Ship structural Manage all the inspections related to Ship Structural Module Ship Structural  Hull 1.Click Ship Structural module at the top. The Hull menu in the cuteQM app helps you to add the master data. Once you click the Hull menu, the following tabs open, Master, Inspection, and Reports.                                                                             Fig 1 Ship Structural Hull 1.0 Master The Hull menu in the cute QM app helps you to add the master data. Once you click the Hull menu, the following tabs open, Master, Inspection, and Reports. 1.Click Hull in the  menu,The Master page opens. 1.1.0 Block You can add the details of Block to be used in the Ship Structural project by using the Block tab in the Hull menu. If youwant to navigate to Block Master,1.Click Block in the Hull menu,The Block Master page opens.                                                                  Fig 1.1.0 Block in Ship Structural 1.1.1 Add a Block Master If you want to add a block, do the following steps,1. Click  (ADD button) in the Block Master page. See Fig 1.1.1 A new window opens to add a new Block Master.                                                                                  Fig 1.1.1 Add a block Master. Enter Block number. Enter revision details of the block number In the Subcontractor box, select from the drop-down list.The subcontractor data must match with actual subcontractor who will creating the QIF to avoid disappear. Note: The fields notified with a symbol (*) are mandatory. You must enter the relevant details in that fields before saving. Click Save. The Block Master is successfully added and listed in the Block page. 1.1.2 Edit a Block Master If you want to edit any existing Block master in the Block master page,                                                                            Fig 1.1.2 Edit a Block Master Click (Edit icon) of the respective Block. Fig See 1.1.2 The Block page shows the details of the selected Block. Edit the details of Block no,Revision no and Subcontrator  as required Click Save. Block updated successfully. 1.1.3 Delete a Block Master If you want to delete any existing block in the Block page, you can use (Delete icon) provided in the Block page. By click confirm delete Click (Delete icon) for the corresponding area. You receive a notification message “Confirm Delete?”. Click OK.                                                                                                                                                                 The Block is deleted successfully. 1.1.4 Export a Block Master You can export a list of Block added in the Block Master page in both the pdf and excel formats by using (PDF button) and  (Excel button). Fig See 1.1.4 page.                                                                                      Fig 1.1.4 Export in Block 1.1.5 Filter a Block Master If you want to filter any specific Block in the Block Master page, you can use (FILTER button) located on the block page.                                                                       Fig 1.1.5 Filter a Block page. 1.2 Frames & Panels The Frames & Panels tab in the Hull menu helps you to add the details of Frames & Pannels to be in used in the Ship structural. If you want to navigate to Frames & Pannels,                                                                              Fig 1.2 Frames & Pannels Page 1.2.1 Add a Frames and Pannels If you want to add a Frames & Pannels, do the following steps,1. Click  (ADD button) in the Frames & Pannels page. See Fig 1.2.1 A new window opens to add a Frames & Pannels.                                                                                   Fig 1.2.1 Add a Frames & Pannels Note: The fields notified with a symbol (*) are mandatory. You must enter the relevant details in that fields before saving. In the Block box, select from the drop-down list. In the Frame and Pannel Number, entre the Frame and Pannel number. In the subcontractor box,select the subcontractor from dropdown list.The subcontractor data must match with actual subcontractor who will creating the QIF to avoid disappear. Click Save. The Frame is successfully added and listed in the Frames page. 1.2.2 Edit a Frame & Panel If you want to edit any existing Frame & Panel master in the Frame & Panels page,                                                                             Fig 1.2.2 Edit a Frames and panel Master Click (Edit icon) of the respective Frame. Fig See 1.2.2 The Frame & Pannels page shows the details of the selected Frame. Edit the details of Block no,Frames and panel no and Subcontractor as required. Click Save. Frames updated successfully. 1.2.3 Delete a Frames & Panels If you want to delete any existing frames  in the Frames & Panels page, you can use (Delete icon) provided in the Frames & Pannels page. By click confirm delete Click (Delete icon) for the corresponding area. You receive a notification message “Confirm Delete?”. Click OK.                                                                                                                                                                 The Frames & Panel deleted successfully. 1.2.4 Export in Frames & Panels You can export a list of Frames & Panels added in the Frames page in both the pdf and excel formats by using (PDF button) and  (Excel button). Fig See 1.2.4 page                                                                             Fig 1.2.4 PDF & Excel in Frames & Pannels 1.2.5 Filter a Frames & Panels If you want to filter any specific Frames in the Frames and Panels page, you can use (FILTER button) located on the Frames page.                                                                  Fig 1.2.5 Filter a Frames & Pannels Page. 1.3 Hull Parts The Hull Parts tab in the Hull menu helps you to add the details of Hull Parts to be in used in the Ship structural. If you want to navigate to Hull Parts,                                                                            Fig 1.3 Hull Parts Page 1.3.1 Add a Hull Parts If you want to add a Hull Parts, do the following steps,1. Click  (ADD button) in the Hull Pages page. See Fig 1.3.1A new window opens to add a Hull Parts.   