1705584335789.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705584335789.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705584335789.png)clicked it will redirected to popup window to enter return comments, priority and attachments. Refer below fig.[![image-1705584763755.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705584763755.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705584763755.png)
5. After entering mandatory fields click **save** button. Refer above fig. Then **New revision** will be created for that drawing.
6. Status will be changed to **New** and email notification will be sent to **Creator** user to submit the drawing.
7. If **Classification approve**[![image-1705589047116.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705589047116.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705589047116.png)clicked , then status will be changed to **Waiting for Production Approval.**
8. Email notification will be sent to **DPM\_Production** role users to approve the drawing.

##### **1.3.4.Production Approval**

1. **DPM\_Production** role user can do Production approval.
2. Login as **DPM\_Production** role user and click [![image-1705583630675.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705583630675.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705583630675.png)manage button to view the drawing details.
3. Now user can see **Production approve** and **Return** buttons at the top. Refer below fig.[![image-1705589416167.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705589416167.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705589416167.png)
4. If **Return** [![image-1705584335789.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705584335789.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705584335789.png)clicked it will redirected to popup window to enter return comments, priority and attachments. Refer below fig.[![image-1705584763755.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705584763755.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705584763755.png)
5. After entering mandatory fields click **save** button. Refer above fig. Then **New revision** will be created for that drawing.
6. Status will be changed to **New** and email notification will be sent to **Creator** user to submit the drawing.
7. If **Production Approve**[![image-1705589507691.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705589507691.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705589507691.png)clicked , then status will be changed to **Waiting for AFC .**
8. Email notification will be sent to **DPM\_AFC** role users to approve the drawing.

##### **1.3.5.AFC Approval**

1. **DPM\_AFC** user can approve drawing at any stage of the workflow .
2. Login as **DPM\_AFC** role user and click [![image-1705583630675.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705583630675.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705583630675.png)manage button to view the drawing details.
3. Now user can see **AFC**  and **Return** buttons at the top. Refer below fig[![image-1705589847714.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705589847714.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705589847714.png)
4. If **Return** [![image-1705584335789.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705584335789.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705584335789.png)clicked it will redirected to popup window to enter return comments, priority and attachments. Refer below fig.[![image-1705584763755.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705584763755.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705584763755.png)
5. After entering mandatory fields click **save** button. Refer above fig. Then **New revision** will be created for that drawing.
6. Status will be changed to **New** and email notification will be sent to **Creator** user to submit the drawing.
7. If **AFC** [![image-1705589960423.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705589960423.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705589960423.png)clicked , then status will be changed to **Approved .**
8. Email notification will be sent to creator user.

##### **1.3.6.Revision**

1. **DPM\_Basic** role user only can Revise the Basic drawing.
2. Once Basic drawing approved, Revision button button will be enabled for **DPM\_Basic** role users.
3. Login as **DPM\_Basic** role user and click manage button to view the drawing details.
4. Click Revision button at the top. Refer below fig. [![image-1705590544318.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705590544318.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705590544318.png)
5. A confirmation msg will be prompted.Click **Ok .**Refer below fig[![image-1705590888807.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705590888807.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705590888807.png)
6. New **Revision** of the drawing will be created. Status changed to **New.**
7. Repeat the steps **1.3** to approve the revised drawing.

### **1.4 Production Drawings**

DPM\_Receiver role users can add Basic drawings and can create revisions.

#####  **1.4.1 Add a Production Drawing**

  
If you want to add a **Production Drawing**, do the following steps.

[![image-1705650747201.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705650747201.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705650747201.png)

Click [![image-1651604374952.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604374952.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604374952.png) (**ADD** button) in the **Add Production Drawings.** See Fig 1.4.1

[![image-1705650890751.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705650890751.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705650890751.png)

 **Figure 1.4. 1 Add Production drawing page**

[![image-1651604404786.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604404786.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604404786.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.

1. **DPM\_Receiver** role user only can add Basic drawings
2. In the **Production Drawings** box, enter the Drawing Type number.
3. In the **Revision** box, enter the revision number.
4. In the **Drawing Number** box, enter the drawing number of the basic drawing.
5. In the **Planned AFC/Delivery Date** box, select the delivery date from drop-down list.
6. In the **Description** box, enter your description if any.
7. Click Save.

##### **1.4.2.Edit a Production Drawing**

If you want to edit any existing Basic drawing in the **Production drawing list** page, do the following steps

1. Click [![image-1651603749311.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603749311.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603749311.png)(Edit icon) in the **Edit** column for the respective drawing. See Fig 1.4.2 A new window opens to edit the saved one. [![image-1705650995801.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705650995801.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705650995801.png)
    
     **Figure 1.4:2 Edit Page**[![image-1705651094782.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705651094782.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705651094782.png)
2. Click any box where you want to edit the details, and then update the details in the respective box.
3. Click **Save**. Selected Production drawing updated successfully.

##### **1.4.3.Delete a Production Drawing**

If you want to delete any specific Production drawing from the list of drawings, you can use (Delete icon) provided in the <span style="font-weight: bold;">Delete </span>column of the Production Drawing<span style="font-weight: bold;"> </span>page. See Fig below

[![image-1705651178511.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705651178511.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705651178511.png)

1. Click [![image-1651603839749.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603839749.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603839749.png) (Delete icon) for the corresponding Basic Drawing .
    
    You receive a confirmation message “**Confirm** **delete?**”.
2. Click **OK .** Selected Production Drawing deleted successfully.

##### **1.4.4.Export Production Drawing**

You can export a list of Production Drawings added in the Production drawing page in both the pdf and excel formats.

<div class="pointer-container" id="bkmrk-%C2%A0-8"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--94" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>1. If you want to export the Production Drawings list in the pdf format, click [![image-1651119905005.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651119905005.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651119905005.png)(**PDF** button).
    
    The Production Drawings list will be downloaded as a pdf file.
2. If you want to export the Production Drawings list in the excel format, click [![image-1651119961686.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651119961686.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651119961686.png) (**Excel** button).
    
    The Production Drawings will be downloaded as an excel file.
    
    [![image-1705642569365.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705642569365.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705642569365.png)

##### **1.4.5 Filter a Production Drawing**

If you want to filter any Basic Drawings from the list of Production Drawing , do the following steps,  
Click [![image-1651604010559.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604010559.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604010559.png) (**FILTER** button) located on the Production Drawing page. See Fig below  
Once you clicked the **Filter** button, the filter box opens for the Drawing Type**, Drawing Number,Description** and **Revision** columns.

[![image-1705652735099.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705652735099.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705652735099.png)

##### **1.4.6 Import multiple Production Drawings** 

If you want to **Import** multiple Production drawings together, do the following steps,

[![image-1705652790293.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705652790293.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705652790293.png)

1. Click [![image-1651604149198.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604149198.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604149198.png) (**IMPORT** button) in the Production drawing screen. Refer above fig.
2. It will redirected to import page.
3. Click [![image-1651120365377.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120365377.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120365377.png) (**TEMPLATE** button) . An excel worksheet will be downloaded with a predefined template to enter the details of Production Drawing details.[![image-1705593670101.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705593670101.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705593670101.png)
4. Enter the required Drawing type and category details in the respective columns of the excel worksheet.
5. Once you have added the details in the excel worksheet, save the excel worksheet on your computer.[![image-1705593775731.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705593775731.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705593775731.png)
6. After saved the excel, click browse and upload the excel.
7. Click populate values ,process and Import buttons. Refer below fig.
8. [![image-1705593998835.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705593998835.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705593998835.png)
9. Imported successfully, imported data will be shown in Production drawings list screen.


#### **1.5.Production Drawings Workflow Approval**

Multiple workflow levels are there to approve Production drawings. DPM\_Receiver role users only can initiate the workflow by creating Production drawings. See Fig 1.5.

[![image-1705654336666.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705654336666.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705654336666.png)

[ ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705580913489.png)**Fig 1.5.Workflow approvals of Basic drawings**

##### **1.5.1.Actual/Receiving Approval**  
  


1. DPM\_Receiver role users can do Basic approval
2. Login as DPM\_Receiver role user and click Manage button placed against the Production drawing. It will redirected to details screen of the Production drawing. Refer below fig [![image-1705654634209.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705654634209.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705654634209.png)
3. Upload the Production drawing which is going to approve. Refer below Fig.[![image-1705581948326.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705581948326.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705581948326.png)
4. User can add comments and additional documents in this details screen. Refer below fig.[![image-1705582695399.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705582695399.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705582695399.png)
5. User can submit the added Production drawing by click the submit button placed at the top right.After Refer below fig.[![image-1705583071496.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705583071496.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705583071496.png)
6. After submission, status of the Production drawing will be changed to **Waiting for Owner Approval/Classification Approval.**Then we can do **Parallel approval for Owner/client approval or Classification approval .**
7. Email notification will be sent to Owner and classification users

##### **1.5.2.Owner/Client Approval**

1. **DPM\_Owner** role users can do Owner/Client approval.
2. Login as **DPM\_Owner** user and click [![image-1705583630675.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705583630675.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705583630675.png)manage button to view the drawing details
3. Now user can see **Owner/client approve** and **Return** buttons at the top. Refer below fig[![image-1705584248874.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705584248874.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705584248874.png)
4. If **Return** [![image-1705584335789.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705584335789.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705584335789.png)clicked it will redirected to popup window to enter return comments, priority and attachments.Refer below fig.[![image-1705584763755.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705584763755.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705584763755.png)
5. After entering mandatory fields click **save** button. Refer above fig. Then **New revision** will be created for that drawing.
6. Status will be changed to **New** and email notification will be sent to **Creator** users to submit the drawing.
7. If **Owner/Client approve** [![image-1705585264891.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705585264891.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705585264891.png)clicked, then status will be changed to **Waiting for Classification Approval.**
8. Email notification will be sent to **DPM\_Classification** role users to approve the drawing

##### **1.5.3.Classification Approval**

1. **DPM\_Classification** role users can do classification approval.
2. Login as **DPM\_Classification** role user and click [![image-1705583630675.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705583630675.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705583630675.png)manage button to view the drawing details .
3. Now user can see **Classification approve** and **Return** buttons at the top.Refer below fig.[![image-1705588858326.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705588858326.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705588858326.png)
4. If **Return** [![image-1705584335789.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705584335789.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705584335789.png)clicked it will redirected to popup window to enter return comments, priority and attachments. Refer below fig.[![image-1705584763755.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705584763755.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705584763755.png)
5. After entering mandatory fields click **save** button. Refer above fig. Then **New revision** will be created for that drawing.
6. Status will be changed to **New** and email notification will be sent to **creator** users to submit the drawing.
7. If **Classification approve**[![image-1705589047116.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705589047116.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705589047116.png)clicked , then status will be changed to **Waiting for AFC.**
8. Email notification will be sent to **DPM\_AFC** role users to approve the drawing.

##### **1.5.4.AFC Approval**

1. **DPM\_AFC** user can approve drawing at any stage of the workflow .
2. Login as **DPM\_AFC** role user and click [![image-1705583630675.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705583630675.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705583630675.png)manage button to view the drawing details.
3. Now user can see **AFC**  and **Return** buttons at the top. Refer below fig[![image-1705589847714.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705589847714.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705589847714.png)
4. If **Return** [![image-1705584335789.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705584335789.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705584335789.png)clicked it will redirected to popup window to enter return comments, priority and attachments. Refer below fig.[![image-1705584763755.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705584763755.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705584763755.png)
5. After entering mandatory fields click **save** button. Refer above fig. Then **New revision** will be created for that drawing.
6. Status will be changed to **New** and email notification will be sent to **creator** user to submit the drawing.
7. If **AFC** [![image-1705589960423.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705589960423.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705589960423.png)clicked , then status will be changed to **Approved .**
8. Email notification will be sent to **creator** user.

##### **1.5.5.Revision**

1. **DPM\_Receiver** role user only can Revise the Productionc drawing.
2. Once Production drawing approved, Revision button button will be enabled for **DPM\_Receiver** role users.
3. Login as **DPM\_Basic** role user and click manage button to view the drawing details.
4. Click Revision button at the top. Refer below fig. [![image-1705590544318.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705590544318.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705590544318.png)
5. A confirmation msg will be prompted.Click **Ok .**Refer below fig[![image-1705590888807.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705590888807.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705590888807.png)
6. New **Revision** of the drawing will be created. Status changed to **New.**
7. Repeat the steps **1.5** to approve the revised drawing.

#### **1.6 Drawing Status Report**

 Drawing status report shown the comments to be closed for both Basic and Production drawings. Refer below fig

[![image-1705595775604.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705595775604.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705595775604.png)

##### **1.6.1.Export PDF &amp; Excel**

1. If you want to export the Drawing status report list in the pdf format, click [![image-1705593162729.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705593162729.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705593162729.png)(PDF button).Drawing status report list will be downloaded as pdf format.
2. If you want to export the Drawing status report in the excel format, click [![image-1651119961686.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651119961686.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651119961686.png) (**Excel** button). Drawing status report list will be downloaded in excel format.

[![image-1705595961837.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705595961837.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705595961837.png)

##### **1.6.2 Filter** 

If you want to filter any Drawings status from the list of Drawings , do the following,  
Click [![image-1651604010559.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604010559.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604010559.png) (**FILTER** button) located on the Drawing status report page. See below fig  
Once you clicked the **Filter** button, the filter box opens for the **Drawing Type, Drawing Number,** and **Revision ,Description ,priority &amp; comments** columns.

[![image-1705596491997.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705596491997.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705596491997.png)

##### **1.6.3 Close Comments**

 1.If you want to close the comments for any of the drawings, click **close** [![image-1705596646398.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705596646398.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705596646398.png)button .Refer below fig

[![image-1705596796036.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705596796036.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705596796036.png)

 2.Once Close button clicked, confirmation msg will be prompted and click **ok**. Refer below fig

[![image-1705596875954.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705596875954.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705596875954.png)

 3.Comment closed successfully. It will updated against drawing in Basic drawing and Production drawing screens

#### **1.7 Equipment List**

 Equipment list screen shown the added equipments.

[![image-1705598286140.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705598286140.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705598286140.png)

##### **1.7.1 Add a Equipment**

If you want to add a Equipment, do the following,  
Click [![image-1651603646996.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603646996.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603646996.png) (**ADD** button) in the Equipment list page. See Fig below  
 The new window open to Add Equipment

[![image-1705598484023.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705598484023.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705598484023.png)

[ ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705028582770.png)

1. [![image-1651603678108.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603678108.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603678108.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.
2. In the Equipment list box, you must enter equipment name
3. In the ABBR box, enter the ABBR of the equipment
4. In the Remarks text box, enter remarks
5. Click **Save**.
    
    The Equipment list successfully added.

##### **1.7.2.Edit a Equipment**

If you want to edit any existing Equipments in the Equipment list page, do the following steps

1. Click [![image-1651603749311.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603749311.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603749311.png)(Edit icon) in the **Edit** column for the respective Equipment. See Fig 1.7.2 A new window opens to edit the saved one. [![image-1705656089840.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705656089840.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705656089840.png)
    
     **Figure 1.7.2 Edit Page**[![image-1705656222546.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705656222546.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705656222546.png)
2. Click any box where you want to edit the details, and then update the details in the respective box.
3. Click **Save**. Selected Equipment updated successfully.

##### **1.7.3.Delete a Equipment**

If you want to delete any specific Equipment from the list of equipments , you can use (Delete icon) provided in the <span style="font-weight: bold;">Delete </span>column of the Equipment list<span style="font-weight: bold;"> </span>page. See Fig below

[![image-1705656360219.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705656360219.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705656360219.png)

1. Click [![image-1651603839749.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603839749.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603839749.png) (Delete icon) for the corresponding Equipment. .
    
    You receive a confirmation message “**Confirm** **delete?**”.
2. Click **OK .** Selected Equipment deleted successfully.

##### **1.7.4 Export Equipment list**

1. If you want to export the Equipment list in the pdf format, click [![image-1705593162729.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705593162729.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705593162729.png)(PDF button).Equipment list will be downloaded as pdf format.
2. If you want to export the Equipment list in the excel format, click [![image-1651119961686.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651119961686.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651119961686.png) (**Excel** button). Equipment list will be downloaded in excel format.

[![image-1705598725351.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705598725351.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705598725351.png)

##### **1.7.5 Filter a Equipment** 

If you want to filter any Equipment from the list of equipments , do the following,  
Click [![image-1651604010559.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604010559.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604010559.png) (**FILTER** button) located on the Equipment list page. See below fig  
Once you clicked the **Filter** button, the filter box opens for the **Equipment, ABBR &amp; Remarks columns.

[![image-1705598931988.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705598931988.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705598931988.png)

##### **1.7.6 Set Reorder Columns**

To Rearrange the order of the columns this button is used

[![image-1705599262501.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705599262501.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705599262501.png)

Drag and change the order of the column name.Then click Set Reorder Columns [![image-1705599193525.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705599193525.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705599193525.png)button.Then the new column order will be saved.

#### **1.6 Procurement Status**

Here we can create procurements and can create punchlists against the procurement status

[![image-1705600286549.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705600286549.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705600286549.png)

##### **1.6.1 Add a Procurement** 

If you want to add a Procurement status, do the following,  
Click [![image-1651603646996.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603646996.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603646996.png) (**ADD** button) in the Procurement status page. See Fig below  
The new window open to Add Procurement status

[![image-1705600542181.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705600542181.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705600542181.png)

[ ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705028582770.png)

1. [![image-1651603678108.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603678108.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603678108.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.
2. Fill all the fields
3. Click **Save**.
4. The Procurement status successfully added.

##### **1.6.2.Edit a Procurement**

If you want to edit any existing Procurement in the **Procurement status list** page, do the following steps

1. Click [![image-1651603749311.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603749311.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603749311.png)(Edit icon) in the **Edit** column for the respective Procurement. See Fig 1.6.2 A new window opens to edit the saved one. [![image-1705656769516.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705656769516.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705656769516.png)
    
     **Figure 1.6:2 Edit Page**[![image-1705656881682.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705656881682.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705656881682.png)
2. Click any box where you want to edit the details, and then update the details in the respective box.
3. Click **Save**. Selected Procurement updated successfully.

##### **1.6.3.Delete a Procurement**

If you want to delete any specific Procurement from the list of drawings, you can use (Delete icon) provided in the <span style="font-weight: bold;">Delete </span>column of the Procurement status<span style="font-weight: bold;"> </span>page. See Fig below.

[![image-1705657044474.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705657044474.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705657044474.png)

1. Click [![image-1651603839749.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603839749.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603839749.png) (Delete icon) for the corresponding Procurement .
    
    You receive a confirmation message “**Confirm** **delete?**”.
2. Click **OK .** Selected Procurement deleted successfully.

##### **1.6.4 Export Procurement**

1. If you want to export the Procurement status in the pdf format, click [![image-1705593162729.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705593162729.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705593162729.png)(PDF button).Procurement status list will be downloaded as pdf format.
2. If you want to export the Procurement status in the excel format, click [![image-1651119961686.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651119961686.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651119961686.png) (**Excel** button). Procurement status list will be downloaded in excel format.

[![image-1705600649746.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705600649746.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705600649746.png)

##### **1.6.5 Filter a Procurement** 

If you want to filter any Procurement status from the list of Procurement status , do the following,  
Click [![image-1651604010559.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604010559.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604010559.png) (**FILTER** button) located on the Procurement status list page. See below fig  
Once you clicked the **Filter** button, the filter box opens for all the columns.

[![image-1705600832628.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705600832628.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705600832628.png)

##### **1.6.6 Import multiple Procurements** 

If you want to **Import** multiple Procurement status together, do the following steps,

[![image-1705601074612.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705601074612.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705601074612.png)

1. Click [![image-1651604149198.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604149198.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604149198.png) (**IMPORT** button) in the Basic drawing screen. Refer above fig.
2. It will redirected to import page.
3. Click [![image-1651120365377.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120365377.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120365377.png) (**TEMPLATE** button) . An excel worksheet will be downloaded with a predefined template to enter the details of Procurement details.[![image-1705601164885.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705601164885.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705601164885.png)
4. Enter the required details in the respective columns of the excel worksheet.
5. Once you have added the details in the excel worksheet, save the excel worksheet on your computer.[![image-1705601252240.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705601252240.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705601252240.png)
6. After saved the excel, browse and upload the excel.
7. Click populate values, process and Import buttons. Refer below fig
8. [![image-1705593998835.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705593998835.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705593998835.png)
9. After Imported successfully, imported data will be shown in Procurement status list screen

##### **1.6.7 Create Punch**

1. Punchlist can be created by clicking create punch button in Procurement status list screen. Refer below fig.[![image-1705601506273.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705601506273.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705601506273.png)
2. Click Create punch [![image-1705601648957.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705601648957.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705601648957.png)button .Popup will be shown .Refer below fig.[![image-1705601705152.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705601705152.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705601705152.png)
3. Enter Description and click **save.**
4. Status of the punch list changed to **open.[![image-1705601943628.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705601943628.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705601943628.png)**
5. Go to View punch list screen and close the punch list (Refer 2.2)
6. Create punch list button again enabled in Procurement list screen once punch closed in view punch list screen .

[![image-1705658000127.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705658000127.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705658000127.png)

##### **1.6.8 Punch Details**

 1.Click punch details[![image-1705602882343.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705602882343.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705602882343.png)button in the Procurement status list screen. Refer below fig.

[![image-1705602941801.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705602941801.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705602941801.png)

 2.Punch status history details will be shown

[![image-1705603032242.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705603032242.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705603032242.png)

##### **1.6.9 Attachments**

 User can upload multiple documents through attachment screen

1. Click Attachment button in the Procurement status list screen. Refer below fig.[![image-1705602174532.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705602174532.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705602174532.png)
2. It will redirected to new attachment screen. Refer below fig.[![image-1705602243062.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705602243062.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705602243062.png)
3. Here user can select category of the document and browse &amp; upload the document.[![image-1705602331158.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705602331158.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705602331158.png)
4. Document uploaded successfully.[![image-1705602632621.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705602632621.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705602632621.png)
5. Once document uploaded date &amp; document name will be updated for corresponding category in the Procurement status list screen

[![image-1705602693878.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705602693878.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705602693878.png)

#### **1.7 Clone Project Data**

 This page is used to copy the project data from one skid project to another skid project with attachments and workflow details

[![image-1705633447451.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705633447451.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705633447451.png)

1. Select From project and To project from dropdown list
2. Select the master screens which are going to clone
3. Select attachments and workflow check boxes if this also need to copy
4. Click **clone .**[![image-1705635389213.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705635389213.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705635389213.png)
5. Project data cloned successfully.

### **2.0 Punch Lists**

A punch list is a list of items or tasks that need to be done before a Document progress project is completed. The **Punch Lists** menu in the home page of the ***cuteQM*** app helps to create and view the punch lists in Document progress project.

#### **2.1** **Create a New Punch List**

If you want to create a punch list, do the following steps,

1. Click Create punch list from punch list menu.[![image-1705661408085.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705661408085.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705661408085.png)
2. It will redirected to punch list create page.
3. Fill all the fields in the create page.[![image-1705661558955.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705661558955.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705661558955.png)
4. In the **Modules** box, select a module from the given modules.
5. In the **Systems** box, select a system from a drop-down list.
6. In the **Sub-Systems** box, select a sub-system from a drop-down list.
7. In the **ITR No** box, enter the ITR number.
8. In the **Drawing No** box, enter the drawing number.
9. In the **Test Pack** box, select a test pack from a drop-down list.
10. In the **Tag No** box, enter the tag number.
11. In the **Reference Types** box, select the reference type from the given options.
12. In the **Select Project** box, select a project from a drop-down list.
13. In the **Category** box, select any category from the given categories such as **A**, **B**, **C &amp; D.**
14. In the **Type** box, select the type of punch such as whether internal or external.
15. In the **Item details** box, enter the item details.
16. In the **Location** box, select a location from a drop-down list.
17. In the **Item name/ Issuer code** box, enter the description for the punch list.
18. In the **Punch Raised From** box, select the detail such as from where the punch has been raised.
19. In the **Date Raised** box, select the date when the punch has been raised.
20. In the **Punch Raised** By box, enter the name of a person who has raised the punch.
21. In the **Responsible party** box, select the responsible party for the punch.
22. In the **Responsible Dept** box, enter the department name, which is responsible for the punch.
23. In the **Responsible Person** box, enter the name of a person who is responsible for the punch.
24. In the **Expected Clearance** box, select the expected date of clearing the punch list.
25. Click **Save.**The punch list is successfully added.

#### **2.2 View Punch Lists**

The **View Punch Lists** tab helps you to view the punch list, which is added by using the **Create New Punch List** tab.

<div class="pointer-container" id="bkmrk-%C2%A0-14"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--96" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>1. Click **View Punch Lists** in the **Punch Lists** menu.

[![image-1705663003563.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705663003563.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705663003563.png)

1. The **Punch List** page opens with added punch lists.
    
    [![image-1705663323141.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705663323141.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705663323141.png)
    
    [![image-1651564462498.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564462498.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564462498.png)**Note**: If you want to verify the added punch list item, click the checkbox provided in the **Verify** column.
    
     If you want to clear the added punch list item, click the checkbox provided in the **Clear** column.

##### **2.2.1 Export Punch lists**

You can export added punch lists in the Punch lists page in both the pdf and excel formats.

<div class="pointer-container" id="bkmrk-%C2%A0-15"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--97" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>1. If you want to export the punch lists in the pdf format, click [![image-1651119905005.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651119905005.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651119905005.png)(**PDF** button).
    
    The punch lists will be downloaded as a pdf file.
2. If you want to export the punch lists in the excel format, click [![image-1651119961686.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651119961686.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651119961686.png) (**Excel** button).
    
    The punch lists will be downloaded as an excel file.

[![image-1705663443466.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705663443466.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705663443466.png)

##### **2.2.2 Filter a Punch list**

  
If you want to filter any Punch list from the punch lists page, do the following,

1\. Click [![image-1651604010559.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604010559.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604010559.png) (FILTER button) located on the punch lists screen. See Fig below

<div class="pointer-container" id="bkmrk-%C2%A0-16"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--98" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div> Once you clicked the **Filter** button, the filter box opens for all the columns.

[![image-1705663665377.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705663665377.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705663665377.png)

2\. Enter relevant detail in the respective column’s filter box to filter any punch lists.

##### **2.2.3 View a Punch List Report**

<div class="pointer anim is-page-editable" id="bkmrk-%C2%A0-17"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--99" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div>
1. ##### If you want to view a punch list report, click[![image-1705664063638.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705664063638.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705664063638.png)(**Print** button) provided in the **Punch List** page. See fig below. [![image-1705664138258.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705664138258.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705664138258.png)
2. It will redirected to new report page. And here report for the punch list shown. See fig below

[![image-1705664255283.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705664255283.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705664255283.png)

##### **2.2.4 Attach a File into a Punch List** 

<div class="pointer anim is-page-editable" id="bkmrk-%C2%A0-18"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--100" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div>
1. ##### If you want to attach any file with any punch list listed in the **Punch List** page, you can attach the file by using [![image-1651564697424.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564697424.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564697424.png) (Attach icon) in the **Attachment** column. [![image-1705664402400.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705664402400.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705664402400.png)
2. It will redirected to new attachment page to attach files.[![image-1705664601938.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705664601938.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705664601938.png)[![image-1651120969847.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120969847.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120969847.png)**Note**: Before uploading any file, read the instructions given in the **File Upload (Punchlist)** page.
3. Click category dropdown and enter category
4. Click [![image-1651120997251.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120997251.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120997251.png) (**Browse** button).
5. Select a file which you want to upload from your computer.
6. Click [![image-1651121030903.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121030903.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121030903.png) (**Upload** button) to attach the file.

The uploaded file will be displayed in the **File Upload** table.

[![image-1705665159422.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705665159422.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705665159422.png)

##### **2.2.5.View Punch list summary**

1. If you want to view a punch list summary, click [![image-1651564654001.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564654001.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564654001.png)<span style="color: #444444;"> (</span>**Punch List Summary** <span style="color: #444444;">button) provided in the upper side of the </span>**Punch List** <span style="color: #444444;">page. See below fig</span>[![image-1705664948716.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705664948716.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705664948716.png)
2. It will redirected to new report page and displayed the punch list report

<div class="pointer-container" id="bkmrk-%C2%A0-22"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--101" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>[![image-1705665259700.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705665259700.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705665259700.png)

#### **2.3 Edit a Punch List**

If you want to edit a existing punch list, click Edit punch list in punch lists menu

[![image-1705665874063.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705665874063.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705665874063.png)

Click [![image-1705665978865.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705665978865.png)(](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705665978865.png)edit icon) in the **Edit** column for the respective punch list.. Edit the details in the respective box you want.

[![image-1705666160391.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705666160391.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705666160391.png)

Update the details you want to change. Then click **save**

[![image-1705666289392.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705666289392.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705666289392.png)

Punch list updated successfully.

##### **2.3.1 Close a punch list**

1. If you want to close the added punch list item, click the checkbox provided in the Close column.
2. Click the [![image-1705666582684.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705666582684.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705666582684.png)close punch button at the top right.[![image-1705666555183.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705666555183.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705666555183.png)
3. Punch list closed successfully.

##### **2.3.2 Filter a Punch list**

  
If you want to filter any Punch list from the punch lists page, do the following,

1\. Click [![image-1651604010559.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604010559.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604010559.png) (FILTER button) located on the punch lists screen. See Fig below

<div class="pointer-container" id="bkmrk-%C2%A0-24"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--102" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div> Once you clicked the **Filter** button, the filter box opens for all the columns.

[![image-1705666884181.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705666884181.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705666884181.png)

2\. Enter relevant detail in the respective column’s filter box to filter any punch lists.

##### **2.3.3 Export Punch lists**

You can export added punch lists in the Punch lists page in both the pdf and excel formats.

<div class="pointer-container" id="bkmrk-%C2%A0-25"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--103" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>1. If you want to export the punch lists in the pdf format, click [![image-1651119905005.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651119905005.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651119905005.png)(**PDF** button).
    
    The punch lists will be downloaded as a pdf file.
2. If you want to export the punch lists in the excel format, click [![image-1651119961686.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651119961686.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651119961686.png) (**Excel** button).
    
    The punch lists will be downloaded as an excel file.

[![image-1705666951159.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/scaled-1680-/image-1705666951159.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2024-01/image-1705666951159.png)

# Material Feasibility - Piping



# Login

### **1.1 Login**

To login into the ***cuteQM*** application,

1\. Open your web browser.

2.Type the URL provided by your administrator, in the address bar of your web browser.

The login page appears.

 [![image-1651709538772.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651709538772.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651709538772.png)

3\. In the login page, enter your user name and password in the respective boxes.

[ ![image-1651709712073.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651709712073.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651709712073.png)**Note**: If you forgot your password, click “**I can’t access my account**”. You will be redirected into a new web page. Enter your username to receive your password.

4\. In the **Module** section, select **Piping**.

5\. Click **Login**.

Once you have successfully logged in into the ***cuteQM*** application, the home page of the ***cuteQM*** application opens.

 [![image-1651710552676.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651710552676.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651710552676.png)

 **Figure 4.1 Home page of *cuteQM application***

[ ![image-1651710988718.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651710988718.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651710988718.png)**Note**: The user name you have entered, the project you have been assigned, and the module you have selected are displayed in the upper right corner of the home page.

### **1.2 Change Password**

If you want to change your current password,

1\. Click your user name displayed on the quick access bar of the home page. See Fig 4.1.

A drop-down list opens with multiple options.

[ ![image-1651710826679.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651710826679.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651710826679.png)

2\. Click the **Change Password**

The **Change Password** page opens.

[ ![image-1651710864900.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651710864900.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651710864900.png)

[ ![image-1651711016244.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651711016244.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651711016244.png)**Note**: Before changing your password read the conditions specified in the **Change Password** page.

3\. In the **Password**box, enter your current password.

4\. In the **NewPassword** box, enter your new password.

5\. In the **ConfirmNew** **Password** box, enter your new password again.

6\. Click **Change Password**.

Your password will be successfully changed.

### **1.3 Log Out**

If you want to log out from the app,

1\. Click your user name displayed on the quick access bar of the home page. See Fig 4.1.

A drop-down list opens with multiple options.

2\. Click **Log out**.

Your current session ends now. The home page appears.

# Materials

### **2.0** **Materials**

The **Materials** menu in the home page of the ***cuteQM*** app used to add the material details such as material certificates, material inspection details, material import details, and material summary and traceability record. Once you click the **Materials** menu, the following tabs open,

 [![image-1651728778134.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651728778134.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651728778134.png)

### **2.1 Material Receiving and Inspection (Heat Numbers)**

Material Receiving Inspection validates quality of purchased raw materials based on set acceptance criteria before the materials are used for the piping project.

The **Material Receiving and Inspection** tab in the **Materials** menu helps you to add an incoming material inspection report (MIR). Incoming MIR includes material name, material size, material specification, heat numbers, and material type.

If you want to add an incoming MIR, do the following,

1\. Click the **Material Receiving and Inspection**tab in the **Materials**

The **Incoming Material Inspection Report** page opens.

[ ![image-1651728877961.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651728877961.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651728877961.png)

 **Figure 2.1: Incoming Material Inspection Report page**

#### **2.1.1 Add an Incoming MIR**

If you want to add an incoming MIR,

1\. Click [![image-1651728973224.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651728973224.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651728973224.png)(**ADD** button) in the **Incoming Material Inspection Report**  See Fig 2.1.

A new window opens to add an incoming MIR.

 [![image-1651729102514.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651729102514.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651729102514.png)

[ ![image-1651729139461.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651729139461.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651729139461.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.

[ ![image-1651729225130.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651729225130.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651729225130.png)**Tip**: A report number and a Request for Inspection (RFI) number for a new MIR will be updated automatically in the **Report Number** and the **RFI Number** boxes, respectively.

2\. In the **Delivery Order Number** box, enter the material’s delivery order number.

3\. If materials are purchased from outside, select the **KPW Incoming Materials** option, and then enter the relevant details in the respective boxes. KPW incoming materials will be added to **StoreInventory** after MIR submission.

[ ![image-1651729261846.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651729261846.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651729261846.png)

 a. In the **O. No**box, enter the purchase order number.

 b. In the **Dated**box, choose the date of the purchase order.

 c. In the **Received On**box, select the received date of materials.

4\. If the materials are received from a client, select the **FREE Issued Materials**option, and then enter the relevant details in the respective boxes. Free issued Materials will be added to **Store Inventory** after MIR submission

[ ![image-1651729350029.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651729350029.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651729350029.png)

 a. In the **Packing List No**box, enter the packing list number.

 b. In the **Dated**box, choose the date of packing.

 c. In the **Received On**box, choose the received date of materials.

5\. In the **Inspection Date**box, choose the date of inspection.

6\. In the **Vendor Name** box, enter the vendor name.

7\. In the **Request Description**box, enter the request description.

8\. In the **ITP Number**box, select an ITP number.

9\. In the **Delivery Note** box, enter the delivery note.

10\. In the **Location** box, enter the location name.

11\. In the **Sub Contractor**box, select the subcontractor name from a drop-down list.

12 . Click **Save**.

The incoming MIR is successfully added. Once you have added the MIR, you must add the material details for the added MIR.

#### **2.1.2 Add Materials for an MIR**

If you want to add the details of materials for the added incoming MIR, do the following steps,

1\. Click [![image-1651736968322.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651736968322.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651736968322.png) (Edit icon) in the **Edit MIR** column of the **Incoming Material Inspection Report** See Fig 2.1.

The **Add/Edit - Materials** window opens.

[ ![image-1651729497724.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651729497724.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651729497724.png)

 **Figure 2.1.2: Add/Edit – Materials window**

2\. Click [![image-1651737038359.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651737038359.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651737038359.png) (**ADD** button) in the **Add/Edit - Materials**

A new window opens to add the material details.

 [![image-1651729605215.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651729605215.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651729605215.png)

[ ![image-1651729637958.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651729637958.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651729637958.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.

3\. In the **Material Description**box, enter the material description.

4\. In the **MaterialSize** box, select the size of the material.

5\. In the **Material Specification** box, enter the material specification.

6\. In the **Material Type**box, enter the type of the material.

7\. In the **Quantity Required**box, enter the required quantity of the material.

8\. In the **Item No**box, enter the item number. This will be added as Item code in the store inventory

9\. In the **Weight**box, enter the weight of the material.

10\. In the **Component**box, select a component.

11\. Click **Update**.

Once you have added the material details, you must add the heat numbers for the added materials.

#### **2.1.3 Add Heat Numbers** 

1\. Click [![image-1651737308407.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651737308407.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651737308407.png) (Add icon) of the respective material in the **Add/Edit - Materials** See Fig 2.1.2.

The **Heat Numbers** window opens.

 [![image-1651729786244.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651729786244.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651729786244.png)

2\. Click [![image-1651737380511.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651737380511.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651737380511.png) (**ADD** button) in the **Heat Numbers**

A new window opens to add a heat number.

 [![image-1651729878479.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651729878479.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651729878479.png)

3\. In the **Heat Number/Certificates**box, select the heat number from a drop-down list. This heat number can be used in Fit up after Material Issuance.

4\. In the **Plate Number/Coil Number/ Tag Number**box, enter the plate number or coil number or tag number of the material.

5\. In the **Delivery Quantity (Total)**box, enter the total delivery quantity of the material including UOM. This quantity can be added in store inventory after MIR submission and it cannot change after added in store inventory.

6\. In the **Delivery Quantity (Partial)**box, enter the partial delivery quantity of the material including UOM.

7\. In the **Dimensions** option, select **Accepted**or **Rejected** based on the inspection detail.

8\. In the **Visual** option, select **Accepted**or **Rejected** based on the inspection detail.

9\. In the **Mill Test Certificates (MTC)** option, select **Accepted**or **Rejected** based on the inspection detail.

10\. In the **Remarks** box, enter your remarks if any.

11\. If the heat treatment is required for the material, select **YES**in the **Heat Treatment** Otherwise select **NO**.

12\. In the NDE is required for the material, select **YES**in the **NDE**  Otherwise select **NO**.

13\. Click **Update.**

[ ![image-1651729948933.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651729948933.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651729948933.png) **Note**: If you want to manage the review material TC, click [![image-1651737526888.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651737526888.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651737526888.png) (Add icon). The Review Material TC window opens to add the material checklist detail.

### **1.1.4 Add MIR Details**

If you want to add the optional details of MIR,

1\. Click [![image-1651737631703.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651737631703.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651737631703.png) (Add icon) in the **Add** See Fig 2.1.

The **MIR Details** window opens.

 [![image-1651731323439.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651731323439.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651731323439.png)

2\. In the **Manufacturer**Name box, enter the manufacturer name.

3\. In the **Supplier**box, enter the supplier name.

4\. In the **Unloaded**box, enter the unloaded detail.

5\. In the **Date**box, select the date of MIR.

6\. In the **Truck/Trailer No**box, enter the truck/trailer number.

7\. In the **Defect Report No**box, enter the defect report number.

8\. In the **Storage Area**box, enter the storage area name.

9\. In the **Defect**box, enter the defect detail.

10\. In the **Remarks**box, enter your remarks if any.

11\. Click **Save**.

### **2.2 Store Inventory**

The **Store Inventory** tab in the **Materials** menu used to add an item code including quantity in the store inventory. To add item code in the store inventory,

1\. Click **Store Inventory**in the **Materials**

The **Store Inventory** page opens.

 [![image-1651731683056.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651731683056.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651731683056.png)

 **Figure 2.2: Store Inventory page**

#### **2.2.1 Add a Store Inventory**

If you want to add a Store Inventory,

1\. Select Inventory type KPW/FIM/Offcut.

