# Structural



# User Management

### **1.1 Login**

To login into the ***cuteQM*** app,

1. Open your web browser.
2. Type the URL provided by your administrator, in the address bar of your web browser.

The login page appears.

[![image-1651599133649.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651599133649.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651599133649.png)

3. In the login page, enter your user name and password in the respective boxes.

 [![image-1651036214183.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651036214183.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651036214183.png)**Note**: If you forgot your password, click “**I can’t access my account**”. You will be redirected into a new web page. Enter your username to receive your password.

4. In the **Module** section, select **Structural**.
5. Click **Login**.

Once you have successfully logged in into the ***cuteQM*** app, the home page of the ***cuteQM*** app opens.

[![image-1651599178493.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651599178493.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651599178493.png)

 **Figure 1.1 Home page of *cuteQM app***

 [![image-1651036329129.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651036329129.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651036329129.png)**Note**: The user name you have entered, the project you have been assigned, and the module you have selected are displayed in the upper right corner of the home page.

### **1.2 Change Password**

If you want to change your current password,

1. Click your user name displayed on the quick access bar of the home page. See Fig 1.1. A drop-down list opens with multiple options.
    
    [![image-1651599229547.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651599229547.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651599229547.png)

2. Click the ****Change Password option.****The **Change Password** page opens.
    
    [![image-1651599263910.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651599263910.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651599263910.png)
    
    [![image-1651599296094.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651599296094.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651599296094.png)**Note**: Before changing your password read the conditions specified in the **Change Password** page.
3. In the **Password** box, enter your current password.
4. In the **New** **Password** box, enter your new password.
5. In the **Confirm** **New** **Password** box, enter your new password again.
6. Click **Change Password**.

Your password will be successfully changed.

### **1.3 Log Out**

If you want to log out from the app,

1. Click your user name displayed on the quick access bar of the home page. See Fig 1.1. A drop-down list opens with multiple options.
2. Click **Log out**.

Your current session ends now. The home page appears.

# Home

### **2.0 Home**

The home menu in the ***cuteQM*** app used to view a dashboard and a switch board of a project. This menu helps you to change project and module.

[![image-1651599843548.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651599843548.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651599843548.png)


### **2.1 Dashboard**

The **Dashboard** tab in the **Home** menu displays graphs, charts, and tables, which helps you to monitor and track the summary reports of various inspection and welding progress in the structural module.

[![image-1651599883883.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651599883883.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651599883883.png) **Note**: The dashboard displayed on the app is linked to a database that allows the report to be constantly updated.

[![image-1651600091378.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651600091378.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651600091378.png)

### **2.2 Switch Board**

The **Switch Board** tab in the **Home** menu show the consolidated view of various tabs listed in multiple menus in the menu bar.

Once you have successfully logged in into the ***cuteQM*** app, you can view the Home Page. In the Home Page, the menu bar appears with multiple menus, otherwise you can select the **Switch Board** tab to view all the menus.

To select the **Switch Board** tab,

1. Navigate to **Home**.
2. Click **Switch Board**.
    
    The **Switch Board** tab includes multiple options such as **Project Data, Materials, Inspection, Structural, MCR, Punch List, and Documentation.**
    
    [![image-1651600257635.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651600257635.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651600257635.png)

### **2.3 Switch Project**

The **Switch Project** tab in the **Home** menu helps you to add a new project/module and switch between various projects and modules added in the app.

#### **2.3.1 Switch Between Various Projects and Modules** 

1. Navigate to the **Home** menu.
2. Click **Switch Project**.
    
    The switch project window opens with a list of projects and modules that are already added in the web.
    
    [![image-1651600627811.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651600627811.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651600627811.png)
    
     **Figure 2.1: Switch project window**
3. If you want to switch between various projects and modules,
    
    
    1. 1. Select a project you want from multiple projects listed in the left side of the window.
            
            Once you have selected the project, a list of modules related to the project is displayed.
        2. Select a module you want from multiple modules listed in the right side of the window.
4. Click **Select**.

#### **2.3.2 Add a New Project** 

If you want to add a new project, do the following

<table border="1" id="bkmrk-if-you-want-to-add-a-0" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">If you want to add a new project, you must have been assigned as an administrator or a power user otherwise you cannot add any new project.

</td></tr></tbody></table>

1. Click **New Skid/ Module**. See Fig 2.1.
    
    The add project/module page opens with two options such as **Projects** and **Skid/ Module**.
    
    [![image-1651600807099.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651600807099.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651600807099.png)
    
     **Figure 2.2: Add project/module page**
2. Click **Projects**. The **Projects** page opens.
    
    [![image-1651600842482.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651600842482.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651600842482.png)
    
     **Figure 5.3: Projects page**
3. Click [![image-1651600928959.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651600928959.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651600928959.png) (**ADD** button) in the upper side of the **Projects** page.
    
    A new window opens to add a new project.
    
    [![image-1651600954477.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651600954477.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651600954477.png)
    
    [![image-1651600968111.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651600968111.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651600968111.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
      
    
    1. 1. In the **Project Number** box, enter the project number.
        2. In the **Project Name** box, enter a project name.
        3. In the **End User** box, select an end user from a drop-down list.
        4. In the **Client** box, select a client from a drop-down list.
        5. In the **AI/ Third Party** box, select an AI or a third party from a drop-down list.
            
            [![image-1651601039616.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651601039616.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651601039616.png)**Note**: If you want to add multiple third parties, add third parties by clicking [![image-1651601075885.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651601075885.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651601075885.png) (**Add TP** button) in the **Third party** column of the **Projects page**.
        6. In the **Purchase Order (PO) Number** box, enter the PO number.
        7. In the **Manufacturer Job Code** box, enter the manufacturer job code number.
        8. In the **Client Project** box, enter the client project code.
        9. In the **Client Job Code** box, enter the client job code.
        10. In the **Owner Project** box, enter the owner project code.
        11. In the **Owner Job** Code box, enter the owner job code.
        12. In the **Delivery Date** box, choose the delivery date.
        13. In the **Location** box, enter the location detail.
        14. In the **Non-Destructive Examination (NDE) Weld Length Limit** box, enter the length limit of NDE welding.
        15. If you need an external qualified welder, click the check box provided with the ****External Qualified Welder****
        16. In the **Weld Repair Allowance** box, enter the amount for weld repair.
4. Click **Save**.

A new project is added successfully.

#### **2.3.3 Edit Any project** 

If you want to edit any existing project details from the list of projects in the **Projects** page, do the following,

1. Click [![image-1651601251562.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651601251562.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651601251562.png)(Edit icon) in the **Edit** column for the respective project. See Fig 2.3. A new window opens to edit the project.
    
    [![image-1651601271857.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651601271857.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651601271857.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box in the ****Projects**** page.
3. Click **Save**.

#### **2.3.4 Delete Any project** 

If you want to delete any specific project from the list of projects, you can use [![image-1651602218165.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651602218165.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651602218165.png) (Delete icon) provided in the **Delete** column of the **Projects** page, See Fig 2.3.

1. Click [![image-1651602244261.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651602244261.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651602244261.png) (Delete icon) for the corresponding project.
    
    You receive a notification message “**Do you want to delete this row**?”.
2. Click **OK**.

#### **2.3.5 Export Projects List**

You can export a list of projects in the pdf and excel formats.

1. If you want to export the projects list in the pdf format, click [![image-1651602321019.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651602321019.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651602321019.png) (**PDF** button). See Fig 2.3. The project list will be downloaded in the pdf format.
2. If you want to export the projects list in the excel format, click [![image-1651602353412.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651602353412.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651602353412.png) (****Excel**** button). The project list will be downloaded in the excel format.

#### **2.3.6 Add a New Module**

If you want to add a new module, do the following

<table border="1" id="bkmrk-if-you-want-to-add-a-2" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">If you want to add a new module, you must have been assigned as an administrator or a power user otherwise you cannot add any new module.

</td></tr></tbody></table>

1. Click **New Skid/ Module**. See Fig 2.1. The add project/module page opens with two options such as **Projects** and **Skid/ Module**. See Fig 2.2.
2. Click **Skid/Module**.
    
    The **Skid/Module** page opens.
    
    [![image-1651602495767.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651602495767.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651602495767.png)
    
     **Figure 2.4: Skid/Module page**
3. Click [![image-1651602534609.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651602534609.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651602534609.png) (**ADD** button) in the upper side of the **Skid/Module** page.
    
    The skid/module box opens to add a new module.
    
    [![image-1651602551803.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651602551803.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651602551803.png)
    
    [![image-1651602565747.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651602565747.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651602565747.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    
    1. 1. In the **Master** **Project Name** box, enter the master project name from a drop-down list.
        2. In the **Skid/Module** box, enter a module name.
        3. In the **Abbreviation** box, enter the abbreviation for the added module.
        4. In the **Report Prefix** box, the report prefix will be entered automatically. If you want change, you can edit the report prefix.
        5. In the **Piping Class** box, enter the piping class name.
        6. In the **Delivery Date** box, choose the delivery date.
        7. In the **Project Type** box, select the type of project from a drop-down list.
        8. If you want to show this module in the ******cuteQM******mobile app, click the check box provided with the ****Show in Apps**** option.
        9. In the **Shift Start Time (24hr)** box, enter the shift starting time.
        10. In the **Shift End Time (24hr)** box, enter the shift ending time.
        11. In the **Break Time (mins)** box, enter the break time duration.
        12. If you want to enable the repair project flow option, select the check box provided with the ****Repair Project Flow**** column.
        13. If you want to enable the welder qualification restriction option, select the check box provided with the **Welder Qualification Restriction** column.
4. Click **Save**.

A new module is added successfully.

#### **2.3.7 Add a Surveyor, a Client or Other Role for Any Module**

If you want to add a surveyor, a client or other role for any added module,

1. Click a respective [![image-1651602765532.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651602765532.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651602765532.png)(Add icon) provided in the **Add Surveyor/Client** column. The **Add Surveyor/Client/Others** window opens.
    
    [![image-1651602780108.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651602780108.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651602780108.png)
2. Click [![image-1651602799574.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651602799574.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651602799574.png) (**ADD** button). A new window opens to enter the name and type of a role.
    
    [![image-1651602818857.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651602818857.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651602818857.png)
3. In the **Name** box, enter the name of the person to whom you want to add a role.
4. In the **Type** box, select the type of role from a drop-down list.
5. Click **Save**.

#### **2.3.7 Edit Any Module**

If you want to edit any existing module details from the list of modules in the **Skid/Module** page, do the following,

1. Click [![image-1651602885218.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651602885218.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651602885218.png)(Edit icon) in the ****Edit**** column for the respective module. See Fig 2.4. A new window opens to edit the module.
    
    [![image-1651602902625.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651602902625.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651602902625.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box in the ****Skid/Module**** page.
3. Click **Save**.

#### **2.3.8 Delete Any Module**

If you want to delete any specific module from the list of modules, you can use [![image-1651602973687.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651602973687.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651602973687.png) (Delete icon) provided in the **Delete** column of the **Skid/Module** page, See Fig 2.4.

1. Click [![image-1651602986271.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651602986271.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651602986271.png) (Delete icon) for the corresponding module. You receive a notification message “**Do you want to delete**?”.
2. Click **OK**.

#### **2.3.9 Export Modules List**

You can export a list of modules added in the **Skid/Module** page in the pdf and excel formats.

1. If you want to export the modules list in the pdf format, click [![image-1651603056401.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603056401.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603056401.png) (**PDF** button). See Fig 2.4. The modules list will be downloaded in the pdf format.
2. If you want to export the modules list in the excel format, click [![image-1651603100803.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603100803.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603100803.png) (**Excel** button).
    
    The modules list will be downloaded in the excel format.

#### **2.3.10 Close a Project** 

If you want to close any project from the app, do the following

<table border="1" id="bkmrk-make-sure-that-once-" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Make sure that once you have closed any project, you cannot even open or access the closed project.

</td></tr></tbody></table>

1. Click **Close Project** in the **Close Project** column for the corresponding module and project type. See Fig 2.4.
    
    You receive a notification message “**Are you sure want to close this project? You will not be able to access/reopen this project again**”.
2. Click **OK** to close the project.

# Project Data

### **3.0 Project Data**

The **Project Data** menu helps you to add the details of master data and personnel data when you started to do a project. This menu explains all the basic works of structural master drawing, weld map drawing, cutting plan drawing and import joints.

The **Project Data** menu appears with two options such as **Masters** and **Personnels**. The **Masters** option helps you to add master data for the structural project. The **Personnels** option helps you to add the details of persons for example welders and inspectors, who are all involved in the structural project.

### **3.1 Area** 

The **Area** tab in the **Project Data** menu helps you to add the details of area. If you want to add any area, do the following,

1. Click **Area** in the **Project Data** menu.
    
    The **Area** page opens.
    
    [![image-1651603589366.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603589366.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603589366.png)
    
     **Figure 3.1: Area page**

#### **3.1.1 Add an Area**

If you want to add an area, do the following,

1. Click [![image-1651603646996.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603646996.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603646996.png) (**ADD** button) in the **Area** page. See Fig 3.1. A new window opens to add an area.
    
    [![image-1651603661879.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603661879.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603661879.png)
    
    [![image-1651603678108.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603678108.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603678108.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.
2. In the **Area** box, enter the name of an area.
3. In the **Abbreviation** box, enter the abbreviation for the added area.
4. In the **Area No** box, enter the area number.
5. Click **Save**.
    
    The area is successfully added.

#### **3.1.2 Edit Any Area**

 If you want to edit any existing area in the **Area** page, do the following,

1. Click [![image-1651603749311.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603749311.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603749311.png)(Edit icon) in the **Edit** column for the respective area. See Fig 3.1. A new window opens to edit the area.
    
    [![image-1651603763233.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603763233.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603763233.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **3.1.3 Delete Any Area**

If you want to delete any specific area from the list of areas, you can use (Delete icon) provided in the **Delete** column of the **Area** page, See Fig 3.1.

1. Click [![image-1651603839749.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603839749.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603839749.png) (Delete icon) for the corresponding area.
    
    You receive a notification message “**Do you want to delete?**”.
2. Click **OK**.

#### **3.1.4 Export Areas List**

You can export a list of areas added in the **Area** page in the pdf and excel formats.

1. If you want to export the areas list in the pdf format, click [![image-1651603910416.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603910416.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603910416.png) (**PDF** button).
    
    The list will be downloaded in the pdf format.
2. If you want to export the areas list in the excel format, click [![image-1651603933698.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651603933698.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651603933698.png) (****Excel**** button). The list will be downloaded in the excel format.

#### **3.1.5 Filter Any Area**

If you want to filter any area from the list of areas in the **Area** page, do the following,

1. Click [![image-1651604010559.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604010559.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604010559.png) (**FILTER** button) located on the **Area** page. See Fig 5.1. Once you clicked the **Filter** button, the filter box opens for the **Area, Abbreviation,** and **Area No** columns.
    
    [![image-1651604031068.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604031068.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604031068.png)
2. Enter relevant detail in the respective column’s filter box to filter any area.

#### **3.1.6 Import Multiple Areas**

If you want to import multiple areas together, do the following,

1. Click [![image-1651604099263.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604099263.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604099263.png) (**TEMPLATE** button) on the **Area** page. See Fig 3.1.
    
    A template will be downloaded as an excel worksheet to enter the details of multiple areas.
    
    [![image-1651604115811.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604115811.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604115811.png)
2. Enter the relevant details in the required columns on the excel worksheet.
3. Once you have added the area details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651604149198.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604149198.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604149198.png) (**IMPORT** button). See Fig 3.1.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651604180432.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604180432.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604180432.png)
5. Click (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651604210730.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604210730.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604210730.png) (**Upload** button) to export the areas that are included in the excel worksheet.

The details of the areas in the worksheet will be displayed in the **Area** page.


### **3.2 Client Master Drawings**

Master drawing is a layout drawing provided to explain about the material such as plate and beam, and the material’s parameters used in the structural project. The **Client Master Drawings** tab helps you to add the client master drawing details.

If you want to add any client master drawing details, do the following,

1. Click **Client** **Master Drawings** in the **Project Data** menu. The **Client** **Master Drawings** page opens.
    
    [![image-1651604306591.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604306591.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604306591.png)
    
     **Figure 3.2 Client Master Drawings page**

#### **3.2.1 Add a Client Master Drawing**

If you want to add a client master drawing, do the following,

1. Click [![image-1651604374952.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604374952.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604374952.png) (**ADD** button) in the **Client Master Drawings** page. See Fig 3.2. A new window opens to add a client master drawing.
    
    [![image-1651604393459.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604393459.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604393459.png)
    
    [![image-1651604404786.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604404786.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604404786.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **Client** **Master Drawing No** box, enter the client master drawing number.
3. In the **Revision** box, enter the revision number.
4. In the **Level** box, enter the level number of the client master drawing.
5. If you want to enable the full traceability option, click the check box provided with the **Full Traceability?** column.
6. In the **Sub System** box, select the system and sub system numbers from a drop-down list.
7. In the **Issued Date** box, select the issued date of the client master drawing.
8. In the **Issued To** box, select the purpose of issuing the client mater drawing.
9. In the **Sheet Number** box, enter the sheet number of the client master drawing.
    
    [![image-1651604481413.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604481413.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604481413.png)**Note**: The sheet number is nothing but a page number of the master drawing sheet. If the master drawing is provided in single sheet, the **Sheet No** should be 1 of 1. If the drawing is stretched to two pages, then the **Sheet No** should be 1 of 2 and 2 of 2.
10. In the **Remarks/Description** box, enter your remarks or description if any.
11. Click **Save**.

The client master drawing is successfully added.

#### **3.2.2 Attach a File into a Client Master Drawing** 

If you want to attach any file with any client master drawing listed in the **Client** **Master Drawings** page,

1. Click [![image-1651604598247.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604598247.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604598247.png) (Attach icon) provided in the **Attachment** column for the respective client master drawing in the **Client** **Master Drawings** page. The **File Upload (Client Master Drawings)** page opens.
    
    [![image-1651604620635.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604620635.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604620635.png)
    
    [![image-1651604636291.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604636291.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604636291.png)**Note**: Before uploading any file, read the instructions given in the **File Upload (Client Master Drawings)** page.
2. Click [![image-1651604666691.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604666691.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604666691.png) (**Browse** button) to select a file to be uploaded.
3. Select any file which you want to upload, from your computer.
4. Click [![image-1651604686833.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604686833.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604686833.png) (**Upload** button) to attach the file.

The uploaded file will be displayed in the **File Upload** table.

#### **3.2.3 Edit Any Client Master Drawing**

If you want to edit any existing client master drawing in the **Client** **Master Drawings** page, do the following,

1. Click [![image-1651604753658.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604753658.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604753658.png)(Edit icon) in the **Edit** column for the respective client master drawing. See Fig 3.2. A new window opens to edit the client master drawing.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **3.2.4 Delete Any Client Master Drawing**

If you want to delete any specific client master drawing from the list of client master drawings, you can use [![image-1651604823360.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604823360.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604823360.png) (Delete icon) provided in the **Delete** column of the **Client** **Master Drawings** page, See Fig 6.2. To know how to delete, see the topic, “**Delete Any Area**”.

#### **3.2.5 Export Client Master Drawings List**

You can export a list of client master drawings added in the **Client** **Master Drawings** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **3.2.6 Filter Any Client Master Drawing**

If you want to filter any client master drawing from the list of client master drawings in the **Client** **Master Drawings** page, you can use the [![image-1651604922967.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651604922967.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651604922967.png) (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.

#### **3.2.7 Import Multiple Client Master Drawings**

If you want to import multiple client master drawings together, do the following,

1. Click [![image-1651605019573.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605019573.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605019573.png) (**TEMPLATE** button) on the **Client** **Master Drawings** See Fig 3.2. A template will be downloaded as an excel worksheet to enter the details of client master drawings.
    
    [![image-1651605039946.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605039946.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605039946.png)
2. Enter the relevant details in the required columns on the excel worksheet.
3. Once you have added the client master drawing details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651605092418.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605092418.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605092418.png)(****IMPORT**** button). See Fig 3.2. A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651605111596.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605111596.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605111596.png)
5. Click [![image-1651605133140.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605133140.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605133140.png) (****Browse**** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651605160791.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605160791.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605160791.png) (**Upload** button) to export the client master drawings that are included in the excel worksheet.

The details of the client master drawings in the worksheet will be displayed in the **Client** **Master Drawings** page.


### **3.3 Master Drawings**

The **Master Drawings** tab helps you to add the master drawing details. If you want to add any master drawing details, do the following,

1. Click **Master Drawings** in the **Project Data** menu.
    
    The **Master Drawings** page opens.
    
    [![image-1651605224694.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605224694.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605224694.png)
    
     **Figure 3.3 Master Drawings page**

#### **3.3.1 Add a Master Drawing**

If you want to add a master drawing, do the following,

1. Click [![image-1651605281438.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605281438.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605281438.png) (**ADD** button) in the **Master Drawings** page. See Fig 3.3. A new window opens to add a master drawing.
    
    [![image-1651605299698.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605299698.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605299698.png)
    
    [![image-1651605310452.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605310452.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605310452.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **Master Drawing No** box, enter the master drawing number.
3. In the **Client Master Drawing** box, select the client master drawing from a drop-down list.
4. In the **Revision** box, enter the revision number.
5. In the **Level** box, enter the level number of the master drawing.
6. In the **Area** box, select an area from a drop-down list.
7. If you want to enable the full traceability option, click the check box provided with the **Full Traceability?** column.
8. In the Sheet Number box, enter the sheet number of the master drawing.
    
    [![image-1651605377911.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605377911.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605377911.png) **Note**: The sheet number is nothing but a page number of the master drawing sheet. If the master drawing is provided in single sheet, the **Sheet No** should be 1 of 1. If the drawing is stretched to two pages, then the **Sheet No** should be 1 of 2 and 2 of 2.
9. In the **Issued Date** box, choose the issued date of the master drawing.
10. In the **Remarks/Description** box, enter your remarks or description if any.
11. In the **Issued To** box, select the purpose of issuing the master drawing, from a drop-down list.
12. Click **Save**.

The master drawing is successfully added.

#### **3.3.2 Attach a File into a Master Drawing** 

If you want to attach any file with any master drawing listed in the **Master Drawings** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **3.3.3 Edit Any Master Drawing**

 If you want to edit any existing master drawing in the **Master Drawings** page, do the following,

1. Click [![image-1651605573165.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605573165.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605573165.png)(Edit icon) in the **Edit** column for the respective master drawing. See Fig 3.3. A new window opens to edit the master drawing.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **3.3.4 Delete Any Master Drawing**

If you want to delete any specific master drawing from the list of master drawings, you can use (Delete icon) provided in the [![image-1651605636955.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605636955.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605636955.png)**Delete** column of the **Master Drawings** page, See Fig 3.3.

1. Click [![image-1651605663402.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605663402.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605663402.png) (Delete icon) for the corresponding master drawing.
    
    You receive a notification message “**Do you want to delete?**”.
2. Click **OK**.
    
    [![image-1651605783245.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605783245.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605783245.png)**Note**: If you receive a notification message “**Delete failed! Please delete dependency records.**”, you must delete the corresponding weld map drawing for the selected master drawing.
    
    [![image-1651605803967.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605803967.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605803967.png)
    
    To delete the corresponding weld map drawing,
3. Navigate to the [<u>Weld Map Drawings</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.4%C2%A0weld-map-drawing) tab.
4. Find out the weld map drawing for the respective master drawing.
    
    [![image-1651605853321.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605853321.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605853321.png)**Tip**: one master drawing has either a single or multiple weld map drawing.
5. Delete the corresponding weld map drawings.
6. Navigate to the ****Master Drawing**** tab, and then repeat the ****steps 1 and 2**** to delete the respective master drawing.

#### **3.3.5 Export Master Drawings List**

You can export a list of master drawings added in the **Master Drawings** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **3.3.6 Filter Any Master Drawing**

If you want to filter any master drawing from the list of master drawings in the **Master Drawings** page, you can use the (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.

#### **3.3.7 Import Multiple Master Drawings**

You can import multiple master drawing details together by using a pre-defined excel template given in the application. If you want to import multiple master drawings together, do the following,

1. Click (**TEMPLATE** button) on the **Master Drawings** page. See Fig 3.3. A template will be downloaded as an excel worksheet to enter the details of master drawings.
    
    [![image-1651605981435.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651605981435.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651605981435.png)
2. Enter the relevant details in the required columns on the excel worksheet.
3. Once you have added the master drawing details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651606009305.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651606009305.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651606009305.png) (****IMPORT**** button). See Fig 3.3. A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651606035510.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651606035510.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651606035510.png)
5. Click [![image-1651606047740.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651606047740.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651606047740.png) (****Browse**** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651606074760.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651606074760.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651606074760.png) (**Upload** button) to export the master drawings that are included in the excel worksheet.

The details of the master drawings in the worksheet will be displayed in the **Master Drawings** page.


### **3.4 Weld Map Drawings**

Weld map drawing is an isometric drawing that assists in identifying weld joints in the structural project. This drawing also shows areas that will be used for NDT once welding is completed. By using the weld map drawing, the welding cycle and lead times will be reduced accordingly.

If you want to add any weld map drawing details, do the following,

1. Click **Weld Map Drawings** in the **Project Data** menu. The **Weld Map Drawings** page opens.
    
    [![image-1651632961854.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651632961854.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651632961854.png)
    
     **Figure 3.4 Weld Map Drawings page**

#### **3.4.1 Add a Weld Map Drawing**

If you want to add a weld map drawing, do the following,

1. Click [![image-1651633165997.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651633165997.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651633165997.png) (**ADD** button) in the **Weld Map Drawings** page. See Fig 3.4. A new window opens to add a weld map drawing.
    
    [![image-1651633183108.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651633183108.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651633183108.png)
    
    [![image-1651633190623.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651633190623.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651633190623.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the ****Master Drawing No**** box, select a master drawing number from a drop-down list.
3. In the **Weld Map Drawing** **No** box, enter the weld map drawing number.
4. In the **Revision** box, enter the revision number.
5. In the **Drawing Prefix** box, enter the drawing prefix.
6. In the ****Radiographic Testing (RT) Requirement (%)**** box, enter the required percentage of RT.
7. In the ****Ultrasonic Testing (UT) Requirement (%)****box, enter the required percentage of UT.
8. In the ****Magnetic Particle Testing (MT) Requirement (%)**** box, enter the required percentage of MT.
9. In the ****Dye penetrant inspection****(****PT) Requirement (%)**** box, enter the required percentage of PT. <table border="1" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.866%;">The RT Requirement (%), UT Requirement (%), MT Requirement (%) and PT Requirement (%) should be filled with valid numerical numbers. The joint testing will be performed based on the value given by you for example, if you enter 100 % of requirement, which means 100 % of the joints will be tested. If you enter 0 %, none of joints will be tested.
    
    </td></tr></tbody></table>
10. If you want to do the magnetic particle inspection after load test, click the check box provided with the ****Magnetic Particle Inspection (MPI) After Load Test?****
11. If you want to do PT after test, click the check box provided with the **PT After Test?** option.
12. In the **code** option, select any one from American Welding Society (AWS) or American Society of Mechanical Engineers (ASME) or BOTH.
13. In the **Remarks** box, enter your remarks if any.
14. In the **Issued Date** box, choose the issued date of the weld map drawing.
15. In the **Issued To** box, select the purpose of issuing the weld map drawing, from a drop-down list.
16. In the **Description** box, enter the description for the added weld map drawing.
17. Click **Save**.

The weld map drawing is successfully added.

#### **3.4.2 Attach a File into a Weld Map Drawing** 

If you want to attach any file with any weld map drawing listed in the **Weld Map Drawings** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **3.4.3 Edit Any Weld Map Drawing**

 If you want to edit any existing weld map drawing in the **Weld Map Drawings** page, do the following,

1. Click [![image-1651634002562.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651634002562.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651634002562.png)(Edit icon) in the **Edit** column for the respective weld map drawing. See Fig 6.4. A new window opens to edit the weld map drawing.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **3.4.4 Delete Any Weld Map Drawing**

If you want to delete any specific weld map drawing from the list of weld map drawings, you can use [![image-1651634129105.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651634129105.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651634129105.png) (Delete icon) provided in the **Delete** column of the **Weld Map Drawings** page, See Fig 6.4. To know how to delete, see the topic, “**Delete Any Area**”.

#### **3.4.5 Export Weld Map Drawings List**

You can export a list of weld map drawings added in the **Weld Map Drawings** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **3.4.6 Filter Any Weld Map Drawing**

If you want to filter any weld map drawing from the list of weld map drawings in the **Weld Map Drawings** page, you can use the[![image-1651634647616.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651634647616.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651634647616.png) (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.

#### **3.4.7 Import Multiple Weld Map Drawings**

If you want to import multiple weld map drawings together, do the following,

1. Click [![image-1651634687248.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651634687248.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651634687248.png) (**TEMPLATE** button) on the **Weld Map Drawings** page. See Fig 3.4. A template will be downloaded as an excel worksheet to enter the details of weld map drawings.
    
    [![image-1651634704830.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651634704830.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651634704830.png)
2. Enter the relevant details in the required columns on the excel worksheet.
3. Once you have added the weld map drawing details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651634738378.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651634738378.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651634738378.png) (****IMPORT**** button). See Fig 3.4. A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651634764620.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651634764620.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651634764620.png)
5. Click [![image-1651634774866.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651634774866.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651634774866.png) (****Browse**** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651634799476.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651634799476.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651634799476.png) (**Upload** button) to export the weld map drawings that are included in the excel worksheet.

The details of the weld map drawings in the worksheet will be displayed in the **Weld Map Drawings** page.



### **3.5 Sheet Number**

The **Sheet No** tab in the **Project Data** menu helps you to add the sheet number for a weld map drawing. The sheet number is nothing but a page number of the weld map drawing.

<table border="1" id="bkmrk-if-the-weld-map-draw" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">If the weld map drawing is provided in single sheet, the **Sheet No** should be 1 of 1. If the drawing is stretched to two pages, then the **Sheet No** should be 1 of 2 and 2 of 2.

</td></tr></tbody></table>

If you want to add the sheet number, do the following,

1. Click **Sheet No** in the **Project Data** menu. The **Sheet No** page opens.
    
    [![image-1651634900307.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651634900307.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651634900307.png)
    
     **Figure 3.5 Sheet No page**

#### **3.5.1 Add a Sheet Number**

If you want to add a sheet number, do the following,

1. Click [![image-1651634979314.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651634979314.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651634979314.png) (**ADD** button) in the **Sheet No** page. See Fig 3.5. A new window opens to add the sheet number for a weld map drawing.
    
    [![image-1651634992523.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651634992523.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651634992523.png)
    
    [![image-1651635001747.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651635001747.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651635001747.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **Weld Map Drawing** **No** box, select the weld map drawing number from a drop-down list.
    
    [![image-1651635025090.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651635025090.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651635025090.png)**Note**: If you want to add the sheet number for any new weld map drawings. You must add the respective weld map drawing details by using the [<u>Weld Map Drawings</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.4%C2%A0weld-map-drawing) tab.
3. In the ****Sheet No**** box, enter the sheet number of the weld map drawing.
4. Click **Save**.

The sheet number for the corresponding weld map drawing is successfully added.

#### **3.5.2 Edit Any Sheet Number** 

 If you want to edit any existing sheet number for the weld map drawing number in the **Sheet No** page, do the following,

1. Click [![image-1651635089023.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651635089023.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651635089023.png)(Edit icon) in the **Edit** column for the respective weld map drawing number. See Fig 3.5. A new window opens to edit the sheet number for the weld map drawing number.
2. Click a box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **3.5.3 Delete Any Sheet Number**

If you want to delete any specific sheet number of the weld map drawing number from the list of sheet numbers, you can use [![image-1651635142996.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651635142996.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651635142996.png)(Delete icon) provided in the **Delete** column of the **Sheet No** page, See Fig 6.5. To know how to delete, see the topic, “**Delete Any Area**”.

#### **3.5.4 Export Sheet Number List**

You can export a list of sheet numbers of the weld map drawing numbers added in the **Sheet No** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **3.5.5 Filter Any Sheet Number**

If you want to filter any sheet number from the list of sheet numbers in the **Sheet No** page, you can use the (**FILTER** button). To know how to filter, see the topic ,”**Filter Any Area**”.

#### **3.5.6 Import Multiple Sheet Numbers**

If you want to import multiple sheet numbers together, do the following,

1. Click [![image-1651635255006.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651635255006.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651635255006.png) (**TEMPLATE** button) on the **Sheet No** page. See Fig 3.5. A template will be downloaded as an excel worksheet to enter the details of weld map drawing numbers including their sheet numbers.
    
    [![image-1651635270452.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651635270452.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651635270452.png)
2. Enter the relevant details in the required columns on the excel worksheet.
3. Once you have added the sheet number details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651635296198.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651635296198.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651635296198.png) (**IMPORT** button). See Fig 3.5.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651635315337.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651635315337.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651635315337.png)
5. Click [![image-1651635336390.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651635336390.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651635336390.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651635359602.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651635359602.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651635359602.png) (****Upload**** button) to export the sheet numbers that are included in the excel worksheet.

The details of the sheet numbers in the worksheet will be displayed in the **Sheet No** page.



### **3.6 Joints**

In structural project, joints are the points where two or more pieces of materials for example pipes, are joined by welding. The **Joints** tab in the **Project Data** helps you add the joint details including joint number, welding type, and piece mark number.

If you want to add any joint details, do the following,

1. Click **Joints** in the **Project Data** menu. The **Joints** page opens.
    
    [![image-1651635650649.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651635650649.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651635650649.png)
    
     **Figure 3.6 Joints page**

#### **3.6.1 Add a Joint**

If you want to add a joint, do the following,

1. Click [![image-1651639257068.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651639257068.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651639257068.png) (**ADD** button) in the **Joints** page. See Fig 3.6. A new window opens to add a joint.
    
    [![image-1651639273577.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651639273577.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651639273577.png)
    
    [![image-1651639316807.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651639316807.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651639316807.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the ****Weld Map Drawing No**** box, enter the weld map drawing number.
3. In the **Sheet Number** box, select a sheet number from a drop-down list.
4. In the **Joint Number** box, select the joint number from a drop-down list.
    
    [![image-1651639386354.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651639386354.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651639386354.png)**Note**: If you want to enter the range for the joint number, click [![image-1651639414040.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651639414040.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651639414040.png) and then enter the ranges in the **From** and **To** boxes, respectively.
5. In the **Weld Type** box, select a weld type from a drop-down list.
6. In the **Thickness Material 1** box, enter the thickness of the first material.
7. In the **Thickness Material 2** box, enter the thickness of the second material.
8. In the **Weld Length** box, enter the length of welding.
9. In the **Dia (INCH)** box, enter the diameter of the joint.
10. In the **Size** box, enter the size of the welding.
11. In the **Thickness** box, enter the thickness of the welding.
12. In the **Category** box, select the category from a drop-down list.
13. In the **Assembly Mark** box, enter the assembly mark details.
14. Select the NDT requirement from the following options such as **RT Required**, **PT Required**, **MT Required**, and **UT Required**.
15. Click **Save**.

The joint is successfully added.

#### **3.6.2 Assign Piece Mark Number**

If you want to assign the piece mark number for any joint number.

1. Click [![image-1651639593119.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651639593119.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651639593119.png) (**Assign Piece Mark** button) in the **Joints** page. The **Joint Piece Mark** window opens.
    
    [![image-1651639614977.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651639614977.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651639614977.png)
2. In the **Joint No** box, select the joint number from a drop-down list.
    
    Once you have selected the joint number, the piece mark numbers related with the selected joint number appear.
    
    [![image-1651639637027.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651639637027.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651639637027.png)
3. If you want to assign a new piece mark number for the selected joint number, in the **Piece Mark No** box, click and then select the piece mark number from a drop-down list. A new piece mark number will be listed along with the existing piece mark numbers.
    
    [![image-1651639664137.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651639664137.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651639664137.png)
4. Select the new piece mark number.
    
    Once you have selected the new piece mark number, the selected piece mark number is assigned to the respective joint number.
    
    [![image-1651639697650.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651639697650.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651639697650.png)**Note**: If you want to delete any piece mark number, select the respective piece mark and click (**Delete Piece Mark** button). Once you have deleted the piece mark number, the joints related with this piece mark number will also be deleted.

#### **3.6.3 Edit Any Joint**

 If you want to edit any existing joint in the **Joints** page, do the following,

1. Click [![image-1651639745309.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651639745309.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651639745309.png)(Edit icon) in the **Edit** column for the respective joint. See Fig 3.6. A new window opens to edit the joint.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **3.6.4 Delete Any Joint**

If you want to delete any specific joint from the list of joints, you can use [![image-1651639811206.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651639811206.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651639811206.png) (Delete icon) provided in the **Delete** column of the **Joins** page, See Fig 6.6. To know how to delete, see the topic, “**Delete Any Area**”.

#### **3.6.5 Export Joints List**

You can export a list of joints added in the **Joints** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **3.6.6 Filter Any Joint** 

If you want to filter any joint from the list of joints in the **Joints** page, you can use the (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.

#### **3.6.7 Import Multiple Joints**

You can import multiple joint details together by using a pre-defined excel template given in the application. If you want to import multiple joints together, do the following,

1. Click [![image-1651639907035.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651639907035.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651639907035.png) (**TEMPLATE** button) on the **Joints** page. See Fig 3.6. A template will be downloaded as an excel worksheet to enter the details of joints.
    
    [![image-1651639928318.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651639928318.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651639928318.png)
2. Enter the relevant details in the required columns on the excel worksheet.
3. Once you have added the joint details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651639964140.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651639964140.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651639964140.png) (**IMPORT** button). See Fig 3.6.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651640055220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651640055220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651640055220.png)
5. Click [![image-1651640072444.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651640072444.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651640072444.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651640095420.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651640095420.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651640095420.png) (**Upload** button) to export the joints that are included in the excel worksheet.

The details of the joints included in the worksheet will be displayed in the **Joints** page.


### **3.7 Cutting Plan Drawings**

Cutting plan drawing is provided for each master drawing. Usually the Cutting Plan Drawing is prepared in AutoCAD. The drawing portion of the cutting plan drawing will be screen captured. A cutting plan drawing report is generated for sending to the clients.

If you want to add any cutting plan drawing details, do the following,

1. Click **Cutting Plan Drawings** in the **Project Data** menu. The **Cutting Plan Drawings** page opens.
    
    [![image-1651640296443.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651640296443.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651640296443.png)
    
     **Figure 3.7 Cutting Plan Drawings page**

#### **3.7.1 Add a Cutting Plan Drawing**

If you want to add a cutting plan drawing, do the following,

1. Click [![image-1651640425228.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651640425228.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651640425228.png) (**ADD** button) in the **Cutting Plan Drawings** page. See Fig 3.7. A new window opens to add a cutting plan drawing.
    
    [![image-1651640414152.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651640414152.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651640414152.png)
    
    [![image-1651640458626.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651640458626.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651640458626.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **Master Drawing No** box, select a master drawing number from a drop-down list.
3. In the **Drawing Prefix** box, enter the drawing prefix.
4. In the **Cutting Plan Drawing No** box, enter a cutting plan drawing number.
5. In the **Revision** box, enter the revision number.
6. In the **Remarks** box, enter your remarks if any.
7. In the **Issued Date** box, choose the issued date of the cutting plan drawing.
8. In the **Issued To** box, select the purpose of issuing the cutting plan drawing, from a drop-down list.
9. In the **Description** box, enter the description for the added cutting plan drawing.
10. In the **(Computer Numerical Control) CNC Program** No box, enter the CNC program number.
11. In the **Assembly Mark** box, enter the assembly mark.
12. Click **Save**.

The cutting plan drawing is successfully added.

#### **3.7.2 Attach a File into a Cutting Plan Drawing** 

If you want to attach any file with any cutting plan drawing listed in the **Cutting Plan Drawings** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **3.7.3 Edit Any Cutting Plan Drawing**

If you want to edit any existing cutting plan drawing in the **Cutting Plan Drawings** page, do the following,

1. Click [![image-1651640778822.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651640778822.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651640778822.png)(Edit icon) in the **Edit** column for the respective cutting plan drawing. See Fig 3.7. A new window opens to edit the cutting plan drawing.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **3.7.4 Delete Any Cutting Plan Drawing**

If you want to delete any specific cutting plan drawing from the list of cutting plan drawings, you can use [![image-1651640909704.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651640909704.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651640909704.png) (Delete icon) provided in the **Delete** column of the **Cutting Plan Drawings** page, See Fig 6.7. To know how to delete, see the topic, “**Delete Any Area**”.

#### **3.7.5 Export Cutting Plan Drawings List**

You can export a list of cutting plan drawings added in the **Cutting Plan Drawings** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **3.7.6 Filter Any Cutting Plan Drawing**

If you want to filter any cutting plan drawing from the list of cutting plan drawings in the **Cutting Plan Drawings** page, you can use the (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.

#### **3.7.7 Import Multiple Cutting Plan Drawings**

If you want to import multiple cutting plan drawings together, do the following,

1. Click [![image-1651641028775.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651641028775.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651641028775.png) (**TEMPLATE** button) on the **Cutting Plan Drawings** See Fig 3.7. A template will be downloaded as an excel worksheet to enter the details of cutting plan drawings.
    
    [![image-1651641099315.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651641099315.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651641099315.png)
2. Enter the relevant details in the required columns on the excel worksheet.
3. Once you have added the weld map drawing details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651641144917.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651641144917.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651641144917.png) (**IMPORT** button). See Fig 3.7.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651641183876.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651641183876.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651641183876.png)
5. Click [![image-1651641201437.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651641201437.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651641201437.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651641228077.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651641228077.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651641228077.png) (**Upload** button) to export the cutting plan drawings that are included in the excel worksheet.

The details of the cutting plan drawings in the worksheet will be displayed in the **Cutting Plan Drawings** page.


### **3.8 Piece Mark number**

The materials used in the Structural Project are cut into multiple pieces by using the cutting plan drawings, where each piece is provided with respective unique number also known as piece mark number. The piece mark number is manually added by a user, and mapped later with weld joints.

The **Piece Mark Number** tab in the **Project Data** helps you add the piece mark number details including cutting plan drawing number. If you want to add any piece mark number details, do the following,

1. Click **Piece Mark Number** in the **Project Data** menu. The **Piece Mark Number** page opens.
    
    [![image-1651641369721.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651641369721.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651641369721.png)
    
     **Figure 3.8 Piece Mark Number page**
    
    <table border="1" style="border-collapse: collapse; width: 100%; height: 80.1719px;"><tbody><tr style="height: 80.1719px;"><td style="width: 99.866%; height: 80.1719px;">The **Master Drawing No** box and **Cutting Plan Drawing No** boxes provided in the upper right-side of the **Piece Mark Number** page including a drop-down arrow to easily sort the specific master drawing number and cutting plan drawing number. See Fig 3.8.
    
    </td></tr></tbody></table>

#### **3.8.1 Add a Piece Mark Number**

If you want to add a piece mark number, do the following,

1. Click [![image-1651641553160.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651641553160.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651641553160.png)(**ADD** button) in the **Piece Mark Number** page. See Fig 3.8. A new window opens to add a piece mark number.
    
    [![image-1651641582348.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651641582348.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651641582348.png)
    
    [![image-1651641595991.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651641595991.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651641595991.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **Cutting Plan Drawing No** box, select a cutting plan drawing number from a drop-down list.
3. In the **Piece Mark No** box, enter a piece mark number from a drop-down list.
4. In the **Material Description** box, select the material description from a drop-down list.
5. In the **Material Specification** box, select the material specification from a drop-down list.
6. In the **Size/Thickness/Diameter** box, enter the size/thickness/diameter of the material.
7. In the **Width** box, enter the width of the material.
8. In the **Length** box, enter the length of welding.
9. In the **Material Grade 1** box, enter the grade 1 material details.
10. Click **Save**.

The piece mark number is successfully added.

#### **3.8.2 Edit Any Piece Mark Number**

If you want to edit any existing piece mark number in the **Piece Mark Number** page, do the following,

1. Click [![image-1651641741157.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651641741157.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651641741157.png)(Edit icon) in the **Edit** column for the respective piece mark number. See Fig 3.8. A new window opens to edit the piece mark number.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **3.8.3 Delete Any Piece Mark Number**

If you want to delete any specific piece mark number from the list of piece mark numbers, you can use [![image-1651641869351.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651641869351.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651641869351.png) (Delete icon) provided in the **Delete** column of the **Piece Mark Number** page, See Fig 6.8. To know how to delete, see the topic, “**Delete Any Area**”.

#### **3.8.4 Export Piece Mark Numbers List**

You can export a list of piece mark numbers added in the **Piece Mark Number** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **3.8.5 Filter Any Piece Mark Number** 

If you want to filter any piece mark number from the list of piece mark numbers in the **Piece Mark Number** page, you can use the (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.

#### **3.8.6 Import Multiple Piece Mark Numbers**

You can import multiple piece mark numbers together by using a pre-defined template given in the application. If you want to import multiple piece mark numbers together, do the following,

1. Click [![image-1651642035085.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651642035085.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651642035085.png) (**TEMPLATE** button) on the **Piece Mark Number** See Fig 3.8. A template will be downloaded as an excel worksheet to enter the details of piece mark numbers.
    
    [![image-1651642124487.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651642124487.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651642124487.png)
2. Enter the relevant details in the required columns on the excel worksheet.
3. Once you have added the piece mark number details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651642151955.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651642151955.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651642151955.png) (**IMPORT** button). See Fig 3.8.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651642174784.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651642174784.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651642174784.png)
5. Click [![image-1651642190711.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651642190711.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651642190711.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651642214734.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651642214734.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651642214734.png) (**Upload** button) to export the piece mark numbers that are included in the excel worksheet.

The details of the piece mark numbers included in the worksheet will be displayed in the **Piece Mark Number** page.



### **3.9 Import Joints**

The **Import Joints** tab helps you to upload various data for different fields included in the **Project Data** menu instead of uploading data for each field individually. If you want to import data for different fields, do the following,

1. Click the **Import Joints** tab in the **Project Data** menu. The **Excel Import** page opens.
    
    [![image-1651643696076.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651643696076.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651643696076.png)
2. Download a template by clicking “**Click here to Download Sample Template**” to enter the details of data.
    
    An excel worksheet will be downloaded.
    
    [![image-1651643733739.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651643733739.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651643733739.png)
3. Enter the relevant details in the respective column of the excel worksheet based on the columns listed in the **Required Columns to Import** field.
4. Click [![image-1651643761031.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651643761031.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651643761031.png) (**Choose File** button).
    
    Once the file has been uploaded successfully, you receive a message, “**Successfully uploaded**”
5. Click [![image-1651643790936.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651643790936.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651643790936.png) (**Get Columns** button).
    
    The columns added in the excel worksheet will be listed in the **Excel Column** field. The system automatically maps the **Required Columns to Import** field and the **Excel Column** field and displays in the **Mapped Columns** field.
    
    [![image-1651643948582.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651643948582.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651643948582.png)
6. If you want to map any columns or to u map any mapped columns, select the respective columns and then click [![image-1651643862545.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651643862545.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651643862545.png)(**Map** button) and [![image-1651643881266.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651643881266.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651643881266.png) (**UnMap** button) accordingly.
7. Once you have completed the mapping and un mapping of columns, in the **Upload Range From** and **To** fields, enter the range of rows you want to upload from the excel worksheet.
    
    [![image-1651643971051.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651643971051.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651643971051.png)**Note**: In the **Total Rows** field, the system indicates the total number of rows filled in the excel worksheet.
    
    [![image-1651643983888.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651643983888.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651643983888.png) **Tip**: You must enter the upload starting range as two in the **Upload Range From** field because a first row in the excel worksheet is having heading of the columns.
8. Click [![image-1651644005233.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651644005233.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651644005233.png) (**Populate Value** button).
9. Click [![image-1651644019267.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651644019267.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651644019267.png) (**Process** button).
    
    Once you have clicked the Process button, the system processes the columns and displays in the **Excel Import** page.
    
    [![image-1651644083553.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651644083553.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651644083553.png)
10. Click (**Import** button) to import the data added in the excel worksheet.



### **3.10 Joints Bulk Edit**

The **Joints Bulk Edit** tab in the **Structural** menu used to hide the specific joints, which are added using the [**<u>Joints</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.6%C2%A0joints) tab.

<table border="1" id="bkmrk-once-the-joints-have" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Once the joints have been hidden, the joints will not be available while adding any fit-up request.

</td></tr></tbody></table>

If you want to hide any joints, do the following,

1. Click the **Joints Bulk Edit** tab. The **Joints Bulk Update** page opens with a list of added joints.
    
    [![image-1651644202743.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651644202743.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651644202743.png)
    
    The **Joints Bulk Update** page shows the weld map drawing number, sheet number, and piece mark number for the corresponding joint number.
2. If you want to hide any joints, select the checkbox of the respective joints, in the ****Hide Joint**** column of the ****Joints Bulk Update**** page.
3. Click **Save Changes**.

The selected joints will be hidden.

### **3.11 Assign Unique/ WPS No**

The **Assign Unique/WPS No** tab in the **Project Data** menu allows you to assign the unique and WPS numbers for the specific joint number, piece mark number, and weld map drawing number.

#### **3.11.1 Assign Unique No**

If you want to assign a unique number for any joint number, piece mark number, and weld map drawing number, do the following,

1. Click the **Assign Unique/WPS No** tab in the ****Project Data**** menu. The **Assign Unique/WPS No** page opens including a list of joint numbers, piece mark numbers, and weld map drawing numbers.
    
    [![image-1651644333210.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651644333210.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651644333210.png)
2. Click the **Assign Unique No** option.
    
    A list of unique numbers appears below the **Assign Unique No** option.
3. If you want to assign any unique number, select the respective unique number, and then select the respective check boxes of the joint numbers, piece mark numbers, and weld map drawing numbers provided in the ****Assign?****
4. Click **Save**.

#### **3.11.2 Assign WPS No**

If you want to assign a WPS number for any joint number, piece mark number, and weld map drawing number, do the following,

1. Click the **Assign WPS No** option in the **Assign Unique No/WPS No** page. [![image-1651644472175.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651644472175.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651644472175.png)
    
    A list of unique numbers appears below the **Assign WPS No** option.
2. If you want to assign any WPS number, select the respective WPS number, and then select the respective check boxes of the joint numbers, piece mark numbers, and weld map drawing numbers provided in the **Assign?** column.
3. Click **Save**.


### **3.12 Clone Project**

The **Clone Project** tab in the Project Data menu helps you to clone the items of any one project to another project. Once you have completed the project cloning, the items are copied into the selected project without need to uploading the items again. If you want to clone any project, do the following,

1. Click the **Clone Project** tab in the **Project Data** menu.
    
    The **CLONE PROJECT** page opens.
    
    [![image-1651644550370.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651644550370.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651644550370.png)
    
     **Figure 3.12: Clone Project page**
2. In the **From Project** box, select a project from which you want to clone the items, from a drop-down list.
3. In the **To Project** box, select a project to which you want to clone the items, from a drop-down list.
4. In the ****Items to clone**** box, select the items you want to clone.
5. Click **Clone**.



### **3.13 Welders in Projects**

The **Welders in Projects** tab in the **Project Data** menu helps you to assign welders for a project. You can add a welder report by using this tab. This tab also helps you to view a welder list and WPQ details.

1. Click the **Welders in Projects** tab in the **Project Data** menu. The welders in projects page opens with four fields such as **Welder Report**, **Assign Welder to Project**, **Welder List**, and **WPQ Details**.
    
    [![image-1651644658879.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651644658879.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651644658879.png)
    
     **Figure 3.13: Welders in project page**

#### **3.13.1 Add a Welder Report**

If you want to add a welder report, do the following,

1. Click [![image-1651644710412.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651644710412.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651644710412.png) (**ADD** button) in the **Welder Report** See Fig 3.13. A new window opens to add a welder report.
    
    [![image-1651644732514.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651644732514.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651644732514.png)
    
    [![image-1651644743645.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651644743645.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651644743645.png)**Tip**: A report number for a new welder report will be updated automatically in the **Report Number** box.
2. In the **Prepared By** box, enter the name of welder who has prepared the welder report.
3. In the **Received By** box, enter the name of welder who has received the welder report.
4. In the **Approved By** box, enter the name of welder who has approved the welder report.
5. In the **Prepared Date** box, choose the prepared date of the welder report.
6. In the **Received Date** box, choose the received date of the welder report.
7. In the **Approved Date** box, choose the approved date of the welder report.
8. Click **Save**.

The welder report is successfully added.

#### **3.13.2 Export Welder Reports List**

You can export a list of welder reports in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **3.13.3 Assign Welder to Project**

The **Assign Welder to Project** field in the welders in projects page allows you to assign any welder to the project. If you want to assign any welder to the project, do the following,

[![image-1651645184559.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651645184559.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651645184559.png)

1. In the **All Welders** box, if you want to view all the welders, click **ALL** otherwise select the respective company’s welder group from a drop-down list to view their welders list. Once you have selected the company’s welder group, the left-side box shows a list of welders. The right-side box shows a list of welders who has been already assigned for the project.
2. If you want to assign any welder for the project, select the respective welder in the left-side box, and then click (Assign welder button).
    
    The selected welder will be assigned to the project.
3. If you want to reject any welder who has been assigned for the project, select the respective welder in the right-side box, and then click (Reject welder button).

#### **3.13.4 Welder List**

The **Welder List** field in the welders in projects page shows the welder details such as welder name, welder number, NRIC, date of birth, and nationality. This field also helps you to assign the WPQs of welders to the project, and remove any WPQs from the project.

[![image-1651645297106.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651645297106.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651645297106.png)

If you click [![image-1651645314112.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651645314112.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651645314112.png)(Expand icon) of the respective welder, the **All WPQ** box shows the details of all WPQs of the welder, and the **Assigned to Project** box shows any WPQ that has been assigned to a project.

[![image-1651645325285.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651645325285.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651645325285.png)

1. If you want to assign any WPQ for the project, select the respective WPQ in the **All WPQ** box, and then click [![image-1651645366344.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651645366344.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651645366344.png) (Assign WPQ button). The selected welder will be assigned to the project.
2. If you want to reject any WPQ that has been assigned for the project, select the respective WPQ in the ****Assigned to Project**** box, and then click (Reject WPQ button).