Note: The fields notified with a symbol (*) are mandatory. You must enter the relevant details in that fields before saving. In the Block box, select from the drop-down list. In the Frame and Pannel Number, entre the Frame and Pannel number. In the Part Code box, enter the Part code number. In the Party Type box, enter the part type number. In the Area box, enter the area number. In the Length box, enter the Length number. Click Save. The Hull Parts is successfully added and listed in the Hull page. 1.3.2 Edit a Hull Parts If you want to edit any existing Hull Parts in the Hull,                                                                            Fig 1.3.2 Edit a Hull Parts Click (Edit icon) of the respective Frame. Fig See 1.3.2 The Hull Parts shows the details of the selected Hull Parts. Edit the details where you want. Click Save. Hull Parts updated successfully. 1.3.3 Delete a Hull Part If you want to delete any existing hull part in the Hull Parts page, you can use (Delete icon) provided in the Hull Parts page. By click confirm delete Click (Delete icon) for the corresponding area. You receive a notification message “Confirm Delete?”. Click OK.                                                                                                                                                                 The Hull Parts deleted successfully. 1.3.4 Export in Hull Parts You can export a list of Hull added in the Hull Part page in both the pdf and excel formats by using (PDF button) and  (Excel button). Fig See 1.3.4 page                                                                             Fig 1.3.4 Export a Hull Parts 1.3.5 Filter a Hull Part If you want to filter any specific Hull in the Hull Parts of page, you can use (FILTER button) located on the Hull page.                                                                   Fig 1.5.5 Filter a Hull Parts Page. 1.3.6 Import  Hull Parts If you want to Import multiple Hull parts together, do the following steps, Click (IMPORT button) in the Basic drawing screen. Refer above fig It will redirected to import page Click (TEMPLATE button) . An excel worksheet will be downloaded with a predefined template to enter the details of  Basic Drawing details. Once you have added the  details in the excel worksheet, save the excel worksheet on your computer. After  saved the excel, browse  and upload the excel, Automap  -This function is used to map system columns and excel columns automatically. Map - This function is used to map each system and excel columns manually Unmap - This is used to remove the mapped column Unmap all -This is used to remove the all mapped columns Click populate values ,process and Import buttons. Refer below fig Hull parts imported successfully. 1.3.7 View Log  Hull Parts You can also use (View Log button) located on the Equipment list. Click (View Log button). See Fig1.3.7 A new window opens for Log Details.Herewe can see the imported Hull part details 2. Inspection The Hull menu in the cuteQM app helps you to add the Inspection data. Once you click the Hull menu, the following tabs open, RFI Hull Fabrication, RFI Hull Assembly, RFI Hull Erection, Other Inspection and View Other Inspection.                                                                      Fig 2. Inspection in Hull 2.1.0 RFI Hull Fabrication List The RFI Hull Fabrication tab in the Hull menu helps you to add the details of RFI Hull Fabrication List to be in used in the Ship structural. If you want to navigate to RFI Hull Fabrication List,                                                                              Fig 2.1.0 RFI Hull Fabrication List Page. 2.1.1 Add RFI Hull Fabrication List CuteQM_Production role user can add/edit RFI Hull Fabrication If you want to add a Hull RFI Hull Fabrication List , do the following steps,1. Click  (ADD button) in the RFI Hull Pages. See Fig 2.1.1A new window opens to add a RFI Hull Fabrications List.                                                                  Fig 2.1.1 Add a Hull Fabrication List Page Click (Add Selected Hull Parts) of the respective block you want to add.                                                               Fig 2.1.1 RFI Hull Fabrication request Page In the Inspection Date and Time box, select the inspection date and time. In the Subcontractor box, select a subcontractor from a drop-down list. Select Inspection type In the Description box, type the description. Click (Add Selected System) of the respective system you want to add. The added Hull parts will be moved and listed in the right side of the page. Tip: If you want to remove any added block, click (Remove icon) of the respective block. In the Description box, enter the description for the added RFI Hull Fabrication Request. Click Save. The RFI Hull Fabrication list request is successfully added. 2.1.2 Edit a RFI Hull Fabrication List If you want to edit any existing RFI Hull Fabrication up request in the RFI Hull Fabrication page, do the following, Click (Edit icon) in the Edit column for the respective RFI Hull Fabrication Request. See Fig 2.1.2 The RFI Hull Fabrication Request page opens with the details of the selected RFI Hull Fabrication list.                                                              Fig 2.1.2 Edit a RFI Hull Fabrication Request Page Add/remove any hull parts Click Save. 2.1.3 Submit a RFI Hull Fabrication List Once you have added the RFI Hull fabrication request, the Submission column in the RFI Hull fabrication List page is appeared with(Submit and Reject icons). See Fig 2.1.3                                                    Fig 2.1.3 Submit & Approve a RFI Hull Fabrication List Page If you want to submit the RFI Hull Fabrication list, click (Submit icon) in the Submit column. Otherwise click (Reject icon) to reject the request. Once you have submitted the RFI Hull Fabrication list request, in the Confirm Status column in the RFI Hull Fabrication List page is appeared with(Confirm and Reject icons). The approved request will be moved to for inspection. 2.1.4 Approve RFI Hull Fabrication Request cuteQM_Licensee_QA user only can approve the RFI request. If you want to approve the RFI Hull Fabrication request, click (confirm icon) in the Confirm Status Otherwise click (Reject icon) to reject the request.2. Once RFI Hull Fabrication list  icon will be enabled to put result. 3.  Click icon  result popup will open.                                                     