# Piping



# User Management

### **1.1 Login**

To login into the ***cuteQM*** app,

1. Open your web browser.
2. Type the URL provided by your administrator, in the address bar of your web browser. The login page appears.
    
    [![image-1651599486234.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651599486234.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651599486234.png)
3. In the login page, enter your user name and password in the respective boxes. [![image-1651599502803.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651599502803.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651599502803.png)**Note**: If you forgot your password, click “**I can’t access my account**”. You will be redirected into a new web page. Enter your username to receive your password.

4. In the **Module** section, select **Piping**.
5. Click **Login**.

Once you have successfully logged in into the ***cuteQM*** app, the home page of the ***cuteQM*** app opens.

[![image-1651599549509.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651599549509.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651599549509.png)

 **Figure 4.1 Home page of *cuteQM app***

[![image-1651599574057.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651599574057.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651599574057.png) **Note**: The user name you have entered, the project you have been assigned, and the module you have selected are displayed in the upper right corner of the home page.

### **1.2 My Profile**

##### **If you want to upload digital signature ,**

1. Click your user name displayed on the quick access bar of the home page. See Fig 1.1. A drop-down list opens with multiple options.
2. Click **My Profile** option

[![image-1724415499138.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724415499138.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724415499138.png)

[![image-1724415789149.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724415789149.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724415789149.png)

3.Click **Edit** button placed at the right top corner as shown above fig

4.Click **file upload** icon as shown below

5.**Upload the signature** from device

7.Click **Update** button.

[![image-1724416213953.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724416213953.png)](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724416213953.png)

**My profile updated successfully.**

### **1.3 Change Password**

If you want to change your current password,

1. Click your user name displayed on the quick access bar of the home page. See Fig 1.1. A drop-down list opens with multiple options.
    
    [![image-1724414555569.png](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/scaled-1680-/image-1724414555569.png) ](https://wiki.cuteinfocomm.com/uploads/images/gallery/2024-08/image-1724414555569.png)

2. Click the **Change Password** option. The **Change Password** page opens.
    
    [![image-1651599664112.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651599664112.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651599664112.png)
    
    [![image-1651599674088.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651599674088.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651599674088.png)**Note**: Before changing your password read the conditions specified in the **Change Password** page.

3. In the **Password** box, enter your current password.
4. In the **New** **Password** box, enter your new password.
5. In the **Confirm** **New** **Password** box, enter your new password again.
6. Click **Change Password**.

Your password will be successfully changed.

### **1.4 Log Out**

If you want to log out from the app,

1. Click your user name displayed on the quick access bar of the home page. See Fig 1.1. A drop-down list opens with multiple options.
2. Click **Log out**.

Your current session ends now. The home page appears.

# Home

**2.0** The home menu in the ***cuteQM*** app used to view a dashboard and a switch board of a project. This menu helps you to change project and module.

[![image-1651060124426.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651060124426.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060124426.png)

### **2.1 Dashboard**

The **Dashboard** tab in the **Home** menu displays graphs, charts, and tables, which helps you to monitor and track the summary reports of various inspection and welding progress in the piping module.

[![image-1651060621986.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651060621986.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060621986.png)**Note**: The dashboard displayed on the app is linked to a database that allows the report to be constantly updated.

The Dashboard page shows the following graphs, charts, and tables:

- Piping – Weld Rejection Rate (Cumulative)
- Piping Drawing Status
- Piping – Weekly Weld Rejection Rate
- Piping Dia Inch
- Piping Status by System
- Piping Welding Progress by Date
- NDT Progress Status
- NDT Number of Joint Status

[![image-1651060865034.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651060865034.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651060865034.png)

### **2.2 Switch Board**

The **Switch Board** tab in the **Home** menu show the consolidated view of various tabs listed in multiple menus in the menu bar.

Once you have successfully logged in into the ***cuteQM*** app, you can view the Home Page. In the Home Page, the menu bar appears with multiple menus, otherwise you can select the **Switch Board** tab to view all the menus.

To select the **Switch Board** tab,

1. Navigate to **Home**.
2. Click **Switch Board**.

The **Switch Board** tab includes multiple options such as **Project Data, Materials, Inspection, Piping, Test Pack, Punch List, and Documentation.**

[![image-1651061654091.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651061654091.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651061654091.png)


### **2.3 Switch Project**

 The **Switch Project** tab in the **Home** menu helps you to add a new project/module and switch between various projects and modules added in the app.

#### **2.3.1 Switch between Various Projects and Modules**

1. Navigate to the **Home** menu.
2. Click **Switch Project**.

The switch project window opens with a list of projects and modules that are already added in the web.

[![image-1651065431654.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651065431654.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651065431654.png)

 **Figure 5.1: Switch project window**

3\. If you want to switch between various projects and modules,

1. Select a project you want from multiple projects listed in the left side of the window. Once you have selected the project, a list of modules related to the project is displayed.
2. Select a module you want from multiple modules listed in the right side of the window.

4\. Click **Select.**

#### **2.3.2 Add a New Project** 

If you want to add a new project, do the following

<table border="1" id="bkmrk-if-you-want-to-add-a-0" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">If you want to add a new project, you must have been assigned as an administrator or a power user otherwise you cannot add any new project.

</td></tr></tbody></table>

1. Click **New Skid/ Module**. See Fig 2.1.

 The add project/module page opens with two options such as **Projects** and **Skid/ Module**.

[![image-1651068352873.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651068352873.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651068352873.png)

 **Figure 2.2: Add project/module page**

2\. Click **Projects**.

The **Projects** page opens.

[![image-1651068415000.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651068415000.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651068415000.png)

 **Figure 2.3: Projects page**

**3.** Click [![image-1651068454494.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651068454494.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651068454494.png) (**ADD** button) in the upper side of the **Projects** page.

A new window opens to add a new project.

[![image-1651068497023.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651068497023.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651068497023.png)

[![image-1651068510033.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651068510033.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651068510033.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.

1. In the **Project Number** box, enter the project number.
2. In the ****Project Name**** box, enter a project name.
3. In the **End User** box, select an end user from a drop-down list.
4. In the ****Client**** box, select a client from a drop-down list.
5. In the ****AI/ Third Party**** box, select an AI or a third party from a drop-down list. [![image-1651112349330.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651112349330.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651112349330.png) **Note**: If you want to add multiple third parties, add third parties by clicking
    
    [![image-1651112372982.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651112372982.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651112372982.png) (**Add TP** button) in the **Third party** column of the **Projects page**.
6. In the ****Purchase Order (PO) Number**** box, enter the PO number.
7. In the ****Manufacturer Job Code**** box, enter the manufacturer job code number.
8. In the **Client Project** box, enter the client project code.
9. In the ****Client Job Code**** box, enter the client job code.
10. In the **Owner Project** box, enter the owner project code.
11. In the **Owner Job** Code box, enter the owner job code.
12. In the ****Delivery Date**** box, choose the delivery date.
13. In the **Location** box, enter the location detail.
14. In the **Non-Destructive Examination (NDE) Weld Length Limit** box, enter the length limit of NDE welding.
15. If you need an external qualified welder, click the check box provided with the ****External Qualified Welder**** option.
16. In the ****Weld Repair Allowance**** box, enter the amount for weld repair.

4\. Click **Save**.

A new project is added successfully.

#### **2.3.3 Edit a Project**

If you want to edit any existing project details from the list of projects in the **Projects** page, do the following,

1\. Click [![image-1651068921167.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651068921167.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651068921167.png)(Edit icon) in the **Edit** column for the respective project. See Fig 2.3.

A new window opens to edit the project.[![image-1651068999405.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651068999405.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651068999405.png)

2\. Click any box where you want to edit the details, and then edit the details in the respective box in the **Projects** page.

3\. Click **Save**.

#### **2.3.4 Delete a Project.**

If you want to delete any specific project from the list of projects, you can use (Delete icon) provided in the **Delete** column of the **Projects** page, See Fig 2.3.

1\. Click [![image-1651072213142.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651072213142.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651072213142.png) (Delete icon) for the corresponding project.

You receive a notification message “**Do you want to delete this row**?”.

2\. Click **OK.**

#### **2.3.5 Export Projects List**

You can export a list of projects in the pdf and excel formats.

1. If you want to export the projects list in the pdf format, click [![image-1651074157833.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651074157833.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651074157833.png) (**PDF** button). See Fig 2.3. The project list will be downloaded in the pdf format.
2. If you want to export the projects list in the excel format, click [![image-1651112491032.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651112491032.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651112491032.png) (**Excel** button).
    
    The project list will be downloaded in the excel format.

#### **2.3.6 Add a New Module**

If you want to add a new module, do the following

<table border="1" id="bkmrk-if-you-want-to-add-a-2" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">If you want to add a new module, you must have been assigned as an administrator or a power user otherwise you cannot add any new module.

</td></tr></tbody></table>

1. Click **New Skid/ Module**. See Fig 2.1. The add project/module page opens with two options such as **Projects** and **Skid/ Module**. See Fig 2.2.
2. Click ****Skid/Module****. The **Skid/Module** page opens.
    
    [![image-1651112732625.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651112732625.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651112732625.png)
    
     **Figure 5.3.1: Skid/Module page**
3. Click [![image-1651112747605.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651112747605.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651112747605.png) (**ADD** button) in the upper side of the **Skid/Module** page.
    
    The skid/module box opens to add a new module.
    
    [![image-1651112824376.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651112824376.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651112824376.png)
    
    [![image-1651112832376.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651112832376.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651112832376.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving. 
    1. 1. In the ****Master** **Project Name**** box, enter the master project name from a drop-down list.
        2. In the ****Skid/Module**** box, enter a module name.
        3. In the ****Abbreviation**** box, enter the abbreviation for the added module.
        4. In the ****Report Prefix**** box, the report prefix will be entered automatically. If you want change, you can edit the report prefix.
        5. In the ****Piping Class**** box, enter the piping class name.
        6. In the ****Delivery Date**** box, choose the delivery date.
        7. In the ****Project Type**** box, select the type of project from a drop-down list.
        8. If you want to show this module in the ***cuteQM*** mobile app, click the check box provided with the **Show in Apps** option.
        9. In the ****Shift Start Time (24hr)****box, enter the shift starting time.
        10. In the ****Shift End Time (24hr)****box, enter the shift ending time.
        11. In the ****Break Time (mins)****box, enter the break time duration.
        12. If you want to enable the repair project flow option, select the check box provided with the ****Repair Project Flow**** column.
        13. If you want to enable the welder qualification restriction option, select the check box provided with the ****Welder Qualification Restriction**** column.
        14. Click **Save**. A new module is added successfully.

#### **2.3.7 Add a Surveyor, a Client or Other Role for Module**

If you want to add a surveyor, a client or other role for any added module,

1. Click a respective [![image-1651113117272.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651113117272.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651113117272.png)(Add icon) provided in the **Add Surveyor/Client** column. The **Add Surveyor/Client/Others** window opens.
    
    [![image-1651113167260.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651113167260.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651113167260.png)
2. Click [![image-1651115778472.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651115778472.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651115778472.png) (**ADD** button). A new window opens to enter the name and type of a role.
    
    [![image-1651115830614.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651115830614.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651115830614.png)
3. In the **Name** box, enter the name of the person to whom you want to add a role.
4. In the **Type** box, select the type of role from a drop-down list.
5. Click ****Save****.

#### **2.3.8 Edit a Module**

If you want to edit any existing module details from the list of modules in the **Skid/Module** page, do the following,

1. Click [![image-1651115972146.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651115972146.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651115972146.png) (Edit icon) in the **Edit** column for the respective module. See Fig 2.3.1.
    
    A new window opens to edit the module.
    
    [![image-1651116016329.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651116016329.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651116016329.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box in the ****Skid/Module**** page.
3. Click **Save**.

#### **2.3.9 Delete a Module**

If you want to delete any specific module from the list of modules, you can use [![image-1651116090538.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651116090538.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651116090538.png) (Delete icon) provided in the **Delete** column of the **Skid/Module** page, See Fig 2.3.1.

1. Click [![image-1651116156710.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651116156710.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651116156710.png) (Delete icon) for the corresponding module.
    
    You receive a notification message “**Do you want to delete**?”.
2. Click **OK**.

#### **2.3.10 Export Modules List**

You can export a list of modules added in the **Skid/Module** page in the pdf and excel formats.

1. If you want to export the modules list in the pdf format, click [![image-1651116320668.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651116320668.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651116320668.png) (**PDF** button). See Fig 2.3.1.
    
    The modules list will be downloaded in the pdf format.
2. If you want to export the modules list in the excel format, click [![image-1651116397692.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651116397692.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651116397692.png)
    
    (**Excel** button).
    
    The modules list will be downloaded in the excel format.

#### **2.3.11 Close a Project**

If you want to close any project from the app, do the following

<table border="1" id="bkmrk-make-sure-that-once-" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.8765%;">Make sure that once you have closed any project, you cannot even open or access the closed project.

</td></tr></tbody></table>

1. Click **Close Project** in the **Close Project** column for the corresponding module and project type. See Fig 2.3.1. You receive a notification message “**Are you sure want to close this project? You will not be able to access/reopen this project again**”.
2. Click **OK** to close the project.

# Project Data

### **3.0 Project Data**

The **Project Data** menu in the ***cuteQM*** app helps you to add the master data and the personal data for the piping project. Once you click the **Project Data** menu, the following tabs open,

### **3.1 Piping and Instrumentation Diagram (P&amp;ID)**

P&amp;ID is a schematic diagram which shows the functional relationship of piping, instrumentation, and system equipment components. The P&amp;ID includes mechanical equipment with names and numbers, Process piping, sizes and identification, Flow directions, and so on.

The **P&amp;ID** tab in the **Project Data** menu helps you to add a P&amp;ID. If you want to navigate to **P&amp;ID,** do the following,

1. Click ****P&amp;ID**** in the ****Project Data**** menu. The **P&amp;ID** page opens.
    
    [![image-1651119091006.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651119091006.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651119091006.png)
    
     **Figure 3.1: P&amp;ID page**

#### **3.1.1 Add a P&amp;ID**

If you want to add a new P&amp;ID, do the following steps,

1. Click [![image-1651119261792.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651119261792.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651119261792.png) (**ADD** button) in the **P&amp;ID** page. See Fig 3.1.
    
    A new window opens to add a new P&amp;ID.
    
    [![image-1651119327370.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651119327370.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651119327370.png)
    
    [![image-1651119345695.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651119345695.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651119345695.png) **Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.
2. In the **P&amp;ID** box, enter the P&amp;ID number.
3. In the **Revision Number** box, enter the revision number for the P&amp;ID.
4. Click ****Save.**** The P&amp;ID is successfully added and listed in the **P&amp;ID** page.

#### **3.1.2 Edit a P&amp;ID**

If you want to edit any existing P&amp;ID in the **P&amp;ID** page,

1. Click [![image-1651119535516.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651119535516.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651119535516.png)(Edit icon) of the respective P&amp;ID. See Fig 3.1.
2. The **P&amp;ID** page shows the details of the P&amp;ID.
3. [![image-1651119624700.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651119624700.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651119624700.png)
4. Edit the details where you want.
5. Click **Save**.

#### **3.1.3 Delete a P&amp;ID**

If you want to delete any existing P&amp;ID in the **P&amp;ID** page,

1. Click [![image-1651119763562.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651119763562.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651119763562.png) (Delete icon) of the respective P&amp;ID. See Fig 3.1.
    
    You receive a notification message “**Confirm Delete?**”.
2. Click **OK**.
    
    The selected P&amp;ID will be deleted from the **P&amp;ID** page.

#### **3.1.4 Export P&amp;ID list**

You can export a list of P&amp;IDs added in the **P&amp;ID** page in both the pdf and excel formats.

1. If you want to export the P&amp;ID list in the pdf format, click [![image-1651119905005.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651119905005.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651119905005.png)(**PDF** button).
    
    The P&amp;ID list will be downloaded as a pdf file.
2. If you want to export the P&amp;ID list in the excel format, click [![image-1651119961686.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651119961686.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651119961686.png) (**Excel** button).
    
    The P&amp;ID list will be downloaded as an excel file.

#### **3.1.5 Filter a P&amp;ID**

If you want to filter any specific P&amp;ID in the **P&amp;ID** page, do the following,

1. Click [![image-1651120162201.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120162201.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120162201.png) (**FILTER** button) located on the **P&amp;ID  See Fig 3.1.
    
    Once you clicked the **Filter** button, the filter box opens for the **P&amp;ID** and **Revision Number** columns.
    
    [![image-1651120201531.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120201531.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120201531.png)
2. Enter relevant detail in the respective column’s filter box to filter any P&amp;ID.

#### **3.1.6 Import Multiple P&amp;IDs**

If you want to import multiple P&amp;IDs together, do the following,

1. Click [![image-1651120365377.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120365377.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120365377.png) (**TEMPLATE** button). See Fig 3.1.
    
    An excel worksheet will be downloaded with a predefined template to enter the details of P&amp;IDs.
    
    [![image-1651120425289.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120425289.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120425289.png)
2. Enter the required P&amp;ID details in the respective columns of the excel worksheet.
3. Once you have added the P&amp;ID details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651120501083.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120501083.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120501083.png) (**IMPORT** button). See Fig 3.1.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651120563525.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120563525.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120563525.png)
5. Click [![image-1651120579811.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120579811.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120579811.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651120651822.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120651822.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120651822.png) (**Upload** button) to export the P&amp;IDs that are included in the excel worksheet.
    
    The details of the P&amp;IDs in the worksheet will be displayed in the **P&amp;ID** page.

#### **3.1.7 Attach a File into a P&amp;ID**

If you want to attach a file for example drawing, with any existing P&amp;ID listed in the **P&amp;ID** page,

1. Click [![image-1651120776655.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120776655.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120776655.png) (Attach icon) provided against the respective P&amp;ID in the **P&amp;ID** page.
    
    The **File Upload (P&amp;ID - Drawings)** page opens.
    
    [![image-1651120946537.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120946537.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120946537.png)
    
    [![image-1651120969847.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120969847.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120969847.png)**Note**: Before uploading any file, read the instructions given in the **File Upload (P&amp;ID - Drawings)** page.
2. Click [![image-1651120997251.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651120997251.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651120997251.png) (**Browse** button).
3. Select a file which you want to upload from your computer.
4. Click [![image-1651121030903.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121030903.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121030903.png) (**Upload** button) to attach the file.
    
    The uploaded file will be displayed in the **File Upload** table.
    
    [![image-1651121061820.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121061820.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121061820.png)


### **3.2 System**

You can add the details of systems to be used in the piping project by using the **Systems** tab in the **Project Data** menu. If you want to navigate to **Systems,**

1. Click **Systems** in the **Project Data** menu.
    
    The **System** page opens.
    
    [![image-1651121131964.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121131964.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121131964.png)
    
     **Figure 3.2: System page**


#### **3.2.1 Add a System**

If you want to add a new system, do the following steps,

1. Click [![image-1651121326059.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121326059.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121326059.png) (**ADD** button) in the **System**  See Fig 3.2.
    
    A new window opens to add a new system.
    
    [![image-1651121364671.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121364671.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121364671.png)
    
    [![image-1651121376559.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121376559.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121376559.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the ****System**** box, enter the system name.
3. In the ****Abbreviation**** box, enter the abbreviation for the system name.
4. In the **System Number** box, enter the system number.
5. Click ****Save.****The system is successfully added and listed in the **System** page.
    
    [![image-1651121590257.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121590257.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121590257.png)**Note**:
    
    
    - - If you want to map cover page for any added system, click the respective [![image-1651121618076.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121618076.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121618076.png) (Add icon)
            
            provided in the **Map Cover Page** column and add the cover pages.
        - If you want to map certificates for any added system, click the respective [![image-1651121746668.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121746668.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121746668.png)(Add icon)
            
            provided in the **Map Certificates** column and add the cover pages.
        - If you want to map Check Record/Check Sheet (CR/CS) for any added system,
            
            click the respective [![image-1651121804240.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121804240.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121804240.png)(Add icon) provided in the **Map CR/CS** column and add the cover pages.

#### **3.2.2 Edit a System**

If you want to edit any existing system in the **System** page,

1. Click [![image-1651121873901.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121873901.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121873901.png)(Edit icon) of the respective System. See Fig 3.2.
    
    The **System** page shows the details of the selected system.
    
    [![image-1651121910492.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651121910492.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651121910492.png)
2. Edit the details where you want.
3. Click **Save**.

#### **3.2.3 Delete a System**

If you want to delete any existing system in the **System** page, you can use (Delete icon) provided in the **System** page. To know how to delete, see the topic, “[<u>Delete P&amp;ID</u>](#bkmrk-3.1.3%C2%A0delete-a-p%26id "Project Data")”.

#### **3.2.4 Export System List**

You can export a list of systems added in the **System** page in both the pdf and excel formats by using [![image-1651122299855.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651122299855.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651122299855.png) (**PDF** button) and [![image-1651122478697.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651122478697.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651122478697.png) (**Excel** button). To know how to export, see the topic, “[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **3.2.5 Filter a System**

If you want to filter any specific system in the **System** page, you can use [![image-1651122763905.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651122763905.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651122763905.png) (**FILTER** button) located on the **System** page. To know how to filter, see the topic, “[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

#### **3.2.6 Import Multiple Systems**

If you want to import multiple systems together, do the following,

1. Click [![image-1651122886316.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651122886316.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651122886316.png) (**TEMPLATE** button). See Fig 3.2.
    
    An excel worksheet will be downloaded with a predefined template to enter the details of systems.
    
    [![image-1651122931636.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651122931636.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651122931636.png)
2. Enter the required system details in the respective columns of the excel worksheet.
3. Once you have added the system details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651122972277.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651122972277.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651122972277.png) (**IMPORT** button). See Fig 3.2.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651122999447.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651122999447.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651122999447.png)
5. Click [![image-1651123014955.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123014955.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123014955.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651123042197.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123042197.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123042197.png) (**Upload** button) to export the systems that are included in the excel worksheet.
    
    The details of the systems in the worksheet will be displayed in the **System** page.

#### **3.2.7 Attach a File into a System**

If you want to attach any file with any system listed in the **System** page, you can attach the file by using (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.


### **3.3 Sub System**

The **Sub** **Systems** tab in the **Project Data** menu helps you to add the details of sub systems to be in used in the piping project. If you want to navigate to **Sub** **Systems,**

1. Click **Sub** **Systems** in the **Project Data** menu.
    
    The **Sub** **Systems** page opens.
    
    [![image-1651123216599.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123216599.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123216599.png)
    
     **Figure 6.3: Sub System page**

#### **3.3.1 Add a Sub System**

If you want to add a new sub system, do the following steps,

1. Click [![image-1651123283337.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123283337.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123283337.png) (**ADD** button) in the **Sub** **System**  See Fig 3.3.
    
    A new window opens to add a new sub system.
    
    [![image-1651123319434.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123319434.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123319434.png)
    
    [![image-1651123334977.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123334977.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123334977.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the ****System**** box, select a system from a drop-down list.
3. In the ****Sub** **System**** box, select a sub system from a drop-down list.
4. In the ****Abbreviation**** box, enter the abbreviation for the sub system.
5. In the ****Sub** **System Number**** box, enter the sub system number.
6. If the added subsystem needs to be flushed, select **Yes** in the **Flushing** option otherwise select **No**.
7. If there is need to perform the leakage test for the added subsystem, select ****Yes**** in the ****Leak Test**** option otherwise select ****No****.
8. In the ****Description**** box, enter the description for the added sub system.
9. Click ****Save.****The sub system is successfully added and listed in the **Sub** **System** page.

#### **3.3.2 Edit a Sub System**

If you want to edit any existing sub system in the **Sub** **System** page,

1. Click [![image-1651123496277.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123496277.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123496277.png)(Edit icon) of the respective sub system. See Fig 3.3.
    
    The **Sub System** page shows the details of the selected sub system.
    
    [![image-1651123531945.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123531945.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123531945.png)
2. Edit the details where you want.
3. Click **Save**.

#### **3.3.3 Delete a Sub System**

If you want to delete any existing sub system in the **Sub System** page, you can use [![image-1651123593833.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123593833.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123593833.png) (Delete icon) provided in the **Sub** **System** page. To know how to delete, see the topic,

#### **3.3.4 Export Sub System List**

You can export a list of sub systems added in the **Sub System** page in both the pdf and excel formats by using [![image-1651123664991.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123664991.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123664991.png) (**PDF** button) and [![image-1651123690259.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123690259.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123690259.png) (**Excel** button). To know how to export, see the topic, “[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **3.3.5 Filter a Sub System**

If you want to filter any specific sub system in the **Sub System** page, you can use [![image-1651123790660.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123790660.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123790660.png) (**FILTER** button) located on the **Sub System** page. To know how to filter, see the topic, “[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

#### **3.3.6 Import Multiple Sub Systems**

If you want to import multiple sub systems together, do the following,

1. Click [![image-1651123870609.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123870609.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123870609.png) (**TEMPLATE** button). See Fig 3.3.
    
    An excel worksheet will be downloaded with a predefined template to enter the details of sub systems.
    
    [![image-1651123911588.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123911588.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123911588.png)
2. Enter the required sub system details in the respective columns of the excel worksheet.
3. Once you have added the sub system details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651123941803.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123941803.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123941803.png) (**IMPORT** button). See Fig 3.3.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651123970121.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123970121.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123970121.png)
5. Click [![image-1651123982893.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651123982893.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651123982893.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651124010915.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651124010915.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651124010915.png) (**Upload** button)to export the sub systems that are included in the excel worksheet.
    
    The details of the sub systems in the worksheet will be displayed in the **Sub System** page.

#### **3.3.7 Attach a File into a Sub System**

If you want to attach any file with any sub system listed in the **Sub** **System** page, you can attach the file by using [![image-1651124079903.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651124079903.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651124079903.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic. “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.


### **3.4 Lines**

The **Lines** tab in the **Project Data** menu helps you to add the details of lines to be in used in the piping project. If you want to add **Lines,**

1. Click ****Lines**** in the ******Project Data****** menu, The **Lines** page opens.
    
    [![image-1651124204405.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651124204405.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651124204405.png)
    
     **Figure 3.4: Lines page**

#### **3.4.1 Add a Line**

If you want to add a line, do the following steps,

1. Click [![image-1651124269606.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651124269606.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651124269606.png) (**ADD** button) in the **Lines** page. See Fig 3.4.
    
    A new window opens to add new lines.
    
    [![image-1651124295360.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651124295360.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651124295360.png)
    
    [![image-1651124303799.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651124303799.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651124303799.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the ****Sub System**** box, select a sub system from a drop-down list.
3. In the ****Line Number**** box, enter the line number.
4. In the ****Size**** box, select the size of the line.
5. In the ****Piping Class**** box, enter the piping class name.
6. In the ****Line Code**** box, enter the line code.
7. In the ****Sheet Number**** box, enter the sheet number.
8. In the ****RT Req. %**** box, enter the requirement percentage of RT.
9. In the ****UT Req. %**** box, enter the requirement percentage of UT.
10. In the ****MT Req. %**** box, enter the requirement percentage of MT.
11. In the ****PT Req. %****box, enter the requirement percentage of PT.
12. In the ****PWHT Req. %****box, enter the requirement percentage of PWHT.
13. In the ****PMI Req. %****box, enter the requirement percentage of PMI. [![image-1651124410452.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651124410452.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651124410452.png)**Note**: The RT, UT, MT, PT, PWHT, and PMI Requirements (%) should be filled with valid numerical numbers. The joint testing will be performed based on the value given by you, for example, if you enter 100 % of requirement, which means 100 % of the joints will be tested. If you enter 0 %, none of joints will be tested.
14. Click **Save.**
    
    The line is successfully added and listed in the **Lines** page.

#### **3.4.2 Edit a Line**

If you want to edit any existing line in the **Lines** page,

1. Click [![image-1651126180149.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651126180149.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651126180149.png)(Edit icon) of the respective sub system. See Fig 3.4.
    
    The **Lines** page shows the details of the selected line.
    
    [![image-1651126233689.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651126233689.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651126233689.png)
2. Edit the details where you want.
3. Click **Save**.

#### **3.4.3 Delete a Line**

If you want to delete any existing line in the **Lines** page, you can use [![image-1651126724369.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651126724369.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651126724369.png) (Delete icon) provided in the **Lines** page. To know how to delete, see the topic, “[<u>Delete P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

#### **3.4.4 Export Line List**

You can export a list of lines added in the **Lines** page in both the pdf and excel formats by using [![image-1651126780734.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651126780734.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651126780734.png) (**PDF** button) and [![image-1651126798134.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651126798134.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651126798134.png)(**Excel** button). To know how to export, see the topic “[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **3.4.5 Filter a Line**

If you want to filter any specific line in the **Lines** page, you can use [![image-1651126966554.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651126966554.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651126966554.png) (**FILTER** button) located on the **Lines** page. To know how to filter, see the topic, “[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

#### **3.4.6 Import Multiple Lines**

If you want to import multiple lines together, do the following,

1. Click [![image-1651127025691.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651127025691.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651127025691.png) (**TEMPLATE** button). See Fig 3.4.
    
    An excel worksheet will be downloaded with a predefined template to enter the details of lines.
    
    [![image-1651127086914.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651127086914.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651127086914.png)
2. Enter the required line details in the respective columns of the excel worksheet.
3. Once you have added the line details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651127121187.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651127121187.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651127121187.png) (**IMPORT** button). See Fig 3.4.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651127150104.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651127150104.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651127150104.png)
5. Click [![image-1651127193042.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651127193042.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651127193042.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651127277086.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651127277086.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651127277086.png) (**Upload** button) to export the lines that are included in the excel worksheet.
    
    The details of the lines in the worksheet will be displayed in the **Lines** page.

#### **3.4.7 Attach a File into a Line**

If you want to attach any file with a line listed in the **Lines** page, you can attach the file by using [![image-1651127356456.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651127356456.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651127356456.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.


### **3.5 Isometric (ISO) Drawings**

An isometric drawing is a detailed orthographic drawing that represents the details of 3D structure of the piping system in a 2D format for fabrication of the pipe. If you want to navigate to **ISO**,

1. Click ****ISO Drawings**** in the ******Project Data****** menu. The **ISO** page opens.
    
    [![image-1651127433012.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651127433012.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651127433012.png)
    
     **Figure 3.5: ISO page**

#### **3.5.1 Add an ISO Drawing**

If you want to add a new ISO drawing, do the following steps,

1. Click [![image-1651127541296.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651127541296.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651127541296.png) (**ADD** button) in the **ISO** page. See Fig 3.5.
    
    A new window opens to add a new ISO drawing.
    
    [![image-1651127575296.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651127575296.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651127575296.png)
    
    [![image-1651127586154.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651127586154.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651127586154.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the ****Line Number**** box, select the line number from a drop-down list.
3. In the ****P&amp;ID**** box, select the P&amp;ID from a drop-down list.
4. In the ****ISO Drawing Number**** box, enter the number for an ISO drawing you want to add.
5. In the ****Revision Number**** box, enter the revision number for the ISO drawing.
6. In the **Internal Drawing No** box, enter the internal drawing number of the isometric drawing.
7. In the ****Internal Drawing Rev. No**** box, enter the revision number for the internal drawing.
8. In the ****Sheet No**** box, enter the sheet number.
9. In the ****Sheet Rev. No**** box, enter the sheet revision number.
10. In the ****Master Sheet No**** box, enter the master sheet number.
11. In the ****Line Size**** box, select the line size from a drop-down list.
12. In the ****Location**** box, select the location from a drop-down list.
13. In the ****Sub Contractor**** box, select the sub-contractor from a drop-down list.
14. In the ****RT Req. %**** box, enter the requirement percentage of RT.
15. In the ****UT Req. %**** box, enter the requirement percentage of UT.
16. In the ****MT Req. %**** box, enter the requirement percentage of MT.
17. In the ****PT Req. %**** box, enter the requirement percentage of PT.
18. In the ****PWHT Req. %**** box, enter the requirement percentage of PWHT.
19. In the ****PMI Req. %**** box, enter the requirement percentage of PMI. [![image-1651127866481.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651127866481.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651127866481.png)**Note**: The RT, UT, MT, PT, PWHT, and PMI Requirements (%) should be filled with valid numerical numbers. The joint testing will be performed based on the value given by you, for example, if you enter 100 % of requirement, which means 100 % of the joints will be tested. If you enter 0 %, none of joints will be tested.
20. Click ****Save.****The ISO drawing is successfully added and listed in the **ISO** page.

#### **3.5.2 Add Revision for ISO Drawing**

Once you have added the ISO drawing, the **ISO** page shows [![image-1651127997956.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651127997956.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651127997956.png) (Revision icon) for the added ISO drawing. You can add multiple revisions for the added ISO by using this revision icon.

1. Click [![image-1651128029530.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128029530.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128029530.png) (Revision icon) of the respective ISO drawing.
    
    The **Add Revision** box opens.
    
    [![image-1651128056098.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128056098.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128056098.png)
2. In the ****Revision Number**** box, enter the revision number.
3. Click ****Add****. The revision for the ISO drawing will be added and listed in the **ISO** page.

#### **3.5.3 Edit an ISO Drawing**

If you want to edit any existing ISO drawing in the **ISO** page,

1. Click [![image-1651128135468.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128135468.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128135468.png)(Edit icon) of the respective sub system. See Fig 3.5.
    
    The **ISO** page shows the details of the selected ISO drawing.
    
    [![image-1651128166066.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128166066.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128166066.png)
2. Edit the details where you want.
3. Click ****Save****.

#### **3.5.4 Delete an ISO Drawing**

If you want to delete any existing ISO drawing in the **ISO** page, you can use [![image-1651128248371.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128248371.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128248371.png) (Delete icon) provided in the **ISO** page. To know how to delete, see the topic, “[<u>Delete P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

#### **3.5.5 Export ISO Drawings List**

You can export a list of ISO drawings added in the **ISO** page in both the pdf and excel formats by using [![image-1651128300644.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128300644.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128300644.png) (**PDF** button) and [![image-1651128311204.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128311204.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128311204.png) (**Excel** button). To know how to export, see the topic, “[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **3.5.6 Filter an ISO Drawing**

If you want to filter any specific ISO drawing in the **ISO** page, you can use [![image-1651128397314.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128397314.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128397314.png) (**FILTER** button) provided on the **ISO** page. To know how to filter, see the topic, “[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

#### **3.5.7 Import Multiple ISO Drawings**

If you want to import multiple ISO drawings together, do the following,

1. Click [![image-1651128469532.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128469532.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128469532.png) (**TEMPLATE** button). See Fig 3.5.
    
    An excel worksheet will be downloaded with a predefined template to enter the details of ISO drawings.
    
    [![image-1651128508757.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128508757.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128508757.png)
2. Enter the required ISO drawing details in the respective columns of the excel worksheet.
3. Once you have added the ISO drawing details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651128544505.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128544505.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128544505.png) (**IMPORT** button). See Fig 3.5.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651128572672.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128572672.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128572672.png)
5. Click [![image-1651128597761.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128597761.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128597761.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651128627885.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128627885.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128627885.png) (**Upload** button) to export the ISO drawings that are added in the excel worksheet.
    
    The details of the ISO drawings in the worksheet will be displayed in the **ISO** page.

#### **3.5.8 Attach a File into an ISO Drawing**

If you want to attach any file with an ISO drawing listed in the **ISO** page, you can attach the file by using [![image-1651128675518.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128675518.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128675518.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.


### **3.6 Spools**

A spool refers to a section of a piping system that is pre-fabricated as smaller segments with flanges and fittings. If you want to navigate to **Spools**,

1. Click ****Spools**** in the ******Project Data.******The **Spools** page opens.
    
    [![image-1651128749796.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128749796.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128749796.png)
    
     **Figure 3.6: Spools page**

#### **3.6.1 Add a Spool**

If you want to add a new spool, do the following steps,

1. Click [![image-1651128843702.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128843702.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128843702.png) (**ADD** button) in the **Spools**  See Fig 3.6.
    
    A new window opens to add a new spool.
    
    [![image-1651128875173.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128875173.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128875173.png)
    
    [![image-1651128883299.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651128883299.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651128883299.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the ****ISO Drawing Number**** box, select the ISO drawing number from a drop-down list.
3. In the ****Spool Number**** box, enter the spool number for a spool you want to add.
4. In the ****Tag Id**** box, enter the tag id number of the spool.
5. In the ****Location**** box, select the location from a drop-down list.
6. In the ****Contractor** **Name**** box, enter the contractor name.
7. In the ****Remarks**** box, enter your remarks if any.
8. Click ****Save.****The spool is successfully added and listed in the **Spools** page.

#### **3.6.2 Edit a Spool**

If you want to edit any existing spool in the **Spools** page,

1. Click [![image-1651129026533.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651129026533.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651129026533.png)(Edit icon)of the respective spool. See Fig 3.6.
    
    The **Spools** page shows the details of the selected spool.
    
    [![image-1651129062410.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651129062410.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651129062410.png)
2. Edit the details where you want.
3. Click ****Save****.

#### **3.6.3 Delete a Spool**

If you want to delete any existing spool in the **Spools** page, you can use [![image-1651129124714.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651129124714.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651129124714.png) (Delete icon) provided in the **Spools** page. To know how to delete, see the topic, “[<u>Delete P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

#### **3.6.4 Export Spool List**

You can export a list of spools added in the **Spools** page in both the pdf and excel formats by using [![image-1651129164359.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651129164359.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651129164359.png) (**PDF** button) and (**Excel** button). To know how to export, see the topic, “[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **3.6.5 Filter a Spool**

If you want to filter any spool in the **Spools** page, you can use [![image-1651129229621.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651129229621.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651129229621.png) (**FILTER** button) provided on the **Spools** page. To know how to filter, see the topic, “[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

#### **3.6.6 Import Multiple Spools**

If you want to import multiple spools together, do the following,

1. Click (**TEMPLATE** button). See Fig 3.6.
    
    An excel worksheet will be downloaded with a predefined template to enter the details of spools.
    
    [![image-1651129313702.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651129313702.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651129313702.png)
2. Enter the required spool details in the respective columns of the excel worksheet.
3. Once you have added the spool details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651129406453.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651129406453.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651129406453.png) (**IMPORT** button). See Fig 3.6.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651129432805.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651129432805.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651129432805.png)
5. Click (****Browse**** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click (**Upload** button) to export the spool details that are added in the excel worksheet.
    
    The details of the spools in the worksheet will be displayed in the **Spools** page.


### **3.7 Joints**

A variety of joints are used in the assembly of pipes. Joints are the points where two or more pieces of materials for example pipes, are joined by welding. The **Joints** tab in the **Project Data** menu helps you add the joint details including joint number, material specification, welding type, and so on.

If you want to navigate to **Joints,**

1. Click **Joints** in the **Project Data** menu.
    
    The **Joints** page opens.
    
    <table border="0" style="border-collapse: collapse; width: 100%; background-color: #ecf0f1;"><tbody><tr><td style="width: 99.866%;">Due to insufficient space, the captured figure of the **Joints** page is split as four.
    
    </td></tr></tbody></table>
    
    [![image-1651130834723.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651130834723.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651130834723.png)
    
    [![image-1651130839151.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651130839151.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651130839151.png)
    
    [![image-1651130844522.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651130844522.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651130844522.png)
    
    [![image-1651130851996.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651130851996.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651130851996.png)
    
     **Figure 3.7: Joints page**

#### **3.7.1 Add a Joint**

If you want to add a new joint, do the following steps,

1. Click [![image-1651131075707.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651131075707.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651131075707.png) (****ADD**** button) in the ****Joints****  See Fig 3.7. A new window opens to add a new joint.
    
    [![image-1651131116014.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651131116014.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651131116014.png)
    
    [![image-1651131198398.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651131198398.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651131198398.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **ISO Drawing Number** box, select the ISO drawing number from a drop-down list.
3. In the ****Spools**** box, select the spool from a drop-down list.
4. In the ****Component (I)**** box, select the first component which you want to join.
5. In the ****Material**** box, select the material of the first component.
6. Enter the details of first component such as ****Material Spec****, ****Material Grade****, ****Material Desc****, ****Diameter (MM)****, ****Thickness (MM)****, ****Rating****, ****Diameter2****, and ****Thickness2****.
7. In the ****Component (II)**** box, select the second component which you want joint.
8. In the ****Material**** box, select the material of the second component.
9. Enter the details of second component such as ****Material Spec****, ****Material Grade****, ****Material Desc****, ****Diameter (MM)****, ****Thickness (MM)****, ****Rating****, ****Diameter2****, and ****Thickness2****.
10. If the component is other than pipe, enter the dimensions in ****Others****
11. In the ****Design Pressure**** box, enter the design pressure value.
12. In the ****Paint System**** box, enter the paint system name.
13. In the ****Design Temp**** box, enter the design temperature value.
14. In the ****Insulation System**** box, enter the insulation system name.
15. In the ****Joint Number**** box, enter the joint number.
16. In the ****Joint Size**** box, enter the joint size range.
17. In the ****Joint Thickness**** box, enter the joint thickness range.
18. In the ****Weld Type**** box, select the welding type from a drop-down list.
19. In the ****Joint Category**** box, select the joint category from a drop-down list.
20. In the ****Fixing Type**** box, select the fixing type from a drop-down list.
21. In the ****WPS Number**** box, select the WPS number from a drop-down list.
22. In the ****Electrode**** box, enter the electrode name.
23. In the ****Filler Rod**** box, enter the filler rod name.
24. If the NDT inspection is not required for the added joint, select the checkbox of the **NDT Not Required** option.
25. If the NDT inspection is required for the added joint, select the checkbox of the respective NDT types given for example **RT Required**, **UT Required**, and so on.
26. In the ****Remarks**** box, enter your remarks if any.
27. Click ****Save.****The joint is successfully added.
28. If you want view the added joint, select the respective drawing number from a drop-down list of the **Select Drawing Number** box in the upper side of the **Joints** page. and listed in the **Joints** page.
    
    [![image-1651131647160.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651131647160.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651131647160.png)
    
    The joint for the selected drawing number will be displayed in the **Joints** page.
    
    [![image-1651131660363.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651131660363.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651131660363.png)

#### **6.7.2 Clone a Joint**

The Clone option provided in the **Joints** page used to add a new joint from previously added joint. If a joint to be added is having the same specifications of any joint already listed in the **Joints** page, you can add the new joint by using [![image-1651131717921.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651131717921.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651131717921.png) (Clone icon).

1. In the ****Joints**** page, find out the joint you want to clone. [![image-1651131757866.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651131757866.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651131757866.png)
2. Click[![image-1651131989751.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651131989751.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651131989751.png)(Clone icon) of the respective joint.
    
    The **Joints** page shows the details of selected joint except joint number in the **Joint Number** box. See the below figure.
    
    [![image-1651132015191.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132015191.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132015191.png)
3. If you want to change any details, you can change in the respective boxes.
4. In the ****Joint Number**** box, enter the joint number for the new joint you want to add.
5. Click ****Save****. The new joint is successfully added and listed in the **Joints** page.
    
    [![image-1651132098303.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132098303.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132098303.png)

#### **3.7.3 Swap Clone Joint**

The Swap Clone option provided in the **Joints** page used to add a new joint from previously added joint. When you do swap clone of any joint, the first and second components in the joint will be swapped each other.

1. In the ****Joints**** page, find out the joint you want to swap clone. [![image-1651132194628.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132194628.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132194628.png)
2. Click [![image-1651132234131.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132234131.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132234131.png) (Swap Clone icon) of the respective joint. The **Joints** page shows the details of selected joint except joint number in the **Joint Number** box. The **Component (I)** and **Component (II)** will be swapped each other. See the below figure.
    
    [![image-1651132275715.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132275715.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132275715.png)
3. If you want to change any details, you can change in the respective boxes.
4. In the ****Joint Number**** box, enter the joint number for the new joint you want to add.
5. Click ****Save****. The new joint is successfully added and listed in the **Joints** page.
    
    [![image-1651132327179.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132327179.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132327179.png)

#### **3.7.4 Edit a Joint**

If you want to edit any existing joint in the **Joints** page,

1. Click (Edit icon) of the respective joint. See Fig 3.7. The **Joints** page shows the details of the selected joint.
    
    [![image-1651132455198.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132455198.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132455198.png)
2. Edit the details where you want.
3. Click ****Save****.

#### **3.7.5 Delete a Joint**

If you want to delete any existing joint in the **Joints** page, you can use [![image-1651132644809.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132644809.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132644809.png) (Delete icon) provided in the **Joints** page. To know how to delete, see the topic, “[<u>Delete P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

#### **3.7.6 Export Joints List**

You can export a list of joints added in the **Joints** page in both the pdf and excel formats by using [![image-1651132703793.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132703793.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132703793.png) (**PDF** button) and [![image-1651132724425.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132724425.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132724425.png) (**Excel** button). To know how to export, see the topic, “[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **3.7.7 Filter a Joint**

If you want to filter any joint in the **Joints** page, you can use [![image-1651132789692.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132789692.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132789692.png) (**FILTER** button) provided on the **Joints** page. To know how to filter, see the topic, “[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

#### **3.7.8 Import Multiple Joints**

If you want to import multiple joints together, do the following,

1. Click [![image-1651132953138.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132953138.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132953138.png) (**TEMPLATE** button). See Fig 3.7.
    
    An excel worksheet will be downloaded with a predefined template to enter the details of joints.
    
    [![image-1651132976303.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651132976303.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651132976303.png)
2. Enter the required joint details in the respective columns of the excel worksheet.
3. Once you have added the joint details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651133055006.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651133055006.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651133055006.png) (****IMPORT**** button). See Fig 3.7.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651133091897.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651133091897.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651133091897.png)
5. Click [![image-1651133119712.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651133119712.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651133119712.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651133155455.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651133155455.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651133155455.png) (****Upload**** button) to export the joint details that are added in the excel worksheet.
    
    The details of the joints in the worksheet will be displayed in the **Joints** page.


### **3.8 Drawing Bulk Edit**

The **Drawing Bulk Edit** tab in the **Project Data** menu helps you to make changes in all the added ISO drawings together, where the ISO drawings are added using the [**<u>ISO Drawings</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.5%C2%A0isometric-%28iso%29-) tab. This feature avoids the need to open each ISO drawing individually for making changes in the ISO drawings because you can make changes in all the ISO drawings together.

If you want to make changes in the ISO drawings together, do the following steps,

1. Click ****Drawing Bulk Edit**** in the ****Project Data**** menu. The **Drawing Bulk Edit** page opens with a list ISO drawing added in the **ISO Drawings** page.
    
    [![image-1651133300204.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651133300204.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651133300204.png)
    
     **Figure 3.8: Drawing Bulk Edit page**
2. If you want make changes in any ISO drawing details, click on the respective detail, and edit.
3. Click ****Save Changes****. The changes you have made here will be reflected in the respective ISO drawing in the [**<u>ISO</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.5%C2%A0isometric-%28iso%29-) page.
    
    [![image-1651133358768.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651133358768.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651133358768.png)**Note**: You can also add a new ISO drawing by using (**ADD** Button) provided in the upper side of the **Drawing Bulk Edit** page.

#### **3.8.1 Export Drawings After Editing**

After making changes in the ISO drawings, you can export a list of drawings in the **Drawing Bulk Edit** page in both the pdf and excel formats by using [![image-1651133450281.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651133450281.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651133450281.png) (**PDF** button) and [![image-1651133459839.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651133459839.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651133459839.png) (**Excel** button). To know how to export, see the topic, “[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **3.8.2 Filter a Drawing**

If you want to filter any ISO drawing in the **Drawing Bulk Edit** page, you can use (**FILTER** button) provided on the **Drawing Bulk Edit** page. To know how to filter, see the topic, “[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **3.9 Joints Bulk Edit**

The **Joints Bulk Edit** tab in the **Project Data** menu helps you to make changes in all the added joints together, where the joints are added using the [<u>Joints</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.-7%C2%A0joints) tab. This feature avoids the need to open each joint individually for making changes in the joint because you can make changes in all the joints together.

If you want to make changes in the joints together, do the following steps,

1. Click ****Joints Bulk Edit**** in the ******Project Data****** menu******.******The **Joints** page opens with a list joints added in the **Joints** page.
    
    [![image-1651133622102.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651133622102.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651133622102.png)
    
     **Figure 3.9: Joints page**
2. In the **Sheet No/Drawing No/Revision** box, select the drawing number from a drop-down list.
    
    The joints corresponding to the selected drawing number will be displayed in the **Joints** page.
    
    [![image-1651133679769.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651133679769.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651133679769.png)
3. If you want make changes in any joint, click on the respective joint detail, and edit.
4. Click ****Save Changes****. The changes you have made here will be reflected in the respective joints in the [**<u>Joints</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.-7%C2%A0joints) page.
    
    [![image-1651133717640.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651133717640.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651133717640.png)**Note**: You can also add a new joint by using provided in the upper right corner of the **Joints Bulk Edit** page.

#### **3.9.1 Export Joints After Editing**

After making changes in the joints, you can export a list of joints in the **Joints** page in both the pdf and excel formats by using [![image-1651133805751.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651133805751.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651133805751.png) (**PDF** button) and [![image-1651133820284.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651133820284.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651133820284.png) (**Excel** button). To know how to export, see the topic, “[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **3.9.2 Filter a Joint**

If you want to filter any joint in the **Joints** page, you can use [![image-1651133877947.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651133877947.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651133877947.png) (**FILTER** button) provided in the **Joints** page. To know how to filter, see the topic, “[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

#### **3.9.3 View Material Traceability Record (MTR)**

You can view the MTR for added joints by using [![image-1651133927232.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651133927232.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651133927232.png) (**MTR** button) provided in the **Joints** page. Once you click the **MTR** button, the page redirects you into the [<u>Material Traceability Record</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/materials/#bkmrk-4.10%C2%A0material-tracea) page.


### **3.10 Import from Excel - Masters**

The **Import from Excel – Masters** tab helps you to upload master data for all fields instead of uploading data for each field individually.

If you want to import master data for different fields, do the following,

1. Click ****Import from Excel – Masters**** in the ******Project Data******The **File Upload** page opens.
    
    [![image-1651134017306.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651134017306.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651134017306.png)
    
     **Figure 3.10: File Upload page**
2. Download a template by using [![image-1651134174669.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651134174669.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651134174669.png) (****TEMPLATE**** button) to enter the details of master data.
    
    An excel worksheet will be downloaded with a pre-defined template to the details.
    
    [![image-1651134236413.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651134236413.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651134236413.png)
3. Enter the relevant details in the respective column of the excel worksheet.
4. Click [![image-1651134292995.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651134292995.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651134292995.png) (Choose File button).
    
    Once the file has been uploaded successfully, you receive a message, “Successfully uploaded”
5. Click [![image-1651134343191.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651134343191.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651134343191.png)(Get Columns button).
    
    The columns added in the excel worksheet will be listed in the **Excel Column** field.
    
    [![image-1651134359459.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651134359459.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651134359459.png)**Note**: Make sure that the **Excel Column** field must have all the columns as in the **System Column** field.
6. To map the columns in the ****System Column**** and ****Excel Column**** fields, do one of the following, 
    1. If you want to map the columns Automatically, click [![image-1651134444969.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651134444969.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651134444969.png) (**AutoMap** button).
        
        The columns will be mapped automatically and displayed in the **Mapped Columns** field.
    2. If you want to map each column manually, select the respective columns in both the **System Columns** and Each **Excel Column** fields and then click [![image-1651134554716.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651134554716.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651134554716.png) (**Map** button). [![image-1651134545201.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651134545201.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651134545201.png)
7. To un-map the columns in the **Mapped Columns** field, select the respective column and then click [![image-1651134731173.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651134731173.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651134731173.png) (**UnMap** button).
    
    Once you have completed the mapping and un-mapping of columns, you must enter the range for uploading the data from the excel worksheet.
    
    [![image-1651134756458.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651134756458.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651134756458.png)**Note**: In the **Total Rows** field, the system indicates the total number of rows filled in the excel worksheet.
    
    [![image-1651134776943.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651134776943.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651134776943.png)**Tip**: You must enter the upload starting range as two in the **Upload Range From** field because a first row in the excel worksheet is having heading of the columns.
8. In the ****Upload Range From and To**** fields, enter the range of rows you want to upload from the excel worksheet.
9. Click [![image-1651134865782.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651134865782.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651134865782.png) (**Populate Values** button).
10. Click [![image-1651134884892.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651134884892.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651134884892.png) (**Process** button).
    
    The system processes all the uploaded data and displays in the **Excel Import** page.
    
    [![image-1651134915245.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651134915245.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651134915245.png)
11. Click [![image-1651134930979.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651134930979.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651134930979.png) (**Update** button) to import the uploaded data.
    
    The data will be successfully imported.

### **3.11 NDT Procedures**

The **NDT procedures** tab in the **Project Data** menu helps you to add an NDT procedure. Once you have added the NDT procedure details you can add revision for the added NDT procedure. If you want to add an NDT procedure, do the following steps,

1. Click ****NDT Procedures**** in the ****Project Data**** menu. The **NDT Procedure** page opens.
    
    [![image-1651135080005.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651135080005.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651135080005.png)
    
     **Figure 3.11: NDT Procedure page**

#### **3.11.1 Add an NDT procedure**

If you want to add an NDT procedure,

1. Click [![image-1651135146245.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651135146245.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651135146245.png) (**ADD** button) in the **NDT Procedure page. See Fig 3.11.
    
    A new window opens to add an NDT procedure.
    
    [![image-1651135200022.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651135200022.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651135200022.png)
2. In the ****NDT Procedure**** box, select the NDT procedure from a drop-down list.
3. In the ****NDT Procedure Title**** box, enter the NDT procedure title.
4. Click ****Save****. The NDT procedure is successfully added.

#### **3.11.2 Add Details of NDT Procedure** 

Once you have added the NDT procedure, you must add the details of the added NDT procedure.

1. Click[![image-1651135343723.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651135343723.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651135343723.png)(Edit icon) of the respective NDT procedure in the **NDT Procedure**  See Fig 3.11.
    
    The **NDT Procedure Revision** window opens.
    
    [![image-1651135384675.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651135384675.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651135384675.png)
2. Click [![image-1651135399350.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651135399350.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651135399350.png) (**ADD** button) in the **NDT Procedure Revision** window.
    
    A new window opens to add the NDT procedure details.
    
    [![image-1651135439130.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651135439130.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651135439130.png)
    
    [![image-1651135447542.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651135447542.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651135447542.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving. [![image-1651135477119.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651135477119.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651135477119.png)**Tip**: A report number for the revision will be updated automatically in the **Report Number/ Revision** box.
3. In the ****Description**** box, enter the description for the NDT procedure.
4. In the ****Prepared By**** box, enter the name a person who has prepared the NDT procedure.
5. In the ****Prepared Date**** box, enter the prepared date of the NDT procedure.
6. In the ****Reviewed By**** box, enter the name a person who has reviewed the NDT procedure.
7. In the ****Reviewed Date**** box, enter the reviewed date of the NDT procedure.
8. In the ****Approved By**** box, enter the name a person who has approved the NDT procedure.
9. In the ****Approved Date**** box, enter the approved date of the NDT procedure.
10. Click ****Save****. The NDT procedure details are successfully saved and listed in the **NDT Procedure Revision** window.

#### **3.11.3 Add Revision for NDT Procedure** 

Once you have added the NDT procedure details, you can add revision for the added NDT procedures. You can add multiple revisions for one NDT procedure. To add revision,

1. Click[![image-1651135631723.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651135631723.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651135631723.png)(Revision icon) of the respective NDT procedure.
    
    A new window opens with the details of existing NDT procedure.
    
    [![image-1651135665658.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651135665658.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651135665658.png)
2. Click **Save**.
    
    The revision for the selected NDT procedure is added.

#### **3.11.4 View an NDT Procedure Report**

If you want to view an NDT procedure report, click[![image-1651135739577.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651135739577.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651135739577.png) (print icon) provided in the **Print** column of the **NDT Procedure** page. See Fig 3.11.

#### **3.11.5 Attach a File into an NDT Procedure**

If you want to attach any file with a NDT procedure listed in the **NDT Procedure** page, you can attach the file by using [![image-1651135785176.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651135785176.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651135785176.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.


### **3.12 WPS in Project**

WPS is a written instruction that specifies materials, consumables and edge preparations for a given joint. The WPS lists the pre- and post-weld operations including heat treatments; machining, grinding, and dressing of the weld.

The **WPS in Project** tab in the **Project Data** menu helps you to add a WPS report and assign the WPS to a project.

1. Click ****WPS in Project**** tab in the ******Project Data****** menu. The WPS by projects page opens with two fields such as **WPS Summary** and **Assign WPS to Project**.
    
    [![image-1651135904499.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651135904499.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651135904499.png)
    
     **Figure 3.12: WPS in projects page**

#### **3.12.1 Add a WPS Summary Report**

If you want to add a new WPS summary report, do the following,

1. Click [![image-1651136003602.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136003602.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136003602.png) (**ADD** button) in the **WPS Summary** field. See Fig 3.12.
    
    A new window opens to add a WPS report.
    
    [![image-1651136040774.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136040774.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136040774.png)
    
    [![image-1651136053842.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136053842.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136053842.png)**Tip**: A report number for a new WPS report will be updated automatically in the **Report Number** box. If you want to change the report number, you can change.
2. In the ****Prepared By**** box, enter the name of a person who has prepared the WPS report.
3. In the ****Reviewed By**** box, enter the name of a person who has reviewed the WPS report.
4. In the ****Approved By**** box, enter the name of a person who has approved the WPS report.
5. In the ****Prepared Date**** box, choose the prepared date of the WPS report.
6. In the ****Reviewed Date**** box, choose the reviewed date of the WPS report.
7. In the ****Approved Date**** box, choose the approved date of the WPS report.
8. Click ****Save****. The WPS summary report is successfully added.

#### **3.12.2 View a WPS Summary Report**

If you want to view a WPS summary report, click (Print icon) provided in the **WPS Summary Report** column.

#### **3.12.3 View a WPS Summary Report with PQR**

If you want to view a WPS summary report with PQR, click (Print icon) provided in the **WPS Summary with PQR** column.

#### **3.12.4 Attach a File into a WPS Summary Report**

If you want to attach any file with any WPS summary report listed in the **WPS Summary** page, you can use [![image-1651136319442.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136319442.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136319442.png) (Attach icon) provided in the **Attachment** column for the respective WPS summary report. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **3.12.5 Export WPS Summary Reports List**

You can export a list of added WPS reports in the pdf and excel formats by using [![image-1651136377809.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136377809.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136377809.png) (**PDF** button) and [![image-1651136397341.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136397341.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136397341.png) (**Excel** button). To know how to export, see the topic, “[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **3.12.6 Assign a WPS to a Project**

The **Assign WPS to Project** field in the **WPS in projects** page allows you to assign the WPS to the project. If you want to assign any WPS to the project, do the following,

[![image-1651136449870.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136449870.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136449870.png)

In the **Assign WPS to Project** field, the **All WPS** box displays a list of available WPS. The **WPS in Project** box displays a list of WPS that has been already assigned for the project.

1. If you want to assign any WPS for the project, select the respective WPS in the ****ALL WPS**** box, and then click [![image-1651136506476.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136506476.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136506476.png) (Assign welder button). The selected WPS will be assigned to the project.
2. If you want to reject any WPS that has been assigned for the project, select the respective WPS in the ****WPS in Project**** box, and then click [![image-1651136568689.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136568689.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136568689.png) (Reject welder button).


### **3.13 Welders in Projects**

The **Welders in Projects** tab in the **Project Data** menu helps you to assign welders for a project. You can add a welder report by using this tab. This tab also helps you to view a welder list and WPQ details.

1. Click **Welders in Projects** tab in **Project Data** menu.
    
    The welders in projects page opens with four fields such as **Welder Report**, **Assign Welder to Project**, **Welder List**, and **WPQ Details**.
    
    [![image-1651136663917.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136663917.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136663917.png)
    
     **Figure 3.13: Welders in project page**

#### **3.13.1 Add a Welder Report**

If you want to add a welder report, do the following steps,

1. Click [![image-1651136796065.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136796065.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136796065.png) (**ADD** button) in the **Welder Report** See Fig 3.13.
    
    A new window opens to add a welder report.
    
    [![image-1651136830683.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136830683.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136830683.png)
    
    [![image-1651136863440.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651136863440.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651136863440.png)**Tip**: A report number for a new welder report will be updated automatically in the **Report Number** box.
2. In the ****Prepared By**** box, enter the name of welder who has prepared the welder report.
3. In the ****Received By**** box, enter the name of welder who has received the welder report.
4. In the ****Approved By**** box, enter the name of welder who has approved the welder report.
5. In the ****Prepared Date**** box, choose the prepared date of the welder report.
6. In the ****Received Date**** box, choose the received date of the welder report.
7. In the ****Approved Date**** box, choose the approved date of the welder report.
8. Click ****Save****. The welder report is successfully added.

#### **3.13.2 View a Welder Report**

If you want to view a welder report, click[![image-1651137043660.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137043660.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137043660.png)(Print icon) provided in the **Report** column.

#### **3.13.3 Attach a File into a Welder Report**

If you want to attach any file with any welder report listed in the **Welder Report** window, you can use[![image-1651137111900.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137111900.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137111900.png) (Attach icon) provided in the **Attachment** column for the respective welder report. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **3.13.4 Export Welder Reports List**

You can export a list of welder reports in the **Welder Report** field in both the pdf and excel formats by using [![image-1651137177474.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137177474.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137177474.png) (**PDF** button) and [![image-1651137189912.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137189912.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137189912.png) (**Excel** button). To know how to export, see the topic, “[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **3.13.5 Assign a Welder to a Project**

The **Assign Welder to Project** field in the welders in projects page allows you to assign any welder to the particular project. If you want to assign any welder to the project, do the following,

[![image-1651137252547.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137252547.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137252547.png)

1. In the **All Welders** box, if you want to view all the welders, click **ALL** otherwise select the respective company’s welder group from a drop-down list to view their welders list.
    
    Once you have selected the company’s welder group, the left-side box shows a list of welders. The right-side box shows a list of welders who has been already assigned for the project.
2. If you want to assign any welder for the project, select the respective welder in the left-side box, and then click [![image-1651137423048.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137423048.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137423048.png)(Assign welder button).
    
    The selected welder will be assigned to the project.
3. If you want to reject any welder who has been assigned for the project, select the respective welder in the right-side box, and then click [![image-1651137530725.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137530725.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137530725.png) (Reject welder button).

#### **3.13.6 Welder List**

The **Welder List** field in the welders in projects page shows the welder details such as welder name, welder number, NRIC, date of birth, and nationality. This field also helps you to assign the WPQs of welders to the project, and remove any WPQs from the project.

[![image-1651137630980.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137630980.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137630980.png)

If you click[![image-1651137642763.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137642763.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137642763.png)(Expand Icon) of the respective welder, the **All WPQ** box shows the details of all WPQs of the welder, and the **Assigned to Project** box shows any WPQ that has been assigned to a project.

[![image-1651137711680.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137711680.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137711680.png)

1. If you want to assign any WPQ for the project, select the respective WPQ in the **All WPQ** box, and then click [![image-1651137746447.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137746447.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137746447.png)
    
    (Assign WPQ button).
    
    The selected welder will be assigned to the project.
2. If you want to reject any WPQ that has been assigned for the project, select the respective WPQ in the **Assigned to Project** box, and then click [![image-1651137824244.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651137824244.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651137824244.png) (Reject WPQ button).

#### **3.13.7 WPQ Details**

The **WPQ details** field in the welders in projects page shows the WPQ details of each welder including welder’s name, welder number, welding process name, weld metal thickness, position, and so on.

[![image-1651138342512.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138342512.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138342512.png)

If you want to take a print of any WPQ details, click the checkbox provided in the **Print** Column.



### **3.14 Inspectors in Projects**

The **Inspectors in Projects** tab in the **Project Data** menu helps you to map inspectors for the specific project.

1. Click the **Inspectors in Projects** tab.
    
    The **Project Mapping – Inspectors** page opens
    
    [![image-1651138418263.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138418263.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138418263.png)
    
     **Figure 3.14: Project Mapping – Inspectors page**
    
    The **Project Mapping – Inspectors** page shows a list of inspectors, which is added in the **Master Data**. If you want to map any inspectors for a specific project, do the following,
2. Select a project you want from the ****Projects**** box. A list of available inspectors will be displayed.
3. Select the check box of the respective inspector which you want to map for the selected project.
    
    [![image-1651138500653.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138500653.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138500653.png)
4. Click [![image-1651138511507.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138511507.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138511507.png) (Map icon).
    
    The selected inspectors are mapped for the selected project.
    
    [![image-1651138535910.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651138535910.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651138535910.png)
    
    The **Inspector List** window shows the inspector’s name, login name, NRIC, and Date of birth.


### **3.15 WPQ Search**

The **WPQ Search** tab in the **Project Data** menu used to filter the specific WPQ result. To perform the WPQ search,

1. Click ****WPQ Search**** in the ******Project Data****** menu. The **WPQ Search** page opens with the **WPQ Results** window.
    
    [![image-1651143779007.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651143779007.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651143779007.png)
    
     **Figure 3.15: WPQ Search page**
2. In the ****Welding Process**** box, select a welding process from the given welding processes.
3. In the ****Welder Name**** box, enter the name of a welder.
4. In the ****Backing**** box, enter the backing details.
5. In the **Weld Metal Thk Max. in mm** box, enter the minimum and maximum thickness of the weld metal.
6. Click [![image-1651143902806.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651143902806.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651143902806.png) (**Search** button).
    
    The **WPQ Results** window shows the WPQ details based on the given data.

#### **3.15.1 Export WPQ Results**

You can export the WPQ results in the **WPQ Results** window in both the pdf and excel formats by using [![image-1651144003140.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651144003140.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651144003140.png) (**PDF** button) and [![image-1651144016905.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651144016905.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651144016905.png) (**Excel** button). To know how to export, see the topic, “[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **3.15.2 Filter WPQ Results**

If you want to filter any WPQ in the **WPQ Results** page, you can use [![image-1651144066532.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651144066532.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651144066532.png) (**FILTER** button) provided on the **WPQ Results page. To know how to filter, see the topic, “[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **3.16 Bill of Material**

Bill of Material is a comprehensive inventory of the raw materials, assembles, sub assembles, parts and components, as well as the quantity of each, needed to the piping fabrication.

The **Bill of Material** tab in the **Project Data** menu used to add a new bill of material.

1. Click **Bill of Material** in the **Project Data** menu.
    
    The **Bill of Material** page opens.
    
    [![image-1651144225149.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651144225149.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651144225149.png)
    
     **Figure 3.16: Bill of Material page**

#### **3.16.1 Add a Bill of Material**

If you want to add a bill of material,

1. In the ****ISO/Drawing No**** box, select the ISO drawing number from a drop-down list.
2. In the ****Material Type**** box, select a material type from a drop-down list.
3. Click [![image-1651144312247.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651144312247.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651144312247.png) (**Add** button).
    
    A new window opens to add the material details.
    
    [![image-1651144342917.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651144342917.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651144342917.png)
4. In the ****Stock Code**** box, enter the stock code.
5. In the ****Quantity**** box, enter the quantity of the material.
6. In the ****Component Details**** box, enter the component details.
7. In the ****Remarks**** box, enter your remarks if any.
8. If the materials are need to be fabricated, enable the checkbox of the ****Required to fabricate**** option.
9. Click ****Submit****. The bill of material is added.


### **3.17 Spools Location – Masters**

The **Spools Location – Masters** tab in the **Project Data** menu used to add the details of the spool location.

1. Click ****Spools Location – Masters**** in the ******Project Data****** menu. The **Spools Location** page opens.
    
    [![image-1651144550068.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651144550068.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651144550068.png)
    
     **Figure 3.17: Spools Location page**

#### **3.17.1 Add a Spool Location**

If you want to add a spool location, do the following steps,

1. Click [![image-1651144642384.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651144642384.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651144642384.png) (**ADD** button) in the **Spools Location** page. See Fig 3.17.
    
    A new window opens to add a new spool location.
    
    [![image-1651144676899.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651144676899.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651144676899.png)
2. In the ****Location Name**** box, enter the location name.
3. In the ****Location Code**** box, enter the location code.
4. In the ****Remarks**** box, enter your remarks if any.
5. Click ****Save.****The spool location is successfully added.

#### **3.17.2 Edit a Spool Location**

If you want to edit any existing spool location detail in the **Spools Location** page,

1. Click [![image-1651144815771.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651144815771.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651144815771.png)(Edit icon)of the respective spool location. See Fig 3.17.
    
    The **Spools Location** page shows the details of the selected location.
2. Edit the details where you want.
3. Click ****Save****.

#### **3.17.3 Delete a Spool Location** 

If you want to delete any existing spool location in the **Spools Location** page, you can use [![image-1651144951947.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651144951947.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651144951947.png) (Delete icon). To know how to delete, see the topic, “[<u>Delete P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

#### **3.17.4 Export Spool Location List**

You can export a list of spool location added in the **Spools Location** page in both the pdf and excel formats by using [![image-1651145002894.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651145002894.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651145002894.png) (**PDF** button) and [![image-1651145022584.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651145022584.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651145022584.png) (**Excel** button). To know how to export, see the topic, “[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **3.17.5 Filter a Spool Location**

If you want to filter any spool location in the **Spools Location** page, you can use [![image-1651145078005.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651145078005.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651145078005.png) (**FILTER** button) provided on the **Spools Location** page. To know how to filter, see the topic, “[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **3.18 Workflow Settings**

The **Workflow Settings** tab in the **Project Data** menu used to set a workflow in the **Piping** project.

1. Click **Workflow Settings** in the **Project Data** menu.
    
    The **Workflow** page opens.
    
    [![image-1651145159460.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651145159460.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651145159460.png)
    
     **Figure 3.18: Workflow page**

#### **3.18.1 Add a Workflow**

If you want to add a workflow,

1. Click [![image-1651145239059.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651145239059.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651145239059.png) (**ADD** button) in the **Workflow**  See Fig 3.18.
    
    The page shows a new window to add the category.
    
    [![image-1651145280544.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651145280544.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651145280544.png)
2. In the **Category** box, select a category from a drop-down list.
3. Click ****Save****. The added category will be listed in the **Workflow** page. See Fig 3.18.
4. Click [![image-1651145382522.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651145382522.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651145382522.png) (Add icon) of the respective category.
    
    The **Workflow Details** window opens.
    
    [![image-1651145419157.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651145419157.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651145419157.png)
5. Click [![image-1651145471636.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651145471636.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651145471636.png) (**ADD** button) in the **Workflow Details** window.
    
    [![image-1651145484842.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651145484842.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651145484842.png)
6. In the ****Role Name**** box, select a role name from a drop-down list.
7. In the ****Description**** box, enter the description for the role name.
8. Click ****Save****.

#### **3.18.2 Edit a Workflow**

If you want to edit any existing workflow in the **Workflow** page,

1. Click [![image-1651145609219.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651145609219.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651145609219.png)(Edit icon) of the respective workflow. See Fig 3.18.
    
    The **Workflow** page shows the details of the selected workflow.
2. Edit the details where you want.
3. Click ****Save****.

#### **3.18.3 Delete a Workflow**

If you want to delete any existing workflow in the **Workflow** page, you can use [![image-1651145702845.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651145702845.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651145702845.png) (Delete icon) provided in the **Workflow** page. To know how to delete, see the topic, “[**<u>Delete P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

#### **3.18.4 Export Workflow List**

You can export a list of workflows added in the **Workflow** page in both the pdf and excel formats by using [![image-1651145783334.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651145783334.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651145783334.png) (**PDF** button) and (**Excel** button). To know how to export, see the topic, **“**[<u>**Export P&amp;ID list**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **3.18.5 Filter a Workflow** 

If you want to filter any specific workflow, you can use [![image-1651145835186.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651145835186.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651145835186.png) (**FILTER** button) located on the **Workflow** page. To know how to filter, see the topic, **“**[<u>**Filter** **P&amp;ID**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **3.19 Inspection Requirements**

The **Inspection Requirements** tab in the **Project Data** menu used to add the requirement details for the inspection.

1. Click ****Inspection Requirements**** in the ******Project Data****** menu. The **Inspection Requirements** page opens.
    
    [![image-1651145927701.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651145927701.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651145927701.png)
    
     **Figure 3.19: Inspection Requirements page**

#### **3.19.1 Add an Inspection Requirement**

If you want to add an inspection requirement, do the following steps,

1. Click **Add Inspection Requirement**.
    
    The **Add New Inspection Requirement** window opens.
    
    [![image-1651146039326.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651146039326.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651146039326.png)
2. In the Inspection Type box, select an inspection type.
3. If you want to add the system detail, select the ****System**** option and choose a system from a drop-down list.
4. If you want to add the line number detail, select the ****Line Number**** option and choose a line number from a drop-down list.
5. In the ****Requirement**** box, enter the inspection requirement percentage.
6. In the ****Pressure Rating From**** and ****To**** box, enter the pressure rating range.
7. Click ****Create****. The inspection requirement details will be added and listed in the **Inspection Requirements** page.

#### **3.19.2 Edit an Inspection Requirement**

If you want to edit any added inspection requirement details,

1. Click[![image-1651146387262.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651146387262.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651146387262.png)(Edit icon) of the respective inspection requirement. See Fig 3.19.
    
    The added inspection requirement details open.
2. Edit the details where you want.
3. Click **Save**.


#### **3.19.3 Delete an Inspection Requirement**

If you want to delete any existing inspection requirement, you can use [![image-1651146563620.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651146563620.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651146563620.png) (Delete icon). To know how to delete, see the topic, “[**<u>Delete P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.


### **3.20 Template Check Sheets**

The **Template** **Check Sheets** tab in the **Project Data** menu helps you to add MC/SC – Check Record (CR)/Check Sheet (CS) templates. To navigate to the templates adding page,

1. Click ****Template**** ****Check Sheets**** in the ****Project Data**** menu. The **MC/SC – CR/CS Templates** page opens.
    