#### **3.13.5 WPQ details**

The **WPQ details** field in the welders in projects page shows the WPQ details of each welder including welder’s name, welder number, welding process name, weld metal thickness, and position.

[![image-1651645423214.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651645423214.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651645423214.png)

If you want to take a print of any WPQ details, click the checkbox provided in the **Print** Column.


### **3.14 Inspectors in Projects**

The **Inspectors in Projects** tab in the **Project Data** menu helps you to map inspectors for the specific project.

1. Click the **Inspectors in Projects** tab. The **Project Mapping – Inspectors** page opens.
    
    [![image-1651645479240.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651645479240.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651645479240.png)
    
     **Figure 3.14: Project Mapping – Inspectors page**
    
     The **Project Mapping – Inspectors** page shows a list of inspectors, which is added in the **Master Data**. If you want to map any inspectors for a specific project, do the following,
2. Select a project you want from the **Projects** box.
    
    A list of available inspectors will be displayed.
3. Select the check box of the respective inspector which you want to map for the selected project.
    
    [![image-1651645606781.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651645606781.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651645606781.png)
4. Click [![image-1651645629170.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651645629170.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651645629170.png) (Map icon).
    
    The selected inspectors are mapped for the selected project.
    
    [![image-1651645646134.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651645646134.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651645646134.png)
    
    The **Inspector List** window shows the inspector’s name, login name, NRIC, and Date of birth.


### **3.15 WPS by Projects**

WPS is a written instruction that specifies materials, consumables and edge preparations for a given joint. The WPS lists the pre- and post-weld operations including heat treatments; machining, grinding, and dressing of the weld.

The **WPS by Projects** tab in the **Project Data** menu helps you to add a WPS report and assign the WPS to a project.

1. Click the **WPS by Projects** tab in the **Project Data** menu. The WPS by projects page opens with two fields such as **WPS Summary** and **Assign WPS to Project**.
    
    [![image-1651645760833.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651645760833.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651645760833.png)
    
     **Figure 3.15: WPS by projects page**

#### **3.15.1 Add a WPS Report**

If you want to add a new WPS report, do the following,

1. Click [![image-1651645825401.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651645825401.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651645825401.png) (**ADD** button) in the **WPS Summary** field. See Fig 3.15. A new window opens to add a WPS report.
    
    [![image-1651645840670.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651645840670.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651645840670.png)
    
    [![image-1651645851632.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651645851632.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651645851632.png)**Tip**: A report number for a new WPS report will be updated automatically in the **Report Number** box.
2. In the ****Prepared By**** box, enter the name of a person who has prepared the WPS report.
3. In the **Reviewed By** box, enter the name of a person who has reviewed the WPS report.
4. In the **Approved By** box, enter the name of a person who has approved the WPS report.
5. In the **Prepared Date** box, choose the prepared date of the WPS report.
6. In the **Reviewed Date** box, choose the reviewed date of the WPS report.
7. In the **Approved Date** box, choose the approved date of the WPS report.
8. Click **Save**.

The WPS report is successfully added.

#### **3.15.2 Export WPS Reports List**

You can export a list of added WPS reports in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **3.15.3 Assign WPS to Project**

The **Assign WPS to Project** field in the WPS in projects page allows you to assign the WPS to the project. If you want to assign any WPS to the project, do the following,

[![image-1651646002495.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651646002495.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651646002495.png)

In the **Assign WPS to Project** field, the **All WPS** box displays a list of available WPS. The **WPS in Project** box displays a list of WPS that has been already assigned for the project.

1. If you want to assign any WPS for the project, select the respective WPS in the **ALL WPS** box, and then click [![image-1651646036889.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651646036889.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651646036889.png)(Assign welder button). The selected WPS will be assigned to the project.
2. If you want to reject any WPS that has been assigned for the project, select the respective WPS in the ****WPS in Project**** box, and then click [![image-1651646070738.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651646070738.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651646070738.png) (Reject welder button).


### **3.16 Master Equipment**

The **Master Equipment** tab in the **Project Data** menu used to add a master equipment.

1. Click **Master Equipment** in the **Project Data** menu. The **Master Equipment** page opens.
    
    [![image-1651646129602.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651646129602.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651646129602.png)
    
     **Figure 3.16: Master Equipment**

#### **3.16.1 Add a Master Equipment**

If you want to add a master equipment,

1. Click (**ADD** button) in the **Master Equipment** page. See Fig 3.16. A new window opens to add a master equipment.
    
    [![image-1651658167523.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651658167523.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651658167523.png)
2. In the **Tag Number** box, enter the tag number.
3. In the **Description** box, enter the description for the master equipment.
4. In the **Sequence Number** box, enter the sequence number.
5. In the **Sub System** box, select a sub system.
6. In the **Area** box, enter the area name.
7. In the **Location** box, enter the location name.
8. In the **Vendor PID** box, enter the vendor PID number.
9. In the **Layout** box, enter the layout detail.
10. In the **Parent Tag** box, enter the parent tag number.
11. In the **PO Number** box, enter the PO number.
12. In the **Manufacturer** box, enter the manufacturer name.
13. In the **Supplier** box, enter the supplier name.
14. In the **Length** box, enter the length of the master equipment.
15. In the **Width** box, enter the width of the master equipment.
16. In the **Height** box, enter the height of the master equipment.
17. In the **Diameter** box, enter the diameter of the master equipment.
18. In the **Dry Weight** box, enter the dry weight of the master equipment.
19. In the **Operating Weight** box, enter the operating weight of the master equipment.
20. In the **Insulation Type** box, enter the insulation type.
21. In the **Serial Number** box, enter the serial number.
22. In the **Remarks** box, enter your remarks if any.
23. In the **Engineering Status** box, enter the engineering status.
24. Click **Save**.

The master equipment is successfully added.

#### **3.16.2 Map CR/CS**

If you want to map Check Record/Check Sheet (CR/CS) for any added master equipment,

1. Click [![image-1651658382695.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651658382695.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651658382695.png)(Add icon) provided in the **Map CR/CS** column. The **Map CR/CS** window opens.
    
    [![image-1651658397833.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651658397833.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651658397833.png)
2. Select the checkbox of the CR/CS which you want to map.
3. Click **Save/Close**.

#### **3.16.3 Clone a Master Equipment**

The **Clone** option in the **Clone** column of the **Master Equipment** page used to add a master equipment as a copy of the previously added master equipment, See Fig 3.16.

1. Click [![image-1651658530987.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651658530987.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651658530987.png) (Clone icon) in the **Clone** column of the **Master Equipment** page. A new window opens to add the master equipment.
2. Enter the details of the master equipment.
    
    The new master equipment will be added.

#### **3.16.4 Edit Any Master Equipment**

If you want to edit any master equipment in the **Master Equipment** page, do the following,

1. Click [![image-1651658605034.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651658605034.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651658605034.png)(Edit icon) in the **Edit** column for the respective master equipment. See Fig 3.16. The page shows the added details of the master equipment.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **3.16.5 Export Master Equipments List**

You can export a list of master equipment added in the **Master Equipment** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **3.16.6 Filter Any Master Equipment** 

If you want to filter any master equipment from the list of master equipments in the **Master Equipment** page, you can use the [![image-1651658691350.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651658691350.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651658691350.png) (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.

#### **3.16.7 Import Multiple Master Equipments**

You can import multiple master equipments together by using a pre-defined template given in the application. If you want to import multiple master equipments together, do the following,

1. Click [![image-1651658744474.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651658744474.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651658744474.png) (**TEMPLATE** button) on the **Master Equipment** See Fig 3.16. A template will be downloaded as an excel worksheet to enter the details of master equipment.
    
    [![image-1651658762614.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651658762614.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651658762614.png)
2. Enter the relevant details in the required columns on the excel worksheet.
3. Once you have added the master equipment details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651658794990.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651658794990.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651658794990.png) (****IMPORT**** button). See Fig 3.16. A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651658856308.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651658856308.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651658856308.png)
5. Click [![image-1651658877295.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651658877295.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651658877295.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651658895629.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651658895629.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651658895629.png) (**Upload** button) to export the piece mark numbers that are included in the excel worksheet.

The details of the master equipments included in the worksheet will be displayed in the **Master Equipment** page.


### **3.17 Systems**

You can add the details of systems to be used in the Structural project by using the **Systems** tab in the **Project Data** menu. If you want to navigate to **Systems,**

1. Click **Systems** in the **Project Data** menu. The **System** page opens.
    
    [![image-1651658984663.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651658984663.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651658984663.png)
    
     **Figure 3.17: System page**

#### **3.17.1 Add System**

If you want to add a new system, do the following steps,

1. Click [![image-1651659058478.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659058478.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659058478.png) (**ADD** button) in the **System** page. See Fig 3.17. A new window opens to add a new system.
    
    [![image-1651659080729.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659080729.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659080729.png)
    
    [![image-1651659093576.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659093576.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659093576.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **System** box, enter the system name.
3. In the **Abbreviation** box, enter the abbreviation for the system name.
4. In the **System Number** box, enter the system number.
5. Click **Save.**
    
    The system is successfully added and listed in the **System** page.
    
    [![image-1651659141800.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659141800.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659141800.png)**Note**: If you want to map cover page for any added system, click the respective [![image-1651659166560.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659166560.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659166560.png)(Add icon) provided in the **Map Cover Page** column and add the cover pages.
    
    If you want to map certificates for any added system, click the respective (Add icon) provided in the **Map Certificates** column and add the cover pages.
    
    If you want to map Check Record/Check Sheet (CR/CS) for any added system, click the respective (Add icon) provided in the **Map CR/CS** column and add the cover pages.

#### **3.17.2 Edit System**

If you want to edit any existing system in the **System** page,

1. Click [![image-1651659256503.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659256503.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659256503.png)(Edit icon) of the respective System. See Fig 3.17. The **System** page shows the details of the selected system.
2. Edit the details where you want.
3. Click **Save**.

#### **3.17.3 Delete System**

If you want to delete any existing system in the **System** page, you can use [![image-1651659320550.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659320550.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659320550.png) (Delete icon) provided in the **System** page. To know how to delete, see the topic, “**Delete Any Area**”.

#### **3.17.4 Export System List**

You can export a list of systems added in the **System** page in both the pdf and excel formats by using[![image-1651659355160.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659355160.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659355160.png) (**PDF** button) and [![image-1651659366247.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659366247.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659366247.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **3.17.5 Filter System**

If you want to filter any specific system in the **System** page, you can use [![image-1651659424215.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659424215.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659424215.png) (**FILTER** button) located on the **System** page. To know how to filter, see the topic, ”**Filter Any Area**”.

#### **3.17.6 Import Multiple Systems**

If you want to import multiple systems together, do the following,

1. Click [![image-1651659462780.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659462780.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659462780.png) (**TEMPLATE** button). See Fig 3.17. An excel worksheet will be downloaded with a predefined template to enter the details of systems.
    
    [![image-1651659480729.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659480729.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659480729.png)
2. Enter the required system details in the respective columns of the excel worksheet.
3. Once you have added the system details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651659510503.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659510503.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659510503.png) (**IMPORT** button). See Fig 3.17.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651659540075.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659540075.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659540075.png)
5. Click [![image-1651659552512.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659552512.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659552512.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651659573527.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659573527.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659573527.png) (**Upload** button) to export the systems that are included in the excel worksheet.

The details of the systems in the worksheet will be displayed in the **System** page.

#### **3.17.7 Attach a File into a System**

If you want to attach any file with any system listed in the **System** page, you can attach the file by using [![image-1651659636106.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659636106.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659636106.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)”.



### **3.18 Sub Systems**

The **Sub** **Systems** tab in the **Project Data** menu helps you to add the details of sub systems to be in used in the Structural Project. If you want to navigate to **Sub** **Systems,**

1. Click **Sub** **Systems** in the **Project Data** menu. The **Sub** **Systems** page opens.
    
    [![image-1651659685247.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659685247.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659685247.png)
    
     **Figure 3.18: Sub System page**

#### **3.18.1 Add Sub System**

If you want to add a new sub system, do the following steps,

1. Click [![image-1651659747623.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659747623.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659747623.png) (**ADD** button) in the **Sub** **System** page. See Fig 3.18. A new window opens to add a new sub system.
    
    [![image-1651659765371.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659765371.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659765371.png)
    
    [![image-1651659788121.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659788121.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659788121.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **System** box, select a system from a drop-down list.
3. In the **Sub** **System** box, select a sub system from a drop-down list.
4. In the **Abbreviation** box, enter the abbreviation for the sub system.
5. In the **Sub** **System Number** box, enter the sub system number.
6. If the added subsystem needs to be flushed, select ****Yes**** in the ****Flushing**** option otherwise select ****No****.
7. If there is need to perform the leakage test for the added subsystem, select **Yes** in the **Leak Test** option otherwise select **No**.
8. In the **Description** box, enter the description for the added sub system.
9. Click **Save.**

The sub system is successfully added and listed in the **Sub** **System** page.

#### **3.18.2 Edit Sub System**

If you want to edit any existing sub system in the **Sub** **System** page,

1. Click [![image-1651659889101.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651659889101.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651659889101.png)(Edit icon) of the respective sub system. See Fig 6.18.
    
    The **Sub System** page shows the details of the selected sub system.
2. Edit the details where you want.
3. Click **Save**.

#### **3.18.3 Delete Sub System**

If you want to delete any existing sub system in the **Sub System** page, you can use [![image-1651660397600.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660397600.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660397600.png) (Delete icon) provided in the **Sub** **System** page. To know how to delete, see the topic, “**Delete Any Area**”.

#### **3.18.4 Export Sub System List**

You can export a list of sub systems added in the **Sub System** page in both the pdf and excel formats by using [![image-1651660435867.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660435867.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660435867.png) (**PDF** button) and [![image-1651660447199.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660447199.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660447199.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **3.18.5 Filter Sub System**

If you want to filter any specific sub system in the **Sub System** page, you can use (**FILTER** button) located on the **Sub System** page. To know how to filter, see the topic, ”**Filter Any Area**”.

#### **3.18.6 Import Multiple Sub Systems**

If you want to import multiple sub systems together, do the following,

1. Click [![image-1651660524739.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660524739.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660524739.png) (**TEMPLATE** button). See Fig 3.18. An excel worksheet will be downloaded with a predefined template to enter the details of sub systems.
    
    [![image-1651660604610.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660604610.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660604610.png)
2. Enter the required sub system details in the respective columns of the excel worksheet.
3. Once you have added the sub system details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651660633001.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660633001.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660633001.png) (****IMPORT**** button). See Fig 3.18. A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651660653449.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660653449.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660653449.png)
5. Click [![image-1651660666611.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660666611.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660666611.png) (****Browse**** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651660691446.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660691446.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660691446.png) (**Upload** button) to export the sub systems that are included in the excel worksheet.
    
    The details of the sub systems in the worksheet will be displayed in the **Sub System** page.

#### **3.18.7 Attach a File into a Sub System**

If you want to attach any file with any sub system listed in the **Sub** **System** page, you can attach the file by using [![image-1651660738631.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660738631.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660738631.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)”.



### **3.19 Import from Excel – Masters**

The **Import from Excel – Masters** tab helps you to upload master data for all fields instead of uploading data for each field individually.

If you want to import master data for different fields, do the following,

1. Click **Import from Excel – Masters** in the **Project Data** menu. The **File Upload** page opens.
    
    [![image-1651660795562.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660795562.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660795562.png)
    
     **Figure 3.19: File Upload page**
2. Download a template by using [![image-1651660833226.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660833226.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660833226.png) (****TEMPLATE**** button) to enter the details of master data. An excel worksheet will be downloaded with a pre-defined template to the details.
    
    [![image-1651660852438.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660852438.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660852438.png)
3. Enter the relevant details in the respective column of the excel worksheet.
4. Click [![image-1651660872295.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660872295.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660872295.png) (Choose File button).
    
    Once the file has been uploaded successfully, you receive a message, “Successfully uploaded”
5. Click [![image-1651660894378.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660894378.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660894378.png) (Get Columns button).
    
    The columns added in the excel worksheet will be listed in the **Excel Column** field.
    
    [![image-1651660919098.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660919098.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660919098.png)**Note**: Make sure that the **Excel Column** field must have all the columns as in the **System Column** field.
6. To map the columns in the **System Column** and **Excel Column** fields, do one of the following,
    
    
    1. 1. If you want to map the columns automatically, click [![image-1651660951231.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660951231.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660951231.png) (****AutoMap**** button). The columns will be mapped automatically and displayed in the **Mapped Columns** field.
        2. If you want to map each column manually, select the respective columns in both the ****System Column****and ****Excel Column**** fields and then click [![image-1651660978678.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660978678.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660978678.png) (****Map**** button). The selected columns will be mapped and displayed in the **Mapped Columns** field.
            
            [![image-1651660997379.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651660997379.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651660997379.png)
7. To un-map the columns in the ****Mapped Columns**** field, select the respective column and then click [![image-1651661022156.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661022156.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661022156.png) (****UnMap**** button). Once you have completed the mapping and un-mapping of columns, you must enter the range for uploading the data from the excel worksheet.
    
    [![image-1651661050096.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661050096.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661050096.png)**Note**: In the **Total Rows** field, the system indicates the total number of rows filled in the excel worksheet.
    
    [![image-1651661067152.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661067152.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661067152.png)**Tip**: You must enter the upload starting range as two in the **Upload Range From** field because a first row in the excel worksheet is having heading of the columns.
8. In the **Upload Range From and To** fields, enter the range of rows you want to upload from the excel worksheet.
9. Click [![image-1651661097560.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661097560.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661097560.png) (**Populate Values** button).
    
    The data are populated.
10. Click [![image-1651661121751.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661121751.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661121751.png) (**Process** button). The system processes all the uploaded data and displays in the **Excel Import** page.
    
    [![image-1651661139834.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661139834.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661139834.png)
11. Click [![image-1651661155970.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661155970.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661155970.png) (**Update** button) to import the uploaded data. The data will be successfully imported.


### **3.20 Workflow Settings**

The **Workflow Settings** tab in the **Project Data** menu used to set a workflow in the **Structural** project.

1. Click **Workflow Settings** in the **Project Data** menu. The **Workflow** page opens.
    
    [![image-1651661209382.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661209382.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661209382.png)
    
     **Figure 3.20: Workflow page**

#### **3.20.1 Add a Workflow**

If you want to add a workflow,

1. Click [![image-1651661336807.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661336807.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661336807.png) (**ADD** button) in the **Workflow** page. See Fig 3.20. The page shows a new window to add the category.
    
    [![image-1651661351358.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661351358.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661351358.png)
2. In the **Category** box, select a category from a drop-down list.
3. Click **Save**.
    
    The added category will be listed in the **Workflow** page. See Fig 3.20.
4. Click [![image-1651661385763.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661385763.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661385763.png) (Add icon) of the respective category.
    
    The **Workflow Details** window opens.
    
    [![image-1651661414300.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661414300.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661414300.png)
5. Click [![image-1651661433296.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661433296.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661433296.png) (**ADD** button) in the **Workflow Details** window. [![image-1651661444807.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661444807.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661444807.png)
6. In the **Role Name** box, select a role name from a drop-down list.
7. In the **Description** box, enter the description for the role name.
8. Click **Save**.

#### **3.20.2 Edit a Workflow**

If you want to edit any existing workflow in the **Workflow** page,

1. Click [![image-1651661497735.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661497735.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661497735.png) (Edit icon) of the respective workflow. See Fig 3.20. The **Workflow** page shows the details of the selected workflow.
2. Edit the details where you want.
3. Click **Save**.

#### **3.20.3 Delete a Workflow**

If you want to delete any existing workflow in the **Workflow** page, you can use [![image-1651661550815.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661550815.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661550815.png) (Delete icon) provided in the **Workflow** page. To know how to delete, see the topic, “**Delete Any Area**”.

#### **3.20.4 Export Workflow List**

You can export a list of workflows added in the **Workflow** page in both the pdf and excel formats by using [![image-1651661587577.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661587577.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661587577.png) (**PDF** button) and [![image-1651661597068.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651661597068.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651661597068.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **3.20.5 Filter Any Workflow** 

If you want to filter any specific workflow, you can use (**FILTER** button) located on the **Workflow** page. To know how to filter, see the topic, ”**Filter Any Area**”.



### **3.21 Job Code**

Job codes are individualized sets of numbers assigned to different jobs in order to identify which class a position belongs to. The **Job Code** tab in the **Project Data** menu used to add a job code.

1. Click **Job Code** in the **Project Data** menu. The **Job Code** page opens.
    
    [![image-1651765401217.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651765401217.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651765401217.png)
    
     **Figure 3.21: Job Code page**

#### **3.21.1 Add a Job Code**

If you want to add a new job code, do the following steps,

1. Click [![image-1651765475784.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651765475784.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651765475784.png) (**ADD** button) in the **Job Code** page. See Fig 3.21. A new window opens to add a new job code.
    
    [![image-1651765490621.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651765490621.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651765490621.png)
    
    [![image-1651765515658.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651765515658.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651765515658.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **Description** box, enter the description for a job code you want to add.
3. In the **Item No** box, enter the item number.
4. In the **Job Code** box, enter the job code.
5. In the **VO No** box, enter the VO number.
6. Click **Save**.
    
    The job code is added and listed in the **Job Code** page.

#### **3.21.2 Edit Any Job Code**

If you want to edit any existing job code in the **Job Code** page,

1. Click [![image-1651765593941.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651765593941.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651765593941.png) (Edit icon) of the respective job code. See Fig 3.21.
    
    The **Job Code** page shows the details of the selected job code.
2. Edit the details where you want.
3. Click **Save**.

#### **3.21.3 Delete Any Job Code**

If you want to delete any existing job code in the **Job Code** page, you can use [![image-1651765816873.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651765816873.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651765816873.png) (Delete icon) provided in the **Job Code** page. To know how to delete, see the topic, “**Delete Any Area**”.

#### **3.21.4 Export Job Code List**

You can export a list of job codes added in the **Job Code** page in both the pdf and excel formats by using [![image-1651765854917.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651765854917.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651765854917.png) (**PDF** button) and [![image-1651765864111.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651765864111.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651765864111.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **3.21.5 Filter Any Job Code**

If you want to filter any specific job code in the **Job Code** page, you can use [![image-1651766144926.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651766144926.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651766144926.png) (**FILTER** button) located on the **Job Code** page. To know how to filter, see the topic, ”**Filter Any Area**”.

#### **3.21.6 Import Multiple Job Codes**

If you want to import multiple job codes together, do the following,

1. Click [![image-1651766197607.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651766197607.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651766197607.png) (**TEMPLATE** button). See Fig 3.21.
    
    An excel worksheet will be downloaded with a predefined template to enter the details of job code.
2. Enter the required job code details in the respective columns of the excel worksheet.
3. Once you have added the job code details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651766248525.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651766248525.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651766248525.png) (****IMPORT**** button). See Fig 3.21. A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651766283289.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651766283289.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651766283289.png)
5. Click [![image-1651766303105.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651766303105.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651766303105.png) (****Browse**** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651766330356.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651766330356.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651766330356.png) (****Upload**** button) to export the sub systems that are included in the excel worksheet.

The details of the job codes in the worksheet will be displayed in the **Job Code** page.


### **3.22 Inspection Test Plan (ITP)**

ITP is a document or series of documents used for quality assurance purposes. ITP outlines how the quality of a particular material will be ensured both at beginning and throughout the service life.

The **Inspection Test Plan** tab in the **Project Data** menu allows you to add the inspection test plan report. If you want to add the inspection test plan report, do the following,

1. Click the ****Inspection Test Plan**** tab in the ****Project Data**** menu. The **Inspection Test Plan (ITP)** page opens.
    
    [![image-1651766524487.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651766524487.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651766524487.png)
    
     **Figure 3.22: ITP page**
    
    [![image-1651766600973.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651766600973.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651766600973.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the ****Template**** box, select a template from a drop-down list appears on the ****Select from Templates**** box or the ****Select from Equipments**** box. [![image-1651768298928.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651768298928.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651768298928.png)**Tip**: A report number for the ITP report will be updated automatically in the **ITP** **Report Number** box.
3. In the **ITP Status** box, select the ITP status from a drop-down list.
4. In the **Date** box, choose the date of status update.
5. In the ****Non-Destructive Examination (NDE)****box, enter the NDE details.
6. In the **Remarks** box, enter your remark if any.
7. In the **Prepared By** box, enter the name of a person who has prepared the ITP report.
8. In the **Reviewed By** box, enter the name of a person who has reviewed the ITP report.
9. In the **Approved By** box, enter the name of a person who has approved the ITP report.
10. In the **Prepared Date** box, choose the prepared date of the ITP report.
11. In the **Reviewed Date** box, choose the reviewed date of the ITP report.
12. In the **Approved Date** box, choose the approved date of the ITP report.
13. Click **Save**.
    
    The ITP report is successfully added.

#### **3.22.1 Export ITP reports list**

You can export a list of added ITP reports in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.


### **3.23 Check List**

The Check List tab in the Project Data menu helps you to add a check list that will be used in adding a final visual test report.

1. Click the **Check List** tab in the **Project Data** menu. The **Check List** page opens.
    
    [![image-1651768493338.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651768493338.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651768493338.png)
    
     **Figure 3.23: Check List page**

#### **3.23.1 Add a Check List** 

If you want to add a check list,

1. Click [![image-1651768901952.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651768901952.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651768901952.png) (**ADD** button) in the **Check List** page. See Fig 3.23. A new window opens to add a check list.
    
    [![image-1651768922326.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651768922326.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651768922326.png)
    
    [![image-1651768935019.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651768935019.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651768935019.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that field before saving.
2. In the **Check List** box, enter the check list number.
3. In the **Comments** box, type your comments if any.
4. Click **Save**.
    
    The check list is added successfully.

#### **3.23.2 Export Check Lists**

You can export a list of added check lists in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.



### **3.24 NDT Procedures**

The NDT procedures tab in the **Project Data** menu helps you to add an NDT procedure. If you want to add an NDT procedure, do the following,

1. Click **NDT Procedures** in the **Project Data** menu. The **NDT Procedure** page opens.
    
    [![image-1651770484433.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651770484433.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651770484433.png)
    
     **Figure 3.24: NDT Procedure page**

#### **3.24.1 Add an NDT Procedure**

If you want to add an NDT procedure,

1. Click [![image-1651770610751.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651770610751.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651770610751.png) (**ADD** button) in the **NDT Procedure page. See Fig 3.24. A new window opens to add an NDT procedure.
    
    [![image-1651770632875.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651770632875.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651770632875.png)
2. In the **NDT Procedure** box, select the NDT procedure from a drop-down list.
3. In the **NDT Procedure Title** box, enter the NDT procedure title.
4. Click **Save**.

The NDT procedure is successfully added.

#### **3.24.2 Add NDT Procedure Revision**

Once you have added the NDT procedure, you must add the NDT procedure revision. You can add multiple revisions for one NDT procedure.

1. Click [![image-1651770736554.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651770736554.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651770736554.png) (Edit icon) in the **Revision** column of the **NDT Procedure**  See Fig 3.24. The **NDT Procedure Revision** window opens.
    
    [![image-1651770798745.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651770798745.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651770798745.png)
2. Click [![image-1651770813084.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651770813084.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651770813084.png) (**ADD** button) in the **NDT Procedure Revision** window.
    
    A new window opens to add the NDT revision procedure.
    
    [![image-1651770841809.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651770841809.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651770841809.png)
    
    [![image-1651770852416.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651770852416.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651770852416.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651770876640.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651770876640.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651770876640.png)**Tip**: A report number for the revision will be updated automatically in the **Report Number/ Revision** box.
3. In the **Description** box, enter the description for the NDT procedure revision.
4. In the **Prepared By** box, enter the name a person who has prepared the revision.
5. In the **Prepared Date** box, enter the prepared date of the revision.
6. In the **Reviewed By** box, enter the name a person who has reviewed the revision.
7. In the **Reviewed Date** box, enter the reviewed date of the revision.
8. In the **Approved By** box, enter the name a person who has approved the revision.
9. In the **Approved Date** box, enter the approved date of the revision.
10. Click **Save**.

#### **3.24.3 Print an NDT procedure report**

If you want to print an NDT procedure report, click[![image-1651770961609.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651770961609.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651770961609.png) (print icon) provided in the **Print** column of the **NDT Procedure** page. See Fig 3.24.

#### **3.24.4 Attach a File into an NDT Procedure**

If you want to attach any file with the NDT procedure listed in the **NDT Procedure** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

# Materials

### **4.0 Materials**

The **Materials** menu in the home page of the ***cuteQM*** app used to add the material details such as material certificates, material inspection details, material import details, and material summary and traceability record.

The **Materials** menu appears with four options such as **Material Certificates, Material Import, Material Inspection,** and **Reports**. The **Material Certificates** option helps you to add material certificates details for the structural project.

The **Material Import** option helps you to bulk add the materials. The **Material Inspection** option helps you to add material receiving report, material inspection, and material verification report.

The **Reports** option used to add material traceability record and material summary by using heat number.

### **4.1 Material Certificates**

Mill Certificate is a certificate document of the steel industry, which is used to certify the product is produced by manufacturing standards of the mill. Once you have received the materials from the manufacturer, you must enter the details of materials.

 The **Material Certificates (Mill Certificates)** tab used to add the received material details including mill certification ID and mill certification number. If you want to add material certificates, do the following,

1. Click **Material Certificates** in the **Materials** menu. The **Mill Certificates** page opens.
    
    [![image-1651771516977.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651771516977.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651771516977.png)
    
     **Figure 4.1: Mill Certificates page**

#### **4.1.1 Add a Material Certificate**

If you want to add a material certificate, do the following,

1. Click [![image-1651771611128.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651771611128.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651771611128.png) (**ADD** button) in the **Mill Certificates** page. See Fig 4.1. A new window opens to add a material certificate.
    
    [![image-1651771631111.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651771631111.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651771631111.png)
    
    [![image-1651771647910.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651771647910.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651771647910.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.
2. In the **Component** box, select a component from a drop-down list.
3. In the **Certification** box, enter the certification number of the material.
4. In the **Manufacturer** box, enter the name of the manufacturer.
5. In the **Mill Certificate Date** box, choose the mill certificate date.
6. In the **Delivery Order (DO) Number** box, enter the delivery order number of the component.
7. In the **Purchase Order (PO)** **Number** box, enter the purchase order number of the component.
8. In the **Size** box, select the size of the received component.
9. In the **Thickness** box, select the thickness of the received component.
10. In the **Class** box, enter the class of the received component.
11. In the **Material** box, select the type of material the component is made from.
12. In the **Rating** box, enter the rating of the component.
13. In the **Expiry Date** box, choose the expiry date of the component.
14. Click **Save**.

The material certificate is successfully added. Once you have added the mill certificate, you must add heat numbers for the added component.

#### **4.1.2 Add Heat Numbers**

If you want to add heat numbers, do the following steps,

1. Click [![image-1651772075895.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651772075895.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651772075895.png) (Add icon) of the respective mill certificate.
    
    The **Heat Numbers** box opens.
    
    [![image-1651772092801.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651772092801.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651772092801.png)
    
     **Figure 4.1.1: Heat Numbers page**
2. Click [![image-1651772349201.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651772349201.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651772349201.png) (****ADD**** button) in the ****Heat Numbers**** box. A new window opens to add the heat number.
    
    [![image-1651772393572.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651772393572.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651772393572.png)
3. In the **planned Project** box, select a project you want from a drop-down list.
4. In the **Heat Number** box, enter the heat number.
5. In the **Remarks** box, enter your remarks if any.
6. Click **Save**.

#### **4.1.3 Edit Any Heat Number**

If you want to edit any existing heat numbers,

1. Click [![image-1651772557789.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651772557789.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651772557789.png)(Edit icon) in the **Edit** column for the respective heat number.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **4.1.4 Delete Any Heat Number**

If you want to delete any heat number, you can use [![image-1651772612576.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651772612576.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651772612576.png) (Delete icon) provided in the **Delete** column of the **Heat Numbers** page, See Fig 4.1.1.

1. Click [![image-1651772645737.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651772645737.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651772645737.png) (Delete icon) for the corresponding heat number. You receive a notification message “**Confirm delete?**”.
2. Click **OK**.

#### **4.1.5 Print a Material Consumption Report**

If you want to print a material consumption report, click [![image-1651772717663.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651772717663.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651772717663.png)(print icon) provided in the **Report** column. See Fig 4.1.1.

#### **4.1.6 Attach a File into a Mill Certificate**

If you want to attach any file with the mill certificates listed in the **Mill Certificates** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **4.1.7 Edit Any Mill Certificates**

 If you want to edit any existing mill certificate in the **Mill Certificates** page, do the following,

1. Click [![image-1651772903048.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651772903048.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651772903048.png)(Edit icon) in the **Edit** column for the respective mill certificate. See Fig 4.1. A new window opens to edit the mill certificate.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **4.1.8 Delete Any Mill Certificate**

If you want to delete any specific mill certificate from the list of mill certificates, you can use [![image-1651772978730.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651772978730.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651772978730.png) (Delete icon) provided in the **Delete** column of the **Mill Certificates** page. To know how to delete, see the topic, “**Delete Any Area**”.

#### **4.1.9 Export Mill Certificates List**

You can export a list of mill certificates added in the **Mill Certificates** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **4.1.10 Filter Any Mill Certificate**

If you want to filter any mill certificate from the list of mill certificates in the **Mill Certificates** page, you can use the [![image-1651773528678.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651773528678.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651773528678.png)(**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.

#### **4.1.11 Import Multiple Mill Certificates**

If you want to import multiple mill certificates together, do the following,

1. Click (**TEMPLATE** button) on the **Mill Certificates** page. See Fig 4.1. A template will be downloaded as an excel worksheet to enter the details of multiple mill certificates.
    
    [![image-1651773684895.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651773684895.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651773684895.png)
2. Enter the relevant details in the required columns on the excel worksheet.
3. Once you have added the mill certificates details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651773727999.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651773727999.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651773727999.png) (**IMPORT** button). See Fig 4.1.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651773747649.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651773747649.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651773747649.png)
5. Click [![image-1651773772350.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651773772350.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651773772350.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651773919523.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651773919523.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651773919523.png) (**Upload** button) to export the mill certificates that are included in the excel worksheet.

The details of the mill certificates in the worksheet will be displayed in the **Mill Certificates**


### **4.2 Material Take Off** 

Material Take Off ((MTO) report refers to a list of a materials including quantities and grades that are required in the structural project.

 The **Material Take Off** tab helps you to add an MTO report. If you want to add an MTO report, do the following,

1. Click the **Material Take Off** tab in the **Materials** menu. The **MTO Report** page opens.
    
    [![image-1651774231233.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651774231233.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651774231233.png)
    
     **Figure 4.2: MTO Report page**

#### **4.2.1 Add an MTO Report**

1. Click [![image-1651774833807.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651774833807.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651774833807.png) (**ADD** button) in the **MTO Report** page. See Fig 4.2. A new window opens to add an MTO report.
    
    [![image-1651774856090.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651774856090.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651774856090.png)
    
    [![image-1651774872306.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651774872306.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651774872306.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651774896045.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651774896045.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651774896045.png)**Tip**: A report number for a new MTO report will be updated automatically in the **Report Number** box.
2. In the **Customer Name** box, select the name of a customer.
3. In the **Prepared By** box, enter the name of a person who has prepared the MTO report.
4. In the **Reviewed By** box, enter the name of a person who has reviewed the MTO report.
5. In the **Approved By** box, enter the name of a person who has approved the MTO report.
6. In the **Prepared Date** box, choose the prepared date of the MTO report.
7. In the **Reviewed Date** box, choose the reviewed date of the MTO report.
8. In the **Approved Date** box, choose the approved date of the MTO report.
9. Click **Save**.

The MTO report is successfully added. Once you have added the MTO report, you must add the material details for the added report.

#### **4.2.2 Add Material Details**

1. Click [![image-1651774992665.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651774992665.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651774992665.png)(Edit icon) in the **Edit Report** column of the **MTO Report** See Fig 4.2. The **Report Parameters** box opens.
    
    [![image-1651775008334.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651775008334.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651775008334.png)
2. Click [![image-1651775024992.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651775024992.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651775024992.png) (**ADD** button) in the **Report Parameters** box.
    
    A new window opens in the **Material Type** column.
3. Enter the material name in the **Material Type** column.
4. Enter the grade of the material in the **Material Grade** column.
5. Enter the relevant details in the respective columns of the **Report Parameters** box.
6. Click **Save**.
    
    [![image-1651775066443.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651775066443.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651775066443.png) **Tip**: If you want to delete the added material details, click [![image-1651775088982.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651775088982.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651775088982.png) (Delete icon) provided in the **Delete** column of the **Report Parameters** box.

#### **4.2.3 Edit Any MTO Reports**

 If you want to edit any existing MTO report in the **MTO Report** page, do the following,

1. Click [![image-1651775146278.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651775146278.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651775146278.png)(Edit icon) in the ****Edit**** column for the respective ****MTO Report**** See Fig 4.2. A new window opens to edit the MTO report.
    
    [![image-1651775171167.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651775171167.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651775171167.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **4.2.4 Attach a File into an MTO Report**

If you want to attach any file with the MTO reports listed in the **MTO Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **4.2.5 Print an MTO Report**

If you want to print an MTO report, click [![image-1651775665751.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651775665751.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651775665751.png) (print icon) provided in the **Report** column of the **MTO Report** page. See Fig 4.2.

#### **4.2.6 Export MTO Reports**

You can export a list of MTO reports added in the **MTO Report** page. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.



### **4.3 Material Receiving and Inspection (Heat Numbers)**

Material Receiving Inspection validates quality of purchased raw materials based on set acceptance criteria before the materials are used for the Structural project.

The **Material Receiving and Inspection** tab in the **Materials** menu helps you to add an incoming material inspection report (MIR). Incoming MIR includes material name, material size, material specification, heat numbers, and material type.

If you want to add an incoming MIR, do the following,

1. Click **Material Receiving and Inspection** in the **Materials** menu. The **Incoming Material Inspection Report** page opens.
    
    [![image-1651775803783.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651775803783.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651775803783.png)
    
     **Figure 4.3: Incoming Material Inspection Report page**

#### **4.3.1 Add an Incoming MIR**

If you want to add an incoming MIR,

1. Click [![image-1651775866163.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651775866163.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651775866163.png) (**ADD** button) in the **Incoming Material Inspection Report**  See Fig 4.3. A new window opens to add an incoming MIR.
    
    [![image-1651775876891.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651775876891.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651775876891.png)
    
    [![image-1651775887800.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651775887800.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651775887800.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651775901856.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651775901856.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651775901856.png)**Tip**: A report number and a Request for Inspection (RFI) number for a new MIR will be updated automatically in the **Report Number** and the **RFI Number** boxes, respectively.
2. In the **Delivery Order Number** box, enter the material’s delivery order number.
3. If the materials are received from a client, select the **MUHIBBAH Incoming Materials** option, and then enter the relevant details in the respective boxes.
    
    [![image-1651775937291.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651775937291.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651775937291.png)
    
    
    1. 1. In the **P.O. No** box, enter the purchase order number.
        2. In the **Dated** box, choose the date of the purchase order.
        3. In the **Received On** box, select the received date of materials.
4. If the materials are purchased from outside, select the ****FREE Issued Incoming Materials**** option, and then enter the relevant details in the respective boxes. [![image-1651776012317.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651776012317.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651776012317.png)
    
    
    1. 1. In the **Packing List No** box, enter the packing list number.
        2. In the **Dated** box, choose the date of packing.
        3. In the **Received On** box, choose the received date of materials.
5. In the **Inspection Date** box, choose the date of inspection.
6. In the **Vendor Name** box, enter the vendor name.
7. In the **Request Description** box, enter the request description.
8. In the **ITP Number** box, select an ITP number.
9. In the **Delivery Note** box, enter the delivery note.
10. In the **Location** box, enter the location name.
11. In the **Sub Contractor** box, select the subcontractor name from a drop-down list.
12. Click **Save**.

The incoming MIR is successfully added. Once you have added the MIR, you must add the material details for the added MIR.

#### **4.3.2 Add Materials for an Incoming MIR**

If you want to add the details of materials for the added incoming MIR, do the following steps,

1. Click [![image-1651776146029.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651776146029.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651776146029.png) (Edit icon) in the **Edit MIR** column of the **Incoming Material Inspection Report** See Fig 4.3. The **Add/Edit - Materials** window opens.
    
    [![image-1651776160778.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651776160778.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651776160778.png)
    
     **Figure 4.3.1: Add/Edit – Materials window**
2. Click [![image-1651776188690.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651776188690.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651776188690.png) (**ADD** button) in the **Add/Edit - Materials** window.
    
    A new window opens to add the material details.
    
    [![image-1651776202338.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651776202338.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651776202338.png)
    
    [![image-1651776212521.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651776212521.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651776212521.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
3. In the **Material Description** box, enter the material description.
4. In the **Material** **Size** box, select the size of the material.
5. In the **Material Specification** box, enter the material specification.
6. In the **Material Type** box, enter the type of the material.
7. In the **Quantity Required** box, enter the required quantity of the material.
8. In the **Item No** box, enter the item number.
9. In the **Weight** box, enter the weight of the material.
10. In the **Component** box, select a component.
11. Click **Update**.

Once you have added the material details, you must add the heat numbers for the added materials.

#### **4.3.3 Add Heat Numbers** 

1. Click [![image-1651776294719.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651776294719.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651776294719.png) (Add icon) of the respective material in the **Add/Edit - Materials** See Fig 4.3.1. The **Heat Numbers** window opens.
    
    [![image-1651776313050.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651776313050.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651776313050.png)
2. Click [![image-1651776552695.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651776552695.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651776552695.png) (**ADD** button) in the **Heat Numbers** window.
    
    A new window opens to add a heat number.
    
    [![image-1651776579466.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651776579466.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651776579466.png)
3. In the **Heat Number/Certificates** box, select the heat number from a drop-down list.
4. In the ****Plate Number/Coil Number/ Tag Number**** box, enter the plate number or coil number or tag number of the material.
5. In the **Delivery Quantity (Total)** box, enter the total delivery quantity of the material including UOM.
6. In the **Delivery Quantity (Partial)** box, enter the partial delivery quantity of the material including UOM.
7. In the **Dimensions** option, select **Accepted** or **Rejected** based on the inspection detail.
8. In the **Visual** option, select **Accepted** or **Rejected** based on the inspection detail.
9. In the **Mill Test Certificates (MTC)** option, select **Accepted** or **Rejected** based on the inspection detail.
10. In the **Remarks** box, enter your remarks if any.
11. If the heat treatment is required for the material, select ****YES**** in the ****Heat Treatment**** Otherwise select ****NO****.
12. In the NDE is required for the material, select **YES** in the **NDE** option. Otherwise select **NO**.
13. Click **Update.**

[![image-1651776667259.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651776667259.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651776667259.png) **Note**: If you want to manage the review material TC, click [![image-1651776689133.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651776689133.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651776689133.png) (Add icon). The Review Material TC window opens to add the material checklist detail.

#### **4.3.4 Add MIR Details**

If you want to add the details of MIR,

1. Click [![image-1651776763148.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651776763148.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651776763148.png) (Add icon) in the **Add** See Fig 4.3. The **MIR Details** window opens.
    
    [![image-1651776778783.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651776778783.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651776778783.png)
2. In the **Manufacturer** Name box, enter the manufacturer name.
3. In the **Supplier** box, enter the supplier name.
4. In the **Unloaded** box, enter the unloaded detail.
5. In the **Date** box, select the date of MIR.
6. In the **Truck/Trailer No** box, enter the truck/trailer number.
7. In the **Defect Report No** box, enter the defect report number.
8. In the **Storage Area** box, enter the storage area name.
9. In the **Defect** box, enter the defect detail.
10. In the **Remarks** box, enter your remarks if any.
11. Click **Save**.

#### **4.3.5 Print an Incoming MIR Report**

If you want to print an incoming MIR report, click [![image-1651776907903.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651776907903.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651776907903.png) (print icon) provided in the **Report** column of the **Incoming Material Inspection Report** page. See Fig 4.3.

#### **4.3.6 Print a Report with MTC**

If you want to print an incoming MIR report including MTC, click[![image-1651776939228.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651776939228.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651776939228.png) (print icon) provided in the **Report** **with MTC** column of the **Incoming Material Inspection Report** page. See Fig 4.3.

#### **4.3.7 Print a Report Raw Material Offer List**

If you want to print a report raw material offer list, click [![image-1651776978589.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651776978589.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651776978589.png) (print icon) provided in the **Report** **Raw Material Offer List** column of the **Incoming Material Inspection Report** page. See Fig 4.3.

#### **4.3.8 Print a MIR Summary Report**

If you want to print a MIR summary report, click (print icon) provided in the upper side of the **Incoming Material Inspection Report** page. See Fig 4.3.

#### **4.3.9 Attach a File into an Added Incoming MIR** 

If you want to attach any file with any incoming MIR listed in the **Incoming Material Inspection Report** page. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)”.

#### **4.3.10 Edit Any Incoming MIR** 

If you want to edit any existing incoming MIR in the **Incoming Material Inspection Report** page, do the following,

1. Click [![image-1651777154026.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651777154026.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651777154026.png)(Edit icon) in the **Edit** column for the respective MIR. See Fig 4.3. A new window opens to edit the added incoming MIR.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **4.3.11 Filter Any Incoming MIR**

If you want to filter any incoming MIR from the list of MIRs in the **Incoming Material Inspection Report** page,

- you can use the request status wise filter box [![image-1651777239636.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651777239636.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651777239636.png) provided in the upper side of the **Incoming Material Inspection Report**
- You can also use [![image-1651777252360.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651777252360.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651777252360.png) (****FILTER**** button) located on the ****Incoming Material Inspection Report**  To know how to filter, see the topic, ”****Filter Any Area****”.

#### **4.3.12 Export Incoming MIR list**

You can export a list of MIR added in the **Incoming Material Inspection Report** page in the pdf and excel formats by using [![image-1651777286334.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651777286334.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651777286334.png) (**PDF** button) and [![image-1651777297552.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651777297552.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651777297552.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)”.


### **4.4 Material Verification Report (MVR) (Heat Numbers)**

MVR will be used while go for material inspection. The **Material Verification Report** tab in the **Materials** menu helps you to add an MVR inspection request. If you want to add an MVR inspection request, do the following steps,

1. Click **Material Verification Report** in the **Materials** menu. The **MVR Inspection Request** page opens.
    
    [![image-1651777346632.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651777346632.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651777346632.png)
    
     **Figure 4.4: MVR Inspection Request page**

#### **4.4.1 Add an MVR Inspection Request**

If you want to add an MVR inspection request,

1. Click [![image-1651777400149.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651777400149.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651777400149.png) (**ADD** button) in the **MVR Inspection Request**  See Fig 4.4. A new window opens to add an MVR inspection request.
    
    [![image-1651777425573.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651777425573.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651777425573.png)
    
    [![image-1651777433487.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651777433487.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651777433487.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651777449029.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651777449029.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651777449029.png)**Tip**: A report number and an RFI report number for a new MVR will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.
2. In the **Inspection Date** box, choose the date of inspection.
3. In the **Description** box, enter the description for the MVR.
4. In the **Location** box, select a location from a drop-down list.
5. Click **Save**.

The MVR is successfully added. Once you have added the MVR, you must add the RFI data for the added MVR.

#### **4.4.2 Add RFI Data for an Added MVR Inspection Request**

If you want to add the details of RFI data for the added MVR inspection request, do the following,

1. Click [![image-1651777532538.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651777532538.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651777532538.png)(Edit icon) in the **RFI Data** column of the **MVR Inspection Request**  See Fig 4.4. The **RFI Inspection Request List** window opens.
    
    [![image-1651777882034.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651777882034.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651777882034.png)
2. In the ****Inspection From**** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the **Inspection Details** option, select 1<sup>st</sup> Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the **Others** box, enter any other inspection related details.
6. In the **Refer to Report No** box, enter the report number for reference.
7. In the **RFI Date** box, choose the RFI date.
8. In the ****Inspection Result**** option, if the inspection result is accepted, select ****Accepted**** otherwise select ****Rejected****.
9. In the **Remarks** box, enter your remarks if any.
10. In the **Inspected by** box, enter the name of a person who has done inspection.
11. In the **Inspected Date** box, choose the date of inspection.
12. In the **Witnessed By** box, enter the name of the witnessed person.
13. In the **Witnessed Date** box, choose the date of witnessed.
14. In the **PCML Rep Name** box, enter the representative name of PCML.
15. In the **PCML Rep Date** box, choose the PCML rep date.
16. In the **MEB Rep Name** box, enter the representative name of MEB.
17. In the **MEB Rep Date box**, choose MEB rep date.
18. Click **Save**.

Once you have added the RFI data, you must add the result for the added MVR inspection request.

#### **4.4.3 View an RFI Report**

If you want to print an RFI report, click [![image-1651778186115.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778186115.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778186115.png) (print icon) provided in the **RFI** **Report** column of the **MVR Inspection Request** page. See Fig 4.4.

#### **4.4.4 Add Result for an Added MVR Inspection Request** 

1. Click [![image-1651778219043.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778219043.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778219043.png) (Add icon) of the respective report number. The **MVR Inspection Request Details** window opens.
    
    [![image-1651778237598.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778237598.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778237598.png)
2. Click [![image-1651778259381.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778259381.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778259381.png) (**ADD** button) in the **MVR Inspection Request Details** window. A new window opens to add result.
    
    [![image-1651778267465.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778267465.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778267465.png)
3. In the **Piece Mark No** box, select the piece mark number from a drop-down list.
4. In the **Heat Number / Certificates** box, select the heat number from a drop-down list.
5. In the **Size** box, enter the size of the material.
6. In the **Type of Material** box, enter the type of material.
7. In the **Remarks** box, enter your remarks if any.
8. Click **Save**.

Once you have added the result for the MVR inspection request, you must submit and approve the MVR inspection request.

#### **4.4.5 Submit and Approve an MVR Inspection Report**

Once you have added the result, the **Submission** column in the **MVR Inspection Request** page is appeared with[![image-1651778360135.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778360135.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778360135.png) (Submit and Reject icons).

1. If you want to submit the MVR inspection request, click [![image-1651778413877.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778413877.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778413877.png)(Submit icon) in the **Submission** Otherwise click [![image-1651778423778.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778423778.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778423778.png) (Reject icon) to reject the request. Once you have submitted the MVR inspection request, the **Request Status** column in the **MVR Inspection Request** page is appeared with (Accept and Reject icons).
2. If you want to approve the MVR inspection request, click [![image-1651778460336.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778460336.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778460336.png) (Submit icon) in the ****Request Status**** Otherwise click [![image-1651778472369.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778472369.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778472369.png) (Reject icon) to reject the request.

#### **4.4.6 Print an MVR Inspection Report**

If you want to print an MVR inspection report, click [![image-1651778518861.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778518861.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778518861.png) (print icon) in the **Report** column of the **MVR Inspection Request** page. See Fig 4.4.

#### **4.4.7 Attach a File into an MVR Inspection Request**

If you want to attach any file with an existing MVR inspection request listed in the **MVR Inspection Request** page, you can attach the file by using [![image-1651778577305.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778577305.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778577305.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)”.

#### **4.4.8 Edit Any MVR Inspection Request** 

If you want to edit any existing MVR inspection request in the **MVR Inspection Request** page, do the following,

1. Click [![image-1651778630941.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778630941.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778630941.png) (Edit icon) in the **Edit** column for the respective MVR inspection request. See Fig 4.4. A new window opens to edit the MVR inspection request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **4.4.9 Filter Any MVR Inspection Request**

If you want to filter any MVR request from the list of requests in the **MVR Inspection Request** page, you can use [![image-1651778749912.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778749912.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778749912.png)(**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.

#### **4.4.10 Export MVR Inspection Request List**

You can export a list of MVR inspection requests added in the **MVR Inspection Request** page in the pdf and excel formats by using [![image-1651778797039.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778797039.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778797039.png) (**PDF** button) and [![image-1651778807609.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778807609.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778807609.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)”.


### **4.5 Welding Consumable Register List**

Welding Consumables are products used to create strong joints between two or more parts while welding. Welding Consumable are segmented based on welding technique, welding consumable type, end-use industry, and region.

The **Welding Consumable Register List tab** in the **Materials** menu used to add a weld consumable list. If you want to add a welding consumable list, do the following,

1. Click the **Welding Consumable Register List** tab in the **Materials** menu. The **Welding Consumable Register List** page opens.
    
    [![image-1651778866330.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778866330.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778866330.png)
    
     **Figure 4.5: Welding Consumable Register List page**

#### **4.5.1 Add a Welding Consumable List**

If you want to add a welding consumable list, do the following,

1. Click [![image-1651778915268.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778915268.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778915268.png) (**ADD** button) in the **Welding Consumable Register List**  See Fig 4.5. A new window opens to add a welding consumable list.
    
    [![image-1651778929256.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778929256.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778929256.png)
    
    [![image-1651778940121.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778940121.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778940121.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that field before saving.
    
    [![image-1651778955652.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651778955652.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651778955652.png) **Tip**: A report number for a new welding consumable list will be updated automatically in the **Report Number** **/ Rev** box.
2. In the **Buyer Name** box, enter the name of a buyer.
3. In the **Supplier** box, enter the name of a supplier of welding consumables.
4. In the ****Prepared By**** box, enter the name of a person who has prepared the welding consumable list.
5. In the ****Reviewed By**** box, enter the name of a person who has reviewed the welding consumable list.
6. In the ****Approved By**** box, enter the name of a person who has approved the welding consumable list.
7. In the ****Prepared Date**** box, choose the prepared date of the welding consumable list.
8. In the **Reviewed Date** box, choose the reviewed date of the welding consumable list.
9. In the ****Approved Date**** box, choose the approved date of the welding consumable list.
10. Click **Save**.

The welding consumable register list is successfully added. Once you have added the register list, you must add the consumable details for the added register list.

[![image-1651779051382.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651779051382.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651779051382.png)**Tip**: If you want to add a copy of added welding consumable register list, click **Revision** in the **Revision** column of the **Welding Consumable Register List** page.