Fig 2.1.4 Approve RFI Hull Fabrication Result Page Click Save RFI result is updated successfully. If RFI Accepts with comments given as result then punch list will be created, and this will be shown in view punch list screen. If need to upload documents against Hull part, then click attachment icon at the result popup and upload documents. 2.1.5 Print RFI Hull fabrication list If you want to print an RFI Hull Fabrication list, click  (print icon) provided in the Report column of the RFI Hull Fabrication List In the print, user can see the signature of both the production user and QC .                                                                                Requestor signature mapped with Production and Inspector signature mapped with QC. Click here to find the steps to upload Digital signature                                                                     Fig 2.1.5 View a RFI Hull Fabrication List Page 2.1.6 Attach a File into a RFI Hull Fabrication List If you want to attach a file with any existing RFI hull fabrication list listed in the RFI Hill Fabrication List page, you can attach the file by using (Attach icon) in the Attachment column. A new window opens for file upload.In the category box, select the category from drop-down list.Select Browse and upload the documents. 2.1.7 Export a RFI Hull Fabrication list You can export a list of RFI Hull Fabrication list requests added in the RFI Hull Fabrication List page in both the pdf and excel formats by using (PDF button) and (Excel button).                                                                Fig 2.1.7 Export a RFI Hull Fabrication list 2.1.8 Filter a RFI Hull Fabrication List If you want to filter any specific RFI fit hull fabrication list in the RFI Hull fabrication list page, you can use (FILTER button) located on the RFI Hull Fabrication list.  2.2.0 RFI Hull Assembly Click HULL in the inspection menu.The RFI Hull Assembly List page opens.                                                                          Fig 2.2.0 RFI Hull Assembly List Page 2.2.1 Add a RFI Hull Assembly List cuteQM_Production role users can create RFI request.If you want to add an RFI Hull Assembly list request, do the following,                                          Fig 2.2.1 Add an RFI Hull Assembly List Page Click (ADD button) in the RFI Hull Assembly List page. A new page opens to add an RFI Hull Assembly request. In the Subcontractor box, select the name of a sub-contractor from a drop-down list. In the Inspection Date & Time box, select the date of inspection. Select inspection type (Fitup/Weld visual) In the Description box, enter the description for the inspection. Click the check box of the respective frames Click (Add Selected Hull button). Click Remove if you want to remove it. 2.2.2 Edit a RFI Hull Assembly list. If you want to edit any existing RFI Hull Assembly  request in the RFI Hull Assembly page, do the following, Click (Edit icon) in the Edit column for the respective RFI Hull Assembly Request. See Fig 2.2.2 The RFI Hull Assembly request page opens with the details of the selected RFI Hull Assembly request list.                                                               Fig 2.2.2 Edit a RFI Hull Assembly Request Page Edit the details in the respective box.And add/remove any hull part Click Save. RFI Hull assembly request updated successfully. 2.2.3 Submit a RFI Hull Assembly List Once you have added the RFI Hull Assembly List,  RFI Hull Assembly List page is appeared with(Submit and Reject icons). See Fig 2.2.3                                                         Fig 2.2.3 Submit a RFI Hull Assembly List If you want to submit the RFI Hull Assembly request, click (Submit icon) in the Submit column. Otherwise click (Reject icon) to reject the request. The submitted request will be moved to for inspection. 2.2.4 Approve RFI Hull Assembly Request cuteQM_LisenceeQA role user only can approve the RFI request. If you want to approve the RFI Hull assembly request, click (confirm icon) in the Confirm Status Otherwise click (Reject icon) to reject the request.2. Once RFI request approved icon will be enabled to put result. 3.  Click icon  result popup will open.                                                   Fig 2.2.4 Approve RFI Hull Assembly List Page Click Save RFI result is updated successfully. If Accepted with comments  given then punch list will be created, and this will be shown in view punch list screen. If need to upload documents against system No, then click attachment icon at the result popup and upload documents. 2.2.5 Print RFI Hull Assembly List If you want to Print a RFI Hull Assembly list request, click  (print icon) provided in the Report column of the RFI Hull Assembly List page. See Fig 2.2.4 View a RFI Hull Assembly list. In the print,user can see the signature of both production user and QC.                                                                                      Requestor signature mapped with Production user and Inspector signature mapped with QC . Click here to find the steps to upload Digital signature 2.2.6 Attach a File into a RFI Hull Assembly List If you want to attach a file with any existing RFI hull assembly list listed in the RFI Hull Assembly List page, you can attach the file by using (Attach icon) in the Attachment column. A new window opens for file upload.In the category box, select the category from drop-down list.Select Browse and upload the documents.                                                              Fig 2.2.6 Attach a RFI Hull Assembly List 2.2.7 Export a RFI Hull Assembly List You can export a list of RFI  Hull Assembly list visual list requests added in the RFI Hull Assembly list page in both the pdf and excel formats by using (PDF button) and (Excel button).                                                           Fig 2.2.7 Export a RFI Hull Assembly List. 2.2.8 Filter a RFI Hull Assembly list If you want to filter any RFI Hull Assembly List request from the list of RFI requests in the RFI Hull Assembly List page, you can use (FILTER button).                                             Fig 2.2.8 Filter a RFI Hull Assembly List 2.3.0 RFI Hull Erection Click HULL in the inspection menu.The RFI Hull Erection List page opens.                                                                      