    [![image-1651146667275.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651146667275.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651146667275.png)
    
     **Figure 3.20: MC/SC – CR/CS Templates page**

#### **3.20.1 Add a CR/CS Template**

If you want to add a CR/CS template,

1. Click [![image-1651146753744.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651146753744.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651146753744.png) (**ADD** button) in the **MC/SC – CR/CS Templates** page. See Fig 3.20.
    
    The page opens a new window to add the details of a template.
    
    [![image-1651146797365.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651146797365.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651146797365.png)
    
    [![image-1651146807542.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651146807542.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651146807542.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.
2. In the ****CR/CS Name**** box, enter the name for CR/CS.
3. In the ****Template Type**** box, select a template whether CR or CS.
4. In the ****Description**** box, enter the description for CR/CS.
5. Click ****Save****. The template is successfully added and listed in the **MC/SC – CR/CS Templates** page. Once you have added the template details, you must import the respective template.

#### **3.20.2 Import a CR/CS Template**

If you want to import CR/CS template,

1. Click [![image-1651146963355.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651146963355.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651146963355.png)(Add icon) of the respective CR/CS name in the ****MC/SC – CR/CS Templates**** page.
    
    The **Check Records** window opens.
2. Click [![image-1651147006091.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147006091.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147006091.png) (**ADD** button) in the **Check Records**
    
    [![image-1651147035140.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147035140.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147035140.png)
3. In ****Items**** box, enter the details of items.
4. Browse and attach a CS/CR template you want to import.
5. Click ****Save****.

#### **3.20.3 Edit a CR/CS Template**

If you want to edit any added CR/CS template in the **MC/SC – CR/CS Templates** page,

1. Click[![image-1651147161197.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147161197.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147161197.png)(Edit icon) of the respective CR/CS template. See Fig 3.20
    
    The **MC/SC – CR/CS Templates** page shows the details of the selected CR/CS template.
2. Edit the details where you want.
3. Click **Save**.

#### **3.20.4 Delete a CR/CS Template**

If you want to delete any existing CR/CS template in the **MC/SC – CR/CS Templates** page, you can use [![image-1651147369017.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147369017.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147369017.png) (Delete icon) provided in the **MC/SC – CR/CS Templates** page. To know how to delete, see the topic, “[<u>**Delete P&amp;ID**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

#### **3.20.5 Export CR/CS Template list**

You can export a list of CR/CS templates added in the **MC/SC – CR/CS Templates** page in both the pdf and excel formats by using [![image-1651147415718.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147415718.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147415718.png) (**PDF** button) and [![image-1651147459655.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147459655.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147459655.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **3.20.6 Filter a CR/CS Template**

If you want to filter any specific CR/CS template in the **MC/SC – CR/CS Templates page, you can use [![image-1651147526981.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147526981.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147526981.png) (**FILTER** button) located on the **MC/SC – CR/CS Templates** page. To know how to filter, see the topic, “**[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)**”.

#### **3.20.7 Import Multiple CR/CS Templates**

If you want to import multiple CR/CS templates together, do the following,

1. Click [![image-1651147608905.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147608905.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147608905.png) (**TEMPLATE** button). See Fig 3.20.
    
    An excel worksheet will be downloaded with a predefined template to enter the details of CR/CS templates.
    
    [![image-1651147662917.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147662917.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147662917.png)
2. Enter the required CR/CS template details in the respective columns of the excel worksheet.
3. Once you have added the CR/CS template details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651147694510.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147694510.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147694510.png) (**IMPORT** button). See Fig 3.20.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651147759788.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147759788.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147759788.png)
5. Click [![image-1651147779396.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147779396.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147779396.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651147820331.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147820331.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147820331.png) (**Upload** button) to export the CR/CS template details that are included in the excel worksheet.

The details of the CR/CS templates in the worksheet will be displayed in the **MC/SC – CR/CS Templates page.


### **3.21 Certificate Template Check Sheets**

The **Certificate Template Check Sheets** tab in the **Project Data** menu used to add the details included in a certificate.

1. Click **Certificate Template Check Sheets** in the **Project Data.**
    
    The **Certificates** page opens.
    
    [![image-1651147963784.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651147963784.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651147963784.png)
    
     **Figure 3.21: Certificates page**

#### **3.21.1 Add a Certificate** 

If you want to add a certificate,

1. Click [![image-1651148035060.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651148035060.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651148035060.png) (**ADD** button) in the **Certificates**  See Fig 3.21.
    
    The page opens a new window to add the details of a certificate.
    
    [![image-1651148072326.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651148072326.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651148072326.png)
    
    [![image-1651148083309.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651148083309.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651148083309.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.
2. In the ****Certificate**** box, enter the name of the certificate.
3. In the ****Status**** box, select the status of the certificate.
4. In the ****Certificate Type**** box, enter the description for CR/CS.
5. In the ****Certificate Created Date**** box, select the created date of the certificate.
6. In the ****Sign off Date**** box, select the sign off date of the certificate.
7. Click ****Save****.

The certificate is successfully added and listed in the **Certificates** page. Once you have added the certificate details, you must import the respective certificate.

#### **3.21.2 Import a Certificate**

If you want to import a copy of the certificate,

1. Click [![image-1651148215594.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651148215594.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651148215594.png)(Import icon) of the respective certificate in the **Certificates** page.
2. Attach the copy of the certificate.

#### **3.21.3 Edit a Certificate**

If you want to edit any added certificate in the **Certificates** page,

1. Click[![image-1651148296607.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651148296607.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651148296607.png)(Edit icon) of the respective certificate. See Fig 3.21.
    
    The **Certificates** page shows the details of the selected certificate.
2. Edit the details where you want.
3. Click **Save**.

#### **3.21.4 Delete a Certificate**

If you want to delete any existing certificate in the **Certificates** page, you can use [![image-1651148377279.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651148377279.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651148377279.png) (Delete icon) provided in the **Certificates** page. To know how to delete, see the topic, “**[<u>Delete P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)**”.

#### **3.21.5 Export Certificate list**

You can export a list of certificates added in the **Certificates** page in both the pdf and excel formats by using [![image-1651148446776.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651148446776.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651148446776.png) (**PDF** button) and [![image-1651148459859.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651148459859.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651148459859.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **3.21.6 Filter a Certificate**

If you want to filter any specific certificate in the **Certificates** page, you can use [![image-1651148572959.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651148572959.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651148572959.png) (**FILTER** button) located on the **Certificates** page. To know how to filter, see the topic, “**[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)**”.

#### **3.21.7 Import Multiple Certificates** 

If you want to import multiple certificates together, do the following,

1. Click [![image-1651148641776.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651148641776.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651148641776.png) (**TEMPLATE** button). See Fig 3.21.
    
    An excel worksheet will be downloaded with a predefined template to enter the details of certificates.
2. Enter the required certificate details in the respective columns of the excel worksheet.
3. Once you have added the certificate details in the excel worksheet, save the excel worksheet on your computer.
4. Click[ ![image-1651148711944.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651148711944.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651148711944.png) (**IMPORT** button). See Fig 3.21.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651148762119.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651148762119.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651148762119.png)
5. Click [![image-1651148782202.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651148782202.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651148782202.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651148808859.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651148808859.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651148808859.png) (**Upload** button) to export the certificate details that are included in the excel worksheet.

The details of the certificates in the worksheet will be displayed in the **Certificates** page.


### **3.22 Welder Qualification Test Coupon**

The **Welder Qualification Test Coupon** tab in the **Project Data** menu used to add the welder qualification test coupon details.

If you want to add a welder qualification test coupon, do the following steps,

1. Click **Welder Qualification Test Coupon** in the **Project Data** menu.
    
    The **Welder Qualification Test Coupon** page opens.
    
    [![image-1651149235081.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651149235081.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651149235081.png)
    
     **Figure 3.22: Welder Qualification Test Coupon** **page**

#### **3.22.1 Add a Welder Qualification Test Coupon** 

If you want to add a welder qualification test coupon report,

1. Click [![image-1651149752001.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651149752001.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651149752001.png) (**ADD** button) in the **Welder Qualification Test Coupon** page. See Fig 3.22.
    
    A new window opens to add the welder qualification test coupon.
    
    [![image-1651149927306.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651149927306.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651149927306.png)
    
    [![image-1651149937676.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651149937676.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651149937676.png)**Tip**: A report number for a new welder qualification test coupon will be updated automatically in the **Report Number** box.
2. In the ****Test Date**** box, select the welder qualification test date.
3. In the ****Work Order**** box, enter the work order name.
4. Click **Save**.

The welder qualification test coupon will be added and listed in the **Welder Qualification Test Coupon.**

#### **3.22.2 Add Welder Qualification Test Coupon Details**

To add the welder qualification test coupon details,

1. Click[![image-1651150112351.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651150112351.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651150112351.png)(Add icon) of the respective test coupon. See Fig 3.22.
    
    The **WQTC Details** window opens.
    
    [![image-1651150153475.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651150153475.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651150153475.png)
2. Click [![image-1651150165836.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651150165836.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651150165836.png) (**ADD** button) in the **WQTC Details** window.
    
    A new window opens to enter the WQTC details.
    
    [![image-1651150217300.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651150217300.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651150217300.png)
3. In the **Welder Name** box, enter the welder name.
4. In the **Position** box, enter the position detail.
5. In the ****Welder No**** box, enter the welder number.
6. In the ****RT Report No**** box, enter the RT report number.
7. In the ****Work Permit**** box, enter the work permit detail.
8. In the ****Remarks**** box, enter your remarks if any.
9. In the ****FIN No**** box, enter the FIN number.
10. In the ****Department**** box, enter the department name.
11. In the ****Weld Type**** box, enter the welding type.
12. In the ****Process**** box, select the welding process.
13. In the ****Size**** box, enter the welding size.
14. In the ****Visual Result**** box, select the visual result.
15. In the ****Thickness**** box, enter the thickness of the welding.
16. In the **RT Result** box, select the RT result.
17. Click ****Save****.

#### **3.22.3 View a Welder Qualification Test Coupon Report**

To view a welder qualification test coupon report, click[![image-1651150484253.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651150484253.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651150484253.png)(Print icon) of the respective test coupon, which is provided in the **Report** column of the **Welder Qualification Test Coupon** page.

#### **3.22.4 Approve a Welder Qualification Test Coupon**

Once you have added the welder qualification test coupon details, you must approve the test coupon. To approve the test coupon,

1. Click [![image-1651154796800.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651154796800.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651154796800.png)(Submit icon) in the **Action** column.


#### **3.33.5 Export Welder Qualification Test Coupon List**

You can export a list of test coupons added in the **Welder Qualification Test Coupon** page in both the pdf and excel formats by using [![image-1651154857721.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651154857721.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651154857721.png) (**PDF** button) and [![image-1651154870961.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651154870961.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651154870961.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **3.33.6 Filter a Welder Qualification Test Coupon**

If you want to filter any specific test coupon in the **Welder Qualification Test Coupon** page, you can use [![image-1651154913038.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651154913038.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651154913038.png)(**FILTER** button) located on the page. To know how to filter, see the topic, “**[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)**”.


### **3.23 Valve List** 

The **Valve List** tab in the **Project Data** menu helps you add the valve details.

If you want to navigate to **Valve List,**

1. Click **Valve List** in the **Project Data** menu.
    
    The **Valve List** page opens.
    
    [![image-1651155000830.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651155000830.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651155000830.png)
    
     **Figure 3.23: Valve List page**


#### **3.23.1 Add a Valve**

If you want to add a new valve, do the following steps,

1. Click [![image-1651155090763.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651155090763.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651155090763.png) (**ADD** button) in the **Valve List** page. See Fig 3.23.
    
    A new window opens to add a new valve.
    
    [![image-1651155128670.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651155128670.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651155128670.png)
    
    [![image-1651155136829.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651155136829.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651155136829.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the ****Tag Number**** box, select the tag number of the valve.
3. In the ****Description**** box, enter the description for the valve.
4. In the ****Function**** box, enter the function name.
5. In the ****Sequence Number**** box, enter the sequence number of the valve.
6. In the ****Site Number**** box, enter the site number.
7. In the ****System**** box, select a system.
8. In the ****Area**** box****,**** enter the area name.
9. In the ****Location**** box, enter the location name.
10. In the ****PID**** box, enter the PID number.
11. In the ****Vendor PID**** box, enter the vendor PID number.
12. In the ****Layout**** box, enter the layout detail.
13. In the ****Parent tag**** box, enter the parent tag number.
14. In the ****Parent type**** box, enter the parent type.
15. In the ****Skid Number**** box, enter the skid number.
16. In the ****PO Number**** box, enter the PO number.
17. In the ****Manufacturer**** box, enter the manufacturer name.
18. In the ****Supplier**** box, enter the supplier name.
19. In the ****Model Number**** box, enter the model number of the valve.
20. In the ****Data Sheet**** box, enter the data sheet detail.
21. In the ****Procurement Status**** box, enter the procurement status detail.
22. In the ****Remarks**** box, enter your remarks if any.
23. Click ****Save.****The valve is successfully added.


#### **3.23.2 Clone a Valve**

The **Clone** option provided in the **Valve List** page used to add a new valve from previously added valve. If a valve to be added is having the same specifications of any valve already listed in the **Valve List** page, you can add the new valve by using [![image-1651155451936.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651155451936.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651155451936.png)(Clone icon).

1. In the **Valve List** page, find out the valve you want to clone.
2. Click [![image-1651155492842.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651155492842.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651155492842.png)(Clone icon) of the respective valve.
    
    The **Valve List** page shows the details of selected valve. See the below figure.
    
    [![image-1651155520510.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651155520510.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651155520510.png)
3. If you want to change any details, you can change in the respective boxes.
4. Click ****Save****. The new valve is successfully added and listed in the **Valve List** page.


#### **3.23.3 Edit a Valve**

If you want to edit any existing valve in the **Valve List** page,

1. Click [![image-1651155657115.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651155657115.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651155657115.png)(Edit icon) of the respective valve. See Fig 3.23.
    
    The **Valve List** page shows the details of the selected valve.
2. Edit the details where you want.
3. Click ****Save****.



#### **3.23.4 Delete a Valve**

If you want to delete any existing valve in the **Valve List** page, you can use [![image-1651155721171.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651155721171.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651155721171.png) (Delete icon) provided in the **Valve List** page. To know how to delete, see the topic, “**[<u>Delete P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)**”.


#### **3.23.5 Export Valve List**

You can export a list of valves added in the **Valve List** page in both the pdf and excel formats by using [![image-1651155777359.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651155777359.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651155777359.png) (**PDF** button) and [![image-1651155792745.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651155792745.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651155792745.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.


#### **3.23.6 Filter a Valve**

If you want to filter any valve in the **Valve List** page, you can use [![image-1651155842391.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651155842391.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651155842391.png) (**FILTER** button) provided on the **Valve List** page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


#### **3.23.7 Import Multiple Valves**

If you want to import multiple valves together, do the following,

1. Click [![image-1651155907259.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651155907259.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651155907259.png) (**TEMPLATE** button). See Fig 3.23.
    
    An excel worksheet will be downloaded with a predefined template to enter the details of joints.
2. Enter the required valve details in the respective columns of the excel worksheet.
3. Once you have added the valve details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651155991999.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651155991999.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651155991999.png) (****IMPORT**** button). See Fig 3.23.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651156015904.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651156015904.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651156015904.png)
5. Click [![image-1651156045571.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651156045571.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651156045571.png) (****Browse**** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651156067415.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651156067415.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651156067415.png) (**Upload** button)to export the valve details that are added in the excel worksheet.

The details of the valves in the worksheet will be displayed in the **Valve List** page.



### **3.24 Special Component** 

The **Special Component** tab in the **Project Data** menu used to add any special component to be used in the Piping project.

To add the details of special component, follow the same procedure given in the topic, “[**<u>Valve List</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.23%C2%A0valve-list%C2%A0)”.

# Materials

### **4.0 Materials**

The **Materials** menu in the home page of the ***cuteQM*** app used to add the material details such as material certificates, material inspection details, material import details, and material summary and traceability record. Once you click the **Materials** menu, the following tabs open,

[![image-1651160222152.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651160222152.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651160222152.png)

The **Materials** menu appears with four options such as **Material Certificates, Material Import, Material Inspection,** and **Reports**.

- The ****Material Certificates**** option helps you to add certificates details of the materials to be in the piping project.
- The ****Material Import**** option helps you to add the bulk materials.
- The ****Material Inspection**** option helps you to add material receiving and inspection report, and material summary by heat number.
- The **Reports** option used to add material traceability record.

### **4.1 Material Certificates**

Material certificate (Mill certificate) is a certificate document used to certify that the product is produced by manufacturing standards of the mill. The material certificate contains the following information: component name, manufacturer name, certification ID, component dimension and heat numbers. Once you have received the materials from the manufacturer, you must enter the details of material certificates.

The **Mill Certificates** tab used to add the received material certificate details. If you want to add material certificate details, do the following,

1. Click ****Material Certificates**** in the ****Materials**  menu. The **Mill Certificates** page opens.
    
    [![image-1651160657192.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651160657192.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651160657192.png)
    
     **Figure 4.1: Mill Certificates page**

#### **4.1.1 Add a Material Certificate**

If you want to add a material certificate, do the following,

1. Click [![image-1651160868230.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651160868230.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651160868230.png) (****ADD**** button) in the ****Mill Certificates****  See Fig 4.1.
    
    A new window opens to add a material certificate.
    
    [![image-1651160894268.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651160894268.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651160894268.png)
    
    [![image-1651160928288.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651160928288.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651160928288.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.
2. In the ****Component**** box, select the received component from a drop-down list.
3. In the ****Certification**** box, enter the certification number of the component.
4. In the ****Manufacturer**** box, enter the name of the manufacturer.
5. In the ****Mill Certificate Date**** box, choose the mill certificate date.
6. In the ****Delivery Order (DO) Number**** box, enter the delivery order number of the component.
7. In the **Purchase Order (PO)** Number box, enter the purchase order number of the component.
8. In the ****Size**** box, select the size of the received component.
9. In the ****Thickness**** box, select the thickness of the received component.
10. In the ****Class**** box, enter the class of the received component.
11. In the ****Material**** box, select the type of material where the component is made from.
12. In the ****Rating**** box, enter the rating of the component.
13. In the ****Expiry Date**** box, choose the expiry date of the component.
14. Click **Save**.

The material certificate is successfully added. Once you have added the mill certificate, you must add heat numbers for the added component.

#### **4.1.2 Add Heat Numbers of Material**

If you want to add heat numbers, do the following steps,

1. Click[![image-1651161203160.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651161203160.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651161203160.png) (Add icon) of the respective mill certificate.
    
    The **Heat Numbers** box opens.
    
    [![image-1651161228682.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651161228682.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651161228682.png)
    
     **Figure 4.1.1: Heat Numbers page**
2. Click [![image-1651161449804.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651161449804.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651161449804.png) (****ADD**** button) in the ****Heat Numbers**** box.
    
    A new window opens to add the heat number.
    
    [![image-1651161480411.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651161480411.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651161480411.png)
3. In the **planned Project** box, select a project you want from a drop-down list.
4. In the ****Heat Number**** box, enter the heat number.
5. In the ****Remarks**** box, enter your remarks if any.
6. Click ****Save****. The heat number is successfully added for the specific component.
    
    [![image-1651161542724.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651161542724.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651161542724.png)**Note**: You can edit and delete the added heat numbers by using the respective [![image-1651161565571.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651161565571.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651161565571.png)(Edit icon) and [![image-1651161576340.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651161576340.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651161576340.png) (Delete icon).

#### **4.1.3 Edit a Mill Certificate**

 If you want to edit any existing mill certificate in the **Mill Certificates** page, do the following,

1. Click [![image-1651161643799.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651161643799.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651161643799.png)(Edit icon) in the ****Edit**** column for the respective mill certificate. See Fig 4.1.
    
    A new window opens including the added mill certificate details.
    
    [![image-1651161683734.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651161683734.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651161683734.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **4.1.4 Delete a Mill Certificate**

If you want to delete any existing mill certificate in the **Mill Certificates** page, you can use (Delete icon) provided in the **Mill Certificates** page. To know how to delete, see the topic, “**[<u>Delete P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)**”.

#### **4.1.5 Export Mill Certificates List**

You can export a list of mill certificates added in the **Mill Certificates** page in both the pdf and excel formats by using [![image-1651161797978.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651161797978.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651161797978.png) (**PDF** button) and [![image-1651161814673.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651161814673.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651161814673.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **4.1.6 Filter a Mill Certificate**

If you want to filter any specific mill certificate in the **Mill Certificates** page,

- you can use the filter box [![image-1651161878235.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651161878235.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651161878235.png)
    
     provided in the upper side of the ****Mill Certificates**** To filter the mill certificate, enter the certification or heat number in the box and click ****Search****.
- you can also use [![image-1651161906470.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651161906470.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651161906470.png) (**FILTER** button) located on the **Mill Certificates  To know how to filter using the **Filter** button, see the topic, “**[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)**”.

#### **4.1.7 Import Multiple Mill Certificates**

If you want to import multiple mill certificates together, do the following,

1. Click [![image-1651161989979.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651161989979.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651161989979.png) (**TEMPLATE** button) on the **Mill Certificates** See Fig 4.1
    
    A template will be downloaded as an excel worksheet with a pre-defined template to enter the details of multiple mill certificates.
    
    [![image-1651162060142.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162060142.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162060142.png)
2. Enter the relevant details in the required columns on the excel worksheet.
3. Once you have added the mill certificates details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651162107209.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162107209.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162107209.png) (**IMPORT** button). See Fig 4.1.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651162134967.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162134967.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162134967.png)
5. Click [![image-1651162144397.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162144397.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162144397.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651162180854.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162180854.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162180854.png) (**Upload** button) to export the mill certificates that are included in the excel worksheet.
    
    The details of the mill certificates in the worksheet will be displayed in the **Mill Certificates** page.

#### **4.1.8 Attach a File into a Mill Certificate**

If you want to attach any file with a mill certificate listed in the **Mill Certificates** page, you can attach the file by using [![image-1651162256071.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162256071.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162256071.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

### **4.2 Test Equipments**

The **Test Equipments** tab in the **Materials** menu used to add the details of a test equipment to be used in the piping project. To add a test equipment,

1. Click ****Test Equipments**** in the ****Materials**  menu. The **Testing Equipments** page opens.
    
    [![image-1651162347946.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162347946.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162347946.png)
    
     **Figure 4.2: Testing Equipments page**

#### **4.2.1 Add a Test Equipment**

If you want to add a test equipment, do the following steps,

1. Click [![image-1651162410824.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162410824.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162410824.png) (**ADD** button) in the **Testing Equipments**  See Fig 4.2.
    
    A new window opens to add a test equipment.
    
    [![image-1651162460513.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162460513.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162460513.png)
    
    [![image-1651162503766.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162503766.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162503766.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.
2. In the **Category** box, enter the category of the test equipment.
3. In the ****Test Equipment**** box, enter the name of the test equipment.
4. In the ****Manufacturer**** box, enter the name of the manufacturer.
5. In the ****Asset Tag Number**** box, enter the asset tag number of the test equipment.
6. In the ****Serial Number**** box, enter the serial number of the test equipment.
7. In the ****Recommended Range**** box, enter the recommended range of test equipment.
8. In the ****Range**** box, enter the actual range of test equipment.
9. In the ****Least Count**** box, enter the least count of the test equipment.
10. In the ****Purpose**** box, enter the purpose of the test equipment.
11. In the **Calibration Frequency (in Months)** box, the calibration frequency duration will be updated automatically. If you want to change the duration you can change.
12. In the ****Alert Frequency****(in Days)**** box, the alert frequency duration will be updated automatically. If you want to change the duration you can change.
13. In the ****Acceptance Criteria**** box, enter the acceptance criteria.
14. In the ****Remarks**** box, enter your remarks if any.
15. In the ****Status**** box, select the status of the test equipment.
16. In the ****Location of Equipment**** box, enter the equipment location detail.
17. In the ****Description**** box, enter the description for the test equipment.
18. Click ****Save****. The test equipment is successfully saved.

#### **4.2.2 Update Calibration Details** 

Once you have added the test equipment, you must add the details of calibration, where the calibration is comparison between a standard measurement and the measurement using the test equipment. To add the calibration details,

1. Click [![image-1651162784258.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162784258.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162784258.png) (Add icon) of the respective test equipment.
    
    The **Calibration** window opens.
    
    [![image-1651162805576.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162805576.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162805576.png)
2. Click [![image-1651162823753.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162823753.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162823753.png) (**ADD** button) in the **Calibration** window.
    
    A new window opens to add the calibration details.
    
    [![image-1651162855335.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162855335.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162855335.png)
3. In the **Calibration Report Number** box, enter the calibration report number.
4. In the **Calibration Date** box, select the calibration date.
5. In the ****Calibration**** By box, enter the name of a person who has calculated the calibration.
6. In the ****Calibration Due Date**** box, select the due date of calibration.
7. In the **Preparation By** box, enter the name of a person who has prepared the calibration report.
8. In the ****Approved By**** box, enter the name of a person who has approved the calibration report.
9. Click ****Update****. The calibration details will be updated.
10. If you want to add additional data, click **Additional Data** option in the **Calibration** window.
    
    The **Additional Parameter** window opens.
    
    [![image-1651162953831.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162953831.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162953831.png)
    
    
    1. 1. Click [![image-1651162985360.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651162985360.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651162985360.png) (**ADD** button) in the **Additional Parameter**
        2. In the ****Nominal Value**** column, enter the nominal value.
        3. In the ****Measured Value**** column, enter the measured value.
        4. Click ****Save Changes****.
11. If you want to add pressure data, click **Pressure Data** option in the **Calibration** window.
    
    The **Pressure Recorder Data** window opens.
    
    [![image-1651163042694.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163042694.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163042694.png)
    
    
    1. 1. In the ****Additional Recorder Data**** field, enter the details of additional recorder data.
        2. Click [![image-1651163069039.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163069039.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163069039.png) (**ADD** button) in the **Pressure Recorder Data** window.
        3. In the ****Input**** and ****Output**** columns, enter the input and output values.
        4. In the ****Error**** column, enter the error value.
        5. Click **Save Changes**.
12. If you want to add temperature data, click ****Temperature Data**** option in the ******Calibration****** window. The **Temperature Recorder Data** window opens.
    
    [![image-1651163190830.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163190830.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163190830.png)
    
    
    1. 1. In the ****Additional Recorder Data**** field, enter the details of additional recorder data.
        2. Click [![image-1651163229408.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163229408.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163229408.png) (**ADD** button) in the **Temperature Recorder Data** window.
        3. In the ****0 Degrees C**** column, enter the calibration value at 0 degree.
        4. In the ****Ambient**** column, enter the ambience value.
        5. In the 4****0 Degrees C**** column, enter the calibration value at 40 degree.
        6. Click ****Save Changes****.

#### **4.2.3 Edit a Test Equipment**

If you want to edit any existing test equipment in the **Testing Equipments** page,

1. Click [![image-1651163343682.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163343682.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163343682.png) (Edit icon) of the respective test equipment. See Fig 4.2.
    
    The **Testing Equipment** page shows the details of the selected test equipment.
2. Edit the details where you want.
3. Click **Save**.

#### **4.2.4 Delete a Test Equipment**

If you want to delete any existing test equipment in the **Testing Equipment** page, you can use [![image-1651163416136.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163416136.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163416136.png) (Delete icon) provided in the **Testing Equipment** page. To know how to delete, see the topic, “[**<u>Delete P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

#### **4.2.5 Export Test Equipment list**

You can export a list of test equipments added in the **Test Equipment** page in both the pdf and excel formats by using [![image-1651163465862.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163465862.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163465862.png) (**PDF** button) and [![image-1651163476334.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163476334.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163476334.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **4.2.6 Filter a Test Equipment**

If you want to filter any specific test equipment in the **Testing Equipment** page,

1. you can use the category wise filter box [![image-1651163518308.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163518308.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163518308.png) provided in the upper side of the **Testing Equipment**  To filter the testing equipment, select the category from the drop-down list.
2. you can also use [![image-1651163568393.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163568393.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163568393.png) (**FILTER** button) located on the **Testing Equipment  To know how to filter using the **Filter** button, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

#### **4.2.7 Import Multiple Test Equipments**

If you want to import multiple test equipments together, do the following,

1. Click [![image-1651163686212.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163686212.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163686212.png) (**TEMPLATE** button). See Fig 4.2.
    
    An excel worksheet will be downloaded with a predefined template to enter the details of test equipments.
    
    [![image-1651163714989.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163714989.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163714989.png)
2. Enter the required test equipment details in the respective columns of the excel worksheet.
3. Once you have added the test equipment details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651163752394.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163752394.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163752394.png) (**IMPORT** button). See Fig 4.2.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651163782872.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163782872.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163782872.png)
5. Click [![image-1651163789045.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163789045.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163789045.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651163813900.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163813900.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163813900.png) (**Upload** button) to export the test equipment details that are included in the excel worksheet.
    
    The details of the test equipments in the worksheet will be displayed in the **Testing Equipment** page.

#### **4.2.8 Attach a File into a Test Equipment**

If you want to attach any file with any existing test equipment listed in the **Testing Equipment** page, you can attach the file by using [![image-1651163889766.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651163889766.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651163889766.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **4.2.9 View a Calibration History Card**

To view a calibration history card, click (Print icon) of the respective test equipment, which is provided in the **Report** column of the **Testing Equipment** page.

### **4.3 Material Receiving and Inspection (Heat Numbers)**

Material Receiving Inspection validates quality of purchased raw materials based on set acceptance criteria before the materials are used for the piping project.

The **Material Receiving and Inspection** tab in the **Materials** menu helps you to add an incoming material inspection report (MIR). Incoming MIR includes material name, material size, material specification, heat numbers, and material type.

If you want to add an incoming MIR, do the following,

1. Click the ****Material Receiving and Inspection**** tab in the ******Materials******The **Incoming Material Inspection Report** page opens.
    
    [![image-1651164044201.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651164044201.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651164044201.png)
    
     **Figure 4.3: Incoming Material Inspection Report page**

#### **4.3.1 Add an Incoming MIR**

If you want to add an incoming MIR,

1. Click [![image-1651164100256.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651164100256.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651164100256.png) (**ADD** button) in the **Incoming Material Inspection Report** page. See Fig 4.3.
    
    A new window opens to add an incoming MIR.
    
    [![image-1651164143568.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651164143568.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651164143568.png)
    
     [![image-1651164152732.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651164152732.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651164152732.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651164177224.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651164177224.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651164177224.png)**Tip**: A report number and a Request for Inspection (RFI) number for a new MIR will be updated automatically in the **Report Number** and the **RFI Number** boxes, respectively.
2. In the ****Delivery Order Number**** box, enter the material’s delivery order number.
3. If the materials are received from a client, select the ****SAN Incoming Materials**** option, and then enter the relevant details in the respective boxes. [![image-1651164323964.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651164323964.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651164323964.png)
    
    
    1. 1. In the **P**.****O. No**** box, enter the purchase order number.
        2. In the ****Dated**** box, choose the date of the purchase order.
        3. In the ****Received On**** box, select the received date of materials.
4. If the materials are purchased from outside, select the ****FREE Issued Incoming Materials**** option, and then enter the relevant details in the respective boxes. [![image-1651164391075.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651164391075.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651164391075.png)
    
    
    1. 1. In the **Packing List No** box, enter the packing list number.
        2. In the ****Dated**** box, choose the date of packing.
        3. In the ****Received On**** box, choose the received date of materials.
5. In the ****Inspection Date**** box, choose the date of inspection.
6. In the ****Vendor Name**** box, enter the vendor name.
7. In the ****Request Description**** box, enter the request description.
8. In the ****ITP Number**** box, select an ITP number.
9. In the ****Delivery Note**** box, enter the delivery note.
10. In the ****Location**** box, enter the location name.
11. In the ****Sub Contractor**** box, select the subcontractor name from a drop-down list.
12. Click ****Save****. The incoming MIR is successfully added. Once you have added the MIR, you must add the material details for the added MIR.

#### **4.3.2 Add Materials for an Incoming MIR**

If you want to add the details of materials for the added incoming MIR, do the following steps,

1. Click[![image-1651166446901.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651166446901.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651166446901.png)(Edit icon) in the **Edit MIR** column of the **Incoming Material Inspection Report** See Fig 4.3.
    
    The **Add/Edit - Materials** window opens.
    
    [![image-1651166494934.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651166494934.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651166494934.png)
    
     **Figure 4.3.1: Add/Edit – Materials window**
2. Click [![image-1651166566688.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651166566688.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651166566688.png) (**ADD** button) in the **Add/Edit - Materials** window,
    
    A new window opens to add the material details.
    
    [![image-1651166607288.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651166607288.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651166607288.png)
    
    [![image-1651166623989.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651166623989.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651166623989.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
3. In the ****Material Description**** box, enter the material description.
4. In the ****Material** **Size**** box, select the size of the material.
5. In the ****Material Specification**** box, enter the material specification.
6. In the ****Material Type**** box, enter the type of the material.
7. In the ****Quantity Required**** box, enter the required quantity of the material.
8. In the ****Item No**** box, enter the item number.
9. In the ****Weight**** box, enter the weight of the material.
10. In the ****Component**** box, select a component.
11. Click **Update**.
    
    Once you have added the material details, you must add the heat numbers for the added materials.

#### **4.3.3 Add Heat Numbers** 

1. Click[![image-1651166783881.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651166783881.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651166783881.png)(Add icon) of the respective material in the **Add/Edit - Materials** window. See Fig 4.3.1.
    
    The **Heat Numbers** window opens.
    
    [![image-1651166822333.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651166822333.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651166822333.png)
2. Click [![image-1651166831350.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651166831350.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651166831350.png) (**ADD** button) in the **Heat Numbers** window.
    
    A new window opens to add a heat number.
    
    [![image-1651166858067.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651166858067.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651166858067.png)
3. In the **Heat Number/Certificates** box, select the heat number from a drop-down list.
4. In the **Plate Number/Coil Number/ Tag Number** box, enter the plate number or coil number or tag number of the material.
5. In the ****Delivery Quantity (Total)**** box, enter the total delivery quantity of the material including UOM.
6. In the ****Delivery Quantity (Partial)**** box, enter the partial delivery quantity of the material including UOM.
7. In the ****Dimensions**** option, select ****Accepted**** or ****Rejected**** based on the inspection detail.
8. In the ****Visual**** option, select ****Accepted**** or ****Rejected**** based on the inspection detail.
9. In the ****Mill Test Certificates (MTC)**** option, select ****Accepted**** or ****Rejected**** based on the inspection detail.
10. In the ****Remarks**** box, enter your remarks if any.
11. If the heat treatment is required for the material, select ****YES**** in the ****Heat Treatment**** Otherwise select ****NO****.
12. In the NDE is required for the material, select ****YES**** in the ****NDE****  Otherwise select ****NO****.
13. Click **Update.**
    
    [![image-1651166988046.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651166988046.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651166988046.png)**Note**: If you want to manage the review material TC, click [![image-1651167005116.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651167005116.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651167005116.png) (Add icon). The Review Material TC window opens to add the material checklist detail.

#### **4.3.4 Add MIR Details**

If you want to add the details of MIR,

1. Click[![image-1651167084279.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651167084279.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651167084279.png)(Add icon) in the ****Add**** See Fig 4.3.
    
    The **MIR Details** window opens.
    
    [![image-1651167099492.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651167099492.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651167099492.png)
2. In the ****Manufacturer**** Name box, enter the manufacturer name.
3. In the ****Supplier**** box, enter the supplier name.
4. In the ****Unloaded**** box, enter the unloaded detail.
5. In the ****Date**** box, select the date of MIR.
6. In the ****Truck/Trailer No**** box, enter the truck/trailer number.
7. In the ****Defect Report No**** box, enter the defect report number.
8. In the ****Storage Area**** box, enter the storage area name.
9. In the ****Defect**** box, enter the defect detail.
10. In the ****Remarks**** box, enter your remarks if any.
11. Click **Save**.

#### **4.3.5 Print an Incoming MIR Report**

If you want to print an incoming MIR report, click[![image-1651167434292.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651167434292.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651167434292.png) (print icon) provided in the **Report** column of the **Incoming Material Inspection Report** page. See Fig 4.3.

#### **4.3.6 Print a Report with MTC**

If you want to print an incoming MIR report including MTC, click [![image-1651167444941.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651167444941.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651167444941.png)(print icon) provided in the **Report** **with MTC** column of the **Incoming Material Inspection Report** page. See Fig 4.3.

#### **4.3.7 Print a Report Raw Material Offer List**

If you want to print a report raw material offer list, click [![image-1651167451162.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651167451162.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651167451162.png) (print icon) provided in the **Report** **Raw Material Offer List** column of the **Incoming Material Inspection Report** page. See Fig 4.3.

#### **4.3.8 Print a MIR Summary Report**

If you want to print a MIR summary report, click [![image-1651167500026.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651167500026.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651167500026.png) (print icon) provided in the upper side of the **Incoming Material Inspection Report** page. See Fig 4.3.

#### **4.3.9 Attach a File into an Added Incoming MIR** 

If you want to attach any file with any incoming MIR listed in the **Incoming Material Inspection Report** page. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **4.3.10 Edit an Incoming MIR** 

If you want to edit any existing incoming MIR in the **Incoming Material Inspection Report** page, do the following,

1. Click [![image-1651167595678.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651167595678.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651167595678.png) (Edit icon)in the **Edit** column for the respective MIR. See Fig 4.3.
    
    A new window opens to edit the added incoming MIR.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **4.3.11 Delete an Incoming MIR**

If you want to delete any specific incoming MIR from the list of MIRs, you can use [![image-1651167673732.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651167673732.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651167673732.png) (Delete icon) provided in the **Delete** column of the **Incoming Material Inspection Report** page. To know how to delete, see the topic, “**[<u>Delete P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)**”.

#### **4.3.12 Filter an incoming MIR**

If you want to filter any incoming MIR from the list of MIRs in the **Incoming Material Inspection Report** page,

1. you can use the request status wise filter box [![image-1651167798180.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651167798180.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651167798180.png)
    
    provided in the upper side of the **Incoming Material Inspection Report** page.
2. you can also use [![image-1651167868058.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651167868058.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651167868058.png) (**FILTER** button) located on the **Incoming Material Inspection Report  To know how to filter using the **Filter** button, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

#### **4.3.13 Export incoming MIR list**

You can export a list of MIR added in the **Incoming Material Inspection Report** page in the pdf and excel formats by using [![image-1651167939332.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651167939332.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651167939332.png) (**PDF** button) and [![image-1651167951937.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651167951937.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651167951937.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.


### **4.4 MVR Inspection Request (Heat Numbers)**

MVR will be used while go for material inspection. The **Material Verification Report** tab in the **Materials** menu helps you to add an MVR inspection request. If you want to add an MVR inspection request, do the following steps,

1. Click **Material Verification Report** in the **Materials** menu.
    
    The **MVR Inspection Request** page opens.
    
    [![image-1651168035514.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651168035514.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651168035514.png)
    
     **Figure 4.4: MVR Inspection Request page**

#### **4.4.1 Add an MVR Inspection Request**

If you want to add an MVR inspection request,

1. Click [![image-1651168100181.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651168100181.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651168100181.png) (**ADD** button) in the **MVR Inspection Request** page. See Fig 4.4.
    
    A new window opens to add an MVR inspection request.
    
    [![image-1651168133266.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651168133266.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651168133266.png)
    
    [![image-1651168146411.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651168146411.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651168146411.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651168160833.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651168160833.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651168160833.png) **Tip**: A report number and an RFI report number for a new MVR will be updated automatically in the **Report Number** and the **RFI Report Number** boxes, respectively.
2. In the ****Inspection Date**** box, choose the date of inspection.
3. In the ****Description**** box, enter the description for the MVR.
4. In the ****Location**** box, select a location from a drop-down list.
5. Click ****Save****. The MVR is successfully added. Once you have added the MVR, you must add the RFI data for the added MVR.

#### **4.4.2 Add RFI Data for an Added MVR Inspection Request**

If you want to add the details of RFI data for the added MVR inspection request, do the following,

1. Click[![image-1651168356717.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651168356717.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651168356717.png) (Edit icon) in the **RFI Data** column of the **MVR Inspection Request**  See Fig 4.4.
    
    The **RFI Inspection Request List** window opens.
    
    [![image-1651168393364.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651168393364.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651168393364.png)
2. In the **Inspection From** box, enter the detail from where the inspection should start.
3. In the ****Inspection To**** box, enter the detail to where the inspection should end.
4. In the ****Inspection Details**** option, select 1<sup>st</sup>Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the ****Others**** box, enter any other inspection related details.
6. In the ****Refer to Report No**** box, enter the report number for reference.
7. In the ****RFI Date**** box, choose the RFI date.
8. In the ****Inspection Result**** option, if the inspection result is accepted, select ****Accepted**** otherwise select ****Rejected****.
9. In the ****Remarks**** box, enter your remarks if any.
10. In the ****Inspected by**** box, enter the name of a person who has done inspection.
11. In the ****Inspected Date**** box, choose the date of inspection.
12. In the ****Witnessed By**** box, enter the name of the witnessed person.
13. In the ****Witnessed Date**** box, choose the date of witnessed.
14. In the ****PCML Rep Name**** box, enter the representative name of PCML.
15. In the ****PCML Rep Date**** box, choose the PCML rep date.
16. In the ****MEB Rep Name**** box, enter the representative name of MEB.
17. In the ****MEB Rep Date box****, choose MEB rep date.
18. Click **Save**.
    
    Once you have added the RFI data, you must add the result for the added MVR inspection request.

#### **4.4.3 View an RFI Report**

If you want to print an RFI report, click (print icon) provided in the **RFI** **Report** column of the **MVR Inspection Request** page. See Fig 4.4.

#### **4.4.4 Add Result for an Added MVR Inspection Request** 

1. Click[![image-1651168754411.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651168754411.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651168754411.png) (Add icon) of the respective report number.
    
    The **MVR Inspection Request Details** window opens.
    
    [![image-1651168778600.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651168778600.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651168778600.png)
2. Click [![image-1651168861985.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651168861985.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651168861985.png) (**ADD** button) in the **MVR Inspection Request Details** window.
    
    A new window opens to add result.
    
    [![image-1651168913891.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651168913891.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651168913891.png)
3. In the **Spool No** box, select the spool number from a drop-down list.
4. In the ****Heat Number / Certificates**** box, select the heat number from a drop-down list.
5. In the ****Size**** box, enter the size of the material.
6. In the ****Type of Material**** box, enter the type of material.
7. In the ****Remarks**** box, enter your remarks if any.
8. Click ****Save****. Once you have added the result for the MVR inspection request, you must submit and approve the MVR inspection request.

#### **4.4.5 Submit and Approve an MVR Inspection Report**

Once you have added the result, the **Submission** column in the **MVR Inspection Request** page is appeared with [![image-1651169026911.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169026911.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169026911.png) (Submit and Reject icons).

1. If you want to submit the MVR inspection request, click [![image-1651169136572.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169136572.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169136572.png)(Submit icon) in the **Submission** column. Otherwise click [![image-1651169148110.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169148110.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169148110.png) (Reject icon) to reject the request.
    
    Once you have submitted the MVR inspection request, the **Request Status** column in the **MVR Inspection Request** page is appeared with [![image-1651169081437.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169081437.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169081437.png) (Accept and Reject icons).
2. If you want to approve the MVR inspection request, click (Submit icon) in the **Request Status** column. Otherwise click
    
    [![image-1651169240161.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169240161.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169240161.png) (Reject icon) to reject the request.

#### **4.4.6 Print an MVR Inspection Report**

If you want to print an MVR inspection report, click [![image-1651169336507.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169336507.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169336507.png)(print icon) in the **Report** column of the **MVR Inspection Request** page. See Fig 4.4.

#### **4.4.7 Attach a File into an MVR Inspection Request**

If you want to attach any file with an existing MVR inspection request listed in the **MVR Inspection Request** page, you can attach the file by using [![image-1651169377053.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169377053.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169377053.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **4.4.8 Edit an MVR inspection request** 

If you want to edit any existing MVR inspection request in the **MVR Inspection Request** page, do the following,

1. Click[![image-1651169424709.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169424709.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169424709.png)(Edit icon)in the **Edit** column for the respective MVR inspection request. See Fig 4.4.
    
    A new window opens to edit the MVR inspection request.
    
    [![image-1651169459926.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169459926.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169459926.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **4.4.9 Filter an MVR inspection request**

If you want to filter any MVR request from the list of requests in the **MVR Inspection Request** page, you can use [![image-1651169546239.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169546239.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169546239.png) (**FILTER** button). To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

#### **4.4.10 Export MVR inspection request list**

You can export a list of MVR inspection requests added in the **MVR Inspection Request** page in the pdf and excel formats by using [![image-1651169584615.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169584615.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169584615.png) (**PDF** button) and [![image-1651169596010.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169596010.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169596010.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.


### **4.5 Material Summary**

The **Material Summary** tab in the **Materials** menu used to track the material summary details. If you want to track the summary details of the material, do the following steps,

1. Click the **Material Summary** tab in the **Materials** menu.
    
    The **Material Summary Details** page opens.
    
    [![image-1651169670133.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169670133.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169670133.png)
    
     **Figure 4.5: Material Summary Details page**
2. In the **Material Specification** box, enter the material specification.
3. In the **From** and **To** boxes, choose the from and to dates to get the material summary details.
4. Click **Search**.
    
    The summary details of the added material specification will be displayed for the selected period.

#### **4.5.1 Export Material Summary Details**

You can export the material summary details in the **Material Summary Details** page in both the pdf and excel formats by using [![image-1651169773552.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169773552.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169773552.png) (**PDF** button) and [![image-1651169789150.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169789150.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169789150.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.


### **4.6 Material Summary by Heat Number**

The **Summary by Heat Number** tab in the **Materials** menu used to track the material summary details by using the respective heat numbers. If you want to track the summary details of the material, do the following steps,

1. Click the **Summary by Heat Number** tab in the **Materials** menu.
    
    The **Material Summary Details (By Heat Number)** page opens.
    
    [![image-1651169845577.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169845577.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169845577.png)
    
     **Fig 4.6:** **Material Summary Details (By Heat Number)** **page**
2. In the **Heat Number** box, select the heat number from a drop-down list.
3. Click **Search**.
    
     The material summary details corresponding to the selected heat number will be displayed.

#### **4.6.1 Export Material Summary Details (by Heat Number)**

You can export the material summary details in the **Material Summary Details (By Heat Number)** page in both the pdf and excel formats by using [![image-1651169945083.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169945083.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169945083.png) (**PDF** button) and [![image-1651169954523.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651169954523.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651169954523.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.


### **4.7 Heat Number – Receiving vs Used**

You can view the history of received and used heat numbers of materials by using this **Heat Number – Receiving vs Used** tab in the **Materials** menu.

1. Click ****Heat Number – Receiving vs Used**** in the ****Materials**** menu. The **Material** **Heat Number – Receiving vs Used** page opens.
    
    [![image-1651170021878.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651170021878.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651170021878.png)
    
     **Figure 4.7:** **Material** **Heat Number – Receiving vs Used page**
    
    This page shows the details of component names, heat numbers, and number of quantities received and used.

#### **4.7.1 Export Material Heat Number Received vs Used History**

You can export the material heat number history in the **Material** **Heat Number – Receiving vs Used** page in both the pdf and excel formats by using [![image-1651170126530.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651170126530.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651170126530.png) (**PDF** button) and [![image-1651170135473.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651170135473.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651170135473.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **4.7.2 Filter Material Heat Number Received vs Used History**

If you want to view the received vs used history of any specific heat number, you can use the filter box provided in each column of the **Material** **Heat Number – Receiving vs Used** page.

[![image-1651170185810.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651170185810.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651170185810.png)

Enter the relevant detail in the respective column to view the received vs used history of heat number you want.


### **4.8 Welding Consumable**

Welding Consumables are products used to create strong joints between two or more parts while welding. Welding Consumable are segmented based on welding technique, welding consumable type, end-use industry, and region.

The **Welding Consumable** tab in the **Materials** menu used to add a weld consumable. If you want to add a welding consumable, do the following,

1. Click ****Welding Consumable**** in the ****Materials**** menu. The **Welding Consumable** page opens.
    
    [![image-1651170265897.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651170265897.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651170265897.png)
    
     **Figure 4.8: Welding Consumable page**

#### **4.8.1 Add a Welding Consumable**

If you want to add a welding consumable, do the following steps,

1. Click [![image-1651170357472.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651170357472.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651170357472.png) (**ADD** button) in the **Welding Consumable** page. See Fig 4.8.
    
    A new window opens to add a welding consumable.
    
    [![image-1651170395028.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651170395028.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651170395028.png)
    
    [![image-1651170403874.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651170403874.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651170403874.png) **Note**: A report number for a new welding consumable list will be updated automatically in the **Report Number** **/ Rev** box.
2. In the **Remarks** box, enter your remarks if any.
3. In the ****Supplier**** box, enter the name of a supplier of welding consumables.
4. In the ****Requested By**** box, enter the name of a person who has requested the welding consumable.
5. In the ****Reviewed By**** box, enter the name of a person who has reviewed the welding consumable.
6. In the ****Approved By**** box, enter the name of a person who has approved the welding consumable.
7. In the ****Requested Date**** box, choose the prepared date of the welding consumable.
8. In the ****Reviewed Date**** box, choose the reviewed date of the welding consumable.
9. In the ****Approved Date**** box, choose the approved date of the welding consumable list.
10. Click ****Save****. The welding consumable is successfully added. Once you have added the welding consumable, you must add the details of welding consumable.

#### **4.8.2 Add Welding Consumable Details for Added Consumable** 

If you want to add the details of welding consumables for the added consumable, do the following,

1. Click [![image-1651170705427.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651170705427.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651170705427.png) (Add icon) for the respective welding consumable. See Fig 4.8.
    
    A new window opens to add the welding consumable details.
    
    [![image-1651170726404.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651170726404.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651170726404.png)
2. In the ****Date**** box, select the date.
3. In the ****Product Description**** box, enter the product description detail.
4. In the **Brand** box, enter the brand name of welding consumable.
5. In the ****Type**** box, enter the type of the welding consumable.
6. In the ****Diameter**** box, enter the diameter of the welding consumable.
7. In the ****Batch No**** box, enter the batch number of the welding consumable.
8. In the ****Certificate No**** box, enter the certificate number.
9. In the ****Report No**** box, enter the report number.
10. In the ****Qty in Kg**** box, enter the quantity of the welding consumable.
11. Click ****Save****.

#### **4.8.3 Print a Welding Consumable Report**

If you want to print a welding consumable report, click [![image-1651171358797.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651171358797.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651171358797.png) (print icon) in the **Report** column of the **Welding Consumable** page. See Fig 4.8.

#### **4.8.4 Attach a File into a Welding Consumable** 

If you want to attach any file with an existing MVR inspection request listed in the **MVR Inspection Request** page, you can attach the file by using [![image-1651171409493.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651171409493.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651171409493.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **4.8.5 Edit a Welding Consumable** 

If you want to edit any existing welding consumable in the **Welding Consumable** page, do the following,

1. Click [![image-1651171474733.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651171474733.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651171474733.png) (Edit icon)in the **Edit** column for the respective welding consumable. See Fig 4.8.
    
    A new window opens and shows the added details of the welding consumable.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **4.8.6 Delete a Welding Consumable**

If you want to delete any specific welding consumable, you can use [![image-1651171566905.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651171566905.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651171566905.png) (Delete icon) provided in the **Delete** column of the **Welding Consumable** page, See Fig 7.8. To know how to delete, see the topic, “[**<u>Delete P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

#### **4.8.7 Export Welding Consumable**

You can export a list of welding consumable added in the **Welding consumable** page in the pdf and excel formats by using [![image-1651171609134.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651171609134.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651171609134.png) (**PDF** button) and [![image-1651171619038.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651171619038.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651171619038.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.



### **4.9 Import from Excel – Materials**

The **Import from Excel – Materials** tab helps you to upload various date related to materials for all fields included in the **Materials** menu instead of uploading data for each field individually.

If you want to import material data for different fields, do the following,

1. Click the **Import from Excel – Materials** tab in the **Materials** menu.
    
    The **File Upload** page opens.
    
    [![image-1651171825423.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651171825423.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651171825423.png)
2. Download a template by using the [![image-1651171841178.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651171841178.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651171841178.png) (**TEMPLATE** button) to enter the details of data.
    
    An excel worksheet will be downloaded.
    
    [![image-1651171873265.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651171873265.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651171873265.png)
3. Enter the relevant details in the respective column of the excel worksheet based on the columns listed in the **System Column** field.
4. Click [![image-1651171896537.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651171896537.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651171896537.png) (**Choose File** button).
    
    Once the file has been uploaded successfully, you receive a message, “**Successfully uploaded"**
5. Click [![image-1651171937423.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651171937423.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651171937423.png) (**Get Columns** button).
    
    The columns added in the excel worksheet will be listed in the **Excel Column** field. The system automatically maps the **Required Columns to Import** field and the **Excel Column** field and displays in the **Mapped Columns** field.
    
    [![image-1651171989832.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651171989832.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651171989832.png)
6. If you want to map any columns or to un-map any mapped columns, select the respective columns and then click [![image-1651172013521.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172013521.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172013521.png) (**Map** button) and [![image-1651172023634.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172023634.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172023634.png) (**UnMap** button) accordingly.
7. If you want to upload the data for specific MIR, select the respective MIR from the drop-down list otherwise select **BULK IMPORT**.
    
    [![image-1651172051172.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172051172.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172051172.png)
8. Once you have completed the mapping and un-mapping of columns, in the **Upload Range From** and **To** fields, enter the range of rows you want to upload from the excel worksheet.
    
    [![image-1651172073928.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172073928.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172073928.png) **Note**: In the **Total Rows** field, the system indicates the total number of rows filled in the excel worksheet.
    
    [![image-1651172097678.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172097678.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172097678.png)**Tip**: You must enter the upload starting range as two in the **Upload Range From** field because a first row in the excel worksheet is having heading of the columns.
9. Click [![image-1651172119340.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172119340.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172119340.png) (**Populate Value** button).
    
    The data added in the excel worksheet will be populated.
10. Click [![image-1651172144178.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172144178.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172144178.png) (**Process** button).
    
    Once you have clicked the **Process** button, the system processes the columns and displays in the **Excel Import** page.
    
    [![image-1651172173359.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172173359.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172173359.png)
11. Click [![image-1651172198729.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172198729.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172198729.png) (**Import** button) to import the data added in the excel worksheet.
    
    The data will be successfully imported.



### **4.10 Material Traceability Record (MTR)**

The **Material Traceability Record** tab in the **Materials** menu helps you to view the MTR for the piping project. The MTR lists material specification, material size, joint number, unique number, and MIR number. To view the MTR,

1. Click **Material Traceability Record** in the **Materials** menu.
    
    The **Piping Material Traceability Record** page opens.
    
    [![image-1651172270185.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172270185.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172270185.png)
2. In the ****ISO Drawing Number**** box, select an ISO drawing from a drop-down list. The **Piping Material Traceability Record** page shows the material details based on the selected ISO drawing number.
    
    [![image-1651172330086.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172330086.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172330086.png)

#### **4.10.1 Print an MTR** 

If you want to print an MTR, use [![image-1651172396029.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172396029.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172396029.png) and [![image-1651172405042.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172405042.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172405042.png) (print icons) provided in the **Piping Material Traceability Record** page.

1. If you want to print the current page of the MTR, click [![image-1651172424228.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172424228.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172424228.png) (print icon including the page number).
2. If you want to print all the pages of the MTR, click [![image-1651172442944.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172442944.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172442944.png) (print icon).

#### **4.10.2 Export an MTR** 

You can export the MTR report in various formats by using the option [![image-1651172484613.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172484613.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172484613.png) provided in the upper right corner of the **Piping Material Traceability Record** page.



### **4.11 Purchase Order (PO) Summary Report**

The **PO Summary Report** tab in the **Material** menu used to view the purchase order summary report. To view the PO summary report,

1. Click **PO Summary Report** in the **Material** menu.
    
    The **PO Summary Report** page opens.
    
    [![image-1651172743997.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172743997.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172743997.png)
    
     **Figure 7.11: PO Summary Report page**
2. In the **PO No** box, select the PO number.
3. In the **From Date** and **To Date** boxes, select the from and to dates to view the PO summary report.
4. Click ****Search****. The page shows the summary report for the purchase order.

#### **4.11.1 Print a PO Summary Report**

If you want to print the PO summary report, use and (print icons) provided in the DPWR page. See Fig 4.11.

1. If you want to print the current page of the PO summary report, click [![image-1651172944071.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172944071.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172944071.png) (print icon including the page number).
2. If you want to print all the pages of the PO summary report, click [![image-1651172966863.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651172966863.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651172966863.png) (print icon).

#### **4.11.2 Export a PO Summary Report** 

You can export the PO Summary Report in various formats by using the option [![image-1651173144994.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651173144994.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651173144994.png) provided in the upper right corner of the page.



### **4.12 MVR Summary by Drawing**

The **MVR Summary by Drawing** tab in the **Materials** menu used to view the MVR summary report. To view an MVR summary report,

1. Click ****MVR Summary by Drawing**** in the ****Materials**** menu. The **MVR Summary (Piping)** page opens.
    
    [![image-1651173372495.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651173372495.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651173372495.png)
    
     **Figure 4.12: MVR Summary (Piping) page**
2. In the ****ISO Drawing**** box, select an ISO drawing from a drop-down list.
3. Click ****Show Report****. The page shows the summary details for the MVR.

#### **4.12.1 Print an MVR Summary Report**

If you want to print the MVR summary report, use [![image-1651173465960.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651173465960.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651173465960.png)and [![image-1651173476881.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651173476881.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651173476881.png) (print icons) provided in the **MVR Summary (Piping)** page. See Fig 4.12.

1. If you want to print the current page of the MVR summary report, click [![image-1651173521311.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651173521311.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651173521311.png) (print icon including the page number).
2. If you want to print all the pages of the MVR summary report, click [![image-1651173546811.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651173546811.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651173546811.png) (print icon).

#### **4.12.2 Export an MVR Summary Report** 

You can export the MVR summary report in various formats by using the option [![image-1651173600742.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651173600742.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651173600742.png) provided in the upper right corner of the **MVR Summary (Piping)** page.



### **4.13 Unique Number Usage Details** 

The **Unique Number Usage Details** tab in the **Materials** menu used to view the usage details of the particular unique number.

1. Click **Unique Number Usage Details** in the **Materials** menu.
    
    The **Unique Number Usage Details** page opens.
    
    [![image-1651173656747.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651173656747.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651173656747.png)
    
     **Figure 4.13: Unique Number Usage Details page**
2. In the ****MIR Report Number**** box, enter the MIR report number.
3. In the ****Component Name**** box, enter the component name.
4. In the ****Heat Number**** box, enter the heat number.
5. In the ****Unique Number**** box, enter the unique number.
6. Click ****Get Details****. [![image-1651173727666.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651173727666.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651173727666.png)


### **4.14 RFI Material Substitution**

An RFI could be issued requesting for material substitutions if certain material is not available or cost exorbitantly high. Various subcontractors could be provided with these requests to find who has the best quality materials for the project.

You can add an RFI for material substitution by using the **RFI Material Substitution** tab in the **Materials** menu.

#### **4.14.1 Add an RFI Material Substitution Request**

If you want to add an RFI material substitution request, do the following steps,

1. Click **RFI Material Substitution** in the **Materials** menu.
    
    The **RFI Material Substitution** page opens.
    
    [![image-1651173849823.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651173849823.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651173849823.png)
    
     **Figure 7.14: RFI Material Substitution page**
2. In the ****Requested By**** box, enter the name of a person who has requested the material substitution.
3. In the **Sub Contractor** box, select a sub-contractor from a drop-down list.
4. In the ****Inspection Date &amp; Time**** box, select the inspection date and time.
5. In the ****Location**** box, enter the location name.
6. In the ****Center**** box, enter the center name.
7. In the ****Details of Work**** box, enter the work details.
8. In the ****Comments**** box, enter your comments if any. Before saving the added material substitution request, you must add the material substitution detail.
9. Click [![image-1651173943860.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651173943860.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651173943860.png) (**ADD** button) in the **Material Substitution Detail**
10. In the **Type** box, select the type of material substitution.
11. In the **Material** box, enter the name of the material.
12. In the **DWG.**  **Ref** box, enter the drawing reference number.
13. In the **Original Size** box, enter the original size of the material.
14. In the **Original Grade** box, enter the original grade of the material.
15. In the **Item** box, select an item.
16. In the **QTY** box, enter the quantity of the material.
17. Click ****Save.****The material substitution details will be added and listed in the **Material Substitution Detail** window.
    
    [![image-1651174091098.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651174091098.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651174091098.png)
    
    If you want to add the proposed material substitution detail,
18. Click [![image-1651174112890.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651174112890.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651174112890.png)(Add icon) in the **Material Substitution Detail** window.
    
    [![image-1651174124654.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651174124654.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651174124654.png)
19. Click [![image-1651174134786.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651174134786.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651174134786.png) (**ADD** button).
    
    [![image-1651174160563.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651174160563.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651174160563.png)
20. Enter the details of proposed material substitution.
21. Click **Save**.
    
    The request for material substitution will be added and listed in the **View RFI Material Substitution** page.



### **4.15 View RFI Material Substitution**

The **View RFI Material Substitution** tab helps you to view and edit the material substitution request, which is added by using the **RFI Material Substitution** tab. This tab also allows you to add a new material substitution request.

1. Click **View RFI Material Substitution** in the **Materials** menu. The **View RFI Material Substitution** page opens with a list of added material substitution requests.
    
    [![image-1651174251969.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651174251969.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651174251969.png)
    
     **Figure 4.15: View RFI Material Substitution page**

#### **4.15.1 Add an RFI Material Substitution Request**

If you want to add a material substitution request, do the following steps,

1. Click [![image-1651174312687.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651174312687.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651174312687.png) (**ADD** button) in the **View RFI Material Substitution page.
    
    The system redirects you to a new page to add a new material substitution request. To know how to add a material substitution request, See the topic, “[**<u>Add an RFI Material Substitution</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/materials/#bkmrk-4.14.1%C2%A0add-an-rfi-ma)”.

Once you have added the material substitution request, you must submit the added request to perform material substitution inspection.

#### **4.15.2 Edit an RFI Material Substitution Request** 

If you want to edit any existing material substitution inspection request in the **View RFI Material Substitution page, do the following,

1. Click [![image-1651174420374.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651174420374.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651174420374.png)(Edit icon) in the **Edit** column for the respective material substitution inspection request. See Fig 4.15.
    
    The **RFI Material Substitution** page opens with the details of the selected material substitution inspection request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **4.15.3 Submit and Approve an RFI Material Substitution Request**

Once you have added the material substitution inspection request, the **Submission** column in the **View RFI Material Substitution** page is appeared with [![image-1651174486749.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651174486749.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651174486749.png) (Submit and Reject icons).

1. If you want to submit the material substitution inspection request, click[![image-1651174511920.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651174511920.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651174511920.png) (Submit icon) in the ****Submission**** Otherwise click [![image-1651174535278.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651174535278.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651174535278.png) (Reject icon) to reject the request. Once you have submitted the material substitution inspection request, the **Request Status** column in the **View RFI Material Substitution** page is appeared with (Approve and Reject icons).
2. If you want to approve the material substitution inspection request, click[![image-1651174584110.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651174584110.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651174584110.png) (Approve icon) in the **Request Status** Otherwise click [![image-1651174601201.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651174601201.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651174601201.png) (Reject icon) to reject the request.

#### **4.15.4 Add Results of Material Substitution Inspection**

After completing the material inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click[![image-1651174675792.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651174675792.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651174675792.png)(Add icon) in the ****Results**** column of the respective request. The Result window opens with the details of proposed and original materials.
    
    [![image-1651174670502.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651174670502.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651174670502.png)
2. In the ****Result**** column, select the result of each material from the given result options in the drop-down list.
3. In the ****Remarks**** column, enter your remarks if any.
4. Click ****Approve All &amp;**** ****Save****.

#### **4.15.5 View a Material Substitution Report**

If you want to view a material substitution report, click [![image-1651176530008.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651176530008.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651176530008.png)(print icon) provided in the **Print** column of the **View RFI Material Substitution** page. See Fig 7.15.

#### **4.15.6 Attach a File into an RFI Material Substitution Request**

If you want to attach a file with any existing material substitution inspection request listed in the **View RFI Material Substitution** page, you can attach the file by using [![image-1651176569090.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651176569090.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651176569090.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **4.15.7 View Signature Details of Inspectors**

You can view the sign details of the inspectors such as QA, Sub contractor, Client, and Owner, once they completed the material substitution inspection and submitted the inspection result details including their signature. To view the signature details, click[![image-1651176617884.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651176617884.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651176617884.png) (Sign icon) in the **Sign Details** column in the **View RFI Material Substitution** page.

#### **4.15.8 Export an RFI Material Substitution List**

You can export a list of material substitution requests added in the **View RFI Material Substitution** page in both the pdf and excel formats by using [![image-1651176655486.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651176655486.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651176655486.png) (**PDF** button) and [![image-1651176664815.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651176664815.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651176664815.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **4.15.9 Filter an RFI Material Substitution Request**

If you want to filter any specific material substitution inspection request in the **View RFI Material Substitution** page, you can use [![image-1651176709098.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651176709098.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651176709098.png) (**FILTER** button) located on the **View RFI Material Substitution** page. To know how to filter, see the topic, “**[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)**”.



### **4.16 Material Verification Report (MVR) (Unique Numbers)**

Material Inspection is nothing but validating the quality of purchased raw materials based on the set acceptance criteria before the materials are used in the piping project.

Material Inspection is nothing but validating the quality of purchased raw materials based on the set acceptance criteria before the materials are used in the piping project.

If you want to add a MIR request, do the following,

1. Click ****Material Receiving and Inspection**** in the ****Materials**** menu. The **Material Verification Report** page opens.
    
    [![image-1651176827519.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651176827519.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651176827519.png)
    
     **Figure 4.16: Material Verification Report page**

#### **4.16.1 Add a MIR Request**

If you want to add a MIR request,

1. Click [![image-1651176899284.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651176899284.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651176899284.png) (**ADD** button) in the **Material Verification Report**  See Fig 4.16.
    
    A new window opens to add a MIR request.
    
    [![image-1651176933606.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651176933606.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651176933606.png)
    
    [![image-1651176948784.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651176948784.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651176948784.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651176965440.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651176965440.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651176965440.png)**Tip**: A report number and a Request for Inspection (RFI) number for a new MIR will be updated automatically in the **Report Number** and the **RFI Number** boxes, respectively.
2. In the ****Delivery Order Number**** box, enter the material’s delivery order number.
3. If the materials are received from a client, select the ****SAN Incoming Materials**** option, and then enter the relevant details in the respective boxes. [![image-1651177011912.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177011912.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177011912.png)
    
    
    1. 1. In the ****O. No/Material ID/M. R**** box, enter the purchase order/material id number/ material receiving number.
        2. In the ****Dated**** box, choose the date of the purchase order.
        3. In the ****Received On**** box, select the received date of materials.
4. If the materials are purchased from outside, select the **FREE Issued Incoming Materials** option, and then enter the relevant details in the respective boxes.
    
    [![image-1651177088895.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177088895.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177088895.png)
    
    
    1. 1. In the **Packing List No** box, enter the packing list number.
        2. In the ****Dated**** box, choose the date of packing.
        3. In the ****Received On**** box, choose the received date of materials.
5. In the ****Inspection Date**** box, choose the date of inspection.
6. In the ****Requested By**** box, enter the name of a person who has requested the MIR.
7. In the ****Vendor Name**** box, enter the vendor name.
8. In the ****Delivery Note**** box, enter the delivery note.
9. In the ****Drawing Reference**** box, enter the reference drawing detail.
10. In the ****Location**** box, enter the location name.
11. In the ****Sub System**** box, select a sub system from a drop-down list.
12. In the ****Description**** box, enter the description for the MIR.
13. In the ****Bar Code**** box, enter the bar code of the material.
14. Click ****Save****. The MIR request is successfully added. Once you have added the MIR request, you must add the material details for the added MIR.

#### **4.16.2 Add Materials for MIR**

To add the details of materials for the added MIR request, do the following steps,

1. Click[![image-1651177270374.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177270374.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177270374.png)(Edit icon) of the respective MIR. See Fig 4.16.
    
    The **Add/Edit - Materials** window opens.
    
    [![image-1651177298644.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177298644.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177298644.png)
    
     **Figure 4.16.1: Add/Edit – Materials window**
2. Click [![image-1651177327481.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177327481.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177327481.png) (**ADD** button) in the **Add/Edit - Materials** window.
    
    A new window opens to add the material details.
    
    [![image-1651177354826.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177354826.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177354826.png)
    
    [![image-1651177370583.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177370583.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177370583.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
3. In the ****Material Description**** box, select the material from a drop-down list and enter the component details.
4. In the ****Material Size**** box, select the size of the material from a drop-down list.
5. In the ****Material Specification**** box, enter the material specification.
6. In the **Material Type** box, select the type of material.
7. In the ****Quantity Required**** box, enter the required quantity of the material.
8. In the Unit of Measurement (****UOM****) box, enter the UOM detail.
9. In the ****Item No**** box, enter the item number.
10. In the ****Material Remarks**** box, enter your remarks if any.
11. Click ****Update****. The added material will be listed in the **Add/Edit – Materials** window.
    
    [![image-1651177485394.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177485394.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177485394.png)**Note**: If **Add/Edit – Materials** window shows the added material in the in red color means that the added component is not matched with the component list. See Fig 4.16.1.
    
    Once you have added the material details, you must add the heat numbers for the added materials.

#### **4.16.3 Add Heat/Unique numbers for materials**

To add heat numbers,

1. Click[![image-1651177615998.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177615998.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177615998.png) (Add icon) of the respective material in the ****Add/Edit - Materials**** See Fig 4.16.1. The **Heat Numbers** window opens.
    
    [![image-1651177647183.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177647183.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177647183.png)
2. Click [![image-1651177679829.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177679829.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177679829.png) (**ADD** button) in the **Heat Numbers** window.
    
    A new window opens to add a heat number.
    
    [![image-1651177708469.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177708469.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177708469.png)
3. In the ****Heat Number**** box, select the heat number from a drop-down list.
4. In the ****Certificates**** box, enter the certificate name.
5. In the ****Plate Number/Equipment Tag Number**** box, enter the plate number or equipment tag number of the material.
6. In the ****Delivery Quantity (Total)**** box, enter the total delivery quantity of the material.
7. In the ****Unique Number**** box, enter the unique number of the material.
8. In the ****Dimensions**** option, update the dimensions result by selecting ****Accepted**** or ****Rejected**** based on the inspection detail.
9. In the **Visual** option, update the visual result by selecting **Accepted** or **Rejected** based on the inspection detail.
10. In the ****Mill Test Certificates (MTC)**** option, update the mill test certificates result by selecting ****Accepted**** or ****Rejected**** based on the inspection detail.
11. In the **Remarks** option, enter your remarks if any.
12. Click **Update.**
    
    The heat numbers are updated. Once you have added the MIR request, you must submit the added request for inspection.

#### **4.16.4 Submit and Approve an MIR Request**

Once you have added the MIR request, the **Submission** column in the **Material Verification Report** page is appeared with [![image-1651177877286.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177877286.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177877286.png) (Submit and Reject icons).

1. If you want to submit the MIR request, click[![image-1651177929342.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177929342.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177929342.png) (Submit icon) in the ****Submission**** Otherwise click [![image-1651177949434.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177949434.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177949434.png) (Reject icon) to reject the request. Once you have submitted the MIR request, the **Request Status** column in the **Material Verification Report** page is appeared with [![image-1651177977558.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651177977558.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651177977558.png)(Approve and Reject icons).
2. If you want to approve the MIR request, click [![image-1651178010785.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178010785.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178010785.png)(Approve icon) in the **Request Status** column. Otherwise click [![image-1651178021406.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178021406.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178021406.png)(Reject icon) to reject the request.

The MIR request will be moved for MIR inspection.

#### **4.16.5 Edit an MIR Request**

If you want to edit any existing MIR request in the **Material Verification Report** page,

1. Click[![image-1651178096286.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178096286.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178096286.png)(Edit icon) of the respective MIR request. See Fig 4.16.
    
    The **Material Verification Report** page shows the details of the selected MIR request.
2. Edit the details where you want.
3. Click **Save**.

#### **4.16.6 Delete an MIR Request**

If you want to delete any existing MIR request in the **Material Verification Report** page, you can use [![image-1651178183446.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178183446.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178183446.png) (Delete icon) provided in the **Material Verification Report** page. To know how to delete, see the topic, “[**<u>Delete P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

#### **4.16.7 Export MIR List**

You can export a list of MIR requests added in the **Material Verification Report** page in both the pdf and excel formats by using [![image-1651178222326.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178222326.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178222326.png) (**PDF** button) and [![image-1651178236615.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178236615.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178236615.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **4.16.8 Filter an MIR Request**

If you want to filter any specific test equipment in the **Material Verification Report page,

- you can use the request status wise filter box [![image-1651178294205.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178294205.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178294205.png) provided in the upper side of the **Material Verification Report page.
- You can also use [![image-1651178339536.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178339536.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178339536.png) (****FILTER**** button) located on the ****Material Verification Report**  To know how to filter using the ****Filter**** button, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

#### **4.16.9 View a Material Receiving Inspection Report**

To view a material receiving inspection report, click [![image-1651178394403.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178394403.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178394403.png)(Print icon) provided in the **Report** column of the **Material Verification Report** page.

#### **4.16.10 View a Material Test Certificate (MTC) Report**

To view an MTC report, click (Print icon) provided in the **Report** **with MTC** column of the **Material Verification Report** page.

#### **4.16.11 View Signature Details of Inspectors**

You can view the sign details of the inspectors such as QA, Sub contractor, Client, and Owner, once they completed the MIR inspection and submitted the inspection result details including their signature. To view the signature details, click [![image-1651178480749.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178480749.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178480749.png)(Sign icon) in the **Sign Details** column in the **Material Verification Report** page.