#### **4.5.2 Add Welding Consumable Details for Added Consumable List**

If you want to add the details of welding consumables for the added list, do the following,

1. Click [![image-1651779097119.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651779097119.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651779097119.png)(Edit icon) in the **Edit Report** column of the **Welding Consumable Register List**  See Fig 4.5. A new window opens to add the welding consumable details.
    
    [![image-1651779113070.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651779113070.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651779113070.png)
2. In the **Welding Process** box, enter the type of welding process.
3. In the **Class** box, enter the class of welding consumable.
4. In the **Trade Name** box, enter the trade name of welding consumable.
5. In the **Lot Number** box, enter the lot number of the welding consumable.
6. In the **Number / Quantity (Kgs)** box, enter the number or quantity of the welding consumable.
7. In the **Dia** box, enter the diameter of the welding consumable.
8. In the **CIR Number** box, enter the CIR number of the welding consumable.
9. In the **Date of CIR** box, select the date of CIR.
10. In the **Certificate No** box, enter the certificate number.
11. In the **Remarks** box, enter your remarks if any
12. In the **Status** box, select **Accepted**, **Rejected** or **Hold** from a drop-down list.
13. Click **Save**.

Once you have added the welding consumable details, you must add the result for the added consumable list.

#### **4.5.3 Submit a Welding Consumable List**

Once you have added the welding consumable details, the **Submission** column in the **Welding Consumable Register List** page is appeared with[![image-1651779641885.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651779641885.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651779641885.png) (Submit and Reject icons).

1. If you want to submit the welding consumable list, click [![image-1651779662146.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651779662146.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651779662146.png)(Submit icon) in the **Submission** Otherwise click [![image-1651779673971.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651779673971.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651779673971.png)(Reject icon) to reject the request.

#### **4.5.4 Print a Welding Consumable Report**

If you want to print a welding consumable report, click (print icon) in the **Report** column of the **Welding Consumable Register List** page. See Fig 4.5.

#### **4.5.5 Attach a File into a Welding Consumable Register List**

If you want to attach any file with any welding consumable register list in the **Welding Consumable Register List** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **4.5.6 Edit Any Welding Consumable Register List** 

If you want to edit any existing welding consumable register list in the **Welding Consumable Register List** page, do the following,

1. Click [![image-1651779906526.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651779906526.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651779906526.png)(Edit icon) in the **Edit** column for the respective welding consumable register list. See Fig 4.5. A new window opens to edit the welding consumable register list.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **4.5.7 Export Welding Consumable Register List**

You can export a list of welding consumable register list added in the **Welding consumable Register List** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.


### **4.6 Import Materials**

The **Import from Excel - Materials** tab helps you to upload various data related to materials for different fields included in the **Materials** menu instead of uploading data for each field individually.

 If you want to import data for different fields, do the following,

1. Click the **Import from Excel – Materials** tab in the **Materials** menu. The **File Upload** page opens.
    
    [![image-1651780410958.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780410958.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780410958.png)
2. Download a template by using the (**TEMPLATE** button) to enter the details of data.
    
    An excel worksheet will be downloaded.
    
    [![image-1651780439095.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780439095.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780439095.png)
3. Enter the relevant details in the respective column of the excel worksheet based on the columns listed in the **System Column** field.
4. Click [![image-1651780473482.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780473482.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780473482.png) (**Choose File** button).
    
    Once the file has been uploaded successfully, you receive a message, “**Successfully uploaded**”
5. Click[![image-1651780514532.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780514532.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780514532.png) (**Get Columns** button).
    
    The columns added in the excel worksheet will be listed in the **Excel Column** field. The system automatically maps the **Required Columns to Import** field and the **Excel Column** field and displays in the **Mapped Columns** field.
    
    [![image-1651780536388.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780536388.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780536388.png)
6. If you want to map any columns or to unmap any mapped columns, select the respective columns and then click (****Map**** button) and (****UnMap**** button) accordingly.
7. Once you have completed the mapping and unmapping of columns, in the **Upload Range From** and **To** fields, enter the range of rows you want to upload from the excel worksheet.
    
    [![image-1651780570418.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780570418.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780570418.png) **Note**: In the **Total Rows** field, the system indicates the total number of rows filled in the excel worksheet.
    
    [![image-1651780585522.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780585522.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780585522.png)**Tip**: You must enter the upload starting range as two in the **Upload Range From** field because a first row in the excel worksheet is having heading of the columns.
8. Click [![image-1651780614878.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780614878.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780614878.png) (**Populate Value** button).
9. Click [![image-1651780623792.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780623792.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780623792.png)(**Process** button).
    
    Once you have clicked the Process button, the system processes the columns and displays in the **Excel Import** page.
    
    [![image-1651780643624.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780643624.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780643624.png)
10. Click [![image-1651780660434.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780660434.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780660434.png) (**Import** button) to import the data added in the excel worksheet.


### **4.7 Material Traceability Record**

The **Material Traceability Record** tab in the **Materials** menu used to track a material traceability record (MTR). If you want to add an MTR, do the following,

1. Click the **Material Traceability Record** tab in the **Materials** menu. The **Material Traceability Record** page opens.
    
    [![image-1651780728698.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780728698.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780728698.png)
    
     **4.7: Material Traceability Record page**
2. Click [![image-1651780761687.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780761687.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780761687.png) (**ADD** button) in the **Material Traceability Record** page. See Fig 4.7.
    
    A new window opens to add an MTR.
    
    [![image-1651780780745.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780780745.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780780745.png)
    
    [![image-1651780791350.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780791350.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780791350.png) **Tip**: A report number for a new MTR will be updated automatically in the **Report Number** box.
3. In the **Location** box, enter the location detail.

The MTR is added. Once you have added the MTR, you must add the cutting plan drawing details for the added MTR.

#### **4.7.1 Add a Cutting Plan Drawing for an MTR**

If you want to add a cutting plan drawing for the added MTR, do the following,

[![image-1651780844611.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780844611.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780844611.png)

1. Click [![image-1651780865668.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780865668.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780865668.png) (Add icon) provided in the **Add Cutting Plan Drawing** column of the **Material Traceability Record** page. The **Cutting Plan Drawing Details** box opens.
    
    [![image-1651780879765.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780879765.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780879765.png)
2. Click [![image-1651780894445.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780894445.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780894445.png) (**ADD** button) in the **Cutting Plan Drawing Details** box. A new window opens to add a master drawing number and a cutting plan drawing number.
    
    [![image-1651780908796.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651780908796.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651780908796.png)
3. In the **Cutting Plan Drawing Number** box, select the mater drawing and cutting plan drawing numbers from a drop-down list.
4. Click **Save**.

#### **4.7.2 Print an MTR report**

If you want to print an MTR report, click [![image-1652072191912.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652072191912.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652072191912.png) (print icon) in the **Report** column of the **Material Traceability Record** page. See Fig 4.7.

#### **4.7.3 Attach a File into an MTR**

If you want to attach any file with any MTR list in the **Material Traceability Record** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **4.7.4 Edit Any MTR**

If you want to edit any existing MTR in the **Material Traceability Record** page, do the following,

1. Click [![image-1652072247567.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652072247567.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652072247567.png)(Edit icon) in the **Edit** column for the respective MTR. See Fig 4.7. A new window opens to edit the MTR.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **4.7.5 Export MTR List**

You can export a list of MTRs added in the **Material Traceability Record** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **4.7.6 Filter Any MTR**

If you want to filter any MTR from the list of MTRs in the **Material Traceability Record** page, you can use the [![image-1652072324053.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652072324053.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652072324053.png) (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.



### **4.8 Material Summary**

The **Material Summary** tab in the **Materials** menu used to track the material summary details. If you want to trach the summary details of the material, do the following,

1. Click the **Material Summary** tab in the **Materials** menu. The **Material Summary Details** page opens.
    
    [![image-1652072371650.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652072371650.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652072371650.png)
    
     **Figure 7.8: Material Summary Details page**
2. In the **Material Specification** box, enter the material specification.
3. In the **From** and **To** boxes, choose the respective from and to dates to get the material summary details.
4. Click **Search**.

The summary details of the added material specification will be displayed for the selected period.

#### **4.8.1 Export Material Summary Details**

You can export a list of MTRs added in the **Material Summary Details** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.



### **4.9 Material Summary by Heat Number**

The **Summary by Heat Number** tab in the **Materials** menu used to track the material summary details by using the respective heat numbers. If you want to track the summary details of the material, do the following,

1. Click the **Summary by Heat Number** tab in the **Materials** menu. The **Material Summary Details (By Heat Number)** page opens.
    
    [![image-1652072488866.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652072488866.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652072488866.png)
    
     **Fig 4.9:** **Material Summary Details (By Heat Number)** **page**
2. In the **Heat Number** box, select the heat number from a drop-down list.
3. Click ****Search****.

 The material summary details corresponding to the selected heat number will be displayed.

#### **4.9.1 Export Material Summary Details (By Heat Number)**

You can export the material summary details in the **Material Summary Details (By Heat Number)** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.


### **4.10 Material Traceability Summary Report**

If you want to view the material traceability summary report, navigate to the **Material Traceability Summary Report** tab in the **Materials** menu.

1. Click **Material Traceability Summary Report** in the **Materials** menu. The **Material Traceability Summary Report** page opens.
    
    [![image-1652072581908.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652072581908.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652072581908.png)
    
     **Figure 4.10: Material Traceability Summary Report page**
2. In the **From Date** and **To Date** boxes, select the from and to dates.
3. Click **Show Report**.

The summary report for the selected date will be opened.

#### **4.10.1 Print Material Traceability Summary Report**

If you want to print a material traceability summary report, use [![image-1652072669995.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652072669995.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652072669995.png)and [![image-1652072687767.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652072687767.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652072687767.png) (print icons) provided in the **Material Traceability Summary Report** page.

1. If you want to print the current page of the summary report, click [![image-1652072744876.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652072744876.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652072744876.png) (print icon including the page number).
2. If you want to print all the pages of the summary report, click [![image-1652072736839.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652072736839.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652072736839.png)(print icon).

#### **4.10.2 Export Material Traceability Summary Report**

You can export the material traceability summary report in various formats by using the option [![image-1652072808282.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652072808282.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652072808282.png) provided in the upper right corner of the **Material Traceability Summary Report** page.



### **4.11 RFI Material Substitution**

An RFI could be issued requesting for material substitutions if certain material is not available or cost exorbitantly high. Various subcontractors could be provided with these requests to find who has the best quality materials for the project.

You can add an RFI for material substitution by using the **RFI Material Substitution** tab in the **Materials** menu.

#### **4.11.1 Add an RFI Material Substitution**

If you want to add an RFI material substitution, do the following steps,

1. Click **RFI Material Substitution** in the **Materials** menu. The **RFI Material Substitution** page opens.
    
    [![image-1652072889246.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652072889246.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652072889246.png)
    
     **Figure 4.11: RFI Material Substitution page**
2. In the ****Requested By**** box, enter the name of a person who has requested the material substitution.
3. In the **Sub Contractor** box, select a sub-contractor from a drop-down list.
4. In the **Inspection Date &amp; Time** box, select the inspection date and time.
5. In the **Location** box, enter the location name.
6. In the **Center** box, enter the center name.
7. In the **Details of Work** box, enter the work details.
8. In the **Comments** box, enter your comments if any.
    
    Before saving the added material substitution request, you must add the material substitution detail.
9. Click [![image-1652072954448.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652072954448.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652072954448.png) (**ADD** button) in the **Material Substitution Detail** window.
10. In the **Type** box, select the type of material substitution.
11. In the **Material** box, enter the name of the material.
12. In the **DWG. Ref** box, enter the drawing reference number.
13. In the **Original Size** box, enter the original size of the material.
14. In the **Original Grade** box, enter the original grade of the material.
15. In the **Item** box, select an item.
16. In the **QTY** box, enter the quantity of the material.
17. Click **Save.**
    
    The material substitution details will be added and listed in the **Material Substitution Detail** window.
    
    [![image-1652073010811.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073010811.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073010811.png)
    
    If you want to add the proposed material substitution detail,
18. Click [![image-1652073057659.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073057659.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073057659.png)(Add icon) in the **Material Substitution Detail** window.
    
    [![image-1652073068840.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073068840.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073068840.png)
19. Click [![image-1652073080388.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073080388.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073080388.png) (**ADD** button).
    
    [![image-1652073090757.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073090757.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073090757.png)
20. Enter the details of proposed material substitution.
21. Click **Save**.
    
    The request for material substitution will be added and listed in the **View RFI Material Substitution** page.


### **4.12 View RFI Material Substitution**

The **View RFI Material Substitution** tab helps you to view and edit the material substitution request, which is added by using the **RFI Material Substitution** tab. This tab also allows you to add a new material substitution request.

1. Click **View RFI Material Substitution** in the **Materials** menu. The **View RFI Material Substitution** page opens with a list of added material substitution requests.
    
    [![image-1652073226948.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073226948.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073226948.png)
    
     **Figure 4.12: View RFI Material Substitution page**

#### **4.12.1 Add an RFI Material Substitution**

If you want to add a material substitution request, do the following steps,

1. Click [![image-1652073318037.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073318037.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073318037.png) (**ADD** button) in the **View RFI Material Substitution page. The system redirects you to a new page to add a new material substitution request. To know how to add a material substitution request, See the topic, “[**<u>Add an RFI Material Substitution</u>**](http://wiki.cuteinfocomm.com/link/68#bkmrk-4.11.1%C2%A0add-an-rfi-ma)”.

Once you have added the material substitution request, you must submit the added request to perform material substitution inspection.

#### **4.12.2 Edit Any Material Substitution Inspection Request** 

If you want to edit any existing material substitution inspection request in the **View RFI Material Substitution page, do the following,

1. Click [![image-1652073460752.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073460752.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073460752.png)(Edit icon) in the **Edit** column for the respective material substitution inspection request. See Fig 4.12. The **RFI Material Substitution** page opens with the details of the selected material substitution inspection request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **4.12.3 Submit and Approve an RFI Material Substitution**

Once you have added the material substitution inspection request, the **Submission** column in the **View RFI Material Substitution** page is appeared with [![image-1652073551320.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073551320.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073551320.png) (Submit and Reject icons).

1. If you want to submit the material substitution inspection request, click [![image-1652073570922.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073570922.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073570922.png) (Submit icon) in the **Submission** column. Otherwise click [![image-1652073581301.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073581301.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073581301.png) (Reject icon) to reject the request. Once you have submitted the material substitution inspection request, the **Request Status** column in the **View RFI Material Substitution** page is appeared with (Approve and Reject icons).
2. If you want to approve the material substitution inspection request, click [![image-1652073633943.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073633943.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073633943.png) (Approve icon) in the ****Request Status**** Otherwise click [![image-1652073642921.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073642921.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073642921.png) (Reject icon) to reject the request. The material substitution inspection request will be moved for material substitution inspection.

#### **4.12.4 Add Results of Material Substitution Inspection**

After completing the material inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click [![image-1652073697054.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073697054.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073697054.png) (Add icon) in the **Results** column of the respective request. The Result window opens with the details of proposed and original materials.
    
    [![image-1652073708634.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073708634.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073708634.png)
2. In the ****Result**** column, select the result of each material from the given result options in the drop-down list.
3. In the **Remarks** column, enter your remarks if any.
4. Click **Approve All &amp;** **Save**.

#### **4.12.5 View a Material Substitution Report**

If you want to view a material substitution report, click [![image-1652073762390.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073762390.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073762390.png)(print icon) provided in the **Print** column of the **View RFI Material Substitution** page. See Fig 4.12.

#### **4.12.6 Attach a File into an RFI Material Substitution**

If you want to attach a file with any existing material substitution inspection request listed in the **View RFI Material Substitution** page, you can attach the file by using [![image-1652073793674.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073793674.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073793674.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)”.

#### **4.12.7 View Signature Details of Inspectors**

You can view the sign details of the inspectors such as QA, Sub contractor, Client, and Owner, once they completed the material substitution inspection and submitted the inspection result details including their signature. To view the signature details, click [![image-1652073826989.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073826989.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073826989.png)(Sign icon) in the **Sign Details** column in the **View RFI Material Substitution** page.

#### **4.12.8 Export an RFI Material Substitution List**

You can export a list of material substitution requests added in the **View RFI Material Substitution** page in both the pdf and excel formats by using [![image-1652073856152.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073856152.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073856152.png) (**PDF** button) and [![image-1652073863875.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073863875.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073863875.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)”.

#### **4.12.9 Filter Any RFI Material Substitution**

If you want to filter any specific material substitution inspection request in the **View RFI Material Substitution** page, you can use [![image-1652073892128.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073892128.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073892128.png) (**FILTER** button) located on the **View RFI Material Substitution** page. To know how to filter, see the topic, ”**Filter Any Area**”.



### **4.13 Material Receiving and Inspection (Unique Numbers)**

Material Receiving Inspection validates quality of purchased raw materials based on set acceptance criteria before the materials are used for the structural project.

The **Material Receiving and Inspection** tab in the **Materials** menu helps you to add an incoming material inspection report (MIR). Incoming MIR includes material name, material size, material specification, and material type.

If you want to add an incoming MIR, do the following,

1. Click the **Material Receiving and Inspection** tab in the **Materials** menu. The **Incoming Material Inspection Report** page opens.
    
    [![image-1652073958183.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652073958183.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652073958183.png)
    
     **Figure 4.13: Incoming Material Inspection Report page**

#### **4.13.1 Add an Incoming MIR**

If you want to add an incoming MIR,

1. Click [![image-1652074028338.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074028338.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074028338.png) (**ADD** button) in the **Incoming Material Inspection Report** page. See Fig 4.13. A new window opens to add an incoming MIR.
    
    [![image-1652074046198.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074046198.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074046198.png)
    
    [![image-1652074055620.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074055620.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074055620.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1652074068771.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074068771.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074068771.png)**Tip**: A report number and an Request for Inspection (RFI) number for a new MIR will be updated automatically in the **Report Number** and the **RFI Number** boxes, respectively.
2. In the **Delivery Order Number** box, enter the material’s delivery order number.
3. If the materials are received from a client, select the ****DM Incoming Materials**** option, and then enter the relevant details in the respective boxes. [![image-1652074097714.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074097714.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074097714.png)
    
    
    1. 1. 1. In the **P.O. No** box, enter the purchase order number.
            2. In the **Dated** box, choose the date of the purchase order.
            3. In the **Received On** box, select the received date of materials.
4. If the materials are purchased from outside, select the **FREE Issued Incoming Materials** option, and then enter the relevant details in the respective boxes.
    
    [![image-1652074132955.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074132955.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074132955.png)
    
    
    1. 1. 1. In the **Packing List No** box, enter the packing list number.
            2. In the **Dated** box, choose the date of packing.
            3. In the **Received On** box, choose the received date of materials.
5. In the **Inspection Date** box, choose the date of inspection.
6. In the **Vendor Name** box, enter the vendor name.
7. In the **Delivery Note** box, enter the delivery note.
8. In the **Location** box, enter the location name.
9. In the ****Sub Contractor**** box, select the subcontractor name from a drop-down list.
10. Click **Save**.

The incoming MIR is successfully added. Once you have added the MIR, you must add the material details for the added MIR.

#### **4.13.2 Add Materials for an Incoming MIR**

If you want to add the details of materials for the added incoming MIR, do the following,

1. Click [![image-1652074213914.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074213914.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074213914.png)(Edit icon) in the **Edit MIR** column of the **Incoming Material Inspection Report** See Fig 4.13. The **Add/Edit - Materials** window opens.
    
    [![image-1652074228247.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074228247.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074228247.png)
    
     **Figure 4.13.1: Add/Edit – Materials window**
2. Click [![image-1652074256935.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074256935.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074256935.png) (**ADD** button) in the **Add/Edit - Materials** window.
    
    A new window opens to add the material details.
    
    [![image-1652074267520.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074267520.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074267520.png)
    
    [![image-1652074275783.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074275783.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074275783.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
3. In the **Material** box, select the name of the material from a drop-down list.
4. In the **Quantity Required** box, enter the required quantity of the material.
5. In the **Certificate Number** box, enter the certificate number.
6. In the **PO No** box, enter the purchase order number.
7. In the **Non-Conformance Report (NCR) No** box, enter the NCR number.
8. In the **Size/Thickness** box, select the size/thickness of the received material from a drop-down list.
9. In the **Heat Number** box, enter the heat number of the material.
10. In the **CEQ** box, enter the CEQ number.
11. In the **DO** box, enter the deliver order number.
12. In the **TQ No** box, enter the TQ number.
13. In the **Length** box, select the length of the material from a drop-down list.
14. In the **Plate Number** box, enter the plate number of the material.
15. In the **Material Type** box, enter the type of the material.
16. In the **CD Number** box, enter the CD number.
17. In the **Status** box, select the status of the received material.
18. In the **Material Type** box, select the type of material from a drop-down list.
19. In the **Grade** box, select the grade of the material.
20. In the **Unique No** box, enter the unique number of the material.
21. In the **Remarks** box, enter your remarks if any.
22. In the **Client Item No** box, enter the client item number.
23. In the **Supply Condition** box, enter the supply condition details of the material.
24. In the **Material Description** box, enter the material description.
25. Click ****Update****.

Once you have added the material details, you must add the heat numbers for the added materials.

#### **4.13.3 Add Heat Numbers** 

1. Click [![image-1652074423045.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074423045.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074423045.png)(Add icon) of the respective material in the **Add/Edit - Materials** window. See Fig 4.13.1. The **Heat Numbers** window opens.
    
    [![image-1652074440463.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074440463.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074440463.png)
2. Click [![image-1652074457514.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074457514.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074457514.png) (**ADD** button) in the **Heat Numbers** window. A new window opens to add a heat number.
    
    [![image-1652074470694.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074470694.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074470694.png)
3. In the **Heat Number/Certificates** box, select the heat number from a drop-down list.
4. In the **Plate Number/Coil Number/ Tag Number** box, enter the plate number or coil number or tag number of the material.
5. In the **Delivery Quantity (Total)** box, enter the total delivery quantity of the material.
6. In the **Delivery Quantity (Partial)** box, enter the partial delivery quantity of the material.
7. In the **CEQ** box, enter the CEQ number.
8. In the **CD Number** box, enter the CD number.
9. In the **Unique Number** box, enter the unique number of the material.
10. In the **Client Item Number** box, enter the client item number.
11. In the ****Dimensions**** option, select ****Accepted**** or ****Rejected**** based on the inspection detail.
12. In the **Visual** option, select **Accepted** or **Rejected** based on the inspection detail.
13. In the ****Mill Test Certificates (MTC)**** option, select ****Accepted**** or ****Rejected**** based on the inspection detail.
14. In the **Remarks** option, enter your remarks if any.
15. If the heat treatment is required for the material, select ****YES**** in the ****Heat Treatment**** Otherwise select ****NO****.
16. In the NDE is required for the material, select **YES** in the **NDE** option. Otherwise select **NO**.
17. Click **Update.**

Once you have added the heat numbers, you must add unique numbers for the material.

#### **4.13.4 Add Unique Numbers**

1. Click [![image-1652074614590.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074614590.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074614590.png)(Add icon) of the respective heat number in the [**<u>Heat Numbers</u>**<u> box</u>](http://wiki.cuteinfocomm.com/link/68#bkmrk-4.13.3%C2%A0add-heat-numb). The **Unique Numbers** box opens.
    
    [![image-1652074623858.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074623858.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074623858.png)
2. Click [![image-1652074642125.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074642125.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074642125.png) (**ADD** button) in the **Unique Numbers** window. A new window opens to add a unique number.
    
    [![image-1652074652843.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074652843.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074652843.png)
3. In the **Unique Number** box, enter a unique number for the respective heat number.
4. In the **Original Number** box, enter the original number of the material.
5. In the **Size** box, enter the size of the material.
6. Click **Update**.

#### **4.13.5 Print an Incoming MIR** 

If you want to print an incoming MIR report, click [![image-1652074708958.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074708958.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074708958.png)(print icon) provided in the **Report** column of the **Incoming Material Inspection Report** page. See Fig 4.13.

#### **4.13.6 Print a Report with MTC**

If you want to print an incoming MIR report including MTC, click [![image-1652074743113.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074743113.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074743113.png) (print icon) provided in the **Report** **with MTC** column of the **Incoming Material Inspection Report** page. See Fig 4.13.

#### **4.13.7 Attach a File into an Added Incoming MIR**

If you want to attach any file with any incoming MIR listed in the **Incoming Material Inspection Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **4.13.7.1 Edit Any Incoming MIR** 

If you want to edit any existing incoming MIR in the **Incoming Material Inspection Report** page, do the following,

1. Click [![image-1652074812500.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074812500.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074812500.png)(Edit icon) in the **Edit** column for the respective MIR. See Fig 4.13. A new window opens to edit the added incoming MIR.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **4.13.8 Filter Any Incoming MIR**

If you want to filter any incoming MIR from the list of MIRs in the **Incoming Material Inspection Report** page,

- you can use the [![image-1652074876548.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074876548.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074876548.png) (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.
- If you want to filter any MIR based on the approval status of the MIR, click the **Request Status** box provided in the **Incoming Material Inspection Report** page and then select the appropriate option from a drop-down list.
    
    [![image-1652074894049.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652074894049.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652074894049.png)
- If you click the **All** option, the system shows a list of all MIRs.
- If you click the **Approved** option, the system shows a list of approved MIRs.
- If you click **Not Approved** option, the system shows a list of not approved MIRs.

#### **4.13.9 Export Incoming MIR List**

You can export a list of MIR added in the **Incoming Material Inspection Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.



### **4.14 Material Verification Report (MVR) (Unique Numbers)**

MVR will be used while go for material inspection. The **Material Verification Report** tab in the **Materials** menu helps you to add an MVR inspection request. If you want to add an MVR inspection request, do the following,

1. Click **Material Verification Report** in the **Materials** menu. The **MVR Inspection Request** page opens.
    
    [![image-1652075030937.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075030937.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075030937.png)
    
     **Figure 4.14: MVR Inspection Request page**

#### **4.14.1 Add an MVR Inspection Request**

If you want to add an MVR inspection request,

1. Click [![image-1652075082788.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075082788.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075082788.png) (**ADD** button) in the **MVR Inspection Request**  See Fig 4.14. A new window opens to add an MVR inspection request.
    
    [![image-1652075102430.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075102430.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075102430.png)
    
    [![image-1652075110359.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075110359.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075110359.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1652075125054.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075125054.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075125054.png)**Tip**: A report number and an RFI report number for a new MVR will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.
2. In the **Inspection Date** box, choose the date of inspection.
3. In the **Description** box, enter the description for the MVR.
4. In the **Location** box, select a location from a drop-down list.
5. Click ****Save****. The MVR is successfully added. Once you have added the MVR, you must add the RFI data for the added MVR.

#### **4.14.2 Add RFI Data for an Added MVR Inspection Request**

If you want to add the details of RFI data for the added MVR inspection request, do the following,

1. Click [![image-1652075211547.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075211547.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075211547.png)(Edit icon) in the **RFI Data** column of the **MVR Inspection Request** page. See Fig 4.14. The **RFI Inspection Request List** window opens.
    
    [![image-1652075245839.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075245839.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075245839.png)
2. In the **Inspection From** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the ****Inspection Details**** option, select 1<sup>st</sup>Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the **Others** box, enter any other inspection related details.
6. In the **Refer to Report No** box, enter the report number for reference.
7. In the **RFI Date** box, choose the RFI date.
8. In the ****Inspection Result**** option, if the inspection result is accepted, select ****Accepted**** otherwise select ****Rejected****.
9. In the **Remarks** box, enter your remarks if any.
10. In the **Inspected by** box, enter the name of a person who has done inspection.
11. In the **Inspected Date** box, choose the date of inspection.
12. In the **Witnessed By** box, enter the name of the witnessed person.
13. In the **Witnessed Date** box, choose the date of witnessed.
14. In the **PCML Rep Name** box, enter the representative name of PCML.
15. In the **PCML Rep Date** box, choose the PCML rep date.
16. In the **MEB Rep Name** box, enter the representative name of MEB.
17. In the **MEB Rep Date box**, choose MEB rep date.
18. Click ****Save****.

Once you have added the RFI data, you must add the result for the added MVR inspection request.

#### **4.14.3 Print an RFI Report**

If you want to print an RFI report, click [![image-1652075364404.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075364404.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075364404.png)(print icon) provided in the **RFI** **Report** column of the **MVR Inspection Request** page. See Fig 4.14.

#### **4.14.4 Add Result for an Added MVR Inspection Request** 

1. Click [![image-1652075396963.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075396963.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075396963.png) (Add icon) of the respective report number. The **MVR Inspection Request Details** window opens.
    
    [![image-1652075408052.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075408052.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075408052.png)
2. Click [![image-1652075426138.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075426138.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075426138.png) (**ADD** button) in the **MVR Inspection Request Details** window.
    
    A new window opens to add result.
    
    [![image-1652075436519.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075436519.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075436519.png)
3. In the **Piece Mark No** box, select the piece mark number from a drop-down list.
4. In the **Heat Number / Certificates** box, select the heat number from a drop-down list.
5. In the **Size** box, enter the size of the material.
6. In the **Type of Material** box, enter the type of material.
7. In the **Remarks** box, enter your remarks if any.
8. Click **Save**.
    
    Once you have added the result for the MVR inspection request, you must submit and approve the MVR inspection request.

#### **4.14.5 Submit and Approve an MVR Inspection Report**

Once you have added the result, the **Submission** column in the **MVR Inspection Request** page is appeared with [![image-1652075522012.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075522012.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075522012.png)(Submit and Reject icons).

1. If you want to submit the MVR inspection request, click [![image-1652075538064.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075538064.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075538064.png)(Submit icon) in the **Submission** column. Otherwise click [![image-1652075546818.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075546818.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075546818.png) (Reject icon) to reject the request. Once you have submitted the MVR inspection request, the **Request Status** column in the **MVR Inspection Request** page is appeared with[![image-1652075590310.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075590310.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075590310.png)(Accept and Reject icons).
2. If you want to approve the MVR inspection request, click [ ![image-1652075613526.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075613526.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075613526.png)(Submit icon) in the **Request Status** column. Otherwise click [![image-1652075628529.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075628529.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075628529.png) (Reject icon) to reject the request.

#### **4.14.6 Print an MVR Inspection Report**

1. If you want to print an MVR inspection report, click [![image-1652075667539.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075667539.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075667539.png)(print icon) in the **Report** column of the **MVR Inspection Request** See Fig 4.14.

#### **4.14.7 Attach a File into an MVR Inspection Request**

If you want to attach any file with any MVR inspection request listed in the **MVR Inspection Request** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **4.14.8 Edit Any MVR Inspection Request** 

If you want to edit any existing MVR inspection request in the **MVR Inspection Request** page, do the following,

1. Click [![image-1652075742403.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075742403.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075742403.png)(Edit icon) in the **Edit** column for the respective MVR inspection request. See Fig 4.14. A new window opens to edit the MVR inspection request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **4.14.9 Filter Any MVR Inspection Request**

If you want to filter any MVR request from the list of requests in the **MVR Inspection Request** page, you can use the [![image-1652075795575.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652075795575.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652075795575.png) (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.

#### **4.14.10 Export MVR Inspection Request List**

You can export a list of MVR inspection requests added in the **MVR Inspection Request** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

# Inspection

### **5.0 Inspection**

The **Inspection** menu in the home page of the ***cuteQM*** app used to add a Request for Inspection (RFI) fit up request, an RFI weld VI request, and an NDT inspection request.

#### **5.1 RFI Fit Up Request Generic**

If you want to add an RFI fit up request generic, do the following,

1. Click [![image-1651805620926.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651805620926.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651805620926.png) (**ADD** button) in the **RFI Fit up Request Generic** page. A new window opens to add an RFI fit up request generic.
    
    [![image-1651805632560.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651805632560.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651805632560.png)
    
    [![image-1651805679460.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651805679460.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651805679460.png) **Tip**: A report number for a new RFI fit up request generic will be updated automatically in the **Report Number** box.
2. In the **Description** box, enter the description for the RFI fit up request generic.
3. In the **System** box, select a system from a drop-down list.
4. In the **Inspection Date** box, choose the date of inspection.
5. In the **Frame No** box, enter the frame number.
6. In the **Elevation** box, enter the elevation value.
7. In the **Longitudinal** box, enter the longitudinal value.
8. In the **Location** box, enter the location where the inspection to be done.
9. In the **Drawing No** box, select the drawing number from a drop-down list.
10. In the **Sub Contractor** box, select the sub-contractor from a drop-down list.
11. In the **Remarks** box, enter your remarks if any.
12. Click **Save**.

The RFI fit up request generic is inserted successfully. Once you have added the RFI fit up request generic, you must add the RFI data for the added request.

#### **5.1.2 Add RFI Data for an Added RFI Fit Up Request Generic**

If you want to add RFI data for the added RFI fit up request generic, do the following,

1. Click [![image-1651805788288.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651805788288.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651805788288.png) (Edit icon) in the **RFI Data** column of the **RFI Fit up Request Generic**  See Fig 5.1. The **RFI Inspection Request List** window opens.
    
    [![image-1651805817685.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651805817685.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651805817685.png)
2. In the **Inspection From** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the ****Inspection Details**** option, select 1<sup>st</sup>Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the **Others** box, enter any other inspection related details.
6. In the **Refer to Report No** box, enter the report number for reference.
7. In the **RFI Date** box, choose the RFI date.
8. In the Inspection Result option, if the inspection result is accepted, select **Accepted** otherwise select **Rejected**.
9. In the **Remarks** box, enter your remarks if any.
10. In the **Inspected by** box, enter the name of a person who has done inspection.
11. In the **Inspected Date** box, choose the date of inspection.
12. In the **Witnessed By** box, enter the name of the witnessed person.
13. In the **Witnessed Date** box, choose the date of witnessed.
14. In the **PCML Rep Name** box, enter the representative name of PCML.
15. In the **PCML Rep Date** box, choose the PCML rep date.
16. In the **MEB Rep Name** box, enter the representative name of MEB.
17. In the **MEB Rep Date box**, choose MEB rep date.
18. Click **Save**.
    
    The RFI data is successfully added.

#### **5.1.3 Clone an RFI Fit Up Request Generic** 

The **Clone** option in the **RFI Fit up Request Generic** page used to create a RFI weld VI generic request in the [**<u>RFI Weld VI Generic</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.28%C2%A0view-applicatio) page, as a copy of RFI fit up request generic, See Fig 5.4.

If you click [![image-1651806045627.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651806045627.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651806045627.png) (Clone icon) in the **Clone** column of the **RFI Fit up Request Generic** page, an RFI weld VI generic request is added in the **RFI weld VI generic** page.

[![image-1651806061978.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651806061978.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651806061978.png) **Tip**: You can create multiple copies of RFI weld VI generic request for a single RFI fit up request generic.

#### **5.1.4 Print an RFI Report**

If you want to print an RFI report, click [![image-1651806095929.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651806095929.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651806095929.png) (print icon) provided in the **RFI** **Report** column of the **RFI Fit up Request Generic** page. See Fig 5.1.

#### **5.1.5 Submit an RFI Fit Up Request Generic**

Once you have added the RFI fit up request generic, the **Submission** column in the **RFI Fit up Request Generic** page is appeared with [![image-1651806136539.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651806136539.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651806136539.png) (Submit and Reject icons).

1. If you want to submit the RFI fit up request generic, click [![image-1651806160602.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651806160602.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651806160602.png) (Submit icon) in the **Submission** column. Otherwise click [![image-1651806171691.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651806171691.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651806171691.png) (Reject icon) to reject the request.

#### **5.1.6 Print an RFI Fit Up Request Generic Report**

If you want to print an RFI fit up request generic report, click[![image-1651806208317.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651806208317.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651806208317.png) (print icon) provided in the **Report** column of the **RFI Fit up Request Generic** page. See Fig 5.1.

#### **5.1.7 Attach a File into an RFI Fit Up Request Generic**

If you want to attach any file with any RFI fit up request generic added in the **RFI Fit up Request Generic page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **5.1.8 View Signature Details of QA User, Surveyor, and Client** 

Once the RFI fit up inspection has completed, the QA, surveyor, and client add their signature based on their corresponding roles. You can view their signature by using [![image-1651806406456.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651806406456.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651806406456.png) (Sign icon) in the **Sign Details** column in the **RFI Fit up Request Generic** page.

#### **5.1.9 Edit Any RFI Fit Up Request Generic**

If you want to edit any existing RFI fit up request generic in the **RFI Fit up Request Generic** page, do the following,

1. Click [![image-1651806477011.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651806477011.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651806477011.png)(Edit icon) in the **Edit** column for the respective RFI fit up request generic. See Fig 5.1. A new window opens to edit the RFI fit up request generic.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.1.10 Export RFI Fit Up Request Generic List**

You can export a list of RFI fit up request generic added in the **RFI Fit up Request Generic** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **5.1.11 Filter Any RFI Fit Up Request Generic**

If you want to filter any RFI fit up request generic from the list of RFI fit up request generic in the **RFI Fit up Request Generic** page, you can use the (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.

### **5.2 RFI Fit up Request (Heat Numbers)**

The **RFI Fit up Request** tab allows you add an RFI fit up request to check the fit-up quality of pipes and joints used in the Structural project by a sub-contractor. To navigate to the RFI fit up request adding page,

1. Click **RFI Fit up Request** in the **Inspection** menu. The **RFI Fit up Inspection Request** page opens.
    
    [![image-1651806657279.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651806657279.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651806657279.png)
    
     **Figure 4.2: RFI Fit up Inspection Request page**

#### **5.2.1 Add an RFI Fit Up Request**

If you want to add an RFI fit up request, do the following steps,

1. In the **Sub Contractor** box, select a sub-contractor from a drop-down list.
2. In the **Inspection Date** box, select the inspection date.
    
    [![image-1651806762299.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651806762299.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651806762299.png)**Note:** The inspection date should be as current date or upcoming dates. The system will not accept if you have given the previous dates.
3. In the **Location** box, select a location from a drop-down list.
4. In the **System** box, select a system from a drop-down list.
5. In the **Drawing No** box, select a drawing number.
6. In the **Description** box, enter the description for the RFI fit up request. Before saving the added fit up request, you must add joints for the fit-up request.
7. Click [![image-1651806862939.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651806862939.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651806862939.png)(Add icon) of the respective joints you want to add.
    
    The added joints will be moved and listed in the right side of the page.
    
    [![image-1651806950910.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651806950910.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651806950910.png)
8. In the **Heat No 1** box, enter the heat number of the first component if you know.
9. In the **Heat No 2** box, enter the heat number of the second component if you know.
    
    [![image-1651806967931.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651806967931.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651806967931.png)**Tip**: If you want to remove any added joint, click[![image-1651806983021.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651806983021.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651806983021.png)(**Remove** icon) of the respective joint.
10. Click **Save**.

The RFI fit up request is successfully added. If you want to view the added request, navigate to t the **View RFI Fit up** page.


### **5.3 View RFI Fit up (Heat Numbers)**

The **View RFI Fit up** tab helps you to view and edit the RFI fit up requests, which are added by using the **RFI Fit up Request** tab. This tab also allows you to add a new RFI fit up request.

1. Click **View RFI Fit up** in the **Inspection** menu. The **Request for Inspection** page opens with a list of added RFI fit up requests.
    
    [![image-1651807142281.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651807142281.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651807142281.png)
    
     **Figure 5.3: Request for Inspection page**

#### **5.3.1 Add an RFI Fit Up Request**

If you want to add an RFI fit up request, do the following,

1. Click [![image-1651807194442.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651807194442.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651807194442.png) (**ADD** button) in the **RFI Fit up Request List** page.
    
    The system redirects you into **RFI Fit up Inspection Request** page. To know how to add an RFI fit up request, See the topic, “[**<u>Add an RFI Fit up Request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.2.1-add-an-rfi-fit)”.

Once you have added the RFI fit up request, you must submit the added request for inspection.

#### **5.3.2 Add Representative for Added RFI Fit Up Request**

If you want to add a representative for any added RFI fit up request,

1. Click [![image-1651807855116.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651807855116.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651807855116.png) (Edit icon) in the **Representative** column for the respective RFI fit up request. The **Edit Form** window opens.
    
    [![image-1651807868464.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651807868464.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651807868464.png)
2. In the **Representative** box, enter the name of a representative.
3. In the **Inspection Date** box, select the date of inspection.
4. In the **Remarks** box, enter your remarks if any.
5. Click **Save**.

#### **5.3.3 Edit Any RFI Fit Up Request** 

If you want to edit any existing RFI fit up request in the **Request for Inspection** page, do the following,

1. Click [![image-1651807927297.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651807927297.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651807927297.png)(Edit icon) in the **Edit** column for the respective RFI fit up request. See Fig 5.3. The **RFI Fit up Inspection Request** page opens with the details of the selected RFI fit up request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.3.4 Submit and Approve an RFI Fit Up Request**

Once you have added the RFI fit up request, the **Submission** column in the **RFI Fit up Request Lists** page is appeared with [![image-1651808019268.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808019268.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808019268.png)(Submit and Reject icons). See Fig 5.3.

1. If you want to submit the RFI fit up request, click [![image-1651808071397.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808071397.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808071397.png)(Submit icon) in the **Submission** Otherwise click [![image-1651808080397.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808080397.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808080397.png) (Reject icon) to reject the request. Once you have submitted the RFI fit up request, the **Request Status** column in the **RFI Fit up Requests List** page is appeared with [![image-1651808114368.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808114368.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808114368.png) (Approve and Reject icons).
2. If you want to approve the RFI fit up request, click [![image-1651808166180.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808166180.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808166180.png) (Submit icon) in the ****Request Status**** Otherwise click [![image-1651808175651.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808175651.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808175651.png) (Reject icon) to reject the request.
    
    The approved request will be moved to for inspection.

#### **5.3.5 Add Results of RFI Fit Up Inspection**

After completing the RFI fit up inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click [![image-1651808356907.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808356907.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808356907.png)(Add icon) in the **Results** column of the respective request. The **RFI Fit up Request List** window opens with a list of joints.
    
    [![image-1651808378174.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808378174.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808378174.png)
2. If you want to update the heat numbers and piece mark details, click on the respective box and update.
3. If you want to update the WPS number in the **WPS Number** column, you can change the WPS number from a drop-down list.
4. Update the result for root gap by selecting ****Accepted**** or ****Rejected**** in the ****Root Gap**** column based on the inspection.
5. Update the result for straight/ alignment by selecting ****Accepted**** or ****Rejected**** in the ****Strgt/Align**** column based on the inspection.
6. In the **Edge Prep** column, select the type of the edge preparation from a drop-down list.
7. In the **Result** column, update the RFI fit up inspection result by selecting **Pending**, **Accepted**, **Rejected**, or **Cancelled**.
8. In the **Remarks** column, enter you remarks if any.

#### **5.3.6 View an RFI Fit Up Report**

If you want to view an RFI fit up report, click [![image-1651808508303.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808508303.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808508303.png) (print icon) provided in the **Report** column of the **Request for Inspection** page. See Fig 5.3.

#### **5.3.7 View Signature Details of Inspectors**

You can view the sign details of the inspectors such as QA, Sub contractor, Client, and Owner, once they completed the RFI fit up inspection and submitted the inspection result details including their signature. To view the signature details, click [![image-1651808856444.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651808856444.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651808856444.png)(Sign icon) in the **Sign Details** column in the **Request for Inspection** page.

#### **5.3.8 Attach a File into an RFI Fit up Request** 

If you want to attach a file with any existing RFI fit up request listed in the **RFI Fit up Requests List** page, you can attach the file by using[![image-1651814106867.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651814106867.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651814106867.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)”.

#### **5.3.9 Export RFI Fit up Request List**

You can export a list of RFI fit up requests added in the **RFI Fit up Requests List** page in both the pdf and excel formats by using [![image-1651814160755.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651814160755.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651814160755.png) (**PDF** button) and [![image-1651814170329.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651814170329.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651814170329.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)”.

#### **5.3.10 Filter RFI Fit up Request**

If you want to filter any specific RFI fit up request in the **RFI Fit up Requests List** page,

- you can use the filter box [![image-1651814511402.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651814511402.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651814511402.png) provided in the upper side of the **RFI Fit up Requests List**  To filter the any specific RFI fit up request, select the **Drawing Number** and **Date** in the boxes and click **Search**.
- you can use [![image-1651814541939.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651814541939.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651814541939.png) (FILTER button) located on the RFI Fit up Requests List page. To know how to filter, see the topic, ”****Filter Any Area****”.



### **5.4 RFI Weld VI Generic**

Once the RFI fit up inspection process has completed, the materials are moved for weld inspection process. The **RFI Weld VI Generic** tab in the **Inspection** menu helps you to add an RFI weld VI generic.

1. Click the ****RFI Weld VI Generic**** tab in the ******Inspection****** menu. The **RFI Weld VI Generic** page opens.
    
    [![image-1651818337672.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651818337672.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651818337672.png)
    
    [![image-1651818349509.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651818349509.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651818349509.png)
    
    [![image-1651818360288.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651818360288.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651818360288.png)
    
     **Figure 5.4: RFI Weld VI Generic page**

#### **5.4.1 Add an RFI Weld VI Generic**

If you want to add an RFI weld VI generic, do the following,

1. Click [![image-1651819746364.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651819746364.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651819746364.png) (**ADD** button) in the **RFI Weld VI Generic** page. A new window opens to add an RFI weld VI generic.
    
    [![image-1651819758491.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651819758491.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651819758491.png)
    
    [![image-1651819769739.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651819769739.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651819769739.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651819781665.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651819781665.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651819781665.png) **Tip**: A report number for a new RFI weld VI generic will be updated automatically in the **Report Number** box.
2. In the **Description** box, enter the description for the RFI weld VI generic.
3. In the **System** box, select a system from a drop-down list.
4. In the **Inspection Date** box, choose the date of inspection.
5. In the **Frame No** box, enter the frame number.
6. In the **Elevation** box, enter the elevation value.
7. In the **Longitudinal** box, enter the longitudinal value.
8. In the **Location** box, enter the location where the inspection to be done.
9. In the **Drawing No** box, select the drawing number from a drop-down list.
10. In the **Sub Contractor** box, select the sub-contractor from a drop-down list.
11. In the **Remarks** box, enter your remarks if any.
12. Click **Save**.

The RFI weld VI generic is added successfully. Once you have added the RFI weld VI generic, you must add the RFI data for the added request.

#### **5.4.2 Add RFI Data for the Added RFI Weld VI Generic**

If you want to add RFI data for the added RFI weld VI generic, do the following,

1. Click [![image-1651819888124.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651819888124.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651819888124.png) (Edit icon) in the **RFI Data** column of the **RFI Weld VI Generic**  See Fig 5.4. The **RFI Inspection Request List** window opens.
    
    [![image-1651820184413.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651820184413.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651820184413.png)
2. In the **Inspection From** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the **Inspection Details** option, select 1<sup>st</sup> Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the **Others** box, enter any other inspection related details.
6. In the **Refer to Report No** box, enter the report number for reference.
7. In the **RFI Date** box, choose the RFI date.
8. In the Inspection Result option, if the inspection result is accepted, select ****Accepted**** otherwise select ****Rejected****.
9. In the **Remarks** box, enter your remarks if any.
10. In the **Inspected by** box, enter the name of a person who has done inspection.
11. In the **Inspected Date** box, choose the date of inspection.
12. In the **Witnessed By** box, enter the name of the witnessed person.
13. In the **PCML Rep Name** box, enter the representative name of PCML.
14. In the **PCML Rep Date** box, choose the PCML rep date.
15. In the **MEB Rep Name** box, enter the representative name of MEB.
16. In the **MEB Rep Date box**, choose MEB rep date.
17. Click **Save**.

The RFI data is successfully added.

#### **5.4.3 Clone an RFI Weld VI Generic**

The **Clone** option in the **RFI Weld VI Generic** page used to create a vacuum test request, an air test request, a hydrostatic test request, and an NDT request, as a copy of RFI weld VI generic request.

1. Click [![image-1651820497116.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651820497116.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651820497116.png) (Clone icon) in the **Clone** column of the **RFI Weld VI Generic** page. The Clone box opens.
2. Select any test from the given list.
3. Click [![image-1652096451071.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652096451071.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652096451071.png) (**Add** button).
    
    A new request for the selected test will be added in the respective pages.

#### **5.4.4 Print an RFI Report**

If you want to print an RFI report, click [![image-1651820553875.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651820553875.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651820553875.png) (print icon) provided in the **RFI** **Report** column of the **RFI Weld VI Generic** page. See Fig 5.4.

#### **5.4.5 Submit an RFI Weld VI Generic**

Once you have added the RFI weld VI generic, the **Submission** column in the **RFI Weld VI Generic** page is appeared with [![image-1651820613399.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651820613399.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651820613399.png)(Submit and Reject icons).

1. If you want to submit the RFI weld VI generic, click [![image-1651820633241.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651820633241.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651820633241.png) (Submit icon) in the **Submission** column. Otherwise click[![image-1651820644265.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651820644265.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651820644265.png) (Reject icon) to reject the request.

#### **5.4.6 Print an RFI Weld VI Generic Report**

If you want to print an RFI weld VI generic report, click [![image-1651820676007.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651820676007.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651820676007.png) (print icon) provided in the **Report** column of the **RFI Weld VI Generic** page. See Fig 5.4.

#### **5.4.7 View Signature Details of QA User, Surveyor, and Client** 

Once the weld VI inspection has completed, the QA, surveyor, and client add their signature based on their corresponding roles. You can view their signature by using[![image-1651820729015.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651820729015.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651820729015.png) (Sign icon) in the **Sign Details** column in the **RFI Weld VI Generic** page.

#### **5.4.8 Attach a File into an RFI Weld VI Generic**

If you want to attach any file with any RFI weld VI generic added in the **RFI Weld VI Generic page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **5.4.9 Edit Any RFI Weld VI Generic**

If you want to edit any existing RFI weld VI generic in the **RFI Weld VI Generic** page, do the following,

1. Click [![image-1651822747960.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651822747960.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651822747960.png) (Edit icon) in the **Edit** column for the respective RFI weld VI generic. See Fig 5.4. A new window opens to edit the RFI weld VI generic.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.4.10 Export RFI Weld VI Generic List**

You can export a list of RFI weld VI generic added in the **RFI Weld VI Generic** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **5.4.11 Filter Any RFI Weld VI Generic**

If you want to filter any RFI weld VI generic from the list of RFI weld VI generic in the **RFI Weld VI Generic** page, you can use the [![image-1651822860270.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651822860270.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651822860270.png) (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.


### **5.5 RFI Weld VI Request (Heat Numbers)**

The **RFI Weld VI Request** tab in the **Inspection** menu allows you to add an RFI weld VI request to perform visual inspection of welded pipes and joints used in the Structural project. To navigate to the RFI weld VI request adding page,

1. Click **RFI Weld VI Request** in the **Inspection** menu. The **RFI Weld Visual Request** page opens.
    
    [![image-1651823246690.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651823246690.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651823246690.png)
    
     **Figure 5.5: RFI Weld Visual Request page**

#### **5.5.1 Add an RFI Weld VI Request**

If you want to add an RFI weld VI request, do the following steps,

1. In the **Sub Contractor** box, select the name of a sub-contractor from a drop-down list.
2. In the **Inspection Date** box, select the inspection date.
    
    [![image-1651823533393.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651823533393.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651823533393.png) **Note:** The inspection date should be as current date or upcoming dates. The system will not accept if you have given the previous dates.
3. In the **Location** box, select a location from a drop-down list.
4. In the **System** box, select a system from a drop-down list.
5. In the **Drawing No** box, select the drawing number from a drop-down list.
6. In the **Description** box, enter the description for the request.
    
    Before saving the added weld VI request, you must add joints for the weld VI request.
    
    [![image-1651823772249.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651823772249.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651823772249.png)**Note**: You can add multiple joints for one request.
    
    The **RFI Weld Visual Request** page shows a list of joints including the corresponding sheet and piece mark numbers. If you want to add joints for the RFI weld VI request, do the following steps,
    
    [![image-1651824001781.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651824001781.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651824001781.png)
7. Select the checkbox of the respective joints you want to add. The added joints will be moved and listed in the right side of the page.
    
    [![image-1651824182325.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651824182325.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651824182325.png)
8. Update the welder details by using (Add icon) provided in the ****Welder Details**** column. 
    1. 1. Click (Add icon) of the respective joint number.
            
            The **Welder- Weld Layer- Weld Process** window opens.
            
            [![image-1651824230871.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651824230871.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651824230871.png)
        2. In the **Date** box, select the date.
        3. In the **Group Name** box, select the group name from a drop-down list.
        4. In the **Weld Process** field, select a weld process.
        5. In the **Weld Position** field, select the welding position.
        6. In the **Weld Layers** field, select the weld layers you want add.
        7. In the **Welder Number/ Name** field, select the welders you want to add.
        8. Click **Add**.
            
            The selected welders will be added and listed in the below table. See the above figure.
        9. In the **Weld Consumable** box, select the weld consumable from a drop-down list.
        10. In the **WPS Number** box, select the WPS number from a drop-down list.
        11. Click **Save**.
            
            [![image-1651824304754.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651824304754.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651824304754.png)**Tip**: If you want to remove any added joint, click (**Remove** icon) of the respective joint.
9. Click **Save**.

The RFI weld VI request is successfully added. If you want to view the added request, navigate to **View RFI Weld VI**.


### **5.6 View RFI Weld VI (Heat Numbers)**

The **View RFI Weld VI** tab helps you to view and edit the RFI weld VI request, which is added by using the **RFI Weld VI Request** tab. This tab also allows you to add a new RFI weld VI request.

1. Click **View RFI Weld VI** in the **Inspection** menu. The **Request for Inspection** page opens with a list of added RFI weld VI requests.
    
    [![image-1651824518475.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651824518475.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651824518475.png)
    
     **Figure 5.6: Request for Inspection page**

#### **5.6.1 Add an RFI Weld VI Request**

If you want to add an RFI weld VI request, do the following,

1. Click [![image-1651824728863.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651824728863.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651824728863.png) (**ADD** button) in the **Request for Inspection** page. The system redirects you into **Request** **for Inspection** page. To know how to add an RFI weld VI request, See the topic, “**Add an RFI Weld VI Request**”.

Once you have added the RFI weld VI request, you must submit the added request for weld visual inspection.