2\. Click [![image-1651737910826.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651737910826.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651737910826.png) (**ADD** button) in the **Store Inventory**  See Fig 2.2.

The page opens a new window to add the details of Store Inventory.

[ ![image-1651733531758.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651733531758.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651733531758.png)

[ ![image-1651733562042.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651733562042.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651733562042.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.

In the **Item Code** box, enter an item code.

3. In the **Description**box, enter the description of an item code.
4. Click **Save**.

An item code including the quantity is successfully added and listed in the **Store Inventory** page.

#### **2.2.2 Edit a Store Inventory**

If you want to edit any existing item code quantity in the **Store Inventory** page, do the following,

1\. Click [![image-1651738165123.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651738165123.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651738165123.png) (Edit icon) in the **Edit** column for the respective Store Inventory. See Fig 2.4.

The page shows the details of the selected item code.

2\. Click stock quantity box, and then edit the quantity.

3\. Click **Save**.

#### **2.2.3 Export Store Inventory List**

You can export a list of Item codes added in the **Store Inventory** page in both the pdf and excel formats.

1\. If you want to export the store inventory list in the pdf format, click [![image-1651735007203.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651735007203.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651735007203.png) (**PDF** button).

The Store Inventory list will be downloaded as a pdf file.

2\. If you want to export the store inventory list in the excel format, click [![image-1651735109052.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651735109052.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651735109052.png) (**Excel** button).

The Store Inventory list will be downloaded as an excel file.

#### **2.2.4 Filter a Store Inventory** 

If you want to filter any Store Inventory from the list of Item codes in the **Store Inventory** page, do the following,

1\. Click [![image-1651735398657.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651735398657.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651735398657.png) (**FILTER** button) located on the **Store Inventory**  See Fig 2.2.

Once you clicked the **Filter** button, the filter box opens in each column of the **Store Inventory** page.

 [![image-1651735479005.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651735479005.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651735479005.png)

2. Enter relevant detail in the respective column’s filter box to filter a Store Inventory you want.

#### **2.2.5 Import Store Inventory**

If you want to import multiple Item codes in store inventory together, do the following,

1\. Click [![image-1651735532878.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651735532878.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651735532878.png) (**IMPORT** button). See Fig 2.2.

The **Excel Import** page opens.

 [![image-1651735599460.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651735599460.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651735599460.png)

2\. Click [![image-1651735626265.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651735626265.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651735626265.png) (**TEMPLATE** button).

An excel worksheet will be downloaded with a predefined template to enter the details of store inventory.

3\. Enter the required store inventory details in the respective columns of the excel worksheet.

4\. Once you have added the store inventory details in the excel worksheet, save the excel worksheet on your computer.

5\. Click [![image-1651735656260.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651735656260.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651735656260.png) (**Browse** button) to select the excel worksheet to be uploaded.

6\. Select the excel worksheet you want to upload from your computer.

7\. Click [![image-1651735681065.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651735681065.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651735681065.png) (**Upload** button) to export the BOM details that are included in the excel worksheet.

The columns added in the excel worksheet will be listed in the **Excel Column** field.

 [![image-1651735704105.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651735704105.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651735704105.png)

[ ![image-1651735758999.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651735758999.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651735758999.png)**Note**: Make sure that the **Excel Column** field must have all the columns as in the **System Column** field.

8\. To map the columns in the **System Column**and **Excel Column** fields, do one of the following,

 a. If you want to map the columns automatically, click [![image-1651735785813.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651735785813.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651735785813.png) (**AutoMap** button).

 The columns will be mapped automatically and displayed in the **Mapped Columns** field.

 b. If you want to map each column manually, select the respective columns in both the **System Column**and **Excel Column** fields and then click [![image-1651735818608.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651735818608.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651735818608.png) (**Map** button).The selected columns will be mapped and displayed in the **Mapped Columns** field.

 [![image-1651735852799.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651735852799.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651735852799.png)

9\. To un-map the columns in the **Mapped Columns**field, select the respective column and then click [![image-1651735867915.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651735867915.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651735867915.png) (**UnMap** button).

[ ![image-1651735885966.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651735885966.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651735885966.png)**Note**: In the **Total Rows** field, the range for uploading the data from the excel worksheet will be updated automatically.

10\. Select Inventory type KPW/FIM

11\. Click [![image-1651735908599.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651735908599.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651735908599.png) (**Populate Values** button).

The data are populated.

12\. Click [![image-1651735929970.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651735929970.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651735929970.png) (**Process** button).

The system processes all the uploaded data and shows if any error with the uploaded data. You can download the error details in the excel worksheet by clicking [![image-1651735950669.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651735950669.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651735950669.png) (**Export to Excel** button).

 [![image-1651735979335.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651735979335.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651735979335.png)

13\. Once you have rectified the identified error in the excel worksheet, follow the above procedures to upload the worksheet.

13. Click [![image-1651735995065.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651735995065.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651735995065.png) (**Import** button) to import the uploaded data.

The data will be successfully imported.

# Planning

### **3.0 Planning**

The **Planning** menu in the home page of the ***cuteQM*** app is mainly used to search for the piping feasibility of the projects and to assign priority. This menu also helps to add the bill of materials and material request.

Here, you can manage the material reservation, material substitution, offcut inventory, material requisition, and material issuance.

Once you click the **Planning** menu, the following tabs open,

 [![image-1651784892301.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651784892301.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651784892301.png)

#### **3.1 Bill of Material (BOM)**


The **BOM** tab in the **Planning** menu used to add a BOM including quantity of items needed for the piping fabrication from the overall quantity in the inventory. To add BOM,

1\. Click **BOM** in the **Planning**

The **Bill of Material** page opens.

 [![image-1651785111568.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651785111568.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651785111568.png)

 **Figure 3.1: Bill of Material page**

#### **3.1.1 Add a BOM**

If you want to add a BOM,

1\. Click [![image-1651785224129.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651785224129.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651785224129.png) (**ADD** button) in the **Bill of Material**  See Fig 3.1.

The page opens a new window to add the details of BOM.

[ ![image-1651785258023.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651785258023.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651785258023.png)

[ ![image-1651785308707.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651785308707.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651785308707.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.

2\. In the **ISO Drawing** box, select an ISO drawing from a drop-down list.

3\. In the **Sum of Qty** box, enter the BOM quantity you want to take from the inventory.

4\. In the **NS1**and **NS2** boxes, enter the NS1 and NS2 information.

5\. In the **Ident Code** box, enter the code of item you want take from the inventory.

6\. In the **Item Type** box, enter the item type.

7\. In the **Tag Number** box, enter the tag number.

8\. In the **Item Code** box, enter the client item code.

9\. In the **UOM** box, enter the unit of measurement.

10\. In the **Description** box, enter the description.

11\. In the **Long Description** box, enter the long description.

12\. In the **Category** box, enter the item category whether Fab or Erection.

13\. In the **PT No** box, enter the PT number.

14\. In the **Client Rev No** box, enter the client revision number.

15\. In the **Rev No** box, enter the revision number.

16\. In the **Transmittal Ref** No box, enter the transmittal reference number.

17\. In the **Date Received** box, choose the received date.

18\. In the **Week No** box, enter the week number.

19\. Click **Save**.

The BOM including the item quantity is successfully added and listed in the **Bill of Material** page.

#### **3.1.2 Edit a BOM**

1\. If you want to edit any existing BOM in the **Bill of Material** page, do the following,

Click [![image-1651785536978.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651785536978.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651785536978.png) (Edit icon) in the **Edit** column for the respective BOM. See Fig 3.1.

The page shows the details of the selected BOM.

2\. Click any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **3.1.3 Delete a BOM**

If you want to delete any existing BOM in the **Bill of Material** page, you can use [![image-1651785654707.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651785654707.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651785654707.png) (Delete icon) provided in the **Bill of Material** page.

#### **3.1.4 Export BOM List**

You can export a list of BOMs added in the **Bill of Material** page in both the pdf and excel formats.

 1. If you want to export the BOM list in the pdf format, click [![image-1651785805717.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651785805717.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651785805717.png) (**PDF** button).

 a. The BOM list will be downloaded as a pdf file.

 2. If you want to export the BOM list in the excel format, click [![image-1651785922614.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651785922614.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651785922614.png) (**Excel** button).

 b. The BOM list will be downloaded as an excel file.

#### **3.1.5 Filter a BOM** 

If you want to filter any BOM from the list of BOMs in the **Bill of Material** page, do the following,

1\. Click [![image-1651786022116.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651786022116.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651786022116.png) (**FILTER** button) located on the **Bill of Material**  See Fig 3.1.

Once you clicked the **Filter** button, the filter box opens in each column of the **Bill of Material** page.

[ ![image-1651786850889.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651786850889.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651786850889.png)

2\. Enter relevant detail in the respective column’s filter box to filter a BOM you want<span style="color: #206ea7;">.</span>

#### **3.1.6 Import Multiple BOMs**

If you want to import multiple BOM together, do the following,

1\. Click [![image-1651787100130.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651787100130.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651787100130.png) (**IMPORT** button). See Fig 3.1.

The **Excel Import** page opens.

 [![image-1651787142650.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651787142650.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651787142650.png)

2\. Click [![image-1651787173258.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651787173258.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651787173258.png) (**TEMPLATE** button).

3\. An excel worksheet will be downloaded with a predefined template to enter the details of BOM.

4\. Enter the required BOM details in the respective columns of the excel worksheet.

5\. Once you have added the BOM details in the excel worksheet, save the excel worksheet on your computer.

6\. Click [![image-1651787198325.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651787198325.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651787198325.png) (**Browse** button) to select the excel worksheet to be uploaded.

7\. Select the excel worksheet you want to upload from your computer.

8\. Click [![image-1651787225797.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651787225797.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651787225797.png) (**Upload** button) to export the BOM details that are included in the excel worksheet.

9\. The columns added in the excel worksheet will be listed in the **Excel Column**

 [![image-1651787250537.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651787250537.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651787250537.png)

 **Note**: Make sure that the **Excel Column** field must have all the columns as in the **System Column** field.

10. To map the columns in the **System Column** and **Excel Column** fields, do one of the following,
11. If you want to map the columns automatically, click [![image-1651787530516.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651787530516.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651787530516.png) (**AutoMap** button). a. The columns will be mapped automatically and displayed in the **Mapped Columns**
12. If you want to map each column manually, select the respective columns in both the **System Column** and **Excel Column** fields and then click [![image-1651790556450.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651790556450.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651790556450.png) (**Map** button). a. The selected columns will be mapped and displayed in the **Mapped Columns** Field**.** b.[ ![image-1651790716046.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651790716046.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651790716046.png)
13. To un-map the columns in the **Mapped Columns** field, select the respective column and then click [![image-1651790874155.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651790874155.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651790874155.png) (**UnMap** button).

[ ![image-1651787364384.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651787364384.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651787364384.png)**Note**: In the **Total Rows** field, the range for uploading the data from the excel worksheet will be updated automatically.

14. Click [![image-1651790901954.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651790901954.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651790901954.png) (**Populate Values** button).
15. The data are populated.
16. Click [![image-1651790927781.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651790927781.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651790927781.png) (**Process** button).
17. The system processes all the uploaded data and shows if any error with the uploaded data. You can download the error details in the excel worksheet by clicking [![image-1651790964638.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651790964638.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651790964638.png) (**Export to Excel** button). **Note**: Different color code explains the different type of errors.
18. Once you have rectified the identified error in the excel worksheet, follow the above procedures to upload the worksheet.
19. Click (**Import** button) to import the uploaded data.
20. The data will be successfully imported.

### **3.2 Assign Priority**

The **Assign Priority** tab in the **Planning** menu helps to assign the priority for KPW, Offcut, and FIM warehouses. Likewise, you can assign priority for Module, Test Pack, System, Line, and ISO. For example, once you have assigned the high priority for any warehouse, the materials from the high priority warehouse will be taken initially for performing piping feasibility.

To assign priority,

1\. Click **Assign Priority** in the **Planning**

The **Assign Priority** page opens.

[ ![image-1651791016497.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651791016497.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651791016497.png)

 **Figure 3.2: Assign Priority page**

[![image-1651791041794.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651791041794.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651791041794.png)**Note:** You can assign the priority by giving the numbers from 1 to 99.

2\. If you want to assign priority for warehouses,

 a. Select the **Warehouse**

The added warehouses will be listed.

 [![image-1651791747191.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651791747191.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651791747191.png)

 b. In the **Priority** column, enter the priority numbers for the respective warehouse.

 c. Click **Save Changes**.

3\. If you want to assign priority for project modules,

 a. Select the **Module**

 The added project modules will be listed.

[ ![image-1651791974584.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651791974584.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651791974584.png)

 b. In the **Priority** column, enter the priority numbers for the respective module.

 c. Click **Save Changes**.

4\. If you want to assign priority for test packs,

 a. Select the **Test Pack**

The added test packs will be listed.

 [![image-1651792138093.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651792138093.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651792138093.png)

 b. In the **Priority** column, enter the priority numbers for the respective test pack.

 c. Click **Save Changes**.

 Once you have set the priority for a particular test pack, the piping feasibility will be loaded based on a list of spools included in the test pack.

5\. If you want to assign priority for systems,

 a. Select the **System**

 The added systems will be listed.

 [![image-1651792455221.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651792455221.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651792455221.png)

 b. In the **Priority** column, enter the priority numbers for the respective system.

 c. Click **Save Changes**.

6\. If you want to assign priority for lines,

 a. Select the **Line**

 The added lines will be listed.

 [![image-1651792618564.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651792618564.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651792618564.png)

 a. In the **Priority** column, enter the priority numbers for the respective line.

 c. Click **Save Changes**.

7\. If you want to assign priority for ISO,

 a. Select the **ISO**

 The added ISO will be listed.

 [![image-1651792935243.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651792935243.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651792935243.png)

 b. In the **Priority** column, enter the priority numbers for the respective ISO.

 c. Click **Save Changes**.

#### **3.2.1 Export Assigned Priority List**

You can export the assigned priority list in the **Assign Priority** page in the pdf and excel formats by using [![image-1651793445455.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651793445455.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651793445455.png) (**PDF** button) and [![image-1651793596393.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651793596393.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651793596393.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export BOM List</u>**](#bkmrk-3.1.4-export-bom-lis)”.

### **2.3 Reserve Material**

The **Reserve Material** tab in the **Planning** menu helps to reserve the material from the inventory quantity. To reserve the material,

1\. Click **Reserve Material** in the **Planning**

 The **Reserve Material** page opens.

[![image-1651793812674.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651793812674.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651793812674.png)

 **Figure 2.3: Reserve Material page**

#### **2.3.1 Reserve a Material**

If you want to reserve a material,

1\. In the **ISO Number** box, select an ISO number from a drop-down list. See Fig 5.3.

 The page shows a list of BOM item codes including the BOM quantity and inventory stock quantity for this corresponding ISO number.

 [![image-1651794125541.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651794125541.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651794125541.png)**Note**: The quantity you want to reserve should be less than the BOM quantity.

2\. In the **Reserved Qty** column, enter the number of quantity of items you want to reserve.

3\. Once you have entered the reserve quantity, select the respective checkbox in the **Reserve?**

4\. Click **Save changes**.

The entered material quantity will be reserved. While feasibility reserved quantity used against the reserved ISO.

[ ![image-1651794193179.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651794193179.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651794193179.png)**Note**: If you want to unreserve all the reserved material quantity, click [![image-1651794225158.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651794225158.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651794225158.png) (**Unreserve All** button).

### **3.4 Revision Comparison**

In BOM, when you subsequently revise the quantity of items added against the ISO number, the revision number will be changed. The revision history will be maintained in the back end.

The **Revision Comparison** tab in the **Planning** menu helps you to view the revision history of items added in the BOM.

1\. Click **Revision Comparison** in the **Planning**

 The **Revision Comparison** page opens.

 [![image-1651794289214.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651794289214.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651794289214.png)

 **Figure 3.4: Revision Comparison page**

[ ![image-1651794346721.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651794346721.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651794346721.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details.

2\. In the **Module** box, select a module from a drop-down list.

3\. In the **System** box, select a system from a drop-down list.

4\. In the **ISO / Drawing Number** box, select an ISO number from a drop-down list.

5\. In the **Week No From** and **Week No To** boxes, select the week numbers.

 a. In the **Comparison Type** box, select one of the following,

 b. If you want to view the revision history for all items, select

 c. If you want to view the revision history for added items, select

 d. If you want to view the revision history for removed items, select

6\. If you want to view the difference in comparison, select **Difference Only.**

7\. In the **Revision From** and **Revision To** boxes, select the revision numbers.

8\. Click **Get Difference**.

 The revision history opens based on the given criteria. The revision history shows the total quantity and difference quantity after completing the revision.

 [![image-1651794633902.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651794633902.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651794633902.png)

#### **3.4.1 Export Revision Comparison Detail**

You can export the revision detail generated in the **Revision Comparison** page in the pdf and excel formats by using [![image-1651795800845.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651795800845.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651795800845.png) (**PDF** button) and [![image-1651795821993.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651795821993.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651795821993.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export BOM List</u>**](#bkmrk-3.1.4-export-bom-lis)”.

### **3.5 Material Substitution**

The **Material Substitution** tab in the **Planning** menu helps to do substitute one item for another item. To perform the material substitution,

1\. Click **Material Substitution** in the **Planning**

The **Material Substitution** page opens.

 [![image-1651795961192.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651795961192.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651795961192.png)

 **Figure 3.5: Material Substitution**

#### **3.5.1 Add Material Substitution**

If you want to do material substitution,

1\. Click [![image-1651796042584.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651796042584.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651796042584.png) (**ADD** button) in the **Material Substitution**  See Fig 3.5.

The page opens a new window to add the details of material substitution.

 [![image-1651796082749.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651796082749.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651796082749.png)

[ ![image-1651796101101.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651796101101.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651796101101.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.

2\. In the **Item Code** box, select an item code from a drop-down list.

[ ![image-1651796120725.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651796120725.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651796120725.png)**Note**: In the **Item Code** box, a list of item codes added in the BOM will be listed.

3\. In the **Substitute Item Code** box, select a substitute item code from a drop-down list.

[ ![image-1651796153781.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651796153781.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651796153781.png) **Note**: In the **Substitute Item Code** box, a list of item codes added in the inventory will be listed.

4\. In the **Quantity** box, select the quantity of items you want to substitute.

5\. Click **Save**.

The entered quantity of items will be substituted successfully. After completing the material substitution, you can do the feasibility search to check the feasibility percentage of the substituted materials.

#### **3.5.2 Export Material Substitution List**

You can export a list of material substitutions added in the **Material** **Substitution** page in the pdf and excel formats by using [![image-1651796246847.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651796246847.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651796246847.png) (**PDF** button) and [![image-1651796266270.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651796266270.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651796266270.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export BOM List</u>**](#bkmrk-3.1.4-export-bom-lis)”.

#### **3.5.3 Filter a Material Substitution** 

If you want to filter any material substitution from the list of material substitutions in the **Material** **Substitution** page, you can use [![image-1651796328582.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651796328582.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651796328582.png) (**FILTER** button). To know how to filter, see the topic, “[**<u>Filter a BOM</u>**](#bkmrk-3.1.5-filter-a-bom%C2%A0)”.

### **3.6 Component Requirement**

The **Component Requirement** tab in the **Planning** menu help to add the components required for the feasibility search. To add the component requirement,

1\. Click **Component Requirement** in the **Planning**

The **Component Requirement** page opens with a list of components.

[ ![image-1651796430744.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651796430744.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651796430744.png)

 **Figure 3.6: Component Requirement page**

2\. Select the module whether **Piping**

3\. Select the checkbox of the component you require.

4\. Click **Save changes**.

### **3.7 Offcut Inventory**

When a material issuance has been created with the Offcut material, we need to add the offcut material details in the Offcut inventory. To add the offcut material details,

1\. Click **Offcut Inventory** in the **Planning**

The **Offcut Inventory** page opens.

[![image-1651796517477.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651796517477.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651796517477.png)

 **Figure 3.7: Offcut Inventory page**

#### **3.7.1 Add Offcut Material Detail**

To add the offcut material detail,

1\. Click [![image-1651796573363.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651796573363.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651796573363.png) (**ADD** button) in the **Offcut Inventory**  See Fig 3.7.

A new window opens to add the details of offcut material.

[ ![image-1651796589115.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651796589115.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651796589115.png)

2\. In the **Material Request** box, select a material request from a drop-down list.

The cut length for the selected material request opens.

 [![image-1651796637417.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651796637417.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651796637417.png)

3\. In the **Cut Length** column, change the cut length of the offcut item if you want.

[ ![image-1651796663958.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651796663958.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651796663958.png)**Note**: The cut length should not be exceeded the material issuance quantity.

4\. In the **Received Date** box, choose the date when the offcut material received in the Offcut inventory.

5\. Click **Save changes**.

The offcut material is added.

#### **3.7.2 Adjust Cut Length Quantity**

To adjust the cut length quantity,

1\. Click [![image-1651796730160.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651796730160.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651796730160.png) (Add icon) in the **Adjustment**

The **Adjustment** window opens.

 [![image-1651796750559.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651796750559.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651796750559.png)

2\. Click [![image-1651796774001.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651796774001.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651796774001.png) (**ADD** button) in the **Adjustment**

 [![image-1651796795228.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651796795228.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651796795228.png)

3\. In the **Adjustment Qty** box, enter the adjustment cut length quantity.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

The adjusted cut length quantity will be updated.

 [![image-1651797352201.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651797352201.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651797352201.png)

#### **3.7.3 Export Offcut Inventory List**

You can export a list of offcut materials added in the **Offcut Inventory** page in the pdf and excel formats by using [![image-1651797418652.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651797418652.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651797418652.png) (**PDF** button) and [![image-1651797441064.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651797441064.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651797441064.png) (**Excel** button). To know how to export, see 1the topic, “[**<u>Export BOM List</u>**](#bkmrk-3.1.4-export-bom-lis)”.

#### **3.7.4 Filter an Offcut Material** 

If you want to filter any offcut material from the list of offcut materials in the **Offcut Inventory** page, you can use [![image-1651797513157.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651797513157.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651797513157.png) (**FILTER** button). To know how to filter, see the topic, “[**<u>Filter a BOM</u>**](#bkmrk-3.1.5-filter-a-bom%C2%A0)”.

### **3.8 Feasibility**

The **Feasibility** tab in the **Planning** menu helps to search the feasibility percentage of items available in the warehouses. Based on the feasibility search percentage, the inspectors will move furtherly for material requisition and material issuance.

To navigate into the Feasibility page,

1\. Click **Feasibility** in the **Planning**

[ ![image-1651797586405.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651797586405.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651797586405.png)

 **Figure 3.8: Feasibility page**

[ ![image-1651797618216.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651797618216.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651797618216.png)**Note**: The feasibility result displayed in different color explains that status of ISO feasibility.

- The feasibility result displayed in Red color shows that the ISO has reserved items.
- The feasibility result displayed in Green color shows that the ISO has 100 percentage feasibility.
- The feasibility result displayed in Blue color shows that the ISO has less than 100 percentage feasibility.

#### **3.8.1 To do Feasibility Search**

To search the feasibility percentage, do the following steps in the **Feasibility** page,

1\. In the **Module** box, select the modules you want.

[ ![image-1651797787653.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651797787653.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651797787653.png)**Note**: According to the selection of modules, the system list will be updated in the **System** box.

2\. In the **System** box, select the systems you want.

[ ![image-1651798334603.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651798334603.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651798334603.png)**Note**: According to the selection of systems, the line list will be updated in the **Line** box.

3\. In the **Line Number** box, select the line numbers you want.

4\. In the **Feasibility** box, enter the feasibility percentage.

[ ![image-1651798407022.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651798407022.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651798407022.png)**Tip**: If you enter 100, the items which have the feasibility percentage of 100 will be listed. If you enter 10, the items which have the feasibility percentage above 10 will be listed.

5\. Select the checkbox of **Reserve Material** option if you want to filter the reserve material items.

 The page shows the feasibility of the reserved materials.

 [![image-1651798466606.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651798466606.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651798466606.png)

Select the checkbox of **Material** **Substitution** option if you want to filter the material substitution items.

6\. If you want to see the feasibility percentage for any particular warehouse, select the warehouse listed in the **Warehouse**

 a. If you want to view the feasibility percentage for the items in the KPW warehouse, select the checkbox of **KPW**.

 b. If you want to view the feasibility percentage for the items in the Offcut warehouse, select the checkbox of **Offcut**.

 c. If you want to view the feasibility percentage for the items in the FIM warehouse, select the checkbox of **FIM**.

7\. In the **Category** field, select the category whether **Shop** or **Field**.

 [![image-1651798598804.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651798598804.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651798598804.png)**Note**: If you want clear the given input data, click [![image-1651798625902.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651798625902.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651798625902.png) (**CLEAR** button).

8\. Click **FEASIBILTY SEARCH**.

The feasibility result opens based on the given feasibility percentage.

[ ![image-1651798670305.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651798670305.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651798670305.png)

9\. Click [![image-1651798715508.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651798715508.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651798715508.png) (Expand icon) of the respective module to view the items included in the module or click [![image-1651798743710.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651798743710.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651798743710.png) (**Expand All** button) to view the items included in each module .A new window opens and shows a list of items included in the module.

 [![image-1651798773607.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651798773607.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651798773607.png)

- **BOM Qty** – shows the item’s quantity added in the BOM.
- **Required Qty** – shows the required quantity of item.
- **Stock Qty** – shows the overall quantity of stock available in all the inventory.
- **Available Qty** – shows the available quantity of item. The available quantity will be changed based on the reserve quantity. Once you reserve any quantity, the same will be reduced from the available quantity.
- **Reserve/Release Qty** – shows the reserve/release quantity of item.

You can reserve the item here while doing feasibility itself by entering the reserve quantity in the respective field.

Make sure that the reserve quantity should not be exceeded the BOM quantity.

To reserve the items,

1. Select the checkbox of item for which you want to reserve the quantity.
2. Enter the reserve quantity in the **Reserve/Release Qty**
3. Click [![image-1651798987753.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651798987753.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651798987753.png) (**RESERVE MATERIAL** button).

The added quantity will be reserved and updated in the [**<u>Reserve Material</u>**](#_Reserve_Material) page.

- **MR Qty**– shows the quantity of item for which the material requests has added.
- **MI Qty**– shows the quantity of item for which the material issuance has done.
- The feasibility percentage is calculated based on the available quantity. For example, in the below figure, the given BOM quantity is higher than the available quantity, so the feasibility percentage will be less than 100.

[ ![image-1651799022785.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651799022785.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651799022785.png)

10\. If you want to give purchase order details, enter in the **PODetails**

11\. Click **Save changes**.

#### **3.8.2 Clear Feasibility Search Data**

If you want to clear the data of feasibility search done by any of the user, you can use this clear feasibility search data functionality.

Users assign with Admin role only have access to view the **Clear Feasibility Search Data** tab in the **Planning** menu.

To clear the feasibility search data,

1\. Click **Clear Feasibility Search Data** in the **Planning**

The **Feasibility Search Clear** page opens.

[ ![image-1651799143050.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651799143050.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651799143050.png)

 **Figure 3.8.2: Feasibility Search Clear page**

The page shows the feasibility search data of all the users.

2\. Click [![image-1651799196741.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651799196741.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651799196741.png)(Clear icon) of the respective user to clear the feasibility search data.

The feasibility search data of the selected user will be cleared.

### **6.9 Material Request**

The **Material Request** tab in the **Planning** menu helps to manage the material requests added in the **Feasibility** page.

#### **6.9.1 Add a Material Request**

If you want to create a material request, do the following steps,

1\. Navigate to the generated feasibility results in the ****Feasibility.****

[ ![image-1651799405776.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651799405776.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651799405776.png)

2\. Select the checkbox of the project for which you want to add the material requests.

3\. Click [![image-1651799432663.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651799432663.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651799432663.png) (**ADD MATERIAL REQUEST** button).

The **Subcon Details** window opens.

[ ![image-1651799456826.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651799456826.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651799456826.png)

4\. In the **Sub Contractor Name** box, select a sub-contractor.

5\. In the **Request Date &amp; Time**box, choose the request date and time.

6\. In the **Location** box, select a location.

7\. Click **SAVE**.

The material request will be added in the **Material Request** page.

 [![image-1651799510584.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651799510584.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651799510584.png)**Note**: For each item code included in the project, one material request will be created individually.

For example, The BOM quantity is 18 and you set the high priority for KPW and the least priority for Offcut. A material request will be created with the KPW inventory if the KPW has the same quantity of 18. If the KPW is available with quantity of 10, then two material requests will be created separately for quantity of 10 in KPW and quantity of 8 in Offcut.

8\. Click **Material Request** in the **Planning**

The **Material Request** page opens and shows the list of created material requests.

[![image-1651799543045.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651799543045.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651799543045.png)

 **Figure 3.9.1: Material Request page**

[ ![image-1651799568459.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651799568459.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651799568459.png) **Note**: The material request displayed in different color explains the status of the request.

- The material request displayed in Black color indicates a new material request. The **Status** column shows **Waiting for MR confirmation**.
- If the **Status** column shows **Fully Issued,** which means that the item’s quantity is issued fully.
- If the **Status** column shows **Partially Issued,** which means that the item’s quantity is issued partially.
- The material request displayed in Green color indicates the completed material request.

9\. If you want to view the material details, click (Expand icon) of the respective request.

The **Material Details** window opens and shows the material details including their issuance status.

 [![image-1651799592726.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651799592726.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651799592726.png)

#### **3.9.2 Approve a Material Request**

Once you have added the material request, the **Request Status** column in the **Material Request** page is appeared with [![image-1651799665117.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651799665117.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651799665117.png) (Submit and Reject icons).

1\. If you want to approve the material request, click [![image-1651799689945.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651799689945.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651799689945.png) (Approve icon) in the **Request Status** Otherwise click [![image-1651799720470.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651799720470.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651799720470.png) (Reject icon) to reject the request.

The approved material request will be moved for Material issuance. The **Status** column shows **MR confirm**.

#### **3.9.3 Cancel a Material Issuance**

If you want to cancel the material issuance,

 [![image-1651799770705.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651799770705.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651799770705.png)**Note**: If the material’s quantity is fully issued, the [![image-1651799802154.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651799802154.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651799802154.png) (Cancel icon) will not be displayed in the **Issuance Status** column for the respective report number. Partially

1. Click [![image-1651799848940.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651799848940.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651799848940.png) (Cancel icon) provided in the **Issuance Status**

Once you have cancelled the issuance, the **Status** column shows **Cancel**.

#### **3.9.4 View a Material Request Report**

If you want to view a material request report, click [![image-1651799909378.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651799909378.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651799909378.png) (Report icon) provided in the **Report** column of the **Material Request** page.

#### **3.9.5 Export Material Request List**

You can export a list of material requests added in the **Material Request** page in the pdf and excel formats by using [![image-1651799948979.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651799948979.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651799948979.png) (**PDF** button) and [![image-1651799971660.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651799971660.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651799971660.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export BOM List</u>**](#bkmrk-3.1.4-export-bom-lis)”.

#### **3.9.6 Export Material Request List**

If you want to filter any material request from the list of material requests in the **Material** **Request** page, you can use [![image-1651800229961.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651800229961.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651800229961.png)(**FILTER** button). To know how to filter, see the topic, “[**<u>Filter a BOM</u>**](#bkmrk-3.1.5-filter-a-bom%C2%A0)”.

### **3.10  Material Issuance**

When a material request has been created, we need to issue materials from the inventory for the created request.

The **Material Issuance** tab in the **Planning** menu helps to issue the materials from the inventory based on the added material request.

1\. Click **Material Issuance** in the **Planning**

The **Material Issuance** page opens.

 [![image-1651800287979.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651800287979.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651800287979.png)

 **Figure 3.10: Material Issuance**

#### **3.10.1 Add a Material Issuance Report**

If you want to add a material issuance report,

1\. Click [![image-1651800358128.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651800358128.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651800358128.png) (**ADD** button) in the **Material Issuance**  See Fig 3.10.

The **Add MR details** window opens.

[ ![image-1651800391416.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651800391416.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651800391416.png)

[ ![image-1651800414045.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651800414045.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651800414045.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.

2\. In the **Material Request Number** box, select a material request number from a drop-down list.

3\. In the **Heat Number** box, enter the heat number.

4\. In the **Issued Date** box, choose the issued date.

5\. Click [![image-1651800455890.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651800455890.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651800455890.png) (**Add** button).

The material issuance request will be added.

 [![image-1651800482428.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651800482428.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651800482428.png)

The **Add MR Details** window shows the total and balance quantity of the item.

6\. In the **Issued Qty** column, enter the issued quantity detail.

 [![image-1651800510680.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651800510680.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651800510680.png)**Note**: The issued quantity can be higher than the total quantity.

The material issuance report is added.

[![image-1651800528143.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651800528143.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651800528143.png)

#### **3.10.2 Approve a Material Issuance**

Once you have added the material issuance, the **Issue Status** column in the **Material Issuance** page is appeared with [![image-1651800596512.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651800596512.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651800596512.png) (Submit and Reject icons).

1\. If you want to approve the material issuance,[![image-1651800629438.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651800629438.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651800629438.png) click (Approve icon) in the **Issue Status** Otherwise click [![image-1651800665230.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651800665230.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651800665230.png) (Reject icon) to reject the request.

After Material Issuance, Heat number can be used in Fit up.

#### **3.10.3 View a Material Issuance Report**

If you want to view a material issuance report, click [![image-1651800744472.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651800744472.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651800744472.png) (Report icon) provided in the **Report** column of the **Material Issuance** page.

#### **3.10.4 Export Material Issuance List**

You can export a list of material issuances added in the **Material Issuance** page in the pdf and excel formats by using [![image-1651800798308.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651800798308.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651800798308.png)

 (**PDF** button) and [![image-1651800815153.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651800815153.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651800815153.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export BOM List</u>**](#bkmrk-3.1.4-export-bom-lis)”.

#### **3.10.5 Filter a Material Issuance** 

If you want to filter any material issuance from the list of material issuances in the **Material** **Issuance** page, you can use [![image-1651800875999.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651800875999.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651800875999.png)

 (**FILTER** button). To know how to filter, see the topic, “[**<u>Filter a BOM</u>**](#bkmrk-3.1.5-filter-a-bom%C2%A0)”.

### **3.11  BOM Status by ISO**

The **BOM Status by ISO** tab in the **Planning** menu helps to view the BOM status added against the ISO number. To view the BOM status,

1\. Click **BOM Status by ISO** in the **Planning**

The **BOM Status by ISO page opens and shows a list of modules with their ISO numbers.

[ ![image-1651800939238.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651800939238.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651800939238.png)

 **Figure 3.11: BOM Status by ISO page**

2\. Click [![image-1651801010989.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651801010989.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651801010989.png) (Expand icon) in the **Details**

The page shows the items included in the respective module including the BOM quantity, material request quantity, material issued quantity, and offcut material quantity.

[ ![image-1651801037926.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651801037926.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651801037926.png)

#### **3.11.1 Export BOM Status**

You can export the BOM generated in the **BOM Status by ISO** page in an excel format by using [![image-1651801099747.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651801099747.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651801099747.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export BOM List</u>**](#bkmrk-3.1.4-export-bom-lis)”.

### **3.12 BOM Details**

The **BOM Details** tab in the **Planning** menu helps to view the added BOM details. To view the BOM details,

1\. Click **BOM Details** in the **Planning**

The **BOM Details** page opens.

[ ![image-1651801166668.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651801166668.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651801166668.png)

 **Figure 3.12: BOM Details page**

2\. If you want to view any particular BOM details, you can use the filter options (Explained below) given in the page,

- If you want to view the BOM details of any sub-contractor, select a sub-contractor in the **Sub Contractor Name**
- If you want to view the BOM details of any module, select a module in the **Module**
- If you want to view the BOM details against an ISO number, select an ISO number in the **ISO Number**
- If you want to view the BOM details for any item code, select an item code in the **Item Code**
- If you want to view the BOM details against a MR number, select a MR number in the **MR Number**
- The **Option 1**, **Option 2**, **Option 3**, and **Option 4**boxes are provided to filter the BOM details by giving the BOM description.

3\. Click **Search**.

The BOM will be displayed based on the given data in the filter boxes.

#### **3.12.1 Export BOM Details**

You can export the BOM details generated in the **BOM Details** page in an excel format by using [![image-1651801239041.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651801239041.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651801239041.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export BOM List</u>**](#bkmrk-3.1.4-export-bom-lis)”.

# Material Feasibility - Structural



# Login

### **1.1** **Login**

To login into the ***cuteQM*** application,

1\. Open your web browser.

2\. Type the URL provided by your administrator, in the address bar of your web browser.

The login page appears.

 [![image-1651735756826.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651735756826.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651735756826.png)

3\. In the login page, enter your user name and password in the respective boxes.

 [![image-1651735786816.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651735786816.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651735786816.png) **Note**: If you forgot your password, click “**I can’t access my account**”. You will be redirected into a new web page. Enter your username to receive your password.

4\. In the **Module** section, select **Structural**.

5\. Click **Login**.

Once you have successfully logged in into the ***cuteQM*** application, the home page of the ***cuteQM*** application opens.

 [![image-1651735821789.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651735821789.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651735821789.png)

 **Figure 1.1 Home page of *cuteQM application***

6\. Navigate to the **Planning** menu in the Home page.

 [![image-1651735848245.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651735848245.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651735848245.png) **Note**: The user name you have entered, the project you have been assigned, and the module you have selected are displayed in the upper right corner of the home page.

### **1.2** **Change Password**

If you want to change your current password,

1\. Click your user name displayed on the quick access bar of the home page. See Fig 4.1.

A drop-down list opens with multiple options.

 [![image-1651735878140.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651735878140.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651735878140.png)

2\. Click the **Change Password**

The **Change Password** page opens.

 [![image-1651735895595.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651735895595.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651735895595.png)

 [![image-1651735930296.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651735930296.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651735930296.png) **Note**: Before changing your password read the conditions specified in the **Change Password** page.

3\. In the **Password** box, enter your current password.

4\. In the **New Password** box, enter your new password.

5\. In the **Confirm New** **Password** box, enter your new password again.

6\. Click **Change Password**.

Your password will be successfully changed.

### **1.3** **Log Out**

If you want to log out from the application,

1\. Click your user name displayed on the quick access bar of the home page. See Fig 4.1.

A drop-down list opens with multiple options.

2\. Click **Log out**.

Your current session ends now. The home page appears.

# Planning

### **2.0** **Planning**

The **Planning** menu in the home page of the ***cuteQM*** app is mainly used to search for the piping feasibility of the structural projects and to assign priority. This menu also helps to add the bill of materials and material request.

Here, you can manage the material reservation, material substitution, offcut inventory, material requisition, and material issuance. For production purpose, you can add and manage fit up, weld visual, and painting inspection requests.

Once you click the **Planning** menu, the following tabs open,

 [![image-1651736629034.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651736629034.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651736629034.png)

### **2.1** **Bill of Material (BOM)**

The **BOM** tab in the **Planning** menu used to add a BOM including quantity of items needed for the pre- fabrication from the overall quantity in the inventory. To add BOM,

1\. Click **BOM** in the **Planning**

The **Bill of Material** page opens.

 [![image-1651736681988.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651736681988.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651736681988.png)

 **Figure 2.1: Bill of Material page**

#### **2.1.1** **Add a BOM**

If you want to add a BOM,

1\. Click [![image-1651736795598.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651736795598.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651736795598.png) (**ADD** button) in the **Bill of Material**  See Fig 5.1.

The page opens a new window to add the details of BOM.

 [![image-1651736813205.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651736813205.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651736813205.png)

 [![image-1651736822797.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651736822797.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651736822797.png) **Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that field before saving.