### **4.17 Material Receiving and Inspection (Unique Numbers)**

The **Material Receiving and Inspection** tab in the **Materials** menu helps you to add an incoming material inspection report (MIR). Incoming MIR includes material name, material size, material specification, and material type.

If you want to add an incoming MIR, do the following,

1. Click the ****Material Receiving and Inspection**** tab in the ******Materials****** menu. The **Incoming Material Inspection Report** page opens.
    
    [![image-1651178572494.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178572494.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178572494.png)
    
     **Figure 4.17: Incoming Material Inspection Report page**

#### **4.17.1 Add an Incoming MIR**

If you want to add an incoming MIR,

1. Click [![image-1651178643329.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178643329.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178643329.png) (**ADD** button) in the **Incoming Material Inspection Report** page. See Fig 4.17.
    
    A new window opens to add an incoming MIR.
    
    [![image-1651178708770.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178708770.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178708770.png)
    
    [![image-1651178721984.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178721984.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178721984.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651178741438.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178741438.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178741438.png) **Tip**: A report number and an Request for Inspection (RFI) number for a new MIR will be updated automatically in the **Report Number** and the **RFI Number** boxes, respectively.
2. In the ****Delivery Order Number**** box, enter the material’s delivery order number.
3. If the materials are received from a client, select the ****DM Incoming Materials**** option, and then enter the relevant details in the respective boxes. [![image-1651178791116.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178791116.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178791116.png)
    
    
    1. 1. In the **P**.****O. No**** box, enter the purchase order number.
        2. In the ****Dated**** box, choose the date of the purchase order.
        3. In the ****Received On**** box, select the received date of materials.
4. If the materials are purchased from outside, select the ****FREE Issued Incoming Materials**** option, and then enter the relevant details in the respective boxes. [![image-1651178857813.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651178857813.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651178857813.png)
    
    
    1. 1. In the ****Packing List No**** box, enter the packing list number.
        2. In the ****Dated**** box, choose the date of packing.
        3. In the ****Received On**** box, choose the received date of materials.
5. In the ****Inspection Date**** box, choose the date of inspection.
6. In the ****Vendor Name**** box, enter the vendor name.
7. In the **Delivery Note** box, enter the delivery note.
8. In the **Location** box, enter the location name.
9. In the ****Sub Contractor**** box, select the subcontractor name from a drop-down list.
10. Click **Save**.
    
    The incoming MIR is successfully added. Once you have added the MIR, you must add the material details for the added MIR.

#### **4.17.2 Add materials for an incoming MIR**

If you want to add the details of materials for the added incoming MIR, do the following,

1. Click [![image-1651179000275.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651179000275.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651179000275.png) (Edit icon) in the **Edit MIR** column of the **Incoming Material Inspection Report** page. See Fig 4.17.
    
    The **Add/Edit - Materials** window opens.
    
    [![image-1651179041751.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651179041751.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651179041751.png)
    
     **Figure 4.17.1: Add/Edit – Materials window**
2. Click [![image-1651179073530.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651179073530.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651179073530.png) (**ADD** button) in the **Add/Edit - Materials** window.
    
    A new window opens to add the material details.
    
    [![image-1651179119233.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651179119233.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651179119233.png)
    
    [![image-1651179138535.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651179138535.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651179138535.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
3. In the ****Material**** box, select the name of the material from a drop-down list.
4. In the ****Quantity Required**** box, enter the required quantity of the material.
5. In the ****Certificate Number**** box, enter the certificate number.
6. In the ****PO No**** box, enter the purchase order number.
7. In the ****Non-Conformance Report (NCR) No**** box, enter the NCR number.
8. In the ****Size/Thickness**** box, select the size/thickness of the received material from a drop-down list.
9. In the ****Heat Number**** box, enter the heat number of the material.
10. In the ****CEQ**** box, enter the CEQ number.
11. In the ****DO**** box, enter the deliver order number.
12. In the ****TQ No**** box, enter the TQ number.
13. In the ****Length**** box, select the length of the material from a drop-down list.
14. In the ****Plate Number**** box, enter the plate number of the material.
15. In the ****Material Type**** box, enter the type of the material.
16. In the **CD Number** box, enter the CD number.
17. In the ****Status**** box, select the status of the received material.
18. In the ****Material Type**** box, select the type of material from a drop-down list.
19. In the ****Grade**** box, select the grade of the material.
20. In the ****Unique No**** box, enter the unique number of the material.
21. In the ****Remarks**** box, enter your remarks if any.
22. In the ****Client Item No**** box, enter the client item number.
23. In the ****Supply Condition**** box, enter the supply condition details of the material.
24. In the ****Material Description**** box, enter the material description.
25. Click ****Update****. Once you have added the material details, you must add the heat numbers for the added materials.

#### **4.17.3 Add Heat Numbers** 

1. Click[![image-1651199735802.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651199735802.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651199735802.png)(Add icon) of the respective material in the ****Add/Edit - Materials**** See Fig 4.17.1. The **Heat Numbers** window opens.
    
    [![image-1651199765779.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651199765779.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651199765779.png)
2. Click [![image-1651199799583.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651199799583.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651199799583.png) (**ADD** button) in the **Heat Numbers** window.
    
    A new window opens to add a heat number.
    
    [![image-1651199834687.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651199834687.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651199834687.png)
3. In the **Heat Number/Certificates** box, select the heat number from a drop-down list.
4. In the **Plate Number/Coil Number/ Tag Number** box, enter the plate number or coil number or tag number of the material.
5. In the ****Delivery Quantity (Total)**** box, enter the total delivery quantity of the material.
6. In the ****Delivery Quantity (Partial)**** box, enter the partial delivery quantity of the material.
7. In the ****CEQ**** box, enter the CEQ number.
8. In the ****CD Number**** box, enter the CD number.
9. In the ****Unique Number**** box, enter the unique number of the material.
10. In the ****Client Item Number**** box, enter the client item number.
11. In the ****Dimensions**** option, select ****Accepted**** or ****Rejected**** based on the inspection detail.
12. In the ****Visual**** option, select ****Accepted**** or ****Rejected**** based on the inspection detail.
13. In the ****Mill Test Certificates (MTC)**** option, select ****Accepted**** or ****Rejected**** based on the inspection detail.
14. In the ****Remarks**** option, enter your remarks if any.
15. If the heat treatment is required for the material, select **YES** in the **Heat Treatment** option. Otherwise select **NO**.
16. In the NDE is required for the material, select ****YES**** in the ****NDE****  Otherwise select ****NO****.
17. Click **Update**. Once you have added the heat numbers, you must add unique numbers for the material.

#### **4.17.4 Add Unique Numbers**

1. Click[![image-1651200085506.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651200085506.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651200085506.png) (Add icon) of the respective heat number in the [**<u>Heat Numbers </u>**<u>box</u>](#HN).
    
    The **Unique Numbers** box opens.
    
    [![image-1651200119677.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651200119677.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651200119677.png)
2. Click [![image-1651200132564.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651200132564.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651200132564.png) (**ADD** button) in the **Unique Numbers** window.
    
    A new window opens to add a unique number.
    
    [![image-1651200165681.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651200165681.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651200165681.png)
3. In the ****Unique Number**** box, enter a unique number for the respective heat number.
4. In the **Original Number** box, enter the original number of the material.
5. In the ****Size**** box, enter the size of the material.
6. Click **Update**.

#### **4.17.5 Print an Incoming MIR** 

If you want to print an incoming MIR report, click [![image-1651200271306.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651200271306.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651200271306.png)(print icon) provided in the **Report** column of the **Incoming Material Inspection Report** page. See Fig 4.17.

#### **4.17.6 Print a Report with MTC**

If you want to print an incoming MIR report including MTC, click[![image-1651200328292.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651200328292.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651200328292.png)(print icon) provided in the **Report** **with MTC** column of the **Incoming Material Inspection Report** page. See Fig 4.17.

#### **4.17.7 Attach a File into an Added Incoming MIR** 

If you want to attach any file with any incoming MIR listed in the **Incoming Material Inspection Report** page. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **4.17.8 Edit an Incoming MIR** 

If you want to edit any existing incoming MIR in the **Incoming Material Inspection Report** page, do the following,

1. Click[![image-1651200432832.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651200432832.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651200432832.png) (Edit icon)in the **Edit** column for the respective MIR. See Fig 4.17.
    
    A new window opens to edit the added incoming MIR.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **4.17.9 Delete an Incoming MIR**

If you want to delete any specific incoming MIR from the list of MIRs, you can use [![image-1651200514617.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651200514617.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651200514617.png) (Delete icon) provided in the **Delete** column of the **Incoming Material Inspection Report** page. To know how to delete, see the topic, “[**<u>Delete P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

#### **4.17.10 Filter an Incoming MIR**

If you want to filter any incoming MIR from the list of MIRs in the **Incoming Material Inspection Report** page,

- you can use the request status wise filter box [![image-1651200586384.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651200586384.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651200586384.png) provided in the upper side of the **Incoming Material Inspection Report** page.
- You can also use [![image-1651200611102.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651200611102.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651200611102.png) (****FILTER**** button) located on the ****Incoming Material Inspection Report**  To know how to filter using the ****Filter**** button, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

#### **4.17.11 Export Incoming MIR List**

You can export a list of MIR added in the **Incoming Material Inspection Report** page in the pdf and excel formats by using [![image-1651200717968.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651200717968.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651200717968.png) (**PDF** button) and (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

# Inspection

### **5.0 Inspection**

The **Inspection** menu in the home page of the ***cuteQM*** app used add a Request for Inspection (RFI) fit up request, an RFI weld VI request, an NDT inspection request, a spool release request, a dimensional inspection request, an RFI painting and blasting work, and other AFI requests.

#### **5.1 RFI Fit up Request (Heat Numbers)**

The RFI Fit up Request tab allows you add an RFI fit up request to check the fit-up quality of pipes and joints used in the piping project by a sub-contractor. To navigate to the RFI fit up request adding page,

1. Click ****RFI Fit up Request**** in the ****Inspection**** menu. The **RFI Fit up Request** page opens.
    
    [![image-1651200865318.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651200865318.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651200865318.png)
    
     **Figure 5.1: RFI Fit up Request page**

#### **5.1.1 Add an RFI Fit up Request**

If you want to add an RFI fit up request, do the following steps,

1. In the **Sub Contractor** box, select the sub-contractor from a drop-down list.
2. In the **Inspection Date and Time** box, select the inspection date and time.
    
    [![image-1651200945483.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651200945483.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651200945483.png)**Note:** The inspection date should be as current date or upcoming dates. The system will not accept if you have given the previous dates. The fit up inspection date should not be later than the RFI weld visual inspection date.
3. In the ****Location**** box, select a location from a drop-down list.
4. In the ****System**** box, select a system from a drop-down list. Before saving the added fit up request, you must add joints for the fit-up request.
    
    [![image-1651201027630.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201027630.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201027630.png)**Note**: You can add multiple joints for one request.
    
    The **RFI Fit up Request** page shows a list of joints for the corresponding line and drawing numbers including the component details. If you want to add joints for the RFI Fit up request, do the following, [![image-1651201059763.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201059763.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201059763.png)
5. Before adding joints, click the respective[![image-1651201091892.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201091892.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201091892.png) (Add component details icon) of the joints which you want to add. The **Component – I &amp; II** box opens.
    
    [![image-1651201190682.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201190682.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201190682.png)
6. Check and edit the details of first and second components. 
    1. 1. Check the first and second components name. If you want to change the component, you can change the component by using a drop-down list.
        2. In the ****Material**** box, select the material that is the components is made with.
        3. Check the material specifications and grade.
        4. In the ****Diameter (MM)**** and ****Thickness (MM)**** boxes, select the diameter and thickness of the components from the given values.
        5. Click ****Save****. The component details will be saved successfully.
7. Click[![image-1651201285984.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201285984.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201285984.png) (Add icon) of the respective joints you want to add. The added joints will be moved and listed in the right side of the page.
    
    [![image-1651201308335.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201308335.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201308335.png)
8. In the ****Heat No 1**** box, enter the heat number of the first component if you know.
9. In the ****Heat No 2**** box, enter the heat number of the second component if you know.
10. In the ****Fitter**** box, select the fitter from a drop-down list.
11. In the ****WPS**** box, select the WPS from a drop-down list. [![image-1651201433945.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201433945.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201433945.png) **Tip**: If you want to remove any added joint, click [![image-1651201449656.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201449656.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201449656.png)(**Remove** icon) of the respective joint.
12. In the ****Description/Note**** box, enter the description for the added RFI fit up request.
13. Click ****Save****.

The RFI fit up request is successfully added. If you want to view the added request, navigate to [**<u>View RFI Fit up</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.2-view-rfi-fit-up-).


### **5.2 View RFI Fit up (Heat Numbers)**

The **View RFI Fit up** tab helps you to view and edit the RFI fit up requests, which are added by using the **RFI Fit up Request** tab. This tab also allows you to add a new RFI fit up request.

1. Click the **View RFI Fit up** tab in the **Inspection** menu.
    
    The **RFI Fit up Request List** page opens with a list of added RFI fit up requests.
    
    [![image-1651201553190.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201553190.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201553190.png)
    
     **Figure 5.2: RFI Fit up Request List page**

#### **5.2.1 Add an RFI Fit up Request**

If you want to add an RFI fit up request, do the following,

1. Click [![image-1651201649669.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201649669.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201649669.png) (****ADD**** button) in the ******RFI Fit up Request List****** page. The system redirects you into **RFI Fit up Request** page. To know how to add an RFI fit up request, See the topic, “**[<u>Add an RFI Fit up Request</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.1.1-add-an-rfi-fit)**”.

Once you have added the RFI fit up request, you must submit the added request for inspection.

#### **5.2.2 Add Representative for Added RFI Fit up Request**

If you want to add a representative for any added RFI fit up request,

1. Click [![image-1651201749585.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201749585.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201749585.png)(Edit icon) in the ****Representative**** column for the respective RFI fit up request. The **Edit Form** window opens.
    
    [![image-1651201773894.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201773894.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201773894.png)
2. In the ****Representative**** box, enter the name of a representative.
3. In the ****Inspection Date**** box, select the date of inspection.
4. In the ****Remarks**** box, enter your remarks if any.
5. Click ****Save****.

#### **5.2.3 Edit an RFI Fit up Request** 

If you want to edit any existing RFI fit up request in the **RFI** **Fit up Request** page, do the following,

1. Click (Edit icon) in the ****Edit**** column for the respective RFI fit up request. See Fig 5.2. The **RFI Fit up Visual Request** page opens with the details of the selected RFI fit up request.
    
    [![image-1651201875898.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201875898.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201875898.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **5.2.4 Submit and Approve an RFI Fit up Request**

Once you have added the RFI fit up request, the **Submission** column in the **RFI Fit up Request Lists** page is appeared with[![image-1651201968441.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201968441.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201968441.png)(Submit and Reject icons). See Fig 5.2.

1. If you want to submit the RFI fit up request, click [![image-1651201981884.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201981884.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201981884.png)(Submit icon) in the **Submission** column. Otherwise click [![image-1651201995224.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651201995224.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651201995224.png)(Reject icon) to reject the request.
    
    Once you have submitted the RFI fit up request, the **Request Status** column in the **RFI Fit up Requests List** page is appeared with[![image-1651202048663.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202048663.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202048663.png)(Approve and Reject icons).
2. If you want to approve the RFI fit up request, click (Submit icon) in the ****Request Status**** Otherwise click [![image-1651202071851.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202071851.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202071851.png)(Reject icon) to reject the request.

The approved request will be moved to for inspection.

#### **5.2.5 Add Results of RFI Fit up Inspection**

After completing the RFI fit up inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click [![image-1651202154608.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202154608.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202154608.png) (Add icon) in the **Results** column of the respective request.
    
    The **RFI Fit up Request List** window opens with a list of joints.
    
    [![image-1651202170647.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202170647.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202170647.png)
2. If you want to update the heat numbers for both the components, click (Edit icon) of the respective component. The Heat Number window opens with a list of heat numbers and MIR numbers.
    
    [![image-1651202202766.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202202766.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202202766.png)
3. Select the heat numbers you want to update.
4. Click ****Save &amp; Close****. The heat numbers will be updated successfully.
5. If you want to update the WPS number in the **WPS Number** column, you can change the WPS number from a drop-down list.
6. Update the result for root gap by selecting ****Accepted**** or ****Rejected**** in the ****Root Gap**** column based on the inspection.
7. Update the result for straight/ alignment by selecting ****Accepted**** or ****Rejected**** in the ****Strgt/Align**** column based on the inspection.
8. In the ****Edge Prep**** column, select the type of the edge preparation from a drop-down list.
9. In the ****Result**** column, update the RFI fit up inspection result by selecting ****Pending****, ****Accepted****, ****Rejected****, or ****Cancelled****.
10. In the ****Remarks**** column, enter you remarks if any. [![image-1651202298446.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202298446.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202298446.png)**Note**: If you want to attach any document to add more information about the inspection results, click (Attach icon) and attach your document.

#### **5.2.6 View an RFI Fit up Report**

If you want to view an RFI fit up report, click [![image-1651202346789.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202346789.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202346789.png)(print icon) provided in the **Report** column of the **RFI Fit up Requests List** page. See Fig 5.2.

#### **5.2.7 View Signature Details of Inspectors**

You can view the sign details of the inspectors such as QA, Sub contractor, Client, and Owner, once they completed the RFI fit up inspection and submitted the inspection result details including their signature. To view the signature details, click[![image-1651202403131.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202403131.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202403131.png)(Sign icon) in the **Sign Details** column in the **RFI Fit up Requests List** page.

#### **5.2.8 Bulk Print the RFI Fit up Reports**

If you want to print all the RFI fit up reports added in the **RFI Fit up Requests List** page together, click [![image-1651202451564.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202451564.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202451564.png) (**Bulk Print** button). The Report page shows all the RFI fit up reports together.

#### **5.2.9 Attach a File into an RFI Fit up Request** 

If you want to attach a file with any existing RFI fit up request listed in the **RFI Fit up Requests List** page, you can attach the file by using [![image-1651202499153.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202499153.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202499153.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.2.10 Export RFI Fit up Request List**

You can export a list of RFI fit up requests added in the **RFI Fit up Requests List** page in both the pdf and excel formats by using [![image-1651202537414.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202537414.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202537414.png) (**PDF** button) and [![image-1651202548613.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202548613.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202548613.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **5.2.11 Filter an RFI Fit up Request**

If you want to filter any specific RFI fit up request in the **RFI Fit up Requests List** page,

- you can use the filter box [![image-1651202605997.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202605997.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202605997.png) provided in the upper side of the ****RFI Fit up Requests List****  To filter the any specific RFI fit up request, select the ****Drawing Number**** and ****Date**** in the boxes and click ****Search****. [![image-1651202632269.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202632269.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202632269.png)
- you can use [![image-1651202662798.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202662798.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202662798.png) (****FILTER**** button) located on the ****RFI Fit up Requests List**  To know how to filter, see the topic, “[<u>**Filter P&amp;ID**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **5.3 RFI Weld VI Request (Heat Numbers)**

The **RFI Weld VI Request** tab in the **Inspection** menu allows you to add an RFI weld VI request to perform visual inspection of welded pipes and joints used in the piping project. To navigate to the RFI weld VI request adding page,

1. Click **RFI Weld VI Request** in the **Inspection** menu.
    
    The **RFI Weld Visual Request** page opens.
    
    [![image-1651202730986.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202730986.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202730986.png)
    
     **Figure 5.3: RFI Weld Visual Request page**

#### **5.3.1 Add an RFI Weld VI Request**

If you want to add an RFI weld VI request, do the following steps,

1. In the ****Sub Contractor Name**** box, select the name of a sub-contractor from a drop-down list.
2. In the ****Inspection Date and Time**** box, select the inspection date and time. [![image-1651202807100.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202807100.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202807100.png) **Note:** The inspection date should be as current date or upcoming dates. The system will not accept if you have given the previous dates.
3. In the ****Location**** box, select a location from a drop-down list.
4. In the **System** box, select a system from a drop-down list. Before saving the added weld VI request, you must add joints for the weld VI request.
    
    [![image-1651202862835.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202862835.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202862835.png) **Note**: You can add multiple joints for one request.
    
    The **RFI Weld Visual Request** page shows a list of joints for the corresponding line and drawing numbers including the spool number. If you want to add joints for the RFI weld VI request, do the following steps,
    
    [![image-1651202894373.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202894373.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202894373.png)
5. Click [![image-1651202920056.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202920056.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202920056.png)(Add icon) of the respective joints you want to add.
    
    The added joints will be moved and listed in the right side of the page.
    
    [![image-1651202933599.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202933599.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202933599.png)
6. Update the welder details by using[![image-1651202963160.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202963160.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202963160.png)(Add icon) provided in the ****Welder Details****
    1. 1. Click[![image-1651202979402.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202979402.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202979402.png) (Add icon) of the respective joint number. The **Welder- Weld Layer- Weld Process** window opens.
            
            [![image-1651202999679.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651202999679.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651202999679.png)
        2. In the ****Date**** box, select the date.
        3. In the ****Group Name**** box, select the group name from a drop-down list.
        4. In the ****Weld Process**** field, select a weld process.
        5. In the ****Weld Position**** field, select the welding position.
        6. In the ****Weld Layers**** field, select the weld layers you want add.
        7. In the ****Welder Number/ Name**** field, select the welders you want to add.
        8. Click ****Add****. The selected welders will be added and listed in the below table. See the above figure.
        9. In the ****Weld Consumable**** box, select the weld consumable from a drop-down list.
        10. In the ****WPS Number**** box, select the WPS number from a drop-down list.
        11. Click ****Save****. [![image-1651203097946.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203097946.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203097946.png)**Tip**: If you want to remove any added joint, click (**Remove** icon) of the respective joint.
        12. In the ****Description**** box, enter the description for the added RFI weld VI request.
        13. Click ****Save****. The RFI weld VI request is successfully added. If you want to view the added request, navigate to [**<u>View RFI Weld VI</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.4-view-rfi-weld-vi).


### **5.4 View RFI Weld VI (Heat Numbers)**

The **View RFI Weld VI** tab helps you to view and edit the RFI weld VI request, which is added by using the **RFI Weld VI Request** tab. This tab also allows you to add a new RFI weld VI request.

1. Click the **View RFI Weld VI** tab in the **Inspection** menu.
    
    The **RFI Weld Visual Requests List** page opens with a list of added RFI weld VI requests.
    
    [![image-1651203226485.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203226485.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203226485.png)
    
     **Figure 5.4: RFI Weld Visual Requests List page**

#### **5.4.1 Add an RFI Weld VI Request**

If you want to add an RFI weld VI request, do the following,

1. Click [![image-1651203276886.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203276886.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203276886.png) (**ADD** button) in the **RFI Weld Visual Requests List** page.
    
    The system redirects you into **RFI Weld Visual Request** page. To know how to add an RFI weld VI request, See the topic, “[**<u>Add an RFI Weld VI Request</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.4-view-rfi-weld-vi)”.

Once you have added the RFI weld VI request, you must submit the added request for weld visual inspection.

#### **5.4.2 Add Representative for Added RFI Weld VI Request**

If you want to add a representative for any added RFI weld VI request,

1. Click [![image-1651203398654.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203398654.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203398654.png)(Edit icon) in the ****Representative**** column for the respective RFI weld VI request.
    
    The **Edit Form** window opens.
    
    [![image-1651203412706.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203412706.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203412706.png)
2. In the ****Representative**** box, enter the name of a representative.
3. In the ****Inspection Date**** box, select the date of inspection.
4. In the ****Remarks**** box, enter your remarks if any.
5. Click ****Save****.

#### **5.4.3 Edit an RFI Weld VI Request** 

If you want to edit any existing RFI weld VI request in the **RFI** **Weld Visual Requests List** page, do the following,

1. Click[![image-1651203594989.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203594989.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203594989.png)(Edit icon) in the **Edit** column for the respective RFI weld VI request. See Fig 5.4. The **RFI Weld Visual Request** page opens with the details of the selected RFI weld VI request.
    
    [![image-1651203621851.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203621851.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203621851.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **5.4.4 Submit an RFI Weld VI Request**

Once you have added the RFI weld VI request, the **Request Status** column in the **RFI Weld Visual Requests List** page is appeared [![image-1651203728786.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203728786.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203728786.png)with (Submit and Reject icons). See Fig 5.4.

1. If you want to submit the RFI weld VI request, click[![image-1651203762346.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203762346.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203762346.png) (Submit icon) in the ****Request Status**** Otherwise click [![image-1651203792080.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651203792080.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651203792080.png) (Reject icon) to reject the request.

The submitted request will be moved to for RFI weld visual inspection.

#### **5.4.5 Add Results of RFI weld Visual Inspection**

After completing the RFI weld visual inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click [![image-1651204298494.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204298494.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204298494.png)(Add icon) in the **Results** column of the respective request. The **RFI Weld Visual Request List** window opens with a list of joints added for the particular request.
    
    [![image-1651204332633.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204332633.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204332633.png)
2. If you want to update the welder details, click[![image-1651204360463.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204360463.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204360463.png) (Add icon) of the respective joint. The **Welder-Weld Layer-Weld Process** window opens.
    
    [![image-1651204372371.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204372371.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204372371.png)
    
    [![image-1651204383612.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204383612.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204383612.png) **Note:** If you want to delete any added weld, click (Delete icon) of the respective welder.
    
    
    1. 1. In the ****Date**** box, select the date.
        2. In the ****Group Name**** box, select the group name from a drop-down list.
        3. In the ****Weld Process**** field, select a weld process.
        4. In the ****Weld Position**** field, select the welding position.
        5. In the ****Weld Layers**** field, select the weld layers you want add.
        6. In the ****Welder Number/ Name**** field, select the welders you want to add.
        7. Click ****Add****. The selected welders will be added and listed in the below table. See the above figure.
        8. In the ****Weld Consumable**** box, select the weld consumable from a drop-down list.
        9. In the ****WPS Number**** box, select the WPS number from a drop-down list.
        10. Click ****Save****.
3. In the ****Result**** column, select the result for each joint from the given result options in the drop-down list.
4. In the ****Remarks**** box, enter your remarks if any.
5. Click ****Save****.

#### **5.4.6 View an RFI Weld VI Report**

If you want to view an RFI weld VI report, click[![image-1651204648220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204648220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204648220.png)(print icon) provided in the **Report** column of the **RFI Weld Visual Requests List** page. See Fig 5.4.

#### **5.4.7 View Signature Details of Inspectors**

You can view the sign details of the inspectors such as QA, Sub contractor, Client, and Owner, once they completed the RFI weld visual inspection and submitted the inspection result details including their signature. To view the signature details, click[![image-1651204812728.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651204812728.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651204812728.png) (Sign icon) in the **Sign Details** column in the **RFI Weld Visual Requests List** page.

#### **5.4.8 Bulk Print RFI Weld VI Reports**

If you want to print all the RFI weld VI reports added in the **RFI Weld Visual Requests List** page together, click [![image-1651223226147.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223226147.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223226147.png) (**Bulk Print** button). The Report page shows all the RFI weld VI reports together.

#### **5.4.9 Attach a File into an RFI Weld VI Request** 

If you want to attach a file with any existing RFI weld VI request listed in the **RFI Weld Visual Requests List** page, you can attach the file by using [![image-1651223269890.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223269890.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223269890.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.4.10 Export RFI Weld VI Request List**

You can export a list of RFI weld VI requests added in the **RFI Weld Visual Requests List** page in both the pdf and excel formats by using [![image-1651223324463.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223324463.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223324463.png) (**PDF** button) and [![image-1651223333795.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223333795.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223333795.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **5.4.11 Filter an RFI Weld VI Request**

If you want to filter any specific RFI weld VI request in the **RFI Weld Visual Requests List** page,

- you can use the filter box [![image-1651223385499.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223385499.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223385499.png) provided in the upper side of the **RFI Weld Visual Requests List**  To filter the any specific RFI weld VI request, select the **Drawing Number** and **Date** in the boxes and click **Search**. [![image-1651223413564.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223413564.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223413564.png)
- you can use [![image-1651223433424.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223433424.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223433424.png) (**FILTER** button) located on the **RFI Weld Visual Requests List** page. To know how to filter, see the topic, “[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **5.5 NDT Inspection Request**

The **NDT Inspection Request** tab in the **Inspection** menu helps you to add an NDT inspection request to perform an NDT inspection. To navigate to the NDT inspection request adding page,

1. Click ****NDT Inspection Request**** in the ****Inspection**** menu. The **NDT Inspection Request** page opens.
    
    [![image-1651223631643.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651223631643.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651223631643.png)
    
     **Figure 5.5: NDT Inspection Request page**

#### **5.5.1 Add an NDT inspection request**

If you want to add an NDT inspection request, do the following

1. Click [![image-1651227156663.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227156663.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227156663.png) (**ADD** button) in the **NDT Inspection Request** page.
    
    A new page opens to add an NDT inspection request.
    
    [![image-1651227171999.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227171999.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227171999.png)
    
     **Figure 5.5: NDT Inspection Request page**
    
    [![image-1651227211421.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227211421.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227211421.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **Requested By** box, enter the name of person who has requested for the NDT inspection.
3. In the **To** box, select the name of a sub-contractor from a drop-down list.
4. In the **Description/ Spec. Ref. No** box, enter the description for the request.
5. In the **Inspection Date &amp; Time** box, select the date of inspection.
6. In the **Location** box, enter the location where the inspection to be done.
7. In the **Requisition** box, enter the requisition detail.
8. In the **Longitudinal** box, enter the longitudinal value.
9. In the **Drawing No** box, select the drawing number from a drop-down list.
10. In the **Designation** box, enter the designation detail.
11. In the **Cost Centre** box, enter the cost centre detail
12. In the **PWHT Request Type** box, select the PWHT request type from a drop-down list.
13. In the **System** box, select a system from a drop-down list.
14. In the **NDT Type** box, select the type of NDT you want to add. Before saving the added NDT request, you must add joints. You can add multiple joints for one NDT inspection request.
    
    [![image-1651227469136.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227469136.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227469136.png)**Note**: The page shows a list of added joints. If you want to view the joints for the specific ISO drawing, select the respective ISO drawing from a drop-down list.
15. Click[![image-1651227533159.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227533159.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227533159.png) (Add icon) of the respective joint which you want to add. The added joints will be moved to the right side of the page.
    
    [![image-1651227563727.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227563727.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227563727.png)
16. In the **Remarks** box, enter your remarks if any.
17. Click **Save NDT Request**. The added NDT inspection request will be listed in the **NDT Inspection Request** page.

#### **5.5.2 Edit an NDT Inspection Request** 

If you want to edit any existing NDT inspection request in the **NDT Inspection Request** page, do the following steps,

1. Click [![image-1651227654663.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227654663.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227654663.png) (Edit icon) in the **Edit** column for the respective NDT request. See Fig 5.5. The **NDT Inspection Request** page opens with the details of the selected NDT inspection request.
    
    [![image-1651227744309.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227744309.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227744309.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **5.5.3 Submit and Approve an NDT Inspection Request**

Once you have added the NDT inspection request, the **Submission** column in the **NDT Inspection Request** page is appeared with [![image-1651227804150.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227804150.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227804150.png) (Submit and Reject icons). See Fig 5.5.

1. If you want to submit the NDT inspection request, click[![image-1651227834918.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227834918.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227834918.png) (Submit icon) in the ****Submission**** Otherwise click [![image-1651227860032.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227860032.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227860032.png) (Reject icon) to reject the request. Once the NDT inspection request has been submitted, the **Request Status** column in the **NDT Inspection Request** page is appeared with [![image-1651227889337.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227889337.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227889337.png) (Approve and Reject icons).
2. If you want to accept the NDT inspection request, click [![image-1651227935228.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227935228.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227935228.png)(Approve icon) in the ****Request Status**** Otherwise click [![image-1651227956151.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651227956151.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651227956151.png)(Reject icon) to reject the request. The approved request will be moved to NDT inspection.

#### **5.5.4 View an NDT Inspection Report**

If you want to view an NDT inspection report, click [![image-1651228014197.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228014197.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228014197.png) (print icon) provided in the **Report** column of the **NDT Inspection Request** page. See Fig 5.5.

#### **5.5.5 Attach a File into an NDT Inspection Request** 

If you want to attach a file with any existing NDT inspection request listed in the **NDT Inspection Request** page, you can attach the file by using [![image-1651228062872.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228062872.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228062872.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.5.6 Export NDT Inspection Request List**

You can export a list of NDT inspection requests added in the **NDT Inspection Request** page in both the pdf and excel formats by using [![image-1651228119589.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228119589.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228119589.png) (**PDF** button) and [![image-1651228129539.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651228129539.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651228129539.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **5.5.7 Filter an NDT Inspection Request**

If you want to filter any specific NDT inspection request in the **NDT Inspection Request** page,

- you can use the filter box [![image-1651238548225.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651238548225.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651238548225.png) provided in the upper side of the **NDT Inspection Request** page. To filter the any specific NDT inspection request, select the request status in the **Request Status** box.
- you can use [ ![image-1651238729214.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651238729214.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651238729214.png) (****FILTER**** button) located on the ****NDT Inspection Request**  To know how to filter, see the topic, “**[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)**”.

#### **5.5.8 Import Multiple NDT Inspection Requests**

If you want to import multiple NDT inspection requests together, do the following,

1. Click [![image-1651239757314.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651239757314.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651239757314.png) (**TEMPLATE** button). See Fig 5.5.
    
    An excel worksheet will be downloaded with a predefined template to enter the details of NDT inspection requests.
    
    [![image-1651239899105.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651239899105.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651239899105.png)
2. Enter the required NDT inspection request details in the respective columns of the excel worksheet.
3. Once you have added the NDT inspection request details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651239958610.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651239958610.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651239958610.png) (****IMPORT**** button). See Fig 5.5. A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651240053690.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240053690.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240053690.png)
5. Click [![image-1651240063806.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240063806.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240063806.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651240093776.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240093776.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240093776.png) (****Upload**** button) to export the NDT inspection request that are included in the excel worksheet.

The details of the NDT inspection request in the worksheet will be displayed in the **NDT Inspection Request** page.


### **5.6 NDT Job Order**

The **NDT Job Order** tab in the **Inspection** menu allows you to add a job order for a specific NDT-contractor to carry out the NDT inspection. Once you have added the job order, you can add the NDT request including the quantity and schedule date to complete the NDT inspection.

1. Click **NDT Job Order** in the **Inspection** menu.
    
    The **Job Order** page opens.
    
    [![image-1651240218199.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240218199.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240218199.png)
    
    [![image-1651240228823.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240228823.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240228823.png)
    
     **Figure 5.6: Job Order page**

#### **5.6.1 Add an NDT Job Order**

If you want to add an NDT job order, do the following steps,

1. Click [![image-1651240354668.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240354668.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240354668.png) (**ADD** button) in the **Job Order** page. See Fig 5.6.
    
    A new window opens to add an NDT job order.
    
    [![image-1651240375655.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240375655.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240375655.png)
    
    [![image-1651240392759.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240392759.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240392759.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651240410621.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240410621.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240410621.png)**Tip**: A report number for a new job order will be updated automatically in the **Report Number** box.
2. In the ****NDT Contractor**** box, select the name of an NDT contractor from a drop-down list.
3. In the ****Attention**** box, enter any note if you want for attention.
4. In the ****Date**** box, select the date of adding an NDT job order.
5. In the **Requested By** box, enter the name of a person who has requested for an NDT job order.
6. In the ****Requested Date**** box, select the requested date of an NDT job order.
7. In the ****Supported By**** boxes, enter the name of a project lead and a HOD, respectively.
8. In the ****Supported Date**** box, select the supported date of an NDT job order.
9. Click ****Save****. The NDT job order is successfully added.

#### **5.6.2 Add an NDT Job Request** 

To add an NDT job request,

1. Click [![image-1651240583606.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240583606.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240583606.png)(Add icon) of the respective job order in the ****Add NDT Request**** column of the ****Job Order**** See Fig 5.6. A new window shows a list of added NDT request.
    
    [![image-1651240612206.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240612206.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240612206.png)
2. If you want to add any request, click [![image-1651240634566.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240634566.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240634566.png) (Add icon) of the respective request. The added NDT request will be assigned under the respective job order.
3. If you want to delete any request, click [![image-1651240675614.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240675614.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240675614.png) (Delete icon) of the respective request.

#### **5.6.3 Attach a File into an NDT Job Order** 

If you want to attach any file with any NDT job order listed in the **Job Order** page, you can attach the file by using [![image-1651240807174.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240807174.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240807174.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.6.4 View an NDT Job Order Report**

If you want to view an NDT job order report, click [![image-1651240896862.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651240896862.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651240896862.png) (print icon) provided in the **Report** column of the **Job Order** page. See Fig 5.6.

#### **5.6.5 Edit an NDT Job Order**

If you want to edit any existing NDT job order in the **Job Order** page, do the following,

1. Click [![image-1651241158257.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651241158257.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651241158257.png)(Edit icon) in the **Edit** column for the respective NDT job order. See Fig 5.6. A new window opens with the added details of NDT job order to edit the job order.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **5.6.6 Delete an NDT Job Order**

If you want to delete any specific NDT job order, you can use [![image-1651241233671.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651241233671.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651241233671.png) (Delete icon) provided in the **Delete** column of the **Job Order** page, See Fig 8.6. To know how to delete, see the topic, “[**<u>Delete P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

#### **5.6.7 Export NDT Job Order List**

You can export a list of NDT job order added in the **Job Order** page in the pdf and excel formats by using [![image-1651241460912.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651241460912.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651241460912.png) (**PDF** button) and [![image-1651241471852.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651241471852.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651241471852.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.


### **5.7 Spool Release Inspection Request**

The **Spool Release Request** tab in the **Inspection** menu helps you to add a spool release request. To navigate to the spool release inspection request adding page,

1. Click ****Spool Release Request**** in the ****Inspection**** menu. The **Spool Release Inspection Request** page opens.
    
    [![image-1651241577517.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651241577517.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651241577517.png)
    
     **Figure 5.7: Spool Release Inspection Request page**

#### **5.7.1 Add a Spool Release Inspection Request**

If you want to add a spool release inspection request, do the following steps in the **Spool Release Inspection Request p**age, See Fig 5.7.

1. In the ****Inspection Date**** box, select the date of spool inspection.
2. In the **Location** box, select the location where the spool inspection to be performed. Before saving the added spool release inspection request, you must add spools. You can add multiple spools for one spool release inspection request.
    
    [![image-1651241851538.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651241851538.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651241851538.png) **Note**: The page shows a list of added spools. If you want to view the specific spools, use the filter options provided in the **System**, **Line Number**, **Drawing Number**, and **Spool Number** columns.
3. Click [![image-1651241879363.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651241879363.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651241879363.png) (Add icon) of the respective spool which you want to add. The added spools will be moved to the right side of the page.
    
    [![image-1651241923753.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651241923753.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651241923753.png)
4. In the **Remarks** box, enter your remarks if any.
5. In the **Inspection Item** box, enter the details of inspection items.
6. In the **Subject Coverage** box, enter the details of subject coverage.
7. Click **Save**.

The spool release request will be added and listed in the **View** **Spool Release** page.


### **5.8 View Spool Release**

The **View Spool Release** tab helps you to view and edit the spool release inspection request, which is added by using the **Spool Release Inspection Request** tab. This tab also allows you to add a new spool release request.

1. Click **View Spool Release** in the **Inspection** menu.
    
    The **Spool Release List** page opens with a list of added spool release requests.
    
    [![image-1651242070121.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651242070121.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651242070121.png)
    
     **Figure 5.8: Spool Release List page**

#### **5.8.1 Add a Spool Release Inspection Request**

If you want to add a spool release request, do the following steps,

1. Click [![image-1651242215588.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651242215588.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651242215588.png) (**ADD** button) in the **Spool Release List** page.
    
    The system redirects you into **Spool Release Inspection Request** page. To know how to add a spool release inspection request, See the topic, “[**<u>Add a Spool Release Inspection Request</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.7.1%C2%A0add-a-spool-re)”.

Once you have added the spool release request, you must submit the added request to perform inspection in the piping spool.

#### **5.8.2 Add Representative for Added Spool Release Inspection Request**

If you want to add a representative for any added spool release request,

1. Click [![image-1651242358767.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651242358767.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651242358767.png)(Edit icon) in the **Representative** column for the respective spool release request. The **Edit Form** window opens.
    
    [![image-1651242414597.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651242414597.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651242414597.png)
2. In the ****Inspection Date**** box, select the date of inspection.
3. In the ****Representative**** box, enter the name of a representative.
4. Click ****Save****.

#### **5.8.3 Edit a Spool Release Inspection Request** 

If you want to edit any existing spool release request in the **Spool Release List** page, do the following,

1. Click [![image-1651242854925.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651242854925.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651242854925.png)(Edit icon) in the ****Edit**** column for the respective spool release request. See Fig 5.8. The **Spool Release Inspection Request** page opens with the details of the selected spool release request.
    
    [![image-1651242882181.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651242882181.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651242882181.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.8.4 Submit a Spool Release Inspection Request**

Once you have added the spool release request, the **Request Status** column in the **Spool Release List** page is appeared with [![image-1651243016713.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651243016713.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651243016713.png) (Submit and Reject icons). See Fig 5.8.

1. If you want to submit the spool release request, click [![image-1651243057735.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651243057735.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651243057735.png) (Submit icon) in the ****Request Status**** Otherwise click [![image-1651243077996.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651243077996.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651243077996.png)(Reject icon) to reject the request. The submitted request will be moved to for spool inspection.

#### **5.8.5 Add Results of Spool Release Inspection**

After completing the spool release inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click [![image-1651243199154.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651243199154.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651243199154.png) (Add icon) in the **Results** column of the respective request.
    
    The **Spool Release List** window opens with a list of spools added for the particular request.
    
    [![image-1651243221400.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651243221400.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651243221400.png)
2. In the **Result** column, select the result for each spool from the given result options in the drop-down list.
3. In the ****Remarks**** box, enter your remarks if any.
4. Click ****Save****.

#### **5.8.6 View a Piping Spool Release Report**

If you want to view a piping spool release report, click[![image-1651243293904.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651243293904.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651243293904.png) (print icon) provided in the **Print** column of the **Spool Release List** page. See Fig 5.8.

#### **5.8.7 Attach a File into a Spool Release Inspection Request** 

If you want to attach a file with any existing spool release request listed in the **Spool Release List** page, you can attach the file by using [![image-1651243363769.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651243363769.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651243363769.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.8.8 View Signature Details of Inspectors**

You can view the sign details of the inspectors such as QA, Sub contractor, Client, and Owner, once they completed the spool release inspection and submitted the inspection result details including their signature. To view the signature details, click [![image-1651243432221.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651243432221.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651243432221.png) (Sign icon) in the **Sign Details** column in the **Spool Release List** page.

#### **5.8.9 Export Spool Release Inspection Request List**

You can export a list of spool release requests added in the **Spool Release List** page in both the pdf and excel formats by using[![image-1651243526591.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651243526591.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651243526591.png) (**PDF** button) and [![image-1651243548643.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651243548643.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651243548643.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **5.8.10 Filter a Spool Release Inspection Request**

If you want to filter any specific spool release request in the **Spool Release List** page, you can use (**FILTER** button) located on the **Spool Release List** page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **5.9 Inspection Release Note**

The **Inspection Release Note** tab in the Inspection menu helps you to add an inspection release note. To navigate to the inspection release note adding page,

1. Click **Inspection Release Note** in the Inspection menu.
    
    The **Inspection Release Note** page opens.
    
    [![image-1651245058346.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651245058346.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651245058346.png)
    
     **Figure 5.9: Inspection Release Note page**

#### **5.9.1 Add an Inspection Release Note**

If you want to add an inspection release note, do the following steps,

1. In the **Inspection Date** box, select the date of inspection. See Fig 5.9.
2. In the ****Sub Contractor Name**** box, select a sub-contractor from a drop-down list.
3. In the ****Location**** box, select a location where the inspection to be held.
4. In the ****System/Area**** box, enter the name of area/system.
5. In the ****Sub System No**** box, enter the sub system number.
6. In the **Item to be Released** field, select the detail of the item to be released that is whether **Piping** or **Structural.** If another item means select the checkbox of **Others** and enter the item detail.
7. In the **Item to be Released** **for** field, select the reason of the item to be released for that is whether for **Pressure Test** or **Blasting &amp; Painting.** If any other reason means select the checkbox of **Others** and enter the reason.
8. Before saving the added inspection release note, you must add spools. You can add multiple spools for one inspection release note.
    
    [![image-1651245606753.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651245606753.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651245606753.png) **Note**: The page shows a list of added spools. If you want to view the specific spools, use the filter options provided in the **System**, **Line Number**, **Drawing Number**, **Sheet No &amp; Rev No** and **Spool Number** columns.
9. Click [![image-1651245665507.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651245665507.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651245665507.png)(Add icon) of the respective spool which you want to add. The added spools will be moved to the right side of the page.
10. In the **Remarks** box, enter your remarks if any.
11. In the **Inspection Item** box, enter the details of inspection items.
12. In the **Subject Coverage** box, enter the detail of subject coverage.
13. Click **Save**.

The inspection release note will be added and listed in the **View** **Inspection Release Note** page.


### **5.10 View Inspection Release Note**

The **View Inspection Release Note** tab helps you to view and edit the inspection release note, which is added by using the **Inspection Release Note** tab. This tab also allows you to add a new inspection release note.

1. Click ****View Inspection Release Note**** in the ******Inspection****** menu. The **Inspection Release Note** page opens with a list of added inspection release notes.
    
    [![image-1651245846288.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651245846288.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651245846288.png)
    
     **Figure 5.10: Inspection Release Note page**

#### **5.10.1 Add an Inspection Release Note**

If you want to add an inspection release note, do the following steps,

1. Click [![image-1651245954971.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651245954971.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651245954971.png) (**ADD** button) in the **Inspection Release Note** page. The system redirects you into **Inspection Release Note** page. To know how to add an inspection release note, See the topic, “[**<u>Add an Inspection Release Note</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.9.1-add-an-inspect)”.

Once you have added the inspection release note, you must submit the added note to perform the release note inspection.

#### **5.10.2 Add a Representative for Added Inspection Release Note**

If you want to add a representative for any added inspection release note,

1. Click [![image-1651246048357.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651246048357.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651246048357.png) (Edit icon) in the **Representative** column for the respective inspection release note.
    
    The **Edit Form** window opens.
    
    [![image-1651246074758.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651246074758.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651246074758.png)
2. In the ****Inspection Date**** box, select the date of inspection.
3. In the ****Representative**** box, enter the name of a representative.
4. Click ****Save****.

#### **5.10.3 Edit an Inspection Release Note**

If you want to edit any existing inspection release note in the **Inspection Release Note** page, do the following,

1. Click [![image-1651246148349.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651246148349.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651246148349.png) (Edit icon) in the ****Edit**** column for the respective inspection release note. See Fig 5.10. The **Inspection Release Note** page opens with the details of the selected inspection release note.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **5.10.4 Submit an Inspection Release Note**

Once you have added the inspection release note, the **Request Status** column in the **Inspection Release Note** page is appeared with (Submit and Reject icons). See Fig 5.10.

1. If you want to submit the inspection release note, click [![image-1651246272287.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651246272287.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651246272287.png) (Submit icon) in the ****Request Status**** Otherwise click [![image-1651246306387.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651246306387.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651246306387.png) Reject icon) to reject the request. The submitted request will be moved to for release note inspection.

#### **5.10.5 Add RFI Data for an Inspection Release Note**

If you want to add the details of RFI data for the added inspection release note, do the following steps,

1. Click (Edit icon) in the **RFI Data** column of the **Inspection Release Note** page. See Fig 5.10.
    
    The **RFI Inspection Request List** window opens.
    
    [![image-1651246399982.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651246399982.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651246399982.png)
2. In the ****Inspection From**** box, enter the detail from where the inspection should start.
3. In the ****Inspection To**** box, enter the detail to where the inspection should end.
4. In the ****Inspection Details**** option, select 1<sup>st</sup>Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the ****Others**** box, enter any other inspection related details.
6. In the ****Refer to Report No**** box, enter the report number for reference.
7. In the ****RFI Date**** box, choose the RFI date.
8. In the **Inspection Result** option, if the inspection result is accepted, select **Accepted** otherwise select **Rejected**.
9. In the ****Remarks**** box, enter your remarks if any.
10. In the ****Inspected by**** box, enter the name of a person who has done inspection.
11. In the ****Inspected Date**** box, choose the date of inspection.
12. In the ****Witnessed By**** box, enter the name of the witnessed person.
13. In the ****Witnessed Date**** box, choose the date of witnessed.
14. In the ****PCML Rep Name**** box, enter the representative name of PCML.
15. In the **PCML Rep Date** box, choose the PCML rep date.
16. In the ****MEB Rep Name**** box, enter the representative name of MEB.
17. In the ****MEB Rep Date box****, choose MEB rep date.
18. Click ****Save****.

The RFI data for the inspection release note is added successfully.

#### **5.10.6 Add Results of Inspection Release Note**

After completing the inspection for the added release note, you can add the inspection result details. To add results, do the following steps,

1. Click [![image-1651246749006.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651246749006.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651246749006.png) (Add icon) in the ****Results**** column of the respective request. The **INR List** window opens with a list of spools added for the particular request.
    
    [![image-1651246773082.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651246773082.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651246773082.png)
2. In the ****Result**** column, select the result for each spool from the given result options in the drop-down list.
3. In the ****Remarks**** box, enter your remarks if any.
4. Click ****Save****.

#### **5.10.7 View an RFI Report** 

If you want to view an RFI report, click[![image-1651246849368.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651246849368.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651246849368.png) (print icon) provided in the **RFI Report** column of the **Inspection Release Note** page. See Fig 5.10.

#### **5.10.8 View an Inspection Release Note Report**

If you want to view an inspection release note report, click[![image-1651246900096.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651246900096.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651246900096.png)(print icon) provided in the **Print** column of the **Inspection Release Note** page. See Fig 5.10.

#### **5.10.9 Attach a File into an Inspection Release Note** 

If you want to attach a file with any existing inspection release note listed in the **Inspection** **Release Note** page, you can attach the file by using [![image-1651246943706.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651246943706.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651246943706.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.10.10 View a Pipe Spool Release Summary**

If you want to view a pipe spool release summary report, click[![image-1651247026360.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651247026360.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651247026360.png) (print icon) provided in the upper side of the **Inspection Release Note** page. See Fig 5.10.

[![image-1651247021407.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651247021407.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651247021407.png)

#### **5.10.11 Export Inspection Release Note List**

You can export a list of inspection release notes added in the **Inspection Release Note** page in both the pdf and excel formats by using [![image-1651247100963.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651247100963.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651247100963.png) (**PDF** button) and [![image-1651247113589.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651247113589.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651247113589.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **5.10.12 Filter an Inspection Release Note**

If you want to filter any specific inspection release note in the **Inspection Release Note** page, you can use [![image-1651247158974.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651247158974.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651247158974.png) (**FILTER** button) located on the **Inspection Release Note** page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **5.11 Dimensional Inspection Request**

The **Dimensional Inspection Request** tab in the **Inspection** menu helps you to add a dimensional inspection request. To navigate to the dimensional inspection request adding page,

1. Click **Dimensional Inspection Request** in the **Inspection** menu.
    
    The **Dimensional Inspection Request** page opens.
    
    [![image-1651247677075.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651247677075.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651247677075.png)
    
     **Figure 5.11: Dimensional Inspection Request page**

#### **5.11.1 Add a Dimensional Inspection Request**

If you want to add a new dimensional inspection request, do the following steps.

1. In the **Inspection Date** box, select the date of dimensional inspection.
2. In the ****Location**** box, select the location where the dimensional inspection to be performed. Before saving the added dimensional inspection request, you must add spools. You can add multiple spools for one dimensional inspection request.
    
    [![image-1651248322032.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651248322032.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651248322032.png) **Note**: The page shows a list of added spools. If you want to view the specific spools, use the filter options provided in the **System**, **Line Number**, **Drawing Number**, and **Spool Number** columns.
3. Click [![image-1651248354041.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651248354041.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651248354041.png) (Add icon) of the respective spool which you want to add. The added spools will be moved to the right side of the page.
4. In the **Remarks** box, enter your remarks if any.
5. In the **Inspection Item** box, enter the details of inspection items.
6. Click **Save**.

The dimensional inspection request will be added and listed in the **Dimensional Inspection List** page.


### **5.12 Dimensional Inspection List**

The **Dimensional Inspection List** tab helps you to view and edit the dimensional inspection request, which is added by using the **Dimensional Inspection Request** tab. This tab also allows you to add a new dimensional inspection request.

1. Click ****Dimensional Inspection List**** in the ******Inspection****** menu. The **Dimensional Inspection List** page opens with a list of added dimensional inspection requests.
    
    [![image-1651248630722.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651248630722.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651248630722.png)
    
     **Figure 5.12: Dimensional Inspection List page**

#### **5.12.1 Add a Dimensional Inspection Request**

If you want to add a dimensional inspection request, do the following steps,

1. Click [![image-1651248827437.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651248827437.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651248827437.png) (**ADD** button) in the **Dimensional Inspection List** page.
    
    The system redirects you into the **Dimensional Inspection Request** page. To know how to add a dimensional inspection request, See the topic, “[**<u>Add a Dimensional Inspection Request</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.11.1-add-a-dimensi)”.

Once you have added the dimensional inspection request, you must submit the added request to perform the dimensional inspection.

#### **5.12.2 Add Representative for Added Dimensional Inspection Request**

If you want to add a representative for any added dimensional inspection request,

1. Click [![image-1651248912250.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651248912250.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651248912250.png)(Edit icon) in the ****Representative**** column for the respective spool release request. The **Edit Form** window opens.
    
    [![image-1651248941358.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651248941358.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651248941358.png)
2. In the ****Inspection Date**** box, select the date of inspection.
3. In the ****Representative**** box, enter the name of a representative.
4. Click ****Save****.

#### **5.12.3 Edit a Dimensional Inspection Request** 

If you want to edit any existing dimensional inspection request in the **Dimensional Inspection List** page, do the following,

1. Click [![image-1651249047665.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651249047665.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651249047665.png)(Edit icon) in the ****Edit**** column for the respective dimensional inspection request. See Fig 5.12. The page opens with the details of the selected dimensional inspection request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **5.12.4 Submit a Dimensional Inspection Request**

Once you have added the dimensional inspection request, the **Request Status** column in the **Dimensional Inspection List** page is appeared with[![image-1651249119857.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651249119857.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651249119857.png)(Submit and Reject icons). See Fig 5.12.

1. If you want to submit the dimensional inspection request, click [![image-1651249148290.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651249148290.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651249148290.png)(Submit icon) in the ****Request Status**** Otherwise click [![image-1651249175802.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651249175802.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651249175802.png) (Reject icon) to reject the request.

The submitted request will be moved to for the dimensional inspection.

#### **5.12.5 Add Results of Dimensional Inspection**

After completing the dimensional inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click[![image-1651249268524.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651249268524.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651249268524.png) (Add icon) in the **Results** column of the respective request.
    
    The **Dimensional Inspection List** window opens with a list of added spools.
    
    [![image-1651249285565.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651249285565.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651249285565.png)
2. In the ****Result**** column, select the result for each spool from the given result options.
3. In the ****Pipe Size**** column, select the result of pipe size.
4. In the ****Dimension**** column, select the result of pipe dimension.
5. In the ****Flange**** column, select the result of flange.
6. In the ****Orientation**** column, select the result of orientation.
7. In the ****Remarks**** box, enter your remarks if any.
8. Click ****Save****.

#### **5.12.6 View a Dimensional Inspection Report**

If you want to view a dimensional inspection report, click[![image-1651249434239.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651249434239.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651249434239.png) (print icon) provided in the **Print** column of the **Dimensional Inspection List** page. See Fig 5.12.

#### **5.12.7 Attach a File into a Dimensional Inspection Request** 

If you want to attach a file with an existing dimensional inspection request listed in the **Dimensional Inspection List** page, you can attach the file by using [![image-1651250022599.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651250022599.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651250022599.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”

#### **5.12.8 Export Dimensional Inspection Request List**

You can export a list of dimensional inspection requests added in the **Dimensional Inspection List** page in both the pdf and excel formats by using [![image-1651250180423.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651250180423.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651250180423.png) (**PDF** button) and [![image-1651250189837.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651250189837.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651250189837.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **5.12.9 Filter a Dimensional Inspection Request**

If you want to filter any dimensional inspection request in the **Dimensional Inspection List** page, you can use [![image-1651250230314.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651250230314.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651250230314.png) (**FILTER** button) located on the **Dimensional Inspection List** page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **5.13 RFI Hydro Pressure**

Hydro Pressure Inspection is the technique in which pipes are tested at required design pressure of the pipes to check the leak and strength. You can add a request for hydro pressure inspection by using the **RFI Hydro Pressure** tab in the **Inspection** menu.

#### **5.13.1 Add an RFI Hydro Pressure Request**

If you want to add an RFI hydro pressure request, do the following steps,

1. Click **RFI Hydro Pressure** in the **Inspection** menu.
    
    The **RFI Hydro Pressure** page opens.
    
    [![image-1651250531524.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651250531524.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651250531524.png)
    
     **Figure 5.13: RFI Hydro Pressure page**
2. In the ****Inspection Date &amp; Time**** box, select the inspection date and time.
3. In the ****Sub Contractor**** box, select a sub-contractor from a drop-down list.
4. In the ****Acceptance Code**** box, enter the acceptance code detail.
5. In the ****Designation**** box, enter the designation detail.
6. In the ****Test Temperature**** box, enter the test temperature value.
7. In the ****Test Medium**** box, select the test medium from the drop-down list.
8. In the ****Requested By**** box, enter the name of a person who has requested the hydro pressure inspection.
9. In the ****Classification**** box, enter the classification detail.
10. In the **Drawing No** box, select the drawing number from a drop-down list.
11. In the ****Work Scope**** box, enter the work scope detail.
12. In the ****Cost Centre**** box, enter the cost centre detail.
13. In the ****Holding Time**** box, enter the holding time range.
14. In the ****Pressure Gauge No**** box, enter the pressure gauge number.
15. In the ****Location**** box, select the location where the inspection to be performed.
16. In the ****System**** box, select a system from a drop-down list.
17. In the ****Procedure No**** box, enter the procedure number.
18. In the ****Design Pressure**** box, enter the design pressure range.
19. In the ****Test Pressure**** box, enter the test pressure range.
20. In the ****Instrument**** box, enter the instrument name.
21. In the ****P&amp;ID No**** box, enter the P&amp;ID number.
22. In the ****Remarks**** box, enter your remarks if any.
23. In the ****Description**** box, enter the description for the hydro pressure inspection. Before saving the added NDT request, you must add spools.
    
    [![image-1651250926040.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651250926040.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651250926040.png) **Note**: You can add multiple spools for one request.
    
    The **RFI Hydro Pressure** page shows a list of added spools. If you want to view the spools for the specific ISO drawing, select the respective ISO drawing from a drop-down list.
    
    [![image-1651250956304.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651250956304.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651250956304.png)
24. Click [![image-1651250973472.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651250973472.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651250973472.png) (Add icon) of the respective spool which you want to add. The added spools will be moved to the right side of the page.
    
    [![image-1651250993402.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651250993402.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651250993402.png)
25. Click **Save Request**.

The hydro pressure inspection request will be added and listed in the **RFI Hydro Pressure** page.


### **5.14 View RFI Hydro Pressure**

The **View RFI Hydro Pressure** tab helps you to view and edit the hydro pressure inspection request, which is added by using the **RFI Hydro Pressure** tab. This tab also allows you to add a new hydro pressure request.

1. Click **View RFI Hydro Pressure** in the **Inspection** menu.
    
    The **RFI Hydro Pressure** page opens with a list of added hydro pressure requests.
    
    [![image-1651251102133.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651251102133.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651251102133.png)
    
     **Figure 5.14: RFI Hydro Pressure page**

#### **5.14.1 Add a Hydro Pressure Inspection Request**

If you want to add a hydro pressure inspection request, do the following steps,

1. Click [![image-1651251169548.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651251169548.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651251169548.png) (**ADD** button) in the **RFI Hydro Pressure** page.
    
    The system redirects you to a new page to add a new hydro pressure inspection request. To know how to add a hydro pressure inspection request, See the topic, “[**<u>Add a Hydro Pressure Inspection Request</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.13.1%C2%A0add-an-rfi-hy)”.

Once you have added the hydro pressure inspection request, you must submit the added request to perform hydro pressure inspection.

#### **5.14.2 Add Representative for Hydro Pressure Inspection Request**

If you want to add a representative for any added hydro pressure inspection request,

1. Click [![image-1651251248556.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651251248556.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651251248556.png)(Edit icon) in the **Representative** column for the respective hydro pressure inspection request.
    
    The **Edit Form** window opens.
    
    [![image-1651251269633.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651251269633.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651251269633.png)
2. In the ****Representative**** box, enter the name of a representative.
3. In the ****Inspection Date**** box, select the date of inspection.
4. In the **Remarks** box, enter your remarks if any.
5. Click **Save**.

#### **5.14.3 Edit a Hydro Pressure Inspection Request** 

If you want to edit any existing hydro pressure inspection request in the **RFI Hydro Pressure page, do the following,

1. Click [![image-1651251445172.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651251445172.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651251445172.png) (Edit icon) in the ****Edit**** column for the respective hydro pressure inspection See Fig 5.14. The **RFI Hydro Pressure** page opens with the details of the selected hydro pressure inspection request.
    
    [![image-1651251470057.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651251470057.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651251470057.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **5.14.4 Submit and Approve a Hydro Pressure Inspection Request**

Once you have added the hydro pressure inspection request, the **Submission** column in the **RFI Hydro Pressure** page is appeared with [![image-1651251535766.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651251535766.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651251535766.png) (Submit and Reject icons).

1. If you want to submit the hydro pressure inspection request, click [![image-1651251564393.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651251564393.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651251564393.png) (Submit icon) in the ****Submission**** Otherwise click [![image-1651251581952.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651251581952.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651251581952.png) (Reject icon) to reject the request. Once you have submitted the hydro pressure inspection request, the **Request Status** column in the **RFI Hydro Pressure** page is appeared with [![image-1651251606585.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651251606585.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651251606585.png) (Approve and Reject icons).
2. If you want to approve the hydro pressure inspection request, click [![image-1651251658922.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651251658922.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651251658922.png) (Approve icon) in the **Request Status** Otherwise click [![image-1651251669174.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651251669174.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651251669174.png) (Reject icon) to reject the request. The hydro pressure inspection request will be moved for hydro pressure inspection.

#### **5.14.5 Add Results of Hydro Pressure Inspection**

After completing the hydro pressure inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click [![image-1651251727159.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651251727159.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651251727159.png) (Add icon) in the **Results** column of the respective request.
    
    The Result window opens a list of spools added for the particular request.
    
    [![image-1651251741652.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651251741652.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651251741652.png)
2. In the ****Result**** column, select the result of each spool from the given result options in the drop-down list.
3. In the ****Temperature**** column, enter the temperature value of each spool.
4. In the ****Start Time**** and ****End Time**** columns, enter the start and end times.
5. In the ****Hydrostatic Test Pressure**** column, enter the hydrostatic test pressure value.
6. In the ****Holding Time Duration**** column, enter the holding time duration.
7. In the ****Remarks**** column, enter your remarks if any.
8. In the ****Attachment**** column, you want to attach any document.
9. Click **Save**.

#### **5.14.6 View a Hydro Pressure Inspection Report**

If you want to view a hydro pressure inspection report, click [![image-1651287048018.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651287048018.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651287048018.png) (print icon) provided in the **Print** column of the **RFI Hydro Pressure** page. See Fig 5.14.

#### **5.14.7 Attach a File into a hydro pressure inspection Request** 

If you want o attach a file with any existing hydro pressure inspection request listed in the **RFI Hydro Pressure** page, you can attach the file by using [![image-1651287181565.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651287181565.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651287181565.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.14.8 View Signature Details of Inspectors**

You can view the sign details of the inspectors such as QA, Sub contractor, Client, and Owner, once they completed the hydro pressure inspection and submitted the inspection result details including their signature. To view the signature details, click [![image-1651287223020.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651287223020.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651287223020.png) (Sign icon) in the **Sign Details** column in the **RFI Hydro Pressure** page.

#### **5.14.9 Export Hydro Pressure Inspection Request List**

You can export a list of hydro pressure requests added in the **RFI Hydro Pressure** page in both the pdf and excel formats by using [![image-1651287259650.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651287259650.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651287259650.png) (**PDF** button) and [![image-1651287270024.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651287270024.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651287270024.png) (**Excel** button). To know how to export, see the topic, “[<u>**Export P&amp;ID list**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **5.14.10 Filter a Hydro Pressure Inspection Request**

If you want to filter any specific hydro pressure inspection request in the **RFI Hydro Pressure** page, you can use [![image-1651287313019.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651287313019.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651287313019.png) (**FILTER** button) located on the **RFI Hydro Pressure** page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **5.15 RFI Painting and Blasting**

The **RFI Painting and Blasting** tab in the **Inspection** menu helps you to add an inspection request for painting and blasting in the piping project. To navigate to the painting and blasting inspection request adding page,

1. Click **RFI Painting and Blasting** in the **Inspection** menu.
    
    The **Blasting and Painting Inspection Record** page opens.
    
    [![image-1651287371263.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651287371263.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651287371263.png)
    
     **Figure 5.15: Painting and blasting Inspection Request page**

#### **5.15.1 Add a Painting and Blasting Inspection Request**

If you want to add a new painting and blasting inspection request, do the following steps.

1. In the ****Sub Contractor Name**** box, select a sub-contractor from a drop-down list.
2. In the **Inspection Date** **and Time** box, select the date and time of painting and blasting inspection.
3. In the **Location** box, select the location where the painting and blasting inspection to be performed.
4. In the ****Drawing**** box, select a drawing from a drop-down list.
5. In the ****NDT Procedure**** box, select an NDT procedure from a drop-down list.
6. In the ****Coating P.O No**** box, enter the purchase order number of coating.
7. In the ****Shift**** box, enter the shit detail. Before saving the added painting and blasting request, you must add spools. You can add multiple spools for one painting and blasting request.
    
    [![image-1651287622339.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651287622339.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651287622339.png) **Note**: The page shows a list of added spools. If you want to view the specific spools, use the filter options provided in the **Line Number**, **Drawing Number**, and **Spool Number** columns.
8. Select the checkbox of the respective spool which you want to add.
9. In the **Prepared By** box, enter the name of a person who has prepared the painting and blasting request.
10. In the ****Prepared Date**** box, select the prepared date of the painting and blasting request.
11. In the ****Reviewed By**** box, enter the name of a person who has reviewed the painting and blasting request.
12. In the ****Reviewed Date**** box, select the reviewed date of the painting and blasting request.
13. In the ****Approved By**** box, enter the name of a person who has approved the painting and blasting request.
14. In the ****Approved Date**** box, select the approved date of the painting and blasting request.
15. In the **Remarks** box, enter your remarks if any.
16. Click **Send Request**.

The painting and blasting inspection request will be added and listed in the **Blasting and Painting Inspection List** page.


### **5.16 View Painting and Blasting**

The **View Painting and Blasting** tab helps you to view and edit the painting and blasting inspection request, which is added by using the **RFI Painting and Blasting** tab. This tab also allows you to add a new painting and blasting inspection request.

1. Click **View Painting and Blasting** in the **Inspection** menu.
    
    The **Blasting and Painting Inspection List** page opens with a list of added painting and blasting requests.
    
    [![image-1651287888234.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651287888234.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651287888234.png)
    
     **Figure 5.16: Blasting and Painting Inspection List page**

#### **5.16.1 Add a Painting and Blasting Inspection Request**

If you want to add a painting and blasting inspection request, do the following steps,

1. Click (**ADD** button) in the ****Blasting and Painting Inspection List**** page. The system redirects you to the **RFI Painting and Blasting** page to add a new painting and blasting inspection request. To know how to add a painting and blasting inspection request, See the topic, “[**<u>Add a Painting and Blasting Inspection Request</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.15.1-add-a-paintin)”.

Once you have added the painting and blasting inspection request, you must submit the added request to perform the painting and blasting inspection.

#### **5.16.2 Edit a Painting and Blasting Inspection Request** 

If you want to edit any existing painting and blasting inspection request in the **Blasting and Painting Inspection List page, do the following steps,

1. Click [![image-1651288073148.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651288073148.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651288073148.png) (Edit icon) in the **Edit** column for the respective painting and blasting inspection request. See Fig 5.16.
    
    The **RFI Painting and Blasting** page opens with the details of the selected painting and blasting inspection request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **5.16.3 Submit and Approve a Painting and Blasting Inspection Request**

Once you have added the painting and blasting inspection request, the **Submission** column in the **Blasting and Painting Inspection List** page is appeared with [![image-1651288752267.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651288752267.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651288752267.png) (Submit and Reject icons).

1. If you want to submit the painting and blasting inspection request, click [![image-1651288796183.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651288796183.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651288796183.png) (Submit icon) in the **Submission** Otherwise click [![image-1651288814438.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651288814438.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651288814438.png) (Reject icon) to reject the request. Once you have submitted the painting and blasting inspection request, the **Request Status** column in the **Blasting and Painting Inspection List** page is appeared with [![image-1651288827171.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651288827171.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651288827171.png)(Approve and Reject icons).
2. If you want to approve the painting and blasting inspection request, click [![image-1651288870796.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651288870796.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651288870796.png) (Approve icon) in the **Request Status** column. Otherwise click [![image-1651288880436.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651288880436.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651288880436.png) (Reject icon) to reject the request.
    
    The painting and blasting inspection request will be moved for painting and blasting inspection.

#### **5.16.4 Add RFI Data for Piping and Blasting Inspection**

If you want to add the details of RFI data for the added piping and blasting inspection request, do the following steps,

1. Click [![image-1651288950684.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651288950684.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651288950684.png)(Edit icon) in the ****RFI Data**** column of the ****Blasting and Painting Inspection List****  See Fig 5.16. The **RFI Inspection Request List** window opens.
    
    [![image-1651288975818.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651288975818.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651288975818.png)
2. In the ****Inspection From**** box, enter the detail from where the inspection should start.
3. In the ****Inspection To**** box, enter the detail to where the inspection should end.
4. In the ****Inspection Details**** option, select 1<sup>st</sup>Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the ****Others**** box, enter any other inspection related details.
6. In the ****Refer to Report No**** box, enter the report number for reference.
7. In the ****RFI Date**** box, choose the RFI date.
8. In the ****Inspection Result**** option, if the inspection result is accepted, select ****Accepted**** otherwise select ****Rejected****.
9. In the ****Remarks**** box, enter your remarks if any.
10. In the ****Inspected by**** box, enter the name of a person who has done inspection.
11. In the ****Inspected Date**** box, choose the date of inspection.
12. In the ****Witnessed By**** box, enter the name of the witnessed person.
13. In the ****Witnessed Date**** box, choose the date of witnessed.
14. In the ****PCML Rep Name**** box, enter the representative name of PCML.
15. In the ****PCML Rep Date**** box, choose the PCML rep date.
16. In the ****MEB Rep Name**** box, enter the representative name of MEB.
17. In the ****MEB Rep Date box****, choose MEB rep date.
18. Click ****Save****.

The RFI data for the painting and blasting inspection is added successfully.

#### **5.16.5 View a Painting and Blasting Inspection Report**

If you want to view a painting and blasting inspection report, click [![image-1651289673254.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651289673254.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651289673254.png) (print icon) provided in the **Print** column of the **Blasting and Painting Inspection List** page. See Fig 5.16.

#### **5.16.6 Attach a File into a Painting and Blasting Inspection Request** 

If you want to attach a file with any existing painting and blasting inspection request listed in the **Blasting and Painting Inspection List page, you can attach the file by using [![image-1651289717873.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651289717873.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651289717873.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.16.7 Export Painting and Blasting Inspection Request List**

You can export a list of painting and blasting requests added in the **Blasting and Painting Inspection List** page in both the pdf and excel formats by using [![image-1651290009919.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651290009919.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651290009919.png) (**PDF** button) and [![image-1651290023068.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651290023068.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651290023068.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **5.16.8 Filter a Painting and Blasting Inspection Request**

If you want to filter any specific painting and blasting inspection request in the **Blasting and Painting Inspection List** page, you can filter the request based on the **Spool No** filter box.

[![image-1651290067747.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651290067747.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651290067747.png)

#### **5.16.9 View a Painting and Blasting Summary Report**

If you want to view a painting and blasting summary report,

1. Click [![image-1651290126047.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651290126047.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651290126047.png)(print icon) provided in the upper side of the ******Blasting and Painting Inspection List****** page. The **Blasting &amp; Painting Summary Report** page opens.
2. In the ****ISO Drawing No**** box, select the ISO drawing number.
3. In the ****Spool No**** box, select the spool number.
4. Click ****Go****. The paining and blasting summary report detail opens.
    
    [![image-1651290187685.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651290187685.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651290187685.png)


### **5.17 Other Application for Inspection (AFI) Requests or RFI Request – PWHT/PMI/Hardness/Ferrite**

The **Other AFI Requests** tab in the **Inspection** menu helps you to add other AFI requests such as PWHT, PMI, Hardness and Ferrite requests.

1. Click **Other AFI Requests** in the **Inspection** menu. The **RFI Request for PWHT/PMI/Hardness/Ferrite** page opens.
    
    [![image-1651290253343.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651290253343.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651290253343.png)
    
     **Figure 5.17: RFI Request for PWHT/PMI/Hardness/Ferrite page**


#### **5.17 Add an AFI Request**

If you want to add an AFI request, do the following steps,

1. Click (**ADD** button) in the **RFI Request for PWHT/PMI/Hardness/Ferrite** page. The page opens a new window to add the details of the AFI request.
    