#### **5.6.2 Add Representative for Added RFI Weld VI Request**

If you want to add a representative for any added RFI weld VI request,

1. Click [![image-1651824800467.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651824800467.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651824800467.png) (Edit icon) in the **Representative** column for the respective RFI weld VI request. The **Edit Form** window opens.
    
    [![image-1651824820417.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651824820417.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651824820417.png)
2. In the **Representative** box, enter the name of a representative.
3. In the **Inspection Date** box, select the date of inspection.
4. In the **Remarks** box, enter your remarks if any.
5. Click **Save**.

#### **5.6.3 Edit Any RFI Weld VI Request** 

If you want to edit any existing RFI weld VI request in the **Request for Inspection** page, do the following,

1. Click [![image-1651824877355.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651824877355.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651824877355.png) (Edit icon) in the **Edit** column for the respective RFI weld VI request. See Fig 5.6. The **Request** **for Inspection** page opens with the details of the selected RFI weld VI request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.6.4 Submit and Approve an RFI Weld VI Request**

Once you have added the RFI weld VI request, the **Submission** column in the **Requests for Inspection** page is appeared with [![image-1651824942944.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651824942944.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651824942944.png) (Submit and Reject icons). See Fig 5.6.

1. If you want to submit the RFI weld VI request, click [![image-1651824975040.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651824975040.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651824975040.png) (Submit icon) in the **Submission** column. Otherwise click [![image-1651824985927.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651824985927.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651824985927.png) (Reject icon) to reject the request.
    
    Once you have submitted the RFI weld VI request, the **Request Status** column in the **Request for Inspection** page is appeared with [![image-1651825025798.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825025798.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825025798.png) (Approve and Reject icons).
2. If you want to approve the RFI weld VI request, click [![image-1651825063577.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825063577.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825063577.png) (Submit icon) in the ****Request Status**** Otherwise click [![image-1651825073218.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825073218.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825073218.png) (Reject icon) to reject the request.

The approved request will be moved to for inspection.

#### **5.6.5 Add Results of RFI weld Visual Inspection**

After completing the RFI weld visual inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click [![image-1651825147956.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825147956.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825147956.png) (Add icon) in the **Results** column of the respective request. The **Request for Inspection** window opens with a list of joints added for the particular request.
    
    [![image-1651825174023.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825174023.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825174023.png)
2. In the ****Result**** column, select the result for each joint from the given result options in the drop-down list.
3. In the **Remarks** box, enter your remarks if any.
4. Click **Save**.

#### **5.6.6 View an RFI Weld VI Report**

If you want to view an RFI weld VI report, click [![image-1651825233051.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825233051.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825233051.png) (print icon) provided in the **Report** column of the **RFI Weld Visual Requests List** page. See Fig 5.6.

#### **5.6.7 View Signature Details of Inspectors**

You can view the sign details of the inspectors such as QA, Sub contractor, Client, and Owner, once they completed the RFI weld visual inspection and submitted the inspection result details including their signature. To view the signature details, click[![image-1651825274978.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825274978.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825274978.png) (Sign icon) in the **Sign Details** column in the **RFI Weld Visual Requests List** page.

#### **5.6.8 Attach a File into an RFI Weld VI Request** 

If you want to attach a file with any existing RFI weld VI request listed in the **RFI Weld Visual Requests List** page, you can attach the file by using [![image-1651825316304.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825316304.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825316304.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)”.

#### **5.6.9 Export RFI Weld VI Request List**

You can export a list of RFI weld VI requests added in the **RFI Weld Visual Requests List** page in both the pdf and excel formats by using [![image-1651825353910.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825353910.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825353910.png) (**PDF** button) and [![image-1651825365357.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825365357.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825365357.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)”.

#### **5.6.10 Filter RFI Weld VI Request**

If you want to filter any specific RFI weld VI request in the **RFI Weld Visual Requests List** page,

- you can use the filter box [![image-1651825412432.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825412432.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825412432.png) provided in the upper side of the **RFI Weld Visual Requests List**  To filter the any specific RFI weld VI request, select the **Drawing Number** and **Date** in the boxes and click **Search**.
- you can use [![image-1651825433459.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825433459.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825433459.png) (FILTER button) located on the RFI Weld Visual Requests List page. To know how to filter, see the topic ”Filter Any Area”.



### **5.7 NDT Inspection Generic**

NDT inspection used to find out welding defects of the materials. Once the fit up and welding process of the materials has completed, the materials will be moved for the NDT inspection. The currently following NDT inspection methods are RT, UT, MT, PT, Ultrasonic Thickness Gaging (UTG), Magnetic Particle Inspection (MPI) after load test, UT/MT, and PT after load test.

The **NDT Inspection Generic** tab in the **Inspection** menu helps you to add an NDT inspection generic. If you want to navigate the NDT inspection generic,

1. Click the **NDT Inspection Generic** in the **Inspection** menu. The **NDT Inspection Generic** page opens.
    
    [![image-1651825529646.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825529646.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825529646.png)
    
    [![image-1651825535975.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825535975.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825535975.png)
    
    [![image-1651825541098.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825541098.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825541098.png)
    
     **Figure 5.7: NDT Inspection Generic page**


#### **5.7.1 Add an NDT Inspection Generic** 

If you want to add an NDT inspection generic, do the following,

1. Click [![image-1651825641028.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825641028.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825641028.png) (**ADD** button) in the **NDT Inspection Generic** page. A new window opens to add an NDT Inspection generic.
    
    [![image-1651825651460.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825651460.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825651460.png)
    
    [![image-1651825674586.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825674586.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825674586.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651825686394.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825686394.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825686394.png)**Tip**: A report number for a new NDT inspection generic will be updated automatically in the **Report Number** box.
2. In the **Description** box, enter the description for the RFI weld VI generic.
3. In the **System** box, select a system from a drop-down list.
4. In the **Inspection Date** box, choose the date of inspection.
5. In the **Frame No** box, enter the frame number.
6. In the **Elevation** box, enter the elevation value.
7. In the **Longitudinal** box, enter the longitudinal value.
8. In the **Location** box, enter the location where the inspection to be done.
9. In the **Drawing No** box, select the drawing number from a drop-down list.
10. In the **Designation** box, enter the designation detail.
11. In the **Cost Centre** box, enter the cost centre detail.
12. In the **Requisition** box, select the type of request from a drop-down list.
13. In the **Welding Position** box, enter the position of welding.
14. In the **Weld Type** box, enter the type of welding.
15. In the **Thickness** box, enter the thickness of the welding.
16. In the **Sub Contractor** box, select the sub-contractor from a drop-down list.
17. In the **Welder** box, select the name of a welder from a drop-down list.
18. In the **WPS** box, enter the WPS detail.
19. In the **Process** box, select the welding process to be done from a specified category.
20. In the **NDT Type** box, select the type of NDT to be done from a specified category.
21. In the **Remarks** box, enter your remarks if any.
22. Click **Save**.

The NDT inspection generic is added successfully. Once you have added the NDT inspection generic, you must add the RFI data for the added NDT inspection generic.

#### **5.7.2 Add RFI Data for the Added NDT Inspection Generic**

If you want to add RFI data for the added NDT inspection generic, do the following,

1. Click [![image-1651825825779.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825825779.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825825779.png) (Edit icon) in the **RFI Data** column of the **NDT Inspection Generic**  See Fig 5.7. The **RFI Inspection Request List** window opens.
    
    [![image-1651825841901.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651825841901.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651825841901.png)
2. In the **Inspection From** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the **Inspection Details** option, select 1<sup>st</sup> Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the **Others** box, enter any other inspection related details.
6. In the **Refer to Report No** box, enter the report number for reference.
7. In the **RFI Date** box, choose the RFI date.
8. In the **Inspection Result** option, if the inspection result is accepted, select **Accepted** otherwise select **Rejected**.
9. In the **Remarks** box, enter your remarks if any.
10. In the **Inspected by** box, enter the name of a person who has done inspection.
11. In the **Inspected Date** box, choose the date of inspection.
12. In the **Witnessed By** box, enter the name of the witnessed person.
13. In the **Witnessed Date** box, choose the date of witnessed.
14. In the **PCML Rep Name** box, enter the representative name of PCML.
15. In the **PCML Rep Date** box, choose the PCML rep date.
16. In the **MEB Rep Name** box, enter the representative name of MEB.
17. In the **MEB Rep Date box**, choose MEB rep date.
18. Click **Save**.

The RFI data is successfully added.

#### **5.7.3 Print an RFI Report**

If you want to print an RFI report, click[![image-1651826055818.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651826055818.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651826055818.png) (print icon) provided in the **RFI** **Report** column of the **NDT Inspection Generic** page. See Fig 5.7.

#### **5.7.4 Submit an NDT Inspection Generic**

Once you have added the NDT inspection generic, the **Submission** column in the **NDT Inspection Generic** page is appeared with [![image-1651826167628.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651826167628.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651826167628.png) (Submit and Reject icons).

If you want to submit the added NDT inspection generic, click[![image-1651826214645.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651826214645.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651826214645.png) (Submit icon) in the **Submission** column. Otherwise click [![image-1651826225150.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651826225150.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651826225150.png)(Reject icon) to reject the request.

#### **5.7.5 Print an NDT Inspection Generic Report**

If you want to print an NDT inspection generic report, click[![image-1651826332425.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651826332425.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651826332425.png) (print icon) provided in the **Report** column of the **NDT Inspection Generic** page. See Fig 5.7.

#### **5.7.6 View Signature Details of QA User, Surveyor, and Client** 

Once the NDT inspection has completed, the QA, surveyor, and client add their signature based on their corresponding roles. You can view their signature by using [![image-1651826371886.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651826371886.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651826371886.png) (Sign icon) in the **Sign Details** column in the **NDT Inspection Generic** page.

#### **5.7.7 Attach a File into an NDT Inspection Generic**

If you want to attach any file with any NDT inspection generic added in the **NDT Inspection Generic page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **5.7.8 Edit Any NDT Inspection Generic**

If you want to edit any existing NDT inspection generic in the **NDT Inspection Generic** page, do the following,

1. Click [![image-1651826479141.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651826479141.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651826479141.png) (Edit icon) in the **Edit** column for the respective NDT inspection generic. See Fig 5.7. A new window opens to edit the NDT inspection generic.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.7.9 Export NDT Inspection Generic List**

You can export a list of NDT inspection generic added in the **NDT Inspection Generic** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **5.7.10 Filter Any NDT Inspection Generic**

If you want to filter any NDT inspection generic from the list of NDT inspection generic in the **NDT Inspection Generic** page, you can use the [![image-1651826596765.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651826596765.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651826596765.png) (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.




### **5.8 NDT Inspection Request**

The **NDT Inspection Request** tab in the **Inspection** menu helps you to add an NDT inspection request to perform the NDT inspection.

#### **5.8.1 Add an NDT Inspection Request**

If you want to add an NDT inspection request, do the following

1. Click the **NDT Inspection Request** tab in the **Inspection** menu. A new page opens to add an NDT inspection request.
    
    [![image-1651826755259.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651826755259.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651826755259.png)
    
     **Figure 5.8: NDT Inspection Request page**
    
    [![image-1651826778999.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651826778999.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651826778999.png) **Tip**: A report number and the request adding date for a new NDT inspection request will be updated automatically in the **Report Number** and the **Date** boxes, respectively.
    
    [![image-1651826800152.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651826800152.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651826800152.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **Requested By** box, enter the name of person who has requested for the inspection.
3. In the **To** box, select the name of a sub-contractor from a drop-down list.
4. In the **Attention** box, enter any note if you want for attention.
5. In the **Inspection Date &amp; Time** box, select the date of inspection.
6. In the **Location** box, enter the location where the inspection to be done.
7. In the **Designation** box, enter the designation detail.
8. In the **Cost Centre** box, enter the cost centre detail.
9. In the **Requisition** box, select the type of request from a drop-down list.
10. In the **Welding Position** box, enter the position of welding.
11. In the **Weld Type** box, enter the type of welding.
12. In the **Thickness** box, enter the thickness of the welding.
13. In the **NDT Procedure Number**, select the NDT procedure number from a drop-down list.
14. In the **Acceptance Criteria** box, enter the detail of acceptance criteria.
15. In the **Test Specification** box, enter the test specification detail.
16. In the **Construction Code** box, enter the construction code.
17. In the **NDT Type** box, select any type of NDT you want to add.
18. In the **Remarks** box, enter your remarks if any.
    
    [![image-1651826902770.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651826902770.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651826902770.png) **Note**: Before saving the added NDT request, you must add the details of joints. You can add multiple joints for any added NDT inspection request by using a box provided in the left side of the page. To know how to add joints, see the topic “[**<u>Add joints for an NDT inspection request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.8.2%C2%A0add-joints-for)”.
19. Click **Save**.

#### **5.8.2 Add Joints for an NDT Inspection Request**

If you want to add joints for any added NDT inspection request, do the following,

[![image-1651826974438.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651826974438.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651826974438.png)

1. Click the check box of the respective joints.
2. Click [![image-1651827303530.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651827303530.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651827303530.png) (**Add Selected Joints** button).
    
    The selected joints are moved into the **Added Joints** box located in the right side of the page.
    
    [![image-1651827318760.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651827318760.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651827318760.png)

The selected joints are successfully added for the NDT inspection request.


### **5.9 View NDT Request**

The **View NDT Request** tab helps you to view and edit the added NDT inspection request, which is added by using the **NDT Inspection Request** tab.

1. Click the **View NDT Request** tab in the **Inspection** menu. The **View NDT Inspection List** page opens with a list of added NDT inspection requests.
    
    [![image-1651827398000.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651827398000.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651827398000.png)
    
     **Figure 5.9: View NDT Inspection List page**

#### **5.9.1 Change the Inspection Date for Any Added NDT Inspection Request**

If you want to change the inspection date of any added NDT inspection request,

1. Click [![image-1651827458444.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651827458444.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651827458444.png) (Edit icon) in the ****Inspection Date**** column for the respective NDT inspection request, See Fig 5.9. The **Edit Form** window opens.
    
    [![image-1651827474618.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651827474618.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651827474618.png)
    
    
    1. 1. In the **Inspection Date** box, select the date of inspection.
        2. Click **Save**.

#### **5.9.2 Print an NDT Inspection Request Report**

If you want to print an NDT inspection request report, click[![image-1651827538972.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651827538972.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651827538972.png) (print icon) provided in the **Report** column of the **View NDT Inspection List** page. See Fig 5.9.

#### **5.9.3 Edit Any NDT Inspection Request** 

If you want to edit any existing NDT Inspection request in the **View NDT Inspection List** page, do the following,

1. Click [![image-1651827596549.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651827596549.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651827596549.png)(Edit icon) in the **Edit** column for the respective NDT inspection request. See Fig 5.9. The **NDT Inspection Request** page opens to edit the NDT Inspection request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.9.4 Export NDT Inspection Request List**

You can export a list of NDT inspection request added in the **View NDT Inspection List** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **5.9.5 Filter Any NDT Inspection Request** 

If you want to filter any NDT inspection request from the list of NDT inspection requests in the **View NDT Inspection List** page, you can use the [![image-1651827676180.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651827676180.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651827676180.png) (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.


### **5.10 RFI Request for Post Weld Heat Treatment (PWHT)**

PWHT is defined as a heat treatment after welding performed to strengthen the weld metal and heat affected zone. Thus, decreasing hardness and improving toughness, and decreasing the residual stresses associated with welding.

The **RFI Request** **for PWHT** tab in the **Inspection** menu used to add an RFI request for PWHT.

1. Click the **RFI Request** **for PWHT** tab in the **Inspection** menu. The **RFI Request** **for PWHT** page opens.
    
    [![image-1651827779135.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651827779135.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651827779135.png)
    
     **Figure 5.10: RFI Request** **for PWHT page**

#### **5.10.1 Add an RFI Request for PWHT**

If you want to add an RFI request for PWHT, do the following,

1. Click [![image-1651827838749.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651827838749.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651827838749.png) (**ADD** button) in the **RFI Request** **for PWHT** page. See Fig 5.10. A new window opens to add an RFI request for PWHT.
    
    [![image-1651827872721.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651827872721.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651827872721.png)
    
    [![image-1651827882542.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651827882542.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651827882542.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
3. In the **Location** box, enter a location where the inspection to be done.
4. In the **Inspection** **Date** box, select the date of inspection.
5. In the **NDT Type** box, select **PWHT**.
6. In the ****Search Joints List by ISO/ Drawing No**** box, select a drawing number from a drop-down list. The Joint numbers and the piece mark numbers will be listed for the selected drawing number.
7. If you want to add joints, click [![image-1651828471923.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651828471923.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651828471923.png)(****Add**** icon) of the respective joint number. The added joints will be moved into the left side window of the **RFI Request for PWHT** page.
8. Click **Save AFI Request**.
    
    The RFI request for PWHT is successfully added.

#### **5.10.2 Submit and Approve an RFI Request for PWHT**

Once you have added the RFI request for PWHT, the **Request Status** column in the **RFI Request for PWHT page is appeared with[![image-1651828599274.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651828599274.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651828599274.png) (Submit and Reject icons).

1. If you want to submit the RFI request for PWHT, click [![image-1651828645465.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651828645465.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651828645465.png) (Submit icon) in the **Request Status** column. Otherwise click [![image-1651828661988.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651828661988.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651828661988.png) (Reject icon) to reject the request.
    
    Once you have submitted the RFI request for PWHT, the **Completed Status** column in the **RFI Request for PWHT** page is appeared with [![image-1651828724896.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651828724896.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651828724896.png) (Accept and Reject icons).
2. If you want to approve the RFI request for PWHT, click [![image-1651828802200.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651828802200.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651828802200.png) (Submit icon) in the ****Completed Status**** Otherwise click [![image-1651828790594.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651828790594.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651828790594.png) (Reject icon) to reject the request.

#### **5.10.3 Attach a File into an RFI Request for PWHT**

If you want to attach any file with any RFI request for PWHT listed in the **RFI Request for PWHT** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **5.10.4 Print an RFI Request for PWHT Report**

If you want to print an RFI request for PWHT report, click [![image-1651828939299.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651828939299.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651828939299.png) (print icon) provided in the **Report** column of the **RFI Request for PWHT** page. See Fig 5.12.

#### **5.10.5 Edit Any RFI Request for PWHT**

 If you want to edit any existing RFI request for PWHT in the **RFI Request for PWHT** page, do the following,

1. Click [![image-1651829052996.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651829052996.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651829052996.png) (Edit icon) in the **Edit** column for the respective RFI request for PWHT. See Fig 5.10. A new window opens to edit the RFI request for PWHT.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save AFI Request**.

#### **5.10.6 Export RFI Request for PWHT**

You can export a list of RFI request for PWHT added in the **RFI Request for PWHT** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.


### **5.11 NDT Job Order**

The **NDT Job Order** tab in the **Inspection** menu allows you to add a job order for a specific NDT-contractor to carry out the NDT inspection. Once you have added the job order, you can add the NDT request including the quantity and schedule date to complete the NDT inspection.

If you want to navigate **NDT Job Order**,

1. Click the **NDT Job Order** tab in the **Inspection** menu.
    
    The **Job Order** page opens.
    
    [![image-1651829189141.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651829189141.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651829189141.png)
    
     **Figure 5.11: Job Order page**

#### **5.11.1 Add NDT Job Order**

If you want to add an NDT job order, do the following,

1. Click [![image-1651829306598.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651829306598.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651829306598.png) (**ADD** button) in the **Job Order** page. See Fig 5.11. A new window opens to add an NDT job order.
    
    [![image-1651829323945.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651829323945.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651829323945.png)
    
    [![image-1651829333579.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651829333579.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651829333579.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651829363867.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651829363867.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651829363867.png) **Tip**: A report number for a new job order will be updated automatically in the **Report Number** box.
2. In the **NDT Contractor** box, select the name of an NDT contractor from a drop-down list.
3. In the **Attention** box, enter any note if you want for attention.
4. In the **Date** box, select the date of adding an NDT job order.
5. In the **Job No** box, enter the job number.
6. In the **Requested By** box, enter the name of a person who has requested for an NDT job order.
7. In the **Requested Date** box, select requested date of an NDT job order.
8. In the **Supported By** boxes, enter the name of a project lead and a HOD, respectively.
9. Click **Save**.

The NDT job order is successfully added.

#### **5.11.2 Add an NDT request** 

1. Click [![image-1651829494834.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651829494834.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651829494834.png) (Add icon) of the respective job order in the **Add NDT Request** column of the **Job Order** See Fig 5.13. A new window shows a list of added NDT request.
    
    [![image-1651829512197.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651829512197.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651829512197.png)
2. If you want to add any request, click [![image-1651829567471.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651829567471.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651829567471.png) (Add icon) of the respective request.
    
    The added NDT request will be assigned under the respective job order.
3. If you want to delete any request, click [![image-1651829558594.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651829558594.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651829558594.png) (Delete icon) of the respective request.

#### **5.11.3 Attach a File into an NDT Job Order** 

If you want to attach any file with any NDT job order listed in the **Job Order** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **5.11.4 Print an NDT Job Order Report**

If you want to print an NDT job order report, click [![image-1651829685976.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651829685976.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651829685976.png) (print icon) provided in the **Report** column of the **Job Order** page. See Fig 5.11.

#### **5.11.5 Edit Any NDT Job Order**

 If you want to edit any existing NDT job order in the **Job Order** page, do the following,

1. Click [![image-1651829755981.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651829755981.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651829755981.png) (Edit icon) in the **Edit** column for the respective NDT job order. See Fig 5.11.
    
    A new window opens to edit the job order.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.11.6 Export NDT Job Order List**

You can export a list of NDT job order added in the **Job Order** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.



### **5.12 NDT Job Verification**

The **NDT Job Verification** tab helps you to add an NDT job verification request. This tab helps the NDT contractor to verify the quantity of job done based on the request issued. If you want to navigate **NDT Job Verification**,

1. Click the **NDT Job Verification** tab in the **Inspection** menu. The **Job Verification** page opens.
    
    [![image-1651829889189.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651829889189.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651829889189.png)
    
     **Figure 5.12: Job Verification page**

#### **5.12.1 Add NDT Job Verification**

If you want to add an NDT job verification, do the following,

1. Click [![image-1651829975202.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651829975202.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651829975202.png) (**ADD** button) in the **Job Verification** page. See Fig 5.12. A new window opens to add an NDT job verification request.
    
    [![image-1651829997771.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651829997771.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651829997771.png)
    
    [![image-1651830007041.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651830007041.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651830007041.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651830020667.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651830020667.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651830020667.png)**Tip**: A report number for a new job verification will be updated automatically in the **Report Number** box.
2. In the **NDT Contractor** box, select the name of an NDT contractor from a drop-down list.
3. In the **Date** box, select the date of adding an NDT job verification request.
4. In the **Job No** box, enter the job number.
5. In the **Prepared By** box, enter the name of a person who prepared the NDT job verification request.
6. In the **Prepared Date** box, select prepared date of the NDT job verification request.
7. In the **Checked By** box, enter the name of a person who has checked the request.
8. In the **Checked Date** box, select checked date of the request.
9. In the ****Verified By**** box, enter the name of a person who has verified the request.
10. Click **Save**.

The NDT job verification request is successfully added.

#### **5.12.2 Attach a File into an NDT Job Verification Request**

If you want to attach any file with any NDT job verification request listed in the **Job Verification** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **5.12.3 Print an NDT Job Verification Report**

If you want to print an NDT job verification report, click[![image-1651830207157.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651830207157.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651830207157.png) (print icon) provided in the **Report** column of the **Job Verification** page. See Fig 5.12.

#### **5.12.4 Edit Any NDT Job Verification Request**

 If you want to edit any existing NDT job verification request in the **Job Verification** page, do the following,

1. Click [![image-1651830268726.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651830268726.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651830268726.png) (Edit icon) in the **Edit** column for the respective NDT job verification request. See Fig 5.12. A new window opens to edit the job order.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.12.5 Export NDT Job Verification Request List**

You can export a list of NDT job verification request added in the **Job Verification** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.


### **5.13 Survey form**

The **Survey form** tab in the **Inspection** menu helps you to add a survey form. To navigate the **Survey form**,

1. Click the **Survey form** tab in the **Inspection** menu. The **Survey form** page opens.
    
    [![image-1651830448638.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651830448638.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651830448638.png)
    
     **Figure 5.13: Survey form page**

#### **5.13.1 Add a Survey Form**

If you want to add a survey form, do the following,

1. Click [![image-1651830510089.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651830510089.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651830510089.png) (**ADD** button) in the **Survey form** page. See Fig 5.13. A new window opens to add a survey form.
    
    [![image-1651830526378.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651830526378.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651830526378.png)
    
    [![image-1651830538113.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651830538113.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651830538113.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **Report Number** box, enter the report number of the survey form.
3. In the **Request** **Date** box, select the request date of the survey form.
4. In the **Part Number** box, enter the part number for the survey form.
5. In the **Part Description** box, enter the description for the added part number.
6. In the **Inspection Request Date** box, select the inspection request date.
7. In the **Location** box, enter the location where the inspection to be done.
8. In the **Batch Number** box, enter the batch number for the survey form.
9. In the **Drawing Number** box, enter the drawing number for the survey form.
10. In the **Inspection and Test Plan (ITP) Document Number** box, enter ITP document number.
11. In the **Section / Clause Number** box, enter the section / clause number.
12. In the **Reference Number** box, enter the reference number.
13. In the **Report Number** box, enter the report number.
14. In the **Report Number** box, enter the report number.
15. In the **Type of Inspection** option, select the required inspection types from the given inspection type list.
16. Click **Save**.

The survey form is successfully added.

#### **5.13.2 Attach a File into a Survey Form**

If you want to attach any file with any survey form added in the **Survey form** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **5.13.3 Submit and Approve a Survey Form**

Once you have added the surveyor, the **Submission** column in the **Survey form** page is appeared with [![image-1651830705341.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651830705341.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651830705341.png) (Submit and Reject icons).

1. If you want to submit the survey form, click [![image-1651830726910.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651830726910.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651830726910.png) (Submit icon) in the **Submission** column. Otherwise click [![image-1651830735618.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651830735618.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651830735618.png) (Reject icon) to reject the survey form.
    
    Once you have submitted the survey form, the **Approval** column in the **Survey form** page is appeared with [![image-1651830787696.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651830787696.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651830787696.png) (Accept and Reject icons).
2. If you want to approve the survey form, click [![image-1651830812125.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651830812125.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651830812125.png) (Submit icon) in the ****Approval****  Otherwise click [![image-1651830823985.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651830823985.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651830823985.png) (Reject icon) to reject the survey form.

#### **5.13.4 Print a Structural Survey Report**

If you want to print a structural survey report, click [![image-1651830878218.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651830878218.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651830878218.png) (print icon) provided in the **Report** column of the **Survey form** page. See Fig 5.13.

#### **5.13.5 Edit Any Survey Form**

 If you want to edit any existing survey form in the **Survey form** page, do the following,

1. Click [![image-1651830956172.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651830956172.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651830956172.png) (Edit icon) in the ****Edit**** column for the respective survey form. See Fig 5.13. A new window opens to edit the survey form.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.13.6 Export Survey Form List**

You can export a list of survey forms added in the **Survey Form** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.



### **5.14 Dimensional Inspection Request**

The **Dimensional Inspection Request** tab in the **Inspection** menu helps you to add a dimensional inspection request. To navigate to the dimensional inspection request adding page,

1. Click **Dimensional Inspection Request** in the **Inspection** menu. The **Dimensional Inspection Request** page opens.
    
    [![image-1651831183622.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651831183622.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651831183622.png)
    
     **Figure 5.14: Dimensional Inspection Request page**

#### **5.14.1 Add a Dimensional Inspection Request**

If you want to add a new dimensional inspection request, do the following steps.

1. In the **Inspection Date** box, select the date of dimensional inspection.
2. In the **Location** box, select the location where the dimensional inspection to be performed.
    
    Before saving the added dimensional inspection request, you must add spools. You can add multiple spools for one dimensional inspection request.
    
    [![image-1651831273703.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651831273703.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651831273703.png) **Note**: The page shows a list of added spools. If you want to view the specific spools, use the filter options provided in the **System**, **Line Number**, **Drawing Number**, and **Spool Number** columns.
3. Click [![image-1651831300876.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651831300876.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651831300876.png) (Add icon) of the respective spool which you want to add. The added spools will be moved to the right side of the page.
4. In the **Remarks** box, enter your remarks if any.
5. In the **Inspection Item** box, enter the details of inspection items.
6. Click **Save**.

The dimensional inspection request will be added and listed in the **Dimensional Inspection List** page.



### **5.15 Dimensional Inspection List**

The **Dimensional Inspection List** tab helps you to view and edit the dimensional inspection request, which is added by using the **Dimensional Inspection Request** tab. This tab also allows you to add a new dimensional inspection request.

1. Click **Dimensional Inspection List** in the **Inspection** menu. The **Dimensional Inspection List** page opens with a list of added dimensional inspection requests.
    
    [![image-1651831411887.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651831411887.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651831411887.png)
    
     **Figure 5.15: Dimensional Inspection List page**

#### **5.15.1 Add a Dimensional Inspection Request**

If you want to add a dimensional inspection request, do the following steps,

1. Click [![image-1651831537724.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651831537724.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651831537724.png) (**ADD** button) in the **Dimensional Inspection List** page. The system redirects you into the **Dimensional Inspection Request** page. To know how to add a dimensional inspection request, See the topic, “[**<u>Add a Dimensional Inspection Request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.14.1%C2%A0add-a-dimensi)”.

Once you have added the dimensional inspection request, you must submit the added request to perform the dimensional inspection.

#### **5.15.2 Add Representative for Added Dimensional Inspection Request**

If you want to add a representative for any added dimensional inspection request,

1. Click [![image-1651831627889.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651831627889.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651831627889.png) (Edit icon) in the **Representative** column for the respective spool release request. The **Edit Form** window opens.
    
    [![image-1651831641317.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651831641317.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651831641317.png)
2. In the **Inspection Date** box, select the date of inspection.
3. In the **Representative** box, enter the name of a representative.
4. Click **Save**.

#### **5.15.3 Edit Any Dimensional Inspection Request** 

If you want to edit any existing dimensional inspection request in the **Dimensional Inspection List** page, do the following,

1. Click [![image-1651831716330.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651831716330.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651831716330.png) (Edit icon) in the **Edit** column for the respective dimensional inspection request. See Fig 5.15. The page opens with the details of the selected dimensional inspection request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.15.4 Submit a Dimensional Inspection Request**

Once you have added the dimensional inspection request, the **Request Status** column in the **Dimensional Inspection List** page is appeared with[![image-1651831788208.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651831788208.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651831788208.png) (Submit and Reject icons). See Fig 5.15.

1. If you want to submit the dimensional inspection request, click [![image-1651831817658.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651831817658.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651831817658.png) (Submit icon) in the **Request Status** Otherwise click [![image-1651831830061.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651831830061.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651831830061.png) (Reject icon) to reject the request.

The submitted request will be moved to for the dimensional inspection.

#### **5.15.5 Add Results of Dimensional Inspection**

After completing the dimensional inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click [![image-1651832248438.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651832248438.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651832248438.png) (Add icon) in the **Results** column of the respective request. The **Dimensional Inspection List** window opens with a list of added spools.
    
    [![image-1651832262309.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651832262309.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651832262309.png)
2. In the **Result** column, select the result for each spool from the given result options.
3. In the **Pipe Size** column, select the result of pipe size.
4. In the **Dimension** column, select the result of pipe dimension.
5. In the **Flange** column, select the result of flange.
6. In the **Orientation** column, select the result of orientation.
7. In the **Remarks** box, enter your remarks if any.
8. Click **Save**.

#### **5.15.6 View a Dimensional Inspection Report**

If you want to view a dimensional inspection report, click (print icon) provided in the **Print** column of the **Dimensional Inspection List** page. See Fig 5.15.

#### **5.15.7 Attach a File into a Dimensional Inspection Request** 

If you want to attach a file with an existing dimensional inspection request listed in the **Dimensional Inspection List** page, you can attach the file by using [![image-1651832487057.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651832487057.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651832487057.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)”.

#### **5.15.8 Export Dimensional Inspection Request List**

You can export a list of dimensional inspection requests added in the **Dimensional Inspection List** page in both the pdf and excel formats by using [![image-1651832584178.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651832584178.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651832584178.png) (**PDF** button) and [![image-1651832593857.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651832593857.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651832593857.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)”.

#### **5.15.9 Filter Dimensional Inspection Request**

If you want to filter any dimensional inspection request in the **Dimensional Inspection List** page, you can use [![image-1651833096628.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651833096628.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651833096628.png) (**FILTER** button) located on the **Dimensional Inspection List** page. To know how to filter, see the topic, ”**Filter Any Area**”.

### **5.16 Inspection Release Note**

The **Inspection Release Note** tab in the **Inspection** menu helps you to add an inspection release note. If you want to navigate the inspection release note adding page,

1. Click **Inspection Release Note** in the **Inspection** menu. The **Inspection Release Note** page opens.
    
    [![image-1651833603254.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651833603254.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651833603254.png)
    
     **Figure 5.16: Inspection Release Note page**

#### **5.16.1 Add an Inspection Release Note** 

If you want to add an inspection release note, do the following,

1. Click [![image-1651844276065.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651844276065.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651844276065.png) (**ADD** button) in the **Inspection Release Note** page. A new window opens to add an Inspection release note.
    
    [![image-1651844288657.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651844288657.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651844288657.png)
    
    [![image-1651844353022.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651844353022.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651844353022.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **Sub Contractor Name** box, select a sub-contractor from a drop-down list.
3. In the **Inspection Date &amp; Time** box, select the date and time of inspection.
4. In the **Location** box, select a location where the inspection to be held.
5. In the **System/Area** box, enter the name of area/system.
6. In the **Sub System No** box, enter the sub system number.
7. In the ****Item to be Released**** field, select the detail of the item to be released that is whether ****Piping**** or ****Structural****. If another item means select the checkbox of ****Others**** and enter the item detail.
8. In the ****Item to be Released for**** field, select the reason of the item to be released for that is whether for ****Pressure Test**** or ****Blasting &amp; Painting****. If any other reason means select the checkbox of ****Others**** and enter the reason.
9. In the **Sheet No** box, enter the sheet number.
10. In the **Revision** box, enter the revision for the weld map drawing.
11. In the **Description** box, enter the description for the weld map drawing.
12. In the **Quantity** box, enter the quantity of the weld map drawing.
13. In the **Remarks** box, enter your remarks if any.
14. Click **Update**.
    
    The weld map drawing is updated.
15. In the **Prepared By** box, enter the name of a person who has prepared the inspection release note.
16. In the ****Prepared Date**** box, select the prepared date of the inspection release note.
17. In the **Reviewed By** box, enter the name of a person who has reviewed the inspection release note.
18. In the ****Reviewed Date**** box, select the reviewed date of the inspection release note.
19. In the ****Approved By**** box, enter the name of a person who has approved the inspection release note.
20. In the ****Approved Date**** box, select the approved date of the inspection release note.
21. In the **Remarks** box, enter your remarks if any.
22. Click **Send Request**.

The inspection release will be added and listed in the **Inspection Release Note** page.

#### **5.16.2 Add RFI Data for the Added Inspection Release Note**

If you want to add RFI data for the added inspection release note, do the following,

1. Click [![image-1651858047227.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651858047227.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651858047227.png)(Edit icon) in the **RFI Data** column of the **Inspection Release Note**  See Fig 5.16. The **RFI Inspection Request List** window opens.
    
    [![image-1651858070087.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651858070087.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651858070087.png)
2. In the **Inspection From** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the **Inspection Details** option, select 1<sup>st</sup> Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the **Others** box, enter any other inspection related details.
6. In the **Refer to Report No** box, enter the report number for reference.
7. In the **RFI Date** box, choose the RFI date.
8. In the ****Inspection Result**** option, if the inspection result is accepted, select ****Accepted**** otherwise select ****Rejected****.
9. In the **Remarks** box, enter your remarks if any.
10. In the **Inspected by** box, enter the name of a person who has done inspection.
11. In the **Inspected Date** box, choose the date of inspection.
12. In the **Witnessed By** box, enter the name of the witnessed person.
13. In the **Witnessed Date** box, choose the date of witnessed.
14. In the **PCML Rep Name** box, enter the representative name of PCML.
15. In the **PCML Rep Date** box, choose the PCML rep date.
16. In the **MEB Rep Name** box, enter the representative name of MEB.
17. In the **MEB Rep Date box**, choose MEB rep date.
18. Click **Save**.

The RFI data is successfully added.

#### **5.16.3 Submit and Approve an NDT Inspection Generic**

Once you have added the inspection release note, the **Submission** column in the **Inspection Release Note** page is appeared with [![image-1651858331817.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651858331817.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651858331817.png) (Submit and Reject icons).

1. If you want to submit the inspection release note, click [![image-1651858357053.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651858357053.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651858357053.png)(Submit icon) in the **Submission** Otherwise click [![image-1651858386272.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651858386272.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651858386272.png) (Reject icon) to reject the request. Once you have submitted the inspection release note, the **Request Status** column in the **Inspection Release Note** page is appeared with [![image-1651858509564.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651858509564.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651858509564.png) (Approve and Reject icons).
2. If you want to approve the inspection release note, click [![image-1651858544843.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651858544843.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651858544843.png) (Approve icon) in the ****Request Status**** Otherwise click [![image-1651858557369.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651858557369.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651858557369.png)(Reject icon) to reject the request.

#### **5.16.4 Print an RFI Report**

If you want to print an RFI report, click [![image-1651860449118.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651860449118.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651860449118.png) (print icon) provided in the **RFI** **Report** column of the **Inspection Release Note** page. See Fig 5.16.

#### **5.16.5 Print an Inspection Release Note**

If you want to print an inspection release note, click [![image-1651860488133.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651860488133.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651860488133.png) (print icon) provided in the **Print** column of the **Inspection Release Note** page. See Fig 5.16.

#### **5.16.6 Attach a File into an Inspection Release Note**

If you want to attach a file with an inspection release note added in the **Inspection Release Note** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **5.16.7 Edit Any Inspection Release Note**

If you want to edit any existing inspection release note in the **Inspection Release Note** page, do the following,

1. Click [![image-1651860584541.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651860584541.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651860584541.png) (Edit icon) in the ****Edit**** column for the respective NDT inspection generic. See Fig 5.16. A new window opens to edit the inspection release note.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.16.8 Export Inspection Release Note List**

You can export a list of inspection release notes added in the **Inspection Release Note** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.


### **5.17 Blasting and Painting Inspection Report**

The **Blasting and Painting** **Inspection Report** tab in the **Inspection** menu helps you to add a blasting and painting inspection report. If you want to navigate the blasting and painting inspection report adding page,

1. Click **Blasting and Painting** **Inspection Report** in the **Inspection** menu. The **Blasting and Painting** **Inspection** **List** page opens.
    
    [![image-1651860701743.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651860701743.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651860701743.png)
    
     **Figure 5.17: Blasting and Painting Inspection List page**

#### **5.17.1 Add a Blasting and Painting Inspection Report**

If you want to add a blasting and painting inspection report, do the following,

1. Click [![image-1651860755536.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651860755536.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651860755536.png) (**ADD** button) in the **Blasting and Painting** **Inspection** **List** page. A new window opens to add the blasting and painting inspection report details.
    
    [![image-1651860768979.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651860768979.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651860768979.png)
    
    [![image-1651860793508.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651860793508.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651860793508.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **Sub Contractor Name** box, select a sub-contractor from a drop-down list.
3. In the **Inspection Date &amp; Time** box, select the date and time of inspection.
4. In the **Location** box, select a location where the inspection to be held.
5. In the **Paint System No** box, enter the paint system number.
6. In the **System/Area** box, enter the name of area/system.
7. In the **Sub System No** box, enter the sub system number.
    
    Before saving the blasting and painting inspection report, you must add the weld map drawing detail.
8. Click [![image-1651860856192.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651860856192.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651860856192.png) (**ADD** button) in the **Weld Map Drawing Detail** window.
    
    The **Edit Form** window shows a new window to add the details of weld map drawing.
    
    [![image-1651860870946.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651860870946.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651860870946.png)
9. In the **Weld Map Drawing No** box, enter the weld map drawing number.
10. In the **Sheet No** box, enter the sheet number.
11. In the **Revision** box, enter the revision for the weld map drawing.
12. In the **Description** box, enter the description for the weld map drawing.
13. In the **Quantity** box, enter the quantity of the weld map drawing.
14. In the **Remarks** box, enter your remarks if any.
15. Click **Update**.
    
    The weld map drawing is updated.
16. In the ****Prepared By**** box, enter the name of a person who has prepared the blasting and painting inspection report.
17. In the **Prepared Date** box, select the prepared date of the blasting and painting inspection report.
18. In the **Reviewed By** box, enter the name of a person who has reviewed the blasting and painting inspection report.
19. In the **Reviewed By** box, enter the name of a person who has reviewed the blasting and painting inspection report.
20. In the **Approved By** box, enter the name of a person who has approved the blasting and painting inspection report.
21. In the **Approved Date** box, select the approved date of the blasting and painting inspection report.
22. In the **Remarks** box, enter your remarks if any.
23. Click **Send Request**.

The blasting and painting inspection report will be added and listed in the **Blasting and Painting Inspection List** page.

#### **5.17.2 Add RFI Data for the Added Blasting and Painting Inspection Report**

If you want to add RFI data for the added blasting and painting inspection report, do the following,

1. Click [![image-1651861075294.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651861075294.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651861075294.png)(Edit icon) in the **RFI Data** column of the **Blasting and Painting** **Inspection List**  See Fig 5.17. The **RFI Inspection Request List** window opens.
    
    [![image-1651861097600.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651861097600.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651861097600.png)
2. In the **Inspection From** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the ****Inspection Details**** option, select 1<sup>st</sup>Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the **Others** box, enter any other inspection related details.
6. In the **Refer to Report No** box, enter the report number for reference.
7. In the **RFI Date** box, choose the RFI date.
8. In the **Inspection Result** option, if the inspection result is accepted, select **Accepted** otherwise select **Rejected**.
9. In the **Remarks** box, enter your remarks if any.
10. In the **Inspected by** box, enter the name of a person who has done inspection.
11. In the **Inspected Date** box, choose the date of inspection.
12. In the **Witnessed By** box, enter the name of the witnessed person.
13. In the **Witnessed Date** box, choose the date of witnessed.
14. In the **PCML Rep Name** box, enter the representative name of PCML.
15. In the **PCML Rep Date** box, choose the PCML rep date.
16. In the **MEB Rep Name** box, enter the representative name of MEB.
17. In the **MEB Rep Date box**, choose MEB rep date.
18. Click **Save**.

The RFI data is successfully added.

#### **5.17.3 The RFI data is successfully added.**

Once you have added the blasting and painting inspection report, the **Submission** column in the **Blasting and Painting Inspection List** page is appeared with [![image-1651861264888.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651861264888.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651861264888.png) (Submit and Reject icons).

1. If you want to submit the blasting and painting inspection report, click [![image-1651861284811.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651861284811.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651861284811.png) (Submit icon) in the **Submission** Otherwise click [![image-1651861296625.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651861296625.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651861296625.png) (Reject icon) to reject the request. Once you have submitted the blasting and painting inspection report, the **Request Status** column in the **Blasting and Painting** **Inspection List** page is appeared with (Approve and Reject icons).
2. If you want to approve the blasting and painting inspection report, click [![image-1651861369071.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651861369071.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651861369071.png)(Approve icon) in the ****Request Status**** Otherwise click [![image-1651861379239.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651861379239.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651861379239.png) (Reject icon) to reject the request. Once you have approved the blasting and painting inspection report, the **Result** column will be enabled with (Add icon) to add the blasting and painting inspection results.
    
    [![image-1651861421664.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651861421664.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651861421664.png)

#### **517.4 Add Blasting and Painting Inspection Results**

If you want to add the blasting and painting inspection results,

1. Click [![image-1651861496065.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651861496065.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651861496065.png) (Add icon) in the **Result** column of the **Blasting and Painting** **Inspection List** page. The page shows a new window.
    
    [![image-1651861530088.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651861530088.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651861530088.png)
2. Click [![image-1651861556306.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651861556306.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651861556306.png) (Edit icon) in the ****Edit**** column. The page shows the **Surface Preparation**, **Paint Preparation**, and **Paint Application** windows.
    
    [![image-1651861585452.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651861585452.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651861585452.png)
3. In the **Surface Profile Height** box, enter the surface profile height value.
4. In the **Cleaning Method** box, enter the cleaning method detail.
5. In the **Surface Cleanliness** box, select the surface cleanliness level.
6. In the **Abrasive Manufacturer** box, enter the abrasive manufacturer detail.
7. In the **Abrasive Type** box, enter the type name of abrasive.
8. In the **Abrasive Grade** box, enter the grade level of abrasive.
9. In the **Date &amp; Time** box, select the date and time.
10. Click **Save**.
11. In the ****Paint Preparation**** window, enter the detail of 1<sup>st</sup> coat, 2<sup>nd</sup> coat and 3<sup>rd</sup> coat in the respective columns.
12. Click **Save changes**.
13. In the **Airless Spray** box, enter the airless spray method detail.
14. In the **Conventional Spray** box, enter the conventional spray method detail.
15. In the **Roller/Brush** box, enter the roller/brush detail.
16. Click **Save**.
17. In the **Paint Application** window, enter the detail of 1<sup>st</sup> coat, 2<sup>nd</sup> coat and 3<sup>rd</sup> coat in the respective columns.
18. Click **Save changes**.
19. In the **Description** box, enter the description for the inspection.
20. In the **1<sup>st</sup> Coat Date &amp; Time** box, select the date and time of 1<sup>st</sup> coat.
21. In the **2<sup>nd</sup>** **Coat Date &amp; Time** box, select the date and time of 2<sup>nd</sup> coat.
22. In the **3<sup>rd</sup>** **Coat Date &amp; Time** box, select the date and time of 3<sup>rd</sup> coat.
23. Click **Save**.

#### **5.17.5 Print an RFI Report**

If you want to print an RFI report, click [![image-1651861750015.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651861750015.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651861750015.png) (print icon) provided in the **RFI** **Report** column of the **Blasting and Painting** **Inspection List page. See Fig 5.17.

#### **5.17.6 Print a Blasting and Painting Inspection Report**

If you want to print a blasting and painting inspection report, click [![image-1651862511970.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651862511970.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651862511970.png) (print icon) provided in the **Print** column of the **Blasting and Painting** **Inspection List** page. See Fig 5.17.

#### **5.17.7 Attach a File into a Blasting and Painting Inspection Report**

If you want to attach a file with a blasting and painting inspection report added in the **Blasting and Painting** **Inspection List page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **5.17.8 Edit Any Blasting and Painting Inspection Report**

If you want to edit any existing blasting and painting inspection report in the **Blasting and Painting** **Inspection List** page, do the following,

1. Click [![image-1651862700242.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651862700242.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651862700242.png)(Edit icon) in the **Edit** column for the respective blasting and painting inspection report. See Fig 5.17. A new window opens to edit the blasting and painting inspection report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.17.9 Export Blasting and Painting Inspection Report List**

You can export a list of blasting and painting inspection reports added in the **Blasting and Painting** **Inspection List** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.



### **5.18 Painting and Coating Final Inspection Report**

The **Painting** **and Coating FIR** tab in the **Inspection** menu helps you to add a painting and coating inspection report. If you want to navigate the painting and coating inspection report adding page,

1. Click **Painting** **and Coating FIR** in the **Inspection** menu. The **Painting** **and Coating FIR** page opens.
    
    [![image-1651864383761.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651864383761.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651864383761.png)
    
     **Figure 5.18: Painting and Coating FIR page**

#### **5.18.1 Add a Painting and Coating FIR** 

If you want to add a painting and coating FIR, do the following,

1. Click [![image-1651864502478.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651864502478.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651864502478.png)(**ADD** button) in the **Painting and Coating FIR** page. A new window opens to add the painting and coating inspection report details.
    
    [![image-1651864517097.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651864517097.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651864517097.png)
    
    [![image-1651864529431.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651864529431.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651864529431.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the ****Sub Contractor Name**** box, select a sub-contractor from a drop-down list.
3. In the ****Sub Contractor Name**** box, select a sub-contractor from a drop-down list.
4. In the **Location** box, select the location where the painting and coating inspection to be performed.
5. In the ****Reference** **Drawing**** box, select a reference drawing from a drop-down list.
6. In the **System** box, select a system from a drop-down list.
7. In the **No** **of Coat Applied** box, enter the number of applied coating.
8. In the **Shift** box, enter the shift detail.
9. In the **Specification** box, enter the specification detail.
10. In the **Job/Item Description** box, enter the description for the job/item.
11. In the **Painted Surface** box, enter the painted surface detail.
12. In the **Client Paint Specification** box, enter the client paint specification detail.
13. In the **Surface Preparation** box, enter the surface preparation detail.
14. In the **Painting/Coating Type** box, enter the painting/coating type.
15. In the **Visual Inspection** box, enter the visual inspection detail.
16. In the **Top Coat D.F.T** box, enter the top coat detail.
17. In the **Degree of Cured** box, enter the degree of cured.
18. In the **Pinhole Testing** box, enter the pinhole testing detail.
19. In the **Wet Sponge Method** box, enter the wet sponge method detail.
20. In the **Holiday Detection** box, enter the holiday detection detail.
21. In the **Brush Coil** box, enter the brush coil detail.
22. In the **K.V Setting (For Pipeline)** box, enter the K.V setting detail for pipeline.
    
    Before saving the painting and coating inspection report, you must add the weld map drawing detail.
23. Click [![image-1651864680218.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651864680218.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651864680218.png) (****ADD**** button) in the ******Weld Map Drawing Detail******The **Edit Form** window shows a new window to add the details of weld map drawing.
    
    [![image-1651864722745.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651864722745.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651864722745.png)
24. In the **Weld Map Drawing No** box, enter the weld map drawing number.
25. In the **Sheet No** box, enter the sheet number.
26. In the **Revision** box, enter the revision for the weld map drawing.
27. In the **Description** box, enter the description for the weld map drawing.
28. In the **Quantity** box, enter the quantity of the weld map drawing.
29. In the **Remarks** box, enter your remarks if any.
30. Click **Update**.
    
    The weld map drawing is updated.
31. In the **Prepared By** box, enter the name of a person who has prepared the painting and coating inspection report.
32. In the **Prepared By** box, enter the name of a person who has prepared the painting and coating inspection report.
33. In the ****Reviewed By**** box, enter the name of a person who has reviewed the painting and coating inspection report.
34. In the ****Reviewed Date**** box, select the reviewed date of the painting and coating inspection report.
35. In the **Approved By** box, enter the name of a person who has approved the painting and coating inspection report.
36. In the ****Approved Date**** box, select the approved date of the painting and coating inspection report.
37. In the **Remarks** box, enter your remarks if any.
38. Click **Send Request**.

The painting and coating inspection report will be added and listed in the **Painting and Coating FIR** page.

#### **5.18.2 Add RFI Data for the Added Painting and Coating FIR**

If you want to add RFI data for the added painting and coating inspection report, do the following,

1. Click [![image-1651864905115.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651864905115.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651864905115.png) (Edit icon) in the **RFI Data** column of the **Painting** **and Coating** **FIR** page. See Fig 5.18. The **RFI Inspection Request List** window opens.
    
    [![image-1651864924449.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651864924449.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651864924449.png)
2. In the **Inspection From** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the **Inspection Details** option, select 1<sup>st</sup>Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the **Others** box, enter any other inspection related details.
6. In the **Refer to Report No** box, enter the report number for reference.
7. In the **RFI Date** box, choose the RFI date.
8. In the ****Inspection Result**** option, if the inspection result is accepted, select ****Accepted**** otherwise select ****Rejected****.
9. In the **Remarks** box, enter your remarks if any.
10. In the **Inspected by** box, enter the name of a person who has done inspection.
11. In the **Inspected Date** box, choose the date of inspection.
12. In the **Witnessed By** box, enter the name of the witnessed person.
13. In the **Witnessed Date** box, choose the date of witnessed.
14. In the **PCML Rep Name** box, enter the representative name of PCML.
15. In the **PCML Rep Date** box, choose the PCML rep date.
16. In the **MEB Rep Name** box, enter the representative name of MEB.
17. In the **MEB Rep Date box**, choose MEB rep date.
18. Click **Save**.

The RFI data is successfully added.

#### **5.18.3 Submit and Approve a Painting and Coating FIR** 

Once you have added the painting and coating inspection report, the **Submission** column in the **Painting and Coating FIR** page is appeared with[![image-1651865091527.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651865091527.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651865091527.png)(Submit and Reject icons).

1. If you want to submit the painting and coating inspection report, click [![image-1651865125002.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651865125002.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651865125002.png) (Submit icon) in the **Submission** column. Otherwise click [![image-1651865135401.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651865135401.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651865135401.png) (Reject icon) to reject the request. Once you have submitted the painting and coating inspection report, the **Request Status** column in the **Painting** **and Coating** **FIR** page is appeared with [![image-1651865188380.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651865188380.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651865188380.png) (Approve and Reject icons).
2. If you want to approve the painting and coating inspection report, click [![image-1651865231804.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651865231804.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651865231804.png) (Approve icon) in the **Request Status** Otherwise click [![image-1651865240711.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651865240711.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651865240711.png) (Reject icon) to reject the request.

#### **5.18.4 Print an RFI report**

If you want to print an RFI report, click[![image-1651865297442.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651865297442.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651865297442.png) (print icon) provided in the **RFI** **Report** column of the **Painting** **and Coating** **FIR** page. See Fig 5.18.

#### **5.18.5 Print a Painting and Coating FIR**

If you want to print a painting and coating inspection report, click [![image-1651865335098.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651865335098.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651865335098.png) (print icon) provided in the **Print** column of the **Painting** **and Coating** **FIR** page. See Fig 5.18.