2\. In the **Drawing No** box, select a drawing number from a drop-down list.

3\. In the **Drawing Rev** box, enter the drawing revision number.

4\. In the **Member Code** box, enter the member code.

5\. In the **Str Type** box, enter the structural type.

6\. In the **Material Category** box, enter the material category.

7\. In the **Member Type** box, enter the member type.

8\. In the **Section** box, enter the section name.

9\. In the **Width MM** box, enter the width of the material in mm.

10\. In the **Length MM** box, enter the width of the material in mm.

11\. In the **Item Quantity** box, enter the item quantity.

12\. In the **Plate Net Area** box, enter the plate net area name.

13\. In the **Rolled** box, enter the rolled detail.

14\. In the **Surface Area** box, enter the surface area name.

15\. In the **Weight FLG Thickness** box, enter the weight FLG thickness detail.

16\. In the **Dimension** box, enter the dimension detail.

17\. In the **Weight LG to Reduce** box, enter the weight that needs to be reduced.

18\. In the **Snip Thickness** box, enter the snip thickness value.

19\. In the **Snip Area** box, enter the snip area value.

20\. In the **Weight Reduced** box, enter the reduced weight.

21\. In the **Mean Length** No box, enter the mean length.

22\. In the **Item** box, enter the item name.

23\. In the **Quantity** box, enter the item quantity.

24\. In the **Material Description** box, enter the material description.

25\. In the **Material Specification** box, enter the material specification.

26\. In the **Item Code** box, select an item code.

27\. In the **Total Quantity** box, enter the item’s total quantity.

28\. In the **UOM** box, enter the UOM detail.

29\. Click **Save**.

The BOM including the item quantity is successfully added and listed in the **Bill of Material** page.

#### **2.1.2** **Edit a BOM**

If you want to edit any existing BOM in the **Bill of Material** page, do the following,

1\. Click [![image-1651737152060.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651737152060.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651737152060.png)(Edit icon) in the **Edit** column for the respective BOM. See Fig 5.1.

The page shows the details of the selected BOM.

2\. Click any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **2.1.3** **Delete a BOM**

If you want to delete any existing BOM in the **Bill of Material** page, you can use [![image-1651737191027.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651737191027.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651737191027.png) (Delete icon) provided in the **Bill of Material** page.

#### **2.1.4** **Export BOM List**

You can export a list of BOMs added in the **Bill of Material** page in both the pdf and excel formats.

1\. If you want to export the BOM list in the pdf format, click [![image-1651737251066.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651737251066.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651737251066.png) (**PDF** button).

The BOM list will be downloaded as a pdf file.

2\. If you want to export the BOM list in the excel format, click [![image-1651737292924.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651737292924.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651737292924.png) (**Excel** button).

The BOM list will be downloaded as an excel file.

#### **2.1.5** **Filter a BOM** 

If you want to filter any BOM from the list of BOMs in the **Bill of Material** page, do the following,

1\. Click [![image-1651737335194.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651737335194.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651737335194.png) (**FILTER** button) located on the **Bill of Material See Fig 5.1.

Once you clicked the **Filter** button, the filter box opens in each column of the **Bill of Material** page.

 [![image-1651737391718.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651737391718.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651737391718.png)

2\. Enter relevant detail in the respective column’s filter box to filter a BOM you want.

#### **2.1.6** **Import Multiple BOMs**

If you want to import multiple BOM together, do the following,

1\. Click [![image-1651737429767.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651737429767.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651737429767.png) (**IMPORT** button). See Fig 5.1.

The **Excel Import** page opens.

 [![image-1651737450246.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651737450246.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651737450246.png)

2\. Click (**TEMPLATE** button).

An excel worksheet will be downloaded with a predefined template to enter the details of BOM.

3\. Enter the required BOM details in the respective columns of the excel worksheet.

4\. Once you have added the BOM details in the excel worksheet, save the excel worksheet on your computer.

5\. Click [![image-1651737488854.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651737488854.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651737488854.png) (**Browse** button) to select the excel worksheet to be uploaded.

6\. Select the excel worksheet you want to upload from your computer.

7\. Click [![image-1651737515688.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651737515688.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651737515688.png) (**Upload** button) to export the BOM details that are included in the excel worksheet.

The columns added in the excel worksheet will be listed in the **Excel Column** field.

 [![image-1651737537221.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651737537221.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651737537221.png)

 [![image-1651737547748.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651737547748.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651737547748.png) **Note**: Make sure that the **Excel Column** field must have all the columns as in the **System Column** field.

8\. To map the columns in the **System Column** and **Excel Column** fields, do one of the following,

 a. If you want to map the columns automatically, click [![image-1651737623953.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651737623953.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651737623953.png) (**AutoMap** button).

The columns will be mapped automatically and displayed in the **Mapped Columns** field.

 b. If you want to map each column manually, select the respective columns in both the **System Column** and **Excel Column** fields and then click [![image-1651737661089.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651737661089.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651737661089.png)(**Map** button).

The selected columns will be mapped and displayed in the **Mapped Columns** field.

 [![image-1651737678774.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651737678774.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651737678774.png)

9\. To un-map the columns in the **Mapped Columns** field, select the respective column and then click [![image-1651740271043.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651740271043.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651740271043.png) (**UnMap** button).

 [![image-1651740301338.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651740301338.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651740301338.png) **Note**: In the **Total Rows** field, the range for uploading the data from the excel worksheet will be updated automatically.

10\. Click [![image-1651740325703.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651740325703.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651740325703.png)(**Populate Values** button).

The data are populated.

11\. Click [![image-1651740347775.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651740347775.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651740347775.png) (**Process** button).

The system processes all the uploaded data and shows if any error with the uploaded data. You can download the error details in the excel worksheet by clicking [![image-1651740368221.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651740368221.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651740368221.png) (**Export to Excel** button).

 [![image-1651740384981.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651740384981.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651740384981.png)

 [![image-1651740393773.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651740393773.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651740393773.png) **Note**: Different color code explains the different types of errors.

12\. Once you have rectified the identified error in the excel worksheet, follow the above procedures to upload the worksheet.

13\. Click (**Import** button) to import the uploaded data.

The data will be successfully imported.

### **2.2** **Import Profile MTO**

### **2.3** **Assign Priority**

The **Assign Priority** tab in the **Planning** menu helps to assign the priority for JDE, Offcut, and FIM warehouses. Likewise, you can assign priority for Module, Level, Type Code, and Cutting Plan Drawing. For example, if you assign the high priority for any warehouse, the materials from the high priority warehouse will be taken initially for performing piping feasibility.

To assign priority,

1\. Click **Assign Priority** in the **Planning**

The **Assign Priority** page opens.

 [![image-1651740481817.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651740481817.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651740481817.png)

 **Figure 2.3: Assign Priority page**

 [![image-1651740500219.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651740500219.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651740500219.png) **Note:** You can assign the priority by giving the numbers from 1 to 99.

2\. If you want to assign priority for warehouses,

 a. Select the **Warehouse**

 The added warehouses will be listed.

 [![image-1651740553538.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651740553538.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651740553538.png)

 b. In the **Priority** column, enter the priority numbers for the respective warehouse.

 c. Click **Save Changes**.

3\. If you want to assign priority for project modules,

 a. Select the **Module**

 The added project modules will be listed.

 [![image-1651740632383.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651740632383.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651740632383.png)

 b. In the **Priority** column, enter the priority numbers for the respective module.

 c. Click **Save Changes**.

4\. If you want to assign priority for levels,

 a. Select the **Level**

 The added levels will be listed.

 Add image

 b. In the **Priority** column, enter the priority numbers for the respective test pack.

 c. Click **Save Changes**.

5\. If you want to assign priority for type code,

 a. Select the **Type Code**

 The added type code will be listed.

 Add image

 b. In the **Priority** column, enter the priority numbers for the respective system.

 c. Click **Save Changes**.

6\. If you want to assign priority for cutting plan drawings,

 a. Select the **Cutting Plan Drawing**

 The added cutting plan drawings will be listed.

 [![image-1651740830595.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651740830595.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651740830595.png)

 b. In the **Priority** column, enter the priority numbers for the respective line.

 c. Click **Save Changes**.

#### **2.3.1** **Export Assigned Priority List**

You can export the assigned priority list in the **Assign Priority** page in the pdf and excel formats by using [![image-1651740891059.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651740891059.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651740891059.png) (**PDF** button) and [![image-1651740905634.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651740905634.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651740905634.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export BOM List</u>**](#bkmrk-1.1.4%C2%A0export-bom-lis)”.

### **2.4** **Reserve Material**

The **Reserve Material** tab in the **Planning** menu helps to reserve the material from the inventory quantity. To reserve the material,

1\. Click **Reserve Material** in the **Planning**

The **Reserve Material** page opens.

[![image-1651740956396.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651740956396.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651740956396.png)

 **Figure 2.4: Reserve Material page**

#### **2.4.1 Reserve a Material**

If you want to reserve a material,

1\. In the **Cutting Plan Drawing** box, select a cutting plan drawing number from a drop-down list. See Fig 5.4.

The page shows a list of BOM item codes including the BOM quantity and inventory stock quantity for this corresponding cutting plan drawing number.

 [![image-1651741034849.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651741034849.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651741034849.png)

 [![image-1651741046648.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651741046648.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651741046648.png) **Note**: The quantity you want to reserve should be less than the BOM quantity.

2\. In the **Reserved Qty** column, enter the number of items you want to reserve.

3\. Once you have entered the reserve quantity, select the respective checkbox in the **Reserve?**

4\. Click **Save changes**.

The entered material quantity will be reserved.

[![image-1651741081124.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651741081124.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651741081124.png) **Note**: If you want to unreserve all the reserved material quantity, click [![image-1651741092378.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651741092378.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651741092378.png) (**Unreserve All** button).

### **2.5 Revision Comparison**

In BOM, when you subsequently revise the quantity of items added against the ISO number, the revision number will be changed. The revision history will be maintained in the back end.

The **Revision Comparison** tab in the **Planning** menu helps you to view the revision history of items added in the BOM.

1\. Click **Revision Comparison** in the **Planning**

The **Revision Comparison** page opens.

 [![image-1651741155945.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651741155945.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651741155945.png)

 **Figure 2.5: Revision Comparison page**

2\. In the **Module** box, select a module from a drop-down list.

3\. In the **Cutting Plan Drawing Number** box, select a cutting plan drawing number from a drop-down list.

4\. In the **Revision From** and **Revision To** boxes, select the revision numbers.

5\. In the **Comparison Type** box, select one of the following,

- If you want to view the revision history for all items, select
- If you want to view the revision history for added items, select
- If you want to view the revision history for removed items, select
- If you want to view the difference in comparison, select **Difference Only.**

6\. Click **Get Difference**.

The revision history opens based on the given criteria. The revision history shows the total quantity and difference quantity after completing the revision.

 [![image-1651741268166.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651741268166.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651741268166.png)

#### **2.5.1 Export Revision Comparison Detail**

You can export the revision detail generated in the **Revision Comparison** page in the pdf and excel formats by using [![image-1651741312302.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651741312302.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651741312302.png)(**PDF** button) and [![image-1651741330049.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651741330049.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651741330049.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export BOM List</u>**](#bkmrk-1.1.4%C2%A0export-bom-lis)”.

### **2.6 Feasibility**

The **Feasibility** tab in the **Planning** menu helps to search the feasibility percentage of items available in the warehouses. Based on the feasibility search percentage, the inspectors will move furtherly for material requisition and material issuance.

To navigate into the Feasibility page,

1\. Click **Feasibility** in the **Planning**

 [![image-1651741379178.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651741379178.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651741379178.png) **Figure 2.6: Feasibility page**

 [![image-1651741416786.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651741416786.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651741416786.png) **Note**: The feasibility result displayed in different colors explains that status of ISO feasibility.

- The feasibility result displayed in Red color shows that the ISO has reserved items.
- The feasibility result displayed in Green color shows that the ISO has 100 percentage feasibility.
- The feasibility result displayed in Blue color shows that the ISO has less than 100 percentage feasibility.

#### **2.6.1 To do Feasibility Search**

To search the feasibility percentage, do the following steps in the **Feasibility** page,

1\. In the **Module** box, select the modules you want.

 [![image-1651741481307.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651741481307.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651741481307.png) **Note**: According to the selection of modules, the system list will be updated in the **System** box.

2\. In the **System** box, select the systems you want.

[![image-1651741494284.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651741494284.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651741494284.png) **Note**: According to the selection of systems, the line list will be updated in the **Line** box.

3\. In the **Line Number** box, select the line numbers you want.

4\. In the **Feasibility** box, enter the feasibility percentage.

[![image-1651741549236.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651741549236.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651741549236.png) **Tip**: If you enter 100, the items which have the feasibility percentage of 100 will be listed. If you enter 10, the items which have the feasibility percentage above 10 will be listed.

5\. Select the checkbox of **Reserve Material** option if you want to filter the reserve material items.

The page shows the feasibility of the reserved materials.

 [![image-1651741576176.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651741576176.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651741576176.png)

6\. Select the checkbox of **Material Substitution** option if you want to filter the material substitution items.

7\. If you want to see the feasibility percentage for any particular warehouse, select the warehouse listed in the **Warehouse**

- If you want to view the feasibility percentage for the items in the JDE warehouse, select the checkbox of **JDE**.
- If you want to view the feasibility percentage for the items in the Offcut warehouse, select the checkbox of **Offcut**.
- If you want to view the feasibility percentage for the items in the FIM warehouse, select the checkbox of **FIM**.

8\. In the **Category** field, select the category whether **Fab** or **Erection**.

 [![image-1651741736378.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651741736378.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651741736378.png) **Note**: If you want clear the given input data, click [![image-1651741749387.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651741749387.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651741749387.png) (**CLEAR** button).

9\. Click **FEASIBILITYSEARCH**.

The feasibility result opens based on the given feasibility percentage.

 [![image-1651741778686.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651741778686.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651741778686.png)

10\. [![image-1651741797171.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651741797171.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651741797171.png)Click (Expand icon) of the respective module.

A new window opens and shows a list of items included in the module.

 [![image-1651741822463.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651741822463.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651741822463.png)

- **BOM Qty** – shows the item’s quantity added in the BOM.
- **Required Qty** – shows the required quantity of item.
- **Stock Qty** – shows the overall quantity of stock available in all the inventories.
- **Available Qty** – shows the available quantity of item.
- **Reserve/Release Qty** – shows the reserve/release quantity of an item.

You can reserve the item here while doing feasibility itself by entering the reserve quantity in the respective field. Make sure that the reserve quantity should not be exceeded the stock quantity.

To reserve the items,

1. Select the checkbox of the item for which you want to reserve the quantity.
2. Enter the reserve quantity in the **Reserve/Release Qty**
3. Click [![image-1651741848108.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651741848108.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651741848108.png) (**RESERVE MATERIAL** button).

The added quantity will be reserved and updated in the [**<u>Reserve Material</u>**](#bkmrk-1.4%C2%A0reserve-material) page.

- **MR Qty**– shows the quantity of item for which the material requests has added
- **MI Qty**– shows the quantity of item for which the material issuance has done
- The feasibility percentage is calculated based on the available quantity. For example, in the below figure, the given BOM quantity is higher than the available quantity, so the feasibility percentage will be less than 100.

 [![image-1651741910533.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651741910533.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651741910533.png)

11. If you want to give purchase order details, enter in the **PO Details**
12. Click **Save changes**.

### **2.7 Clear Feasibility Search Data**

If you want to clear the data of feasibility search done by any of the users, you can use this clear feasibility search data functionality.

Users assigned with Admin role only have access to view the **Clear Feasibility Search Data** tab in the **Planning** menu.

To clear the feasibility search data,

1\. Click **Clear Feasibility Search Data** in the **Planning**

The **Feasibility Search Clear** page opens.

[![image-1651741990825.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651741990825.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651741990825.png)

 **Figure 2.7.1: Feasibility Search Clear page**

The page shows the feasibility search data of all the users.

2\. Click [![image-1651742023738.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651742023738.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651742023738.png) (Clear icon) of the respective user to clear the feasibility search data.

The feasibility search data of the selected user will be cleared.

### **2.8 Material Substitution**

The **Material Substitution** tab in the **Planning** menu helps to substitute one item for another item. To perform the material substitution,

1\. Click **Material Substitution** in the **Planning**

The **Material Substitution** page opens.

 [![image-1651742086198.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651742086198.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651742086198.png)

 **Figure 2.8: Material Substitution**

#### **2.8.1 Add Material Substitution**

If you want to do material substitution,

1\. Click [![image-1651742137680.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651742137680.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651742137680.png) (**ADD** button) in the **Material Substitution**  See Fig 5.8.

The page opens a new window to add the details of material substitution.

 [![image-1651742155842.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651742155842.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651742155842.png)

 [![image-1651742165212.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651742165212.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651742165212.png) **Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that field before saving.

2\. In the **Item Code** box, select an item code from a drop-down list.

 [![image-1651742656188.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651742656188.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651742656188.png) **Note**: In the **Item Code** box, a list of item codes added in the BOM will be listed.

3\. In the **Substitute Item Code** box, select a substitute item code from a drop-down list.

[![image-1651742675722.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651742675722.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651742675722.png) **Note**: In the **Substitute Item Code** box, a list of item codes added in the inventory will be listed.

4\. In the **Quantity** box, select the quantity of items you want to substitute.

5\. Click **Save**.

The entered quantity of items will be substituted successfully. After completing the material substitution, you can do the feasibility search to check the feasibility percentage of the substituted materials.

#### **2.8.2** **Export Material Substitution List**

You can export a list of material substitutions added in the **Material** **Substitution** page in the pdf and excel formats by using [![image-1651742727583.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651742727583.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651742727583.png) (**PDF** button) and [![image-1651742745185.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651742745185.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651742745185.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export BOM List</u>**](#bkmrk-1.1.4%C2%A0export-bom-lis)”.

#### **2.8.3** **Filter a Material Substitution** 

If you want to filter any material substitution from the list of material substitutions in the **Material** **Substitution** page, you can use

[![image-1651742775431.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651742775431.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651742775431.png) (**FILTER** button). To know how to filter, see the topic, “[**<u>Filter a BOM</u>**](#bkmrk-1.1.5%C2%A0filter-a-bom%C2%A0)”.

### **2.9** **Component Requirement**

The **Component Requirement** tab in the **Planning** menu helps to add the components required for the items. To add the component requirement,

1\. Click **Component Requirement** in the **Planning**

The **Component Requirement** page opens with a list of components.

 [![image-1651742842040.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651742842040.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651742842040.png)

 **Figure 2.9: Component Requirement page**

2\. Select the module whether **Piping** or **Structural**.

3\. Select the checkbox of the component you require.

4\. Click **Save changes**.

### **2.10** **Offcut Inventory**

When a material issuance has been created with the Offcut material, we need to add the offcut material details in the Offcut inventory. To add the offcut material details,

1\. Click **Offcut Inventory** in the **Planning**

The **Offcut Inventory** page opens.

 [![image-1651742927868.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651742927868.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651742927868.png)

 **Figure 2.10: Offcut Inventory page**

#### **2.10.1 Add Offcut Material Detail**

To add the offcut material detail,

1\. Click [![image-1651742979431.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651742979431.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651742979431.png) (**ADD** button) in the **Offcut Inventory**  See Fig 5.10.

A new window opens to add the details of offcut material.

 [![image-1651743021342.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651743021342.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651743021342.png)

2\. In the **Material Request** box, select a material request from a drop-down list.

The cut length for the selected material request opens.

 [![image-1651743038640.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651743038640.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651743038640.png)

3\. In the **Cut Length** column, change the cut length of the offcut item if you want.

[![image-1651743066778.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651743066778.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651743066778.png) **Note**: The cut length should not be exceeded the material issuance quantity.

4\. In the **Received Date** box, choose the date when the offcut material received in the Offcut inventory.

5\. Click **Save changes**.

The offcut material is added.

#### **2.10.2** **Adjust Cut Length Quantity**

To adjust the cut length quantity,

1\. Click[ ![image-1651743118398.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651743118398.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651743118398.png) (Add icon) in the **Adjustment**

The **Adjustment** window opens.

 [![image-1651743362271.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651743362271.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651743362271.png)

2\. Click [![image-1651743383896.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651743383896.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651743383896.png) (**ADD** button) in the **Adjustment**

 [![image-1651743403332.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651743403332.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651743403332.png)

3\. In the **Adjustment Qty** box, enter the adjustment cut length quantity.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

The adjusted cut length quantity will be updated.

 [![image-1651743439949.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651743439949.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651743439949.png)

#### **2.10.3** **Export Offcut Inventory List**

You can export a list of offcut materials added in the **Offcut Inventory** page in the pdf and excel formats by using

[![image-1651743504423.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651743504423.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651743504423.png) (**PDF** button) and [![image-1651743515998.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651743515998.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651743515998.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export BOM List</u>**](#bkmrk-1.1.4%C2%A0export-bom-lis)”.

#### **2.10.4** **Filter an Offcut Material** 

If you want to filter any offcut material from the list of offcut materials in the **Offcut Inventory** page, you can use

[![image-1651743750614.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651743750614.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651743750614.png) (**FILTER** button). To know how to filter, see the topic, “[**<u>Filter a BOM</u>**](#bkmrk-1.1.5%C2%A0filter-a-bom%C2%A0)”.

### **2.11** **Material Request**

The **Material Request** tab in the **Planning** menu helps to manage the material requests added in the **Feasibility** page.

#### **2.11.1 Add a Material Request**

If you want to create a material request, do the following steps,

1\. Navigate to the generated feasibility results in the **Feasibility**

 [![image-1651743835210.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651743835210.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651743835210.png)

2\. Select the checkbox of the project for which you want to add the material requests.

3\. Click [![image-1651743856110.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651743856110.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651743856110.png) (**ADD MATERIAL REQUEST** button).

The **Sub con Details** window opens.

 [![image-1651743884044.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651743884044.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651743884044.png)

4\. In the **Sub Contractor Name** box, select a sub-contractor.

5\. In the **Request Date &amp; Time** box, choose the request date and time.

6\. In the **Location** box, select a location.

7\. Click **SAVE**.

The material request will be added in the **Material Request** page.

 [![image-1651743922601.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651743922601.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651743922601.png) **Note**: For each item code included in the project, one material request will be created individually.

For example, The BOM quantity is 18 and you set the high priority for JDE and the least priority for Offcut. A material request will be created with the JDE inventory if the JDE has the same quantity of 18. If the JDE is available with quantity of 10, then two material requests will be created separately for quantity of 10 in JDE and quantity of 8 in Offcut.

8\. Click **Material Request** in the **Planning**

The **Material Request** page opens and shows the list of created material requests.

 [![image-1651743952634.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651743952634.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651743952634.png)

 **Figure 2.11: Material Request page**

 [![image-1651743971621.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651743971621.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651743971621.png)**Note**: The material request displayed in different colors explains the status of the request.

- The material request displayed in Blue color indicates a new material request.
- The material request displayed in Green color indicates the completed material request.

9\. If you want to view the material details, click (Expand icon) of the respective request.

The **Material Details** window opens and shows the material details.

 [![image-1651743998654.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651743998654.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651743998654.png)

#### **2.11.2** **Approve a Material Request**

Once you have added the material request, the **Request Status** column in the **Material Request** page is appeared with [![image-1651744031602.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651744031602.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651744031602.png)

 (Submit and Reject icons).

1\. If you want to approve the material request, click [![image-1651744047397.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651744047397.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651744047397.png)(Approve icon) in the **Request Status** Otherwise click [![image-1651744069780.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651744069780.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651744069780.png) (Reject icon) to reject the request.

The approved material request will be moved for Material Acceptance.

#### **2.11.3** **View a Material Request Report**

If you want to view a material request report, click [![image-1651744140848.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651744140848.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651744140848.png)(Report icon) provided in the **Report** column of the **Material Request** page.

#### **2.11.4 Export Material Request List**

You can export a list of material requests added in the **Material Request** page in the pdf and excel formats by using [![image-1651744160958.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651744160958.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651744160958.png)

 (**PDF** button) and [![image-1651744172606.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651744172606.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651744172606.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export BOM List</u>**](#bkmrk-1.1.4%C2%A0export-bom-lis)”.

#### **2.11.5** **Filter a Material Request** 

If you want to filter any material request from the list of material requests in the **Material** **Request** page, you can use [![image-1651744204086.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651744204086.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651744204086.png)

 (**FILTER** button). To know how to filter, see the topic, “[**<u>Filter a BOM</u>**](#bkmrk-1.1.5%C2%A0filter-a-bom%C2%A0)”.

### **2.12 Material Issuance**

When a material request has been created with the Offcut inventory, we need to issue materials from the Offcut inventory for the created request.

 [![image-1651744280776.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651744280776.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651744280776.png)**Note**: You can do the material issuance process for materials only in the Offcut inventory.

The **Material Issuance** tab in the **Planning** menu helps to issue the materials from the Offcut inventory based on the added material request.

1\. Click **Material Issuance** in the **Planning**

The **Material Issuance** page opens.

 [![image-1651744303076.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651744303076.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651744303076.png)

 **Figure 2.12: Material Issuance**

#### **2.12.1** **Add a Material Issuance Report**

If you want to add a material issuance report,

1\. Click [![image-1651744358938.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651744358938.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651744358938.png) (**ADD** button) in the **Material Issuance**  See Fig 2.12.

The page opens a new window to add the details of material issuance.

 [![image-1651744389851.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651744389851.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651744389851.png)

 [![image-1651744399253.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651744399253.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651744399253.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that field before saving.

2\. In the **Material Request Number** box, select a material request number from a drop-down list.

3\. In the **Issued Date** box, choose the issued date.

4\. Click **Save**.

The material issuance request will be added.

#### **2.12.2 Add Issued Quantity**

Once you have added the material issuance request, you must add the issued quantity details. To add,

1\. Click [![image-1651744456875.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651744456875.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651744456875.png)(Add icon) in the **Result**

The **Material Details** window opens.

 [![image-1651744471560.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651744471560.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651744471560.png)

2\. Check the available quantity in the **Total Quantity**

3\. In the **Issued Qty** column, enter the issued quantity.

 [![image-1651744491762.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651744491762.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651744491762.png) **Note**: The issued quantity can be higher than the available total quantity for all type of components.

4\. Click **Save changes**.

#### **2.12.3 Approve a Material Issuance**

Once you have added the material issuance, the **Issue Status** column in the **Material Issuance** page is appeared with [![image-1651744541143.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651744541143.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651744541143.png)

(Submit and Reject icons).

1\. If you want to approve the material issuance, click [![image-1651744564780.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651744564780.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651744564780.png) (Approve icon) in the **Issue Status** Otherwise click [![image-1651744579333.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651744579333.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651744579333.png) (Reject icon) to reject the request.

The approved material issuance will be moved to Offcut Inventory.

#### **2.12.4 View a Material Issuance Report**

If you want to view a material issuance report, click [![image-1651744620840.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651744620840.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651744620840.png)(Report icon) provided in the **Report** column of the **Material Issuance** page.

#### **2.12.5 Export Material Issuance List**

You can export a list of material issuances added in the **Material Issuance** page in the pdf and excel formats by using [![image-1651744642792.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651744642792.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651744642792.png)

 (**PDF** button) and [![image-1651744653713.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651744653713.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651744653713.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export BOM List</u>**](#bkmrk-1.1.4%C2%A0export-bom-lis)”.

#### **2.12.6 Filter a Material Issuance** 

If you want to filter any material issuance from the list of material issuances in the **Material** **Issuance** page, you can use [![image-1651744690014.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651744690014.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651744690014.png)

 (**FILTER** button). To know how to filter, see the topic, “[**<u>Filter a BOM</u>**](#bkmrk-1.1.5%C2%A0filter-a-bom%C2%A0)”.

### **2.13 CNC Process**

### **2.14 BOM Summary**

The **BOM Summary** tab in the **Planning** menu helps to view the BOM status added against the module. To view the BOM status,

1\. Click **BOM Summary** in the **Planning**

The **BOM Status by ISO** page opens and shows a list of modules with their cutting plan drawings.

 [![image-1651744740722.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651744740722.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651744740722.png)

 **Figure 2.14: BOM Status by ISO page**

2\. Click [![image-1651744771611.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651744771611.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651744771611.png) (Expand icon) in the **Details**

The page shows the items included in the respective module including the BOM quantity, material request quantity, and material issued quantity.

 [![image-1651744805122.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651744805122.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651744805122.png)

#### **2.14.1 Export BOM Status**

You can export the BOM generated in the **BOM Status by ISO** page in an excel format by using [![image-1651744842567.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651744842567.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651744842567.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export BOM List</u>**](#bkmrk-1.1.4%C2%A0export-bom-lis)”.

### **2.15 BOM Details**

The **BOM Details** tab in the **Planning** menu helps to view the added BOM details. To view the BOM details,

1\. Click **BOM Details** in the **Planning**

The **BOM Details** page opens.

 [![image-1651744905643.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651744905643.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651744905643.png)

 **Figure 2.15: BOM Details page**

2\. If you want to view any particular BOM details, you can use the filter options (Explained below) given in the page,

- If you want to view the BOM details of any sub-contractor, select a sub-contractor in the **Sub Contractor Name**
- If you want to view the BOM details of any module, select a module in the **Module**
- If you want to view the BOM details against a drawing number, select a drawing number in the **Drawing No**
- If you want to view the BOM details for any item code, select an item code in the **Item Code**
- If you want to view the BOM details against a MR number, select a MR number in the **MR Number**
- The **Option 1**, **Option 2**, **Option 3**, and **Option 4**boxes are provided to filter the BOM details by giving the BOM description.

3\. Click **Search**.

The BOM will be displayed based on the given data in the filter boxes.

#### **2.15.1 Export BOM Details**

You can export the BOM details generated in the **BOM Details** page in an excel format by using [![image-1651745007960.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651745007960.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651745007960.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export BOM List</u>**](#bkmrk-1.1.4%C2%A0export-bom-lis)”.

### **2.16 Fit up Production Joints**

The **Fit up Production Joints** tab in the **Planning** menu helps you to add an RFI Fit up request.

1\. Click **Fit up Production Joints** in the **Planning**

The **Production – Joints (Structural Fit up)** page opens and shows a list of added joints.

 [![image-1651745096760.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651745096760.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651745096760.png)

 **Figure 2.16: Production – Joints (Structural Fit up) page**

#### **2.16.1 Add New Joints**

Before creating an RFI fit up request, you can add the joints. If you want to add a new joint, do the following steps.

1\. Click [![image-1651745172678.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651745172678.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651745172678.png) (**ADD** button) in the **Production – Joints (Structural Fit up)**

The **Add Joints** window opens.

 [![image-1651745190333.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651745190333.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651745190333.png)

 [![image-1651745201821.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651745201821.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651745201821.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that field before saving.

2\. In the **Joints** box, select a joint from a drop-down list.

After the selection of joint, the **Unique Number 1** and **Piece Mark 1** boxes appear.

 [![image-1651745222487.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651745222487.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651745222487.png)

3\. In the **WPS** box, select a WPS from a drop-down list.

4\. In the **Unique Number 1**box, enter the unique number.

5\. Click **Save &amp; Close**.

The added joint will be listed in the **Production – Joints (Structural Fit up)** page.

#### **2.16.2 Create an RFI Fit up Request**

To create an RFI fit up request,

1\. Select the checkbox of the joints for which you want to create an RFI fit up request.

2\. Click [![image-1651745280566.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651745280566.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651745280566.png) (**Create RFI** button).

The **Create RFI** window opens.

 [![image-1651745301047.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651745301047.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651745301047.png)

 [![image-1651745311323.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651745311323.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651745311323.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that field before saving.

3\. In the **Sub Contractor Name** box, select a sub-contractor from a drop-down list.

4\. In the **Inspection Date &amp; Time**box, choose the inspection date and time.

5\. In the **Location** box, select a location from a list of locations.

6\. In the **Report Number** box, edit/change the report number if you want.

7\. In the **Description** box, enter the description for the request.

8\. Click **Create**.

The added fit up request will be created successfully. The added fit up request will be moved to the **View RFI Fit up** tab in the **Inspection** menu. See Fig 4.1.

 [![image-1651745501271.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651745501271.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651745501271.png)

9\. To view the added request,

 a. Navigate to the **View RFI Fit up** tab in the **Inspection**

The **REQUEST FOR INSPECTION** page opens and shows the added request.

 [![image-1651745541440.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651745541440.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651745541440.png)

10\. To submit the request, click[ ![image-1651745583887.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651745583887.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651745583887.png) (Submit icon) in the **Request Status**

Once you have submitted the request, the result icon will be enabled in the **Result** column.

 [![image-1651745603777.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651745603777.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651745603777.png)

11\. Click [![image-1651745621709.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651745621709.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651745621709.png)(Result icon) and add your fit up inspection results.

 [![image-1651745638086.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651745638086.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651745638086.png)

#### **2.16.3 Export Joints List**

You can export a list of joints added in the **Production – Joints (Structural Fit up)** page in the pdf and excel formats by using

[![image-1651745683581.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651745683581.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651745683581.png) (**PDF** button) and [![image-1651745697682.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651745697682.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651745697682.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export BOM List</u>**](#bkmrk-1.1.4%C2%A0export-bom-lis)”.

#### **2.16.4 Filter a joint** 

If you want to filter any joint from the list of joints in the **Production – Joints (Structural Fit up)** page, you can use

[![image-1651745738145.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651745738145.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651745738145.png) (**FILTER** button). To know how to filter, see the topic, “[**<u>Filter a BOM</u>**](#bkmrk-1.1.5%C2%A0filter-a-bom%C2%A0)”.

### **2.17 Weld VI Production Joints**

The **Weld VI Production Joints** tab in the **Planning** menu helps you to add a weld VI request.

1\. Click **Weld VI Production Joints** in the **Planning**

The **Production – Joints (Structural Weld VI)** page opens and shows a list of added joints.

[![image-1651745770643.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651745770643.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651745770643.png)

 **Figure 2.17: Production – Joints (Piping Weld VI) page**

#### **2.17.1 Add New Joints**

Before creating a weld request, you should add the joints. If you want to add a new joint, do the following steps.

1\. Click [![image-1651745815472.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651745815472.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651745815472.png) (**ADD** button) in the **Production – Joints (Piping Weld VI)**

The **Add Joints** window opens.

[![image-1651745828403.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651745828403.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651745828403.png)

 [![image-1651745836768.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651745836768.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651745836768.png) **Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that field before saving.

2\. In the **Joints** box, select a joint from a drop-down list.

According to the selection of joints, the drawing number, line number, spool number, and sheet number will be updated.

3\. In the **WPS b**ox, select a WPS from a drop-down list.

4\. In the **Weld Date** box, choose the weld date.

5\. In the **Add Welder** window, click [![image-1651745881329.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651745881329.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651745881329.png) (**ADD** button).

A new field opens to add the welder details.

 [![image-1651745896454.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651745896454.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651745896454.png)

- In the **Weld Process** box, select a weld process.
- In the **Weld Position** box, select a weld position.
- In the **Weld Layers** box, select the checkbox of the weld layers.
- In the **Welder Number / Name** box, select a welder name and number.
- Click **Save**.

6\. Click **Save &amp; Close**.

The added joint will be listed in the **Production – Joints (Piping Weld VI)** page.

#### **2.17.2 Create a Weld VI Request**

To create a weld VI request,

1\. Select the checkbox of the joints for which you want to create a weld VI request.

2\. Click [![image-1651745966132.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651745966132.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651745966132.png) (**Create RFI** button).

The **Create RFI** window opens.

 [![image-1651745996194.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651745996194.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651745996194.png)

 [![image-1651746010556.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651746010556.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651746010556.png) **Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that field before saving.

3\. In the **Sub Contractor Name** box, select a sub-contractor from a drop-down list.

4\. In the **Inspection Date &amp; Time**box, choose the inspection date and time.

5\. In the **Location** box, select a location from a list of locations.

6\. In the **Report Number** box, edit/change the report number if you want.

7\. In the **Description** box, enter the description for the request.

8\. Click **Create**.

The added weld VI request will be created successfully. The added weld VI request will be moved to the **View RFI Weld VI** tab in the **Inspection** menu. See Fig 4.1.

 [![image-1651746075158.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651746075158.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651746075158.png)

9\. To view the added request, navigate to the **View RFI Weld VI** tab in the **Inspection**

The **RFI Weld Visual Request List** page opens and shows the added weld VI request.

 [![image-1651746097499.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651746097499.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651746097499.png)

10\. To submit the request, click [![image-1651746113727.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651746113727.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651746113727.png)(Submit icon) in the **Request Status**

Once you have submitted the request, the result icon will be enabled in the **Result** column.

 [![image-1651746132111.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651746132111.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651746132111.png)

11\. Click [![image-1651746146125.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651746146125.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651746146125.png) (Result icon) and add your weld visual inspection results.

 [![image-1651746159640.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651746159640.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651746159640.png)

#### **2.17.3 Export Joints List**

You can export a list of joints added in the **Production – Joints (Piping Weld VI)** page in the pdf and excel formats by using

[![image-1651746230107.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651746230107.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651746230107.png) (**PDF** button) and [![image-1651746240724.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651746240724.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651746240724.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export BOM List</u>**](#bkmrk-1.1.4%C2%A0export-bom-lis)”.

#### **2.17.4 Filter a joint** 

If you want to filter any joint from the list of joints in the **Production – Joints (Piping Weld VI)** page, you can use

[![image-1651746260246.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651746260246.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651746260246.png) (**FILTER** button). To know how to filter, see the topic, “[**<u>Filter a BOM</u>**](#bkmrk-1.1.5%C2%A0filter-a-bom%C2%A0)”.

### **2.18 View Release Notes**

### **2.19 View Painting Inspection**

# Material Feasibility - Pre Planning - Structural



# Login

### **1.1** **Login**

To login into the ***cuteQM*** application,

1\. Open your web browser.

2, Type the URL provided by your administrator, in the address bar of your web browser.

The login page appears.

 [![image-1651752517998.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651752517998.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651752517998.png)

3\. In the login page, enter your user name and password in the respective boxes.

 [![image-1651752550047.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651752550047.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651752550047.png) **Note**: If you forgot your password, click “**I can’t access my account**”. You will be redirected into a new web page. Enter your username to receive your password.

4\. In the **Module** section, select **Structural**.

5\. Click **Login**.

Once you have successfully logged in into the ***cuteQM*** application, the home page of the ***cuteQM*** application opens.

 [![image-1651752578018.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651752578018.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651752578018.png)

 **Figure 1.1 Home page of *cuteQM application***

6\. Navigate to the **Pre Planning** menu in the Home page.

[![image-1651752921998.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651752921998.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651752921998.png) **Note**: The user name you have entered, the project you have been assigned, and the module you have selected are displayed in the upper right corner of the home page.

### **1.2 Change Password**

If you want to change your current password,

1\. Click your user name displayed on the quick access bar of the home page. See Fig 4.1.

A drop-down list opens with multiple options.

 [![image-1651752948589.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651752948589.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651752948589.png)

2\. Click the **Change Password**

The **Change Password** page opens.

 [![image-1651752970292.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651752970292.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651752970292.png)

 [![image-1651752980905.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651752980905.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651752980905.png) **Note**: Before changing your password read the conditions specified in the **Change Password** page.

3\. In the **Password** box, enter your current password.

4\. In the **New Password** box, enter your new password.

5\. In the **Confirm New** **Password** box, enter your new password again.

6\. Click **Change Password**.

Your password will be successfully changed.

### **1.3** **Log Out**

If you want to log out from the app,

1\. Click your user name displayed on the quick access bar of the home page. See Fig 4.1.

A drop-down list opens with multiple options.

2\. Click **Log out**.

Your current session ends now. The home page appears.