Fig 2.3.0 RFI Hull Erection List Page 2.3.1 Add a RFI Hull Erection List .CuteQM_Production role user only can add/edit RFI requests. If you want to add an RFI Hull Erection list request, do the following,                                                              Fig 2.3.1 Add an RFI Hull Erection List Page Click (ADD button) in the RFI Hull Erection List page. A new page opens to add an RFI Hull Erection request. In the Subcontractor box, select the name of a sub-contractor from a drop-down list. In the Inspection Date & Time box, select the date of inspection. In the Inspection Type box, choose an inspection type from given list. In the Description box, enter the description for the inspection. Click the check box of the respective compartments. Click (Add Selected blocks button). Click Remove if you want to remove it. Click save buttion. RFI Hull erection request created successfully. 2.3.2 Edit a RFI Hull Erection List If you want to edit any existing RFI Hull Erection list up request in the RFI Hull erection page, do the following, Click (Edit icon) in the Edit column for the respective RFI Hull erection list. See Fig 2.3.2 The RFI Hull Erection request page opens with the details of the selected RFI Hull erection request list.                                                              Fig 2.3.2 Edit a RFI Hull Erection List Page Edit the details in the respective box. Click Save. 2.3.3 Submit a RFI Hull Erection List Once you have added the RFI Hull Erection List, the result column in the RFI Hull Erection List page is appeared with(Submit and Reject icons). See Fig 2.3.3                                                   Fig 2.3.3 Submit a RFI Hull Erection List If you want to submit the RFI Hull Erection List request, click (Submit icon) in the Submit column. Otherwise click (Reject icon) to reject the request. The submitted request will be moved to for inspection. 2.3.4 Approve RFI Hull Erection Request cuteQM_Lisencee QA role user only can approve the RFI request. If you want to approve the RFI Hull Erection request, click (confirm icon) in the Confirm Status Otherwise click (Reject icon) to reject the request.2. Once RFI request approved icon will be enabled to put result. 3.  Click icon  result popup will open.                                                   Fig 2.3.4 Approve RFI Hull Erection List Page Click Save RFI result is updated successfully. If Accept with comments given as result,then punch list will be created, and this will be shown in view punch list screen. If need to upload documents against system No, then click attachment icon at the result popup and upload documents. 2.3.5 Print a RFI Hull Erection List If you want to Print an RFI Hull Erection List, click  (print icon) provided in the Report column of the RFI Hull erection list page. In the print,user can see the signature of both production user and QC.                                                                            Requestor signature mapped with Production user and Inspector signature mapped with QC . Click here to find the steps to upload Digital signature                                                                           See Fig 2.3.5 Print a RFI Hull Erection List. 2.3.6 Attach a File into RFI Hull Erection List If you want to attach a file with any existing RFI hull Erection list listed in the RFI Hull Erection List page, you can attach the file by using (Attach icon) in the Attachment column. A new window opens for file upload.In the category box, select the category from drop-down list.Select Browse and upload the documents.                                                               Fig 2.3.6 Attach a RFI Hull Erection List. 2.3.7 Export a RFI Hull Erection List You can export a list of RFI Hull Erection List requests added in the RFI Hull erection list page in both the pdf and excel formats by using (PDF button) and (Excel button).                                                           Fig 2.3.7 Export a RFI Hull Erection list Page. 2.3.8 Filter a RFI Hull Erection List If you want to filter any RFI Hull erection List request from the list of RFI requests in the RFI Hull Erection List page, you can use (FILTER button).                                                                                Fig 2.3.8 Filter a RFI Hull Erection List Page 2.4.0 Other Inspection Click Hull in the inspection menu.The Other Inspection page opens.                                                                       Fig 3.0 Other Inspection Page1. To add Inspection type select any Inspection type from the drop-down list2. Select the Block Number.3. Click  RFQ Inspection4. A new window opens for Inspection to enter the data and time.5. In the Description box, enter the description for the inspection.6. Click Save. 2.4.1 View  Other Inspection. If you want to view a View Other Inspection. click view other inspection menu.                                                   Fig 2.4.1 View an Other Inspection page. 2.4.2 Submit an Other Inspection cuteQM_Production role user only can submit RFI request.                                                                        Fig 2.4.2 Submit a View Other Inspection Once you have added the View Other Inspection request list, the Submit column in the View other Inspection page is appeared with (Submit and Reject icons). If you want to submit the View Other Inspection request, click (Submit icon) in the Request Status Otherwise click (cancel icon) to cancel the request. The submitted request will be moved to for View Other Inspection. 2.4.3 Approve a  Other Inspection cuteQM_Lisencee QA role user only can approve the RFI request. If you want to approve the view other inspection request, click (confirm icon) in the Confirm Status Otherwise click (Reject icon) to reject the request.2. Once RFI request approved icon will be enabled to put result. 3.  Click icon  result popup will open.                                                   Fig 2.4.3 Approve View Other Inspection Page Click Save Result is updated successfully. If Accept with comments given as result, then punch list will be created, and this will be shown in view punch list screen. If need to upload documents against system No, then click attachment icon at the result popup and upload documents. 2.4.4 Print an other inspection. If you want to print other Inspection, click  (print icon) provided in the Report column of the view other inspection list page.   