#### **5.18.6 Attach a File into a Painting and Coating Inspection Report**

If you want to attach a file with a painting and coating inspection report added in the **Painting and Coating FIR** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **5.18.7 Edit Any Painting and Coating FIR**

If you want to edit any existing painting and coating inspection report in the **Painting** **and Coating** **FIR** page, do the following,

1. Click [![image-1651865437635.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651865437635.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651865437635.png)(Edit icon) in the **Edit** column for the respective painting and coating inspection report. See Fig 5.18. A new window opens to edit the painting and coating inspection report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.18.8 Export Painting and Coating FIR list**

You can export a list of painting and coating inspection reports added in the **Painting and Coating FIR** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **5.18.9 Filter Painting and Coating FIR**

If you want to filter any specific painting and blasting inspection request in the **Painting and Coating FIR** page, you can filter the request based on the **Spool No** filter box. [![image-1651865549340.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651865549340.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651865549340.png)


### **5.19 RFI Hydro Pressure**

Hydro Pressure Inspection is the technique in which pipes used in the structural project, are tested at required design pressure of the pipes to check the leak and strength. You can add a request for hydro pressure inspection by using the **RFI Hydro Pressure** tab in the **Inspection** menu.

#### **5.19.1 Add an RFI Hydro Pressure Request**

If you want to add an RFI hydro pressure request, do the following steps,

1. Click **RFI Hydro Pressure** in the **Inspection** menu. The **RFI Hydro Pressure** page opens.
    
    [![image-1651865631016.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651865631016.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651865631016.png)
    
     **Figure 5.19: RFI Hydro Pressure page**
2. In the **Inspection Date &amp; Time** box, select the inspection date and time.
3. In the **Description** box, enter the description for the hydro pressure inspection.
4. In the **Drawing No** box, select a drawing number.
5. In the **System** box, select a system.
6. In the **Test Type** box, select a test type.
7. In the **Test Pressure** box, enter the test pressure value.
8. In the **Design Pressure** box, enter the design pressure value.
9. In the **Classification** box, enter the classification detail.
10. In the **Holding Time** box, enter the holding time range.
11. In the **Test Medium** box, enter the test medium detail.
12. In the **Job Code** box, enter the job code.
13. In the **Remarks** box, enter your remarks if any.
    
    Before saving the added NDT request, you must add the pressure gauge details.
14. Click [![image-1651865718338.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651865718338.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651865718338.png) (**ADD** button) in the **Pressure Gauge Details** window.
    
    [![image-1651865728886.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651865728886.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651865728886.png)
15. In the **Type of Test** box, select a type of test.
16. In the **Description** box, enter the description detail.
17. In the **Serial No** box, enter the serial number.
18. In the **Certificate No** box, enter the certificate number.
19. In the **Calibration Date** box, select the calibration date.
20. In the **Expiry Date** box, select the expiry date.
21. Click **Save Request**.

The hydro pressure inspection request will be added and listed in the **RFI Hydro Pressure** page.


### **5.20 View RFI Hydro Pressure**

The **View RFI Hydro Pressure** tab helps you to view and edit the hydro pressure inspection request, which is added by using the **RFI Hydro Pressure** tab. This tab also allows you to add a new hydro pressure request.

1. Click **View RFI Hydro Pressure** in the **Inspection** menu. The **RFI Hydro Pressure** page opens with a list of added hydro pressure requests.
    
    [![image-1651865816283.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651865816283.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651865816283.png)
    
     **Figure 5.20: RFI Hydro Pressure page**

#### **5.20.1 Add a Hydro Pressure Inspection Request**

If you want to add a hydro pressure inspection request, do the following steps,

1. Click [![image-1651865874271.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651865874271.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651865874271.png) (**ADD** button) in the **RFI Hydro Pressure** page. The system redirects you to a new page to add a new hydro pressure inspection request. To know how to add a hydro pressure inspection request, See the topic, “[**<u>Add a Hydro Pressure Inspection Request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.19.1%C2%A0add-an-rfi-hy)”.

The system redirects you to a new page to add a new hydro pressure inspection request. To know how to add a hydro pressure inspection request, See the topic, “[**<u>Add a Hydro Pressure Inspection Request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.19.1%C2%A0add-an-rfi-hy)”.

#### **5.20.2 Edit Any Existing Hydro Pressure Inspection Request** 

If you want to edit any existing hydro pressure inspection request in the **RFI Hydro Pressure page, do the following,

1. Click [![image-1651865959322.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651865959322.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651865959322.png) (Edit icon) in the **Edit** column for the respective hydro pressure inspection request. See Fig 5.20. The **RFI Hydro Pressure** page opens with the details of the selected hydro pressure inspection request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.20.3 Submit and Approve a Hydro Pressure Inspection Request**

Once you have added the hydro pressure inspection request, the **Submission** column in the **RFI Hydro Pressure** page is appeared with[![image-1651866095070.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866095070.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866095070.png) (Submit and Reject icons).

1. If you want to submit the hydro pressure inspection request, click [![image-1651866113296.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866113296.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866113296.png) (Submit icon) in the **Submission** Otherwise click [![image-1651866125621.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866125621.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866125621.png) (Reject icon) to reject the request. Once you have submitted the hydro pressure inspection request, the **Request Status** column in the **RFI Hydro Pressure** page is appeared with [![image-1651866145893.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866145893.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866145893.png) (Approve and Reject icons).
2. If you want to approve the hydro pressure inspection request, click [![image-1651866163849.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866163849.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866163849.png) (Approve icon) in the ****Request Status**** Otherwise click [![image-1651866172603.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866172603.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866172603.png) (Reject icon) to reject the request.

The hydro pressure inspection request will be moved for hydro pressure inspection.

#### **5.20.4 View a Hydro Pressure Inspection Report**

If you want to view a hydro pressure inspection report, click [![image-1651866246126.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866246126.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866246126.png) (print icon) provided in the **Print** column of the **RFI Hydro Pressure** page. See Fig 5.20.

#### **5.20.5 Attach a File into a hydro pressure inspection Request** 

If you want to attach a file with any existing hydro pressure inspection request listed in the **RFI Hydro Pressure** page, you can attach the file by using [![image-1651866291793.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866291793.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866291793.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)”.

#### **5.20.6 View Signature Details of Inspectors**

You can view the sign details of the inspectors such as QA, Sub contractor, Client, and Owner, once they completed the hydro pressure inspection and submitted the inspection result details including their signature. To view the signature details, click [![image-1651866335073.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866335073.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866335073.png)(Sign icon) in the **Sign Details** column in the **RFI Hydro Pressure** page.

#### **5.20.7 Export Hydro Pressure Inspection Request List**

You can export a list of hydro pressure requests added in the **RFI Hydro Pressure** page in both the pdf and excel formats by using [![image-1651866375958.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866375958.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866375958.png) (**PDF** button) and [![image-1651866384994.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866384994.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866384994.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)”.

#### **5.20.8 Filter Hydro Pressure Inspection Request**

If you want to filter any specific hydro pressure inspection request in the **RFI Hydro Pressure** page, you can use [![image-1651866418962.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866418962.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866418962.png) (**FILTER** button) located on the **RFI Hydro Pressure** page. To know how to filter, see the topic, ”**Filter Any Area**”.


### **5.21 RFI Mechanical Completion Request**

Mechanical completion takes place through all phases of the piping project, starting at equipment supplier and continuing through fabrication up to commissioning phase. Mechanical completion encompasses all disciplines. If you want to add an RFI mechanical completion request,

1. Click **RFI Mechanical Completion Request** in the **Inspection** menu. The **RFI Mechanical Completion Request** page opens.
    
    [![image-1651866475456.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866475456.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866475456.png)
    
     **Figure 5.21: RFI Mechanical Completion Request page**

#### **5.21.1 Add an RFI Mechanical Completion Request**

If you want to add an RFI mechanical completion request, do the following steps,

1. In the **Sub Contractor** box, select a sub-contractor from a drop-down list.
2. In the **Inspection Date** box, select the date of inspection.
3. In the **Location** box, enter the name of the location.
    
    Before saving the added RFI mechanical completion request, you must add a system. You can add multiple system for one request.
    
    [![image-1651866553268.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866553268.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866553268.png) **Note**: The page shows a list of added systems. If you want to view the specific system, use the filter options provided in the **System**, **Sub System**, **Drawing Number**, **Equipment Number** and **Check Records** columns.
4. Select [![image-1651866579615.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866579615.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866579615.png) (Add icon) of the respective system which you want to add.
    
    The added system will be moved into the right side of the page.
5. In the **Remarks** box, enter your remarks if any.
6. In the **Description** box, enter the description for the request.
7. In the **Work Scope** box, enter the work scope detail.
8. Click **Save**.

The RFI mechanical completion request will be added and listed in the **View RFI Mechanical Completion** page.


### **5.22 View RFI Mechanical Completion** 

The **View RFI Mechanical Completion** tab helps you to view and edit the RFI mechanical completion request, which is added by using the **RFI Mechanical Completion Request** tab. This tab also allows you to add a new RFI mechanical completion request.

1. Click **View RFI Mechanical Completion** in the **Inspection** menu. The **View RFI Mechanical Completion List** page opens with a list of added RFI mechanical completion requests.
    
    [![image-1651866702007.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866702007.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866702007.png)
    
     **Figure 5.22: View RFI Mechanical Completion List page**

#### **5.22.1 Add an RFI Mechanical Completion Request**

If you want to add an RFI mechanical completion request, do the following steps,

1. Click [![image-1651866758888.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866758888.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866758888.png) (**ADD** button) in the **View RFI Mechanical Completion List** page. The system redirects you to a new page to add a new RFI mechanical completion request. To know how to add an RFI mechanical completion request, See the topic, “[**<u>Add an RFI Mechanical Completion Request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.21.1%C2%A0add-an-rfi-me)”.

Once you have added the RFI mechanical completion request, you must submit the added request to perform mechanical completion inspection.

#### **5.22.2 Edit Any RFI Mechanical Completion Request** 

If you want to edit any existing mechanical completion request in the **View RFI Mechanical Completion List** page, do the following,

1. Click [![image-1651866861961.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866861961.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866861961.png) (Edit icon) in the **Edit** column for the respective RFI mechanical completion request. See Fig 5.22. The **RFI Mechanical Completion Request** page opens with the details of the selected RFI mechanical completion request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.22.3 Submit and Approve an RFI Mechanical Completion Request**

Once you have added the RFI mechanical completion request, the **Submission** column in the **RFI Mechanical Completion Request** page is appeared with [![image-1651866943782.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866943782.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866943782.png) (Submit and Reject icons).

1. If you want to submit the mechanical completion request, click [![image-1651866972041.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866972041.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866972041.png) (Submit icon) in the **Submission** Otherwise click [![image-1651866984816.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651866984816.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651866984816.png)(Reject icon) to reject the request. Once you have submitted the mechanical completion request, the **Request Status** column in the **View RFI Mechanical Completion List** page is appeared with [![image-1651867037163.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651867037163.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651867037163.png) (Approve and Reject icons).
2. If you want to approve the mechanical completion request, click [![image-1651867068229.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651867068229.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651867068229.png) (Approve icon) in the ****Request Status**** Otherwise click [![image-1651867079600.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651867079600.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651867079600.png) (Reject icon) to reject the request. The mechanical completion request will be moved for mechanical completion inspection.

#### **5.22.4 Add Results of Mechanical Completion Inspection**

After completing the mechanical completion inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click [![image-1651867139655.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651867139655.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651867139655.png) (Add icon) in the **Results** column of the respective request. The Result window opens a list of test pack added for the particular request.
    
    [![image-1651867153258.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651867153258.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651867153258.png)
2. In the ****Result**** column, select the result of each test pack from the given result options in the drop-down list.
3. In the **Remarks** column, enter your remarks if any.
4. Click **Approve All &amp;** **Save**.

#### **5.22.5 View a Mechanical Completion Inspection Report**

If you want to view a mechanical completion inspection report, click [![image-1651867211491.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651867211491.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651867211491.png) (print icon) provided in the **Print** column of the **View RFI Mechanical Completion List** page. See Fig 5.22.

#### **5.22.6 Attach a File into a Mechanical Completion inspection Request** 

If you want to attach a file with any existing mechanical completion inspection request listed in the **View RFI Mechanical Completion List** page, you can attach the file by using [![image-1651867252315.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651867252315.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651867252315.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)”.

#### **5.22.7 Export Mechanical Completion Inspection Request List**

You can export a list of mechanical completion inspection requests added in the **View RFI Mechanical Completion List** page in both the pdf and excel formats by using [![image-1651867296920.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651867296920.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651867296920.png) (**PDF** button) and [ ![image-1651867307893.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651867307893.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651867307893.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)”

#### **5.22.8 Filter Any Mechanical Completion Inspection Request**

If you want to filter any specific mechanical completion inspection request in the **View RFI Mechanical Completion List** page, you can use [![image-1651867357204.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651867357204.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651867357204.png) (**FILTER** button) located on the **View RFI Mechanical Completion List page. To know how to filter, see the topic, ”**Filter Any Area**”.


### **5.23 RFI Static Commissioning** 

Static Commissioning take place when Mechanical completion is completed for a system or part of a system. If you want to add an RFI static commissioning request,

1. Click **RFI Static Commissioning** in the **Inspection** menu. The **RFI Static Commissioning Request** page opens.
    
    [![image-1651890708264.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651890708264.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651890708264.png)
    
     **Figure 5.23: RFI Static Commissioning Request page**

#### **8.23.1 Add an RFI Static Commissioning Request**

If you want to add an RFI static commissioning request, do the following steps,

1. In the **Sub Contractor** box, select a sub-contractor from a drop-down list.
2. In the **Inspection Date** box, select the date of inspection.
3. In the **Location** box, enter the name of the location.
    
    Before saving the added RFI static commissioning request, you must add a system. You can add multiple systems for one request.
    
    [![image-1651890813732.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651890813732.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651890813732.png)**Note**: The page shows a list of added systems. If you want to view the specific system, use the filter options provided in the **System**, **Sub System**, **Drawing Number**, **Equipment Number** and **Check Records** columns.
4. Select the checkbox of the respective system which you want to add. The added systems will be moved into the right side of the page.
5. In the **Remarks** box, enter your remarks if any.
6. In the **Description** box, enter the description for the request.
7. In the **Work Scope** box, enter the work scope detail.
8. Click **Save**.

The RFI mechanical completion request will be added and listed in the **View RFI Static Commissioning** page.



### **5.24 View RFI Static Commissioning**

The **View RFI Static Commissioning** tab helps you to view and edit the RFI static commissioning request, which is added by using the **RFI Static Commissioning** tab. This tab also allows you to add a new RFI static commissioning request.

1. Click **View RFI Static Commissioning** in the **Inspection** menu. The **View RFI Static Commissioning List** page opens with a list of added RFI static commissioning requests.
    
    [![image-1651890938822.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651890938822.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651890938822.png)
    
     **Figure 5.24: View RFI Static Commissioning List page**

#### **5.24.1 Add an RFI Static Commissioning Request**

If you want to add an RFI static commissioning request, do the following steps,

1. Click [![image-1651891011183.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651891011183.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651891011183.png) (**ADD** button) in the **View RFI Static Commissioning List** page. The system redirects you to a new page to add a new RFI static commissioning request. To know how to add an RFI static commissioning request, See the topic, “[**<u>Add an RFI Static Commissioning Request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-8.23.1%C2%A0add-an-rfi-st)”.

Once you have added the RFI static commissioning request, you must submit the added request to perform the static commissioning.

#### **5.24.2 Edit Any RFI Static Commissioning Request** 

If you want to edit any existing static commissioning request in the **View RFI Static Commissioning List** page, do the following,

1. Click [![image-1651891392942.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651891392942.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651891392942.png)(Edit icon) in the **Edit** column for the respective RFI static commissioning request. See Fig 5.24. The **RFI Static Commissioning Request** page opens with the details of the selected RFI request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.24.3 Submit and Approve an RFI Static Commissioning Request**

Once you have added the RFI static commissioning request, the **Submission** column in the **RFI Static Commissioning Request** page is appeared with[![image-1651891502533.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651891502533.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651891502533.png) (Submit and Reject icons).

1. If you want to submit the static commissioning request, click [![image-1651891520406.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651891520406.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651891520406.png) (Submit icon) in the **Submission** Otherwise click [![image-1651891531767.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651891531767.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651891531767.png) (Reject icon) to reject the request. Once you have submitted the static commissioning request, the **Request Status** column in the **View RFI Static Commissioning List** page is appeared with [![image-1651891557433.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651891557433.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651891557433.png)(Approve and Reject icons).
2. If you want to approve the static commissioning request, click [![image-1651891583630.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651891583630.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651891583630.png) (Approve icon) in the **Request Status** Otherwise click [![image-1651891596391.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651891596391.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651891596391.png) (Reject icon) to reject the request.

The static commissioning request will be moved for static commissioning inspection.

#### **5.24.4 Add Results of Static Commissioning Inspection**

After completing the static commissioning inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click [![image-1651891931990.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651891931990.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651891931990.png) (Add icon) in the **Results** column of the respective request. The Result window opens a list of system added for the particular request.
    
    [![image-1651891944579.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651891944579.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651891944579.png)
2. In the **Result** column, select the result of each system from the given result options in the drop-down list.
3. In the **Remarks** column, enter your remarks if any.
4. Click **Approve All &amp;** **Save**.

#### **5.24.5 View a Static Commissioning Inspection Report**

If you want to view a static commissioning inspection report, click [![image-1651892038656.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651892038656.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651892038656.png)(print icon) provided in the **Print** column of the **View RFI Static Commissioning List** page. See Fig 5.24.

#### **5.24.6 Attach a File into a Static Commissioning Inspection Request** 

If you want to attach a file with any existing static commissioning inspection request listed in the **View RFI Static Commissioning List** page, you can attach the file by using [![image-1651892198883.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651892198883.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651892198883.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)”.

#### **5.24.7 Export Static Commissioning Inspection Request List**

You can export a list of static commissioning inspection requests added in the **View RFI Static Commissioning List** page in both the pdf and excel formats by using [![image-1651892445010.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651892445010.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651892445010.png) **PDF** button) and [![image-1651892453652.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651892453652.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651892453652.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)”.

#### **5.24.8 Filter Any Static Commissioning Inspection Request**

If you want to filter any specific static commissioning inspection request in the **View RFI Static Commissioning List** page, you can use [![image-1651892495629.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651892495629.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651892495629.png) (**FILTER** button) located on the **View RFI Static Commissioning List page. To know how to filter, see the topic, ”**Filter Any Area**”.


### **5.25 Weekly Welders Performance Record**

The **Weekly Welders Performance Record** tab in the **Inspection** menu helps you to view the welders performance record on a weekly basis. To view the report,

1. Click **Weekly Welders Performance Record** in the **Inspection** menu. The **Weekly Welders Performance Record** page opens.
    
    [![image-1651892594158.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651892594158.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651892594158.png)
    
     **Figure 5.25: Weekly Welders Performance Record page**
2. If you want to view the weekly welders performance record for all project, select the checkbox of the **All Project** option.
3. In the **NDT Type** box, select an NDT type.
4. In the **Joint Category** box, select a joint category.
5. In the ****From Date**** and ****To Date**** boxes, select the from and to dates.
6. Click **Show Report**.

#### **5.25.1 Print Weekly Welders Performance Record**

If you want to print a weekly welders performance record, use [![image-1651892686181.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651892686181.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651892686181.png) and [![image-1651892698067.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651892698067.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651892698067.png) (print icons) provided in the **Weekly Welders Performance Record** page.

1. If you want to print the current page of the weekly welders performance record, click [![image-1651892719058.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651892719058.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651892719058.png) (print icon including the page number).
2. If you want to print all the pages of the weekly welders performance record, click [![image-1651892737106.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651892737106.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651892737106.png) (print icon).

#### **5.25.2 View Weekly Welders Performance Record** 

You can view the weekly welders performance record in various formats by using the option [![image-1651892780272.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651892780272.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651892780272.png) provided in the upper right corner of the **Weekly Welders Performance Record** page.


### **5.26 RFI Fit up Request (Unique Numbers)**

The **RFI Fit up Request** tab in the **Inspection** menu allows you to add an RFI fit up request to check the fit-up quality of pipes and joints used in the structural project by a sub-contractor.

#### **5.26.1 Add an RFI Fit up Request**

If you want to add an RFI fit up request, do the following

1. Click the **RFI Fit up Request** tab in the **Inspection** menu. A new page opens to add an RFI fit up request.
    
    [![image-1651892856893.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651892856893.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651892856893.png)
    
     **Figure 5.26: A page for adding an RFI fit up request**
    
    [![image-1651892885747.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651892885747.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651892885747.png) **Tip**: A report number and an RFI number for a new RFI fit up request will be updated automatically in the **Report Number** and the **RFI Number** boxes, respectively.
2. In the **Sub Contractor** box, select the name of a sub-contractor from a drop-down list.
3. In the **Inspection Date &amp; Time** box, select the date of inspection.
4. In the **Location** box, enter the location detail.
5. In the **Description** box, enter the description for the inspection.
    
    [![image-1651892928906.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651892928906.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651892928906.png)**Note**: Before saving the added RFI fit up request, you must add the details of joints. You can add multiple joints for any added fit up request by using a box provided in the left side of the page. To know how to add joints, see the topic “[**<u>Add joints for an RFI fit up request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.26.2%C2%A0add-joints-fo)”.
6. Click **Save**.

#### **5.26.2 Add Joints for an RFI Fit up Request**

This page shows a list of joints for the corresponding weld map drawing. If you want to add joints for any added RFI Fit up request, do the following,

[![image-1651892978672.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651892978672.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651892978672.png)

1. In the **Weld Map Drawing** box, select a weld map drawing number from a drop-down list. A list of joints including the piece mark numbers opens for the selected weld map drawing.
2. Click the check box of the respective joints.
3. Click [![image-1651893058080.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893058080.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893058080.png) (**Add Selected Joints** button).
    
    The selected joints are moved into the **Added Joints** box located in the right side of the page.
    
    [![image-1651893075968.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893075968.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893075968.png)
4. To update WPS number and unique number for the added joints, do one of the following steps, 
    1. 1. If you want to update the WPS number for any joint, click the **WPS Number** column for the respective joint and then select the WPS number from a drop-down list.
            
            [![image-1651893103848.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893103848.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893103848.png)
        2. Enter the unique number for the corresponding joint number in the respective **Unique Number** column. [![image-1651893141188.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893141188.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893141188.png)**Note**: If you want to update the same WPS number of first joint to other joints, click (**Update WPS No** button). The WPS number for the first joint will be updated for other joints.
5. If you want to update the WPS number, unique number, piece mark number details together, do the following,
    
    
    1. 1. Click [![image-1651893176716.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893176716.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893176716.png) (**TEMPLATE** button) on the **Added Joints** box.
            
            An excel worksheet will be downloaded with a pre-defined template. The template contains a list of added joints.
            
            [![image-1651893194594.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893194594.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893194594.png)
        2. Enter the relevant details in the required columns on the excel worksheet.
        3. Once you have added the WPS, piece mark and other details in the excel worksheet, save the excel worksheet on your computer.
        4. Click [![image-1651893220607.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893220607.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893220607.png) (**IMPORT** button).
            
            A new window opens for importing the excel worksheet saved on your computer.
            
            [![image-1651893239309.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893239309.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893239309.png)
        5. Click [![image-1651893252738.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893252738.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893252738.png) (**Browse** button) to select the excel worksheet to be uploaded.
        6. Select the excel worksheet you want to upload from your computer.
        7. Click [![image-1651893273707.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893273707.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893273707.png) (****Upload**** button) to export the joint details that are included in the excel worksheet.  The details of the joints in the worksheet will be updated.
        8. Click **Save**.
            
            The RFI Fit up request is successfully added and moved to the **View RFI Fit up** tab.


### **5.27 View RFI Fit up (Unique Numbers)**

The **View RFI Fit up** tab helps you to view and edit the RFI fit up request, which added by using the **RFI Fit up Request** tab. This tab also allows you to add a new RFI fit up request.

1. Click the **View RFI Fit up** tab in the **Inspection** menu. The **REQUEST FOR INSPECTION** page opens with a list of added RFI fit up requests.
    
    [![image-1651893381842.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893381842.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893381842.png)
    
     **Figure 5.27: Request for Inspection page**

#### **5.27.1 Add an RFI Fit up Request**

If you want to add an RFI fit up request, do the following,

1. Click [![image-1651893453168.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893453168.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893453168.png) (**ADD** button) in the **REQUEST FOR INSPECTION** page. A new page opens to add an RFI fit up request. To know how to add an RFI fit up request, see the topic, “[**<u>Add an RFI fit up request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.26.1%C2%A0add-an-rfi-fi)”.

Once you have added the RFI fit up request, you must submit the added request for inspection.

#### **5.27.2 Submit an RFI Fit up Request**

Once you have added the RFI fit up request, the **Request Status** column in the **REQUEST FOR INSPECTION** page is appeared with [![image-1651893507020.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893507020.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893507020.png) (Submit and Reject icons). See Fig 5.27.

1. If you want to submit the RFI fit up request, click [![image-1651893531324.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893531324.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893531324.png) (Submit icon) in the **Request Status** Otherwise click [![image-1651893541233.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893541233.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893541233.png) (Reject icon) to reject the request.

#### **5.27.3 Add a Representative for Any RFI Fit up Request**

If you want to add a representative for any added RFI fit up request,

1. Click [![image-1651893618434.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893618434.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893618434.png) (Edit icon) in the **Representative** column for the respective RFI fit up request. The **Edit Form** window opens.
    
    [![image-1651893635634.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893635634.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893635634.png)
2. In the **Representative** box, enter the name of a representative.
3. Click **Save**.

#### **5.27.4 Print an RFI Fit up Report**

If you want to print an RFI fit up report, click [![image-1651893686121.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893686121.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893686121.png) (print icon) provided in the **Report** column of the **REQUEST FOR INSPECTION** page. See Fig 5.27.

#### **5.27.5 Add Result Details of RFI Fit up Inspection**

If you want to add the inspection results details of an added RFI fit up inspection request, do the following,

1. Click [![image-1651893728587.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893728587.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893728587.png) (Add icon) in the **Results** column of the **REQUEST FOR INSPECTION** page. The **Joint Details** window opens.
    
    [![image-1651893740838.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893740838.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893740838.png)
2. If you want to check and update the joint details automatically, click (Check and update button).
3. If you want to update the joint details manually, do the following steps, 
    1. 1. Click the respective number in the ****WPS Number**** column and change the WPS number from a drop-down list.
        2. Click the respective number in the ****Unique Number**** column and change the unique number from a drop-down list.
        3. Click **Save changes**.

#### **5.27.6 Attach a File into an RFI Fit up Request** 

If you want to attach any file with any RFI fit up request listed in the **REQUEST FOR INSPECTION** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **5.27.7 Edit Any RFI Fit up Request** 

If you want to edit any existing RFI fit up request in the **REQUEST FOR INSPECTION** page, do the following,

1. Click [![image-1651893868567.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893868567.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893868567.png) (Edit icon) in the **Edit** column for the respective RFI fit up request. See Fig 5.27. The page shows the added details of the RFI fit up request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **5.27.8 Export RFI Fit up Request List**

You can export a list of RFI fit up request added in the **REQUEST FOR INSPECTION** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **5.27.9 Filter Any RFI Fit up Request** 

If you want to filter any RFI fit up request from the list of RFI fit up requests in the **REQUEST FOR INSPECTION** page, you can use [![image-1651893957189.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651893957189.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651893957189.png) the (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.



### **5.28 View Application for Inspection (AFI) Fit up (Unique Numbers)**

The **View AFI Fit up** allows you to add a new AFI fit up request. This tab also helps you to view and edit the added AFI fit up request.

1. Click the **View AFI Fit up** tab in the **Inspection** menu. The **INSPECTION REQUEST (AFI)** page opens.
    
    [![image-1651894010107.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651894010107.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651894010107.png)
    
     **Figure 5.28: INSPECTION REQUEST (AFI) page**

#### **5.28.1 Add an AFI Fit up Request**

If you want to add an AFI fit up request, do the following,

1. Click [![image-1651894061003.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651894061003.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651894061003.png) (**ADD** button) in the **INSPECTION REQUEST (AFI)** page. The **AFI Request** page opens to add an AFI fit up request.
    
    [![image-1651894082333.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651894082333.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651894082333.png)
    
    [![image-1651894091654.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651894091654.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651894091654.png) **Tip**: A report number and RFI number for a new AFI fit up request will be updated automatically in the **Report Number** and **RFI Number** boxes.
2. In the **Representative (AI)** box, enter representative name for the application inspection and enter their email id and contact number in the **Email** and **Contact No** boxes, respectively.
3. In the **Representative (Client)** box, enter representative name from the client and enter their email id and contact number in the **Email** and **Contact No** boxes, respectively.
4. In the **Inspection Date** box, select the date of inspection.
5. In the **Representative (Contractor)** box, enter representative name from the contractor and enter their email id and contact number in the **Email** and **Contact No** boxes, respectively.
6. In the **Activity Code As Per ITP** box, select the activity code as per ITP from a drop-down list.
7. In the **Activity Code As Per Client** box, select the activity code as per client from a drop-down list.
8. In the **Location** box, enter the location detail.
9. In the **Description** box, enter the description for the inspection.
10. In the **Inspection Item** box, enter the details of items to be inspected.
11. In the **Subject Coverage** box, enter the subject coverage detail.
12. In the **Comments** box, enter your comments if any.
    
    [![image-1651894246216.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651894246216.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651894246216.png) **Note**: Before saving the added AFI fit up request, you must add the details of joints. You can add multiple joints for any added fit up request by using a box provided in the left side of the page. To know how to add joints, see the topic “[**<u>Add joints for an AFI fit up request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.28.2-add-joints-fo)”.
13. Click **Save**.

#### **5.28.2 Add Joints for an AFI Fit up Request**

If you want to add joints for any added AFI fit up request, do the following,

[![image-1651894295511.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651894295511.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651894295511.png)

Once you enter the details to add an AFI fit up request, a list of joints including the joint numbers, sheet numbers, and drawing numbers opens.

1. Click the check box of the respective joints.
2. Click [![image-1651894335943.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651894335943.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651894335943.png) (**Add Selected Joints** button).
    
    The selected joints are moved into the **Added Joints** box located in the right side of the page.
    
    [![image-1651894360466.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651894360466.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651894360466.png)
3. Click **Save**.

The selected joints are successfully added for the AFI fit up request.

Once you have added the RFI fit up request, you must submit the added request for inspection.

#### **5.28.3 Submit an AFI Fit up Request**

Once you have added the AFI fit up request, the **Request Status** column in the **INSPECTION** **REQUEST (AFI)** page is appeared with[![image-1651894423857.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651894423857.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651894423857.png)(Submit and Reject icons). See Fig 5.28.

1. If you want to submit the AFI fit up request, click [![image-1651894443922.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651894443922.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651894443922.png) (Submit icon) in the **Request Status** Otherwise click [![image-1651894476196.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651894476196.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651894476196.png) (Reject icon) to reject the request.

#### **5.28.4 Change the Added Representative for Any AFI Fit up Request**

If you want to change the added representative for any AFI fit up request,

1. Click [![image-1651894514557.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651894514557.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651894514557.png) (Edit icon) in the **Representative** column for the respective AFI fit up request. The **Edit Form** window opens.
    
    [![image-1651894531476.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651894531476.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651894531476.png)
2. In the **Representative** box, edit the name of a representative.
3. Click **Save**.

#### **5.28.5 Print an AFI Fit up Report**

If you want to print an AFI fit up report, click [![image-1651894691736.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651894691736.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651894691736.png) (print icon) provided in the **Report** column of the **INSPECTION** **REQUEST (AFI)** page. See Fig 5.28.

#### **5.28.6 Add Result Details of AFI Fit up Inspection**

If you want to update results for the AFI fit up inspection request, do the following,

1. Click [![image-1651894733695.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651894733695.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651894733695.png) (Add icon) in the **Results** column of the **INSPECTION** **REQUEST (AFI)** page. A new window opens.
    
    [![image-1651894753035.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651894753035.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651894753035.png)
2. In the ****Result**** column, select the results of AFI inspection from a drop-down list, for the respective drawing and joint numbers.
3. In the **Remarks** column, enter your remarks if any.
4. Click **Save**.

#### **5.28.7 Attach a File into an AFI Fit up Request** 

If you want to attach any file with any AFI fit up request listed in the **INSPECTION REQUEST (AFI)** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **5.28.8 Edit Any AFI Fit up Request** 

If you want to edit any existing AFI fit up request in the **INSPECTION** **REQUEST (AFI)** page, do the following,

1. Click [![image-1651894888603.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651894888603.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651894888603.png) (Edit icon) in the **Edit** column for the respective AFI fit up request. See Fig 5.28. The page shows the added details of the AFI fit up request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.28.9 Export AFI Fit up Request List**

You can export a list of AFI fit up request added in the **INSPECTION REQUEST (AFI)** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **5.28.10 Filter Any AFI Fit up Request** 

If you want to filter any AFI fit up request from the list of AFI fit up requests in the **INSPECTION** **REQUEST (AFI)** page, you can use the (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.


### **5.29 RFI Weld VI Request (Unique Numbers)**

The **RFI Weld VI Request** tab in the **Inspection** menu allows you to add an RFI weld VI request to perform visual inspection of welded pipes and joints used in the structural project by a sub-contractor.

#### **5.29.1 Add an RFI weld VI request**

If you want to add an RFI weld VI request, do the following,

1. Click the **RFI Weld VI Request** tab in the **Inspection** menu. The **REQUEST FOR INSPECTION** page opens to add an RFI weld VI request.
    
    [![image-1651895029877.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895029877.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895029877.png)
    
     **Figure 5.29: REQUEST FOR INSPECTION** **page**
    
    [![image-1651895055512.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895055512.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895055512.png)**Tip**: A report number and an RFI number for a new RFI weld VI request will be updated automatically in the **Report Number** and the **RFI Number** boxes, respectively.
2. In the **Sub Contractor** box, select the name of a sub-contractor from a drop-down list.
3. In the **Inspection Date &amp; Time** box, select the date of inspection.
4. In the **Location** box, enter the location detail.
5. In the **Description** box, enter the description for the inspection.
    
    [![image-1651895100657.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895100657.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895100657.png) **Note**: Before saving the added RFI weld VI request, you must add the details of joints. You can add multiple joints for any added RFI weld VI request by using a box provided in the left side of the **REQUEST FOR INSPECTION** page. To know how to add joints, see the topic “[**<u>Add joints for an RFI weld VI request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.29.2%C2%A0add-joints-fo)”.
6. Click **Save**.

#### **5.29.2 Add Joints for an RFI Weld VI Request**

This page shows a list of joints for the corresponding weld map drawing. If you want to add joints for any added RFI weld VI request, do the following,

[![image-1651895145225.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895145225.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895145225.png)

1. In the **Weld Map Drawing** box, select a weld map drawing number from a drop-down list. A list of joints including the piece mark numbers opens for the selected weld map drawing.
2. Click the check box of the respective joints.
3. Click [![image-1651895193011.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895193011.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895193011.png) (**Add Selected Joints** button).
    
    The selected joints are moved into the **Added Joints** box located in the right side of the page.
    
    [![image-1651895210681.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895210681.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895210681.png)
4. To update WPS number and unique number for the added joints, do one of the following steps,
    
    
    1. 1. If you want to update the WPS number for any joint, click the **WPS Number** column for the respective joint and then select the WPS number from a drop-down list.
            
            [![image-1651895250281.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895250281.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895250281.png)
        2. Enter the unique number for the corresponding joint number in the respective **Unique Number column.**
            
            [![image-1651895276427.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895276427.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895276427.png) **Note**: If you want to update the same WPS number of first joint to other joints, click [![image-1651895290875.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895290875.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895290875.png) (**Update WPS No** button). The WPS number for the first joint will be updated for other joints.
5. If you want to update the WPS number, unique number, piece mark number details together, do the following, 
    1. 1. Click [![image-1651895391280.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895391280.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895391280.png) (**TEMPLATE** button) on the **Added Joints** box.
            
            An excel worksheet will be downloaded with a pre-defined template. The template contains a list of added joints.
            
            [![image-1651895420922.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895420922.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895420922.png)
        2. Enter the relevant details in the required columns on the excel worksheet.
        3. Once you have added the WPS, piece mark and other details in the excel worksheet, save the excel worksheet on your computer.
        4. Click [![image-1651895442768.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895442768.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895442768.png) (**IMPORT** button).
            
            A new window opens for importing the excel worksheet saved on your computer.
            
            [![image-1651895457563.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895457563.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895457563.png)
        5. Click [![image-1651895475955.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895475955.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895475955.png) (**Browse** button) to select the excel worksheet to be uploaded.
        6. Select the excel worksheet you want to upload from your computer.
        7. Click [![image-1651895497148.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895497148.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895497148.png) (**Upload** button) to export the joint details that are included in the excel worksheet.
            
            The details of the joints in the worksheet will be updated.
6. Click **Save**.

The RFI weld VI request is successfully added.


### **5.30 View RFI Weld VI (Unique Numbers)**

The **View RFI Weld VI** tab helps you to view and edit the RFI weld VI request, which added by using the **RFI Weld VI Request** tab. This tab also allows you to add a new RFI weld VI request.

1. Click the **View RFI Weld VI** tab in the **Inspection** menu. The **REQUEST FOR INSPECTION** page opens with a list of added RFI weld VI requests.
    
    [![image-1651895579880.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895579880.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895579880.png)
    
     **Figure 5.30: REQUEST FOR INSPECTION page**

#### **5.30.1 Add an RFI Weld VI Request**

If you want to add an RFI weld VI request, do the following,

1. Click [![image-1651895641312.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895641312.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895641312.png) (**ADD** button) in the **REQUEST FOR INSPECTION** page. A new page opens to add an RFI weld VI request. To know how to add an RFI weld VI request, see the topic, “[**<u>Add an RFI weld VI request</u>**](#_Add_an_RFI_1)”.

Once you have added the RFI weld VI request, you must submit the added request for inspection.

#### **5.30.2 Submit an RFI Weld VI Request**

Once you have added the RFI weld VI request, the **Request Status** column in the **REQUEST FOR INSPECTION** page is appeared with[![image-1651895696598.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895696598.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895696598.png) (Submit and Reject icons). See Fig 5.30.

1. If you want to submit the RFI weld VI request, click [![image-1651895715617.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895715617.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895715617.png)(Submit icon) in the **Request Status** Otherwise click [![image-1651895724147.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895724147.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895724147.png) (Reject icon) to reject the request.

#### **5.30.3 Add a Representative for Any RFI Weld VI Request**

If you want to add a representative for any added RFI weld VI request,

1. Click [![image-1651895780942.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651895780942.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651895780942.png)(Edit icon) in the **Representative** column for the respective RFI weld VI request. The **Edit Form** window opens.
    
    [![image-1651896527099.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651896527099.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651896527099.png)
2. In the **Representative** box, enter the name of a representative.
3. Click **Save**.

#### **5.30.4 Add Result for an RFI Weld VI Request**

If you want to add for the added RFI weld VI inspection request, do the following,

1. Click [![image-1651896588550.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651896588550.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651896588550.png) (Add icon) in the **Results** column of the **REQUEST FOR INSPECTION** page, for the respective RFI weld VI request. See Fig 5.30. A new window opens including the drawing number, joint number and WPS number for the respective RFI weld VI request.
    
    [![image-1651896617342.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651896617342.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651896617342.png)
2. In the **Result** column, select the results from a drop-down list based on your inspection.

#### **5.30.5 Print an RFI Weld VI Report**

If you want to print an RFI weld VI report, click [![image-1651896655616.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651896655616.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651896655616.png)(print icon) provided in the **Report** column of the **REQUEST FOR INSPECTION** page. See Fig 5.30.

#### **5.30.6 Attach a File into an RFI Weld VI Request** 

If you want to attach any file with any RFI weld VI request listed in the **REQUEST FOR INSPECTION** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **5.30.7 Edit Any RFI Weld VI Request** 

If you want to edit any existing RFI weld VI request in the **REQUEST FOR INSPECTION** page, do the following,

1. Click [![image-1651896744473.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651896744473.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651896744473.png)(Edit icon) in the **Edit** column for the respective RFI weld VI request. See Fig 5.30. The page shows the added details of the RFI weld VI request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.30.8 Export RFI Weld VI Request List**

You can export a list of RFI weld VI request added in the **REQUEST FOR INSPECTION** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **5.30.9 Filter Any RFI Weld VI Request** 

If you want to filter any RFI weld VI request from the list of RFI weld VI requests in the **REQUEST FOR INSPECTION** page, you can use the [![image-1651897196423.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651897196423.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651897196423.png) (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.


### **5.31 View AFI Weld VI (Unique Numbers)**

The **View AFI Weld VI** allows you to add a new AFI weld VI request. This tab also helps you to view and edit the added AFI weld VI request.

1. Click the **View AFI Weld VI** tab in the **Inspection** menu. The **WELD VI** **INSPECTION REQUEST** page opens.
    
    [![image-1651897246840.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651897246840.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651897246840.png)
    
     **Figure 5.31: WELD VI INSPECTION REQUEST page**

#### **5.31.1 Add an AFI Weld VI Request**

If you want to add an AFI weld VI request, do the following,

1. Click [![image-1651897318313.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651897318313.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651897318313.png)(**ADD** button) in the **WELD VI INSPECTION REQUEST** page. The **WELD VI** **- AFI Request** page opens to add an AFI weld VI request.
    
    [![image-1651897340537.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651897340537.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651897340537.png)
    
    [![image-1651897358028.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651897358028.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651897358028.png) **Tip**: A report number and RFI number for a new AFI weld VI request will be updated automatically in the **Report Number** and **RFI Number** boxes.
2. In the **Representative (AI)** box, enter representative name for the application inspection and enter their email id and contact number in the **Email** and **Contact No** boxes, respectively.
3. In the **Representative (Client)** box, enter representative name from the client and enter their email id and contact number in the **Email** and **Contact No** boxes, respectively.
4. In the **Inspection Date** box, select the date of inspection.
5. In the **Representative (Contractor)** box, enter representative name from the contractor and enter their email id and contact number in the **Email** and **Contact No** boxes, respectively.
6. In the **Activity Code As Per ITP** box, select the activity code as per ITP from a drop-down list.
7. In the **Activity Code As Per Client** box, select the activity code as per client from a drop-down list.
8. In the **Examination Area** box, enter the detail of examination area.
9. In the **Viewing Condition** box, enter the viewing condition detail.
10. In the **Project Specification** box, enter the project specification detail.
11. In the **Instrument** box, select an instrument from a drop-down list.
12. In the **Surface Condition** box, enter the surface condition detail.
13. In the **Location** box, enter the location detail.
14. In the **Description/ Code Acceptance** box, enter the description or the code acceptance detail for the inspection.
15. In the **Inspection Item/ Technique Used** box, enter the details of items to be inspected or used technique detail.
16. In the **Subject Coverage/ Object** box, enter the subject coverage or object detail.
17. In the **Comments** box, enter your comments if any.
    
    [![image-1651897515969.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651897515969.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651897515969.png)**Note**: Before saving the added AFI weld VI request, you must add the details of joints. You can add multiple joints for any added weld VI request by using a box provided in the left side of the page. To know how to add joints, see the topic “[**<u>Add joints for an AFI fit up request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.28.2-add-joints-fo)”.
18. Click **Save**.

#### **5.31.2 Add Joints for an AFI Weld VI Request**

If you want to add joints for any added AFI weld VI request, do the following,

[![image-1651897564408.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651897564408.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651897564408.png)

Once you enter the details to add an AFI weld VI request, a list of joints including the joint numbers, sheet numbers, and drawing numbers opens.

1. Click the check box of the respective joints.
2. Click [![image-1651897598754.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651897598754.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651897598754.png) (**Add Selected Joints** button). The selected joints are moved into the **Added Joints** box located in the right side of the page.
    
    [![image-1651897618995.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651897618995.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651897618995.png)
3. Click **Save**.

The selected joints are successfully added for the AFI weld VI request.

The AFI weld VI request is successfully added. Once you have added the AFI weld VI request, you must submit the added weld VI request for inspection.

#### **5.31.3 Submit an AFI Weld VI Request**

Once you have added the AFI weld VI request, the **Request Status** column in the **WELD VI** **INSPECTION** **REQUEST** page is appeared with[![image-1651897679303.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651897679303.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651897679303.png) (Submit and Reject icons). See Fig 5.31.

1. If you want to submit the RFI weld VI request, click [![image-1651897705144.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651897705144.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651897705144.png) (Submit icon) in the **Request Status** column. Otherwise click [![image-1651897725095.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651897725095.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651897725095.png) (Reject icon) to reject the request.

#### **5.31.4 Change a Representative for Any AFI Weld VI Request**

If you want to change a representative for any added AFI weld VI request,

1. Click [![image-1651897769209.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651897769209.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651897769209.png) (Edit icon) in the **Representative** column for the respective AFI weld VI request. The **Edit Form** window opens.
    
    [![image-1651897786502.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651897786502.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651897786502.png)
2. In the **Representative** box, enter the name of a representative.
3. Click **Save**.

#### **5.31.5 Add Result for an AFI Weld VI Request**

If you want to add result for the added AFI weld VI inspection request, do the following,

1. Click [![image-1651897840474.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651897840474.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651897840474.png) (Add icon) in the **Results** column of the **WELD VI INSPECTION** **REQUEST** page, for the respective AFI weld VI request. See Fig 5.31. A new window opens including the drawing number and joint number for the respective AFI weld VI request.
    
    [![image-1651897861414.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651897861414.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651897861414.png)
2. In the **Result** column, select the results from a drop-down list based on your inspection.
3. Click **Save**.

#### **5.31.6 Print an AFI Weld VI Report**

If you want to print an AFI weld VI report, click[![image-1651897913191.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651897913191.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651897913191.png) (print icon) provided in the **Report** column of the **WELD VI INSPECTION** **REQUEST** page. See Fig 5.31.

#### **5.31.7 Attach a File into an AFI Weld VI Request** 

If you want to attach any file with any AFI weld VI request listed in the **WELD VI INSPECTION REQUEST** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **5.31.8 Edit Any AFI Weld VI Request** 

If you want to edit any existing AFI weld VI request in the **WELD VI INSPECTION** **REQUEST** page, do the following,

1. Click [![image-1651898065391.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651898065391.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651898065391.png)(Edit icon) in the **Edit** column for the respective AFI weld VI request. See Fig 5.31. The page shows the added details of the AFI weld VI request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.31.9 Export AFI weld VI Request List**

You can export a list of AFI weld VI request added in the **WELD VI INSPECTION REQUEST** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **5.31.10 Filter Any AFI Weld VI Request** 

If you want to filter any AFI weld VI request from the list of AFI weld VI requests in the **WELD VI INSPECTION** **REQUEST** page, you can use the [![image-1651898185092.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651898185092.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651898185092.png) (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.


### **5.32 Dust Level**

Dust level test is performed to check the dust level. The **Dust Level** tab in the **Inspection** menu used to perform the dust level in the **Structural** project.

1. Click **Dust Level** in the **Inspection** menu. The **Dust Level** page opens.
    
    [![image-1651898231679.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651898231679.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651898231679.png)
    
     **Figure 5.32: Dust Level page**

#### **5.32.1 Add a Dust Level**

If you want to add a dust level,

1. Click [![image-1651898288939.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651898288939.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651898288939.png) (**ADD** button) in the **Dust Level**  See Fig 5.32. The page shows a new window to add the details of the dust level.
    
    [![image-1651898305216.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651898305216.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651898305216.png)
2. In the **Painting System** box, enter the painting system name.
3. In the **Item No** box, enter the item number.
4. In the **Date of Testing** box, select the dust level testing date.
5. In the **Abrasives Used** box, enter the detail of abrasives used in the dust level testing.
6. In the **Equipment Used** box, enter the detail of equipment used in the dust level testing.
7. In the **Acceptable Level** box, enter the acceptable level detail.
8. Click **Save**.
    
    The added dust level test will be listed in the **Dust Level** page.

#### **5.32.2 Edit a Dust Level**

If you want to edit any existing dust level in the **Dust Level** page,

1. Click [![image-1651898391905.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651898391905.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651898391905.png) (Edit icon) of the respective dust level. See Fig 5.32. The **Dust Level** page shows the details of the selected dust level.
2. Edit the details where you want.
3. Click **Save**.

#### **5.32.3 Delete a Dust Level**

If you want to delete any existing dust level in the **Dust Level** page, you can use [![image-1651898442682.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651898442682.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651898442682.png) (Delete icon) provided in the **Dust Level** page. To know how to delete, see the topic, “**Delete Any Area**”.

#### **5.32.4 Attach a File into a Dust Level**

If you want to attach any file with any dust level listed in the **Dust Level** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **5.32.5 Print a Dust Level Report**

If you want to print a dust level report, click[![image-1651901548669.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651901548669.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651901548669.png) (print icon) provided in the **Report** column of the **Dust Level** page. See Fig 5.32.

#### **5.32.6 Export Dust Level List**

You can export a list of dust levels added in the **Dust Level** page in both the pdf and excel formats by using [![image-1651901624609.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651901624609.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651901624609.png) (**PDF** button) and [![image-1651901641936.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651901641936.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651901641936.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **5.32.7 Filter Any Dust Level**

If you want to filter any specific dust level, you can use [![image-1651901682828.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651901682828.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651901682828.png) (**FILTER** button) located on the **Dust Level** page. To know how to filter, see the topic, ”**Filter Any Area**”.



### **5.33 Blotter Test**

Blotter test is used to check the cleanliness of the compressed air, where the compressed air free from any form of contaminants is necessary before its usage. The **Blotter Test** tab in the **Inspection** menu helps you to add the results of blotter test.

1. Click **Blotter Test** in the **Inspection** menu. The **Blotter Test** page opens.
    
    [![image-1651901737456.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651901737456.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651901737456.png)
    
     **Figure 5.33: Blotter Test page**

#### **5.33.1 Add a Blotter Test Report**

If you want to add a blotter test report, do the following steps,

1. Click [![image-1651901793616.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651901793616.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651901793616.png) (**ADD** button) in the **Blotter Test** page. The page shows a new window to add the details of the blotter test report.
    
    [![image-1651901814469.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651901814469.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651901814469.png)
2. In the **Location** box, enter the location name.
3. In the **Date of Testing** box, select the date of blotter test.
4. In the **Test Method** box, enter the test method detail.
5. In the **Acceptable Level** box, enter the acceptable level detail.
6. In the **Remarks** box, enter your remarks if any.
7. Click **Save**.

The blotter test report will be added and listed in the **Blotter Test** page. Once you have added the blotter test report, you must add the results of blotter test.

#### **5.33.2 Add Results of Blotter Test**

After completing the blotter test, you can add the blotter test result details. To add results, do the following steps,

1. Click [![image-1651901892500.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651901892500.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651901892500.png) (Add icon) in the **Results** column of the respective report. The Result window opens with the test readings.
    
    [![image-1651901906016.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651901906016.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651901906016.png)
2. In the **Result** column, select the result of each test reading from the given result options in the drop-down list.
3. In the **Remarks** column, enter your remarks if any.
4. Click **Save**.

#### **5.33.3 Edit Any Blotter Test Report** 

If you want to edit any existing blotter test report in the **Blotter Test** page, do the following,

1. Click [![image-1651901964504.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651901964504.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651901964504.png)(Edit icon) in the **Edit** column for the respective blotter test report. See Fig 5.33. The **Blotter Test** page opens with the details of the selected blotter test report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.33.4 View a Blotter Test Report**

If you want to view a blotter test report, click[![image-1651902047167.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651902047167.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651902047167.png) (print icon) provided in the **Print** column of the **Blotter Test** page. See Fig 5.33.

#### **5.33.5 Attach a File into a Blotter Test Report** 

If you want to attach a file with any existing blotter test report listed in the **Blotter Test** page, you can attach the file by using [![image-1651902100292.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651902100292.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651902100292.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)”.

#### **5.33.6 Export Blotter Test Report List**

You can export a list of blotter test report list added in the **Blotter Test** page in both the pdf and excel formats by using (**PDF** button) and (**Excel** button). To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)”.

#### **5.33.7 Filter Any Blotter Test Report**

If you want to filter any specific blotter test report in the **Blotter Test** page, you can use [![image-1651902178629.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651902178629.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651902178629.png) (**FILTER** button) located on the **Blotter Test** page. To know how to filter, see the topic, ”**Filter Any Area**”.


### **5.34 Fairing Report**

The **Fairing Report** tab in the **Inspection** menu helps you to add the results of fairing test.

1. Click **Fairing Report** in the **Inspection** menu. The **Fairing Report** page opens.
    
    [![image-1651902229076.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651902229076.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651902229076.png)
    
     **Figure 5.34: Fairing Report page**

#### **5.34.1 Add a Fairing Report**

If you want to add a fairing report, do the following steps,

1. Click [![image-1651902347564.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651902347564.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651902347564.png)(**ADD** button) in the **Fairing Report** page. The page shows a new window to add the details of the fairing report.
    
    [![image-1651902368876.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651902368876.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651902368876.png)
2. In the **Inspection** **Date** box, select the date of inspection.
3. In the **Prepared By** box, enter the name of a person who has prepared the fairing report.
4. In the **Prepared Date** box, select the prepared date of the fairing report.
5. In the **Reviewed By** box, enter the name of a person who has reviewed the fairing report.
6. In the **Reviewed Date** box, select the reviewed date of the fairing report.
7. In the **Approved By** box, enter the name of a person who has approved the fairing report.
8. In the **Approved Date** box, select the approved date of the fairing report.
9. Click **Save**.

The fairing report will be added and listed in the **Fairing Report** page. Once you have added the fairing report, you must add the results of fairing test.

#### **5.34.2 Add Results of Fairing Test**

After completing the fairing test, you can add the fairing test result details. To add results, do the following steps,

1. Click [![image-1651912474698.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651912474698.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651912474698.png) (Add icon) in the **Results** column of the respective report. The **Fairing Request Details** window opens.
    
    [![image-1651912488947.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651912488947.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651912488947.png)
2. Click [![image-1651912521284.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651912521284.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651912521284.png) (**ADD** button) in the **Fairing Request Details** window.
    
    [![image-1651912549936.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651912549936.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651912549936.png)
3. In the **Description** box, enter the description for the fairing test.
4. In the **Drawing No** box, enter the drawing number.
5. In the **Temperature** box, enter the temperature value.
6. In the **Deformation Status** box, enter the deformation status detail.
7. In the **Structural Thickness** box, enter the structural thickness value.
8. In the **Structural Thickness** box, enter the structural thickness value.
9. In the **Type of Material** box, enter the type of material.
10. Click **Save**.