# Pre Planning

### **2.0** **Pre Planning**

The **Pre** **Planning** menu in the home page of the ***cuteQM*** app is mainly used to perform pre-fabrication in the structural projects. You can search the feasibility of the material and to assign the priority. This menu also helps to add the material request.

Here, you can manage the offcut inventory and material issuance. You can also view the reports related with the BOM.

Once you click the **Pre** **Planning** menu, the following tabs open,

 [![image-1651753577478.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651753577478.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651753577478.png)

### **2.1 Bill of Material (BOM)**

The **BOM** tab in the **Pre** **Planning** menu helps to add the size of BOM needed for the pre-fabrication in the structural project. To add a BOM,

1\. Click **BOM** in the **Pre** **Planning**

The **Bill of Material** page opens.

 [![image-1651753628210.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651753628210.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651753628210.png)

 **Figure 2.1: Bill of Material page**

#### **2.1.1 Add a BOM**

If you want to add a BOM,

1\. Click [![image-1651753670986.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651753670986.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651753670986.png) (**ADD** button) in the **Bill of Material**  See Fig 2.1.

The page opens a new window to add the details of BOM.

 [![image-1651753689988.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651753689988.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651753689988.png)

[![image-1651753698479.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651753698479.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651753698479.png)  **Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.

2\. In the **Nesting No** box, enter the nesting number.

3\. In the **CNC sheet No** box, enter the CNC sheet number.

4\. In the **Drawing No** box, enter the drawing number.

5\. In the **Cut No** box, enter the cut number.

6\. In the **Piece Mark No** box, select a piece mark number from a drop-down list.

7\. In the **Material Grade** box, enter the material grade.

8\. In the **Plate thick (mm)**box, enter the plate thickness value.

9\. In the **Size (length x Width)**box, enter the length and width of the plate.

10\. In the **JDE Item code** box, enter the JDE item code.

11\. In the **Size M2**box, enter the size value.

12\. In the **Type** box, select the type of material.

13\. In the **Nesting** box, select Yes or No according to your requirement.

14\. In the **Weight (kg)** box, enter the weight value.

15\. In the **Remarks** box, enter your remarks if any.

16\. Click **Save**.

The BOM is successfully added and listed in the **Bill of Material** page.

#### **2.1.2 Edit a BOM**

If you want to edit any existing BOM in the **Bill of Material** page, do the following,

1\. Click [![image-1651753845194.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651753845194.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651753845194.png)(Edit icon) in the **Edit** column for the respective BOM. See Fig 2.1.

The page shows the details of the selected BOM.

 [![image-1651753860842.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651753860842.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651753860842.png)

2\. Click any box where you want to edit the details, and then edit the details in the respective box.

3\. Click **Save**.

#### **2.1.3 Delete a BOM**

If you want to delete any existing BOM in the **Bill of Material** page, you can use [![image-1651753934365.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651753934365.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651753934365.png) (Delete icon) provided in the **Bill of Material** page.

#### **2.1.4 Export BOM List**

You can export a list of BOMs added in the **Bill of Material** page in both the pdf and excel formats.

1\. If you want to export the BOM list in the pdf format, click [![image-1651753965329.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651753965329.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651753965329.png)(**PDF** button).

The BOM list will be downloaded as a pdf file.

2\. If you want to export the BOM list in the excel format, click [![image-1651753980125.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651753980125.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651753980125.png)(**Excel** button).

The BOM list will be downloaded as an excel file.

#### **2.1.5 Filter a BOM** 

If you want to filter any BOM from the list of BOMs in the **Bill of Material** page, do the following,

1\. Click [![image-1651754024841.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651754024841.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651754024841.png) (**FILTER** button) located on the **Bill of Material See Fig 2.1.

Once you clicked the **Filter** button, the filter box opens in each column of the **Bill of Material** page.

 [![image-1651754041475.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651754041475.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651754041475.png)

2\. Enter relevant detail in the respective column’s filter box to filter a BOM you want.

#### **2.1.6 Import Multiple BOMs**

If you want to import multiple BOM together, do the following,

1\. Click [![image-1651754087710.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651754087710.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651754087710.png) (**IMPORT** button). See Fig 2.1.

The **Excel Import** page opens.

 [![image-1651754103096.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651754103096.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651754103096.png)

2\. Click [![image-1651754116728.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651754116728.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651754116728.png) (**TEMPLATE** button).

An excel worksheet will be downloaded with a predefined template to enter the details of BOM.

3\. Enter the required BOM details in the respective columns of the excel worksheet.

4\. Once you have added the BOM details in the excel worksheet, save the excel worksheet on your computer.

5\. Click [![image-1651754177018.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651754177018.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651754177018.png) (**Browse** button) to select the excel worksheet to be uploaded.

6\. Select the excel worksheet you want to upload from your computer.

7\. Click [![image-1651754195200.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651754195200.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651754195200.png) (**Upload** button) to export the BOM details that are included in the excel worksheet.

The columns added in the excel worksheet will be listed in the **Excel Column** field.

 [![image-1651754210665.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651754210665.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651754210665.png)

 [![image-1651754229002.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651754229002.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651754229002.png) **Note**: Make sure that the **Excel Column** field must have all the columns as in the **System Column** field.

8\. To map the columns in the **System Column** and **Excel Column** fields, do one of the following,

 a. If you want to map the columns automatically, click (**AutoMap** button).

 The columns will be mapped automatically and displayed in the **Mapped Columns** field.

 b. If you want to map each column manually, select the respective columns in both the **System Column** and **Excel Column** fields and then click (**Map** button).

The selected columns will be mapped and displayed in the **Mapped Columns** field.

 [![image-1651754317650.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651754317650.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651754317650.png)

9\. To un-map the columns in the **Mapped Columns** field, select the respective column and then click (**UnMap** button).

 [![image-1651754339686.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651754339686.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651754339686.png) **Note**: In the **Total Rows** field, the range for uploading the data from the excel worksheet will be updated automatically.

10\. Click (**Populate Values** button).

 The data are populated.

11\. Click (**Process** button).

The system processes all the uploaded data and shows if any error with the uploaded data. You can download the error details in the excel worksheet by clicking [![image-1651754380115.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651754380115.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651754380115.png) (**Export to Excel** button).

 [![image-1651754402726.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651754402726.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651754402726.png)

 [![image-1651754413646.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651754413646.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651754413646.png) **Note**: Different color code explains the different type of errors.

12\. Once you have rectified the identified error in the excel worksheet, follow the above procedures to upload the worksheet.

13\. Click [![image-1651754447327.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651754447327.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651754447327.png) (**Import** button) to import the uploaded data.

The data will be successfully imported.

### **2.2 Assign Priority**

The **Assign Priority** tab in the **Pre** **Planning** menu helps to assign the priority for JDE, Offcut, and FIM warehouses. Likewise, you can assign priority for Material Type and Material Size. For example, if you assign the high priority for any warehouse, the materials from the high priority warehouse will be taken initially for performing feasibility.

To assign priority,

1\. Click **Assign Priority** in the **Pre** **Planning**

The **Assign Priority** page opens.

 [![image-1651754835462.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651754835462.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651754835462.png)

 **Figure 2.2: Assign Priority page**

 [![image-1651754875430.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651754875430.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651754875430.png)**Note:** You can assign the priority by giving the numbers from 1 to 99.

2\. If you want to assign priority for warehouses,

- Select the **Warehouse**

 The added warehouses will be listed.

 [![image-1651754915194.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651754915194.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651754915194.png)

- In the **Priority** column, enter the priority numbers for the respective warehouse.
- Click **Save Changes**.

3\. If you want to assign priority for material type,

- Select the **Type** option

 The material types will be listed.

 [![image-1651755030177.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651755030177.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651755030177.png)

- In the **Priority** column, enter the priority numbers for the respective type.
- Click **Save Changes**.

4\. If you want to assign priority for material size,

- Select the **Size**

 The added sizes will be listed.

 [![image-1651755095019.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651755095019.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651755095019.png)

- In the **Priority** column, enter the priority numbers for the respective size.
- Click **Save Changes**.

#### **2.2.1 Export Assigned Priority List**

You can export the assigned priority list in the **Assign Priority** page in the pdf and excel formats by using [![image-1651755145834.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651755145834.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651755145834.png)

(**PDF** button) and [![image-1651755154956.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651755154956.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651755154956.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export BOM List</u>**](#bkmrk-2.1.4-export-bom-lis)”.

### **2.3 Feasibility**

The **Feasibility** tab in the **Pre** **Planning** menu helps to search the feasibility percentage of material type and size available in the warehouses. Based on the feasibility search percentage, the inspectors will move furtherly for material requisition and material issuance.

To navigate into the Feasibility page,

1\. Click **Feasibility** in the **Pre** **Planning**

 [![image-1651755309386.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651755309386.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651755309386.png)

 **Figure 2.3: Feasibility page**

 [![image-1651755336952.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651755336952.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651755336952.png) **Note**: The feasibility result displayed in different color explains that status of material feasibility.

- The feasibility result displayed in Green color shows that the material has 100 percentage feasibility.
- The feasibility result displayed in Blue color shows that the material has less than 100 percentage feasibility.

#### **2.3.1 To do Feasibility Search**

To search the feasibility percentage, do the following steps in the **Feasibility** page,

1\. In the **Type** box, select the material type.

- If you select **PG**(I Beam), the feasibility percentage will be calculated based on three types such as BF, WP, and TF. See below figure.

 [![image-1651755428301.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651755428301.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651755428301.png)

- If you select PT (T Beam), the feasibility percentage will be calculated based on two types such as BF and WP. See below figure.

 [![image-1651755455038.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651755455038.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651755455038.png)

- If you select Node means it is only one. See below figure.

 [![image-1651755476960.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651755476960.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651755476960.png)

2\. In the **Size** box, select the material size.

3\. In the **Feasibility** box, enter the feasibility percentage.

 [![image-1651755520222.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651755520222.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651755520222.png) **Tip**: If you enter 100, the items which have the feasibility percentage of 100 will be listed. If you enter 10, the items which have the feasibility percentage above 10 will be listed.

4\. If you want to see the feasibility percentage for any particular warehouse, select the warehouse listed in the **Warehouse** field

- If you want to view the feasibility percentage for the items in the JDE warehouse, select the checkbox of **JDE**.
- If you want to view the feasibility percentage for the items in the Offcut warehouse, select the checkbox of **Offcut**.
- If you want to view the feasibility percentage for the items in the FIM warehouse, select the checkbox of **FIM**.

5\. Click **FEASIBILTY SEARCH**.

The feasibility result opens based on the given input and feasibility percentage.

 [![image-1651755722868.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651755722868.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651755722868.png)

According to the material type i.e., PG, PT, or Node, the feasibility percentage is calculated in the back end by using the pre-defined formula, respectively.

 [![image-1651755735773.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651755735773.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651755735773.png) **Note**: If you want clear the given input data, click [![image-1651755747844.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651755747844.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651755747844.png) (**CLEAR** button).

6\. Click (Expand icon) of the respective type or click [![image-1651755772070.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651755772070.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651755772070.png) (**Expand All** button) to expand all the type together.

A new window opens and shows a list of items included in the type.

 [![image-1651755804898.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651755804898.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651755804898.png)

- **CNC sheet no** – shows the respective CNC sheet number of the item.
- **Warehouse** – shows the warehouse type.
- **BOM Qty** – shows the material size added in the BOM.
- **Required Qty** – shows the required quantity of item.
- **Stock Qty** – shows the overall quantity of stock available in all the inventories.
- **Available Qty** – shows the available quantity of item.
- **Reserve / Release Qty**– shows the reserved / released quantity of item.
- **MR Qty**– shows the quantity of item for which the material requests has added.
- **MI Qty**– shows the quantity of item for which the material issuance has done.

7\. If you want to give purchase order details, enter in the **PO Details** column.

8\. Click **Save changes**.

### **2.4 Clear Feasibility Search Data**

If you want to clear the data of feasibility search done by any of the user, you can use this clear feasibility search data functionality.

Users assign with Admin role only have access to view the **Clear Feasibility Search Data** tab in the **Pre** **Planning** menu.

To clear the feasibility search data,

1\. Click **Clear Feasibility Search Data** in the **Pre** **Planning**

The **Feasibility Search Clear** page opens.

[ ![image-1651755890160.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651755890160.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651755890160.png)

 **Figure 2.4: Feasibility Search Clear page**

The page shows the feasibility search data of all the users.

2\. Click [![image-1651755919514.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651755919514.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651755919514.png) (Clear icon) of the respective user to clear the feasibility search data.

The feasibility search data of the selected user will be cleared.

### **2.5 Offcut Inventory**

When a material issuance has been created with the Offcut material, we need to add the offcut material details in the Offcut inventory. To add the offcut material details,

1\. Click **Offcut Inventory** in the **Pre** **Planning**

The **Offcut Inventory** page opens.

 [![image-1651755974244.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651755974244.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651755974244.png)

 **Figure 2.5: Offcut Inventory page**

#### **2.5.1 Add Offcut Material Detail**

To add the offcut material detail,

1\. Click [![image-1651756016664.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756016664.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756016664.png) (**ADD** button) in the **Offcut Inventory**  See Fig 2.5.

A new window opens to add the details of offcut material.

 [![image-1651756036551.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756036551.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756036551.png)

1\. In the **Material Request** box, select a material request from a drop-down list.

The cut length for the selected material request opens.

 [![image-1651756062565.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756062565.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756062565.png)

2\. In the **Cut Length** column, change the cut length of the offcut item if you want.

 [![image-1651756078645.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756078645.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756078645.png) **Note**: The cut length should not be exceeded the material issuance quantity.

3\. In the **Received Date** box, choose the date when the offcut material received in the Offcut inventory.

4\. Click **Save changes**.

The offcut material is added.

#### **2.5.2 Change the Received Cut Length Quantity**

If you want to change the quantity of the received cut length,

1\. Click [![image-1651756122770.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756122770.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756122770.png)(Edit icon) in the **Edit** column for the respective material request. See Fig 5.5.

The page shows the added details.

 [![image-1651756137944.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756137944.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756137944.png)

2\. In the **Cut Length** box, enter the received cut length quantity.

3\. In the **Unique Number** box, enter the unique number.

4\. Click **Save**.

The added cut length quantity will be updated in the **Received Cut Length** column.

#### **2.5.3** **Adjust Cut Length Quantity**

To adjust the cut length quantity,

1\. Click [![image-1651756185406.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756185406.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756185406.png)(Add icon) in the **Adjustment**

 The **Adjustment** window opens.

 [![image-1651756206315.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756206315.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756206315.png)

2\. Click [![image-1651756220845.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756220845.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756220845.png)(**ADD** button) in the **Adjustment**

 [![image-1651756236257.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756236257.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756236257.png)

3\. In the **Adjustment Qty** box, enter the adjustment cut length quantity.

4\. In the **Remarks** box, enter your remarks if any.

5\. Click **Save**.

The adjusted cut length quantity will be updated.

 [![image-1651756275859.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756275859.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756275859.png)

#### **2.5.4** **Export Offcut Inventory List**

You can export a list of offcut materials added in the **Offcut Inventory** page in the pdf and excel formats by using [![image-1651756305394.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756305394.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756305394.png)

 (**PDF** button) and [![image-1651756315431.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756315431.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756315431.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export BOM List</u>**](#bkmrk-2.1.4-export-bom-lis)”.

#### **2.5.5** **Filter an Offcut Material** 

If you want to filter any offcut material from the list of offcut materials in the **Offcut Inventory** page, you can use

[![image-1651756343354.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756343354.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756343354.png) (**FILTER** button). To know how to filter, see the topic, “[**<u>Filter a BOM</u>**](#bkmrk-2.1.5-filter-a-bom%C2%A0)”.

### **2.6** **Material Request**

The **Material Request** tab in the **Pre** **Planning** menu helps to manage the material requests added in the **Feasibility** page.

#### **2.6.1** **Add a Material Request**

If you want to add a material request, do the following steps,

1\. Navigate to the generated feasibility results in the **Feasibility**

 [![image-1651756402760.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756402760.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756402760.png)

2\. Select the checkbox of the type for which you want to add the material requests.

3\. Click [![image-1651756427415.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756427415.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756427415.png) (**ADD MATERIAL REQUEST** button).

The **Subcon Details** window opens.

 [![image-1651756443185.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756443185.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756443185.png)

4\. In the **Sub Contractor Name** box, select a sub-contractor.

5\. In the **Request Date &amp; Time**box, choose the request date and time.

6\. In the **Location** box, select a location.

7\. Click **SAVE**.

The material request will be added in the **Material Request** page.

 [![image-1651756480170.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756480170.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756480170.png) **Note**: For each item code included in the project, one material request will be created individually.

For example, The BOM quantity is 18 and you set the high priority for JDE and the least priority for Offcut. A material request will be created with the JDE inventory if the JDE has the same quantity of 18. If the JDE is available with quantity of 10, then two material requests will be created separately for quantity of 10 in JDE and quantity of 8 in Offcut.

8\. Click **Material Request** in the **Pre** **Planning**

The **Material Request** page opens and shows the list of created material requests.

 [![image-1651756551737.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756551737.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756551737.png)

 **Figure 2.6: Material Request page**

 [![image-1651756578335.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756578335.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756578335.png) **Note**: The material request displayed in different color explains the status of the request.

- The material request displayed in Blue color indicates a new material request.
- The material request displayed in Green color indicates the completed material request.

9\. If you want to view the material details, click (Expand icon) of the respective request.

The **Material Details** window opens and shows the material details.

 [![image-1651756605648.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756605648.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756605648.png)

#### **2.6.2** **Approve a Material Request**

Once you have added the material request, the **Request Status** column in the **Material Request** page is appeared with [![image-1651756623723.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756623723.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756623723.png)

(Submit and Reject icons).

1\. If you want to approve the material request, click [![image-1651756642040.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756642040.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756642040.png)(Approve icon) in the **Request Status** Otherwise click [![image-1651756651681.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756651681.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756651681.png) (Reject icon) to reject the request.

The approved material request will be moved for Material Acceptance.

#### **2.6.3 View a Material Request Report**

If you want to view a material request report, click [![image-1651756686517.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756686517.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756686517.png) (Report icon) provided in the **Report** column of the **Material Request** page.

#### **2.6.4 Export Material Request List**

You can export a list of material requests added in the **Material Request** page in the pdf and excel formats by using [![image-1651756717941.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756717941.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756717941.png)

 (**PDF** button) and [![image-1651756727906.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756727906.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756727906.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export BOM List</u>**](#bkmrk-2.1.4-export-bom-lis)”.

#### **2.6.5 Filter a Material Request** 

If you want to filter any material request from the list of material requests in the **Material** **Request** page, you can use

[![image-1651756754663.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756754663.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756754663.png) (**FILTER** button). To know how to filter, see the topic, “[**<u>Filter a BOM</u>**](#bkmrk-2.1.5-filter-a-bom%C2%A0)”.

### **2.7 Material Issuance**

When a material request has been created with the Offcut inventory, we need to issue materials from the Offcut inventory for the created request.

[![image-1651756783582.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756783582.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756783582.png) **Note**: You can do the material issuance process for materials only in the Offcut inventory.

The **Material Issuance** tab in the **Pre** **Planning** menu helps to issue the materials from the Offcut inventory based on the added material request.

1\. Click **Material Issuance** in the **Pre** **Planning**

The **Material Issuance** page opens.

 [![image-1651756803616.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756803616.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756803616.png)

 **Figure 2.7: Material Issuance**

#### **2.7.1 Add a Material Issuance Report**

If you want to add a material issuance report,

1\. Click [![image-1651756858355.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756858355.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756858355.png) (**ADD** button) in the **Material Issuance**  See Fig 2.7.

The page opens a new window to add the details of material issuance.

 [![image-1651756875603.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756875603.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756875603.png)

 [![image-1651756886331.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756886331.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756886331.png) **Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.

2\. In the **Material Request Number** box, select a material request number from a drop-down list.

3\. In the **Issued Date** box, choose the issued date.

4\. Click **Save**.

The material issuance request will be added.

#### **2.7.2 Add Issued Quantity**

Once you have added the material issuance request, you must add the issued quantity details. To add,

1\. Click [![image-1651756942566.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756942566.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756942566.png)(Add icon) in the **Result**

The **Material Details** window opens.

 [![image-1651756956099.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756956099.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756956099.png)

2\. Check the available quantity in the **Total Quantity**

3\. In the **Issued Qty** column, enter the issued quantity.

 [![image-1651756981773.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651756981773.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651756981773.png) **Note**: The issued quantity can be higher than the available total quantity for all type of components.

4\. Click **Save changes**.

#### **2.7.3 Approve a Material Issuance**

Once you have added the material issuance, the **Issue Status** column in the **Material Issuance** page is appeared with [![image-1651757025083.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651757025083.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651757025083.png)

 (Submit and Reject icons).

1\. If you want to approve the material issuance, click [![image-1651757039975.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651757039975.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651757039975.png)(Approve icon) in the **Issue Status** Otherwise click [![image-1651757053621.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651757053621.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651757053621.png)(Reject icon) to reject the request.

The approved material issuance will be moved to Offcut Inventory.

#### **2.7.4 View a Material Issuance Report**

If you want to view a material issuance report, click [![image-1651757090631.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651757090631.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651757090631.png)(Report icon) provided in the **Report** column of the **Material Issuance** page.

#### **2.7.5 Export Material Issuance List**

You can export a list of material issuances added in the **Material Issuance** page in the pdf and excel formats by using

[![image-1651757120606.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651757120606.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651757120606.png) (**PDF** button) and [![image-1651757129444.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651757129444.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651757129444.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export BOM List</u>**](#bkmrk-2.1.4-export-bom-lis)”.

#### **2.7.6 Filter a Material Issuance** 

If you want to filter any material issuance from the list of material issuances in the **Material** **Issuance** page, you can use

[![image-1651757159363.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651757159363.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651757159363.png) (**FILTER** button). To know how to filter, see the topic, “[**<u>Filter a BOM</u>**](#bkmrk-2.1.5-filter-a-bom%C2%A0)”.

### **2.8 CNC Process**

The **CNC Process** tab in the **Pre Planning** menu helps to update the unique number of the added material request.

1\. Click **CNC Process** in the **Pre** **Planning**

The **CNC Process Update** page opens and shows a list of added material requests.

 [![image-1651757193208.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651757193208.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651757193208.png)

 **Figure 2.8: CNC Process page**

2\. In the **Unique Number** column, enter the unique number of the material request.

The unique number will be updated successfully.

### **2.9 BOM Status by Size**

The **BOM Status by ISO** tab in the **Planning** menu helps to view the BOM status added against the ISO number. To view the BOM status,

1\. Click **BOM Status by ISO** in the **Planning**

The **BOM Status by ISO** page opens and shows a list of modules with their ISO numbers.

 [![image-1651757243508.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651757243508.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651757243508.png)

 **Figure 2.9: BOM Status by ISO page**

2\. Click [![image-1651757271157.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651757271157.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651757271157.png) (Expand icon) in the **Details**

The page shows the items included in the respective module including the BOM quantity, material request quantity, material issued quantity, and offcut material quantity.

 [![image-1651757295035.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651757295035.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651757295035.png)

#### **2.9.1 Export BOM Status**

You can export the BOM generated in the **BOM Status by ISO** page in an excel format by using [![image-1651757325031.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651757325031.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651757325031.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export BOM List</u>**](#bkmrk-2.1.4-export-bom-lis)”.

### **2.10 BOM Details**

The **BOM Details** tab in the **Planning** menu helps to view the added BOM details. To view the BOM details,

1\. Click **BOM Details** in the **Planning**

The **BOM Details** page opens.

 [![image-1651757363290.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651757363290.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651757363290.png)

 **Figure 2.10: BOM Details page**

2\. If you want to view any particular BOM details, you can use the filter options (Explained below) given in the page,

- If you want to view the BOM details of any sub-contractor, select a sub-contractor in the **Sub Contractor Name** box.
- If you want to view the BOM details of any module, select a module in the **Module box.**
- If you want to view the BOM details against an ISO number, select an ISO number in the **ISO Number box.**
- If you want to view the BOM details for any item code, select an item code in the **Item Code box.**
- If you want to view the BOM details against a MR number, select a MR number in the **MR Number box.**
- The **Option 1**, **Option 2**, **Option 3**, and **Option 4**boxes are provided to filter the BOM details by giving the BOM description.

3\. Click **Search**.

The BOM will be displayed based on the given data in the filter boxes.

#### **2.10.1 Export BOM Details**

You can export the BOM details generated in the **BOM Details** page in an excel format by using [![image-1651757463946.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651757463946.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651757463946.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export BOM List</u>**](#bkmrk-2.1.4-export-bom-lis)”.

### **2.11 View Release Note**

The **View Release Note** tab in the **Pre Planning** menu helps you to add a new spool release note and the spool inspection result for the added release note.

1\. Click **View Release Note** in the **Pre Planning**

The **View** **Release Note** page opens.

 [![image-1651757504991.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651757504991.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651757504991.png)

 **Figure 2.11: View Release Note**

#### **2.11.1 Add a Spool Release Note**

If you want to add a new spool release note, do the following steps,

1\. Click [![image-1651757545514.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651757545514.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651757545514.png) (**ADD** button) in the **View** **Release Note**

The **Release Note** page opens.

 [![image-1651757557502.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651757557502.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651757557502.png)

 [![image-1651757567958.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651757567958.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651757567958.png) **Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.

2\. In the **Release Note Date** box, choose the release note date.

3\. In the **Location** box, select a location.

Before saving the request, you must add spools.

 [![image-1651757594829.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651757594829.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651757594829.png) **Note**: You can add multiple spools for one request.

The page shows a list of added spools.

3\. Click [![image-1651757614665.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651757614665.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651757614665.png)(Add icon) of the respective spool which you want to add.

The added spools will be moved to the right side of the page.

4\. In the **Remarks** box, enter your remarks if any.

5\. In the **Inspection Item** box, enter the inspection item detail.

6\. In the **Subject Coverage** box, enter the subject coverage detail.

7\. Click **Save**.

The release note for spool will be added and listed in the **View Release Note** page.

#### **2.11.2 Add Results of Spool Inspection**

After completing the spool inspection for the added request, you can add the inspection result details. To add the results, do the following steps,

1\. Click [![image-1651757698904.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651757698904.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651757698904.png)(Result icon) in the **Result** column of the respective request.

The window opens and shows with a list of spools including their inspection result.

 [![image-1651757715848.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651757715848.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651757715848.png)

#### **2.11.3 Submit a Spool Release Note**

Once you have completed the spool inspection, you should submit the inspection for the further process. the **Request Status** column in the **Release Note for Spool Inspection** page is appeared with [![image-1651757753398.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651757753398.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651757753398.png)(Submit and Reject icons). See Fig 2.11.

1\. If you want to submit the spool inspection, click [![image-1651757776736.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651757776736.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651757776736.png)(Submit icon) in the **Completed Status** Otherwise click [![image-1651757787608.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651757787608.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651757787608.png) (Reject icon) to reject the request.

#### **2.11.4 View a Spool Inspection Report**

If you want to view a spool inspection report, click [![image-1651757817550.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651757817550.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651757817550.png)(print icon) provided in the **Report** column of the **View** **Release Note** page. See Fig 2.11.

#### **2.11.5 Attach a File into a Spool Inspection Report** 

If you want to attach a file with any existing spool inspection report in the **View** **Release Note** page,

1\. Click [![image-1651757855955.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651757855955.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651757855955.png)(Attach icon) provided against the respective request in the **View Release Note**

The **File Upload (P&amp;ID - Drawings)** page opens.

 [![image-1651757871755.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651757871755.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651757871755.png)

 [![image-1651757880991.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651757880991.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651757880991.png) **Note**: Before uploading any file, read the instructions given in the **File Upload (PN)** page.

2\. Click [![image-1651757913545.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651757913545.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651757913545.png) (**Browse** button).

3\. Select a file which you want to upload from your computer.

4\. Click [![image-1651757923962.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651757923962.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651757923962.png) (**Upload** button) to attach the file.

The uploaded file will be displayed in the **File Upload** table.

 [![image-1651757943155.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651757943155.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651757943155.png)

#### **2.11.6 Export Spool Inspection Report List**

You can export a list of spool inspection reports in the **View** **Release Note** page in the pdf and excel formats by using

[![image-1651757984588.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651757984588.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651757984588.png) (**PDF** button) and [![image-1651757995273.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651757995273.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651757995273.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export BOM List</u>**](#bkmrk-2.1.4-export-bom-lis)”.

# User Management

Users and Roles Management

# Master Data

Company wide master data such as PQR, WPS, Welders, Projects etc

# Welder Management

**WQT Request** ( Welder Qualification Test Report Request)

WQT is a critical process in the welding industry designed to assess the skills and proficiency of welders to ensure that they meet specific standards for various welding applications.

**View WQT Request**: The created WQT request will be displayed in the list.

[![image-1772287728779.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-02/scaled-1680-/image-1772287728779.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-02/image-1772287728779.png)

**Create WQT Request:**

[![image-1772286747754.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-02/scaled-1680-/image-1772286747754.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-02/image-1772286747754.png)

- The system will automatically generate Report number and the user is able to change the report number.
- Select Master Project name
- Select Module Name
- WQT Type (Official / Outsource / Internal) 
    - Official ()
    - Outsource ()
    - Internal ()
- WQT Tested Date
- WQT Issue Date
- Application Code: (ASME or AWS)
- Witnessed By: ( Supervisor Name)

**Add Welder in WQT Request**

If the user wants to add a welder to the WQT request, click Result ([![image-1772288046151.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-02/scaled-1680-/image-1772288046151.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-02/image-1772288046151.png)**plus icon**) in the WQT view request

**View WQT Details**: The created welders in the WQT request will be displayed in the list.

[![image-1772288214929.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-02/scaled-1680-/image-1772288214929.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-02/image-1772288214929.png)

Add Welder for qualification

[![image-1772288374837.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-02/scaled-1680-/image-1772288374837.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-02/image-1772288374837.png)

if its new welder coming for qualification, select "**New Welder**" option and keyin all mandatory columns, and if you click the Save button, data will be saved in the WQT request, and this Welder will be added in Welder Master and WPQ list ONLY when the Visual &amp; RT result value should be accepted; otherwise, this welder won;t be added in WPQ list.

[![image-1772289129434.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-02/scaled-1680-/image-1772289129434.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-02/image-1772289129434.png)

If its existing welder and wants to add a new qualification, select "**Existing Welder**" option and select welder from the list and keyin all mandatory columns, and if you click the Save button, data will be saved in the WQT request, and this Welder will be added in WPQ list ONLY when the Visual &amp; RT result value should be accepted; otherwise, this welder won;t be added in WPQ list.

[![image-1772289220688.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-02/scaled-1680-/image-1772289220688.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-02/image-1772289220688.png)

Update welder certificate

If you click "**Welder Certificate**" icon in each qualification, the certificate pop-up window will be opened.

[![image-1773025983223.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/scaled-1680-/image-1773025983223.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/image-1773025983223.png)

[![image-1773026404237.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/scaled-1680-/image-1773026404237.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/image-1773026404237.png)

1\. If the WQT request is piping, the system will automatically select "**Pipe**" option, and the user can't change and if the WQT request is structural, the system will automatically select "**Plate**" option.

2\. Certificate variables will be loaded based on the discipline (**Pipe / Plate**) and the variable master value in **WQT Parameters** screen.

[![image-1773026906146.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/scaled-1680-/image-1773026906146.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/image-1773026906146.png)

[![image-1773027080197.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/scaled-1680-/image-1773027080197.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/image-1773027080197.png)

3\. If the user keyin exact "**Actual Values**" for that variable, the system will automatically combine **Min** &amp; **Max** values and update in 4. "**Range Qualified**" column.

[![image-1773027603375.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/scaled-1680-/image-1773027603375.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/image-1773027603375.png)

[![image-1773027662817.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/scaled-1680-/image-1773027662817.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/image-1773027662817.png)

An **ADMIN** user can generate a welder certificate report using **Report** icon

[![image-1773027742801.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/scaled-1680-/image-1773027742801.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/image-1773027742801.png)

[![image-1773027959014.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/scaled-1680-/image-1773027959014.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/image-1773027959014.png)

An **ADMIN** user can set the workflow approval process in the workflow master, and the workflow category is **WQT.** The approver's signature will be displayed in the Welder Certificate report footer.

**Welder Pass**

If you click "**Pass**" icon in each qualification, the system will combine all this welder's qualifications &amp; displayed in welder pass.

[![image-1773028531852.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/scaled-1680-/image-1773028531852.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/image-1773028531852.png)

[![image-1773028774245.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/scaled-1680-/image-1773028774245.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/image-1773028774245.png)

If you scan the QR code in the welder pass on your mobile, the system will show the scanned welder's current valid qualifications. Because the welder pass might be printed &amp; issued to the welder some months before. Suppose if the client representative wants to check the welder's current valid qualification in the welding yard, just scan and check, and there is no need to call the welder's pass-issued person or coordinator to check.

**Piping** qualifications are shown in <span style="background-color: #2dc26b;">green</span> color (if it's)

**Structural** qualifications are shown in <span style="background-color: #edf310;">yellow</span> color (if it's). For Example, pls refer to the screenshots below.

[![image-1773984680378.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/scaled-1680-/image-1773984680378.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/image-1773984680378.png)

[![image-1773984701364.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/scaled-1680-/image-1773984701364.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/image-1773984701364.png)

**Welder Pass Inspection**

If you want to print the selected welder's pass in the report, add those welders in weder pass inspection request and generate welder pass report after submission. Here user can set the **Workflow Approval** process also.

[![image-1773029312476.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/scaled-1680-/image-1773029312476.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/image-1773029312476.png)

[![image-1773029482111.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/scaled-1680-/image-1773029482111.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/image-1773029482111.png)

**WQT Reports**

**WQT Report.**

[![image-1773033246960.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/scaled-1680-/image-1773033246960.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/image-1773033246960.png)

[![image-1773033125866.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/scaled-1680-/image-1773033125866.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/image-1773033125866.png)

**WQT Contractor-wise Report.**

The ADMI user can take contractor wise welder qualification register report. It will show No. of welder pass or fail details &amp; No. of coupons issued for the qualification test in a WQT request-wise.

[![image-1773033236626.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/scaled-1680-/image-1773033236626.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/image-1773033236626.png)

[![image-1773030240850.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/scaled-1680-/image-1773030240850.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/image-1773030240850.png)

**WQT Overall Status (Contractor &amp; Material-wise status Report)**

[![image-1773033213743.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/scaled-1680-/image-1773033213743.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/image-1773033213743.png)

[![image-1773032924970.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/scaled-1680-/image-1773032924970.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/image-1773032924970.png)

**WQT Contractor Wise Pass &amp; Coupon status Report**

[![image-1773033200491.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/scaled-1680-/image-1773033200491.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/image-1773033200491.png)

[![image-1773032999601.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/scaled-1680-/image-1773032999601.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-03/image-1773032999601.png)

# Mobile Apps - Piping



# New Page



# User Management

### **1.1 Downloading *cuteQM* app**

To use the ***cuteQM*** app you must first download it from the **Play Store**.

1. Open the **Play Store** and search for “***cuteQM***”.
2. Download and install the ***cuteQM***app on your mobile phone.
3. After installation, open the ***cuteQM***

You are ready to go!

### **1.2 Log in** 

After installation, when you open the ***cuteQM*** app you may be asked to Login. Follow the steps to successfully log into your account.

[![image-1651671682832.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651671682832.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651671682832.png) [![image-1651671693357.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651671693357.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651671693357.png)[![image-1651671707161.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651671707161.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651671707161.png)

1\. Before enter your user id and password, tap [![image-1651671754003.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651671754003.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651671754003.png)(Settings icon) and enter the app URL that is provided by your administrator.

2\. Tap **Save**.

3\. Enter your user id and password in the allocated fields.

4\. Tap **Log in** to complete the process.

The home screen of the ***cuteQM*** app is appeared.

### **1.3 Home screen of *cuteQM* app**

 [![image-1651671838455.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651671838455.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651671838455.png)[![image-1651671859309.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651671859309.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651671859309.png)

 **Figure 2.2 Home screen of cuteQM app**

 [![image-1651671890490.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651671890490.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651671890490.png) - [![image-1651671901898.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651671901898.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651671901898.png) (show/hide icon) helps to show/hide the user id information that is displayed in the left pane of the home screen. if you touch this icon the information appears on, if you touch this icon again the information goes off.

[![image-1651671928722.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651671928722.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651671928722.png) - provided with a down arrow. If you click the down arrow, a list opens with three options such as **Clear Storage**, **Sync Data**, and **Log out**.

- **Clear Storage** - clears all data in this app. Tap the **Clear Storage**option to delete all the data.
- **Sync Data**- synchronizes your inspection results with the respective reports in the web application. If your inspection results are not automatically synchronized with the web application, tap the **Sync Data** option for manual synchronization.
- **Log out** - See "<span style="color: #236fa1;">[**<u>Log out</u>**](#bkmrk-1.4-log-out%C2%A0)</span>" section for details about log out of the app.

[![image-1651671946674.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651671946674.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651671946674.png) **Project** – helps to select the project. To select the project,

1. Tap the **Project** box, and select the project from a drop-down list.

[![image-1651671956919.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651671956919.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651671956919.png) **Module** – helps to select the module. To select the module,

2. Select **Piping** under the **Module**
3. Tap **GO**.

A dashboard of the app is appeared.

[![image-1651671969459.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651671969459.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651671969459.png) Note: The dashboard does not display **MILL CERTIFICATES** and **TEST EQUIPMENT** tabs unless your administrator adds your role in the **cuteQM\_Certificate Access** option in the web application.

 [![image-1651671983089.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651671983089.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651671983089.png)[![image-1651671995897.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651671995897.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651671995897.png)

 **Figure 2.3 Dashboard of cuteQM app**

You can navigate through the app using the dashboard. The dashboard shows different tabs according to the type of project and module that you have selected.

### **1.4 Log out** 

Log out of your user's account from this **Log out** option. This command ends your current session of the app work.

1. Tap the Log out option for logging out of the app. This will lead you back to the Log in Screen. See Fig 2.2.

# SET DEFAULT PROJECT

### **2.0 SET DEFAULT PROJECT** 

The **SET DEFAULT PROJECT** tab helps you to select or change the project and module.

 [![image-1651672280917.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651672280917.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651672280917.png)

To select or change the project and module,

[![image-1651672291207.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651672291207.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651672291207.png) **Note**: if you are signing in to the app after the first-time login process, the app automatically redirects you into the dashboard page.

1. Tap **SET DEFAULT PROJECT**. See Fig 2.3. The **SET DEFAULT PROJECT** page opens.

 [![image-1651672307125.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651672307125.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651672307125.png)

2. Tap the **Project** box, and select the project from a drop-down list.
3. Select the module you want, under the **Module**
4. Tap **GO**.

# TAKE OFFLINE DATA

### **3.0 TAKE OFFLINE DATA**

The **TAKE OFFLINE DATA** tab helps you viewing the reports for the specific inspection dates you want.

 [![image-1651672526165.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651672526165.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651672526165.png)

When you select the respective dashboard tab you can view a list of reports corresponding to today and previous day. However, if you want to view the reports other than today and previous day, you must navigate to the **TAKE OFFLINE DATA** tab.

Do the following steps to view the reports using the **TAKE OFFLINE DATA** tab,

1. Tap **TAKE OFFLINE DATA.** See Fig 2.3.

A new window opens for selecting category and date you want.

 [![image-1651672541152.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651672541152.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651672541152.png)

2. In the **Category**box, tap and select the option you want to view the reports from a drop-down list.
3. In the **Date** box, choosethe period of inspection by selecting respective dates.

 [![image-1651672563065.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651672563065.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651672563065.png) **Tip**: If you want to choose the period of inspection for more than one day, you must select from and to dates, accordingly.