In the print,user can see the signature of both production user and QC.                                                                                           Requestor signature mapped with Production user and Inspector signature mapped with QC . Click here to find the steps to upload Digital signature                                                                           See Fig 2.4.4 Print an Other Inspection Page 2.4.5 Attach a File for other Inspection. If you want to attach a file with any existing view other inspection list  in the other inspection page, you can attach the file by using (Attach icon) in the Attachment column. A new window opens for file upload.In the category box, select the category from drop-down list.Select Browse and upload the documents.  2.4.6 Export an  Other Inspection request You can export a list of View other Inspection requests added in the View Other Inspection List page in both the pdf and excel formats by using (PDF button) and (Excel button).                                                               Fig 2.4.6 Export a View other Inspection 2.4.7 Filter a View Other Inspection request If you want to filter any specific filter a view other inspection in view other inspection List page, you can use the filter box provided in the upper side of the Filter a View other Inspection To filter the any View Other Inspection request, select the Report Number, Inspection Date and Date in the boxes and click. you can use (FILTER button) located on the View Other Inspection. 2.5 Hull Parts Summary We can see the summary of all the RFI requests for all the Hull parts here. You can export a list of hull parts summary added in the Hull Parts Summary page in both the pdf and excel formats by using (PDF button) and (Excel button). 2.5.1 Filter a Hull Parts Summary If you want to filter any specific Hull Parts Summary in the Hull Parts Summary page, 3.0 Outfitting Area Click Outfitting in the Master menu.The Outfitting page opens.                                                                                   Fig 3.0 Out Fitting Page 3.1 Add an Outfitting Area If you want to add an Outfitting Area, do the following steps,Click (ADD button) in the Outfitting area List. A new page opens to add an Outfitting area request.  In the Area box, enter an area number. In the Description box, enter the description for the inspection. Click Save. The Area is successfully added in Outfitting area page. 3.1.2 Edit an Outfitting Area. 1.Click (Edit icon) of the respective Fig See 3.1.2 The page shows the details of the selected Area.1. Edit Are and description as required.2. Click Save. 3.1.3 Delete an Outfitting Area If you want to delete any existing system in the Outfitting Area page, you can use (Delete icon) provided in the Outfitting page. By click confirm delete Click (Delete icon) for the corresponding area. You receive a notification message “Confirm Delete?”. Click OK.                                                                                                                                                                                  The Outfitting Area deleted successfully. 3.1.4 Export a Outfitting Area You can export a list of outfitting area added in the outfitting page in both the pdf and excel formats by using (PDF button) and  (Excel button). Fig See35.1.4 page                                                              Fig 3.1.4 Export a painting work page 3.1.5 Filter an outfitting area If you want to filter any specific outfitting area in the outfitting area page, you can use (FILTER button) located on the outfitting area page.                                                                Fig 3.1.5 Filter an outfitting area page 3.2 Outfitting Work Click Outfitting in the Master menu.The Outfitting page opens.        3.2 Out Fitting Work Page 3.2.1 Add an Outfitting Work If you want to add an Outfitting Work, do the following steps,Click (ADD button) in the Outfitting work List. A new page opens to add an Outfitting work request.  In the Frames and Panel box, enter an area number. In the Drawing Number box, enter the drawing number. In the Area Box select for the drop-down list. In the Description Item box, enter the description item. Click Save. The Outfitting work is successfully added in Outfitting work page. 3.2.2 Edit an Outfitting work. 1.Click (Edit icon) of the respective Fig See 3.2.2 The page shows the details of the selected work.1. In work box, enter an area number.2. Click Save.Outfitting work updated successfully. 3.2.3 Delete an Outfitting work. If you want to delete any existing system in the Outfitting work page, you can use (Delete icon) provided in the Outfitting page. By click confirm delete Click  (Delete icon) for the corresponding work. You receive a notification message “Confirm Delete?”. Click OK.                                                                                                                                                                                  The Outfitting work is deleted successfully. 3.2.4 Export an Outfitting Work You can export a list of outfitting work added in the outfitting page in both the pdf and excel formats by using (PDF button) and  (Excel button). Fig See3.2.4 page                                                              Fig 3.2.4 Export an Outfitting Work page 3.2.5 Filter an outfitting Work If you want to filter any specific outfitting work in the outfitting work page, you can use (FILTER button) located on the outfitting work page. 3.2.6 Import an Outfitting Work If you want to Import multiple work parts together, do the following steps, Click (IMPORT button) in the outfitting work. Refer above fig3.2.6 It will redirected to import page Click (TEMPLATE button) . An excel worksheet will be downloaded with a predefined template to enter the details of. Once you have added the outfitting details in the excel worksheet, save the excel worksheet on your computer. After saved the excel, browse and upload the excel. Automap  -This function is used to map system columns and excel columns automatically. Map - This function is used to map each system and excel columns manually Unmap - This is used to remove the mapped column Unmap all -This is used to remove the all the mapped columns Click populate values ,process and Import buttons. Refer below fig Outfitting details imported successfully. 