    [![image-1651290324578.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651290324578.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651290324578.png)
2. In the ****Requested By**** box, enter the name of a person who has requested the AFI inspection.
3. In the ****To**** box, select the sub-contractor for the AFI inspection.
4. In the **Location** box, select a location from a drop-down list.
5. In the ****Inspection Date and Time**** box, select the inspection date and time.
6. In the ****Requisition**** box, enter the requisition detail of the AFI inspection.
7. In the ****Drawing No**** box, select the drawing number from a drop-down list.
8. In the ****Designation**** box, enter the designation detail.
9. In the ****Cost Centre**** box, enter the cost centre detail.
10. In ****System**** box, select a system from a drop-down list.
11. In the ****Type**** box, select the type of AFI for which you want to add request.
12. In the ****Test Description**** box, enter the test description detail. Before saving the added request, you must add joints. You can add multiple joints for one request.
    
    [![image-1651290965332.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651290965332.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651290965332.png)**Note**: The page shows a list of added joints. If you want to view the joints for the specific isometric drawing, use the filter option.
    
    [![image-1651290979529.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651290979529.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651290979529.png)
13. Click [![image-1651290989725.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651290989725.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651290989725.png) (Add icon) of the respective joint which you want to add. The added joints will be moved to the right side of the page.
    
    [![image-1651291007916.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651291007916.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651291007916.png)
14. Click **Save**. The AFI inspection request will be added and listed in the **RFI Request for PWHT/PMI/ Hardness /Ferrite page. Once you have added the AFI inspection request, you must submit the added request to perform the respective inspection.

#### **5.17.2 Edit an AFI Inspection Request** 

If you want to edit any existing AFI inspection request in the **RFI Request for PWHT/PMI/ Hardness /Ferrite page, do the following steps,

1. Click [![image-1651291099821.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651291099821.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651291099821.png) (Edit icon) in the **Edit** column for the respective AFI request. See Fig 5.17.
    
    The page shows the details of the selected AFI request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **5.17.3 Submit and Approve an AFI Inspection Request**

Once you have added the AFI inspection request, the **Submission** column in the **RFI Request for PWHT/PMI/ Hardness /Ferrite** page is appeared with [![image-1651291175048.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651291175048.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651291175048.png) (Submit and Reject icons).

1. If you want to submit the AFI inspection request, click [![image-1651291235900.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651291235900.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651291235900.png)(Submit icon) in the ****Submission**** Otherwise click [![image-1651291244895.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651291244895.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651291244895.png) (Reject icon) to reject the request. Once you have submitted the AFI inspection request, the **Request Status** column in the **RFI Request for PWHT/PMI/ Hardness /Ferrite** page is appeared with (Approve and Reject icons).
2. If you want to approve the AFI inspection request, click [![image-1651291297042.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651291297042.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651291297042.png)(Approve icon) in the **Request Status** Otherwise click [![image-1651291311258.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651291311258.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651291311258.png)(Reject icon) to reject the request. The AFI inspection request will be moved for inspection.

#### **5.17.4 Add RFI Data for an AFI Inspection Request**

If you want to add the details of RFI data for the added AFI inspection request, do the following steps,

1. Click (Edit icon) in the **RFI Data** column of the **RFI Request for PWHT/PMI/ Hardness /Ferrite** page. See Fig 5.17. The **RFI Inspection Request List** window opens.
    
    [![image-1651294586880.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651294586880.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651294586880.png)
2. In the ****Inspection From**** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the **Inspection Details** option, select 1<sup>st</sup> Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the ****Others**** box, enter any other inspection related details.
6. In the ****Refer to Report No**** box, enter the report number for reference.
7. In the ****RFI Date**** box, choose the RFI date.
8. In the ****Inspection Result**** option, if the inspection result is accepted, select ****Accepted**** otherwise select ****Rejected****.
9. In the ****Remarks**** box, enter your remarks if any.
10. In the ****Inspected by**** box, enter the name of a person who has done inspection.
11. In the ****Inspected Date**** box, choose the date of inspection.
12. In the ****Witnessed By**** box, enter the name of the witnessed person.
13. In the ****Witnessed Date**** box, choose the date of witnessed.
14. In the ****PCML Rep Name**** box, enter the representative name of PCML.
15. In the ****PCML Rep Date**** box, choose the PCML rep date.
16. In the ****MEB Rep Date box****, choose MEB rep date.
17. Click ****Save****. The RFI data for the AFI inspection is added successfully.

#### **5.17.5 View an AFI Inspection Report**

If you want to view an AFI inspection report, click[![image-1651295130244.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651295130244.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651295130244.png) (print icon) provided in the **Print** column of the **RFI Request for PWHT/PMI/ Hardness /Ferrite** page. See Fig 5.17.

#### **5.17.6 Export AFI Inspection Request List**

You can export a list of AFI requests added in the **RFI Request for PWHT/PMI/ Hardness /Ferrite** page in both the pdf and excel formats by using (**PDF** button) and (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **5.17.7 Filter an AFI Inspection Request**

If you want to filter any specific AFI inspection request in the **RFI Request for PWHT/PMI/ Hardness /Ferrite** page, you can use [![image-1651295192194.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651295192194.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651295192194.png) (**FILTER** button) located on the **RFI Request for PWHT/PMI/ Hardness /Ferrite** page. To know how to filter, see the topic, “**[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)**”.


### **5.18 Painting &amp; Coasting FIR**

The **Painting Coasting FIR** tab in the Inspection menu helps you to add a painting &amp; coasting FIR.

To navigate to the painting and coating FIR adding page,

1. Click ****Painting Coasting FIR**** in the ****Inspection**** menu. The **Painting &amp; Coasting FIR** page opens.
    
    [![image-1651295417038.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651295417038.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651295417038.png)
    
     **Figure 5.18: Painting &amp; Coasting FIR page**

#### **5.18.1 Add a Painting and Coasting FIR**

If you want to add a new painting and coasting FIR, do the following steps.

1. In the **Sub Contractor Name** box, select a sub-contractor from a drop-down list.
2. In the **Inspection Date** **and Time** box, select the date and time of painting and blasting inspection.
3. In the ****Location**** box, select the location where the painting and coasting inspection to be performed.
4. In the ****Reference** **Drawing**** box, select a reference drawing from a drop-down list.
5. In the ****System**** box, select a system from a drop-down list.
6. In the ****No** **of Coat Applied**** box, enter the number of applied coating.
7. In the ****Shift**** box, enter the shift detail.
8. In the ****Specification**** box, enter the specification detail.
9. In the ****Job/Item Description**** box, enter the description for the job/item.
10. In the ****Painted Surface**** box, enter the painted surface detail.
11. In the ****Client Paint Specification**** box, enter the client paint specification detail.
12. In the ****Surface Preparation**** box, enter the surface preparation detail.
13. In the ****Painting/Coating Type**** box, enter the painting/coating type.
14. In the ****Visual Inspection**** box, enter the visual inspection detail.
15. In the ****Top Coat D.F.T**** box, enter the top coat detail.
16. In the ****Degree of Cured**** box, enter the degree of cured.
17. In the ****Pinhole Testing**** box, enter the pinhole testing detail.
18. In the ****Wet Sponge Method**** box, enter the wet sponge method detail.
19. In the ****Holiday Detection**** box, enter the holiday detection detail.
20. In the ****Brush Coil**** box, enter the brush coil detail.
21. In the ****V Setting (For Pipeline)****box, enter the K.V setting detail for pipeline. Before saving the added painting and coasting request, you must add spools. You can add multiple spools for one painting and coasting request.
    
    [![image-1651296172594.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651296172594.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651296172594.png)**Note**: The page shows a list of added spools. If you want to view the specific spools, use the filter options provided in the **Line Number**, **Drawing Number**, and **Spool Number** columns.
22. Select the checkbox of the respective spool which you want to add.
23. In the **Prepared By** box, enter the name of a person who has prepared the painting and coasting request.
24. In the ****Prepared Date**** box, select the prepared date of the painting and coasting request.
25. In the ****Reviewed By**** box, enter the name of a person who has reviewed the painting and coasting request.
26. In the ****Reviewed Date**** box, select the reviewed date of the painting and coasting request.
27. In the ****Approved By**** box, enter the name of a person who has approved the painting and coasting request.
28. In the **Approved Date** box, select the approved date of the painting and coasting request.
29. In the **Remarks** box, enter your remarks if any.
30. Click **Send Request**.

The painting and coasting inspection request will be added and listed in the **Panting and Coasting FIR** page.


### **5.19 View Painting &amp; Coasting FIR**

The **View Painting and Coasting** tab helps you to view and edit the painting and coasting FIR, which is added by using the **Painting &amp; Blasting FIR** tab. This tab also allows you to add a new painting and coasting inspection request.

1. Click **View Painting and Coasting** in the **Inspection** menu.
    
    The **Painting Coasting FIR** page opens with a list of added painting and coasting FIRs.
    
    [![image-1651296366319.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651296366319.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651296366319.png)
    
     **Figure 5.19: Painting Coasting FIR page**

#### **5.19.1 Add a Painting and Coasting FIR**

If you want to add a painting and coasting FIR, do the following steps,

1. Click [![image-1651296450154.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651296450154.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651296450154.png) (****ADD**** button) in the ****Painting Coasting FIR**** page. The system redirects you to the **Painting &amp; Coasting FIR** page to add a new painting and coasting request. To know how to add a painting and coasting inspection request, See the topic, “[**<u>Add a Painting and Coasting FIR</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.18.1%C2%A0add-a-paintin)”.

Once you have added the painting and coasting inspection request, you must submit the added request to perform the painting and coasting inspection.

#### **5.19.2 Edit a Painting and Coasting FIR** 

If you want to edit any existing painting and coasting inspection request in the **Painting Coasting FIR** page, do the following steps,

1. Click [![image-1651296571420.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651296571420.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651296571420.png)(Edit icon) in the **Edit** column for the respective painting and coasting inspection request. See Fig 5.19.
    
    The **Painting and Coasting FIR** page opens with the details of the selected painting and coasting inspection request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.19.3 Submit and Approve a Painting and coasting FIR**

Once you have added the painting and coasting inspection request, the **Submission** column in the **Painting Coasting FIR** page is appeared with [![image-1651296641794.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651296641794.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651296641794.png)(Submit and Reject icons).

1. If you want to submit the painting and coasting inspection request, click [![image-1651296694368.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651296694368.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651296694368.png) (Submit icon) in the **Submission** column. Otherwise click [![image-1651296710718.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651296710718.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651296710718.png) (Reject icon) to reject the request.
    
    Once you have submitted the painting and coasting inspection request, the **Request Status** column in the **Painting Coasting FIR** page is appeared with [![image-1651296791263.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651296791263.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651296791263.png) (Approve and Reject icons).
2. If you want to approve the painting and coasting inspection request, click [![image-1651296823161.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651296823161.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651296823161.png)(Approve icon) in the **Request Status** column. Otherwise click [![image-1651296832797.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651296832797.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651296832797.png) (Reject icon) to reject the request.
    
    The painting and coasting inspection request will be moved for painting and coasting inspection.

#### **5.19.4 Add RFI Data for Painting and Coasting Inspection**

If you want to add the details of RFI data for the added painting and coasting inspection request, do the following steps,

1. Click[![image-1651297402429.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651297402429.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651297402429.png) (Edit icon) in the ****RFI Data**** column of the ****Painting Coasting FIR****  See Fig 5.19. The **RFI Inspection Request List** window opens.
    
    [![image-1651297427253.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651297427253.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651297427253.png)
2. In the **Inspection From** box, enter the detail from where the inspection should start.
3. In the ****Inspection To**** box, enter the detail to where the inspection should end.
4. In the ****Inspection Details**** option, select 1<sup>st</sup>Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the ****Others**** box, enter any other inspection related details.
6. In the ****Refer to Report No**** box, enter the report number for reference.
7. In the ****RFI Date**** box, choose the RFI date.
8. In the ****Inspection Result**** option, if the inspection result is accepted, select ****Accepted**** otherwise select ****Rejected****.
9. In the ****Remarks**** box, enter your remarks if any.
10. In the ****Inspected by**** box, enter the name of a person who has done inspection.
11. In the ****Inspected Date**** box, choose the date of inspection.
12. In the ****Witnessed By**** box, enter the name of the witnessed person.
13. In the ****Witnessed Date**** box, choose the date of witnessed.
14. In the ****PCML Rep Name**** box, enter the representative name of PCML.
15. In the ****PCML Rep Date**** box, choose the PCML rep date.
16. In the ****MEB Rep Name**** box, enter the representative name of MEB.
17. In the ****MEB Rep Date box****, choose MEB rep date.
18. Click ****Save****. The RFI data for the painting and coasting inspection is added successfully.

#### **5.19.5 View an RFI Report**

If you want to view an RFI report, click [![image-1651297756957.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651297756957.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651297756957.png)(print icon) provided in the **RFI Report** column of the **Painting Coasting FIR** page. See Fig 5.19.

#### **5.19.6 View a Painting and Coasting FIR Report**

If you want to view a painting and coasting FIR report, click [![image-1651297807548.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651297807548.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651297807548.png) (print icon) provided in the **Print** column of the **Painting Coasting FIR** page. See Fig 5.19.

#### **5.19.7 Attach a File into a Painting and Coasting FIR**

If you want to attach a file with any existing painting and coasting inspection request listed in the **Painting Coasting FIR** page, you can attach the file by using (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.19.8 Export Painting and Coasting FIR List**

You can export a list of painting and coasting requests added in the **Painting Coasting FIR** page in both the pdf and excel formats by using [![image-1651297892649.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651297892649.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651297892649.png) (**PDF** button) and [![image-1651297901162.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651297901162.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651297901162.png) (**Excel** button). To know how to export, see the topic, “[<u>**Export P&amp;ID list**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **5.19.9 Filter a Painting and Coasting FIR**

If you want to filter any specific painting and coasting inspection request in the **Painting Coasting FIR** page, you can filter the request based on the **Spool No** filter box. [![image-1651297953730.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651297953730.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651297953730.png)


### **5.20 Final Inspection Report**

The **Final Inspection Report** tab in the **Inspection** menu helps you to add a final inspection report. To navigate to the final inspection report adding page,

1. Click **Final Inspection Report** in the **Inspection** menu.
    
    The **Final Inspection Report** page opens with a **Weld Map Drawing Detail** window.
    
    [![image-1651298030230.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651298030230.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651298030230.png) **Figure 5.20: Final Inspection Report page**

#### **5.20.1 Add a Final Inspection Report**

If you want to add a new final inspection report, do the following steps,

1. In the **Sub Contractor Name** box, select a sub-contractor from a drop-down list.
2. In the ****Inspection Date** **and Time**** box, select the date and time of final inspection.
3. In the ****Location**** box, select the location where the final inspection to be performed.
4. In the ****Paint System No**** box, enter the paint system number.
5. In the ****System/Area**** box, enter the system/area name.
6. In the ****Sub System No**** box, enter the sub system number.
7. In the ****Shift**** box, enter the shift detail.
8. In the ****Specification**** box, enter the specification detail.
9. In the ****Job/Item Description**** box, enter the description for the job/item.
10. In the ****Painted Surface**** box, enter the painted surface detail.
11. In the ****Client Paint Specification**** box, enter the client paint specification detail.
12. In the ****Surface Preparation**** box, enter the surface preparation detail.
13. In the ****Painting/Coating Type**** box, enter the painting/coating type.
14. In the ****Visual Inspection**** box, enter the visual inspection detail.
15. In the ****Top Coat D.F.T**** box, enter the top coat detail.
16. In the ****Degree of Cured**** box, enter the degree of cured.
17. In the ****Pinhole Testing**** box, enter the pinhole testing detail.
18. In the ****Wet Sponge Method**** box, enter the wet sponge method detail.
19. In the ****Holiday Detection**** box, enter the holiday detection detail.
20. In the ****Brush Coil**** box, enter the brush coil detail.
21. In the ****V Setting (For Pipeline)**** box, enter the K.V setting detail for pipeline.
22. In the ****No of Coat Applied**** box, enter the number of coats applied. Before saving the added final inspection request, you must add weld map drawing detail.
23. Click [![image-1651298457300.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651298457300.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651298457300.png) (**ADD** button) in the **Weld Map Drawing Detail** window. See Figure 5.19.
    
    The **Edit Form** window shows a new window to add the details of weld map drawing.
    
    [![image-1651298474872.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651298474872.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651298474872.png)
24. In the **Weld Map Drawing No** box, enter the weld map drawing number.
25. In the **Sheet No** box, enter the sheet number.
26. In the **Revision** box, enter the revision for the weld map drawing.
27. In the **Description** box, enter the description for the weld map drawing.
28. In the **Quantity** box, enter the quantity of the weld map drawing.
29. In the **Remarks** box, enter your remarks if any.
30. Click **Update**.
    
    The weld map drawing is updated.
31. In the ****Prepared By**** box, enter the name of a person who has prepared the final inspection request.
32. In the ****Prepared Date**** box, select the prepared date of the final inspection request.
33. In the ****Reviewed By**** box, enter the name of a person who has reviewed the final inspection request.
34. In the ****Reviewed Date**** box, select the reviewed date of the final inspection request.
35. In the ****Approved By**** box, enter the name of a person who has approved the final inspection request.
36. In the ****Approved Date**** box, select the approved date of the final inspection request.
37. In the **Remarks** box, enter your remarks if any.
38. Click **Send Request**. The final inspection request will be added and listed in the **Final Inspection Report** page.


### **5.21 View Final Inspection Report**

The **View Final Inspection Report** tab helps you to view and edit the final inspection request, which is added by using the **Final Inspection Report** tab. This tab also allows you to add a new final inspection request.

1. Click **View Final Inspection Report** in the **Inspection** menu.
    
    The **Final Inspection Report** page opens with a list of added final inspection reports.
    
    [![image-1651298703752.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651298703752.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651298703752.png) **Figure 5.21: View Final Inspection Report page**

#### **5.21.1 Add a Final Inspection Report**

If you want to add a final inspection report, do the following steps,

1. Click [![image-1651298840283.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651298840283.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651298840283.png) (**ADD** button) in the **View** **Final Inspection Report** page.
    
    The system redirects you to the **Final Inspection Report** page to add a new final inspection report. To know how to add a final inspection report, See the topic, “[**<u>Add a Final Inspection Report</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.20.1%C2%A0add-a-final-i)”.

Once you have added the final inspection report, you must submit the added report to perform the final inspection.

#### **5.21.2 Edit a Final Inspection Report**

If you want to edit any existing final inspection report in the **Final Inspection Report** page, do the following steps,

1. Click [![image-1651298970266.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651298970266.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651298970266.png) (Edit icon) in the **Edit** column for the respective final inspection report. See Fig 5.21.
    
    The **Final Inspection Report** page opens with the details of the selected final inspection report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.21.3 Submit and Approve a Final Inspection Report**

Once you have added the final inspection report, the **Submission** column in the **Final Inspection Report** page is appeared with [![image-1651299063545.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651299063545.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651299063545.png) (Submit and Reject icons).

1. If you want to submit the final inspection report, click [![image-1651299100573.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651299100573.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651299100573.png)(Submit icon) in the **Submission** column. Otherwise click [![image-1651299113955.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651299113955.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651299113955.png)(Reject icon) to reject the request.
    
    Once you have submitted the final inspection report, the **Request Status** column in the **Final Inspection Report** page is appeared with [![image-1651299143065.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651299143065.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651299143065.png)(Approve and Reject icons).
2. If you want to approve the final inspection report, click (Approve icon) in the ****Request Status**** Otherwise click (Reject icon) to reject the request. The final inspection report will be moved for final inspection.

#### **5.21.4 Add RFI Data for a Final Inspection Report**

If you want to add the details of RFI data for the added final inspection report, do the following steps,

1. Click [![image-1651299842353.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651299842353.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651299842353.png) (Edit icon) in the ****RFI Data**** column of the ****Final Inspection Report****  See Fig 5.21. The **RFI Inspection Request List** window opens.
    
    [![image-1651300057471.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651300057471.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651300057471.png)
2. In the ****Inspection From**** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the **Inspection To** box, enter the detail to where the inspection should end.
5. In the **Others** box, enter any other inspection related details.
6. In the ****Refer to Report No**** box, enter the report number for reference.
7. In the ****RFI Date**** box, choose the RFI date.
8. In the ****Inspection Result**** option, if the inspection result is accepted, select ****Accepted**** otherwise select ****Rejected****.
9. In the ****Remarks**** box, enter your remarks if any.
10. In the ****Inspected by**** box, enter the name of a person who has done inspection.
11. In the **Inspected Date** box, choose the date of inspection.
12. In the ****Witnessed By**** box, enter the name of the witnessed person.
13. In the ****Witnessed Date**** box, choose the date of witnessed.
14. In the ****PCML Rep Name**** box, enter the representative name of PCML.
15. In the ****PCML Rep Date**** box, choose the PCML rep date.
16. In the ****MEB Rep Name**** box, enter the representative name of MEB.
17. In the ****MEB Rep Date box****, choose MEB rep date.
18. Click ****Save****. The RFI data for the final inspection report is added successfully.

#### **5.21.5 View an RFI Report**

If you want to view an RFI report, click [![image-1651300381418.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651300381418.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651300381418.png) (print icon) provided in the **RFI Report** column of the **Final Inspection Report** page. See Fig 5.21.

#### **5.21.6 View a Final Inspection Report**

If you want to view a final inspection report, click [![image-1651300440368.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651300440368.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651300440368.png)(print icon) provided in the **Print** column of the **Final Inspection Report** page. See Fig 5.21.

#### **5.21.7 Attach a File into a Final Inspection Report**

If you want to attach a file with any existing final inspection report listed in the **Final Inspection Report** page, you can attach the file by using [![image-1651300515525.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651300515525.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651300515525.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.21.8 Export Final Inspection Report List**

You can export a list of final inspection reports added in the **Final Inspection Report** page in both the pdf and excel formats by using [![image-1651300568875.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651300568875.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651300568875.png) (**PDF** button) and [![image-1651300578458.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651300578458.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651300578458.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.


### **5.22 Generate Daily Pipe Welder Record (DPWR)**

The **Generate Daily Pipe Welder Record** tab in the **Inspection** menu helps you to generate a DPWR.

1. Click ****Generate Daily Pipe Welder Record**** in the ****Inspection**** menu. The **Daily Pipe Welder Record** page opens.
    
    [![image-1651300910465.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651300910465.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651300910465.png)
    
     **Figure 5.22: Daily Pipe Welder Record** **page**

The **Daily Pipe Welder Record** page shows the list of welding completed on each day including the details of the welder, location, and report type.

- In this page, the welding completed details are grouped based on the respective date.
- Each group has a maximum of 20 number of welding.
- Each group is separated by different group number.
- You can generate a report for each group individually by using the respective report generating option provided in the ****Daily** **Pipe** **Welder Record**** page.

2\. If you want to generate report of DPWR for any group or date, click [![image-1651301045470.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651301045470.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651301045470.png) (**Generate Report** button) of the respective group or date.

The generated reports will be moved to the [**<u>Daily </u><u>Pipe</u><u> Welder Record</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.23%C2%A0daily-pipe-weld) page. To view the generated reports, navigate to the [**<u>Daily Pipe Welder Record</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.23%C2%A0daily-pipe-weld) tab.


### **5.23 Daily Pipe Welder Record (DWPR)**

The **Daily Pipe Welder Record** tab in the **Inspection** menu helps you to view a DPWR report, which is generated using the **Generate** **Daily Pipe Welder Record** tab. To view the generated report,

1. Click ****Daily** **Pipe** **Welder Record**** in the ****Inspection**** menu. The **Daily Pipe Welder Record** page opens including the generated DPWR reports.
    
    [![image-1651301244398.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651301244398.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651301244398.png)
    
     **Figure 5.23: Daily Pipe Welder Record page**
    
    The generated DPWR reports are listed based on the welding date.
2. If you want to view the DPWR report for any particular date, click (Expand icon) of the respective date.
    
    The **Reports** window opens including the report number and report type.
3. Click [![image-1651301402867.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651301402867.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651301402867.png)(****Print**** icon) in the ******Print******  column. The Report will be opened.
    
    [![image-1651301449911.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651301449911.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651301449911.png)


### **5.24 Individual Pipe Welder Record**

The **Individual Pipe Welder Record** tab in the **Inspection** menu used to view the completed pipe welding details of each welder individually.

1. Click **Individual Pipe Welder Record** in the **Inspection** menu.
    
    The **Individual Pipe Welder Record** page opens.
    
    [![image-1651301719384.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651301719384.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651301719384.png)
    
     **Figure 5.24: Individual Pipe Welder Record page**
2. In the **Welder** box, select a welder from a drop-down list.
3. In the **Joint Category** box, select a joint category from the given option.
    
    The completed welding details of selected welder will be displayed.


#### **5.25 Weekly Welders Performance Record**

If you want to view the performance record of welders on weekly basis, navigate to the **Weekly Welders Performance Record** tab in the **Inspection** menu.

1. Click ****Weekly Welders Performance Record**** in the ****Inspection**** menu. The **Weekly Welders Performance Record** page opens.
    
    [![image-1651301904025.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651301904025.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651301904025.png)
    
     **Figure 5.25: Weekly Welders Performance Record page**
2. If you want to view the performance record of welders for all the projects, select the checkbox of the **All Project** option.
3. In the **NDT Type** box, select the NDT type from a drop-down list.
4. In the ****Joint Category**** box, select the joint category of pipe whether ****Shop****, ****Field****, or ****All**** from a drop-down list.
5. In the ****From Date**** and ****To Date**** boxes, select the from and to dates.
6. Click ****Show Report****. The performance record of welders will be opened.
    
    [![image-1651304259967.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304259967.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304259967.png)

#### **5.25.1 Print a Weekly Welders Performance Record**

If you want to print a weekly welders performance record, use [![image-1651304335454.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304335454.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304335454.png) and [![image-1651304353011.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304353011.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304353011.png) (print icons) provided in the **Weekly Welders Performance Record** page.

1. If you want to print the current page of the weekly welder performance record, click [ ![image-1651304377904.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304377904.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304377904.png) (print icon including the page number).
2. If you want to print all the pages of the weekly welder performance record, click[![image-1651304426762.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304426762.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304426762.png) (print icon).

#### **5.25.2 Export a Weekly Welders Performance Record**

You can export the weekly welders performance record in various formats by using the option [![image-1651304479763.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304479763.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304479763.png) provided in the upper right corner of the **Weekly Welders Performance Record** page.


### **5.26 RFI and AFI Excel Import**

The **RFI and AFI Excel Import** tab in the **Inspection** menu helps you to upload various data related with RFI and AFI for different fields included in the **Project Data** menu instead of uploading data for each field individually. If you want to import data for different fields, do the following,

1. Click the ****RFI and AFI Excel Import**** tab in the ******Inspection****** menu. The **File Upload** page opens.
    
    [![image-1651304582162.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304582162.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304582162.png)
2. Download a template by clicking [![image-1651304618715.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304618715.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304618715.png) (****TEMPLATE**** button) to enter the details of RFI and AFI data. An excel worksheet will be downloaded as a pre-defined template.
3. Enter the relevant details in the respective column of the excel worksheet based on the columns listed in the ****System Column**** field.
4. Click [![image-1651304673383.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304673383.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304673383.png) (****Choose File**** button). Once the file has been uploaded successfully, you receive a message, “**Successfully uploaded**”
5. Click [![image-1651304786081.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304786081.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304786081.png) (**Get Columns** button).
    
    The columns added in the excel worksheet will be listed in the **Excel Column** field.
6. Click [![image-1651304832151.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304832151.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304832151.png). The system automatically maps the **System Column** field and the **Excel Column** field and displays in the **Mapped Columns** field.
    
    [![image-1651304860355.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304860355.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304860355.png)
7. If you want to map any columns or to unmap any mapped columns, select the respective columns and then click [![image-1651304881413.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304881413.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304881413.png) (****Map**** button) and [![image-1651304899901.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304899901.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304899901.png) (****UnMap**** button) accordingly. [![image-1651304929038.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304929038.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304929038.png) **Note**: If you want to unmap all columns, click [![image-1651304946162.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304946162.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304946162.png).
8. Once you have completed the mapping and un mapping of columns, in the **Upload Range From** and **To** fields, enter the range of rows you want to upload from the excel worksheet.
    
    [![image-1651304997061.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651304997061.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651304997061.png)**Note**: In the **Total Rows** field, the system indicates the total number of rows filled in the excel worksheet.
    
    [![image-1651305018953.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651305018953.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651305018953.png) **Tip**: You must enter the upload starting range as two in the **Upload Range From** field because a first row in the excel worksheet is having heading of the columns.
9. Click [![image-1651305592173.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651305592173.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651305592173.png) (****Populate Value**** button).
10. Click [![image-1651305624416.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651305624416.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651305624416.png) (**Process** button).
    
    Once you have clicked the Process button, the system processes the columns and displays in the **Excel Import** page.
    
    [![image-1651305449362.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651305449362.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651305449362.png)
11. Click [![image-1651305474379.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651305474379.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651305474379.png) (****Import**** button) to import the data added in the excel worksheet.

#### **5.27 RFI and AFI Joint Status**

The **RFI and AFI Joint Status** tab in the **Inspection** menu used to view the RFI and AFI fit up and weld inspection completed status for the joints.

1. Click **RFI and AFI Joint Status** in the ****Inspection.****The **RFI and AFI Joints Status** page opens.
    
    [![image-1651310952534.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651310952534.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651310952534.png)
    
     **Figure 5.27: RFI and AFI Joints Status page**

You can view the status of the joints by selecting one of the below options given in the page.

- Joints – RFI Fit up completed &amp; Ready for AFI Fit up
- Joints – AFI Fit up completed &amp; Ready for RFI Weld VI
- Joints – RFI Weld VI completed &amp; Ready for AFI Weld VI

For example, if you select the **Joints – AFI Fit up completed &amp; Ready for RFI Weld VI** option, then the system shows the list of joints which has completed the AFI fit up and are ready for RFI weld VI.

#### **5.27.1 Export the RFI and AFI Joints Status**

You can export the joint status including a list of joints in the **RFI and AFI Joints Status** page in both the pdf and excel formats by using [![image-1651336086938.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651336086938.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651336086938.png) (**PDF** button) and [![image-1651336097442.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651336097442.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651336097442.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.


### **5.28 RFI and AFI Status**

The **RFI and AFI Status** tab in the **Inspection** menu used to view and check the status of the RFI and AFI inspection status.

1. Click ****RFI and AFI Status**** in the ******Inspection****** menu. The **RFI and AFI Status** page opens.
    
    [![image-1651336176679.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651336176679.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651336176679.png)
    
     **Figure 5.28: RFI and AFI Status page**
    
    The page shows the total number of added RFI and AFI inspection requests, and also shows the number of completed and outstanding inspections.

#### **5.28.1 Export the RFI and AFI Status**

You can export the RFI and AFI status in both the pdf and excel formats by using [![image-1651336488936.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651336488936.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651336488936.png) (**PDF** button) and [![image-1651336500232.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651336500232.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651336500232.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.


### **5.29 Threaded Joint Report**

The **Threaded Joint Report** tab in the **Inspection** menu used to view and update the completed status of the threaded joints.

1. Click ****Threaded Joint Report**** in the ****Inspection**** menu. The **Threaded Joints** page opens.
    
    [![image-1651336585220.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651336585220.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651336585220.png)
    
     **Figure 5.29: Threaded Joints page**
2. In the ****Status**** column, select the status of the joints. If you select **Pending,** the page shows the details of the joints which are pending.
3. Click ****Search****.
4. In the ****Complete**** column, if the particular joint has completed then enable the checkbox of the respective joint.
5. In the ****Completed by**** box, enter the name of a person who has completed the joint work.
6. In the ****Completed Date**** box, select the completed date of the joint work.

#### **5.29.1 Export a Threaded Joint Report**

You can export the threaded joint report in both the pdf and excel formats by using [![image-1651336729349.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651336729349.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651336729349.png) (**PDF** button) and [![image-1651336739411.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651336739411.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651336739411.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.


### **5.30 Welder Performance Report**

The **Welder Performance Report** tab in the **Inspection** menu used to view the performance report of each welder for a particular project.

1. Click **Welder Performance Report** in the **Inspection** menu.
    
    The **Welder Performance Report** page opens.
    
    [![image-1651336819421.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651336819421.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651336819421.png)
    
     **Figure 5.30: Welder Performance Report page**
2. In the ****Project**** box, select a project from a drop-down list.
3. In the ****From Date**** and ****To Date**** boxes, select the from and to dates.
4. In the ****Joint Type**** box, select the joint type.
5. Click ****Load Report****.. The performance report for the selected project will be opened.
    
    [![image-1651336901427.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651336901427.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651336901427.png)

#### **5.30.1 Print a Welder Performance Report**

If you want to print a welder performance report, use [![image-1651336946103.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651336946103.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651336946103.png)and [![image-1651336961637.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651336961637.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651336961637.png) (print icons) provided in the **Welder Performance Report** page.

1. If you want to print the current page of the welder performance report, click [![image-1651336984177.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651336984177.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651336984177.png) (print icon including the page number).
2. If you want to print all the pages of the welder performance report, click [![image-1651337034498.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651337034498.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651337034498.png)(print icon).

#### **5.30.2 Export a Welder Performance Report**

You can export the welder performance report in various formats by using the option [![image-1651337120307.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651337120307.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651337120307.png) provided in the upper right corner of the **Welder Performance Report** page.


### **5.31 Create Auto Fit up and Visual Request**

If you want to create the new fit up and visual requests in both RFI and AFI automatically, you can create by using the **Create Auto Fit up and Visual Request** tab in the **Inspection** menu.

1. Click ****Create Auto Fit up and Visual Request**** in the ****Inspection**** menu. The **RFI and AFI Create** page opens.
    
    [![image-1651337211459.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/scaled-1680-/image-1651337211459.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-04/image-1651337211459.png)
    
     **Figure 5.31: RFI and AFI Create page**
2. In the ****Sub Contractor Name**** box, select a sub-contractor.
3. In the ****Inspection Date and Time**** box, select the inspection date and time.
4. In the ****Location**** box, select the location.
5. In the ****Select RFI/AFI**** box, if you want to create the fit up or visual request, select ****Fit up**** or ****Visual****. If you want to create both fit up and visual, select ****Both****. The page shows the list of drawing numbers, sheet numbers, and spool numbers.
6. Select the checkbox of the respective drawing, sheet and spool number which you want to add for creating the request.
7. Click ****Generate****. The selected RFI and AFI request will be added and moved into the respective requests page.


### **5.32 Weld Rejection Statistics Record**

If you want to view the statistics report of weld rejection rate, navigate to the **Weld Rejection Statistics Record** tab in the **Inspection** menu.

1. Click **Weld Rejection Statistics Record** in the **Inspection** menu. The **Weld Rejection Statistics Report** page opens.
    
    [![image-1651416424177.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651416424177.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651416424177.png)
    
     **Figure 5.32: Weld Rejection Statistics Report page**
2. In the ****Sub Contractor**** box, select a sub-contractor from a list.
3. In the ****From Date**** and ****To Date**** boxes, select the from and to dates.
4. Click ******Load Report**.****The statistics report of the weld rejection rate will be displayed.
    
    [![image-1651416494666.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651416494666.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651416494666.png)

#### **5.32.1 Print a Weld Rejection Statistics Record**

If you want to print the weld rejection statistics details, use [![image-1651416542790.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651416542790.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651416542790.png)and [![image-1651416556751.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651416556751.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651416556751.png) (print icons) provided in the **Weld Rejection Statistics Report** page.

1. If you want to print the current page of the weld rejection statistics record, click (print icon including the page number).
2. If you want to print all the pages of the weld rejection statistics record, click [![image-1651416633546.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651416633546.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651416633546.png)(print icon).

#### **5.32.2 Export a Weld Rejection Statistics Record**

You can export the weld rejection statistics details in various formats by using the option [![image-1651416683351.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651416683351.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651416683351.png) provided in the upper right corner of the **Weld Rejection Statistics Report** page.


### **5.33 View Spool Contractor**

The **View Spool Contractor** tab in the **Inspection** menu used to view and add the details of the spool installation contractor.

1. Click **View Spool Contractor** in the **Inspection** menu.
    
    The **Spool Installation Contractor** page opens.
    
    [![image-1651416742295.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651416742295.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651416742295.png)
    
     **Figure 5.33: Spool Installation Contractor page**
2. In the **Sheet No/ Drawing No/ Revision** box, select the respective sheet, drawing and revision numbers.
    
    The list of spools for the selected drawing number opens.
3. Enter the contractor name for the respective spools in the ****Contractor Name****
4. Click ****Save Changes****.


### **5.34 RFI Mechanical Completion Request**

Mechanical completion takes place through all phases of the piping project, starting at equipment supplier and continuing through fabrication up to commissioning phase. Mechanical completion encompasses all disciplines. If you want to add an RFI mechanical completion request,

1. Click ****RFI Mechanical Completion Request**** in the ****Inspection**** menu. The **RFI Mechanical Completion Request** page opens.
    
    [![image-1651416989995.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651416989995.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651416989995.png)
    
     **Figure 5.34: RFI Mechanical Completion Request page**

#### **5.34.1 Add an RFI Mechanical Completion Request**

If you want to add an RFI mechanical completion request, do the following steps,

1. In the **Sub Contractor** box, select a sub-contractor from a drop-down list.
2. In the ****Inspection Date**** box, select the date of inspection.
3. In the ****Location**** box, enter the name of the location. Before saving the added RFI mechanical completion request, you must add a system. You can add multiple system for one request.
    
    [![image-1651417125530.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651417125530.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651417125530.png) **Note**: The page shows a list of added systems. If you want to view the specific system, use the **Search by Test Pack No** filter box or use the filter options provided in the **System**, **Sub System**, **Test Pack**, and **Check Records** columns.
4. Select the checkbox of the respective system which you want to add.
5. In the **Remarks** box, enter your remarks if any.
6. In the **Description** box, enter the description for the request.
7. In the **Work Scope** box, enter the work scope detail.
8. Click **Save**. The RFI mechanical completion request will be added and listed in the **View RFI Mechanical Completion** page.


### **5.35 View RFI Mechanical Completion**

The **View RFI Mechanical Completion** tab helps you to view and edit the RFI mechanical completion request, which is added by using the **RFI Mechanical Completion Request** tab. This tab also allows you to add a new RFI mechanical completion request.

1. Click ****View RFI Mechanical Completion**** in the ****Inspection**** menu. The **View RFI Mechanical Completion List** page opens with a list of added RFI mechanical completion requests.
    
    [![image-1651417447008.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651417447008.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651417447008.png)
    
     **Figure 5.35: View RFI Mechanical Completion List page**

#### **5.35.1 Add an RFI Mechanical Completion Request**

If you want to add an RFI mechanical completion request, do the following steps,

1. Click (****ADD**** button) in the ****View RFI Mechanical Completion List**** page. The system redirects you to a new page to add a new RFI mechanical completion request. To know how to add an RFI mechanical completion request, See the topic, “[**<u>Add an RFI Mechanical Completion Request</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.34.1%C2%A0add-an-rfi-me)”.

Once you have added the RFI mechanical completion request, you must submit the added request to perform mechanical completion inspection.

#### **5.35.2 Edit an RFI Mechanical Completion Request** 

If you want to edit any existing mechanical completion request in the **View RFI Mechanical Completion List** page, do the following,

1. Click [![image-1651418870378.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651418870378.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651418870378.png) (Edit icon) in the ****Edit**** column for the respective RFI mechanical completion request. See Fig 8.35. The **RFI Mechanical Completion Request** page opens with the details of the selected RFI mechanical completion request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **5.35.3 Submit and Approve an RFI Mechanical Completion Request**

Once you have added the RFI mechanical completion request, the **Submission** column in the **RFI Mechanical Completion Request** page is appeared with [![image-1651418959326.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651418959326.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651418959326.png)(Submit and Reject icons).

1. If you want to submit the mechanical completion request, click [![image-1651418988857.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651418988857.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651418988857.png) (Submit icon) in the ****Submission**** Otherwise click [![image-1651419010008.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651419010008.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651419010008.png) (Reject icon) to reject the request.
    
    Once you have submitted the mechanical completion request, the **Request Status** column in the **View RFI Mechanical Completion List** page is appeared with [![image-1651419042833.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651419042833.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651419042833.png) (Approve and Reject icons).
2. If you want to approve the mechanical completion request, click [![image-1651419111744.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651419111744.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651419111744.png)(Approve icon) in the ****Request Status**** Otherwise click [![image-1651419129412.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651419129412.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651419129412.png) (Reject icon) to reject the request.

The mechanical completion request will be moved for mechanical completion inspection.

#### **5.35.4 Add Results of Mechanical Completion Inspection**

After completing the mechanical completion inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click [![image-1651419228291.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651419228291.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651419228291.png)(Add icon) in the **Results** column of the respective request.
    
    The Result window opens a list of test pack added for the particular request.
    
    [![image-1651419244562.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651419244562.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651419244562.png)
2. In the ****Result**** column, select the result of each test pack from the given result options in the drop-down list.
3. In the ****Remarks**** column, enter your remarks if any.
4. Click ****Approve All &amp;**** ****Save****.

#### **5.35.5 View a Mechanical Completion Inspection Report**

If you want to view a mechanical completion inspection report, click [![image-1651419343803.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651419343803.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651419343803.png)(print icon) provided in the **Print** column of the **View RFI Mechanical Completion List** page. See Fig 5.35.

#### **5.35.6 Attach a File into a Mechanical Completion inspection Request** 

If you want to attach a file with any existing mechanical completion inspection request listed in the **View RFI Mechanical Completion List** page, you can attach the file by using [![image-1651419396286.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651419396286.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651419396286.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.35.7 Export Mechanical Completion Inspection Request List**

You can export a list of mechanical completion inspection requests added in the **View RFI Mechanical Completion List** page in both the pdf and excel formats by using [![image-1651419463880.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651419463880.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651419463880.png) (**PDF** button) and [![image-1651419476238.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651419476238.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651419476238.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **5.35.8 Filter a Mechanical Completion Inspection Request**

If you want to filter any specific mechanical completion inspection request in the **View RFI Mechanical Completion List** page, you can use [![image-1651419532888.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651419532888.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651419532888.png) (**FILTER** button) located on the **View RFI Mechanical Completion List page. To know how to filter, see the topic, “**[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)**”.


### **5.36 RFI Static Commissioning**

Static Commissioning take place when Mechanical completion is completed for a system or part of a system. If you want to add an RFI static commissioning request,

1. Click **RFI Static Commissioning** in the **Inspection** menu. The **RFI Static Commissioning Request** page opens.
    
    [![image-1651419615186.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651419615186.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651419615186.png)
    
     **Figure 5.36: RFI Static Commissioning Request page**

#### **5.36.1 Add an RFI Static Commissioning Request**

If you want to add an RFI static commissioning request, do the following steps,

1. In the **Sub Contractor** box, select a sub-contractor from a drop-down list.
2. In the **Inspection Date** box, select the date of inspection.
3. In the **Location** box, enter the name of the location.
    
    Before saving the added RFI static commissioning request, you must add a system. You can add multiple systems for one request.
    
    [![image-1651419760307.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651419760307.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651419760307.png) **Note**: The page shows a list of added systems. If you want to view the specific system, use the **Search by Test Pack No** filter box or use the filter options provided in the **System**, **Sub System**, **Test Pack**, and **Check Records** columns.
4. Select the checkbox of the respective system which you want to add.
5. In the **Remarks** box, enter your remarks if any.
6. In the **Description** box, enter the description for the request.
7. In the **Work Scope** box, enter the work scope detail.
8. Click **Save**.

The RFI mechanical completion request will be added and listed in the **View RFI Static Commissioning** page.


### **5.37 View RFI Static Commissioning**

The **View RFI Static Commissioning** tab helps you to view and edit the RFI static commissioning request, which is added by using the **RFI Static Commissioning** tab. This tab also allows you to add a new RFI static commissioning request.

1. Click ****View RFI Static Commissioning**** in the ******Inspection****** menu. The **View RFI Static Commissioning List** page opens with a list of added RFI static commissioning requests.
    
    [![image-1651420065662.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651420065662.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651420065662.png)
    
     **Figure 5.37: View RFI Static Commissioning List page**

#### **5.37.1 Add an RFI Static Commissioning Request**

If you want to add an RFI static commissioning request, do the following steps,

1. Click [![image-1651420210211.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651420210211.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651420210211.png) (****ADD**** button) in the ******View RFI Static Commissioning List page.******The system redirects you to a new page to add a new RFI static commissioning request. To know how to add an RFI static commissioning request, See the topic, “[**<u>Add an RFI Static Commissioning Request</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.36.1-add-an-rfi-st)”.

Once you have added the RFI static commissioning request, you must submit the added request to perform the static commissioning.

#### **5.37.2 Edit an RFI Static Commissioning Request** 

If you want to edit any existing static commissioning request in the **View RFI Static Commissioning List** page, do the following,

1. Click (Edit icon) in the **Edit** column for the respective RFI static commissioning request. See Fig 5.37.
    
    The **RFI Static Commissioning Request** page opens with the details of the selected RFI request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.37.3 Submit and Approve an RFI Static Commissioning Request**

Once you have added the RFI static commissioning request, the **Submission** column in the **RFI Static Commissioning Request** page is appeared with [![image-1651423781694.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651423781694.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651423781694.png)(Submit and Reject icons).

1. If you want to submit the static commissioning request, click [![image-1651423771606.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651423771606.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651423771606.png) (Submit icon) in the **Submission** column. Otherwise click [![image-1651423800885.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651423800885.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651423800885.png)(Reject icon) to reject the request.
    
    Once you have submitted the static commissioning request, the **Request Status** column in the **View RFI Static Commissioning List** page is appeared with [![image-1651423822281.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651423822281.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651423822281.png) (Approve and Reject icons).
2. If you want to approve the static commissioning request, click [![image-1651423854611.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651423854611.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651423854611.png)(Approve icon) in the ****Request Status**** Otherwise click [![image-1651423867916.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651423867916.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651423867916.png) (Reject icon) to reject the request. The static commissioning request will be moved for static commissioning inspection.

#### **5.37.4 Add Results of Static Commissioning Inspection**

After completing the static commissioning inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click [![image-1651423936644.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651423936644.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651423936644.png) (Add icon) in the **Results** column of the respective request.
    
    The Result window opens a list of system added for the particular request.
    
    [![image-1651423955896.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651423955896.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651423955896.png)
2. In the **Result** column, select the result of each system from the given result options in the drop-down list.
3. In the **Remarks** column, enter your remarks if any.
4. Click **Approve All &amp;** **Save**.

#### **5.37.5 View a Static Commissioning Inspection Report**

If you want to view a static commissioning inspection report, click [![image-1651424025434.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651424025434.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651424025434.png)(print icon) provided in the **Print** column of the **View RFI Static Commissioning List** page. See Fig 5.37.

#### **5.37.6 Attach a File into a Static Commissioning Inspection Request** 

If you want to attach a file with any existing static commissioning inspection request listed in the **View RFI Static Commissioning List** page, you can attach the file by using [![image-1651424068516.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651424068516.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651424068516.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.37.7 Export Static Commissioning Inspection Request List**

You can export a list of static commissioning inspection requests added in the **View RFI Static Commissioning List** page in both the pdf and excel formats by using [![image-1651424111522.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651424111522.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651424111522.png) (**PDF** button) and [![image-1651424120464.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651424120464.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651424120464.png) (**Excel** button). To know how to export, see the topic, “[<u>**Export P&amp;ID list**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **5.37.8 Filter a Static Commissioning Inspection Request**

If you want to filter any specific static commissioning inspection request in the **View RFI Static Commissioning List** page, you can use [![image-1651424170119.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651424170119.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651424170119.png) (**FILTER** button) located on the **View RFI Static Commissioning List page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **5.38 RFI Fit up Generic**

The **RFI Fit up Request Generic** tab in the **Inspection** menu helps you to add a generic RFI fit up request.

1. Click **RFI Fit up Request Generic** in the **Inspection** menu.
    
    The **RFI Fit up Request Generic** page opens.
    
    [![image-1651424242470.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651424242470.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651424242470.png)
    
    [![image-1651424250282.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651424250282.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651424250282.png)
    
     **Figure 5.38: RFI Fit up Request Generic page**

#### **5.38.1 Add an RFI Fit up Request Generic**

If you want to add an RFI fit up request generic, do the following,

1. Click [![image-1651424343469.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651424343469.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651424343469.png) (**ADD** button) in the **RFI Fit up Request Generic** page. A new window opens to add an RFI fit up request generic.
    
    [![image-1651424374653.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651424374653.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651424374653.png)
    
    [![image-1651424383656.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651424383656.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651424383656.png)**Tip**: A report number for a new RFI fit up request generic will be updated automatically in the **Report Number** box.
2. In the **Description** box, enter the description for the RFI fit up request generic.
3. In the **System** box, select a system from a drop-down list.
4. In the **Inspection Date** box, choose the date of inspection.
5. In the **Frame No** box, enter the frame number.
6. In the **Elevation** box, enter the elevation value.
7. In the **Longitudinal** box, enter the longitudinal value.
8. In the **Location** box, enter the location where the inspection to be done.
9. In the **Drawing No** box, select the drawing number from a drop-down list.
10. In the **Sub Contractor** box, select the sub-contractor from a drop-down list.
11. In the **Remarks** box, enter your remarks if any.
12. Click **Save**. The RFI fit up request generic is inserted successfully. Once you have added the RFI fit up request generic, you must add the RFI data for the added request.

#### **8.38.2 Add RFI data for an Added RFI Fit up Request Generic**

If you want to add RFI data for the added RFI fit up request generic, do the following,

1. Click [![image-1651424546968.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651424546968.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651424546968.png)(Edit icon) in the **RFI Data** column of the **RFI Fit up Request Generic** page. See Fig 5.38. The **RFI Inspection Request List** window opens.
    
    [![image-1651424570282.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651424570282.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651424570282.png)
2. In the **Inspection From** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the **Inspection Details** option, select 1<sup>st</sup> Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the **Others** box, enter any other inspection related details.
6. In the **Refer to Report No** box, enter the report number for reference.
7. In the **RFI Date** box, choose the RFI date.
8. In the Inspection Result option, if the inspection result is accepted, select **Accepted** otherwise select **Rejected**.
9. In the **Remarks** box, enter your remarks if any.
10. In the **Inspected by** box, enter the name of a person who has done inspection.
11. In the **Inspected Date** box, choose the date of inspection.
12. In the **Witnessed By** box, enter the name of the witnessed person.
13. In the **Witnessed Date** box, choose the date of witnessed.
14. In the **PCML Rep Name** box, enter the representative name of PCML.
15. In the **PCML Rep Date** box, choose the PCML rep date.
16. In the **MEB Rep Name** box, enter the representative name of MEB.
17. In the **MEB Rep Date box**, choose MEB rep date.
18. Click **Save**. The RFI data is successfully added.

#### **5.38.3 Clone an RFI Fit up Request Generic** 

The **Clone** option in the **RFI Fit up Request Generic** page used to create a RFI weld VI generic request in the [**<u>RFI Weld VI Generic</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.39-rfi-weld-vi-gen) page, as a copy of RFI fit up request generic, See Fig 5.39.

If you click [![image-1651425124423.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651425124423.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651425124423.png) (Clone icon) in the **Clone** column of the **RFI Fit up Request Generic** page, an RFI weld VI generic request is added in the **RFI weld VI generic** page.

[![image-1651425139612.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651425139612.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651425139612.png)**Tip**: You can create multiple copies of RFI weld VI generic request for a single RFI fit up request generic.

#### **5.38.4 Print an RFI Report**

If you want to print an RFI report, click [![image-1651425274307.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651425274307.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651425274307.png) (print icon) provided in the **RFI** **Report** column of the **RFI Fit up Request Generic** page. See Fig 5.38.

#### **5.38.5 Submit an RFI Fit up Request Generic**

Once you have added the RFI fit up request generic, the **Submission** column in the **RFI Fit up Request Generic** page is appeared with [![image-1651425316951.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651425316951.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651425316951.png)(Submit and Reject icons).

1. If you want to submit the RFI fit up request generic, click [![image-1651425337798.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651425337798.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651425337798.png)(Submit icon) in the **Submission** Otherwise click [![image-1651425351825.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651425351825.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651425351825.png) (Reject icon) to reject the request.

#### **5.38.6 Print an RFI Fit up Request Generic Report**

If you want to print an RFI fit up request generic report, click [![image-1651425421742.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651425421742.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651425421742.png)(print icon) provided in the **Report** column of the **RFI Fit up Request Generic** page. See Fig 5.38.

#### **5.38.7 Attach a File into an RFI Fit up Request Generic**

If you want to attach any file with any RFI fit up request generic added in the **RFI Fit up Request Generic page, you can attach the file by using [![image-1651425478937.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651425478937.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651425478937.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.38.8 View Signature Details of QA User, Surveyor, and Client** 

Once the RFI fit up inspection has completed, the QA, surveyor, and client add their signature based on their corresponding roles. You can view their signature by using[![image-1651425527501.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651425527501.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651425527501.png) (Sign icon) in the **Sign Details** column in the **RFI Fit up Request Generic** page.

#### **5.38.9 Edit an RFI Fit up Request Generic**

If you want to edit any existing RFI weld VI generic in the **RFI Weld VI Generic** page, do the following,

1. Click[![image-1651425695691.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651425695691.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651425695691.png)(Edit icon) in the **Edit** column for the respective RFI weld VI generic. See Fig 5.39. A new window opens to edit the RFI weld VI generic.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.38.10 Export RFI Weld VI Generic List**

You can export a list of RFI weld VI generic added in the **RFI Weld VI Generic** page in the pdf and excel formats by using [![image-1651425771131.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651425771131.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651425771131.png) (**PDF** button) and [![image-1651425783009.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651425783009.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651425783009.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **5.38.11 Filter an RFI Weld VI Generic**

If you want to filter any RFI weld VI generic from the list of RFI weld VI generic in the **RFI Weld VI Generic** page, you can use [![image-1651425823936.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651425823936.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651425823936.png) (**FILTER** button) located on the **View RFI Mechanical Completion List page. To know how to filter, see the topic, “**[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)**”.

### **5.39 RFI Weld VI Generic**

Once the RFI fit up inspection process has completed, the materials are moved for weld inspection process. The **RFI Weld VI Generic** tab in the **Inspection** menu helps you to add a generic RFI weld VI request.

1. Click **RFI Weld VI Generic** in the **Inspection** menu.
    
    The **RFI Weld VI Generic** page opens.
    
    [![image-1651688032861.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651688032861.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651688032861.png)
    
    [![image-1651688043418.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651688043418.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651688043418.png)
    
    [![image-1651688057432.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651688057432.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651688057432.png)
    
     **Figure 5.39: RFI Weld VI Generic page**

#### **5.39.1 Add an RFI Weld VI Generic** 

If you want to add an RFI weld VI generic, do the following,

1. Click [![image-1651690492306.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651690492306.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651690492306.png) (**ADD** button) in the **RFI Weld VI Generic** page. A new window opens to add an RFI weld VI generic.
    
    [![image-1651690514499.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651690514499.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651690514499.png)
    
    [![image-1651690534288.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651690534288.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651690534288.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651690550149.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651690550149.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651690550149.png) **Tip**: A report number for a new RFI weld VI generic will be updated automatically in the **Report Number** box.
2. In the **Description** box, enter the description for the RFI weld VI generic.
3. In the **System** box, select a system from a drop-down list.
4. In the **Inspection Date** box, choose the date of inspection.
5. In the **Frame No** box, enter the frame number.
6. In the **Elevation** box, enter the elevation value.
7. In the **Longitudinal** box, enter the longitudinal value.
8. In the **Location** box, enter the location where the inspection to be done.
9. In the **Drawing No** box, select the drawing number from a drop-down list.
10. In the **Sub Contractor** box, select the sub-contractor from a drop-down list.
11. In the **Remarks** box, enter your remarks if any.
12. Click **Save**.

The RFI weld VI generic is added successfully. Once you have added the RFI weld VI generic, you must add the RFI data for the added request.

#### **5.39.2 Add RFI data for RFI Weld VI Generic**

If you want to add RFI data for the added RFI weld VI generic, do the following,

1. Click [![image-1651691833242.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651691833242.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651691833242.png)(Edit icon) in the **RFI Data** column of the **RFI Weld VI Generic** page. See Fig 5.39. The **RFI Inspection Request List** window opens.
    
    [![image-1651691864240.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651691864240.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651691864240.png)
2. In the **Inspection From** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the ****Inspection Details**** option, select 1<sup>st</sup>Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the **Others** box, enter any other inspection related details.
6. In the **Refer to Report No** box, enter the report number for reference.
7. In the **RFI Date** box, choose the RFI date.
8. In the Inspection Result option, if the inspection result is accepted, select **Accepted** otherwise select **Rejected**.
9. In the **Remarks** box, enter your remarks if any.
10. In the **Inspected by** box, enter the name of a person who has done inspection.
11. In the **Inspected Date** box, choose the date of inspection.
12. In the **Witnessed By** box, enter the name of the witnessed person.
13. In the **Witnessed Date** box, choose the date of witnessed.
14. In the **PCML Rep Name** box, enter the representative name of PCML.
15. In the **PCML Rep Date** box, choose the PCML rep date.
16. In the **MEB Rep Name** box, enter the representative name of MEB.
17. In the **MEB Rep Date box**, choose MEB rep date.
18. Click **Save**.

The RFI data is successfully added.

#### **5.39.3 Clone an RFI Weld VI Generic**

The **Clone** option in the **RFI Weld VI Generic** page used to create a vacuum test request, an air test request, a hydrostatic test request, and an NDT request, as a copy of RFI weld VI generic request.

1. Click [![image-1651692329078.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651692329078.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651692329078.png) (Clone icon) in the **Clone** column of the **RFI Weld VI Generic** page. The Clone box opens.
    
    [![image-1651692357401.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651692357401.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651692357401.png)
2. Select any test from the given list.
3. Click [![image-1651692384498.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651692384498.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651692384498.png) (**Add** button).
    
    A new request for the selected test will be added in the respective pages.

#### **5.39.4 Print an RFI Report**

If you want to print an RFI report, click[![image-1651693014480.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651693014480.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651693014480.png) (print icon) provided in the **RFI** **Report** column of the **RFI Weld VI Generic** page. See Fig 5.39.

#### **5.39.5 Submit an RFI Weld VI Generic**

Once you have added the RFI weld VI generic, the **Submission** column in the **RFI Weld VI Generic** page is appeared with[![image-1651693203082.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651693203082.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651693203082.png)(Submit and Reject icons).

1. If you want to submit the RFI weld VI generic, click[![image-1651693761189.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651693761189.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651693761189.png) (Submit icon) in the **Submission** Otherwise click[![image-1651693771139.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651693771139.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651693771139.png) (Reject icon) to reject the request.

#### **5.39.6 Print an RFI Weld VI Generic Report**

1. If you want to print an RFI weld VI generic report, click[![image-1651693864312.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651693864312.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651693864312.png)(print icon) provided in the **Report** column of the **RFI Weld VI Generic** See Fig 5.39.

#### **5.39.7 View Signature Details of QA User, Surveyor, and Client** 

Once the weld VI inspection has completed, the QA, surveyor, and client add their signature based on their corresponding roles. You can view their signature by using[![image-1651693985485.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651693985485.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651693985485.png)(Sign icon) in the **Sign Details** column in the **RFI Weld VI Generic** page.

#### **5.39.8 Attach a File into an RFI Weld VI Generic**

If you want to attach any file with any RFI weld VI generic added in the **RFI Weld VI Generic page, you can attach the file by using[![image-1651694073141.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651694073141.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651694073141.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.39.9 Edit an RFI Weld VI Generic**

If you want to edit any existing RFI weld VI generic in the **RFI Weld VI Generic** page, do the following,

1. Click[![image-1651694198554.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651694198554.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651694198554.png) (Edit icon) in the **Edit** column for the respective RFI weld VI generic. See Fig 5.39. A new window opens to edit the RFI weld VI generic.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.39.10 Export RFI Weld VI Generic List**

You can export a list of RFI weld VI generic added in the **RFI Weld VI Generic** page in the pdf and excel formats by using [![image-1651694318708.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651694318708.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651694318708.png)(**PDF** button) and [![image-1651694335286.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651694335286.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651694335286.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **5.39.11 Filter an RFI Weld VI Generic**

If you want to filter any RFI weld VI generic from the list of RFI weld VI generic in the **RFI Weld VI Generic** page, you can use[![image-1651694420929.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651694420929.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651694420929.png) (**FILTER** button) located on the **View RFI Mechanical Completion List page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.



### **5.40 NDT Inspection Generic**

NDT inspection used to find out welding defects of the materials. Once the fit up and welding process of the materials has completed, the materials will be moved for the NDT inspection. The currently following NDT inspection methods are RT, UT, MT, PT, Ultrasonic Thickness Gaging (UTG), Magnetic Particle Inspection (MPI) after load test, UT/MT, and PT after load test.

The **NDT Inspection Generic** tab in the **Inspection** menu helps you to add an NDT inspection generic. If you want to navigate the NDT inspection generic,

1. Click **NDT Inspection Generic** in the **Inspection** menu. The **NDT Inspection Generic** page opens.
    
    [![image-1651425901242.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651425901242.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651425901242.png)
    
    [![image-1651425909456.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651425909456.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651425909456.png)
    
    [![image-1651425918468.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651425918468.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651425918468.png)
    
     **Figure 5.40: NDT Inspection Generic page**

#### **5.40.1 Add an NDT Inspection Generic** 

If you want to add an NDT inspection generic, do the following,

1. Click [![image-1651425992025.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651425992025.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651425992025.png) (**ADD** button) in the **NDT Inspection Generic** page. A new window opens to add an NDT Inspection generic.
    
    [![image-1651426025961.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651426025961.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651426025961.png)
    
    [![image-1651426037257.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651426037257.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651426037257.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651426056877.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651426056877.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651426056877.png) **Tip**: A report number for a new NDT inspection generic will be updated automatically in the **Report Number** box.
2. In the **Description** box, enter the description for the NDT inspection generic.
3. In the **System** box, select a system from a drop-down list.
4. In the **Inspection Date** box, choose the date of inspection.
5. In the **Frame No** box, enter the frame number.
6. In the **Elevation** box, enter the elevation value.
7. In the **Longitudinal** box, enter the longitudinal value.
8. In the **Location** box, enter the location where the inspection to be done.
9. In the **Drawing No** box, select the drawing number from a drop-down list.
10. In the **Designation** box, enter the designation detail.
11. In the **Cost Centre** box, enter the cost centre detail.
12. In the **Requisition** box, select the type of request from a drop-down list.
13. In the **Welding Position** box, enter the position of welding.
14. In the **Weld Type** box, enter the type of welding.
15. In the **Thickness** box, enter the thickness of the welding.
16. In the **Sub Contractor** box, select the sub-contractor from a drop-down list.
17. In the **Welder** box, select the name of a welder from a drop-down list.
18. In the **WPS** box, enter the WPS detail.
19. In the **Process** box, select the welding process to be done from a specified category.
20. In the **NDT Type** box, select the type of NDT to be done from a specified category.
21. In the **Remarks** box, enter your remarks if any.
22. Click **Save**.

The NDT inspection generic is added successfully. Once you have added the NDT inspection generic, you must add the RFI data for the added NDT inspection generic.

#### **5.40.2 Add RFI Data for NDT Inspection Generic**

If you want to add RFI data for the added NDT inspection generic, do the following,

1. Click [![image-1651426269187.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651426269187.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651426269187.png) (Edit icon) in the **RFI Data** column of the **NDT Inspection Generic**  See Fig 5.40. The **RFI Inspection Request List** window opens.
    
    [![image-1651426306146.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651426306146.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651426306146.png)
2. In the **Inspection From** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the **Inspection Details** option, select 1<sup>st</sup>Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the **Others** box, enter any other inspection related details.
6. In the **Refer to Report No** box, enter the report number for reference.
7. In the **RFI Date** box, choose the RFI date.
8. In the **Inspection Result** option, if the inspection result is accepted, select **Accepted** otherwise select **Rejected**.
9. In the **Remarks** box, enter your remarks if any.
10. In the **Inspected by** box, enter the name of a person who has done inspection.
11. In the **Inspected Date** box, choose the date of inspection.
12. In the **Witnessed By** box, enter the name of the witnessed person.
13. In the **Witnessed Date** box, choose the date of witnessed.
14. In the **PCML Rep Name** box, enter the representative name of PCML.
15. In the **PCML Rep Date** box, choose the PCML rep date.
16. In the **MEB Rep Name** box, enter the representative name of MEB.
17. In the **MEB Rep Date box**, choose MEB rep date.
18. Click **Save**. The RFI data is successfully added.

#### **5.40.3 Print an RFI Report**

If you want to print an RFI report, click [![image-1651426624774.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651426624774.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651426624774.png)(print icon) provided in the **RFI** **Report** column of the **NDT Inspection Generic** page. See Fig 5.40.

#### **5.40.4 Submit an NDT Inspection Generic**

Once you have added the NDT inspection generic, the **Submission** column in the **NDT Inspection Generic** page is appeared with[![image-1651426709164.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651426709164.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651426709164.png)(Submit and Reject icons).

1. If you want to submit the added NDT inspection generic, click [![image-1651426946998.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651426946998.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651426946998.png)(Submit icon) in the **Submission** column. Otherwise click [![image-1651426992565.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651426992565.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651426992565.png) (Reject icon) to reject the request.

#### **5.40.5 Print an NDT Inspection Generic Report**

If you want to print an NDT inspection generic report, click[![image-1651427028783.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427028783.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427028783.png) (print icon) provided in the **Report** column of the **NDT Inspection Generic** page. See Fig 5.40.

#### **5.40.6 View Signature Details of QA User, Surveyor, and Client** 

Once the NDT inspection has completed, the QA, surveyor, and client add their signature based on their corresponding roles. You can view their signature by using [![image-1651427075870.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427075870.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427075870.png) (Sign icon) in the **Sign Details** column in the **NDT Inspection Generic** page.

#### **5.40.7 Attach a File into an NDT Inspection Generic**

If you want to attach any file with any NDT inspection generic added in the **NDT Inspection Generic page, you can attach the file by using [![image-1651427127824.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427127824.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427127824.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.40.8 Edit an NDT Inspection Generic**

If you want to edit any existing NDT inspection generic in the **NDT Inspection Generic** page, do the following,

1. Click [![image-1651427188344.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427188344.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427188344.png)(Edit icon) in the **Edit** column for the respective NDT inspection generic. See Fig 5.40. A new window opens to edit the NDT inspection generic.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.40.9 Export NDT Inspection Generic List**

You can export a list of NDT inspection generic added in the **NDT Inspection Generic** page in the pdf and excel formats by using [![image-1651427268813.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427268813.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427268813.png) (**PDF** button) and [![image-1651427281553.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427281553.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427281553.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **5.40.10 Filter an NDT Inspection Generic**

If you want to filter any NDT inspection generic from the list of NDT inspection generic in the **NDT Inspection Generic** page, you can use [![image-1651427325711.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427325711.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427325711.png) (**FILTER** button) located on the **NDT Inspection Generic** page. To know how to filter, see the topic, “[<u>**Filter P&amp;ID**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **5.41 View RFI Fit up (Unique Numbers)**

The **View RFI Fit up** tab helps you to add a new RFI fit up request. This tab also allows you to view and edit the added RFI fit up request.

1. Click **View RFI Fit up** in the **Inspection** menu.
    
    The **RFI Fit up Requests List** page opens.
    
    [![image-1651427384134.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427384134.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427384134.png)
    
     **Figure 5.41: RFI Fit up Requests List page**

#### **5.41.1 Add an RFI Fit up Request**

If you want to add an RFI fit up request, do the following,

1. Click [![image-1651427486684.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427486684.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427486684.png) (**ADD** button) in the **RFI Fit up Requests List** page. A new page opens to add an RFI fit up request.
    
    [![image-1651427529650.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427529650.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427529650.png)
    
     **Figure 5.41.1: A page for adding an RFI fit up request**
    
    [![image-1651427557166.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427557166.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427557166.png) **Tip**: A report number and an RFI number for a new RFI fit up request will be updated automatically in the **Report Number** and the **RFI Number** boxes, respectively.
2. In the **Sub Contractor** box, select the name of a sub-contractor from a drop-down list.
3. In the **Inspection Date &amp; Time** box, select the date of inspection. [![image-1651427598014.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427598014.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427598014.png) **Note**: The fit up inspection date should not be later than the RFI weld visual inspection date.
4. In the **Location** box, enter the location detail.
5. In the **Description** box, enter the description for the inspection.
    
    [![image-1651427630404.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651427630404.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651427630404.png) **Note**: Before saving the added RFI fit up request, you must add the joints. You can add multiple joints for any added fit up request by using a box provided in the left side of the page.
6. Click **Save**.

#### **5.41.2 Add Joints for an RFI Fit up Request**

If you want to add joints for any added RFI fit up request, do the following steps,

[![image-1651431118087.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651431118087.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651431118087.png)

1. Click the check box of the respective joints.
2. Click [![image-1651431150888.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651431150888.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651431150888.png) (**Add Selected Joints** button). The selected joints are moved into the **Added Joints** box located in the right side of the page.
    
    [![image-1651431179627.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651431179627.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651431179627.png)
3. If you want to update the unique numbers and WPS number for any joint, click the **Unique No** and **WPS Number** columns for the respective joints and then enter the unique numbers and select the WPS number from a drop-down list.
4. Click **Save**.
    
    The selected joints are successfully added for the RFI fit up request.

#### **5.41.3 Import Multiple Joints for an RFI Fit up Request**

If you want to import multiple joints together, do the following,

1. Click [![image-1651431257723.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651431257723.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651431257723.png) (**TEMPLATE** button) on the **Added Joints** box.
    
    A template will be downloaded as an excel worksheet to enter the details of multiple joints.
    
    [![image-1651431274316.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651431274316.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651431274316.png)
2. Enter the relevant details in the required columns on the excel worksheet.
3. Once you have added the joint details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651431307320.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651431307320.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651431307320.png) (**IMPORT** button). A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651431333144.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651431333144.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651431333144.png)
5. Click [![image-1651431352044.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651431352044.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651431352044.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651431376049.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651431376049.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651431376049.png) (**Upload** button) to export the joints that are included in the excel worksheet.

The details of the joints in the worksheet will be displayed in the page.

The RFI fit up request is added successfully. Once you have added the RFI fit up request, you must submit the added request for inspection.

#### **5.41.4 Submit an RFI Fit up Request**

Once you have added the RFI fit up request, the **Request Status** column in the **RFI Fit up Requests List** page is appeared with [![image-1651431487236.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651431487236.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651431487236.png) (Submit and Reject icons). See Fig 5.41.

1. If you want to submit the RFI fit up request, click [![image-1651431518451.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651431518451.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651431518451.png)(Submit icon) in the **Request Status** Otherwise click [![image-1651431532974.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651431532974.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651431532974.png)(Reject icon) to reject the request.

#### **5.41.5 Change a Representative for Any RFI Fit up Request**

If you want to change a representative for any added RFI fit up request,

1. Click [![image-1651431593336.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651431593336.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651431593336.png) (Edit icon) in the **Representative** column for the respective RFI fit up request.
    
    The **Edit Form** window opens.
    
    [![image-1651431606643.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651431606643.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651431606643.png)
2. In the **Representative** box, enter the name of a representative.
3. Click **Save**.

#### **5.41.6 Print an RFI Fit up Report**

If you want to print an RFI fit up report, click [![image-1651432298538.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432298538.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432298538.png) (print icon) provided in the **Report** column of the **RFI Fit up Requests List** page. See Fig 5.41.

#### **5.41.7 Add Result for an Added RFI Fit up Request** 

Once you have fit up inspection, you can add the results. To add results,

1. Click [![image-1651432356265.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432356265.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432356265.png) (Add icon) in the **Results** column of the **RFI Fit up Requests List** page.
    
    The Result window opens.
    
    [![image-1651432370139.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432370139.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432370139.png)
2. If you want to check and update the unique number details for both the components, click [![image-1651432391933.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432391933.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432391933.png)(Edit icon) in the **Update Unique Number 1** and **Update Unique Number 2** columns and update.
3. If you want to update the WPS number, select the respective number in the **WPS** column and change the WPS number from a drop-down list.
4. If you want to update the result, select the respective result in the **Result** column from a drop-down list.
5. In the **Remarks** box, enter your remarks if any.
6. Click **Save changes**.

#### **5.41.8 Attach a File into an RFI Fit up Request** 

If you want to attach any file with any RFI fit up request listed in the **RFI Fit up Requests List page, you can attach the file by using [![image-1651432486195.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432486195.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432486195.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.41.9 Edit an RFI Fit up Request** 

If you want to edit any existing RFI fit up request in the **RFI Fit up Requests List** page, do the following,

1. Click [![image-1651432542926.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432542926.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432542926.png) (Edit icon) in the **Edit** column for the respective RFI fit up request. See Fig 5.41. A new page opens to edit the RFI fit up request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.41.10 Export RFI Fit up Request List**

You can export a list of RFI fit up request added in the **RFI Fit up Requests List** page in the pdf and excel formats by using [![image-1651432628555.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432628555.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432628555.png) (**PDF** button) and [![image-1651432638077.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432638077.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432638077.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **5.41.11 Filter an RFI Fit Up Request** 

If you want to filter any RFI fit up request from the list of RFI fit up requests in the **RFI Fit up Requests List** page, you can use [![image-1651432698911.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432698911.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432698911.png) (**FILTER** button). To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **5.42 View RFI Weld VI (Unique Numbers)**

The **View RFI Weld VI** tab helps you to add a new RFI weld VI request. This tab also allows you to view and edit the added RFI weld VI request.

1. Click **View RFI Weld VI** in the **Inspection** menu.
    
    The **RFI Weld Visual Request List** page opens.
    
    [![image-1651432752542.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432752542.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432752542.png)
    
     **Figure 5.42: RFI Weld Visual Request List page**

#### **8.42.1 Add an RFI Weld VI Request**

If you want to add an RFI weld VI request, do the following,

1. Click [![image-1651432818954.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432818954.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432818954.png) (**ADD** button) in the **RFI Weld Visual Request List** Page. A new page opens to add an RFI weld VI request.
    