#### **5.34.3 Edit Any Fairing Report** 

If you want to edit any existing fairing report in the **Fairing Report** page, do the following,

1. Click [![image-1651912698020.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651912698020.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651912698020.png)(Edit icon) in the **Edit** column for the respective fairing report. See Fig 5.34. The **Fairing Report** page opens with the details of the selected fairing report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.34.4 View a Fairing Report**

If you want to view a fairing report, click [![image-1651912778699.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651912778699.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651912778699.png) (print icon) provided in the **Print** column of the **Fairing Report** page. See Fig 5.34.

#### **5.34.5 Attach a File into a Fairing Report** 

If you want to attach a file with any existing fairing report listed in the **Fairing Report** page, you can attach the file by using (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)”.

#### **5.34.6 Export Fairing Report List**

You can export a list of fairing report list added in the **Fairing Report** page in both the pdf and excel formats by using [![image-1651912857186.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651912857186.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651912857186.png) (**PDF** button) and [![image-1651912925607.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651912925607.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651912925607.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)”.

#### **5.34.7 Filter Any Fairing Report**

If you want to filter any specific fairing report in the **Fairing Report** page, you can use [![image-1651913154457.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651913154457.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651913154457.png) (**FILTER** button) located on the **Fairing Report** page. To know how to filter, see the topic, ”**Filter Any Area**”.


### **5.35 Chloride Test**

The **Chloride Test** tab in the **Inspection** menu helps you to add the results of chloride test.

1. Click **Chloride Test** in the **Inspection** menu. The **Chloride Test** page opens.
    
    [![image-1651913236408.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651913236408.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651913236408.png)
    
     **Figure 5.35: Chloride Test page**

#### **5.35.1 Add a Chloride Test Report**

If you want to add a chloride test report, do the following steps,

1. Click [![image-1651913308606.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651913308606.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651913308606.png) (**ADD** button) in the **Chloride Test** page. The page shows a new window to add the details of the chloride test report.
    
    [![image-1651913322779.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651913322779.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651913322779.png)
2. In the **Surface Preparation** box, enter the surface preparation detail.
3. In the **Location** box, enter the location detail.
4. In the **Date of Testing** box, select the date of chloride test.
5. In the **Test Method** box, enter the test method detail.
6. In the **Acceptance Level** box, enter the acceptance level detail.
7. In the **Remarks** box, enter your remarks if any.
8. Click **Save**.

The chloride test report will be added and listed in the **Chloride Test** page. Once you have added the chloride test report, you must add the results of chloride test.

#### **5.35.2 Add Results of Chloride Test**

After completing the chloride test, you can add the chloride test result details. To add results, do the following steps,

1. Click [![image-1651913429145.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651913429145.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651913429145.png) (Add icon) in the **Results** column of the respective report. The **Chloride Request Details** window opens.
    
    [![image-1651913575631.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651913575631.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651913575631.png)
2. Click [![image-1651913590897.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651913590897.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651913590897.png) **ADD** button) in the **Chloride Request Details** window.
    
    [![image-1651913611112.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651913611112.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651913611112.png)
3. In the **Test Reading** box, enter the test reading detail.
4. In the **Position** box, enter the position detail.
5. In the **Result** box, select the result of the chloride test.
6. Click **Save**.

#### **5.35.3 Edit Any Chloride Test Report** 

If you want to edit any existing chloride test report in the **Chloride Test** page, do the following,

1. Click [![image-1651913730100.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651913730100.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651913730100.png)(Edit icon) in the **Edit** column for the respective chloride test report. See Fig 5.35. The **Chloride Test** page opens with the details of the selected chloride test report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.35.4 View a Chloride Test Report**

If you want to view a chloride test report, click [![image-1651913826379.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651913826379.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651913826379.png) (print icon) provided in the **Print** column of the **Chloride Test** page. See Fig 5.34.

#### **5.35.5 Attach a File into a Chloride Test Report** 

If you want to attach a file with any existing chloride test report listed in the **Chloride Test** page, you can attach the file by using [![image-1651913869575.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651913869575.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651913869575.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)”.

#### **5.35.6 Export Chloride Test Report List**

You can export a list of chloride test report list added in the **Chloride Test** page in both the pdf and excel formats by using [![image-1651914072033.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651914072033.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651914072033.png)(**PDF** button) and [![image-1651914092636.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651914092636.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651914092636.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)”.

#### **5.35.7 Filter Any Chloride Test Report**

If you want to filter any specific chloride test report in the **Chloride Test** page, you can use [![image-1651914209307.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651914209307.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651914209307.png) (**FILTER** button) located on the **Chloride Test** page. To know how to filter, see the topic, ”**Filter Any Area**”.


### **5.36 Inspection Requisition Summary Report**

The **Inspection Requisition Summary** tab in the **Inspection** menu used to view the inspection requisition summary report for a particular period.

1. Click **Inspection Requisition Summary** in the **Inspection** menu. The **Requisition Inspection Summary** page opens.
    
    [![image-1651914291795.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651914291795.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651914291795.png)
    
     **Figure 5.36: Requisition Inspection Summary page**
2. In the **Start Date** and **End Date** boxes, select the start and end dates.
3. Click **Get Report**.
    
    The inspection requisition summary report for the selected period will be opened.
    
    [![image-1651914343114.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651914343114.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651914343114.png)

#### **5.36.1 Print an Inspection Requisition Summary Report**

If you want to print an inspection requisition summary report, use [![image-1651914395188.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651914395188.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651914395188.png) and [![image-1651914414647.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651914414647.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651914414647.png) (print icons) provided in the **Requisition Inspection Summary** page.

1. If you want to print the current page of the inspection requisition summary report, click [![image-1651914484636.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651914484636.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651914484636.png) (print icon including the page number).
2. If you want to print all the pages of the inspection requisition summary report, click [![image-1651914505680.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651914505680.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651914505680.png)(print icon).

#### **5.36.2 Export an Inspection Requisition Summary Report**

You can export the inspection requisition summary report in various formats by using the option [![image-1651914626034.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651914626034.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651914626034.png) provided in the upper right corner of the **Requisition Inspection Summary** page.

# Structural

### **6.0 Structural**

The Structural menu in the home page of the ***cuteQM*** app used to add result after performing structural related inspections. This menu also helps you to view structural reports, graphical reports, and other reports.

### **6.1 Radiographic Testing (RT)** 

The RT method is one of the NDT inspection methods used for inspecting the materials in the structural project by using either x-rays or gamma rays. Once the RT inspection request added in the [**<u>NDT Inspection Request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.8-ndt-inspection-r) tab, you can add the RT inspection result details by using this **Radiographic Testing (RT)** tab**.**

If you want to navigate **Radiographic Testing (RT)**,

1. Click the **Radiographic Testing (RT)** tab in the **Structural** menu. The **RT Report** page opens.
    
    [![image-1651915359832.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651915359832.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651915359832.png)
    
     **Figure 6.1: RT Report page**

#### **6.1.1 Add an RT Report**

If you want to add an RT report, do the following,

1. Click [![image-1651915422152.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651915422152.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651915422152.png) (**ADD** button) in the **RT Report** page. See Fig 6.1. A new window opens to add an RT report.
    
    [![image-1651915452611.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651915452611.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651915452611.png)
    
    [![image-1651915460726.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651915460726.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651915460726.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651915484902.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651915484902.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651915484902.png) **Tip**: A report number for a new RT report will be updated automatically in the **Report Number** box.
2. In the ****NDT By**** box, select the creation of NDT whether by third party or internal from a drop-down list.
3. In the **Request Number** box, select an RT request number from a drop-down list.
4. In the **Prepared By** box, enter the name of a person who has prepared the RT report.
5. In the **Prepared Date** box, select the prepared date of the RT report.
6. In the **Reviewed By** box, enter the name of a person who has reviewed the RT report.
7. In the **Reviewed Date** box, select the reviewed date of the RT report.
8. In the **Approved By** boxes, enter the name of a person who has approved the RT report.
9. In the **Approved Date** box, select the approved date of the RT report.
10. In the **Rep. Accept Date** box, select the report accept date.
11. In the **Inspection Date** box, select the date of inspection.
12. In the **Job Done Report Number** box, enter the report number of completed inspection job.
13. In the **Job Completed Date** box, select the completed date of the inspection job.
14. Click **Save**.

The RT report is successfully added. Once you have added the RT report, you must add RT results for the respective added RT report.

#### **6.1.2 Add RT Results** 

If you want to add the RT results for the respective RT report, do the following,

1. Click the respective added RT report in the **RT Report** page. See Fig 6.1. The RT Results window opens.
    
    [![image-1651915646092.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651915646092.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651915646092.png)
    
     **Figure 6.1.1: RT Results page**
2. In the **Image Quality Indicator (IQI)** box, select IQI from a drop-down list.
3. In the **Source &amp; Size (MM)** box, select the RT source and their size from a drop-down list.
4. In the **Density** box, enter the radiographic density range.
5. In the **Code** box, select the code of the material from a drop-down list.
6. In the **Procedure Number** box, select the procedure number from a drop-down list.
7. In the **Sensitivity (%)** box, set the radiographic sensitivity by using up and down arrows.
8. In the **Approved By** boxes, enter the name of a person who has approved the RT report.
9. In the **Approved Date** box, select the approved date of the RT report.
10. In the **Rep. Accept Date** box, select the report accept date.
11. In the **Inspection Date** box, select the date of inspection.
12. In the **Job Done Report Number** box, enter the report number of completed inspection job.
13. In the **Job Completed Date** box, select the completed date of the inspection job.
14. Click **Save**.

The RT report is successfully added. Once you have added the RT report, you must add RT results for the respective added RT report.

#### **6.1.2 Add RT Results** 

If you want to add the RT results for the respective RT report, do the following,

1. Click the respective added RT report in the **RT Report** page. See Fig 6.1. The RT Results window opens.
    
    [![image-1651983962662.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651983962662.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651983962662.png)
    
     **Figure 6.1.1: RT Results page**
2. In the **Image Quality Indicator (IQI)** box, select IQI from a drop-down list.
3. In the **Source &amp; Size (MM)** box, select the RT source and their size from a drop-down list.
4. In the **Density** box, enter the radiographic density range.
5. In the **Code** box, select the code of the material from a drop-down list.
6. In the **Procedure Number** box, select the procedure number from a drop-down list.
7. In the **Sensitivity (%)** box, set the radiographic sensitivity by using up and down arrows.
8. In the **Developing Time (Mins)** box, set the developing time by using up and down arrows.
9. In the **Film/ Type** box, select the name of a film including type from a drop-down list.
10. In the **Placement of IQI** box, select any one option from source side and film side.
11. In the **Source to Object Distance (SOD)** box, enter the distance range between the source and the object.
12. In the **Screens Type** box, enter the type of screens.
13. In the **Visible Wire/ Hole** box, enter the relevant detail.
14. In the **Acceptance Criteria** box, select the acceptance criteria from a drop-down list.
15. In the ****Source to Film Distance (SFD)****box, enter the distance range between the source and the film.
16. In the **Focus Film Distance (FFD)** box, enter the focus film distance range.
17. In the **Source** box, select any one source option whether inside, outside, or other.
18. In the **Technique** box, select the radiographic technique from a drop-down list.
19. In the **Examination Stage** box, select the examination stage from the specified options.
20. In the **Material** box, select the material from a drop-down list.
21. In the **Surface Condition** box, select the condition of the surface from the specified options.
22. In the **Source Strength** box, enter the source strength range.
23. In the **Exposure Time (Mins)** box, set the exposure time by using up and down arrows.
24. In the **Note** box, enter any note if you want.
25. Click **Save RT Details**.

The RT results are successfully updated. Once you have updated the RT results, you must import joints added for the RT inspection.

#### **6.1.3 Import Joints**

If you want to import joints for the updated RT results,

1. Click [![image-1651984603138.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651984603138.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651984603138.png) (**Import Joints** button) in the **RT Results** See Fig 6.1.1. The **Joints** window opens with a list of joints.
    
    [![image-1651984618657.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651984618657.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651984618657.png)
2. Select the joints you want to import.
3. Click [![image-1651984648770.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651984648770.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651984648770.png) (**Import Selected Joints** button).
    
    The selected joints are imported for the respective RT results. Once you have imported the joints, you must add the marker results.

#### **6.1.4 Add Marker Results**

If you want to add marker results for the respective RT results,

[![image-1651984688412.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651984688412.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651984688412.png)

1. Click [![image-1651984710955.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651984710955.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651984710955.png) (Add icon) for the respective RT results. The **Marker Results** window opens.
    
    [![image-1651984728723.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651984728723.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651984728723.png)
2. If you want to add any additional markers,
    
    
    1. 1. Set the number in the **No. of Additional Markers** box by using up and down arrows.
        2. Click [![image-1651984771433.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651984771433.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651984771433.png) (**ADD** button).
3. If you want edit any existing marker results, 
    1. 1. Click [![image-1651984794840.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651984794840.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651984794840.png) (Edit icon) in the **Edit** column for the respective marker results.
            
            A new window opens to edit the marker results.
            
            [![image-1651984835180.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651984835180.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651984835180.png)
        2. Click any box where you want to edit the details, and edit the marker results.
        3. Click **Save**.
4. If you want delete any existing marker results, click (Delete icon) for the respective marker results.

#### **6.1.5 Add Report Photos**

If you want to add any report photos for the updated RT results,

1. Click [![image-1651984922206.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651984922206.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651984922206.png) (**ADD** button) in the **Report Photos** box in the **RT Results** window. See Fig 6.1.1. [![image-1651984944230.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651984944230.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651984944230.png)
2. Click [![image-1651984959950.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651984959950.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651984959950.png) (****Browse**** button) to browse a photo stored in your computer.
3. Click **Upload**.

The selected photo will be updated.

#### **6.1.6 Attach a File into an RT Report**

If you want to attach any file with any RT report listed in the **RT Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.1.7 Print an NDT – RT report**

If you want to print an NDT - RT report, click [![image-1651985039630.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651985039630.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651985039630.png) (print icon) provided in the **Report** column of the **RT Report** page. See Fig 6.1.

#### **6.1.8 Edit Any RT Report**

 If you want to edit any existing RT report in the **RT Report** page, do the following,

1. Click [![image-1651985091602.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651985091602.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651985091602.png) (Edit icon) in the **Edit** column for the respective RT report. See Fig 6.1. A new window opens to edit the RT report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.1.9 Export RT Report List**

You can export a list of RT reports added in the **RT Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **6.1.10 Filter Any RT Report** 

If you want to filter any RT report, do one of the following, [![image-1651985206408.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651985206408.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651985206408.png)

1. If you want to filter any RT report based on the report number, enter the corresponding report number in the **Report No** box in the **RT Report** page, and then Click **Search**.
2. If you want to filter any RT report based on the request number, enter the corresponding request number in the **Request No** box in the **RT Report** page, and then Click **Search**.
3. If you want to filter any RT report based on the drawing number, enter the corresponding drawing number in the ****Drawing No**** box in the ****RT Report**** page, and then Click ****Search****.



### **6.2 Ultrasonic Testing (UT)** 

The UT method is one of the NDT inspection methods used for inspecting the materials in the structural project by using high frequency sound waves. Once the UT inspection request added in the[<u> </u>**<u>NDT Inspection Request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.8-ndt-inspection-r) tab, you can add the UT inspection result details by using this **Ultrasonic Testing (UT)** tab**.** If you want to navigate **Ultrasonic Testing (UT)**,

1. Click the **Ultrasonic Testing (UT)** tab in the **Structural** menu. The **UT Report** page opens.
    
    [![image-1651985300157.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651985300157.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651985300157.png)
    
     **Figure 6.2: UT Report page**

#### **6.2.1 Add an UT Report**

If you want to add an UT report, do the following,

1. Click [![image-1651985351149.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651985351149.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651985351149.png) (**ADD** button) in the U**T Report** page. See Fig 6.2. A new window opens to add an UT report.
    
    [![image-1651985371929.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651985371929.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651985371929.png)
    
    [![image-1651985395804.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651985395804.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651985395804.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651985407432.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651985407432.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651985407432.png)**Tip**: A report number for a new UT report will be updated automatically in the **Report Number** box.
2. In the ****NDT By**** box, select the creation of NDT whether by third party or internal from a drop-down list.
3. In the **Request Number** box, select an UT request number from a drop-down list.
4. In the **Prepared By** box, enter the name of a person who has prepared the UT report.
5. In the **Prepared Date** box, select the prepared date of the UT report.
6. In the ****Reviewed By**** box, enter the name of a person who has reviewed the UT report.
7. In the **Reviewed Date** box, select the reviewed date of the UT report.
8. In the **Approved By** boxes, enter the name of a person who has approved the UT report.
9. In the **Approved Date** box, select the approved date of the UT report.
10. In the **Rep. Accept Date** box, select the report accept date.
11. In the **Inspection Date** box, select the date of inspection.
12. In the **Job Done Report Number** box, enter the report number of completed inspection job.
13. In the **Job Completed Date** box, select the completed date of the inspection job.
14. Click **Save**.

The UT report is successfully added. Once you have added the UT report, you must add UT results for the respective added UT report.

#### **6.2.2 Add UT Results** 

If you want to add the UT results for the respective UT report, do the following,

1. Click the respective added UT report in the **UT Report** page. See Fig 6.2. The UT Results window opens.
    
    [![image-1651985545268.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651985545268.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651985545268.png)
    
    [![image-1651985556004.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651985556004.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651985556004.png)
    
    [![image-1651985564176.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651985564176.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651985564176.png)
    
     **Figure 6.2.1: UT Results page**
2. In the **Test Method** box, select the test method from a drop-down list.
3. In the **Description** box, enter the description about the UT inspection.
4. In the **Material** box, select the material from a drop-down list.
5. In the **Test Equipment** box, select the test equipment from a drop-down list.
6. In the **Acceptance Criteria** box, select the acceptance criteria from a drop-down list.
7. In the **Couplant** box, select the couplant material from a drop-down list.
8. In the **Test** **Procedure Number** box, select the test procedure number from a drop-down list.
9. In the **Simulation Blocks** box, enter the detail of simulation blocks.
10. In the **Ref. Hole Diameter** box, enter the diameter value of the reference hole.
11. In the **Sensitivity Setting** box, enter the information about the sensitivity setting.
12. In the **Sides Scanned** box, enter the details of the sides that are scanned.
13. In the **Special Equipment** box, enter the name of the special equipment if any.
14. In the **Computerized Program Name** box, enter the computerized program name.
15. In the **Surface Scanned** box, the details of the surfaces that are scanned.
16. In the **Flaw Detector** box, select a flaw detector from a drop-down list.
17. In the **Scan Limitation** box, enter the limitation range of scanning.
18. In the **Bevel Type** box, enter the type of the bevel.
19. In the **Specification** box, select the specification from a drop-down list.
20. In the **Calibration Block** box, select the calibration block from a drop-down list.
21. In the **Remarks** box, enter your remarks if any.
22. In the **Technique** box, select the technique from a drop-down list.
23. In the **Examination Stage** box, select the examination stage from the specified options.
24. In the **Surface Condition** box, select the surface condition from the specified options.
25. Click **Save UT Details**.

The UT results are successfully updated. Once you have updated the UT results, you must add the probe and cable details for the UT inspection.

#### **6.2.3 Add Probe and Cable details** 

If you want to add probe and cable details for the updated UT results,

1. Click [![image-1651985830317.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651985830317.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651985830317.png) (**Add Probe/ Cable** button) in the **Probe&amp; Cable Details** window. See Fig 6.2.1. A new window opens to add the probe and cable details.
    
    [![image-1651985848658.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651985848658.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651985848658.png)
2. In the **Probe** box, select a probe from a drop-down list.
3. In the **Cable** box, select a cable from a drop-down list.
4. In the **Ref. dB** box, enter the reference decibel range.
5. In the **Surf Comp dB** box, enter the decibel range of the surface component.
6. In the **Test Range (MM)** box, enter the test range in millimeters.
7. In the **Reference Level** box, enter the reference level detail.
8. In the **Scanning dB** box, enter the scanning decibel range.
9. In the **TR Loss** box, enter the transmission loss detail.
10. Click **Save**.

The probe and cable details are successfully added. Once you have added the probe and cable details, you must add the reference setting details.

#### **6.2.4 Add Reference Setting details** 

If you want to add the reference setting details for the updated UT results,

1. Click [ ![image-1651985956553.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651985956553.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651985956553.png) (**Add Reference Setting** button) in the **Reference Setting Details** See Fig 6.2.1. A new window opens to add the reference setting details.
    
    [![image-1651985982525.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651985982525.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651985982525.png)
2. In the **Reference Block** box, select the reference block from a drop-down list.
3. In the **Probe Sr. No** box, select the serial number of the probe from a drop-down list.
4. In the **Reference** box, enter the reference detail.
5. In the **Eqpt Gain (dB)** box, enter the equipment gain in decibels.
6. In the **Damping** box, enter the damping ratio.
7. In the **Rejection** box, enter the rejection detail.
8. In the **Amplitude Height** box, enter the amplitude height range.
9. In the **Skip** box, enter the skip detail.
10. In the **Beam Path** box, enter the beam path detail.
11. In the **Range** box, enter the range detail.
12. Click **Save**.

The reference setting details are successfully added. Once you have added the reference setting details, you must import joints for the updated UT results.

#### **6.2.5 Import Joints for UT**

If you want to import joints for the updated UT results,

1. Click [![image-1651986113562.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651986113562.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651986113562.png) (**Import Joints** button) in the U**T Results** See Fig 6.2.1. The **Joints** window opens with a list of joints.
    
    [![image-1651986185110.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651986185110.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651986185110.png)
2. Select the joints you want to import.
3. Click [![image-1651986242236.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651986242236.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651986242236.png) (**Import Selected Joints** button).

The selected joints are imported for the respective UT results. Once you have imported the joints, you must add the UT detail results.

#### **6.2.6 Add UT Results**

If you want to add UT detail results for the respective UT results,

[![image-1651986280609.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651986280609.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651986280609.png)

1. Click [![image-1651986301680.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651986301680.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651986301680.png) (Add icon) for the respective UT results. The **UT Detail Results** window opens.
    
    [![image-1651986314412.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651986314412.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651986314412.png)
2. Click [![image-1651986326534.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651986326534.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651986326534.png) (**ADD** button) in the **UT Detail Results** window.
    
    A new window opens in the **Probes** column.
    
    [![image-1651986344825.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651986344825.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651986344825.png)
3. Select the probe from a drop-down list.
4. Enter other details in the respective columns.
5. Click **Save**.

#### **6.2.7 Add Report Photos**

If you want to add any report photos for the updated UT results,

1. Click [![image-1651986389344.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651986389344.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651986389344.png) (**ADD** button) in the **Report Photos** box in the **UT Results** See Fig 6.2.1. [![image-1651986402335.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651986402335.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651986402335.png)
2. Click [![image-1651986417627.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651986417627.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651986417627.png) (**Browse** button) to browse a photo stored in your computer.
3. Click **Upload**.

The selected photo will be updated.

#### **6.2.8 Attach a File into an UT Report**

If you want to attach any file with any UT report listed in the **UT Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.2.9 Print an NDT – UT Report**

If you want to print an NDT - UT report, click[![image-1651986568467.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651986568467.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651986568467.png)(print icon) provided in the **Report** column of the **UT Report** page. See Fig 6.2.

#### **6.2.10 Edit Any UT report**

 If you want to edit any existing UT report in the U**T Report** page, do the following,

1. Click [![image-1651986610066.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651986610066.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651986610066.png) (Edit icon) in the **Edit** column for the respective UT report. See Fig 6.2. A new window opens to edit the UT report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.2.11 Export UT Report List**

You can export a list of UT reports added in the **UT Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **6.2.12 Filter Any UT Report** 

If you want to filter any UT report, do one of the following,[![image-1651987820280.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651987820280.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651987820280.png)

1. If you want to filter any UT report based on the report number, enter the corresponding report number in the **Report No** box in the **UT Report** page, and then Click **Search**.
2. If you want to filter any UT report based on the request number, enter the corresponding request number in the ****Request No**** box in the ****UT Report**** page, and then Click ****Search****.

If you want to filter any UT report based on the drawing number, enter the corresponding drawing number in the **Drawing No** box in the **UT Report** page, and then Click **Search**.


### **6.3 Dye Penetrant Testing (DPT)**

The DPT method is one of the oldest and simplest NDT inspection methods used for inspecting the materials in the structural project by using ultraviolet or white light, depending on the type of dye used - fluorescent or non fluorescent (visible). PT also called liquid penetrate inspection (LPI) or penetrant testing (PT).

Once the UT inspection request added in the [**<u>NDT Inspection Request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.8-ndt-inspection-r) tab, you can add the UT inspection result details by using this **Dye Penetrant Testing (DPT)** tab**.** If you want to navigate **Dye Penetrant Testing (DPT)**,

1. Click the **Dye Penetrant Testing (DPT)** tab in the **Structural** menu. The **PT Report** page opens.
    
    [![image-1651987913649.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651987913649.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651987913649.png)
    
     **Figure 6.3: PT Report page**

#### **6.3.1 Add a DPT Report**

If you want to add a DPT report, do the following,

1. Click [![image-1651987980001.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651987980001.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651987980001.png) (**ADD** button) in the **PT Report** page. See Fig 6.3. A new window opens to add an PT report.
    
    [![image-1651988268574.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651988268574.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651988268574.png)
    
    [![image-1651988283988.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651988283988.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651988283988.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651988299424.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651988299424.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651988299424.png)**Tip**: A report number for a new PT report will be updated automatically in the **Report Number** box.
2. In the **NDT By** box, select the creation of NDT whether by third party or internal from a drop-down list.
3. In the **Request Number** box, select an PT request number from a drop-down list.
4. In the **Prepared By** box, enter the name of a person who has prepared the PT report.
5. In the **Prepared Date** box, select the prepared date of the PT report.
6. In the **Reviewed By** box, enter the name of a person who has reviewed the PT report.
7. In the **Reviewed Date** box, select the reviewed date of the PT report.
8. In the **Approved By** boxes, enter the name of a person who has approved the PT report.
9. In the **Approved Date** box, select the approved date of the PT report.
10. In the **Rep. Accept Date** box, select the report accept date.
11. In the **Inspection Date** box, select the date of inspection.
12. In the **Job Done Report Number** box, enter the report number of completed inspection job.
13. In the **Job Completed Date** box, select the completed date of the inspection job.
14. Click **Save**.

The PT report is successfully added. Once you have added the PT report, you must add PT results for the respective added PT report.

#### **6.3.2 Add DPT Results** 

If you want to add the DPT results for the respective PT report, do the following,

1. Click the respective added PT report in the **PT Report** page. See Fig 6.3. The DPT Results window opens.
    
    [![image-1651988667279.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651988667279.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651988667279.png)
    
    [![image-1651988674053.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651988674053.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651988674053.png)
    
     **Figure 6.3.1: DPT Results page**
2. In the **Light Source** box, enter the light source detail.
3. In the **Description** box, enter the description.
4. In the **Test Procedure** box, select the test procedure from a drop-down list.
5. In the **Test Method** box, select the test method from a drop-down list.
6. In the **Acceptance Criteria** box, select the acceptance criteria from a drop-down list.
7. In the **Surface Condition** box, enter the condition of the surface.
8. In the **Dwell Time** box, enter dwell time range.
9. In the **Surface Temperature** box, enter the surface temperature value.
10. In the **Cleaner** box, select the cleaner from a drop-down list.
11. In the **Penetrant** box, select the penetrant from a drop-down list.
12. In the **Developer** box, select the developer from a drop-down list.
13. In the **Material Specification** box, enter the material specification.
14. In the **Material Thickness** box, enter the material thickness value.
15. In the **Development Time** box, enter the time for development.
16. In the **Welding Process** box, enter the type of welding process.
17. In the **Code** box, enter the code detail.
18. In the **Examination Stage** box, select the examination stage from the specified options.
19. In the **Item Tested** box, select the tested items from the specified options.
20. In the **Inspection Method** box, select the inspection method from the specified options.
21. In the **Material** box, select the material from a drop-down list.
22. In the **Remarks** box, enter your remarks if any.
23. Click **Save DPT Details**.

The DPT results are successfully updated. Once you have updated the DPT results, you must import joints added for the DPT inspection results.

#### **6.3.3 Import Joints for DPT**

If you want to import joints for the updated DPT results,

1. Click [![image-1651988870782.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651988870782.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651988870782.png) (**Import Joints** button) in the **DPT Results** window. See Fig 6.3.1. The **Joints** window opens with a list of joints.
    
    [![image-1651988896812.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651988896812.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651988896812.png)
2. Select the joints you want to import.
3. Click [![image-1651988911579.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651988911579.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651988911579.png) (**Import Selected Joints** button).
    
    The selected joints are imported for the respective DPT results.

#### **6.3.4 Add Report Photos**

If you want to add any report photos for the updated DPT results,

1. Click [![image-1651988951316.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651988951316.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651988951316.png) (**ADD** button) in the **Report Photos** box in the **DPT Results** window. See Fig 6.3.1. [![image-1651988976728.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651988976728.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651988976728.png)
2. Click [![image-1651988988048.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651988988048.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651988988048.png) (**Browse** button) to browse a photo stored in your computer.
3. Click **Upload**.
    
    The selected photo will be updated.

#### **6.3.5 Attach a File into a DPT Report**

If you want to attach any file with any DPT report listed in the **PT Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.3.6 Print an NDT – DPT report**

If you want to print an NDT - PT report, click [![image-1651989107514.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651989107514.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651989107514.png)(print icon) provided in the **Report** column of the **PT Report** page. See Fig 6.3.

#### **6.3.7 Edit Any DPT report**

 If you want to edit any existing DPT report in the **RT Report** page, do the following,

1. Click [![image-1651989141539.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651989141539.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651989141539.png) (Edit icon) in the **Edit** column for the respective DPT report. See Fig 6.3. A new window opens to edit the DPT report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.3.8 Export DPT Report List**

You can export a list of DPT reports added in the **PT Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **6.3.9 Filter Any DPT Report** 

If you want to filter any DPT report, do one of the following,[![image-1651989245911.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651989245911.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651989245911.png)

1. If you want to filter any DPT report based on the report number, enter the corresponding report number in the **Report No** box in the **PT Report** page, and then Click **Search**.
2. If you want to filter any DPT report based on the report number, enter the corresponding report number in the **Report No** box in the **PT Report** page, and then Click **Search**.

If you want to filter any DPT report based on the report number, enter the corresponding report number in the **Report No** box in the **PT Report** page, and then Click **Search**.



### **6.4 PT After Load Test**

The **PT After Load Test** tab in the **Structural** menu helps you to add PT results while performing the PT inspection after completing the load test.

Once the PT after load test inspection request added in the [**<u>NDT Inspection Request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.8-ndt-inspection-r) tab, you can add the PT result details by using this **PT After Load Test** tab**.** If you want to navigate **PT After Load Test**,

1. Click the **PT After Load Test** tab in the **Structural** menu. The **PT After Load Test Report** page opens. [![image-1651989380363.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651989380363.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651989380363.png)
    
     **Figure 6.4: PT After Load Test Report page**

#### **6.4.1 Add a PT after load test report**

If you want to add a PT after load test report, do the following,

1. Click [![image-1651989429583.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651989429583.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651989429583.png) (**ADD** button) in the **PT After Load Test Report** page. See Fig 6.4. A new window opens to add a PT after load test report.
    
    [![image-1651989443350.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651989443350.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651989443350.png)
    
    [![image-1651989462745.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651989462745.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651989462745.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651989704531.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651989704531.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651989704531.png)**Tip**: A report number for a new PT report will be updated automatically in the **Report Number** box.
2. In the **NDT By** box, select the creation of NDT whether by third party or internal from a drop-down list.
3. In the **Request Number** box, select an PT request number after load test from a drop-down list.
4. In the **Prepared By** box, enter the name of a person who has prepared the PT report after load test.
5. In the ****Prepared Date**** box, select the prepared date of the PT report after load test.
6. In the ****Reviewed By**** box, enter the name of a person who has reviewed the PT report after load test.
7. In the ****Reviewed Date**** box, select the reviewed date of the PT report after load test.
8. In the ****Approved By**** boxes, enter the name of a person who has approved the PT report after load test.
9. In the ****Approved Date**** box, select the approved date of the PT report after load test.
10. In the **Rep. Accept Date** box, select the report accept date.
11. In the **Inspection Date** box, select the date of inspection.
12. In the **Job Done Report Number** box, enter the report number of completed inspection job.
13. In the **Job Completed Date** box, select the completed date of the inspection job.
14. Click **Save**.

The PT report after load test is successfully added. Once you have added the PT report, you must add PT results for the respective PT report.

#### **6.4.2 Add PT Results** 

If you want to add the PT results for the respective PT report after load test, do the following,

1. Click the respective added PT report in the **PT After Load Test Report** page. See Fig 6.4. The **PT After Load Test Results** page opens.
    
    [![image-1651991710992.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651991710992.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651991710992.png)
    
     **Figure 6.4.1: PT After Load Test Results** **page**
2. In the **Light Source** box, enter the light source detail.
3. In the **Description** box, enter the description.
4. In the **Test Procedure** box, select the test procedure from a drop-down list.
5. In the **Test Method** box, select the test method from a drop-down list.
6. In the **Acceptance Criteria** box, select the acceptance criteria from a drop-down list.
7. In the **Surface Condition** box, enter the condition of the surface.
8. In the **Dwell Time** box, enter dwell time range.
9. In the **Surface Temperature** box, enter the surface temperature value.
10. In the **Cleaner** box, select the cleaner from a drop-down list.
11. In the **Penetrant** box, select the penetrant from a drop-down list.
12. In the **Developer** box, select the developer from a drop-down list.
13. In the **Material Specification** box, enter the material specification.
14. In the **Material Thickness** box, enter the material thickness value.
15. In the **Development Time** box, enter the time for development.
16. In the **Welding Process** box, enter the type of welding process.
17. In the **Examination Stage** box, select the examination stage from the specified options.
18. In the **Remarks** box, enter your remarks if any.
19. Click **Save PTLT Details**.

The PT after load test results are successfully updated. Once you have updated the PT results, you must import joints added for the PT after load test inspection results.

#### **6.4.3 Import Joints for PT After Load Test**

If you want to import joints for the updated PT after load test results,

1. Click [![image-1651991888610.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651991888610.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651991888610.png) (**Import Joints** button) in the **PT After Load Test Results** window. See Fig 6.4.1. The **Joints** window opens with a list of joints.
    
    [![image-1651991913384.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651991913384.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651991913384.png)
2. Select the joints you want to import.
3. Click [![image-1651991932082.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651991932082.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651991932082.png) (**Import Selected Joints** button).
    
    The selected joints are imported for the respective DPT results.

#### **6.4.4 Add Report Photos**

If you want to add any report photos for the updated PT after load test results,

1. Click [![image-1651991965975.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651991965975.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651991965975.png) (**ADD** button) in the **Report Photos** box in the **PT After Load Test Results** See Fig 6.4.1. [![image-1651991982159.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651991982159.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651991982159.png)
2. Click [![image-1651992000367.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992000367.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992000367.png) (**Browse** button) to browse a photo stored in your computer.
3. Click **Upload**.
    
    The selected photo will be updated.

#### **6.4.5 Attach a file into a PT After Load Test Report**

If you want to attach any file with any PT report listed in the **PT After Load Test Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.4.6 Print an NDT – PT After Load Test Report**

If you want to print an NDT – PT after load test report, click[![image-1651992108377.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992108377.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992108377.png)(print icon) provided in the **Report** column of the **PT After Load Test Report** page. See Fig 6.4.

#### **6.4.7 Edit Any PT After Load Test Report**

 If you want to edit any existing PT report in the **PT After Load Test Report** page, do the following,

1. Click [![image-1651992194889.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992194889.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992194889.png)(Edit icon) in the **Edit** column for the respective PT report. See Fig 6.4. A new window opens to edit the PT report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.4.8 Export PT after load test report list**

You can export a list of PT reports added in the **PT After Load Test Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **6.4.9 Filter Any PT After Load Test Report** 

If you want to filter any PT report, do one of the following,[![image-1651992271777.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992271777.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992271777.png)

1. If you want to filter any PT report based on the report number, enter the corresponding report number in the **Report No** box in the **PT After Load Test Report** page, and then Click **Search**.
2. If you want to filter any PT report based on the request number, enter the corresponding request number in the **Request No** box in the **PT After Load Test Report** page, and then Click **Search**.

If you want to filter any PT report based on the drawing number, enter the corresponding drawing number in the **Drawing No** box in the **PT After Load Test Report** page, and then Click **Search**.



### **6.5 Magnetic Particle Testing (MPT)**

MPT also referred to as Magnetic Particle Inspection is one of the NDT inspection methods used to detect defects or discontinuities such as cracks, at or near the surface in ferromagnetic metals such as iron, steel, nickel, cobalt and so on.

Once the MPT inspection request added in the [**<u>NDT Inspection Request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.8-ndt-inspection-r) tab, you can add the MPT inspection result details by using this **Magnetic Particle Testing (MPT)** tab**.** If you want to navigate **Magnetic Particle Testing (MPT)**,

1. Click the **Magnetic Particle Testing (MPT)** tab in the **Structural** menu. The **MT Report** page opens.
    
    [![image-1651992414838.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992414838.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992414838.png) **Figure 6.5: MT Report page**

#### **6.5.1 Add an MPT Report**

If you want to add an MPT report, do the following,

1. Click [![image-1651992467914.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992467914.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992467914.png) (**ADD** button) in the **MT Report** page. See Fig 6.5. A new window opens to add an MPT report.
    
    [![image-1651992480844.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992480844.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992480844.png)
    
    [![image-1651992491566.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992491566.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992491566.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651992511163.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992511163.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992511163.png) **Tip**: A report number for a new MPT report will be updated automatically in the **Report Number** box.
2. In the **NDT By** box, select the creation of NDT whether by third party or internal from a drop-down list.
3. In the **Request Number** box, select an MPT request number from a drop-down list.
4. In the **Prepared By** box, enter the name of a person who has prepared the MPT report.
5. In the **Prepared Date** box, select the prepared date of the MPT report.
6. In the **Reviewed By** box, enter the name of a person who has reviewed the MPT report.
7. In the **Reviewed Date** box, select the reviewed date of the MPT report.
8. In the **Approved By** boxes, enter the name of a person who has approved the MPT report.
9. In the **Approved Date** box, select the approved date of the MPT report.
10. In the **Rep. Accept Date** box, select the report accept date.
11. In the **Inspection Date** box, select the date of inspection.
12. In the **Job Done Report Number** box, enter the report number of completed inspection job.
13. In the **Job Completed Date** box, select the completed date of the inspection job.
14. Click **Save**.

The MPT report is successfully added. Once you have added the MPT report, you must add MPT results for the respective MPT report.

#### **6.5.2 Add MPT Results** 

If you want to add the MPT results for the respective MPT report, do the following,

1. Click the respective MPT report in the **MT Report** page. See Fig 6.5. The MPT Results window opens.
    
    [![image-1651992626683.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992626683.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992626683.png)
    
    [![image-1651992634124.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992634124.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992634124.png)
    
    [![image-1651992642609.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992642609.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992642609.png)
    
     **Figure 6.5.1: MPT Results page**
2. In the **Test Equipment** box, select the test equipment from a drop-down list.
3. In the **Description** box, enter the description.
4. In the **Test Procedure** box, select the test procedure from a drop-down list.
5. In the **Test Method** box, select the test method from a drop-down list.
6. In the **Black Magnetic Ink** box, select the type of black magnetic ink from a drop-down list.
7. In the **Surface Condition** box, enter the condition of the surface.
8. In the **Light Source** box, enter the light source detail.
9. In the **White Contrast Paint** box, select the type of white contrast paint.
10. In the **Material Specification** box, enter the material specification.
11. In the **Material Thickness** box, enter the material thickness value.
12. In the **Type of Current** box, enter the type of current.
13. In the **Lifting Capacity** box, select the lifting capacity value.
14. In the **Acceptance Criteria** box, select the acceptance criteria from a drop-down list.
15. In the **Yoke/ Prod Space** box, enter the relevant information.
16. In the **Particles Type** box, select the type of particles from a drop-down list.
17. In the **Particles Make &amp; model** box, enter the model of the particle including made of materials.
18. In the **Background Contrast &amp; Type** box, enter the type of background including contrast range.
19. In the ****Demagnetization**** box, if you want demagnetization select ****Yes**** otherwise select ****No****.
20. In the **Magnetizing Technique** box, enter the magnetizing technique.
21. In the **Surface Temperature** box, enter the surface temperature value.
22. In the **Calibration Sensitivity** box, enter the calibration sensitivity range.
23. In the **Method of Inspection** box, enter the inspection method.
24. In the **Code** box, enter the code detail.
25. In the **Color** box, select any color from the specified options.
26. In the **Suspension** box, select any suspension liquid from the specified options.
27. In the **Lighting** box, select any lighting from the specified options.
28. In the **Method** box, select any method from the specified options.
29. In the **Item Tested** box, select the tested items from the specified options.
30. In the **Examination Stage** box, select the examination stage from the specified options.
31. Click **Save MPT Details**.

The MPT results are successfully updated. Once you have updated the MPT results, you must import joints added for the MPT inspection results.

#### **6.5.3 Import Joints for MPT** 

If you want to import joints for the updated MPT results,

1. Click [![image-1651992843501.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992843501.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992843501.png) (**Import Joints** button) in the **MPT Results** See Fig 6.5.1. The **Joints** window opens with a list of joints.
    
    [![image-1651992855632.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992855632.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992855632.png)
2. Select the joints you want to import.
3. Click [![image-1651992877171.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992877171.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992877171.png) (**Import Selected Joints** button).
    
    The selected joints are imported for the respective MPT results.

#### **6.5.4 Add Report Photos**

If you want to add any report photos for the updated MPT results,

1. Click [![image-1651992927758.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992927758.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992927758.png) (**ADD** button) in the **Report Photos** box in the **MPT Results** window. See Fig 6.5.1. [![image-1651992937159.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992937159.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992937159.png)
2. Click [![image-1651992952724.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651992952724.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651992952724.png) (**Browse** button) to browse a photo stored in your computer.
3. Click **Upload**.

The selected photo will be updated.

#### **6.5.5 Attach a File into an MPT Report**

If you want to attach any file with any MPT report listed in the **MT Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.5.6 Print an NDT – MPT Report**

If you want to print an NDT - MPT report, click [![image-1651993041568.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651993041568.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651993041568.png) (print icon) provided in the **Report** column of the **MT Report** page. See Fig 6.5.

#### **6.5.7 Edit Any MPT Report**

 If you want to edit any existing MPT report in the **MT Report** page, do the following,

1. Click [![image-1651993088249.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651993088249.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651993088249.png)(Edit icon) in the **Edit** column for the respective MPT report. See Fig 6.5. A new window opens to edit the MPT report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.5.8 Export MPT Report List**

You can export a list of MPT reports added in the **MT Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **6.5.9 Filter Any MPT Report** 

If you want to filter any MPT report, do one of the following,[![image-1651993352168.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651993352168.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651993352168.png)

1. If you want to filter any MPT report based on the report number, enter the corresponding report number in the **Report No** box in the **MT Report** page, and then Click **Search**.
2. If you want to filter any MPT report based on the report number, enter the corresponding report number in the ****Report No**** box in the ****MT Report**** page, and then Click ****Search****.

If you want to filter any MPT report based on the drawing number, enter the corresponding drawing number in the **Drawing No** box in the **MT Report** page, and then Click **Search**.


### **6.6 MPI After Load Test (MPI)**

The **MPI After Load Test (MPI)** tab in the **Structural** menu helps you to add MPI results while performing the MPI inspection after completing the load test.

Once the MPI after load test inspection request added in the [**<u>NDT Inspection Request</u>**](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.8-ndt-inspection-r) tab, you can add the MPI result details by using this **MPI After Load Test (MPI) tab**.** If you want to navigate **MPI After Load Test (MPI)**,

1. Click the **MPI After Load Test (MPI)** tab in the **Structural** menu. The **MPI Report** page opens.
    
    [![image-1652024082308.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652024082308.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652024082308.png)
    
     **Figure 6.6: MPI Report page**

#### **3.6.1 Add an MPI After Load Test Report**

If you want to add an MPI after load test report, do the following,

1. Click [![image-1652024140271.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652024140271.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652024140271.png) (**ADD** button) in the **MPI Report** page. See Fig 6.6. A new window opens to add an MPI after load test report.
    
    [![image-1652024153566.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652024153566.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652024153566.png)
    
    [![image-1652024165147.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652024165147.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652024165147.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1652024178795.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652024178795.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652024178795.png) **Tip**: A report number for a new MPI report will be updated automatically in the **Report Number** box.
2. In the ****NDT By**** box, select the creation of NDT whether by third party or internal from a drop-down list.
3. In the **Request Number** box, select an MPI request number after load test from a drop-down list.
4. In the ****Prepared By**** box, enter the name of a person who has prepared the MPI report after load test.
5. In the ****Prepared Date**** box, select the prepared date of the MPI report after load test.
6. In the ****Reviewed By**** box, enter the name of a person who has reviewed the MPI report after load test.
7. In the ****Reviewed Date**** box, select the reviewed date of the MPI report after load test.
8. In the ****Approved By**** boxes, enter the name of a person who has approved the MPI report after load test.
9. In the ****Approved Date**** box, select the approved date of the MPI report after load test.
10. In the **Rep. Accept Date** box, select the report accept date.
11. In the **Inspection Date** box, select the date of inspection.
12. In the **Job Done Report Number** box, enter the report number of completed inspection job.
13. In the **Job Completed Date** box, select the completed date of the inspection job.
14. Click **Save**.

The MPI report after load test is successfully added. Once you have added the MPI report, you must add MPI results for the respective MPI report.

#### **6.6.2 Add MPI Results** 

If you want to add the MPI results for the respective MPI report after load test, do the following,

1. Click the respective MPI report in the **MPI Report** page. See Fig 6.6. The MPI Results page opens.
    
    [![image-1652024590451.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652024590451.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652024590451.png)
    
    [![image-1652024601471.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652024601471.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652024601471.png)
    
     **Figure 6.6.1: MPI Results page**
2. In the **Test Equipment** box, select the test equipment from a drop-down list.
3. In the **Description** box, enter the description.
4. In the **Test Procedure** box, select the test procedure from a drop-down list.
5. In the **Test Method** box, select the test method from a drop-down list.
6. In the **Black Magnetic Ink** box, select the type of black magnetic ink from a drop-down list.
7. In the **Surface Condition** box, enter the condition of the surface.
8. In the **Light Source** box, enter the light source detail.
9. In the **White Contrast Paint** box, select the type of white contrast paint.
10. In the **Material Specification** box, enter the material specification.
11. In the **Material Thickness** box, enter the material thickness value.
12. In the **Type of Current** box, enter the type of current.
13. In the **Lifting Capacity** box, select the lifting capacity value.
14. In the **Acceptance Criteria** box, select the acceptance criteria from a drop-down list.
15. In the **Yoke/ Prod Space** box, enter the relevant information.
16. In the **Particles Type** box, select the type of particles from a drop-down list.
17. In the **Particles Make &amp; model** box, enter the model of the particle including made of materials.
18. In the **Background Contrast &amp; Type** box, enter the type of background including contrast range.
19. In the **Demagnetization** box, if you want demagnetization select **Yes** otherwise select **No**.
20. In the **Magnetizing Technique** box, enter the magnetizing technique.
21. In the **Surface Temperature** box, enter the surface temperature value.
22. In the **Remarks** box, enter your remarks if any.
23. Click **Save MPI Details**.

The MPI results are successfully updated. Once you have updated the MPI results, you must import joints added for the MPI inspection results.

#### **6.6.3 Import Joints for MPI**

If you want to import joints for the updated MPI results,

1. Click [![image-1652024814416.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652024814416.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652024814416.png) (**Import Joints** button) in the **MPI Results** See Fig 6.6.1. The **Joints** window opens with a list of joints.
    
    [![image-1652024827712.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652024827712.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652024827712.png)
2. Select the joints you want to import.
3. Click [![image-1652024850661.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652024850661.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652024850661.png) (**Import Selected Joints** button).
    
    The selected joints are imported for the respective MPI results.

#### **6.6.4 Add Report Photos**

If you want to add any report photos for the updated MPI results,

1. Click [![image-1652024937690.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652024937690.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652024937690.png) (**ADD** button) in the **Report Photos** box in the **MPI Results** See Fig 6.6.1. [![image-1652024947546.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652024947546.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652024947546.png)
2. Click [![image-1652024965904.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652024965904.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652024965904.png) (**Browse** button) to browse a photo stored in your computer.
3. Click **Upload**.
    
    The selected photo will be updated.

#### **6.6.5 Attach a File into an MPI Report**

If you want to attach any file with any MPI report listed in the **MPI Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.6.6 Print an NDT – MPI Report**

If you want to print an NDT - MPI report, click [![image-1652025151954.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652025151954.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652025151954.png) (print icon) provided in the **Report** column of the **MPI Report** page. See Fig 6.6.

#### **6.6.7 Edit Any MPI Report**

 If you want to edit any existing MPI report in the **MPI Report** page, do the following,

1. Click [![image-1652025191428.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652025191428.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652025191428.png) (Edit icon) in the **Edit** column for the respective MPI report. See Fig 6.6. A new window opens to edit the MPI report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.6.8 Export MPI Report List**

You can export a list of MPI reports added in the **MPI Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **6.6.9 Filter any MPI report** 

If you want to filter any MPI report, do one of the following,[![image-1652025264711.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652025264711.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652025264711.png)

1. If you want to filter any MPI report based on the report number, enter the corresponding report number in the **Report No** box in the **MPI Report** page, and then Click **Search**.
2. If you want to filter any MPI report based on the request number, enter the corresponding request number in the ****Request No**** box in the ****MPI Report**** page, and then Click ****Search****.
3. If you want to filter any MPI report based on the drawing number, enter the corresponding drawing number in the ****Drawing No**** box in the ****MPI Report**** page, and then Click ****Search****.



### **6.7 PWHT**

The **PWHT** tab in the **Structural** menu helps you to add a PWHT report after completing the PWHT inspection process. If you want to add a PWHT report, do the following,

Once the RFI request for PWHT added using the [<u>RFI Request for PWHT</u>](http://wiki.cuteinfocomm.com/link/69#bkmrk-5.10%C2%A0-rfi-request-fo) tab, you can add the PWHT result details by using this **PWHT tab**.** If you want to navigate **PWHT**,

1. Click the **PWHT** tab in the **Structural** menu. The **PWHT Report** page opens.
    
    [![image-1652025363945.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652025363945.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652025363945.png)
    
     **Figure 6.7: PWHT Report page**

#### **9.7.1 Add a PWHT Report**

If you want to add a PWHT report, do the following,

1. Click [![image-1652025737782.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652025737782.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652025737782.png) (**ADD** button) in the **PWHT Report** page. See Fig 6.7. A new window opens to add a PWHT report.
    
    [![image-1652025753803.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652025753803.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652025753803.png)
    
    [![image-1652025807967.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652025807967.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652025807967.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1652025824772.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652025824772.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652025824772.png)**Tip**: A report number for a new PWHT report will be updated automatically in the **Report Number** box.
2. In the **NDT By** box, select the creation of NDT whether by third party or internal from a drop-down list.
3. In the **Request Number** box, select an RFI request for PWHT number from a drop-down list.
4. In the **Prepared By** box, enter the name of a person who has prepared the PWHT report.
5. In the **Prepared Date** box, select the prepared date of the PWHT report.
6. In the **Reviewed By** box, enter the name of a person who has reviewed the PWHT report.
7. In the **Reviewed Date** box, select the reviewed date of the PWHT report.
8. In the ****Accepted/ Approved By**** boxes, enter the name of a person who has approved the PWHT report.
9. In the **Accepted/ Approved Date** box, select the approved date of the PWHT report.
10. Click **Save**.

The PWHT report is successfully added. Once you have added the PWHT report, you must add PWHT result details for the respective PWHT report.

#### **6.7.2 Add PWHT Results** 

If you want to add the PWHT results for the respective PWHT report, do the following,

1. Click the respective PWHT report in the **PWHT Report** page. See Fig 6.7. The **PWHT Results** page opens.
    
    [![image-1652025939153.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652025939153.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652025939153.png)
    
     **Figure 6.7.1: PWHT Results page**
2. In the **Inspection Date** box, select the inspection date.
3. In the **Material Specification** box, enter the specification for the material.
4. In the **Speed** box, enter the speed range.
5. In the **HT Procedure No** box, select the HT procedure number.
6. In the **Heating Rate** box, enter the heating rate value.
7. In the **Holding (Temperature)** box, enter the holding temperature.
8. In the **Holding Time** box, enter the holding time value.
9. In the **Cooling Rate** box, enter the cooling rate value.
10. In the **Remarks** box, enter your remarks if any.
11. Click **Save PWHT Details**.

The PWHT results are successfully updated. Once you have updated the PWHT results, you can edit the joints added for the PWHT inspection results in the **Joint Results** window.

#### **6.7.3 Add Report Photos**

If you want to add any report photos for the updated PWHT results,

1. Click [![image-1652026076553.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652026076553.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652026076553.png) (**ADD** button) in the **Report Photos** box in the **PWHT Results** See Fig 6.7.1. [![image-1652026087869.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652026087869.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652026087869.png)
2. Click [![image-1652026109369.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652026109369.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652026109369.png) (**Browse** button) to browse a photo stored in your computer.
3. Click **Upload**.

The selected photo will be updated.

#### **6.7.4 Attach a File into a PWHT Report**

If you want to attach any file with any PWHT report listed in the **PWHT Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.7.5 Print a PWHT Report**

If you want to print a PWHT report, click [![image-1652026175817.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652026175817.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652026175817.png) (print icon) provided in the **Report** column of the **PWHT Report** page. See Fig 6.7.