3.3 RFI Fabrication Click Outfitting in the Master menu.The RFI Fabrication page opens.                                      Fig 3.2 RFI Fabrication Page 3.3.1 Add a RFI Fabrication cuteQM_Production role user only can add RFI request.If you want to add an RFI Fabrication, do the following steps,Click (ADD button) in the Outfitting work List. A new page opens to add a RFI fabrication request.  In the Inspection Date & Time box, select the inspection date and time. In the Subcontractor box, select the subcontractor from the drop-down list. In the Inspection Type box, choose by selecting anyone. In the Description Item box, enter the description. Click (Add Selected Outfitting) of the respective outfitting you want to add. The added outfitting will be moved and listed in the right side of the page. Tip: If you want to remove any added outfitting, click (Remove icon) of the respective joint. In the Description box, enter the description for the added RFI fabrication request. Click Save. The RFI Fabrication request is successfully added. 3.3.2 Edit a RFI Fabrication list 1.Click (Edit icon) of the respective Fig See 3.3.2 The page shows the details of the selected Outfitting.1. In the Subcontractor box, select the subcontractor from the drop-down list. 2. Click Save. 1. If you want to edit an Inspection date, then you can click  edit button to edit inspection date.2. Click Save. 3.3.3 Submit a RFI Fabrication List Once you have added the RFI fabrication request, the Submission column in the RFI Fabrication Lists page is appeared with(Submit and Reject icons). See Fig 3.3.3                                                        Fig 3.3.3 Submit & Approve a RFI Fabrication Page If you want to submit the RFI fabrication request, click (Submit icon) in the Submit column. Otherwise click (Reject icon) to reject the request. Once you have submitted the RFI fabrication list request, in the Confirm Status column in the RFI Fabrication List page is appeared with(Confirm and Reject icons). The approved request will be moved to for inspection. 3.3.4 Approve RFI Fabrication List. cuteQM_Licensee_QA user only can approve the RFI request. If you want to approve the RFI Fabrication list request, click (confirm icon) in the Confirm Status Otherwise click (Reject icon) to reject the request.2. Once RFI request approved icon will be enabled to put result. 3.  Click icon  result popup will open.                                                     Fig 3.3.4 Approve RFI Fabrication Page Click Save RFI result is updated successfully. If Accepted with comments given as result, then punch list will be created, and this will be shown in view punch list screen. If need to upload documents against system No, then click attachment icon at the result popup and upload documents. 3.3.5 Print RFI Fabrication list report. If you want to print an RFI fabrication report, click  (print icon) provided in the Report column of the RFI Fabrication page.      In the print,user can see the signature of both production user and QC.                                                                                           Requestor signature mapped with Production user and Inspector signature mapped with QC .  Click here to find the steps to upload Digital signature                                                                     Fig 3.3.5 View a RFI Fabrication page.                                                                Fig 3.3.5 RFI Fabrication print Page 3.3.6 Attach a File into a RFI Fabrication If you want to attach a file with any existing RFI fabrication list listed in the RFI Fabrication page, you can attach the file by using (Attach icon) in the Attachment column.                                                          Fig 3.3.6 Attach a RFI Fabrication Page 3.3.3 Export a RFI Fabrication list You can export a list of RFI Fabrication added in the outfitting page in both the pdf and excel formats by using (PDF button) and  (Excel button). Fig See3.3.3 page                                                              Fig 3.3.3 Export an RFI Fabrication List Page 3.3.4 Filter a RFI Fabrication If you want to filter any specific outfitting work in the outfitting work page, you can use (FILTER button) located on the outfitting work page.                                                                  Fig 3.3.4 Filter a RFI fabrication Page. 3.4 RFI Installation Click Outfitting in the Master menu.The RFI Installation page opens.                                      Fig 3.2 RFI Installation Page 3.4.1 Add a RFI Installation list cuteQM_Production role user can add RFI request.If you want to add an RFI Installation, do the following steps,Click (ADD button) in the RFI installation List. A new page opens to add a RFI Installation request.  In the Inspection Date & Time box, select the inspection date and time. In the Subcontractor box, select the subcontractor from the drop down list. In the Inspection Type box, choose by selecting anyone. In the Description Item box, enter the description. Click (Add Selected Outfitting) of the respective outfitting you want to add. The added outfitting will be moved and listed in the right side of the page. Tip: If you want to remove any added outfitting, click (Remove icon) of the respective outfitting work. In the Description box, enter the description for the added RFI installation request. Click Save. The RFI Installation request is successfully added. 3.4.2 Edit a RFI Installation List 1.Click (Edit icon) of the respective Fig See 3.4.2 The page shows the details of the selected Outfitting.1. In the Subcontractor box, select the subcontractor from the drop-down list. 2. Click Save. 1. If you want to edit an Inspection date, then you can click  (edit button) to edit inspection date.2. Click Save. 3.4.3 Submit a RFI Installation List Once you have added the RFI installation request, the Submission column in the RFI Installation Lists page is appeared with(Submit and Reject icons). See Fig 3.4.3                                                       Fig 3.3.3 Submit & Approve a RFI Installation Page If you want to submit the RFI Installation request, click (Submit icon) in the Submit column. Otherwise click (Reject icon) to reject the request. Once you have submitted the RFI Installation list request, in the Confirm Status column in the RFI Installation List page is appeared with(Confirm and Reject icons). The approved request will be moved to for inspection. 