4. Tap **Submit**.

A new page opens for the selected option in the **Category** box.

# MILL CERTIFICATES

# **4.0 MILL CERTIFICATES**

The **MILL CERTIFICATES** tab allows you to view the material certificates added in the web application. This feature works only in online mode.

[ ![image-1651672786618.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651672786618.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651672786618.png)

To view the material certificates,

1. Tap **MILL CERTIFICATES**. See Fig 2.3.

The **Mill Certificates** page opens.

 [![image-1651672816554.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651672816554.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651672816554.png)[![image-1651672829384.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651672829384.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651672829384.png)

2. Tap the **Component** box and select the component name from a drop-down list.

 [![image-1651672872369.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651672872369.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651672872369.png) **Note**: If you want to view the certificate for a specific component, enter the size, thickness, material name, class, heat number, rating, do number, expiry date or remarks of the component in the respective boxes.

3. Tap **Get Certificates**. A list of material certificates for the selected component is appeared.

 [![image-1651672892443.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651672892443.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651672892443.png)

[![image-1651672908344.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651672908344.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651672908344.png)  **Tip**: If you want to view any attachment added with the material certificate, tap (Attach icon).

 [![image-1651672917728.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651672917728.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651672917728.png) **Note**: If the number of certificates exceeds 500, you will receive the following notification: “**The result records are more than 500, so system can’t load, pls add another filter and search**”.

# TEST EQUIPMENT

# **5.0 TEST EQUIPMENT**

The **TEST EQUIPMENT** tab helps you to get the details of the testing equipment that are added in the web application. This feature works only in online mode.

 [![image-1651673008118.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651673008118.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651673008118.png)

To get the test equipment details,

1\. Tap **TEST EQUIPMENT**. See Fig 2.3.

The **Testing Equipment** page opens.

 [![image-1651673021254.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651673021254.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651673021254.png)

2\. Enter the component name in the **Component**

 [![image-1651673033405.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651673033405.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651673033405.png) **Note**: If you want to get details for the specific test equipment, enter the description, test date, expiry date, or remarks of the equipment in the respective boxes.

3\. Tap **Get Test Equipment**. A list of test equipment reports for the selected component is appeared.

 [![image-1651673047303.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651673047303.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651673047303.png) **Tip**: If you want to view an attachment added with the test equipment, tap [![image-1651673061846.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651673061846.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651673061846.png) (Attach icon).

 [![image-1651673097448.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651673097448.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651673097448.png)

 [![image-1651673111632.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651673111632.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651673111632.png) **Note**: If the number of test equipment reports exceeds 500, you will receive the following notification: “**The result records are more than 500, so system can’t load, pls add another filter and search**”.

# MIR

# **6.0 MIR**

The **MIR** tab helps you to check and update a material verification report for the MIR requests, which are uploaded in the web application, by adding your inspection details. This MIR feature automatically updates and synchronizes your inspection details with the material verification report in the web application.

 [![image-1651673391124.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651673391124.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651673391124.png)

[![image-1651673404205.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651673404205.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651673404205.png) **Note**: when you click the **MIR** tab in the dashboard, the **MIR** page displays a list of reports corresponding to today and previous day. However, if you want to view the reports for other dates, you must navigate to the **TAKE OFFLINE DATA** option. (See " <span style="color: #236fa1;">[**<u>TAKE OFFLINE DATA</u>** ](http://wiki.cuteinfocomm.com/books/cuteqm/page/take-offline-data/#bkmrk-3.0-take-offline-dat)</span>" for more details).

1\. Tap **MIR**. See Fig 2.3.

The **MIR** page opens with a list of reports for the selected date.

 [![image-1651673464382.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651673464382.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651673464382.png)

 **Figure 6.1 MIR page**

 [![image-1651673486690.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651673486690.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651673486690.png) **Tip**: I. You can configure displaying of the number of reports per page by selecting **10**, **25**, **50** or **100**, accordingly.

1. If you want to filter one report among the list of reports, you must enter the report number, inspection date or location details in the respective boxes given in the **MIR** page.

The **MIR** page contains the following fields:

- **Report Number**– shows the request’s report number.
- **Inspection Date**– shows the date of inspection.
- **Location**– shows the location where the inspection to be performed.
- **Result**– you can add your inspection results.
- **Signature**– you can add your signature after completing the inspection.
- **Attach –** you can view any supporting document that is attached in the web application by tapping [![image-1651673505795.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651673505795.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651673505795.png) (**Attach** icon).

 [![image-1651673543849.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651673543849.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651673543849.png) **Tip**: You can filter the supporting document by using the **File Name** and **File Size in KB** options provided in the **Attach** page. See Fig given below.

 [![image-1651673560133.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651673560133.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651673560133.png)

- **Print**– you can download a copy of the report by tapping [![image-1651673571083.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651673571083.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651673571083.png) (**Print** icon). [![image-1651673620088.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651673620088.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651673620088.png)  **Tip**: After adding your inspection details and signature into the MIR report, you can download a latest copy of the report by using the **Print** option to check whether your inspection details and signature are successfully updated with the report.
- **Sync –** notifieswhether your inspection details are automatically synchronized with the web application or not. This **Sync** section initially shows the Sync icon like [![image-1651673649444.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651673649444.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651673649444.png) . Once you add your inspection details the Sync icon appears in [![image-1651673681621.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651673681621.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651673681621.png). After synchronization of your inspection details, the **Sync** section changes the Sync icon into [![image-1651673708313.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651673708313.png) .](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651673708313.png)
    
    [![image-1651673737396.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651673737396.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651673737396.png) **Tip**: If your inspection details are not automatically synchronized, navigate to the manual synchronization option. (See “[<span style="color: #1f1de0;"><span style="color: #236fa1;">**<u>Sync Data</u>** </span></span>](http://wiki.cuteinfocomm.com/books/cuteqm/page/user-management-FuQ/#bkmrk-clear-storage---clea)“for more details.)

**To add your MIR inspection result**

1. Once you find out the report where you need to add your inspection details, tap [![image-1651673759065.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651673759065.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651673759065.png) (**Result** icon) to add your inspection results, See Fig 7.1.

The **Result** page opens with a list of reports with the material details. Each report shows material specifications such as description, specification, size, and type.

 [![image-1651673801652.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651673801652.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651673801652.png)

2. In the **Remarks**box, type your remarks if any.
3. In **Cert** column, [![image-1651673823588.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651673823588.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651673823588.png)tap (Edit icon) for the report you want to add your result.

A new page for the selected report opens.

 [![image-1651673846711.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651673846711.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651673846711.png)

4. Check and re-enter **Quantity** of the materials if you want.
5. In **Heat No** box, enter the heat number.
6. Checkthe certificate number in the **Cert
7. In **Dimen**, **Visual**, and **Mill Test**options, choose **Accepted** or **Rejected** based on your inspection details.
8. In **Plate No**box, enter the plate number.
9. In **Uniq No**box, enter the unique number.
10. In the **Remarks**box, type your remarks if any.
11. Tap **Save**.

**To add your signature**

Once you have saved your inspection results, you must add your signature in the **Signature** field.

[![image-1651673866018.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651673866018.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651673866018.png) **Note**: Make sure that you can add your signature if your role has assigned as QA, Subcontractor, Client or Owner, by the administrator.

1. Tap [![image-1651673881470.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651673881470.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651673881470.png) (**Signature** icon), See Fig 7.1. The signature page opens.

 [![image-1651673899480.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651673899480.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651673899480.png) **Note**: If you are a login user, you can directly do sign for the respective role in the signature box, otherwise you must login with your user id and password before signing.

 [![image-1651673926231.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651673926231.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651673926231.png)

2. Tap [![image-1651673939066.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651673939066.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651673939066.png) (**Sign** icon) provided in the right-side pane for the corresponding **Type** based on your role.

A new signature box opens.

 [![image-1651673958191.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651673958191.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651673958191.png)

3. In the **Name** box, enter your name.

[![image-1651673974828.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651673974828.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651673974828.png) Note: If your role has assigned as QA, your name will be displayed automatically in the **Name** box. Other than QA, you must add your name before signing.

4. In the **Signature** box, write your signature, and tap **Save**.

# RFI FITUP INSPECTION

### **7.0 RFI FITUP INSPECTION**

The **RFI FITUP INSPECTION** tab helps you to check and approve the RFI fitup request raised in the web application, by adding and updating your inspection details. This RFI fitup inspection feature automatically updates and synchronizes your inspection details with the RFI Fitup report that is uploaded in the web application.

 [![image-1651720450596.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651720450596.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651720450596.png)

[![image-1651720463465.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651720463465.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651720463465.png)  **Note**: when you click the **RFI FITUP INSPECTION** tab in the dashboard, the **RFI Fitup Inspection page displays a list of reports corresponding to today and previous day. However, if you want to view the reports for other dates, you must navigate to the **TAKE OFFLINE DATA** option. (See " [**<u>TAKE OFFLINE DATA</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/take-offline-data/#bkmrk-3.0-take-offline-dat)" for more details.)

1\. Tap **RFI FITUP INSPECTION**.See Fig 2.3.

The **RFI Fitup Inspection** page opens with a list of reports for the selected date.

 [![image-1651720485651.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651720485651.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651720485651.png)

 **Figure 8.1 RFI Fitup Inspection page**

 [![image-1651720504210.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651720504210.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651720504210.png) **Tip**: 1. You can configure displaying of the number of reports per page by selecting **10**, **25**, **50** or **100**, accordingly.

 2. If you want to filter one report among the list of reports, you must enter the report number, inspection date or location details in the respective boxes given in the **RFI Fitup Inspection**page.

The **RFI Fitup Inspection** page contains multiple fields such as **Report Number, Inspection Date, Location, Result**, **Signature**, **Attach, Print, and Sync.** (See the topic “[<u>The </u>**<u>MIR</u>**<u> page contains the following fields</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/mir/#bkmrk-the-mir%C2%A0page-opens-w)“ for more details about each field in the **RFI Fitup Inspection** page.)

**To add your RFI fitup inspection result**

1\. Once you find out the report where you need to add your inspection details, tap [![image-1651720579098.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651720579098.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651720579098.png) (**Result** icon) to add your inspection results, See Fig 8.1.

The **Result** page opens with a list of reports with the material details. Each report shows material specifications such as system details, line numbers, heat numbers, spool number, components name, MIR details, etc.

 [![image-1651720635861.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651720635861.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651720635861.png)

2\. In the **Remarks**box, type your remarks if any.

3\. Check and reenter the heat numbers of the respective report where you want to add your inspection details.

4\. In the **Result**box, tab and choose **Pending, Accepted, Rejected or Cancelled** from a drop-down list based on your inspection details.

5\. In the **Remarks**box, type your remarks if any.

6\. If you want to add any photo with the report, do the following steps,

 a. Tab [![image-1651720742125.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651720742125.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651720742125.png)(photo capturing icon).

 Your mobile camera starts to capture the image.

 b. Capture the material part, which you want to add.

 The captured images are automatically saved in the image’s gallery.

 c. Tab[![image-1651720828710.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651720828710.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651720828710.png)(**Images** icon) to view the captured images.

 [![image-1651721655159.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651721655159.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651721655159.png) **Note**: The captured images are automatically updated with the web application.

7. Tab **Save**.

 To add your signature**

Once you have saved your inspection results, the **Result** page automatically redirects you into the **Signature** page. Otherwise, tap

[![image-1651721807377.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651721807377.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651721807377.png) (**Signature** icon), See Fig 8.1.

To know how to add your signature, see the topic “[**<u>To add your signature</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/mir/#bkmrk-to-add-your-signatur)“**.**

# RFI WELD INSPECTION

### **8.0 RFI WELD INSPECTION**

The **RFI WELD INSPECTION** tab allows you to check and approve the RFI weld visual request raised in the web application, by adding and updating your inspection details. This RFI weld inspection feature automatically updates and synchronizes your inspection details with the RFI weld report that is uploaded in the web application.

 [![image-1651722814808.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651722814808.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651722814808.png)

[![image-1651722825510.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651722825510.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651722825510.png)  **Note**: when you click the **RFI WELD INSPECTION** tab in the dashboard, the **RFI Weld Inspection page displays a list of reports corresponding to today and previous day. However, if you want to view the reports for other dates, you must navigate to the **TAKE OFFLINE DATA** option. (See " [**<u>TAKE OFFLINE DATA</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/take-offline-data/#bkmrk-3.0-take-offline-dat)" for more details.)

1\. Tap **RFI WELD INSPECTION**.See Fig 2.3.

The **RFI Weld Inspection** page opens with a list of reports for the selected date.

 [![image-1651722851330.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651722851330.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651722851330.png)

 **Figure 9.1 RFI Weld Inspection page**

 [![image-1651723066945.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651723066945.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651723066945.png) **Tip**: 1. You can configure displaying of the number of reports per page by selecting **10**, **25**, **50** or **100**, accordingly.

 2. If you want to filter one report among the list of reports, you must enter the report number, inspection date or location details in the respective boxes given in the **RFI Weld Inspection**page.

The **RFI Weld Inspection** page contains multiple fields such as **Report Number, Inspection Date, Location, Result**, **Signature**, **Attach, Print, and Sync.** (See the topic “[<u>The </u>**<u>MIR</u>**<u> page contains the following fields</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/mir/#bkmrk-the-mir%C2%A0page-opens-w)“ for more details about each field in the **RFI Weld Inspection** page.)

**To add your RFI weld inspection result**

1\. Once you find out the report where you need to add your inspection details, tap [![image-1651723142809.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651723142809.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651723142809.png) (**Result** icon) to add your inspection results, See Fig 9.1.

 [![image-1651723180674.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651723180674.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651723180674.png)

The **Result** page opens with a list of reports with the material details. Each report shows material specifications such as system name, line name, heat numbers, spool number, components name, joint number, etc.

2\. In the **Remarks**box, type your remarks if any. See Fig given below step 5.

3\. In the **Result** box, tap and choose **Pending, Accepted, Rejected or Cancelled** from a drop-down list based on your inspection details.

4\. In the **Remarks**box, type your remarks if any.

5\. In the **Consumable** box, enter the weld consumable name.

6\. To add the welding details, tap [![image-1651723264996.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651723264996.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651723264996.png) (welding details add icon). A new window opens.

 [![image-1651723293451.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651723293451.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651723293451.png)

1. In the **Date**box, choose date.
2. In the **Name**box, tap and select your name from a drop-down list.
3. In the **Layers** box,tap and select layers from a drop-down list.
4. In the **Process** box, tap and select the weld process from a drop-down list.
5. Tap **Save**.

7\. If you want to delete any welder ID details from a list, tap [![image-1651723321620.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651723321620.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651723321620.png) (delete icon).

 [![image-1651723338619.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651723338619.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651723338619.png)

You will receive the following notification: “**Confirm delete?**”. If you want to delete tap **Yes**, otherwise tap **No.**

8. Tab **Save**.

**To add your signature**

Once you have saved your inspection results, the **Result** page automatically redirects you into the **Signature** page. Otherwise, tap

[![image-1651723390660.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651723390660.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651723390660.png) (**Signature** icon), See Fig 9.1.

To know how to add your signature, see the topic “[**<u>To add your signature</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/mir/#bkmrk-to-add-your-signatur)“.

# SPOOL RELEASE

### **9.0 SPOOL RELEASE**

The **SPOOL RELEASE** tab helps you to check and update the spools added in the web application, by adding your inspection details. This feature automatically updates and synchronizes your inspection details with the spool report that is uploaded in the web application.

 [![image-1651723477909.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651723477909.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651723477909.png)

 [![image-1651723797741.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651723797741.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651723797741.png) **Note**: when you click the **SPOOL RELEASE** tab in the dashboard, the **Spool Release page displays a list of reports corresponding to today and previous day. However, if you want to view the reports for other dates, you must navigate to the **TAKE OFFLINE DATA** option. (See " [**<u>TAKE OFFLINE DATA</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/take-offline-data/#bkmrk-3.0-take-offline-dat)" for more details.)

1\. Tap **SPOOL RELEASE**.See Fig 2.3. The **Spool Release** page opens with a list of reports for the selected date.

 [![image-1651723824074.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651723824074.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651723824074.png)

 **Figure 10.1 Spool Release page**

[![image-1651723843843.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651723843843.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651723843843.png)  **Tip**: 1. You can configure displaying of the number of reports per page by selecting **10**, **25**, **50** or **100**, accordingly.

 2. If you want to filter one report among the list of reports, you must enter the report number, inspection date or location details in the respective boxes given in the **Spool Release**page.

The **Spool Release** page contains multiple fields such as **Report Number, Inspection Date, Location, Result**, **Signature**, **Attach, Print, and Sync.** (See the topic “[<u>The </u>**<u>MIR</u>**<u> page contains the following fields</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/mir/#bkmrk-the-mir%C2%A0page-opens-w)“ for more details about each field in the **Spool Release** page.)

**To add your spool inspection result**

1\. Once you find out the report where you need to add your inspection details, tap [![image-1651723883100.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651723883100.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651723883100.png) (**Result** icon) to add your inspection results, See Fig 10.1.

 [![image-1651723903921.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651723903921.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651723903921.png)

The **Result** page opens with a list of reports with the material details. Each report shows material specifications such as spool number, line number, and drawing number.

2. In the **Remarks**box, type your remarks if any.
3. In the **Result**box, tap and choose **Pending, Accepted, Rejected or Cancelled** from a drop-down list based on your inspection details
4. In the **Remarks**box, type your remarks if any.
5. Tap **Save**.

 To add your signature**

Once you have saved your inspection results, the **Result** page automatically redirects you into the **Signature** page. Otherwise, tap

[![image-1651723930899.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651723930899.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651723930899.png) (**Signature** icon), See Fig 10.1.

To know how to add your signature, see the topic “[**<u>To add your signature</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/mir/#bkmrk-to-add-your-signatur)“.

# SHOW ALL PENDING REPORTS

### **10.0 SHOW ALL PENDING REPORTS**

The **SHOW ALL PENDING REPORTS** tab helps you to view all pending reports for the inspections those are not completed yet. By using this feature, you can check whether the QA, Sub contractor, Client, and Owner have submitted their inspection report.

 [![image-1651724009808.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651724009808.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651724009808.png)

This feature automatically updates the detail of all pending reports from the web application. You can view the pending reports in an offline mode also.

Do the following steps to view the pending reports,

1\. Tap **SHOW ALL PENDING REPORTS**. The **Pending Reports** page opens.

 [![image-1651724026386.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651724026386.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651724026386.png)

 **Figure 11.1 Pending Reports page**

 [![image-1651724275451.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651724275451.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651724275451.png) **Tip**: 1. You can configure displaying of the number of reports per page by selecting **10**, **25**, **50** or **100**, accordingly.

 2. If you want to filter one report among the list of reports, you must enter the report number or category details in the respective boxes given in the **Pending Reports**page.

The **Pending Reports** page contains the following fields:

- **Report Number** - shows the report number of the pending reports.
- **Category** - shows the category of the pending reports.
- **QA, Subcon, Client, and Owner**- each field appears with a check box to show whether the inspection has completed by the QA, Subcontractor, Client, and Owner, respectively.

 [![image-1651724304523.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651724304523.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651724304523.png) **Note**: If the check box of any field is enabled with the tick mark, it means that the respective person has completed the inspection.

- **Not required** - appears with a check box that helps you to decide about further inspection process. You can enable the check box if you have decided that no need of any further inspection process to be done by the QA, Subcontractor, Client or Owner. 
    2. Tap the **Category** box, and select the category from a drop-down list.

The **Pending Reports** page shows a list of pending reports corresponding to the selected category. You can check the status of the report.

3. If want to end up the inspection process, enable the check box in the **Not required**
4. Tap **Save**.

# HYDRO PRESSURE

### **11.0 HYDRO PRESSURE**

The **HYDRO PRESSURE** tab helps you to update the status and result of the RFI hydro pressure request raised in the web application. You can add your hydro pressure inspection details by using this feature. This feature automatically updates and synchronizes your inspection details with the hydro pressure report of the request, which is uploaded in the web application.

 [![image-1651724450996.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651724450996.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651724450996.png)

 [![image-1651724458844.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651724458844.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651724458844.png) **Note**: when you click the **HYDRO PRESSURE** tab in the dashboard, the **Hydro Pressure page displays a list of reports corresponding to today and previous day. However, if you want to view the reports for other dates, you must navigate to the **TAKE OFFLINE DATA** option. (See " [**<u>TAKE OFFLINE DATA</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/take-offline-data/#bkmrk-3.0-take-offline-dat)" for more details.)

1\. Tap **HYDRO PRESSURE**. See Fig 2.3.

The **Hydro Pressure** page opens with a list of reports for the selected date.

 [![image-1651724487700.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651724487700.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651724487700.png)

 **Figure 12.1 Hydro Pressure page**

 [![image-1651724515251.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651724515251.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651724515251.png) **Tip**: 1. You can configure displaying of the number of reports per page by selecting **10**, **25**, **50** or **100**, accordingly.

 2. If you want to filter one report among the list of reports, you must enter the report number, inspection date or location details in the respective boxes given in the **Hydro Pressure**page.

The **Hydro** **Pressure** page contains multiple fields such as **Report Number, Inspection Date, Location, Result**, **Signature**, **Attach, Print, and Sync.** (See the topic “[<u>The </u>**<u>MIR</u>**<u> page contains the following fields</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/mir/#bkmrk-the-mir%C2%A0page-opens-w)“ for more details about each field in the **Hydro Pressure** page.)

**To add your hydro pressure inspection result**

1\. Once you find out the report where you need to add your inspection details, tap [![image-1651724573485.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651724573485.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651724573485.png) (**Result** icon) to add your inspection results, See Fig 12.1.

 [![image-1651724589723.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651724589723.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651724589723.png)

The **Result** page opens with a list of reports with the material details. Each report shows material specifications such as spool number, line number, drawing number, size, test pressure and medium, and pressure gauge number.

2\. In the **Remarks**box, type your remarks if any.

3\. In the **Result**box, tap and choose **Pending, Accepted, Rejected or Cancelled** from a drop-down list based on your inspection details.

4\. In the **Remarks**box, type your remarks if any.

5\. Tap **Save**.

**To add your signature**

Once you have saved your inspection results, the **Result** page automatically redirects you into the **Signature** page. Otherwise, tap

[![image-1651724629250.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651724629250.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651724629250.png) (**Signature** icon), See Fig 10.1.

To know how to add your signature, see the topic “[**<u>To add your signature</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/mir/#bkmrk-to-add-your-signatur)“.

# NDT REPORTS

### **12.0 NDT REPORTS**

The **NDT REPORTS** tab allows you to check and update the NDT request raised in the web application, by adding and updating your inspection details. This feature automatically updates and synchronizes your inspection details with the NDT report that is uploaded in the web application.

 [![image-1651724728567.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651724728567.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651724728567.png)

There are four main types of NDT Reports: **RT**, **UT**, **DPT**, and **MPT**.

 [![image-1651724746255.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651724746255.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651724746255.png) **Note**: when you click the **NDT REPORTS** tab in the dashboard, the **NDT Reports page displays a list of reports corresponding to today and previous day. However, if you want to view the reports for other dates, you must navigate to the **TAKE OFFLINE DATA** option. (See " [**<u>TAKE OFFLINE DATA</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/take-offline-data/#bkmrk-3.0-take-offline-dat)" for more details.)

1\. Tap **NDT REPORTS**.See Fig 2.3.

The **NDT Reports** page opens with a list of reports for the corresponding types such as **RT**, **UT**, **DPT**, and **MPT**. You must select the respective type to view the relevant reports.

 [![image-1651724769042.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651724769042.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651724769042.png)

 **Figure 13.1 NDT Reports page**

[![image-1651724786754.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651724786754.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651724786754.png)  **Tip**: I. You can configure displaying of the number of reports per page by selecting **10**, **25**, **50** or **100**, accordingly.

1. If you want to filter one report among the list of reports, you must enter the report number, NDT request number or inspection date details in the respective boxes given in the **NDT Reports**page.

The **NDT Reports** page contains multiple fields such as **Report Number, NDT Request number, Inspection Date, Result**, **Signature**, **Attach, and Sync.** (See the topic “[<u>The </u>**<u>MIR</u>**<u> page contains the following fields</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/mir/#bkmrk-the-mir%C2%A0page-opens-w)“ for more details about each field in the **NDT Reports** page.)

 [![image-1651724796738.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651724796738.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651724796738.png) **Tip**: In the **NDT Reports** option, the **Print** field is not available.

**To add your inspection result for NDT RT report**

1. Tap **RT**.
2. Once you find out the NDT RT report where you need to add your inspection details, tap [![image-1651724814358.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651724814358.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651724814358.png)(**Result** icon) to add your inspection results, See Fig 13.1.

The **Result** page opens with a list of reports with the material details.

 [![image-1651724834755.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651724834755.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651724834755.png)

Each report shows material specifications such as drawing number, spool number, joint number, and joint length.

3\. In the **Remarks**box, type your remarks if any.

4\. If you want to add the new NDT RT report, tap [![image-1651724869487.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651724869487.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651724869487.png) (Add icon). A new window opens.

 [![image-1651724886359.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651724886359.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651724886359.png)

- In the **Marker** box, enter the marker number.
- In the **Result**box, tap and choose **NA, Accepted, Rejected or Reshoot** from a drop-down list based on your inspection details.
- In the **Remarks**box, type your remarks if any.
- Tap **Save**.

5\. If you want to edit the existing NDT RT report, tap [![image-1651725036927.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651725036927.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651725036927.png) (Edit icon). A new window opens.

 [![image-1651725070898.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651725070898.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651725070898.png)

- In the **Marker** box, check and edit the marker number if you want.
- In the **Result**box, tap and choose **NA, Accepted, Rejected or Reshoot** from a drop-down list based on your inspection details.
- In the **Remarks**box, type your remarks if any.
- Tap **Save**.

6\. If you want to delete any existing NDT RT report from a list, tap [![image-1651726402402.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651726402402.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651726402402.png) [ ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651724984761.png)(Delete icon).

 [![image-1651726418901.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651726418901.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651726418901.png)

You will receive the following notification: “**Confirm delete?**”. If you want to delete tab **Yes**, otherwise tab **No.**

7. Tap **Save**.

**To add your signature for NDT RT Report**

Once you have saved your inspection results, the **Result** page automatically redirects you into the **Signature** page. Otherwise, tap

[![image-1651726431481.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651726431481.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651726431481.png) (**Signature** icon), See Fig 10.1.

To know how to add your signature, see the topic “[**<u>To add your signature</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/mir/#bkmrk-to-add-your-signatur)“.

**To add your inspection result for NDT UT, DPT, and MPT reports**

 [![image-1651726442060.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651726442060.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651726442060.png)**Note**: Follow the same procedure to add result for the NDT UT, DPT or MPT reports.

1. Tap **UT**,**DPT** or **MPT,** See Fig 13.1.
2. Once you find out the NDT UT, DPT or MPT report, where you need to add your inspection details, tap [![image-1651726455537.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651726455537.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651726455537.png) (**Result** icon) to add your inspection results, See Fig 13.1.

The **Result** page opens with a list of reports with the material details.

 [![image-1651726478774.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651726478774.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651726478774.png)

Each report shows material specifications such as drawing number, spool number, joint number, and joint length.

3. In the **Remarks**box, type your remarks if any.
4. In the **Result**box, tab and choose **Accepted, Rejected or Cancelled** from a drop-down list based on your inspection details.
5. In the **Remarks**box, type your remarks if any.
6. Tap **Save**.

**To add your signature for NDT UT, DPT, and MPT reports**

Once you have saved your inspection results, the **Result** page automatically redirects you into the **Signature** page. Otherwise, tap

[![image-1651726493947.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651726493947.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651726493947.png) (**Signature** icon), See Fig 10.1.

To know how to add your signature, see the topic “[**<u>To add your signature</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/mir/#bkmrk-to-add-your-signatur)“.

# Mobile App - Structural



# User Management

### **1.1 Downloading *cuteQM* app**

To use the ***cuteQM*** app you must first download it from the **Play Store**.

1. Open the **Play Store** and search for “***cuteQM***”.
2. Download and install the ***cuteQM***app on your mobile phone.
3. After installation, open the ***cuteQM***

You are ready to go!

### **1.2 Log in** 

After installation, when you open the ***cuteQM*** app you may be asked to Login.

 [![image-1651646657223.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651646657223.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651646657223.png) [![image-1651646857889.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651646857889.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651646857889.png) [![image-1651646786283.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651646786283.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651646786283.png)

Follow the steps to successfully log into your account.

1. Before enter your user id and password, tap (Settings icon) and enter the app URL that is provided by your administrator.
2. Tap **Save**.
3. Enter your user id and password in the allocated fields.
4. Tap **Log in** to complete the process.

The home screen of the ***cuteQM*** app is appeared.

### **1.3 Home screen of *cuteQM* app**

 [![image-1651646943393.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651646943393.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651646943393.png)[![image-1651646990146.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651646990146.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651646990146.png)

  **Figure 1.3 Home screen of cuteQM app**

[![image-1651647208872.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651647208872.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651647208872.png) - [![image-1651647235358.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651647235358.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651647235358.png) (show/hide icon) helps to show/hide the user id information that is displayed in the left pane of the home screen. if you touch this icon the information appears on, if you touch this icon again the information goes off.

[![image-1651647291202.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651647291202.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651647291202.png) - provided with a down arrow. If you click the down arrow, a list opens with three options such as **Clear Storage**, **Sync Data**, and **Log out**.

- **Clear Storage** - clears all data in this app. Tap the **Clear Storage**option to delete all the data.
- **Sync Data**- synchronizes your inspection results with the respective reports in the web application. If your inspection results are not automatically synchronized with the web application, tap the **Sync Data** option for manual synchronization.
- **Log out** - See "<span style="color: #1f1de0;"><span style="color: #236fa1;">**[<span style="text-decoration: underline;">Log </span><span style="text-decoration: underline;">out</span>](#bkmrk-1.4-log-out%C2%A0)**</span>"</span> section for details about log out of the app.

[![image-1651647412329.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651647412329.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651647412329.png) **Project** – helps to select the project. To select the project,

1. Tap the **Project** box, and select the project such as vessel or repair vessel, from a drop-down list.

[![image-1651647440021.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651647440021.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651647440021.png) **Module** – helps to select the module. To select the module,

2. Select **Structural** under the **Module**
3. Tap **GO**.

A dashboard of the app is appeared.

You can navigate through the app using the dashboard. The dashboard shows different tabs according to the type of project and module that you have selected.

1\. If you have selected the vessel project in the **Project** box, the dashboard shows the following tabs, (See the topic, “**<span style="color: #1f1de0;">[<u><span style="color: #236fa1;">VESSEL PROJECT</span></u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/vessel-project/#bkmrk-page-title)</span>**” for more details about the vessel project.)

 [![image-1651647510823.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651647510823.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651647510823.png)[![image-1651647536682.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651647536682.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651647536682.png)

 **Figure 2.3 Dashboard for vessel project in cuteQM app**

2\. If you have selected the repair vessel project in the **Project** box, the dashboard shows the following tabs, (See the topic, “**<span style="color: #1f1de0;"><span style="color: #236fa1;">[<u>REPAIR VESSEL PROJECT</u>](http://wiki.cuteinfocomm.com/link/48#bkmrk-page-title)</span>”</span>** for more details about the repair vessel project.)

 [![image-1651647797931.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651647797931.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651647797931.png)[![image-1651647819758.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651647819758.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651647819758.png)

 **Figure 2.4 Dashboard for repair vessel project in cuteQM app**

[![image-1651647895961.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651647895961.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651647895961.png)Note: The dashboard does not display **MILL CERTIFICATES** and **TEST EQUIPMENT** tabs unless your administrator adds your role in the **cuteQM\_Certificate Access** option in the web application.

### **1.4 Log out** 

Log out of your user's account from this **Log out** option. This command ends your current session of the app work.

1. Tap the Log out option for logging out of the app. This will lead you back to the Log in Screen. See Fig 2.2.

# VESSEL PROJECT

### **2.0 Vessel Project**

The dashboard of the vessel project contains various tabs See Fig 2.3. The following sections explain you about the functionalities of each tab associated with the vessel project,

### **2.1 SET DEFAULT PROJECT**

The **SET DEFAULT PROJECT** tab helps you to select or change the project and module.

[ ![image-1651649043463.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651649043463.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651649043463.png)

To switchover between the vessel and repair vessel projects and modules,

[![image-1651649063618.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651649063618.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651649063618.png)**Note**: If you are signing in to the app after the first-time login process, the app automatically redirects you into the dashboard page.

1\. Tap **SET DEFAULT PROJECT**. See Fig 2.3. The **SET DEFAULT PROJECT** page opens.

[ ![image-1651649129195.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651649129195.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651649129195.png)

2\. Tap the **Project** box, and select the vessel type project from a drop-down list.

3\. Select the module you want, under the **Module**

4\. Tap **GO**.

### **2.2 TAKE OFFLINE DATA**

The **TAKE OFFLINE DATA** tab helps you viewing the reports for the specific inspection dates you want.

 [![image-1651649245262.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651649245262.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651649245262.png)

When you select the respective dashboard tab you can view a list of reports corresponding to today and previous day. However, if you want to view the reports other than today and previous day, you must navigate to the **TAKE OFFLINE DATA** tab.

Do the following steps to view the reports using the **TAKE OFFLINE DATA** tab,

1\. Tap **TAKE OFFLINE DATA.** See Fig 2.3.

A new window opens for selecting category and date you want.

 [![image-1651649313301.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651649313301.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651649313301.png)

2\. In the **Category** box, tap and select the option you want to view the reports from a drop-down list.

3\. In the **Date** box, choose the period of inspection by selecting respective dates.

 [![image-1651649382189.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651649382189.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651649382189.png)**Tip**: If you want to choose the period of inspection for more than one day, you must select from and to dates, accordingly.

4\. Tap **Submit**.

A new page opens for the selected option in the **Category** box.

### **2.3 MILL CERTIFICATES** 

The **MILL CERTIFICATES** tab allows you to view the material certificates added in the web application. This feature works only in online mode.

[ ![image-1651649487315.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651649487315.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651649487315.png)

To view the material certificates,

1\. Tap **MILL CERTIFICATES**. See Fig 2.3.

The **Mill Certificates** page opens.

 [![image-1651649526819.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651649526819.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651649526819.png)[![image-1651649552706.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651649552706.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651649552706.png)

2\. Tap the **Component** box and select the component name from a drop-down list.

[![image-1651649587639.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651649587639.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651649587639.png) **Note**: If you want to view the certificate for a specific component, enter the size, thickness, material name, class, heat number, rating, do number, expiry date or remarks of the component in the respective boxes.

3\. Tap **Get Certificates**. A list of material certificates for the selected component is appeared.

[![image-1651649622437.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651649622437.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651649622437.png) **Tip**: If you want to view any attachment added with the material certificate, tap (Attach icon).

 [![image-1651649678098.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651649678098.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651649678098.png)

 [![image-1651649731121.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651649731121.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651649731121.png) **Note**: If the number of certificates exceeds 500, you will receive the following notification: “**The result records are more than 500, so system can’t load, pls add another filter and search**”.

### **2.4 TEST EQUIPMENT**

The **TEST EQUIPMENT** tab helps you to get the details of the testing equipment that are added in the web application. This feature works only in online mode.

 [![image-1651650750037.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651650750037.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651650750037.png)

To get the test equipment details,

1\. Tap **TEST EQUIPMENT**. See Fig 2.3.

 The **Testing Equipment** page opens.

 [![image-1651650770835.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651650770835.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651650770835.png)

2\. Enter the component name in the **Component**

 [![image-1651650852566.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651650852566.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651650852566.png) **Note**: If you want to get details for the specific test equipment, enter the description, test date, expiry date, or remarks of the equipment in the respective boxes.

3\. Tap **Get Test Equipment**. A list of test equipment reports for the selected component is appeared.

 [![image-1651650903793.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651650903793.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651650903793.png) **Tip**: If you want to view an attachment added with the test equipment, tap (Attach icon).

 [![image-1651650931130.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651650931130.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651650931130.png)

 [![image-1651650961628.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651650961628.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651650961628.png) **Note**: If the number of test equipment reports exceeds 500, you will receive the following notification: “**The result records are more than 500, so system can’t load, pls add another filter and search**”.

### **2.5 MIR** 

The **MIR** tab helps you to check and update a material verification report for the MIR requests, which are uploaded in the web application, by adding your inspection details. This MIR feature automatically updates and synchronizes your inspection details with the material verification report in the web application.

 [![image-1651651008404.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651651008404.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651651008404.png)

 [![image-1651651018446.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651651018446.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651651018446.png) **Note**: When you click the **MIR** tab in the dashboard, the **MIR** page displays a list of reports corresponding to today and previous day. However, if you want to view the reports for other dates, you must navigate to the **TAKE OFFLINE DATA** option. (See "<span style="color: #1f1de0;">[ <span style="color: #236fa1;">**<u>TAKE OFFLINE DATA</u>**</span>](http://wiki.cuteinfocomm.com/link/47#bkmrk-2.2-take-offline-dat)</span><span style="color: #236fa1;"> </span>" for more details).

1\. Tap **MIR**. See Fig 2.5.

The **MIR** page opens with a list of reports for the selected date.

 [![image-1651651061543.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651651061543.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651651061543.png)

 **Figure 2.5 MIR page**

 [![image-1651651105774.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651651105774.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651651105774.png) **Tip**: I. You can configure displaying of the number of reports per page by selecting **10**, **25**, **50** or **100**, accordingly.

1\. If you want to filter one report among the list of reports, you must enter the report number, inspection date or location details in the respective boxes given in the **MIR** page.

The **MIR** page contains the following fields:

- **Report Number**– shows the request’s report number.
- **Inspection Date**– shows the date of inspection.
- **Location**– shows the location where the inspection to be performed.
- **Result**– you can add your inspection results.
- **Signature**– you can add your signature after completing the inspection.
- **Attach –** you can view any supporting document that is attached in the web application by tapping (**Attach** icon).

 [![image-1651651131600.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651651131600.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651651131600.png) **Tip**: You can filter the supporting document by using the **File Name** and **File Size in KB** options provided in the **Attach** page. See Fig given below.

 [![image-1651651155852.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651651155852.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651651155852.png)

- **Print**– you can download a copy of the report by tapping (**Print** icon).

 **[![image-1651651131600.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651651131600.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651651131600.png) Tip**: After adding your inspection details and signature into the MIR report, you can download a latest copy of the report by using the **Print** option to check whether your inspection details and signature are successfully updated with the report.

- **Sync –** notifies whether your inspection details are automatically synchronized with the web application or not. This **Sync** section initially shows the Sync icon like . Once you add your inspection details the Sync icon appears in . After synchronization of your inspection details, the **Sync** section changes the Sync icon into .

 **[![image-1651651131600.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651651131600.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651651131600.png) Tip**: If your inspection details are not automatically synchronized, navigate to the manual synchronization option. (See <span style="color: #1f1de0;">“</span><span style="color: #236fa1;">[**<u>Sync Data</u>**](http://wiki.cuteinfocomm.com/link/46#bkmrk-clear-storage---clea)</span> “for more details.)

**To add your MIR inspection result**

1. Once you find out the report where you need to add your inspection details, tap (**Result** icon) to add your inspection results, See Fig 3.1.

 [![image-1651651256759.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651651256759.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651651256759.png)

The **Result** page opens with a list of reports including the material details. Each report shows material specifications such as description, specification, size, and type.

2\. In the **Remarks**box, type your remarks if any.

3\. In **Cert** column, tap (Edit icon) for the report you want to add your result.

A new page for the selected report opens.