#### **6.7.6 Edit Any PWHT Report**

 If you want to edit any existing PWHT report in the **PWHT Report** page, do the following,

1. Click [![image-1652026236129.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652026236129.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652026236129.png)(Edit icon) in the **Edit** column for the respective PWHT report. See Fig 6.7. A new window opens to edit the PWHT report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.7.7 Export PWHT Report List**

You can export a list of PWHT reports added in the **PWHT Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **6.7.8 Filter Any PWHT Report** 

If you want to filter any PWHT report, use [![image-1652026324516.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652026324516.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652026324516.png) (**FILTER** button) in the **PWHT Report** page, See Fig 6.7 or do one of the following, [![image-1652026338211.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652026338211.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652026338211.png)

1. If you want to filter any PWHT report based on the report number, enter the corresponding report number in the **Report No** box in the **PWHT Report** page, and then Click **Search**.
2. If you want to filter any PWHT report based on the request number, enter the corresponding request number in the ****Request No**** box in the ****PWHT Report**** page, and then Click ****Search****.
3. If you want to filter any PWHT report based on the drawing number, enter the corresponding drawing number in the **Drawing No** box in the **PWHT Report** page, and then Click **Search**.



### **6.8 Hydrostatic Report**

Hydrostatic testing is a type of pressure test where the materials are tested for strength and leaks. The **Hydrostatic Report** tab in the **Structural** menu helps you to add a hydrostatic pressure test report after completing the hydrostatic testing in the structural project.

If you want to add a hydrostatic pressure test report, do the following,

1. Click the **Hydrostatic Report** Tab. The **Hydrostatic Pressure Test Report** page opens.
    
    [![image-1652026453734.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652026453734.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652026453734.png)
    
     **Figure 6.8: Hydrostatic Pressure Test Report** **page**

#### **6.8.1 Add a Hydrostatic Pressure Test Report**

If you want to add a hydrostatic pressure test report,

1. Click [![image-1652026525840.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652026525840.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652026525840.png) (**ADD** button) in the **Hydrostatic Pressure Test Report** page. See Fig 6.8. A new window opens to add a hydrostatic pressure test report.
    
    [![image-1652026540997.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652026540997.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652026540997.png)
    
    [![image-1652026550510.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652026550510.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652026550510.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1652026565074.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652026565074.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652026565074.png)**Tip**: A report number for a new hydrostatic pressure test report will be updated automatically in the **Report Number** box.
2. In the **Drawing** box, select the drawing from a drop-down list.
3. In the ****Prepared By**** box, enter the name of a person who has prepared the hydrostatic pressure test report.
4. In the **Prepared Date** box, select the preparation date of the report.
5. In the ****Reviewed By**** box, enter the name of a person who has reviewed the hydrostatic pressure test report.
6. In the **Reviewed Date** box, select the reviewed date of the report.
7. In the **Approved By** box, enter the name of a person who has approved the hydrostatic pressure test report.
8. In the **Approved Date** box, select the approved date of the report.
9. Click **Save**.

The hydrostatic pressure test report is successfully added. Once you have added the hydrostatic pressure test report, you must add the pressure test result details for the added report.

#### **6.8.2 Add Pressure Test Results for an Added Hydrostatic Pressure Test Report**

If you want to add the details of pressure test results for the added hydrostatic pressure test report, do the following,

1. Click [![image-1652026694611.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652026694611.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652026694611.png) (Edit icon) in the **Edit Report** column of the **Hydrostatic Pressure Test Report** See Fig 6.8. Multiple windows open.
    
    [![image-1652026708096.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652026708096.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652026708096.png)
    
     **Figure 6.8.1: Pressure test results page**
2. If you want to add test parameters, do the following steps,
    
    
    1. 1. Navigate to the **Test Parameters** window. See Fig 6.8.1.
        2. In the **Test Pressure** box, enter the test pressure value.
        3. In the **Test Temperature** box, enter the test temperature value.
        4. In the **Item/Part** box, select any item/part from a drop-down list.
        5. In the **Test Medium** box, enter the test medium information.
        6. In the **Holding Period** box, enter the holding period value.
        7. In the **Design Pressure** box, enter the design pressure value.
        8. In the **Test Date** box, select the test date.
        9. In the **Position** box, enter the position detail.
        10. In the **Operating Pressure** box, enter the operating pressure value.
        11. In the **Hydrostatic Test (HT) Procedure No** box, enter the hydrostatic test procedure number.
        12. In the **Maximum Allowable Working Pressure (MAWP)** box, enter the maximum allowable working pressure value.
        13. In the ****Design Temperature**** box, enter the design temperature value.
        14. In the ****Maximum Allowable Pressure (MAP)****box, enter the maximum allowable pressure value.
        15. In the ****Results/ Remarks**** box, select the result from a drop-down list.
        16. In the **Chloride** box, enter the chloride value.
        17. In the **Actual Test Pressure** box, enter the actual test pressure value.
        18. In the **Test Location** box, enter the test location detail.
        19. In the **Test Observation** box, enter the test observation detail.
        20. In the **Test Code** box, select the test code from the specified options.
        21. Click **Save**.
            
            The test parameters are successfully added.
3. If you want to add equipment details, do the following steps, 
    1. 1. Navigate to the **Equipment Details** window. See Fig 6.8.1.
        2. In the ****Conducted By**** box, select any one option whether internal or external from a drop-down list.
        3. In the **Position** box, select the position from a drop-down list.
        4. In the **Equipment Details** box, select the equipment from a drop-down list.
        5. Click **Save**.
            
            The equipment details are successfully added.
4. If you want to add test record, do the following,
    
    
    1. 1. Navigate to the **Test Records** window. See Fig 6.8.1.
        2. In the **Time** box, enter the time duration of testing.
        3. In the **PG- Bottom** box, enter the pressure value in the bottom of the bars.
        4. In the **PG- Top** box, enter the pressure value in the top of the bars.
        5. In the **Water** box, enter the temperature of the water.
        6. In the **Air** box, enter the temperature of the air.
        7. In the **Remarks** box, enter your remarks if any.
        8. Click **Save**.
            
            The test records are added successfully.
5. If you want to add report photos, do the following,
    
    
    1. 1. Navigate to the **Report Photos** window. See Fig 6.8.1.
        2. Click [![image-1652027036155.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027036155.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027036155.png) (**ADD** button) in the **Report Photos** window.
            
            [![image-1652027053497.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027053497.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027053497.png)
        3. Click (****Browse**** button) to browse a photo stored in your computer.
        4. Click **Upload**.
            
            The selected photo will be updated.

#### **6.8.3 Print a Hydrostatic Pressure Test Report**

If you want to print a hydrostatic pressure test report, click[![image-1652027120652.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027120652.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027120652.png) (print icon) provided in the **Report** column of the **Hydrostatic Pressure Test Report** page. See Fig 6.8.

#### **6.8.4 Print a Hydrostatic Pressure Test Report with Certificates**

If you want to print a hydrostatic pressure test report with certificates, click [![image-1652027156165.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027156165.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027156165.png)(print icon) provided in the **Report** **with Certificates** column of the **Hydrostatic Pressure Test Report** page. See Fig 6.8.

#### **6.8.5 Attach a File into a Hydrostatic Pressure Test Report**

If you want to attach any file with any hydrostatic pressure test report listed in the **Hydrostatic Pressure Test Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.8.6 Edit Any Hydrostatic Pressure Test Report**

If you want to edit any existing hydrostatic pressure test report in the **Hydrostatic Pressure Test Report** page, do the following,

1. Click [![image-1652027232973.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027232973.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027232973.png)(Edit icon) in the **Edit** column for the respective hydrostatic pressure test report. See Fig 6.8.
    
    A new window opens to edit the hydrostatic pressure test report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.



### **6.9 Vacuum Test**

Vacuum test performed to check for the existence of any leak in the materials utilized in the Structural project. The **Vacuum Test** tab in the **Structural** menu helps you to add a vacuum test report once the vacuum test has completed.

If you want to add a vacuum test report, do the following,

1. Click the **Vacuum Test** Tab. The **Vacuum Test** page opens.
    
    [![image-1652027304515.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027304515.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027304515.png)
    
     **Figure 6.9: Vacuum Test** **page**

#### **6.9.1 Add a Vacuum Test Report**

If you want to add a vacuum test report,

1. Click [![image-1652027605837.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027605837.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027605837.png) (**ADD** button) in the **Vacuum Test Report** page. See Fig 6.9. A new window opens to add a vacuum test report.
    
    [![image-1652027640696.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027640696.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027640696.png)
    
    [![image-1652027661534.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027661534.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027661534.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1652027680045.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027680045.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027680045.png) **Tip**: A report number for a new vacuum test report will be updated automatically in the **Report Number** box.
2. In the **Description** box, enter the description for the vacuum test.
3. In the **Sub-System** box, select the sub-system from a drop-down list.
4. In the **Inspection Date** box, select the inspection date.
5. In the **Frame No** box, enter the frame number.
6. In the **Elevation** box, enter the elevation detail.
7. In the **Longitudinal** box, enter the longitudinal detail.
8. In the **Location** box, enter the location where the vacuum test is performed.
9. In the **Drawing No** box, select the drawing number from a drop-down list.
10. In the **Sub Contractor** box, select the sub-contractor from a drop-down list.
11. In the **Remarks** box, enter your remarks if any.
12. Click **Save**.

The vacuum test report is successfully added.

#### **6.9.2 Submit and Approve a Vacuum Test Report**

Once you have added the vacuum test report, the **Submission** column in the **Vacuum Test** page is appeared with [![image-1652027790673.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027790673.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027790673.png) (Submit and Reject icons).

1. If you want to submit the vacuum test report, click [![image-1652027811581.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027811581.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027811581.png) (Submit icon) in the **Submission** column. Otherwise click [![image-1652027820882.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027820882.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027820882.png)(Reject icon) to reject the request. Once you have submitted the vacuum test report, the **Request Status** column in the **Vacuum Test** page is appeared with [![image-1652027841004.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027841004.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027841004.png)(Accept and Reject icons).
2. If you want to approve the vacuum test report, click [![image-1652027878917.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027878917.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027878917.png) (Submit icon) in the ****Request Status**** Otherwise click [![image-1652027887313.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027887313.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027887313.png)(Reject icon) to reject the request.

#### **6.9.3 Print a Vacuum Test Report**

If you want to print a vacuum test report, click [![image-1652027921149.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027921149.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027921149.png) (print icon) provided in the **Report** column of the **Vacuum Test Report** page. See Fig 6.9.

#### **6.9.4 Attach a File into a Vacuum Test Report**

If you want to attach any file with any vacuum test report listed in the **Vacuum Test** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.9.5 Edit Any Vacuum Test Report**

If you want to edit any existing vacuum test report in the **Vacuum Test** page, do the following,

1. Click [![image-1652027997598.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652027997598.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652027997598.png)(Edit icon) in the **Edit** column for the respective vacuum test report. See Fig 6.9. A new window opens to edit the vacuum test report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.9.6 Export Vacuum Test Report List**

You can export a list of vacuum test reports added in the **Vacuum Test** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **6.9.7 Filter Any Vacuum Test Report**

If you want to filter any vacuum test report from the list of in the **Vacuum Test** page, you can use the [![image-1652028071435.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028071435.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028071435.png) (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.


### **6.10 Back-Gouging**

Back-gouging is a removing process performed to remove weld metal and base metal from the weld root side by grinding, gas cutting or by using gouging electrode.

The **Back-Gouging** tab in the **Structural** menu helps you to add a back-gouging report once the back-gouging process has completed. If you want to add a back-gouging report, do the following,

1. Click the **Back-Gouging** Tab. The **Back-Gouging** page opens.
    
    [![image-1652028169487.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028169487.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028169487.png)
    
     **Figure 6.10: Back-Gouging page**

#### **6.10.1 Add a Back-Gouging Report**

If you want to add a back-gouging report,

1. Click [![image-1652028254343.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028254343.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028254343.png) (**ADD** button) in the B**ack-Gouging** page. See Fig 6.10. A new window opens to add a back-gouging report.
    
    [![image-1652028276185.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028276185.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028276185.png)
    
    [![image-1652028285653.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028285653.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028285653.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1652028301208.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028301208.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028301208.png) **Tip**: A report number for a new back-gouging report will be updated automatically in the **Report Number** box.
2. In the **Description** box, enter the description for the back-gouging.
3. In the **Sub-System** box, select the sub-system from a drop-down list.
4. In the **Inspection Date** box, select the inspection date.
5. In the **Frame No** box, enter the frame number.
6. In the **Elevation** box, enter the elevation detail.
7. In the **Longitudinal** box, enter the longitudinal detail.
8. In the **Location** box, enter the location where the back-gouging is performed.
9. In the **Drawing No** box, select the drawing number from a drop-down list.
10. In the **Sub Contractor** box, select the sub-contractor from a drop-down list.
11. In the **Remarks** box, enter your remarks if any.
12. Click **Save**.

The back-gouging report is successfully added.

#### **6.10.2 Add Back-Gouging Report Photos**

1. Click [![image-1652028400682.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028400682.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028400682.png) (Edit icon) in the **Edit Report** column of the **Back-Gouging** page. See Fig 6.10. The **Report Photos** box opens.
    
    [![image-1652028419255.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028419255.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028419255.png)
2. Click [![image-1652028432824.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028432824.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028432824.png) (**ADD** button) in the **Report Parameters** box.
    
    [![image-1652028468290.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028468290.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028468290.png)
3. Click [![image-1652028486070.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028486070.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028486070.png) (**Browse** button) to browse a photo stored in your computer.
4. Click **Upload**.

The selected photo will be updated.

#### **6.10.3 Submit and Approve a Back-Gouging Report**

Once you have added the back-gouging report, the **Submission** column in the **Back-Gouging** page is appeared with [![image-1652028570280.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028570280.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028570280.png)(Submit and Reject icons).

1. If you want to submit the back-gouging report, click [![image-1652028589685.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028589685.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028589685.png)(Submit icon) in the **Submission** column. Otherwise click [![image-1652028599840.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028599840.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028599840.png) (Reject icon) to reject the request.
    
    Once you have submitted the back-gouging report, the **Request Status** column in the **Back-Gouging** page is appeared with (Accept and Reject icons).
2. If you want to approve the back-gouging report, click [![image-1652028628364.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028628364.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028628364.png)(Submit icon) in the ****Request Status**** Otherwise click [![image-1652028636624.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028636624.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028636624.png)(Reject icon) to reject the request.

#### **6.10.4 Print a Back-Gouging Report**

If you want to print a back-gouging report, click[![image-1652028668149.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028668149.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028668149.png)(print icon) provided in the **Report** column of the **Back-Gouging** page. See Fig 6.10.

#### **6.10.5 View the Back-Gouging Signature Details** 

If you want to view the signature details of the persons who has completed the back-gouging, click [![image-1652028713712.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028713712.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028713712.png)(Sign icon) provided in the **Sign Details** column of the **Back-Gouging** page. See Fig 6.10.

#### **6.10.6 Attach a File into a Back-Gouging Report**

If you want to attach any file with any back-gouging report listed in the **Back-Gouging** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.10.7 Edit Any Back-Gouging Report**

If you want to edit any existing back-gouging report in the **Back-Gouging** page, do the following,

1. Click [![image-1652028803775.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028803775.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028803775.png)(Edit icon) in the **Edit** column for the respective back-gouging report. See Fig 6.10. A new window opens to edit the back-gouging report.
    
    [![image-1652028821255.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028821255.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028821255.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.10.8 Export Back-Gouging Report List**

You can export a list of back-gouging reports added in the **Back-Gouging** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **6.10.9 Filter Any Back-Gouging Report**

If you want to filter any back-gouging report from the list of in the **Back-Gouging** page, you can use the (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.


### **6.11 Final Visual** 

Visual testing is one of methods of NDT of optical type. Final visual testing is usually performed with the naked eye or with magnifying glasses (magnifiers) with magnification up to 7x.

The **Final Visual** tab in the **Structural** menu helps you to add a final visual test report after completing the final visual test. If you want to add a final visual test report, do the following,

1. Click the **Final Visual** Tab. The **Final Visual Test** page opens.
    
    [![image-1652028936757.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028936757.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028936757.png)
    
     **Figure 6.11: Final Visual Test page**

#### **6.11.1 Add a Final Visual Test Report**

If you want to add a final visual test report,

1. Click [![image-1652028997630.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652028997630.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652028997630.png) (**ADD** button) in the **Final Visual Test page. See Fig 6.11. A new window opens to add a final visual test report.
    
    [![image-1652029012910.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652029012910.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652029012910.png)
    
    [![image-1652029023886.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652029023886.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652029023886.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **Report Number** box, enter the report number for the final visual test.
3. In the **Description** box, enter the description for the final visual test.
4. In the **System** box, select the system from a drop-down list.
5. In the **Inspection Date** box, select the inspection date.
6. In the **Frame No** box, enter the frame number.
7. In the **Elevation** box, enter the elevation detail.
8. In the **Longitudinal** box, enter the longitudinal detail.
9. In the **Location** box, enter the location where the final visual test is performed.
10. In the **Drawing No** box, select the drawing number from a drop-down list.
11. In the **Assessment Checklist** box, enter the assessment checklist detail.
12. In the **Checklist No** box, select the check list number from a drop-down list.
13. In the **Discipline** box, enter the discipline detail.
14. In the **Site** box, enter the site detail.
15. In the **Contractor** box, enter the name of a contractor.
16. In the **Sub Contractor** box, select the sub-contractor from a drop-down list.
17. In the **Module No** box, enter the module number.
18. In the **Area/ Component** box, enter the area/ component detail.
19. In the **Stage of Completion** box, select the stage of completion of visual test from the given options.
20. In the **Document Type** box, enter the type of document.
21. In the **Class** box, enter the class detail.
22. In the **Status** box, enter the status of the visual test.
23. In the **Rev. Date** box, enter the revision date of the visual test.
24. In the **Contractor Document Number** box, enter the document number of the contractor.
25. In the **Equipment** box, enter the equipment name.
26. In the **Inspector/ Representative** box, enter the name of inspector/ representative.
27. In the **Detail Description/Tagging** box, enter the detail description.
28. In the **Remarks** box, enter your remarks if any.
29. Click **Save**.
    
    The final visual test report is successfully added.

#### **6.11.2 View Checklist Details**

If you want to view the check list details, do the following,

1. Click [![image-1652029207861.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652029207861.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652029207861.png) (Add icon) in the **Edit** column for the respective final visual test report in the **Final Visual Test**  See Fig 6.11. The **Check List Details** window opens.
    
    [![image-1652029227467.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652029227467.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652029227467.png)
    
    The **Check List Details** window shows a list of added check lists using the [<u>Check List</u>](#_Check_List) tab. This window also shows the results of check list whether accepted or not.

#### **6.11.3 Submit and Approve a Final Visual Test Report**

Once you have added the visual test report, the **Request Status** column in the **Final** **Visual Test** page is appeared with[![image-1652029276973.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652029276973.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652029276973.png)(Submit and Reject icons).

1. If you want to submit the visual test report, click [![image-1652029305930.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652029305930.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652029305930.png)(Submit icon) in the **Request Status** column. Otherwise click [![image-1652029319325.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652029319325.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652029319325.png) (Reject icon) to reject the request.
    
    Once you have submitted the visual test report, the **Completed Status** column in the **Final Visual Test** page is appeared with [![image-1652029334379.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652029334379.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652029334379.png)(Accept and Reject icons).
2. If you want to approve the visual test report, click [![image-1652034360649.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652034360649.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652034360649.png)(Submit icon) in the ****Completed Status**** Otherwise click [![image-1652034368986.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652034368986.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652034368986.png)(Reject icon) to reject the request.

#### **6.11.4 Print a Final Visual Checklist Report**

If you want to print a final visual checklist report, click[![image-1652034420278.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652034420278.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652034420278.png)(print icon) provided in the **Checklist** **Report** column of the **Final Visual Test** page. See Fig 6.11.

#### **6.11.5 Print a General Visual Checklist Report**

If you want to print a general visual checklist report, click [![image-1652034456172.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652034456172.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652034456172.png)(print icon) provided in the **General Report** column of the **Final Visual Test** page. See Fig 6.11.

#### **6.11.6 Print a Final Visual Test Report**

If you want to print a final visual test report, click[![image-1652034511305.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652034511305.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652034511305.png)(print icon) provided in the **Report** column of the **Final Visual Test** page. See Fig 6.11.

#### **6.11.7 Attach a File into a Final Visual Test Report**

If you want to attach any file with any final visual test report listed in the **Final Visual Test** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.11.8 Edit Any Final Visual Test Report**

If you want to edit any existing final visual test report in the **Final Visual Test** page, do the following,

1. Click [![image-1652034604746.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652034604746.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652034604746.png)(Edit icon) in the **Edit** column for the respective final visual test report. See Fig 6.11. A new window opens to edit the final visual test report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.11.9 Export Final Visual Test Report List**

You can export a list of final visual test reports added in the **Final Visual Test** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **6.11.10 Filter Any Final Visual Test Report**

If you want to filter any visual test report from the list of in the **Final Visual Test** page, you can use the (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.


### **6.12 Machining Report**

The **Machining Report** tab in the **Structural** menu used to add a machining report once the machining process has completed. If you want to add a machining report, do the following,

1. Click the **Machining Report** Tab. The **Machining** page opens.
    
    [![image-1652034801414.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652034801414.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652034801414.png)
    
     **Figure 6.12: Machining page**

#### **6.12.1 Add a Machining Report**

If you want to add a machining report,

1. Click [![image-1652034863719.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652034863719.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652034863719.png) (**ADD** button) in the **Machining** page. See Fig 6.12. A new window opens to add a machining report.
    
    [![image-1652034883455.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652034883455.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652034883455.png)
    
    [![image-1652034896342.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652034896342.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652034896342.png) **Tip**: A report number for a new machining report will be updated automatically in the **Report Number** box.
2. In the **Remarks** box, enter your remarks if any.
3. Click **Save**.

The machining report is successfully added.

#### **6.12.2 Add Machining Report Details**

1. Click [![image-1652034965359.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652034965359.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652034965359.png)(Edit icon) in the **Edit Report** column of the **Machining** page. See Fig 6.12. The **Machining Report Details** window opens.
    
    [![image-1652034981315.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652034981315.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652034981315.png)
2. Click [![image-1652035004879.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035004879.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035004879.png) (**ADD** button) in the **Machining Report Details** window.
    
    A new window opens in the **Drawing No** column.
    
    [![image-1652035021483.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035021483.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035021483.png)
3. In the ****Drawing No**** column, select the drawing number from a drop-down list.
4. In the **Piece Mark No** column, click and select the piece mark number from a drop-down list.
5. In the **Description** column, click and enter the description.
6. In the **Material Grade** column, click and enter the material grade.
7. In the ****Hole Before Line Boring (mm)****column, enter the size of a hole made before line boring.
8. In the **Hole After Line Boring (mm)** column, enter the size of a hole made after line boring.
9. In the **Deviation** column, enter the deviation between holes.
10. In the **Inspection Date** column, select the inspection date.
11. In the **Remarks** column, enter your remarks if any.
12. Click **Save**.

The added machining report details will be updated.

#### **6.12.3 Submit and Approve a Machining Report**

Once you have added the machining report details, the **Submission** column in the **Machining** page is appeared with[![image-1652035192415.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035192415.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035192415.png) (Submit and Reject icons).

1. If you want to submit the machining report, click [![image-1652035161967.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035161967.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035161967.png) (Submit icon) in the **Submission** Otherwise click [![image-1652035182259.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035182259.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035182259.png)(Reject icon) to reject the request. Once you have submitted the machining report, the **Request Status** column in the **Machining** page is appeared with
    
    [![image-1652035259166.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035259166.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035259166.png)(Accept and Reject icons).
2. If you want to approve the machining report, click [![image-1652035273434.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035273434.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035273434.png)(Submit icon) in the **Request Status** column. Otherwise click
    
    [![image-1652035284857.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035284857.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035284857.png) (Reject icon) to reject the request.
3. If you have completed the machining report, click [![image-1652035313097.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035313097.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035313097.png)(Completed icon) in the **Completed** **Status** column. If incomplete, click [![image-1652035325959.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035325959.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035325959.png) (Incomplete icon).

#### **6.12.4 Print a Machining Report**

If you want to print a machining report, click[![image-1652035362855.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035362855.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035362855.png)(print icon) provided in the **Report** column of the **Machining** page. See Fig 6.12.

#### **6.12.5 Attach a File into a Machining Report**

If you want to attach any file with any machining report listed in the **Machining** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.12.6 Edit Any Machining Report**

If you want to edit any existing machining report in the **Machining** page, do the following,

1. Click [![image-1652035434175.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035434175.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035434175.png)(Edit icon) in the **Edit** column for the respective machining report. See Fig 6.12. A new window opens to edit the machining report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.12.7 Export Machining Report List**

You can export a list of machining reports added in the **Machining** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **6.12.8 Filter any machining report**

If you want to filter any machining report from the list in the **Machining** page, you can use the (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.



### **6.13 Load Test Report**

The **Load Test Report** tab in the **Structural** menu used to add a load test report once the load test has completed. If you want to add a load test report, do the following,

1. Click the **Load Test Report** Tab. The **Load Test Report** page opens.
    
    [![image-1652035600195.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035600195.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035600195.png)
    
     **Figure 6.13: Load Test Report page**

#### **6.13.1 Add a Load Test Report**

If you want to add a load test report,

1. Click [![image-1652035688811.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035688811.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035688811.png) (**ADD** button) in the **Load Test Report** page. See Fig 6.13. A new window opens to add a load test report.
    
    [![image-1652035715846.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035715846.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035715846.png)
    
    [![image-1652035726023.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035726023.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035726023.png) **Tip**: A report number for a new load test report will be updated automatically in the **Report Number** box.
2. In the **Prepared By** box, enter the name a person who has prepared the load test report.
3. In the **Prepared Date** box, enter the prepared date of the load test report.
4. In the **Reviewed By** box, enter the name a person who has reviewed the load test report.
5. In the **Reviewed Date** box, enter the reviewed date of the load test report.
6. In the **Approved By** box, enter the name a person who has approved the load test report.
7. In the **Approved Date** box, enter the approved date of the load test report.
8. Click **Save**.

The load test report is successfully added. Once you have added the load test report, you must add the details for the added report.

#### **6.13.2 Add Load Test Report Details** 

1. Click [![image-1652035815704.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035815704.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035815704.png)(Edit icon) in the **Edit Report** column of the **Load Test Report**  See Fig 6.14. The **Load Test Parameters**, **Equipment Details**, and **Report Photos** windows open in the **Load Test Report** page.
    
    [![image-1652035839349.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035839349.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035839349.png)
2. If you want to add the load test parameters in the ****Load Test Parameters**** window, do the following, 
    1. 1. 1. In the **Load Test Pressure Required** box, enter the required range of load test pressure.
            2. In the **Test Load** box, enter the test load detail.
            3. In the **Test Duration** box, enter the load test time duration.
            4. In the **Pressure Gauge Reading** box, enter the pressure gauge reading value.
            5. In the **Hydraulic Jack System S/N** box, enter the hydraulic jack system detail.
            6. In the **Pull up Jack Capacity** box, enter the value of pull up jack capacity.
            7. In the **Document Procedure No** box, select the document procedure number from a drop-down list.
            8. In the **Description of Items** box, enter the item description.
            9. In the **Reference Drawing** box, enter the reference drawing detail.
            10. In the **Client Reference Drawing No** box, enter the client reference drawing number.
            11. In the **Load Test Pressure Requirement** box, enter the requirement for load test pressure.
            12. In the **Actual Pressure Requirement** box, enter the requirement for actual pressure.
            13. In the **Holding Time** box, enter the holding time duration.
            14. In the **Result** box, select the result from a drop-down list.
            15. Click **Save**.
3. If you want to add the equipment details in the ****Equipment Details**** window, do the following, 
    1. 1. 1. Click [![image-1652035992474.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652035992474.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652035992474.png) (****ADD**** button) in the ****Equipment Details**** window. A new window opens to add the equipment details.
                
                [![image-1652036038406.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652036038406.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652036038406.png)
            2. In the **Conducted By** box, select **Internal** if the load test is conducted internally or select **External** if the load test is conducted externally.
            3. In the **Equipment Details** box, select the equipment from a drop-down list.
            4. Click **Save**.
4. If you want to add the report photos in the **Report Photos** window, do the following, 
    1. 1. 1. Click [![image-1652036087252.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652036087252.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652036087252.png) (**ADD** button) in the **Report Photos** window.
                
                [![image-1652036081886.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652036081886.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652036081886.png)
            2. Click [![image-1652036107417.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652036107417.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652036107417.png) (**Browse** button) to browse a photo stored in your computer.
            3. Click **Upload**.
                
                The selected photo will be updated.

#### **6.13.3 Print a Load Test Report**

If you want to print a load test report, click [![image-1652036218554.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652036218554.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652036218554.png)(print icon) provided in the **Report** column of the **Load Test Report** page. See Fig 6.13.

[![image-1652036232278.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652036232278.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652036232278.png) **Tip**: If you want to lock any load test report, click the check box provided in the **Lock Report?** column of the **Load Test Report** page. See Fig 6.13.

#### **6.13.4 Attach a File into a Load Test Report**

If you want to attach any file with any load test report listed in the **Load Test Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](#_Attach_a_file)” in the **Client Master Drawing** section.

#### **6.13.5 Edit Any Load Test Report**

If you want to edit any existing load test report in the **Load Test Report** page, do the following,

1. Click [![image-1652036689318.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652036689318.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652036689318.png)(Edit icon) in the **Edit** column for the respective load test report. See Fig 6.13. A new window opens to edit the load test report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **6.13.6 Export Load Test Report List**

You can export a list of load test reports added in the **Load Test Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](#_Export_areas_list)” in the **Area** option.

### **6.14 Survey Booking**

Survey Booking is an enhanced survey booking process, which helps the surveyors to manage their survey requirements more efficiently with respect to time and scope.

The **Survey Booking** tab in the **Structural** menu helps in adding a survey booking once the survey booking process has completed.

If you want to add a survey booking, do the following,

1. Click the **Survey Booking** Tab. The **Survey Booking** page opens.
    
    [![image-1652036984277.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652036984277.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652036984277.png)
    
     **Figure 6.14: Survey Booking page**

#### **6.14.1 Add a Survey Booking**

If you want to add a survey booking,

1. Click [![image-1652037090632.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652037090632.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652037090632.png) (**ADD** button) in the **Survey Booking** page. See Fig 6.15. A new window opens to add a survey booking.
    
    [![image-1652037226578.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652037226578.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652037226578.png)
2. In the **Surveyor** box, enter the name of a surveyor.
3. In the ****Survey Date**** box, select the survey date from a drop-down list.
4. In the **Authority** box, enter the name of authority person.
5. In the **Client Rep** box, enter the name of the client representative.
6. In the **Location** box, enter the location where the survey to be performed.
7. Click **Save**.

The survey booking is successfully added.

#### **6.14.2 Add Survey Booking Details**

1. Click [![image-1652037653290.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652037653290.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652037653290.png) (Edit icon) in the **Edit Report** column of the **Survey Booking**  See Fig 6.14. The **Survey Booking Details** window opens.
    
    [![image-1652037676250.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652037676250.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652037676250.png)
2. Click [![image-1652037732440.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652037732440.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652037732440.png) (**ADD** button) in the **Survey Booking Details** window.
    
    A new window opens to add the survey booking details.
    
    [![image-1652037763898.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652037763898.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652037763898.png)
3. In the **Time** box, select the survey time.
4. In the **Description** box, enter the description for the survey booking.
5. In the ****Trade**** box, enter the trade detail.
6. In the ****Type**** box, enter the type of survey.
7. In the ****QC Code**** box, enter the QC code.
8. In the ****Location**** box, enter the location where the survey is to be performed.
9. In the ****Drawing No**** box, select the drawing number from a drop-down list.
10. In the ****For CTR**** box, enter the CTR detail.
11. In the ****For RG/ CA**** box, enter the RG/ CA detail.
12. In the ****Requested By**** box, enter the name of a person who has requested for the survey booking.
13. In the ****For CPY**** box, enter the CPY detail.
14. In the **Sub Contractor** box, select the sub-contractor name from a drop-down list.
15. In the **Remarks** column, enter your remarks if any.
16. Click **Save**.

The survey booking details will be updated.

#### **6.14.3 Print a Survey Booking Report**

If you want to print a survey booking report, click [![image-1652038207770.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652038207770.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652038207770.png)(print icon) provided in the **Report** column of the **Survey Booking** page. See Fig 6.14.

#### **6.14.4 Attach a File into a Survey Booking**

If you want to attach any file with any survey booking listed in the **Survey Booking** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](#_Attach_a_file)” in the **Client Master Drawing** section.

#### **6.14.5 Edit Any Survey Booking**

If you want to edit any existing survey booking in the **Survey Booking** page, do the following,

1. Click [![image-1652038274986.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652038274986.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652038274986.png) (Edit icon) in the **Edit** column for the respective survey booking. See Fig 6.14. A new window opens to edit the survey booking.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.14.6 Export Survey Booking List**

You can export a list of survey booking added in the **Survey Booking** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](#_Export_areas_list)” in the **Area** option.

#### **6.14.7 Filter Any Survey Booking**

If you want to filter any survey booking from the list in the **Survey Booking** page, you can use the [![image-1652038364954.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652038364954.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652038364954.png) (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.


### **6.15 Dimensional Control Report**

Dimensional control used to determine part-to-part variation and clearance between two parts of material. By applying Dimensional Control, accurate three-dimensional information can be determined and mapped at various stages throughout the Structural project.

The **Dimensional Control Report** tab in the **Structural** menu used to add a dimensional control report once the dimensional control has completed. If you want to add a dimensional control report, do the following,

1. Click the **Dimensional Control Report** Tab. The **Dimensional Control Report** page opens.
    
    [![image-1652038426047.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652038426047.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652038426047.png)
    
     **Figure 6.15: Dimensional Control Report page**

#### **6.15.1 Add a dimensional control report**

If you want to add a dimensional control report,

1. Click [![image-1652038481610.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652038481610.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652038481610.png) (**ADD** button) in the **Dimensional Control Report**  See Fig 6.15. A new window opens to add a dimensional control report.
    
    [![image-1652038499123.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652038499123.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652038499123.png)
    
    [![image-1652038517464.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652038517464.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652038517464.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1652038529623.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652038529623.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652038529623.png) **Tip**: A report number for a new dimensional control report will be updated automatically in the **Report Number** box.
2. In the **Drawing** box, select the drawing from a drop-down list.
3. In the **Prepared By** box, enter the name a person who has prepared the dimensional control report.
4. In the **Prepared Date** box, enter the prepared date of the dimensional control report.
5. In the **Reviewed By** box, enter the name a person who has reviewed the dimensional control report.
6. In the **Reviewed Date** box, enter the reviewed date of the dimensional control report.
7. In the **Approved By** box, enter the name a person who has approved the dimensional control report.
8. In the **Approved Date** box, enter the approved date of the dimensional control report.
9. Click **Save**.

The dimensional control report is successfully added. Once you have added the dimensional control report, you must add the details for the added dimensional control report.

#### **6.15.2 Add Dimensional Control Report Details** 

1. Click [![image-1652038626257.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652038626257.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652038626257.png) (Edit icon) in the **Edit Report** column of the **Dimensional Control Report**  See Fig 6.15. The **<u>D</u>imensional Control Parameters**, **<u>D</u>imensional Control Details**, and **Report Photos** windows open in the **<u>D</u>imensional Control Report** page.
    
    [![image-1652038646861.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652038646861.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652038646861.png)
    
    [![image-1652038661379.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652038661379.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652038661379.png)
    
    [![image-1652038672058.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652038672058.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652038672058.png) **Tip**: If you want to add any notes for dimensional control report, you can add in the **Notes** window provided in the **<u>D</u>imensional Control Report** page.
2. If you want to add the dimensional control parameters in the ****D****imensional Control Parameters**** window, do the following, 
    1. 1. 1. In the **Date of Survey** box, enter the survey date.
            2. In the **Time** box, enter the survey time.
            3. In the **Weather** box, enter the weather details.
            4. In the **Temp C** box, enter the temperature control value.
            5. In the ****Location**** box, enter the location where the dimensional control is to be performed
            6. In the **Instrument** box, select the instrument from a drop-down list.
            7. In the **Description** box, enter the description for dimensional control.
            8. In the **Status** box, enter the status for dimensional control.
            9. Click **Save**.
3. If you want to add the dimensional control details in the **Dimensional Control Details** window, do the following,
    
    
    1. 1. 1. Click [![image-1652038799188.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652038799188.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652038799188.png) (****ADD**** button) in the ****Dimensional Control Details**** window. Boxes opens in the respective columns to add the dimensional control details.
                
                [![image-1652038880049.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652038880049.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652038880049.png)
                
                [![image-1652038915645.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652038915645.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652038915645.png) **Tip**: You can add multiple dimensional control result details by using the **ADD** button. If you want to order the added details, use the up and down symbols in the **Order By** column.
            2. In the **Symbol/ Description** column, enter the symbol or description for the dimensional control.
            3. In the **Drawing** column, enter the drawing detail.
            4. In the **Tolerance** column, enter the tolerance value.
            5. In the **Actual** column, enter the actual value.
            6. In the **Result** column, enter the result for the dimensional control.
            7. In the **Remarks** column, enter your remarks if any.
            8. Click **Save Changes**.
4. If you want to add the report photos in the ****Report Photos**** window, do the following, 
    1. 1. 1. Click [![image-1652038993773.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652038993773.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652038993773.png) (**ADD** button) in the **Report Photos** window.
                
                [![image-1652039009541.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652039009541.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652039009541.png)
            2. Click [![image-1652039023301.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652039023301.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652039023301.png) (**Browse** button) to browse a photo stored in your computer.
            3. Click **Upload**.
                
                The selected photo will be updated.

#### **6.15.3 Print a Dimensional Control Report**

If you want to print a dimensional control report, click [![image-1652039097349.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652039097349.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652039097349.png)(print icon) provided in the **Report** column of the **Dimensional Control** **Report** page. See Fig 6.15.

#### **6.15.4 Attach a File into a Dimensional Control Report**

If you want to attach any file with any dimensional control report listed in the **Dimensional Control** **Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.15.5 Edit Any Dimensional Control Report**

If you want to edit any existing dimensional control report in the **Dimensional Control** **Report** page, do the following,

1. Click [![image-1652039222474.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652039222474.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652039222474.png)(Edit icon) in the **Edit** column for the respective dimensional control report. See Fig 6.15. A new window opens to edit the dimensional control report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.15.6 Export Dimensional Control Report List**

You can export a list of dimensional control reports added in the **Dimensional Control** **Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.


### **6.16 Trail Fit Report**

Trail Fit report prepared to send the trail fit-up photos once the trail fit-up has completed. The **Trail Fit Report** tab in the **Structural** menu used to add a trail fit report. If you want to add a trail fit report, do the following,

1. Click **Trail Fit Report** in the **Structural** menu. The **Trail Fit Report** page opens. [![image-1652039316791.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652039316791.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652039316791.png)
    
     **Figure 6.16: Trail Fit Report page**

#### **6.16.1 Add a Trail Fit Report**

If you want to add a trail fit report,

1. Click [![image-1652039377787.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652039377787.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652039377787.png) (**ADD** button) in the **Trail Fit Report** page. See Fig 6.16. A new window opens to add a trail fit report.
    
    [![image-1652039414571.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652039414571.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652039414571.png)
    
    [![image-1652039430813.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652039430813.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652039430813.png) **Tip**: A report number for a new trail fit report will be updated automatically in the **Report Number** box.
2. In the ****Prepared By**** box, enter the name a person who has prepared the trail fit report.
3. In the **Prepared Date** box, enter the prepared date of the trail fit report.
4. In the **Reviewed By** box, enter the name a person who has reviewed the trail fit report.
5. In the **Reviewed Date** box, enter the reviewed date of the trail fit report.
6. In the **Approved By** box, enter the name a person who has approved the trail fit report.
7. In the **Approved Date** box, enter the approved date of the trail fit report.
8. Click **Save**.

The trail fit report is successfully added. Once you have added the trail fit report, you must add the trail fit details for the added trail fit report.

#### **6.16.2 Add Trail Fit Report Details** 

1. Click [![image-1652039531457.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652039531457.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652039531457.png) (Edit icon) in the **Edit Report** column of the **Trail Fit** **Report**  See Fig 6.16. The **Report Photos** window opens in the **Trail Fit** **Report** page.
    
    [![image-1652039547712.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652039547712.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652039547712.png)
    
    [![image-1652039569533.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652039569533.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652039569533.png) **Tip**: If you want to add any remarks for trail fit report, you can add in the **Remarks** window provided in the **Trail Fit** **Report** page.
2. If you want to add the report photos in the **Report Photos** window, do the following,
    
    
    1. 1. Click [![image-1652039599062.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652039599062.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652039599062.png) (**ADD** button) in the **Report Photos** window.
            
            [![image-1652039609077.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652039609077.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652039609077.png)
        2. Click [![image-1652039632753.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652039632753.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652039632753.png) (**Browse** button) to browse a photo stored in your computer.
        3. Click **Upload**.
            
            The selected photo will be updated.

#### **6.16.3 Print a Trail Fit Report**

If you want to print a trail fit report, click [![image-1652039696442.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652039696442.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652039696442.png) (print icon) provided in the **Report** column of the **Trail Fit** **Report** page. See Fig 6.16.

[![image-1652039751225.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652039751225.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652039751225.png) **Tip**: If you want to lock any trail fit report, click the check box provided in the **Lock Report?** column of the **Trail Fit Report** page. See Fig 6.16.

#### **6.16.4 Attach a File into a Trail Fit Report**

If you want to attach any file with any trail fit report listed in the **Trail Fit Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.16.5 Edit Any Trail Fit Report**

If you want to edit any existing trail fit report in the **Trial Fit Report** page, do the following,

1. Click [![image-1652039899804.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652039899804.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652039899804.png)(Edit icon) in the **Edit** column for the respective trail fit report. See Fig 3.16. A new window opens to edit the trail fit report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.16.6 Export Trail Fit Report List**

You can export a list of trail fit reports added in the **Trail Fit Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.


### **6.17 Heat Straightening Report**

Heat straightening is a repair procedure in which controlled heat is applied in specific patterns to the plastically deformed regions of damaged material in repetitive heating and cooling cycles to gradually straighten the material.

The **Heat Straightening Report** tab in the **Structural** menu used to add a heat straightening report once the heat straightening process has completed. If you want to add a heat straightening report, do the following,

1. Click the **Heat Straightening Report** Tab. The **Heat Straightening Report** page opens.
    
    [![image-1652040040963.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652040040963.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652040040963.png)
    
     **Figure 6.17: Heat Straightening Report page**

#### **6.17.1 Add a Heat Straightening Report**

If you want to add a heat straightening report,

1. Click [![image-1652040202665.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652040202665.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652040202665.png) (**ADD** button) in the **Heat Straightening Report**  See Fig 6.17. A new window opens to add a heat straightening report.
    
    [![image-1652040215343.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652040215343.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652040215343.png)
    
    [![image-1652040226440.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652040226440.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652040226440.png) **Tip**: A report number for a new heat straightening report will be updated automatically in the **Report Number** box.
2. In the **Description** box, enter the description for the heat straightening report.
3. In the **Description** box, enter the description for the heat straightening report.
4. In the **Prepared Date** box, enter the prepared date of the heat straightening report.
5. In the **Prepared Date** box, enter the prepared date of the heat straightening report.
6. In the **Reviewed Date** box, enter the reviewed date of the heat straightening report.
7. In the **Approved By** box, enter the name a person who has approved the heat straightening report.
8. In the ****Approved Date**** box, enter the approved date of the heat straightening
9. Click **Save**.

The heat straightening report is successfully added. Once you have added the heat straightening report, you must add the heat straightening details for the added report.

#### **6.17.2 Add Heat Straightening Details** 

1. Click [![image-1652040473971.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652040473971.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652040473971.png)(Edit icon) in the **Edit Report** column of the **Heat Straightening Report** page. See Fig 6.17. The **Report Parameters** and **Report Photos** windows open in the **Heat Straightening Report** page.
    
    [![image-1652040495655.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652040495655.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652040495655.png)
2. If you want to add the report parameters in the **Report Parameters** window, do the following, 
    1. 1. Click [![image-1652040588764.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652040588764.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652040588764.png) (**ADD** button) in the **Report Parameters** window.
        2. In the **Description** box, enter the description for heat straightening.
        3. In the **Size** box, enter the thickness of the material.
        4. In the **Start** **Time** box, enter the start time of heat straightening.
        5. In the **End Time** box, enter the end time of heat straightening.
        6. In the **Temperature** box, enter the temperature range for heat straightening.
        7. In the **Length** box, enter the length of material to do heat straightening.
        8. In the **Heating Speed** box, enter the heating speed of heat straightening.
        9. In the **Cycle** box, enter the detail of heat straightening cycle.
        10. In the **Remarks** box, enter your remarks if any.
        11. Click **Save**.
3. If you want to add the report photos in the **Report Photos** window, do the following,
    
    
    1. 1. Click [![image-1652040633894.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652040633894.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652040633894.png) (**ADD** button) in the **Report Photos** window.
            
            [![image-1652040643621.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652040643621.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652040643621.png)
        2. Click [![image-1652040661294.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652040661294.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652040661294.png) (**Browse** button) to browse a photo stored in your computer.
        3. Click **Upload**.
            
            The selected photo will be updated.

#### **6.17.3 Print a Heat Straightening Report**

If you want to print a heat straightening report, click[![image-1652040740042.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652040740042.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652040740042.png)(print icon) provided in the **Report** column of the **Heat Straightening Report** page. See Fig 6.17.

#### **6.17.4 Attach a File into a Heat Straightening Report**

If you want to attach any file with any heat straightening report listed in the **Heat Straightening Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

### **6.17.5 Edit Any Heat Straightening Report**

If you want to edit any existing heat straightening report in the **Heat Straightening Report** page, do the following,

1. Click [![image-1652040830944.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652040830944.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652040830944.png) (Edit icon) in the **Edit** column for the respective heat straightening report. See Fig 6.17. A new window opens to edit the heat straightening report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.17.6 Export Heat Straightening Report List 

You can export a list of heat straightening reports added in the **Heat Straightening Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.


### **6.18 Inspection Release Note**

Inspection Release Note is a written announcement which is issued by QC contractor to denote the successful completion of the inspection.

The **Inspection Release Note** tab in the **Structural** menu used to add an inspection release note after completion of the inspection. If you want to add an inspection release note, do the following,

1. Click the **Inspection Release Note** Tab. The **Release Form** page opens.
    
    [![image-1652040963563.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652040963563.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652040963563.png)
    
     **Figure 6.18: Release Form page**

#### **6.18.1 Add an Inspection Release Note**

If you want to add an inspection release note,

1. Click [![image-1652041151175.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652041151175.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652041151175.png) (**ADD** button) in the **Release Form** page. See Fig 6.18. A new window opens to add an inspection release note.
    
    [![image-1652041167463.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652041167463.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652041167463.png)
    
    [![image-1652041183324.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652041183324.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652041183324.png) **Tip**: A report number for a new inspection release note will be updated automatically in the **Report Number** box.
2. In the **Activity** box, select the activity from a drop-down list.
3. In the **Prepared By** box, enter the name a person who has prepared the inspection release note.
4. In the **Prepared Date** box, enter the prepared date of the inspection release note.
5. In the **Reviewed By** box, enter the name a person who has reviewed the inspection release note.
6. In the **Reviewed Date** box, enter the reviewed date of the inspection release note.
7. In the **Approved By** box, enter the name a person who has approved the inspection release note.
8. In the ****Approved Date**** box, enter the approved date of the inspection release note.
9. Click **Save**.

The inspection release note is successfully added. Once you have added the inspection release note, you must add the details for the added note.

#### **6.18.2 Add Inspection Release Note Details** 

1. Click [![image-1652041374618.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652041374618.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652041374618.png)(Edit icon) in the **Edit Report** column of the **Release Form**  See Fig 6.18. The **Release Form Parameters**, **Details**, and **Report Photos** windows open in the **Release Form** page.
    
    [![image-1652041408835.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652041408835.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652041408835.png)
2. If you want to add the release form parameters in the ****Release Form Parameters**** window, do the following, 
    1. 1. In the **Test Package No** box, enter the test package number.
        2. In the **Tag ID** box, enter the tag ID number.
        3. In the **Activity** box, enter the activity detail.
        4. In the ****Comments**** box, enter any comments relevant to the inspection release note.
        5. Click **Save**.
3. If you want to add the release note details in the ****Details**** window, do the following, 
    1. 1. Click [![image-1652041487140.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652041487140.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652041487140.png) (**ADD** button) in the **Details** window.
            
            A new window opens to add the release note details.
            
            [![image-1652041519404.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652041519404.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652041519404.png)
        2. In the **Description** box, enter the description for the inspection release note.
        3. If the company’s QC contractor issues the inspection release note, select the check box provided with the **QC Contractor/ Company** and select the date in the respective **Date** box.
        4. If the company’s QC contractor issues the inspection release note, select the check box provided with the **QC Contractor/ Company** and select the date in the respective **Date** box.
        5. Click **Save**.
4. If you want to add the report photos in the ****Report Photos**** window, do the following, 
    1. 1. Click [![image-1652041617005.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652041617005.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652041617005.png) (**ADD** button) in the **Report Photos** window.
            
            [![image-1652041643105.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652041643105.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652041643105.png)
        2. Click [![image-1652041659019.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652041659019.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652041659019.png) (****Browse**** button) to browse a photo stored in your computer.
        3. Click **Upload.**

The selected photo will be updated.

#### **6.18.3 Print an Inspection Release Form Report**

If you want to print an inspection release form report, click [![image-1652041726928.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652041726928.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652041726928.png)(print icon) provided in the **Report** column of the **Release Form** page. See Fig 6.18.

[![image-1652041741059.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652041741059.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652041741059.png) **Tip**: If you want to lock any inspection release note, click the check box provided in the **Lock Report?** column of the **Release Form** page. See Fig 6.18.

#### **6.18.4 Attach a File into an Inspection Release Note**

If you want to attach any file with any inspection release note listed in the **Release Form** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.18.5 Edit Any Inspection Release Note**

If you want to edit any existing inspection release note in the **Release Form** page, do the following,

1. Click [![image-1652041888095.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652041888095.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652041888095.png) (Edit icon) in the **Edit** column for the respective inspection release note. See Fig 6.18. A new window opens to edit the inspection release note.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.18.6 Export Inspection Release Note List**

You can export a list of inspection release notes added in the **Release Form** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **6.19 Shell Plate Rolling Report**

Shell Plate Rolling is a process of rolling different kinds of metal plates into a round or conical shape by using a plate rolling machine in the Structural project.

The **Shell Plate Rolling Report** tab in the **Structural** menu used to add a shell plate rolling report once the shell plate rolling process has completed. If you want to add a shell plate rolling report, do the following,

1. Click the **Shell Plate Rolling Report** Tab. The **Shell Plate Rolling Report page opens.
    
    [![image-1652042003752.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652042003752.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652042003752.png)
    
     **Figure 6.19: Shell Plate Rolling Report page.**

#### **6.19.1 Add a Shell Plate Rolling Report**

If you want to add a shell plate rolling report,

1. Click [![image-1652042137837.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652042137837.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652042137837.png) (**ADD** button) in the **Shell Plate Rolling** **Report**  See Fig 6.19. A new window opens to add a shell plate rolling report.
    
    [![image-1652042165785.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652042165785.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652042165785.png)
    
    [![image-1652042180519.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652042180519.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652042180519.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1652042209049.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652042209049.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652042209049.png) **Tip**: A report number for a new shell plate rolling report will be updated automatically in the **Report Number** box.
2. In the **Drawing** box, select the drawing from a drop-down list.
3. In the **Prepared By** box, enter the name a person who has prepared the shell plate rolling report.
4. In the **Prepared Date** box, enter the prepared date of the shell plate rolling report.
5. In the **Prepared Date** box, enter the prepared date of the shell plate rolling report.
6. In the **Reviewed By** box, enter the name a person who has reviewed the shell plate rolling report.
7. In the ****Reviewed Date**** box, enter the reviewed date of the shell plate rolling report.
8. In the ****Approved By**** box, enter the name a person who has approved the shell plate rolling report.
9. In the **Approved Date** box, enter the approved date of the shell plate rolling report.
10. Click **Save**.

The shell plate rolling report is successfully added. Once you have added the shell plate rolling report, you must add the details for the added report.

#### **6.19.2 Add Shell Plate Rolling Report Details** 

1. Click [![image-1652042478858.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652042478858.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652042478858.png)(Edit icon) in the **Edit Report** column of the **Shell Plate Rolling Report** page. See Fig 6.19. The **Shell Plate Rolling** **Details** and **Report Photos** windows open in the **Shell Plate Rolling** **Report** page.
    
    [![image-1652042500387.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652042500387.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652042500387.png)
    
    [![image-1652042516881.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652042516881.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652042516881.png)**Tip**: If you want to add any notes for the shell plate rolling report, you can add in the **Notes** window provided in the **Shell Plate Rolling** **Report** page.
2. If you want to add the shell plate rolling details in the ****Shell Plate Rolling Details**** window, do the following, 
    1. 1. 1. Click [![image-1652042564607.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652042564607.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652042564607.png) (****ADD**** button) in the ******Shell Plate Rolling Details window.******Boxes opens in the respective columns to add the shell plate rolling details.
                
                [![image-1652042590993.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652042590993.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652042590993.png)
            2. In the **PLATE HEAT NO** column, enter the heat number of the plate.
            3. In the **DATE** column, select the date when the shell plate rolling process is performed.
            4. In the **(S)** **EXTREME CURVATURE** column, enter the extreme curvature value for the respective **A SIDE** and **B SIDE** of the rolling plate.
            5. In the **(R)** **CURVATURE** column, enter the radius curvature value of the rolling plate.
            6. In the **LENGTH** column, enter the length of **C SIDE** and **D SIDE** of the rolling plate.
            7. In the **EDGE- PREPARATION** column, enter the root and angle values for **A, B, C,** and **D** **SIDES**, respectively.
            8. Click **Save Changes**.
3. If you want to add the report photos in the **Report Photos** window, do the following,
    
    
    1. 1. 1. Click [![image-1652042689944.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652042689944.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652042689944.png) (**ADD** button) in the **Report Photos** window.
                
                [![image-1652042706147.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652042706147.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652042706147.png)
            2. Click (****Browse**** button) to browse a photo stored in your computer.
            3. Click **Upload.**
                
                The selected photo will be updated.

#### **6.19.3 Print a Shell Plate Rolling Report**

If you want to print a shell plate rolling report, click[![image-1652042776179.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652042776179.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652042776179.png)(print icon) provided in the **Report** column of the **Shell Plate Rolling** **Report** page. See Fig 6.19.