3.4.4 Approve RFI Installation List. cuteQM_Licensee_QA user only can approve the RFI request. f you want to approve the RFI Installation list request, click (confirm icon) in the Confirm Status Otherwise click (Reject icon) to reject the request.2. Once RFI Installation request approved  icon will be enabled to put result. 3.  Click icon  result popup will open.                                                     Fig 3.4.4 Approve RFI In Page Click Save RFI result is updated successfully. If Accepted with coments given as result, then punch list will be created, and this will be shown in view punch list screen. If need to upload documents against system No, then click attachment icon at the result popup and upload documents. 3.4.5 Print a RFI Installation If you want to print an RFI fabrication report, click  (print icon) provided in the Report column of the RFI Fabrication page. In the print,user can see the signature of both  production user and QC.                                                                Requestor signature mapped with Production user and Inspector signature mapped with QC .          Click here to find the steps to upload Digital signature                                                                     Fig 3.4.5 View a RFI Installation page.                                                              Fig 3.4.5 RFI Installation print Page 3.4.6 Attach a File into a RFI Installation List. If you want to attach a file with any existing RFI Installation list listed in the RFI Installation page, you can attach the file by using (Attach icon) in the Attachment column.                                                          Fig 3.4.6 Attach a RFI Installation Page 3.4.7 Export a RFI Installation list You can export a list of RFI Installation added in the outfitting page in both the pdf and excel formats by using (PDF button) and  (Excel button). Fig See3.4.7 page                                                              Fig 3.4.7 Export an RFI Installation List Page 3.4.8 Filter a RFI Installation list If you want to filter any specific RFI Installation in the Inspection page, you can use (FILTER button) located on the outfitting page.                                                                  Fig 3.4.8 Filter a RFI Installation Page. 4.0 Outfitting Summary Click Outfitting in the Outfitting menu.The Outfitting Summary page opens. Here we can see the summary of all the outfitting works.                                                           Fig 4.0 Outfitting Summary page 4.1 Export an Outfitting Summary list You can export a list of Outfitting Summary added in the outfitting page in both the pdf and excel formats by using (PDF button) and  (Excel button). Fig See4.1 page                                                              Fig 4.1 Export an Outfitting Summary Page 4.2 Filter an Outfitting Summary List If you want to filter any specific in the Outfitting Summary page,                                                            Fig 4.2 Filter an Outfitting Summary List Page. 5.0 Painting The Ship Structural menu in the cute QM app helps you to add the master data. Once you click the Painting menu, the following tabs opens Master (Painting Work) Inspection (RFI Coat) Reports (Painting Summary) 1.Click Painting in the menu,The Master page opens. 5.1.1 Add a Painting Work Click (ADD button) in the Painting Work page. A new page opens to add Painting work List request.                                                                Fig 5.1.1 Add a Painting Work Page In the Painting Item box, enter the painting item number. In the Area box, enter the painting area In the Number of Coat box, select a number of coats from a drop-down list. In the surface preperation box,enter the surface preperation In the Subcontractor box, select a subcontractor from drop down list. Click Save.The Painting is added successfully. 5.1.2 Edit a Painting Work If you want to edit any existing painting in the painting page,                                                                                Fig 5.1.2 Edit a Painting Page 1. Click (Edit icon) of the respective paintings. Fig See 5.1.2 The Painting page shows the details of the selected Painting.  Edit the details of Painting item,area,Number of coat,surface preperation and subcontractor as required. Click Save. Painting updated successfully. 5.1.3 Delete a Painting master. If you want to delete any existing in the Painting works page, you can use (Delete icon) provided in the painting work's page. By click confirm delete Click (Delete icon) for the corresponding area. You receive a notification message “Confirm Delete?”. Click OK.  Painting work deleted successfully.    5.1.4 Export a Painting Works You can export a list of Paintings added in the Painting Works page in both the pdf and excel formats by using (PDF button) and  (Excel button). Fig See 5.1.4 page                                                              Fig 5.1.4 Export a painting work page 5.1.5 Filter a Painting Works If you want to filter any specific Painting in the Painting page, you can use (FILTER button) located on the painting page.                                                                      Fig 5.1.5 Filter a Painting Works Page. 5.1.6 Import Multiple Painting Works If you want to import multiple Painting works together, do the following. Once you have added the painting details in the excel worksheet, save the excel worksheet on your computer. Click  (IMPORT button). See Fig 5.1.6 A new window opens for importing the excel worksheet saved on your computer. Click (Browse button) to select the excel worksheet to be uploaded. Select the excel worksheet you want to upload from your computer. Click (Upload button) to export the systems that are included in the excel worksheet. Click  (TEMPLATE button). See Fig 5.1.6 An excel worksheet will be downloaded with a predefined template to enter the details of painting. Enter the required painting details in the respective columns of the excel worksheet. After saved the excel, browse and upload the excel. Automap  -This function is used to map system columns and excel columns automatically. Map - This function is used to map each system and excel columns manually Unmap - This is used to remove the mapped column Unmap all -This is used to remove the all mapped columns Click populate values ,process and Import buttons. Refer below fig Painting details imported successfully. 