 [![image-1651651300612.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651651300612.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651651300612.png)

4\. Check and re-enter **Quantity** of the materials if you want.

5\. In **Heat No** box, enter the heat number.

6\. Check the certificate number in the **Cert

7\. In **Dimen**, **Visual**, and **Mill Test** options, choose **Accepted** or **Rejected** based on your inspection details.

8\. In **Plate No** box, enter the plate number.

9\. In **Unique No** box, enter the unique number.

10\. In the **Remarks** box, type your remarks if any.

11\. Tap **Save**.

**To add your signature**

Once you have saved your inspection results, you must add your signature in the **Signature** field.

 [![image-1651651369912.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651651369912.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651651369912.png) **Note**: Make sure that you can add your signature if your role has assigned as QA, Subcontractor, Client or Owner, by the administrator.

1. Tap [![image-1651651776716.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651651776716.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651651776716.png) (**Signature** icon), See Fig 3.1. The signature page opens.

 [![image-1651651377808.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651651377808.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651651377808.png) **Note**: If you are a login user, you can directly do sign for the respective role in the signature box, otherwise you must login with your user id and password before signing.

 [![image-1651651715097.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651651715097.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651651715097.png)

2\. Tap [![image-1651651732552.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651651732552.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651651732552.png) (**Sign** icon) provided in the right-side pane for the corresponding **Type** based on your role.

A new signature box opens.

 [![image-1651651878554.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651651878554.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651651878554.png)

3\. In the **Name** box, enter your name.

[![image-1651651903107.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651651903107.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651651903107.png)Note: If your role has assigned as QA, your name will be automatically displayed in the **Name** box. Other than QA, you must add your name before signing.

4\. In the **Signature** box, write your signature, and tap **Save**.

### **2.6 MATERIAL SUBSTITUTION** 

The **MATERIAL SUBSTITUTION** tab helps you to check and update the material substitution request, which is uploaded in the web application, by adding your inspection details. This material substitution feature automatically updates and synchronizes your inspection details with the material substitution report in the web application.

 [![image-1651651940364.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651651940364.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651651940364.png)

 [![image-1651651958880.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651651958880.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651651958880.png) **Note**: When you click the **MATERIAL SUBSTITUTION** tab in the dashboard, the **RFI Material Substitution page displays a list of reports corresponding to today and previous day. However, if you want to view the reports for other dates, you must navigate to the **TAKE OFFLINE DATA** option. (See " <span style="color: #236fa1;">[**<u>TAKE OFFLINE DATA</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-2.2-take-offline-dat)</span> " for more details).

1\. Tap **MATERIAL SUBSTITUTION**. See Fig 2.6.

The **RFI Material Substitution** page opens with a list of reports for the selected date.

 [![image-1651651992910.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651651992910.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651651992910.png)

 **Figure 2.6 RFI Material Substitution page**

 [![image-1651652011212.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651652011212.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651652011212.png) **Tip**: 1. You can configure displaying of the number of reports per page by selecting **10**, **25**, **50** or **100**, accordingly.

 2. If you want to filter one report among the list of reports, you must enter the report number, inspection date, location or status details in the respective boxes given in the **RFI Material Substitution** page.

The **RFI Material Substitution** page contains multiple fields such as **Report Number, Inspection Date, Location, Status, Result**, **Signature**, **Attach, Print, and Sync.**

- **Status –** shows the status of comment added in the **Result**

 **None**- notifies that there are no comments in the **Result** page.

 **Open**- notifies that there is a comment added in the **Open comment** box.

 **Close** - notifies that there is a comment added in the **Close comment** box.

(See the topic “<span style="color: #236fa1;">[<u>The </u>**<u>MIR</u>**<u> page contains the following fields</u>](http://wiki.cuteinfocomm.com/link/47#bkmrk-the-mir%C2%A0page-opens-w)</span>“ for more details about other fields in the **RFI Material Substitution** page.)

**To add your RFI material substitution result**

1. Once you find out the report where you need to add your inspection details, tap [![image-1651652134211.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651652134211.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651652134211.png) (**Result** icon) to add your inspection results, See Fig 3.2.
    
    [![image-1651652236386.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651652236386.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651652236386.png)

The **Result** page opens with a list of reports including the material details. Each report shows material specifications such as DWG. Ref detail, material name, original size, original grade, and quantity.

2. In the **Remarks** box, type your remarks if any. See Fig 3.
3. If you do not want to give any comments, enable **None**.
4. If you want to give an open comment, enable the **Open** option and enter your comment in the **Open Comment**
5. If you want to give a close comment, enable the **Close** option and enter your comment in the **Close Comment**
6. Tap **Save**.

**To add your signature**

Once you have saved your inspection results, the **Result** page automatically redirects you into the **Signature** page. Otherwise, tap

[![image-1651652268632.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651652268632.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651652268632.png) (**Signature** icon), See Fig 3.2.

To know how to add your signature, see the topic “<span style="color: #236fa1;">[**<u>To add your signature</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-to-add-your-signatur)</span>“**.**

### **2.7 RFI FITUP INSPECTION** 

The **RFI FITUP INSPECTION** tab helps you to check and approve the RFI fitup request raised in the web application, by adding and updating your inspection details. This RFI fitup inspection feature automatically updates and synchronizes your inspection details with the RFI Fitup report that is uploaded in the web application.

 [![image-1651652305170.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651652305170.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651652305170.png)

[![image-1651652318998.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651652318998.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651652318998.png) **Note**: When you click the **RFI FITUP INSPECTION** tab in the dashboard, the **RFI Fitup Request page displays a list of reports corresponding to today and previous day. However, if you want to view the reports for other dates, you must navigate to the **TAKE OFFLINE DATA** option. (See " <span style="color: #236fa1;">[**<u>TAKE OFFLINE DATA</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-2.2-take-offline-dat)</span>" for more details.)

1\. Tap **RFI FITUP INSPECTION**.See Fig 2.7.

The **RFI Fitup Request** page opens with a list of reports for the selected date.

 [![image-1651652344158.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651652344158.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651652344158.png)

 **Figure 2.7 RFI Fitup Request page**

 [![image-1651652367454.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651652367454.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651652367454.png) **Tip**: 1. You can configure displaying of the number of reports per page by selecting **10**, **25**, **50** or **100**, accordingly.

 2. If you want to filter one report among the list of reports, you must enter the report number, inspection date, location or status details in the respective boxes given in the **RFI Fitup Request** page.

The **RFI Fitup Request** page contains multiple fields such as **Report Number, Inspection Date, Location, Status, Result**, **Signature**, **Attach, Print, and Sync.**

- **Status –** shows the status of comment added in the **Result**

 **None**- notifies that there are no comments in the **Result** page.

 **Open**- notifies that there is a comment added in the **Open comment** box.

 **Close** - notifies that there is a comment added in the **Close comment** box.

(See the topic “<span style="color: #236fa1;">[<u>The </u>**<u>MIR</u>**<u> page contains the following fields</u>](http://wiki.cuteinfocomm.com/link/47#bkmrk-the-mir%C2%A0page-opens-w)</span>“ for more details about other fields in the **RFI Fitup Request** page.)

**To add your RFI fitup inspection result

1. Once you find out the report where you need to add your inspection details, tap [![image-1651652503455.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651652503455.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651652503455.png) (**Result** icon) to add your inspection results, See Fig 3.3.
    
    [![image-1651652534005.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651652534005.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651652534005.png)

The **Result** page opens with a list of reports including the material specifications such as system and sub system numbers, drawing number, joint number, piece mark number, size, and width details, WPS, and plate number.

2. In the **Remarks** box, type your remarks if any. See Fig 3.
3. If you do not want to give any comments, enable **None**.
4. If you want to give an open comment, enable the **Open** option and enter your comment in the **Open Comment**
5. If you want to give a close comment, enable the **Close** option and enter your comment in the **Close Comment**
6. In the **Heat No** box, check and edit the heat number.
7. In the **Result** box, tap and choose **Accepted, Rejected or Cancelled** from a drop-down list based on your inspection details.
8. In the **Remarks** box, type your remarks if any.
9. Tap **Save**.

**To add your signature**

Once you have saved your inspection results, the **Result** page automatically redirects you into the **Signature** page. Otherwise, tap

[![image-1651652651846.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651652651846.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651652651846.png) (**Signature** icon), See Fig 3.3.

To know how to add your signature, see the topic “<span style="color: #236fa1;">[**<u>To add your signature</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-to-add-your-signatur)</span>“**. <a name="_Toc24466463"></a>**

### **2.8 RFI WELD INSPECTION**

The **RFI WELD INSPECTION** tab allows you to check and approve the RFI weld visual request raised in the web application, by adding and updating your inspection details. This RFI Weld Inspection feature automatically updates and synchronizes your inspection details with the RFI Weld report that is uploaded in the web application.

 [![image-1651652682805.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651652682805.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651652682805.png)

[![image-1651652692947.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651652692947.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651652692947.png) **Note**: When you click the **RFI WELD INSPECTION** tab in the dashboard, the **RFI Weld Inspection page displays a list of reports corresponding to today and previous day. However, if you want to view the reports for other dates, you must navigate to the **TAKE OFFLINE DATA** option. (See "<span style="color: #1f1de0;">[ <span style="color: #236fa1;">**<u>TAKE OFFLINE DATA</u>**</span>](http://wiki.cuteinfocomm.com/link/47#bkmrk-2.2-take-offline-dat)</span>" for more details.)

1\. Tap **RFI WELD INSPECTION**. See Fig 2.3.

The **RFI Weld Inspection** page opens with a list of reports for the selected date.

 [![image-1651652726784.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651652726784.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651652726784.png)

 **Figure 3.4 RFI Weld Inspection page**

 [![image-1651652753313.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651652753313.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651652753313.png) **Tip**: I. You can configure displaying of the number of reports per page by selecting **10**, **25**, **50** or **100**, accordingly.

1\. If you want to filter one report among the list of reports, you must enter the report number, inspection date or location details in the respective boxes given in the **RFI Weld Inspection** page.

The **RFI Weld Inspection** page contains multiple fields such as **Report Number, Inspection Date, Location, Result**, **Signature**, **Attach, Print, and Sync.** (See the topic “<span style="color: #236fa1;">[<u>The </u>**<u>MIR</u>**<u> page contains the following fields</u>](http://wiki.cuteinfocomm.com/link/47#bkmrk-the-mir%C2%A0page-opens-w)</span>“ for more details about each field in the **RFI Weld Inspection** page.)

**To add your RFI weld inspection result**

1\. Once you find out the report where you need to add your inspection details, tap

[![image-1651652851350.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651652851350.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651652851350.png) (**Result** icon) to add your inspection results, See Fig 3.4.

 [![image-1651652873609.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651652873609.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651652873609.png)

The **Result** page opens with a list of reports including the material details. Each report shows material specifications such as system and sub system names, drawing number, joint number, and WPS.

2\. In the **Remarks** box, type your remarks if any.

3\. If you do not want to give any comments, enable **None**.

4\. If you want to give an open comment, enable the **Open** option and enter your comment in the **Open Comment**

5\. If you want to give a close comment, enable the **Close** option and enter your comment in the **Close Comment**

6\. In the **Result** box, tap and choose **Pending, Accepted, Rejected or Cancelled** from a drop-down list based on your inspection details.

7\. In the **Remarks** box, type your remarks if any.

8\. To add the welding details, tap [![image-1651652995265.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651652995265.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651652995265.png) (welding details add icon). A new window opens.

 [![image-1651653017902.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651653017902.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651653017902.png)

- In the **Date** box, choose date.
- In the **Name** box, tap and select your name from a drop-down list.
- In the **Layers** box,tap and select layers from a drop-down list.
- In the **Process** box, tap and select the weld process from a drop-down list.
- In the **Position** box, tap and select the weld position from a drop-down list.
- Tap **Save**.

9\. If you want to delete any welder ID details from a list, tap [![image-1651653094014.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651653094014.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651653094014.png)(delete icon).

 [![image-1651653119519.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651653119519.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651653119519.png)

You will receive the following notification: “**Confirm delete?**”. If you want to delete tap **Yes**, otherwise tap **No.**

10\. Tab **Save**.

**To add your signature**

Once you have saved your inspection results, the **Result** page automatically redirects you into the **Signature** page. Otherwise, tap

[![image-1651653149997.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651653149997.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651653149997.png) (**Signature** icon), See Fig 3.4.

To know how to add your signature, see the topic “<span style="color: #236fa1;">[**<u>To add your signature</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-to-add-your-signatur)</span>“.

### **2.9 RFI HYDRO PRESSURE** 

The **RFI HYDRO PRESSURE** tab helps you to check and update the RFI hydro pressure request, which is uploaded in the web application, by adding your inspection details. This RFI hydro pressure feature automatically updates and synchronizes your inspection details with the material substitution report in the web application.

 [![image-1651653181458.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651653181458.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651653181458.png)

[![image-1651653192424.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651653192424.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651653192424.png) **Note**: When you click the **RFI** **HYDRO PRESSURE** tab in the dashboard, the **RFI** **Hydro Pressure page displays a list of reports corresponding to today and previous day. However, if you want to view the reports for other dates, you must navigate to the **TAKE OFFLINE DATA** option. (See “ <span style="color: #236fa1;">[**<u>TAKE OFFLINE DATA</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-2.2-take-offline-dat)</span>” for more details.)

1\. Tap **RFIHYDRO PRESSURE**. See Fig 2.3.

The **RFI** **Hydro Pressure** page opens with a list of reports for the selected date.

 [![image-1651653235929.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651653235929.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651653235929.png)

 **Figure 3.5 RFI Hydro Pressure page**

 [![image-1651653256562.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651653256562.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651653256562.png) **Tip**: 1. You can configure displaying of the number of reports per page by selecting **10**, **25**, **50** or **100**, accordingly.

 2. If you want to filter one report among the list of reports, you must enter the report number, inspection date or status details in the respective boxes given in the **RFI Hydro Pressure** page.

The **RFI** **Hydro** **Pressure** page contains multiple fields such as **Report Number, Inspection Date, Status, Result**, **Signature**, **Attach, Print, and Sync.**

- **Status –** shows the status of comment added in the **Result**

 **None**- notifies that there are no comments in the **Result** page.

 **Open**- notifies that there is a comment added in the **Open comment** box.

 **Close** – notifies that there is a comment added in the **Close comment** box.

(See the topic “<span style="color: #236fa1;">[<u>The </u>**<u>MIR</u>**<u> page contains the following fields</u>](http://wiki.cuteinfocomm.com/link/47#bkmrk-the-mir%C2%A0page-opens-w)</span>“ for more details about other fields in the **RFI** **Hydro Pressure** page.)

**To add your RFI hydro pressure inspection result**

1. Once you find out the report where you need to add your inspection details, tap [![image-1651653512798.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651653512798.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651653512798.png) (**Result** icon) to add your inspection results, See Fig 3.5.
    
    [![image-1651653530001.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651653530001.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651653530001.png)

The **Result** page opens with a list of reports including the material details. Each report shows material specifications such as description certificate number and test type serial number.

2. In the **Remarks** box, type your remarks if any.
3. If you do not want to give any comments, enable **None**.
4. If you want to give an open comment, enable the **Open** option and enter your comment in the **Open Comment**
5. If you want to give a close comment, enable the **Close** option and enter your comment in the **Close Comment**
6. Tap **Save**.

**To add your signature**

Once you have saved your inspection results, the **Result** page automatically redirects you into the **Signature** page. Otherwise, tap

[![image-1651653559012.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651653559012.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651653559012.png) (**Signature** icon), See Fig 3.5.

To know how to add your signature, see the topic “<span style="color: #236fa1;">[**<u>To add your signature</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-to-add-your-signatur)</span>“.

### **2.10 RFI MECHANICAL COMPLETION**

The **RFI MECHANICAL COMPLETION** tab helps you to check and update the RFI mechanical completion request, which is uploaded in the web application, by adding your inspection details. This RFI mechanical completion feature automatically updates and synchronizes your inspection details with the material substitution report in the web application.

 [![image-1651653634017.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651653634017.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651653634017.png)

 [![image-1651653645429.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651653645429.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651653645429.png) **Note**: When you click the **RFI** **MECHANICAL COMPLETION** tab in the dashboard, the **RFI Mechanical Completion page displays a list of reports corresponding to today and previous day. However, if you want to view the reports for other dates, you must navigate to the **TAKE OFFLINE DATA** option. (See “ <span style="color: #236fa1;">[**<u>TAKE OFFLINE DATA</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-2.2-take-offline-dat)</span>” for more details.)

1\. Tap **RFIMECHANICAL COMPLETION**. See Fig 2.3.

The **RFI Mechanical Completion** page opens with a list of reports for the selected date.

 [![image-1651653682894.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651653682894.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651653682894.png)

 **Figure 2.10 RFI Mechanical Completion page**

 [![image-1651653703929.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651653703929.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651653703929.png) **Tip**: 1. You can configure displaying of the number of reports per page by selecting **10**, **25**, **50** or **100**, accordingly.

 2. If you want to filter one report among the list of reports, you must enter the report number, inspection date or status details in the respective boxes given in the **RFI Mechanical Completion** page.

The **RFI Mechanical Completion** page contains multiple fields such as **Report Number, Inspection Date, Status, Result**, **Signature**, **Attach, Print, and Sync.**

- **Status –** shows the status of comment added in the **Result**

 **None**- notifies that there are no comments in the **Result** page.

 **Open**- notifies that there is a comment added in the **Open comment** box.

 **Close** – notifies that there is a comment added in the **Close comment** box.

(See the topic “<span style="color: #1f1de0;">[<u>The </u>**<u>MIR</u>**<u> page contains the following fields</u>](http://wiki.cuteinfocomm.com/link/47#bkmrk-the-mir%C2%A0page-opens-w)</span>“ for more details about other fields in the **RFI Mechanical Completion page.)

**To add your RFI Mechanical Completion inspection result**

1. Once you find out the report where you need to add your inspection details, tap [![image-1651653805333.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651653805333.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651653805333.png) (**Result** icon) to add your inspection results, See Fig 3.6.
    
    [![image-1651653830938.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651653830938.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651653830938.png)

2. In the **Remarks** box, type your remarks if any.
3. If you do not want to give any comments, enable **None**.
4. If you want to give an open comment, enable the **Open** option and enter your comment in the **Open Comment**
5. If you want to give a close comment, enable the **Close** option and enter your comment in the **Close Comment**
6. Tap **Save**.

**To add your signature**

Once you have saved your inspection results, the **Result** page automatically redirects you into the **Signature** page. Otherwise, tap

[![image-1651653871757.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651653871757.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651653871757.png) (**Signature** icon), See Fig 3.6.

To know how to add your signature, see the topic “<span style="color: #236fa1;">[**<u>To add your signature</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-to-add-your-signatur)</span>“.

### **2.11 LOAD TEST** 

The **LOAD TEST** tab helps you to check and update the load test request, which is uploaded in the web application, by adding your inspection details. This load test feature automatically updates and synchronizes your inspection details with the load test report in the web application.

 [![image-1651654056753.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651654056753.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651654056753.png)

 [![image-1651654066114.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651654066114.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651654066114.png) **Note**: When you click the **LOAD TEST** tab in the dashboard, the **Load Test page displays a list of reports corresponding to today and previous day. However, if you want to view the reports for other dates, you must navigate to the **TAKE OFFLINE DATA** option. (See " <span style="color: #236fa1;">[**<u>TAKE OFFLINE DATA</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-2.2-take-offline-dat)</span>" for more details.)

2\. Tap **LOAD TEST**.See Fig 2.11.

The **Load Test** page opens with a list of reports for the selected date.

 [![image-1651654096637.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651654096637.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651654096637.png)

 Figure 2.11 Load Test page**

 [![image-1651654129821.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651654129821.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651654129821.png) **Tip**: 1. You can configure displaying of the number of reports per page by selecting **10**, **25**, **50** or **100**, accordingly.

 2. If you want to filter one report among the list of reports, you must enter the report number, inspection date, location or status details in the respective boxes given in the **Load Test** page.

The **Load Test** page contains multiple fields such as **Report Number, Inspection Date, Location, Status, Result**, **Signature**, **Attach, Print, and Sync.**

- **Status –** shows the status of comment added in the **Result**

 **None**- notifies that there are no comments in the **Result** page.

 **Open**- notifies that there is a comment added in the **Open comment** box.

 **Close** - notifies that there is a comment added in the **Close comment** box.

(See the topic “<span style="color: #1f1de0;"><span style="color: #236fa1;">[<u>The </u>**<u>MIR</u>**<u> page contains the following fields</u>](http://wiki.cuteinfocomm.com/link/47#bkmrk-the-mir%C2%A0page-opens-w)</span>“</span> for more details about other fields in the **Load Test** page.)

**To add your load test inspection result**

1. Once you find out the report where you need to add your inspection details, tap [![image-1651654183734.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651654183734.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651654183734.png) (**Result** icon) to add your inspection results, See Fig 3.7.
    
    [![image-1651654200914.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651654200914.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651654200914.png)

The **Result** page opens with a list of reports including the material details. Each report shows material specifications such as drawing number, sub-contractor name, location, longitudinal and elevation details, frame number, work scope, and test performed.

2. In the **Remarks** box, type your remarks if any.
3. If you do not want to give any comments, enable **None**.
4. If you want to give an open comment, enable the **Open** option and enter your comment in the **Open Comment**
5. If you want to give a close comment, enable the **Close** option and enter your comment in the **Close Comment**
6. Tap **Save**.

**To add your signature**

Once you have saved your inspection results, the **Result** page automatically redirects you into the **Signature** page. Otherwise, tap

[![image-1651654228757.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651654228757.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651654228757.png) (**Signature** icon), See Fig 3.7.

To know how to add your signature, see the topic “<span style="color: #236fa1;">[**<u>To add your signature</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-to-add-your-signatur)</span>“.

### **2.12 DIMENSION** 

The **DIMENSION** tab helps you to check and update the dimension request, which is uploaded in the web application, by adding your inspection details. This dimension feature automatically updates and synchronizes your inspection details with the load test report in the web application.

 [![image-1651654256349.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651654256349.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651654256349.png)

 [![image-1651654267642.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651654267642.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651654267642.png) **Note**: When you click the **DIMENSION** tab in the dashboard, the **Dimension page displays a list of reports corresponding to today and previous day. However, if you want to view the reports for other dates, you must navigate to the **TAKE OFFLINE DATA** option. (See " <span style="color: #236fa1;">[**<u>TAKE OFFLINE DATA</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-2.2-take-offline-dat)</span>" for more details.)

1\. Tap **DIMENSION**. See Fig 2.3. The **Dimension** page opens with a list of reports for the selected date.

 [![image-1651654294959.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651654294959.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651654294959.png)

 **Figure 3.8 Dimension page**

 [![image-1651654321561.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651654321561.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651654321561.png) **Tip**: 1. You can configure displaying of the number of reports per page by selecting **10**, **25**, **50** or **100**, accordingly.

 2. If you want to filter one report among the list of reports, you must enter the report number, inspection date, location or status details in the respective boxes given in the **Dimension** page.

The **Dimension** page contains multiple fields such as **Report Number, Inspection Date, Location, Status, Result**, **Signature**, **Attach, Print, and Sync.**

- **Status –** shows the status of comment added in the **Result**

 **None**- notifies that there are no comments in the **Result** page.

 **Open**- notifies that there is a comment added in the **Open comment** box.

 **Close** - notifies that there is a comment added in the **Close comment** box.

(See the topic “<span style="color: #236fa1;">[<u>The </u>**<u>MIR</u>**<u> page contains the following fields</u>](http://wiki.cuteinfocomm.com/link/47#bkmrk-the-mir%C2%A0page-opens-w)</span>“ for more details about other fields in the **Dimension** page.)

**To add your load test inspection result**

1. Once you find out the report where you need to add your inspection details, tap [![image-1651654398868.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651654398868.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651654398868.png) (**Result** icon) to add your inspection results, See Fig 3.8.

 [![image-1651654415049.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651654415049.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651654415049.png)

The **Result** page opens with a list of reports including the material details. Each report shows material specifications such as drawing number, sub-contractor name, location, longitudinal and elevation details, frame number, work scope, and test performed.

2. In the **Remarks** box, type your remarks if any.
3. If you do not want to give any comments, enable **None**.
4. If you want to give an open comment, enable the **Open** option and enter your comment in the **Open Comment**
5. If you want to give a close comment, enable the **Close** option and enter your comment in the **Close Comment**
6. Tap **Save**.

**To add your signature**

Once you have saved your inspection results, the **Result** page automatically redirects you into the **Signature** page. Otherwise, tap

[![image-1651654444425.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651654444425.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651654444425.png) (**Signature** icon), See Fig 3.8.

To know how to add your signature, see the topic “<span style="color: #236fa1;">[**<u>To add your signature</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-to-add-your-signatur)</span>“.


### **2.13 NDT REPORTS**

The **NDT REPORTS** tab allows you to check and update the NDT request raised in the web application, by adding and updating your inspection details. This feature automatically updates and synchronizes your inspection details with the NDT report that is uploaded in the web application.

 [![image-1651654480081.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651654480081.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651654480081.png)

There are four main types of NDT Reports: **RT**, **UT**, **PT**, and **MT**.

 [![image-1651654753974.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651654753974.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651654753974.png) **Note**: When you click the **NDT REPORTS** tab in the dashboard, the **NDT Reports page displays a list of reports corresponding to today and previous day. However, if you want to view the reports for other dates, you must navigate to the **TAKE OFFLINE DATA** option. (See " <span style="color: #236fa1;">[**<u>TAKE OFFLINE DATA</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-2.2-take-offline-dat)</span>" for more details.)

1\. Tap **NDT REPORTS**. See Fig 2.13.

The **NDT Reports** page opens with a list of reports for the corresponding types such as **RT**, **UT**, **PT**, and **MT**. You must select the respective type to view the relevant reports.

 [![image-1651654778966.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651654778966.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651654778966.png)

 **Figure 2.13 NDT Reports page**

 [![image-1651654800740.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651654800740.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651654800740.png) **Tip**: 1. You can configure displaying of the number of reports per page by selecting **10**, **25**, **50** or **100**, accordingly.

 2. If you want to filter one report among the list of reports, you must enter the report number, NDT request number or inspection date details in the respective boxes given in the **NDT Reports** page.

The **NDT Reports** page contains multiple fields such as **Report Number, NDT Request number, Inspection Date, Result**, **Signature**, **Attach, and Sync.** (See the topic “<span style="color: #236fa1;">[<u>The </u>**<u>MIR</u>**<u> page contains the following fields</u>](http://wiki.cuteinfocomm.com/link/47#bkmrk-the-mir%C2%A0page-opens-w)</span>“ for more details about each field in the **Hydro Pressure** page.)

 [![image-1651654841089.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651654841089.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651654841089.png) **Tip**: In the **NDT Reports** option, the **Print** field is not available.

 To add your inspection result for NDT RT report**

1. Tap **RT**.
2. Once you find out the NDT RT report where you need to add your inspection details, tap [![image-1651654861270.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651654861270.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651654861270.png) (**Result** icon) to add your inspection results, See Fig 3.9.

The **Result** page opens with a list of reports including the material details.

 [![image-1651654883214.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651654883214.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651654883214.png)

Each report shows material specifications such as drawing number, spool number, joint number, and joint length.

3\. In the **Remarks** box, type your remarks if any.

4\. If you want to add the new NDT RT report, tap [![image-1651654901608.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651654901608.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651654901608.png) (Add icon). A new window opens.

 [![image-1651655031758.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651655031758.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651655031758.png)

- In the **Marker** box, enter the marker number.
- In the **Result** box, tap and choose **NA, Accepted, Rejected or Reshoot** from a drop-down list based on your inspection details.
- In the **Remarks** box, type your remarks if any.
- Tap **Save**.

5\. If you want to edit the existing NDT RT report, tap [![image-1651655081477.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651655081477.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651655081477.png) (Edit icon). A new window opens.

 [![image-1651655141167.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651655141167.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651655141167.png)

- In the **Marker** box, check and edit the marker number if you want.
- In the **Result** box, tap and choose **NA, Accepted, Rejected or Reshoot** from a drop-down list based on your inspection details.
- In the **Remarks** box, type your remarks if any.
- Tap **Save**.

6\. If you want to delete any existing NDT RT report from a list, tap [![image-1651655383541.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651655383541.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651655383541.png) (Delete icon).

 [![image-1651655395151.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651655395151.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651655395151.png)

You will receive the following notification: “**Confirm delete?**”. If you want to delete tab **Yes**, otherwise tab **No.**

7. Tap **Save**.

**To add your signature for NDT RT Report**

Once you have saved your inspection results, the **Result** page automatically redirects you into the **Signature** page. Otherwise, tap

[![image-1651655419941.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651655419941.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651655419941.png) (**Signature** icon), See Fig 3.9.

To know how to add your signature, see the topic “<span style="color: #236fa1;">[**<u>To add your signature</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-to-add-your-signatur)</span>“.

**To add your inspection result for NDT UT, PT, and MT reports**

 [![image-1651655436146.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651655436146.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651655436146.png) **Note**: Follow the same procedure to add result for the NDT UT, PT or MT reports.

1. Tap **UT**,**PT** or **MT,** See Fig 3.9.
2. Once you find out the NDT UT, PT or MT report, where you need to add your inspection details, tap [![image-1651655456788.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651655456788.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651655456788.png) (**Result** icon) to add your inspection results, See Fig 3.9.

The **Result** page opens with a list of reports including the material details.

 [![image-1651655474609.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651655474609.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651655474609.png)

Each report shows material specifications such as drawing number, spool number, joint number, and joint length.

3. In the **Remarks** box, type your remarks if any.
4. In the **Result** box, tab and choose **Accepted, Rejected or Cancelled** from a drop-down list based on your inspection details.
5. In the **Remarks** box, type your remarks if any.
6. Tap **Save**.

**To add your signature for NDT UT, PT, and MT reports**

Once you have saved your inspection results, the **Result** page automatically redirects you into the **Signature** page. Otherwise, tap

[![image-1651655500507.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651655500507.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651655500507.png) (**Signature** icon), See Fig 3.9.

To know how to add your signature, see the topic “<span style="color: #236fa1;">[**<u>To add your signature</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-to-add-your-signatur)</span>“.

# REPAIR VESSEL PROJECT

### **3.0 REPAIR VESSEL PROJECT**

The dashboard of the repair vessel project contains various tabs See Fig 2.4. The following sections explain you about the functionalities of each tab associated with the vessel project,

[![image-1651656015404.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651656015404.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651656015404.png) Note: The following tabs in the dashboard of the repair vessel project have same functionalities of vessel project, so these tabs had already explained in the vessel project chapter. If you want to know more about each tab, click the respective tab.

1. <span style="color: #236fa1;">[**<u>SET DEFAULT PROJECT</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-2.1-set-default-proj)</span>
2. <span style="color: #236fa1;">[**<u>TAKE OFFLINE DATA</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-2.2-take-offline-dat)</span>
3. <span style="color: #236fa1;">[**<u>MILL CERTIFICATES</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-2.3-mill-certificate)</span>
4. <span style="color: #236fa1;">[**<u>TEST EQUIPMENT</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-2.4-test-equipment)</span>
5. <span style="color: #236fa1;">[**<u>MIR</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-2.5-mir%C2%A0)</span>
6. <span style="color: #236fa1;">[**<u>MATERIAL SUBSTITUTION</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-3.6-material-substit)</span>
7. <span style="color: #236fa1;">[**<u>LOAD TEST</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-3.11-load-test%C2%A0)</span>
8. <span style="color: #236fa1;">[**<u>DIMENSION</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-3.12-dimension%C2%A0)</span>
9. <span style="color: #236fa1;">[**<u>RFI HYDRO PRESSURE</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-3.9-rfi-hydro-pressu)</span>

### **3.1 RFI FITUP GENERIC**

The **RFI FITUP GENERIC** tab helps you to check and approve the RFI fitup generic request raised in the web application, by adding and updating your inspection details. This RFI Fitup Generic feature automatically updates and synchronizes your inspection details with the RFI fitup generic report that is uploaded in the web application.

 [![image-1651656066359.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651656066359.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651656066359.png)

 [![image-1651656076141.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651656076141.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651656076141.png) **Note**: When you click the **RFI FITUP GENERIC** tab in the dashboard, the **RFI Fitup Generic** page displays a list of reports corresponding to today and previous day. However, if you want to view the reports for other dates, you must navigate to the **TAKE OFFLINE DATA** option. (See " <span style="color: #236fa1;">[**<u>TAKE OFFLINE DATA</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-2.2-take-offline-dat)</span>" for more details.)

1\. Tap **RFI FITUP GENERIC**.See Fig 2.4.

The **RFI Fitup Generic** page opens with a list of reports for the selected date.

 [![image-1651656103362.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651656103362.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651656103362.png)

 **Figure 4.1 RFI Fitup Generic page**

[![image-1651656123965.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651656123965.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651656123965.png)  **Tip**: 1. You can configure displaying of the number of reports per page by selecting **10**, **25**, **50** or **100**, accordingly.

 2. If you want to filter one report among the list of reports, you must enter the report number, inspection date, location or status details in the respective boxes given in the **RFI Fitup Generic**page.

The **RFI Fitup Generic** page contains multiple fields such as **Report Number, Inspection Date, Location, Status, Result**, **Signature**, **Attach, Print, and Sync.**

- **Status –** shows the status of comment added in the **Result**

 **None**- notifies that there are no comments in the **Result** page.

 **Open**- notifies that there is a comment added in the **Open comment** box.

 **Close** - notifies that there is a comment added in the **Close comment** box.

(See the topic “<span style="color: #236fa1;">[<u>The </u>**<u>MIR</u>**<u> page contains the following fields</u>](http://wiki.cuteinfocomm.com/link/47#bkmrk-the-mir%C2%A0page-opens-w)</span>“ for more details about other fields in the **RFI Fitup Generic** page.)

[![image-1651656196850.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651656196850.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651656196850.png) **Note**: Each report has a corresponding check box, which is located on the left pane of the **RFI Fitup Generic** page. If you want to do sign together for more than one report, you must enable the respective check boxes.

1. You must enable the respective check box of the reports.

If you have enabled more than one check box, [![image-1651656221911.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651656221911.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651656221911.png) (**Signature** icon) will appear in the top of the page.

 [![image-1651656275559.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651656275559.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651656275559.png)

2\. Tap [![image-1651656288199.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651656288199.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651656288199.png) (**Signature** icon). The signature page opens.

3\. Tap your assigned role, enter your name, and do sign.

**To add your RFI fitup generic inspection result

1. Once you find out the report where you need to add your inspection details, tap [![image-1651656305716.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651656305716.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651656305716.png) (**Result** icon) to add your inspection results, See Fig 4.1.

 [![image-1651656334604.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651656334604.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651656334604.png)

The **Result** page opens with a list of reports including the material details. Each report shows material specifications such as drawing number, sub-contractor name, location, longitudinal and elevation details, and frame number.

2. In the **Remarks**box, type your remarks if any.
3. If you do not want to give any comments, enable **None**.
4. If you want to give an open comment, enable the **Open** option and enter your comment in the **Open Comment**
5. If you want to give a close comment, enable the **Close** option and enter your comment in the **Close Comment**
6. Tap **Save**.

**To add your signature**

Once you have saved your inspection results, the **Result** page automatically redirects you into the **Signature** page. Otherwise, tap

[![image-1651656353098.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651656353098.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651656353098.png) (**Signature** icon), See Fig 4.1.

To know how to add your signature, see the topic “<span style="color: #236fa1;">[**<u>To add your signature</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-to-add-your-signatur)</span>“**.**

### **3.2 RFI WELDVI GENERIC**

The **RFI WELDVI GENERIC** tab allows you to check and approve the RFI weldVI generic request raised in the web application, by adding and updating your inspection details. This RFI WeldVI Generic feature automatically updates and synchronizes your inspection details with the RFI WeldVI generic report that is uploaded in the web application.

 [![image-1651656376460.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651656376460.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651656376460.png)

 [![image-1651656403781.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651656403781.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651656403781.png) **Note**: When you click the **RFI WELDVI GENERIC** tab in the dashboard, the **RFI WeldVI Generic** page displays a list of reports corresponding to today and previous day. However, if you want to view the reports for other dates, you must navigate to the **TAKE OFFLINE DATA** option. (See " <span style="color: #236fa1;">[**<u>TAKE OFFLINE DATA</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-2.2-take-offline-dat)</span>" for more details.)

1\. Tap **RFI WELDVI GENERIC**.See Fig 2.4.

The **RFI WeldVI Generic** page opens with a list of reports for the selected date.

 [![image-1651656430333.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651656430333.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651656430333.png)

 **Figure 4.2 RFI WeldVI Generic page**

 [![image-1651656454986.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651656454986.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651656454986.png) **Tip**: I. You can configure displaying of the number of reports per page by selecting **10**, **25**, **50** or **100**, accordingly.

1. If you want to filter one report among the list of reports, you must enter the report number, inspection date, location or status details in the respective boxes given in the **RFI WeldVI Generic**page.

The **RFI WeldVI Generic** page contains multiple fields such as **Report Number, Inspection Date, Location, Status, Result**, **Signature**, **Attach, Print, and Sync.**

- **Status –** shows the status of comment added in the **Result**

 **None**- notifies that there are no comments in the **Result** page.

 **Open**- notifies that there is a comment added in the **Open comment** box.

 **Close** - notifies that there is a comment added in the **Close comment** box.

(See the topic “<span style="color: #236fa1;">[<u>The </u>**<u>MIR</u>**<u> page contains the following fields</u>](http://wiki.cuteinfocomm.com/link/47#bkmrk-the-mir%C2%A0page-opens-w)</span>“ for more details about other fields in the **RFI WeldVI Generic** page.)

 [![image-1651656500314.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651656500314.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651656500314.png) **Note**: Each report has a corresponding check box, which is located on the left pane of the **RFI WeldVI Generic** page. If you want to do sign together for more than one report, you must enable the respective check boxes.

1. You must enable the respective check box of the reports.

If you have enabled more than one check box, [![image-1651656520152.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651656520152.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651656520152.png) (**Signature** icon) will appear in the top of the page.

 [![image-1651656542560.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651656542560.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651656542560.png)

2. Tap [![image-1651656596063.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651656596063.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651656596063.png) (**Signature** icon). The signature page opens.
3. Tap your assigned role, enter your name, and do sign.

**To add your RFI WeldVI generic inspection result

1. Once you find out the report where you need to add your inspection details, tap [![image-1651656681761.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651656681761.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651656681761.png) (**Result** icon) to add your inspection results, See Fig 4.2.

 [![image-1651656694527.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651656694527.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651656694527.png)

The **Result** page opens with a list of reports including the material details. Each report shows material specifications such as drawing number, sub-contractor name, location, longitudinal and elevation details, and frame number.

2. In the **Remarks**box, type your remarks if any.
3. If you do not want to give any comments, enable **None**.
4. If you want to give an open comment, enable the **Open** option and enter your comment in the **Open Comment**
5. If you want to give a close comment, enable the **Close** option and enter your comment in the **Close Comment**
6. Tap **Save**.

**To add your signature**

Once you have saved your inspection results, the **Result** page automatically redirects you into the **Signature** page. Otherwise,

[![image-1651656719130.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651656719130.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651656719130.png) tap (**Signature** icon), See Fig 4.2.

To know how to add your signature, see the topic “<span style="color: #236fa1;">[**<u>To add your signature</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-to-add-your-signatur)</span>“**.**

### **3.3 BACK GOUGING**

The **BACK GOUGING** tab helps you to check and update the back-gouging request, which is uploaded in the web application, by adding your inspection details. This back-gouging feature automatically updates and synchronizes your inspection details with the back-gouging report in the web application.