#### **6.19.4 Attach a File into a Shell Plate Rolling Report**

If you want to attach any file with any shell plate rolling report listed in the **Shell Plate Rolling** **Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.19.5 Edit Any Shell Plate Rolling Report**

If you want to edit any existing shell plate rolling report in the **Shell Plate Rolling** **Report** page, do the following,

1. Click [![image-1652042866288.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652042866288.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652042866288.png) (Edit icon) in the **Edit** column for the respective shell plate rolling report. See Fig 6.19. A new window opens to edit the shell plate rolling report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.19.6 Export Shell Plate Rolling Report List**

You can export a list of shell plate rolling reports added in the **Shell Plate Rolling** **Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.



### **6.20 Deviation Request Report**

Deviation Report used to find out any deviations in the materials utilized in the Structural project. The **Deviation Request Report** tab in the **Structural** menu helps you to add a deviation request report.

If you want to add a deviation request report, do the following,

1. Click the **Deviation Request Report** Tab. The **Deviation Request Report page opens.
    
    [![image-1652043019256.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652043019256.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652043019256.png)
    
     **Figure 6.20: Deviation Request Report page**

#### **6.20.1 Add a Deviation Request Report** 

If you want to add a deviation request report,

1. Click [![image-1652043095016.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652043095016.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652043095016.png) (**ADD** button) in the **Deviation Request Report  See Fig 6.20. A new window opens to add a deviation request report.
    
    [![image-1652043111365.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652043111365.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652043111365.png)
    
    [![image-1652043125157.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652043125157.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652043125157.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1652043138881.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652043138881.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652043138881.png) **Tip**: A report number for a new deviation request report will be updated automatically in the **Report Number** box.
2. In the **Inspection Date** box, select the inspection date of the deviation request report.
3. In the ****Prepared By**** box, enter the name a person who has prepared the deviation request report.
4. In the **Prepared Date** box, enter the prepared date of the deviation request report.
5. In the ****Reviewed By**** box, enter the name a person who has reviewed the deviation request report.
6. In the **Reviewed Date** box, enter the reviewed date of the deviation request report.
7. In the **Reviewed Date** box, enter the reviewed date of the deviation request report.
8. In the **Approved Date** box, enter the approved date of the deviation request report.
9. Click **Save**.

The deviation request report is successfully added. Once you have added the deviation request report, you must add the details for the added deviation request.

[![image-1652043228212.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652043228212.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652043228212.png)**Tip**: If you want to add a copy of added deviation request report, click **Revision** in the **Revision** column of the **Deviation Request Report** page.

#### **6.20.2 Add Deviation Request Details** 

1. Click [![image-1652043298916.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652043298916.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652043298916.png)(Edit icon) in the **Edit Report** column of the **Deviation Request Report  See Fig 6.20. The **Material Clarification, Ref. Documents, Query Description, Attachments, Proposed Solutions,** and **Technip Response** windows open in the **Deviation Request Report** page.
    
    [![image-1652043333938.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652043333938.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652043333938.png)
    
    [![image-1652043347497.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652043347497.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652043347497.png)
    
    [![image-1652043360441.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652043360441.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652043360441.png)
    
    [![image-1652043369867.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652043369867.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652043369867.png)
2. To add the material clarification details, do the following,
    
    
    1. 1. 1. In the ****From**** and ****To**** boxes, enter details of deviation occurred up to which material.
            2. In the ****Impact**** box, if the deviation leads to the cost impact then select ****Cost Impact**** or if the deviation leads to the schedule impact then select ****Schedule Impact****.
            3. In the ****Criticality**** box, if there is need to correct the deviation in the materials immediately then select ****Urgent**** otherwise select ****Routine**** based on the deviation criticality.
            4. In the **Classification** box, if the classification of deviation is mandatory then select **Mandatory** otherwise select **Non- Mandatory**.
            5. In the ****Requirements**** box, if you need clarification for the deviations occurred then select ****Clarification**** otherwise select ****Change to Project Requirement****.
            6. Click **Save**.
3. To add reference documents of the material deviations,
    
    
    1. 1. 1. Click [![image-1652043488794.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652043488794.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652043488794.png) (****ADD**** button) in the  ****Documents**** window. A new window opens in the **Technip Document No** column to add the reference document number.
            2. Enter the revision detail for the reference document number in the ****Revision**** column.
            3. Enter the vendor document number in the **Vendor Document No** column.
            4. Enter the revision detail for the vendor document number in the **Revision** column.
            5. Click **Save Changes**.
4. If you want to add query description, you can add in the **Query Description** window.
5. To add any attachment for the deviation request report,
    
    
    1. 1. 1. Click [![image-1652043596005.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652043596005.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652043596005.png) (**ADD** button) in the **Attachments** window.
                
                A new window opens in the **Document No** column to add the number of a document to be attached.
            2. Enter the revision detail for the document number in the **Revision** column.
            3. Enter the title of the document in the **Title** column.
            4. Click **Save Changes**.
6. If you want to add the proposed solution details for the material deviation, you can add in the **Proposed Solutions** window.
7. If you want to add the proposed solution details for the material deviation, you can add in the **Proposed Solutions** window.

#### **6.20.3 Print a Deviation Request Report**

If you want to print a deviation request report, click[![image-1652043691026.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652043691026.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652043691026.png) (print icon) provided in the **Report** column of the **Deviation Request Report** page. See Fig 6.20.

#### **6.20.4 Attach a File into a Deviation Request Report**

If you want to attach any file with any deviation request report listed in the **Deviation Request Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.20.5 Edit Any Deviation Request Report**

If you want to edit any existing deviation request report in the **Deviation Request Report** page, do the following,

1. Click [![image-1652043784079.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652043784079.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652043784079.png)(Edit icon) in the **Edit** column for the respective deviation request report. See Fig 6.20. A new window opens to edit the deviation request report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.20.6 Export Deviation Request Report List**

You can export a list of deviation request reports added in the **Deviation Request** **Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.


### **6.21 Technical Query Report**

Technical query usually raised to get clarification on technical fault, which is occurred in the execution of the Structural project. The Technical query can be raised between site operations of the contractor and engineering team of the contractor.

The **Technical Query Report** tab in the **Structural** menu used to add a technical query report. If you want to add a technical query report, do the following,

1. Click the **Technical Query Report** Tab. The **Technical Query Report page opens.
    
    [![image-1652043929311.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652043929311.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652043929311.png)
    
     **Figure 6.21: Technical Query Report page**

#### **6.21.1 Add a Technical Query Report** 

If you want to add a technical query report,

1. Click [![image-1652044006507.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652044006507.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652044006507.png) (**ADD** button) in the **Technical Query Report page. See Fig 6.21. A new window opens to add a technical query report.
    
    [![image-1652044027139.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652044027139.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652044027139.png)
    
    [![image-1652044040343.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652044040343.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652044040343.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving. [![image-1652044196130.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652044196130.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652044196130.png)**Tip**: A report number for a new technical query report will be updated automatically in the **Report Number** box.
2. In the **Inspection Date** box, select the inspection date of the technical query report.
3. In the **Prepared By** box, enter the name a person who has prepared the technical query report.
4. In the ****Prepared Date**** box, enter the prepared date of the technical query report.
5. In the ****Reviewed By**** box, enter the name a person who has reviewed the technical query report.
6. In the ****Reviewed Date**** box, enter the reviewed date of the technical query report.
7. In the **Approved By** box, enter the name a person who has approved the technical query report.
8. In the ****Approved Date**** box, enter the approved date of the deviation request report.
9. Click ****Save.****

The technical query report is successfully added. Once you have added the technical query report, you must add the details for the added report.

[![image-1652044315613.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652044315613.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652044315613.png)**Tip**: If you want to add a copy of added technical query report, click **Revision** in the **Revision** column of the **Technical Query** **Report** page.

#### **6.21.2 Add Technical Query Report Details** 

1. Click [![image-1652044403145.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652044403145.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652044403145.png)(Edit icon) in the **Edit Report** column of the **Technical Query** **Report** See Fig 6.21. The **Material Clarification, Ref. Documents, Query Description, Attachments, Proposed Solutions,** and **Technip Response** windows open in the **Technical Query** **Report** page.
    
    [![image-1652044447645.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652044447645.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652044447645.png)[![image-1652044460024.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652044460024.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652044460024.png)
    
    [![image-1652044493495.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652044493495.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652044493495.png)
2. To add the material clarification details, do the following,
    
    
    1. 1. 1. In the **From** and **To** boxes, enter details of technical fault.
            2. In the ****Impact**** box, if the technical fault leads to the cost impact then select ****Cost Impact**** or if the technical fault leads to the schedule impact then select ****Schedule Impact****.
            3. In the ****Impact**** box, if the technical fault leads to the cost impact then select ****Cost Impact**** or if the technical fault leads to the schedule impact then select ****Schedule Impact****.
            4. In the ****Criticality**** box, if there is need to correct the technical fault immediately then select ****Urgent**** otherwise select ****Routine**** based on the technical fault criticality.
            5. In the ****Classification**** box, if the classification of technical fault is mandatory then select ****Mandatory**** otherwise select ****Non- Mandatory****.
            6. In the ****Requirements**** box, if you need clarification for the technical fault occurred then select ****Clarification**** otherwise select ****Change to Project Requirement****.
            7. Click **Save**.
3. To add reference documents of the technical fault,
    
    
    1. 1. 1. Click [![image-1652044678729.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652044678729.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652044678729.png) (**ADD** button) in the **Ref. Documents** window.
                
                A new window opens in the **Technip Document No** column to add the reference document number.
            2. Enter the revision detail for the reference document number in the **Revision** column.
            3. Enter the vendor document number in the **Vendor Document No** column.
            4. Enter the revision detail for the vendor document number in the **Revision** column.
            5. Click **Save Changes**.
4. If you want to add query description for technical fault, you can add in the ****Query Description**** window.
5. To add any attachment for the technical query report,
    
    
    1. 1. Click [![image-1652044785199.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652044785199.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652044785199.png) (**ADD** button) in the **Attachments** window.
            
            A new window opens in the **Document No** column to add the number of a document to be attached.
        2. Enter the revision detail for the document number in the **Revision** column.
        3. Enter the title of the document in the **Title** column.
        4. Click **Save Changes**.
6. If you want to add the proposed solution details for the technical fault, you can add in the **Proposed Solutions** window.
7. If you want to add the Technip response for the technical fault, you can add in the **Technip Response** window.

#### **6.21.3 Print a Technical Query Report**

If you want to print a technical query report, click[![image-1652044903649.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652044903649.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652044903649.png) (print icon) provided in the **Report** column of the **Technical Query** **Report** page. See Fig 6.22.

#### **6.21.4 Attach a File into a Technical Query Report**

If you want to attach any file with any technical query report listed in the **Technical Query Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.21.5 Edit Any Technical Query Report**

If you want to edit any existing technical query report in the **Technical Query Report** page, do the following,

1. Click [![image-1652045036774.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652045036774.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652045036774.png) (Edit icon) in the **Edit** column for the respective technical query report. See Fig 6.21. A new window opens to edit the technical query report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.21.6 Export Technical Query Report List**

You can export a list of technical query reports added in the Technical Query Report page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.



### **6.22 Electrical Continuity Report**

Electrical continuity test is a technique to check and verify the current flow in the metal paths. The **Electrical Continuity Report** tab in the **Structural** menu used to add an electrical continuity report after the completion of electrical continuity test.

If you want to add an electrical continuity report, do the following,

1. Click the **Electrical Continuity Report** Tab. The **Electrical Continuity Report page opens.
    
    [![image-1652045163507.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652045163507.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652045163507.png)
    
     **Figure 6.22: Electrical Continuity Report page**

#### **6.22.1 Add an Electrical Continuity Report**

If you want to add an electrical continuity report,

1. Click [![image-1652045230351.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652045230351.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652045230351.png) (**ADD** button) in the **Electrical Continuity Report**  See Fig 6.22. A new window opens to add an electrical continuity report.
    
    [![image-1652045286986.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652045286986.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652045286986.png)
    
    [![image-1652045317440.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652045317440.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652045317440.png) **Tip**: A report number for a new electrical continuity report will be updated automatically in the **Report Number** box.
2. In the ****Prepared By**** box, enter the name a person who has prepared the electrical continuity report.
3. In the **Prepared Date** box, enter the prepared date of the electrical continuity report.
4. In the ****Reviewed By**** box, enter the name a person who has reviewed the electrical continuity report.
5. In the **Reviewed Date** box, enter the reviewed date of the electrical continuity report.
6. In the **Approved By** box, enter the name a person who has approved the electrical continuity report.
7. In the ****Approved Dat e****box, enter the approved date of the electrical continuity report.
8. Click **Save**.

The electrical continuity report is successfully added. Once you have added the electrical continuity report, you must add the details for the added report.

#### **6.22.2 Add Electrical Continuity Report Details** 

1. Click [![image-1652045470699.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652045470699.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652045470699.png) (Edit icon) in the **Edit Report** column of the **Electrical Continuity** **Report**  See Fig 6.22. The **Electrical Continuity Parameters**, **Electrical Continuity**, and **Report Photos** windows open in the **Electrical Continuity** **Report** page.
    
    [![image-1652045492051.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652045492051.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652045492051.png)
    
    [![image-1652045508125.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652045508125.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652045508125.png) **Tip**: If you want to add any notes for the electrical continuity report, you can add in the **Notes** window provided in the **Electrical Continuity** **Report** page.
2. If you want to add the electrical continuity parameters in the ****Electrical Continuity Parameters**** window, do the following, 
    1. 1. 1. In the ****Item Measured**** box, enter the number of items, which are measured for electrical continuity.
            2. In the **Procedure No** box, enter the electrical continuity procedure number.
            3. Click **Save**.
3. If you want to add the electrical continuity details in the **Electrical Continuity** window, do the following, 
    1. 1. 1. Click [![image-1652045597409.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652045597409.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652045597409.png) (****ADD**** button) in the ******Electrical Continuity****** window. Boxes opens in the respective columns to add the electrical continuity details.
                
                [![image-1652046520219.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652046520219.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652046520219.png)
            2. In the **Location Test** column, enter the location test detail.
            3. In the ****Reading**** column, enter the electrical continuity reading values for the respective ****Reading 1**** and ****Reading 2****.
            4. In the ****Average Reading 1 and 2****columns, enter the average reading value.
            5. In the **Specification Requirement** column, enter the specification requirement detail.
            6. In the **Result** column, enter the result of the electrical continuity test.
            7. In the **Remarks** column, enter you remarks if any.
            8. Click **Save Changes**.
4. If you want to add the report photos in the ****Report Photos**** window, do the following, 
    1. 1. 1. Click [![image-1652046594768.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652046594768.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652046594768.png) (**ADD** button) in the **Report Photos** window.
                
                [![image-1652046606117.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652046606117.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652046606117.png)
            2. Click [![image-1652046623106.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652046623106.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652046623106.png) (**Browse** button) to browse a photo stored in your computer.
            3. Click **Upload**.
                
                The selected photo will be updated.

#### **6.22.3 Print an Electrical Continuity Report**

If you want to print an electrical continuity report, click[![image-1652046700590.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652046700590.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652046700590.png) (print icon) provided in the **Report** column of the **Electrical Continuity** **Report** page. See Fig 6.22.

#### **6.22.4 Attach a File into an Electrical Continuity Report**

If you want to attach any file with any electrical continuity report listed in the **Electrical Continuity Report** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.22.5 Edit Any Electrical Continuity Report**

If you want to edit any existing electrical continuity report in the **Electrical Continuity Report** page, do the following,

1. Click [![image-1652046842113.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652046842113.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652046842113.png)(Edit icon) in the **Edit** column for the respective electrical continuity report. See Fig 6.22. A new window opens to edit the electrical continuity report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.22.6 Export Electrical Continuity Report List**

You can export a list of electrical continuity reports added in the **Electrical Continuity Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.


### **6.23 Joint Summary Report**

The **Joint Summary report** tab in the **Structural** menu used to view a joint summary report. If you want to see a joint summary report,

1. Click the **Joint Summary Report** tab. A list of joint summary reports opens.
    
    [![image-1652046962819.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652046962819.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652046962819.png)
    
     **Figure 6.23: Joint Summary Report page**
    
    [![image-1652046988847.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652046988847.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652046988847.png) **Tip**: If you want to view a joint summary report for all projects, click the check box provided with the **All Projects** option.

#### **6.23.1 Export Joint Summary Report List**

You can export a list of joint summary reports in the **Joint Summary Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.


### **6.24 Joint Status Report (Skid)**

The **Joint Status Report (Skid)** tab in the **Structural** menu helps you to view a joint status report (Skid) based on an inspection status report.

If you want to view a joint status report (Skid),

1. Click the **Joint Status Report** **(Skid)** tab. A joint status report (Skid) opens.
    
    [![image-1652047103519.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652047103519.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652047103519.png)
    
     **Figure 6.24: Joint Status Report (Skid)** **page**

#### **6.24.1 Print a Joint Status Report (Skid)**

If you want to print a joint status report (Skid), use [![image-1652047182625.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652047182625.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652047182625.png) and [![image-1652047193157.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652047193157.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652047193157.png) (print icons) provided in the **Joint Status** **Report (Skid)** page. See Fig 6.24.

1. If you want to print the current page of the joint status report (Skid), click [![image-1652047219242.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652047219242.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652047219242.png) (print icon including the page number).
2. If you want to print all the pages of the joint status report (Skid), click [![image-1652047240540.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652047240540.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652047240540.png)(print icon).

#### **6.24.2 Export Joint Status Report (Skid) List**

You can export a joint status report (Skid) in the **Joint Status Report (Skid)** page in various formats by using the option [![image-1652047294521.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652047294521.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652047294521.png) provided in the upper right corner of the **Joint Status Report (Skid)** page.


### **6.25 Joint Status Report (Project)**

The **Joint Status Report (Project)** tab in the **Structural** menu helps you to view a joint status report (project) depends on the project type.

If you want to view a joint status report (project),

1. Click the **Joint Status Report** **(Project)** tab. A joint status report (project) opens.
    
    [![image-1652047361864.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652047361864.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652047361864.png)
    
     **Figure 9.25: Joint Status Report (Project) page**
2. In the **Project** box, select a project for which you want to view a joint status report (project), from a drop-down list.
    
    A joint status report (project) opens for the selected project.

#### **6.25.1 Print a Joint Status Report (Project)**

If you want to print a joint status report (project), use[![image-1652047446876.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652047446876.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652047446876.png) and [![image-1652047459582.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652047459582.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652047459582.png) (print icons) provided in the **Joint Status** **Report** **(Project)** page. See Fig 6.25.

1. If you want to print the current page of the joint status report (project), click [![image-1652047492141.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652047492141.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652047492141.png)(print icon including the page number).
2. If you want to print all the pages of the joint status report (project), click [![image-1652047511343.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652047511343.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652047511343.png)(print icon).

#### **6.25.2 Export Joint Status Report (Project) List**

You can export a joint status report (project) in the **Joint Status Report (Project)** page in various formats by using the option[![image-1652047561730.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652047561730.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652047561730.png) provided in the upper right corner of the **Joint Status Report (Project)** page.


### **6.26 Joint Status Report (Weekly)**

The **Joint Status Report (Weekly)** tab in the **Structural** menu helps you to view a joint status report (Weekly) on a weekly basis.

If you want to view a joint status report (Weekly),

1. Click the **Joint Status Report** **(Weekly)** tab. A joint status report (Weekly) opens.
    
    [![image-1652047779006.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652047779006.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652047779006.png)
    
     **Figure 6.26: Joint Status Report (Weekly) page**
2. In the **From Date** and **To Date** boxes, select the from and to dates in respectively.
3. Click **Go**.
    
    A joint status report (Weekly) opens for the selected dates.

#### **6.26.1 Print a Joint Status Report (Weekly)**

If you want to print a joint status report (Weekly), use [![image-1652047892172.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652047892172.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652047892172.png)and [![image-1652047908641.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652047908641.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652047908641.png) (print icons) provided in the **Joint Status** **Report** **(Weekly)** page. See Fig 6.26.

1. If you want to print the current page of the joint status report (Weekly), click [![image-1652047938697.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652047938697.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652047938697.png) (print icon including the page number).
2. If you want to print all the pages of the joint status report (Weekly), click [![image-1652047961932.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652047961932.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652047961932.png)(print icon).

#### **6.26.2 Export Joint Status Report (Weekly) List**

You can export a joint status report (Weekly) in the **Joint Status Report (Weekly)** page in various formats by using the option [![image-1652048047107.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652048047107.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652048047107.png) provided in the upper right corner of the **Joint Status Report (Weekly)** page.



### **6.27 Inspection Status Report**

Inspection Status Report shows the overall inspection reports such as from fit-up inspection status to NDT inspection status.

If you want to view an inspection status report, do the following,

1. Click the **Inspection Status Report** tab. The **Inspection Status Report** page opens.
    
    [![image-1652048124122.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652048124122.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652048124122.png)
    
    [![image-1652048131033.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652048131033.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652048131033.png)
    
    [![image-1652048138243.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652048138243.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652048138243.png)
    
    [![image-1652048143835.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652048143835.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652048143835.png)
    
     **Figure 6.27: Inspection Status Report page**
    
    The **Inspection Status Report** page contains joint information, RFI fit-up, RFI weld VI, and NDT inspection status.
2. In the **From Date** and **To Date** boxes, select the from and to dates in respectively.
3. Click **Search**.
    
    The inspection status report opens for the selected dates.
    
    [![image-1652048214170.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652048214170.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652048214170.png) **Tip**: If you want to view the inspection status report including the weld and NDT inspection date, click the check box provided with the **Weld Date/ NDT Date** option.

#### **6.27.1 Print an Inspection Status Report** 

If you want to print an inspection status report, use[![image-1652048273665.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652048273665.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652048273665.png) (print icon) provided in the **Inspection Status** **Report** page. See Fig 6.27.

#### **6.27.2 Export Inspection Status Report List**

You can export a list of inspection status report in the **inspection Status Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.



### **6.28 Weld Traceability Record**

The **Weld Traceability Record** tab in the **Structural** menu used to add and track a weld traceability record.

If you want add a weld traceability record, do the following,

1. Click the **Weld Traceability Record** tab. The **Weld Traceability Record** page opens.
    
    [![image-1652048387272.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652048387272.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652048387272.png)
    
     **Figure 6.28: Weld Traceability Record page**

#### **6.28.1 Add a Weld Traceability Record**

If you want to add a weld traceability record, do the following,

1. Click [![image-1652048479543.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652048479543.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652048479543.png) (**ADD** button) in the **Weld Traceability Record** page. See Fig 6.28. A new window opens to add a weld traceability record.
    
    [![image-1652048494833.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652048494833.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652048494833.png)
    
    [![image-1652048507407.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652048507407.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652048507407.png) **Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1652048538854.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652048538854.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652048538854.png) **Tip**: A report number for a new weld traceability record will be updated automatically in the **Report Number** box.
2. In the **Drawing Number** box, select a drawing number from a drop-down list.
3. In the **Date** box, enter the date of adding the weld traceability record.
4. In the **Prepared By** box, enter the name of a person who has prepared the weld traceability record.
5. In the **Prepared Date** box, select the prepared date of the weld traceability record.
6. In the **Reviewed By** box, enter the name of a person who has reviewed the weld traceability record.
7. In the **Reviewed Date** box, select the reviewed date of the weld traceability record.
8. In the **Approved By** boxes, enter the name of a person who has approved the weld traceability record.
9. In the ****Approved Date**** box, select the approved date of the weld traceability record.
10. If you want to display Not Applicable (NA) in any field instead of leaving as an empty one, select the **Is NA?** check box.
11. In the **Remarks** box, enter your remarks if any.
12. In the **Comments** box, enter your comments if any.
13. Click **Save**.
    
    The weld traceability record is successfully added.

#### **6.28.2 Print a Weld Traceability Report**

If you want to print a weld traceability report, click[![image-1652048718116.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652048718116.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652048718116.png) (print icon) provided in the **Report** column in the Weld Traceability Record page. See Fig 6.28.

#### **6.28.3 Attach a File into a Weld Traceability Record**

If you want to attach any file with the weld traceability record listed in the **Weld Traceability Record** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **6.28.4 Edit Any Weld Traceability Record** 

 If you want to edit any existing weld traceability record in the **Weld Traceability Record** page, do the following,

1. Click [![image-1652048863926.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652048863926.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652048863926.png)(Edit icon) in the **Edit** column for the respective weld traceability record. See Fig 6.28. A new window opens to edit the weld traceability record.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.28.5 Export Weld Traceability Record List**

You can export a list of weld traceability record added in the **Weld Traceability Record** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **6.28.6 Filter Any Weld Traceability Record**

If you want to filter any weld traceability record from the list in the **Weld Traceability Record** page, you can use the [![image-1652048966742.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652048966742.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652048966742.png) (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.



### **6.29 Weld Rejection Rate**

In Structural project, Weld Rejection Rate is the difference between the tested length and repair length of the welded material, which are calculated using RT and UT inspection. The Weld Rejection Rate is used to calculate the weld success rate.

The **Weld Rejection Rate** tab in the **Structural** menu shows a weld rejection rate report including weekly and cumulative weld success rate summary details.

If you want to view a weld rejection rate report,

1. Click the **Weld Rejection Rate** tab. The weld rejection rate report page opens.
    
    [![image-1652049050613.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049050613.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049050613.png)
    
     **Figure 9.29: Weld Rejection Rate Report page**
2. In the **Project** box, select a project for which you want to view a weld rejection rate report, from a drop-down list.
3. In the **From Date** and **To Date** boxes, select the from and to dates in respectively.
4. Click **Show Report**.
    
    The weld rejection rate report opens for the selected project.

#### **6.29.1 Print a Weld Rejection Rate Report**

If you want to print a weld rejection rate report, use[![image-1652049203474.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049203474.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049203474.png) and [![image-1652049212838.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049212838.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049212838.png) (print icons) provided in the **Weld Rejection Rate** **Report** page. See Fig 6.29.

1. If you want to print the current page of the weld rejection rate report, click [![image-1652049246147.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049246147.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049246147.png) (print icon including the page number).
2. If you want to print all the pages of the weld rejection rate report, click [![image-1652049266955.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049266955.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049266955.png) (print icon).

#### **6.29.2 Export Weld Rejection Rate Report** 

You can export the weld rejection rate report in various formats by using the option [![image-1652049322650.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049322650.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049322650.png) provided in the upper right corner of the **Weld Rejection Rate Report** page.


### **6.30 Weld Rejection Rate (MPI)**

In Structural project, Weld Rejection Rate (MPI) is the difference between the tested length of and repair length of the Complete Joint Penetration (CJP) and Fillet welding materials, which are calculated using MPI inspection. The Weld Rejection Rate is used to calculate the weld success rate.

The **Weld Rejection Rate** **(MPI)** tab in the **Structural** menu shows a weld rejection rate report including weekly and cumulative weld success rate summary details.

If you want to view a weld rejection rate report,

1. Click the **Weld Rejection Rate (MPI)** tab. The **Weld Rejection Rate Report** page opens.
    
    [![image-1652049397923.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049397923.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049397923.png)
2. In the **Project** box, select a project for which you want to view a weld rejection rate report, from a drop-down list.
3. In the **Report Type** box, select the report type from a drop-down list.
4. In the **From Date** and **To Date** boxes, select the from and to dates in respectively.
5. Click **Show Report**.
    
    The weld rejection rate report opens for the selected project.

#### **6.30.1 Print a Weld Rejection Rate Report**

If you want to print a weld rejection rate report, use [![image-1652049461136.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049461136.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049461136.png) and [![image-1652049473558.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049473558.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049473558.png) (print icons) provided in the **Weld Rejection Rate** **Report** page. See Fig 6.30.

1. If you want to print the current page of the weld rejection rate report, click [![image-1652049499294.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049499294.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049499294.png) (print icon including the page number).
2. If you want to print all the pages of the weld rejection rate report, click [![image-1652049520253.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049520253.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049520253.png) (print icon).

#### **6.30.2 Export Weld Rejection Rate Report** 

You can export the weld rejection rate report in various formats by using the option [![image-1652049571075.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049571075.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049571075.png) provided in the upper right corner of the **Weld Rejection Rate Report** page.


### **6.31 Inspection Progress Status Report**

The **Inspection Progress Status Report** tab in the **Structural** menu helps you to view an inspection progress status report depends on the project type.

If you want to view an inspection progress status report,

1. Click the **Inspection Progress Status Report** tab. The inspection progress status report page opens.
    
    [![image-1652049627996.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049627996.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049627996.png)
    
     **Figure 6.31: Inspection Progress Status Report page**
2. In the **Project** box, select a project for which you want to view an inspection progress status report, from a drop-down list.
3. Click **Show Report**.
    
    The inspection progress status report opens for the selected project.

#### **6.31.1 Print an Inspection Progress Status Report**

If you want to print an inspection progress status report, use [![image-1652049726649.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049726649.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049726649.png) and [![image-1652049737678.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049737678.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049737678.png) (print icons) provided in the **Inspection Progress Status** **Report** page. See Fig 6.31.

1. If you want to print the current page of the inspection progress status report, click [![image-1652049767881.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049767881.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049767881.png) (print icon including the page number).
2. If you want to print all the pages of the inspection progress status report, click [![image-1652049799140.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049799140.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049799140.png) (print icon).

#### **6.31.2 Export Inspection Progress Status Report** 

You can export the inspection progress status report in the **Inspection Progress Status Report** page in various formats by using the option [![image-1652049858780.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049858780.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049858780.png) provided in the upper right corner of the **Inspection Progress Status Report** page.


### **6.32 Welder Performance Report**

Welder performance report used to view the welder performance details. If you want to view a welder performance report, do the following,

1. Click the **Welder Performance** tab. The **Welder Performance Report** page opens.
    
    [![image-1652049909338.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652049909338.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652049909338.png)
    
     **Figure 6.32: Welder Performance Report page**
2. In the **Project** box, select a project for which you want to view a welder performance report, from a drop-down list.
3. In the **From Date** and **To Date** boxes, select the from and to dates in respectively.
4. In the **Joint type** box, select the joint type from a drop-down list.
5. Click **Load Report**.

The welder performance report opens for the selected project.

#### **6.32.1 Print a Welder Performance Report**

If you want to print a welder performance report, use [![image-1652050004576.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652050004576.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652050004576.png) and [![image-1652050014487.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652050014487.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652050014487.png) (print icons) provided in the **Welder Performance Report** page. See Fig 6.32.

1. If you want to print the current page of the welder performance report, click [![image-1652050038083.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652050038083.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652050038083.png) (print icon including the page number).
2. If you want to print all the pages of the welder performance report, click (print icon).

#### **6.32.2 Export Welder Performance Report** 

You can export the welder performance report in various formats by using the option [![image-1652050086168.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652050086168.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652050086168.png) provided in the upper right corner of the **Welder Performance Report** page.


### **6.33 Welder Statistic Report**

Welder Statistics Report shows the statistical data of the welders. If you want to view a welder statistics report, do the following,

1. Click the **Welder Statistic Report** tab in the **Structural** meu. The **Welder Statistic Report** page opens.
    
    [![image-1652050195567.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652050195567.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652050195567.png)
    
     **Figure 9.33: Welder Statistic Report page**
2. In the **From Date** and **To Date** boxes, select the from and to dates in respectively.
3. Click **Load Report**.

The welder statistic report opens for the selected dates.

#### **6.33.1 Print a Welder Statistic Report**

If you want to print a welder statistic report, use [![image-1652050275812.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652050275812.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652050275812.png)and [![image-1652050288670.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652050288670.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652050288670.png) (print icons) provided in the **Welder Statistic Report** page. See Fig 6.33.

1. If you want to print the current page of the welder statistic report, click [![image-1652050320148.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652050320148.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652050320148.png) (print icon including the page number).
2. If you want to print all the pages of the welder statistic report, click [![image-1652050340084.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652050340084.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652050340084.png)(print icon).

#### **6.33.2 Export Welder Statistic Report**

You can export the welder statistic report in various formats by using the option [![image-1652050401231.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652050401231.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652050401231.png)provided in the upper right corner of the **Welder Statistic Report** page.


### **6.34 Joint Summary Report (Detailed)**

Joint Summary Report (Detailed) used to track the detailed weld joints summary. Do the following steps to view a joint summary report,

1. Click the **Joint Summary Report (Detailed)** tab. The **Welding Summary Report** page opens. [![image-1652050462332.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652050462332.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652050462332.png)
    
    [![image-1652050476776.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652050476776.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652050476776.png)
    
     **Figure 6.34: Welding Summary Report page**

#### **6.34.1 Edit Joint Details**

If you want to edit the joint details in the welding summary details,

1. Click the respective joint number in the **Joint No** column of the **Welding Summary Report** page. The Joint Details window opens
    
    [![image-1652050572704.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652050572704.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652050572704.png)
2. Click [![image-1652050595820.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652050595820.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652050595820.png)(Edit icon) in the **Edit** column for the respective joint numbers of the columns where you want to make changes in the thickness of the weld joint, piece mark number, and heat number.
3. Edit the details in the respective columns.
4. Click **Save**.

#### **6.34.2 Print a Welding Summary Report**

If you want to print a welding summary report, use [![image-1652051286060.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652051286060.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652051286060.png) (print icon) provided in the **Welding Summary Report** page. See Fig 6.35.

#### **6.34.3 Export Welding Summary Report List**

You can export a list of welding summary reports added in the **Welding Summary Report** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

# Punch Lists

### **7.0 Punch Lists**

A punch list is a list of items or tasks that need to be done before a project is completed. The **Punch Lists** menu in the home page of the ***cuteQM*** app helps to create and view the punch lists in Structural project.

#### **7.1 Create a New Punch List**

If you want to create a punch list, do the following,

1. Click the **Create New Punch List** in the **Punch lists** menu. The **Create Punch** page opens. [![image-1652051542829.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652051542829.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652051542829.png)
    
     **Figure 7.1: Create Punch page**
2. In the **Modules** box, select any module from the given modules.
3. In the **Systems** box, select a system from a drop-down list.
4. In the **Sub-Systems** box, select a sub-system from a drop-down list.
5. In the **ITR No** box, enter the ITR number.
6. In the **Drawing No** box, enter the drawing number.
7. In the **Test Pack** box, select a test pack from a drop-down list.
8. In the **Tag No** box, enter the tag number.
9. In the **Reference Types** box, select the reference type from the given options.
10. In the **Select Project** box, select a project from a drop-down list.
11. In the **Category** box, select any category from the given categories such as **A**, **B**, and **C**.
    
    <table border="1" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.866%;">**A** - Item to be cleared before hydrostatic test.
    
    **B** - Item to be cleared after hydrostatic test.
    
    **C** - Item which can be cleared after hydrostatic test but before final acceptance of the whole plant.
    
    </td></tr></tbody></table>
12. In the **Type** box, select the type of punch such as whether internal or external.
13. In the **Item** box, enter the item details.
14. In the **Location** box, select a location from a drop-down list.
15. In the **Description/ Punch** box, enter the description for the punch list.
16. In the **Punch Raised From** box, select the detail such as from where the punch has been raised.
17. In the **Date Raised** box, select the date when the punch has been raised.
18. In the **Punch Raised** By box, enter the name of a person who has raised the punch.
19. In the **Responsible Dept** box, enter the department name, which is responsible for the punch.
20. In the **Responsible Person** box, enter the name of a person who is responsible for the punch.
21. In the **Expected Clearance** box, select the expected date of clearing the punch list.
22. Click **Save**.

The punch list is successfully added.

#### **7.1.11 Add report photos**

If you want to add any report photos for the punch list,

1. Click [![image-1652051763264.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652051763264.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652051763264.png) (**ADD** button) in the **Report Photos** box. [![image-1652051776205.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652051776205.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652051776205.png)
2. Click [![image-1652051794306.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652051794306.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652051794306.png) (**Browse** button) to browse a photo stored in your computer.
3. Click **Upload**.
    
    The selected photo will be updated.

### **7.2 View Punch Lists**

The **View Punch Lists** tab helps you to view and edit the punch list, which is added by using the **Create New Punch List** tab.

1. Click the **View Punch Lists** tab in the **Punch Lists** menu. The **Punch List** page opens with added punch lists.
    
    [![image-1652051850423.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652051850423.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652051850423.png)
    
     **Figure 7.2: Punch List page**
    
    [![image-1652051874994.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652051874994.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652051874994.png)**Note**: If you want to verify the added punch list item, click the check box provided in the **Verify** column.
    
     If you want to clear the added punch list item, click the check box provided in the **Clear** column.

#### **7.2.1 Print a Punch List Report**

If you want to print a punch list report, click (**Print** button) provided in the upper side of the **Punch List** page. See Fig 7.2.

#### **7.2.2 Attach a File into a Punch List**

If you want to attach any file with any punch list listed in the **Punch List** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **7.2.3 Edit Any Punch List**

If you want to edit any existing punch list in the **Punch List** page, click (Edit icon) in the **Edit** column for the respective punch list. See Fig 7.2. Edit the details in the respective box you want.

#### **7.2.4 Export Punch Lists**

You can export the punch lists added in the **Punch List** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **7.2.5 Filter Any Punch List**

If you want to filter any punch list in the **Punch List** page, you can use the [![image-1652052137050.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652052137050.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652052137050.png) (**FILTER** button). To know how to filter, see the topic, ”**Filter Any Area**”.



### **7.3 Punch List Detail Report**

The **Punch List Detail Report** tab in the **Punch Lists** menu helps you to view a detailed report of the punch lists. To view the punch list detail report,

1. Click **Punch List Detail Report** in the **Punch Lists** menu. The **Punch List Detail Report** page opens.
    
    [![image-1652052208862.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652052208862.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652052208862.png)
    
     **Figure 7.3: Punch List Detail Report page**
2. In the **Modules** field, select **Piping** from the given modules.
3. In the **Systems** box, select a system from a drop-down list.
4. In the **Sub Systems** box, select a sub-system from a drop-down list.
5. In the **ITR No** box, enter the ITR number.
6. In the **Drawing** box, enter the drawing number.
7. In the **Category** box, select a category from a list.
8. In the **Status** box, select a status from a drop-down list.
9. In the **Punch Raised From** box, select a person who has raised the punch list.
10. In the **Responsible Party** box, select a responsible party from a drop-down list.
11. In the **Test Pack** box, select a test pack from a drop-down list.
12. In the **Tag No** box, enter the tag number.
13. In the **Raised Date** box, select a raised date of the punch list.
    
    The punch list report opens based on the selected data.

#### **7.3.1 Print Punch List Detail Report**

If you want to print the punch list detail report, use [![image-1652069116379.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652069116379.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652069116379.png)and [![image-1652069124035.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652069124035.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652069124035.png) (print icons) provided in the Punch List Detail Report page.

- If you want to print the current page of the punch list detail report, click [![image-1652069099724.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652069099724.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652069099724.png) (print icon including the page number).
- If you want to print all the pages of the punch list detail report, click [![image-1652069107885.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652069107885.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652069107885.png)(print icon).

#### **7.3.2 View Punch List Detail Report** 

You can view the punch list detail report in various formats by using the option [![image-1652069160264.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652069160264.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652069160264.png) provided in the upper right corner of the punch list detail report page.


### **7.4 Punch List System Report**

The **Punch List System Report** tab in the **Punch Lists** menu helps you to view a punch list system report. To view the punch list system report,

1. Click **Punch List System Report** in the **Punch Lists** menu. The **Punch List System Report** page opens.
    
    [![image-1652069207961.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652069207961.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652069207961.png)
    
     **Figure 7.4: Punch List System Report page**
2. In the **Modules** field, select **Piping** from the given modules.
3. In the **Systems** box, select a system from a drop-down list.
4. In the **Sub Systems** box, select a sub-system from a drop-down list.
    
    The punch list system report opens based on the selected data.

#### **7.4.1 Print Punch List System Report**

If you want to print the punch list system report, use [![image-1652069265200.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652069265200.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652069265200.png) and [![image-1652069273966.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652069273966.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652069273966.png)(print icons) provided in the Punch List system Report page.

1. If you want to print the current page of the punch list system report, click [![image-1652069306220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652069306220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652069306220.png) (print icon including the page number).
2. If you want to print all the pages of the punch list system report, click [![image-1652069321325.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652069321325.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652069321325.png)(print icon).

#### **7.4.2 View Punch List System Report** 

You can view the punch list system report in various formats by using the option [![image-1652069359546.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652069359546.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652069359546.png) provided in the upper right corner of the punch list system report page.


### **7.5 Punch List Sub System Report**

The **Punch List Sub System Report** tab in the **Punch Lists** menu helps you to view a punch list sub system report. To view the punch list sub system report,

1. Click **Punch List Sub System Report** in the ****Punch Lists**** menu. The **Punch List Sub System Report** page opens.
    
    [![image-1652070042852.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070042852.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070042852.png)
    
     **Figure 7.5: Punch List Sub System Report page**
2. In the **Modules** field, select **Piping** from the given modules.
3. In the **Systems** box, select a system from a drop-down list.
4. In the **Sub Systems** box, select a sub-system from a drop-down list.
    
    The punch list sub system report opens based on the selected data.

#### **7.5.1 Print Punch List Sub System Report**

If you want to print the punch list sub system report, use[![image-1652070103449.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070103449.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070103449.png) and [![image-1652070111749.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070111749.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070111749.png) (print icons) provided in the Punch List Sub System Report page.

1. If you want to print the current page of the punch list sub system report, click [![image-1652070128856.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070128856.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070128856.png) (print icon including the page number).
2. If you want to print all the pages of the punch list sub system report, click [![image-1652070145170.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070145170.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070145170.png)(print icon).

#### **7.5.2 View Punch List Sub System Report** 

You can view the punch list sub system report in various formats by using the option [![image-1652070185592.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070185592.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070185592.png) provided in the upper right corner of the punch list sub system report page.



### **7.6 Punch List Category Report**

The **Punch List Category Report** tab in the **Punch Lists** menu helps you to view a punch list category report. To view the punch list category report,

1. Click **Punch List Category Report** in the **Punch Lists** menu. The **Punch List Category Report** page opens.
    
    [![image-1652070229263.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070229263.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070229263.png)
    
     **Figure 7.6: Punch List Category Report page**
2. In the **Modules** field, select **Piping** from the given modules.
3. In the **Systems** box, select a system from a drop-down list.
4. In the **Sub Systems** box, select a sub-system from a drop-down list.
    
    The punch list category report opens based on the selected data.

#### **7.6.1 Print Punch List Category Report**

If you want to print the punch list category report, use [![image-1652070296448.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070296448.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070296448.png) and [![image-1652070305892.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070305892.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070305892.png) (print icons) provided in the Punch List Category Report page.

1. If you want to print the current page of the punch list category report, click [![image-1652070314649.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070314649.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070314649.png) (print icon including the page number).
2. If you want to print all the pages of the punch list category report, click [![image-1652070328140.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070328140.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070328140.png) (print icon).

#### **7.6.2 View Punch List Category Report** 

You can view the punch list category report in various formats by using the option [![image-1652070389962.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070389962.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070389962.png)provided in the upper right corner of the punch list category report page.

# Non-Conformance Report (NCR)

### **8.0 Non-Conformance Report (NCR)** 

NCR used to document the details of a non-conformance identified in a quality audit or other process review. The **NCR** menu helps to add an NCR in the Structural project. Once you click the **NCR** menu, the following tabs open,

[![image-1652070434784.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070434784.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070434784.png)

### **8.1 Add NCR**

The **Add NCR** tab in the **NCR** menu used to add an NCR. Do the following steps to add an NCR,

1. Click the **Add NCR** tab. The **NCR** page opens.
    
    [![image-1652070485758.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070485758.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070485758.png)
    
    [![image-1652070492845.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070492845.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070492845.png)
    
    [![image-1652070505269.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070505269.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070505269.png)
    
    [![image-1652070513900.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070513900.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070513900.png)
    
    [![image-1652070525879.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070525879.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070525879.png)
    
     **Figure 8.1: NCR page**
    
    [![image-1652070550378.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070550378.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070550378.png) **Tip**: A report number for a new NCR will be updated automatically in the **Report Number** box.
2. In the **Type** box, select the type of non-conformance from a drop-down list.
3. In the **Classification** box, select whether minor classification or major classification from a drop-down list.
4. In the **Source/ Item** box, select the source of NCR from a drop-down list.
5. To add controlling/ reference documents,
    
    [![image-1652070579007.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070579007.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070579007.png)
    
    
    1. 1. 1. Click [ ![image-1652070606962.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070606962.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070606962.png) (**ADD** button) in the **Controlling/ Reference documents** box.
                
                A new window opens in the **Doc No** column.
            2. Enter the document number in the new window of the **Doc No** column.
            3. Enter the description for the document in a box of the **Description of document** column.
            4. Enter the section reference number in a box of the **Section ref No** column.
            5. Click **Save**.
6. In the ****NCR**** box, enter the description for the identified deficiency of the selected non-conformance type.
7. In the **Reference Document** box, enter the reference document detail.
8. In the **Owner Reference Document** box, enter the owner reference document detail.
9. In the **Supplier Reference Document** box, enter the supplier reference document detail.
10. In the **NCR originator** box, enter the originator of NCR.
11. In the **Origin** **Date** box, select the origin date of NCR.
12. In the **NCR Accepted By** box, enter the name of a person who has accepted the NCR.
13. In the **NCR Accepted Date** box, select the NCR accepted date.
14. In the **Agreed Closure Date** box, select the agreed closure date.
15. In the **Issued By** box, select the company who has issued the NCR.
16. In the **Issued To** box, select the company for which the NCR has issued.
17. In the **Root Cause** box, enter the root cause detail.
18. If you want to add the corrective action detail, do the following,
    
    
    1. 1. 1. In the **Action** box, select any corrective action from the given options.
            2. In the **Corrective Action** box, enter the corrective action detail.
            3. In the **Proposed by** box, enter the name of a person who has proposed the corrective action.
            4. In the **Target Close-out Date** box, select the target close out date.
            5. In the **Preventive Action** box, enter the preventive actions.
            6. In the **Probability** box, select the probability percentage of non-conformance.
            7. In the **consequences** box, select the consequences level you have faced.
19. If you want to add any remarks, click ****Remarks**** option and enter your remarks, otherwise click ****No Remarks**** option.
20. In the ****Verification**** box, enter the verification detail on completion of corrective action/ preventive action.
21. In the **Inspected by QC Inspector**, and **Date** boxes, enter the name of the QC inspector who has inspected the NCR, and date, respectively.
22. In the **Verified and NCR closed by**, and **Date** boxes, enter the name of a person who has verified and closed the NCR, and date, respectively.
23. In the ****Supplier NCR Close out by****, and ****Close Out Date**** boxes, enter the name of a person who has closed the supplier NCR, and close out date, respectively.
24. In the ****Owner NCR Close out by****, and ****Close Out Date**** boxes, enter the name of a person who has closed the owner NCR, and close out date, respectively.
25. In the ****Approval Req**** box, if you need approval, click ****Yes,**** otherwise click **NO.**
26. If you have selected ****Yes****, you must enter the reference detail in the ****If Yes, Then Reference****
27. In the **Description** box, enter the description of proposal.
28. In the **Proposal Accepted by**, and **Date** boxes, enter the name of a person who has accepted the proposal, and date, respectively.
29. In the NCR Close Notes box, enter the NCR close notes.
30. In the ****Disposition Completed by,**** and ****Date**** boxes, enter the name of a person who has completed the disposition, and date, respectively.
31. Click **Save**.

The NCR is successfully added.

### **8.2 View NCR**

The **View NCR** tab helps you to add, view, and edit the NCR, which is added by using the **Add NCR** tab.

1. Click the **View NCR** tab in the **NCR** menu. The **View NCR** page opens with added NCR.
    
    [![image-1652070974200.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652070974200.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652070974200.png)
    
     **Figure 8.2: View NCR page**

#### **8.2.1 Add an NCR**

If you want to add an NCR, do the following,

1. Click [![image-1652071020947.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652071020947.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652071020947.png) (**ADD** button) in the **View NCR** page. The **View NCR** page redirects you into the **NCR** page. Follow the same procedure in the topic, “[**<u>Add NCR</u>**](http://wiki.cuteinfocomm.com/link/72#bkmrk-8.1-add-ncr)” to add an NCR.

#### **8.2.2 Print an NCR**

If you want to print an NCR, click [![image-1652071063247.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652071063247.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652071063247.png) (**Print** button) provided in the upper side of the **View NCR** page. See Fig 8.2.

#### **8.2.3 Attach a File into an NCR** 

If you want to attach any file with any NCR listed in the **View NCR** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **8.2.4 Update Any NCR**

If you want to update any existing NCR in the **View** **NCR** page, click [![image-1652071121785.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652071121785.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652071121785.png) (Update icon) in the **Update** column for the respective NCR. See Fig 8.2. Edit the details in the respective box you want.

#### **8.2.5 Export NCR**

You can export the NCR added in the **View NCR** page in the pdf and excel formats. To know how to export, see the topic, “[**<u>Export Areas list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.1.4%C2%A0export-areas-l)” in the **Area** option.

#### **8.2.6 Delete NCR**

If you want to delete any NCR in the **View NCR** page, click[![image-1652071182518.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652071182518.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652071182518.png) (Delete icon) provided in the **Delete** column of the **View NCR** page, See Fig 8.2.

# Documentation

### **9.0 Documentation**

The **Documentation** menu used to combine the number of files, which are attached to every menu of this ***cuteQM*** app. The combined files will be shown as a pdf file. This menu also used to attach a new file to a module that is not provided with an attachment option to attach any file.

### **9.1 Document Upload**

The **Document Upload** tab in the **Documentation** menu used to upload documents for various process.

1. Click **Document Upload** in the **Documentation** menu. The **Upload Documents** page opens.
    
    [![image-1652071269981.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652071269981.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652071269981.png)
    
     **Figure 9.1: Upload Documents page**
2. Select a file which you want to upload by click **Select a file for upload**.
    
    The selected file will be added in the **File Upload** window.


### **9.2 Manufacture Data Report (MDR) Settings**

The **MDR** **Settings** tab in the **Documentation** menu helps you to do page setup for the pdf file which will be shown after combining the attached files.

1. Click the **MDR Settings** tab. The **MDR Settings** page opens.
    
    [![image-1652071331435.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652071331435.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652071331435.png)
    
     **Figure 9.2: MDR Settings page**
2. In the **Page Numbering** box, select the page numbering option that is whether **Section wise** or **Continuous**.
3. In the **Page Number (Digits)** box, select the page number displaying format from a drop-down list.
4. If you want to append the section number with the page number, click ****Yes,**** otherwise click ****No**** in the ****Append Section number with Page number**** box.
5. In the **Page Number Template** box, select the page number template from a drop-down list.
6. If you want to add the starting page numbers from TOC, click ****Yes,**** otherwise click ****No**** in the ****Page Number Starting From TOC ?****
7. If you want to add alphabet page numbers, click **Yes,** otherwise click **No** in the **Alphabet Page number?** box.
8. In the **Logo** box, attach your logo by using [![image-1652071404328.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652071404328.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652071404328.png) (**Browse** button).
9. Click **Save**.


### **9.3 Document Category**

The **Document Category** tab in the **Documentation** menu used to attach a file to any module that is not provided with an attachment option to attach any file. Before attaching a file for any module, you must add the relevant category name of the module.

#### **9.3.1 Add a Document Category**

1. Click the **Document Category** tab. The **Document Category** page opens.
    
    [![image-1652071469441.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652071469441.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652071469441.png)
    
     **Figure 9.3: Document Category page**
2. Click [![image-1652071496313.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652071496313.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652071496313.png)(**ADD** button) in the **Document Category** page. A new window opens to add a document category.
    
    [![image-1652071506965.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652071506965.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652071506965.png)
3. In the **Category Name** box, enter the relevant category name for the module for which you want to attach a file.
4. In the **Description** box, enter the description for the added category.
5. Click ****Save****. (OR)
6. If you want to import any document category from another vessel, Click ****Import from Another Vessel****. The **Import from Another Vessel** window opens.
    
    [![image-1652071555479.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652071555479.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652071555479.png)
    
      
    
    1. 1. 1. In the **Equipment** box, select an equipment from a drop-down list.
            2. Click **Save**.

The added category name will be listed in the **Document Category** page. Once you have added the document category, you can attach any file to the added category.

#### **9.3.2 Attach a File into an Added Document Category**

If you want to attach any file with the added category listed in the **Document Category** page, follow the procedures given in the topic “[**<u>Attach a file into a client master drawing</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data-qXJ/#bkmrk-3.2.2%C2%A0attach-a-file-)” in the **Client Master Drawing** section.

#### **9.3.3 Edit Any Document Category**

If you want to edit any existing category in the **Document Category** page, click [![image-1652071641422.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652071641422.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652071641422.png)(Edit icon) for the respective category, and then edit the details in the respective box.

#### **9.3.4 Delete Any Document Category**

If you want to delete any specific added category from the list, you can use [![image-1652071676082.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652071676082.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652071676082.png)(Delete icon) provided in the **Delete** column of the **Document Category** page, See Fig 9.3.



### **9.4 One Click Documentation**

The **One Click Documentation** tab used to combine the attached file of the various module.

1. Click the **One Click Documentation** tab. The **One Click Documentation** page opens.
    
    [![image-1652071745375.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652071745375.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652071745375.png)
    
     **Figure 9.4: One Click Documentation page**
    
    The **One Click Documentation** page shows a list of reports name of each module including the attachment file counts. This page also shows the list of document categories including their attachments, which are added using the [**<u>Document Category</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/documentation-O15/#bkmrk-9.3%C2%A0document-categor) tab. [![image-1652071777626.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652071777626.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652071777626.png) **Note**: If you want to edit any existing category in the **Document Category** page, click [![image-1652071796556.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652071796556.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652071796556.png) (Edit icon) for the respective category, and then edit the details in the respective box.
2. Click the check box of the respective reports which you want to combine.
3. Click **Generate MDR**.
    
    The system combines the selected files and shows as the pdf file in the left side of the **One Click Documentation** page, See Fig 9.4.
    
    [![image-1652071832723.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1652071832723.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1652071832723.png)**Tip**: You can view the pdf file by clicking the respective pdf file. The file will be opened including the data in the combined files.