5.1.7 View Log a Painting Works If you want to view a painting report, click (view log detail icon) provided in the Excel Import page. Once you click View Log detailNew window open with Log Details In the Log details click View details to get Painting Item list. 5.2 RFI Coat Inspection                                                                                          Fig 5.2 RFI Coat Inspection Page. 5.2.1 Add a RFI Coat Inspection cuteQM_Production role user only can add RFI request.If you want to add a RFI Coat Inspection list, do the following steps, 1. Click  (ADD button) in the RFI paint Coat Request See Fig 5.2.1A new window opens to add a RFI Paint Coat request. In the Inspection Date and Time box, select the inspection date and time. In the Subcontractor box, select a subcontractor from a drop-down list. in the Inspection Type box, choose the inspection type. In the Description box, enter the description for the added RFI Painting Coat is request. You can add multiple Coats for one request.  Click (Add Selected Coats) of the respective RFI Coat inspection you want to add. The added Coats will be moved and listed in the right side of the page. Tip: If you want to remove any added Coats, click (Remove icon) of the respective Painting. In the Description box, enter the description for the added RFI Coat Request. Click Save. The RFI Paint Coat list request is successfully added. 5.2.2 Edit a RFI Coat Inspection If you want to edit any existing a coat in the RFI Paint Coat inspection request page, Click (Edit icon) of the respective RFI Coat Inspection Request page opens. See Fig 5.2.2 2. Edit the details where you want.3. Click Save. The RFI Paint Inspection list is successfully updated. 5.2.3 Submit RFI Coat Inspection Once you have added the RFI Coat inspection request, the Submission column in the RFI Coat inspection page is appeared with(Submit and Reject icons). See Fig 5.2.3                                                        Fig 5.2.3 Submit RFI Coat Inspection If you want to submit the RFI Coat Inspection request, click (Submit icon) in the Submit column. Otherwise click (Reject icon) to reject the request. Once you have submitted the RFI Coat Inspection request, in the Confirm Status column in the RFI coat inspection request List page is appeared with(Confirm and Reject icons). The approved request will be moved to for inspection. 5.2.4 Approve RFI Coat Inspection cuteQM_Licensee_QA user only can approve the RFI request. f you want to approve the RFI Coat Inspection request, click (confirm icon) in the Confirm Status Otherwise click (Reject icon) to reject the request.2. Once RFI coat inspection request approved  icon will be enabled to put result. 3.  Click icon  result popup will open.                                                     Fig 5.2.4 Approve RFI Inspection Page Click Save RFI result is updated successfully. If Remarks given then painting list will be created, and this will be shown in view painting list screen. If need to upload documents against system No, then click attachment icon at the result popup and upload documents. 5.2.5 View result of RFI Coat Inspection If you want to view an RFI Coat inspection report, click (add) provided in the Report column of the RFI Coat Inspection page. Click icon  result popup will open. Click icon  file upload popup will open.                                                           Fig 5.2.5 File upload for RFI Coat inspection page Click Save RFI result is updated successfully. If Accepted with comments  given as result,then punch list will be created, and this will be shown in view punch list screen. If need to upload documents against system No, then click attachment icon at the result popup and upload documents. 5.2.6 Print a RFI Coat Inspection If you want to view an RFI Coat Inspection, click  (print icon) provided in the Report column of the RFI Coat Inspection List Signature of production user and QC also shown in the print.                                                                                          Requestor signature mapped with Production user and Inspector signature mapped with QC . Click here to find the steps to upload Digital signature                                              Fig 5.2.6 View a RFI Coat Inspection Page 5.2.7 Attach a File into a RFI Coat Inspection If you want to attach a file with any existing RFI Coat inspection list listed in the RFI Coat inspection List page, you can attach the file by using (Attach icon) in the Attachment column. A new window opens for file upload.In the category box, select the category from drop-down list.Select(Browse button) and upload the documents.                                                           Fig 5.2.7 Attach a file RFI Coat Inspection 5.2.8 Export a RFI Coat Inspection You can export a list of RFI Coat Inspection requests added in the RFI Fit coat Inspection page in both the pdf and excel formats by using (PDF button) and (Excel button).                                                                    Fig 5.2.8 Export a RFI Coat Inspection Page. 5.2.9 Filter a RFI Coat Inspection If you want to filter any specific RFI Coat Inspection list in the RFI Coat Inspection page, you can use (FILTER button) located on the RFI Coat Inspection.                                              Fig 5.2.9 Filter a RFI Coat inspection. 5.3.0 Painting Works Summary We can see the summary of all the painting RFI details here. You can export a Painting Works Summary requests added in the painting work summary page in both the pdf and excel formats by using (PDF button) and (Excel button).                                                                           Fig 5.3.0 Painting Work Summary Page 5.3.1 Export an Painting Summary list You can export a list of Painting Summary added in the painting page in both the pdf and excel formats by using (PDF button) and  (Excel button). 5.3.2 Filter a Painting Works Summary If you want to filter any specific painting work summary in the paintings page, you can use (FILTER button) located on the Hull page.                                                         Fig 5.3.1 Filter a Painting Works Summary Page