 [![image-1651656757940.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651656757940.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651656757940.png)

[![image-1651656769629.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651656769629.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651656769629.png) **Note**: When you click the **BACK GOUGING** tab in the dashboard, the **Back Gouging page displays a list of reports corresponding to today and previous day. However, if you want to view the reports for other dates, you must navigate to the **TAKE OFFLINE DATA** option. (See " <span style="color: #236fa1;">[**<u>TAKE OFFLINE DATA</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-2.2-take-offline-dat)</span>" for more details.)

1\. Tap **BACK GOUGING**.See Fig 2.4.

The **Back Gouging** page opens with a list of reports for the selected date.

 [![image-1651656797276.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651656797276.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651656797276.png)

 **Figure 4.3 Back Gouging page**

 [![image-1651656822908.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651656822908.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651656822908.png) **Tip**: I. You can configure displaying of the number of reports per page by selecting **10**, **25**, **50** or **100**, accordingly.

1. If you want to filter one report among the list of reports, you must enter the report number, inspection date, location or status details in the respective boxes given in the **Back Gouging**page.

The **Back Gouging** page contains multiple fields such as **Report Number, Inspection Date, Location, Status, Result**, **Signature**, **Attach, Print, and Sync.**

- **Status –** shows the status of comment added in the **Result**

 **None**- notifies that there are no comments in the **Result** page.

 **Open**- notifies that there is a comment added in the **Open comment** box.

 **Close** - notifies that there is a comment added in the **Close comment** box.

(See the topic “<span style="color: #236fa1;">[<u>The </u>**<u>MIR</u>**<u> page contains the following fields</u>](http://wiki.cuteinfocomm.com/link/47#bkmrk-the-mir%C2%A0page-opens-w)</span>“ for more details about other fields in the **Back Gouging** page).

 [![image-1651656870926.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651656870926.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651656870926.png) **Note**: Each report has a corresponding check box, which is located on the left pane of the **Back Gouging** page. If you want to do sign together for more than one report, you must enable the respective check boxes.

1. You must enable the respective check box of the reports.

If you have enabled more than one check box, [![image-1651656894886.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651656894886.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651656894886.png) (**Signature** icon) will appear in the top of the page.

 [![image-1651656923670.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651656923670.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651656923670.png)

2\. Tap [![image-1651656950656.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651656950656.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651656950656.png) (**Signature** icon). The signature page opens.

3\. Tap your assigned role, enter your name, and do sign.

**To add your back gouging inspection result

1. Once you find out the report where you need to add your inspection details, tap [![image-1651656971770.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651656971770.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651656971770.png) (**Result** icon) to add your inspection results, See Fig 4.3.
    
    [![image-1651656999972.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651656999972.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651656999972.png)

The **Result** page opens with a list of reports including the material details. Each report shows material specifications such as drawing number, sub-contractor name, location, longitudinal and elevation details, and frame number.

2. In the **Remarks**box, type your remarks if any.
3. If you do not want to give any comments, enable **None**.
4. If you want to give an open comment, enable the **Open** option and enter your comment in the **Open Comment**
5. If you want to give a close comment, enable the **Close** option and enter your comment in the **Close Comment**
6. Tap **Save**.

**To add your signature**

Once you have saved your inspection results, the **Result** page automatically redirects you into the **Signature** page. Otherwise, tap

[![image-1651657027169.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651657027169.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651657027169.png) (**Signature** icon), See Fig 4.3.

To know how to add your signature, see the topic “<span style="color: #236fa1;">[**<u>To add your signature</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-to-add-your-signatur)</span>“**.**

### **3.4 VACUUM TEST**

The **VACUUM TEST** tab helps you to check and update the vacuum test request, which is uploaded in the web application, by adding your inspection details. This vacuum test feature automatically updates and synchronizes your inspection details with the vacuum test report in the web application.

 [![image-1651657062500.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651657062500.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651657062500.png)

[![image-1651657070889.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651657070889.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651657070889.png) **Note**: When you click the **VACUUM** **TEST** tab in the dashboard, the **Vacuum Test page displays a list of reports corresponding to today and previous day. However, if you want to view the reports for other dates, you must navigate to the **TAKE OFFLINE DATA** option. (See " <span style="color: #236fa1;">[**<u>TAKE OFFLINE DATA</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-2.2-take-offline-dat)</span>" for more details.)

1. Tap **VACUUM TEST**.See Fig 2.4.

The **Vacuum Test** page opens with a list of reports for the selected date.

 [![image-1651657095570.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651657095570.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651657095570.png)

 **Figure 4.4 Vacuum Test page**

[![image-1651657124002.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651657124002.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651657124002.png) **Tip**:1. You can configure displaying of the number of reports per page by selecting **10**, **25**, **50** or **100**, accordingly.

 2. If you want to filter one report among the list of reports, you must enter the report number, inspection date, location or status details in the respective boxes given in the **Vacuum Test**page.

The **Vacuum Test** page contains multiple fields such as **Report Number, Inspection Date, Location, Status, Result**, **Signature**, **Attach, Print, and Sync.**

- **Status –** shows the status of comment added in the **Result**

 **None**- notifies that there are no comments in the **Result** page.

 **Open**- notifies that there is a comment added in the **Open comment** box.

 **Close** - notifies that there is a comment added in the **Close comment** box.

(See the topic “<span style="color: #236fa1;">[<u>The </u>**<u>MIR</u>**<u> page contains the following fields</u>](http://wiki.cuteinfocomm.com/link/47#bkmrk-the-mir%C2%A0page-opens-w)</span>“ for more details about other fields in the **Vacuum Test** page).

 [![image-1651657187253.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651657187253.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651657187253.png) **Note**: Each report has a corresponding check box, which is located on the left pane of the **Vacuum Test** page. If you want to do sign together for more than one report, you must enable the respective check boxes.

1\. You must enable the respective check box of the reports.

If you have enabled more than one check box, [![image-1651657223825.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651657223825.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651657223825.png) (**Signature** icon) will appear in the top of the page.

 [![image-1651657249792.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651657249792.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651657249792.png)

2\. Tap [![image-1651657272840.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651657272840.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651657272840.png) (**Signature** icon). The signature page opens.

3\. Tap your assigned role, enter your name, and do sign.

**To add your vacuum test inspection result

1. Once you find out the report where you need to add your inspection details, tap [![image-1651657294257.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651657294257.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651657294257.png) (**Result** icon) to add your inspection results, See Fig 4.3.
    
    [![image-1651657322230.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651657322230.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651657322230.png)

The **Result** page opens with a list of reports including the material details. Each report shows material specifications such as drawing number, sub-contractor name, location, longitudinal and elevation details, and frame number.

2. In the **Remarks**box, type your remarks if any.
3. If you do not want to give any comments, enable **None**.
4. If you want to give an open comment, enable the **Open** option and enter your comment in the **Open Comment**
5. If you want to give a close comment, enable the **Close** option and enter your comment in the **Close Comment**
6. Tap **Save**.

**To add your signature**

Once you have saved your inspection results, the **Result** page automatically redirects you into the **Signature** page. Otherwise, tap

[![image-1651657341632.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651657341632.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651657341632.png) (**Signature** icon), See Fig 4.4.

To know how to add your signature, see the topic “<span style="color: #236fa1;">[**<u>To add your signature</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-to-add-your-signatur)</span>“**.**

### **3.5 NDT INSPECTION GENERIC**

The **NDT INSPECTION GENERIC** tab allows you to check and update the NDT inspection generic request raised in the web application, by adding and updating your inspection details. This feature automatically updates and synchronizes your inspection details with the NDT inspection generic report uploaded in the web application.

 [![image-1651657390178.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651657390178.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651657390178.png)

There are four main types of NDT Inspection Generic: **RT**, **UT**, **PT**, and **MT**.

 [![image-1651657402041.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651657402041.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651657402041.png) **Note**: When you click the **NDT INSPECTION GENERIC** tab in the dashboard, the **NDT Inspection Generic** page displays a list of reports corresponding to today and previous day. However, if you want to view the reports for other dates, you must navigate to the **TAKE OFFLINE DATA** option. (See " <span style="color: #236fa1;">[**<u>TAKE OFFLINE DATA</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-2.2-take-offline-dat)</span>" for more details.)

1\. Tap **NDT INSPECTION GENERIC**.See Fig 2.4.

The **NDT Inspection Generic** page opens with a list of reports for the corresponding types such as **RT**, **UT**, **PT**, and **MT**. You must select the respective type to view the relevant reports.

 [![image-1651657444637.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651657444637.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651657444637.png)

 **Figure 4.5 NDT Inspection Generic page**

 [![image-1651657465838.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651657465838.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651657465838.png) **Tip**: 1. You can configure displaying of the number of reports per page by selecting **10**, **25**, **50** or **100**, accordingly.

 2. If you want to filter one report among the list of reports, you must enter the report number, inspection date, location or status details in the respective boxes given in the **NDT Inspection Generic**page.

The **NDT Inspection Generic** page contains multiple fields such as **Report Number, Inspection Date, Location, Status, Result**, **Signature**, **Attach, Print, and Sync.**

- **Status –** shows the status of comment added in the **Result**

 **None**- notifies that there are no comments in the **Result** page.

 **Open**- notifies that there is a comment added in the **Open comment** box.

 **Close** - notifies that there is a comment added in the **Close comment** box.

(See the topic “<span style="color: #236fa1;">[<u>The </u>**<u>MIR</u>**<u> page contains the following fields</u>](http://wiki.cuteinfocomm.com/link/47#bkmrk-the-mir%C2%A0page-opens-w)</span>“ for more details about other fields in the **NDT Inspection Generic** page).

 [![image-1651657548742.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651657548742.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651657548742.png) **Note**: Each report has a corresponding check box, which is located on the left pane of the **NDT Inspection Generic** page. If you want to do sign together for more than one report, you must enable the respective check boxes.

1. You must enable the respective check box of the reports.

If you have enabled more than one check box, [![image-1651657568069.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651657568069.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651657568069.png)(**Signature** icon) will appear in the top of the page.

 [![image-1651657601959.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651657601959.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651657601959.png)

[2. Tap ![image-1651657628502.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651657628502.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651657628502.png) (**Signature** icon). The signature page opens.

3\. Tap your assigned role, enter your name, and do sign.

**To add your NDT RT, UT, PT, and MT inspection results**

1\. Tap **RT, UT, PT** or**MT**. A list of reports is appeared for the selected type.

2\. Once you find out the report where you need to add your inspection details, tap [![image-1651657694614.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651657694614.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651657694614.png) (**Result** icon) to add your inspection results, See Fig 4.5.

The **Result** page opens with a list of material details.

 [![image-1651657736403.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651657736403.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651657736403.png)

Each report shows material specifications such as drawing number, sub-contractor name, designation, welding position, weld type, cost centre, requisition name, thickness, location, longitudinal and elevation details, WPS, process, and welder names.

3\. In the **Remarks**box, type your remarks if any.

4\. If you do not want to give any comments, enable **None**.

5\. If you want to give an open comment, enable the **Open** option and enter your comment in the **Open Comment**

6\. If you want to give a close comment, enable the **Close** option and enter your comment in the **Close Comment**

7\. Tap **Save**.

**To add your signature**

Once you have saved your inspection results, the **Result** page automatically redirects you into the **Signature** page. Otherwise, tap

[![image-1651657812427.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651657812427.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651657812427.png) (**Signature** icon), See Fig 4.5.

To know how to add your signature, see the topic “<span style="color: #236fa1;">[**<u>To add your signature</u>**](http://wiki.cuteinfocomm.com/link/47#bkmrk-to-add-your-signatur)</span>“**.**

### **3.6 SHOW ALL PENDING REPORTS**

The **SHOW ALL PENDING REPORTS** tab helps you to view all pending reports for the inspections those are not completed yet. By using this feature, you can check whether the QA, Sub contractor, Client, and Owner have submitted their inspection report.

 [![image-1651657859522.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651657859522.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651657859522.png)

This feature automatically updates the detail of all pending reports from the web application. You can view the pending reports in an offline mode also.

Do the following steps to view the pending reports,

1\. Tap **SHOW ALL PENDING REPORTS**. See Fig 2.4. The **Pending Reports** page opens.

 [![image-1651657888164.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651657888164.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651657888164.png)

 **Figure 4.6 Pending Reports page**

[![image-1651657906744.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651657906744.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651657906744.png)  **Tip**: 1. You can configure displaying of the number of reports per page by selecting **10**, **25**, **50** or **100**, accordingly.

 2. If you want to filter one report among all reports, you must enter the report number or category details in the respective boxes given in the **Pending Reports**page.

The **Pending Reports** page contains the following fields:

- **Report Number** - shows the report number of the pending reports.
- **Category** - shows the category of the pending reports.
- **QA, Subcon, Client, and Owner**- each field appears with a check box to show whether the inspection has completed by the QA, Subcontractor, Client, and Owner, respectively.

 [![image-1651657942976.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651657942976.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651657942976.png) **Note**: If the check box of any field is enabled with the tick mark, it means that the respective person has completed the inspection.

- **Not required** - appears with a check box that helps you to decide about further inspection process. You can enable the check box if you have decided that no need of any further inspection process to be done by the QA, Subcontractor, Client or Owner. 
    2. Tap the **Category** box, and select the category from a drop-down list.

The **Pending Reports** page shows a list of pending reports corresponding to the selected category. You can check the status of the report.

3. If want to end up the inspection process, enable the check box in the **Not required**
4. Tap **Save**.

# Mobile App - Ship Structural



# 1.User Management

### **1.1 Downloading *cuteQM* app**

To use the ***cuteQM*** app you must first download it from the **Play Store**.

1. Open the **Play Store** and search for “***cuteQM***”.
2. Download and install the ***cuteQM*** app on your mobile phone.
3. After installation, open the ***cuteQM***

***You are ready to go!***

### **1.2 Log in**

**After installation, when you open the *cuteQM* app you may be asked to Login. Follow the steps to successfully log into your account.**

[![image-1724221885734.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724221885734.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724221885734.png)[![image-1724221798542.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724221798542.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724221798542.png)

1\. Before enter your user id and password, tap [![image-1651671754003.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651671754003.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651671754003.png)(Settings icon) and enter the app URL http://www.cuteqm.com/cuteQMPTUSPAPI.

2\. Tap **Save**.

3\. Enter your user id and password in the allocated fields.

4\. Tap **Log in** to complete the process.

The home screen of the ***cuteQM*** app is appeared.

### **1.3 Home screen of *cuteQM* app**

[![image-1724222407954.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724222407954.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724222407954.png)[![image-1724222471135.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724222471135.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724222471135.png)

1. **Module** – helps to select the module. Select ship structural module
2. **Project** – Helps to select the project. select the project.
3. Click **Save** button to go to the menu screen.

[![image-1724239800309.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724239800309.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724239800309.png)(show/hide icon) helps to show/hide the user id information that is displayed in the right panel of the home screen. if you touch this icon the information appears on, if you touch this icon again the information goes off.

- **Clear Storage** - clears all data in this app. Tap the **Clear Storage** option to delete all the data.
- **Sync Data**- synchronizes your inspection results with the respective reports in the web application. If your inspection results are not automatically synchronized with the web application, tap the **Sync Data** option for manual synchronization.
- **Log out** - To log out from the cuteQM app.

# 2.Hull RFI

### **2.1.RFI Hull Fabrication**

#### **2.1.1.RFI Fabrication Add**

[![image-1724316522383.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724316522383.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724316522383.png)[![image-1724316606135.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724316606135.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724316606135.png)

1. Click **RFI Fabrication Add** menu .This menu helps to add the hull parts for the RFI fabrication request.
2. Select partcode in the dropdown list.
3. Select the appropriate hull part
4. Enter **description**.
5. Click [![image-1724334603626.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724334603626.png)S](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724334603626.png)**ave** icon.

**Hull Fabrication request added successfully.**

#### **2.1.2.RFI Fabrication Create**

[![image-1724316757332.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724316757332.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724316757332.png)[![image-1724316778238.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724316778238.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724316778238.png)

1. Click **RFI fabrication create** menu.This menu helps to create RFI requests from added hull parts.
2. Select the part no from dropdown list
3. Select the fitup toggle(Defaultly selected)
4. Select the hull part
5. Click **Create** button at the top
6. After create button clicked,a popup will open to key in **inspection date,subcontractor and description**. [![image-1724302153174.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724302153174.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724302153174.png)
7. Click **Create** button.

**RFI Fabrication request created successfully.**

#### **2.1.3.RFI Fabrication Approve**

[![image-1724317252355.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724317252355.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724317252355.png)[![image-1724317438790.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724317438790.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724317438790.png)

1. Click **RFI Fabrication approve** menu
2. Select the RFI request no from dropdown list
3. Click **Approve** button.

**Hull Fabrication request approved successfully.**

#### **2.1.4.RFI Fabrication Inspection**

1. Click **RFI Fabrication** menu in Inspection.
2. [ ![image-1724303024731.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724303024731.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724303024731.png)

1. Click [![image-1724304171025.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724304171025.png) button .It will redirected to new page](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724304171025.png)

[ ![image-1724317725362.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724317725362.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724317725362.png)[![image-1724317903894.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724317903894.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724317903894.png)

1. Result will be defaultly accepted,If need to reject,you can change the dropdown as Reject
2. Enter **remarks**
3. Click **Save** button.  **RFI** **Fabrication inspection approved successfully.**

### **2.2.RFI Hull Assembly**

#### **2.2.1.RFI Assembly Add**

[![image-1724307797796.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724307797796.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724307797796.png)[![image-1724307847627.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724307847627.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724307847627.png)

1. Click **RFI Assembly Add** menu .This menu helps to add the hull parts and frames for the RFI Assembly request.
2. Select partcode in the dropdown list.
3. Select the appropriate hull part
4. Enter **description.**
5. Click [![image-1724334603626.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724334603626.png)S](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724334603626.png)**ave** icon.

**Hull Assembly request added successfully.**

#### **2.2.2.RFI Assembly Create**

[![image-1724307229951.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724307229951.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724307229951.png)[![image-1724307516105.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724307516105.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724307516105.png)

1. Click **RFI Assembly create** menu.This menu helps to create RFI requests from added hull parts and frames.
2. Select the part no from dropdown list
3. Select the fitup toggle(Defaultly selected)
4. Select the hull part
5. Click **Create** button at the top
6. After create button clicked,a popup will open to key in **inspection date,subcontractor and description.**

[ ![image-1724306449712.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724306449712.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724306449712.png)

7.Click **Create** button

**RFI Assembly request created successfully.**

#### **2.2.3.RFI Assembly Approve**

[ ![image-1724308053863.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724308053863.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724308053863.png)[![image-1724308079107.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724308079107.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724308079107.png)

1. Click **RFI Assembly approve** menu
2. Select the RFI request no from dropdown list
3. Click **Approve** button

**Hull Assembly request approved successfully.**

#### **2.2.4.RFI Assembly Inspection**

1. Click RFI Assembly menu in Inspection.[ ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724303024731.png)[ ![image-1724305268684.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724305268684.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724305268684.png)
2. Click [![image-1724304171025.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724304171025.png) button .It will redirected to new page](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724304171025.png)

[![image-1724306785755.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724306785755.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724306785755.png) [![image-1724306676667.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724306676667.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724306676667.png)

[ ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724304381939.png)

1. Result will be defaultly loaded as accepted,If need to reject,you can change the dropdown as Reject
2. Enter **remarks**
3. Click **Save** button. **RFI Assembly inspection approved successfully.**

### **2.3.RFI Hull Erection**

#### **2.3.1.RFI Hull Erection Add**

[![image-1724309770873.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724309770873.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724309770873.png)[![image-1724309931686.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724309931686.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724309931686.png)

1. Click **RFI Hull Erection Add** menu .This menu helps to add the hull parts and frames for the RFI Erection request.
2. Select partcode in the dropdown list.
3. Select the appropriate hull part
4. Enter **description**.
5. Click [![image-1724334603626.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724334603626.png)S](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724334603626.png)**ave** icon.

**Hull Erection request added successfully.**

#### **2.3.2.RFI Erection Create**

[![image-1724307188540.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724307188540.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724307188540.png)[![image-1724310056271.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724310056271.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724310056271.png)

1. Click **RFI Assembly create** menu.This menu helps to create RFI requests from added hull parts and frames.
2. Select the part no from dropdown list
3. Select the fitup toggle(Defaultly selected)
4. Select the hull part
5. Click **Create** button at the top
6. After create button clicked,a popup will open to key in **inspection date,subcontractor and description.**

 [![image-1724310151680.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724310151680.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724310151680.png)

7.Click **Create** button

**RFI Erection request created successfully.**

#### **2.3.3.RFI Erection Approve**

[![image-1724310336737.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724310336737.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724310336737.png)[![image-1724310348848.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724310348848.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724310348848.png)

1. Click **RFI Erection approve** menu
2. Select the RFI request no from dropdown list
3. Click **Approve** button

**Hull Erection request approved successfully.**

#### **2.3.4.RFI Erection Inspection**

1. Click **RFI Assembly** menu in Inspection.[ ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724303024731.png)[ ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724305268684.png)
    
     [![image-1724307399392.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724307399392.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724307399392.png)
2. Click [![image-1724304171025.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724304171025.png) button .It will redirected to new page](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724304171025.png)

[![image-1724310560266.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724310560266.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724310560266.png) [![image-1724310713314.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724310713314.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724310713314.png)

1. Result will be defaultly loaded as accepted,If need to reject,you can change the dropdown as Reject
2. Enter **remarks**
3. Click **Save** button. **RFI Erection inspection approved successfully.**

### **2.4.RFI Other Inspection**

#### **2.4.1.RFI Other inspection Add**

**[![image-1724319170678.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724319170678.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724319170678.png)[ ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724309770873.png)**[![image-1724319575247.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724319575247.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724319575247.png)

1. Click **RFI other inspection Add** menu .This menu helps to add the request for Tank test,Hose test and Vaccum test.
2. Select the **test type** as required (Tank test,Hose test and Vaccum test)
3. Select partcode in the dropdown list.
4. Select the appropriate hull part
5. Enter **description**.
6. Click [![image-1724334603626.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724334603626.png)S](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724334603626.png)**ave** icon.

**Hull other inspection request added successfully.**

#### **2.4.2.RFI Other inspection Create**

[![image-1724319728321.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724319728321.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724319728321.png)[![image-1724319802515.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724319802515.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724319802515.png)

1. Click **RFI Other inspection create** menu.This menu helps to create RFI requests from added hull parts .
2. Select the type of the test toggle button as required.
3. Select the required hull part toggle
4. Click **Create** button at the top
5. After create button clicked,a popup will open to key in **inspection date,subcontractor and descriptio**n.

[ ![image-1724320052823.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724320052823.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724320052823.png)

7.Click **Create** button

**RFI Other inspection request created successfully.**

#### **2.4.3.RFI Other inspection Approve**

[![image-1724320169289.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724320169289.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724320169289.png)[ ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724310336737.png)[![image-1724320368870.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724320368870.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724320368870.png)

1. Click **RFI Other inspection approve** menu
2. Select the RFI request no from dropdown list
3. Click **Approve** button

**Hull Other inspection request approved successfully.**

#### **2.4.4.RFI Other Inspection**

1. Click **RFI Other inspection** menu in Inspection.[ ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724303024731.png)[ ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724305268684.png)
    
    [![image-1724320464395.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724320464395.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724320464395.png)
2. Click [![image-1724304171025.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724304171025.png) button .It will redirected to new page](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724304171025.png)

[ ![image-1724320550731.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724320550731.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724320550731.png)[![image-1724320673970.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724320673970.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724320673970.png)

1. Result will be defaultly loaded as accepted,If need to reject,you can change the dropdown as Reject
2. Enter **Description**
3. Enter **remarks**
4. Click **Save** button. **RFI Other inspection approved successfully.**

# 3.Outfitting RFI

### **3.1.RFI Fabrication**

#### **3.1.1.RFI Fabrication Add**

[ ![image-1724321887473.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724321887473.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724321887473.png)[![image-1724322123801.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724322123801.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724322123801.png)

[ ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724321887473.png)

1. Click **RFI Fabrication Add** menu .This menu helps to add the outfitting work for the RFI fabrication request.
2. Select Drawing no in the dropdown list.
3. Select the appropriate outfitting drawing
4. Enter **description**.
5. Click [![image-1724334603626.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724334603626.png)S](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724334603626.png)**ave** icon.

**Outfitting Fabrication request added successfully.**

#### **3.1.2.RFI Fabrication Create**

[![image-1724322367438.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724322367438.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724322367438.png)[![image-1724322475400.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724322475400.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724322475400.png)

1. Click **RFI fabrication create** menu.This menu helps to create RFI requests from added outfitting parts.
2. Select the drawing no from dropdown list
3. Select the fitup toggle(Defaultly selected)
4. Select the outfitting part
5. Click **Create** button at the top
6. After create button clicked,a popup will open to key in **inspection date,subcontractor and description.**  [![image-1724302153174.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724302153174.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724302153174.png)
7. Click **Create** button.

**RFI Fabrication request created successfully.**

#### **3.1.3.RFI Fabrication Approve**

[![image-1724331709468.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724331709468.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724331709468.png)[ ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724317252355.png)[![image-1724317438790.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724317438790.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724317438790.png)

1. Click **RFI Fabrication approve** menu
2. Select the RFI request no from dropdown list
3. Click **Approve** button.

**Outfitting Fabrication request approved successfully.**

#### **3.1.4.RFI Fabrication Inspection**

1. Click **RFI Fabrication** menu in Inspection.
2. [ ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724303024731.png)[![image-1724322772618.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724322772618.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724322772618.png)

1. Click [![image-1724304171025.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724304171025.png) button .It will redirected to new page](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724304171025.png)

[ ![image-1724322856296.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724322856296.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724322856296.png)[![image-1724322921610.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724322921610.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724322921610.png)

[ ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724317725362.png)

<div class="pointer-container" id="bkmrk-%C2%A0-10"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--13" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>1. Result will be defaultly accepted,If need to reject,you can change the dropdown as Reject
2. Enter **remarks**
3. Click **Save** button.  **RFI** **Fabrication inspection approved successfully.**

### **3.2.RFI Installation**

#### **3.2.1.RFI Installation Add**

[![image-1724324164730.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724324164730.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724324164730.png)[![image-1724324332757.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724324332757.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724324332757.png)

1. Click **RFI Installation Add** menu .This menu helps to add the outfitting work for the RFI installation request.
2. Select Drawing no in the dropdown list.
3. Select the appropriate outfitting drawing toggle
4. Enter **description**.
5. Click [![image-1724334603626.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724334603626.png)S](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724334603626.png)**ave** icon.

**Outfitting Installation request added successfully.**

#### **3.2.2.RFI Installation Create**

[![image-1724324426258.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724324426258.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724324426258.png)[![image-1724326588616.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724326588616.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724326588616.png)

1. Click **RFI Installation create** menu.This menu helps to create RFI requests from added outfitting parts.
2. Select the drawing no from dropdown list
3. Select the fitup toggle(Defaultly selected)
4. Select the outfitting part toggle button
5. Click **Create** button at the top
6. After create button clicked,a popup will open to key in **inspection date,subcontractor and descriptio**n. [![image-1724302153174.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724302153174.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724302153174.png)
7. Click **Create** button.

**RFI Installation request created successfully.**

#### **3.2.3.RFI Installation Approve**

[![image-1724328495041.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724328495041.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724328495041.png)[![image-1724328631165.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724328631165.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724328631165.png)

1. Click **RFI Installation approve** menu
2. Select the RFI request no from dropdown list
3. Click **Approve** button.

**Outfitting Installation request approved successfully.**

#### **3.2.4.RFI Installation Inspection**

1. Click **RFI Installation** menu in Inspection.
2. [ ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724303024731.png)[![image-1724328742147.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724328742147.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724328742147.png)

1. Click [![image-1724304171025.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724304171025.png) button .It will redirected to new page](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724304171025.png)

[ ![image-1724328793405.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724328793405.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724328793405.png)[![image-1724328889268.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724328889268.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724328889268.png)[ ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724322856296.png)

<div class="pointer-container" id="bkmrk-%C2%A0-16"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--14" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>1. Result will be defaultly accepted,If need to reject,you can change the dropdown as Reject
2. Enter **remarks**
3. Click **Save** button.  **RFI** **Installation inspection approved successfully.**

# 4.Painting RFI

### **4.1. RFI Coat**

#### **4.1.1.RFI Coat Add**

[![image-1724330340746.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724330340746.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724330340746.png)[![image-1724330456583.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724330456583.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724330456583.png)

1. Click **RFI Coat Add** menu .This menu helps to add the painting coat work for the RFI coat request.
2. Select Painting name in the dropdown list.
3. Select the appropriate painting type toggle button (Blasting,coat1,coat2....)
4. Enter **description**.
5. Enter **painting area**
6. Click [![image-1724334603626.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724334603626.png)S](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724334603626.png)**ave** icon.

**Painting coat RFI request added successfully.**

#### **3.1.2.RFI Coat Create**

[![image-1724330745241.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724330745241.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724330745241.png)[![image-1724330764407.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724330764407.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724330764407.png)

1. Click **RFI Coat create** menu.This menu helps to create RFI requests from added painting names.
2. Select the painting name from dropdown list
3. Select the painting tyep toggle(Defaultly blasting selected)
4. Select the painting name
5. Click **Create** button at the top
6. After create button clicked,a popup will open to key in **inspection date,subcontractor and description.**

 [![image-1724330937133.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724330937133.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724330937133.png)

 7.Click **Create** button.

**RFI Coat request created successfully.**

#### **3.1.3.RFI Coat Approve**

[![image-1724331003361.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724331003361.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724331003361.png)[![image-1724331039322.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724331039322.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724331039322.png)

1. Click **RFI Coat approve** menu
2. Select the RFI request no from dropdown list
3. Select the paint type toggle(Defaultly blasting selected)
4. Click **Approve** button.

**RFI Coat request approved successfully.**

#### **3.1.4.RFI Coat Inspection**

1. Click **RFI Coat** menu in Inspection.
2. [ ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724303024731.png)[![image-1724331155234.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724331155234.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724331155234.png)

1. Click [![image-1724304171025.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724304171025.png) button .It will redirected to new page](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724304171025.png)

[![image-1724331207540.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724331207540.png)vvvv](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724331207540.png)[![image-1724331251735.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724331251735.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724331251735.png)

<div class="pointer-container" id="bkmrk-%C2%A0-1"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--4" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>1. Result will be defaultly accepted,If need to reject,you can change the dropdown as Reject
2. Enter **remarks**
3. Click **Save** button.  **RFI** **Coat inspection approved successfully.**

# Mobile App - Electrical and Instrumentation



# 1.User Management

### **1.1 Downloading *cuteQM* app**

To use the ***cuteQM*** app you must first download it from the **Play Store**.

1. Open the **Play Store** and search for “***cuteQM***”.
2. Download and install the ***cuteQM*** app on your mobile phone.
3. After installation, open the ***cuteQM***

***You are ready to go!***

### **1.2 Log in**

**After installation, when you open the *cuteQM* app you may be asked to Login. Follow the steps to successfully log into your account.**

[![image-1724221885734.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724221885734.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724221885734.png)[![image-1724221798542.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724221798542.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724221798542.png)

1\. Before enter your user id and password, tap [![image-1651671754003.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651671754003.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651671754003.png)(Settings icon) and enter the app URL http://www.cuteqm.com/cuteQMPTUSPAPI.

2\. Tap **Save**.

3\. Enter your user id and password in the allocated fields.

4\. Tap **Log in** to complete the process.

The home screen of the ***cuteQM*** app is appeared.

### **1.3 Home screen of *cuteQM* app**

[![image-1724222407954.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724222407954.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724222407954.png)[![image-1724222471135.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724222471135.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724222471135.png)

1. **Module** – helps to select the module. Select **Electrical** module
2. **Project** – Helps to select the project. select the project.
3. Click **Save** button to go to the menu screen.

[![image-1724239800309.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724239800309.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724239800309.png)(show/hide icon) helps to show/hide the user id information that is displayed in the right panel of the home screen. if you touch this icon the information appears on, if you touch this icon again the information goes off.

- **Clear Storage** - clears all data in this app. Tap the **Clear Storage** option to delete all the data.
- **Sync Data**- synchronizes your inspection results with the respective reports in the web application. If your inspection results are not automatically synchronized with the web application, tap the **Sync Data** option for manual synchronization.
- **Log out** - To log out from the cuteQM app.

# 2. RFI

### **2.1. Glanding &amp; Termination RFI**

#### **2.1.1.RFI Glanding Add**

[ ![image-1724379663208.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724379663208.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724379663208.png)[![image-1724379677647.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724379677647.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724379677647.png)

[ ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724334273188.png)

1. Click **RFI Glanding Add** menu .This menu helps to add the cables for the RFI Glanding request.
2. Select cable no in the dropdown list.
3. Toggle **ON** the appropriate cable
4. Enter L1,L2,L3..Values
5. Enter **description**.
6. Enter **Continuity**
7. Click [![image-1724334603626.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724334603626.png)S](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724334603626.png)**ave** icon.

**Glanding request added successfully.**

#### **2.1.2.RFI Glanding Create**

[![image-1724379823938.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724379823938.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724379823938.png)[![image-1724379844669.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724379844669.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724379844669.png)

1. Click **RFI Glanding create** menu.This menu helps to create RFI requests from added cables.
2. Select the cable no from dropdown list
3. Toggle **ON** the required cable
4. Click **Create** button at the top
5. After create button clicked,a popup will open to key in **inspection date,subcontractor ,description &amp; calibration details.**

[ ![image-1724379931286.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724379931286.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724379931286.png)

6\. Click **Create** button.

**RFI Glanding request created successfully.**

#### **2.1.3.RFI Glanding Approve**

[![image-1724379975132.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724379975132.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724379975132.png)[![image-1724379988437.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724379988437.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724379988437.png)

1. Click **RFI Glanding approve** menu
2. Select the RFI request no from dropdown list
3. Click **Approve** button.

**Glanding request approved successfully.**

#### **2.1.4.RFI Glanding Inspection**

1.Click **RFI Glanding** menu in Inspection.

[![image-1724380036667.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724380036667.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724380036667.png)

2.Click [![image-1724304171025.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724304171025.png) button .It will redirected to new page](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724304171025.png)

[![image-1724380355083.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724380355083.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724380355083.png)[![image-1724380396970.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724380396970.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724380396970.png)[ ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724335418846.png)

<div class="pointer-container" id="bkmrk-%C2%A0-10"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--107" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>1. Result will be defaultly accepted,If need to reject,you can change the dropdown as Reject
2. Enter **Description**
3. Enter **Remarks**
4. Click **Save** button.  **RFI** **Glanding inspection approved successfully.**

### **2.2. Fitup/Visual RFI**

#### **2.2.1.RFI Fitup/Visual Add**

[![image-1724380758169.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724380758169.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724380758169.png)[![image-1724380804851.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724380804851.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724380804851.png)

1. Click **RFI Fitup/visual Add** menu .This menu helps to add the compartments for the RFI Fitup/visual request.
2. Select compartment no in the dropdown list.
3. Toggle ON Fitup or weld as required
4. Toggle **ON** the appropriate compartment
5. Enter **description**.
6. Enter **location**.
7. Click [![image-1724334603626.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724334603626.png)S](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724334603626.png)**ave** icon.

 **Fitup/visual request added successfully.**

#### **2.2.2.RFI Fitup/Visual Create**

[![image-1724380973668.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724380973668.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724380973668.png)[![image-1724380998744.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724380998744.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724380998744.png)

1. Click **RFI Fitup/visual create** menu.This menu helps to create RFI requests from added compartments.
2. Select the compartment no from dropdown list
3. Toggle **ON** the required comprtment
4. Click **Create** button at the top
5. After create button clicked,a popup will open to key in **inspection date,subcontractor and description.**

[ ![image-1724381091581.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724381091581.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724381091581.png)

6\. Click **Create** button.

**RFI Fitup/visual request created successfully.**

#### **2.2.3.RFI Fitup/Visual Approve**

[![image-1724381207373.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724381207373.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724381207373.png)[![image-1724381219349.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724381219349.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724381219349.png)

1. Click **RFI Fitup/visual approve** menu
2. Select the RFI request no from dropdown list
3. Click **Approve** button.

 **Fitup/visual request approved successfully.**

#### **2.2.4.RFI Fitup/Visual Inspection**

1.Click **RFI Fitup/visual** menu in Inspection.

[![image-1724381269824.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724381269824.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724381269824.png)

2.Click [![image-1724304171025.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724304171025.png) button .It will redirected to new page](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724304171025.png)

[![image-1724381319997.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724381319997.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724381319997.png)[![image-1724381364646.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724381364646.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724381364646.png)

<div class="pointer-container" id="bkmrk-%C2%A0-11"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--108" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>1. Result will be defaultly accepted,If need to reject,you can change the dropdown as Reject
2. Enter **Description**
3. Enter **Remarks**
4. Click **Save** button.  **RFI**  **Fitup/visual inspection approved successfully.**

### **2.3. Cable dressing &amp; Banding RFI**

#### **2.3.1.Cable dressing Add**

[![image-1724387281177.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724387281177.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724387281177.png)[![image-1724387294002.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724387294002.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724387294002.png)

1. Click **RFI** **Cable dressing Add** menu .This menu helps to add the compartments for the RFI cable dressing request.
2. Select compartment no in the dropdown list.
3. Toggle **ON** the appropriate compartment
4. Enter **description**.
5. Click [![image-1724334603626.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724334603626.png)S](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724334603626.png)**ave** icon.

 **Cable dressing &amp; Banding request added successfully.**

#### **2.3.2.RFI Cable dressing Create**

[![image-1724387447832.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724387447832.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724387447832.png)[![image-1724387458092.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724387458092.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724387458092.png)

1. Click RFI **Cable dressing**  create menu.This menu helps to create RFI requests from added compartments.
2. Select the compartment no from dropdown list
3. Toggle **ON** the required comprtment
4. Click **Create** button at the top
5. After create button clicked,a popup will open to key in **inspection date,subcontractor and description.**

[ ![image-1724381091581.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724381091581.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724381091581.png)

6\. Click **Create** button.

**RFI Cable dressing &amp; Banding request created successfully.**

#### **2.3.3.RFI Cable dressing Approve**

[![image-1724387585574.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724387585574.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724387585574.png)[![image-1724387596462.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724387596462.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724387596462.png)

1. Click **RFI Cable dressing approve** menu
2. Select the RFI request no from dropdown list
3. Click **Approve** button.

 **Cable dressing &amp; Banding request approved successfully.**

#### **2.3.4.RFI Cable dressing &amp; Banding Inspection**

1.Click **RFI** **Cable dressing** menu in Inspection.

[![image-1724387727098.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724387727098.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724387727098.png)

2.Click [![image-1724304171025.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724304171025.png) button .It will redirected to new page](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724304171025.png)

[![image-1724387750459.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724387750459.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724387750459.png) [![image-1724387792561.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724387792561.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724387792561.png)

<div class="pointer-container" id="bkmrk-%C2%A0-12"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--109" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>1. Result will be defaultly accepted,If need to reject,you can change the dropdown as Reject
2. Enter **Description**
3. Enter **Remarks**
4. Click **Save** button.  **RFI**  **Cable dressing &amp; Banding inspection approved successfully.**

### **2.4. Torque Tightening RFI**

#### **2.4.1.RFI Torque Add**

[![image-1724388730306.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724388730306.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724388730306.png)[![image-1724388743656.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724388743656.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724388743656.png)[ ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724379663208.png)[ ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724334273188.png)

1. Click **RFI Torque Add** menu .This menu helps to add the equipments for the RFI Torque request.
2. Select equipment location in the dropdown list.
3. Toggle **ON** the appropriate equipment
4. Enter **description**.
5. Click [![image-1724334603626.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724334603626.png)**S**](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724334603626.png)**ave** icon.