    [![image-1651432853375.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432853375.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432853375.png)
    
    [![image-1651432862747.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432862747.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432862747.png) **Tip**: A report number and an RFI number for a new RFI weld VI request will be updated automatically in the **Report Number** and the **RFI Number** boxes, respectively.
2. In the **Sub Contractor** box, select the name of a sub-contractor from a drop-down list.
3. In the **Inspection Date &amp; Time** box, select the date of inspection.
4. In the **Location** box, enter the location detail. [![image-1651432929724.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651432929724.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651432929724.png)**Note**: Before saving the added RFI weld VI request, you must add the joints. You can add multiple joints for any added RFI weld VI request by using a box provided in the left side of the **RFI Weld Visual Request** page.
5. Click **Save**.

#### **5.42.2 Add Joints for an RFI Weld VI Request**

If you want to add joints for any added RFI weld VI request, do the following,

[![image-1651433001485.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433001485.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433001485.png)

1. In the **RFI Report Number** box, select an RFI report number from a drop-down list. A list of joints including the ISO drawing and spool numbers opens for the selected RFI report number.
2. Click the check box of the respective joints.
3. Click [![image-1651433045501.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433045501.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433045501.png) (**Add Selected Joints** button). The selected joints are moved into the **Added Joints** box located in the right side of the page.
    
    [![image-1651433073627.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433073627.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433073627.png)
4. If you want to update the WPS number for any joint, click the **WPS Number** column for the respective joints and then select the WPS number from a drop-down list.
5. If you want to update the welder details, click [![image-1651433107494.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433107494.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433107494.png) (Add icon) in the Welder Details column.
    
    The **Weld-Weld Layer- Weld Process** window opens.
    
    [![image-1651433130267.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433130267.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433130267.png)
6. In the **Date** box, select the date of adding welder details.
7. In the **Weld Process** column, select a weld process.
8. In the **Weld Position** column, select a weld position.
9. In the **Weld Layers** column, select a weld layer. A list of welders will be displayed in the **Welder Number/Name** column for the selected criteria.
10. Select a welder you want to add.
11. Click [![image-1651433209333.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433209333.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433209333.png)(**Add** button). The selected welder details will be listed below.
    
    [![image-1651433231832.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433231832.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433231832.png) **Note**: If you want to add welder details for the next joint, click [![image-1651433248649.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433248649.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433248649.png) (**Next Joint** button).
12. Click **Save**. The selected joints are successfully added for the RFI weld VI request.

#### **5.42.3 Import Multiple joints for an RFI Weld VI Request**

You can import multiple joints together by using a pre-defined excel template given in the application. If you want to import multiple joints together, do the following,

1. Click [![image-1651433312393.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433312393.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433312393.png) (**TEMPLATE** button) on the **Added Joints** box. A template will be downloaded as an excel worksheet to enter the details of multiple joints.
    
    [![image-1651433356628.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433356628.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433356628.png)
2. Enter the relevant details in the required columns on the excel worksheet.
3. Once you have added the joint details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651433392459.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433392459.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433392459.png) (**IMPORT** button). A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651433415504.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433415504.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433415504.png)
5. Click [![image-1651433524821.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433524821.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433524821.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651433552075.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433552075.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433552075.png) (**Upload** button) to export the joints that are included in the excel worksheet. The details of the joints in the worksheet will be displayed in the page.

The RFI weld VI request is added successfully. Once you have added the RFI weld VI request, you must submit the added request for inspection.

#### **5.42.4 Submit an RFI Weld VI Request**

Once you have added the RFI weld VI request, the **Request Status** column in the **RFI Weld Visual Request List** page is appeared [![image-1651433666499.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433666499.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433666499.png)with (Submit and Reject icons). See Fig 5.42.

1. If you want to submit the RFI weld VI request, click [![image-1651433684525.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433684525.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433684525.png)(Submit icon) in the **Request Status** column. Otherwise click [![image-1651433697946.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433697946.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433697946.png) (Reject icon) to reject the request.

#### **5.42.5 Add a Representative for Any RFI Weld VI Request**

If you want to add a representative for any added RFI weld VI request,

1. Click [![image-1651433749565.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433749565.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433749565.png)(Edit icon) in the **Representative** column for the respective RFI weld VI request. The **Edit Form** window opens.
    
    [![image-1651433764540.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433764540.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433764540.png)
2. In the **Representative** box, enter the name of a representative.
3. Click **Save**.

#### **5.42.6 Add Result for an RFI Weld VI Request**

If you want to add for the added RFI weld VI inspection request, do the following,

1. Click [![image-1651433832495.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433832495.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433832495.png)(Add icon) in the **Results** column of the **RFI Weld Visual Request List** page, for the respective RFI weld VI request. See Fig 5.42. A new window opens including the line, drawing number, joint number and WPS number including welder details for the respective RFI weld VI request.
    
    [![image-1651433867422.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433867422.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433867422.png)
2. If you want to update the welder details, click [![image-1651433900284.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651433900284.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651433900284.png) (Add icon) in the **Welder Details** column and update the welder details.
3. In the **Visual OD** column, select the result for visual OD.
4. In the **Visual ID** column, select the result for visual ID.
5. In the **Debris** column, select the result for debris.
6. In the **Drift** column, select the result for drift.
7. In the **Result** column, select the results from a drop-down list based on your inspection.
8. In the **Remarks** column, enter your remarks if any.
9. Click **Save**.

#### **5.42.7 Print an RFI Weld VI Request**

If you want to print an RFI weld VI report, click [![image-1651434038428.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651434038428.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651434038428.png)(print icon) provided in the **Report** column of the **RFI Weld Visual Request List** page. See Fig 5.42.

#### **5.42.8 Attach a File into an RFI Weld VI Request**

If you want to attach any file with any RFI weld VI request listed in the **RFI Weld Visual Request List** page, you can attach the file by using [![image-1651434098004.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651434098004.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651434098004.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.42.9 Edit an RFI Weld VI Request**

If you want to edit any existing RFI weld VI request in the **RFI Weld Visual Request List** page, do the following,

1. Click [![image-1651434341071.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651434341071.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651434341071.png)(Edit icon) in the **Edit** column for the respective RFI weld VI request. See Fig 5.42.
    
    A new page opens to edit the RFI weld VI request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.42.10 Export RFI Weld VI Request List**

You can export a list of RFI weld VI request added in the **RFI Weld Visual Request List** page in the pdf and excel formats by using [![image-1651434503796.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651434503796.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651434503796.png) (**PDF** button) and [![image-1651434514726.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651434514726.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651434514726.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **5.42.11 Filter an RFI Weld VI Request**

If you want to filter any RFI weld VI request from the list of RFI weld VI requests in the **RFI Weld Visual Request List** page, you can use [![image-1651434833853.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651434833853.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651434833853.png) (**FILTER** button). To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **5.43 View AFI Fit up (Unique Numbers)**

The **View AFI Fit up** allows you to add a new AFI fit up request. This tab also helps you to view and edit the added AFI fit up request.

1. Click **View AFI Fit up** in the **Inspection** menu.
    
    The **AFI Fit up Request List** page opens.
    
    [![image-1651434885483.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651434885483.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651434885483.png)
    
     **Figure 5.43: AFI Fit up Request List page**


#### **5.43.1 Add an AFI Fit up Request**

If you want to add an AFI fit up request, do the following,

1. Click [![image-1651434960555.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651434960555.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651434960555.png) (**ADD** button) in the **AFI Fit up Request List** page.
    
    The **AFI Fit up Inspection Request** page opens to add an AFI fit up request.
    
    [![image-1651434976662.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651434976662.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651434976662.png)

[![image-1651434991128.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651434991128.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651434991128.png)**Tip**: A report number and RFI number for a new AFI fit up request will be updated automatically in the **Report Number** and **RFI Number** boxes.

2. In the **Representative (AI)** box, enter representative name for the application inspection and enter their email id and contact number in the **Email** and **Contact No** boxes, respectively.
3. In the **Representative (Client)** box, enter representative name from the client and enter their email id and contact number in the **Email** and **Contact No** boxes, respectively.
4. In the **Inspection Date** box, select the date of inspection.
5. In the **Representative (Contractor)** box, enter representative name from the contractor and enter their email id and contact number in the **Email** and **Contact No** boxes, respectively.
6. In the **Location** box, enter the location detail.
7. In the **Remarks** box, enter your remarks if any.
8. In the **Inspection Item** box, enter the details of items to be inspected.
9. In the **Subject Coverage** box, enter the subject coverage detail.
    
    [![image-1651435176622.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651435176622.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651435176622.png)**Note**: Before saving the added AFI fit up request, you must add the joints. You can add multiple joints for any added fit up request by using a box provided in the left side of the page.
10. Click **Save**.
    
    Once you enter the details to add an AFI fit up request, a list of joints including the joint numbers, sheet numbers, and spool and drawing numbers opens.

#### **5.43.2 Add Joints for an AFI Fit up Request**

If you want to add joints for any added AFI fit up request, do the following,

1. Click the check box of the respective joints.
2. Click [![image-1651435266493.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651435266493.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651435266493.png) (**Add Selected Joints** button). The selected joints are moved into the **Added Joints** box located in the right side of the page.
    
    [![image-1651435295850.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651435295850.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651435295850.png)

The selected joints are successfully added for the AFI fit up request.

Once you have added the RFI fit up request, you must submit the added request for inspection.

#### **5.43.3 Submit an AFI Fit up Request**

Once you have added the AFI fit up request, the **Request Status** column in the **AFI Fit up Request List page is appeared with [![image-1651435383249.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651435383249.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651435383249.png) (Submit and Reject icons). See Fig 5.43.

1. If you want to submit the AFI fit up request, click [![image-1651435414597.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651435414597.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651435414597.png) (Submit icon) in the **Request Status** Otherwise click [![image-1651435447388.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651435447388.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651435447388.png) (Reject icon) to reject the request.

#### **5.43.4 Change Representative for Any AFI Fit up Request**

If you want to change the added representative for any AFI fit up request,

1. Click [![image-1651435491352.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651435491352.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651435491352.png)(Edit icon) in the **Representative** column for the respective AFI fit up request. The **Edit Form** window opens.
    
    [![image-1651435515203.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651435515203.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651435515203.png)
2. In the **Representative** box, edit the name of a representative.
3. Click **Save**.

#### **5.43.5 Print an AFI Fit up Report**

If you want to print an AFI fit up report, click [![image-1651435586901.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651435586901.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651435586901.png)(print icon) provided in the **Report** column of the **AFI Fit up Request List** page. See Fig 5.43.

#### **5.43.6 Add Result of AFI Fit up Inspection**

If you want to update results for the AFI fit up inspection request, do the following,

1. Click [![image-1651435649572.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651435649572.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651435649572.png) (Add icon) in the **Results** column of the **AFI Fit up Request List** page. A new window opens.
    
    [![image-1651435668711.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651435668711.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651435668711.png)
2. In the **Result** column, select the results of AFI inspection from a drop-down list, for the respective drawing and joint numbers.
3. In the **Remarks** column, enter your remarks if any.
4. Click **Save**.

#### **5.43.7 Attach a File into an AFI Fit up Request** 

If you want to attach any file with any AFI fit up request listed in the **AFI Fit up Request List page, you can attach the file by using [![image-1651435747491.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651435747491.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651435747491.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.43.8 Edit an AFI Fit up Request** 

If you want to edit any existing AFI fit up request in the **AFI Fit up Request List page, do the following,

1. Click [![image-1651435798588.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651435798588.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651435798588.png)(Edit icon) in the **Edit** column for the respective AFI fit up request. See Fig 5.43.
    
    A new page opens to edit the AFI fit up request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.43.9 Export AFI Fit up Request List**

You can export a list of AFI fit up request added in the **AFI Fit up Request List** page in the pdf and excel formats by using [![image-1651435875820.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651435875820.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651435875820.png) (**PDF** button) and [![image-1651435886053.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651435886053.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651435886053.png) **Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

### **8.44 View AFI Weld VI (Unique Numbers)**

The **View AFI Weld VI** allows you to add a new AFI weld VI request. This tab also helps you to view and edit the added AFI weld VI request.

1. Click **View AFI Weld VI** in the **Inspection** menu.
    
    The **AFI** **Weld Visual Request List** page opens.
    
    [![image-1651435967663.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651435967663.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651435967663.png)
    
     **Figure 5.44: AFI** **Weld Visual Request List page**

#### **8.44.1 Add an AFI Weld VI Request**

If you want to add an AFI weld VI request, do the following,

1. Click [![image-1651436297680.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651436297680.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651436297680.png) (**ADD** button) in the **AFI** **Weld Visual Request List** page.
    
    The **AFI Weld Visual Inspection Request** page opens to add an AFI weld VI request.
    
    [![image-1651436319326.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651436319326.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651436319326.png)
    
    [![image-1651436334902.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651436334902.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651436334902.png)**Tip**: A report number and RFI number for a new AFI weld VI request will be updated automatically in the **Report Number** and **RFI Number** boxes.
2. In the **Representative (AI)** box, enter representative name for the application inspection and enter their email id and contact number in the **Email** and **Contact No** boxes, respectively.
3. In the **Representative (Client)** box, enter representative name from the client and enter their email id and contact number in the **Email** and **Contact No** boxes, respectively.
4. In the **Inspection Date** box, select the date of inspection.
5. In the **Representative (Contractor)** box, enter representative name from the contractor and enter their email id and contact number in the **Email** and **Contact No** boxes, respectively.
6. In the **Inspection Item** box, enter the details of items to be inspected.
7. In the **Subject Coverage** box, enter the subject coverage detail.
8. In the **Remarks** box, enter your remarks if any. [![image-1651436436044.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651436436044.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651436436044.png) **Note**: Before saving the added AFI weld VI request, you must add the joints. You can add multiple joints for any added weld VI request by using a box provided in the left side of the page.
9. Click **Save**.

#### **5.44.2 Add Joints for an AFI Weld VI Request**

If you want to add joints for any added AFI weld VI request, do the following,

1. Click the check box of the respective joints.
2. Click [![image-1651436528886.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651436528886.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651436528886.png) (**Add Selected Joints** button). The selected joints are moved into the **Added Joints** box located in the right side of the page.
    
    [![image-1651436578437.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651436578437.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651436578437.png)
3. Click **Save**.

The selected joints are successfully added for the AFI weld VI request.

The AFI weld VI request is successfully added. Once you have added the AFI weld VI request, you must submit the added weld VI request for inspection.

#### **5.44.3 Submit an AFI Weld VI Request**

Once you have added the AFI weld VI request, the **Request Status** column in the **AFI** **Weld Visual Request List page is appeared with [![image-1651436719301.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651436719301.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651436719301.png)(Submit and Reject icons). See Fig 5.44.

1. If you want to submit the RFI weld VI request, click [![image-1651436746891.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651436746891.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651436746891.png)(Submit icon) in the **Request Status** Otherwise click [![image-1651436761124.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651436761124.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651436761124.png) (Reject icon) to reject the request.

#### **5.44.4 Change a Representative for Any AFI Weld VI Request**

If you want to change a representative for any added AFI weld VI request,

1. Click [![image-1651436823162.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651436823162.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651436823162.png) (Edit icon) in the **Representative** column for the respective AFI weld VI request. The **Edit Form** window opens.
    
    [![image-1651436848432.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651436848432.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651436848432.png)
2. In the **Representative** box, enter the name of a representative.
3. Click **Save**.

#### **5.44.5 Add Result for an AFI Weld VI Inspection**

If you want to add result for the added AFI weld VI inspection, do the following,

1. Click [![image-1651436934741.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651436934741.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651436934741.png) (Add icon) in the **Results** column of the **AFI** **Weld Visual Request List** page, for the respective AFI weld VI request. See Fig 5.44. A new window opens including the line, drawing numbers and joint number for the respective AFI weld VI request.
    
    [![image-1651436964255.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651436964255.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651436964255.png)
2. In the **Result** column, select the results from a drop-down list based on your inspection.
3. In the **Remarks** column, enter your remarks if any.
4. Click **Save**.

#### **5.44.6 Print an AFI Weld VI Report**

If you want to print an AFI weld VI report, click[![image-1651437040171.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651437040171.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651437040171.png) (print icon) provided in the **Report** column of the **AFI** **Weld Visual Request List** page. See Fig 5.44.

#### **5.44.7 Attach a file into an AFI weld VI request** 

If you want to attach any file with any AFI weld VI request listed in the **AFI** **Weld Visual Request List** page, you can attach the file by using [![image-1651437108192.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651437108192.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651437108192.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.44.8 Edit an AFI Weld VI Request** 

If you want to edit any existing AFI weld VI request in the **AFI** **Weld Visual Request List** page, do the following steps,

1. Click [![image-1651437163743.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651437163743.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651437163743.png) (Edit icon) in the **Edit** column for the respective AFI weld VI request. See Fig 5.44.
    
    A new page opens to edit the AFI weld VI request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.44.9 Export AFI Weld VI Request List**

You can export a list of AFI weld VI request added in the **AFI** **Weld Visual Request List** page in the pdf and excel formats by using[![image-1651437237289.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651437237289.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651437237289.png) (**PDF** button) and [![image-1651437255234.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651437255234.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651437255234.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **5.44.10 Filter an AFI weld VI request** 

If you want to filter any AFI weld VI request from the list of AFI weld VI requests in the **AFI** **Weld Visual Request List** page, you can use [![image-1651437302567.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651437302567.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651437302567.png) (**FILTER** button). To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **5.45 RFI Line Walk**

The **RFI Line Walk** tab in the **Inspection** menu is used to add a request for line walk inspection.

#### **5.45.1 Add a Line Walk Inspection Request**

If you want to add a line walk inspection request, do the following steps,

1. Click **RFI Line Walk** in the **Inspection** menu. The **RFI Line Walk** page opens.
    
    [![image-1651437403080.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651437403080.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651437403080.png)
    
     **Figure 5.45: RFI Line Walk page**
2. In the **Requested By** box, enter the name of a person who has requested the line walk inspection.
3. In the **Location** box, select the location where the inspection to be performed.
4. In the **Inspection Date &amp; Time** box, select the inspection date and time.
5. In the **Classification** box, enter the classification detail.
6. In the **System** box, select a system from a drop-down list.
7. In the **Sub Contractor** box, select a sub-contractor from a drop-down list.
8. In the **Acceptance Code** box, enter the acceptance code detail.
9. In the **Designation** box, enter the designation detail.
10. In the **Test Temperature** box, enter the test temperature value.
11. In the **Test Medium** box, select the test medium from the drop-down list.
12. In the **Drawing No** box, select the drawing number from a drop-down list.
13. In the **Work Scope** box, enter the work scope detail.
14. In the **Cost Centre** box, enter the cost centre detail.
15. In the **Holding Time**box, enter the holding time range.
16. In the **Pressure Gauge No** box, enter the pressure gauge number.
17. In the **Procedure No** box, enter the procedure number.
18. In the **Design Pressure** box, enter the design pressure range.
19. In the **Test Pressure** box, enter the test pressure range.
20. In the **Instrument** box, enter the instrument name.
21. In the **P&amp;ID No** box, enter the P&amp;ID number.
22. In the **Remarks** box, enter your remarks if any.
23. In the **Description** box, enter the description for the line walk inspection. Before saving the added line walk inspection request, you must add spools.
    
    [![image-1651437670438.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651437670438.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651437670438.png) **Note**: You can add multiple spools for one request.
    
    The **RFI Line Walk** page shows a list of added spools. If you want to view the spools for the specific ISO drawing, select the respective ISO drawing from a drop-down list.
    
    [![image-1651437719674.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651437719674.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651437719674.png)
24. Click [![image-1651437736378.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651437736378.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651437736378.png) (Add icon) of the respective spool which you want to add. The added spools will be moved to the right side of the page.
25. Click **Save Request**.

The line walk inspection request will be added and listed in the **RFI Line Walk Report** page.

### **5.46 View RFI Line Walk**

The **View RFI Line Walk** tab helps you to view and edit the line walk inspection request, which is added by using the **RFI Line Walk** tab. This tab also allows you to add a new line walk inspection request.

1. Click **View RFI Line Walk** in the **Inspection** menu. The **RFI Line Walk Report** page opens with a list of added line walk inspection requests.
    
    [![image-1651437863575.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651437863575.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651437863575.png)
    
     **Figure 5.46: RFI Line Walk Report page**

#### **5.46.1 Add a Line Walk Inspection Request**

If you want to add a line walk inspection request, do the following steps,

1. Click (**ADD** button) in the **RFI Line Walk Report** page. The system redirects you to a new page to add a new line walk inspection request. To know how to add a line walk inspection request, See the topic, “[**<u>Add a Line Walk Inspection Request</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.45.1%C2%A0add-a-line-wa)”.

Once you have added the line walk inspection request, you must submit the added request to perform the line walk inspection.

#### **5.46.2 Add Representative for a Line Walk Inspection Request**

If you want to add a representative for any added line walk inspection request,

1. Click (Edit icon) in the **Representative** column for the respective line walk inspection request. The **Edit Form** window opens.
    
    [![image-1651438066675.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651438066675.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651438066675.png)
2. In the **Representative** box, enter the name of a representative.
3. In the **Inspection Date** box, select the date of inspection.
4. In the **Remarks** box, enter your remarks if any.
5. Click **Save**.

#### **5.46.3 Edit a Line Walk Inspection Request**

If you want to edit any existing line walk inspection request in the **RFI Line Walk Report** page, do the following,

1. Click [![image-1651438150399.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651438150399.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651438150399.png)(Edit icon) in the **Edit** column for the respective line walk inspection request. See Fig 5.46. The **RFI Line Walk Report** page opens with the details of the selected line walk inspection request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.46.4 Submit and Approve a Line Walk Inspection Request**

Once you have added the line walk inspection request, the **Submission** column in the **RFI Line Walk Report** page is appeared with [![image-1651438223698.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651438223698.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651438223698.png)(Submit and Reject icons).

1. If you want to submit the line walk inspection request, click[![image-1651438265792.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651438265792.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651438265792.png)(Submit icon) in the **Submission** column. Otherwise click [![image-1651438284282.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651438284282.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651438284282.png) (Reject icon) to reject the request.
    
    Once you have submitted the line walk inspection request, the **Request Status** column in the **RFI Line Walk Report** page is appeared with[![image-1651438309416.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651438309416.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651438309416.png)(Approve and Reject icons).
2. If you want to approve the line walk inspection request, click [![image-1651438364790.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651438364790.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651438364790.png)(Approve icon) in the **Request Status** Otherwise click [![image-1651438389182.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651438389182.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651438389182.png) (Reject icon) to reject the request.

The line walk inspection request will be moved for line walk inspection.

#### **5.46.5 Add RFI Data for a Line Walk Inspection Request**

If you want to add RFI data for the added line walk inspection request, do the following,

1. Click [![image-1651438469907.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651438469907.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651438469907.png)(Edit icon) in the **RFI Data** column of the **RFI Line Walk Report**  See Fig 5.46. The **RFI Inspection Request List** window opens.
    
    [![image-1651438496650.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651438496650.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651438496650.png)
2. In the **Inspection From** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the **Inspection Details** option, select 1<sup>st</sup> Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the **Others** box, enter any other inspection related details.
6. In the **Refer to Report No** box, enter the report number for reference.
7. In the **RFI Date** box, choose the RFI date.
8. In the **Inspection Result** option, if the inspection result is accepted, select **Accepted** otherwise select **Rejected**.
9. In the **Remarks** box, enter your remarks if any.
10. In the **Inspected by** box, enter the name of a person who has done inspection.
11. In the **Inspected Date** box, choose the date of inspection.
12. In the **Witnessed By** box, enter the name of the witnessed person.
13. In the **Witnessed Date** box, choose the date of witnessed.
14. In the **PCML Rep Name** box, enter the representative name of PCML.
15. In the **PCML Rep Date** box, choose the PCML rep date.
16. In the **MEB Rep Name** box, enter the representative name of MEB.
17. In the **MEB Rep Date box**, choose MEB rep date.
18. Click **Save**.

The RFI data is successfully added.

#### **5.46.6 View an RFI Report**

If you want to view an RFI report, click [![image-1651438717825.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651438717825.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651438717825.png)(print icon) provided in the **RFI Report** column of the **RFI Line Walk Report** page. See Fig 5.46.

#### **5.46.7 Add Results of Line Walk Inspection**

After completing the line walk inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click [![image-1651438803823.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651438803823.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651438803823.png) (Add icon) in the **Results** column of the respective request. The Result window opens a list of spools added for the particular request.
    
    [![image-1651438824876.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651438824876.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651438824876.png)
2. In the **Result** column, select the result of each spool from the given result options in the drop-down list.
3. In the **Temperature** column, enter the temperature value of each spool.
4. In the **Start Time** and **End Time** columns, enter the start and end times.
5. Click **Save**.

#### **5.46.8 Attach a File into a Line Walk Inspection Request**

If you want to attach a file with any existing line walk inspection request listed in the **RFI Line Walk Report** page, you can attach the file by using [![image-1651438934559.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651438934559.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651438934559.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.46.9 Export Line Walk Inspection Request List**

You can export a list of line walk inspection requests added in the **RFI Line Walk Report** page in both the pdf and excel formats by using [![image-1651438983474.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651438983474.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651438983474.png) (**PDF** button) and [![image-1651438995767.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651438995767.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651438995767.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **5.46.10 Filter a Line Walk Inspection Request**

If you want to filter any specific line walk inspection request in the **RFI Line Walk Report** page, you can use [![image-1651439037389.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651439037389.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651439037389.png) (**FILTER** button) located on the **RFI Line Walk Report** page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.



### **5.47 RFI Flushing**

The **RFI Flushing** tab in the **Inspection** menu is used to add a request for pipe flushing inspection.

#### **5.47.1 Add a Flushing Inspection Request**

If you want to add a flushing inspection request, do the following steps,

1. Click **RFI Flushing** in the **Inspection** menu. The **RFI Flushing** page opens.
    
    [![image-1651439162179.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651439162179.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651439162179.png)
    
     **Figure 5.47: RFI Flushing page**
2. In the **Requested By** box, enter the name of a person who has requested the flushing inspection.
3. In the **Location** box, select the location where the inspection to be performed.
4. In the **Inspection Date &amp; Time**box, select the inspection date and time.
5. In the **Classification** box, enter the classification detail.
6. In the **System** box, select a system from a drop-down list.
7. In the **Sub Contractor** box, select a sub-contractor from a drop-down list.
8. In the **Acceptance Code** box, enter the acceptance code detail.
9. In the **Designation** box, enter the designation detail.
10. In the **Test Temperature** box, enter the test temperature value.
11. In the **Test Medium** box, select the test medium from the drop-down list.
12. In the **Drawing No** box, select the drawing number from a drop-down list.
13. In the **Work Scope** box, enter the work scope detail.
14. In the **Cost Centre** box, enter the cost centre detail.
15. In the **Holding Time** box, enter the holding time range.
16. In the **Pressure Gauge No** box, enter the pressure gauge number.
17. In the **Procedure No** box, enter the procedure number.
18. In the **Design Pressure** box, enter the design pressure range.
19. In the **Test Pressure** box, enter the test pressure range.
20. In the **Instrument** box, enter the instrument name.
21. In the **P&amp;ID No** box, enter the P&amp;ID number.
22. In the **Remarks** box, enter your remarks if any.
23. In the **Description** box, enter the description for the flushing inspection.
    
    Before saving the added flushing inspection request, you must add spools.
    
    [![image-1651439356347.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651439356347.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651439356347.png) **Note**: You can add multiple spools for one request.
    
    The **RFI Flushing** page shows a list of added spools. If you want to view the spools for the specific ISO drawing, select the respective ISO drawing from a drop-down list. [![image-1651439397100.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651439397100.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651439397100.png)
24. Click [![image-1651439408070.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651439408070.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651439408070.png)(Add icon) of the respective spool which you want to add. The added spools will be moved to the right side of the page.
25. Click **Save Request**.

The flushing inspection request will be added and listed in the **RFI Flushing Report** page.


### **5.48 View RFI Flushing**

The **View RFI Flushing** tab helps you to view and edit the flushing inspection request, which is added by using the **RFI Flushing** tab. This tab also allows you to add a new flushing inspection request.

1. Click **View RFI Flushing** in the **Inspection** menu. The **RFI Flushing Report** page opens with a list of added flushing inspection requests.
    
    [![image-1651439509180.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651439509180.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651439509180.png)
    
     **Figure 5.48: RFI Flushing Report page**

#### **5.48.1 Add a Flushing Inspection Request**

If you want to add a flushing inspection request, do the following steps,

1. Click [![image-1651439613769.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651439613769.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651439613769.png) (**ADD** button) in the **RFI Flushing Report** page.
    
    The system redirects you to a new page to add a new flushing inspection request. To know how to add a flushing inspection request, See the topic, “[**<u>Add a Flushing Inspection Request</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.47.1%C2%A0add-a-flushin)”.

Once you have added the flushing inspection request, you must submit the added request to perform the flushing inspection.

#### **5.48.2 Add Representative for a Flushing Inspection Request**

If you want to add a representative for any added flushing inspection request,

1. Click [![image-1651439689832.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651439689832.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651439689832.png)(Edit icon) in the **Representative** column for the respective flushing inspection request. The **Edit Form** window opens.
    
    [![image-1651439718130.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651439718130.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651439718130.png)
2. In the **Representative** box, enter the name of a representative.
3. In the **Inspection Date** box, select the date of inspection.
4. In the **Remarks** box, enter your remarks if any.
5. Click **Save**.

#### **5.48.3 Edit a Flushing Inspection Request**

If you want to edit any existing flushing inspection request in the **RFI Flushing Report** page, do the following,

1. Click[![image-1651439822540.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651439822540.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651439822540.png)(Edit icon) in the **Edit** column for the respective flushing inspection See Fig 5.48. The **RFI Flushing Report** page opens with the details of the selected flushing inspection request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.48.4 Submit and Approve a Flushing Inspection Request**

Once you have added the flushing inspection request, the **Submission** column in the **RFI Flushing Report** page is appeared with [![image-1651439907831.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651439907831.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651439907831.png)(Submit and Reject icons).

1. If you want to submit the flushing inspection request, click [![image-1651439944247.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651439944247.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651439944247.png)(Submit icon) in the **Submission** Otherwise click [![image-1651439960920.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651439960920.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651439960920.png)(Reject icon) to reject the request. Once you have submitted the flushing inspection request, the **Request Status** column in the **RFI Flushing Report** page is appeared with [![image-1651439989387.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651439989387.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651439989387.png)(Approve and Reject icons).
2. If you want to approve the flushing inspection request, click[![image-1651440012735.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651440012735.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651440012735.png) (Approve icon) in the **Request Status** Otherwise click [![image-1651440030261.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651440030261.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651440030261.png)(Reject icon) to reject the request.

The flushing inspection request will be moved for flushing inspection.

#### **5.48.5 Add RFI Data for a Flushing Inspection Request**

If you want to add RFI data for the added flushing inspection request, do the following,

1. Click [![image-1651440122290.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651440122290.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651440122290.png)(Edit icon) in the **RFI Data** column of the **RFI Flushing Report**  See Fig 5.48. The **RFI Inspection Request List** window opens.
    
    [![image-1651440158830.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651440158830.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651440158830.png)
2. In the **Inspection From** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the **Inspection Details** option, select 1<sup>st</sup>Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the **Others** box, enter any other inspection related details.
6. In the **Refer to Report No** box, enter the report number for reference.
7. In the **RFI Date** box, choose the RFI date.
8. In the **Inspection Result** option, if the inspection result is accepted, select **Accepted** otherwise select **Rejected**.
9. In the **Remarks** box, enter your remarks if any.
10. In the **Inspected by** box, enter the name of a person who has done inspection.
11. In the **Inspected Date** box, choose the date of inspection.
12. In the **Witnessed By** box, enter the name of the witnessed person.
13. In the **Witnessed Date** box, choose the date of witnessed.
14. In the **PCML Rep Name** box, enter the representative name of PCML.
15. In the **PCML Rep Date** box, choose the PCML rep date.
16. In the **MEB Rep Name** box, enter the representative name of MEB.
17. In the **MEB Rep Date box**, choose MEB rep date.
18. Click **Save**.

The RFI data is successfully added.

#### **5.48.6 View an RFI Report**

If you want to view an RFI report, click [![image-1651440450815.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651440450815.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651440450815.png)(print icon) provided in the **RFI Report** column of the **RFI Flushing Report** page. See Fig 5.48.

#### **5.48.7 Add Results of Flushing Inspection**

After completing the flushing inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click [![image-1651440497663.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651440497663.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651440497663.png) (Add icon) in the **Results** column of the respective request.
    
    The Result window opens a list of spools added for the particular request.
    
    [![image-1651440518343.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651440518343.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651440518343.png)
2. In the **Result** column, select the result of each spool from the given result options in the drop-down list.
3. In the **Temperature** column, enter the temperature value of each spool.
4. In the **Start Time** and **End Time** columns, enter the start and end times.
5. Click **Save**.

#### **5.48.8 Attach a File into a Flushing Inspection Request**

If you want to attach a file with any existing flushing inspection request listed in the **RFI Flushing Report** page, you can attach the file by using [![image-1651440609417.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651440609417.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651440609417.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.48.9 Export Flushing Inspection Request List**

You can export a list of flushing inspection requests added in the **RFI Flushing Report** page in both the pdf and excel formats by using [![image-1651440650319.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651440650319.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651440650319.png) (**PDF** button) and [![image-1651440660942.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651440660942.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651440660942.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **5.48.10 Filter a Flushing Inspection Request**

If you want to filter any specific flushing inspection request in the **RFI Flushing Report** page, you can use [![image-1651440703497.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651440703497.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651440703497.png) (**FILTER** button) located on the **RFI Flushing Report** page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **5.49 RFI Chemical Cleaning**

The **RFI Chemical Cleaning** tab in the **Inspection** menu is used to add a request for the pipe chemical cleaning inspection.

#### **5.49.1 Add a Chemical Cleaning Inspection Request**

If you want to add a chemical cleaning inspection request, do the following steps,

1. Click **RFI Chemical Cleaning** in the **Inspection** menu. The **RFI Chemical Cleaning** page opens.
    
    [![image-1651440795617.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651440795617.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651440795617.png)
    
     **Figure 5.49: RFI Chemical Cleaning page**
2. In the ****Requested By**** box, enter the name of a person who has requested the chemical cleaning inspection.
3. In the ****Location**** box, select the location where the inspection to be performed.
4. In the **Inspection Date &amp; Time** box, select the inspection date and time.
5. In the **Classification** box, enter the classification detail.
6. In the **System** box, select a system from a drop-down list.
7. In the **Sub Contractor** box, select a sub-contractor from a drop-down list.
8. In the **Acceptance Code** box, enter the acceptance code detail.
9. In the **Designation** box, enter the designation detail.
10. In the **Test Temperature** box, enter the test temperature value.
11. In the **Test Medium** box, select the test medium from the drop-down list.
12. In the **Drawing No** box, select the drawing number from a drop-down list.
13. In the **Work Scope** box, enter the work scope detail.
14. In the **Cost Centre** box, enter the cost centre detail.
15. In the **Holding Time** box, enter the holding time range.
16. In the **Pressure Gauge No** box, enter the pressure gauge number.
17. In the **Procedure No** box, enter the procedure number.
18. In the **Design Pressure** box, enter the design pressure range.
19. In the **Test Pressure** box, enter the test pressure range.
20. In the **Instrument** box, enter the instrument name.
21. In the **P&amp;ID No** box, enter the P&amp;ID number.
22. In the **Remarks** box, enter your remarks if any.
23. In the **Description** box, enter the description for the chemical cleaning inspection. Before saving the added chemical cleaning inspection request, you must add spools.
    
    [![image-1651588915460.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651588915460.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651588915460.png)**Note**: You can add multiple spools for one request.
    
    The **RFI Chemical Cleaning** page shows a list of added spools. If you want to view the spools for the specific ISO drawing, select the respective ISO drawing from a drop-down list.
    
    [![image-1651588945673.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651588945673.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651588945673.png)
24. Click [![image-1651588986707.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651588986707.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651588986707.png)(Add icon) of the respective spool which you want to add. The added spools will be moved to the right side of the page.
25. Click **Save Request**.

The chemical cleaning inspection request will be added and listed in the **RFI Chemical Cleaning Report** page.

### **5.50 View RFI Chemical Cleaning**

The **View RFI Chemical Cleaning** tab helps you to view and edit the chemical cleaning inspection request, which is added by using the **RFI Chemical Cleaning** tab. This tab also allows you to add a new chemical cleaning inspection request.

1. Click **View RFI Chemical Cleaning** in the **Inspection** menu. The **RFI Chemical Cleaning Report** page opens with a list of added chemical cleaning inspection requests.
    
    [![image-1651589148449.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651589148449.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651589148449.png)
    
     **Figure 5.50: RFI Chemical Cleaning Report page**

#### **5.50.1 Add a Chemical Cleaning Inspection Request**

If you want to add a chemical cleaning inspection request, do the following steps,

1. Click [![image-1651589221375.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651589221375.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651589221375.png) (**ADD** button) in the **RFI Chemical Cleaning Report** page. The system redirects you to a new page to add a new chemical cleaning inspection request. To know how to add a chemical cleaning inspection request, See the topic, “[**<u>Add a </u><u>Chemical Cleaning </u><u>Inspection Request</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.49.1%C2%A0add-a-chemica)”.
    
    Once you have added the chemical cleaning inspection request, you must submit the added request to perform the chemical cleaning inspection.

#### **5.50.2 Add Representative for a Chemical Cleaning Inspection Request**

If you want to add a representative for any added chemical cleaning inspection request,

1. Click [![image-1651589308476.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651589308476.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651589308476.png)(Edit icon) in the **Representative** column for the respective chemical cleaning inspection request. The **Edit Form** window opens.
    
    [![image-1651589327829.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651589327829.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651589327829.png)
2. In the **Representative** box, enter the name of a representative.
3. In the **Inspection Date** box, select the date of inspection.
4. In the **Remarks** box, enter your remarks if any.
5. Click **Save**.

#### **5.50.3 Edit a Chemical Cleaning Inspection Request**

If you want to edit any existing chemical cleaning inspection request in the **RFI Chemical Cleaning Report** page, do the following,

1. Click [![image-1651589481941.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651589481941.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651589481941.png)(Edit icon) in the **Edit** column for the respective chemical cleaning inspection See Fig 5.50. The **RFI Chemical Cleaning Report** page opens with the details of the selected chemical cleaning inspection request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **5.50.4 Submit and Approve a Chemical Cleaning Inspection Request**

Once you have added the chemical cleaning inspection request, the **Submission** column in the **RFI Chemical Cleaning Report** page is appeared with [![image-1651589558239.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651589558239.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651589558239.png) (Submit and Reject icons).

1. If you want to submit the chemical cleaning inspection request, click [![image-1651589590074.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651589590074.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651589590074.png) (Submit icon) in the **Submission** Otherwise click [![image-1651589606094.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651589606094.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651589606094.png) (Reject icon) to reject the request. Once you have submitted the chemical cleaning inspection request, the **Request Status** column in the **RFI Chemical Cleaning Report** page is appeared with [![image-1651589625179.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651589625179.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651589625179.png) (Approve and Reject icons).
2. If you want to approve the chemical cleaning inspection request, click [![image-1651589653940.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651589653940.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651589653940.png)(Approve icon) in the ****Request Status**** Otherwise click [![image-1651589672065.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651589672065.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651589672065.png) (Reject icon) to reject the request. The chemical cleaning inspection request will be moved for chemical cleaning inspection.

#### **5.50.5 Add RFI Data for a Chemical Cleaning Inspection Request**

If you want to add RFI data for the added chemical cleaning inspection request, do the following,

1. Click [![image-1651589790180.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651589790180.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651589790180.png) (Edit icon) in the **RFI Data** column of the **RFI Chemical Cleaning Report**  See Fig 5.50. The **RFI Inspection Request List** window opens.
    
    [![image-1651589810916.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651589810916.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651589810916.png)
2. In the **Inspection From** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the ****Inspection Details**** option, select 1<sup>st</sup>Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the ****Others**** box, enter any other inspection related details.
6. In the ****Refer to Report No**** box, enter the report number for reference.
7. In the ****RFI Date**** box, choose the RFI date.
8. In the **Inspection Result** option, if the inspection result is accepted, select **Accepted** otherwise select **Rejected**.
9. In the ****Remarks**** box, enter your remarks if any.
10. In the ****Inspected by**** box, enter the name of a person who has done inspection.
11. In the ****Inspected Date**** box, choose the date of inspection.
12. In the ****Witnessed By**** box, enter the name of the witnessed person.
13. In the **Witnessed Date** box, choose the date of witnessed.
14. In the **PCML Rep Name** box, enter the representative name of PCML.
15. In the **PCML Rep Date** box, choose the PCML rep date.
16. In the **MEB Rep Name** box, enter the representative name of MEB.
17. In the **MEB Rep Date box**, choose MEB rep date.
18. Click **Save**.

The RFI data is successfully added.


#### **5.50.6 View an RFI Report**

If you want to view an RFI report, click[![image-1651590041754.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651590041754.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651590041754.png)(print icon) provided in the **RFI Report** column of the **RFI Chemical Cleaning Report** page. See Fig 5.50.

#### **5.50.7 Add Results of Chemical Cleaning Inspection**

After completing the chemical cleaning inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click [![image-1651590101313.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651590101313.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651590101313.png) (Add icon) in the **Results** column of the respective request. The Result window opens a list of spools added for the particular request.
    
    [![image-1651590122102.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651590122102.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651590122102.png)
2. In the **Result** column, select the result of each spool from the given result options in the drop-down list.
3. In the **Temperature** column, enter the temperature value of each spool.
4. In the **Start Time** and **End Time** columns, enter the start and end times.
5. Click **Save**.

#### **5.50.8 Attach a File into a Chemical Cleaning Inspection Request**

If you want to attach a file with any existing chemical cleaning inspection request listed in the **RFI Chemical Cleaning Report** page, you can attach the file by using [![image-1651590279773.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651590279773.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651590279773.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.50.9 Export Chemical Cleaning Inspection Request List**

You can export a list of chemical cleaning inspection requests added in the **RFI Chemical Cleaning Report** page in both the pdf and excel formats by using [![image-1651590339890.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651590339890.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651590339890.png) (**PDF** button) and [![image-1651590351607.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651590351607.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651590351607.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **5.50.10 Filter a Chemical Cleaning Inspection Request**

If you want to filter any specific chemical cleaning inspection request in the **RFI Chemical Cleaning Report** page, you can use [![image-1651590406512.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651590406512.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651590406512.png) (**FILTER** button) located on the **RFI Chemical Cleaning Report** page. To know how to filter, see the topic, “[<u>**Filter P&amp;ID**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

### **5.51 RFI Reinstatement**

The **RFI Reinstatement** tab in the **Inspection** menu is used to add a request for pipe reinstatement inspection.

#### **5.51.1 Add a Reinstatement Inspection Request**

If you want to add a reinstatement inspection request, do the following steps,

1. Click **RFI Reinstatement** in the **Inspection** menu. The **RFI Reinstatement** page opens.
    
    [![image-1651590505981.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651590505981.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651590505981.png)
    
     **Figure 5.51: RFI Reinstatement page**
2. In the ****Requested By**** box, enter the name of a person who has requested the reinstatement inspection.
3. In the ****Location**** box, select the location where the inspection to be performed.
4. In the **Inspection Date &amp; Time** box, select the inspection date and time.
5. In the **Classification** box, enter the classification detail.
6. In the **System** box, select a system from a drop-down list.
7. In the **Sub Contractor** box, select a sub-contractor from a drop-down list.
8. In the **Acceptance Code** box, enter the acceptance code detail.
9. In the **Designation** box, enter the designation detail.
10. In the **Test Temperature** box, enter the test temperature value.
11. In the **Test Medium** box, select the test medium from the drop-down list.
12. In the **Drawing No** box, select the drawing number from a drop-down list.
13. In the **Work Scope** box, enter the work scope detail.
14. In the **Cost Centre** box, enter the cost centre detail.
15. In the **Holding Time** box, enter the holding time range.
16. In the **Pressure Gauge No** box, enter the pressure gauge number.
17. In the **Procedure No** box, enter the procedure number.
18. In the **Design Pressure** box, enter the design pressure range.
19. In the **Test Pressure** box, enter the test pressure range.
20. In the **Instrument** box, enter the instrument name.
21. In the **P&amp;ID No** box, enter the P&amp;ID number.
22. In the **Remarks** box, enter your remarks if any.
23. In the **Description** box, enter the description for the reinstatement inspection.
    
    Before saving the added reinstatement inspection request, you must add spools.
    
    [![image-1651590679343.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651590679343.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651590679343.png) **Note**: You can add multiple spools for one request.
    
    The **RFI Reinstatement** page shows a list of added spools. If you want to view the spools for the specific ISO drawing, select the respective ISO drawing from a drop-down list.
    
    [![image-1651590705505.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651590705505.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651590705505.png)
24. Click [![image-1651590723201.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651590723201.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651590723201.png) (Add icon) of the respective spool which you want to add. The added spools will be moved to the right side of the page.
25. Click **Save Request**.

The reinstatement inspection request will be added and listed in the **RFI Reinstatement Report** page.

### **5.52 View RFI Reinstatement**

The **View RFI Reinstatement** tab helps you to view and edit the reinstatement inspection request, which is added by using the **RFI Reinstatement** tab. This tab also allows you to add a new reinstatement inspection request.

1. Click **View RFI Reinstatement** in the **Inspection** menu.
    
    The **RFI Reinstatement Report** page opens with a list of added reinstatement inspection requests.
    
    [![image-1651590896257.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651590896257.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651590896257.png)
    
     **Figure 5.52: RFI Reinstatement Report page**

#### **5.52.1 Add a Reinstatement Inspection Request**

If you want to add a reinstatement inspection request, do the following steps,

1. Click (**ADD** button) in the **RFI Reinstatement Report** page. The system redirects you to a new page to add a new reinstatement inspection request. To know how to add a reinstatement inspection request, See the topic, “[**<u>Add a Reinstatement Inspection Request</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.51.1%C2%A0add-a-reinsta)”.

Once you have added the reinstatement inspection request, you must submit the added request to perform the reinstatement inspection.

#### **5.52.2 Add Representative for a Reinstatement Inspection Request**

If you want to add a representative for any added reinstatement inspection request,

1. Click [![image-1651591073123.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591073123.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591073123.png)(Edit icon) in the **Representative** column for the respective reinstatement inspection request. The **Edit Form** window opens.
    
    [![image-1651591098312.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591098312.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591098312.png)
2. In the **Representative** box, enter the name of a representative.
3. In the **Inspection Date** box, select the date of inspection.
4. In the **Remarks** box, enter your remarks if any.
5. Click **Save**.

#### **5.52.3 Edit a Reinstatement Inspection Request**

If you want to edit any existing reinstatement inspection request in the **RFI Reinstatement Report** page, do the following,

1. Click [![image-1651591195935.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591195935.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591195935.png) (Edit icon) in the **Edit** column for the respective reinstatement inspection See Fig 5.52. The **RFI Reinstatement Report** page opens with the details of the selected reinstatement inspection request.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **5.52.4 Submit and Approve a Reinstatement Inspection Request**

Once you have added the reinstatement inspection request, the **Submission** column in the **RFI Reinstatement Report** page is appeared with [![image-1651591272141.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591272141.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591272141.png) (Submit and Reject icons).

1. If you want to submit the reinstatement inspection request, click [![image-1651591301087.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591301087.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591301087.png) (Submit icon) in the **Submission** Otherwise click [![image-1651591317099.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591317099.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591317099.png) (Reject icon) to reject the request. Once you have submitted the reinstatement inspection request, the **Request Status** column in the **RFI Reinstatement Report** page is appeared with[![image-1651591351175.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591351175.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591351175.png) (Approve and Reject icons).
2. If you want to approve the reinstatement inspection request, click [![image-1651591377901.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591377901.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591377901.png) (Approve icon) in the ****Request Status**** Otherwise click [![image-1651591393637.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591393637.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591393637.png) (Reject icon) to reject the request. The reinstatement inspection request will be moved for reinstatement inspection.

#### **5.52.5 Add RFI Data for a Reinstatement Inspection Request**

If you want to add RFI data for the added reinstatement inspection request, do the following,

1. Click [![image-1651591477577.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591477577.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591477577.png)(Edit icon) in the **RFI Data** column of the **RFI Reinstatement Report**  See Fig 5.52. The **RFI Inspection Request List** window opens.
    
    [![image-1651591497373.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591497373.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591497373.png)
2. In the **Inspection From** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the ****Inspection Details**** option, select 1<sup>st</sup>Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the **Others** box, enter any other inspection related details.
6. In the **Refer to Report No** box, enter the report number for reference.
7. In the **RFI Date** box, choose the RFI date.
8. In the ****Inspection Result**** option, if the inspection result is accepted, select ****Accepted**** otherwise select ****Rejected****.
9. In the **Remarks** box, enter your remarks if any.
10. In the **Inspected by** box, enter the name of a person who has done inspection.
11. In the **Inspected Date** box, choose the date of inspection.
12. In the **Witnessed By** box, enter the name of the witnessed person.
13. In the **Witnessed Date** box, choose the date of witnessed.
14. In the **PCML Rep Name** box, enter the representative name of PCML.
15. In the **PCML Rep Date** box, choose the PCML rep date.
16. In the **MEB Rep Name** box, enter the representative name of MEB.
17. In the **MEB Rep Date box**, choose MEB rep date.
18. Click **Save**.

The RFI data is successfully added.


#### **5.52.6 View an RFI Report**

If you want to view an RFI report, click [![image-1651591702432.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591702432.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591702432.png) (print icon) provided in the **RFI Report** column of the **RFI Reinstatement Report** page. See Fig 5.52.

#### **5.52.7 Add Results of Reinstatement Inspection**

After completing the reinstatement inspection for the added request, you can add the inspection result details. To add results, do the following steps,

1. Click [![image-1651591768252.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591768252.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591768252.png) (Add icon) in the **Results** column of the respective request. The Result window opens a list of spools added for the particular request.
    
    [![image-1651591789927.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591789927.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591789927.png)
2. In the ****Result**** column, select the result of each spool from the given result options in the drop-down list.
3. In the ****Temperature**** column, enter the temperature value of each spool.
4. In the **Start Time** and **End Time** columns, enter the start and end times.
5. Click **Save**.

#### **5.52.8 Attach a File into a Reinstatement Inspection Request**

If you want to attach a file with any existing reinstatement inspection request listed in the **RFI Reinstatement Report** page, you can attach the file by using [![image-1651591888170.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591888170.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591888170.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **5.52.9 Export Reinstatement Inspection Request List**

You can export a list of reinstatement inspection requests added in the **RFI Reinstatement Report** page in both the pdf and excel formats by using [![image-1651591936770.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591936770.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591936770.png) (**PDF** button) and [![image-1651591950522.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591950522.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591950522.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **5.52.10 Filter a Reinstatement Inspection Request**

If you want to filter any specific reinstatement inspection request in the **RFI Reinstatement Report** page, you can use [![image-1651591997799.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651591997799.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651591997799.png) (**FILTER** button) located on the **RFI Reinstatement Report** page. To know how to filter, see the topic, “**[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)**”.


### **5.53 Inspection Requisition Summary Report**

The **Inspection Requisition Summary** tab in the **Inspection** menu used to view the inspection requisition summary report for a particular period.

1. Click **Inspection Requisition Summary** in the **Inspection** menu. The **Requisition Inspection Summary** page opens.
    
    [![image-1651592061350.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651592061350.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651592061350.png)
    
     **Figure 5.53: Requisition Inspection Summary page**
2. In the **Start Date** and **End Date** boxes, select the start and end dates.
3. Click **Get Report**.
    
    The inspection requisition summary report for the selected period will be opened.
    
    [![image-1651592115499.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651592115499.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651592115499.png)

#### **5.53.1 Print an Inspection Requisition Summary Report**

If you want to print an inspection requisition summary report, use[![image-1651592168087.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651592168087.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651592168087.png) and [![image-1651592178752.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651592178752.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651592178752.png) (print icons) provided in the **Requisition Inspection Summary** page.

1. If you want to print the current page of the inspection requisition summary report, click [![image-1651592202297.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651592202297.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651592202297.png) (print icon including the page number).
2. If you want to print all the pages of the inspection requisition summary report, click [![image-1651592256145.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651592256145.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651592256145.png)(print icon).

#### **5.53.2 Export an Inspection Requisition Summary Report**

You can export the inspection requisition summary report in various formats by using the option [![image-1651592398427.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651592398427.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651592398427.png) provided in the upper right corner of the **Requisition Inspection Summary** page.

# Piping

## **6.0 Piping**

The **Piping** menu in the home page of the ***cuteQM*** app used to add results after performing the piping related inspections. This menu also helps you to view the inspection reports.

### **6.1 Radiographic Testing (RT)** 

RT inspection method is one of the types of NDT inspection used to conduct inspection in the piping project by using either x-rays or gamma rays.

Once the NDT inspection request is added with the selection of RT type by using the [<u>**NDT Inspection Request**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.5%C2%A0ndt-inspection-r) tab, the added inspection request will be moved here. After completing RT inspection, you can add the RT inspection result details by using this RT tab.

To navigate to **Radiographic Testing (RT)**,

1. Click **Radiographic Testing (RT)** in the **Piping** menu.
    
    The **RT Report** page opens.
    
    [![image-1651456975125.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651456975125.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651456975125.png)
    
     **Figure 6.1: RT Report page**

### **6.11 Add an RT Report**

If you want to add an RT report, do the following steps,

1. Click (**ADD** button) in the **RT Report** page. See Fig 6.1.
    
    The **RT Report** page opens a new window to add an RT report.
    
    [![image-1651457045679.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457045679.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457045679.png)
    
    [![image-1651457054027.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457054027.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457054027.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651457074555.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457074555.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457074555.png)**Tip**: A report number for a new RT report will be updated automatically in the **Report Number** box. If you want change the report number, you can change.
2. In the ****NDT By**** box, select the requisition detail of NDT whether by third party or internal from a drop-down list.
3. In the ****NDT Request No**** box, select an RT request number from a drop-down list.
4. In the ****Prepared By**** box, enter the name of a person who has prepared the RT report.
5. In the ****Prepared Date**** box, select the prepared date of the RT report.
6. In the ****Reviewed By**** box, enter the name of a person who has reviewed the RT report.
7. In the ****Reviewed Date**** box, select the reviewed date of the RT report.
8. In the **Accepted/Approved By** boxes, enter the name of a person who has accepted/approved the RT report.
9. In the ****Accepted/Approved Date**** box, select the accepted/approved date of the RT report.
10. Click **Save**.

The RT report is successfully added. Once you have added the RT report, you must add RT inspection results.

#### **6.1.2 Add RT Inspection Results** 

If you want to add the RT inspection results for the added RT report, do the following steps,

1. Click the respective added RT report in the **RT Report** See Fig 6.1. The **RT Report** page shows **RT Results**, **Joint Results**, and **Report Photos** windows to add RT results.
    
    [![image-1651457210104.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457210104.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457210104.png)
    
     **Figure 6.1.1: RT Results page**
2. In the **Inspection Date** box, select the date of inspection.
3. In the ****Image Quality Indicator (IQI)**** box, select IQI from a drop-down list.
4. In the ****Source &amp; Size (MM)**** box, select the RT source and their size from a drop-down list.
5. In the ****Density**** box, enter the radiographic density range.
6. In the ****Code**** box, select the code of the material from a drop-down list.
7. In the ****Procedure Number**** box, select the procedure number from a drop-down list.
8. In the ****Sensitivity (%)****box, set the radiographic sensitivity by using up and down arrows.
9. In the ****Developing Time (Mins)****box, set the developing time by using up and down arrows.
10. In the ****Film/ Type**** box, select the name of a film including type from a drop-down list.
11. In the ****Acceptance Criteria**** box, select the acceptance criteria from a drop-down list.
12. In the **Source to Film Distance (SFD)** box, enter the distance range between the source and the film.
13. In the ****Focus Film Distance (FFD)****box, enter the focus film distance range.
14. In the ****Source**** box, select any one source option whether inside, outside, or other.
15. In the ****Technique**** box, select the radiographic technique from a drop-down list.
16. In the ****Examination Stage**** box, select the examination stage from the specified options.
17. In the ****Material**** box, select the material from a drop-down list.
18. In the ****Surface Condition**** box, select the condition of the surface from the specified options.
19. In the ****Placement of IQI**** box, select any one option from source side and film side.
20. In the ****Source Strength (Ci)****box, enter the source strength value.
21. In the ****Exposure Time (Mins)****box, set the exposure time by using up and down arrows.
22. In the ****Remarks**** box, enter your remarks if any.
23. Click **Save RT Details**.
    
    The RT details are successfully updated. Once you have updated the RT details, you must add marker results of added joints.

[![image-1651457424614.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457424614.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457424614.png)**Note**: Once you have added RT details, you can save the added RT details and reuse the saved details while you adding RT details for any other RT report.

[![image-1651457441877.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457441877.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457441877.png)

- To save the added RT details, enter any name in the **Set Default** box and click .
- If you want to add the same RT details for any other RT report, select the name in the **Get Default**.
    
    The saved details will be automatically updated in the respective boxes.

#### **6.1.2.1 Add Marker Results for Joints**

The **RT Results** window shows a list of joints added for the RT inspection. If you want to add marker results for the respective joints,

[![image-1651457522125.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457522125.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457522125.png)

1. Click [![image-1651457537910.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457537910.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457537910.png) (Add icon) for the respective joint. The **Marker Results** window opens with a list of markers of the respective joint.
    
    [![image-1651457553612.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457553612.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457553612.png)
2. If you want to add any additional markers, click [![image-1651457569760.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457569760.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457569760.png) (****ADD**** button). The **Marker Results** window shows a new window to add a new marker.
    
    [![image-1651457587529.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457587529.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457587529.png)
    
    
    1. 1. In the **Marker** box, enter the marker number.
        2. In the ****Sensitivity**** box, enter the sensitivity range.
        3. In the ****Result**** box, select the marker result from the given result options.
        4. In the ****Defect**** box, select the defect type if any.
        5. In the ****Defect Length (MM)****box, enter the defect length value.
        6. In the ****Remarks**** box, enter your remarks if any.
        7. Click **Save**. The marker is added and listed in the **Marker Results** window.
3. If you want to update marker results,
    
    
    1. 1. Click [![image-1651457705186.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457705186.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457705186.png)(Edit icon) in the ****Edit**** column for the respective marker results. A new window opens to edit the marker results.
            
            [![image-1651457723040.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457723040.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457723040.png)
        2. Click any box where you want to edit the details, and edit the marker results.
        3. Click **Save**.
4. If you want delete any existing marker results, click[![image-1651457759689.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457759689.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457759689.png)(Delete icon) for the respective marker results.

#### **9.1.2.2 Import Additional Joints**

If you want to import additional joints for the RT inspection,

1. Click [![image-1651457878755.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457878755.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457878755.png) (****Import Joints**** button) in the ****RT Results**** See Fig 6.1.1. The **Joints** window opens with a list of joints.
    
    [![image-1651457894177.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457894177.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457894177.png)
2. Select the joints you want to import.
3. Click [![image-1651457914402.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457914402.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457914402.png) (****Import Selected Joints**** button). The selected joints are imported for the respective RT inspection. Once you have imported the joints, you must perform the RT inspection and add the marker results for the added joints.

#### **6.1.2.3 Add Report Photos**

If you want to add any report photos for the updated RT results,

1. Click [![image-1651457976604.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457976604.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457976604.png) (****ADD**** button) in the ****Report Photos**** box in the ****RT Results**** See Fig 6.1.1. [![image-1651457998647.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651457998647.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651457998647.png)
2. Click [![image-1651458019569.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458019569.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458019569.png) (****Browse**** button) to browse a photo stored in your computer.
3. Click **Upload**.
    
    The selected photo will be updated.

#### **6.1.3 Attach a File into an RT Report**

If you want to attach any file with any RT report listed in the **RT Report** page, you can attach the file by using[![image-1651458091734.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458091734.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458091734.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **6.1.4 View an NDT – RT Report**

If you want to view an NDT - RT report, click[![image-1651458111372.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458111372.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458111372.png) (print icon) provided in the **Report** column of the **RT Report** page. See Fig 6.1.

#### **6.1.5 Edit an RT Report**

 If you want to edit any existing RT report in the **RT Report** page, do the following,

1. Click [![image-1651458157295.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458157295.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458157295.png)(Edit icon) in the ****Edit**** column for the respective RT report. See Fig 6.1. A new window opens to edit the RT report.
    
    [![image-1651458179837.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458179837.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458179837.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.
4. If you want to edit the RT inspection results of any report, click the respective report and change the results.

#### **6.1.6 Export RT Report List**

You can export a list of RT reports added in the **RT Report** page in both the pdf and excel formats by using [![image-1651458263661.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458263661.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458263661.png) (**PDF** button) and [![image-1651458275233.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458275233.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458275233.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **6.1.7 Filter an RT Report** 

If you want to filter any RT report, do one of the following,

[![image-1651458307102.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458307102.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458307102.png)

1. If you want to filter any RT report based on the report number, enter the corresponding report number in the **Report No** box in the **RT Report** page, and then Click **Search**.
2. If you want to filter any RT report based on the request number, enter the corresponding request number in the ****Request No**** box in the ****RT Report**** page, and then Click ****Search****.
3. If you want to filter any RT report based on the drawing number, enter the corresponding drawing number in the ****Drawing No**** box in the ****RT Report**** page, and then Click ****Search****.

### **6.2 Ultrasonic Testing (UT)** 

The UT method is one of the NDT inspection methods used for performing inspection in the piping project by using high frequency sound waves.

Once the NDT inspection request is added with the selection of UT type by using the [<u>**NDT Inspection Request**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.5%C2%A0ndt-inspection-r) tab, the added inspection request will be moved here. After completing UT inspection, you can add the UT inspection result details by using this UT tab.

To navigate to **Ultrasonic Testing (UT)**,

1. Click the **Ultrasonic Testing (UT)** tab in the **Piping** menu.
    
    The **UT Report** page opens.
    
    [![image-1651458397668.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458397668.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458397668.png)
    
     **Figure 6.2: UT Report page**

#### **6.2.1 Add an UT Report**

If you want to add an UT report, do the following,

1. Click [![image-1651458451141.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458451141.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458451141.png) (**ADD** button) in the U**T Report** page. See Fig 6.2.
    
    A new window opens to add an UT report.
    
    [![image-1651458470068.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458470068.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458470068.png)
    
    [![image-1651458479581.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458479581.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458479581.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651458494051.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458494051.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458494051.png)**Tip**: A report number for a new UT report will be updated automatically in the **Report Number** box.
2. In the ****NDT By**** box, select the requisition of NDT whether by third party or internal from a drop-down list.
3. In the **NDT** **Request No** box, select an UT request number from a drop-down list.
4. In the ****Prepared By**** box, enter the name of a person who has prepared the UT report.
5. In the ****Prepared Date**** box, select the prepared date of the UT report.
6. In the ****Reviewed By**** box, enter the name of a person who has reviewed the UT report.
7. In the ****Reviewed Date**** box, select the reviewed date of the UT report.
8. In the **Accepted/Approved By** boxes, enter the name of a person who has accepted/approved the UT report.
9. In the ****Accepted/Approved Date**** box, select the accepted/approved date of the UT report.
10. In the  ****Accept Date**** box, select the report accept date.
11. Click ****Save****.

The UT report is successfully added. Once you have added the UT report, you must add UT results for the respective added UT report.

#### **6.2.2 Add UT Results** 

If you want to add the UT results for the respective UT report, do the following,

1. Click the respective added UT report in the **UT Report** page. See Fig 6.2.
    
    The **UT Report** page shows **UT Results**, **Probe &amp; Cable Details**, **Reference Setting Details**, **UT Results**, and **Report Photos** windows.
    
    [![image-1651458661419.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458661419.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458661419.png)
    
    [![image-1651458667578.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458667578.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458667578.png)
    
     **Figure 6.2.1: UT Results page**
2. In the **Inspection Date** box, select the date of UT inspection.
3. In the **Test Method** box, select the test method from a drop-down list.
4. In the **Description** box, enter the description about the UT inspection.
5. In the **Material** box, select the material from a drop-down list.
6. In the **Test Equipment** box, select the test equipment from a drop-down list.
7. In the **Acceptance Criteria** box, select the acceptance criteria from a drop-down list.
8. In the **Couplant** box, select the couplant material from a drop-down list.
9. In the **Test** **Procedure No** box, select the test procedure number from a drop-down list.
10. In the **Simulation Blocks** box, enter the detail of simulation blocks.
11. In the **Ref. Hole Diameter** box, enter the diameter value of the reference hole.
12. In the **Sensitivity Setting** box, enter the information about the sensitivity setting.
13. In the **Sides Scanned** box, enter the details of the sides that are scanned.
14. In the **Special Equipment** box, enter the name of the special equipment if any.
15. In the **Computerized Program Name** box, enter the computerized program name.
16. In the **Surface Scanned** box, the details of the surfaces that are scanned.
17. In the **Scan Limitation** box, enter the limitation range of scanning.
18. In the **Code/Specification** box, select the specification from a drop-down list.
19. In the **Calibration Block** box, select the calibration block from a drop-down list.
20. In the **Technique** box, select the technique from a drop-down list.
21. In the **Examination Stage** box, select the examination stage from the specified options.
22. In the **Surface Condition** box, select the surface condition from the specified options.
23. In the **Remarks** box, enter your remarks if any.
24. Click **Save UT Details**.

The UT details are successfully updated. Once you have updated the UT details, you must add the probe and cable details for the UT inspection.

[![image-1651458828873.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458828873.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458828873.png)**Note**: Once you have added UT details, you can save the added UT details and reuse the saved details while you adding UT details for any other UT report.

[![image-1651458849409.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458849409.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458849409.png)

- To save the added UT details, enter any name in the ****Set Default**** box and click [![image-1651458875012.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651458875012.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651458875012.png). The added details will be saved in the given name.
- If you want to add the same UT details for any other UT report, select the name in the **Get Default**.

The saved details will be automatically updated in the respective boxes.

#### **6.2.2.1 Add Probe &amp; Cable Details**

If you want to add probe and cable details for the updated UT results,

1. Click (****Add Probe/ Cable**** button) in the ****Probe&amp; Cable Details**** See Fig 6.2.1. A new window opens to add the probe and cable details.
    
    [![image-1651459151707.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459151707.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459151707.png)
2. In the ****Probe**** box, select a probe from a drop-down list.
3. In the ****Cable**** box, select a cable from a drop-down list.
4. In the  ****dB**** box, enter the reference decibel range.
5. In the ****Surf Comp dB**** box, enter the decibel range of the surface component.
6. In the ****Test Range (MM)**** box, enter the test range in millimeters.
7. In the ****Reference Level**** box, enter the reference level detail.
8. In the ****Scanning dB**** box, enter the scanning decibel range.
9. In the ****TR Loss**** box, enter the transmission loss detail.
10. Click ****Save****.

The probe and cable details are successfully added. Once you have added the probe and cable details, you must add the reference setting details.

#### **6.2.2.2 Add Reference Setting Details**

If you want to add the reference setting details for the updated UT results,

1. Click [![image-1651459275518.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459275518.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459275518.png) (**Add Reference Setting** button) in the **Reference Setting Details** window. See Fig 6.2.1.
    
    A new window opens to add the reference setting details.
    
    [![image-1651459291934.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459291934.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459291934.png)
2. In the **Reference Block** box, select the reference block from a drop-down list.
3. In the **Probe Sr. No** box, select the serial number of the probe from a drop-down list.
4. In the **Reference** box, enter the reference detail.
5. In the **Eqpt Gain (dB)** box, enter the equipment gain in decibels.
6. In the **Damping** box, enter the damping ratio.
7. In the ****Rejection**** box, enter the rejection detail.
8. In the ****Amplitude Height**** box, enter the amplitude height range.
9. In the ****Skip**** box, enter the skip detail.
10. In the ****Beam Path**** box, enter the beam path detail.
11. In the **Range** box, enter the range detail.
12. Click **Save**.

The reference setting details are successfully added. Once you have added the reference setting details, you must add the inspection results for added joints.

#### **6.2.2.3 Add UT Results**

The **UT Results** window shows a list of joints added for the UT inspection. If you want to add UT results for joints,

1. Click [![image-1651459415594.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459415594.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459415594.png)(Edit icon) for the respective UT results listed in the **UT Results** window.
    
    The **UT Results** window opens with the added UT details.
    
    [![image-1651459427454.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459427454.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459427454.png)
2. In the ****Result**** box, update your UT inspection results whether ****Accepted****, ****Rejected****, or ****Cancelled****.
3. In the ****Remarks**** box, enter your remarks if any.
4. Click Save.

#### **6.2.2.4 Import Additional Joints**

If you want to add more joints, you can add by using the import joints option. To import joints,

1. Click [![image-1651459489964.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459489964.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459489964.png)(**Import Joints** button) in the **UT Results** See Fig 6.2.1. The **Joints** window opens with a list of joints.
    
    [![image-1651459509609.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459509609.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459509609.png)
2. Select the joints you want to import.
3. Click [![image-1651459530724.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459530724.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459530724.png)(****Import Selected Joints**** button).

The selected joints are imported for the respective UT and listed in the **UT Results** window. Once you have imported the joints, you must add the UT results for the imported joints.

#### **6.2.2.5 Add Report Photos**

If you want to add any report photos for the updated UT results,

1. Click [![image-1651459581706.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459581706.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459581706.png) (****ADD**** button) in the ****Report Photos**** box in the ****UT Results**** See Fig 6.2.1. [![image-1651459597770.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459597770.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459597770.png)
2. Click [![image-1651459614550.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459614550.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459614550.png) (****Browse**** button) to browse a photo stored in your computer.
3. Click **Upload**.
    
    The selected photo will be updated.

The UT results will be updated successfully.

#### **6.2.3 Attach a File into an UT Report**

If you want to attach any file with any UT report listed in the **UT Report** page, you can attach the file by using [![image-1651459668994.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459668994.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459668994.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **6.2.4 View an NDT – UT Report**

If you want to print an NDT - UT report, click [![image-1651459708135.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459708135.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459708135.png)(print icon) provided in the **Report** column of the **UT Report** page. See Fig 6.2.

#### **6.2.5 Edit an UT Report**

 If you want to edit any existing UT report in the **UT Report** page, do the following,

1. Click [![image-1651459752424.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459752424.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459752424.png)(Edit icon) in the ****Edit**** column for the respective UT report. See Fig 6.2. A new window opens to edit the UT report.
    
    [![image-1651459773622.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459773622.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459773622.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **6.2.6 Export UT Report List**

You can export a list of UT reports added in the **UT Report** page in both the pdf and excel formats by using [![image-1651459825907.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459825907.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459825907.png) (**PDF** button) and [![image-1651459839034.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459839034.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459839034.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **6.2.7 Filter an UT Report** 

If you want to filter any UT report, do one of the following,

[![image-1651459936550.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651459936550.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651459936550.png)

1. If you want to filter any UT report based on the report number, enter the corresponding report number in the ****Report No**** box in the ****UT Report**** page, and then Click ****Search****.
2. If you want to filter any UT report based on the request number, enter the corresponding request number in the **Request No** box in the **UT Report** page, and then Click **Search**.
3. If you want to filter any UT report based on the drawing number, enter the corresponding drawing number in the ****Drawing No**** box in the ****UT Report**** page, and then Click ****Search****.

### **6.3 Ultrasonic Thickness Testing (UTG)**

The UTG method is one of the NDT inspection methods used for performing inspection in the piping project.

Once the NDT inspection request is added with the selection of UTG type by using the [<u>**NDT Inspection Request**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.5%C2%A0ndt-inspection-r) tab, the added inspection request will be moved here. After completing UTG inspection, you can add the UTG inspection result details by using this UTG tab.

To navigate to **Ultrasonic Testing (UTG)**,

1. Click the ****Ultrasonic Testing (UTG)**** tab in the ****Piping**** menu. The **UTG Report** page opens.
    
    [![image-1651460058584.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651460058584.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651460058584.png)
    
     **Figure 6.3: UTG Report page**

#### **6.3.1 Add an UTG Report**

If you want to add an UTG report, do the following,

1. Click [![image-1651460196041.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651460196041.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651460196041.png) (**ADD** button) in the **UTG Report** page. See Fig 6.3.
    
    A new window opens to add an UTG report.
    
    [![image-1651460213845.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651460213845.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651460213845.png)
    
    [![image-1651460224352.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651460224352.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651460224352.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651460254211.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651460254211.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651460254211.png) **Tip**: A report number for a new UTG report will be updated automatically in the **Report Number** box.
2. In the **NDT By** box, select the requisition of NDT whether by third party or internal from a drop-down list.
3. In the ****NDT** **Request No**** box, select an UTG request number from a drop-down list.
4. In the ****Prepared By**** box, enter the name of a person who has prepared the UTG report.
5. In the ****Prepared Date**** box, select the prepared date of the UTG report.
6. In the ****Reviewed By**** box, enter the name of a person who has reviewed the UTG report.
7. In the ****Reviewed Date**** box, select the reviewed date of the UTG report.
8. In the ****Accepted/Approved By**** boxes, enter the name of a person who has accepted/approved the UTG report.
9. In the ****Accepted/Approved Date**** box, select the accepted/approved date of the UTG report.
10. In the  ****Accept Date**** box, select the report accept date.
11. Click **Save**.

The UTG report is successfully added. Once you have added the UTG report, you must add UTG results for the respective added UTG report.

#### **6.3.2 Add UTG Results** 

If you want to add the UTG results for the respective UT report, do the following steps,

1. Click the respective added UTG report in the ****UTG Report**** See Fig 6.3. The **UT Report** page shows **UTG Details**, **Probe &amp; Cable Details**, **Reference Setting Details**, **UTG Results**, and **Report Photos** windows.
    