**Torque RFI request added successfully.**

#### **2.4.2.RFI Torque Create**

[![image-1724388911125.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724388911125.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724388911125.png)[![image-1724388922855.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724388922855.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724388922855.png)

1. Click **RFI Torque create** menu.This menu helps to create RFI requests from added equipments.
2. Select the equipment location from dropdown list
3. Toggle **ON** the required equipment
4. Click **Create** button at the top
5. After create button clicked,a popup will open to key in **inspection date,subcontractor ,description &amp; calibration details.**

[![image-1724389019172.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724389019172.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724389019172.png)

6\. Click **Create** button.

**RFI Torque request created successfully.**

#### **2.4.3.RFI Torque Approve**

[![image-1724389507428.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724389507428.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724389507428.png)[![image-1724389524560.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724389524560.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724389524560.png)

1. Click **RFI Torque approve** menu
2. Select the RFI request no from dropdown list
3. Click **Approve** button.

**Torque RFI request approved successfully.**

#### **2.4.4.RFI Torque Inspection**

1.Click **RFI Torque**  menu in Inspection.

[![image-1724389609711.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724389609711.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724389609711.png)

2.Click [![image-1724304171025.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724304171025.png) button .It will redirected to new page](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724304171025.png)

[![image-1724389651648.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724389651648.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724389651648.png)[![image-1724389689295.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724389689295.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724389689295.png)[ ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724335418846.png)

<div class="pointer-container" id="bkmrk-%C2%A0-14"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--110" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>1. Result will be defaultly accepted,If need to reject,you can change the dropdown as Reject
2. Enter **Description**
3. Enter **Remarks**
4. Click **Save** button.  **RFI** **Torque inspection approved successfully.**

### **2.5. Compound filling/MCT Packing RFI**

#### **2.5.1.Compound filling Add**

[ ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724390162223.png)[![image-1724390181419.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724390181419.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724390181419.png)[![image-1724390248943.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724390248943.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724390248943.png)

1. Click **RFI** **Compound filling Add** menu .This menu helps to add the compartments for the RFI **Compound filling** request.
2. Select compartment no in the dropdown list.
3. Toggle **ON** the appropriate compartment
4. Enter **description**.
5. Click [![image-1724334603626.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724334603626.png)S](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724334603626.png)**ave** icon.

 **Compound filling request added successfully.**

#### **2.5.2.RFI Compound filling Create**

[![image-1724390326343.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724390326343.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724390326343.png)[![image-1724390337585.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724390337585.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724390337585.png)

1. Click **RFI**  **Compound filling create** menu.This menu helps to create RFI requests from added compartments.
2. Select the compartment no from dropdown list
3. Toggle **ON** the required comprtment
4. Click **Create** button at the top
5. After create button clicked,a popup will open to key in **inspection date,subcontractor and description.**

[ ![image-1724390402874.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724390402874.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724390402874.png)

6\. Click **Create** button.

**RFI Compound filling request created successfully.**

#### **2.5.3.RFI Compound filling Approve**

[![image-1724390493896.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724390493896.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724390493896.png)[![image-1724390506160.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724390506160.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724390506160.png)

1. Click ****RFI Compound filling** approve** menu
2. Select the RFI request no from dropdown list
3. Click **Approve** button.

 **Compound Filling /MCT Packing RFI request approved successfully.**

#### **2.5.4.RFI Compound Filling /MCT Packing Inspection**

1.Click **RFI** **Cable dressing** menu in Inspection.

[![image-1724390548821.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724390548821.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724390548821.png)

2.Click [![image-1724304171025.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724304171025.png) button .It will redirected to new page](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724304171025.png)

[![image-1724390589035.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724390589035.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724390589035.png)[![image-1724390662330.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724390662330.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724390662330.png)

<div class="pointer-container" id="bkmrk-%C2%A0-16"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--111" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>1. Result will be defaultly accepted,If need to reject,you can change the dropdown as Reject
2. Enter **Description**
3. Enter **Remarks**
4. Click **Save** button.  **RFI**  **Compound Filling /MCT Packing inspection approved successfully.**

### **2.6. Equipment Megger Test RFI**

#### **2.6.1.RFI Megger Add**

[![image-1724390977542.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724390977542.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724390977542.png)[![image-1724390993104.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724390993104.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724390993104.png)

1. Click **RFI Torque Add** menu .This menu helps to add the equipments for the RFI megger request.
2. Select equipment location in the dropdown list.
3. Toggle **ON** the appropriate equipment
4. Enter **description**.
5. Enter **L1,L2,L3** Values
6. Enter **room temperature**
7. Enter **Equipment temperature**
8. Click [![image-1724334603626.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724334603626.png)S](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724334603626.png)**ave** icon.

**RFI Megger request added successfully.**

#### **2.6.2.RFI Megger Create**

[![image-1724391204048.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724391204048.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724391204048.png)[![image-1724391227504.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724391227504.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724391227504.png)

1. Click **RFI Megger create** menu.This menu helps to create RFI requests from added equipments.
2. Select the equipment location from dropdown list
3. Toggle **ON** the required equipment
4. Click **Create** button at the top
5. After create button clicked,a popup will open to key in **inspection date,subcontractor ,description &amp; calibration details.**

[![image-1724391300447.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724391300447.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724391300447.png)

6\. Click **Create** button.

**RFI Megger request created successfully.**

#### **2.6.3.RFI Megger Approve**

[![image-1724391358240.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724391358240.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724391358240.png)[![image-1724391370876.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724391370876.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724391370876.png)

1. Click **RFI Megger approve** menu
2. Select the RFI request no from dropdown list
3. Click **Approve** button.

**Equipment megger RFI request approved successfully.**

#### **2.6.4.RFI Megger Inspection**

1.Click **RFI Megger** menu in Inspection.

 [![image-1724391428485.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724391428485.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724391428485.png)

2.Click [![image-1724304171025.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724304171025.png) button .It will redirected to new page](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724304171025.png)

[![image-1724391462495.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724391462495.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724391462495.png)[![image-1724391501387.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724391501387.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724391501387.png)

<div class="pointer-container" id="bkmrk-%C2%A0-17"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--112" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>1. Result will be defaultly accepted,If need to reject,you can change the dropdown as Reject
2. Enter **Description**
3. Enter **L1,L2,L3,Room temperature &amp; Equipment temperature** values
4. Enter **Remarks**
5. Click **Save** button.  **RFI** **Equipment megger test inspection approved successfully.**

# Mobile App - Mechanical



# 1.User Management

### **1.1 Downloading *cuteQM* app**

To use the ***cuteQM*** app you must first download it from the **Play Store**.

1. Open the **Play Store** and search for “***cuteQM***”.
2. Download and install the ***cuteQM*** app on your mobile phone.
3. After installation, open the ***cuteQM***

***You are ready to go!***

### **1.2 Log in**

**After installation, when you open the *cuteQM* app you may be asked to Login. Follow the steps to successfully log into your account.**

[![image-1724221885734.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724221885734.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724221885734.png)[![image-1724221798542.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724221798542.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724221798542.png)

1\. Before enter your user id and password, tap [![image-1651671754003.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651671754003.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651671754003.png)(Settings icon) and enter the app URL http://www.cuteqm.com/cuteQMPTUSPAPI.

2\. Tap **Save**.

3\. Enter your user id and password in the allocated fields.

4\. Tap **Log in** to complete the process.

The home screen of the ***cuteQM*** app is appeared.

### **1.3 Home screen of *cuteQM* app**

[![image-1724222407954.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724222407954.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724222407954.png)[![image-1724222471135.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724222471135.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724222471135.png)

1. **Module** – helps to select the module. Select Mechanical module
2. **Project** – Helps to select the project. select the project.
3. Click **Save** button to go to the menu screen.

[![image-1724239800309.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724239800309.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724239800309.png)(show/hide icon) helps to show/hide the user id information that is displayed in the right panel of the home screen. if you touch this icon the information appears on, if you touch this icon again the information goes off.

<div class="pointer-container" id="bkmrk-%C2%A0-2"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--0" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>- **Clear Storage** - clears all data in this app. Tap the **Clear Storage** option to delete all the data.
- **Sync Data**- synchronizes your inspection results with the respective reports in the web application. If your inspection results are not automatically synchronized with the web application, tap the **Sync Data** option for manual synchronization.
- **Log out** - To log out from the cuteQM app.

# 2. RFI

### **2.1. Pre-Alignment RFI**

#### **2.1.1.RFI Pre-Alignment Add**

[ ![image-1724334273188.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724334273188.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724334273188.png)[![image-1724334313905.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724334313905.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724334313905.png)[ ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724321887473.png)

1. Click **RFI Pre alignment Add** menu .This menu helps to add theequipments for the RFI pre alignment request.
2. Select Equipment no in the dropdown list.
3. Toggle ON the appropriate Equipment
4. Enter **description**.
5. Click [![image-1724334603626.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724334603626.png)S](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724334603626.png)**ave** icon.

**Pre alignment request added successfully.**

#### **2.1.2.RFI Pre alignment Create**

[![image-1724334842799.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724334842799.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724334842799.png)[![image-1724334932899.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724334932899.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724334932899.png)

1. Click **RFI Pre alignment create** menu.This menu helps to create RFI requests from added equipments.
2. Select the equipment no from dropdown list
3. Toggle **ON** the required equipment
4. Click **Create** button at the top
5. After create button clicked,a popup will open to key in **inspection date,subcontractor and description.**

[![image-1724335152096.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724335152096.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724335152096.png)

6\. Click **Create** button.

**RFI Pre alignment request created successfully.**

#### **2.1.3.RFI Pre alignment Approve**

[![image-1724335188639.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724335188639.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724335188639.png)[![image-1724335232848.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724335232848.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724335232848.png)

1. Click **RFI Pre alignment approve** menu
2. Select the RFI request no from dropdown list
3. Click **Approve** button.

**Pre alignment request approved successfully.**

#### **2.1.4.RFI Pre Alignment Inspection**

1.Click **RFI Pre alignment** menu in Inspection.

[ ![image-1724335360005.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724335360005.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724335360005.png)

2.Click [![image-1724304171025.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724304171025.png) button .It will redirected to new page](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724304171025.png)

[ ![image-1724335418846.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724335418846.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724335418846.png)[![image-1724335456295.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724335456295.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724335456295.png)

<div class="pointer-container" id="bkmrk-%C2%A0-10"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--74" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>1. Result will be defaultly accepted,If need to reject,you can change the dropdown as Reject
2. Enter **Description**
3. Enter **Remarks**
4. Click **Save** button.  **RFI** **Pre alignment inspection approved successfully.**

### **2.2. Alignment RFI**

#### **2.2.1.RFI Alignment Add**

**[![image-1724335629840.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724335629840.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724335629840.png)[![image-1724335666039.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724335666039.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724335666039.png)**

1. Click **RFI Alignment Add** menu .This menu helps to add theequipments for the RFI alignment request.
2. Select Equipment no in the dropdown list.
3. Toggle ON the appropriate Equipment
4. Enter **description**.
5. Click [![image-1724334603626.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724334603626.png)S](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724334603626.png)**ave** icon.

**Alignment request added successfully.**

#### **2.2.2.RFI Alignment Create**

[![image-1724335831343.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724335831343.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724335831343.png)[![image-1724335869238.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724335869238.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724335869238.png)

1. Click **RFI Alignment create** menu.This menu helps to create RFI requests from added equipments.
2. Select the equipment no from dropdown list
3. Toggle **ON** the required equipment
4. Click **Create** button at the top
5. After create button clicked,a popup will open to key in **inspection date,subcontractor and description.**

[ ![image-1724336002199.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724336002199.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724336002199.png)

6\. Click **Create** button.

**RFI Alignment request created successfully.**

#### **2.2.3.RFI Alignment Approve**

[![image-1724336066298.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724336066298.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724336066298.png)[![image-1724336098529.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724336098529.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724336098529.png)

1. Click **RFI Alignment approve** menu
2. Select the RFI request no from dropdown list
3. Click **Approve** button.

**Alignment request approved successfully.**

#### **2.2.4.RFI Alignment Inspection**

1.Click **RFI Alignment** menu in Inspection.

[ ![image-1724336180489.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724336180489.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724336180489.png)

2.Click [![image-1724304171025.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724304171025.png) button .It will redirected to new page](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724304171025.png)

[![image-1724336237281.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724336237281.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724336237281.png)[![image-1724336265573.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724336265573.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724336265573.png)[ ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724335418846.png)

<div class="pointer-container" id="bkmrk-%C2%A0-15"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--75" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>1. Result will be defaultly accepted,If need to reject,you can change the dropdown as Reject
2. Enter **Description**
3. Enter **Remarks**
4. Click **Save** button.  **RFI** **Alignment inspection approved successfully.**

### **2.3. Machining RFI**

#### **2.3.1.RFI Machining Add**

[![image-1724340666565.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724340666565.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724340666565.png)[![image-1724340689978.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724340689978.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724340689978.png)

1. Click **RFI Machining Add** menu .This menu helps to add the equipments for the RFI Machining request.
2. Select Equipment no in the dropdown list.
3. Toggle **ON** the appropriate Equipment
4. Enter **description**.
5. Click [![image-1724334603626.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724334603626.png)S](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724334603626.png)**ave** icon.

**Machining RFI request added successfully.**

#### **2.3.2.RFI Machining Create**

[![image-1724340784666.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724340784666.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724340784666.png)[![image-1724340799806.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724340799806.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724340799806.png)

1. Click **RFI Machining create** menu.This menu helps to create RFI requests from added equipments.
2. Select the equipment no from dropdown list
3. Toggle **ON** the required equipment
4. Click **Create** button at the top
5. After create button clicked,a popup will open to key in **inspection date,subcontractor and description.**

 [![image-1724340885094.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724340885094.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724340885094.png)

6\. Click **Create** button.

**RFI Maching request created successfully.**

#### **2.3.3.RFI Machining Approve**

[![image-1724340964086.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724340964086.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724340964086.png)[![image-1724340979097.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724340979097.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724340979097.png)

1. Click **RFI Machining approve** menu
2. Select the RFI request no from dropdown list
3. Click **Approve** button.

**Machining RFI request approved successfully.**

#### **2.3.4.RFI Machining Inspection**

1.Click **RFI Machining** menu in Inspection.

 [![image-1724341053347.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724341053347.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724341053347.png)

2.Click [![image-1724304171025.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724304171025.png) button .It will redirected to new page](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724304171025.png)

[![image-1724341118892.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724341118892.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724341118892.png)[![image-1724341173689.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724341173689.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724341173689.png)

<div class="pointer-container" id="bkmrk-%C2%A0-16"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--76" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>1. Result will be defaultly accepted,If need to reject,you can change the dropdown as Reject
2. Enter **Description**
3. Enter **Remarks**
4. Click **Save** button.  **RFI Machining** **inspection approved successfully.**

### **2.4. Torque Tightening RFI**

#### **2.4.1.RFI Torque Tightening Add**

[![image-1724341432462.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724341432462.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724341432462.png)[![image-1724341447064.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724341447064.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724341447064.png)

1. Click **RFI Torque Add** menu .This menu helps to add the equipments for the RFI Torque request.
2. Select Equipment no in the dropdown list.
3. Toggle **ON** the appropriate Equipment
4. Enter description.
5. Click [![image-1724334603626.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724334603626.png)S](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724334603626.png)**ave** icon.

**Torque RFI request added successfully.**

#### **2.4.2.RFI Torque Create**

[![image-1724341533603.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724341533603.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724341533603.png)[![image-1724341549121.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724341549121.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724341549121.png)

1. Click **RFI Torque create** menu.This menu helps to create RFI requests from added equipments.
2. Select the equipment no from dropdown list
3. Toggle **ON** the required equipment
4. Click **Create** button at the top
5. After create button clicked,a popup will open to key in **inspection date,subcontractor and description.**

[ ![image-1724341637863.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724341637863.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724341637863.png)

6\. Click **Create** button.

**RFI Torque request created successfully.**

#### **2.4.3.RFI Torque Approve**

[![image-1724341719726.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724341719726.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724341719726.png)[![image-1724341732401.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724341732401.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724341732401.png)

1. Click **RFI Torque approve** menu
2. Select the RFI request no from dropdown list
3. Click **Approve** button.

**Torque RFI request approved successfully.**

#### **2.4.4.RFI Torque Inspection**

1.Click **RFI Torque** menu in Inspection.

[![image-1724341792666.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724341792666.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724341792666.png)

2.Click [![image-1724304171025.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724304171025.png) button .It will redirected to new page](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724304171025.png)

[![image-1724341833461.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724341833461.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724341833461.png)[![image-1724341879205.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724341879205.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724341879205.png)

<div class="pointer-container" id="bkmrk-%C2%A0-17"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--77" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>1. Result will be defaultly accepted,If need to reject,you can change the dropdown as Reject
2. Enter **Description**
3. Enter **Remarks**
4. Click **Save** button.  **RFI Torque** **inspection approved successfully.**

### **2.5. Visual RFI**

#### **2.5.1.RFI Visual Add**

[![image-1724342341647.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724342341647.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724342341647.png)[![image-1724342362571.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724342362571.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724342362571.png)

1. Click **RFI Visual Add** menu .This menu helps to add the equipments for the RFI visual request.
2. Select Equipment no in the dropdown list.
3. Toggle **ON** the appropriate Equipment
4. Enter **description**.
5. Click [![image-1724334603626.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724334603626.png)S](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724334603626.png)**ave** icon.

**Visual RFI request added successfully.**

#### **2.5.2.RFI Visual Create**

[![image-1724342444303.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724342444303.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724342444303.png)[![image-1724342454103.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724342454103.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724342454103.png)

1. Click **RFI Visual create** menu.This menu helps to create RFI requests from added equipments.
2. Select the equipment no from dropdown list
3. Toggle **ON** the required equipment
4. Click **Create** button at the top
5. After create button clicked,a popup will open to key in **inspection date,subcontractor and description.**

 [![image-1724342833202.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724342833202.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724342833202.png)

6\. Click **Create** button.

**RFI Visual request created successfully.**

#### **2.5.3.RFI Visual Approve**

[![image-1724342937943.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724342937943.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724342937943.png)[![image-1724343032700.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724343032700.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724343032700.png)

1. Click **RFI Torque approve** menu
2. Select the RFI request no from dropdown list
3. Click **Approve** button.

**Visual RFI request approved successfully.**

#### **2.5.4.RFI Visual Inspection**

1.Click **RFI Visual** menu in Inspection.

 [![image-1724343142113.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724343142113.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724343142113.png)

2.Click [![image-1724304171025.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724304171025.png) button .It will redirected to new page](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724304171025.png)

[![image-1724343250717.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724343250717.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724343250717.png)[![image-1724343288907.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724343288907.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724343288907.png)

<div class="pointer-container" id="bkmrk-%C2%A0-19"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--78" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>1. Result will be defaultly accepted,If need to reject,you can change the dropdown as Reject
2. Enter **Description**
3. Enter **Remarks**
4. Click **Save** button.  **RFI Visual** **inspection approved successfully.**

# Mobile App - HVAC



# 1.User Management

### **1.1 Downloading *cuteQM* app**

To use the ***cuteQM*** app you must first download it from the **Play Store**.

1. Open the **Play Store** and search for “***cuteQM***”.
2. Download and install the ***cuteQM*** app on your mobile phone.
3. After installation, open the ***cuteQM***

***You are ready to go!***

### **1.2 Log in**

**After installation, when you open the *cuteQM* app you may be asked to Login. Follow the steps to successfully log into your account.**

[![image-1724221885734.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724221885734.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724221885734.png)[![image-1724221798542.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724221798542.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724221798542.png)

1\. Before enter your user id and password, tap [![image-1651671754003.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651671754003.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651671754003.png)(Settings icon) and enter the app URL http://www.cuteqm.com/cuteQMPTUSPAPI.

2\. Tap **Save**.

3\. Enter your user id and password in the allocated fields.

4\. Tap **Log in** to complete the process.

The home screen of the ***cuteQM*** app is appeared.

### **1.3 Home screen of *cuteQM* app**

[![image-1724222407954.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724222407954.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724222407954.png)[![image-1724222471135.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724222471135.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724222471135.png)

1. **Module** – helps to select the module. Select **HVAC** module
2. **Project** – Helps to select the project. select the project.
3. Click **Save** button to go to the menu screen.

[![image-1724239800309.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724239800309.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724239800309.png)(show/hide icon) helps to show/hide the user id information that is displayed in the right panel of the home screen. if you touch this icon the information appears on, if you touch this icon again the information goes off.

- **Clear Storage** - clears all data in this app. Tap the **Clear Storage** option to delete all the data.
- **Sync Data**- synchronizes your inspection results with the respective reports in the web application. If your inspection results are not automatically synchronized with the web application, tap the **Sync Data** option for manual synchronization.
- **Log out** - To log out from the cuteQM app.

# 2. RFI

### **2.1.RFI Fitup Inspection** 

#### **2.1.1.RFI Fitup Add**

[![image-1724393381980.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724393381980.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724393381980.png)[![image-1724393436973.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724393436973.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724393436973.png)

1. Click **RFI** **Fitup Add** menu .This menu helps to add the items for the RFI **Fitup** request.
2. Select item no in the dropdown list.
3. Toggle **ON** the appropriate item
4. Enter **description**.
5. Click [![image-1724334603626.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724334603626.png)S](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724334603626.png)**ave** icon.

**Fitup request added successfully.**

#### **2.1.2.RFI Fitup Create**

[![image-1724393538903.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724393538903.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724393538903.png)[![image-1724393551372.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724393551372.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724393551372.png)

1. Click **RFI**  **Fitup create** menu.This menu helps to create RFI requests from added items.
2. Select the item no from dropdown list
3. Toggle **ON** the required item
4. Click **Create** button at the top
5. After create button clicked,a popup will open to key in **inspection date,subcontractor and description.**

[![image-1724393631856.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724393631856.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724393631856.png)

6\. Click **Create** button.

**RFI Fitup request created successfully.**

#### **2.1.3.RFI Fitup Approve**

[![image-1724393687453.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724393687453.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724393687453.png)[![image-1724393712734.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724393712734.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724393712734.png)

1. Click **RFI Fitup approve** menu
2. Select the RFI request no from dropdown list
3. Click **Approve** button.

**Fitup RFI request approved successfully.**

#### **2.1.4.RFI Fitup Inspection**

1.Click **RFI** **Fitup** menu in Inspection.

[![image-1724394260753.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724394260753.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724394260753.png)

2.Click [![image-1724304171025.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724304171025.png) button .It will redirected to new page](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724304171025.png)

[![image-1724394300059.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724394300059.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724394300059.png)[![image-1724394339896.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724394339896.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724394339896.png)

<div class="pointer-container" id="bkmrk-%C2%A0-16"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--111" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>1. Result will be defaultly accepted,If need to reject,you can change the dropdown as Reject
2. Enter **Description**
3. Enter **Remarks**
4. Click **Save** button.  **RFI**  **Fitup inspection approved successfully.**

### **2.1.RFI Visual Inspection** 

#### **2.1.1.RFI Visual Add**

[![image-1724394566285.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724394566285.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724394566285.png)[![image-1724394576202.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724394576202.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724394576202.png)

1. Click **RFI** **Visual** **Add** menu .This menu helps to add the items for the RFI **Visual** request.
2. Select item no in the dropdown list.
3. Toggle **ON** the appropriate item
4. Enter **description**.
5. Click [![image-1724334603626.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724334603626.png)S](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724334603626.png)**ave** icon.

**Visual request added successfully.**

#### **2.1.2.RFI Visual Create**

[![image-1724394659261.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724394659261.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724394659261.png)[![image-1724394669128.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724394669128.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724394669128.png)

1. Click **RFI**  **Fitup create** menu.This menu helps to create RFI requests from added items.
2. Select the item no from dropdown list
3. Toggle **ON** the required item
4. Click **Create** button at the top
5. After create button clicked,a popup will open to key in **inspection date,subcontractor and description.**

 [![image-1724394722469.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724394722469.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724394722469.png)

6\. Click **Create** button.

**RFI Visual request created successfully.**

#### **2.1.3.RFI Visual Approve**

[![image-1724394769598.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724394769598.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724394769598.png)[![image-1724394782258.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724394782258.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724394782258.png)

1. Click **RFI Fitup approve** menu
2. Select the RFI request no from dropdown list
3. Click **Approve** button.

**Visual RFI request approved successfully.**

#### **2.2.4.RFI Visual Inspection**

1.Click **RFI** **Visual** menu in Inspection.

[![image-1724394845270.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724394845270.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724394845270.png)

2.Click [![image-1724304171025.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724304171025.png) button .It will redirected to new page](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724304171025.png)

[![image-1724394866216.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724394866216.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724394866216.png)[![image-1724394917378.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724394917378.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724394917378.png)

<div class="pointer-container" id="bkmrk-%C2%A0-0"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--45" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>1. Result will be defaultly accepted,If need to reject,you can change the dropdown as Reject
2. Enter **Remarks**
3. Click **Save** button.  **RFI**  **Visual inspection approved successfully.**

### **2.3.Other RFI Inspection** 

#### **2.3.1.RFI OtherAdd**

[![image-1724395207539.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724395207539.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724395207539.png)[![image-1724395221386.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724395221386.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724395221386.png)

1. Click **RFI** **Other Add** menu .This menu helps to add the items for the RFI **Other** request.
2. Select item no in the dropdown list.
3. Toggle **ON** the appropriate item
4. Enter **description**.
5. Click [![image-1724334603626.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724334603626.png)S](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724334603626.png)**ave** icon.

**Other RFI request added successfully.**

#### **2.3.2.RFI Other Create**

[![image-1724395326075.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724395326075.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724395326075.png)[![image-1724395376131.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724395376131.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724395376131.png)

1. Click **RFI**  **other create** menu.This menu helps to create RFI requests from added items.
2. Select the item no from dropdown list
3. Toggle **ON** the required item
4. Click **Create** button at the top
5. After create button clicked,a popup will open to key in **inspection date,subcontractor and description.**

 [![image-1724395423650.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724395423650.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724395423650.png)

6\. Click **Create** button.

**Other RFI request created successfully.**

#### **2.3.3.RFI Other Approve**

[![image-1724395467842.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724395467842.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724395467842.png)[![image-1724395476434.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724395476434.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724395476434.png)

1. Click **RFI Orher approve** menu
2. Select the RFI request no from dropdown list
3. Click **Approve** button.

**Other RFI request approved successfully.**

#### **2.3.4.RFI Other Inspection**

1.Click **RFI** **Fitup** menu in Inspection.

[![image-1724395555690.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724395555690.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724395555690.png)

2.Click [![image-1724304171025.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724304171025.png) button .It will redirected to new page](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724304171025.png)

[![image-1724395573677.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724395573677.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724395573677.png)[![image-1724395607070.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724395607070.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724395607070.png)

<div class="pointer-container" id="bkmrk-%C2%A0-2"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--46" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>1. Result will be defaultly accepted,If need to reject,you can change the dropdown as Reject
2. Enter **Remarks**
3. Click **Save** button.  **RFI**  **Other inspection approved successfully.**

# Bill Of Material Extraction

Bill Of Material Extraction

# AutoXtract Bill of Material

The BOM can be extracted from drawing PDF files and it can be converted to Excel sheets.

Login to the portal

[![image-1756209881789.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756209881789.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756209881789.png)

Upon login, click on Upload menu

[![image-1756209938211.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756209938211.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756209938211.png)

[![image-1756209965721.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1756209965721.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1756209965721.png)

Choose the Project on the Top,

Locate the PDF copy of the drawings. It contains the BOM as below

[![image-1755748621716.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1755748621716.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1755748621716.png)

Drag and drop your files into the folder. At a time 10 files is currently enforced.

[![image-1755748085384.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1755748085384.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1755748085384.png)

It will start to process and once processed they will disappear from list.

[![image-1755748167537.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1755748167537.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1755748167537.png)

The extracted data will be available in BOM List menu page.

You can navigate to any page while the process is going on as it happens in the background.

The extracted data is available and searchable and ready to export to Excel.

[![image-1755748242009.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1755748242009.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1755748242009.png)

Click Export. The file contains all the data.

[![image-1755748494503.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1755748494503.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1755748494503.png)

We can click on View All button in extract page to see the status of all uploaded drawings. If there are any errors we can review and reconfigure extraction.

[![image-1755748394584.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/scaled-1680-/image-1755748394584.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2025-08/image-1755748394584.png)

**Note:**

The BOM format depends on the project and hence to add a new project, contact us by sending two sample PDF files.

**License**

This tool is licensed separately.

Onboarding $1000.00

Per Drawing $5.00

# Mobile App -Pressure Vessel



# User Management

### **1.1 Downloading *cuteQM* app**

To use the ***cuteQM*** app you must first download it from the **Play Store**.

1. Open the **Play Store** and search for “***cuteQM***”.
2. Download and install the ***cuteQM*** app on your mobile phone.
3. After installation, open the ***cuteQM***

***You are ready to go!***

### **1.2 Log in**

**After installation, when you open the *cuteQM* app you may be asked to Login. Follow the steps to successfully log into your account.**

[![image-1724221885734.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724221885734.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724221885734.png)[![image-1724221798542.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724221798542.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724221798542.png)

1\. Before enter your user id and password, tap [![image-1651671754003.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651671754003.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651671754003.png)(Settings icon) and enter the app URL https://apiassurex.temaindia.com .

2\. Tap **Save**.

3\. Enter your user id and password in the allocated fields.

4\. Tap **Log in** to complete the process.

The home screen of the ***cuteQM*** app is appeared.

### **1.3 Home screen of *cuteQM* app**

[![image-1780314068819.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780314068819.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780314068819.png)[ ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724222407954.png)[![image-1780314088665.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780314088665.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780314088665.png)

[ ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724222407954.png)

1. **Module** – helps to select the module. Select pressure vessel module
2. **Project** – Helps to select the project. select the project.
3. Click **Save** button to go to the menu screen.

[![image-1724239800309.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724239800309.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724239800309.png)(show/hide icon) helps to show/hide the user id information that is displayed in the right panel of the home screen. if you touch this icon the information appears on, if you touch this icon again the information goes off.

<div class="pointer-container" id="bkmrk-%C2%A0-4"><div class="pointer anim is-page-editable"><svg class="svg-icon" data-icon="link" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg><div class="input-group inline block"><input id="bkmrk--0" placeholder="url" readonly="readonly" type="text"></input> <button class="button outline icon" data-clipboard-target="#pointer-url" title="Copy Link" type="button"><svg class="svg-icon" data-icon="copy" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></button></div><svg class="svg-icon" data-icon="edit" role="presentation" viewbox="0 0 24 24" xmlns="http://www.w3.org/2000/svg"></svg></div></div>- **Clear Storage** - clears all data in this app. Tap the **Clear Storage** option to delete all the data.
- **Sync Data**- synchronizes your inspection results with the respective reports in the web application. If your inspection results are not automatically synchronized with the web application, tap the **Sync Data** option for manual synchronization.
- **Log out** - To log out from the cuteQM app.

# Take Offline Data

The **Offline** tab helps you viewing the reports for the specific inspection dates you want.

[![image-1780316757831.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780316757831.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780316757831.png)[![image-1780316765203.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780316765203.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780316765203.png)

Do the following steps to take offline date

1. Click **Offline** menu.A new window opens for selecting category and date you want.
2. In the **Date** box, choose the period by selecting respective dates.
3. In the **Category box, tap and select the option you want.
4. Click **Submit**

**Offine data stored successfully.**

# Fitup

### **Fitup Create**

The **Fitup Create** tab helps you to create Fitup request in mobile and sync the details to the web application.

[![image-1780321060394.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780321060394.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780321060394.png)[![image-1780321089017.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780321089017.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780321089017.png)

[![image-1780319255897.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780319255897.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780319255897.png)[![image-1780319337977.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780319337977.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780319337977.png)

To **create Fitup** request,do the following

1. Take **offline**data for **Master Data-FITUP/WeldVI.**
2. Click **Fitup Create** menu
3. Here joints listed to create the **Fitup**
4. Select the **joints**
5. Enable **Fitup completed** toggle button
6. Click **Save**

**Fitup request** created successfully.

Click **Sync** button at the top to sync data to web manually.Otherwise it will be synced automatically.

### **Fitup Inspection**

For fitup inspection,do the following steps

[![image-1780321222742.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780321222742.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780321222742.png)[![image-1780321248822.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780321248822.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780321248822.png)

[![image-1780321269784.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780321269784.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780321269784.png)[![image-1780321288610.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780321288610.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780321288610.png)

1. Take **offline** data for **Fitup Inspection.**
2. Click **Fitup** menu in inspection
3. Here fitup inspection created joints listed
4. **Select** the joint
5. Enable **inspection** toggle button
6. Select **heat number 1**and **heat number 2** and **Result**
7. Click **Save** button placed at the bottom

Fitup inspection updated successfully.

Click **Sync** button at the top to sync data to web.Otherwise it will be synced automatically.

# Weld Visual

### **WeldVI Create**

The **WeldVI create** tab helps you to create weld visual request in mobile and sync the details to the web application.

To create Weld visual request,do the following steps

1. Click **weldvi create**menu
2. **Select**the joint
3. Enable the toggle button as **Completed**
4. Click **+ icon**to add welder details
5. Click **Save**button

**Weldvi request** created successfully.

Click **Sync** button at the top to sync data to web.Otherwise it will be synced automatically.

### [![image-1780322956024.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780322956024.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780322956024.png)[![image-1780322975298.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780322975298.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780322975298.png)[![image-1780322994846.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780322994846.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780322994846.png)

###  

### **WeldVI Inspection**

For **weld visual inspection,**do the following steps.

1. Click **Weldvi** menu in inspection
2. **Select** the joint
3. Enable the **Inspection** toggle button
4. Select the result as **Accepted**
5. Click **Save**

 **WeldVI** inspection updated successfully.

Click **Sync** button at the top to sync data to web.Otherwise it will be synced automatically.

[![image-1780323122234.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780323122234.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780323122234.png)[![image-1780323130210.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780323130210.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780323130210.png)[![image-1780323141747.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780323141747.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780323141747.png)

# NDT Request and NDT report

### **NDT Request**

The **NDT Request** **Add** tab helps you to create NDT request in mobile and sync the details to the web application.

[![image-1780382195698.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780382195698.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780382195698.png)[![image-1780381713850.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780381713850.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780381713850.png)[![image-1780381779415.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780381779415.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780381779415.png)

To **create NDT Request** request,do the following

1. Take **offline** data for **NDT Request.**
2. Click **NDT Request Add** menu
3. Here joints listed to create the **NDT Request**
4. Select the **NDT request type** from the dropdown(Before fitup/Before pwht,after pwht etc)
5. Select the **Type of the NDT (**RT/UT/PT/MT etc**)**
6. Select the **joints**
7. Click the **+ icon** placed at the top
8. This will navigate to add popup
9. Select the i**nspection date**
10. Select the **NDT contractor**
11. Select the **site location** from the dropdown list
12. Select **attention**
13. Select the appropriate **code** for the NDT Request
14. Click **Create**

**NDT Request** created successfully.

Click **Sync** button at the top to sync data to web manually.Otherwise it will be synced automatically.

### **NDT Report**

The **NDT Report** tab helps you to create NDT reports in mobile and sync the details to the web application.

[![image-1780382243314.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780382243314.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780382243314.png)[![image-1780381906591.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780381906591.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780381906591.png)[![image-1780381949912.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780381949912.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780381949912.png)

1. Take **offline** data for **NDT Report.**
2. Click **NDT Report** menu
3. Here joints listed to create the **NDT Report** based on **NDT type**
4. Select the **Type of the NDT report**
5. Select the **joints**
6. Click the **+ icon** placed at the top
7. This will navigate to add popup
8. Select the **NDT By** from the dropdown list
9. Enter the **Report number**
10. Click **Create**

**NDT Report** created successfully.

Click **Sync** button at the top to sync data to web manually.Otherwise it will be synced automatically.

# Welding Jobcard and Weld Spot Check

### **Welding Jobcard**

The Welding Job Card feature in the mobile app is used to record and manage welding activities performed on specific weld joints. It allows users to capture welding details such as weld number, welder information, welding process, WPS used, welding date, consumables, and other relevant data.

[![image-1780390430774.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780390430774.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780390430774.png)

To create welding job card,do the following steps

[![image-1780390489186.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780390489186.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780390489186.png)[![image-1780390539252.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780390539252.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780390539252.png)

[![image-1780390689377.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780390689377.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780390689377.png)[![image-1780390778750.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780390778750.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780390778750.png)

1. Take **offline** data for **Master Data-Fitup/WeldVI/Jobcard**
2. Take offline data for **Job Card.**
3. Click **Job Card** menu in inspection
4. Here jobcard list will be shown
5. Click **Create** button at top
6. Page will navigate to Add screen of job card
7. Select the **Type** of the job card
8. Select the **date** of jobcard
9. Select the **shift**
10. Select the **supervisor**
11. Select the **joint** from the dropdown
12. Select the **wps number**
13. Enter **pre heat temperature**
14. Enter **remarks**
15. Select the **process** in welder details
16. Select the weld **layer**
17. Select the **welder**.
18. Once welder selected ,click **+ icon**
19. Select the **welding procedure parameter**
20. Click **Save.**

**Job Card created successfully.**

Click **Sync** button at the top to sync data to web.Otherwise it will be synced automatically.

### **Weld spot check**

The Weld Spot Check feature in the mobile app is used to perform and record inspection checks on selected jobcard's joint. Inspectors can review weld quality, verify compliance with project requirements, record observations, attach photos, and document any defects or remarks. This helps ensure welding quality and provides traceable inspection records directly from the field.

[![image-1780557211786.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780557211786.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780557211786.png)

#### **Add weld spot check**

  To add weld spot check for a welding job card,do the following steps

[![image-1780558672186.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780558672186.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780558672186.png)[![image-1780557211786.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780557211786.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780557211786.png)[![image-1780558707226.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780558707226.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780558707226.png)[![image-1780558755416.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780558755416.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780558755416.png)

1.Take **offline** data for **weld spot check**

2.Click **Weld spot check menu**

3.Click **scan** button placed at the top

4.A **QR code scan window** will open.Scan the QR code of the job card.

5.A weld spot check record will automatically created.

6.Fill all the observations one by one

7.Click **Save** button to save the observations.

**Weld spot check created successfully.**

Click **Sync** button at the top to sync data to web.Otherwise it will be synced automatically.

#### **Update a weld spot check**

 To update weld spot check ,do the following steps

[![image-1780558831433.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780558831433.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780558831433.png)

1.Take **offline data** for **weld spot check**

2.Click **Weld spot check menu**

3.Here all the existing spot check record will be displayed

4.Click **+ icon** of the record to be updated

5.It will navigate to updte widow and update the observations here

6.Click **Save** button placed at bottom

**Weld spot check updated successfully.**

Click **Sync** button at the top to sync data to web.Otherwise it will be synced automatically.

#### **Attach photo/files in weld spot check**

To attach photo/files in the weld spot check,dothe following steps

[![image-1780558868782.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780558868782.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780558868782.png)[![image-1780558919906.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780558919906.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780558919906.png)

1.Take **offline data** for **weld spot check**

2.Click **Weld spot check menu**

3.Here all the existing spot check record will be displayed

4.Click **attachmment** [![image-1780558550981.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780558550981.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780558550981.png)icon

5.Enter category if required

6.Click **camera**[![image-1780558578256.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/scaled-1680-/image-1780558578256.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2026-06/image-1780558578256.png)**icon** and then phone camera will open.Capture the photo directly from the phone

7.If need to attach a file then **click Choose file** and select the file from phone and attach

8.Click **save**

**Attachment saved successfully**