    [![image-1651460391549.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651460391549.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651460391549.png)
    
     **Figure 6.3.1: UTG Results page**
2. In the ****Inspection Date**** box, select the date of UTG inspection.
3. In the ****Test Method**** box, select the test method from a drop-down list.
4. In the ****Description**** box, enter the description about the UTG inspection.
5. In the ****Material**** box, select the material from a drop-down list.
6. In the ****Test Equipment**** box, select the test equipment from a drop-down list.
7. In the ****Acceptance Criteria**** box, select the acceptance criteria from a drop-down list.
8. In the ****Couplant**** box, select the couplant material from a drop-down list.
9. In the ****Test** **Procedure No**** box, select the test procedure number from a drop-down list.
10. In the ****Simulation Blocks**** box, enter the detail of simulation blocks.
11. In the  ****Hole Diameter**** box, enter the diameter value of the reference hole.
12. In the ****Sensitivity Setting**** box, enter the information about the sensitivity setting.
13. In the ****Sides Scanned**** box, enter the details of the sides that are scanned.
14. In the ****Special Equipment**** box, enter the name of the special equipment if any.
15. In the **Computerized Program Name** box, enter the computerized program name.
16. In the ****Surface Scanned**** box, the details of the surfaces that are scanned.
17. In the ****Scan Limitation**** box, enter the limitation range of scanning.
18. In the ****Remarks**** box, enter your remarks if any.
19. Click **Save UTG Details**.

The UTG details are successfully updated. Once you have updated the UTG details, you must add the probe and cable details for the UTG inspection.

[![image-1651460552733.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651460552733.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651460552733.png)**Note**: Once you have added UTG details, you can save the added UTG details and reuse the saved details while you adding UTG details for any other UTG report.

[![image-1651460568853.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651460568853.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651460568853.png)

- To save the added UTG details, enter any name in the **Set Default** box and click . The added details will be saved in the given name.
- If you want to add the same UTG details for any other UTG report, select the name in the ****Get Default****.

The saved details will be automatically updated in the respective boxes.

#### **6.3.2.1 Add Probe &amp; Cable Details**

If you want to add probe and cable details for the updated UTG results,

1. Click [![image-1651460652486.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651460652486.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651460652486.png) (****Add Probe/ Cable**** button) in the ****Probe&amp; Cable Details**** See Fig 6.3.1. A new window opens to add the probe and cable details.
    
    [![image-1651460671701.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651460671701.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651460671701.png)
2. In the **Probe** box, select a probe from a drop-down list.
3. In the **Cable** box, select a cable from a drop-down list.
4. In the **Ref. dB** box, enter the reference decibel range.
5. In the **Surf Comp dB** box, enter the decibel range of the surface component.
6. In the **Test Range (MM)** box, enter the test range in millimeters.
7. In the **Reference Level** box, enter the reference level detail.
8. In the **Scanning dB** box, enter the scanning decibel range.
9. In the **TR Loss** box, enter the transmission loss detail.
10. Click **Save**.

The probe and cable details are successfully added. Once you have added the probe and cable details, you must add the reference setting details.

#### **6.3.22 Add Reference Setting Details**

If you want to add the reference setting details for the updated UTG results,

1. Click [![image-1651460825806.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651460825806.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651460825806.png) (**Add Reference Setting** button) in the **Reference Setting Details** window. See Fig 6.3.1.
    
    A new window opens to add the reference setting details.
    
    [![image-1651460865480.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651460865480.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651460865480.png)
2. In the ****Reference Block**** box, select the reference block from a drop-down list.
3. In the ****Probe Sr. No**** box, select the serial number of the probe from a drop-down list.
4. In the ****Reference**** box, enter the reference detail.
5. In the ****Eqpt Gain (dB)**** box, enter the equipment gain in decibels.
6. In the ****Damping**** box, enter the damping ratio.
7. In the ****Rejection**** box, enter the rejection detail.
8. In the ****Amplitude Height**** box, enter the amplitude height range.
9. In the ****Skip**** box, enter the skip detail.
10. In the ****Beam Path**** box, enter the beam path detail.
11. In the **Range** box, enter the range detail.
12. Click **Save**.

The reference setting details are successfully added. Once you have added the reference setting details, you must add the inspection results for added joints.

#### **6.3.2.3 Add UTG Results**

The **UTG Results** window shows a list of joints added for the UTG inspection. If you want to add UTG results for joints,

1. Click [![image-1651460993514.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651460993514.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651460993514.png)(Edit icon) for the respective UTG results listed in the **UTG Results** window. The **UTG Results** window opens with the added UTG details.
    
    [![image-1651461015609.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651461015609.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651461015609.png)
2. In the **Result** box, update your UTG inspection results whether **Accepted**, **Rejected**, or **Cancelled**.
3. In the **Remarks** box, enter your remarks if any.
4. Click Save.

#### **6.3.2.4 Import Additional Joints**

If you want to add more joints, you can add by using the import joints option. To import joints,

1. Click (**Import Joints** button) in the **UTG Results** See Fig 6.3.1. The **Joints** window opens with a list of joints.
    
    [![image-1651461090378.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651461090378.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651461090378.png)
2. Select the joints you want to import.
3. Click [![image-1651461111654.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651461111654.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651461111654.png) (**Import Selected Joints** button).

The selected joints are imported for the respective UTG and listed in the **UTG Results** window. Once you have imported the joints, you must add the UTG results for the imported joints.

#### **6.3.2.5 Add Report Photos**

If you want to add any report photos for the updated UTG results,

1. Click (**ADD** button) in the **Report Photos** box in the **UTG Results** window. See Fig 6.3.1.
    
    [![image-1651461205079.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651461205079.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651461205079.png)
2. Click [![image-1651461219859.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651461219859.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651461219859.png) (****Browse**** button) to browse a photo stored in your computer.
3. Click **Upload**.
    
    The selected photo will be updated.

The UTG results will be updated successfully.

#### **6.3.3 Attach a File into an UTG Report**

If you want to attach any file with any UTG report listed in the **UTG Report** page, you can attach the file by using [![image-1651461281438.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651461281438.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651461281438.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **6.3.4 View an NDT – UTG Report**

If you want to print an NDT - UTG report, click [![image-1651461321440.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651461321440.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651461321440.png)(print icon) provided in the **Report** column of the **UTG Report** page. See Fig 6.3.

#### **6.3.5 Edit an UTG Report**

 If you want to edit any existing UTG report in the **UTG Report** page, do the following,

1. Click (Edit icon) in the ****Edit**** column for the respective UTG report. See Fig 6.3. A new window opens to edit the UTG report.
    
    [![image-1651461367585.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651461367585.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651461367585.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.3.6 Export UTG Report List**

You can export a list of UTG reports added in the **UTG Report** page in both the pdf and excel formats by using[![image-1651461411002.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651461411002.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651461411002.png) (**PDF** button) and [![image-1651461419476.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651461419476.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651461419476.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **6.3.7 Filter an UTG Report** 

If you want to filter any UTG report, do one of the following,

[![image-1651461459776.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651461459776.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651461459776.png)

1. If you want to filter any UTG report based on the report number, enter the corresponding report number in the ****Report No**** box in the ****UTG Report**** page, and then Click ****Search****.
2. If you want to filter any UTG report based on the request number, enter the corresponding request number in the **Request No** box in the **UTG Report** page, and then Click **Search**.
3. If you want to filter any UTG report based on the drawing number, enter the corresponding drawing number in the ****Drawing No**** box in the ****UTG Report**** page, and then Click ****Search****.


### **6.4 Dye Penetrant Testing (PT)**

Dye Penetrant Testing **(**DPT) method is one of the oldest and simplest NDT inspection methods used for inspecting the materials in the piping project by using ultraviolet or white light, depending on the type of dye used - fluorescent or non fluorescent (visible). PT also called liquid penetrate inspection (LPI) or penetrant testing (PT).

Once the NDT inspection request is added with the selection of PT type by using the **[<u>NDT Inspection Request</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.5%C2%A0ndt-inspection-r)** tab, the added inspection request will be moved here. After completing PT inspection, you can add the PT inspection result details by using this PT tab.

To navigate to **Dye Penetrant Testing (PT)**,

1. Click **Dye Penetrant Testing (PT)** in the **Piping** menu.
    
    The **PT Report** page opens.
    
    [![image-1651461576408.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651461576408.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651461576408.png)
    
     **Figure 6.4: PT Report page**

#### **6.4.1 Add a PT Report**

If you want to add a PT report, do the following steps,

1. Click [![image-1651461626702.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651461626702.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651461626702.png)(**ADD** button) in the **PT Report** page. See Fig 6.4.
    
    The **PT Report** page opens a new window to add an PT report.
    
    [![image-1651461649609.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651461649609.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651461649609.png)
    
    [![image-1651461657621.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651461657621.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651461657621.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651461669928.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651461669928.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651461669928.png)**Tip**: A report number for a new PT report will be updated automatically in the **Report Number** box.
2. In the **NDT By** box, select the requisition detail of NDT whether by third party or internal from a drop-down list.
3. In the **NDT** **Request No** box, select an NDT request number from a drop-down list.
4. In the **Prepared By** box, enter the name of a person who has prepared the PT report.
5. In the **Prepared Date** box, select the prepared date of the PT report.
6. In the **Reviewed By** box, enter the name of a person who has reviewed the PT report.
7. In the **Reviewed Date** box, select the reviewed date of the PT report.
8. In the ****Accepted/Approved By**** boxes, enter the name of a person who has accepted/approved the PT report.
9. In the ****Accepted/Approved Date**** box, select the accepted/approved date of the PT report.
10. Click **Save**.

The PT report is successfully added and listed in the **PT Report** page. Once you have added the PT report, you must add PT results for the respective added PT report.

#### **6.4.2 Add PT Results** 

If you want to add the PT results for the respective PT report, do the following steps,

1. Click the respective added PT report in the ****PT Report**** See Fig 6.4. The **RT Report** page shows the **DPT Results** and **Report Photos** windows.
    
    [![image-1651461795280.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651461795280.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651461795280.png)
    
     **Figure 6.4.1: DPT Results page**
2. In the **Inspection Date** box, select the date of DPT inspection.
3. In the ****Inspection By**** box, enter the name of a person who has done the DPT inspection.
4. In the **Light Source** box, enter the light source detail.
5. In the **Description** box, enter the description.
6. In the **Test Procedure** box, select the test procedure from a drop-down list.
7. In the **Test Method** box, select the test method from a drop-down list.
8. In the **Acceptance Criteria** box, select the acceptance criteria from a drop-down list.
9. In the **Surface Condition** box, enter the condition of the surface.
10. In the **Dwell Time** box, enter dwell time range.
11. In the **Surface Temperature** box, enter the surface temperature value.
12. In the **Cleaner** box, select the cleaner from a drop-down list.
13. In the **Penetrant** box, select the penetrant from a drop-down list.
14. In the **Developer** box, select the developer from a drop-down list.
15. In the **Material Specification** box, enter the material specification.
16. In the **Material Thickness** box, enter the material thickness value.
17. In the **Development Time** box, enter the time for development.
18. In the **Extend of Scanning** box, enter the details of scanning extend.
19. In the **PWHT** box, enter the PWHT detail.
20. In the **Technique** box, select the PT technique from a drop-down list.
21. In the **Light Intensity** box, enter the light intensity value.
22. In the **Joint Preparation** box, enter the joint preparation detail.
23. In the **Certification** box, enter the certification detail.
24. In the **Reference Standard** box, enter the reference standard detail.
25. In the **Reference No** box, enter the reference number.
26. In the **Welding Process** box, enter the type of welding process.
27. In the **Code** box, enter the code detail.
28. In the **Examination Stage** box, select the examination stage from the specified options.
29. In the **Item Tested** box, select the tested items from the specified options.
30. In the **Inspection Method** box, select the inspection method from the specified options.
31. In the **Material** box, select the material from a drop-down list.
32. In the **Penetrant System** box, select the type of penetrant system.
33. In the **Lighting** box, select the type of lighting.
34. In the **Remarks/Drawing Title** box, enter your remarks if any.
35. Click **Save DPT Details**.

The DPT details are successfully updated. Once you have updated the DPT details, you must add DPT inspection results for the added joints.

[![image-1651462044014.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651462044014.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651462044014.png)**Note**: Once you have added DPT details, you can save the added DPT details and reuse the saved details while you adding DPT details for any other DPT report.

[![image-1651462057600.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651462057600.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651462057600.png)

- To save the added DPT details, enter any name in the **Set Default** box and click .
- If you want to add the same DPT details for any other DPT report, select the name in the ****Get Default****. The saved details will be automatically updated in the respective boxes.

#### **6.4.2.1 Add PT Results for Joints**

The **DPT Results** window shows a list of joints added for the PT inspection. If you want to add PT results for joints,

1. Click [![image-1651462136442.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651462136442.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651462136442.png)(Edit icon) for the respective joint listed in the ****DPT Results**** window. The **UT Results** window opens with the added UT details.
    
    [![image-1651462159549.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651462159549.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651462159549.png)
2. In the **Result** box, update your PT inspection results whether **Accepted**, **Rejected**, or **Cancelled**.
3. In the **Remarks** box, enter your remarks if any.
4. Click Save.

#### **6.4.2.2 Import Additional Joints**

If you want to add more joints, you can add by using the import joints option. To import joints,

1. Click [![image-1651462236651.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651462236651.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651462236651.png) (**Import Joints** button) in the **DPT Results** window. See Fig 6.4.1.
    
    The **Joints** window opens with a list of joints.
    
    [![image-1651462253710.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651462253710.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651462253710.png)
2. Select the joints you want to import.
3. Click [![image-1651462290676.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651462290676.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651462290676.png) (****Import Selected Joints**** button). The selected joints are imported and listed in the **DPT Results** window. Once you have added joints, you must update the DPT results for added joints.

#### **6.4.2.3 Add Report Photos**

If you want to add any report photos for the updated DPT results,

1. Click [![image-1651462362252.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651462362252.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651462362252.png) (****ADD**** button) in the ****Report Photos**** box in the ****DPT Results**** See Fig 6.4.1. [![image-1651462378894.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651462378894.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651462378894.png)
2. Click [![image-1651462395423.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651462395423.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651462395423.png) (**Browse** button) to browse a photo stored in your computer.
3. Click **Upload**.

The selected photo will be updated.

#### **6.4.3 Attach a File into a PT Report**

If you want to attach any file with any PT report listed in the P**T Report** page, you can attach the file by using [![image-1651462436780.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651462436780.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651462436780.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **6.4.4 View an NDT – PT Report**

If you want to view an NDT - PT report, click [![image-1651462480783.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651462480783.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651462480783.png)(print icon) provided in the **Report** column of the **PT Report** page. See Fig 6.4.

#### **6.4.5 Edit a PT Report**

If you want to edit any existing PT report in the **RT Report** page, do the following steps,

1. Click [![image-1651462525855.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651462525855.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651462525855.png)(Edit icon) in the ****Edit**** column for the respective DPT report. See Fig 6.4. The **RT Report** page shows the details of the selected PT report.
    
    [![image-1651462547666.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651462547666.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651462547666.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.4.6 Export PT Report List**

You can export a list of RT reports added in the **RT Report** page in both the pdf and excel formats by using[![image-1651462599355.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651462599355.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651462599355.png) (**PDF** button) and [![image-1651462608849.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651462608849.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651462608849.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **6.4.7 Filter a PT Report** 

If you want to filter any PT report, do one of the following,

[![image-1651462644477.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651462644477.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651462644477.png)

1. If you want to filter any DPT report based on the report number, enter the corresponding report number in the **Report No** box in the **PT Report** page, and then Click **Search**.
2. If you want to filter any DPT report based on the request number, enter the corresponding request number in the ****Request No**** box in the ****PT Report**** page, and then Click ****Search****.
3. If you want to filter any DPT report based on the drawing number, enter the corresponding drawing number in the ****Drawing No**** box in the ****PT Report**** page, and then Click ****Search****.

### **6.5 Magnetic Particle Testing (MT)**

Magnetic Particle Testing also referred to as Magnetic Particle Inspection is one of the NDT inspection methods used to detect defects or discontinuities such as cracks, at or near the surface in ferromagnetic metals such as iron, steel, nickel, cobalt and so on, in the piping project.

Once the NDT inspection request is added with the selection of MT type by using the [<u>**NDT Inspection Request**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.5%C2%A0ndt-inspection-r) tab, the added inspection request will be moved here. After completing the MT inspection, you can add the MT inspection result details by using this MT tab.

To navigate to **Magnetic Particle Testing (MT)**,

1. Click ****Magnetic Particle Testing (MT)****in the ****Piping**** menu. The **MT Report** page opens.
    
    [![image-1651463363441.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651463363441.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651463363441.png)
    
     **Figure 6.5: MT Report page**

#### **6.5.1 Add an MT Report**

If you want to add an MT report, do the following steps,

1. Click [![image-1651463425912.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651463425912.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651463425912.png) (**ADD** button) in the **MT Report** page. See Fig 6.5.
    
    The **MT Report** page shows a new window opens to add an MT report.
    
    [![image-1651463462784.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651463462784.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651463462784.png)
    
    [![image-1651463476191.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651463476191.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651463476191.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651463516998.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651463516998.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651463516998.png)**Tip**: A report number for a new MT report will be updated automatically in the **Report Number** box.
2. In the ****NDT By**** box, select the requisition detail of NDT inspection whether by third party or internal.
3. In the ****NDT** **Request No**** box, select an NDT request number from a drop-down list.
4. In the **Prepared By** box, enter the name of a person who has prepared the MT report.
5. In the ****Prepared Date**** box, select the prepared date of the MT report.
6. In the ****Reviewed By**** box, enter the name of a person who has reviewed the MT request.
7. In the ****Reviewed Date**** box, select the reviewed date of the MT report.
8. In the **Accepted/Approved By** boxes, enter the name of a person who has accepted/approved the MT report.
9. In the ****Accepted/Approved Date**** box, select the accepted/approved date of the MT report.
10. Click **Save**.

The MT report is successfully added and listed in the **MT Report** page. Once you have added the MT report, you must add MT results for the respective MT report.

#### **6.5.2 Add MT Results** 

If you want to add the MT results for the respective MT report, do the following,

1. Click the respective MT report in the **MT Report** page. See Fig 6.5. The **MT Report** page shows **MPT Results** and **Report Photos** window.
    
    [![image-1651463644963.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651463644963.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651463644963.png)
    
     **Figure 6.5.1: MT Results page**
2. In the **Inspection Date** box, select the date of inspection.
3. In the **Test Equipment** box, select the test equipment from a drop-down list.
4. In the **Description** box, enter the description.
5. In the **Test Procedure** box, select the test procedure from a drop-down list.
6. In the **Test Method** box, select the test method from a drop-down list.
7. In the **Black Magnetic Ink** box, select the type of black magnetic ink from a drop-down list.
8. In the **Surface Condition** box, enter the condition of the surface.
9. In the **Light Source** box, enter the light source detail.
10. In the **White Contrast Paint** box, select the type of white contrast paint.
11. In the **Material Specification** box, enter the material specification.
12. In the **Material Thickness** box, enter the material thickness value.
13. In the **Type of Current** box, enter the type of current.
14. In the **Lifting Capacity** box, select the lifting capacity value.
15. In the **Acceptance Criteria** box, select the acceptance criteria from a drop-down list.
16. In the **Yoke/ Prod Space** box, enter the relevant information.
17. In the **Particles Type** box, select the type of particles from a drop-down list.
18. In the **Particles Make &amp; model** box, enter the model of the particle including made of materials.
19. In the **Background Contrast &amp; Type** box, enter the type of background including contrast range.
20. In the ****Demagnetization**** box, if you want demagnetization select ****Yes**** otherwise select ****No****.
21. In the ****Magnetizing Technique**** box, enter the magnetizing technique.
22. In the **Surface Temperature** box, enter the surface temperature value.
23. In the **Code** box, enter the code detail.
24. In the **Color** box, select any color from the specified options.
25. In the **Suspension** box, select any suspension liquid from the specified options.
26. In the **Lighting** box, select any lighting from the specified options.
27. In the **Method** box, select any method from the specified options.
28. In the **Item Tested** box, select the tested items from the specified options.
29. In the **Examination Stage** box, select the examination stage from the specified options.
30. In the **Remarks** box, enter your remarks if any.
31. Click **Save MPT Details**.

The MT details are successfully updated. Once you have updated the MT details, you must add MT inspection results for the added joints.

[![image-1651463886205.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651463886205.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651463886205.png)**Note**: Once you have added MT details, you can save the added MT details and reuse the saved details while you adding MT details for any other MT report.

[![image-1651463903221.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651463903221.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651463903221.png)

- To save the added MT details, enter any name in the **Set Default** box and click. The added details will be saved in the given name.
- If you want to add the same MT details for any other MT report, select the name in the **Get Default**.

The saved details will be automatically updated in the respective boxes.

#### **6.5.2.1 Add MT Results for Joints**

The **MPT Results** window shows a list of joints added for the MT inspection. If you want to add MT results for joints,

1. Click [![image-1651467449934.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651467449934.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651467449934.png)(Edit icon) for the respective joint listed in the ****MPT Results**** window. The **MPT Results** window opens a new window with the added MT details.
    
    [![image-1651467485929.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651467485929.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651467485929.png)
2. In the **Result** box, update your MT inspection results whether **Accepted**, **Rejected**, or **Cancelled**.
3. In the ****Remarks**** box, enter your remarks if any.
4. Click **Save**.

#### **6.5.2.2 Import Additional joints**

If you want to import joints for the updated MPT results,

1. Click [![image-1651467647315.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651467647315.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651467647315.png) (**Import Joints** button) in the **MPT Results** window. See Fig 6.5.1.
    
    The **Joints** window opens with a list of joints.
    
    [![image-1651467668812.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651467668812.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651467668812.png)
2. Select the joints you want to import.
3. Click [![image-1651467741861.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651467741861.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651467741861.png) (****Import Selected Joints**** button). The selected joints are added and listed in the **MPT results** window. You must add the MT inspection results for the added joints.

#### **6.5.2.3 Add Report Photos**

If you want to add any report photos for the updated MT results,

1. Click (**ADD** button) in the **Report Photos** box in the **MPT Results** window. See Fig 6.5.1.
    
    [![image-1651467845780.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651467845780.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651467845780.png)
2. Click [![image-1651467878820.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651467878820.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651467878820.png) (**Browse** button) to browse a photo stored in your computer.
3. Click **Upload**.

The selected photo will be updated.

### **6.5.3 Attach a File into an MT Report**

If you want to attach any file with any MT report listed in the **MT Report** page, you can attach the file by using [![image-1651467978037.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651467978037.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651467978037.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

### **6.5.4 View an NDT – MT Report**

If you want to view an NDT - MT report, click [![image-1651468087425.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651468087425.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651468087425.png)(print icon) provided in the **Report** column of the **MT Report** page. See Fig 6.5.

### **6.5.5 Edit a MT Report**

 If you want to edit any existing MT report in the **MT Report** page, do the following steps,

1. Click [![image-1651468355189.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651468355189.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651468355189.png)(Edit icon) in the ****Edit**** column for the respective MT report. See Fig 6.5. A new window opens to edit the MT report.
    
    [![image-1651468379679.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651468379679.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651468379679.png)
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

### **6.5.6 Export MT Report List**

You can export a list of RT reports added in the **RT Report** page in both the pdf and excel formats by using [![image-1651468439909.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651468439909.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651468439909.png)(**PDF** button) and [![image-1651468450780.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651468450780.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651468450780.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

### **6.5.7 Filter a MT Report** 

If you want to filter any MT report, do one of the following,

[![image-1651468483436.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651468483436.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651468483436.png)

1. If you want to filter any MT report based on the report number, enter the corresponding report number in the **Report No** box in the **MT Report** page, and then Click **Search**.
2. If you want to filter any MT report based on the request number, enter the corresponding request number in the ****Request No**** box in the ****MT Report**** page, and then Click ****Search****.
3. If you want to filter any MT report based on the drawing number, enter the corresponding drawing number in the ****Drawing No**** box in the ****MT Report**** page, and then Click ****Search****.

### **6.6 Phased Array Ultrasonic Testing (PAUT) Inspection**

PAUT is an advanced NDT inspection technique that utilizes multiple UT probes to inspect more complex geometries. PAUT used to inspect almost any material where traditional UT methods have been utilized for weld inspections and crack detection.

The **PAUT** tab in the **Piping** menu helps you to add a PAUT report. Once the NDT inspection request is added with the selection of PAUT type by using the [<u>**NDT Inspection Request**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.5%C2%A0ndt-inspection-r) tab, the added inspection request will be moved here.

After completing the PAUT inspection, you can add the PAUT inspection result details by using this **PAUT** tab. To navigate to **PAUT**,

1. Click **PAUT** in the **Piping** menu.
    
    The **PAUT Report** page opens.
    
    [![image-1651468857506.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651468857506.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651468857506.png)
    
    [![image-1651468864583.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651468864583.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651468864583.png)
    
     **Figure 6.6: PAUT Report page**

#### **6.6.1 Add a PAUT Report**

If you want to add a PAUT report, do the following steps,

1. Click [![image-1651469266450.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651469266450.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651469266450.png) (**ADD** button) in the **PAUT Report** page. See Fig 6.6. The **PAUT Report** page shows a new window to add the details of a PAUT report.
    
    [![image-1651469461920.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651469461920.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651469461920.png)
    
    [![image-1651469472224.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651469472224.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651469472224.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651469491662.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651469491662.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651469491662.png)**Tip**: A report number for a new PAUT report will be updated automatically in the **Report Number** box. If you want to change the report number, you can change.
2. In the **NDT By** box, select the requisition detail of NDT whether by third party or internal.
3. In the **NDT** **Request No** box, select an NDT request number from a drop-down list.
4. In the **Prepared By** box, enter the name of a person who has prepared the PAUT report.
5. In the **Prepared Date** box, select the prepared date of the PAUT report.
6. In the **Reviewed By** box, enter the name of a person who has reviewed the PAUT report.
7. In the **Reviewed Date** box, select the reviewed date of the PAUT report.
8. In the ****Accepted/ Approved By**** boxes, enter the name of a person who has approved the PAUT report.
9. In the **Accepted/ Approved Date** box, select the approved date of the PAUT report.
10. Click **Save**.

The PAUT report is successfully added and listed in the **PAUT Report** page. Once you have added the PAUT report, you must add PAUT inspection result details.

#### **6.6.2 Add PAUT Inspection Results**

If you want to add the PAUT results for the respective PAUT report, do the following steps,

1. Click the respective PAUT report in the **PAUT Report** page. See Fig 6.6.
    
    The **PAUT Report** page shows **Joint Results**, **PAUT Results**, and **Report Photos** windows.
    
    [![image-1651469637487.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651469637487.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651469637487.png)
    
     **Figure 6.6.1: PAUT Results adding page**
2. In the **Inspection Date** box, select the date of inspection.
3. In the **Material Thickness** box, enter the thickness of the material.
4. In the **Selection of IQI** box, select an IQI from a drop-down list.
5. In the **Source and Size (MM)** box, select a source from a drop-down list.
6. In the **Material** box, enter the name of the material.
7. In the **Density** box, enter the density value of the material.
8. In the **Acceptance Standard/Code** box, select the acceptance standard/code from a drop-down list.
9. In the **Procedure Number** box, select the procedure number from a drop-down list.
10. In the **Sensitivity** box, set the sensitivity value of the material.
11. In the **Developing Time (Mins)** box, set the developing time.
12. In the **Film Type** box, select the type of film.
13. In the **Surface Condition** box, enter the surface condition detail.
14. In the **Source to Object Distance (SOD)** box, enter the distance value from source to object.
15. In the **Placement of IQI** box, enter the placement detail of IQI.
16. In the **Lead Screens** box, enter the lead screens detail.
17. In the **Density through IQI** box, enter the density through IQI detail.
18. In the **Front** and **Back** boxes, enter the front and back details.
19. In the **Location Marker** box, enter the location marker detail.
20. In the **Densitometer Serial Number** box, enter the densitometer serial number.
21. In the **Visible Wire/Hole** box, enter the detail of visible wire/hole.
22. In the **Remarks** box, enter your remarks if any.
23. Click **Save PAUT Details**.

The PAUT details are successfully updated. Once you have updated the PAUT details, you must add the PAUT inspection results for joints in the **Joint Results** window.

[![image-1651469819519.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651469819519.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651469819519.png)**Note**: Once you have added PAUT details, you can save the added PAUT details and reuse the saved details while you adding PAUT details for any other PAUT report.

[![image-1651469836535.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651469836535.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651469836535.png)

- To save the added PAUT details, enter any name in the **Set Default** box and click . The added details will be saved in the given name.
- If you want to add the same PAUT details for any other PAUT report, select the name in the ****Get Default****.

The saved details will be automatically updated in the respective boxes.

#### **6.6.2.1 Add PAUT Results for Joints**

The **Joint Results** window shows a list of joints added for the PAUT inspection. If you want to add PAUT results for joints,

1. Click [![image-1651469915727.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651469915727.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651469915727.png) (Edit icon) for the respective joint listed in the ****Joint Results**** window. The **Joint Results** window opens a new window with the added joint details.
    
    [![image-1651469942131.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651469942131.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651469942131.png)
2. In the ****Result**** box, update your PWHT inspection results whether ****Accepted****, ****Rejected****, or ****Cancelled****.
3. In the **Remarks** box, enter your remarks if any.
4. Click **Save**.

#### **6.6.2.2 Add Report Photos**

If you want to add any report photos for the updated PAUT results,

1. Click [![image-1651470017102.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651470017102.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651470017102.png) (**ADD** button) in the **Report Photos** window. See Fig 6.6.1.
    
    [![image-1651470010993.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651470010993.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651470010993.png)
2. Click [![image-1651470038246.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651470038246.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651470038246.png) (****Browse**** button) to browse a photo stored in your computer.
3. Click **Upload**.

The selected photo will be updated.

#### **6.6.3 Attach a File into a PAUT Report**

If you want to attach any file with any PAUT report listed in the **PAUT Report** page, you can attach the file by using [![image-1651470394291.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651470394291.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651470394291.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **6.6.4 View a PAUT Report**

If you want to view a PAUT report, click [![image-1651470435010.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651470435010.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651470435010.png)(print icon) provided in the **Report** column of the **PAUT Report** page. See Fig 6.6.

#### **6.6.5 Edit a PAUT Report**

 If you want to edit any existing PAUT report in the **PAUT Report** page, do the following,

1. Click[![image-1651470484604.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651470484604.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651470484604.png)(Edit icon) in the **Edit** column for the respective PAUT report. See Fig 6.6. The **PAUT Report** page shows the details of the added PAUT report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.6.6 Export PAUT Report List**

You can export a list of PAUT reports added in the **PAUT Report** page in both the pdf and excel formats by using [![image-1651470557699.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651470557699.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651470557699.png) (**PDF** button) and [![image-1651470567609.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651470567609.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651470567609.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **6.6.7 Filter a PAUT Report** 

If you want to filter any PAUT report,

[![image-1651470602365.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651470602365.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651470602365.png)

1. If you want to filter any PAUT report based on the report number, enter the corresponding report number in the **Report No** box in the **PAUT Report** page, and then Click **Search**.
2. If you want to filter any PAUT report based on the request number, enter the corresponding request number in the ****Request No**** box in the ****PAUT Report**** page, and then Click ****Search****.
3. If you want to filter any PAUT report based on the drawing number, enter the corresponding drawing number in the ****Drawing No**** box in the ****PAUT Report**** page, and then Click ****Search****.

### **6.7 Time of Flight Diffraction (TOFD) Inspection**

TOFD is a reliable method of NDT- UT used to look for flaws in welds. TOFD uses the time of flight of an ultrasonic pulse to find the location of a reflector. TOFD can also be used for weld overlays in piping.

The **TOFD** tab in the **Piping** menu helps you to add a TOFD report. Once the NDT inspection request is added with the selection of TOFD type by using the [**<u>NDT Inspection Request</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.5%C2%A0ndt-inspection-r) tab, the added inspection request will be moved here.

After completing the TOFD inspection, you can add the TOFD inspection result details by using this **TOFD** tab. To navigate to **TOFD**,

1. Click **TOFD** in the **Piping** menu.
    
    The **TOFD Report** page opens.
    
    [![image-1651470727236.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651470727236.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651470727236.png)
    
    [![image-1651470736781.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651470736781.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651470736781.png)
    
     **Figure 6.7: TOFD Report page**

#### **6.7.1 Add a TOFD Report**

If you want to add a TOFD report, do the following steps,

1. Click [![image-1651470811053.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651470811053.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651470811053.png) (****ADD**** button) in the ****TOFD Report****  See Fig 6.7. The **TOFD Report** page shows a new window to add the details of a TOFD report.
    
    [![image-1651470833318.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651470833318.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651470833318.png)
    
    [![image-1651470838266.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651470838266.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651470838266.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651470857877.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651470857877.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651470857877.png)**Tip**: A report number for a new TOFD report will be updated automatically in the **Report Number** box. If you want to change the report number, you can change.
2. In the **NDT By** box, select the requisition detail of NDT whether by third party or internal.
3. In the **NDT** **Request No** box, select an NDT request number from a drop-down list.
4. In the **Prepared By** box, enter the name of a person who has prepared the TOFD report.
5. In the **Prepared Date** box, select the prepared date of the TOFD report.
6. In the **Reviewed By** box, enter the name of a person who has reviewed the TOFD report.
7. In the **Reviewed Date** box, select the reviewed date of the TOFD report.
8. In the **Accepted/ Approved By** boxes, enter the name of a person who has approved the TOFD report.
9. In the **Accepted/ Approved Date** box, select the approved date of the TOFD report.
10. Click **Save**.

The TOFD report is successfully added and listed in the **TOFD Report** page. Once you have added the TOFD report, you must add TOFD inspection result details.

#### **6.7.2 Add TOFD Inspection Results**

If you want to add the TOFD results for the respective TOFD report, do the following steps,

1. Click the respective TOFD report in the **TOFD Report** page. See Fig 6.7.
    
    The **TOFD Report** page shows **Joint Results**, **TOFD Results**, and **Report Photos** windows.
    
    [![image-1651470982952.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651470982952.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651470982952.png)
    
     **Figure 6.7.1: TOFD Results adding page**
2. In the **Inspection Date** box, select the date of inspection.
3. In the **Material Thickness** box, enter the thickness of the material.
4. In the **Selection of IQI** box, select an IQI from a drop-down list.
5. In the **Source and Size (MM)** box, select a source from a drop-down list.
6. In the **Material** box, enter the name of the material.
7. In the **Density** box, enter the density value of the material.
8. In the **Acceptance Standard/Code** box, select the acceptance standard/code from a drop-down list.
9. In the **Procedure Number** box, select the procedure number from a drop-down list.
10. In the **Sensitivity** box, set the sensitivity value of the material.
11. In the **Developing Time (Mins)** box, set the developing time.
12. In the **Film Type** box, select the type of film.
13. In the **Surface Condition** box, enter the surface condition detail.
14. In the **Source to Object Distance (SOD)** box, enter the distance value from source to object.
15. In the **Placement of IQI** box, enter the placement detail of IQI.
16. In the **Lead Screens** box, enter the lead screens detail.
17. In the **Density through IQI** box, enter the density through IQI detail.
18. In the **Remarks** box, enter your remarks if any.
19. Click **Save TOFD Details**.

The TOFD details are successfully updated. Once you have updated the TOFD details, you must add the TOFD inspection results for joints in the **Joint Results** window.

[![image-1651471174153.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471174153.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471174153.png)**Note**: Once you have added TOFD details, you can save the added TOFD details and reuse the saved details while you adding TOFD details for any other TOFD report.

[![image-1651471214319.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471214319.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471214319.png)

- To save the added TOFD details, enter any name in the **Set Default** box and click . The added details will be saved in the given name.
- If you want to add the same TOFD details for any other TOFD report, select the name in the ****Get Default****.

The saved details will be automatically updated in the respective boxes.

#### **6.7.2.1 Add TOFD Results for Joints**

The **Joint Results** window shows a list of joints added for the TOFD inspection. If you want to add TOFD results for joints,

1. Click [![image-1651471296024.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471296024.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471296024.png)(Edit icon) for the respective joint listed in the **Joint Results** window.
    
    The **Joint Results** window opens a new window with the added joint details.
    
    [![image-1651471307571.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471307571.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471307571.png)
2. In the **Result** box, update your PWHT inspection results whether **Accepted**, **Rejected**, or **Cancelled**.
3. In the ****Remarks**** box, enter your remarks if any.
4. Click **Save**.

#### **6.7.2.2 Add Report Photos**

If you want to add any report photos for the updated TOFD results,

1. Click [![image-1651471402733.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471402733.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471402733.png)(****ADD**** button) in the ****Report Photos**** See Fig 6.7.1. [![image-1651471395181.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471395181.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471395181.png)
2. Click [![image-1651471421838.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471421838.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471421838.png) (****Browse**** button) to browse a photo stored in your computer.
3. Click **Upload**.

The selected photo will be updated.

### **6.7.3 Attach a File into a TOFD Report**

If you want to attach any file with any TOFD report listed in the **TOFD Report** page, you can attach the file by using [![image-1651471473855.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471473855.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471473855.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

### **6.7.4 View a TOFD Report**

If you want to view a TOFD report, click[![image-1651471517482.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471517482.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471517482.png)(print icon) provided in the **Report** column of the **PAUT Report** page. See Fig 6.7.

### **6.7.5 Edit a TOFD Report**

 If you want to edit any existing TOFD report in the **TOFD Report** page, do the following,

1. Click [![image-1651471590133.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471590133.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471590133.png)(Edit icon) in the **Edit** column for the respective TOFD report. See Fig 6.7. The **TOFD Report** page shows the details of the added TOFD report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

### **6.7.6 Export TOFD Report List**

You can export a list of TOFD reports added in the **TOFD Report** page in both the pdf and excel formats by using [![image-1651471657278.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471657278.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471657278.png) (**PDF** button) and [![image-1651471667825.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471667825.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471667825.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

### **6.7.7 Filter a TOFD Report** 

If you want to filter any TOFD report,

[![image-1651471713753.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471713753.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471713753.png)

1. If you want to filter any TOFD report based on the report number, enter the corresponding report number in the **Report No** box in the **TOFD Report** page, and then Click **Search**.
2. If you want to filter any TOFD report based on the request number, enter the corresponding request number in the **Request No** box in the **TOFD Report** page, and then Click **Search**.
3. If you want to filter any TOFD report based on the drawing number, enter the corresponding drawing number in the ****Drawing No**** box in the ****TOFD Report**** page, and then Click ****Search****.

### **6.8 Post Weld Heat Treatment (PWHT)**

The **PWHT** tab in the **Piping** menu helps you to add a PWHT report. Once the NDT inspection request is added with the selection of PWHT type by using the **[<u>NDT Inspection Request</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.5%C2%A0ndt-inspection-r)** tab, the added inspection request will be moved here.

After completing the PWHT inspection, you can add the PWHT inspection result details by using this PWHT tab. To navigate to **PWHT**,

1. Click **PWHT** in the **Piping** menu. The **PWHT Report** page opens.
    
    [![image-1651471815374.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471815374.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471815374.png)
    
     **Figure 6.8: PWHT Report page**

#### **6.8.1 Add a PWHT Report**

If you want to add a PWHT report, do the following,

1. Click [![image-1651471876805.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471876805.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471876805.png) (****ADD**** button) in the ****PWHT Report****  See Fig 6.8. The **PWHT Report** page shows a new window to add a PWHT report.
    
    [![image-1651471893507.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471893507.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471893507.png)
    
    [![image-1651471904175.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471904175.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471904175.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651471919572.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651471919572.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651471919572.png)**Tip**: A report number for a new PWHT report will be updated automatically in the **Report Number** box. If you want to change the report number, you can change.
2. In the **NDT By** box, select the requisition detail of NDT whether by third party or internal.
3. In the ****Request Number**** box, select an NDT request number from a drop-down list.
4. In the ****Prepared By**** box, enter the name of a person who has prepared the PWHT report.
5. In the ****Prepared Date**** box, select the prepared date of the PWHT report.
6. In the ****Reviewed By**** box, enter the name of a person who has reviewed the PWHT report.
7. In the ****Reviewed Date**** box, select the reviewed date of the PWHT report.
8. In the ****Reviewed Date**** box, select the reviewed date of the PWHT report.
9. In the **Accepted/ Approved Date** box, select the approved date of the PWHT report.
10. Click **Save**.

The PWHT report is successfully added and listed in the **PWHT Report** page. Once you have added the PWHT report, you must add PWHT inspection result details.

#### **6.8.2 Add PWHT Results** 

If you want to add the PWHT results for the respective PWHT report, do the following steps,

1. Click the respective PWHT report in the **PWHT Report** See Fig 6.8. The **PWHT Report** page shows **PWHT Results**, **Joint Results**, and **Report Photos** windows.[![image-1651472107759.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651472107759.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651472107759.png) **Figure 9.8.1: PWHT Results page**
2. In the **Inspection Date** box, select the inspection date.
3. In the **Material Specification** box, enter the specification for the material.
4. In the **Governing Thickness** box, enter the governing thickness value.
5. In the **Governing Code/Specification** box, enter the governing code/specification.
6. In the **HT Procedure No** box, select the HT procedure number.
7. In the **No. of Thermo Couple** box, enter the number of thermo couple.
8. In the **Controlled** **Heating Rate** box, enter the controlled heating rate value.
9. In the **Heating Rate From (Temperature)** box, enter the heating rate starting range.
10. In the **Soaking Temperature** box, enter the soaking temperature value.
11. In the **Soaking Time** box, enter the soaking time value.
12. In the **Controlled Cooling Rate** box, enter the range of controlled cooling rate.
13. In the **Cooling Rate Up to (Temperature)** box, enter the cooling rate temperature range.
14. In the **Soaking Temperature** box, enter the soaking temperature value.
15. In the **Remarks** box, enter your remarks if any.
16. In the **Result** box, enter your PWHT result.
17. Click **Save PWHT Details**.

The PWHT details are successfully updated. Once you have updated the PWHT details, you must add the PWHT inspection results for joints in the **Joint Results** window.

[![image-1651472359339.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651472359339.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651472359339.png)**Note**: Once you have added PWHT details, you can save the added PWHT details and reuse the saved details while you adding PWHT details for any other PWHT report.

[![image-1651472395679.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651472395679.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651472395679.png)

- To save the added PWHT details, enter any name in the **Set Default** box and click . The added details will be saved in the given name.
- If you want to add the same PWHT details for any other PWHT report, select the name in the ****Get Default****.

The saved details will be automatically updated in the respective boxes.

#### **6.8.21 Add PWHT Results for Joints**

The **Joint Results** window shows a list of joints added for the PWHT inspection. If you want to add PWHT results for joints,

1. Click [![image-1651472469335.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651472469335.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651472469335.png)(Edit icon) for the respective joint listed in the ****Joint Results**** window. The **Joint Results** window opens a new window with the added joint details.
    
    [![image-1651472500428.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651472500428.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651472500428.png)
2. In the ****Result**** box, update your PWHT inspection results whether ****Accepted****, ****Rejected****, or ****Cancelled****.
3. In the **Remarks** box, enter your remarks if any.
4. Click **Save**.

#### **6.8.2.2 Add Report Photos**

If you want to add any report photos for the updated PWHT results,

1. Click (**ADD** button) in the **Report Photos** window. See Fig 6.8.1. [![image-1651475015929.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651475015929.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651475015929.png)
2. Click [![image-1651475034790.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651475034790.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651475034790.png) (****Browse**** button) to browse a photo stored in your computer.
3. Click **Upload**.

The selected photo will be updated.

### **6.8.3 Attach a File into a PWHT Report**

If you want to attach any file with any PWHT report listed in the **PWHT Report** page, you can attach the file by using [![image-1651475091390.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651475091390.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651475091390.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

### **6.8.4 View a PWHT Report**

If you want to view a PWHT report, click[![image-1651475142945.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651475142945.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651475142945.png)(print icon) provided in the **Report** column of the **PWHT Report** page. See Fig 6.8.

### **6.8.5 Edit a PWHT Report**

If you want to edit any existing PWHT report in the **PWHT Report** page, do the following,

1. Click [![image-1651475201757.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651475201757.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651475201757.png)(Edit icon) in the **Edit** column for the respective PWHT report. See Fig 6.8. The **PWHT Report** page shows the details of the added PWHT report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

### **6.8.6 Export PWHT Report List**

You can export a list of PWHT reports added in the **PWHT Report** page in both the pdf and excel formats by using [![image-1651475288882.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651475288882.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651475288882.png)(**PDF** button) and [![image-1651475311047.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651475311047.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651475311047.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

### **6.8.7 Filter a PWHT Report** 

If you want to filter any PWHT report,

- Use [![image-1651475359425.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651475359425.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651475359425.png) (**FILTER** button) in the **PWHT Report** page, See Fig 6.8. (OR)
- Do one of the following steps to filter the PWHT report,
    
    [![image-1651475377449.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651475377449.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651475377449.png)
    
    
    1. 1. If you want to filter any PWHT report based on the report number, enter the corresponding report number in the **Report No** box in the **PWHT Report** page, and then Click **Search**.
        2. If you want to filter any PWHT report based on the request number, enter the corresponding request number in the ****Request No**** box in the ****PWHT Report**** page, and then Click ****Search****.
        3. If you want to filter any PWHT report based on the drawing number, enter the corresponding drawing number in the ****Drawing No**** box in the ****PWHT Report**** page, and then Click ****Search****.

### **6.9 Positive Material Identification (PMI)**

PMI is one of the more specialized NDT methods. With positive material identification, the alloy composition of materials can be determined.

PMI is one of the more specialized NDT methods. With positive material identification, the alloy composition of materials can be determined.

After completing the PMI inspection, you can add the PMI inspection result details by using this **PMI** tab. To navigate to **PMI**,

1. Click ****PMI**** in the ******Piping****** menu. The **PMI Report** page opens.
    
    [![image-1651475539031.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651475539031.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651475539031.png)
    
     **Figure 6.9: PMI Report page**

#### **6.9.1 Add a PMI Report**

If you want to add a PMI report, do the following,

1. Click [![image-1651475655267.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651475655267.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651475655267.png) (**ADD** button) in the **PMI Report** page. See Fig 6.9.
    
    The **PMI Report** page shows a new window to add a new PMI report.
    
    [![image-1651475676855.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651475676855.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651475676855.png)
    
    [![image-1651475692787.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651475692787.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651475692787.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651475714260.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651475714260.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651475714260.png)**Tip**: A report number for a new PMI report will be updated automatically in the **Report Number** box. If you want to change the report number, you can change.
2. In the ****NDT By**** box, select the requisition detail of NDT whether by third party or internal.
3. In the ****Request No**** box, select an NDT request number from a drop-down list.
4. In the ****Prepared By**** box, enter the name of a person who has prepared the PMI report.
5. In the ****Prepared Date**** box, select the prepared date of the PMI report.
6. In the ****Reviewed By**** box, enter the name of a person who has reviewed the PMI report.
7. In the ****Reviewed Date**** box, select the reviewed date of the PMI report.
8. In the ****Accepted/ Approved By**** boxes, enter the name of a person who has approved the PMI report.
9. In the ****Accepted/ Approved Date**** box, select the approved date of the PMI report.
10. Click **Save**.

The PMI report is successfully added and listed in the **PMI Report** page. Once you have added the PMI report, you must add PMI inspection result details.

### **6.6.2 Add PMI Results** 

If you want to add the PMI results for the respective PMI report, do the following steps,

1. Click the respective PMI report in the ****PMI Report**** See Fig 6.9. The **PMI Report** page shows **PMI Results**, **PMI Elements, PMI** **Joint Details**, and **Report Photos** windows.
    
    [![image-1651475866923.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651475866923.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651475866923.png)
    
     **Figure 9.9.1: PMI Results page**
2. In the **Inspection Date** box, select the inspection date.
3. In the ****Test Equipment**** box, select the test equipment from a drop-down list.
4. In the **Material Spec** box, select the material specification from a drop-down list.
5. In the ****Text Range**** box, enter the detail of text range.
6. In the ****Examination Stage**** box, select the examination stage from the given options.
7. Click ****Save PMI Details****.

The PMI details are successfully updated. Once you have updated the PMI details, you must add the PMI inspection results for the added elements.

#### **6.9.2.1 Add PMI Results for Elements**

The **PMI Elements** window shows a list of elements added for the PMI inspection. If you want to add PMI results for elements,

1. Click [![image-1651476005640.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651476005640.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651476005640.png)(Edit icon) for the respective element listed in the **PMI Elements** window. The **PMI Elements** window opens a new window on each column with the added element details.
    
    [![image-1651476035438.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651476035438.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651476035438.png)
2. Enter the relevant details in each column.
3. In the ****Result**** column, update your PMI inspection results whether ****Accepted****, ****Rejected****, or ****Cancelled****.
4. Click ****Save****.

#### **6.9.2.2 Add More Elements**

If you want to add more elements, do the following steps,

1. Click **Add Element** in the **PMI Elements** window. A new window opens in each column of the **PMI Elements** window to add a new element.
    
    [![image-1651476117771.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651476117771.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651476117771.png)
2. Enter the relevant details in the respective columns.
3. Click **Save.**
    
    The element is successfully added.

#### **6.9.2.3 Add PMI Results for Joints**

The **PMI** **Joint Details** window shows a list of joints added for the PMI inspection. If you want to add PMI results for joints,

1. Click [![image-1651476186231.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651476186231.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651476186231.png)(Edit icon) for the respective joint listed in the **PMI Joint Details** window. The **PMI** **Joint Details** window opens a new window with the added joint details.
    
    [![image-1651476224471.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651476224471.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651476224471.png)
2. In the **Result** box, update your PMI inspection results whether **Accepted**, **Rejected**, or **Cancelled.**
3. In the ****Remarks**** box, enter your remarks if any.
4. Click ****Save****.

#### **6.9.2.4 Add Report Photos**

If you want to add any report photos for the updated PMI results,

1. Click [![image-1651476366836.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651476366836.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651476366836.png) (**ADD** button) in the **Report Photos** window. See Fig 6.9.1. [![image-1651476386070.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651476386070.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651476386070.png)
2. Click [![image-1651476406366.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651476406366.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651476406366.png) (****Browse**** button) to browse a photo stored in your computer.
3. Click **Upload**.
    
    The selected photo will be updated.

### **6.9.3 Attach a File into a PMI Report**

If you want to attach any file with any PMI report listed in the **PMI Report** page, you can attach the file by using [![image-1651476463151.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651476463151.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651476463151.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

### **6.9.4 View a PMI Report**

If you want to view a PMI report, click [![image-1651476502082.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651476502082.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651476502082.png)(print icon) provided in the **Report** column of the **PMI Report** page. See Fig 6.9.

### **6.9.5 Edit a PMI Report**

If you want to edit any existing PMI report in the **PMI Report** page, do the following,

1. Click [![image-1651476573380.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651476573380.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651476573380.png)(Edit icon) in the **Edit** column for the respective PMI report. See Fig 6.9. The **PMI Report** page shows the details of the added PMI report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

### **6.9.6 Export PMI Report List**

You can export a list of PMI reports added in the **PMI Report** page in both the pdf and excel formats by using [![image-1651476663846.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651476663846.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651476663846.png) (**PDF** button) and [![image-1651476682614.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651476682614.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651476682614.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

### **6.9.7 Filter a PMI Report** 

If you want to filter any PMI report,

- Use [![image-1651476737184.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651476737184.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651476737184.png) (**FILTER** button) in the **PMI Report** page, See Fig 6.9. (OR)
- Do one of the following steps to filter the PMI report,
    
    [![image-1651476758789.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651476758789.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651476758789.png)
    
    
    - 1. If you want to filter any PMI report based on the report number, enter the corresponding report number in the ****Report No**** box in the ****PMI Report**** page, and then Click ****Search****.
        2. If you want to filter any PMI report based on the request number, enter the corresponding request number in the ****Request No**** box in the ****PMI Report**** page, and then Click ****Search****.
        3. If you want to filter any PMI report based on the drawing number, enter the corresponding drawing number in the ****Drawing No**** box in the ****PMI Report**** page, and then Click ****Search****.

### **6.10 Ferrite**

Ferrite testing, also referred to as a ferrite scope test, is a rapid NDT method used to measure the amount of delta ferrite on materials used in the piping project.

The **Ferrite** tab in the **Piping** menu helps you to add a ferrite report. Once the NDT inspection request is added with the selection of ferrite type by using the **[<u>NDT Inspection Request</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.5%C2%A0ndt-inspection-r)** tab, the added inspection request will be moved here.

The **Ferrite** tab in the **Piping** menu helps you to add a ferrite report. Once the NDT inspection request is added with the selection of ferrite type by using the **[<u>NDT Inspection Request</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.5%C2%A0ndt-inspection-r)** tab, the added inspection request will be moved here.

1. Click **Ferrite** in the **Piping** menu. The **Ferrite Report** page opens.
    
    [![image-1651477113567.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651477113567.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651477113567.png)
    
     **Figure 6.10: Ferrite Report page**

#### **6.10.1 Add a Ferrite Report**

If you want to add a ferrite report, do the following steps,

1. Click [![image-1651477182875.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651477182875.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651477182875.png) (**ADD** button) in the **Ferrite Report** page. See Fig 6.10. The **Ferrite Report** page shows a new window to add a new ferrite report.
    
    [![image-1651477200421.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651477200421.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651477200421.png)
    
    [![image-1651477211722.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651477211722.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651477211722.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651477228893.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651477228893.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651477228893.png)**Tip**: The report number for a new ferrite report will be updated automatically in the **Report Number** box. If you want to change the report number, you can change.
2. In the ****NDT By**** box, select the requisition detail of NDT whether by third party or internal.
3. In the ****Request No**** box, select an NDT request number from a drop-down list.
4. In the **Prepared By** box, enter the name of a person who has prepared the ferrite report.
5. In the **Prepared Date** box, select the prepared date of the ferrite report.
6. In the **Reviewed By** box, enter the name of a person who has reviewed the ferrite report.
7. In the **Reviewed Date** box, select the reviewed date of the ferrite report.
8. In the ****Accepted/ Approved By**** boxes, enter the name of a person who has approved the ferrite report.
9. In the ****Accepted/ Approved Date**** box, select the approved date of the PMI report.
10. Click **Save**. The ferrite report is successfully added and listed in the **Ferrite Report** page. Once you have added the ferrite report, you must add ferrite inspection result details.

#### **6.10.2 Add Ferrite Inspection Results** 

If you want to add ferrite inspection results for the respective ferrite report, do the following steps,

1. Click the respective ferrite report in the ****Ferrite Report**** See Fig 6.10. The **Ferrite Report** page shows **Ferrite Results**, **Ferrite Inspection Details, Joint Results**, and **Report Photos** windows.
    
    [![image-1651477384949.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651477384949.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651477384949.png)
    
     **Figure 6.10.1: Ferrite Results page**
2. In the **Inspection Date** box, select the date of ferrite inspection.
3. In the **Test Equipment** box, select the test equipment from a drop-down list.
4. In the **Barcode** box, enter the barcode of the material.
5. In the **Inspection Item** box, enter the detail of inspection items.
6. In the **QCF No** box, enter the QCF number.
7. In the **Line No** box, enter the line number.
8. Click **Save Ferrite Details**.

The ferrite details are successfully updated. Once you have updated the ferrite details, you must add the ferrite inspection results.

#### **6.10.2.1 Add Ferrite Inspection Details**

If you want to add ferrite inspection details,

1. Click **Add Ferrite Inspection** in the **Ferrite Inspection Details** window.
    
    The **Ferrite Inspection Details** window opens a new window on each column.
    
    [![image-1651477824561.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651477824561.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651477824561.png)
2. Enter the relevant details in each column.
3. Click **Save**.

#### **6.10.2.2 Add Joint Results**

The **Joint Results** window shows a list of joints added for the ferrite inspection. If you want to add ferrite inspection results for joints,

[![image-1651477895948.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651477895948.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651477895948.png)

1. Click [![image-1651735737445.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651735737445.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651735737445.png)(Edit icon) for the respective joint listed in the **Joint Results** window. The **Joint Results** window opens a new window with the added joint details.
    
    [![image-1651477939840.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651477939840.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651477939840.png)
2. In the ****Result**** box, update your ferrite inspection results whether ****Accepted****, ****Rejected****, or ****Cancelled****.
3. In the ****Remarks**** box, enter your remarks if any.
4. Click **Save**.

#### **6.10.2.3 Import Joints**

If you want to import multiple joints,

1. Click (**Import Joints** button) in the **Joint Results** window. The **Joints** window opens.
    
    [![image-1651478017444.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651478017444.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651478017444.png)
2. Select the checkbox of the joints you want to import.
3. Click **Import Selected Joints**.
    
    The imported joints will be listed in the **Joint Results** window.

#### **6.10.2.4 Add Report Photos**

If you want to add any report photos for the updated ferrite inspection results,

1. Click [![image-1651480544542.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651480544542.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651480544542.png) (**ADD** button) in the **Report Photos** window. [![image-1651480555413.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651480555413.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651480555413.png)
2. Click [![image-1651480568969.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651480568969.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651480568969.png) (****Browse**** button) to browse a photo stored in your computer.
3. Click **Upload**.
    
    The selected photo will be updated.


### **6.10.3 Attach a File into a Ferrite Report**

If you want to attach any file with any ferrite report listed in the **Ferrite Report** page, you can attach the file by using [![image-1651480626457.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651480626457.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651480626457.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

### **6.10.4 View a Ferrite Report**

If you want to view a ferrite report, click[![image-1651480702173.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651480702173.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651480702173.png)(print icon) provided in the **Report** column of the **Ferrite Report** page. See Fig 6.10.

### **6.10.5 Edit a Ferrite Report**

 If you want to edit any existing ferrite report in the **Ferrite Report** page, do the following steps,

1. Click [![image-1651480780466.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651480780466.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651480780466.png) (Edit icon) in the **Edit** column for the respective ferrite report. See Fig 6.10. The **Ferrite Report** page shows the details of the added ferrite report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

### **6.10.6 Export Ferrite Report List**

You can export a list of ferrite reports added in the **Ferrite Report** page in both the pdf and excel formats by using [![image-1651480859460.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651480859460.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651480859460.png)(**PDF** button) and [![image-1651480871231.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651480871231.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651480871231.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

### **6.10.7 Filter a Ferrite Report**

If you want to filter any ferrite report,

- Use (**FILTER** button) in the **Ferrite Report** page, See Fig 9.10. (OR)
- Do one of the following steps to filter the ferrite report,[![image-1651481112722.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651481112722.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651481112722.png)
    
    
    - 1. If you want to filter any ferrite report based on the report number, enter the corresponding report number in the **Report No** box in the **Ferrite Report** page, and then Click **Search**.
        2. If you want to filter any ferrite report based on the request number, enter the corresponding request number in the ****Request No**** box in the ****Ferrite Report**** page, and then Click ****Search****.
        3. If you want to filter any ferrite report based on the drawing number, enter the corresponding drawing number in the ****Drawing No**** box in the ****Ferrite Report**** page, and then Click ****Search****.


### **6.11 Hardness**

Harness testing is one of the NDT type of inspection. Hardness testing is performed to evaluate the mechanical properties metal joints and other materials thus helps to ensure that the material meets a particular specification.

The **Hardness** tab in the **Piping** menu helps you to add a hardness report. Once the NDT inspection request is added with the selection of hardness type testing by using the [**<u>NDT Inspection Request</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-5.5%C2%A0ndt-inspection-r) tab, the added inspection request will be moved here.

After completing the hardness testing, you can add the hardness testing result details by using this **Hardness** tab. To navigate to **Hardness**,

1. Click **Hardness** in the **Piping** menu. The **Hardness Report** page opens.
    
    [![image-1651481281389.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651481281389.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651481281389.png)
    
     **Figure 6.11: Hardness Report page**

#### **6.11.1 Add a Hardness Report**

If you want to add a hardness report, do the following steps,

1. Click [![image-1651481375997.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651481375997.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651481375997.png) (**ADD** button) in the **Hardness Report**  See Fig 6.11. The **Hardness Report** page shows a new window to add a new hardness report.
    
    [![image-1651481397369.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651481397369.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651481397369.png)
    
    [![image-1651481408213.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651481408213.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651481408213.png) **Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651481421689.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651481421689.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651481421689.png)**Tip**: A report number for a new hardness report will be updated automatically in the **Report Number** box. If you want to change the report number, you can change.
2. In the **NDT By** box, select the requisition detail of NDT whether by third party or internal.
3. In the **Request No** box, select an NDT request number from a drop-down list.
4. In the **Prepared By** box, enter the name of a person who has prepared the hardness report.
5. In the **Prepared Date** box, select the prepared date of the hardness report.
6. In the **Reviewed By** box, enter the name of a person who has reviewed the hardness report.
7. In the **Reviewed Date** box, select the reviewed date of the hardness report.
8. In the **Accepted/ Approved By** boxes, enter the name of a person who has approved the hardness report.
9. In the **Accepted/ Approved Date** box, select the approved date of the hardness report.
10. Click **Save**.

The hardness report is successfully added and listed in the **Hardness Report** page. Once you have added the hardness report, you must add hardness testing result details.

#### **6.11.2 Add Harness Results** 

If you want to add the hardness testing results for the respective Hardness report, do the following steps,

1. Click the respective hardness report in the **Hardness Report** See Fig 6.11. The **Hardness Report** page shows **Hardness Results**, **Joint Results**, and **Report Photos** windows.
    
    [![image-1651481619145.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651481619145.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651481619145.png)
    
     **Figure 6.11.1: Hardness Results page**
2. In the **Inspection Date** box, select the date of hardness testing.
3. In the **Part Description** box, enter the description of a part to be tested for hardness.
4. In the **Weld Map No** box, enter the weld map drawing number.
5. In the **Material Spec &amp; Grade** box, enter the grade and description for the material.
6. In the **Instrument** box, enter the name of the instrument to be used for hardness testing.
7. In the **Instrument Make/ Model/ SL. No.** box, enter the instrument model or serial number.
8. In the **Intender Type** box, enter the type of intender.
9. In the **Result** box, enter the result of hardness test.
10. In the **Procedure No** box, select the procedure number from a drop-down list.
11. In the **Remarks** box, enter your remarks if any.
12. Click **Save Hardness Details**.

The hardness details are successfully updated. Once you have updated the hardness details, you must add the hardness inspection results for the joints.

#### **6.11.2.1 Add Hardness Testing Results of joints**

The **Joint Results** window shows a list of joints added for the hardness test. If you want to add hardness test results for joints,

1. Click [![image-1651481762609.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651481762609.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651481762609.png)(Edit icon) for the respective joint listed in the **Joint Results** window. The **Joint Results** window opens a new window for each column with the added joint details.
    
    [![image-1651481786724.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651481786724.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651481786724.png)
2. Update your hardness test details in all columns.
3. Click **Save**.

#### **6.11.2.2 Add Report Photos**

If you want to add any report photos for the updated hardness test results,

1. Click [![image-1651481861643.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651481861643.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651481861643.png) (**ADD** button) in the **Report Photos** window. [![image-1651481856617.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651481856617.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651481856617.png)
2. Click [![image-1651481889873.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651481889873.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651481889873.png) (**Browse** button) to browse a photo stored in your computer.
3. Click **Upload**.
    
    The selected photo will be updated.

#### **6.11.3 Attach a File into a Hardness Report**

If you want to attach any file with any hardness report listed in the **Hardness Report** page, you can attach the file by using[![image-1651481943631.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651481943631.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651481943631.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **6.11.4 View a Hardness Report**

If you want to view a hardness report, click[![image-1651481989772.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651481989772.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651481989772.png)(print icon) provided in the **Report** column of the **Hardness Report** page. See Fig 6.11.

#### **6.11.5 Edit a Hardness Report**

 If you want to edit any existing hardness report in the **Hardness Report** page, do the following steps,

1. Click [![image-1651482097945.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651482097945.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651482097945.png)(Edit icon) in the **Edit** column for the respective hardness report. See Fig 6.11. The **Hardness Report** page shows the details of the added hardness report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.11.6 Export Hardness Report List**

You can export a list of hardness reports added in the **Hardness Report** page in both the pdf and excel formats by using [![image-1651482171052.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651482171052.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651482171052.png) (**PDF** button) and [![image-1651482183501.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651482183501.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651482183501.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **6.11.7 Filter a Hardness Report** 

If you want to filter any hardness report,

- Use [![image-1651482237773.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651482237773.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651482237773.png) (**FILTER** button) in the **Hardness Report** page, See Fig 6.11. (OR)
- Do one of the following steps to filter the hardness report, [![image-1651482250782.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651482250782.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651482250782.png)
    
    
    - 1. If you want to filter any hardness report based on the report number, enter the corresponding report number in the **Report No** box in the **Hardness Report** page, and then Click **Search**.
        2. If you want to filter any hardness report based on the request number, enter the corresponding request number in the **Request No** box in the **Hardness Report** page, and then Click **Search**.
        3. If you want to filter any hardness report based on the drawing number, enter the corresponding drawing number in the **Drawing No** box in the **Hardness Report** page, and then Click **Search**.


### **6.12 RFI Hydro Pressure Report**

The **RFI Hydro Pressure Report** tab in the **Piping** menu helps you to add a hydro pressure report in piping project. To navigate to **RFI Hydro Pressure Report,**

1. Click **RFI Hydro Pressure Report** in the **Piping** menu. The **Pressure Report** page opens.
    
    [![image-1651482356392.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651482356392.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651482356392.png)
    
     **Figure 6.12: Pressure Report page**

#### **6.12.1 Add a Hydro Pressure Report**

If you want to add a hydro pressure report, do the following steps,

1. Click [![image-1651482424320.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651482424320.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651482424320.png) (**ADD** button) in the **Pressure Report** page. See Fig 6.12. The **Pressure Report** page shows a new window to add details of a new hydro pressure report.
    
    [![image-1651482444728.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651482444728.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651482444728.png)
    
    [![image-1651482457687.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651482457687.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651482457687.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651482472061.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651482472061.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651482472061.png)**Tip**: A report number for a new hydro pressure report will be updated automatically in the **Report Number** box. If you want to change the report number, you can change.
2. In the **Test Pack** box, select the test pack from a drop-down list.
3. In the **Prepared By** box, enter the name of a person who has prepared the hydro pressure report.
4. In the **Prepared Date** box, select the prepared date of the hydro pressure report.
5. In the **Reviewed By** box, enter the name of a person who has reviewed the hydro pressure report.
6. In the **Reviewed Date** box, select the reviewed date of the hydro pressure report.
7. In the **Approved By** boxes, enter the name of a person who has approved the hydro pressure report.
8. In the **Approved Date** box, select the approved date of the hydro pressure report.
9. Click **Save**.

The hydro pressure report is successfully added and listed in the **Pressure Report** page. Once you have added the hydro pressure report, you must add hydro pressure test details.

#### **6.12.2 Add Hydro Pressure Test Details**

If you want to add the hydro pressure test details, do the following steps,

1. Click [![image-1651482616086.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651482616086.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651482616086.png)(Edit icon) in the **Edit Report** column of the **Pressure Report** page. See Fig 6.12. The **Pressure Report** page shows **Test Parameters**, **Equipment Details**, and **Pressure Raise &amp; Reduce Records** windows.
    
    [![image-1651482634787.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651482634787.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651482634787.png)
    
     **Figure 6.12.1: Pressure Report page**
2. In the **Unit No** box, enter the unit number.
3. In the **Sub Contractor** box, enter the name of a sub-contractor.
4. In the **Test Zone** box, enter the detail of test zone.
5. In the **Isometric Drawing No** box, enter the isometric drawing number.
6. In the **Decision** box, select your decision whether confirm or non-confirm.
7. In the **Remarks** box, enter your remarks if any.

#### **6.12.2.1 Add Test Parameters**

If you want to add test parameters for the hydro pressure test, enter the following details in the **Test Parameters** window,

1. In the **Type of Test** box, select the test type from a drop-down list.
2. In the **Test Medium** box, select the test medium from a drop-down list.
3. In the **Test Temperature** box, enter the test temperature value.
4. In the **Procedure No** box, enter the procedure number.
5. In the **Test Date** box, select the test date.
6. In the **Start Time** and **End Time** boxes, enter the start time and end time of test.
7. In the **Duration** box, enter the duration of test.
8. In the **Operating Pressure** box, enter the operating pressure value.
9. In the **Design Pressure** box, enter the design pressure value.
10. In the **Recorded Test Pressure** box, enter the recorded test pressure value.
11. In the **Position** box, enter the position detail.
12. In the **Holding Time (Hrs)** box, enter the holding period in hours.
13. In the **Holding Time (Min)** box, enter the holding period in minutes.
14. In the **Remarks/Observations** box, enter your remarks/observations if any.
15. Click **Save**.

#### **6.12.2.2 Add Equipment Details**

If you want to add equipment details for the hydro pressure test,

1. Click (**ADD** button) in the **Equipment Details** window. [![image-1651482921383.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651482921383.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651482921383.png)
2. In the **Conducted By** box, select the method of conducting hydro pressure test whether **Internal** or
3. In the **Equipment Details** box, select an equipment from a drop-down list.
4. Click **Save**.
    
    The equipment is successfully added and listed in the **Equipment Details** window. Once you have added the equipment, you must add the calibration detail for the added equipment.
5. To add calibration detail, click [![image-1651483173602.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651483173602.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651483173602.png)(Edit icon) in the **Edit** column for the equipment.
    
    The **Equipment Details** windows shows a new window with added equipment details.
    
    [![image-1651483192710.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651483192710.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651483192710.png)
6. In the **Manufacturer** box, enter the name of the manufacturer.
7. In the **Last Calibration Date** box, select the last calibration date.
8. In the **Calibration Due Date** box, select the calibration due date.
9. In the **Calibration Report No** box, enter the calibration report number.
10. Click **Save**.

#### **6.12.2.3 Add Pressure Raise and Reduce Records**

If you want to add pressure raise and reduce records,

1. Click [![image-1651483274292.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651483274292.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651483274292.png) (**ADD** button) in the **Pressure Raise &amp; Reduce Records** window. The **Pressure Raise &amp; Reduce Records** window opens a new window to add the required details.
    
    [![image-1651483302755.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651483302755.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651483302755.png)
2. In the **Date** box, select the pressure testing date.
3. In the **Time** box, enter the time of pressure testing.
4. In the **Pressure** box, enter the pressure value.
5. In the **Remarks** box, enter your remarks if any.
6. Click **Save**.

#### **6.12.3 Attach a File into a Hydro Pressure report**

If you want to attach any file with any hydro pressure report listed in the **Pressure Report** page, you can attach the file by using [![image-1651483358342.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651483358342.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651483358342.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **6.12.4 View a Hydro Pressure Report**

If you want to view a hydro pressure report, click[![image-1651483489650.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651483489650.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651483489650.png)(print icon) provided in the **Report** column of the **Pressure Report** page. See Fig 6.12.

#### **6.12.5 Edit a Hydro Pressure Report**

 If you want to edit any existing hydro pressure report in the **Pressure Report** page, do the following steps,

1. Click[![image-1651483545628.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651483545628.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651483545628.png) (Edit icon) in the **Edit** column for the respective hydro pressure report. See Fig 6.12.
    
    The **Pressure Report** page shows the details of the added pressure report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.12.6 Export Hydro Pressure Report List**

You can export a list of hydro pressure reports added in the **Pressure Report** page in both the pdf and excel formats by using[![image-1651483749235.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651483749235.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651483749235.png) (**PDF** button) and [![image-1651483761023.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651483761023.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651483761023.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **6.12.7 Lock a Hydro Pressure Report** 

If you want to lock any hydro pressure report, select the checkbox of the respective hydro pressure report. See Fig 6.12.



### **6.13 PMI/Hardness Summary Report**

The **PMI/HARDNESS Summary Report** tab in the **Piping** menu helps you to view the PMI and hardness summary report. To view the report,

1. Click **PMI/HARDNESS Summary Report** in the **Piping** menu. The PMI and Hardness summary report page opens.
    
    [![image-1651483860313.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651483860313.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651483860313.png)
    
     **Figure 6.13: PMI/Hardness Summary Report page**
2. If you want to view the PMI summary report, click the **PMI** option. The PMI Summary Report opens.
3. If you want to view the hardness summary report, click the **HARDNESS** option. The Hardness Summary Report opens.

#### **6.13.1 Print a PMI and Hardness Summary Report**

If you want to print a PMI/Hardness summary report, use [![image-1651483966995.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651483966995.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651483966995.png) and [![image-1651483978597.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651483978597.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651483978597.png) (print icons) provided in the PMI and Hardness summary report page.

1. If you want to print the current page of the PMI and Hardness summary report, click[![image-1651484006858.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651484006858.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651484006858.png) (print icon including the page number).
2. If you want to print all the pages of the PMI and Hardness summary report, click[![image-1651484042994.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651484042994.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651484042994.png)(print icon).

#### **6.13.2 View a PMI and Hardness Summary Report** 

You can view the PMI and Hardness summary report in various formats by using the option [![image-1651488463299.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651488463299.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651488463299.png)provided in the upper right corner of the PMI and Hardness summary report page.


### **6.14 Preheat/PWHT Summary Report**

The **PREHEAT/PWHT Summary Report** tab in the **Piping** menu helps you to view the Preheat and PWHT summary report. To view the report,

1. Click **PREHEAT/PWHT Summary Report** in the **Piping** menu. The Preheat and PWHT summary report page opens.
    
    [![image-1651488516069.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651488516069.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651488516069.png)
    
     **Figure 6.14: Preheat/PWHT Summary Report page**
2. If you want to view the preheat summary report, click the ****PREHEAT**** option. The Preheat Summary Report opens.
3. If you want to view the PWHT summary report, click the **PWHT** option.
    
    The PWHT Summary Report opens.

#### **6.14.1 Print a Preheat and PWHT Summary Report**

If you want to print a Preheat/PWHT summary report, use [![image-1651488628251.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651488628251.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651488628251.png)and [![image-1651488642316.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651488642316.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651488642316.png) (print icons) provided in the Preheat and PWHT summary report page.

1. If you want to print the current page of the Preheat and PWHT summary report, click [![image-1651488689373.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651488689373.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651488689373.png) (print icon including the page number).
2. If you want to print all the pages of the Preheat and PWHT summary report, click [![image-1651488715490.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651488715490.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651488715490.png) (print icon).


#### **6.14.2 View a Preheat and PWHT Summary Report** 

You can view the preheat and PWHT summary report in various formats by using the option [![image-1651488787421.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651488787421.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651488787421.png)provided in the upper right corner of the Preheat and PWHT summary report page.


### **6.15 PAUT Summary Report**

The **PAUT Summary Report** tab in the **Piping** menu helps you to view the PAUT summary report. To view the report,

1. Click **PAUT Summary Report** in the **Piping** menu. The PAUT summary report page opens.
    
    [![image-1651491579262.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651491579262.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651491579262.png)
    
     **Figure 6.15: PAUT Summary Report page**

#### **6.15.1 Print a PAUT Summary Report**

If you want to print a PAUT summary report, use [![image-1651491656810.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651491656810.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651491656810.png)and [![image-1651491678343.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651491678343.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651491678343.png) (print icons) provided in the PAUT summary report page.

1. If you want to print the current page of the PAUT summary report, click [![image-1651491711275.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651491711275.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651491711275.png) (print icon including the page number).
2. If you want to print all the pages of the PAUT summary report, click[![image-1651491737978.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651491737978.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651491737978.png) (print icon).

#### **6.15.2 View a PAUT Summary Report** 

You can view the PAUT summary report in various formats by using the option [![image-1651491784222.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651491784222.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651491784222.png)provided in the upper right corner of the PAUT summary report page.


### **6.16 RT Summary Report**

The **RT Summary Report** tab in the **Piping** menu helps you to view the RT summary report. To view the report,

1. Click **RT Summary Report** in the **Piping** menu. The RT summary report page opens.
    
    [![image-1651491841782.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651491841782.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651491841782.png)
    
     **Figure 6.16: RT Summary Report page**

#### **6.16.1 Print a RT Summary Report**

If you want to print a RT summary report, use [![image-1651491902854.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651491902854.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651491902854.png)and [![image-1651491916423.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651491916423.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651491916423.png) (print icons) provided in the RT summary report page.

1. If you want to print the current page of the RT summary report, click [![image-1651491957064.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651491957064.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651491957064.png) (print icon including the page number).
2. If you want to print all the pages of the RT summary report, click[![image-1651491975666.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651491975666.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651491975666.png)(print icon).

#### **6.16.2 View a RT Summary Report** 

You can view the RT summary report in various formats by using the option [![image-1651492015362.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651492015362.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651492015362.png) provided in the upper right corner of the RT summary report page.


### **6.17 Welder Performance Record**

The **Welder Performance Record** tab in the **Piping** menu helps you to view a performance record of welders. To view the welder performance record,

1. Click **Welder Performance Record** in the **Piping** menu. The **Welder Performance Record** page opens.
    
    [![image-1651492255075.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651492255075.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651492255075.png)
    
     **Figure 6.17: Welder Performance Record page**

#### **6.17.1 Add a Welder Performance Record**

If you want to add a welder performance record, do the following steps,

1. Click [![image-1651492326718.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651492326718.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651492326718.png) (**ADD** button) in the **Welder Performance Record** page. The page opens a new window to add the details of the welder performance record.
    
    [![image-1651492362277.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651492362277.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651492362277.png)
    
    [![image-1651492375176.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651492375176.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651492375176.png)**Tip:** The **r**eport number for the welder performance record will be updated automatically. If you want to change the report number, you can change.
2. In the ****Start Date**** and ****End Date**** boxes, select the start and ending dates to view the welder performance record.
3. In the **Prepared By** box, enter the name a person who has prepared the welder performance record.
4. In the ****Prepared Date**** box, enter the prepared date of the welder performance record.
5. In the **Reviewed By** box, enter the name a person who has reviewed the welder performance record.
6. In the **Reviewed By** box, enter the name a person who has reviewed the welder performance record.
7. In the **Approved By** box, enter the name a person who has approved the welder performance record.
8. In the ****Approved Date**** box, enter the approved date of the welder performance record.
9. Click ****Save****. The welder performance record will be added and listed in the **Welder Performance Record** page.

#### **6.17.2 Edit a Welder Performance Record**

 If you want to edit any existing welder performance record in the **Welder Performance Record** page, do the following steps,

1. Click [![image-1651493134127.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651493134127.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651493134127.png)(Edit icon) in the **Edit** column for the respective welder performance record. See Fig 6.17. The **Welder Performance Record** page shows the details of the added welder performance record.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click ****Save****.

#### **6.17.3 View a Welder Performance Record**

If you want to view a welder performance record, click[![image-1651493230771.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651493230771.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651493230771.png)(print icon) provided in the **Welder Performance Record** page. See Fig 6.17.

#### **6.17.4 Attach a File into a Welder Performance Record**

If you want to attach any file with a welder performance record listed in the **Welder Performance Record** page, you can attach the file by using [![image-1651493270431.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651493270431.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651493270431.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **6.17.5 Export a Welder Performance Record**

You can export the welder performance in the **Welder Performance Record** page in both the pdf and excel formats by using[![image-1651493320700.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651493320700.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651493320700.png) (**PDF** button) and [![image-1651493333475.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651493333475.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651493333475.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.


### **6.18 Generate Weld Visual Report**

The **Generate Weld Visual Report** tab in the **Piping** menu helps you to generate a weld visual report.

1. Click **Generate Weld Visual Report** in the **Piping** menu. The **Daily Pipe Weld Visual Record** page opens.
    
    [![image-1651493397068.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651493397068.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651493397068.png)
    
     **Figure 6.18: Daily Pipe Weld Visual Record** **page**
    
    The **Daily Pipe Weld Visual Record** page shows the list of weld visual inspections completed on each day including the welding date, weld process name, location, pipe size, and drawing name.
    
    
    1. - The **Daily Pipe Weld Visual Record** page shows the list of weld visual inspections completed on each day including the welding date, weld process name, location, pipe size, and drawing name.
        - Each group has a maximum of 20 number of weld visual inspection.
        - Each group is separated by different group number.
        - You can generate a report for each group individually by using the respective report generating option provided in the ****Daily** **Pipe** **Weld Visual Record**** page.
2. If you want to generate report of DPWR for any group or date, click [![image-1651493577374.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651493577374.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651493577374.png) (****Generate Report**** button) of the respective group or date.

The generated reports will be moved to the [**<u>Weld Visual Report</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-6.19%C2%A0weld-visual-rep) page. To view the generated reports, navigate to the [**<u>Weld Visual Report</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-6.19%C2%A0weld-visual-rep) tab.



### **6.19 Weld Visual Report**

The **Weld Visual Report** tab in the **Piping** menu helps you to view a weld visual report. Once you have generated the weld visual report, the generated report will be moved here. You can view the respective report by using this tab. To view the weld visual report,

1. Click **Weld Visual Report** in the **Piping** menu. The **Weld Visual Report** page opens.
    
    [![image-1651493689271.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651493689271.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651493689271.png)
    
     **Figure 6.19: Weld Visual Report page**
    
    [![image-1651493758040.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651493758040.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651493758040.png)**Note**: If you want to view the welded joints, select the checkbox of the **Show Welded Joints** option provided in the page. The page shows the list of welded joints.

#### **6.19.1 Add Weld Visual Report**

If you want to add a weld visual report, do the following steps,

1. Click [![image-1651493813056.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651493813056.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651493813056.png) (**ADD** button) in the ****Weld Visual Report**** page. The page opens a new window to add the details of the weld visual report.
    
    [![image-1651493870645.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651493870645.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651493870645.png)
2. In the **Drawing Number** box, select the drawing number from a drop-down list.
    
    The field report number and shop report number will be updated automatically in the respective boxes.
3. Click **Save**.
    
    The weld visual report is successfully added and listed in the **Weld Visual Report** page.

#### **6.19.2 Edit a Weld Visual Report**

If you want to edit any existing weld visual report in the **Weld Visual Report** page, do the following steps,

1. Click [![image-1651493969060.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651493969060.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651493969060.png)(Edit icon) in the **Edit** column for the respective weld visual report. See Fig 6.19. The **Weld Visual Report** page shows the details of the added report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.19.3 Delete a Weld Visual Report**

If you want to delete any weld visual report in the **Weld Visual Report** page, you can use [![image-1651494056968.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651494056968.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651494056968.png) (Delete icon) provided in the **Weld Visual Report** page. To know how to delete, see the topic, “[<u>**Delete P&amp;ID**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

#### **6.19.4 View a Weld Visual Report**

- If you want to view a weld visual report related with the field inspection, click [![image-1651494130879.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651494130879.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651494130879.png)(print icon) provided in the **Field** column. See Fig 6.19.
- If you want to view a weld visual report related with the shop inspection, click [![image-1651494170970.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651494170970.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651494170970.png) (print icon) provided in the ****Shop****  See Fig 6.19.

#### **6.19.5 Filter a Weld Visual Report**

If you want to filter any weld visual report in the **Weld Visual Report** page, you can use [![image-1651494232278.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651494232278.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651494232278.png) (**FILTER** button) located on the **Weld Visual Report** page. To know how to filter, see the topic, “[<u>**Filter P&amp;ID**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

#### **6.19.6 Export a Weld Visual Report**

You can export the weld visual reports in the **Weld Visual Report** page in both the pdf and excel formats by using (**PDF** button) and (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.



### **6.20 Weld Joint Log Sheet**

The **Weld Joint Log sheet** tab in the Piping menu helps you to view a log sheet of pipe welding inspection. To view the log sheet,

1. Click **Weld Joint Log sheet** in the **Piping** menu. The pipe welding inspection log sheet page opens.
    
    [![image-1651494348611.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651494348611.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651494348611.png)
    
     **Figure 6.20: Pipe welding inspection log sheet page**
2. In the **Type** box, select the type of joint.
3. Do one of the following steps,
    
    
    1. 1. In the ****ISO Drawing Number**** box, select the isometric drawing number from a drop-down list.
        2. In the **Line Number** box, select the line number from a drop-down list.
        3. In the **System** box, select the system from a drop-down list.
4. Click **Go.**
5. If you want to open the log sheet in a threaded joint template, click the checkbox of the ****Open in Threaded Joint Template**** option.
6. If you want to open the log sheet in a threaded joint template, click the checkbox of the ******Open in Threaded Joint Template****** option. The pipe welding inspection log sheet opens for the selected option.
    
    [![image-1651494499475.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651494499475.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651494499475.png)

#### **6.20.1 Print a Weld Joint Log sheet**

If you want to print the weld joint log sheet, use [![image-1651494668204.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651494668204.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651494668204.png) and [![image-1651494691298.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651494691298.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651494691298.png) (print icons) provided in the Weld Joint Log sheet page.

1. If you want to print the current page of the Weld Joint Log sheet, click [![image-1651494755663.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651494755663.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651494755663.png) (print icon including the page number).
2. If you want to print all the pages of the Weld Joint Log sheet, click [![image-1651494789720.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651494789720.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651494789720.png) (print icon).

#### **6.20.2 View a Weld Joint Log sheet** 

You can view the weld joint log sheet in various formats by using the option[![image-1651494832436.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651494832436.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651494832436.png) provided in the upper right corner of the Weld Joint Log sheet page.


### **6.21 Joint Summary Report**

The **Joint Summary report** tab in the **Piping** menu used to view a joint summary report. If you want to see a joint summary report,

1. Click **Joint Summary Report** in the **Piping** menu.
    
    The **Joint Summary Report** page shows summary details of isometric drawing, joints, welders, components and so on.
    
    [![image-1651494915152.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651494915152.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651494915152.png)
    
     **Figure 9.21: Joint Summary Report page**

#### **6.21.1 Export a Joint Summary Report** 

You can export the joint summary report in both the pdf and excel formats by using [![image-1651494973329.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651494973329.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651494973329.png) (**PDF** button) and [![image-1651494982755.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651494982755.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651494982755.png) (**Excel** button) in the **Joint Summary Report** page. To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **6.21.2 View a Joint Summary Report**

If you want to view a joint summary report, click (print icon) provided in the **Joint Summary** **Report** page. See Fig 6.21.

### **6.22 Welding Application Report**

The **Welding Application Report** tab in the **Piping** menu shows a welding application report.

If you want to view a welding application report,

1. Click **Welding Application Report** in the **Piping** menu. The welding application report page opens with the details of welding application.
    
    [![image-1651495097652.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651495097652.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651495097652.png)
    
     **Figure 6.22: Welding Application Report page**


#### **6.22.1 Print a Welding Application Report**

If you want to print a welding application report, use [![image-1651497685540.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651497685540.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651497685540.png) and [![image-1651497698512.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651497698512.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651497698512.png) (print icons) provided in the **Welding Application Report** page. See Fig 6.22.

1. If you want to print the current page of the welding application report, click [![image-1651497718556.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651497718556.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651497718556.png) (print icon including the page number).
2. If you want to print all the pages of the welding application report, click [![image-1651497748592.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651497748592.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651497748592.png)(print icon).

#### **6.22.2 Export a Welding Application Report** 

You can export the welding application report in various formats by using the option [![image-1651497789166.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651497789166.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651497789166.png) provided in the upper right corner of the **Welding Application Report** page.


### **6.23 Weld Rejection Rate**

Weld Rejection Rate is the difference between the tested length and repair length of the welded material, which are calculated using RT and UT inspection. The Weld Rejection Rate is used to calculate the weld success rate.

The **Weld Rejection Rate** tab in the **Piping** menu shows a weld rejection rate report including weekly and cumulative weld success rate summary details.

If you want to view a weld rejection rate report,

1. Click **Weld Rejection Rate** in the Piping menu. The weld rejection rate report page opens.
    
    [![image-1651497859303.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651497859303.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651497859303.png)
    
     **Figure 6.23: Weld Rejection Rate Report page**
2. In the ****Project**** box, select a project for which you want to view a weld rejection rate report, from a drop-down list.
3. In the **From Date** and **To Date** boxes, select the from and to dates in respectively.
4. Click **Show Report**.

The weld rejection rate report opens for the selected project.

#### **6.23.1 Print a Weld Rejection Rate Report**

If you want to print a weld rejection rate report, use [![image-1651498088555.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651498088555.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651498088555.png) and [![image-1651498276432.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651498276432.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651498276432.png) (print icons) provided in the **Weld Rejection Rate** **Report** page. See Fig 6.23.

1. If you want to print the current page of the weld rejection rate report, click [![image-1651498310342.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651498310342.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651498310342.png) (print icon including the page number).
2. If you want to print all the pages of the weld rejection rate report, click [![image-1651498338237.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651498338237.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651498338237.png) (print icon).

#### **6.23.2 Export a Weld Rejection Rate Report** 

You can export the weld rejection rate report in various formats by using the option [![image-1651498407543.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651498407543.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651498407543.png) provided in the upper right corner of the **Weld Rejection Rate Report** page.


### **6.24 Weekly/Monthly DPWR**

The **Weekly/Monthly DPWR** tab in the **Piping** menu used to view a DPWR on a weekly or monthly basis. To view a DPWR,

1. Click **Weekly/Monthly DPWR** in the **Piping** menu.
    
    The DPWR page opens.
    
    [![image-1651498490263.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651498490263.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651498490263.png)
2. In the **Category** box, select the category from a drop-down list.
3. In the ****Start Date**** and ****End Date**** boxes, select the starting and ending date to view the DPWR.
4. Click ****Get Report****. The DPWR page shows the welder details for the selected category and period.
    
    [![image-1651498533151.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651498533151.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651498533151.png)

#### **6.24.1 Print a Weekly/Monthly DPWR**

If you want to print the DPWR, use [![image-1651498590658.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651498590658.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651498590658.png) and [![image-1651498606050.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651498606050.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651498606050.png) (print icons) provided in the DPWR page. See Fig 6.24.

1. If you want to print the current page of the DPWR, click [![image-1651498656599.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651498656599.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651498656599.png) (print icon including the page number).
2. If you want to print all the pages of the DPWR, click [![image-1651498675442.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651498675442.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651498675442.png) (print icon).

#### **6.24.2 Export a Weekly/Monthly DPWR** 

You can export the DPWR in various formats by using the option [![image-1651498737094.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651498737094.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651498737094.png)provided in the upper right corner of the DPWR page.


### **6.25 Piping Inspection Completion Status by System**

The **Status by System** tab in the **Piping** menu used to view the completed status of the piping inspection based on the system data. To view the status,

1. Click **Status by System** in the **Piping** menu. The **Piping Inspection Completion Status by System** page opens and shows the NDT inspection details.
    
    [![image-1651498832679.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651498832679.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651498832679.png)
    
     **Figure 6.25: Piping Inspection Completion Status by System page**

#### **6.25.1 Export Piping Inspection Completion Status by System**

You can export the piping inspection completion status in the **Piping Inspection Completion Status by System** page in both the pdf and excel formats by using [![image-1651498938174.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651498938174.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651498938174.png) (**PDF** button) and [![image-1651498947234.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651498947234.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651498947234.png) (**Excel** button). To know how to export, see the topic, “[<u>**Export P&amp;ID list**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **6.25.2 Filter Piping Inspection Completion Status by System**

If you want to filter any piping inspection completion status, you can use [![image-1651498997708.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651498997708.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651498997708.png) (**FILTER** button) in the **Piping Inspection Completion Status by System** page. To know how to filter, see the topic, “[<u>**Filter P&amp;ID**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **6.26 Piping Inspection Completion Status by Sub System**

The **Status by Sub System** tab in the **Piping** menu used to view the completed status of the piping inspection based on the sub system data. To view the status,

1. Click **Status by Sub System** in the **Piping** menu. The **Piping Inspection Completion Status by Sub System** page opens and shows the NDT inspection details.
    
    [![image-1651499055109.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651499055109.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651499055109.png)
    
     **Figure 6.26: Piping Inspection Completion Status by Sub System page**

#### **6.26.1 Export Piping Inspection Completion Status by Sub System**

You can export the piping inspection completion status in the **Piping Inspection Completion Status by Sub System** page in both the pdf and excel formats by using [![image-1651499115460.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651499115460.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651499115460.png) (**PDF** button) and [![image-1651499128218.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651499128218.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651499128218.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **6.26.2 Filter Piping Inspection Completion Status by Sub System**

If you want to filter any piping inspection completion status, you can use (**FILTER** button) in the **Piping Inspection Completion Status by Sub System** page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **6.27 Piping Inspection Completion Status by Line**

The **Status by Line** tab in the **Piping** menu used to view the completed status of the piping inspection based on the Lines data. To view the status,

1. Click **Status by Line** in the **Piping** menu. The **Piping Inspection Completion Status by Line** page opens and shows the NDT inspection details.
    
    [![image-1651499296156.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651499296156.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651499296156.png)
    
     **Figure 9.27: Piping Inspection Completion Status by Line page**

#### **6.27.1 Export Piping Inspection Completion Status by Line** 

You can export the piping inspection completion status in the **Piping Inspection Completion Status by Line** page in both the pdf and excel formats by using [![image-1651499475217.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651499475217.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651499475217.png) (**PDF** button) and [![image-1651499484705.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651499484705.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651499484705.png) (**Excel** button). To know how to export, see the topic, “[<u>**Export P&amp;ID list**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **6.27.2 Filter Piping Inspection Completion Status by Line** 

If you want to filter any piping inspection completion status, you can use [![image-1651499528945.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651499528945.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651499528945.png) (**FILTER** button) in the **Piping Inspection Completion Status by Line** page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.



### **6.28 Piping Inspection Completion Status by ISO**

The **Status by ISO** tab in the **Piping** menu used to view the completed status of piping inspection based on the isometric drawing data. To view the status,

1. Click **Status by ISO** in the **Piping** menu. The **Piping Inspection Completion Status by ISO** page opens and shows the drawing status and NDT inspection details.
    
    [![image-1651499583872.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651499583872.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651499583872.png)
    
     **Figure 6.28: Piping Inspection Completion Status by ISO page**

#### **6.28.1 Export Piping Inspection Completion Status by ISO** 

You can export the piping inspection completion status in the **Piping Inspection Completion Status by ISO** page in both the pdf and excel formats by using [![image-1651499648311.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651499648311.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651499648311.png) (**PDF** button) and [![image-1651499657976.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651499657976.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651499657976.png) (**Excel** button). To know how to export, see the topic, “[<u>**Export P&amp;ID list**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **6.28.2 Filter Piping Inspection Completion Status by ISO** 

If you want to filter any piping inspection completion status, you can use [![image-1651499693063.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651499693063.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651499693063.png) (**FILTER** button) in the **Piping Inspection Completion Status by ISO** page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.


### **6.29 Piping Inspection Completion Status by Spools**

The **Status by Spools** tab in the **Piping** menu used to view the completed status of piping inspection based on the spool data. To view the status,

1. Click **Status by Spools** in the **Piping** menu.
    
    The **Piping Inspection Completion Status by Spools** page opens and shows the NDT inspection details.
    
    [![image-1651499754946.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651499754946.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651499754946.png)
    
     **Figure 6.29: Piping Inspection Completion Status by Spools page**

#### **6.29.1 Export Piping Inspection Completion Status by Spools**

You can export the piping inspection completion status in the **Piping Inspection Completion Status by Spools** page in both the pdf and excel formats by using [![image-1651499835714.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651499835714.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651499835714.png)(**PDF** button) and [![image-1651499844906.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651499844906.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651499844906.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **6.29.2 Filter Piping Inspection Completion Status by Spools** 

If you want to filter any piping inspection completion status, you can use [![image-1651499886062.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651499886062.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651499886062.png) (**FILTER** button) in the **Piping Inspection Completion Status by Spools** page. To know how to filter, see the topic, “**[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)**”.



### **6.30 Piping Inspection Completion Status by Test Pack**

The **Status by Test Pack** tab in the **Piping** menu used to view the completed status of piping inspection based on the test pack data. To view the status,

1. Click **Status by Test Pack** in the **Piping** menu. The **Piping Inspection Completion Status by Test Pack** page opens and shows the NDT inspection details.
    
    [![image-1651500138294.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651500138294.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651500138294.png)
    
     **Figure 6.30: Piping Inspection Completion Status by Test Pack page**

#### **6.30.1 Export Piping Inspection Completion Status by Test Pack**

You can export the piping inspection completion status in the **Piping Inspection Completion Status by Test Pack** page in both the pdf and excel formats by using [![image-1651500200778.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651500200778.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651500200778.png) (**PDF** button) and [![image-1651500211838.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651500211838.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651500211838.png) (**Excel** button). To know how to export, see the topic, “[<u>**Export P&amp;ID list**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **6.30.2 Filter Piping Inspection Completion Status by Test Pack**

If you want to filter any piping inspection completion status, you can use [![image-1651500261626.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651500261626.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651500261626.png) (**FILTER** button) in the **Piping Inspection Completion Status by Test Pack** page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

### **6.31 Outstanding Joints**

The **Outstanding Joints** tab in the **Piping** menu used to view and track the details of outstanding joints. To view the outstanding joints,

1. Click **Outstanding Joints** in the **Piping** menu. The **Outstanding Joints** page opens.
    
    [![image-1651500314780.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651500314780.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651500314780.png)
    
     **Figure 6.31: Outstanding Joints page**
2. Select the joint category from the given options such as All, Shop, and Field. The page shows the details of outstanding joints based on the selected category.
    
    [![image-1651500354229.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651500354229.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651500354229.png)

#### **6.3.11 Export Outstanding Joints**

You can export the list of outstanding joints in the **Outstanding Joints** page in both the pdf and excel formats by using [![image-1651500397743.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651500397743.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651500397743.png) (**PDF** button) and [![image-1651500406196.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651500406196.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651500406196.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **6.3.12 Filter Outstanding Joints**

If you want to filter any specific outstanding, you can use the filter box provided in each column of the **Outstanding Joints** page.

[![image-1651500443173.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651500443173.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651500443173.png)


### **6.32 Completed Drawings**

The **Completed Drawings** tab in the **Piping** menu used to view and track the details of completed drawings. To view the completed drawings details,

1. Click **Completed Drawings** in the **Piping** menu. The **Completed Drawings** page opens.
    
    [![image-1651500482247.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651500482247.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651500482247.png)
    
     **Figure 6.32: Completed Drawings page**
2. Select the joint category from the given options such as All, Shop, and Field. The page shows the details of completed drawings based on the selected category.
    
    [![image-1651500535524.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651500535524.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651500535524.png)

#### **6.32.1 Export Completed Drawings**

You can export the list of completed drawings in the **Completed Drawings** page in both the pdf and excel formats by using [![image-1651503197101.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651503197101.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651503197101.png) (**PDF** button) and [![image-1651503208116.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651503208116.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651503208116.png) (**Excel** button). To know how to export, see the topic, “[<u>**Export P&amp;ID list**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.


### **6.33 Weld Progress by Date**

The **Weld Progress by Date** tab in the **Piping** menu helps you to view the graphical representation of welding progress on a day basis. To view the welding progress detail,

1. Click **Weld Progress by Date** in the **Piping** menu. The **Welding Progress** page opens with a graphical representation.
    
    [![image-1651503271308.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651503271308.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651503271308.png)
    
    The chart shows the number of welding such as shop weld and field weld, performed on every day.
2. If you want to view the progress detail of welding performed in the shop, click **Shop Weld**. The chart shows the shop welding progress details.
3. If you want to view the progress detail of welding performed in the field, click ****Field Weld****. The chart shows the field welding progress details.

#### **6.33.1 Print a Welding Progress chart**

If you want to print the welding progress chart,

1. Click (menu icon) in the Weld Progress page. [![image-1651503459767.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651503459767.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651503459767.png)
2. Click **Print Chart**.
    
    The chart will be printed.

#### **6.33.2 Download a Welding Progress Chart**

You can download the welding progress chart in PNG image, JPEG image, SVG vector image, and PDF formats by using the respective options provided in the menu icon.


### **6.34 Inspection Request Summary Report**

The **Inspection Request Summary** tab in the **Piping** menu used to view the summary of inspection request. To view the inspection request summary report,

1. Click **Inspection Request Summary** in the **Piping** menu.
    
    The **Inspection Request Summary Report** page opens.
    
    [![image-1651503573328.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651503573328.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651503573328.png)
    
     **Figure 6.34: Inspection Request Summary Report page**
2. In the **Start Date** and **End Date** boxes, select the start and end dates.
3. Click **Search**.
    
    The page shows the details of inspection request.
    
    [![image-1651503620537.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651503620537.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651503620537.png)

#### **6.34.1 Export an Inspection Request Summary Report**

You can export the inspection request summary report in both the pdf and excel formats by using (**PDF** button) and (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **6.34.2 Filter an Inspection Request Summary** 

If you want to filter any inspection request detail, you can use [![image-1651505498979.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651505498979.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651505498979.png) (**FILTER** button) in the **Inspection Request Summary Report** page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.



### **6.35 Piping Progress Status Report**

The **Piping Progress Status Report** tab in the **Piping** menu used to view the piping progress status report. To view the piping progress status report,

1. Click **Piping Progress Status Report** in the **Piping** menu.
    
    The **Piping Progress Status Report** page opens.
    
    [![image-1651505560536.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651505560536.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651505560536.png)
    
     **Figure 9.35: Piping Progress Status Report page**
2. In the **From Date** and **To Date** boxes, select the from and to dates to view the piping progress status.
3. Click **Load Report**.
    
    The page shows the details of piping progress status.
    
    [![image-1651505637247.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651505637247.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651505637247.png)

#### **6.35.1 Print a Piping Progress Status Report**

If you want to print the piping progress status report, use [![image-1651505681173.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651505681173.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651505681173.png) and [![image-1651505696561.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651505696561.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651505696561.png) (print icons) provided in the **Piping Progress Status Report** page. See Fig 6.35.

1. If you want to print the current page of the piping progress status report, click [![image-1651505734940.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651505734940.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651505734940.png) (print icon including the page number).
2. If you want to print all the pages of the piping progress status report, click [![image-1651505759624.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651505759624.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651505759624.png)(print icon).

#### **6.35.2 Export a Piping Progress Status Report** 

You can export the piping progress status report in various formats by using the option [![image-1651505802195.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651505802195.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651505802195.png) provided in the upper right corner of the **Piping Progress Status Report** page.



### **6.36 Welder Defect Analysis Report** 

The **Welder Defect Analysis Report** tab in the **Piping** menu used to view the defect analysis report of the particular welder. To view the welder defect analysis report,

1. Click **Welder Defect Analysis Report** in the **Piping** menu.
    
    The **Welder Defect Analysis** page opens.
    
    [![image-1651505863398.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651505863398.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651505863398.png)
    
     **Figure 9.36: Welder Defect Analysis page**
2. In the **Select Welder** box, select a welder from the list of welders.
3. Click **Generate Report**.
    
    The page shows the defect analysis report of the selected welder.
    
    [![image-1651505908437.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651505908437.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651505908437.png)

#### **6.36.1 Print a Welder Defect Analysis Report**

If you want to print the welder defect analysis report, use [![image-1651505982090.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651505982090.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651505982090.png) and [![image-1651505991195.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651505991195.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651505991195.png) (print icons) provided in the **Welder Defect Analysis** page. See Fig 6.36.

1. If you want to print the current page of the welder defect analysis report, click [![image-1651506221443.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651506221443.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651506221443.png) (print icon including the page number).
2. If you want to print all the pages of the welder defect analysis report, click[![image-1651506250701.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651506250701.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651506250701.png) (print icon).

#### **6.36.2 Export a Welder Defect Analysis Report** 

You can export the welder defect analysis report in various formats by using the option [![image-1651506309296.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651506309296.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651506309296.png) provided in the upper right corner of the **Welder Defect Analysis Report** page.


#### **6.37 Weld Traceability Record**

The **Weld Traceability Record** tab in the **Piping** menu used to add a weld traceability record and track welding records.

If you want add a weld traceability record, do the following,

1. Click **Weld Traceability Record** in the **Piping** menu.
    
    The **Weld Traceability Record** page opens.
    
    [![image-1651506585145.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651506585145.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651506585145.png)
    
     **Figure 6.37: Weld Traceability Record page**

#### **6.37.1 Add a Weld Traceability Record**

If you want to add a weld traceability record, do the following,

1. Click [![image-1651508423614.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651508423614.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651508423614.png) (**ADD** button) in the **Weld Traceability Record** page. See Fig 6.37. The page opens a new window to add the details of a weld traceability record.
    
    [![image-1651508471580.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651508471580.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651508471580.png)
    
    [![image-1651508482284.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651508482284.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651508482284.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651512981166.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651512981166.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651512981166.png)**Tip**: A report number for a new weld traceability record will be updated automatically in the **Report Number** box. If you want to change the report number, you can change.
2. In the **Drawing Number** box, select a drawing number from a drop-down list.
3. In the **Date** box, enter the date of adding the weld traceability record.
4. In the **Prepared By** box, enter the name of a person who has prepared the weld traceability record.
5. In the **Prepared Date** box, select the prepared date of the weld traceability record.
6. In the **Reviewed By** box, enter the name of a person who has reviewed the weld traceability record.
7. In the **Reviewed Date** box, select the reviewed date of the weld traceability record.
8. In the **Approved By** boxes, enter the name of a person who has approved the weld traceability record.
9. In the **Approved Date** box, select the approved date of the weld traceability record.
10. Click **Save**.
    
    The weld traceability record is successfully added.

#### **6.37.2 View a Weld Traceability Report**

If you want to view a weld traceability report, click [![image-1651513252508.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651513252508.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651513252508.png) (print icon) provided in the **Report** column in the Weld Traceability Record page. See Fig 6.37.

#### **6.37.3 Attach a File into a Weld Traceability Record**

If you want to attach any file with a weld traceability record listed in the **Weld Traceability Record** page, you can attach the file by using [![image-1651513297696.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651513297696.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651513297696.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **6.37.4 Edit a Weld Traceability Record** 

If you want to edit any existing weld traceability record in the **Weld Traceability Record** page, do the following,

1. Click [![image-1651513427021.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651513427021.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651513427021.png) (Edit icon) in the **Edit** column for the respective weld traceability record. The page shows the added details of the weld traceability record.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.37.5 Delete a Weld Traceability Record**

If you want to delete any existing system in the **System** page, you can use [![image-1651513492123.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651513492123.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651513492123.png) (Delete icon) provided in the **System** page. To know how to delete, see the topic, **“**[<u>**Delete** **P&amp;ID**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.


### **6.38 Add Non-Conformance Report (NCR)**

NCR used to document the details of a non-conformance identified in a quality audit or other process review. The **Add** **NCR** tab in the **Piping** menu helps you to add an NCR in the Piping project. Do the following steps to add an NCR,

1. Click **Add NCR** in the **Piping** menu. The **NCR** page opens.
    
    [![image-1651513589335.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651513589335.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651513589335.png)
    
     **Figure 6.38: NCR page**
    
    [![image-1651513634624.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651513634624.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651513634624.png)**Tip**: A report number for a new NCR will be updated automatically in the **Report Number** box. If you want to change the report number, you can change.
2. In the **Type** box, select the type of non-conformance from a drop-down list.
3. In the **Classification** box, select whether minor classification or major classification from a drop-down list.
4. In the **Source/ Item** box, select the source of NCR from a drop-down list.
5. In the **NCR** box, enter the description for the identified deficiency of the selected non-conformance type.
6. In the **Reference Document** box, enter the reference document detail.
7. In the **Owner Reference Document** box, enter the owner reference document detail.
8. In the **Supplier Reference Document** box, enter the supplier reference document detail.
9. In the **NCR originator** box, enter the originator of NCR.
10. In the **Origin** **Date** box, select the origin date of NCR.
11. In the **NCR Accepted By** box, enter the name of a person who has accepted the NCR.
12. In the **NCR Accepted Date** box, select the NCR accepted date.
13. In the **Agreed Closure Date** box, select the agreed closure date.
14. In the **Issued By** box, select the company who has issued the NCR.
15. In the **Issued To** box, select the company for which the NCR has issued.
16. In the **Root Cause** box, enter the root cause detail.
17. If you want to add the corrective action detail, do the following, 
    1. 1. In the **Action** box, select any corrective action from the given options.
        2. In the **Corrective Action** box, enter the corrective action detail.
        3. In the **Proposed by** box, enter the name of a person who has proposed the corrective action.
        4. In the **Target Close-out Date** box, select the target close out date.
        5. In the **Preventive Action** box, enter the preventive actions.
        6. In the **Probability** box, select the probability percentage of non-conformance.
        7. In the **consequences** box, select the consequences level you have faced.
18. If you want to add any remarks, click **Remarks** option and enter your remarks, otherwise click **No Remarks** option.
19. In the **Verification** box, enter the verification detail on completion of corrective action/ preventive action.
20. In the **Inspected by QC Inspector**, and **Date** boxes, enter the name of the QC inspector who has inspected the NCR, and date, respectively.
21. In the **Inspected by QC Inspector**, and **Date** boxes, enter the name of the QC inspector who has inspected the NCR, and date, respectively.
22. In the **Supplier NCR Close out by**, and **Close Out Date** boxes, enter the name of a person who has closed the supplier NCR, and close out date, respectively.
23. In the **Owner NCR Close out by**, and **Close Out Date** boxes, enter the name of a person who has closed the owner NCR, and close out date, respectively.
24. In the **Approval Req** box, if you need approval, click **Yes,** otherwise click
25. If you have selected **Yes**, you must enter the reference detail in the **If Yes, Then Reference**
26. In the **Description** box, enter the description of proposal.
27. In the **Proposal Accepted by**, and **Date** boxes, enter the name of a person who has accepted the proposal, and date, respectively.
28. In the NCR Close Notes box, enter the NCR close notes.
29. In the **Disposition Completed by,** and **Date** boxes, enter the name of a person who has completed the disposition, and date, respectively.
30. Click **Save**.

The NCR is successfully added.

### **6.39 View NCR**

The **View NCR** tab helps you to view and edit the details of added NCR. You can also add a new NCR by using the add option. To navigate to **View NCR,**

1. Click **View NCR** in the **NCR** menu.
    
    The **View NCR** page opens with an added NCR.
    
    [![image-1651514495076.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651514495076.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651514495076.png)
    
     **Figure 6.39: View NCR page**

#### **6.39.1 Add an NCR**

If you want to add a new NCR, follow the same procedure in the topic, “[**<u>Add NCR</u>**](#bkmrk-6.38%C2%A0add-non-conform)”.

#### **6.39.2 View an NCR Log Summary Report**

If you want to view an NCR log summary report, click [![image-1651514642061.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651514642061.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651514642061.png) provided in the upper side of the **View NCR** page. See Fig 6.39.

#### **6.39.3 Attach a File into an NCR** 

If you want to attach any file with an NCR listed in the **View NCR** page, you can attach the file by using [![image-1651514734111.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651514734111.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651514734111.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **6.39.4 Update an NCR**

If you want to update any existing NCR in the **View** **NCR** page, click [![image-1651514809156.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651514809156.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651514809156.png)(Update icon) in the **Update** column for the respective NCR. Edit the details in the respective box you want.

#### **6.39.5 Export an NCR**

You can export a list of NCRs added in the **View NCR** page in both the pdf and excel formats by using [![image-1651514861183.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651514861183.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651514861183.png) (**PDF** button) and [![image-1651514876263.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651514876263.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651514876263.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **6.39.6 Delete an NCR**

If you want to delete any existing NCR in the **View NCR** page, you can use [![image-1651514921299.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651514921299.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651514921299.png) (Delete icon) provided in the **View NCR** page. To know how to delete, see the topic, “[**<u>Delete P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

### **6.40 Spools Generate Barcode &amp; QR Code**

By using the **Spools Generate Barcode &amp; QR Code** tab in the **Piping** menu, you can generate the bar code and QR code for the spools for which you have added.

1. Click **Spools Generate Barcode &amp; QR Code** in the **Piping** menu.
    
    The **Spools Generate Barcode** page opens.
    
    [![image-1651514986994.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651514986994.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651514986994.png)
    
     **Figure 6.40: Spools Generate Barcode page**
2. Select the checkbox of the spool for which you want to generate barcode and QR code.
3. If you want to generate the barcode, click [![image-1651515058621.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515058621.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515058621.png) (**Print Barcode** button).
    
    [![image-1651515048619.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515048619.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515048619.png)
4. If you want to generate the QR code, click [![image-1651515082114.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515082114.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515082114.png) (**Print QR code** button).
    
    [![image-1651515094715.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515094715.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515094715.png)

### **6.41 RT Weekly Report**

The **RT Weekly Report** tab in the **Piping** menu used to view the week wise RT inspection status. To view the RT inspection status,

1. Click **RT Weekly Report** in the **Piping** menu. The **RT Weekly Report** page opens and shows the RT inspection status.
    
    [![image-1651515152646.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515152646.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515152646.png)

#### **6.42 Weld Summary Sheet**

The **Weld Summary sheet** tab in the **Piping** menu used you to view a summary report of pipe welding inspection. To view the summary report,

1. Click **Weld Summary sheet** in the ****Piping menu.****The Piping Weld Inspection Log Sheet page opens.
    
    [![image-1651515211664.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515211664.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515211664.png)
    
     **Figure 9.42: Piping Weld Inspection Log Sheet page**
2. In the **Type** box, select the type of joint.
3. Do one of the following steps,
    
    
    1. 1. In the ****ISO Drawing Number**** box, select the isometric drawing number from a drop-down list.
        2. In the ****Line Number**** box, select the line number from a drop-down list.
        3. In the ****System**** box, select the system from a drop-down list.
4. In the ****Joints**** box, select a joint from a list of joints loaded based on the selected ISO.
5. Click **Go.**
6. If you want to open the log sheet in a threaded joint template, click the checkbox of the ****Open in Threaded Joint Template****
7. If you want to open the log sheet for Vendor supply pre-fabricated PTFE, click the checkbox of the ****VENDOR SUPPLY PRE-FABRICATED PTFE****
8. The pipe welding inspection log sheet opens for the selected option.[![image-1651515370972.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515370972.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515370972.png)

#### **6.42.1 Print a Weld Summary Sheet**

If you want to print the weld summary sheet, use [![image-1651515487359.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515487359.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515487359.png)and [![image-1651515499193.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515499193.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515499193.png) (print icons) provided in the Weld Summary Sheet page.

1. If you want to print the current page of the weld summary sheet, click [![image-1651515524036.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515524036.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515524036.png) (print icon including the page number).
2. If you want to print all the pages of the weld summary sheet, click[![image-1651515559599.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515559599.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515559599.png) (print icon).

#### **6.42.2 View a Weld Summary Sheet** 

You can view the weld summary sheet in various formats by using the option [![image-1651515622205.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515622205.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515622205.png) provided in the upper right corner of the Weld Summary Sheet page.

### **6.43 Inspection Status Report**

**Inspection Status Report** shows the overall inspection reports such as from fit-up inspection status to NDT inspection status.

If you want to view an inspection status report, do the following steps,

1. Click **Inspection Status Report** in the **Piping** menu. The **Inspection Status Report** page opens.
    
    [![image-1651515692671.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515692671.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515692671.png)
    
     **Figure 6.43: Inspection Status Report page**
2. In the **Start Date** and **End Date** boxes, select the start and end dates.
3. In the **Project** box, select the project from a drop-down list.
4. Click **Show Report**.
    
    The **Inspection Status Report** page shows the spool information, RFI fit-up, RFI weld VI, and NDT inspection status.

#### **6.43.1 Print an Inspection Status Report**

If you want to print the inspection status report, use [![image-1651515800569.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515800569.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515800569.png)and [![image-1651515811999.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515811999.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515811999.png) (print icons) provided in the **Inspection Status Report** page. See Fig 6.43.

1. If you want to print the current page of the inspection status report, click [![image-1651515848688.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515848688.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515848688.png) (print icon including the page number).
2. If you want to print all the pages of the inspection status report, click [![image-1651515867800.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515867800.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515867800.png) (print icon).

#### **6.43.2 Export an Inspection Status Report** 

You can export the inspection status report in various formats by using the option [![image-1651515926830.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651515926830.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651515926830.png) provided in the upper right corner of the **Inspection Status Report** page.

### **6.44 Surveillance Entry**

The **Surveillance Entry** tab in the **Piping** menu helps you to add the observation details of various category, which is done by an inspector.

If you want add a surveillance entry, do the following,

1. Click **Surveillance Entry** in the **Piping** menu.
    
    The **Surveillance** page opens.
    
    [![image-1651516003952.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651516003952.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651516003952.png)
    
     **Figure 6.44: Surveillance page**

#### **6.44.1 Add a Surveillance Entry**

If you want to add a surveillance entry, do the following,

1. Click [![image-1651516158029.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651516158029.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651516158029.png) (**ADD** button) in the **Surveillance** page. See Fig 6.44.
    
    A new window opens to add a surveillance entry.
    
    [![image-1651516182891.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651516182891.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651516182891.png)
    
    [![image-1651516196536.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651516196536.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651516196536.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **Surveillance Date** box, select the surveillance date.
3. In the **Category** box, select a surveillance category from a drop-down list.
4. In the **Location** box, select a location where the surveillance has done.
5. In the **Sub Contractor** box, select the sub-contractor from a drop-down list.
6. In the **Observation By Inspector** box, enter the name of the inspector who has done the observation.
7. In the **Action by (Supervisor)** box, enter the name of the supervisor who has done the action.
8. In the **Target Date to Close ou**t box, select the target date to close out the observation.
9. In the **Remarks** box, enter your remarks if any.
10. In the **Observation** box, enter the observation’s description.
11. In the **Action Taken To Close Observation** box, enter the actions to close out the observation.
12. In the **Status** box, select the status Open or Close based on the observation.
13. Click **Save**.

The surveillance entry is successfully added.

#### **6.44.2 Attach a File into a Surveillance Entry**

If you want to attach any file with the surveillance entry listed in the **Surveillance** page, you can attach the file by using [![image-1651516385393.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651516385393.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651516385393.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **6.44.3 Edit a Surveillance Entry**

 If you want to edit any existing surveillance entry in the **Surveillance** page, do the following,

1. Click [![image-1651516449133.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651516449133.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651516449133.png)(Edit icon) in the **Edit** column for the respective surveillance entry. See Fig 6.44.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.44.4 Delete a Surveillance Entry**

If you want to delete any from the list, you can use (Delete icon) provided in the **Delete** column of the **Surveillance** page, See Fig 6.44. To know how to delete, see the topic, “[**<u>Delete P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

#### **6.44.5 Export a Surveillance Entry**

You can export a list of surveillance entry added in the **Surveillance** page in the pdf and excel formats by using [![image-1651516595441.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651516595441.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651516595441.png)(**PDF** button) and [![image-1651516608147.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651516608147.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651516608147.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **6.44.6 Filter a Surveillance Entry**

If you want to filter any surveillance entry from the list in the **Surveillance** page, you can use [![image-1651516683319.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651516683319.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651516683319.png) (**FILTER** button) located on the **Surveillance** page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

### **6.45 Surveillance Report**

Once you have added the surveillance entry by using the **Surveillance Entry** tab, you can view a surveillance report by using the **Surveillance Report** tab in the **Piping** menu. If you want to view a surveillance report, do the following steps,

1. Click **Surveillance Report** in the **Piping** menu. The **Surveillance Report** page opens.
    
    [![image-1651516750293.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651516750293.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651516750293.png) **Figure 6.45: Surveillance Report** **page**
2. In the **Project** box, select a project from a drop-down list.
3. In the **Subcontractor** box, select a sub-contractor from a drop-down list.
4. In the **From Date** and **To Date** boxes, select the from and to dates in respectively.
5. In the **Status** box, select the status from a drop-down list.
6. Click **Preview Report**.
    
    The surveillance report will be displayed for the selected dates and status.

#### **6.45.1 Print a Surveillance Report**

If you want to print a surveillance report, use [![image-1651516884041.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651516884041.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651516884041.png)and [![image-1651516894340.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651516894340.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651516894340.png) (print icons) provided in the **Surveillance** **Report** page. See Fig 6.45.

1. If you want to print the current page of the surveillance report, click [![image-1651516946516.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651516946516.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651516946516.png) (print icon including the page number).
2. If you want to print all the pages of the surveillance report, click [![image-1651516967368.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651516967368.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651516967368.png)(print icon).

#### **6.45.2 Export a Surveillance Report**

You can export the surveillance report in various formats by using the option [![image-1651517050864.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651517050864.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651517050864.png) provided in the upper right corner of the **Surveillance** **Report** page.

### **6.46 Surveillance Category Report**

The **Surveillance Categories Report** tab in the **Piping** menu shows the surveillance report based on the category wise status.

1. Click **Surveillance Categories Report** in the **Piping** menu.
    
    The **Surveillance Category Wise Status Report** page opens.
    
    [![image-1651517111845.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651517111845.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651517111845.png)
    
     **Figure 6.46: Surveillance Report** **page**
2. In the **Project** box, select a project from a drop-down list.
3. In the **Subcontractor** box, select a sub-contractor from a drop-down list.
4. In the **From Date** and **To Date** boxes, select the from and to dates in respectively.
5. In the **Status** box, select the status from a drop-down list.
6. Click **Preview Report**.

The surveillance report will be displayed based on the category wise status.

### **6.46.1 Print a Surveillance Category Wise Status Report**

If you want to print a surveillance report, use [![image-1651517717973.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651517717973.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651517717973.png)and [![image-1651517728798.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651517728798.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651517728798.png) (print icons) provided in the **Surveillance** **Category Wise Status Report** page. See Fig 6.46.

1. If you want to print the current page of the surveillance report, click [![image-1651517821687.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651517821687.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651517821687.png) (print icon including the page number).
2. If you want to print all the pages of the surveillance report, click [![image-1651517848488.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651517848488.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651517848488.png)(print icon).

#### **6.46.2 Export a Surveillance Category Wise Status Report**

You can export the surveillance report in various formats by using the option [![image-1651517946300.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651517946300.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651517946300.png) provided in the upper right corner of the **Surveillance** **Category Wise Status Report** page.


### **6.47 Blasting and Painting View**

The **Blasting and Painting View** tab in the **Piping** menu used to add the blasting and painting inspection report.

1. Click **Blasting and Painting View** in the **Piping** menu.
    
    The **Blasting and Painting** page opens.
    
    [![image-1651518079348.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651518079348.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651518079348.png)
    
     **Figure 6.47: Blasting and Painting page**

#### **6.47.1 Add a Blasting and Painting Report**

If you want to add a blasting and painting report, do the following steps,

1. Click [![image-1651518173090.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651518173090.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651518173090.png) (**ADD** button) in the **Blasting and Painting** page. See Fig 6.47.
    
    The page opens a new window to add the details of the blasting and painting report.
    
    [![image-1651518193978.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651518193978.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651518193978.png)
2. In the **Requested by** box, enter the name of a person who has requested the blasting and painting report.
3. In the **Requested To** box, enter the name of a person for whom you want to send the blasting and painting report.
4. In the **Description / Spec,Ref.No** box, select the specification report number.
5. In the **Inspection Date &amp; Time** box, select the inspection date and time.
6. In the **Location** box, select the inspection location.
7. In the **Requisition** box, enter the requisition detail.
8. In the **System** box, select the system.
9. In the **Report Type** field, select the report type which you want to create.
    
    Before saving the added request, you must add the spools.
    
    [![image-1651518540053.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651518540053.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651518540053.png)**Note**: You can add multiple spools for one request.
    
    The page shows a list of spools. If you want to add spools for the request, do the following steps,
10. Click [![image-1651518577497.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651518577497.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651518577497.png)(Add icon) of the respective spools you want to add.
    
    The added spools will be moved and listed in the right side of the page.
11. Click **Save NDT Request**.
    
    The added report will be listed in the **Blasting and Painting** page.

#### **6.47.2 Edit a Blasting and Painting Report**

If you want to edit any existing blasting and painting report in the **Blasting and Painting** page, do the following steps,

1. Click [![image-1651518784195.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651518784195.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651518784195.png)(Edit icon) in the **Edit** column for the respective blasting and painting See Fig 6.47. The **Blasting and Painting** page opens with the details of the selected blasting and painting report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.47.3 Submit and Approve a Blasting and Painting Report**

Once you have added the blasting and painting report, the **Submission** column in the **Blasting and Painting** page is appeared with [![image-1651518880356.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651518880356.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651518880356.png) (Submit and Reject icons).

1. If you want to submit the blasting and painting report, click [![image-1651518909051.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651518909051.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651518909051.png)(Submit icon) in the **Submission** Otherwise click [![image-1651518932798.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651518932798.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651518932798.png) (Reject icon) to reject the request.
    
    Once you have submitted the blasting and painting report, the **Request Status** column in the **Blasting and Painting** page is appeared with [![image-1651518960906.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651518960906.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651518960906.png) (Approve and Reject icons).
2. If you want to approve the blasting and painting report, click [![image-1651519019335.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651519019335.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651519019335.png)(Approve icon) in the **Request Status** Otherwise click [![image-1651519038372.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651519038372.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651519038372.png)(Reject icon) to reject the request.

#### **6.47.4 Attach a File into a Blasting and Painting Report**

If you want to attach a file with any existing blasting and painting report listed in the **Blasting and Painting** page, you can attach the file by using [![image-1651519149148.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651519149148.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651519149148.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

### **6.48 NDT Summary Report**

The **NDT Summary Report** tab in the **Piping** menu shows the summary report of the NDT inspection.

1. Click **NDT Summary Report** in the **Piping** menu. The **NDT Summary Report** page opens.
    
    [![image-1651519234930.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651519234930.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651519234930.png)
    
     **Figure 6.48: NDT Summary Report page**

#### **6.48.1 Print an NDT Summary Report**

If you want to print an NDT summary report, click [![image-1651519304378.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651519304378.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651519304378.png) (print icon) provided in the upper side of the **NDT Summary Report** page. See Fig 6.48.

#### **6.48.2 Export an NDT Summary Report**

You can export a list of NDT summary report added in the **NDT Summary Report** page in the pdf and excel formats by using[![image-1651519349018.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651519349018.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651519349018.png) (**PDF** button) and [![image-1651519359507.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651519359507.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651519359507.png) (**Excel** button). To know how to export, see the topic, “[<u>**Export P&amp;ID list**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

### **6.49 Component Summary Report** 

Component Summary Report shows the component summary details. If you want to view a component summary report, do the following steps,

1. Click **Component Summary Report** in the **Piping** menu. The **Component Summary Report** page opens.
    
    [![image-1651519423625.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651519423625.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651519423625.png)
    
     **Figure 6.49: Component Summary Report page**
2. In the **From Date** and **To Date** boxes, select the from and to dates in respectively.
3. Click **Show Report**.
    
    The component summary report opens for the selected dates.

#### **6.49.1 Print a Component Summary Report**

If you want to print a component summary report, use [![image-1651519505815.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651519505815.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651519505815.png) and [![image-1651519529914.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651519529914.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651519529914.png) (print icons) provided in the **Component Summary Report** page. See Fig 6.49.

1. If you want to print the current page of the component summary report, click [![image-1651519561128.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651519561128.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651519561128.png) (print icon including the page number).
2. If you want to print all the pages of the component summary report, click[![image-1651519584698.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651519584698.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651519584698.png) (print icon).

#### **6.49.2 Export a Component Summary Report**

You can export the component summary report in various formats by using the option [![image-1651519634162.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651519634162.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651519634162.png) provided in the upper right corner of the **Component Summary Report** page.


### **6.50 NDT Performance Report (RT &amp; UT)**

NDT Performance Report shows the performance details of RT and UT. If you want to view an NDT performance report, do the following steps,

1. Click **NDT Performance Report** in the **Piping** menu. The **NDT Performance Report** page opens.
    
    [![image-1651595514807.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651595514807.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651595514807.png)
    
     **Figure 6.50: NDT Performance Report page**
2. In the **From Date** and **To Date** boxes, select the from and to dates in respectively.
3. Click **Show Report**.
    
    The NDT performance report opens for the selected dates.

#### **6.50.1 Print an NDT Performance Report**

If you want to print an NDT performance report, use [![image-1651595624122.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651595624122.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651595624122.png)and [![image-1651595636905.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651595636905.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651595636905.png) (print icons) provided in the **NDT Performance Report** page. See Fig 6.50.

1. If you want to print the current page of the NDT performance report, click [![image-1651595664046.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651595664046.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651595664046.png) (print icon including the page number).
2. If you want to print all the pages of the NDT performance report, click [![image-1651595712461.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651595712461.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651595712461.png)(print icon).

#### **6.50.2 Export NDT Performance Report**

You can export the NDT performance report in various formats by using the option [![image-1651595753441.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651595753441.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651595753441.png) provided in the upper right corner of the **NDT Performance Report** page.

### **6.51 Pipe Flushing Check List**

The **Pipe Flushing Check List** tab in the **Piping** menu used to add the pipe flushing check list detail.

1. Click **Pipe Flushing Check List** in the **Piping** menu.
2. The **Pipe Flushing Check List** page opens.
    
    [![image-1651595904511.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651595904511.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651595904511.png)
    
     **Figure 6.51: Pipe Flushing Check List page**

#### **6.51.1 Add a Pipe Flushing Check List**

1. Click [![image-1651606641935.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651606641935.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651606641935.png) (****ADD**** button) in the ****Pipe Flushing Check List**** See Fig 6.51. A new window opens to add a pipe flushing check list.
    
    [![image-1651606662976.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651606662976.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651606662976.png)
    
    [![image-1651606699982.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651606699982.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651606699982.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **User Report** box, enter the user report number.
3. In the **Client Ref** box, enter the client reference number.
4. In the **Survey Ref** box, enter the survey reference number.
5. In the **Drawing** box, select a drawing number.
6. In the **Inspection Date** box, select the inspection date.
7. In the **Work Scope** box, enter the work scope detail.
8. In the **Remarks** box, enter your remarks if any.
9. In the **Description** box, enter the description for check list.
10. In the **Location** box, enter the name of a location.
11. In the **Acceptance Code** box, enter the acceptance code.
12. In the **Flushing Pressure** box, enter the flushing pressure value.
13. In the **Flushing Temperature** box, enter the flushing temperature value.
14. In the **Flushing Time** box, select the flushing time.
15. In the **Flushing Medium** box, enter the flushing medium name.
16. In the **Instrument Serial No** box, enter the instrument serial number.
17. Click **Save**.

The pipe flushing checklist is successfully added.

#### **6.51.2 Edit a Pipe Flushing Check List**

 If you want to edit any existing pipe flushing check list in the **Pipe Flushing Check List** page, do the following steps,

1. Click [![image-1651606865709.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651606865709.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651606865709.png) (Edit icon) in the **Edit** column for the respective pipe flushing check list. See Fig 6.51. A new window opens with the added details of the pipe flushing check list.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.51.3 Export a Pipe Flushing Check List**

You can export a list of pipe flushing check list added in the **Pipe Flushing Check List** page in the pdf and excel formats by using [![image-1651606945375.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651606945375.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651606945375.png) (**PDF** button) and [![image-1651606956507.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651606956507.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651606956507.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>”**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li).

#### **6.51.4 Filter a Pipe Flushing Check List**

If you want to filter any pipe flushing check list, you can use (**FILTER** button) in the **Pipe Flushing Check List** page. To know how to filter, see the topic, “[<u>**Filter P&amp;ID**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

#### **6.51.5 Print a Pipe Flushing Check List**

If you want to print a pipe flushing check list, click (print icon) provided in the **Print** column of the **Pipe Flushing Check List** page. See Fig 6.51.

### **6.52 Pipe Inspection Check List**

The **Pipe Inspection Check List** tab in the **Piping** menu used to add the pipe inspection check list detail.

1. Click **Pipe Inspection Check List** in the **Piping** menu.
    
    The **Pipe Inspection Check List** page opens.
    
    [![image-1651646434211.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651646434211.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651646434211.png)
    
     **Figure 6.52: Pipe Inspection Check List page**

#### **6.52.1 Add a Pipe Inspection Check List**

1. Click [![image-1651646535308.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651646535308.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651646535308.png) (**ADD** button) in the **Pipe Inspection Check List** page. See Fig 6.52.
    
    A new window opens to add a pipe inspection check list.
    
    [![image-1651646567001.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651646567001.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651646567001.png)
    
    [![image-1651646577615.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651646577615.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651646577615.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **User Report Number** box, enter the user report number.
3. In the **Drawing** box, select a drawing number.
4. In the **Date** box, select the inspection date.
5. In the **Remarks** box, enter your remarks if any.
6. In the **Status** field, select the status of the check list.
7. In the **Report Type** box, select the report type of the check list.
8. Click **Save**.

The pipe inspection checklist is successfully added.

#### **6.52.2 Edit a Pipe Inspection Check List**

 If you want to edit any existing pipe inspection check list in the **Pipe Inspection Check List** page, do the following steps,

1. Click [![image-1651646995460.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651646995460.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651646995460.png) (Edit icon) in the **Edit** column for the respective pipe inspection check list. See Fig 6.52. A new window opens with the added details of the pipe inspection check list.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.52.3 Export a Pipe Inspection Check List**

You can export a list of pipe inspection check list added in the **Pipe Inspection Check List** page in the pdf and excel formats by using [![image-1651647082184.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651647082184.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651647082184.png) (**PDF** button) and [![image-1651647094292.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651647094292.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651647094292.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **6.52.4 Filter a Pipe Inspection Check List**

If you want to filter any pipe inspection check list, you can use [![image-1651647198790.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651647198790.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651647198790.png) (**FILTER** button) in the **Pipe Inspection Check List** page. To know how to filter, see the topic, “**[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)**”.

#### **6.52.5 Print a Pipe Inspection Check List**

If you want to print a pipe Inspection check list, click[![image-1651647888162.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651647888162.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651647888162.png)(print icon) provided in the **Print** column of the **Pipe Inspection Check List** page. See Fig 6.52.


### **6.53 Warning Letter**

The **Warning Letter Report** tab in the **Piping** menu helps you to add a warning letter that addresses the performance issue of a worker. The warning letter explains about the mistakes done by the worker. If you want to add a warning letter against any worker, do the following,

1. Click **Warning Letter** in the **Piping** menu. The **Warning Letter Report** page opens.
    
    [![image-1651647958957.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651647958957.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651647958957.png)
    
     **Figure 6.53: Warning Letter Report page**

#### **6.53.1 Add a Warning Letter Report**

If you want to add a warning letter report,

1. Click [![image-1651648021092.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651648021092.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651648021092.png) (**ADD** button) in the **Warning Letter Report**  See Fig 6.53. A new window opens to add a warning letter report.
    
    [![image-1651648052345.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651648052345.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651648052345.png)
    
    [![image-1651648063981.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651648063981.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651648063981.png)**Tip**: A report number for a new warning letter report will be updated automatically in the **Report Number** box.
2. In the ****Prepared By**** box, enter the name a person who has prepared the warning letter report.
3. In the **Prepared Date** box, enter the prepared date of the warning letter report.
4. In the **Reviewed By** box, enter the name a person who has reviewed the warning letter report.
5. In the **Reviewed Date** box, enter the reviewed date of the warning letter report.
6. In the **Approved By** box, enter the name a person who has approved the warning letter report.
7. In the **Approved Date** box, enter the approved date of the warning letter report.
8. Click **Save**.

The warning letter report is successfully added. Once you have added the warning letter report, you must add the warning letter details.

#### **6.53.2 Add Warning Letter Details** 

1. Click [![image-1651648227693.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651648227693.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651648227693.png)(Edit icon) in the **Edit Report** column of the **Warning Letter Report** page. See Fig 6.53. The **Warning Letter Details** window opens including a default warning letter template.
    
    [![image-1651648256254.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651648256254.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651648256254.png)
2. In the **Date** box, select the date of issuing the warning letter.
3. In the **From** box, enter the name of a person who issues the warning letter.
4. In the **To** box, enter the name of a person who receives the warning letter.
5. In the **Attention** box, enter the relevant detail.
6. In the **Subject** box, enter the subject of this warning letter.
7. In the **Remarks** box, enter your remarks if any.
8. In the **Content** box, if you want to change any information given in the template, you can change.
9. Click **Save Details**.

#### **6.53.3 Print a Warning Letter Report**

If you want to print a warning letter report, click [![image-1651648375313.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651648375313.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651648375313.png) (print icon) provided in the **Report** column of the **Warning Letter Report** page. See Fig 6.53.

[![image-1651648393478.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651648393478.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651648393478.png)**Tip**: If you want to lock any warning letter report, click the check box provided in the **Lock Report?** column of the **Warning Letter Report** page. See Fig 6.53.

#### **6.53.4 Attach a File into a Warning Letter Report**

If you want to attach any file with any warning letter report listed in the **Warning Letter Report** page. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

### **6.54 Welder Performance Summary**

The **Welder Performance Summary** tab in the **Piping** menu used to add welder performance record. To add the welder performance record,

1. Click **Welder Performance Summary** in the **Piping** menu. The **Welder Performance Record** page opens.
    
    [![image-1651648500690.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651648500690.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651648500690.png)
    
     **Figure 6.54: Welder Performance Record page**

#### **6.54.1 Add a Welder Performance Record**

1. Click [![image-1651648581903.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651648581903.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651648581903.png) (**ADD** button) in the **Welder Performance Record** See Fig 6.54. A new window opens to add a welder performance record.
    
    [![image-1651648598586.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651648598586.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651648598586.png)
    
    [![image-1651648608913.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651648608913.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651648608913.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
2. In the **Start Date** and **End Date** boxes, select the start and end dates.
3. In the **Prepared By** box, enter the name a person who has prepared the welder performance record.
4. In the **Prepared Date** box, enter the prepared date of the welder performance record.
5. In the **Reviewed By** box, enter the name a person who has reviewed the welder performance record.
6. In the **Reviewed Date** box, enter the reviewed date of the welder performance record.
7. In the **Approved By** box, enter the name a person who has approved the welder performance record.
8. In the **Approved Date** box, enter the approved date of the welder performance record.
9. Click **Save**.

The welder performance record is successfully added.

#### **6.54.2 Edit a Welder Performance Record**

 If you want to edit any existing welder performance record in the **Welder Performance Record** page, do the following steps,

1. Click [![image-1651648730805.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651648730805.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651648730805.png) (Edit icon) in the **Edit** column for the respective welder performance record. See Fig 6.54. A new window opens with the added details of the welder performance record.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **6.54.3 Export a Welder Performance Record**

You can export a list of welder performance records added in the **Welder Performance Record** page in the pdf and excel formats by using [![image-1651648819810.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651648819810.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651648819810.png) (**PDF** button) and [![image-1651648833418.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651648833418.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651648833418.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **6.54.4 Filter a Welder Performance Record**

If you want to filter any welder performance record, you can use [![image-1651648960846.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651648960846.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651648960846.png) (**FILTER** button) in the **Welder Performance Record** page. To know how to filter, see the topic, “**[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)**”.

#### **6.54.5 Print a Welder Performance Record**

If you want to print a welder performance record, click [![image-1651648948027.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651648948027.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651648948027.png) (print icon) provided in the **Print** column of the **Welder Performance Record** page. See Fig 6.54.

#### **6.54.5 Attach a File into a Welder Performance Record**

If you want to attach a file with any existing welder performance record listed in the **Welder Performance Record** page, you can attach the file by using (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

### **6.55 Weld Repair Log Report**

Weld Repair Log Report shows the weld repair log details. If you want to view a weld repair log report, do the following steps,

1. Click **Weld Repair Log Report** in the **Piping** menu.
    
    The **Weld Repair Log Report** page opens.
    
    [![image-1651649042002.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651649042002.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651649042002.png)
    
     **Figure 6.55: Weld Repair Log Report page**

#### **6.55.1 Print a Weld Repair Log Report**

If you want to print a weld repair log report, use [![image-1651649142665.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651649142665.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651649142665.png) and [![image-1651649161776.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651649161776.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651649161776.png) (print icons) provided in the **Weld Repair Log Report** page. See Fig 6.55.

1. If you want to print the current page of the weld repair log report, click [![image-1651649126422.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651649126422.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651649126422.png) (print icon including the page number).
2. If you want to print all the pages of the weld repair log report, click [![image-1651649182964.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651649182964.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651649182964.png)(print icon).

#### **6.55.2 Export a Weld Repair Log Report**

You can export the weld repair log report in various formats by using the option provided in the upper right corner of the **Weld Repair Log Report** page.

### **6.56 AFI Report Status**

The **AFI Report** **Status** tab in the **Piping** menu shows the AFI report status.

1. Click **AFI Report** **Status** in the **Piping** menu. The **AFI Report** **Status** page opens.
    
    [![image-1651748426324.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651748426324.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651748426324.png)
    
     **Figure 6.56: AFI Report Status page**
2. In the **Project** box, select a project from a drop-down list.
3. In the **Category** box, select a category from a drop-down list.
4. In the **From Date** and **To Date** boxes, select the from and to dates in respectively.
5. Click **Show Report**.

The AFI report status will be displayed.

#### **6.56.1 Print an AFI Report Status**

If you want to print an AFI report status, use [![image-1651748531942.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651748531942.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651748531942.png) and [![image-1651748545338.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651748545338.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651748545338.png) (print icons) provided in the **AFI Report** **Status** page. See Fig 6.56.

1. If you want to print the current page of the AFI report status, click [![image-1651748585464.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651748585464.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651748585464.png) (print icon including the page number).
2. If you want to print all the pages of the AFI report status, click [![image-1651748602784.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651748602784.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651748602784.png) (print icon).

#### **6.56.2 Export an AFI Report Status**

You can export the AFI report status in various formats by using the option provided in the upper right corner of the **AFI Report** **Status** page.

### **6.57 Status by ISO for NDT Requirement**

The **Status by ISO for NDT Requirement** tab in the **Piping** menu used to view the ISO status for NDT requirement.

1. Click **Status by ISO for NDT Requirement** in the **Piping** menu. The page shows the status by ISO for NDT requirement.
    
    [![image-1651748698757.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651748698757.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651748698757.png)
    
     **Figure 6.57: Status by ISO for NDT Requirement page**

#### **6.57.1 Export Status by ISO for NDT Requirement**

You can export the status in the **Status by ISO for NDT Requirement** page in the pdf and excel formats by using (**PDF** button) and (**Excel** button). To know how to export, see the topic, **“**[<u>**Export P&amp;ID list**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.**

### **6.58 Piping Widget**

The **Piping Widget** tab in the **Piping** menu used to view overall summary of the piping NDT, NDT number of joint status, and overall welder rejected status.

[![image-1651748853334.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651748853334.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651748853334.png)

### **6.59 Welder Not Welded List**

The **Welder Not Welded List** tab in the **Piping** menu used to view the list of welders who has not performing the welding work for more than 15 days. If you want to view the welder list,

1. Click **Welder Not Welded List** in the **Piping** menu. The **Welder Recently Not Welded List** page shows a list of welders including their NRIC and welder numbers, last weld date, and no of days not performing welding.
    
    [![image-1651748920812.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651748920812.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651748920812.png)
    
     **Figure 6.59: Welder Recently Not Welded List page**

#### **6.59.1 Export Welder Not Welded List**

You can export the welder list in the **Welder Recently Not Welded List** page in the pdf and excel formats by using [![image-1651748992439.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651748992439.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651748992439.png)(**PDF** button) and (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

### **6.60 Daily Piping Production Log Report**

The **Daily Piping Production Log** **Report** tab in the **Piping** menu used to view the production details in the piping project on a daily basis. If you want to view the production log report,

1. Click **Daily Piping Production Log Report** in the **Piping** menu. The **Daily Piping Production Log** **Report** page shows production details in the piping project on a daily basis.
    
    [![image-1651749109366.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651749109366.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651749109366.png)
    
     **Figure 6.60: Daily Piping Production Log** **Report page**

#### **6.60.1 Print a Daily Piping Production Log Report**

If you want to print a daily piping production log report, use [![image-1651749213979.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651749213979.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651749213979.png) and [![image-1651749228663.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651749228663.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651749228663.png) (print icons) provided in the **Daily Piping Production Log** **Report** page. See Fig 6.60.

1. If you want to print the current page of the daily piping production log report, click [![image-1651749296303.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651749296303.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651749296303.png) (print icon including the page number).
2. If you want to print all the pages of the daily piping production log report, click [![image-1651749309040.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651749309040.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651749309040.png)(print icon).

#### **6.60.2 Export a Daily Piping Production Log Report**

You can export the daily piping production log report in various formats by using the option [![image-1651749373282.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651749373282.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651749373282.png) provided in the upper right corner of the **Daily Piping Production Log** **Report** page.

### **6.61 RFI Log Report**

### **6.62 NDT Log Report**

The **NDT Log** **Report** tab in the **Piping** menu used to view the NDT log report. If you want to view the NDT log report,

1. Click **NDT Log** **Report** in the **Piping** menu. The **NDT Log** **Report** page shows NDT log report.
2. In the **From Date** and **To Date** boxes, select the from and to dates.
3. Click **Load Report**.
    
    [![image-1651749488485.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651749488485.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651749488485.png)
    
     **Figure 6.62: NDT Log** **Report page**

#### **6.62.1 Print an NDT Log Report**

If you want to print an NDT log report, use [![image-1651750158863.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651750158863.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651750158863.png) and [![image-1651750176142.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651750176142.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651750176142.png) (print icons) provided in the **NDT Log** **Report** page. See Fig 6.62.

1. If you want to print the current page of the NDT log report, click [![image-1651750143974.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651750143974.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651750143974.png) (print icon including the page number).
2. If you want to print all the pages of the NDT log report, click [![image-1651750208764.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651750208764.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651750208764.png)(print icon).

#### **6.62.2 Export an NDT Log Report**

You can export the NDT log report in various formats by using the option [![image-1651750421993.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651750421993.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651750421993.png) provided in the upper right corner of the **NDT Log** **Report** page.

### **6.63 DB Summary Report**

The **DB Summary** **Report** tab in the **Piping** menu used to view the DB summary report. If you want to view the DB summary report,

1. Click **DB Summary Report** in the **Piping** menu. The **Total Piping DB Summary** page shows the DB summary report.
    
    [![image-1651750679864.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651750679864.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651750679864.png)
    
     **Figure 6.63: Total Piping DB Summary page**

#### **6.63.1 Print a DB Summary Report**

If you want to print a DB summary report, use [![image-1651750817968.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651750817968.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651750817968.png) and [![image-1651750873767.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651750873767.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651750873767.png) (print icons) provided in the **Total Piping DB Summary** page. See Fig 6.63.

1. If you want to print the current page of the DB summary report, click [![image-1651750895970.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651750895970.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651750895970.png) (print icon including the page number).
2. If you want to print all the pages of the DB summary report, click [![image-1651750923965.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651750923965.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651750923965.png) (print icon).

#### **6.63.2 Export a DB Summary Report**

You can export the DB summary report in various formats by using the option [![image-1651750964295.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651750964295.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651750964295.png) provided in the upper right corner of the **Total Piping DB Summary** page.

### **6.64 Weld Repair Report**

Weld Repair Report shows the weld repair details. If you want to view a weld repair report, do the following steps,

1. Click **Weld Repair Report** in the **Piping** menu.
    
    The **Weld Repair Report** page opens.
2. In the **Repair No** box, select the repair number.
3. In the ****ISO/Drawing Number**** box, select the ISO drawing number.
4. Click **Go**.
    
    The weld repair details open for the selected repair number.
    
    [![image-1651751146401.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651751146401.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651751146401.png)
    
     **Figure 6.64: Weld Repair Report page**

#### **6.64.1 Print a Weld Repair Report**

If you want to print a weld repair report, use [![image-1651751272809.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651751272809.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651751272809.png) and [![image-1651751530812.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651751530812.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651751530812.png) (print icons) provided in the **Weld Repair Report** page. See Fig 6.64.

1. If you want to print the current page of the weld repair report, click [![image-1651751510267.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651751510267.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651751510267.png) (print icon including the page number).
2. If you want to print all the pages of the weld repair report, click [![image-1651751567555.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651751567555.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651751567555.png)(print icon).

#### **6.64.2 Export a Weld Repair Report**

You can export the weld repair report in various formats by using the option [![image-1651751629536.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651751629536.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651751629536.png) provided in the upper right corner of the **Weld Repair Report** page.

### **6.65 Pending NDT Log Report**

Pending NDT Log Report shows the pending NDT log details. If you want to view the pending NDT log report, do the following steps,

1. Click **Pending NDT Log Report** in the **Piping** menu. The **Pending NDT Log** page opens.
2. In the **ISO/Drawing Number** box, select the ISO drawing number.
3. Click **Show Report**.
    
    The pending NDT log details open for the selected ISO drawing number.
    
    [![image-1651764468233.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651764468233.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651764468233.png)
    
     **Figure 6.65: Pending NDT Log page**

#### **6.65.1 Print a Pending NDT Log Report**

If you want to print a pending NDT log report, use [![image-1651764552316.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651764552316.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651764552316.png) and [![image-1651764568047.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651764568047.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651764568047.png) (print icons) provided in the **Pending NDT Log** page. See Fig 6.65.

1. If you want to print the current page of the pending NDT log report, click [![image-1651764598993.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651764598993.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651764598993.png) (print icon including the page number).
2. If you want to print all the pages of the pending NDT log report, click [![image-1651764620957.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651764620957.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651764620957.png) (print icon).

#### **6.65.2 Export a Pending NDT Log Report**

You can export the pending NDT log report in various formats by using the option [![image-1651764853813.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651764853813.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651764853813.png) provided in the upper right corner of the **Pending NDT Log** page.


### **6.66 RT Films Status Report**

The **RT Film Status Report** tab in the **Piping** menu used to view the RT film status. If you want to view the RT film status report,

1. Click **RT Film Status Report** in the **Piping** menu. The **RT Film Report** page shows the RT film status.
    
    [![image-1651764909212.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651764909212.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651764909212.png)
    
     **Figure 6.66: RT Film Status Report page**

#### **6.66.1 Print an RT Film Status Report**

If you want to print an RT film status report, use [![image-1651764981716.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651764981716.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651764981716.png) and [![image-1651764996485.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651764996485.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651764996485.png) (print icons) provided in the **RT Film Status Report** page. See Fig 6.66.

1. If you want to print the current page of the RT film status report, click [![image-1651765015334.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651765015334.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651765015334.png) (print icon including the page number).
2. If you want to print all the pages of the RT film status report, click [![image-1651765033658.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651765033658.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651765033658.png)(print icon).

#### **6.66.2 Export an RT Film Status Report**

You can export the RT film status report in various formats by using the option [![image-1651765119038.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651765119038.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651765119038.png) provided in the upper right corner of the **RT Film Status Report** page.

# Test Pack (ISO)

## **7.1 Test Pack (ISO)**

The **Test Pack (ISO)** tab in the **Test Pack** menu helps you to add a test back (ISO). To navigate to the test pack adding page,

1. Click **Test Pack (ISO)** in the **Test Pack** menu. The **Test Pack** page opens. [![image-1651543354232.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651543354232.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651543354232.png)
    
     **Figure 7.1: Test Pack (ISO) page**

#### **7.1.1 Add a Test Pack**

If you want to add a test pack, do the following steps,

1. Click [![image-1651543543330.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651543543330.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651543543330.png) (**ADD** button) in the **Test Pack** page. See Fig 7.1.
    
    The page opens a new window to add the details of a test pack.
    
    [![image-1651543565541.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651543565541.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651543565541.png)
    
    [![image-1651543577053.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651543577053.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651543577053.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651543595388.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651543595388.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651543595388.png)**Tip**: A report number for a new test pack will be updated automatically in the **Report Number** box. If you want to change the report number, you can change.
2. In the **System** box, select a system from a drop-down list.
3. In the **Name** box, enter the name of the test pack.
4. In the **Sub System** box, select a sub system from a drop-down list.
5. In the **Type of Test** box, enter the type of test.
6. In the **Test Medium** box, enter the name of a test medium.
7. In the **Test Pressure** box, enter the test pressure value.
8. In the **Test Area** box, enter the name of a test area.
9. In the **Hot Oil Flush** box, enter the detail of hot oil flush.
10. In the **Chem. Clean** box, enter the detail of chemical cleaning.
11. In the **Test Duration (Hours)** box, enter the duration of test.
12. Click **Save**.
    
    The test pack is successfully added and listed in the **Test Pack** page. Once you have added a test pack, you can manage the checklist of MCR and map ISO drawings/spool for the added test pack.

#### **7.1.2 Manage a Checklist**

If you want to manage the checklist of test pack,

1. Click (Add icon) in the **Manage Checklist** See Fig 7.1. The page redirects you to the **Checklist Name** page.
    
    [![image-1651543710003.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651543710003.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651543710003.png)
2. Click [![image-1651543727678.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651543727678.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651543727678.png) (**ADD** button) in the **Checklist Name** page.
    
    The page opens a new window to add the details of the checklist.
    
    [![image-1651543745781.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651543745781.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651543745781.png)
3. In the **Checklist** box, enter the checklist name.
4. In the **Status** box, select the status of the checklist.
5. In the **Completed by** box, enter the name of a person who has completed checklist.
6. In the **Completed Date** box, select the completed date of the checklist.
7. Click **Save**.
    
    The added checklist will be listed in the **Checklist Name** page.
8. If you want to manage the added checklist, click (Add icon) in the ****Manage Checklist**** column of the ****Checklist Name**** page. The **MCR Checklist** page opens for the selected checklist.
    
    [![image-1651543808517.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651543808517.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651543808517.png)
9. In the Description box, enter the description for the checklist you want to add.
10. In the Type box, select the checklist type and click [![image-1651543831025.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651543831025.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651543831025.png). The added checklist will be listed in the **MCR Checklist** window.
    
    [![image-1651543851553.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651543851553.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651543851553.png)
11. If you want to add the checklists from a template, in the ****Template**** box, select the template from a drop-down list and click [![image-1651543872691.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651543872691.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651543872691.png). The checklists in the template will be listed in the **MCR Checklist** window.
12. In the **Remarks** box, enter your remarks.
13. Click [![image-1651543897241.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651543897241.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651543897241.png).

#### **7.1.3 Map ISO**

If you want to map ISO drawings/ spool for the added test pack, do the following steps,

1. Click [![image-1651543951214.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651543951214.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651543951214.png)(Add icon) in the Map ISO column of the respective test pack. The **Map Drawings/Spool** window opens.
    
    [![image-1651543968426.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651543968426.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651543968426.png)
2. Click [![image-1651543986339.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651543986339.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651543986339.png) (**ADD** button) in the **Map Drawings/Spool** window. The window shows a list of drawing and their spools.
    
    [![image-1651544002519.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544002519.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544002519.png)
3. Do one of the following steps to add spools, 
    1. 1. If you want to add a spool, click[![image-1651544024461.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544024461.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544024461.png)(Add icon) provided in the **Add** column.
            
            The added spools will be moved to right side of the window.
        2. If you want to add all spools in the drawing, click[![image-1651544093925.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544093925.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544093925.png) (Add icon) provided in the ******Drawing Number****** column. The added spools will be moved to right side of the window.
4. Click **Save**.
    
    The added spools will be listed in the in the **Map Drawings/Spool** window.
    
    
    1. 1. If you want to view a weld inspection summary report, click [![image-1651544156692.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544156692.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544156692.png) (print icon) provided in the **Welding Summary** column.
        2. If you want to view a visual welding report, click [![image-1651544174998.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544174998.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544174998.png)(print icon) provided in the **Visual Welding Report** column.

#### **7.1.4 Edit a Test Pack**

If you want to edit any added test pack in the **Test Pack** page,

1. Click [![image-1651544227928.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544227928.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544227928.png) (Edit icon) of the respective test pack. See Fig 7.1. The **Test Pack** page shows the details of the selected test pack.
2. Edit the details where you want.
3. Click **Save**.

#### **7.1.5 Delete a Test Pack**

If you want to delete any existing test pack in the **Test Pack** page, you can use [![image-1651544304884.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544304884.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544304884.png) (Delete icon) provided in the **Test Pack** page. To know how to delete, see the topic, **“**[<u>**Delete** **P&amp;ID**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

#### **7.1.6 View a Test Pack Spool List Report**

If you want to view a test pack spool list report, click [![image-1651544333949.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544333949.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544333949.png) (print icon) provided in the **Spool** column.

#### **7.1.7 View a Drawing List Report**

If you want to view a drawing list report, click[![image-1651544367459.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544367459.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544367459.png)(print icon) provided in the **Drawing** column.

#### **7.1.8 View a Cover Page of Test Pack**

If you want to view a cover page of test pack, click [![image-1651544405303.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544405303.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544405303.png)(print icon) provided in the **Cover Page** column.

#### **7.1.9 View a Test Pack Report**

If you want to view a test pack report, click [![image-1651544435366.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544435366.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544435366.png)(print icon) provided in the **Test Pack** column.

#### **7.1.10 Export Test Pack list**

You can export a list of test packs added in the **Test Pack** page in both the pdf and excel formats by using [![image-1651544467667.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544467667.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544467667.png)(**PDF** button) and [![image-1651544475915.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544475915.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544475915.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

### **7.2 Test Pack (Spool)**

The **Test Pack (Spool)** tab in the **Test Pack** menu helps you to add a test back (Spool). To navigate to the test pack adding page,

1. Click **Test Pack (Spool)** in the **Test Pack** menu. The **Test Pack** page opens.
    
    [![image-1651544528920.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544528920.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544528920.png)
    
     **Figure 7.2: Test Pack page**

#### **7.2.1 Add a Test Pack**

If you want to add a test pack, do the following steps,

1. Click [![image-1651544580391.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544580391.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544580391.png) (**ADD** button) in the **Test Pack**  See Fig 7.2. The page opens a new window to add the details of a test pack.
    
    [![image-1651544599891.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544599891.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544599891.png)
    
    [![image-1651544614011.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544614011.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544614011.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651544626835.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544626835.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544626835.png)**Tip**: A report number for a new test pack will be updated automatically in the **Report Number** box. If you want to change the report number, you can change.
2. In the **System Name** box, select a system from a drop-down list.
3. In the **Name** box, enter the name of the test pack.
4. In the **Sub System** **Name** box, select a sub system from a drop-down list.
5. In the **Type of Test** box, enter the type of test.
6. In the **Templates** box, select a template from a drop-down list.
7. In the **Remarks** box, enter your remarks if any.
8. In the **Test Medium** box, enter the name of a test medium.
9. In the **Test Pressure** box, enter the test pressure value.
10. In the **Test Area** box, enter the name of a test area.
11. In the **Hot Oil Flush** box, enter the detail of hot oil flush.
12. In the **Chem. Clean** box, enter the detail of chemical cleaning.
13. In the **Test Duration (Hours)** box, enter the duration of test.
14. In the **Prepared By** box, enter the name of a person who has prepared the test pack.
15. In the **Test Pack Status** box, enter the status of the test pack.
16. Click **Save**.
    
    The test pack is successfully added and listed in the **Test Pack** page. Once you have added a test pack, you can manage the checklist and assign spools and components for the added test pack.
    
    [![image-1651544726989.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544726989.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544726989.png)**Note**: If you want to perform the above tasks, click [![image-1651544741313.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544741313.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544741313.png)(Add icon) in the **Assign Spool/ Components** column of the respective test pack.
    
    The page shows the **Manage Checklist**, **Assign Spool**, and **Assign Component** options.
    
    [![image-1651544756068.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544756068.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544756068.png)

#### **7.2.2 Manage a Checklist**

If you want to manage the test pack checklist, Click the **Manage Checklist** option.

The **Test Pack Checklist** window opens.

[![image-1651544795099.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544795099.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544795099.png)

If you want to edit any checklist, you can edit the checklist.

#### **7.2.3 Assign a Spool**

If you want to assign spool for the added test pack, do the following steps,

1. Select the **Assign Spool** option. The **Assign** **Spool** window opens.
    
    [![image-1651544837324.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544837324.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544837324.png)
2. Click [![image-1651544853964.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544853964.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544853964.png) (**ADD** button) in the **Assign Spool** window.
    
    The window shows a list of spools.
    
    [![image-1651544870561.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544870561.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544870561.png)
3. If you want to add a spool, click [![image-1651544887244.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544887244.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544887244.png) (Add icon) provided in the ****Add**** column.
4. Click **Save**.
    
    The added spools will be listed in the in the **Assign Spool** window.

#### **7.2.4 Assign a Component**

If you want to assign a component, click the **Assign Component** option.

The **Assign Component** window opens.

[![image-1651544945174.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544945174.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544945174.png)

#### **7.2.5 Add Test Pack Result**

After completing the spool test for the added test pack request, you can add the result details. To add results, do the following steps,

1. Click [![image-1651544980036.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544980036.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544980036.png)(Add icon) in the **Result** column of the **Test Pack**  See Fig 7.2. The **Test Package** window opens.
    
    [![image-1651544995255.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651544995255.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651544995255.png)
    
    [![image-1651545001001.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545001001.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545001001.png)
    
    The **Test Package** window contains the following options: **Index**, **Pre-Pressure Checklist**, **Pressure Test**, **Final Review**, **Flushing Test, Content, Work instruction, Pre-Checklist, Punch List, Weld Inspection, Hydro Test Report, Flushing Check, BP Test, Instrument List,** and **Post Checklist**.

##### **Index**

If you want to add index for the test pack,

1. Click **Index** option. The **Index** window opens with a list of contents.
    
    [![image-1651545049095.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545049095.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545049095.png)
2. Select the contents which you want to add in the Index.

##### **Pre-Pressure Checklist**

If you want to add pre-pressure checklist for the test pack,

1. Click **Pre-Pressure Checklist** option. The **Pre-Pressure Checklist** window opens with a list of checklists.
    
    [![image-1651545087165.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545087165.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545087165.png)
2. Select the checklists which you want to add.
    
    
    1. 1. If you want to add the checklist, select the checkbox in the **Yes** column for the respect checklist.
        2. If the checklist is not applicable, select the checkbox in the ****N/A**** column.
        3. If you do not want to any checklist, select the checkbox in the ****No**** column for the respect checklist.

##### **Pressure Test**

If you want to add pressure test results,

1. Click **Pressure Test** option. The **Pressure Test** window opens with the following boxes: **ISO List**, **Test Description**, and **Test Equipment**.
    
    [![image-1651545163781.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545163781.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545163781.png)
2. In the **Test Description** box, click [![image-1651545180020.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545180020.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545180020.png) (**ADD** button).
    
    The **Test Method** box opens.
    
    
    1. 1. In the **Design Pressure** box, enter the design pressure value.
        2. In the **Required Test Pressure** box, enter the required test pressure value.
        3. In the **Actual Test Pressure** box, enter the actual test pressure value.
        4. In the **Holding Time** box, enter the holding time range.
        5. In the **Start Time** box, enter the start time of the pressure test.
        6. In the **End Time** box, enter the end time of the pressure test.
        7. In the **Test Medium** box, enter the test medium name.
        8. In the ****Metal Temperature**** box, enter the metal temperature value.
        9. Click **Save**.
3. In the ****Result**** field, select the result of the pressure test whether ****Acceptable**** or ****Not Acceptable****.
4. Click **Save**.

##### **Final Review**

If you want to view the final review of the test pack,

1. Click **Final Review** option. The **Final Review** window opens with the final review report.
    
    [![image-1651545291024.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545291024.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545291024.png)
2. If you want to view the final review report, click [![image-1651545317403.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545317403.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545317403.png)(print icon).

##### **Flushing Test**

If you want to add flushing test results,

1. Click **Flushing Test** option. The **Flushing Test** window opens with the following boxes: **Test Description (Pipe Spool), Test Description**, and **Test Equipment**.
    
    [![image-1651545380776.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545380776.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545380776.png)
2. In the **Test Description (Others)** box, click [![image-1651545397156.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545397156.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545397156.png) (**ADD** button).
    
    The **General Information** box opens.
    
    
    1. 1. In the **Installation Area** box, enter the installation area value.
        2. In the **Hydrotest Area** box, enter the hydrotest area value.
        3. In the **Start Time** box, enter the start time of the flushing test
        4. In the **Time** **Finished** box, enter the finished time of the flushing test.
        5. In the **Test Date** box, select the date of flushing test.
        6. In the **Test Medium** box, enter the test medium name.
        7. Click **Save.**
3. In the ****Test** **Result**** field, select the result of the pressure test whether ****Acceptable**** or ****Not Acceptable****.
4. Click **Save**.

##### **Content**

If you want to add content for the test pack,

1. Click **Content** option.
    
    The **Contents** window opens with a list of contents.
    
    [![image-1651545498658.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545498658.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545498658.png)
2. Select the contents which you want to add in the Content.

##### **Work Instruction Sheet**

If you want to add the work instruction,

1. Click **Work Instruction Sheet** option. The **Work Instruction Sheet** window opens.
    
    [![image-1651545539441.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545539441.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545539441.png)
2. In the **Schedule** field, enter the work schedule details.
3. In the **Design Condition** field, enter the design condition details.
4. In the **Test Condition** field, enter the test condition details.
5. In the **Judgement** field, enter the judgement details.
6. Click **Save**.

##### **Pre-Test Checklist**

If you want to add pre-test checklist for the test pack,

1. Click **Pre-Test Checklist** option. The **Pre-Test Checklist** window opens with a list of checklists.
    
    [![image-1651545597768.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545597768.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545597768.png)
2. Select the checklists which you want to add. 
    1. 1. If you want to add the checklist, select the checkbox in the ****Yes**** column for the respect checklist.
        2. If the checklist is not applicable, select the checkbox in the **N/A** column.
        3. If you do not want to any checklist, select the checkbox in the ****No**** column for the respect checklist.

##### **Welding Inspection Record**

If you want to view the welding inspection record,

1. Click **Welding Inspection Record** option.
    
    The **Welding Inspection Record** window shows the welding inspection record.
    
    [![image-1651545671140.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545671140.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545671140.png)

##### **Hydro Test Report**

If you want to add the hydro test report,

1. Click **Hydro Test Report** option. The **Hydrostatic Test Report** window shows a new window to add the hydrostatic test report details.
    
    [![image-1651545712404.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545712404.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545712404.png)
2. In the **Test Fluid** box, enter the test fluid name.
3. In the **Type of Test** box, enter the test type.
4. In the **Test Gauge Range** box, enter the test gauge range.
5. In the **Test Gauge No** box, enter the test gauge number.
6. In the **Duration** **Test Start** box, enter the test starting time.
7. In the **Duration** **Test Finish** box, enter the test finishing time.
8. In the **Date of Test** box, select the test date.
9. In the **Test Pressure** box, enter the test pressure value.
10. In the **Actual Pressure** box, enter the actual pressure value.
11. Click **Save**.

##### **Flushing Check List**

If you want to add the flushing check list,

1. Click **Flushing Check List** option. The **Flushing Check List** window shows a new window to add the flushing check list details.
    
    [![image-1651545808835.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545808835.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545808835.png)
2. In the **Flushing Circuit No** box, enter the flushing circuit number.
3. In the **Origin** box, enter the origin name.
4. In the **Termination** box, enter the termination detail.
5. In the **Remarks** box, enter your remarks if any.
6. Select the appropriate checklist.
7. Click **Save**.

##### **BP List**

If you want to add the BP list detail,

1. Click **BP List** option. The **BP List** window shows a new window to add the BP list details.
    
    [![image-1651545873388.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545873388.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545873388.png)
2. Click [![image-1651545892274.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545892274.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545892274.png) (**ADD** button) in the **BP List** window.
3. In the **Location** box, enter the location name.
4. In the **Control No** box, enter the control number.
5. In the **Size** box, enter the size vale.
6. In the **Thickness** box, enter the thickness value.
7. In the **Gasket** box, enter the gasket detail.
8. Click **Save**.

##### **Instrument List**

If you want to add the instrument list detail,

1. Click **Instrument List** option. The **Instrument List** window shows a new window to add the instrument list details.
    
    [![image-1651545955999.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545955999.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545955999.png)
2. Click [![image-1651545968812.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651545968812.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651545968812.png) (**ADD** button) in the **Instrument List** window.
3. In the **Location** box, enter the location name.
4. In the **Tag No** box, enter the tag number.
5. In the **P&amp;I No** box, enter the P&amp;I number.
6. In the **Size** box, enter the size vale.
7. In the **Gasket** box, enter the gasket detail.
8. In the **Remarks** box, enter your remarks if any.
9. Click **Save**.

##### **Post-Test Checklist**

If you want to add post-test checklist for the test pack,

1. Click **Post-Test Checklist** option. The **Post-Test Checklist** window opens with a list of checklists.
    
    [![image-1651546053227.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546053227.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546053227.png)
2. Select the checklists which you want to add. 
    1. 1. If you want to add the checklist, select the checkbox in the ****Yes**** column for the respect checklist.
        2. If the checklist is not applicable, select the checkbox in the **N/A** column.
        3. If you do not want to any checklist, select the checkbox in the ****No**** column for the respect checklist.


#### **7.2.6 Edit a Test Pack**

If you want to edit any added test pack in the **Test Pack** page,

1. Click [![image-1651546164159.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546164159.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546164159.png)(Edit icon) of the respective test pack. See Fig 7.2.
    
    The **Test Pack** page shows the details of the selected test pack.
2. Edit the details where you want.
3. Click **Save**.

#### **7.2.7 Delete a Test Pack**

If you want to delete any existing test pack in the **Test Pack** page, you can use [![image-1651546226610.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546226610.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546226610.png) (Delete icon) provided in the **Test Pack** page. To know how to delete, see the topic, “[<u>**Delete P&amp;ID**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

#### **7.2.8 View a Test Pack MDR Report**

If you want to view a test pack MDR report, click [![image-1651546273073.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546273073.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546273073.png)(print icon) provided in the **Assign Spool/Components** column.

#### **7.2.9 Attach a File into a Test Pack**

If you want to attach any file with any test pack listed in the **Test Pack** page, you can attach the file by using (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **7.2.10 Export Test Pack list**

You can export a list of test packs added in the **Test Pack** page in both the pdf and excel formats by using [![image-1651546334034.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546334034.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546334034.png) (**PDF** button) and [![image-1651546341921.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546341921.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546341921.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **7.2.11 Filter a Test Pack**

If you want to filter any specific test pack in the **Test Pack** page, you can use [![image-1651546374497.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546374497.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546374497.png) (**FILTER** button) located on the **Test Pack** page. To know how to filter, see the topic, “**[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)**”.

#### **7.2.12 Import Multiple Test Packs**

If you want to import multiple test packs together, do the following,

1. Click [![image-1651546418940.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546418940.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546418940.png) (**TEMPLATE** button). See Fig 7.2. An excel worksheet will be downloaded with a predefined template to enter the details of systems.
    
    [![image-1651546438111.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546438111.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546438111.png)
2. Enter the required test pack details in the respective columns of the excel worksheet.
3. Once you have added the test pack details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651546461777.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546461777.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546461777.png) (**IMPORT** button). See Fig 7.2.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651546480404.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546480404.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546480404.png)
5. Click [![image-1651546491813.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546491813.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546491813.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651546518022.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546518022.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546518022.png) (**Upload** button) to export the test pack details that are included in the excel worksheet.

The details of the test packs in the worksheet will be displayed in the **Test Pack** page.

#### **7.2.13 View a Test Pack Summary Report**

If you want to view a test pack summary report, click (**Summary Report** icon) provided in the **Test Pack** page.

[![image-1651546673870.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546673870.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546673870.png)


### **7.3 Test Pack Checklist**

The **Test Pack Checklist** tab in the **Test Pack** menu helps you add the checklist items for the specific test pack. To add the checklist,

1. Click **Test Pack Checklist** in the **Test Pack** menu. The **MCR Checklist** page opens.
    
    [![image-1651546715359.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546715359.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546715359.png)
2. In the **Test Pack Name** box, select the test pack name from a drop-down list.
3. In the **Checklist Name** box, select a checklist from a drop-down list.
    
    The **Checklist Items** and **MCR Checklist** windows open.
    
    [![image-1651546760538.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546760538.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546760538.png)
4. In the Description box, enter the description for the checklist you want to add.
5. In the Type box, select the checklist type and click [![image-1651546780027.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546780027.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546780027.png).
    
    The added checklist will be listed in the **MCR Checklist** window.
    
    [![image-1651546802461.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546802461.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546802461.png)
6. If you want to add the checklists from a template, in the ****Template**** box, select the template from a drop-down list and click [![image-1651546817649.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546817649.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546817649.png). The checklists in the template will be listed in the **MCR Checklist** window.
7. In the **Remarks** box, enter your remarks.
8. Click [![image-1651546851304.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651546851304.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651546851304.png).



### **7.4 MCR Checklist Template**

The **MCR Checklist Template** tab in the **Test Pack** menu helps you to add MC/SC – Check Record (CR)/Check Sheet (CS) templates. To navigate to the templates adding page,

1. Click **MCR Checklist Template** in the **Test Pack** menu.
    
    The **MC/SC – CR/CS Templates** page opens.
    
    [![image-1651547076013.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547076013.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547076013.png)
    
     **Figure 7.4: MC/SC – CR/CS Templates page**

#### **7.4.1 Add a CR/CS Template**

If you want to add a CR/CS template,

1. Click [![image-1651547133354.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547133354.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547133354.png) (**ADD** button) in the **MC/SC – CR/CS Templates** page. See Fig 7.4.
    
    The page opens a new window to add the details of a test pack.
    
    [![image-1651547150827.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547150827.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547150827.png)
    
    [![image-1651547155894.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547155894.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547155894.png)**Note**: The field notified with a symbol (\*) is mandatory. You must enter the relevant details in that fields before saving.
2. In the ****CR/CS Name**** box, enter the name for CR/CS.
3. In the ****Template Type**** box, select a template whether CR or CS.
4. In the **Description** box, enter the description for CR/CS.
5. Click **Save**.
    
    The template is successfully added and listed in the **MC/SC – CR/CS Templates** page. Once you have added the template details, you must import the respective template.

#### **7.4.2 Import a CR/CS Template**

If you want to import CR/CS template,

1. Click [![image-1651547260900.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547260900.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547260900.png)(Add icon) of the respective CR/CS name in the **MC/SC – CR/CS Templates** page. The **Check Records** window opens.
    
    [![image-1651547236749.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547236749.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547236749.png)
2. Click [![image-1651547248791.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547248791.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547248791.png) (**ADD** button) in the **Check Records** window.
    
    [![image-1651547276765.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547276765.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547276765.png)
3. In **Items** box, enter the details of items.
4. Browse and attach a CS/CR template you want to import.
5. Click **Save**.

#### **7.4.3 Edit a CR/CS Template**

If you want to edit any added CR/CS template in the **MC/SC – CR/CS Templates** page,

1. Click [![image-1651547336350.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547336350.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547336350.png)(Edit icon) of the respective CR/CS template. See Fig 7.4. The **MC/SC – CR/CS Templates** page shows the details of the selected CR/CS template.
2. Edit the details where you want.
3. Click **Save**.

#### **7.4.4 Delete a CR/CS Template**

If you want to delete any existing CR/CS template in the **MC/SC – CR/CS Templates** page, you can use [![image-1651547404028.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547404028.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547404028.png) (Delete icon) provided in the **MC/SC – CR/CS Templates** page. To know how to delete, see the topic, “[<u>**Delete P&amp;ID**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)”.

#### **7.4.5 Export CR/CS Template list**

You can export a list of CR/CS templates added in the **MC/SC – CR/CS Templates** page in both the pdf and excel formats by using [![image-1651547446615.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547446615.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547446615.png) (**PDF** button) and [![image-1651547455236.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547455236.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547455236.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **7.4.6 Filter a CR/CS Template**

If you want to filter any specific CR/CS template in the **MC/SC – CR/CS Templates page, you can use [![image-1651547488133.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547488133.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547488133.png) (**FILTER** button) located on the **Test Pack** page. To know how to filter, see the topic, “[<u>**Filter P&amp;ID**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

#### **7.4.7 Import Multiple CR/CS Templates**

If you want to import multiple CR/CS templates together, do the following,

1. Click [![image-1651547526814.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547526814.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547526814.png) (**TEMPLATE** button). See Fig 7.4. An excel worksheet will be downloaded with a predefined template to enter the details of CR/CS templates.
    
    [![image-1651547550384.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547550384.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547550384.png)
2. Enter the required CR/CS template details in the respective columns of the excel worksheet.
3. Once you have added the CR/CS template details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651547573724.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547573724.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547573724.png) (****IMPORT**** button). See Fig 7.4. A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651547597892.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547597892.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547597892.png)
5. Click [![image-1651547607462.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547607462.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547607462.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651547629419.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547629419.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547629419.png) (**Upload** button) to export the CR/CS template details that are included in the excel worksheet.

The details of the CR/CS templates in the worksheet will be displayed in the **MC/SC – CR/CS Templates page.

### **7.5 Test Pack Contents**

The Test Pack Contents page used to view a list of reports of the documents included in the Test Pack. To view the test pack content’s report,

1. Click **Test Pack Contents** in the **Test Pack** menu. The **Test Pack Contents** page opens.
    
    [![image-1651547737967.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547737967.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547737967.png)
    
     **Figure 7.5: Test Pack Contents page**
2. In the **Test Pack Name** box, select a test pack from a drop-down list.
    
    The **Test Pack Contents** page shows a list of reports in the selected test pack.
    
    [![image-1651547775494.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547775494.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547775494.png)**Note**: If you want to view any specific report, click the respective (Print icon) in the **Print** column.

### **7.6 Joints Not in Any Test Pack Report**

The **Joints Not in Any Test Pack Report** tab in the **Test Pack** menu shows a list of joints not added in any test pack report. To view of the details of joints,

1. Click **Joints Not in Any Test Pack Report** in the **Test Pack** menu.
2. The **Joints Not in Any Test Pack Report** page opens with a list of joints, which are not added in any test pack report.
    
    [![image-1651547956061.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651547956061.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651547956061.png)


### **7.7 Overall Status** 

The **Overall Status** tab in the **Test Pack** menu helps you to view the overall status of NDT inspection, welding progress and piping. To view the overall status,

1. Click **Overall Status** in the **Test Pack** menu.
    
    The page shows the overall status.
    
    [![image-1651548098092.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651548098092.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651548098092.png)


### **7.8 Acid Pickling Certificate**

Pickling is a metal surface treatment used to remove impurities such as stains, inorganic contaminants, rust or scale from ferrous metals, copper, precious metals and aluminum alloys. A solution called pickle liquor, which usually contains acid, is used to remove the surface impurities.

The **Acid Pickling Certificate** tab in the **Test Pack** menu used to add the acid pickling certificate. To add the acid pickling certificate, do the following steps,

1. Click **Acid Pickling Certificate** in the **Test Pack** menu. The **View Acid Pickling Certificate** page opens.
    
    [![image-1651548179437.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651548179437.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651548179437.png)
    
     **Figure 7.8: View Acid Pickling Certificate page**

#### **7.8.1 Add an Acid Pickling Certificate**

If you want to add an acid pickling certificate, do the following steps,

1. Click [![image-1651548328208.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651548328208.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651548328208.png)(****ADD**** button) in the ****View Acid Pickling Certificate**** page. The **ACID PICKLING** page opens.
    
    [![image-1651548352396.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651548352396.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651548352396.png)
2. In the **Sub Contractor** box, select a sub-contractor from a drop-down list.
3. In the **Inspection Date &amp; Time** box, select the inspection date and time.
4. In the **Specification** box, enter the specification.
5. In the **Pickling Material** box, enter the name of the pickling material.
6. In the **System Material** box, select the system material.
7. In the **Procedure No** box, enter the procedure number.
8. If you use the chloride content of water for the acid pickling testing, select ****Yes**** in the ****Chloride Content of Water**** option otherwise select ****No****.
9. In the **Remarks** box, enter your remarks if any.
    
    Before saving the added acid pickling certificate, you must add joints for the acid pickling certificate.
    
    [![image-1651548413696.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651548413696.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651548413696.png)**Note**: You can add multiple joints for one acid pickling certificate.
    
    The **ACID PICKLING** page shows a list of joints for the corresponding line and drawing numbers including the spool number. If you want to add joints for the acid pickling certificate, do the following steps,
    
    [![image-1651548452133.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651548452133.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651548452133.png)
10. Click [![image-1651548467961.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651548467961.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651548467961.png)(Add icon) of the respective joints you want to add. The added joints will be moved and listed in the right side of the page.
    
    [![image-1651548483224.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651548483224.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651548483224.png)
11. Click **Save**.
    
    The acid pickling certificate will be added and listed in the **View Acid Pickling Certificate** page.

#### **7.8.2 Edit an Acid Pickling Certificate** 

If you want to edit any existing acid pickling certificate added in the **View Acid Picking Certificate page, do the following steps,

1. Click [![image-1651548538681.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651548538681.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651548538681.png)(Edit icon) in the ****Edit**** column for the respective acid pickling certificate. See Fig 10.8. The **ACID PICKLING** page opens with the details of the selected acid pickling certificate.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **7.8.3 Approve an Acid Pickling Certificate**

Once you have added the acid pickling certificate, the **Request Status** column in the **View Acid Pickling Certificate** page is appeared with[![image-1651548648350.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651548648350.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651548648350.png)(Approve and Reject icons).

1. If you want to approve the acid pickling certificate, click [![image-1651548669700.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651548669700.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651548669700.png)(Approve icon) in the **Request Status** column. Otherwise click [![image-1651548679681.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651548679681.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651548679681.png) (Reject icon) to reject the certificate.

#### **7.8.4 Add RFI Data for an Acid Pickling Certificate**

If you want to add the details of RFI data for the added acid pickling certificate, do the following steps,

1. Click [![image-1651548731406.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651548731406.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651548731406.png)(Edit icon) in the **RFI Data** column of the **View Acid Pickling Certificate**  See Fig 7.8. The **RFI Inspection Request List** window opens.
    
    [![image-1651548765056.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651548765056.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651548765056.png)
2. In the **Inspection From** box, enter the detail from where the inspection should start.
3. In the **Inspection To** box, enter the detail to where the inspection should end.
4. In the ****Inspection Details**** option, select 1<sup>st</sup>Inspection, 2<sup>nd</sup> Inspection or 3<sup>rd</sup> Inspection according to the inspection details.
5. In the **Others** box, enter any other inspection related details.
6. In the **Refer to Report No** box, enter the report number for reference.
7. In the **RFI Date** box, choose the RFI date.
8. In the ****Inspection Result**** option, if the inspection result is accepted, select ****Accepted**** otherwise select ****Rejected****.
9. In the ****Remarks**** box, enter your remarks if any.
10. In the **Inspected by** box, enter the name of a person who has done inspection.
11. In the **Inspected Date** box, choose the date of inspection.
12. In the **Witnessed By** box, enter the name of the witnessed person.
13. In the **Witnessed Date** box, choose the date of witnessed.
14. In the **PCML Rep Name** box, enter the representative name of PCML.
15. In the **PCML Rep Date** box, choose the PCML rep date.
16. In the **MEB Rep Name** box, enter the representative name of MEB.
17. In the **MEB Rep Date box**, choose MEB rep date.
18. Click **Save**.

The RFI data for the acid pickling certificate is added successfully.

#### **7.8.5 View an RFI Report for Acid Pickling Certificate**

If you want to view an RFI report for the acid pickling certificate, click [![image-1651549018650.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651549018650.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651549018650.png) (print icon) provided in the **RFI Report** column of the **View Acid Pickling Certificate** page. See Fig 7.8.

#### **7.8.6 View an Acid Pickling Report**

If you want to view the acid pickling report, click [![image-1651549124084.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651549124084.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651549124084.png)(print icon) provided in the **Print** column of the **View Acid Pickling Certificate** page. See Fig 7.8.

#### **7.8.7 Add Result for Acid Pickling Test**

After completing the acid pickling test for the added request, you can add the result details. To add results, do the following steps,

1. Click [![image-1651549219239.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651549219239.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651549219239.png)(Edit icon) in the **RFI Data** column of the ****View Acid Pickling Certificate**** page. The Result window opens a list of systems added for the particular request.
    
    [![image-1651549260463.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651549260463.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651549260463.png)
2. In the **Result** column, select the result of each system from the given result options in the drop-down list.
3. In the **Remarks** column, enter your remarks if any.
4. Click **Save**.

#### **7.8.8 Attach a File into an Acid Pickling Certificate** 

If you want to attach a file with any acid pickling certificate listed in the **View** **Acid Pickling Certificate** page, you can attach the file by using [![image-1651549318288.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651549318288.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651549318288.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **7.8.9 Export Acid Pickling Certificate List**

You can export a list of acid pickling certificates added in the **View Acid Pickling Certificate** page in both the pdf and excel formats by using [![image-1651549363620.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651549363620.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651549363620.png) (**PDF** button) and [![image-1651549372379.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651549372379.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651549372379.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **7.8.10 Filter an Acid Pickling Certificate**

If you want to filter any specific acid pickling certificate in the **View Acid Pickling Certificate** page, you can use [![image-1651549409415.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651549409415.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651549409415.png)(**FILTER** button) located on the **View Acid Pickling Certificate** page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.



### **7.9 Valve Leak Test Record**

All valves are inspected and tested by the inspectors to ensure that they conform to the required valve leakage standards. Valve leakage is tested using either a hydrostatic test that is the test medium is a liquid, such as water or kerosene, or a pneumatic test that is the test medium is a gas, such as air or nitrogen.

The **Valve Leak Test Record** tab in the **Test Pack** menu used to add the valve leak test report. To add the valve leak test report, do the following steps,

1. Click **Valve Leak Test Record** in the **Test Pack** menu. The **Valve Leak Test** page opens.
    
    [![image-1651549479725.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651549479725.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651549479725.png)
    
     **Figure 7.9: Valve Leak Test page**

#### **7.9.1 Add a Valve Leak Test Report**

If you want to add a valve leak test report, do the following steps,

1. Click [![image-1651549542580.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651549542580.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651549542580.png) (**ADD** button) in the **Valve Leak Test** page. A new window opens to add the details of the valve leak test report.
    
    [![image-1651549562477.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651549562477.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651549562477.png)
    
    [![image-1651549570417.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651549570417.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651549570417.png)**Note**: The fields notified with a symbol (\*) are mandatory. You must enter the relevant details in that fields before saving.
    
    [![image-1651549585308.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651549585308.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651549585308.png)**Tip**: A report number for a new valve leak test report will be updated automatically in the **Report Number** box. If you want change the report number, you can change.
2. In the **Test Pack** box, select a test pack from a drop-down list.
3. In the **Specification** box, enter the specification.
4. In the ****Prepared By**** box, enter the name a person who has prepared the valve leak test report.
5. In the ****Prepared Date**** box, enter the prepared date of the valve leak test report.
6. In the ****Reviewed By**** box, enter the name a person who has reviewed the valve leak test report.
7. In the ****Reviewed Date**** box, enter the reviewed date of the valve leak test report.
8. In the **Approved By** box, enter the name a person who has approved the valve leak test report.
9. In the ****Approved Date**** box, enter the approved date of the valve leak test report.
10. Click **Save**.

The valve leak test report will be added and listed in the **Valve Leak Test** page.

#### **7.9.2 Edit a Valve Leak Test Report**

If you want to edit any existing valve leak test report added in the **Valve Leak Test page, do the following steps,

1. Click[ ![image-1651549840941.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651549840941.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651549840941.png) (Edit icon) in the **Edit** column for the respective valve leak test report. See Fig 7.9. The **Valve Leak Test page opens with the details of the selected valve leak test report.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **7.9.3 Add Result for Valve Leak Test**

After completing the valve leak test, you can add the test result details. To add results, do the following steps,

1. Click [![image-1651549929056.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651549929056.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651549929056.png)(Edit icon) in the **Edit Report** column of the **Valve Leak Test** page. The Result window opens.
    
    [![image-1651549960391.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651549960391.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651549960391.png)
2. Click (**Add** button).
    
    [![image-1651549984582.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651549984582.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651549984582.png)
3. In the **Valve Type** box, enter the type of the valve.
4. In the **Location** box, enter the location of the valve.
5. In the **Size** box, enter the size of the valve.
6. In the **Rating** box, enter the rating of the valve.
7. In the **Tag Number** box, enter the tag number of the valve.
8. In the **Serial No** box, enter the serial number of the valve.
9. In the **Body Test (Hydro)** box, enter the detail of hydrostatic valve body test.
10. In the **Seat Test (Hydro)** box, enter the detail of the hydrostatic valve seat test.
11. In the **Body Test (Pneumatic)** box, enter the detail of pneumatic valve body test.
12. In the **Seat Test (Pneumatic)** box, enter the detail of the pneumatic valve seat test.
13. In the **Results** box, select the results whether Accepted or Rejected.
14. In the **Remarks** box, enter your remarks if any.
15. Click **Save**.

#### **7.9.4 View a Valve Leak Test Report**

If you want to view the valve leak test report, click [![image-1651550133251.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550133251.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550133251.png)(print icon) provided in the **Report** column of the **Valve Leak Test** page. See Fig 7.9.

#### **7.9.5 Attach a File into a Valve Leak Test Report**

If you want to attach a file with any valve leak test report listed in the **Valve Leak Test page, you can attach the file by using [![image-1651550176289.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550176289.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550176289.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **7.9.6 Export Valve Leak Test Report List**

You can export a list of valve leak test reports added in the **Valve Leak Test** page in both the pdf and excel formats by using [![image-1651550247104.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550247104.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550247104.png) (**PDF** button) and [![image-1651550270439.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550270439.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550270439.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.



### **7.10 ITR Register (Generic)**

The **ITR Register (Generic)** tab in the **Test Pack** menu used to add the ITR register.

1. Click **ITR Register (Generic)** in the **Test Pack** menu.
    
    The **ITR Register (Generic)** page opens.
    
    [![image-1651550315668.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550315668.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550315668.png)
    
     **Figure 10.10: ITR Register (Generic) page**

#### **7.10.1 Add an ITR Register**

If you want to add an ITR Register,

1. Click (**Add** button) in the **ITR Register (Generic)** page. The **ITR Register (Generic)** page opens a new window to add the details of the ITR register.
    
    [![image-1651550387415.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550387415.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550387415.png)
2. In the **System** box, enter the system name.
3. In the **Sub System** box, enter the subsystem name.
4. In the **Tag No** box, enter the tag number.
5. In the **Tag Type** box, enter the tag type.
6. In the **Tag Description** box, enter the tag description.
    
    The page shows three options such as **ITR-A Check Sheet (Construction)**, **ITR-B Check Sheet (Pre-Commissioning), ITR-C Check Sheet (Commissioning).**
    
     You must add the following details for each option individually.
7. In the **ITR No** box, enter the ITR number for each option.
8. In the **Prepared by MEB** box, select the prepared date of ITR register for each option.
9. In the **Submitted to Client** box, select the submitted date of ITR register for each option.
10. In the **Accepted to Client** box, select the accepted date of ITR register for each option.
11. Click **Save**.

The ITR register will be saved and listed in the **ITR Register (Generic)** page.

#### **7.10.2 Edit an ITR Register**

If you want to edit any existing ITR register in the **ITR Register (Generic)** page, do the following steps,

1. Click [![image-1651550519244.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550519244.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550519244.png)(Edit icon) in the **Edit** column for the respective ITR register. See Fig 7.10. The **ITR Register (Generic) page shows the details of the added ITR register.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **7.10.3 Delete an ITR Register** 

If you want to delete any ITR register in the **ITR Register (Generic) page, you can use [![image-1651550576420.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550576420.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550576420.png) (Delete icon) provided in the **ITR Register (Generic) page. To know how to delete, see the topic, “**[<u>Delete P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.3%C2%A0delete-a-p%26id)**”.

#### **7.10.4 View an ITR Register Report**

If you want to view the ITR register report, click [![image-1651550619124.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550619124.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550619124.png)(print icon) provided in the upper side of the **ITR Register (Generic) page. See Fig 7.10.

#### **7.10.5 Filter an ITR Register**

If you want to filter any ITR register in the **ITR Register (Generic) page, you can use [![image-1651550692090.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550692090.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550692090.png) (**FILTER** button) located on the **ITR Register (Generic) page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

#### **7.10.6 Export an ITR Register**

You can export the ITR Register in the **ITR Register (Generic) page in both the pdf and excel formats by using [![image-1651550727042.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550727042.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550727042.png)(**PDF** button) and [![image-1651550741307.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550741307.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550741307.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **7.10.7 Import Multiple ITR Register**

If you want to import multiple ITR register together, do the following,

1. Click [![image-1651550797950.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550797950.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550797950.png) (**TEMPLATE** button). See Fig 7.10. An excel worksheet will be downloaded with a predefined template to enter the details of ITR register.
    
    [![image-1651550816720.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550816720.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550816720.png)
2. Enter the required ITR register details in the respective columns of the excel worksheet.
3. Once you have added the ITR register details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651550846438.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550846438.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550846438.png) (**IMPORT** button). See Fig 7.10.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651550862919.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550862919.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550862919.png)
5. Click [![image-1651550880711.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550880711.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550880711.png) (**Browse** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651550902330.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550902330.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550902330.png) (**Upload** button) to export the ITR register details that are included in the excel worksheet.

The details of the ITR register in the worksheet will be displayed in the **ITR Register (Generic)** page.


### **7.10 ITR Register Summary**

The **ITR Register Summary** tab in the **Test Pack** menu helps you to view the ITR register summary report. To view the report,

1. Click **ITR Register Summary** in the **Test Pack** menu. The **ITR Register (Generic) Summary** **Report** page opens.
    
    [![image-1651550965151.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651550965151.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651550965151.png)
    
     **Figure 10.11: ITR Register (Generic) Summary** **Report** **page**

#### **7.11.1 Print an ITR Register Summary Report**

If you want to print an ITR register summary report, use [![image-1651551026048.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551026048.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551026048.png) and [![image-1651551033551.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551033551.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551033551.png) (print icons) provided in the **ITR Register (Generic) Summary** **Report** page.

1. If you want to print the current page of the ITR register summary report, click [![image-1651551072179.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551072179.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551072179.png) (print icon including the page number).
2. If you want to print all the pages of the ITR register summary report, click[![image-1651551098549.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551098549.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551098549.png)(print icon).

#### **7.11.2 View an ITR Register Summary Report** 

You can view the ITR register summary report in various formats by using the option [![image-1651551137488.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551137488.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551137488.png) provided in the upper right corner of the **ITR Register (Generic) Summary** **Report** page.



### **7.12 Management of Change** 

Management of change (MOC) is a systematic approach to organizational changes with the aim of ensuring the continued safety of the workforce throughout the process. These systematic processes ensure that the change is dealt with in a proactive fashion.

The **Management of Change** tab in the **Test Pack** menu used to add the details of the management of change.

1. Click **Management of Change** in the **Test Pack** menu. The **Management of Change** page opens.
    
    [![image-1651551223562.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551223562.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551223562.png)
    
     **Figure 7.12: Management of Change page**

#### **7.12.1 Add the Details of Management of Change**

If you want to add the details of the management of change, do the following steps,

1. Click [![image-1651551284151.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551284151.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551284151.png) (**Add** button) in the **Management of Change** page. The page shows a new window to add the details of the management of change.
    
    [![image-1651551301517.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551301517.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551301517.png)
2. In the **MOC Number** box, enter the management of change number.
3. In the **Description** box, enter the description for the management of change.
4. In the **Status** box, enter the status of the management of change.
5. In the **Cleared by** box, enter the name of a person who has cleared the management of change.
6. In the **Cleared Date** box, select the cleared date of the management of change.
7. In the **Status Date** box, select the status date of the management of change.
8. In the **Document File Name** box, enter the document file name.
9. Click **Save**.
    
    The management of change is added and listed in the **Management of Change** page.

#### **7.12.2 Edit a Management of Change** 

If you want to edit any existing management of change in the **Management of Change** page, do the following steps,

1. Click [![image-1651551388920.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551388920.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551388920.png)(Edit icon) in the ****Edit**** column for the respective management of change. See Fig 7.12. The page opens with the details of the selected management of change.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **7.12.3 Attach a File into a Management of Change**

If you want to attach a file with any existing management of change listed in the **Management of Change** page, you can attach the file by using [![image-1651551485978.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551485978.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551485978.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **7.12.4 Export Management of Change List**

You can export a list of management of change added in the **Management of Change** page in both the pdf and excel formats by using [![image-1651551518634.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551518634.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551518634.png) (**PDF** button) and [![image-1651551526050.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551526050.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551526050.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **7.12.5 Filter a Management of Change**

If you want to filter any specific management of change in the **Management of Change** page, you can use [![image-1651551560189.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551560189.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551560189.png) (**FILTER** button) located on the **Management of Change** page. To know how to filter, see the topic, “**[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)**”.

#### **7.12.6 Import Multiple Management of Change**

If you want to import multiple management of change together, do the following,

1. Click [![image-1651551613579.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551613579.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551613579.png) (**TEMPLATE** button). See Fig 7.12.
    
    An excel worksheet will be downloaded with a predefined template to enter the details of management of change.
2. Enter the required management of change details in the respective columns of the excel worksheet.
3. Once you have added the management of change details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651551662245.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551662245.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551662245.png) (**IMPORT** button). See Fig 7.12.
    
    A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651551683931.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551683931.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551683931.png)
5. Click [![image-1651551703407.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551703407.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551703407.png) (****Browse**** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651551732734.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551732734.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551732734.png) (****Upload**** button) to export the management of change that are included in the excel worksheet.

The details of the management of change in the worksheet will be displayed in the **Management of Change** page.



### **7.13 Technical Queries**

Technical queries are used by companies and their contractors to ask each other questions or to gather more information.

The **Technical Queries** tab in the **Test Pack** menu used to add the details of the technical query.

1. Click **Technical Queries** in the **Test Pack** menu. The **Technical Queries** page opens.
    
    [![image-1651551864443.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551864443.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551864443.png)
    
     **Figure 7.13: Technical Queries page**

#### **7.13.1 Add the Details of Technical Query**

If you want to add the details of the technical query, do the following steps,

1. Click [![image-1651551919764.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551919764.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551919764.png) (**Add** button) in the **Technical Queries page.
    
    The page shows a new window to add the details of the technical query.
    
    [![image-1651551960175.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651551960175.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651551960175.png)
2. In the **Document Number** box, enter the document number.
3. In the **Tag Number** box, enter the tag number.
4. In the **System** box, select a system.
5. In the **Unit** box, enter the name of a unit.
6. In the **Area** box, enter the name of an area.
7. In the **Department** box, enter the department name.
8. In the **Priority** box, enter the priority detail.
9. In the **Description** box, enter the description of the technical query.
10. In the **Document File Name** box, enter the document file name.
11. In the **Drawing** box, enter the drawing number.
12. In the **Issued on** box, enter the issued date of technical query.
13. In the **Status** box, enter the status of the technical query.
14. Click **Save**.
    
    The technical query is added and listed in the **Technical Queries** page.

#### **7.13.2 Edit a Technical Query** 

If you want to edit any existing technical query in the **Technical Queries** page, do the following steps,

1. Click [![image-1651552143603.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651552143603.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651552143603.png)(Edit icon) in the **Edit** column for the respective technical query. See Fig 7.13. The page opens with the details of the selected technical query.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **7.13.3 Attach a File into a Technical Query**

If you want to attach a file with any existing technical query listed in the **Technical Queries** page, you can attach the file by using [![image-1651554236401.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651554236401.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651554236401.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **7.13.4 Export Technical Queries List**

You can export a list of technical queries added in the **Technical Queries** page in both the pdf and excel formats by using [![image-1651554517256.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651554517256.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651554517256.png) (**PDF** button) and [![image-1651554533305.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651554533305.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651554533305.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **7.13.5 Filter a Technical Query**

If you want to filter any specific technical query in the **Technical Queries** page, you can use [![image-1651554696852.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651554696852.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651554696852.png) (**FILTER** button) located on the **Technical Queries** page. To know how to filter, see the topic, “**[<u>Filter P&amp;ID</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)**”.

#### **7.13.6 Import Multiple Technical Queries**

If you want to import multiple technical queries together, do the following,

1. Click [![image-1651554880246.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651554880246.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651554880246.png) (**TEMPLATE** button). See Fig 7.13. An excel worksheet will be downloaded with a predefined template to enter the details of technical query.
2. Enter the required technical query details in the respective columns of the excel worksheet.
3. Once you have added the technical query details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651554929323.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651554929323.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651554929323.png) (****IMPORT**** button). See Fig 7.13. A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651554955886.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651554955886.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651554955886.png)
5. Click [![image-1651554970806.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651554970806.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651554970806.png) (****Browse**** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651554999288.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651554999288.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651554999288.png) (**Upload** button) to export the technical query that are included in the excel worksheet.

The details of the technical query in the worksheet will be displayed in the **Technical Queries** page.


### **7.14 Site Instructions**

A site instruction is a formal instruction sent from the head contractor that contains directives for contractors working on a piping project.

The **Site Instructions** tab in the **Test Pack** menu used to add the details of the site instruction.

1. Click **Site Instructions** in the **Test Pack** menu. The **Site Instructions** page opens.
    
    [![image-1651555089022.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651555089022.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651555089022.png)

#### **7.14.1 Add the Details of Site Instructions**

If you want to add the details of the site instruction, do the following steps,

1. Click [![image-1651555271884.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651555271884.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651555271884.png) (**Add** button) in the **Site Instructions page. The page shows a new window to add the details of the site instruction.
    
    [![image-1651555329008.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651555329008.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651555329008.png)
2. In the **Item ID** box, enter the item id number.
3. In the **Tag Number** box, enter the tag number.
4. In the **System** box, select a system.
5. In the **Unit** box, enter the name of a unit.
6. In the **Area** box, enter the name of an area.
7. In the **Department** box, enter the department name.
8. In the **Priority** box, enter the priority detail.
9. In the **Description** box, enter the description of the technical query.
10. In the **Document File Name** box, enter the document file name.
11. In the **Drawing** box, enter the drawing number.
12. In the **Issued on** box, enter the issued date of technical query.
13. In the **Status** box, enter the status of the technical query.
14. Click **Save**.
    
    The site instruction is added and listed in the **Site Instructions page.

#### **7.14.2 Edit a Site Instruction**

If you want to edit any existing site instruction in the **Site Instructions** page, do the following steps,

1. Click [![image-1651555500701.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651555500701.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651555500701.png)(Edit icon) in the **Edit** column for the respective site instruction. See Fig 7.14. The page opens with the details of the selected site instruction.
2. Click any box where you want to edit the details, and then edit the details in the respective box.
3. Click **Save**.

#### **7.14.3 Attach a File into a Site Instruction**

If you want to attach a file with any existing site instruction listed in the **Site Instructions page, you can attach the file by using [![image-1651555568776.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651555568776.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651555568776.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **7.14.4 Export Site Instructions List**

You can export a list of site instructions added in the **Site Instructions** page in both the pdf and excel formats by using [![image-1651555749935.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651555749935.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651555749935.png) (**PDF** button) and [![image-1651555758977.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651555758977.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651555758977.png) (**Excel** button). To know how to export, see the topic, “**[<u>Export P&amp;ID list</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)**”.

#### **7.14.5 Filter a Site Instruction**

If you want to filter any specific site instruction in the **Site Instructions** page, you can use [![image-1651556001499.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651556001499.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651556001499.png) (**FILTER** button) located on the **Site Instructions** page. To know how to filter, see the topic, “[<u>**Filter P&amp;ID**</u>](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

#### **7.14.6 Import Multiple Site Instructions**

If you want to import multiple site instructions together, do the following,

1. Click [![image-1651556042278.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651556042278.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651556042278.png) (**TEMPLATE** button). See Fig 7.14. An excel worksheet will be downloaded with a predefined template to enter the details of site instruction.
2. Enter the required site instruction details in the respective columns of the excel worksheet.
3. Once you have added the site instruction details in the excel worksheet, save the excel worksheet on your computer.
4. Click [![image-1651556094848.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651556094848.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651556094848.png) (****IMPORT**** button). See Fig 7.14. A new window opens for importing the excel worksheet saved on your computer.
    
    [![image-1651556114873.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651556114873.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651556114873.png)
5. Click [![image-1651556128442.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651556128442.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651556128442.png) (****Browse**** button) to select the excel worksheet to be uploaded.
6. Select the excel worksheet you want to upload from your computer.
7. Click [![image-1651556153252.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651556153252.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651556153252.png) (**Upload** button) to export the site instruction that are included in the excel worksheet.

The details of the site instruction in the worksheet will be displayed in the **Site Instructions** page.


### **7.15 Test Pack Status Report**

**Test Pack Status Report** shows the status of test pack.

If you want to view a test pack status report, do the following steps,

1. Click **Test Pack Status Report** in the **Piping** menu. The **Test Pack Status Report** page opens.
    
    [![image-1651556242868.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651556242868.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651556242868.png)
    
     **Figure 7.15: Test Pack Status Report page**
2. In the **ISO/Drawing Number** box, select the ISO/drawing from a drop-down list.
3. In the ****Spool Number**** box, select the spool number from a drop-down list.
4. Click **Go**.

The **Test Pack Status Report** page shows the test pack number, subcontractor name, system/service information, and test pack status.

#### **7.15.1 Print a Test Pack Status Report**

If you want to print the test pack status report, use [![image-1651557077358.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651557077358.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651557077358.png) and [![image-1651557085627.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651557085627.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651557085627.png) (print icons) provided in the **Test Pack Status Report** page. See Fig 7.15.

1. If you want to print the current page of the test pack status report, click [![image-1651557112461.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651557112461.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651557112461.png) (print icon including the page number).
2. If you want to print all the pages of the test pack status report, click [![image-1651557131328.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651557131328.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651557131328.png)(print icon).

#### **7.15.2 Export a Test Pack Status Report** 

You can export the test pack status report in various formats by using the option provided in the upper right corner of the **Test Pack Status Report** page.

# Punch Lists

### **8.0 Punch List**

A punch list is a list of items or tasks that need to be done before a piping project is completed. The **Punch Lists** menu in the home page of the ***cuteQM*** app helps to create and view the punch lists in Piping project.

### **8.1 Create a New Punch List**

If you want to create a punch list, do the following steps,

1. Click **Create New Punch List** in the **Punch lists** menu. The **Create Punch** page opens.
    
    [![image-1651563761302.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651563761302.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651563761302.png)
    
     **Figure 8.1: Create Punch page**
2. In the **Modules** box, select a module from the given modules.
3. In the **Systems** box, select a system from a drop-down list.
4. In the **Sub-Systems** box, select a sub-system from a drop-down list.
5. In the **ITR No** box, enter the ITR number.
6. In the **Drawing No** box, enter the drawing number.
7. In the **Test Pack** box, select a test pack from a drop-down list.
8. In the **Tag No** box, enter the tag number.
9. In the **Reference Types** box, select the reference type from the given options.
10. In the **Select Project** box, select a project from a drop-down list.
11. In the **Category** box, select any category from the given categories such as **A**, **B**, and **C**.
    
    <table border="1" style="border-collapse: collapse; width: 100%;"><tbody><tr><td style="width: 99.866%;">**A** - Item to be cleared before hydrostatic test.
    
    **B** - Item to be cleared after hydrostatic test.
    
    **C** - Item which can be cleared after hydrostatic test but before final acceptance of the whole plant.
    
    </td></tr></tbody></table>
12. In the **Type** box, select the type of punch such as whether internal or external.
13. In the ****Item**** box, enter the item details.
14. In the **Location** box, select a location from a drop-down list.
15. In the **Description/ Punch** box, enter the description for the punch list.
16. In the ****Punch Raised From**** box, select the detail such as from where the punch has been raised.
17. In the **Date Raised** box, select the date when the punch has been raised.
18. In the **Punch Raised** By box, enter the name of a person who has raised the punch.
19. In the **Responsible Dept** box, enter the department name, which is responsible for the punch.
20. In the **Responsible Person** box, enter the name of a person who is responsible for the punch.
21. In the **Expected Clearance** box, select the expected date of clearing the punch list.
22. Click **Save**.

The punch list is successfully added.

#### **8.1.1 Add Report Photos**

If you want to add any report photos for the punch list,

1. Click [![image-1651564332218.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564332218.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564332218.png) (**ADD** button) in the **Report Photos** box. [![image-1651564347455.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564347455.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564347455.png)
2. Click [![image-1651564367139.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564367139.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564367139.png) (**Browse** button) to browse a photo stored in your computer.
3. Click **Upload**.

The selected photo will be updated.

### **8.2 View Punch Lists**

The **View Punch Lists** tab helps you to view and edit the punch list, which is added by using the **Create New Punch List** tab.

1. Click **View Punch Lists** in the **Punch Lists** menu. The **Punch List** page opens with added punch lists.
    
    [![image-1651564439486.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564439486.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564439486.png)
    
     **Figure 8.2: Punch List page**
    
    [![image-1651564462498.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564462498.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564462498.png)**Note**: If you want to verify the added punch list item, click the checkbox provided in the **Verify** column.
    
     If you want to clear the added punch list item, click the checkbox provided in the **Clear** column.

#### **8.2.1 View a Punch List Report**

If you want to view a punch list report, click [![image-1651564523183.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564523183.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564523183.png) (**Print** button) provided in the upper side of the **Punch List** page. See Fig 11.2.

#### **8.2.2 View a Punch List Register**

If you want to view a punch list register, click [![image-1651564556647.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564556647.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564556647.png) (**Punch List Register** button) provided in the upper side of the **Punch List** page. See Fig 8.2.

[![image-1651564597790.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564597790.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564597790.png)

#### **8.2.3 View a Punch List Summary**

If you want to view a punch list summary, click [![image-1651564654001.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564654001.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564654001.png) (**Punch List Summary** button) provided in the upper side of the **Punch List** page. See Fig 8.2.

[![image-1651564665102.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564665102.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564665102.png)

#### **8.2.4 Attach a File into a Punch List** 

If you want to attach any file with any punch list listed in the **Punch List** page, you can attach the file by using [![image-1651564697424.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564697424.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564697424.png) (Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **8.2.5 Edit a Punch List**

If you want to edit any existing punch list in the **Punch List** page, click [![image-1651564736837.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564736837.png) ](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564736837.png)(Edit icon) in the **Edit** column for the respective punch list. See Fig 8.2. Edit the details in the respective box you want.

#### **8.2.6 Export Punch Lists**

You can export a list of punch lists added in the **Punch List** page in both the pdf and excel formats by using [![image-1651564790767.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564790767.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564790767.png) (**PDF** button) and [![image-1651564799808.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564799808.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564799808.png) (**Excel** button). To know how to export, see the topic, “[**<u>Export P&amp;ID list</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.4%C2%A0export-p%26id-li)”.

#### **8.2.7 Filter a Punch List**

If you want to filter any punch list in the **Punch List page, you can use [![image-1651564830901.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564830901.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564830901.png) (**FILTER** button) located on the **Punch List** page. To know how to filter, see the topic, “[**<u>Filter P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.5%C2%A0filter-a-p%26id)”.

### **8.3 Punch List Detail Report**

The **Punch List Detail Report** tab in the **Punch Lists** menu helps you to view a detailed report of the punch lists. To view the punch list detail report,

1. Click **Punch List Detail Report** in the **Punch Lists** menu. The **Punch List Detail Report** page opens.
    
    [![image-1651564880865.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564880865.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564880865.png)
    
     **Figure 11.3: Punch List Detail Report page**
2. In the **Modules** field, select **Piping** from the given modules.
3. In the **Systems** box, select a system from a drop-down list.
4. In the **Sub Systems** box, select a sub-system from a drop-down list.
5. In the **ITR No** box, enter the ITR number.
6. In the **Drawing** box, enter the drawing number.
7. In the **Category** box, select a category from a list.
8. In the **Status** box, select a status from a drop-down list.
9. In the **Punch Raised From** box, select a person who has raised the punch list.
10. In the **Responsible Party** box, select a responsible party from a drop-down list.
11. In the **Test Pack** box, select a test pack from a drop-down list.
12. In the **Tag No** box, enter the tag number.
13. In the **Raised Date** box, select a raised date of the punch list.
    
    The punch list report opens based on the selected data.

#### **8.3.1 Print a Punch List Detail Report**

If you want to print the punch list detail report, use [![image-1651564984856.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564984856.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564984856.png) and [![image-1651564994571.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651564994571.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651564994571.png) (print icons) provided in the Punch List Detail Report page.

1. If you want to print the current page of the punch list detail report, click [![image-1651565010716.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565010716.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565010716.png) (print icon including the page number).
2. If you want to print all the pages of the punch list detail report, click [![image-1651565030275.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565030275.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565030275.png)(print icon).

#### **8.3.2 View a Punch List Detail Report** 

You can view the punch list detail report in various formats by using the option [![image-1651565072341.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565072341.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565072341.png) provided in the upper right corner of the punch list detail report page.


### **8.4 Punch List System Report**

The **Punch List System Report** tab in the **Punch Lists** menu helps you to view a punch list system report. To view the punch list system report,

1. Click **Punch List System Report** in the **Punch Lists** menu. The **Punch List System Report** page opens.
    
    [![image-1651565127081.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565127081.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565127081.png)
    
     **Figure 8.4: Punch List System Report page**
2. In the **Modules** field, select **Piping** from the given modules.
3. In the **Systems** box, select a system from a drop-down list.
4. In the **Sub Systems** box, select a sub-system from a drop-down list.
    
    The punch list system report opens based on the selected data.

#### **8.4.1 Print a Punch List System Report**

If you want to print the punch list system report, use [![image-1651565199162.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565199162.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565199162.png)and [![image-1651565209554.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565209554.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565209554.png) (print icons) provided in the Punch List system Report page.

1. If you want to print the current page of the punch list system report, click [![image-1651565231247.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565231247.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565231247.png) (print icon including the page number).
2. If you want to print all the pages of the punch list system report, click [![image-1651565251350.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565251350.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565251350.png) (print icon).

#### **8.4.2 View a Punch List System Report** 

You can view the punch list system report in various formats by using the option [![image-1651565284055.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565284055.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565284055.png)provided in the upper right corner of the punch list system report page.


### **8.5 Punch List Sub System Report**

The **Punch List Sub System Report** tab in the **Punch Lists** menu helps you to view a punch list sub system report. To view the punch list sub system report,

1. Click **Punch List Sub System Report** in the **Punch Lists** menu. The **Punch List Sub System Report** page opens.
    
    [![image-1651565349914.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565349914.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565349914.png)
    
     **Figure 8.5: Punch List Sub System Report page**
2. In the **Modules** field, select **Piping** from the given modules.
3. In the **Systems** box, select a system from a drop-down list.
4. In the **Sub Systems** box, select a sub-system from a drop-down list.
    
    The punch list sub system report opens based on the selected data.

#### **8.5.1 Print a Punch List Sub System Report**

If you want to print the punch list sub system report, use [![image-1651565494422.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565494422.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565494422.png) and [![image-1651565501892.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565501892.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565501892.png) (print icons) provided in the Punch List Sub System Report page.

1. If you want to print the current page of the punch list sub system report, click [![image-1651565520665.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565520665.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565520665.png) (print icon including the page number).
2. If you want to print all the pages of the punch list sub system report, click[![image-1651565540672.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565540672.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565540672.png) (print icon).

#### **8.5.2 View a Punch List Sub System Report** 

You can view the punch list sub system report in various formats by using the option [![image-1651565573134.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565573134.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565573134.png) provided in the upper right corner of the punch list sub system report page.

### **8.6 Punch List Category Report**

The **Punch List Category Report** tab in the **Punch Lists** menu helps you to view a punch list category report. To view the punch list category report,

1. Click **Punch List Category Report** in the **Punch Lists** menu. The **Punch List Category Report** page opens.
    
    [![image-1651565615247.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565615247.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565615247.png)
    
     **Figure 8.6: Punch List Category Report page**
2. In the **Modules** field, select **Piping** from the given modules.
3. In the **Systems** box, select a system from a drop-down list.
4. In the **Sub Systems** box, select a sub-system from a drop-down list.
    
    The punch list category report opens based on the selected data.

#### **8.6.1 Print a Punch List Category Report**

If you want to print the punch list category report, use [![image-1651565709840.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565709840.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565709840.png) and [![image-1651565719251.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565719251.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565719251.png) (print icons) provided in the Punch List Category Report page.

1. If you want to print the current page of the punch list category report, click [![image-1651565739157.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565739157.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565739157.png) (print icon including the page number).
2. If you want to print all the pages of the punch list category report, click [![image-1651565760598.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651565760598.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651565760598.png)(print icon).

#### **8.6.2 View a Punch List Category Report** 

You can view the punch list category report in various formats by using the option [![image-1651566069654.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651566069654.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651566069654.png) provided in the upper right corner of the punch list category report page.

# Documentation

### **9.0 Documentation**

The **Documentation** menu used to combine the number of files, which are attached to every menu of this ***cuteQM*** app. The combined files will be shown as a pdf file. This menu also used to attach a new file to a module that is not provided with an attachment option to attach any file.

### **9.1 Document Category**

The **Document Category** tab in the **Documentation** menu used to attach a file to any module which has no attachment option to attach the file. Before attaching a file for any module, you must add the relevant category name of the module.

#### **9.1.1 Add a Document Category**

1. Click **Document Category** in the **Documentation** menu. The **Document Category** page opens.
    
    [![image-1651570310375.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651570310375.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651570310375.png)
    
     **Figure 9.1: Document Category page**
2. Click [![image-1651570333634.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651570333634.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651570333634.png) (**ADD** button) in the **Document Category** page. A new window opens to add a document category.
    
    [![image-1651570506319.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651570506319.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651570506319.png)
3. In the **Category Name** box, enter the relevant category name for the module for which you want to attach a file.
4. In the **Description** box, enter the description for the added category.
5. Click **Save**.
    
     (OR)
6. If you want to import any document category from another vessel, Click ****Import from Another Vessel****. The **Import from Another Vessel** window opens.
    
    [![image-1651570554836.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651570554836.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651570554836.png)
    
    
    1. 1. In the **Equipment** box, select an equipment from a drop-down list.
        2. Click **Save**.
7. The added category name will be listed in the **Document Category** page. Once you have added the document category, you can attach any file to the added category.

#### **9.1.2 Attach a File into an Added Category**

If you want to attach any file with the added category listed in the **Document Category** page, you can attach the file by using [![image-1651570732592.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651570732592.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651570732592.png)(Attach icon) in the **Attachment** column. To know how to attach, follow the procedures given in the topic “[**<u>Attach a file into </u><u>P&amp;ID</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/project-data/#bkmrk-3.1.7%C2%A0attach-a-file-)”.

#### **9.1.3 Edit a Category**

If you want to edit any existing category in the **Document Category** page, click [![image-1651570769266.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651570769266.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651570769266.png)(Edit icon) for the respective category, and then edit the details in the respective box.

#### **9.1.4 Delete a category**

If you want to delete any specific added category from the list, you can use [![image-1651570809674.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651570809674.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651570809674.png) (Delete icon) provided in the **Delete** column of the **Document Category** page, See Fig 9.1.

### **9.2 Hierarchical Report**

The **Hierarchical Report** tab in the **Documentation** menu helps you to view a hierarchical report of a project. If you want to view the hierarchical report,

1. Click **Hierarchical Report** in the **Documentation** menu.
    
    The hierarchical report page opens.
    
    [![image-1651571079057.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651571079057.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651571079057.png)
2. In the **Project** box, select a project for which you want to view he hierarchical report.
3. Select a category that is whether **System**, **Sub-System**, or **Tag No**.
4. Click **Search**.
    
    The page shows the hierarchical report for the selected project and category.
    
    [![image-1651571105084.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651571105084.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651571105084.png)
    
    [![image-1651571114254.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651571114254.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651571114254.png)**Note**: If you want to export the hierarchical report as excel file, click **Export to Excel**.


### **9.3 Manufacture Data Report (MDR) Settings**

The **MDR** **Settings** tab in the **Documentation** menu helps you to do page setup for the pdf file which will be shown after combining the attached files.

1. Click the **MDR Settings** tab. The **MDR Settings** page opens.
    
    [![image-1651572679436.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651572679436.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651572679436.png)
    
     **Figure 9.3: MDR Settings page**
2. In the **Page Numbering** box, select the page numbering option that is whether **Section wise** or **Continuous**.
3. In the ****Page Number (Digits)**** box, select the page number displaying format from a drop-down list.
4. If you want to append the section number with the page number, click **Yes,** otherwise click **No** in the **Append Section number with Page number** box.
5. In the ****Page Number Template**** box, select the page number template from a drop-down list.
6. If you want to add the starting page numbers from TOC, click ****Yes,**** otherwise click ****No**** in the ****Page Number Starting From TOC?**** box.
7. If you want to add alphabet page numbers, click **Yes,** otherwise click **No** in the **Alphabet Page number?** box.
8. In the **Logo** box, attach your logo by using (**Browse** button).
9. Click **Save**.


### **9.4 One Click Documentation**

The **One Click Documentation** tab used to combine the attached file of the various module.

1. Click **One Click Documentation** in the **Documentation** menu. The **One Click Documentation** page opens.
    
    [![image-1651572938916.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651572938916.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651572938916.png)
    
     **Figure 9.4: One Click Documentation page**
    
    The **One Click Documentation** page shows a list of reports name of each module including the attachment file counts. This page also shows the list of document categories including their attachments, which are added using the [**<u>Document Category</u>**](http://wiki.cuteinfocomm.com/books/cuteqm/page/inspection/#bkmrk-9.1%C2%A0document-categor) tab.
    
    [![image-1651572973671.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651572973671.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651572973671.png)**Note**: If you want to edit any existing category in the **Document Category** page, click (Edit icon) for the respective category, and then edit the details in the respective box.
2. Click the check box of the respective reports which you want to combine.
3. Click **Generate MDR**.
    
    The system combines the selected files and shows as the pdf file in the left side of the **One Click Documentation** page, See Fig 9.4.

[![image-1651573017690.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651573017690.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651573017690.png)**Tip**: You can view the pdf file by clicking the respective pdf file. The file will be opened including the data in the combined files.


### **9.5 Document Upload**

The **Document Upload** tab in the **Documentation** menu used to upload documents for various process.

1. Click **Document Upload** in the **Documentation** menu. The **Upload Documents** page opens.
    
    [![image-1651573070510.png](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/scaled-1680-/image-1651573070510.png)](http://wiki.cuteinfocomm.com/uploads/images/gallery/2022-05/image-1651573070510.png)
    
     **Figure 9.5: Upload Documents page**
2. Select a file which you want to upload by click **Select a file for upload**. The selected file will be added in the **File Upload** window.

